Building permits — Rural Municipality of Craik No. 222, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Craik No. 222, Saskatchewan, building permit rules are set by Building Bylaw (Bylaw No. 2023-08), verified 2026-09-27. Permit required for: All work within the local authority; retaining walls >600 mm differential grade on non-agricultural lands. Permit fees: VOC' × $ / $1,000; residential administration fees per Schedule A; minimum fees per Schedule B; additional $160.00 per additional 40 m'. Fees set in: fee bylaw adopted pursuant to subsection 17(3) of the CC act.

Building Bylaw (Bylaw No. 2023-08) adopted bylaw
permit required for All work within the local authority; retaining walls >600 mm differential grade on non-agricultural lands. s. 4(1); s. 6(1)(b); s. 7(2)
exemptions Accessory buildings not greater than 10 m2 (no hazard, no sleeping accommodations); decks under 600 mm on residential lands; farm buildings meeting definition (no residential occupancy). s. 4(4); s. 4(5); s. 6(2)
fee basis VOC' × $ / $1,000; residential administration fees per Schedule A; minimum fees per Schedule B; additional $160.00 per additional 40 m'. Schedule "B"; Schedule "A"; s. 5(1)
fees location fee bylaw adopted pursuant to subsection 17(3) of the CC act Appendix "B"
authority Building Official; local authority (Rural Municipality of Craik No. 222) s. 3(3); s. 8(5); s. 8(6)
scout note

RM of Craik No. 222 Building Bylaw providing for administration and enforcement of The Construction Codes Act and National Building Code within the local authority.

Machine-readable: building-permits.json · Official website: https://rmcraik222.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities