Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 1
ARTICLE 6 - SITE PLAN REVIEW
601
PURPOSE
Site Plan Review regulations are established to promote the public health, safety and general
welfare by requiring plans to be submitted to, and reviewed by, the Planning Board for
certain uses which have a potential for significant impact, but which when properly designed
with respect to their surroundings can become acceptable uses. The overall purpose of such
review shall be to ensure orderly and beneficial development and the most appropriate use of
land in keeping with the purposes of the district in which a development is proposed. As
such, the provisions set forth in this Article are intended to protect the public health and
safety, promote the general welfare of the community, and conserve the environment by
assuring that nonresidential and multifamily construction is designed and developed in a
manner which assures that adequate provisions are made for traffic safety and access;
emergency access; water supply; sewage disposal; management of storm water, erosion, and
sedimentation; protection of groundwater; protection of the environment, wildlife habitat,
fisheries, and unique natural areas; protection of historic and archaeological resources;
minimizing the adverse impacts on adjacent properties; and fitting the project harmoniously
into the fabric of the community.
602
PRE-APPLICATION (#2) (#69)
The Code Enforcement Officer shall review an applicant's proposed use to determine if the
proposed use is allowed and, if so, whether the project requires site plan approval. If site plan
review is required, the applicant shall determine whether the project is a major or minor site
plan and submit the application accordingly. Upon receiving the application, the Planning
Department shall determine if the applicant's classification of major or minor site plan is
acceptable. If not acceptable, the applicant shall begin the process again with the submission
of a new application.
602.1
MAJOR DEVELOPMENTS (#2)
Projects involving any of the following shall be classified as a major development:
602.1.1
Any project which contemplates drilling for or excavating natural resources,
including mineral extraction, on land or under water where the area effected is in
excess of 30,000 square feet.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 2
602.1.2
Hazardous activities involving the consumption, generation, or handling of:
Hazardous wastes as defined in Title 38, MRSA, Section 1303, as the same may
be amended from time to time;
Hazardous wastes as defined in Title 38, MRSA, Section 1317, as the same may
be amended from time to time;
Oil, as defined in Title 38, MRSA, Section 1451, as the same may be amended
from time to time; and
Low-level radioactive wastes, as defined in Title 38, MRSA, Section 1451, as the
same may be amended from time to time.
602.1.3
Any building or buildings on a tract or parcel of land constructed or erected with a
fixed location on or in the ground or attached to something on or in the ground
which occupies a ground area in excess of 20,000 square feet.
602.1.4
Any project where parking lots, roads, paved areas, or other areas to be stripped
or graded and not to be revegetated causes the total project, including any
buildings, to occupy a ground area in excess of 60,000 square feet.
602.1.5
Any multi-unit housing development involving a building or buildings for the
purpose of providing three (3) or more housing units located on a tract or parcel
of land.
602.1.6
Any project which is a conversion of an existing project meeting the description
stated above.
602.2
MINOR DEVEOPMENTS (#2)
Minor Development - Projects not classified as a Major Development shall be classified
as a minor development.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 3
603
APPLICATION PROCEDURE
603.1
SUBMISSION TO CITY PLANNER (#2) (#6) (#37) (#57)
Persons seeking site plan review shall submit four (4) copies of the site plans and
accompanying written information including the application form, meeting the
specifications of Section 606 with the Planning Department along with a non-refundable
application fee as set forth in the then current City Council adopted fee schedule, payable
to the City of Brewer four weeks prior to the Planning Board meeting.
In addition, an applicant applying for site plan approval shall pay a separate technical
review and escrow account fee of $1,000.00 for minor developments or $2,500.00 for
major developments upon submitting the application. Said funds shall be held in an
account and used to cover the cost for legal notices and any of the following support
services which the City of Brewer reasonably incurs in the review, approval or
disapproval of the application:
A. attorney, including the City Solicitor
B. professional engineer
C. licensed architect
D. professional land surveyor
E. certified geologist
F. licensed site evaluator
G. and any other expert the Planning Board, City Council, City Planner and/or Code
Officer feels is necessary to adequately evaluate the proposed site plan. All technical
review consultants shall be chosen by the City and not the applicant.
If the balance in this account is drawn down by 50% or more, the Board or City Planner
shall notify the applicant, and may require that the account be fully replenished by the
applicant within ten days in order for the application to proceed. The Board or City
Planner shall continue to notify the applicant and may require the account be fully
replenished as necessary whenever the balance of the account is drawn down by 50% of
the original deposit. Any monies not expended shall be returned to the applicant or his
designee, without interest, by the City.
No application shall be acted upon by the Board and/or City Council until the required
money has been posted with the City which includes sufficient funds posted to cover the
total cost of the support services required by the City in reviewing the application.
Notwithstanding the above, upon receipt of these materials, the City Planner or designee
shall review the application to determine whether all the information requested in Section
606 has been provided. The applicant shall be notified of any deficiencies within five
business days and given the opportunity to correct them. (#76)
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 4
603.2
TECHNICAL REVIEW (#57)
After it has been determined that the application and site plan conform to the
requirements for submission, the City Planner or designee shall conduct a technical
review of the materials to determine compliance with the provisions of this Land Use
Code. During this process, the City Planner or designee shall consult with the City
Engineer, Police Chief, Fire Chief, Water Department Superintendent, Treatment Plant
Superintendent, Code Enforcement Officer, and any other individuals or agencies, as
deemed necessary. (#4) (#6)
Within ten working days after the application has been deemed complete, the City
Planner or designee shall notify the applicant in writing of any technical deficiencies in
the application or site plan, and recommend modifications. The applicant may then
revise the plan addressing the staff recommendations or request Planning Board review
without amendment. The City Planner or designee shall submit written
recommendation(s) to the Planning Board and provide a copy of such to the applicant.
Site Plan Review Applications not acted upon by an applicant within six (6) months after
technical review of the materials has taken place and/or for which Planning Board review
and/or approval of said application has not occurred within said time period shall be
deemed void and submission of a new current complete application including plans and
accompanying written materials and application fees shall be required for technical
review as if a new application. (#76)
603.3
FILING OF APPLICATION AND SITE PLAN FOR PUBLIC HEARING (#2)
(#4) (#57)
The applicant shall submit fourteen (14) copies of the site plan submission to the
Planning Department at least fifteen days prior to a scheduled Planning Board meeting or
as indicated in the tech review letter. The City Planner or designee shall give one copy of
the application to the Code Enforcement Officer and to the City Engineer. The applicant
shall also submit two rolled plans of the site plan drawing for Planning Board signatures.
604
PUBLIC HEARING (#2) (#42)
Before taking final action thereon, the Planning Board shall hold a public hearing on the
application. Notice of said hearing shall be mailed to abutting landowners, including those
directly across the street, and published in a local newspaper at least seven (7) days in
advance of said hearing. The City Clerk shall mail said public hearing notices and send
notification to be published, both at the applicant's expense as set forth in the then current
City Council adopted fee schedule. Land owners shall be considered to be those against
whom property taxes are assessed. Failure of any abutting landowner to receive a notice of
public hearing shall not necessitate another hearing or invalidate any action of the Planning
Board. The purpose of the public hearing shall be to receive input from the general public
relative to the elements listed in Section 607. (#42)
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 5
604.1
PROCEDURE
An applicant may be represented by an attorney or other representative at such hearing.
Any scheduled public hearing shall not be continued, except for good cause, and when
such continuance is requested by the applicant, all advertising costs shall be borne by the
applicant. Failure of the applicant or the designated representative to appear at the public
hearing shall result in the proposal being tabled until the next regular scheduled meeting
with resultant advertising and notification costs borne by the applicant. Failure to appear
at the next meeting shall be deemed withdrawal of the application.
605
PLANNING BOARD REVIEW AND ACTION
Within thirty-five (35) days after the public hearing on an application, the Planning Board
shall approve, approve with conditions, or disapprove the site plan. This deadline may be
extended by mutual agreement of the Board and the applicant, either in writing or orally on
the record at a public meeting. The board shall limit its review to the criteria set forth in
Section 607. The board may consult with the applicant or any other party in making its
review. The board shall inform the applicant of its decision in writing, and in cases of
disapproval or approval with modifications, reasons for such action shall be stated within
thirty-five (35) days. A copy of the Board's decision shall be filed with the City Planner and
the Code Enforcement Officer. (#4)
605.1
EXPIRATION OF PLANNING BOARD APPROVAL (#2) (#61) (#69) (#76)
The ability and procedure of a major site plan to be approved and constructed in phases
shall be determined on a case-by-case basis by the Planning Board. If permitted, details
of such phasing including but not limited to building construction and site development,
stormwater management facilities and/or systems, utilities, water and wastewater,
driveways and landscaping/screening along with proposed timeframes for completion of
site improvements in each phase shall be outlined on the site plan, written exhibit and
written Planning Board Order. Previously approved major site plans may be eligible for
phasing if brought before the Planning Board for an amended site plan review within
eighteen months of approval.
Fill and Grade approval granted by the Planning Board shall expire one year from the
date in which the approval is granted. Site plan approval granted by the Planning Board
shall expire if the use, work, construction, alteration, or change involved is not started
and continued after substantial commencement (which includes obtaining a current valid
building permit issued by the Code Enforcement Officer) within one year of the date on
which site plan approval was granted or said work or activity is not substantially
completed or said use is not activated within two years of the date on which said approval
is granted. For purposes of this section, commencement is defined as the earliest date on
which a material operation such as construction, demolition, foundation work, road
construction, or site alteration activity that constitutes a substantial step towards the
completion of the approved development takes place. Substantially complete indicates a
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 6
project is sufficiently completed according to the terms of the construction plans,
Planning Board approved site plan, and site plan conditions of approval. For instance,
the owner could begin using or occupying the project for its intended purpose, as the
project meets necessary requirements for use, but may not have met every site plan detail.
Expiration of the applicable dates prior to commencement or substantial completion shall
void the site plan approval unless the Code Enforcement Officer has granted an extension
for a period not to exceed ninety days. The Code Enforcement Officer shall grant a 90-
day extension if they find that the applicant has diligently pursued their obligations under
the site plan approval and that an extension is justified by adverse weather, delay in
material delivery due to no fault of the applicant or by other valid reason and the
extension request is submitted in writing prior to the above outlined expiration date. If
additional extensions are required, the Planning Board may grant up to two (2) one-year
extensions of the site plan Planning Board approval prior to the site plan approval
expiration deadline based on a written finding of reasonable cause. Applicants that have
not commenced work or substantially completed work after two (2) extensions as
outlined in this section shall have the site plan approval deemed null and void and further
action by the applicant on site projects shall require the applicant to restart the site plan
review application process as a new site plan application.
Requests for the Planning Board to grant an extension shall be submitted four (4) weeks
prior to the expiration of the site plan approval date and shall include a letter stating the
current owner and/or applicant name, address, site location, and include the following:
a.) status of the project;
b.) reason for the extension request;
c.) proposed extension date;
d.) current and valid evidence that the applicant has obtained any and all Federal and
State agency permits, notices, licenses, and authorizations and that activities are
authorized by said agencies;
e.) whether the approved use meets Section 607 Standards Governing Site Plan Review
in this Land Use Code and the conditions of the site plan approval;
f.) whether the extension request will involve any material changes to the site plan, site
plan area, site use, or otherwise, including but not limited to: square footage of
structure(s), alteration to location of access drives and vehicular circulation, reduction in
parking spaces, changes to: contour elevations, traffic flow or volume, drainage, water
demand/availability, sewer capacity, and/or landscape elements.
The non-refundable fee as set forth in the then current City Council adopted fee schedule,
payable to the City of Brewer and three (3) copies of the above information and the check
shall be submitted to the Planning Department four weeks prior to the Planning Board
meeting.
In the event that any Fill and Grade or Site Plan Planning Board approved use(s)
conducted in a structure or otherwise, ceases, for whatever reason, for a period of one (1)
year or more such use(s) shall become null and void and shall not be resumed without
first having obtained Planning Board approval.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 7
606
REQUIRED INFORMATION (#2) (#61) (#69)
Application for the establishment of uses and/or site improvements requiring site plan review
shall be accompanied by 24" x 36" plans (one inch equals twenty feet is preferred) drawn to
scale, and accompanying written materials bound either in a punch and bind or 3-ring binder.
Site plans shall be based on field measurements and current on-site data prepared, signed,
and stamped by a State of Maine licensed professional land surveyor, engineer, or landscape
architect. For purposes of site plan review, the "site" consists of the entire parcel of land and
not just the portion developed. The required submission containing at a minimum the
following information:
606.1
INFORMATION FOR ALL SUBMISSIONS (#2) (#4)
1. A brief narrative describing the overall goals and objectives of the project, the nature
of the operations of the site use, along with the expected schedule of operation and
number of employees. Also included shall be the reason for the applicant's
determination of the project as either a major or minor site plan. (#69)
2. Applicant. An application will be considered only when an applicant has
demonstrated sufficient title, right or interest in all of the property which is proposed
for development or use. If the applicant is a business or corporation, a current
Certificate of Good Standing from the State of Maine shall be supplied. If the
applicant is incorporated, a copy of the Articles of Incorporation shall be supplied.
An applicant shall demonstrate in writing sufficient title, right or interest as follows:
A. When an applicant claims ownership of the property, copies of the deeds to the
property shall be supplied.
B. When the applicant has an option to buy the property, a copy of the option
agreement shall be supplied. Option agreements shall contain terms deemed
sufficient by the Board to establish future title. Copies of the current deeds to the
property shall also be supplied.
C. When the applicant has a lease on the property, copy of the lease shall be
supplied. The lease shall be of sufficient duration, as determined by the Board, to
permit construction and reasonable use of the development. Copies of the current
deeds to the property shall also be supplied.
D. When the applicant has eminent domain power over the property, evidence shall
be supplied of the ability and intent to use the eminent domain power to acquire
sufficient title, right or interest as determined by the Board. Copies of the current
deeds to the property shall also be supplied.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 8
E. When the applicant has a bond for a deed on the property, a copy of the bond for a
deed shall be supplied. Copies of the current deeds to the property shall also be
supplied.
F. When the applicant has a purchase and sales agreement to purchase the property,
the applicant shall provide a copy of the purchase and sales agreement. Copies of
the current deeds to the property shall also be supplied.
3. Graphic scale with appropriate labels
4. A location map showing the relation of the proposed development to the surrounding
area.
5. Current boundary survey showing boundaries of the tract of land, improvements,
easements, and rights of ways therein, bearing the surveyor's seal, indicating north
arrows, corners of parcel, date of survey and total acreage, prepared in accordance
with the Board of Licensure for Professional Land Surveyors.
6. Location, height in stories, ground floor area and first floor elevation of existing and
proposed buildings and other structures, including use and proposed use thereof. The
number of floors, square footage for each floor, and use for each floor included on
site plan and in narratives. (#57)
7. Location, ground floor area and height in stories of buildings within 100 feet of the
proposed project.
8. Location, names and traveled way widths of existing public streets.
9. Location of proposed drives and drives serving the site to the lot from public streets,
depicting, curb radii, centerline radii, grade (s) width, and sight distances. Locations
of adjacent entrances as measured from the closest adjacent edge of each driveway
excluding radii, whether these be located on the subject lot, or adjacent lots shall be
depicted on the plan. Distances from intersections shall also be labeled. (#76)
10. Location and arrangement of proposed off-street parking loading areas and their
appurtenant drives and maneuvering areas, including ADA requirements for parking
and visitor parking as needed. Calculations determining the minimum required
amount of parking spaces shall be included. The distance from the parking spaces to
the nearest property line shall be labeled. (#57) (#69)
11. Specifications for landscaping/screening including species, spacing and height at time
of planting of trees or shrubs are used; where earthen berms are used, slope, base
dimensions and vegetation cover used; where fencing is employed, height, type and
material of fencing. (#57)
12. Location of existing and proposed pedestrian walkways.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 9
13. Location, size, material, and elevations of existing and proposed utilities and
easements therefore, including sanitary sewerage, water, (including existing and/or
proposed hydrants), telephone and electricity.
14. If the site is not to be served by a public sewer line, plan shall show the location of
test pits, and the proposed location of the sub-surface disposal system, including
reserve leach field locations. An on-site soils investigation report by a licensed site
evaluator shall be provided. The report shall contain the types of soil, location of test
pits, and proposed locations and design of the best practical subsurface disposal
system for the site, including reserve leach field locations.
15. Location of existing natural drainage ways, critical areas and proposed storm drainage
facilities, including size, material and elevations culverts, pipes, etc. Where channels
are used, the depth, slope, grade and type of channel covering of lining shall be
shown. Where subsurface drainage is employed, the layout of the system and the
disposition of the flow shall be shown.
16. Lighting intensity, type, size and direction of all outdoor lighting.
17. Location and proposed use of areas proposed for outdoor recreation.
18. Location and type of existing and proposed landscaping, fences, hedges and trees
fourteen inches in diameter and over, measured at a point 4.5 feet above ground level.
Existing trees and landscaping to remain and be preserved shall be labeled. Existing
specimen trees fourteen inches in diameter and over and unique stands of trees shall
be shown and labeled. (#69)
19. All existing and proposed contours of the entire site with spot elevations at critical
areas. No more than two foot contour intervals shall be used, unless the City
Engineer determines that large contour intervals are adequate to evaluate the effect on
adjacent property and site conditions. All plans showing contour lines and/or
elevations shall include a note stating the basis of elevation and who/how the
contours were determined. On plans with proposed improvements, a temporary
benchmark shall be included. (#57)
20. Locations and size of signs and all permanent outdoor fixtures, existing or proposed.
21. All existing and proposed setback dimensions. Distances from proposed buildings to
nearest property line shall be shown and labeled on the site plan. (#57) (#69)
22. The type, size and location of all incineration devices and dumpsters.
23. The type, size and location of all machinery likely to generate noise at the lot lines.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 10
24. The quantity and type of any raw, finished or waste materials to be stored outside of
roofed buildings, including their physical and chemical properties, as appropriate.
25. The location of all wetlands over 4,000 sq. ft. cumulatively on the site, prepared by a
State Certified Soil Scientist or Geologist registered in the State of Maine or other
qualified professional showing expertise in wetland delineation, and based on a
current on-site investigation. Said submission shall include a narrative describing
method of delineation and location and description of such wetland features including
functions and values. All plans showing wetlands and/or vernal pools shall include a
note stating who, how, and when the delineation and locations were determined.
(#69) (#76)
26. An appropriate place on the site plan for the signatures of the Planning Board.
27. The location of stone walls, graveyards, fences, stands of trees, and other important or
unique natural areas and site features, including but not limited to, floodplains, deer
wintering areas, significant wildlife habitats, fisheries, scenic areas, habitat for rare
and endangered plants and animals, unique natural communities and natural areas,
sand and gravel aquifers, and historic and/or archaeological resources, together with a
description of such features.
28. The location of the project site drawn to scale on the Federal Emergency
Management Agency Flood Insurance Rate Map for the City of Brewer, Maine.
29. Supporting design calculations for (a) sanitary sewage and (b) water demand.
30. Supporting calculations indicating the average daily volume of traffic to be generated
by the project along with the expected peak hour volume as determined from the ITE
manual "Trip Generation".
31. Stormwater drainage provisions showing existing and proposed methods of handling
stormwater runoff and directional arrows showing the flow.
32. An erosion and sedimentation control plan detailing the methods of controlling
erosion and sedimentation during and after construction.
33. For projects proposing to disturb 1 (one) acre or more, a stormwater management
plan will be required to meet the requirements of Chapter 31, Article 6-C of the City
of Brewer's Charter, Codes and Ordinances. This section refers to post construction
stormwater monitoring and maintenance requirements for all persons discharging into
the City storm sewer system. (#44)
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 11
34. For projects involving residential uses, the applicant shall include information on the
number of potential students added to the school system estimated by using the most
recent available published regional numbers. The applicant shall also include a written
statement from the Superintendent of Schools indicating any concerns with the additional
students and bus stop locations. (#69)
35. Written request for waivers of any item(s) specified.
606.2
ADDITIONAL INFORMATION REQUIRED FOR MAJOR
DEVELOPMENTS (#2)
1. A stormwater management plan, prepared by a Maine licensed professional engineer
with supporting storm drainage calculations based on a 25 year storm, unless
stipulated higher by the City Engineer, and a separate map of the drainage area(s)
using either the rational method TR-20 or the TR-55, "Urban Hydrology" method.
(#44)
2. A traffic impact analysis, prepared by a professional traffic engineer, demonstrating
the impact of the proposed project on the capacity, level of service and safety on
adjacent streets including supporting calculations indicating the average daily volume
of traffic to be generated by the project along with the expected peak hour volume as
determined from the ITE manual "Trip Generation".
3. A written statement from a professional engineer or licensed architect stating the
adequacy of the water supply for both domestic and fire protection.
4. A groundwater impact analysis prepared by a groundwater hydrologist for projects
involving common on-site water supply or sewage disposal facilities with a capacity
of 2,000 gallons or more per day.
5. The location, width, typical cross-section, grades and profiles of all proposed streets
and sidewalks.
6. An assessment of the impact of the development on wetlands, streams, ponds, flood
plains, archaeological resources and significant wildlife habitats, including review
letters from appropriate State Officials.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 12
606.3
OTHER INFORMATION
1. When a development has a use with specific Performance Standards included in
Article 4 of this Land Use Code, the application shall include sufficient information
to show said Performance Standards are met. Such uses include, but are not limited
to, narcotic treatment facilities, marijuana uses, and solar energy systems. (#57)
2. In cases where construction or operation of the proposed project may adversely affect
such things as light, noise, public safety or cause electromagnetic effects, the
applicant may be required to provide expert outside testimony at the applicant's
expense.
3. Such additional information as requested in writing by the City Planner to insure
compliance with the terms of this Land Use Code.
607
STANDARDS GOVERNING SITE PLAN REVIEW
The following standards are to be used by the Planning Board in evaluating Site Plan Review
applications and shall serve as minimum requirements for approval of the site plan. Upon
consideration of these factors and standards, the Planning Board may attach such conditions,
in addition to those listed elsewhere in this ordinance, that it finds necessary to further the
purposes of this ordinance. Such conditions may include, but are not limited to,
specifications for: increased setbacks and yards; landscaping and planting screens; period of
operation; locations of parking and signs; or any other conditions necessary to fulfill the
purposes of this Land Use Code. Violation of any conditions so attached to an approved Site
Plan shall constitute a violation of this Land Use Code. In all instances, the burden of proof
shall be upon the applicant to produce evidence sufficient to warrant a finding that all
applicable criteria have been met. (#76)
607.1
COMPATIBILITY WITH LAND USES
The proposed development is compatible with land use of adjacent properties and other
property in the district.
1. The proposed development is a use which is allowed within that district.
2. Historic and Archaeological Sites - any proposed land use activity in the Shoreland
Zoning protection District or soil disturbance on or adjacent to sites listed on, or
eligible to be listed on the National Register of Historic Places, as determined by the
permitting authority shall be submitted by the application to the Maine Historic
preservation Commission for review and comment, at least twenty (20) days prior to
action being taken by the permitting authority. The permitting authority shall
consider comments received from the Commission prior to rendering a decision on
the application. The development shall include appropriate measures for protecting
these resources, including but not limited to, modification of the proposed design of
the site, timing of construction, limiting extent of excavation.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 13
3. The layout and arrangement of structures are visually and/or functionally related to
one another or adjoining properties in a reasonable manner.
4. The development must provide for the buffering of adjacent uses where there is a
transition from one type of use to another use and for the screening of mechanical
equipment and service and storage areas. The buffer may be provided by distance,
landscaping, fencing, changes in grade, and/or a combination of these or other
techniques.
607.2
COMPATIBILITY WITH LANDSCAPE
The plan for the development will reflect the natural capabilities of the site to support
development. Buildings, lots, and support facilities will be clustered in those portions of
the site that have the most suitable conditions for development. Environmentally
sensitive areas, including but not limited to, wetlands, steep slopes, floodplains,
significant wildlife habitats, fisheries, scenic areas, habitat for rare and endangered plants
and animals, unique natural communities and natural areas, and sand and gravel aquifers
will be maintained and preserved to the maximum extent. The development shall include
appropriate measures for protecting these resources, including but not limited to,
modification of the proposed design of the site, timing of construction, and limiting the
extent of excavation.
1. The proposed development does not use excessive cuts or fills
2. The development attempts to create focal points with respect to avenues of
approach, terrain features, or other buildings.
3. The development is consistent with the City's Open Space and Trail Plan, if any,
and preserves open space to the maximum extent possible.
607.3
EROSION (#44)
Adequate provisions must be made for minimizing erosion and controlling sedimentation.
1. For all projects, Performance Standards set forth in Article 4, Section 440 Erosion
Control of this Land Use Code shall be met. (#54)
2. Whenever State or Federal permits are required for a proposed site plan application,
whichever standard between City, State, or Federal standards is more strict shall govern.
607.4
STORM WATER (#44)
Adequate provision must be made for the collection and disposal of stormwater that runs
off proposed streets, parking areas, roofs, and other surfaces, through a stormwater
drainage system and maintenance plan, which must not have adverse impacts on abutting
or downstream properties.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 14
1. For all projects, Performance Standards set forth in Article 4, Section 439
Stormwater Management of this Land Use Code shall be met.
2. Unless the discharge is directly to the Penobscot River, stormwater runoff systems
must detain or retain water such that the rate of flow from the site after development
does not exceed the predevelopment rate.
3. The biological and chemical properties of the receiving waters must not be degraded
by the stormwater runoff from the development site. The use of oil and grease traps
in manholes, the use of on-site vegetated waterways, and vegetated buffer strips
along waterways and drainage swales, and the reduction in use of deicing salts and
fertilizers may be required.
4. Site designs shall include Low Impact Development (LID) techniques as feasible. The
use of dry ponds, rain gardens, and stormwater management chamber systems are
encouraged in lieu of traditional wet ponds. If space is limited, other stormwater
treatment systems, such as tree boxes, should be considered. LID techniques mimic
natural processes by promoting the use of relatively small scale treatment measures
to disconnect impervious surfaces and enhance filtration, treatment, and management
of stormwater runoff as close to its source as possible. These measures include, but
are not limited to bioretention filters, grass swales and channels, vegetated filter
strips, permeable pavements, and rain gardens. (#54)
5. Whenever State or Federal permits are required for a proposed site plan application,
whichever standard between City, State, or Federal standards is more strict shall
govern.
607.5
ACCESS AND PARKING (#4) (#57)
The location of points of access to public streets and the design and location of access
roads are such that traffic congestion and unsafe conditions on public streets are
minimized.
1. If the development is located in a commercial or industrial district, the entrances shall
comply with Section 906.4 of this ordinance.
2. Driveways and access roads intersect streets at an angle as close to 90 degrees as
possible for a minimum of 50 feet.
3. Curb cuts or access drives are located and designed to provide safe sight distances in
each direction as outlined in the table below:
Design Speed
25
30
35
40
45
Sight Distance
300'
380'
480'
580'
710'
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 15
Sight distances shall be measured at a distance of 15' back from the edge of the travel
lane and at a height of 3.5' above the proposed access road grade to an object 4.25
feet above the pavement.
4. Curb cuts are located so as to allow a minimum clearance as prescribed in 906.4 of
this Land Use Ordinance from unsignalized intersections of streets. The minimum
clearance distance at signalized intersections shall be 150 feet. Clearance distances
are to be measured from the point of tangency (pt.) for the corner to the pt. for the
access drive. (#69)
5. Left turning traffic will not block or impede turning traffic out of another driveway or
intersection.
6. Access ways must be designed and have sufficient capacity to avoid queuing of
entering vehicles on any public street.
7. Where a lot has frontage on two (2) or more streets, the primary access to and egress
from the lot should be provided from the street where there is less potential for traffic
congestion and for traffic and pedestrian hazards. Access from other streets may be
allowed if it is safe and does not promise shortcutting through the site.
8. Where it is necessary to safeguard against hazards to traffic and pedestrians and/or to
avoid traffic congestion, the applicant shall be responsible for providing turning
lanes, traffic directional islands, and traffic controls for public streets or other
remedies.
9. The following criteria must be used to limit the number of driveways serving a
proposed project:
a. No use which generates less than one hundred (100) vehicle trips per day shall
have more than (1) two-way driveway onto a single roadway. Such driveway
must be no greater than thirty (30) feet wide.
b. No use which generates one hundred (100) or more vehicle trips per day shall
have more than two (2) points of entry from and two (2) points of egress to a
single roadway unless otherwise approved by the Planning Board. The combined
width of all access ways must not exceed sixty (60) feet.
10. The site has adequate maneuvering areas, loading zones, and parking to meet the
minimum ordinance requirements and the project needs. Parking shall also meet
minimum ADA requirements.
607.6
ROAD SYSTEM IMPACT
The proposed development will not cause an unreasonable burden on existing road
systems.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 16
Levels of service "D" (see Article 14) as determined by capacity analysis shall be
considered the minimum necessary to provide safe, reasonable traffic movement.
Where such a level of service is determined to operate at a lower level of the project's
build-out year, a finding of safe, reasonable traffic movement shall be made given the
following:
1. Improvements will be made to raise the level of service to "D" or above;
OR
2. If the above is found not to be reasonable by the Board, improvements will be
made such that the proposed development will not increase delay at a signalized
intersection, decrease the reserve capacity at an unsignalized intersection, or
otherwise worsen the operational condition of the road or intersection in the
project build-out year.
607.7
LANDSCAPING AND PLANTING
Landscaping must be provided as part of site design. The landscape plan for the entire
site must use landscape materials to integrate the various elements on site, preserve and
enhance the particular identity of the site and create a pleasing site character. The
landscaping should define street edges, break up parking areas, soften the appearance of
the development, and protect abutting properties.
Landscaping may include plant materials such as trees, shrubs, groundcovers, perennials
and annuals, and other materials such as rocks, water, sculpture, art, walls, fences, paving
materials, and street furniture.
1. Areas with (4) four or more parking spaces are screened from view of abutting
properties. Front yard screening for Narcotic Treatment Facilities shall meet the
requirement of Section 424.2. (#11) (#55)
2. Parking areas larger than 12,000 square feet shall have interior landscaping
equivalent to seven percent of the total parking; except in the industrial zone
where the requirement is five per cent. Each separate interior landscaped area
contains a minimum of (50) fifty square feet and have a minimum dimension of
(5) five feet. Interior landscaped areas shall be planted with trees, shrubs, ground
cover or other acceptable landscaping material which shall not exceed three feet
in height where necessary for site distances. Such interior landscaping is located
as an aid to traffic and pedestrian safety and circulation and shall include raised
landscaped islands at the end of parking rows and raised parking row dividers
with landscaping for every other row of double parking. (#55)
3. Additional plantings of shrubs and trees beyond that specifically required
elsewhere in this Land Use Code are included to break up extensive building
facades, front, side or rear yards of more than (50) fifty feet in length; or open
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 17
space areas not used for active recreation of more than (500) five-hundred square
feet in area. (#55)
4. Landscaping materials are specified as number 1 grade as determined by the
American Association of Nurserymen. Landscape materials will be maintained
and dead plant material replaced within one year or by the next planting season,
whichever occurs first.
5. A Medical Marijuana Registered Dispensary, Medical Marijuana Cultivation
Facility, and/or Adult-Use Marijuana Establishment shall meet the requirements
of Article 4, Section 424.2.3.c. of this Ordinance. (#16) (#55)
NOTE: The Planning Board may waive the requirement for screening of more than (5)
five parking spaces in the General Business District, the Industrial District and the
Industrial-two District, upon written request provided that the proposed project does not
abut a Residential District. If the proposed project does abut Residential District
screening of parking from the Residential District is required. If screening is waived, tree
planting, at a rate of one tree per (50) fifty feet of parking perimeter, shall be substituted
for screening. (#55)
6. The minimum plant sizes, unless specifically indicated otherwise by the Planning
Board, shall meet the following minimum standards:
A. Shade trees: high crowned species with ascending or lateral branching habit
indigenous to the area, tolerant to existing soils and urbanized conditions,
caliper measured six inches up from the base 1 1/2 inches to two inches
B. Flowering and evergreen trees will be a minimum of (5) five to (6) six foot
size. (#55)
C. Shrubs, deciduous will be a minimum of (2) two to (3) three foot size. (#55)
D. Shrubs, evergreen will be a minimum of (36) thirty-six to (42) forty-two inch
size (for those specified by height); (18) eighteen to (24) twenty-four inches
for those specified by spread. (#55)
607.8
OUTDOOR LIGHTING
Outdoor lighting is designed so that it will not cause glare (either directly or indirectly)
on adjacent properties or on a public way so as to impair the vision of the driver of any
vehicle upon that public way.
1. If the proposed development is within, or abuts a residential area, the lighting is
designed so that it will not cause an illumination in excess of 0.5 foot-candles at the
property line abutting the residential area, as measured by a photoelectric photometer
having a spectral response similar to that of the human eye.
2. All exterior lighting, except security lighting, must be turned off between 11 P.M. and
6 A.M. unless located on the site of a commercial or industrial use which is open for
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 18
business during that period. Wiring to light poles and standards must be
underground.
607.9
OUTDOOR RECREATION
Outdoor recreation areas are located so as to minimize potential effect on adjacent
properties.
1. Screening is of such a nature to mitigate noise levels to Noise Performance standards
in Article 4 of this Land Use Code.
607.10
WASTEWATER
The proposed development does not impose an unreasonable burden on sanitary sewers
or the Wastewater Treatment Plant (WWTP).
1. The development will not over tax the existing downstream sanitary system or, where
necessary, improvements to the existing system are proposed so as to avoid
overtaxing the system.
2. The development will not cause the WWTP to operate beyond its licensed discharge
or any limitations or allowances placed thereon by State and Federal agencies. The
WWTP superintendent will be formally consulted for each site plan review involving
municipal wastewater treatment.
3. If the development is to be served by an on-site wastewater disposal system, the
system has been designed according to Maine Department of Human Services,
Division of Health Engineering rules and is of sufficient capacity to handle
wastewater from the number of people expected to use the system.
4. The requirements of Chapter 31, City of Brewer Sewer and Pretreatment Ordinance
of the City of Brewer Charter, Codes and Ordinances are met.
607.11
SUFFICIENT WATER (#4)
The proposed development will not impose an unreasonable burden on the municipal
water system and has sufficient water available to meet its needs for the foreseeable
future for both domestic water and fire protection.
1. The Water Department Superintendent and the Fire Chief will be formally consulted
for each site plan review involving municipal water service.
2. Hydrants shall also be placed such that one (or more if required by the Authority
Having Jurisdiction (AHJ)) shall be located within five hundred (500) feet of all
structures. The hydrants are to be standard hydrants as approved by the AHJ. Said
hydrants to supply seven hundred fifty (750) gpm or more each with a residual
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 19
pressure of 20 psi. Further, for selected developments, subject to the AHJ, more
hydrants and larger fire flows may be required for greater than normal hazards or
large structures. (#69)
3. A minimum storage capacity of 10,000 gallons shall be provided for a project not
served by a public water supply. Additional storage of 2,000 gallons per lot or
commercial development unit shall be provided. If multiple principal buildings are
present in the project, storage capacity shall be provided sufficient for initial flows to
automatic fire suppression systems required by the Brewer Building Code.
4. Hydrants or other provisions for drafting water shall be provided to the specifications
of the Fire Department. Minimum pipe size connecting dry hydrants to ponds or
storage vaults shall be eight inches.
5. Where the dry hydrant or other water source is not within the right-of-way of a
proposed or existing street, an easement to the municipality shall be provided to allow
access. A suitable access way to the hydrant or other water source shall be
constructed.
6. The Board shall require an opinion of adequacy of fire protection water supply from
the Fire Chief and the Brewer Water Department Superintendent.
607.12
SCHOOL SYSTEM
The proposed development will not cause an unreasonable burden on the school system.
1. The superintendent of schools will be formally consulted for each site plan review
involving residential developments. The number of students added to the school
system as a result of the development will be estimated using the most recent
available published regional multipliers.
607.13
DEVELOPMENTS IN FLOOD HAZARD AREAS - See Article 8, Floodplain
Management
607.14
IMPACT ON ABUTTING PROPERTIES
The use of the proposed project will not have a significant detrimental effect on the use
and peaceful enjoyment of abutting properties as a result of noise, vibrations, fumes,
odor, dust, glare, or other cause.
1. Operation of the project will be in compliance with the performance standards in
Article 4 of this Land Use Code.
2. The design of the proposed development takes into account the scenic character of the
surrounding area.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 20
3. A development which is not in keeping with the surrounding scenic character will be
located, designed and landscaped to minimize its visual impact to the fullest extent
possible.
4. The development must provide for buffering of adjacent uses where there is a
transition from one type of use to another use and for screening of mechanical
equipment and service and storage areas. Buffering must be designed to provide a
year-round visual screen in order to minimize adverse impacts. It may consist of
fencing, evergreens, berms, rocks, boulders, mounds or a combination thereof.
A. Development must provide sufficient buffering when topographical or other
barriers do not provide reasonable screening and where there is a need to:
1) Shield neighboring properties from any adverse external effects of the
development, or
2) Shield the development from the negative impacts of adjacent uses.
The width of the buffer may vary depending on the treatment of the area.
Within densely built-up areas, a buffer with dense plantings, fencing or
changes in grade may be as little as five (5) feet in width. A buffer with
moderate levels of plantings should be ten (10) feet to fifteen (15) feet in
width. In suburban and rural settings, the width of the vegetated buffer shall
be increased to a minimum of twenty-five (25) feet. Areas adjacent to service,
loading or storage areas should be screened by dense planting, berms, fencing,
or a combination thereof with a width of a minimum of five (5) feet.
608
SCREENING MAINTENANCE REQUIREMENTS
As a condition of any site plan review approval, the applicant shall furnish the City of
Brewer an irrevocable letter of credit, performance bond, cash, or other form of security
approved by the Code Enforcement Office, equal to at least 15% of all planting required for
screening, buffering, and/or internal parking area. The dollar amount shall be proposed by
the applicant and found acceptable by the Code Enforcement Office. The bond shall be
binding for a minimum of two years commencing on the final approval of the Code
Enforcement Office and the issuance of the permanent Certificate of Occupancy, and shall be
subject to the condition that such plantings be maintained in accordance with the terms of the
site plan approval and in a good and healthy condition.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 21
609 CERTIFICATE OF OCCUPANCY (#82)
No Certificate of Occupancy shall be issued by the Code Enforcement Officer unless all
improvements shown on the approved site plan, including but not limited to screening,
planting, landscaping, paving, parking lot striping and signage and stormwater improvements
and/or stormwater agreements are completed. For projects that include a phasing plan, the
site improvements shown on the approved site plan for each phase must be completed prior
to issuance of a Certificate of Occupancy for any units/structures in that phase. If changes
occur during construction, the applicant may need to be amend their site plan approval prior
to any issuance of a Certificate of Occupancy. If the Planning Board requires a Certificate of
Compliance stamped by a registered professional engineer or a registered land surveyor be
provided by the applicant at the applicant's expense as a condition of site plan approval, if the
Code Enforcement Officer shall not issue the Certificate of Occupancy until said Certificate
of Compliance is submitted to the Code Enforcement Officer.
Prior to issuance of a Certificate of Occupancy, the City Planner shall provide to the Code
Enforcement Officer written verification that the landscaping and/or plantings have been
completed to the specifications of the site plan approval by the Planning Board.
If the Planning Board requires the applicant to submit an "as built" site plan, the Code
Enforcement Officer shall not issue the Certificate of Occupancy until the "as built" site plan
is received.
The applicant may request, or the Code Enforcement Office may require, a performance
bond or other financial assurance where completion of a project is precluded by winter
conditions or other factors as per Article 2 of this Land Use Code. (#76)
610 SITE PLAN AMENDMENTS (#57)
Minor revisions to an approved site plan may be permitted by the City Planner, subject to the
following conditions:
610.1
A narrative and revised 24"x36" plan(s) based on field measurements and current
on-site data prepared, signed, and stamped by a State of Maine licensed
professional land surveyor, engineer, or landscape architect showing the revision
is submitted (in four copies) to the Planning Department along with the non-
refundable fee as set forth in the then current City Council adopted fee schedule,
payable to the City of Brewer. (#61) (#76)
610.2
The City Engineer and Code Enforcement Officer agree that the proposed change
is a "minor revision" and that the proposed change does not violate this Land Use
Code or materially change a plan approved by the Planning Board.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 6
6 - 22
610.3
If the City Engineer and Code Enforcement Officer request it, the proposed plan
revision will be placed on the agenda of the next Planning Board Meeting for the
Board's review.
610.4
Minor revisions to the Site Plan may be approved by the City Planner, provided
that such "minor revision" will not materially alter the layout or scale of the
development nor its impact on its surroundings, nor will it specifically:
1. Expand the size of a project by increasing the number of lots or dwelling
units; or by increasing the gross floor area of a primary use structure; or by
adding a primary use structure or an accessory use structure containing more
than two hundred (200) square feet of gross floor area to the site;
2. Violate the provisions of any City Code or Ordinance;
3. Delete landscaping, screening or buffer yard elements;
4. Change the number of vehicular access points to the public street system or
significantly alter the location of such access drives; and
5. Reduce the number of parking spaces below the number required by this
ordinance or significantly alter on-site vehicular circulation.
610.5
Major revisions to an approved site plan require review and approval as if a new
project.