Building permits — Rural Municipality of Eldon No. 471, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Eldon No. 471, Saskatchewan, building permit rules are set by Building Bylaw (Bylaw 1-2017), verified 2026-09-27. Permit required for: Work regulated by the Act and Regulations; construct, erect, place, alter, repair, renovate or reconstruct a building; demolish or remove a building. Exemptions: Farm buildings, as defined and referenced by the Act and Regulations, are exempt; farm residences are not exempt. Administered by: Building Official; local authority or its authorized representative.

Building Bylaw (Bylaw 1-2017) adopted bylaw
permit required for Work regulated by the Act and Regulations; construct, erect, place, alter, repair, renovate or reconstruct a building; demolish or remove a building. s. 4(1); s. 5(1); s. 6(1)
exemptions Farm buildings, as defined and referenced by the Act and Regulations, are exempt; farm residences are not exempt. s. 4(4)
fee basis Building permit: 10% administration fee of service provider's fee plus service provider's fees plus Saskatchewan Assessment Management Agency maintenance fee; special inspection fee double authorized representative fee schedule; demolition/removal $100.00. s. 5(6)(a)-(c); s. 5(7); s. 6(1)
authority Building Official; local authority or its authorized representative. s. 2(4); s. 5(3)-(5)
scout note

Adopted building bylaw administering The Uniform Building and Accessibility Standards Act and the National Building Code within the R.M. of Eldon No. 471.

Machine-readable: building-permits.json · Official website: https://rmeldon.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities