This is the exact embedded text of the captured official document.
Snapshot c785f498ed71 · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 1
ARTICLE 7 - SUBDIVISION REVIEW (#20)
701
PURPOSES
The purposes of these regulations are:
701.1
To provide for an expeditious and efficient process for the review of proposed
subdivisions;
701.2
To clarify the approval criteria of the state Subdivision Law, found in Title 30-A
M.R.S.A., Section 4404;
701.3
To assure new development in the City of Brewer meets the goals and conforms to
the policies of the Brewer Comprehensive Plan;
701.4
To assure the comfort, convenience, safety, health and welfare of the people of the
City of Brewer;
701.5
To protect the environment and conserve the natural and cultural resources identified
in the Brewer Comprehensive Plan as important to the community;
701.6
To assure that a minimal level of services and facilities are available to the residents
of new subdivisions and that lots in subdivisions are capable of supporting the
proposed uses and structures;
701.7
To minimize the potential impacts from new subdivisions on neighboring properties
and on the municipality; and
701.8
To promote the development of an economically sound and stable community.
701.9
The subdivision provisions set forth in this Article are intended to protect the public
health and safety, promote the general welfare of the community, and conserve the
environment by assuring that nonresidential and multifamily construction is designed
and developed in a manner which assures that adequate provisions are made for
traffic safety and access; emergency access; water supply; sewage disposal;
management of storm water, erosion, and sedimentation; protection of groundwater;
protection of the environment, wildlife habitat, fisheries, and unique natural areas;
protection of historic and archaeological resources; minimizing the adverse impacts
on adjacent properties; and fitting the project harmoniously into the fabric of the
community.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 2
702
AUTHORITY AND ADMINISTRATION
702.1
AUTHORITY
1. These standards have been prepared in accordance with the provisions of Title 30-A
M.R.S.A., Section 4403.
2. These standards shall be known and may be cited as "Subdivision Ordinance of the
City of Brewer, Maine."
702.2
ADMINISTRATION
1. The Planning Board of the City of Brewer, hereinafter called the Board, shall
administer these regulations.
2. The provisions of these regulations shall pertain to all land and buildings proposed for
subdivision within the boundaries of the City of Brewer.
3. Notwithstanding the provisions of this Article, leased dwelling units are not subject to
subdivision review if the Municipal Reviewing Authority has determined that the
units are otherwise subject to municipal review at least as stringent as that required
under Article 6 of this Land Use Code.
702.3
AMENDMENTS
This Article may be amended in accordance with Article 1 of this Land Use Code.
703
ADMINISTRATIVE PROCEDURE
In order to establish an orderly, equitable and expeditious procedure for reviewing
subdivisions and to avoid unnecessary delays in processing applications for subdivision
review, the Board shall prepare a written agenda for each regularly scheduled meeting. The
agenda shall be prepared no less than one week in advance of the meeting, distributed to the
Board members and any applicants appearing on the agenda, and posted at the municipal
offices. Applicants shall request to be placed on the Board's agenda by contacting the City
Planner. Applicants who attend a meeting but who are not on the Board's agenda may be
heard only after all agenda items have been completed, and then only if a majority of the
Board so votes. However, the Board shall take no action on any application not appearing on
the Board's written agenda.
704
PREAPPLICATIONPROCEDURES AND SKETCH PLAN AND REVIEW
704.1
PURPOSE
The purpose of the pre-application meeting and on-site inspection is for the applicant to
present general information regarding the proposed subdivision to the Board and receive
the Board's comments prior to the expenditure of substantial sums of money on
surveying, soils identification, and engineering by the applicant.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 3
704.2
PROCEDURE
1. The applicant shall present the Pre-application Sketch Plan and make a verbal
presentation regarding the site and the proposed subdivision.
2. Following the applicant's presentation, the Board may ask questions and make
suggestions to be incorporated by the applicant into the application.
3. The date of the on-site inspection is selected.
704.3
SUBMISSION
The Pre-application Sketch Plan shall show in simple sketch form the proposed layout of
streets, lots, buildings and other features in relation to existing conditions. The Sketch
Plan, which does not have to be engineered and may be a free-hand penciled sketch,
should be supplemented with general information to describe or outline the existing
conditions of the site and the proposed development. It will be most helpful to both the
applicant and the Board for site conditions such as steep slopes, wet areas and vegetative
cover to be identified in a general manner. The Sketch Plan shall be accompanied by:
1. A copy of a City of Brewer five foot (5') contour topographic map or similar map
with 5 foot contours, showing the outline of the proposed subdivision.
2. A copy of the Brewer assessor's map(s) on which the land is located.
704.4
CONTOUR INTERVAL AND ON-SITE INSPECTION
Within thirty days of the pre-application meeting, the Board shall hold an on-site
inspection of the property and inform the applicant in writing of the required contour
interval on the Preliminary Plan, or Final Plan in the case of a Minor Subdivision. The
applicant shall place "flagging" at the centerline of any proposed streets, and at the
approximate intersections of the street centerlines and lot corners, prior to the on-site
inspection. The Board shall not conduct on-site inspections when there is more than one
foot of snow on the ground.
704.5
RIGHTS NOT VESTED
The pre-application meeting, the submittal or review of the sketch plan or the on-site
inspection shall not be considered the initiation of the review process for the purposes of
bringing the plan under the protection of Title 1 M.R.S.A., Section 402.
704.6
ESTABLISHMENT OF FILE
Following the pre-application meeting the Board shall establish a file for the proposed
subdivision. All correspondence and submissions regarding the pre-application meeting
and application shall be maintained in the file.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 4
705
MINOR SUBDIVISION REVIEW PROCESS
705.1
GENERAL
The Board may require, where it deems necessary to make a determination regarding the
criteria for approval from Title 30-A M.R.S.A., Section 4404, or the Performance
Standards from Section 710 of this Article, that a Minor Subdivision comply with some
or all of the submission requirements for a Major Subdivision.
705.2
PROCEDURE (#37) (#42) (#57)
1. REQUEST FOR FINAL PLAN REVIEW. Within six months after the on-site inspection
by the Board, the applicant shall submit an application for approval of a final plan at least
four weeks prior to a scheduled meeting of the Board. Applications shall be submitted by
mail to the Board in care of the City Planner or delivered by hand to the City Planner.
Failure to submit the application within six months shall require resubmission of the
Sketch Plan to the Board. The final plan shall approximate the layout shown on the
Sketch Plan, plus any recommendations made by the Board.
2. APPLICATION FEE AND TECHNICAL REVIEW/ESCROW ACCOUNT. All
applications for final plan approval for a Minor Subdivision shall be accompanied by a
non-refundable application fee as set forth in the then current City Council adopted fee
schedule, payable to the City of Brewer. In addition, an applicant applying for minor
subdivision approval shall pay a separate technical review and escrow account fee of
$200.00 per lot or dwelling upon submitting the application. Said funds shall be held in
escrow and used to cover the cost of legal notices, recording plans and documents in the
Registry of Deeds, and for any of the following support services which the City of
Brewer reasonably incurs in the review, approval or disapproval of the application:
A.
attorney, including the City Solicitor
B.
engineer
C.
architect
D.
surveyor
E.
any other expert the Planning Board, City Council, City Planner and/or Code
Enforcement Officer feels is necessary to adequately evaluate the proposed
subdivision plan. All technical review consultants shall be chosen by the City and
not the applicant.
If the balance in this account is drawn down by 50% or more, the Board or City
Planner shall notify the applicant, and require that an additional $150.00 per lot or
dwelling unit be deposited by the applicant within ten days in order for the
application to proceed. The Board or City Planner shall continue to notify the
applicant and require an additional $150.00 per lot or dwelling unit be deposited
as necessary whenever the balance of the account is drawn down 50% of the
original deposit. Any monies not expended shall be returned to the applicant or
his designee, without interest, by the City.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 5
No application shall be deemed complete until the required money has been
posted with the City. No application shall be acted upon by the board and/or City
Council until sufficient funds have been posted to cover the total cost of the
support services required by the City in reviewing the application.
3. STAFF REVIEW. The City Planner shall review the submission packet and place on the
agenda of the technical review committee as needed. If the City Planner determines that
the submission packet is not complete, notification of the missing information will be
forwarded to the applicant. The City Planner shall not place an applicant on the Planning
Board agenda until determining that the applicant has presented the submission packet
required for Minor Subdivisions by this Ordinance.
If the City Planner determines that the submission packet is complete, the
applicant shall be notified and placed on the agenda of the next regularly
scheduled Panning Board meeting.
4. APPLICANT ATTENDANCE. The applicant, or his duly authorized representative, shall
attend the meeting of the Board to present the final plan. Failure to attend the meeting to
present the final plan shall result in a delay of the Board's receipt of the plan until the
next meeting which the applicant attends.
5. PLANNING BOARD REVIEW. Within thirty days of the receipt of the final plan
application, the Board shall determine whether the application is complete and notify the
applicant in writing of its determination. If the application is not complete, the Board
shall notify the applicant of the specific additional material needed to complete the
application. A failure to submit a complete final plan application within the time frame
specified in Section 705.2.1 shall require the application be re-reviewed as provided in
Section 704, Sketch Plan.
Upon a determination that a complete application has been submitted for review, the
Board shall notify the applicant in writing of that determination. The determination of a
complete application does not constitute the Planning Board's approval of the
information submitted. The Planning Board reserves the right to request additional
information throughout the review process up to and until Final Plan approval. Full
evaluation of the final plan shall begin only after the Planning Board has determined that
a complete application has been submitted. The Board shall hold a public hearing on the
final plan application.
6. FINAL PLAN PUBLIC HEARING. The Board shall hold the hearing within thirty days
of determining that it has received a complete application, and shall publish a notice of
the date, time and place of the hearing in a newspaper of general circulation in the
municipality at least two times, the date of the first publication to be at least seven days
prior to the hearing. In addition, the notice of the hearing shall be posted at City Hall or
at such places as State statute requires at least seven days prior to the hearing. A copy of
the notice shall be mailed to the abutting landowners, including those directly across the
street. The City Clerk shall mail said public hearing notices and send notification to be
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 6
published, both at the applicant's expense as set forth in the then current City Council
adopted fee schedule. Land owners shall be considered to be those against whom
property taxes are assessed. Failure of any abutting landowner to receive a notice of
public hearing shall not necessitate another hearing or invalidate any action of the
Planning Board.(#42)
7. PLANNING BOARD DECISION. Within thirty days from the public hearing or within
sixty days of determining a complete application has been received, or within another
time limit as may be otherwise mutually agreed to by the Board and the applicant, the
Board shall make findings of fact, and conclusions relative to the criteria contained in
Title 30-A M.R.S.A., Section 4404 and the standards of Section 710. If the Board finds
that all the criteria of the Statute and the standards of Section 710 have been met, they
shall approve the final plan. If the Board finds that any of the criteria of the statute or the
standards of Section 710 have not been met, the Board shall either deny the application or
approve the application with conditions to ensure all of the criteria and standards will be
met by the subdivision. The Board shall issue a written notice of its decision to the
applicant, including its findings, conclusions and any reasons for denial or conditions of
approval.
8. PERFORMANCE GUARANTEE. Within sixty (60) days of Planning Board approval,
the final plan shall be submitted to the City Council for its approval on any contracts or
bonds. Submission to the City Council shall include Planning Board and city staff
recommendations.
9. SIGNATURES. Upon approving the Final Plan, those members of the Planning Board
voting for approval shall sign two (2) paper copies of the approved subdivision plan.
10. DIGITAL PLAN. The applicant shall supply the City Planner with a digital copy of the
approved subdivision plan in order to facilitate the addition of the subdivision into the
municipal property records. The digital file shall be supplied prior to recording the
subdivision plan in the Registry of Deeds and in a format compatible with the assessor's
records.
11. FILING OF APPROVED FINAL PLAN. After the City Council has approved any
contracts and bonds and they have been filed with the City Clerk, the City shall record
the subdivision plans and documents in the Registry of Deeds at the expense of the
applicant using the escrowed technical review/recording fee funds as provided by the
Article. Any subdivision not recorded in the Registry of Deeds within ninety (90) days of
the date which the plan is approved and signed by the Planning Board or ninety (90) days
after City Council approval on any contracts or bonds, whichever is later, shall become
null and void.
The City Planner, or designee, shall scan said signed plan and make available to the City
Assessor and Code Enforcement Office.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 7
12. The approval by the Board of a subdivision plan shall not be deemed to constitute or be
evidence of any acceptance by the municipality of any street, easement, or other open
space shown on such plan. When a park, playground, or other recreation area shall have
been shown on the plan to be dedicated to the municipality, approval of the plan shall not
constitute an acceptance by the municipality of such areas. The Board shall require the
plan to contain appropriate notes to this effect. The Board may also require the filing of a
written agreement between the applicant and the municipal officers covering future deed
and title dedication, and provision for the cost of grading, development, equipment, and
maintenance of any such dedicated area.
705.3
SUBMISSIONS (#57)
The final plan application shall consist of the following items.
1. APPLICATION FORM AND EXHIBITS. The application form and attachments for
minor subdivisions shall be submitted as specified in Section 707.
2. FINAL PLAN. The subdivision plan for a Minor Subdivision shall contain
information as specified in Section 707 and consist of two rolled paper site plan
sheets and fifteen copies of one or more maps or drawings drawn to a scale of not
more than one hundred feet to the inch. The plans shall be signed and embossed with
the seal of the individual responsible for preparation of the plan. Plans for
subdivisions containing more than one hundred acres may be drawn at a scale of not
more than two hundred feet to the inch provided all necessary detail can easily be
read. Plans shall be no larger than 24 by 36 inches in size, and shall have a margin of
two inches outside of the border lines on the left side for binding and a one inch
margin outside the border along the remaining sides. Space shall be provided for
endorsement by the Board. In addition, one copy of the Plan(s) reduced to a size of 8
1/2 by 11 inches or 11 by 17 inches shall be submitted.
3. APPLICATION FEES AND ESCROW ACCOUNT. The application fees and escrow
account monies shall be submitted as specified in Section 705.2.2.
706
MAJOR SUBDIVISION REVIEW PROCEDURES
706.1
PROCEDURE (#37)
1. REQUEST FOR PRELIMINARY PLAN REVIEW. Within six months after the on-site
inspection by the Board, the applicant shall submit an application for approval of a
preliminary plan at least four weeks prior to a scheduled meeting of the Board.
Applications shall be submitted by mail to the City Planner or delivered by hand to the
City Planner. Failure to submit an application within six months shall require
resubmission of the Sketch Plan to the Board. The preliminary plan shall approximate
the layout shown on the Sketch Plan, plus any recommendations made by the Board.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 8
2. APPLICATION FEE AND TECHNICAL REVIEW/ESCROW ACCOUNT. All
applications for preliminary plan approval for a Major Subdivision shall be accompanied
by an application fee as set forth in the then current City Council adopted fee schedule,
payable to the City of Brewer. In addition, an applicant applying for major subdivision
approval shall pay a separate technical review and escrow account fee of $200.00 per lot
or dwelling upon submitting the application. Said funds shall be held in escrow and used
to cover the cost of legal notices, recording plan and documents in the Registry of Deeds,
and for any of the following support services which the City of Brewer reasonably incurs
in the review, approval or disapproval of the application:
A. attorney, including the City Solicitor
B. engineer
C. architect
D. surveyor
E. any other expert the Planning Board, City Council, City Planner and/or Code
Enforcement Officer feels is necessary to adequately evaluate the proposed
subdivision plan application submission. All technical review consultants shall be
chosen by the City and not the applicant.
If the balance in this account is drawn down by 50% or more, the Board or City Planner
shall notify the applicant, and require that an additional $150.00 per lot or dwelling unit
be deposited by the applicant within ten days in order for the application to proceed. The
Board or City Planner shall continue to notify the applicant and require an additional
$150.00 per lot or dwelling unit be deposited as necessary whenever the balance of the
account is drawn down by 50% of the original deposit. Any monies not expended shall
be returned to the applicant or his designee, without interest, by the City.
No application shall be deemed complete until the required money has been posted with
the City. No application shall be acted upon by the board and/or City Council until
sufficient funds have been posted to cover the total cost of the support services required
by the City in reviewing the application.
3. STAFF REVIEW. The City Planner shall review the submission packet and place on the
agenda of the technical review committee as needed. If the City Planner determines that
the submission packet is not complete, notification of the missing information will be
forwarded to the applicant. The City Planner shall not place an applicant on the Planning
Board agenda until determining that the applicant has presented the submission packet
required for Preliminary Plan for Major Subdivisions by this Ordinance.
If the City Planner determines that the submission packet is complete, the applicant shall
be notified and placed on the agenda of the next regularly scheduled Panning Board
meeting.
4. APPLICANT ATTENDANCE. The applicant, or his duly authorized representative, shall
attend the meeting of the Board to present the preliminary plan application. Failure to
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 9
attend the meeting to present the preliminary plan application shall result in a delay of the
Board's receipt of the plan until the next meeting that the applicant attends.
5. PLANNING BOARD REVIEW. Within thirty days of the receipt of the preliminary plan
application, the Board shall determine whether the application is complete and notify the
applicant in writing of its determination. If the application is not complete, the Board
shall notify the applicant of the specific additional material needed to complete the
application. A failure to submit a complete preliminary plan application within the
timeframe specified in Section 706.1.1 shall require the application be re-reviewed as
provided in Section 704, Sketch Plan.
Upon determination that a complete application has been submitted for review, the Board
shall notify the applicant in writing of its determination. The determination of a complete
application does not constitute the Planning Board's approval of the information
submitted. The Planning Board reserves the right to request additional information
throughout the review process up to and until Final Plan approval. Full evaluation of the
final plan shall begin only after the Planning Board has determined that a complete
application has been submitted. The Board shall hold a public hearing on the preliminary
plan application.
6. PRELIMINARY PLAN PUBLIC HEARING. The Board shall hold the hearing within
thirty days of determining that it has received a complete application, and shall publish a
notice of the date, time and place of the hearing in a newspaper of general circulation in
the municipality at least two times, the date of the first publication to be at least seven
days prior to the hearing. In addition, the notice of the hearing shall be posted at City Hall
or at such places as State statute requires at least seven days prior to the hearing. A copy
of the notice shall be mailed to abutting landowners, including those directly across the
street. The City Clerk shall mail said public hearing notices and send notifications to be
published, both at the applicant's expense as set forth in the then current City Council
adopted fee schedule. Landowners shall be considered to be those against whom property
taxes are assessed. Failure of any abutting landowner to receive a notice of public hearing
shall not necessitate another hearing or invalidate any action of the Planning Board. (#42)
7. PLANNING BOARD DECISION ON PRELIMINARY PLAN. Within thirty days from
the public hearing, or within another time limit as may be otherwise mutually agreed to
by the Board and the applicant, the Board shall make findings of fact on the application,
and approve, approve with conditions, or deny the preliminary plan application. The
Board shall specify in writing its findings of facts and reasons for any conditions or
denial.
When granting approval to a preliminary plan, the Board shall state the conditions of
such approval, if any, with respect to:
The specific changes which it will require in the final plan;
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 10
The character and extent of the required improvements for which waivers may have been
requested and which the Board finds may be waived without jeopardy to the public
health, safety, and general welfare; and
Approval of a preliminary plan shall not constitute approval of the final plan or intent to
approve the final plan, but rather it shall be deemed an expression of approval of the
design of the preliminary plan as a guide to the preparation of the final plan. The final
plan shall be submitted for approval by the Board upon fulfillment of the requirements of
these regulations and the conditions of preliminary approval, if any. Prior to the approval
of the final plan, the Board may require that additional information be submitted and
changes in the plan be made as a result of further study of the proposed subdivision or as
a result of new information received. No signatures on the Preliminary Plan shall be
required. (#57)
8. REQUEST FOR FINAL PLAN REVIEW. Within six months after the approval of the
preliminary plan, the applicant shall submit an application for approval of the final plan
at least four weeks prior to a scheduled meeting of the Board. Applications shall be
submitted by mail to the City Planner or delivered by hand to the City Planner. If the
application for the final plan is not submitted within six months after preliminary plan
approval, the Board shall require resubmission of the preliminary plan, except as
stipulated below. The final plan shall approximate the layout shown on the preliminary
plan, plus any changes required by the Board.
If an applicant cannot submit the final plan within six months, due to delays caused by
other regulatory bodies, or other reasons, the applicant may request an extension. Such a
request for an extension to the filing deadline shall be filed, in writing, with the Board
prior to the expiration of the filing period. In considering the request for an extension the
Board shall make findings that the applicant has made due progress in preparation of the
final plan and in pursuing approval of the plans before other agencies, and that municipal
ordinances or regulations which may impact on the proposed development have not been
amended.
9. STAFF REVIEW. The City Planner shall review the submission packet and place on the
agenda of the technical review committee as needed. If the City Planner determines that
the submission packet is not complete, notification of the missing information will be
forwarded to the applicant. The City Planner shall not place an applicant on the Planning
Board agenda until determining that the applicant has presented the submission packet
required for Final Plan for Major Subdivisions by this Ordinance.
If the City Planner determines that the submission packet is complete, the applicant shall
be notified and placed on the agenda of the next regularly scheduled Panning Board
meeting.
10. APPLICANT ATTENDANCE. The applicant, or his duly authorized representative, shall
attend the meeting of the Board to discuss the final plan. Failure to attend the meeting to
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 11
present the final plan application shall result in a delay of the Board's receipt of the plan
until the next meeting which the applicant attends.
11. PLANNING BOARD REVIEW. Within thirty days of the receipt of the final plan
application, the Board shall determine whether the application is complete and notify the
applicant in writing of its determination. If the application is not complete, the Board
shall notify the applicant of the specific additional material needed to complete the
application. A failure to submit a complete preliminary plan application within the
timeframe specified in Section 706.1.8 shall require the application be re-reviewed as
provided in Section 704, Sketch Plan.
Upon determination that a complete application has been submitted for review, the Board
shall notify the applicant in writing of its determination. The determination of a complete
application does not constitute the Planning Board's approval of the information
submitted. The Planning Board reserves the right to request additional information
throughout the review process up to and until Final Plan approval. Full evaluation of the
final plan shall begin only after the Planning Board has determined that a complete
application has been submitted. The Board shall hold a public hearing on the final plan
application.
12. FINAL PLAN PUBLIC HEARING. The Board shall hold the hearing within thirty days
of determining it has received a complete application, and shall publish a notice of the
date, time and place of the hearing in a newspaper of local circulation at least two times,
the date of the first publication to be at least seven days before the hearing. In addition,
the notice of the hearing shall be posted in at City Hall or at such places as State statute
requires at least seven days prior to the hearing. A copy of the notice shall be mailed to
abutting landowners, including those directly across the street. The City Clerk shall mail
said public hearing notices and send notification to be published, both at the applicant's
expense as set forth in the then current City Council adopted fee schedule. Land owners
shall be considered to be those against whom property taxes are assessed. Failure of any
abutting landowner to receive a notice of public hearing shall not necessitate another
hearing or invalidate any action of the Planning Board. (#41)(#42)
13. PLANNING BOARD DECISION ON FINAL PLAN. Within thirty days from the public
hearing, or within another time limit as may be otherwise mutually agreed to by the
Board and the applicant, the Board shall make findings of fact, and conclusions relative
to the criteria for approval contained in Title 30-A M.R.S.A., Section 4404 and the
standards of these regulations. If the Board finds that all the criteria of the statute and the
standards of these regulations have been met, they shall approve the final plan. If the
Board finds that any of the criteria of the statute or the standards of these regulations have
not been met, the Board shall either deny the application or approve the application with
conditions to ensure all of the standards will be met by the subdivision. The Board shall
specify in writing its findings of facts and reasons for any conditions or denial.
14. PERFORMANCE GUARANTEE. Within sixty (60) days of Planning Board approval,
the final plan shall be submitted to the City Council for its approval on any contracts or
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 12
bonds. Submission to the City Council shall include Planning Board and city staff
recommendations.
15. SIGNATURES. Upon approving the Final Plan, those members of the Planning Board
voting for approval shall sign two (2) paper copies of the approved subdivision plan.
(#57)
16. DIGITAL PLAN. The applicant shall supply the City Planner with a digital copy of the
approved subdivision plan in order to facilitate the addition of the subdivision into the
municipal property records. The digital file shall be supplied prior to recording the
subdivision plan in the Registry of Deeds and in a format compatible with the assessor's
records.
17. FILING OF APPROVED FINAL PLAN. After the City Council has approved any
contracts and bonds and they have been filed with the City Clerk, the City shall record
the subdivision plans and documents in the Registry of Deeds at the expense of the
applicant using the escrowed technical review/recording fee funds as provided by the
Article. Any subdivision not recorded in the Registry of Deeds within ninety (90) days of
the date which the plan is approved and signed by the Planning Board or within ninety
(90) days of City Council approval on any contracts or bonds, whichever is later, shall
become null and void.
The City Planner, or designee, shall scan said signed plan and make available to the City
Assessor and Code Enforcement Office. (#57)
18. The approval by the Board of a subdivision plan shall not be deemed to constitute or be
evidence of any acceptance by the municipality of any street, easement, or other open
space shown on such plan. When a park, playground, or other recreation area shall have
been shown on the plan to be dedicated to the municipality, approval of the plan shall not
constitute an acceptance by the municipality of such areas. The Board shall require the
plan to contain appropriate notes to this effect. The Board may also require the filing of a
written agreement between the applicant and the municipal officers covering future deed
and title dedication, and provision for the cost of grading, development, equipment, and
maintenance of any such dedicated area.
706.2
SUBMISSIONS
1. APPLICATION FORM AND EXHIBITS. The application form and attachments for
minor subdivisions shall be submitted as specified in Section 707.
2. PLAN. The subdivision plan for a Major Subdivision shall contain information as
specified in Section 707 and consist of two rolled paper site plan sheets, and fifteen
copies of one or more maps or drawings drawn to a scale of not more than one
hundred feet to the inch. The plans shall be signed and embossed with the seal of the
individual responsible for preparation of the plan. Plans for subdivisions containing
more than one hundred acres may be drawn at a scale of not more than two hundred
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 13
feet to the inch provided all necessary detail can easily be read. Plans shall be no
larger than 24 by 36 inches in size, and shall have a margin of two inches outside of
the border lines on the left side for binding and a one inch margin outside the border
along the remaining sides. Space shall be provided for endorsement by the Board. In
addition, one copy of the Plan(s) reduced to a size of 8 1/2 by 11 inches or 11 by 17
inches shall be submitted. (#57)
3. APPLICATION FEES AND ESCROW ACCOUNT. The application fees and escrow
account monies shall be submitted as specified in Section 706.1.2.
707
SUBDIVISION APPLICATION, EXHIBITS, AND PLANS
707.1
APPLICATION FORM
The applicant shall include an application form supplied by the City Planner and filled
out by the applicant. Said application form shall include the following information:
1. Date of application.
2. Tax map designation
3. Zoning designation of the property, including whether or not any part of the parcel
is within shoreland zoning.
4. Name, address, and phone number of the applicant.
5. Name address, and phone number of the record owner.
6. Name and contact information of person in which all City correspondence is sent.
7. Estimated dates of starting and completing any proposed construction.
707.2
EXHIBITS AND PLANS
The applicant shall include the following information either in the form of an exhibit(s)
or shown on the plan(s):
Note: All plans shall include the date the plan was prepared, who prepared the plan, north
point, and graphic scale.
707.2.1 INFORMATION ON THE APPLICANT, CONSULTANTS, AND PROPERTY
1. Name of proposed or existing subdivision, number of proposed lots or units, and total
acreage. If part of an existing subdivision or phase of an existing subdivision, include a
history of the development including number of existing lots or units and plan recording
designations.
2. Location map drawn at a size adequate to show the relationship of the proposed
subdivision to the adjacent properties and to allow the Board to locate the subdivision
within the municipality.
3. Copy of Brewer tax map(s) with the proposed subdivision shown.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 14
4. If the applicant is not the record owner, a letter from the record owner stating approval of
applicant to proceed with the proposed subdivision.
5. If an agent is applying on behalf of the applicant, and the name, address, phone number
and email address of the applicant's authorized agent and an authorization letter from the
applicant.
6. The name, address, phone number, email address, and Maine professional registration
number of the Land Surveyors and any other professionals employed by the applicant to
design or consult on the proposed subdivision. All professionals must hold current
professional licenses with the State of Maine.
7. Verification of right, title or interest in the property. An application will be considered
only when an applicant has demonstrated sufficient title, right or interest in all of the
property which is proposed for development or use. An applicant shall demonstrate in
writing sufficient title, right or interest as follows:
A. When the applicant claims ownership of the property, copies of the deeds to the
property shall be supplied.
B. When the applicant has an option to buy the property, a copy of the option agreement
shall be supplied. Option agreements shall contain terms deemed sufficient by the
Board to establish future title. Copies of the current deeds to the property shall also be
supplied.
C. When the applicant has a lease on the property, a copy of the lease shall be supplied.
The lease shall be of sufficient duration, as determined by the Board, to permit
construction and reasonable use of the development. Copies of the current deeds to
the property shall also be supplied.
D. When the applicant has eminent domain power over the property, evidence shall be
supplied of the ability and intent to use the eminent domain power to acquire
sufficient title, right, or interest as determined by the Board. Copies of the current
deeds to the property shall also be supplied.
E. When the applicant has a bond for deed for a deed on the property, a copy of the bond
for a deed shall be supplied. Copies of the current deeds to the property shall also be
supplied.
F. When the applicant has a purchase and sale agreement to purchase the property, the
applicant shall provide a copy of the purchase and sale agreement. Copies of the
current deeds to the property shall also be supplied.
8. Information on whether the applicant is a business or corporation, and if so, a current
Certificate of Good Standing from the State of Maine.
9. A history narrative and graphic of the property, prepared, signed and stamped by a
licensed Maine Professional Land Surveyor, to include ownership of the past five years
including any land which was acquired, land conveyed out, property line agreements, and
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 15
leases. This history shall include names and deed references, and copies of the documents
if unrecorded.
10. Information regarding the applicant's or record owner's interest in any property abutting
the parcel to be subdivided and that the proposed subdivision plan covers his/her entire,
contiguous holdings.
11. A current standard boundary survey of the property, giving complete descriptive data by
bearings and distances, made and certified by a licensed Maine Professional Land
Surveyor bearing the surveyor's seal and signature and prepared in accordance with the
Maine Board of Licensure for Professional Land Surveyors. The corners of the parcel
shall be located on the ground and marked by permanent monuments indicated on the
plan.
12. Information on all easements, rights-of-ways, leases, restrictions, or other encumbrances
currently affecting the property. The locations of such encumbrances shall be accurately
shown on plans and copies of deeds and documents included.
13. The current use of the property to be subdivided, location of existing buildings, existing
vegetative cover type, and any other essential existing physical features. The location of
any trees larger than 14 inches in diameter at breast height shall be shown on the plan.
14. A medium intensity soil survey map and a written report describing the soils present on
the site, prepared by a Maine Certified Soil Scientist. The Board may require a high
intensity soil survey for areas of intensive development such as roads and structures.
15. The location of all wetlands and vernal pools shall be identified on the survey, regardless
of size, prepared by a State Certified Soil Scientist or Geologist registered in the State of
Maine, or other qualified professional showing expertise in wetland delineation, and
based on an on-site investigation. Said submission shall include a narrative describing
method of delineation and location and a description of such wetland features including
functions and values.
16. The location of all farmland shall be identified on the survey, regardless of size. Said
submission shall include a narrative description of such farmland.
17. The location of all rivers, streams and brooks, as defined in Title 38, section 480-B,
subsection 9, within or adjacent to the proposed subdivision
18. A narrative stating whether any portion of the proposed subdivision is located in the
direct watershed of a great pond and if so, which great pond.
19. Contour lines at the interval specified by the Board showing elevations in relation to
mean sea level.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 16
20. The zoning district(s) in which the proposed subdivision is located and location of any
zoning boundaries affecting the subdivision, including shoreland zoning.
21. The location of the project site drawn to scale on the current Federal Emergency
Management Agency Flood Insurance Rate Map for the City of Brewer, Maine. If any
portion of the subdivision is in a flood prone area, the boundaries of any flood hazard
areas and the 100-year flood elevation, as depicted on the municipalities Flood Insurance
Rate Map shall be delineated on the plan.
22. The location of open drainage courses, wetlands, vernal pools, stonewalls, graveyards,
fences, stands of trees, and other important or unique natural areas and site features,
including but not limited to, floodplains, deer wintering areas, significant wildlife
habitats, fisheries, scenic areas, high or moderate value habitat, habitat for rare and/or
endangered plants and animals, unique natural communities and natural areas, sand and
gravel aquifers, and historic and/or archeological resources, together with a description of
such features. Major subdivision applications shall include letters from State and Federal
agencies, including the Maine Department of Inland Fisheries and Wildlife, Maine
Natural Areas Program, and the Maine Historic Preservation Commission.
23. The location of snowmobile trails shown on the Interconnecting Trail System map
published by the Maine Department of Conservation, or recognized, club-maintained
trails.
24. The width and location of any existing or proposed streets, public improvements or open
space shown upon the official map and the comprehensive plan, if any, within or adjacent
to the proposed subdivision.
707.2.2 INFORMATION ON PROPOSED DEVELOPMENT
1. Name of proposed subdivision and number of proposed lots or units.
2. A subdivision plan, based on a standard boundary survey of the parcel, made and
certified by a Maine Professional Land Surveyor bearing the surveyor's seal and
signature and prepared in accordance with the Maine Board of Licensure for Professional
Land Surveyors. Said subdivision plan shall include, but is not limited to:
a. Name of proposed subdivision.
b. Boundary and lot lines giving complete descriptive data by bearings and distances.
c. Type and location of permanent monuments at the corners of the corners of the
proposed lots and set on the ground if not existing.
d. Lot numbers and areas. For lots containing wetlands and/or water bodies, the net area
of the lot shall be included.
e. Names of adjacent property owners.
f. Signature block for Planning Board approval as supplied by the City.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 17
3. The location and design of any proposed streets meeting the requirements of Article 9 of
the Brewer Land Use Code.
4. A copy of any deed restrictions intended to cover all or part of the lots or dwelling units
in the proposed subdivision.
5. The location of areas where clearing for lawns and structures shall be permitted and/or
any restrictions to be placed on clearing existing vegetation.
6. The location, size and type of proposed plantings including street trees.
7. An indication of the type of sewage disposal to be used in the proposed subdivision:
A. When sewage disposal is to be accomplished by connection to the public sewer, a
written statement from the Director of Environmental Services shall be submitted
stating that the facility has the capacity to collect and treat the waste water and that
the department approves the design plans for extensions where necessary.
B. When sewage disposal is to be accomplished by subsurface waste water disposal
systems, test pit analyses, prepared by a Maine Licensed Site Evaluator shall be
provided. A map showing the location of all test pits dug on the site shall be
submitted.
8. An indication of the type of domestic water supply system(s) to be used in the proposed
subdivision:
A. When domestic water is to be supplied by public water supply, a written statement
from the City Water Department shall be submitted indicating that there is adequate
supply and pressure for the subdivision and that the department approves the design
plans for extensions where necessary.
B. When water is to be supplied by private wells, evidence of adequate ground water
supply and quality shall be submitted by a well driller or a hydrologeologist familiar
with the area.
9. An indication of the type of fire protection to be used in the proposed subdivision along
with a written statement from the Fire Department approving the method.
A. When water for fire protection is to be supplied by public water supply, a written
statement from the Fire Department shall be submitted indicating approval of the
location of existing and/or proposed fire hydrants and type of hydrants.
B. When water for fire protection is to be supplied by ponds with dry hydrants,
underground water storage reservoirs or other methods, a written statement from the
Fire Department shall be submitted indicating approval of the type, location and
design. An easement shall be granted to the municipality granting access to and
maintenance of dry hydrants or reservoirs where necessary.
10. The location and size of existing and proposed sewers, water mains, culverts, and
drainage ways on or adjacent to the property to be subdivided.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 18
11. A hydrogeologic assessment prepared by a Certified Geologist or Registered Professional
Engineer, experienced in hydrology, when the subdivision is not served by public sewer
and
A. Any part of the subdivision is located over a sand and gravel aquifer, as shown on a
map entitled "Sand and Gravel Aquifers, Map 28", by the Maine Geological Survey,
Open File No. 81-60; or
B. The subdivision has an average density of more than one dwelling unit per 100,000
square feet.
The Board may require a hydro geologic assessment in other cases where site
considerations or development design indicate greater potential of adverse impacts on
ground water quality. These cases include extensive areas of shallow to bedrock soils; or
cluster developments in which the average density is less than on dwelling unit per
100,000 square feet but the density of the portion is in excess of one dwelling unit per
80,000 square feet; or proposed use of shared or common subsurface waste water
disposal systems.
12. If the proposed subdivision is in the direct watershed of a great pond, phosphorus control
plan.
A. For subdivisions which qualify for the simplified review procedure as described in
Section 710.16.2, the plan shall indicate the location and dimensions of vegetative
buffer strips or infiltration systems.
B. For subdivisions which do not qualify for the simplified review procedure as
described in Section 710.16.2, the following shall be submitted:
1. A phosphorus impact analysis and control plan conducted using the procedures set
forth in Phosphorus Control in Lake Watersheds: A Technical Guide for Evaluating
New Development, published by the Maine Department of Environmental Protection,
September 1992 revision.
2. A long term maintenance plan for all phosphorus control measures.
3. The contour lines shown on the plan shall be at an interval of no less than five feet.
4. Areas with sustained slopes greater than 25% covering more than one acre shall be
delineated.
13. An estimate of the amount and type of vehicular traffic to be generated on a daily basis
and at peak hours. Trip generation rates used shall be taken from the latest version of the
ITE Trip Generation Manual, the current version being the sixth edition 1997, published
by the Institute of Transportation Engineers. Trip generation rates from other sources
may be used if the applicant demonstrates that these sources better reflect local
conditions.
14. For subdivisions involving 40 or more parking spaces or projected to generate more than
400 vehicle trips per day, a traffic impact analysis, prepared by a Maine Registered
Professional Engineer with experience in traffic engineering, shall be submitted. The
analysis shall indicate the expected average daily vehicle trips, peak hour volumes, access
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 19
conditions at the site, distribution of traffic, types of vehicles expected, effect upon the
level of service of the street giving access to the site and neighboring streets which may
be affected, and recommended improvements to maintain the desired level of service on
the affected streets.
15. For subdivisions requiring driveways or entrances onto a state or state aid highway
located outside the urban compact area as defined by Title 23, section 754,
documentation by the Maine Department of Transportation indicating that the driveways
or entrances conform to Title 23, section 704 and any rules adopted under that section
shall be submitted.
16. For all projects, Performance Standards set forth in Article 4, Section 439, Stormwater
Management, of this Land Use Code shall be met. A stormwater management plan,
prepared by a Maine Licensed Professional Engineer, in accordance with the Maine
Stormwater Management Design Manual - Volume 1, March 2016, published by the
Maine Department of Environmental Protection, in accordance with the Maine
Stormwater Management Law, Title 38 M.R.S.A. 420D, and in accordance with Brewer
Codes and Ordinances. The Board may not waive submission of the stormwater
management plan unless the subdivision is not in the watershed of a great pond, the
proposed subdivision will not involve grading which changes drainage patterns, and the
addition of impervious surfaces such as roofs and driveways is less than 5% of the area of
the subdivision. (#44)
17. An erosion and sedimentation control plan prepared in accordance with the Maine
Erosion and Sedimentation Control Best Management Practices (BMPs) Manual for
Designers and Engineers, October 2016, published by the Maine Department of
Environmental Protection. The Board may not waive submission of the erosion and
sedimentation control plan unless the subdivision is not in the watershed of a great pond,
the proposed subdivision will not involve grading which changes drainage patterns, and
the addition of impervious surfaces such as roofs and driveways is less than 5% of the
area of the subdivision. (#44)
18. For subdivisions located within the watershed of a great pond, a report on how the long-
term cumulative effects of the subdivision will not unreasonably increase the great pond's
phosphorus concentration during the construction phase and life of the proposed
subdivision.
19. The location and method of disposal for land clearing and construction debris.
20. A narrative stating whether the property has been timber harvested in violation of rules
adopted pursuant to Title 12, section 8869, subsection 14.
21. The location of any open space to be preserved and a description of proposed
improvements and its management.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 20
22. Visual, historic resources, unique natural resources, wetland and vernal pool protection,
groundwater, and fisheries and wildlife habitat impact statement prepared by qualified
professionals, detailing steps that have been taken or will be taken to minimize any
adverse impact from the proposed subdivision on such significant resources.
23. The location and description of any proposed easements and rights-of-ways. Final plan
submissions shall include copies of legal documents ready for signatures.
24. All parcels of land proposed to be dedicated to public use and the conditions of such
dedication. Final plan submissions shall include written offers to convey title to the
municipality of all open spaces shown on the plan, and copies of agreements or other
documents showing the manner in which open spaces to be retained by the applicant or
lot owners are to be maintained shall be submitted. If open space or other land is to be
offered to the municipality, written evidence that the municipal officers are satisfied with
the legal sufficiency of the written offer to convey title shall be included. Final plan
submission shall also include copies of legal documents ready for signatures.
25. A list of construction items, with cost estimates, that will be completed by the applicant
prior to the sale of lots, and evidence that the applicant has financial commitments or
resources to cover these costs.
26. A proposed performance guarantee, meeting Section 714 of this Article, for an amount
adequate to cover the total construction costs of all required improvements, taking into
account the time-span of the construction schedule and the inflation rate for construction
costs.
27. A compliance statement outlining the proposed subdivision's conformance with the
City's adopted Comprehensive Plan, Land Use Code, and other applicable locally
adopted ordinances and regulations along with a list of all required State and/or Federal
reviews and permits and their status.
708
REVISIONS TO APPROVED PLANS
708.1
PROCEDURE
An applicant for a revision to a previously approved plan shall, at least ten days prior to a
scheduled meeting of the Board, request to be placed on the Board's agenda. If the
revision involves the creation of additional lots or dwelling units, the procedures for
preliminary plan approval shall be followed. If the revision involves only modifications
of the approved plan, without the creation of additional lots or dwelling units, the
procedures for final plan approval shall be followed.
708.2
SUBMISSIONS
The applicant shall submit a copy of the approved plan as well as twelve copies of the
proposed revisions. The application shall also include enough supporting information to
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 21
allow the Board to make a determination that the proposed revisions meet the standards
of these regulations and the criteria of the statute. The revised plan shall indicate that it is
the revision of a previously approved and recorded plan and shall show the title of the
subdivision and the book and page or cabinet and sheet on which the original plan is
recorded at the Registry of Deeds.
708.3
SCOPE OF REVIEW
The Board's scope of review shall be limited to those portions of the plan which are
proposed to be changed.
709
INSPECTIONS AND ENFORCEMENT
709.1
INSPECTION OF REQUIRED IMPROVEMENTS (#4)
1. At least five working days prior to commencing construction of required improvements,
the sub divider or builder shall notify the code enforcement officer and city engineer in
writing of the time when (s)he proposes to commence construction of such
improvements, so that the municipal officers can arrange for inspections to assure that all
municipal specifications, requirements, and conditions of approval are met during the
construction of required improvements, and to assure the satisfactory completion of
improvements and utilities required by the Board. The sub divider shall also notify the
City of the name of the qualified inspector whom will be responsible for the continuing
inspection of the on-going work.
2. If the Code Enforcement Officer, City Engineer or City Planner finds upon inspection of
the improvements that any of the required improvements have not been constructed in
accordance with the plans and specifications filed by the sub divider, the Code
Enforcement Officer shall take any steps necessary to assure compliance with the
approved plans.
3. If at any time it appears necessary or desirable to modify the required improvements
before or during the construction of the required improvements, the City Planner is
authorized to approve minor modifications due to unforeseen circumstances such as
encountering hidden outcrops of bedrock, natural springs, etc. The City Planner shall
issue any approval under this section in writing and shall transmit a copy of the approval
to the Board. Revised plans shall be filed with the Board. For major modifications, such
as relocation of rights-of-way, property boundaries, changes of grade by more than 1%,
etc., the sub divider shall obtain permission from the Board to modify the plans.
4. At the close of each summer construction season the City shall, at the expense of the sub
divider, have the site inspected by a qualified individual. By October 31 of each year
during which construction was done on the site, the inspector shall submit a report to the
Board based on that inspection, addressing whether storm water and erosion control
measures (both temporary and permanent) are in place, are properly installed, and appear
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 22
adequate. The report shall also include a discussion and recommendations on any
problems which were encountered.
5. Prior to the sale of any lot, the sub divider shall provide the Board with a letter from a
Maine Registered Land Surveyor, stating that all permanent monumentation shown on
the plan has been installed.
6. Acceptance of streets shall be in accordance with Section 712 of this Article.
7. The sub divider shall be required to maintain all improvements and provide for snow
removal on streets and sidewalks until acceptance of the improvements by the
municipality or control is placed with a lot owners' association.
709.2
VIOLATIONS AND ENFORCEMENT (#2)
1. No plan of a division of land within the municipality which would constitute a
subdivision shall be recorded in the Registry of Deeds until a final plan has been
approved by the Board and the contracts and/or bonds approved by the City Council,
which is then filed with the City Clerk in accordance with this Article.
2. A person shall not convey, offer or agree to convey any land in a subdivision which has
not been approved by the Board and the contracts and/or bonds approved by the City
Council, which is then filed with the City Clerk and recorded in the Registry of Deeds as
hereinbefore provided.
3. No changes, erasures, modifications, or revisions shall be made in any final plan after
approval has been given by the Board and endorsed in writing on the plan, unless the
revised final plan is first submitted and the Board and the City Council approves any
contract and/or bond modifications that is filed with the City Clerk, except in accordance
with Section 708 of this Article. The Board shall make findings that the revised plan
meets the criteria of Title 30-A M.R.S.A., Section 4404, and the standards of these
regulations. Review and approvals of the final plan revision shall follow Section 705 or
Section 706 as provided in this Article. In the event that a Plan is recorded without
complying with this requirement, it shall be considered null and void, and the Board shall
institute proceedings to have the plan stricken from the records of the Registry of Deeds.
4. A person shall not sell, lease or otherwise convey any land in an approved subdivision
which is not shown on the plan as a separate lot.
5. No public utility, utility district, water department, sanitary department or any utility
company of any kind shall serve any lot in a subdivision for which a final plan has not
been approved by the Board.
6. Development of a subdivision without Board approval shall be a violation of law.
Development includes grading or construction of roads, grading of land or lots, or
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 23
construction of buildings which require a plan approved as provided in these regulations
and recorded in the Registry of Deeds.
7. No lot in a subdivision may be sold, leased, or otherwise conveyed prior to the
completion of all improvements proposed for the subdivision unless specifically stated in
the Planning Board approval. Notwithstanding the foregoing, the Code Enforcement
Officer may authorize the sale, lease, or conveyance of one lot in an approved
subdivision when the said lot is located within the Industrial (IND) and Industrial-2
(IND2) districts and all required improvements are being constructed by the City of
Brewer with City Council approval. No unit in a multi-family development shall be
occupied before the street upon which the unit is accessed is completed in accordance
with the Brewer Land Use Code and all improvements are constructed. (#8)
8. No lot which has received subdivision approval shall be further divided without approval
from the Planning Board, except the division of an approved lot by the transfer to the
State of Maine or City of Brewer shall not require Planning Board approval.
9. Except in the case of a phased development plan, failure to begin construction within six
months of the date of approval and signing of the plan and complete construction of the
subdivision within two years of the date of approval and signing of the plan shall render
the plan null and void. Phased developments shall be completed as stated in the Planning
Board approval. Upon determining that a subdivision's approval has expired under this
paragraph, the Board shall have a notice placed in the Registry of Deeds to that effect.
10. No plan shall be approved by the Board as long as the applicant is in violation of the
provisions of a previously approved Plan within the municipality.
11. Violations of the above provisions of this Section are a nuisance and shall be punished in
accordance with the provisions of Title 30-A M.R.S.A., Section 4452.
710
PERFORMANCE STANDARDS
710.1
GENERAL
The performance standards in this Article are intended to clarify and expand upon the
criteria for approval found within the subdivision statute (Title 30-A M.R.S.A., Section
4404). In reviewing a proposed subdivision, the Board shall review the application for
conformance with the following performance standards and make findings that each has
been met prior to the approval of a final plan. Compliance with the design guidelines of
Section 711 shall be considered to be evidence of meeting the appropriate performance
standards. Proposed subdivisions not in compliance with the design guidelines of Section
711 may be considered, but the applicant shall provide clear and convincing evidence that
the proposed design will meet the performance standard(s) and the statutory criteria. In
all instances the burden of proof shall be upon the applicant to present adequate
information to indicate all performance standards and statutory criteria for approval have
been or will be met.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 24
710.2
POLLUTION
1. The proposed subdivision shall not discharge waste water to a water body without a
license from the Maine Department of Environmental Protection.
2. Discharges of storm water shall be treated to remove fat, oil, grease, sediment, trash,
and other solid debris prior to discharge into surface water bodies. When the
subdivision is within the watershed of a great pond, the storm water shall be treated in
order to remove excess nutrients. (#62)
710.3
SUFFICIENT WATER (#4)
1. Water Supply
A. Any subdivision within the area designated in the comprehensive plan for future
public water supply service shall make provisions for connection to the public
system. When public water supply service will not be available at the time of
construction of the subdivision, a "capped system" shall be installed within the
subdivision to allow future connection when service becomes available without
excavation within the right-of-way of any street within the subdivision.
B. When a subdivision is to be served by a public water system, the complete supply
system within the subdivision including fire hydrants shall be installed at the
expense of the applicant. The size and location of mains, gate valves, hydrants,
and service connections shall be reviewed and approved in writing by the City
Water Department Superintendent and the Fire Chief. Fire hydrants shall be
placed every eight hundred (800) feet along all public streets, roads and ways on
the public water system with privately paid hydrants connected to the public
system every eight hundred (800) feet along private roads and ways that lead to
any structure(s). The last hydrant on a dead end street shall be within four
hundred (400) feet of the end of the street or road. Hydrants shall also be placed
such that one (or more if required by the AHJ) shall be located within five
hundred (500) feet of all structures, as fire apparatus can travel in all seasons.
The hydrants are to be standard hydrants as approved by the AHJ. Said hydrants
to supply seven hundred fifty (750) gpm or more each with a residual pressure of
20 psi. Further, for selected developments, subject to the AHJ, more hydrants and
larger fire flows may be required for greater than normal hazards or large
structures.
C. When a proposed subdivision is not within the area designated for public water
supply service in the comprehensive plan, water supply shall be from individual
wells or a private community water system.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 25
1) Individual wells shall be sited and constructed to prevent infiltration of
surface water, and contamination from subsurface waste water disposal
systems and other sources of potential contamination.
2) Lot design shall permit placement of wells, subsurface waste water disposal
areas, and reserve sites for subsurface waste water disposal areas in
compliance with the latest version of the Maine Subsurface Wastewater
Disposal Rules and the Well Drillers and Pump Installers Rules.
3) If a central water supply system is provided by the applicant, the location and
protection of the source, the design, construction and operation of the system
shall conform to the latest version of the standards of the Maine Rules
Relating to Drinking Water (10-144E C.M.R. 231).
4) In areas where the comprehensive plan has identified the need for additional
water storage capacity for firefighting purposes, the applicant shall provide
adequate water storage facilities. Facilities may be ponds with dry hydrants,
underground storage reservoirs or other methods acceptable to the fire chief.
An easement shall be granted to the municipality granting access to and
maintenance of dry hydrants or reservoirs where necessary. The Board may
waive the requirement for water storage only upon submittal of evidence that
the soil types in the subdivision will not permit their construction or
installation and that the fire chief has indicated in writing that alternate
methods of fire protection are available.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 26
2. Water Quality
A. Water supplies shall meet the primary drinking water standards contained in the
latest version of the Maine Rules Relating to Drinking Water (10-144E C.M.R.
231). If existing water quality contains contaminants in excess of the secondary
drinking water standards in the Maine Rules Relating to Drinking Water, that fact
shall be disclosed in a note on the plan to be recorded in the Registry of Deeds.
710.4
IMPACT ON EXISTING WATER SUPPLIES (#4)
1. In meeting the standards of Section 710.3.1., a proposed subdivision shall not
generate a demand on the source, treatment facilities or distribution system of the
City Water Department beyond the capacity of those system components, considering
improvements that are planned to be in place prior to occupancy of the subdivision.
2. The applicant shall be responsible for paying the costs of system improvements to the
City's water system as necessary to alleviate existing deficiencies.
710.5
SOIL EROSION (#44)
1. For all projects, Performance Standards set forth in Article 4, Section 440 Erosion
Control for this Land Use Code shall be met.
2. Whenever State or Federal permits are required for a proposed subdivision plan
application, whichever standard between City, State, or Federal standards is more
strict shall govern. (#44)
710.6
TRAFFIC CONDITIONS
1. In general, provision shall be made for vehicular access to the subdivision and
circulation within the subdivision in such a manner as to:
A. Safeguard against hazards to traffic and pedestrians in existing streets and within
the subdivision;
B. Avoid traffic congestion on any street; and
C. Provide safe and convenient circulation on public streets and within the
subdivision.
2. More specifically, access and circulation shall also conform to the following
standards.
A. The vehicular access to the subdivision shall be arranged to avoid through traffic
use of existing streets which the comprehensive plan has classified as residential
access streets.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 27
B. The street giving access to the subdivision and neighboring streets and
intersections which can be expected to carry traffic generated by the subdivision
shall have the capacity or be suitably improved to accommodate that traffic and
avoid unreasonable congestion. No subdivision shall reduce the Level of Service
(LOS) (see Article 14) of the street giving access to the subdivision and
neighboring streets and intersections to "E" or below, unless the comprehensive
plan has indicated that Levels of Service "E" or "F" are acceptable for that street
or intersection.
C. Where necessary to safeguard against hazards to traffic and pedestrians and/or to
avoid traffic congestion, provision shall be made for turning lanes, traffic
directional islands, frontage roads, sidewalks, bicycle ways and traffic controls
within existing public streets.
D. Access ways to non-residential subdivisions or to multifamily subdivisions shall
be designed to avoid queuing of entering vehicles on any street. Left lane storage
capacity shall be provided to meet anticipated demand. A study or analysis to
determine the need for a left-turn storage lane shall be done.
E. Where topographic and other site conditions allow, provision shall be made for
street connections to adjoining lots of similar existing or potential use within areas
of the municipality designated as growth areas in the comprehensive plan; or in
non-residential subdivisions when such access shall be provided if it will:
1) Facilitate fire protection services as approved by the fire chief; or
2) Enable the public to travel between two existing or potential uses, generally
open to the public, without need to travel upon a public street.
F. Street Names, Signs and Lighting. Streets which join and are in alignment with
streets of abutting or neighboring properties shall bear the same name. Names of
new streets shall not duplicate, nor bear phonetic resemblance to the names of
existing streets within the municipality, and shall be subject to the approval of the
Board. No street name shall be the common given name of a person. The
developer shall either install street name, traffic safety and control signs meeting
municipal specifications or reimburse the municipality for the costs of their
installation. Street lighting shall be installed as approved by the Board.
G. Clean-up. Following street construction, the developer or contractor shall conduct
a thorough clean-up of stumps and other debris from the entire street
right-of-way. If on-site disposal of the stumps and debris is proposed, the site
shall be indicated on the plan, and be suitably covered with fill and topsoil, limed,
fertilized, and seeded.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 28
710.7
SEWAGE DISPOSAL
1. Public System
A. Any subdivision within two hundred (200) feet of an existing public sewer must
connect to the public sewer system unless specifically allowed otherwise by the
Brewer Environmental Services Department. All connections and sewers shall
meet the requirements of Chapter 31 of the City of Brewer Charter, Codes, and
Ordinances. (#62)
B. When a subdivision is proposed to be served by the public sewage system, the
complete collection system within the subdivision, including manholes and pump
stations, shall be installed at the expense of the applicant.
C. The Director of Environmental Services shall certify that providing service to the
proposed subdivision is within the capacity of the system's existing collection and
treatment system or improvements planned to be complete prior to the
construction of the subdivision.
D. The Director of Environmental Services and/or the City Engineer shall review and
approve the construction drawings for the sewerage system. The size and location
of laterals, collectors, manholes, and pump stations shall be reviewed and
approved in writing by the servicing sewer department.
2. Private Systems
A. Private sewage systems shall meet the requirements of Chapter 31 of the City of
Brewer Charter, Codes, and Ordinances and all applicable State regulations.
(#62)
B. The applicant shall submit evidence of site suitability for subsurface sewage
disposal prepared by a Maine Licensed Site Evaluator in full compliance with the
latest requirements of the State of Maine Subsurface Wastewater Disposal Rules.
1) The site evaluator shall certify in writing that all test pits which meet the
requirements for a new system represent an area large enough to install a
disposal area on soils which meet the Disposal Rules.
2) On lots in which the limiting factor has been identified as being within 24
inches of the surface, a second site with suitable soils shall be shown as a
reserve area for future replacement of the disposal area. The reserve area shall
be shown on the plan and restricted so as not to be built upon.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 29
710.8
IMPACT ON THE MUNICIPALITY'S ABILITY TO DISPOSE OF SOLID WASTE
1. If the additional solid waste from the proposed subdivision exceeds the capacity of
the municipal solid waste facility, causes the municipal facility to no longer be in
compliance with its license from the Department of Environmental Protection, or
causes the municipality to exceed its contract with a non-municipal facility, the
applicant shall make alternate arrangements for the disposal of solid waste. The
alternate arrangements shall be at a disposal facility which is in compliance with its
license. The Board may not require the alternate arrangement to exceed a period of
five years.
710.9
IMPACT ON NATURAL BEAUTY, AESTHETICS, HISTORIC SITES,
WILDLIFE HABITAT, RARE NATURAL AREAS OR PUBLIC ACCESS TO THE
SHORELINE
1. Preservation of Natural Beauty and Aesthetics
A. The plan shall, by notes on the final plan and deed restrictions, limit the clearing
of trees to those areas designated on the plan.
B. Except in areas of the municipality designated by the comprehensive plan as
growth areas, the subdivision shall be designed to minimize the visibility of
buildings from existing public roads.
C. The Board may require the application to include a landscape plan that will show
the preservation of any existing trees larger than 14 inches diameter breast height,
the replacement of trees and vegetation, and graded contours.
D. When a proposed subdivision street traverses open fields the plans shall include
the planting of street trees.
2. Retention of Open Spaces and Natural or Historic Features
A. If any portion of the subdivision is located within an area designated by the
comprehensive plan as open space or greenbelt, that portion shall be reserved for
open space preservation.
B. If any portion of the subdivision is located within an area designated as a unique
natural area by the comprehensive plan or the Maine Natural Areas Program the
plan shall indicate appropriate measures for the preservation of the values which
qualify the site for such designation.
C. If any portion of the subdivision is designated a site of historic or prehistoric
importance by the comprehensive plan or the Maine Historic Preservation
Commission, appropriate measures for the protection of the historic or prehistoric
resources shall be included in the plan.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 30
D. The subdivision shall reserve sufficient undeveloped land to provide for the
recreational needs of the occupants. The percentage of open space to be reserved
shall depend on the identified needs for outdoor recreation in the portion of the
municipality in which the subdivision is located according to the comprehensive
plan, the proposed lot sizes within the subdivision, the expected demographic
makeup of the occupants of the subdivision, and the site characteristics.
E. Land reserved for open space purposes shall be of a character, configuration and
location suitable for the particular use intended.
F. Reserved open space land may be dedicated to the municipality.
G. Where land within the subdivision is not suitable or is insufficient in amount,
where the applicant prefers, or when suggested by the comprehensive plan, a
payment in lieu of dedication may be substituted for the reservation of some or
part of the open space requirement. Payments in lieu of dedication shall be
calculated based on the percentage of reserved open space that otherwise would
be required and that percentage of the projected market value of the developed
land at the time of the subdivision, as determined by the municipal tax assessor.
The payment in lieu of dedication shall be deposited into a municipal land open
space or outdoor recreation facility acquisition or improvement fund.
3. Protection of Significant Wildlife Habitat
A. If any portion of a proposed subdivision lies within 250 feet of the following areas
identified and mapped by the Department of Inland Fisheries and Wildlife or the
comprehensive plan as:
1) Habitat for species appearing on the official state or federal lists of
endangered or threatened species;
2) High and moderate value waterfowl and wading bird habitats, including
nesting and feeding areas;
3) Shorebird nesting, feeding and staging areas and seabird nesting islands;
4) Critical spawning and nursery areas for Atlantic sea run salmon as defined by
the Atlantic Sea Run Salmon Commission; or
B. 1,320 feet of an area identified and mapped by the Department of Inland Fisheries
and Wildlife as a high or moderate value deer wintering area or travel corridor;
C. Or other important habitat areas identified in the comprehensive plan including
coastal wildlife concentration areas, the applicant shall demonstrate that there
shall be no adverse impacts on the habitat and species it supports. A report
prepared by a wildlife biologist certified by the Wildlife Society with
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 31
demonstrated experience with the wildlife resource being impacted shall be
submitted. This report shall assess the potential impact of the subdivision on the
significant habitat and adjacent areas that are important to the maintenance of the
affected species and shall describe appropriate mitigation measures to ensure that
the subdivision will have no adverse impacts on the habitat and the species it
supports.
D. Any existing public rights of access to the shoreline of a water body shall be
maintained by means of easements or rights-of-way, or should be included in the
open space with provisions made for continued public access.
710.10
CONFORMANCE WITH REQUIREMENT OF ARTICLES 3 AND 4 OF THE
LAND USE CODE
1. All lots other than cluster subdivisions shall meet or exceed the minimum
dimensional requirements set forth in Article 3 of this Land Use Code for the zoning
district in which they are located. The proposed subdivision shall meet all applicable
performance standards or design criteria set forth in Article 4 of this Land Use Code.
710.11
FINANCIAL AND TECHNICAL CAPACITY
1. Financial Capacity. The applicant shall have adequate financial resources to
construct the proposed improvements and meet the criteria of the statute and the
standards of this Article. When the applicant proposes to construct the buildings as
well as the subdivision improvements, the applicant shall have adequate financial
resources to construct the total subdivision. In making the above determinations the
Board shall consider the proposed time frame for construction and the effects of
inflation.
2. Technical Ability
A. The applicant shall retain qualified contractors and consultants to supervise,
construct and inspect the required improvements in the proposed subdivision.
B. In determining the applicant's technical ability the Board shall consider the
applicant's previous experience, the experience and training of the applicant's
consultants and contractors, and the existence of violations of previous approvals
granted to the applicant.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 32
710.12
IMPACT ON GROUND WATER QUALITY OR QUANTITY
1. Ground Water Quality
A. When a hydro geologic assessment is submitted, the assessment shall contain at
least the following information:
1) A map showing the basic soils types.
2) The depth to the water table at representative points throughout the
subdivision.
3) Drainage conditions throughout the subdivision.
4) Data on the existing ground water quality, either from test wells in the
subdivision or from existing wells on neighboring properties.
5) An analysis and evaluation of the effect of the subdivision on ground water
resources. In the case of residential subdivisions, the evaluation shall, at a
minimum, include a projection of post development nitrate-nitrogen
concentrations at any wells within the subdivision, or at the subdivision
boundaries; or at a distance of 1,000 feet from potential contamination
sources, whichever is a shortest distance.
6) A map showing the location of any subsurface waste water disposal systems
and drinking water wells within the subdivision and within 200 feet of the
subdivision boundaries.
B. Projections of ground water quality shall be based on the assumption of drought
conditions (assuming 60% of annual average precipitation).
C. No subdivision shall increase any contaminant concentration in the ground water
to more than one half of the Primary Drinking Water Standards. No subdivision
shall increase any contaminant concentration in the ground water to more than the
Secondary Drinking Water Standards.
D. If ground water contains contaminants in excess of the primary standards, and the
subdivision is to be served by on-site ground water supplies, the applicant shall
demonstrate how water quality will be improved or treated.
E. If ground water contains contaminants in excess of the secondary standards, the
subdivision shall not cause the concentration of the parameters in question to
exceed 150% of the ambient concentration.
F. Subsurface waste water disposal systems and drinking water wells shall be
constructed as shown on the map submitted with the assessment. If construction
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 33
standards for drinking water wells or other measures to reduce ground water
contamination and protect drinking water supplies are recommended in the
assessment, those standards shall be included as a note on the final plan, and as
restrictions in the deeds to the affected lots.
2. Ground Water Quantity
A. Ground water withdrawals by a proposed subdivision shall not lower the water
table beyond the boundaries of the subdivision.
B. A proposed subdivision shall not result in a lowering of the water table at the
subdivision boundary by increasing runoff with a corresponding decrease in
infiltration of precipitation.
710.13
FLOODPLAIN MANAGEMENT
When any part of a subdivision is located in a special flood hazard area as identified by
the latest version of the Federal Emergency Management Agency, Flood Boundary and
Floodway Map (Community Panel No. 230104 0005 B) the most current version being
dated June 1, 1978:
1. All public utilities and facilities, such as sewer, gas, electrical and water systems shall
be located and constructed to minimize or eliminate flood damages.
2. Adequate drainage shall be provided so as to reduce exposure to flood hazards.
3. The plan shall include a statement that structures in the subdivision shall be
constructed with their lowest floor, including the basement, at least one foot above
the 100-year flood elevation. Such a restriction shall be included in any deed, lease,
purchase and sale agreement, or document transferring or expressing an intent to
transfer any interest in real estate or structure, including but not limited to a
time-share interest. The statement shall clearly articulate that the municipality may
enforce any violation of the construction requirement and that fact shall also be
included in the deed or any other document previously described. The construction
requirement shall also be clearly stated on the plan.
710.14
IDENTIFICATION OF FRESHWATER WETLANDS
All freshwater wetlands shall be identified in accordance with the most current version of
the Corps of Engineers Wetland Delineation Manual, published by the United States
Army Corps of Engineers, the most current version being dated 1989.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 34
710.15
STORM WATER MANAGEMENT (#4) (#44)
1. Adequate provision shall be made for the management of the quantity and quality of
all storm water generated within the subdivision, and any drained ground water
through a management system of swales, culverts, underdrains, storm drains and best
management practices equivalent to those described in the Maine Erosion and
Sediment Control Best Management Practices (BMPs) Manual for Designers and
Engineers, October 2016, published by the Maine Department of Environmental
Protection, in conformance with the policies of the comprehensive plan. The storm
water management system shall be designed to meet the following standards:
A. Quantity. Peak post- development discharge rates shall be limited to the
pre-development levels for the 2-year, 10-year, and 25-year frequency, 24-hour
duration storm unless storm water from the subdivision will drain directly into a
major water body such as a great pond or the ocean.
2. Where necessary to achieve the above standards, there shall be provided easements or
drainage rights-of-way for existing and proposed swales, culverts, catch basins,
stormwater pipes, or other means of treating and/or channeling surface water within
the subdivision and over other properties. Wherever the storm drainage system is not
within the right-of-way of a public street, perpetual easements shall be provided as
necessary. The subdivision plan shall include who will own and be responsible for
the maintenance and/or replacement of the storm drainage system. Such responsibility
may be designated to the individual lot owner on which the infrastructure is located or
may be a group or entity. A Homeowners Association may be created to own and
maintain all stormwater infrastructure that is not within the public right of way. All
stormwater infrastructure that is not within the public right of way will not be
maintained by the City. If the City is required to perform maintenance to
infrastructure owned by the lot owner, group, entity, or Homeowners Association, all
expenses that are incurred will be charged to said owner for reimbursement, including
labor by City Staff. (#62)
3. The stormwater management plan shall meet the requirements of Article 4, section
439 of this Land Use Code and Chapter 31 of the City of Brewer's Charter, Codes
and Ordinances. The stormwater management plan shall also include post
construction stormwater monitoring and maintenance requirements for all persons
discharging into the City storm sewer system. (#62)
4. Whenever State or Federal permits are required for a proposed subdivision plan
application, whichever standard between City, State, or Federal standards is more
strict shall govern.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 35
710.16
RESERVATION OR DEDICATION AND MAINTENANCE OF OPEN SPACE
AND COMMON LAND, FACILITIES AND SERVICES
1. All open space common land, facilities and property shall be owned by:
A. The owners of the lots or dwelling units by means of a lot owners' association or in
common;
B. An association which has as its principal purpose the conservation or preservation of
land in essentially its natural condition; or
C. The municipality.
2. Further subdivision of the common land or open space and its use for other than
non-commercial recreation, agriculture, or conservation purposes, except for easements
for underground utilities, shall be prohibited. Structures and buildings accessory to
non-commercial recreational or conservation uses may be erected on the common land.
When open space is to be owned by an entity other than the municipality, there shall be a
conservation easement deeded to the municipality prohibiting future subdivision.
3. The common land or open space shall be shown on the final plan with appropriate
notations on the plan to indicate:
A. It shall not be used for future building lots; and
B. Which portions of the open space, if any, may be dedicated for acceptance by the
municipality.
4. The final plan application shall include the following:
A. Covenants for mandatory membership in the lot owners' association setting forth the
owners' rights, interests, and privileges in the association and the common property
and facilities, to be included in the deed for each lot or dwelling.
B. Draft articles of incorporation of the proposed lot owners' association as a
not-for-profit corporation; and
C. Draft by-laws of the proposed lot owners' association specifying the responsibilities
and authority of the association, the operating procedures of the association and
providing for proper capitalization of the association to cover the costs of major
repairs, maintenance and replacement of common facilities.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 36
5. In combination, the documents referenced in subsection 710.16.4.C above shall provide
for the following:
A. The homeowners' association shall have the responsibility of maintaining the
common property or facilities.
B. The association shall levy annual charges against all owners of lots or dwelling units
to defray the expenses connected with the maintenance, repair and replacement of
common property and facilities and tax assessments.
C. The association shall have the power to place a lien on the property of members who
fail to pay dues or assessments.
D. The developer or sub divider shall maintain control of the common property, and be
responsible for its maintenance until development sufficient to support the association
has taken place. Such determination shall be made by the Board upon request of the
lot owners' association or the developer.
710.17
PHOSPHORUS IMPACTS ON GREAT PONDS
1. Phosphorus Export
A. Any subdivision within the watershed of a great pond shall limit its post
development phosphorus export to the standards contained in Table 711.10.3,
dependent on the great pond in whose watershed the subdivision is located.
B. The Board shall keep an accurate record of permits issued by watershed and shall
notify the comprehensive planning committee of the actual development rates at
five year intervals, as the comprehensive plan is revised. The above table shall be
amended as required by amendments to the comprehensive plan, reflecting
changes in expected development rates.
2. Simplified Phosphorus Review. The simplified review may be used for any:
A. Proposed subdivision of three or four lots with less than 200 feet of new or
upgraded street with a cumulative driveway length not to exceed 450 feet for a
three lot subdivision or 600 feet for a four lot subdivision;
B. Proposed subdivision of three or four lots with no new or upgraded street with a
cumulative driveway length not to exceed 950 feet for three lot subdivisions or
1,100 feet for four lot subdivisions; or
C. Proposed subdivision consisting of multi-family dwellings that have less than
20,000 square feet of disturbed area including building parking, driveway, lawn,
subsurface waste water disposal systems, and infiltration areas, and new or
upgraded streets not exceeding 200 linear feet.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 37
D. A proposed subdivision which creates lots which could be further divided such
that five or more lots may result shall be subject to the standard review procedures
unless there are deed restrictions prohibiting future divisions of the lots.
3. Standard Review. This section shall apply to proposed subdivisions which do not
qualify for the simplified review. Phosphorus export from a proposed subdivision
shall be calculated according to the latest version of the procedures in Phosphorus
Control in Lake Watersheds: A Technical Guide for Evaluating New Development,
published by the Maine Department of Environmental Protection, the most current
version being dated September, 1992. When a proposed subdivision creates lots
which are more than twice the required minimum lot size and there are no deed
restrictions proposed to prohibit future divisions, the applicant shall either calculate
phosphorus loading based on the maximum feasible number of lots, and shall design
controls adequate to limit the resulting phosphorus loading, or shall reserve a portion
of the permitted phosphorus export for future divisions.
4. Maintenance and Use Restrictions for Phosphorus Control Measures. Provisions for
monitoring, inspections, and maintenance of phosphorus control measures shall be
included in the application.
A. Vegetative Buffer Strips. Individual lot owners shall be required to maintain
buffer areas on their individual lots in accordance with the following standards, to
be specified in recorded deed restrictions and as notes on the plan. Where a
vegetative buffer strip is to be owned in common by property owners in the
subdivision, documentation establishing the lot owners' association shall include
the following standards.
1) Wooded Buffers. Maintenance provisions for wooded buffers shall provide
for either of the following two options.
a) No Disturbance. Maintenance and use provisions for wooded buffer strips
which are located on hydrologic soil group D soils and within 250 feet of
the great pond or a tributary, or which are located on slopes over 20%
shall include the following.
i.
Buffers shall be inspected annually for evidence of erosion or
concentrated flows through or around the buffer. All eroded areas
must be seeded and mulched. A shallow stone trench must be
installed as a level spreader to distribute flows evenly in any area
showing concentrated flows.
ii.
All existing undergrowth (vegetation less than four feet high),
forest floor duff layer, and leaf litter must remain undisturbed and
intact, except that one winding walking path, no wider than six
feet, is allowed through the buffer. This path shall not be a straight
line to the great pond or tributary and shall remain stabilized.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 38
iii.
Pruning of live tree branches that do not exceed twelve feet above
the ground level is permitted provided that at least the top
two-thirds of the tree canopy is maintained.
iv.
No cutting is allowed of trees except for normal maintenance of
dead, wind-blown, or damaged trees.
v.
Buffers shall not be used for all-terrain vehicle or vehicular traffic.
b) Limited Disturbance. Maintenance and use provisions for other buffer
strips may include the following:
i.
There shall be no cleared openings. An evenly distributed stand of
trees and other vegetation shall be maintained.
ii.
Activity within the buffer shall be conducted to minimize
disturbance of existing forest floor, leaf litter and vegetation less
than four feet in height. Where the existing ground cover is
disturbed and results in exposed mineral soil, that area shall be
immediately stabilized to avoid soil erosion.
iii.
Removal of vegetation less than four feet in height is limited to
that necessary to create a winding foot path no wider than six feet.
This path shall not be a straight line to the great pond or a
tributary. The path must remain stabilized.
iv.
Pruning of live tree branches that do not exceed 12 feet in height
above the ground level is permitted provided that at least the top
two-thirds of the tree canopy is maintained.
v.
Where the removal of storm-damaged, diseased, unsafe, or dead
trees results in a cleared opening, those openings shall be replanted
with native trees at least three feet in height unless existing new
tree growth is present.
vi.
Buffers shall not be used for all terrain vehicle or vehicular traffic.
2) Non-wooded Buffers.
a) Non-wooded buffers may be allowed to revert or to be planted to forest, in
which case the standards above shall apply.
b) A buffer must maintain a dense, complete and vigorous cover of
"non-lawn" vegetation which shall be mowed no more than once a year.
Vegetation may include grass, other herbaceous species, shrubs and trees.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 39
c) Activity within the buffer shall be conducted so as to prevent damage to
vegetation and exposure of mineral soil. Burning of vegetation shall be
prohibited.
d) Buffers shall not be used for all-terrain vehicles or other vehicular traffic.
3) Infiltration Systems. Individual lot owners shall be responsible for maintenance
of individual infiltration systems according to the standards specified in the latest
version of Phosphorus Control in Lake Watersheds: A Technical Guide for
Evaluating New Development, published by the Maine Department of
Environmental Protection, the current version being dated September, 1992.
Requirements for maintenance shall be included in deed restrictions and as notes
upon the plan. As an alternative to maintenance by individual lot owners, the
applicant may designate some other entity to be contracted to take the
responsibility, and shall include the above referenced maintenance provisions in
any contractual agreement. Where infiltration systems serve more than one lot, a
lot owners' association shall be established and the above referenced maintenance
provisions shall be referenced in the documentation establishing the association.
4) Wet Ponds. A lot owners' association shall be established to maintain wet ponds,
unless the municipality or some other public entity agrees to assume inspection
and maintenance duties. Documentation establishing the association or
establishing an agreement with a public entity shall include the maintenance
standards specified in the latest version of the manual Phosphorus Control in Lake
Watersheds: A Technical Guide for Evaluating New Development, published by
the Maine Department of Environmental Protection, the current version being
dated September, 1992.
711
DESIGN GUIDELINES
711.1
GENERAL
1. This section is intended to provide an example of design guidelines, which if followed
will result in meeting the appropriate performance standards of Section 710.
2. Compliance with these guidelines shall be considered evidence of meeting those
Performance Standards.
3. Proposed subdivisions not in compliance with the design guidelines of this Article may
be considered, but the applicant shall provide clear and convincing evidence that the
proposed design will meet the performance standard(s), the standards of the Land Use
Code of the City of Brewer, Maine and the statutory criteria applicable to subdivisions, as
applicable.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 40
4. In all instances, the burden of proof shall be upon the applicant to present adequate
information to indicate all ordinance requirements, performance standards and statutory
criteria for approval have been or will be met.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 41
711.2
SUFFICIENT WATER
1. Well Construction
A. Due to the increased chance of contamination from surface water, dug wells shall
be prohibited on lots smaller than one acre. On lots of one acre or smaller, the
applicant shall prohibit dug wells by deed restrictions and a note on the plan.
B. Wells shall not be constructed within 100 feet of the traveled way of any street if
located downhill from the street, or within 50 feet of the traveled way of any
street if located uphill of the street.
C. This restriction shall be included as a note on the plan and deed restriction to the
affected lots.
2. Fire Protection
A. Fire hydrants connected to a public water supply system shall be located no
further than 500 feet from any building.
B. A minimum storage capacity of 10,000 gallons shall be provided for a project not
served by a public water supply. Additional storage of 2,000 gallons per lot or
commercial development unit shall be provided. If multiple principal buildings
are present in the project, storage capacity shall be provided sufficient for initial
flows to automatic fire suppression systems required by the Brewer Building
Code, or any other applicable codes or ordinances.
C. Hydrants or other provisions for drafting water shall be provided to the
specifications of the Fire Department. Minimum pipe size connecting dry
hydrants to ponds or storage vaults shall be eight inches.
D. Where the dry hydrant or other water source is not within the right-of-way of a
proposed or existing street, an easement to the municipality shall be provided to
allow access. A suitable access way to the hydrant or other water source shall be
constructed.
E. The Board shall require an opinion of adequacy of fire protection water supply
from the Fire Chief and the Brewer Water Department Superintendent. (#4)
711.3
STREET DESIGN CRITERIA (#4)
All subdivision proposals shall comply with Article 9 of this Land Use Code.
711.4
IMPACT ON NATURAL BEAUTY, AESTHETICS, HISTORIC SITES,
WILDLIFE HABITAT, RARE NATURAL AREAS OR PUBLIC ACCESS TO THE
SHORELINE
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 42
1. Preservation of Natural Beauty and Aesthetics
A. Unless located in areas designated as a growth area in the comprehensive plan, a
subdivision in which the land cover type at the time of application is forested shall
maintain a wooded buffer strip no less than fifty feet in width along all existing
public roads. The buffer may be broken only for driveways and streets.
B. Unless located in areas designated as a growth area in the comprehensive plan,
building location shall be restricted from open fields, and shall be located within
forested portions of the subdivision. When the subdivision contains no forest or
insufficient forested portions to include all buildings, the subdivision shall be
designed to minimize the appearance of building when viewed from existing
public streets.
C. When a proposed subdivision contains a ridge line identified in the
comprehensive plan as a visual resource to be protected, the plan shall restrict tree
removal and prohibit building placement within 50 feet vertical distance of the
ridge top. These restrictions shall appear as notes on the plan and as covenants in
the deed.
D. When proposed subdivision street traverses open fields, the plan shall include the
planting of street trees. Street trees shall include a mix of tall shade trees and
medium height flowering species. Trees shall be planted no more than fifty feet
apart.
2. Protection of Significant Wildlife Habitat and Important Habitat Areas
The following guidelines are designed to protect the significant wildlife resources
identified in the municipality. The Board recognizes that wildlife management must take
into account many site specific variables. Applicants proposing to subdivide land within
identified wildlife resources must consult with the Maine Department of Inland Fisheries
and Wildlife or a qualified wildlife biologist and provide their written comments to the
Board. The guidelines of this section shall apply to only those subdivisions which
include significant wildlife habitat or resources identified in Section 710.9.3.
A. Protection of Habitat of Endangered or Threatened Species
1) Habitat or species appearing on the official state or federal lists of endangered or
threatened species shall be placed in open space.
2) Deed restrictions and notes on the plan shall reflect standards from the
Department of Inland Fisheries and Wildlife for removal of vegetation within 250
feet of the habitat for species appearing on the list of endangered or threatened
species unless the Department of Inland Fisheries and Wildlife has approved
cutting of vegetation in writing.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 43
B. Protection of Waterfowl, Shorebird, and Wading Bird Habitat, Atlantic Salmon
Spawning and Nursery Areas.
1) There shall be no cutting of vegetation within the strip of land extending 75 feet
inland from the normal high-water mark of the following habitat areas:
a) Shorebird nesting, feeding and staging areas and seabird nesting islands;
b) High and moderate value waterfowl and wading bird habitats, including
nesting and feeding areas;
c) Critical spawning and nursery areas for Atlantic sea run salmon as defined by
the Atlantic Sea Run Salmon Commission, or
d) Other important habitat areas identified in the comprehensive plan.
2) This restriction shall appear as a note on the plan and as a deed restriction to the
affected lots.
C. Protection of Deer Wintering Areas. The report prepared by a wildlife biologist,
selected or approved by the Board, shall include a management plan for deer
wintering areas.
D. Protection of Important Shoreland Areas.
1) Except as provided elsewhere in this Land Use Code, within all areas subject to
the 250 foot shoreland zone:
a) Tree removal shall be limited to no more than 40% of the volume of trees 4
inches or more in diameter measured at 4 1/2 feet above the ground level on
any lot in any ten year period.
b) Harvesting operations shall not create single clear-cut openings greater than
10,000 square feet in the forest canopy. Where such openings exceed 5,000
square feet they shall be at least 100 feet apart. Such clear-cut openings shall
be included in the calculation of total volume removal. For the purposes of the
guidelines volume may be considered to be equivalent to basal area.
c) Cleared openings for subdivision, including but not limited to, principal and
accessory structures, driveways and sewage disposal areas, shall not exceed in
the aggregate, 25% of the lot area or 10,000 square feet, whichever is greater,
including land previously developed.
2) These restrictions shall appear as notes on the plan and as deed restrictions to the
affected lots.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 44
E. If the proposed subdivision includes other important wildlife habitat as identified by the
Department of Inland Fisheries and Wildlife or the comprehensive plan, the restrictions
on activities in and around these areas shall be reviewed by the Department or a qualified
wildlife biologist and their comments presented in writing to the Board.
711.5
STORM WATER MANAGEMENT DESIGN GUIDELINES (#44)
1. Design of best management practices shall be substantially equivalent to those described
in the Maine Erosion and Sediment Control Best Management Practices (BMPs) Manual
for Designers and Engineers, October 2016, published by the Maine Department of
Environmental Protection.
2. Drainage easements for existing water courses or proposed drainage ways shall be
provided at least 30 feet wide, conforming substantially with the lines of existing natural
drainage.
3. The minimum pipe size for any storm drainage pipe shall be 15 inches for driveway
entrances and eighteen inches for cross culverts. If site conditions prohibit the use of
minimum size culverts, the City Engineer or Planning Board may consider allowing the
use of a smaller diameter pipe. Maximum trench width at the pipe crown shall be the
outside diameter of the pipe plus two feet. Pipe shall be bedded in a fine granular
material, containing no stones larger than three inches, lumps of clay, or organic matter,
reaching a minimum of six inches below the bottom of the pipe extending to a minimum
of twelve inches above the top of the driveway pipe and eighteen inches above the cross
culvert. (#62)
4. Catch basins shall be installed where necessary and when located within a street shall be
located at the curb line.
5. Storm Drainage Construction Standards
A. Materials.
1) Storm drainage pipes shall conform to the requirements of Maine Department of
Transportation materials specifications Section 706 for non-metallic pipe. Plastic
(polyethylene) pipes shall not be installed except in closed systems such as street
underdrains. Bituminous-coated steel pipes shall not be used.
2) Where the storm drainage pipe is to be covered by ten feet or more of fill material,
pipe material with a fifty year life shall be used. These materials include concrete
pipe, polyvinyl-chloride (PVC) pipe, polyethylene (PE) pipe, and corrugated
aluminum alloy pipe. Manufacturer's guidelines should be followed for proper
installation techniques and recommendations.
3) Where storm drainage pipe may come into contact with salt water, corrugated
aluminum alloy or HDPE plastic pipes shall be used.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 45
B. Drain inlet alignment shall be straight in both horizontal and vertical alignment unless
specific approval of a curvilinear drain is obtained in writing from the Board, after
consultation with the municipal engineer.
C. Manholes shall be provided at all changes in vertical or horizontal alignment and at
all junctions. On straight runs, manholes shall be placed at a maximum of 300 foot
intervals.
D. Upon completion, each catch basin or manhole shall be cleaned of all accumulation of
silt, debris or foreign matter and shall be kept clean until final acceptance.
711.6
BLOCKS
1. Where street lengths exceed 1,000 feet between intersections with other streets, the Board
may require a utility/pedestrian easement, at least 20 feet in width, to provide for
underground utility crossings and/or a pedestrian pathway of at least five feet in width.
2. Maintenance obligations of the easement shall be included in the written description of
the easement.
711.7
LOTS
1. Wherever possible, side lot lines shall be perpendicular to the street.
2. The subdivision of tracts into parcels with more than twice the required minimum lot size
shall be laid out in such a manner as either to provide for or preclude future division.
Deed restrictions and notes on the plan shall either prohibit future divisions of the lots or
specify that any future division shall constitute a revision to the plan and shall require
approval from the Board, subject to the criteria of the subdivision statute, the standards of
these regulations and conditions placed on the original approval.
3. If a lot on one side of a stream, tidal water, road or other similar barrier fails to meet the
minimum requirements for lot size, it may not be combined with a lot on the other side of
the stream, tidal water, or road to meet the minimum lot size.
4. The ratio of lot length to width shall not be more than three to one. Flag lots and other
odd shaped lots in which narrow strips are joined to other parcels in order to meet
minimum lot size requirements are prohibited.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 46
711.8
MONUMENTS
1. Granite, precast concrete monuments or iron pins shall be set at all street intersections
and points of curvature, but no further than 750 feet apart along street lines without
curves or intersections.
2. Granite, precast concrete monuments shall be set at all corners and angle points of the
subdivision boundaries where the interior angle of the subdivision boundaries is 135
degrees or less.
3. Granite, precast concrete monuments or iron pins shall be a minimum of four inches
square at the top and four feet in length, and set in the ground at final grade level. After
they are set, a drill hole 1/2 inch deep shall locate the point or points described above.
4. All other subdivision boundary corners and angle points, as well as all lot boundary
corners and angle points shall be marked by iron pins as required by the Maine Board of
Registration of Land Surveyors.
711.9
CLUSTER SUBDIVISIONS
1. Purpose
A. The purpose of these provisions is to allow for flexibility in the design of housing
subdivisions to allow for the creation of open space which provides recreational
opportunities or protects important natural features from the adverse impacts of
development, provided that the net residential density shall be no greater than is
permitted in the district in which the subdivision is proposed.
B. Notwithstanding provisions elsewhere in this Land Use Code relating to dimensional
requirements, the Board, in reviewing and approving proposed residential
subdivisions, may modify the provisions related to dimensional requirements to
permit flexibility in approaches to housing and environmental design in accordance
with the following guidelines. This shall not be construed as granting variances.
2. Application Procedure
A. The Board may allow lots within subdivisions to be reduced in area and width below
the minimum normally required by this Land Use Code in return for open space
where the Board determines that the benefits of the cluster approach will decrease
subdivision costs, increase recreational opportunities or prevent the loss of natural
features without increasing the net density of the subdivision. Two sketch plans shall
be submitted with one layout as a standard subdivision and the second as a cluster
subdivision indicating open space and significant natural features. Each lot in the
standard subdivision shall meet the minimum lot size and lot width requirements of
this ordinance, and if not serviced by public sewer have an area suitable for
subsurface waste water disposal according to the Maine Subsurface Wastewater
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 47
Disposal Rules. The number of buildable lots or dwelling units in the cluster
subdivision shall in no case exceed the number of lots or dwelling units in the
standard subdivision.
B. Estimated costs of infrastructure development (roads, utilities, etc.) shall accompany
the plan. The written statement shall describe the natural features which will be
preserved or enhanced by the cluster approach.
C. Natural features include, but are not limited to moderate-to-high value wildlife and
waterfowl habitats, important agricultural soils, moderate-to-high yield aquifers and
important natural or historic sites identified by the comprehensive plan as worthy of
preservation. The statement shall also compare the impacts upon the municipality
from each plan.
D. Examples of impacts are municipal cost for roads, school bussing, solid waste
removal, utility efficiencies, recreational opportunities, protection of flood water
storage areas, environmental impacts on sensitive lands caused by construction
activities, underground utilities, reclamation of land and provision of land for
conservation use.
E. Within ten days of receiving the application, the Board shall invite comments on the
application from the conservation commission, the recreation commission, other
appropriate City agencies, and abutters.
F. Within thirty days of receiving the application, the Board shall determine whether to
allow the subdivision to be developed in accordance with the cluster standards of this
section.
3. Basic Requirements for Cluster Subdivisions
A. Cluster subdivisions shall meet all requirements of these regulations.
B. Each building shall be an element of an overall plan for site development. Only
subdivisions having a total site plan for structures will be considered. The application
shall illustrate the placement of buildings and the treatment of spaces, paths, roads,
service and parking and in so doing shall take into consideration all requirements of
this section and of other relevant sections of these regulations.
C. The net residential acreage shall be calculated by taking the total area of the lot and
subtracting, in order, the following:
1) 15% of the area of the lot to account for roads and parking.
2) Portions of the lot which, because of existing land uses or lack of access, are
isolated and unavailable for building purposes or for use in common with the
remainder of the lot, as determined by the Board.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 48
3) Portions of the lot shown to be in a floodway or a coastal high hazard zone as
designated in the Flood Boundary and Floodway Map prepared by the Federal
Insurance Administration.
4) Portions of the lot which are unsuitable for development in their natural state due
to topographical, drainage or subsoil conditions such as, but not limited to:
a) slopes greater than 20%
b) organic soils.
c) wetland soils.
d) 50% of the poorly drained soils.
5) Portions of the lot subject to rights of way.
6) Portions of the lot located in the resource protection zone.
7) Portions of the lot covered by surface waters.
8) Portions of the lot utilized for storm water management facilities.
D. In order to determine the maximum number of dwelling units permitted on a tract of
land, the net residential acreage shall be divided by the minimum lot size required by
the zoning ordinance. No building shall be sited on slopes steeper than 25%, within
100 feet of any water body or wetland, or on soil classified as being very poorly
drained.
E. The total area of reserved open space within the subdivision shall equal or exceed the
sum of the areas by which any building lots are reduced below the minimum lot area
normally required by the zoning ordinance. No less than 30% of the reserved open
space shall be usable open space.
F. Every building lot that is reduced in area below the amount normally required shall be
within 1,000 feet of the common land.
G. The distance between dwellings shall not be less than 25 feet.
H. No individual lot or dwelling unit shall have direct vehicular access onto a public
road existing at the time of subdivision.
I. Shore frontage shall not be reduced below the minimum normally required by the
zoning ordinance.
J. Where a cluster subdivision abuts a body of water, a usable portion of the shoreline,
as well as reasonable access to it, shall be a part of the common land.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 49
711.10
PHOSPHORUS EXPORT
1. When a proposed subdivision is within the direct watershed of a great pond and qualifies
for the simplified review procedure, buffer strips shall be provided in accordance with the
following table.
A. Buffer strips shall be provided on the downhill side of all lots along all tributaries to
great ponds and along the great pond.
B. The minimum required width of buffer strips are designated in Table 711.10.3 and
depend on the watershed in which the proposed subdivision is located, the size of the
lot, the hydrologic soil group, and whether deed restrictions are proposed to limit the
area which may be cleared on each lot.
2. When the proposed subdivision is within the direct watershed of a great pond and does
not qualify for simplified reviewed, the phosphorus control measures shall meet the
design criteria in the latest version of the Phosphorus Control in Lake Watersheds: A
Technical Guide for Evaluating New Development, published by the Maine Department
of Environmental Protection, the most current version being dated September, 1992.
Table 711.10.3
Buffer Strip Widths in Watershed of Hypothetical Pond
Phosphorus Standard: 0.07 - 0.08 lbs./acre
Buffer Width in Feet Per Lot
Lot
Hydrologic
Soil Group
Clearing
Restricted to
12,500 sq. ft.
No Clearing
Restrictions
< 1 Acre
A
75
85
B
130
150
C
NA
NA
D
NA
NA
1-1.99 Acres
A
25
25
B
25
55
C
55
190
D
200
NA
2-2.99 Acres
A
25
25
B
25
25
C
25
50
D
25
200
All lots 3 acres and larger shall provide a minimum 25 foot buffer.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 50
711.11
UTILIZATION OF THE SITE
Utilization of the Site - The plan for the development will reflect the natural capabilities
of the site to support development. Buildings, lots, and support facilities will be clustered
in those portions of the site that have the most suitable conditions for development.
Environmentally sensitive areas, including but not limited to, wetlands, steep slopes,
floodplains, significant wildlife habitats, fisheries, scenic areas, habitat for rare and
endangered plants and animals, unique natural communities and natural areas, and sand
and gravel aquifers will be maintained and preserved to the maximum extent. The
development shall include appropriate measures for protecting these resources, including
but not limited to, modification of the proposed design of the site, timing of construction
and limiting the extent of excavation.
711.12
HISTORIC AND ARCHAEOLOGICAL RESOURCES
Historic and Archaeological Resources - If any portion of the site has been identified as
containing historic or archaeological resources, the development shall include appropriate
measures for protecting these resources, including but not limited to, modification of the
proposed design of the site, timing of construction, limiting extent of excavation.
712
ACCEPTANCE OF STREETS IN A FULLY APPROVED SUBDIVISION
Upon the application of the sub divider and the receipt of a written certification from a
professional engineer licensed in the State of Maine that a street or streets and any
improvements associated therewith in a fully approved subdivision in the City of Brewer has
been constructed and/or reconstructed in accordance with this Subdivision Article, other City
Ordinances, and the conditions of approval imposed by the Brewer Planning Board and/or
City Council, the City Council shall refer the written certification to the City Engineer and
the City Manager for their review. Within thirty (30) days after the City Engineer and the
City Manager receive the written certification, they shall review the street and associated
improvements for compliance with this Subdivision Article and the conditions of approval
imposed by the Brewer Planning Board or City Council and they shall each submit to the
City Council their written recommendation on the proposed acceptance of the street and
reasons therefor. The City Council shall accept the street as a city street upon the written
certification of a professional engineer as hereinbefore provided for and favorable
recommendations from both the City Engineer and City Manager to accept the street.
Conversely, if the City Council does not receive a favorable recommendation from either the
City Engineer or City Manager, the City Council need not accept the street and may take
such action as it deems appropriate.
The sub divider shall file a deed conveying the street to the City satisfactory to the City
Council and an affidavit stating the sub divider voluntarily offers to transfer the street to the
City and waives any claim for damages in accordance with Title 23 M.R.S.A. Section 3025
before the City Council shall consider acceptance of the proposed street.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 51
A sub divider may not request a street in a fully approved subdivision be accepted by the
City Council more than twice in any calendar year.
All applications which shall include "as built" plans and certifications under this Article shall
be filed with the City Clerk as agent for the City Council.
712.1
ENGINEERING CERTIFICATION
A professional engineer, licensed in the State of Maine and paid for by the developer,
shall certifying in writing to the City that the following have been constructed in
accordance with the provisions of this subdivision article, other ordinances of the City of
Brewer, and any conditions of the subdivision's approval established by the Brewer
Planning:
1. Utilities which are located below the surface of the street have been properly
installed. Utilities shall include, but not be limited to water, sewer, storm drains, and
underdrains.
2. The sub-grade has been properly prepared and installed.
3. The gravel base has been tested for material compliance, thickness and properly
graded, compacted and installed.
4. All asphalt materials have been properly installed.
5. Curbs, ditches and any stormwater detention facilities and any stormwater structures
have been properly installed.
6. Permanent monumentation of all property lines and street rights-of-ways have been
set.
712.1.1
DEVELOPER'S RESPONSIBILITIES FOR TESTING, INSPECTION AND
REPORTING (#6)
Testing of the various materials used for construction of the street and inspection of
the in-place products is the responsibility of the developer. A qualified inspector shall
be retained by the developer to provide these services. The following items shall be
submitted to the City Engineer upon application for conditional or final acceptance of
a street as minimum evidence that the street has been constructed in accordance with
the provisions of this ordinance.
A. The project inspector will be required to certify that all underground utilities have
been installed in accordance with the approved subdivision plans and generally
accepted construction standards. Prior to acceptance, the City may also videotape
sewers and storm drains to check for sagging, squatting, misalignment or other
evidence of improper installation.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 52
B. Prior to placing filter fabric and sub-base gravel, the subgrade shall be visually
inspected to ensure proper grubbing and sloping has been accomplished. The
condition of the subgrade shall also be visually evaluated for suitability to support
the sub-base material. Proper compaction of all utility trenches should be
verified. Copies of all inspection reports shall be forwarded to the City Engineer.
C. The specifications for the gravel sub-base and base materials shall be shown on
the project drawings. Samples of each should be obtained from the source and
tested by an MDOT approved lab to ensure compliance with the MDOT gradation
specifications and to determine the theoretical maximum density and optimum
water content. The project inspector shall evaluate the lab results to ensure
compliance with the project and City specifications and a copy of the results shall
be sent to the City Engineer.
D. Compaction testing shall be performed on each layer of the road base gravel to
ensure 95% compaction is achieved. The method, location and frequency of tests
shall be determined by the inspector to ensure representative results are obtained
for the project. The certified results of all compaction testing shall be forwarded
to the City Engineer. Visual inspections shall be performed daily, or as necessary,
to ensure that contaminated materials are removed from the sub-base and base
gravels. Measurement of the depth of each layer of gravel shall be made by the
project inspector to ensure compliance with the project specifications and results
shall be sent to the City Engineer.
E. Final approval of the road base prior to paving shall be performed by the project
inspector base on the visual inspection and the testing specified above. Final lines
and grades shall meet MDOT tolerances. Prior to the start of paving a written
certification from a Registered Professional Engineer shall be submitted to the
City Engineer stating that the roadway base was constructed in accordance with
the project specifications and is ready for paving.
F. As-built drawings certified by a Registered Professional Engineer shall be
submitted to the City Engineer prior to the acceptance of any street. These shall
document all changes to the approved plans and show final locations of all
utilities including water, sewer and storm drain stubs to individual lots.
712.1.2
WRITTEN ADVICE
The City Council shall receive the written recommendations of the City Engineer,
City Planner, and the City Manager on the advisability of the acceptance of the
street prior to acceptance. Such advice may include conditions of street
acceptance and recommendations as to the necessity of additional guarantees.
712.1.3
SUBDIVIDER RESPONSIBILITY
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 53
The sub divider accepts complete responsibility for any damages or problems
with the street and improvements until the street is accepted by the City Council.
In the event that the City Council determines additional security is necessary, a
guarantee shall be provided at the City Council's discretion according to Section
714 of this Article. Said guarantee shall be filed with the City Clerk prior to street
acceptance.
713
(LEFT BLANK/SKIPPED)
714
PERFORMANCE GUARANTEES
714.1
TYPES OF GUARANTEES
With submittal of the application for final plan approval, the applicant shall provide one
of the following performance guarantees for an amount adequate to cover the total
construction costs of all required improvements, taking into account the time-span of the
construction schedule and the inflation rate for construction costs:
1. Either a certified check payable to the municipality or a savings account or certificate
of deposit naming the municipality as owner, for the establishment of an escrow
account;
2. A performance bond payable to the municipality issued by a surety company,
approved by the City Council;
3. An irrevocable letter of credit from a financial institution establishing funding for the
construction of the subdivision, from which the City may draw if construction is
inadequate, approved by the City Council; or
4. An offer of conditional approval limiting the number of units built or lots sold until
all required improvements have been constructed.
The conditions and amount of the performance guarantee shall be determined by the City
Council based upon the recommendation of the Planning Board.
714.2
CONTENTS OF GUARANTEE
The performance guarantee shall contain a construction schedule, cost estimates for each
major phase of construction taking into account inflation, provisions for inspections of
each phase of construction, provisions for the release of part or all of the performance
guarantee to the developer, and a date after which the applicant will be in default and the
municipality shall have access to the funds to finish construction.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 54
714.3
ESCROW ACCOUNT.
A cash contribution to the establishment of an escrow account shall be made by either a
certified check made out to the municipality, the direct deposit into a savings account, or
the purchase of a certificate of deposit. For any account opened by the applicant, the
municipality shall be named as owner or co-owner, and the consent of the municipality
shall be required for a withdrawal. Any interest earned on the escrow account shall be
returned to the applicant unless the municipality has found it necessary to draw on the
account, in which case the interest earned shall be proportionately divided between the
amount returned to the applicant and the amount withdrawn to complete the required
improvements.
714.4
PERFORMANCE BOND
A performance bond shall detail the conditions of the bond, the method for release of the
bond or portions of the bond to the applicant, and the procedures for collection by the
municipality. The bond documents shall specifically reference the subdivision for which
approval is sought. Performance bond shall be approved as to form by the City Solicitor.
714.5
LETTER OF CREDIT
An irrevocable letter of credit from a bank or other lending institution shall indicate that
funds have been set aside for the construction of the subdivision and may not be used for
any other project or loan. Letter of Credit shall be approved as to form by the City
Solicitor.
714.6
CONDITIONAL AGREEMENT
The Board at its discretion may provide for the applicant to enter into a binding
agreement with the municipality in lieu of the other financial performance guarantees.
Such an agreement shall provide for approval of the final plan on the condition that no
more than four lots may be sold or built upon until either:
1. It is certified by the Board, or its agent, that all of the required improvements have
been installed in accordance with these regulations and the regulations of the
appropriate utilities; or
2. A performance guarantee, acceptable to the municipality, is submitted in an amount
necessary to cover the completion of the required improvements at an amount
adjusted for inflation and prorated for the portions of the required improvements
already installed.
Notice of the agreement and any conditions shall be on the final plan that is recorded
at the Registry of Deeds. Release from the agreement shall follow the procedures for
release of the performance guarantees contained in Section 714.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 55
714.7
PHASING OF DEVELOPMENT
The Board may approve plans to develop a major subdivision in separate and distinct
phases. This may be accomplished by limiting final approval to those lots abutting that
section of the proposed subdivision street which is covered by a performance guarantee.
When development is phased, road construction shall commence from an existing public
way. Final approval of lots in subsequent phases shall be given only upon satisfactory
completion of all requirements pertaining to previous phases.
714.8
RELEASE OF GUARANTEE
Prior to the release of any part of the performance guarantee, the Board shall determine to
its satisfaction, in part upon the report of the City Planner or other qualified individual
retained by the municipality and any other agencies and departments who may be
involved, that the proposed improvements meet or exceed the design and construction
requirements for that portion or phase of the subdivision for which the release is
requested.
714.9
DEFAULT
If upon inspection, the City Planner or other qualified individual retained by the
municipality finds that any of the required improvements have not been constructed in
accordance with the plans and specifications filed as part of the application, he or she
shall so report in writing to the code enforcement officer, the City Council, the Board,
and the applicant or builder. The City Council shall take any steps necessary to preserve
the municipality's rights.
714.10
IMPROVEMENTS GUARANTEED
Performance guarantees shall be tendered for all improvements required to meet the
standards of these regulations and for the construction of the streets, storm water
management facilities, public sewage collection or disposal facilities, public water
systems, and erosion and sedimentation control measures.
715
WAIVERS
715.1
WAIVERS AUTHORIZED
Where the Board makes written findings of fact that there are special circumstances of a
particular parcel proposed to be subdivided, it may waive portions of the submission
requirements, unless otherwise indicated in the regulations, provided the applicant has
demonstrated that the performance standards of these regulations and the criteria of the
subdivision statute have been or will be met, the public health, safety, and welfare are
protected, and provided the waivers do not have the effect of nullifying the intent and
purpose of the comprehensive plan, the zoning ordinance, or these regulations.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 56
715.2
FINDINGS OF FACT REQUIRED
Where the Board makes written findings of fact that due to special circumstances of a
particular lot proposed to be subdivided, the provision of certain required improvements
is not requisite to provide for the public health, safety or welfare, or are inappropriate
because of inadequate or lacking connecting facilities adjacent to or in proximity of the
proposed subdivision, it may waive the requirement for such improvements, subject to
appropriate conditions, provided the waivers do not have the effect of nullifying the
intent and purpose of the comprehensive plan, the Land Use Code, or these regulations,
and further provided the performance standards of these regulations and the criteria of the
subdivision statute have been or will be met by the proposed subdivision.
715.3
CONDITIONS
Waivers may only be granted in accordance with Sections 715.1 and 715.2. When
granting waivers, the Board shall set conditions so that the purposes of these regulations
are met.
715.4
WAIVERS TO BE SHOWN ON FINAL PLAN
When the Board grants a waiver to any of the improvements required by these
regulations, the final plan, to be recorded at the Registry of Deeds, shall indicate the
waivers granted and the date on which they were granted.
716
BUILDING PERMITS
The Code Enforcement Officer shall not issue any building permit required under this Land
Use Code and/or Chapter 16 of the Brewer Charter, Codes and Ordinances for any structure
upon a lot in a subdivision for which a plan has not been approved and the street that the lot
is located upon has not been accepted or conditionally accepted under this Land Use Code.
Notwithstanding the foregoing, the Code Enforcement Officer may issue building and other
required permits on one lot in an approved subdivision, located in the Industrial (IND) and
Industrial-2 (IND2) districts, where all required improvements are being constructed by the
City of Brewer, with City Council approval, and where site plan approval has been obtained
from the Planning Board if required. (#8)
717
APPEALS
717.1
APPEALS TO THE BOARD OF APPEALS
Pursuant to Article 13 of this Land Use Code and Chapter 34 of the City of Brewer
Charter, Codes and Ordinances, an administrative appeal may be taken to the Brewer
Zoning Board of Appeals by an aggrieved party from any decision of the Brewer
Planning Board. Such appeal shall be taken within thirty (30) days of the date of the
decision appealed from.
Brewer City Ordinances, Chapter 24 Land Use Code, Article 7
7 - 57
717.2
APPEALS TO SUPERIOR COURT
An aggrieved party may appeal any decision of the Board of Appeals under these
regulations to Penobscot County Superior Court, within thirty days of the date the Board
issues a written order of its decision.