This is the exact embedded text of the captured official document.
Snapshot 9d6697517d9d · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
1
FLOODPLAIN MANAGEMENT ORDINANCE
CONTENTS
ARTICLE
PAGE
I.
PURPOSE AND ESTABLISHMENT ................................................................................ 2
II.
PERMIT REQUIRED .......................................................................................................... 2
III.
APPLICATION FOR PERMIT ........................................................................................... 2
IV.
APPLICATION FEE AND EXPERT'S FEE ...................................................................... 4
V.
REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS ................................................................................................................. 4
VI.
DEVELOPMENT STANDARDS ....................................................................................... 6
VII.
CERTIFICATE OF COMPLIANCE ................................................................................. 11
VIII. REVIEW OF SUBDIVISIONS AND DEVELOPMENT PROPOSALS ......................... 11
IX.
APPEALS AND VARIANCES ......................................................................................... 12
X.
ENFORCEMENT AND PENALTIES .............................................................................. 14
XI.
VALIDITY AND SEVERABILITY ................................................................................. 15
XII.
CONFLICT WITH OTHER ORDINANCES ................................................................... 15
XIII. DEFINITIONS ................................................................................................................... 15
XIV. ABROGATION ................................................................................................................. 20
60.3 (e) Rev. 01/15
2
ARTICLE I-PURPOSE AND ESTABLISHMENT
Certain areas of the Town of Arrowsic, Maine are subject to periodic flooding, causing serious damages to
properties within these areas. Relief is available in the form of flood insurance as authorized by the
National Flood Insurance Act of 1968.
Therefore, the Town of Arrowsic, Maine has chosen to become a participating community in the National
Flood Insurance Program, and agrees to comply with the requirements of the National Flood Insurance
Act of 1968 (P.L. 90-488, as amended) as delineated in this Floodplain Management Ordinance.
It is the intent of the Town of Arrowsic, Maine to require the recognition and evaluation of flood hazards
in all official actions relating to land use in the floodplain areas having special flood hazards.
The Town of Arrowsic has the legal authority to adopt land use and control measures to reduce future
flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352, 4401-4407, and Title 38 MRSA,
Section 440.
The National Flood Insurance Program, established in the aforesaid Act, provides that areas of the Town
of Arrowsic having a special flood hazard be identified by the Federal Emergency Management Agency
and that floodplain management measures be applied in such flood hazard areas. This Ordinance
establishes a Flood Hazard Development Permit system and review procedure for development activities
in the designated flood hazard areas of the Town of Arrowsic, Maine.
The areas of special flood hazard, Zones A, AE, and VE for the Town of Arrowsic, Sagadahoc County,
Maine, identified by the Federal Emergency Management Agency in a report entitled "Flood Insurance
Study - Sagadahoc County, Maine," dated July 16, 2015 with accompanying "Flood Insurance Rate Map"
dated July 16, 2015 with panels: 216F, 218F, 219F, 281F, 282F, 283F, 284F, 291F, 292F derived from the
county wide digital Flood Insurance Rate Map entitled "Digital Flood Insurance Rate Map, Sagadahoc
County, Maine," are hereby adopted by reference and declared to be a part of this Ordinance.
ARTICLE II - PERMIT REQUIRED
The Arrowsic Zoning Ordinance prohibits new construction in the special flood hazard area. Before a
substantial improvement or other development (as defined in Article XIII), begins within any areas of
special flood hazard established in Article I, a Flood Hazard Development Permit shall be obtained from
the Code Enforcement Officer. This permit shall be in addition to any other permits which may be
required pursuant to the codes and ordinances of the Town of Arrowsic, Maine.
ARTICLE III - APPLICATION FOR PERMIT
The application for a Flood Hazard Development Permit shall be submitted to the Code Enforcement
Officer and shall include:
A. The name, address and phone number of the applicant, owner, and contractor;
B. An address and a map indicating the location of the construction site;
3
C. A site plan showing location of existing and/or proposed development, including but not limited to
structures, sewage disposal facilities, water supply facilities, areas to be cut and filled, and lot
dimensions;
D. A statement of the intended use of the structure and/or development;
E. A statement of the cost of the development including all materials and labor;
F. A statement as to the type of sewage system proposed;
G. Specification of dimensions of the proposed structure and/or development;
[Items H-K.3. apply only to substantial improvements.]
H. The elevation in relation to the National Geodetic Vertical Datum (NGVD), North American Vertical
Datum (NAVD), or to a locally established datum in Zone A only, of the:
1. base flood at the proposed site of all substantially improved structures, which is determined:
a. in Zones AE and VE from data contained in the "Flood Insurance Study - Sagadahoc
County, Maine," as described in Article I; or,
b. in Zone A:
(1) from any base flood elevation data from federal, state, or other technical sources (such
as FEMA's Quick-2 model, FEMA 265), including information obtained pursuant to
Article VI.K. and VIII.D.;
(2) from the contour elevation extrapolated from a best fit analysis of the floodplain
boundary when overlaid onto a USGS Quadrangle Map or other topographic map
prepared by a Professional Land Surveyor or registered professional engineer, if the
floodplain boundary has a significant correlation to the elevation contour line(s); or, in
the absence of all other data,
(3) to be the elevation of the ground at the intersection of the floodplain boundary and a line
perpendicular to the shoreline which passes along the ground through the site of the
proposed building.
2. highest and lowest grades at the site adjacent to the walls of the proposed building; and
3. lowest floor, including basement; and whether or not such structures contain a basement.
I.
A description of an elevation reference point established on the site of all developments for which
elevation standards apply as required in Article VI;
4
J.
A written certification by a Professional Land Surveyor, registered professional engineer or architect,
that the base flood elevation and grade elevations shown on the application are accurate
K. The following certifications as required in Article VI by a registered professional engineer or
architect:
1. a V-Zone Certificate to verify that substantial improvements in coastal high hazard areas, Zone
VE, will meet the criteria of Article VI.P.; and other applicable standards in Article VI;
2. a Hydraulic Openings Certificate to verify that engineered hydraulic openings in foundation
walls will meet the standards of Article VI.L.2.a.;
3. a certified statement that bridges will meet the standards of Article VI.M.;
4. a certified statement that containment walls will meet the standards of Article VI.N.;
L. A description of the extent to which any water course will be altered or relocated as a result of the
proposed development; and,
M. A statement of construction plans describing in detail how each applicable development standard in
Article VI will be met.
ARTICLE IV - APPLICATION FEE AND EXPERT'S FEE
Permit application fees are set by the Board of Selectmen and are to be submitted with the application to
the Code Enforcement Officer and paid to the Town of Arrowsic.
An additional fee may be charged if the Code Enforcement Officer and/or Board of Appeals needs the
assistance of a professional engineer or other expert. The expert's fee shall be paid in full by the applicant
within 10 days after the town submits a bill to the applicant. Failure to pay the bill shall constitute a
violation of the ordinance and be grounds for the issuance of a stop work order. An expert shall not be
hired by the municipality at the expense of an applicant until the applicant has either consented to such
hiring in writing or been given an opportunity to be heard on the subject. An applicant who is dissatisfied
with a decision to hire expert assistance may appeal that decision to the Board of Appeals.
ARTICLE V - REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS
The Code Enforcement Officer shall:
A. Review all applications for the Flood Hazard Development Permit to assure that proposed
developments are reasonably safe from flooding and to determine that all pertinent requirements of
Article VI (Development Standards) have been, or will be met;
B. Utilize, in the review of all Flood Hazard Development Permit applications:
5
1. the base flood and floodway data contained in the "Flood Insurance Study - Sagadahoc County,
Maine," as described in Article I.;
2. in special flood hazard areas where base flood elevation and floodway data are not provided, the
Code Enforcement Officer shall obtain, review and reasonably utilize any base flood elevation
and floodway data from federal, state, or other technical sources, including information obtained
pursuant to Article III.H.1.b.; Article VI.K.; and Article VIII.D., in order to administer Article VI
of this Ordinance; and,
3. when the community establishes a base flood elevation in a Zone A by methods outlined in
Article III.H.1.b., the community shall submit that data to the Maine Floodplain Management
Program.
C. Make interpretations of the location of boundaries of special flood hazard areas shown on the maps
described in Article I of this Ordinance;
D. In the review of Flood Hazard Development Permit applications, determine that all necessary permits
have been obtained from those federal, state, and local government agencies from which prior
approval is required by federal or state law, including but not limited to Section 404 of the Federal
Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1344;
E. Notify adjacent municipalities, the Department of Environmental Protection, and the Maine
Floodplain Management Program prior to any alteration or relocation of a water course and submit
copies of such notifications to the Federal Emergency Management Agency;
F. If the application satisfies the requirements of this Ordinance, approve the issuance of one of the
following Flood Hazard Development Permits, based on the type of development:
1. A two-part Flood Hazard Development Permit for elevated structures. Part I shall authorize the
applicant to rebuild a structure to and including the first horizontal floor only above the base flood
level. At that time the applicant shall provide the Code Enforcement Officer with a Elevation
Certificate completed by a Professional Land Surveyor, registered professional engineer or
architect based on the Part I permit construction, "as built", for verifying compliance with the
elevation requirements of Article VI, paragraphs F, G, H, or P. Following review of the Elevation
Certificate data, which shall take place within 72 hours of receipt of the application, the Code
Enforcement Officer shall issue Part II of the Flood Hazard Development Permit. Part II shall
authorize the applicant to complete the construction project; or,
2. A Flood Hazard Development Permit for Minor Development for all development that is not new
construction or a substantial improvement, such as repairs, maintenance, renovations, or
additions, whose value is less than 50% of the market value of the structure. Minor development
also includes, but is not limited to: accessory structures as provided for in Article VI.J., mining,
dredging, filling, grading, paving, excavation, drilling operations, storage of equipment or
materials, deposition or extraction of materials, public or private sewage disposal systems or
water supply facilities that do not involve structures; and non-structural projects such as bridges,
dams, towers, fencing, pipelines, wharves, and piers.
6
G. Maintain, as a permanent record, copies of all Flood Hazard Development Permit Applications,
corresponding Permits issued, and data relevant thereto, including reports of the Board of Appeals on
variances granted under the provisions of Article IX of this Ordinance, and copies of Elevation
Certificates, Certificates of Compliance and certifications of design standards required under the
provisions of Articles III, VI, and VII of this Ordinance.
ARTICLE VI - DEVELOPMENT STANDARDS
All developments in areas of special flood hazard shall meet the following applicable standards:
A. All Development - All development shall:
1. be designed or modified and adequately anchored to prevent flotation (excluding piers and
docks), collapse or lateral movement of the development resulting from hydrodynamic and
hydrostatic loads, including the effects of buoyancy;
2. use construction materials that are resistant to flood damage;
3. use construction methods and practices that will minimize flood damage; and
4. use electrical, heating, ventilation, plumbing, and air conditioning equipment, and other service
facilities that are designed and/or located to prevent water from entering or accumulating within
the components during flooding conditions.
B. Water Supply - All new and replacement water supply systems shall be designed to minimize or
eliminate infiltration of flood waters into the systems.
C. Sanitary Sewage Systems - All new and replacement sanitary sewage systems shall be designed and
located to minimize or eliminate infiltration of flood waters into the system and discharges from the
system into flood waters.
D. On Site Waste Disposal Systems - On-site waste disposal systems shall be located and constructed
to avoid impairment to them or contamination from them during floods.
E. Watercourse Carrying Capacity - All development associated with altered or relocated portions of
a watercourse shall be constructed and maintained in such a manner that no reduction occurs in the
flood carrying capacity of the watercourse.
F. Residential - New construction is prohibited in the special flood hazard area. Substantial
improvement of any residential structure located within:
1. Zones AE shall have the lowest floor (including basement) elevated to at least one foot above the
base flood elevation.
7
2. Zone A shall have the lowest floor (including basement) elevated to at least one foot above the
base flood elevation utilizing information obtained pursuant to Article III.H.1.b.; Article V.B.; or
Article VIII.D.
3. Zone VE shall meet the requirements of Article VI.P.
G. Non Residential - New construction of any non-residential structure is prohibited in the special
flood hazard area.
H. Manufactured Homes - New placement of a manufactured home is prohibited in the special flood
hazard area.
I.
Recreational Vehicles - Recreational Vehicles located within:
1. Zones A and AE shall:
a.
be on the site for fewer than 180 consecutive days, and
b.
be fully licensed and ready for highway use. A recreational vehicle is ready for highway use
if it is on its wheels or jacking system, is attached to the site only by quick disconnect type
utilities and security devices, and has no permanently attached additions.
2. Zone VE shall meet the requirements of either Article VI.I.1.a. and b.
J.
Accessory Structures - Accessory Structures, as defined in Article XIII, located within Zones A and
AE, shall be exempt from the elevation criteria required in Article VI.F. & G. above, if all other
requirements of Article VI and all the following requirements are met. Accessory Structures shall:
1. be 500 square feet or less and have a value less than $3000;
2. have unfinished interiors and not be used for human habitation;
3. have hydraulic openings, as specified in Article VI.L.2., in at least two different walls of the
accessory structure;
4. be located outside the floodway;
5. when possible be constructed and placed on the building site so as to offer the minimum
resistance to the flow of floodwaters and be placed further from the source of flooding than is the
primary structure; and,
6. have only ground fault interrupt electrical outlets. The electric service disconnect shall be
located above the base flood elevation and when possible outside the Special Flood Hazard Area.
8
K. Floodways -
1. In Zone AE riverine areas, encroachments, including fill, substantial improvement, and other
development shall not be permitted within a regulatory floodway which is designated on the
community's Flood Insurance Rate Map unless a technical evaluation certified by a registered
professional engineer is provided demonstrating that such encroachments will not result in any
increase in flood levels within the community during the occurrence of the base flood discharge.
2. In Zones AE and A riverine areas, for which no regulatory floodway is designated,
encroachments, including fill, substantial improvement, and other development shall not be
permitted in the floodway as determined in Article VI.K.3. unless a technical evaluation certified
by a registered professional engineer is provided demonstrating that the cumulative effect of the
proposed development, when combined with all other existing development and anticipated
development:
a.
will not increase the water surface elevation of the base flood more than one foot at any
point within the community; and,
b.
is consistent with the technical criteria contained in FEMA's guidelines and standards for
flood risk analysis and mapping.
3. In Zones AE and A riverine areas, for which no regulatory floodway is designated, the regulatory
floodway is determined to be the channel of the river or other water course and the adjacent land
areas to a distance of one-half the width of the floodplain as measured from the normal high
water mark to the upland limit of the floodplain.
L. Enclosed Areas Below the Lowest Floor - Substantial improvement of any structure in Zones A and
AE that meets the development standards of Article VI, including the elevation requirements of
Article VI, paragraphs F, G, or H and is elevated on posts, columns, piers, piles, "stilts," or crawl
spaces may be enclosed below the base flood elevation requirements provided all the following
criteria are met or exceeded:
1. Enclosed areas are not "basements" as defined in Article XIII;
2. Enclosed areas shall be designed to automatically equalize hydrostatic flood forces on exterior
walls by allowing for the entry and exit of flood water. Designs for meeting this requirement
must either:
a.
be engineered and certified by a registered professional engineer or architect; or,
b.
meet or exceed the following minimum criteria:
(1) a minimum of two openings having a total net area of not less than one square inch for
every square foot of the enclosed area;
9
(2) the bottom of all openings shall be below the base flood elevation and no higher than
one foot above the lowest grade; and,
(3) openings may be equipped with screens, louvers, valves, or other coverings or devices
provided that they permit the entry and exit of flood waters automatically without any
external influence or control such as human intervention, including the use of electrical
and other non-automatic mechanical means;
3. The enclosed area shall not be used for human habitation; and,
4. The enclosed areas are usable solely for building access, parking of vehicles, or storage.
M. Bridges - Construction or improvement of any bridge in Zones A, AE and VE shall be designed such
that:
1. when possible, the lowest horizontal member (excluding the pilings, or columns) is elevated to at
least one foot above the base flood elevation; and
2. a registered professional engineer shall certify that:
a.
the structural design and methods of construction shall meet the elevation requirements of
this section and the floodway standards of Article VI.K.; and
b.
the foundation and superstructure attached thereto are designed to resist flotation, collapse
and lateral movement due to the effects of wind and water loads acting simultaneously on all
structural components. Water loading values used shall be those associated with the base
flood.
N. Containment Walls - Construction or improvement of any containment wall located within:
1. Zones A, AE and VE shall:
a.
have the containment wall elevated to at least one foot above the base flood elevation;
b.
have structural components capable of resisting hydrostatic and hydrodynamic loads and the
effects of buoyancy; and,
c.
be certified by a registered professional engineer or architect that the design and methods of
construction are in accordance with accepted standards of practice for meeting the provisions
of this section. Such certification shall be provided with the application for a Flood Hazard
Development Permit, as required by Article III.K.
O. Wharves, Piers and Docks - Construction or improvement of wharves, piers, and docks are
permitted in Zones A, AE and VE, in and over water and seaward of the mean high tide if the
following requirements are met:
10
1. wharves, piers, and docks shall comply with all applicable local, state, and federal regulations;
and
2. for commercial wharves, piers, and docks, a registered professional engineer shall develop or
review the structural design, specifications, and plans for the construction.
P. Coastal Floodplains - New Construction is prohibited in the coastal high hazard area.
1. Substantial improvement of any structure located within Zone VE shall:
a.
be elevated on posts or columns such that:
(1) the bottom of the lowest horizontal structural member of the lowest floor (excluding the
pilings or columns) is elevated to one foot above the base flood elevation;
(2) the pile or column foundation and the elevated portion of the structure attached thereto
is anchored to resist flotation, collapse, and lateral movement due to the effects of wind
and water loads acting simultaneously on all building components; and,
(3) water loading values used shall be those associated with the base flood. Wind loading
values used shall be those required by applicable state and local building standards.
b.
have the space below the lowest floor:
(1) free of obstructions; or,
(2) constructed with open wood lattice-work, or insect screening intended to collapse under
wind and water without causing collapse, displacement, or other structural damage to
the elevated portion of the building or supporting piles or columns; or,
(3) constructed to enclose less than 300 square feet of area with non-supporting breakaway
walls that have a design safe loading resistance of not less than 10 or more than 20
pounds per square foot.
c.
require a registered professional engineer or architect to:
(1) develop or review the structural design, specifications, and plans for the construction,
which must meet or exceed the technical criteria contained in the Coastal Construction
Manual, (FEMA-55); and,
(2) certify that the design and methods of construction to be used are in accordance with
accepted standards of practice for meeting the criteria of Article VI.P.1.
2. The use of fill for structural support in Zone VE is prohibited.
11
3. Human alteration of sand dunes within Zone VE is prohibited unless it can be demonstrated that such
alterations will not increase potential flood damage.
4. The area below the lowest floor shall be used solely for parking vehicles, building access, and storage.
ARTICLE VII - CERTIFICATE OF COMPLIANCE
No land in a special flood hazard area shall be occupied or used and no structure which is substantially
improved shall be occupied until a Certificate of Compliance is issued by the Code Enforcement Officer
subject to the following provisions:
A. For Substantial Improvement of any elevated structure the applicant shall submit to the Code
Enforcement Officer:
1. an Elevation Certificate completed by a Professional Land Surveyor, registered professional
engineer, or architect, for compliance with Article VI, paragraphs F, H, or P and,
2. for structures in Zone VE, certification by a registered professional engineer or architect that the
design and methods of construction used are in compliance with Article VI.P.1.
B. The applicant shall submit written notification to the Code Enforcement Officer that the development
is complete and complies with the provisions of this ordinance.
C. Within 10 working days, the Code Enforcement Officer shall:
1. review the required certificate(s) and the applicant's written notification; and,
1. upon determination that the development conforms to the provisions of this ordinance, shall issue
a Certificate of Compliance.
ARTICLE VIII - REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS
The Planning Board shall, when reviewing subdivisions and other proposed developments that require
review under other federal law, state law, local ordinances or regulations, and all projects on 5 or more
disturbed acres, or in the case of manufactured home parks divided into two or more lots, assure that:
A. All such proposals are consistent with the need to minimize flood damage.
B. All public utilities and facilities, such as sewer, gas, electrical and water systems are located and
constructed to minimize or eliminate flood damages.
C. Adequate drainage is provided in order to reduce exposure to flood hazards.
D. All proposals include base flood elevations, flood boundaries, and, in a riverine floodplain, floodway
data. These determinations shall be based on engineering practices recognized by the Federal
Emergency Management Agency.
12
E. Any proposed development plan must include a condition of plan approval prohibiting new structures
(as defined in Article XIII) within a Special Flood Hazard Area. Such requirement will be included
in any deed, lease, purchase and sale agreement, or document transferring or expressing an intent to
transfer any interest in real estate or structure, including but not limited to a time-share interest. The
condition shall clearly articulate that the municipality may enforce any violation of the construction
requirement and that fact shall also be included in the deed or any other document previously
described. The construction requirement shall also be clearly stated on any map, plat, or plan to be
signed by the Planning Board or local reviewing authority as part of the approval process.
ARTICLE IX - APPEALS AND VARIANCES
The Board of Appeals of the Town of Arrowsic may, upon written application of an aggrieved party, hear
and decide appeals where it is alleged that there is an error in any order, requirement, decision, or
determination made by, or failure to act by, the Code Enforcement Officer or Planning Board in the
administration or enforcement of the provisions of this Ordinance.
The Board of Appeals may grant a variance from the requirements of this Ordinance consistent with state
law and the following criteria:
A. Variances shall not be granted within any designated regulatory floodway if any increase in flood
levels during the base flood discharge would result.
B. Variances shall be granted only upon:
1. a showing of good and sufficient cause; and,
2. a determination that should a flood comparable to the base flood occur, the granting of a variance
will not result in increased flood heights, additional threats to public safety, public expense, or
create nuisances, cause fraud or victimization of the public or conflict with existing local laws or
ordinances; and,
3. a showing that the issuance of the variance will not conflict with other state, federal or local laws
or ordinances; and,
4. a determination that failure to grant the variance would result in "undue hardship," which in this
sub-section means:
a.
that the land in question cannot yield a reasonable return unless a variance is granted; and,
b.
that the need for a variance is due to the unique circumstances of the property and not to the
general conditions in the neighborhood; and,
c.
that the granting of a variance will not alter the essential character of the locality; and,
d.
that the hardship is not the result of action taken by the applicant or a prior owner.
13
C. Variances shall only be issued upon a determination that the variance is the minimum necessary,
considering the flood hazard, to afford relief, and the Board of Appeals may impose such conditions
to a variance as is deemed necessary.
D. Variances may be issued for substantial improvements, or other development for the conduct of a
functionally dependent use provided that:
1. other criteria of Article IX and Article VI.K. are met; and,
2. the structure or other development is protected by methods that minimize flood damages during
the base flood and create no additional threats to public safety.
E. Variances may be issued for the repair, reconstruction, rehabilitation, or restoration of Historic
Structures upon the determination that:
1. the development meets the criteria of Article IX, paragraphs A. through D. above; and,
2. the proposed repair, reconstruction, rehabilitation, or restoration will not preclude the structure's
continued designation as a Historic Structure and the variance is the minimum necessary to
preserve the historic character and design of the structure.
F. Any applicant who meets the criteria of Article IX, paragraphs A. through E. shall be notified by the
Board of Appeals in writing over the signature of the Chairman of the Board of Appeals that:
1. the issuance of a variance to substantially improve a structure below the base flood level will
result in greatly increased premium rates for flood insurance up to amounts as high as $25 per
$100 of insurance coverage;
2. such improvements below the base flood level increases risks to life and property; and,
3. the applicant agrees in writing that the applicant is fully aware of all the risks inherent in the use
of land subject to flooding, assumes those risks and agrees to indemnify and defend the
municipality against any claims filed against it that are related to the applicant's decision to use
land located in a floodplain and that the applicant individually releases the municipality from any
claims the applicant may have against the municipality that are related to the use of land located
in a floodplain.
G. Appeal Procedure for Administrative and Variance Appeals
1. An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved party
within thirty days after receipt of a written decision of the Code Enforcement Officer or Planning
Board.
14
2. Upon being notified of an appeal, the Code Enforcement Officer or Planning Board, as
appropriate, shall transmit to the Board of Appeals all of the papers constituting the record of the
decision appealed from.
3. The Board of Appeals shall hold a public hearing on the appeal within thirty-five days of its
receipt of an appeal request.
4. The person filing the appeal shall have the burden of proof.
5. The Board of Appeals shall decide all appeals within thirty-five days after the close of the
hearing, and shall issue a written decision on all appeals.
6. The Board of Appeals shall submit to the Code Enforcement Officer a report of all variance
actions, including justification for the granting of the variance and an authorization for the Code
Enforcement Officer to issue a Flood Hazard Development Permit, which includes any
conditions to be attached to said permit.
7. Any aggrieved party who participated as a party during the proceedings before the Board of
Appeals may take an appeal to Superior Court in accordance with State laws within forty-five
days from the date of any decision of the Board of Appeals.
ARTICLE X - ENFORCEMENT AND PENALTIES
A. It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance
pursuant to Title 30-A MRSA § 4452.
B. The penalties contained in Title 30-A MRSA § 4452 shall apply to any violation of this Ordinance.
C. In addition to other actions, the Code Enforcement Officer may, upon identifying a violation, submit
a declaration to the Administrator of the Federal Insurance Administration requesting a flood
insurance denial. The valid declaration shall consist of;
1. the name of the property owner and address or legal description of the property sufficient to
confirm its identity or location;
2. a clear and unequivocal declaration that the property is in violation of a cited State or local law,
regulation, or ordinance;
3. a clear statement that the public body making the declaration has authority to do so and a citation
to that authority;
4. evidence that the property owner has been provided notice of the violation and the prospective
denial of insurance; and,
5. a clear statement that the declaration is being submitted pursuant to Section 1316 of the National
Flood Insurance Act of 1968, as amended.
15
ARTICLE XI - VALIDITY AND SEVERABILITY
If any section or provision of this Ordinance is declared by the courts to be invalid, such decision shall not
invalidate any other section or provision of this Ordinance.
ARTICLE XII - CONFLICT WITH OTHER ORDINANCES
This Ordinance shall not in any way impair or remove the necessity of compliance with any other
applicable rule, ordinance, regulation, bylaw, permit, or provision of law. Where this Ordinance imposes
a greater restriction upon the use of land, buildings, or structures, the provisions of this Ordinance shall
control.
ARTICLE XIII - DEFINITIONS
Unless specifically defined below, words and phrases used in this Ordinance shall have the same meaning
as they have at common law, and to give this Ordinance its most reasonable application. Words used in
the present tense include the future, the singular number includes the plural, and the plural number
includes the singular. The word "may" is permissive; "shall" is mandatory and not discretionary.
Accessory Structure - a small detached structure that is incidental and subordinate to the principal
structure.
Adjacent Grade - the natural elevation of the ground surface prior to construction next to the proposed
walls of a structure.
Area of Special Flood Hazard - land in the floodplain having a one percent or greater chance of flooding
in any given year, as specifically identified in the Flood Insurance Study cited in Article I of this
Ordinance.
Base Flood - a flood having a one percent chance of being equaled or exceeded in any given year,
commonly called the 100-year flood.
Basement - area of a building that includes a floor that is subgrade (below ground level) on all sides.
Breakaway Wall - a wall that is not part of the structural support of the building and is intended through
its design and construction to collapse under specific lateral loading forces, without causing damage to the
elevated portion of the building or supporting foundation system.
Building - see Structure.
Certificate of Compliance - a document signed by the Code Enforcement Officer stating that a structure
is in compliance with all of the provisions of this Ordinance.
Code Enforcement Officer - a person certified under Title 30-A MRSA, Section 4451 (including
exceptions in Section 4451, paragraph 1) and employed by a municipality to enforce all applicable
comprehensive planning and land use laws.
16
Containment Wall - wall used to convey or direct storm water or sanitary water from the initial source to
the final destination.
Development - a manmade change to improved or unimproved real estate. This includes, but is not
limited to, buildings or other structures; mining, dredging, filling, grading, paving, excavation, drilling
operations or storage of equipment or materials; and the storage, deposition, or extraction of materials.
Digital Flood Insurance Rate Map (FIRM) - see Flood Insurance Rate Map
Elevated Building - a non-basement building that is:
a.
built, in the case of a building in Zones A or AE, so that the top of the elevated floor, or in the case of
a building in Zone VE, to have the bottom of the lowest horizontal structural member of the elevated
floor, elevated above the ground level by means of pilings, columns, post, piers, or "stilts;" and
b.
adequately anchored to not impair the structural integrity of the building during a flood of up to one
foot above the magnitude of the base flood.
In the case of Zones A or AE, Elevated Building also includes a building elevated by means of fill or
solid foundation perimeter walls with hydraulic openings sufficient to facilitate the unimpeded movement
of flood waters, as required in Article VI.L. In the case of Zone VE, Elevated Building also includes a
building otherwise meeting the definition of elevated building, even though the lower area is enclosed by
means of breakaway walls, if the breakaway walls meet the standards of Article VI.P.1.b.(3).
Elevation Certificate - an official form (FEMA Form 81-31, as amended) that:
a.
is used to verify compliance with the floodplain management regulations of the National Flood
Insurance Program; and,
b.
is required for purchasing flood insurance.
Flood or Flooding
a.
A general and temporary condition of partial or complete inundation of normally dry land areas from:
1. The overflow of inland or tidal waters.
2. The unusual and rapid accumulation or runoff of surface waters from any source.
b.
The collapse or subsidence of land along the shore of a lake or other body of water as a result of
erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or
suddenly caused by an unusually high water level in a natural body of water, accompanied by a
severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or
by some similarly unusual and unforeseeable event which results in flooding as defined in paragraph
a.1. of this definition.
17
Flood Elevation Study - an examination, evaluation and determination of flood hazards and, if
appropriate, corresponding water surface elevations.
Flood Insurance Rate Map (FIRM) - an official map of a community, on which the Federal Insurance
Administrator has delineated both the special hazard areas and the risk premium zones applicable to the
community.
Flood Insurance Study - see Flood Elevation Study.
Floodplain or Floodprone Area - land area susceptible to being inundated by water from any source (see
flooding).
Floodplain Management - means the operation of an overall program of corrective and preventive
measures for reducing flood damage, including but not limited to emergency preparedness plans, flood
control works, and floodplain management regulations.
Floodplain Management Regulations - zoning ordinances, subdivision regulations, building codes,
health regulations, special purpose ordinances (such as a floodplain ordinance, grading ordinance, and
erosion control ordinance) and other applications of police power. The term describes such state or local
regulations, in any combination thereof, which provide standards for the purpose of flood damage
prevention and reduction.
Floodproofing - any combination of structural and non-structural additions, changes, or adjustments to
structures which reduce or eliminate flood damage to real estate or improved real property, water and
sanitary facilities, structures and contents.
Floodway - see Regulatory Floodway.
Floodway Encroachment Lines - the lines marking the limits of floodways on federal, state, and local
floodplain maps.
Freeboard - a factor of safety usually expressed in feet above a flood level for purposes of floodplain
management. Freeboard tends to compensate for the many unknown factors, such as wave action, bridge
openings, and the hydrological effect of urbanization of the watershed, which could contribute to flood
heights greater than the height calculated for a selected size flood and floodway conditions.
Functionally Dependent Use - a use that cannot perform its intended purpose unless it is located or
carried out in close proximity to water. The term includes only docking facilities, port facilities that are
necessary for the loading and unloading of cargo or passengers, and ship building and ship repair
facilities, but does not include long-term storage or related manufacturing facilities.
Historic Structure - means any structure that is:
a.
Listed individually in the National Register of Historic Places (a listing maintained by the Department
of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements
for individual listing on the National Register;
b.
Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical
significance of a registered historic district or a district preliminarily determined by the Secretary of
the Interior to qualify as a registered historic district;
18
c.
Individually listed on a state inventory of historic places in states with historic preservation programs
which have been approved by the Secretary of the Interior; or
d.
Individually listed on a local inventory of historic places in communities with historic preservation
programs that have been certified either:
1. By an approved state program as determined by the Secretary of the Interior, or
2. Directly by the Secretary of the Interior in states without approved programs.
Locally Established Datum - for purposes of this ordinance, an elevation established for a specific site to
which all other elevations at the site are referenced. This elevation is generally not referenced to the
National Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD) or any other
established datum and is used in areas where Mean Sea Level data is too far from a specific site to be
practically used.
Lowest Floor - the lowest floor of the lowest enclosed area (including basement). An unfinished or flood
resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a
basement area is not considered a building's lowest floor, provided that such enclosure is not built so as to
render the structure in violation of the applicable non-elevation design requirements described in Article
VI.L. of this Ordinance.
Manufactured Home - a structure, transportable in one or more sections, which is built on a permanent
chassis and is designed for use with or without a permanent foundation when connected to the required
utilities. For floodplain management purposes the term manufactured home also includes park trailers,
travel trailers, and other similar vehicles placed on a site for greater than 180 consecutive days.
Manufactured Home Park or Subdivision - a parcel (or contiguous parcels) of land divided into two or
more manufactured home lots for rent or sale.
Mean Sea Level - when related to the National Flood Insurance Program, the National Geodetic Vertical
Datum (NGVD) of 1929, North American Vertical Datum (NAVD) or other datum, to which base flood
elevations shown on a community's Flood Insurance Rate Map are referenced.
Minor Development - means all development that is not new construction or a substantial improvement,
such as repairs, maintenance, renovations, or additions, whose value is less than 50% of the market value
of the structure. It also includes, but is not limited to: accessory structures as provided for in Article VI.J.,
mining, dredging, filling, grading, paving, excavation, drilling operations, storage of equipment or
materials, deposition or extraction of materials, public or private sewage disposal systems or water supply
facilities that do not involve structures; and non-structural projects such as bridges, dams, towers, fencing,
pipelines, wharves, and piers.
National Geodetic Vertical Datum (NGVD) - the national vertical datum, a standard established in
1929, which is used by the National Flood Insurance Program (NFIP). NGVD is based upon mean sea
level in 1929 and also has been called "1929 Mean Sea Level (MSL)".
19
New Construction - structures for which the "start of construction" commenced on or after the effective
date of the initial floodplain management regulations adopted by a community and includes any
subsequent improvements to such structures.
North American Vertical Datum (NAVD)- means the national datum whose standard was established in
1988, which is the new vertical datum used by the National Flood Insurance Program (NFIP) for all new
Flood Insurance Rate Maps. NAVD is based upon vertical datum used by other North American countries
such as Canada and Mexico and was established to replace NGVD because of constant movement of the
earths crust, glacial rebound, and subsidence and the increasing use of satellite technology.
100-year flood - see Base Flood.
Recreational Vehicle - a vehicle that is:
a.
built on a single chassis;
b.
400 square feet or less when measured at the largest horizontal projection, not including slideouts;
c.
designed to be self-propelled or permanently towable by a motor vehicle; and
d.
designed primarily not for use as a permanent dwelling but as temporary living quarters for
recreational, camping, travel, or seasonal use.
Regulatory Floodway -
a. the channel of a river or other water course and the adjacent land areas that must be reserved in order
to discharge the base flood without cumulatively increasing the water surface elevation more than one
foot, and
b.
when not designated on the community's Flood Insurance Rate Map, it is considered to be the
channel of a river or other water course and the adjacent land areas to a distance of one-half the width
of the floodplain, as measured from the normal high water mark to the upland limit of the floodplain.
Riverine - relating to, formed by, or resembling a river (including tributaries), stream, brook, etc.
Special Flood Hazard Area - see Area of Special Flood Hazard.
Start of Construction - the date the building permit was issued, provided the actual start of construction,
repair, reconstruction, rehabilitation, addition, placement, substantial improvement or other improvement
was within 180 days of the permit date. The actual start means either the first placement of permanent
construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the
construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured
home on a foundation. Permanent construction does not include land preparation, such as clearing,
grading and filling; nor does it include the installation of streets and/or walkways; nor does it include
excavation for basement, footings, piers, or foundations or the erection of temporary forms; nor does it
include the installation on the property of accessory buildings, such as garages or sheds not occupied as
dwelling units or not part of the main structure. For a substantial improvement, the actual start of
construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, or
20
modification of any construction element, whether or not that alteration affects the external dimensions of
the building.
Structure - means, for floodplain management purposes, a walled and roofed building. A gas or liquid
storage tank that is principally above ground is also a structure.
Substantial Damage - means, damage of any origin sustained by a structure whereby the cost of restoring
the structure to its before damage condition would equal or exceed 50 percent of the market value of the
structure before the damage occurred.
Substantial Improvement - means any reconstruction, rehabilitation, addition, or other improvement of a
structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the
start of construction of the improvement. This term includes structures which have incurred substantial
damage, regardless of the actual repair work performed. The term does not, however, include either:
a.
Any project for improvement of a structure to correct existing violations of state or local health,
sanitary, or safety code specifications which have been identified by the local code enforcement
official and which are the minimum necessary to assure safe living conditions; or
b.
Any alteration of a Historic Structure, provided that the alteration will not preclude the structure's
continued designation as a historic structure, and a variance is obtained from the Board of Appeals.
Variance - means a grant of relief by a community from the terms of a floodplain management regulation.
Violation - means the failure of a structure or development to comply with a community's floodplain
management regulations.
ARTICLE XIV - ABROGATION
This ordinance repeals and replaces any municipal ordinance previously enacted to comply with the
National Flood Insurance Act of 1968 (P.L. 90-488, as amended).
60.3 (e) Rev. 01/15
Prepared by DACF/JP