THE TOWN OF BLUE HILL
"TELECOMMUNICATIONS TOWER ORDINANCE"
Effective Date: April 1, 2011
Certified By:
'[)_,/(,h-f t. }IA Ahl
Municipal Officers~r
A«..I Trao Copy, lttzf),~
Town Clerk
4-7- IJ
ATTEST TRUE COPY
Date 4-,-;b
Signature ?:'A =g:J:; ~
' .
Town of Blue Hill Telecommunications Tower Ordinance
Adopted _____ _
Section l. Title and Purpose
A
B.
Title
The title of this ordinance shall be the "Town of Blue Hill Telecommunications
Tower Ordinance".
·
Purpose
The purpose of this Ordinance is to balance the interests of the residents of the
Town of Blue Hill with the need for wireless telecommunications. These
standards are intended to establish general guidelines for the siting of
telecommunications towers and antennas .
Section 2. Ordinance Administration
Authority
A.
B.
c.
D.
This Ordinance has been prepared in accordance with the provisions of Article
VIII, Part 2, § I of the Maine Constitution (Municipal Home Rule), the provisions
of Title 30-A, M.R.S.A § 3001 (Hoi;ne Rule) and the provisions of the Planning
and Land Use ~gulation Act, Title 30-A M.R.S.A § 4312, etc. seq.
(Comprehensive Planning and Land Use Regulation, or "Growth Management
Act")
.
Applicability
This Ordinance applies to all construction and expansion of wireless
telecommunications facilities, existing or proposed, within the Town of Blue Hill
except as provided in Section 3. Wireless Telecommunications Facilities shall be
classified as Major Developments and shall be reviewed by the Planning Board,
as defined in Section 3;2 of the Blue Hill Commercial Site Plan Review dated
March 16, 2002.
. ..
Confficts with Other Ordinances, Laws and Regulations
Whenever a provision of this Orc.iinance conflicts with or is inconsistent with
another provision of this Ordinance or of any other ordinance, regulation or
statute administered by the municipality, the more restrictive provision shall
control.
·
Validity and SeverabiUty
Should any section or provision of this OrdinancA be declared by the courts to be
invalid, such decisions shall not invalidate any other section or provision of the
Ordinance.
E.
Penalties
Any person or company that owns or controls any building or property connected
with a Telecommunications facility that violates this Ordinance shall be liable for
civil penalties in accordance with Title 30-A M.R.S.A § 4452. Each day such a
violation cohtinues after notification by the CEO shall constitute a separate
offense. Each offense shall be subject to civil penalties, orders to correct
I
F.
G.
Section 3.
A.
violations and attorney and expert witness fees in accord with Title 30-A M. R. S.
A.§ 4452.
Availability
A certified copy of this Ordinance shall be filed with the Municipal Clerk and
shaJI be accessible to any member of the public upon request. Copies shall be
made available to the public at reasonable cost at the expense of the person
making the request.
Effective Date
This Orclina11ce was adopted by the Municipal Legislative body on
Exemptions
Exempted Telecommunications
The following are exempt from the provisions oftijs ordinance as long as the
fall setback from the property lines meets or exceeds one and one-half ( I ½) times
the height of the antenna and tire owner follows the height restrictions.
1. Amateur(ham) radio stations : Amateur (11am) C11dio stations licensed by the
Federal Communications Commission (FCC) under thirty-five (JS) feet high.
2. Parabolic Antennas: Parabolic Antellllas Jess than (7) seven feet in diameter,
that are an accessory use of the prope11y under thirty-five (JS) feet high.
3. Antennas as accessory uses: An antelllla that is _an accessory use to a
residential dwelling unit under thirty-five ( 3 S) feet high.
The fullowing are exempt :from the provisions of this ordinance, no permits
are required.
1. Emergeney Wireless Teleeommlinieations Facility: Temporary wireless
communication facilities fur emergency communications by public agencies.
2. Routine repair and maintenance or repair: Routine maintenance or repair of
a wireless telecommunications facility and related equipment, provided that
there is no change in height or any other dinlension of the facility.
3. Temporary wireless telecommunication facility: Temporary wireless
telecommunications :facility in operation fur a mEdmum period of (180) one
hundred and eighty days. This may include, but is not limited to, "cellular on
wheels" mobile equipment. It is required that the applicant must give prior
written notification to the CEO and the height is limited to 190 feet or less.
4. "Special event": (see Definitions) wireless telecommunication facility:
Temporary special event telecommunication :fttcilities fur a period not to exceed
five days preceding an event and five days after a special event. It is required
that the applicant must give prior written notification to the CEO and the height
is limited to 190 feet or less.
2
..
Section 4.
Review and Approval Authority
Approval Required
A.
B.
Section S.
A.
Section 6.
No person shall construct, reconstruct or expand a wireless telecf'rorounin11tions
facility without approval of the PJanning Board and notification of the CEO as
follows:
1. New Construction, Expansion of an Existing Facility. Approval by the
Planning 13oard is required for construction of a new wireless
telecommunications facility; and expansion of an existing wireless
telecommunications facility that increl!Ses the height or any other dimension of
the facility; and accessory use of an existing wireless telecommunications facility.
2. Reconstruction of an Existing Facility. Notification of the CEO is required
for reconstruction of a wireless telecommunications facility. Reconstruction is
allowed provided there is no change in the height or any other dimension of the
facility. Reconstruction is allowed only within (18) eighteen months of damage,
the full surety bond must be maintained during this time. After (18) eighteen
months, a new application and surety bond must be submitted or the facility will
be declared abandoned.
3. Expiration of Approved Applications. All site plan approvals shall expire
within (1) one year of the date of issuance uoless work there-under is substantially
commenced. Substantial to mean at least 30¾ of the total value of the project is
to be completed. If work is not substantially completed within (2) two years from
the date of issuance, a new application must be made.
Approval Authority
In accordance with Section 4A, above, the Planning Board shall review
applications for wireless telecommunications facilities, and make written findings
of fact on whether the proposed facility complies with this Ordinanci,.
Requirements for All Applicants
Pre-Application Conference
The Pre.application conference is not optional. All persons seeking approval of
the Planning Board under this ordinance shall meet with the CEO or PJanning
Board, no less than (30) thirty days before filing an application.
At this meeting, the CEO or Planning Board shall explain to the applicant the
ordinance provisions, possible locations to avoid for tower sites (including areas
identified as Scenic Resources in the 1999 Comprehensive Piao) as well as
applications forms and submissions that will be required under this ordinance.
There is no fee for the Pre-Application Review, any review or comment by the
CEO is not binding upon either the CEO or the PJanning Board. The use of this
procedure shall not render an application to be a pending application.
Application for Planning Board Preliminary Review
All persons seeking review by the Planning Board under this ordinance shall
submit an application with the information as provided below. These materials
shall be contained in a bound report or a three-ring notebook.
3
A.
General Information:
1. Name of owner of record and address;
2. Applicant's name and address;
3. The name of the proposed development;
4. Names and addresses of all abutting property owners;
· 5. Sketch map showing general location of the site within the Town;
6. Location map showing the relationship of the proposed project to adjacent
properties and to the general surrounding area within three thousand+ -
(3,000+ -) feet of any property line of the site. The scale shall not be
smaller than 1 "=400'
.
.
7. The tax map(s) and lot number(s) ofthe parcel or parcels where
the parcel is located and ofabutting parcels;
8. A copy of the deed to the property, option to purchase the property or
other documentation to demonstrate the applicant's right, title, or interest
in the property upon which the :facility is to be sited;
!I. A statement stating whether any portion of the project is located
within the watershed of the Blue Hill Water District;
10. The name(s), registration number(s), and seal(s) of the land surveyor,
architect, engineer and/or similar professionals assisting with the
preparation of the plan.
11. A copy of the FCC license for the facility, or a signed statement from the
owner or operator of the :facility attesting that the facility complies with
current FCC regulations;
12. A USGS 7.5 minute topographic map showing the location of all structures
and wireless telecommunications facilities above one hundred fifty (150) feet
in height above ground level, except antennas located on rooftops, within a
five (5) mile radius of the proposed :facility, unless this information has been
previously made available to the municipality. This requirement may be met
by submitting current information (within thirty (30) days of the date the
application is filed) from the FCC Tower Registration Database;
13. A schedule of construction, including anticipated beginning and completion
dates.
14. Projects involving the storing, generating or handling ofbazardous wastes or
materials, oil or radioactive wastes shall specify the exact amount and nature
of all such substances that will be on the site and the specific method of
handling "nd containing those substances that will be used.
15. Performance Bond: A yearly renewable bond indemnifying the town fort 00 % of
the costs of removal ofthe facility as determined by the Planning Board shall be
submitted to the municipal authority before construction starts and maintained yearly
as long as the structure exists. Notice of renewal of the bond shall be sent to the
selectmen yearly by the owner or the bonding agent. Should the bond not be
renewed, the bonding company must give the town sixty (60) days notice of non
renewal and advise the town of steps required to renew the bond.
B.
Site Information-Mapping
1. The following information regarding proposed development and existing conditions is
required. This information must accompany, or be submitted on, a map using the
following scale and showing the date of the map, magnetic north, the scale and the
4
identity of the draftsman:
Acres
Scale
1-10
1"==10' to l" == 50'
10-50
1''==50' to 1"==100'
50+(1ots 4 acres)
1"=100'
50+(1ots>4acres)
l "=200'
2. Zoning classification{s) of the property and the location of zoning district boundaries if
the property is wholly or partially located in an area subject to Shoreland Zoning.
3. Identification of districts, sites, buildings, structures or objects, significant h1
American History, architecture, archaeology, e1igmeermg or culture, that are listed, or
eligible for listing, in the National Register ofHistoric Places
4. A site plan prepared and certified by a professional engmeer registered ht the State of
Maine, mdicating the location, type and height of the proposed facility, antenna
capacity, on-site and abuttmg off-site land uses, means of access, setbacks from
property lines, and all applicable American National Standards Institute (ANSI)
technical and structural codes.
S. Certification by the applicant that the proposed :fiu:ility complies with all FCC
standards for radio emissions is required.
6. A boundary survey for the project performed by a licensed professional surveyor
licensed by the State of Maine. The bearings and distance of all property lines of the
property to be developed and the source of this information shall be on the map.
7. A copy of such covenants or deed restrictions, if any, as are hrtended to cover all or
part of the site. Such covenants or deed restrictions shall be referenced on the plan.
8. A survey of the lessor's or current owner's entire property shall be presented
The applicant may request and the PJanning Board may consent to a survey of the
entire property hi the form of a mortgage loan mspection sketch, mcluding information
requested by the Plaruoog Board.
!J. Location and size of all exist.htg and proposed wells, sewer and water mams, culverts,
drains, above or below ground utilities and waste water disposal systems 011 the
property to be developed, and of any of these items that currently serves or will serve
. the development from abutting streets or land.
10. -Location, i1ames, and widths of all existing and proposed streets and rights- 0£,.way
adjacent to the proposed development.
11. The location, dimensions, and ground :floor elevations of all existing and proposed
buildings on the site.
12. The location and dimensions of all existing and proposed driveways, streets, parking
and loading areas, and walkways on the site.
13. The existing and proposed topography of the site at an appropriate contour mterval
(not greater than 5') depending on the nature of the use and character of the site.
14. Major natural features on the site and including, within two hundred fifty (250') feet of
the boundaries of the site, wetlands, streams, ponds, :flood plains, groundwater
aquifers, significant wildlife habitats (including bird nesting, staging and feeding areas,
and deer yards identified by the IF& W),archaeological resources or other important
natural features.
15. The delineation of all the full zones, one and a half (1 ½) tinles the height of the tower
:from existing and proposed buildings, property lines and buffers required by this
Ordinance shall be shown on the applicant's plan.
5
C.
Site Information- Soils and Erosion Control
1. Soils information if on-site sewage disposal is proposed. This information
should be detailed enough to allow those portions of the site not suitable for on-site
disposal systems to be identified, if applicable.
2. The direction and amount of pre-development and proposed surmce water drainage
flow across and from the site, based upon 24-hour, 2-10-and 25-year storms. Where
proposed flow exceeds pre-development flows by 10% or more, the applicant shall
submit a storm-water management plan, showing the steps taken to minimize the
impact of storm water runoff. The storm water management plan shall be based upon
24-hour, 2-,10- and 25-year storms.
3. An erosion control and sedimentation control plan setting furth the measures to be
taken to comply with Section 4.5 "Erosion !'D4 Sedimgtion Control" of Blue Hill's
Qnnmerdal Site Plan Review starting on page 18 shall be included.
D.
Site Information- Visual Impact
1. The location, front view, dimensions and type of all existing and proposed exterior
signs.
2. A visual assessment consisting of the following:
a.)Elevation drawings of the proposed facility, and any· other proposed
structures, showing height above ground level;
b.)A landscaping plan indicating the proposed placement of the filcility on
the site: location of existing structures, trees and other significant features; the
type and location of plants proposed to screen the facility; the method of
fencing, the color of the structure, and the proposed lighting method.
c.) Photo simulations of the proposed :facility taken from perspectives determined
by the Plamting 13oard, or their designee. Each photo must be labeled with the
line of sight, elevation, and with the date taken imprinted on the photograph.
The photos must show the color of the facility and method of screening.
d.) A narrative discussing the extent to which the proposed facility would be
visible from or within a designated scenic resource. The tree line elevation of
vegetation within 100 feet of the :facility, and the distance to the proposed
facility from the designated scenic resource's noted viewpoints.
E.
Site Information- Propagation Studies
1. Propagation studies of areas already covered by telecommunication :facilities as
well as areas proposed to be covered by the applicant.
2. A written description ofhow the proposed :facility fits into the applicant's
telecommunications network. This submission requirement does not require
disclosure of confidential business information.
3. Certification by the applicant that the proposed facility complies with all FCC
standards fur radio emissions is required.
4. Evidence demonstrating that no existing building, site, or structure can accommodate
the applicant's proposed facility, the evidence fur which, may consist of any one of
the following:
a.) Evidence that no existing facilities are located within the targeted market
coverage area as required to meet the applicant's engineering requirements.
b.) Evidence that existing facilities do not have sufficient height or cannot be
increased in height at a reasonable cost to meet the applicant's engineering
requirements up to the limit of 190 feet.
6
e.) Evidence that existing facilities do not have sufficient structural strength to
support the applicant's proposed antenna and related equipment. Specifically:
i.) Planned, necessary equipment would exceed the structural capacity of
the existing facility, considering the existing and planned use of those
facilities, and these existing facilities cannot be reinforced to
accommodate the new equipment.
ii.)The applicant's proposed antenna or equipment would cause
electromagnetic interference with tbe antenna on the existing towers or
structures, or the antenna or equipment on the existing facility would
cause interference with the applicant's proposed antenna.
iii.)Existing or approved facilities do not have space on which planned
equipment can be placed so it can function effectively.
d.) For facilities existing prior to the effective date of this ordinance, there is
evidence that the fees, costs, or contractual provisions required by the owner in
order to share, or adapt an existing facility are unreasonable. Costs exceeding
the pro rata share of a new facility development are presumed to be
unreasonable. This evidence shall also be satisfactory fur a tower built after
the passage of this ordinance.
e.) Evidence that the applicant has made diligent good faith effurts to negotiate
co-location on an existing facility, building, or structure, and has been denied
access.
F.
Site Information - Submission Waivers
I. The Planning Board, as appropriate, may waive any of the submission requirements
based upon a written list of requested waivers submitted by the applicant at the time of
application, accompanied by the written reasons why each waiver is being requested.
2. A waiver of any submission requirement may be granted only if the Planning Board
finds in writing that due to special circumstances of the application, the infurmation is
not required to determine compliance with the standards of the Ordinance.
Section 7
Fees, Public Hearing & Final Application Review Procedure
A.
Permit Application Fee
·
1. An application fur Planning Board approval shall include payment of a permit
application fee of$0.20 per square root ofwtal area fenced compound. Each
accessory building requires i, minimum. fee of$500;00. The application shall not be
considered complete until this fee is paid. An applicant is entitled to a refund of the
application portion of the fee if the application is withdrawn within fifteeu(IS) days
of the date of filing.
B.
Planning Board Review Fee (held in Escrow)
1. A11 applicant requesting approval by the Planning Board shall deposit with the Town a
$5000. 00 fee to cover all reasonable and customary fees incurred by the municipality
that are necessary to review the application and to obtain the permit. Additional
monies shall be required to cover all town expenses in the event of an appeal. The
review fee shall be paid at the time of application.
2. This Review Fee shall be held in Escrow. That portion of the review fee not used
shall be returned tci the applicant within thirty (30) days of the Planning Board's
final decision.
7
C.
Application Procedure
1.
Filing the Application & Fees
Nine (9) copies of the application shall be filed with the CEO or Planning Roard
two (2) weeks prior to the scheduled meeting for review. The application shall be
accompanied by the Permit Application Fees (Section 7 Al) and the Planning
Board Review Fee (Section 7Bl).
2.
Planning Board Preliminary Review
Within forty-five (45) days of the filing of the application, the Planning Board
shall review the application and determine if the application meets the
submission requiremellts. The Plalllling Board, as appropriate, shall review any
written requests for a waiver from the submission requirements and sball act 011
these requests prior to determining the completeness of the application.
3.
Complete Application
If the application is complete, the Planning Board shall notify the applicant in
writing of this determination, or if the application is incomplete, the Planning
Board shall notify the applicant in writing, specifying the additional materials or
information required to complete the application. After the Planning Board has
determined that a complete application has been filed, it shall notify the applicant
in writing and begin its review of the proposed development.
4.
Public Hearing & Abutter's Notices
The Planning Board will hold a Public Hearing within 30 days of the filing of the
completed application. The CEO or the Planning Board shall publish the time,
date and place of the hearing at least one (1) time at least seven (7) days prior to
the hearing in a newspaper of area-wide circulation. The applicant must supply to
the Board a list of the abutting land owners. The abutting land-owners shall be
notified by certified mail by the Code En:tbrcement Officer of the hearing. Failure
on the part of any abutter to receive such notice shall not be grounds for delay of
any consideration of the application nor denial of the project.
5.
Final Planning Board Review
.
Within sixty (60) days of the Public Hearing or ninety (90) days of receiving a
complete application for approval , the Planning Board shall either approve,
approve with conditions, or deny the application in writing, together with the
:findings on which that decision is based. The time limit for review may be
extended by mutual agreement between tbe Planning Board and tbe applicant
Section 8
Planning Board Review Standards
An application for approval by the Plalllling Board for New Construction or Expansion of
an Existing Facility must meet the following standards:
A.
Designed for Co-Location
A new wireless telecommunications facility and related equipment must be
designed and constructed to accommodate expansion for future co-location of at
least three additional wireless telecommunications facilities or providers at
commercially reasonable rental rates which will be subject to review and approval
of the Planning Board.
8
B.
Height
A wireless telecommunications facility must be no more than one hundred
ninety (190) feet in height.
C.
Setbacks
A new or expanded wireless telecommunications facility must be set back
one and one half ( I ½ ) times it's height measured from the outer edge of the
compound's fence from all property lines, structures or roads, except the tower's
access road. The setback may be satisfied by including the areas outside the
property boundaries if secured by an easement. The height of the tower shall be
measured from the base of the tower.
D.
Landscaping
A new wireless telecommunications facility and related equipment must be
screened with plants from view by abutting properties, to the maximum extent
practicable. Existing plants and natural land forms on the site shall also be
preserved to the maximum extent practicable.
E.
Fencing
A new wireless telecommunications facility must be fenced to discourage
trespass 011 the facility and to discourage climbing 011 any structure by
trespassers. The fence must encircle the entire facility.
F.
Lighting .
A new wireless telecommunications facility must be illuminated only as necessary
to comply with FAA.or other applicable state and federal requirements. Lighting
must meet the standards of the Blue Hill Commercial Site Plan Review.
G.
Color and Materials
A new wireless teleco111111u11icatio11s facility must be constructed with materials
and colors that match or blend with the surrounding natural or built environment,
to the maximum extent practicable. Unless otherwise required, muted colors,
earth tones, and subdued hues shall be used.
B.
Structural Standards
A new wireless telecommunications facility must comply with the current
Electronic Industries Association/Telecommunications Industries Association
(EIZ/TIA) 222 Revision Standard entitled "Structural Standards for Steel Antenna
Towers and Antenna Supporting Structures," and with Hancock County Standards
for wind shear and ice load.
L
Visual Impact
The proposed wireless telecoll111lunications facility will have 110 unreasonable
adverse impact upon designated scenic resources as identified in Section! of this
Ordinance or by a State or Federal Agency.
1. In detemrining the potential unreasonable adverse impact of the proposed
facility upon the designated scenic resources, the Planning Board sball
consider the following criteria:
a.) The extent to which the proposed wireless telecommunications facility
is visible above the tree line from viewpoints of the impacted
designated scenic resource.
b.) The type, number, height and proximity of existing structures and
features, and background features within the same line of sight as
the proposed facility.
c.) The amount of vegetative screening.
d.) The distance of the proposed facility from viewpoints and the
9
facility's location within the designated scenic resource.
e.) The presence of reasonable alternatives that allow the facility to
function consistently with its purpose.
J.
Historic & Archeological Properties
The proposed facility, to the greatest degree practicable, will have 110
unreasonable adverse impact upon an historic district, site or structure which is
currently listed or eligible for listing on the National Register of Historic Places.
Section 9
A.
Standard Conditions of Approval
Town of Blue Hill Commercial Site Piao Review Ordinance
B.
c.
D.
An approved project must meet the Permnpance Standards of Section 4, page 16.
of the Town of Blue Hill Commercial Site Plan Review Ordinanc" and satisfy all
applicable review criteria.
Amendment to ao Approved Application
Any changes to an approved application must be approved by the Planning Board,
in accordance with Section 4.
Abandonment
1. A wireless telecommunications facility that is not operated for a continuous
period of twelve (14) months shall be considered abandoned. The CEO shall
notify the owrier of an abandoned facility in writing and order the removal of
the facility within ninety (90) days of receipt of the written notice. The owner
of the mcility shall have thirty (30) days from receipt of the notice to
demonstrate to the CEO that the facility has not been abandoned. If the owner
fails to show that the facility is in active operation, the
owner shall have 11brty (60) days to remove the facility. If the facility is not
removed within this time period, the municipality may remove the facility at
the owner's expense. The owner of the facility shall pay all site reclamation
costs deemed necessary and reasonable to return the site to its pre-construction
condition, including the removal of roads, and re-establishment of vegetation.
2. The owner of the facility may apply to the Planning Board for release of the
surety bond when the facility and related equipment are removed to the
satisfaction of the Planning Board.
3. If the bond is to be cancelled or reduced, the bonding agent must directly
notify the CEO and the Selectmen. The Selectmen shall review the surety
bond annually.
Co-Location As a condition of approval, the owner of the wireless
telecommunications facility, bis or her successors and assigns agree to:
1. Respond in a timely, comprehensive manner to a request for information
from a potential co-location applicant, in exchange for a reasonable fee not in
excess of the actual cost of preparing a response.
2. Negotiate in good faith for shared use of the wireless telecommunications
facility by third parties;
3. Allow shared use of the wireless telecommunications facility if an applicant
agrees in writing to pay reasonable charges for co-location.
4. Require no more than a reasonable charge for shared use of the wireless
telecommunications mcility, based on community rates and generally
accepted accounting principles. This charge may include, but is not limited
to, a pro rata share of the cost of site selection, planning project administration,
land costs, site design, construction and maintenance, financing, return on
10
. .
equity, depreciation, and all of the costs of adapting the tower or equipment to
accommodate a shared user without causing electromagnetic interference. The
amortization of the above costs by the facility owner shall be accomplished at
a reasonable rate, over the life span of the useful life of the
telecommunications facility.
E.
Emissions As a further condition of approval, and upon request by the Town,
the applicant shall, at various times, while the wireless telecommunications
facility is in operation, certify to the Town that it is in full compliance with all
applicable FCC radio frequency emissions regulations.
Section 10. Appeals
A Any p~rson aggrieved by a decision of the Planning Board on a Telecommunications
Tower application may appeal the decision to the Maine Superior Court in accordance
with Rule SO(B) Maine Rules of Civil Procedure. Written notice of an appeal must be
filed with the court within thirty ( 3 O) days of the Planning Board's written decision.
The applicant's notice of appeal shall clearly state the reasons for the appeal.
Section 11. Administration and Enforcement
A. Tl1e CEO, as appointed by the Board of Selectmen, shall enforce this ordinance. If
the CEO finds that any provision of this ordinance has been violated, the CEO shall
notify in writing, the person responsible for such violation, indicating the nature of
the violation, and ordering the action necessary to correct it. The CEO shall order
correction of the violation and may take any other legal action to ensure compliance
with this ordinance.
B. The Board of Selectmen is authorized to enter into administrative consent agreements
for the pUipOse of eliminating violations of this ordinance·and recovering fines
without court action. Such agreements shall not allow a violation of this ordinance to
continue unless there is clear and convincing evidence that the violation occurred as a
direct result of erroneous advice given by an authorized municipal official upon
which the applicant reasonably relied to its detriment and there is no evidence that the
owner acted in bad faith. The removal of the violation will not result in a threat to
public health and safety or substantial environmental damage.
Section 12. Dertnitions
Antenna -A system of poles, panels, rods, reflecting discs or similar devices used for
the transmission or reception of radio or electromagnetic frequency signals.
Antenna Height- The vertical distance measured from the base of the antenna support
structure at grade to the highest point of the structure, even if said highest point is an
antenna. Measurement of tower height shall include antenna, base pad, and other
appurtenances and shall be measured from the finished grade of the facility site. If the
support structure is on a sloped grade, then the average between the highest and lowest
grades shall be used in calculating the antenna height.
Compound-the total of the fenced area surrounding all structures and equipment
associated with the tower.
11
Co-Location -The use ofa wireless telecommunications :racility by more than one
wireless telecommunications provider.
. '
Designated Scenic Resource - The specific location, view or corridor, as identified as a
scenic resource in a municipally adopted comprehensive plan or by a State or Federal
agency that consists of:
1. A three dimensional area extending out from a particular viewpoint on a public
way or within a public recreational area, fucusing on a single object, such as a
mountain, resulting in a narrow corridor, or a group of objects, such as a
downtown skyline or mountain range.
2. Lateral terrain features such as valley sides or woodland as observed to either
side of the observer, constraining the view into a narrow or particular field, as
seen from a viewpoint on a public way or within a public recreational area.
Expansion - The addition of antennas, towers or other devices to-an existing structure.
FAA - Federal Aviation Administration
Fall Setback- The distance measured from the outside of the wireless
telecommunications filcility' s fence, which encircles the entire mcility.
FCC - Federal Communications Commission, or its lawful successor.
Height- The vertical measurement from a point on the ground at the mean finish grade
adjoining the fuundation as calculated by averaging the highest and lowest finished grade
around the building or structure, to the highest point ofthe building structure. The
highest point shall exclude mrm building components, flagpoles, chimneys, ventilators,
skylights, drunes, water towers, bell towers, church spires, processing towers, tanks,
bulkheads, or other building accessory features usually erected at a height greater than the
main roofs of buildings.
Historic or Areheological Resources - Resources that are:
1. Listed individually in the National Register of Historic Places or eligible fur
listing on the National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as
contributing to the historical significance of a registered historic district or a
district preliminarily determined by the Secretary of the Interior to qualify as a
registered historic district.
3. Individually listed on a state inventory of historic places in states with historic
preservation programs approved by the Secretary of the Interior.
4, Individually listed on a local inventory of historic places in communities with
historic preservation programs that have been certified by Secretary of the Interior
through the Maine Historic Preservation Commission
5, Areas identified by a government agency such as the Maine Historic
Preservation Commission as having significant value as an historic or
archaeological resource.
6, Any areas identified as having an historic value in the municipality which are
listed or shown on a municipal map dated 2004 and the 1999 Comprehensive
Plan.
Historic Landmark - Any improvement, building or structure of particular historic or
archeological significance to the Town relating to its heritage, cultural, social, economic
or political history, or which exemplifies historic personages or important events in local,
state, or national history identified in the municipality's comprehensive plan, which have
been listed or are eligible to be listed on the National Register of Historic Places.
Line of sight - The direct view of the object from the designated scenic resource.
12
-
, '
...
'
It
Parabolic antenna - (also know as a satellite dish antenna) An antenna which is bowl-
shaped, designed for the reception and or transmission of radio frequency communication
signals in a specific directional pattern.)
Principal Use - The use other than one which is wholly incidental or accessory to
another use on the same premises.
Public Recreational Facility - A regionally or locally significant facility, as defined and
identified either by State statute or in the municipality's adopted comprehensive plan,
designed to serve the recreational needs of municipal property owners.
Special Event-A rare and unpredicted event.
Substantial Start- The completion of thirty percent (30%) of a structure or use
measured as a percentage of estimated total cost
Targeted Market Coverage Area - The area which is targeted to be served by this
proPQsed telecommunications facility.
Unreasonable Adverse Impact- The proposed project would produce an end result
which is:
1. Excessively out of character with the designated scenic resources affected,
including existing building structures and features within the designated scenic
resource, and
2. Would significantly diminish the scenic value of the designated scenic
resource.
Viewpoint - That location which is identified either in the municipally adopted
comprehensive plan or by a Federal or State agency , and which serves as the basis for
the location and determination of a particular designated scenic resource.
Wireless Telecommunications Facility or Facilities - Any structure, antenna, tower,
or other device which provides radio/television, commercial mobile wireless services,
unlicensed wireless services, cellular phone services, specialized mobile radio
communications (SMR.), common carrier wireless exchange access services, and personal
comm~?ations service (PCS) or pager services., or any kind of wireless communication
transm1ss1ons.
13
. '