| permit required for | A permit is required whenever work regulated by the Act and Regulations is to be undertaken. | s. 4(1) |
| exemptions | Farm buildings; accessory building not greater than 10 m2(108 ft) provided it does not create a hazard. | s. 3(4); s. 3(5) |
| fee basis | Permit administration fee plus service fees for plan review, field inspection and enforcement, plus Saskatchewan Assessment Management Agency maintenance fee(s); demolition/removal permit fee $50.00. | s. 5(5); s. 6(1) |
| authority | Local authority or its authorized representative; plan review/inspection may be by building officials designated by the minister or contracted person/firm/corporation. | s. 2(3); s. 5(2); s. 5(3); s. 5(4) |
scout note
Building bylaw on the RM's own official site; PDF not openable (captcha-walled).