| permit required for | Work (construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, occupancy or change of occupancy of a building) must not commence before a permit is issued. | s. 3(1)(r); s. 6(6) |
| fee basis | The permit fee shall be calculated according to the sum of: a permit administration fee listed in a fee bylaw; fees for plan review, field inspection of construction and enforcement; SAMA fees; and a deposit, if required. | s. 6(7) |
| fees location | a fee bylaw | s. 6(7)(a) |
| authority | local authority or the building official | s. 6(2); s. 6(3) |
scout note
Adopted Building Bylaw of the RM of Torch River No. 488; adopted 16 October 2023.