Building permits — Rural Municipality of Perdue No. 346, Saskatchewan
Do I need a building permit? What does it cost?
In the Rural Municipality of Perdue No. 346, Saskatchewan, building permit rules are set by Bylaw Respecting Buildings (2025-6), verified 2026-09-27. Permit required for: Work must not commence before a permit is issued; buildings with sleeping accommodations; retaining walls greater than 1200 mm. Exemptions: Accessory buildings not greater than 10m' in building area if no hazard; decks not more than 600 mm above adjacent ground. Permit fees: Sum of permit administration fee in a fee bylaw, building official service provider fees, SAMA fees, and any required deposit.
Bylaw Respecting Buildings (2025-6)
adopted bylaw
permit required for
Work must not commence before a permit is issued; buildings with sleeping accommodations; retaining walls greater than 1200 mm.
s. 6(6); s. 12(8); s. 12(9)
exemptions
Accessory buildings not greater than 10m' in building area if no hazard; decks not more than 600 mm above adjacent ground.
s. 5(4); s. 5(6)
fee basis
Sum of permit administration fee in a fee bylaw, building official service provider fees, SAMA fees, and any required deposit.
s. 6(7)
fees location
a fee bylaw
s. 6(7)(a)
authority
Local authority or building official
s. 6(2); s. 10(1)
scout note
Adopted Building Bylaw for the RM of Perdue No. 346 under The Construction Codes Act.