Town of Beddington
Ordinance Allowing High Impact Power Lines in designated area
with in the Town of Beddington, Maine
Whereas, the Town of Beddington Select Board and Planning
Board have researched and reviewed the pros and
Cons of High Impact Power Lines, and
Whereas, said Boards have found the only place said Power
Lines could be placed would be on the Beddington-
Deblois Line. The designated area would include the
Land within the Town of Beddington, 1320 feet from
said Town Line and must comply with Beddington's
Land Use Plan and Shoreland Zoning Ordinance which
states that a public utility, water district, sanitary
District or any utility company of any kind may not
Install services to any new structure located in the
Shoreland zone unless written authorization
Attesting to the validity and currency of all local
Permits required under this or any previous
Ordiance has been issued by the appropriate
Municipal officials or other written arrangements
Have been made between the municipal officials
And the utility. No power lines may cross a lake
Or river segment as it presents a flight hazard to
Firefighting aircraft and sail propelled vessels. Also
The access road must comply with Section 9, pages
22 and 23 of the Subdivision Ordinance for the Town
Of Beddington entitled Road Design and Construction
Standards, and
NOW THEREFORE, the Select Board of the of the Town of
Beddington ask the residents to approve
Said Ordinance.
THEREFORE, BE IT RESOLVED by the Beddington Town Select Board
Declares a designated place for High Impact
Power Lines within Town lines.
Christen Beal Amy St. Aubin Jean Kaye
Approved: April 5, 2025
I, Cynthia Gay, Town Clerk of Beddington, do witness and attest this
Ordinance passed.
__________________________________ Date ___________________