Building & Planning Fee Schedule (posted Aug 2026)

Weyburn, Saskatchewan · summary & facts

This is the exact embedded text of the captured official document. Snapshot 8d6fbbf04b53 · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

BUILDING & PLANNING FEE SCHEDULE www.weyburn.ca BUILDING PERMITS $7.00 per $1000 of project value (Project value: Total value of building in its completed form. Includes: Cost of design, building work, materials of construction, building systems, labour and overhead, and profit of the contractor and subcontractors. Altus Group Guide for Canadian Cost of Construction used if project appears to be undervalued.)  Class 1 Minimum Fee - $100 (one-to-two-unit dwellings up to 600m2)  Class 2 Minimum Fee - $175 (commercial buildings up to 600m2)  Class 3 Minimum Fee - $1000 (for project values up to $100,000) $2000 (for project values more than $100,000) (commercial buildings greater than 600m2) Permit fee is doubled if construction begins without an approved building permit from the City of Weyburn Additional Inspections: If callback inspections are required due to deficiencies, the cost shall be $80.00 per inspection. Or in the case of inspections done by a contracted company, the cost payable shall be the cost invoiced to the city for the additional inspections, plus a $10.00 administration fee. $80.00 - Residential (single & semi-detached) and residential accessory structures $150.00 - Commercial or multi-unit residential Demolition Deposits (Refundable):  $1500 (Refundable upon final site inspection and if no damage to City infrastructure)  $1000 (Refundable upon re-connection to sewer & water services within max. of 2 years) MOVING PERMITS: $80.00 Permit Fee $500 Moving Deposit: Refundable upon final inspection and if no damage to City infrastructure. Damages incurred to City infrastructure in excess of the $500 deposit will be invoiced to the applicant in addition to the retention of the deposit by the City of Weyburn. DEMOLITION PERMITS: BUILDING & PLANNING FEE SCHEDULE www.weyburn.ca PLANNING FEES: Development Permits: Minor Variance: Development Appeal: Portable Sign: Billboard: Home Occupations: Zoning Amendment: OCP Amendment: Subdivision: Concept Plan Review: Condo Conversion: Bareland Condo: Zoning Certificates & Enviro. Searches: $100 (Permitted Use) $500 (Discretionary Use) $100 $300 $120 annually $100 annually (single-sided) $150 annually (double-sided) $250 $950 (plus advertising costs) $2500 (plus advertising costs) $150 (plus $150 per lot created) $1400 (plus advertising costs) $550 (Plus $300/unit - max $4000) $150 (plus $150 per lot) $50 ($75 for rush request of 1-2 days) Permanent Sign: $100 per sign