Shoreland Zoning Ordinance, Town of Brooklin
Brooklin, Maine
· adopted 2009-04-04
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 7f5caeb14afe · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
TOWN OF BROOKLIN :
Shoreland Zoning Ordinance |
Effective Date:. 3/9] (Gq ] |
Amended: afulacng |
Certified by: Lheall Seay Y-/Y-OF
Buns. OGan 1-09
| ey) HY-OF
Municipal Officers Date
Attest: True Copy: dfifecc
Table of Contents .
Section 1. Purposes ...........cccccsesssssssssssssesssesessssesesssvevssacacacavsceacaeaceasscsvssaususscassessssssssasaeeavaceseeee 3
C) Section 2. Authority 0.0.0... eseessssessssesessscscsssssesssseevesscstsvscsesessesacassvesusessessestseserststatsssesceseee 3
\ Section 3. Applicability ...........c.cccccsscsscsessssssesssscscsessessssevcsessecstecatesatacsusecsssesessesasasavsssessesesenaee 3
Section 4, Effective Date and Ordinance Amendment...............ccccssccessssssessesssessessscssesscesseee 4
A. Effective Date of Ordinance and Ordinance Amendments............cccccccccsesesesesereceeee 4
B. Repeal of Municipal Timber Harvesting Regulation ............0..ccccscsscccssscssssssseseees 4
Section 5. Availability... ccssssssssssssssecsessessesessessessssessessssssessssessecersessecnusssssssssessssesersveves 4
Section 6. Severability........ceecssssssssesessssscsessesessesssscssscssssessssscsecesesuessnesesarsatecsstsssssesesseesene 5
Section 7. Conflicts with Other Ordinances ...........cccccccccssssscsesesessssesvsssscsecsssseceessssesesseecsescasee 5
Section 8. Amendments 0.00... .c.cccccsssessesessessessssessssesscessesesasscsensacscscsvsnearsussesecsarscssceesesarecsessseen 5
Section 9. Districts and Zoming Map.........cecccsscsssssssessessesecsesesseesecssssssesssssusssrcsvesessavsacaneane 5
A. Official Shoreland Zoning Map.............ccccccssssessssssssssessscessscsssscscsssssseseeacecseecseee 5
B. Scale Of Man... cccsssssssscsssssssssssscsesesssesssssssesessscsesseasssussacscareeseersusaesessavanevavacseasseeee 5
C. Certification of Official Shoreland Zoning Map........cccccccccssssesssssssssssesveseeccreeesseseee 6
D. Changes to the Official Shoreland Zoning Map...........ccccccccsessessecsscccesesesssssssscsesees 6
Section 10. Interpretation of District Boundaries.........0.0.cccccccsssescsesssesescecssseseecescscscsesesessee ©
Section 11. Land Use Requirements.............cscssscssssssssessssecseestecseecneecsesesssessssssecssseessesssesssecsee ©
Section 12, Non-comforMance .0........ sec ssssssssssessssssessssessscsessscscscsesesessesestssssesecsesesssssstacsesesesersenees O
A. PUPPOSC.........c ccc cccscssseceseseecstsseseseatsesssscsescseseccssscscassesssscsssacssnsseactsaeseatensecucaresesscacecasaee O
DB. General... eccccccccscesscscsesssscssssssssssvsccassecsecssesavenecancessscseceascsacsarsarsatascesssesecsserseresseseee ©
; 1. Transfer of Ownership: ...........ccccccssssecssssssescesecesesscsssossessesssscerscsestsesearsvacsssssseacsecaee ©
2. Repair and Maintemance? ..........ccsccsescssscscsessssecccecescscsecessssscsssvacereracacacecessatacsececeee 7
C. Non-conforming Structures .0..........cccssesssecssscsssscsescsscerevsesscesscsessacstsasaresseseacacacacsceneae 7
1. EXPAMsiONs: 0... eesssssssssscssssssssesessecsscscsssscssssossensscsevescccsstssscvscacecsessvscseasacsacacesceee 7
C) 2. Relocations ......cecccccssescssccecesescsssssssseseseeessescsesseesesecseusevsscasscacsssessesvsestasentenssessacencsecsee 7 .
3. Reconstruction or Replacement: ...........c.ccsccccsccssscssscsssssscssessessecesssasecesesssssseeceesete 8
4. Change of Use of a Non-conforming Structure. .......cccccccccccsccssecsesssssescecsesescssseseeees 9
D. Non-conforming Uses... ccsesssssesssessssssesescsssessesssscscscesessssecsessseersasesscsvscassscseesecee D
1, Expansions? oo... scessssssssesesesesnsecsssesesesssesessssesesavscscsavscsvscessenssesaeasesstarsresresseeses D
2. Resumption Prohibited: 0.0... .cccscssssessscsssssssesssescesscassscscessssesessssverseersescasacnenesaee 9
3. Change Of Use? 0... sssesecessssssesntssssneessnecsssessnessnessessseesnessesssresssseessanesnnesesesseeessee 10
E. Non-conforming Lots... cccssssssssscsesssescsessscscsessessescscasescscessvasscarsnsacacsessatecetecsees LO
1. Non-conformiing Lots: 0.0... ccssssssececesssssssessscsscseceveccasesssvecssseeseseesecsesrarsersisesees 10
2. Contiguous Built Lots: 0... essesssssessssesesssssscssescsescsesesesssssssesssersesessescsssearereeee LO
. 3, Contiguous Lots - Vacant or Partially Built: ..0.0...0...éccccccsscscsessscsesssssteseesesseeeeee 10 ,
Section 13. Establishment of Districts ...0.0........ccccccscssssssssscsssesssscsssssssnsssscstsscsesesescscscseneee LO
A. Resource Protection District ...........ccccccessssecsesscessesessssessesssessssesessessesstssssveeceee 10°12
B. Limited Residential District ...0.0......0.cc.ccccesesssessssscsssssscsessceceessssessssscsesavscseseseecatacaseses LZ
C. Limited Commercial District .....0.0..0.....ccccscssssesesessssescssesesscsssscsessersscestsessssssescerseee 12
D. General Development I District. .....0.......ccceccsessssscscessssssssscsssssrsesessesssavscesestsceneseeee LZ
E. General Development II District..............c.ccccccesssssssessssssssscsssscscatssestsrstsseessenserseeee 13
F. Commercial Fisheries/Maritime Activities District. .......0.0..0.ccccccsesssscssseseesseeseseeee 13
G. Stream Protection District ...00...0.0...cccccccscssessescsssssssssvscsscererssacessssssessetatseseseereeseeeee 13
Section 14, Table of Land Uses. ..........c.cessssessssesssscsescssseessvescessersesesesscsessessssuesererseetsaseresesesseeee 14
Key to Table 1: oo... cesessssssesssesessssessscscssssvsusscscscsssssssssessssevscaseneasasevsscesarsrsssessesusasacsescesave 14
i Abbreviations: ...........ccsecccsscscsecsesssesssesssssesssseseseessessscsessssacsassesscsasescarsessevsacavarseacssarecasseeee 14
TABLE 1. LAND USES IN THE SHORELAND ZONE oon eecsccccssssessecsesssssessesseces., 15-17
Section 15. Land Use StAMATAS a rercstcnrsrstintunstutttinininnnn 18
A. Minimum Lot StAMALAS ..-eeseeonentetniemeimtnntiiunnnenn 18
B. Principal and Accessory Structures rrttteseeteeeeeeeeeeseesesereeesenstessscesateseeessessssssareccsesess 19-22
C) OF Piers, Docks, Wharves, Breakwaters, Causeways, Marinas, Bridges and Other
Structures and Uses Extending Over or Below the Normal High-Water Line of a Water
Body or Within a Wetland. Ttrttereseeseescensstesesssesstesesseasevesassussaesstecsesstesssessessetsssesseseesiveseeses., 22
D. FAMPEFOUNAS wn nnnnnininnninnnnnninnnnnnnennnn 23
E. Individual Private CAMPSIECS..eeserrorereetntntttneneitinnnnec 23
F. Commercial and Industrial Uses (bordering great POMS) 0. ec cscsecsessesseseeses 24
G. Parking PCBS rnsevertnentininnntnnneiiniitiitinnunnnecc 24
H. Roads and Driveways Fine netiennesenescatecnsssasecevertcsssssncanesssetssssscssssessessesseenessvess 25627
J. Storm Water RUMOF ao rorrestnnnntnntutinntnttntitininnnnn 27
K. Septic Waste DISPOSAL .srneonssneninnneisnimtiinnnnennn 28
L. Essential Services een ere retenenrreteseeissectecsnasesecassaseasisaansssesssenessaesasessicssesteesseesevsses., 28
M. Mineral Exploration and PX ACTON. eeecsssstesssttnttssttinientiininc 29
N. PETC MTEMN Cs nntnnnnnninminnnnnnmninnnenennn 30
O. Timber Harvesting (REPEALED PURSUANT TO SECTION 4B )osessstereseenes 30-32
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting 33
TABLE 3, POINTS FOR "WELL-DISTRIBUTED STAND OF TREES'............... 33.
Q. Erosion and Sedimentation COMETOL..essseeseesssteensssteesssetintusttitintiiicn 35
R, ibe innsnntnnninnsnninsnnnunnnnnnnnnnn nn 36
S. Water QALY re rrntrennsenmnnititinunnunnnnnnnnnnrec 36
T. Archaeological SHES serrrretisnstntutenetnetntnitititiininenn 37
C) Section 16. Administration ..nsnnonnnnnnennnnninnnccncc 37
A. Administering Bodies and Agents Tetererereetecseeseessstecetesesssssnesstesssserassssssssteverssesersesses 37
B. Permits Required ereeeeenennenensensenacenssesscenseseseueanscnssnssessanesssasssessrissnesassstsencsusssesaveseessce 37
C. Permit APPHICAEION .entrooernsttettnnnninentinnnnnrnenc 38
D. Procedure for Administering the Permits (Approval of Permits)... cccccseesees 38
EK. Special PXCEPLONS oo reerrreotnennininsnsnintintinunenn 39
F. Expiration of POP MI ororoteresesrrtemennsnstintutitutiunnnnnc 40
G. Installation of Public Utility Service Tttttteeereesseeesesssecssestrsenssnsnesserssssssesescasersssececssseee 40)
H. Appeals and VATEANCES oo oenrorsonestnneteneitntititianininnrn cn AO-Ad
I. BMTOFEEMENE nr initetnnnntminnmnnnnnunnnnnrnnncc ent AN
Section 17. Definitions. "*erenennnneensntsseeseranenseeescotsesesesessenessassenssessacseecsacsteessssssssersacarersesese, 46055
CO)
2
Shoreland Zoning Ordinance for the Municipality of Brooklin
Section 1. Purposes
The purposes of this Ordinance are:
to further the maintenance of safe and healthful conditions;
to prevent and control water pollution;
to protect fish spawning grounds aquatic life, bird and other wildlife habitat;
to protect buildings and lands from flooding and accelerated erosion;
to protect archaeological and historic resources;
to protect commercial fishing and maritime industries;
to protect freshwater and coastal wetlands;
to control building sites, placement of structures and land uses;
to conserve shore cover, and visual as well as actual points of access to'inland and coastal
waters; ;
to conserve natural beauty and open space;
and to anticipate and respond to the impacts of development in a shoreland areas.
. Section 2. Authority
This Ordinance has been prepared in accordance with the provisions of Title 38 sections 435-
O 449 of the Maine Revised Statutes Annotated (M.R.S.A.).
Section 3. Applicability |
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
e normal high-water line of any river,
: e upland edge of a coastal wetland, including all areas affected by tidal action, or
¢ upland edge of a freshwater wetland rated by the Maine Department of Inland Fisheries
_ and Wildlife as having moderate or high value; .
and within 75 feet, horizontal distance, of the
e upland edge of a wetland that is rated low value or is not rated by the Maine
Department of Inland Fisheries and Wildlife, .
e normal high-water line of an outlet stream or
e normal high-water line of a stream.
This Ordinance also applies to any structure built on, over, or abutting a dock, wharf or pier, or
other structure extending or located below the normal high-water line of a water body or within
a wetland.
; 3 ;
Section 4. Effective Date and Ordinance Amendments
A. Effective Date of Ordinance and Ordinance Amendments.
a
©) This Ordinance amends the Ordinance, which was adopted by the municipal legislative
, body on March 9, 1991, as subsequently amended effective April 4, 1998, April 16,
2002 and April 4, 2009, shall not be effective unless approved by the Commissioner of
the Department of Environmental Protection, A certified copy of this Ordinance,
attested and signed by the Municipal Clerk, shall be forwarded to the Commissioner for
approval. If the Commissioner of Environmental Protection fails to act on this
Ordinance within forty-five (45) days of his/her receipt of the Ordinance, it shall be
automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45)
day period shall be governed by the terms of this Ordinance, if the Ordinance is
approved by the Commissioner or is otherwise automatically approved.
B. . Repeal of Municipal Timber Harvesting Regulation
The municipal regulation of timber harvesting activities is repealed on the statutory
date established under 38 M.R.S.A. section 438-A (5), at which time the State of
Maine Department of Conservation's Bureau of Forestry shall administer timber
harvesting standards in the shoreland zone. On the date established under 38 M.R.S.A,
-- section 438-A(5), the following provisions of this Ordinance are repealed: -
C) Section 14. Table of Land Uses, Item 3 ( Forest management
- activities except for timber harvesting) and Item 4 (Timber
Harvesting); and Item 27 (Land Management Roads);
Section 15(O) in it's entirety; and
Section 17. Definitions, the definitions of "forest management
activities", "residual basal area" and "slash",
NOTE: The statutory date is defined as "the first day of January of the 2"4 year
following the year in which the Commissioner of Conservation determines that at least
252 of the 336 municipalities identified by the Commissioner of Conservation as the
municipalities with the highest acreage of timber harvesting activity on an annual basis
for the period 1992-2003 have either accepted the state-wide standards or have adopted
an ordinance identical to the state-wide standards." 38 M.R.S.A. section 438-A(5)
further provides that "the Commissioner of Conservation shall notify the Secretary of
State in writing and advise the Secretary of the effective date of the state-wide --
standards," |
Section 5. Availability :
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public, at ,
() |
4
reasonable cost, at the expense of the person making the request. Notice of availability of this
Ordinance shall be posted.
CY Section 6. Severability _
NL _
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance. .
Section 7. Conflicts with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision
of this Ordinance or of any other ordinance, regulation or statute administered by the
municipality, the more restrictive provision shall control.
Section 8. Amendments .
This Ordinance may be amended by majority vote of the legislative body. Copies of -
amendments, attested and si gned by the Municipal Clerk, shall be submitted to the ~~
Commissioner of the Department of Environmental Protection following adoption by the
municipal legislative body and shall not be effective unless approved by the Commissioner, If
the Commissioner fails to act on any amendment within forty-five (45) days of his/her receipt
of the amendment, the amendment is automatically approved. Any application for a permit
submitted to the municipality within the forty-five (45) day period shall be governed by the
terms of the amendment, if such amendment is approved by the Commissioner or is otherwise
- automatically approved.
C)
, Section 9. Districts and Zoning Map
A. Official Shoreland Zoning Map
The areas to which this Ordinance is applicable are hereby divided into the following
districts as shown on the Official Shoreland Zoning Map(s) which is (are) made a part
of this Ordinance:
1. Resource Protection
2. Limited Residential-Recreational District
3. Limited Commercial
4. General Development I
5. General Development II
6. Commercial Fisheries/Maritime Activities
7. Stream Protection
B. Scale of Map
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch
= 2000 feet. District boundaries shall be clearly delineated and a legend indicating the
>) symbols for each district shall be placed on the map.
5
C. Certification of Official Shoreland Zoning Map ;
C) The Official Shoreland Zoning Map shall be certified by the attested signature of the
Municipal Clerk and shall be located in the municipal office. In the event the -
municipality does not have a municipal office, the Municipal Clerk shall be the
custodian of the map.
D. Changes to the Official Shoreland Zoning Map
If amendments, in accordance with Section 8, are made in the district boundaries or
other matter portrayed on the Official Shoreland Zoning Map, such changes shall be
made on the Official Shoreland Zoning Map within thirty (30) days after the
amendment has been approved by the Commissioner of the Department of
Environmental Protection.
Section 10. Interpretation of District Boundaries . .
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary te
lines are property lines, the centerlines of streets, roads and rights of way, and the
boundaries of the shoreland area as defined herein. Where uncertainty exists as to the
exact location of district boundary lines, the Board of appeals shail be the final
_ authority as to location.
Section 11. Land Use Requirements
O Except as hereinafter specified, no building, structure or land shall hereafter be used or
occupied, and no building or structure or part thereof shall hereafter be erected, constructed,
expanded, moved, or altered and no new lot shall be created except in conformity with all of
the regulations herein specified for the district in which it is located, unless a variance is
granted.
Section 12. Non-conformance .
A. Purpose a
It is the intent of this Ordinance to promote land use conformities, except that non- -
conforming conditions that existed before the effective date of this Ordinance or
Amendments there to, shall be allowed to continue, subject to the requirements set forth
in Section 12. Except as otherwise provided in this Ordinance, a non-conforming
condition shall not be permitted to become more non-conforming. .
B. General
1. Transfer of Ownership: Non-conforming structures, lots, and uses
may be transferred, and the new owner may continue the non-conforming use or
continue to use the non-conforming structure or lot, subject to the provisions of
- this Ordinance.
O
| 6
2. Repair and Maintenance: This Ordinance allows, without a permit,
. the normal upkeep and maintenance of non-conforming uses and structures,
_~ including repairs or renovations that do not involve expansion of the non-.
a, conforming use or structure, and such other changes in a non-conforming use or
structure as federal, state, or local building and safety codes may require.
NOTE: See Section 17 for the definitions of non-conforming structures,
non-conforming uses and non-conforming lots.
Cc, Non-conforming Structures
1, Expansions: A non-conforming structure may be added to or expanded after
obtaining a permit from the same permitting authority as that for a new
7 structure, if such addition or expansion does not increase the non-conformity of
the structure and is in accordance with sub-paragraphs (a) and (b) below.
Further Limitations: oo -
(a.) After January 1, 1989 if any portion of a structure is less than the
required setback from the normal high-water line of a water
body or tributary stream or the upland edge of a wetland, that portion of
the structure shall not be expanded as measured in floor area or volume,
by 30% or more, during the lifetime of the structure. If a replacement
structure conforms with the requirements of Section 12(C)(3), and is less
. than the required setback from a water body, tributary stream or wetland,
. the replacement structure may not be expanded if the original
C) structure existing on January 1, 1989 had been expanded by 30% in floor
area and volume since that date.
(b.) | Whenever a new, enlarged, or replacement foundation is constructed
under a non-conforming structure, the structure and new foundation
must be placed such that the setback requirement is met to the greatest
- practical extent as determined by the Planning Board, or its designee,
. basing its decision on the criteria specified in Section 12(C)(2)
Relocation, below. If the completed foundation does not extend beyond
Oe the exterior dimensions of the structure, except for expansion in
* conformity with Section 12(C)(1)(a) above, and the foundation does not
cause the structure to be elevated by more than three (3) additional feet
as measured from the uphill side of the structure (from original ground
level to the bottom of the first floor sill) it shall not be considered to be.
an expansion of the structure. |
2. Relocation: A non-conforming structure may be relocated within the
boundaries of the parcel on which the structure is located provided that the site
of relocation conforms to all setback requirements to the greatest practical .
extent as determined by the Planning Board, or its designee, and provided that
; the applicant demonstrates that the present subsurface sewage disposal system
- meets the requirements of State law and the State of Maine Subsurface .
C) |
7
Wastewater Disposal Rules (Rules), or that a new system can be installed in
compliance with the law and said Rules. In no case shall a structure be
. relocated in a manner that causes the structure to be more non-conforming.
C) In determining whether the building relocation meets the setback to the greatest
practical extent, the Planning Board, or its designee, shall consider the size of ©
the lot, the slope of the land, the potential for soil erosion, the location of other
structures on the property and on adjacent properties, the location of the septic
system and other on-site soils suitable for septic systems, and the type and
amount of vegetation to be removed to accomplish the relocation. When it is
necessary to remove vegetation within the water or wetland setback area in
order to relocate a structure, the Planning Board shall require replanting of
native vegetation to compensate for the destroyed vegetation. In addition, the
area from which the relocated structure was removed must be replanted with
vegetation. Replanting shall be required-as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least
one native tree, three (3) feet in height, for every tree removed. If more than
--_ five trees are planted, no one species of tree shall-make-up-more than 50%-of the - - - - - -
_ number of trees planted. Replaced trees must be planted no further from the
water or wetland than the trees that were removed.
Other woody & herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at
least the same size as the area where vegetation and/or ground cover was
e disturbed, damaged, or removed must be reestablished within the setback area.
The vegetation and/or ground cover must consist of similar native vegetation
and/or ground cover that was disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original
location of the structure shall be replanted with vegetation which may consist of
grasses, shrubs, trees, or a combination thereof.
3. Reconstruction or Replacement: Any non-conforming structure which is
: located less than the required setback from a water body, tributary stream, or
wetland and which is removed, or damaged or destroyed, regardless of the
cause, by more than 50% of the market value of the structure before such
damage, destruction or removal, may be reconstructed or replaced provided that
a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal and provided that such reconstruction or replacement is
in compliance with the water body, tributary stream or wetland setback
requirement to the greatest practical extent as determined by the Planning Board
; or its designee, in accordance with the purposes of this Ordinance. In no case
shall a structure be reconstructed or replaced so as to increase its non-
conformity. If the reconstructed or replacement structure is less than the
required setback it shall not be any larger than the original structure, except as
allowed pursuant to Section 12(C)(1) above, as determined by the non- _
O conforming floor area and volume of the reconstructed or replaced structure at
8
its new location. If the total amount of floor area and volume of the original
structure can be relocated or reconstructed beyond the required setback area, no
portion of the relocated or reconstructed structure shall be replaced or
C) constructed at less than the setback requirement for a new structure. When it is
SN necessary to remove vegetation in order to replace or reconstruct a structure,
vegetation shall be replanted in accordance with Section 12(C)(2) above.
Any non-conforming structure which is located less than the required setback
from a water body, tributary stream, or wetland and which is removed by 50%
or less of the market value or damaged or destroyed by 50% or less of the
market value of the structure, excluding normal maintenance and repair, may be
reconstructed in place if a permit is obtained from the Code Enforcement
Officer within eighteen (18) months of such damage, destruction, or removal.
. In determining whether the building reconstruction or replacement meets the
setback to the greatest practical extent, the Planning Board or its designee shall
consider, in addition to the criteria in Section 12(C)(2) above, the physical
condition and type of foundation present,ifany, - oe
4. Change of Use of a Non-conforming Structure.
The use of a non-conforming structure may not be changed to another use
unless the Planning Board, after receiving a written application, determines that
~ the new use will have no greater adverse impact on the water body, tributary
stream or wetland, or on the Subject or adjacent properties and resources than
the existing use.
C) In determining that no greater adverse impact will occur, the Planning Board
shall require written documentation from the applicant, regarding the probable
effects on public health and safety, erosion and sedimentation, water quality,
fish and wildlife habitat, vegetative cover, visual and actual points of public
access to waters, natural beauty, floodplain management, archaeological and
historic resources, and commercial fishing and maritime activities, and other
; functionally water-dependent uses.
D. Non-conforming Uses
1, Expansions: Expansions of non-conforming uses are prohibited, except that
non-conforming residential uses may, after obtaining a permit from the Planning
Board, be expanded within existing residential structures or within expansions _
of such structures as allowed in Section 12(C)(1)(a) above.
; 2. Resumption Prohibited: A lot, building or structure in or on which a non-
conforming use is discontinued for a period exceeding one year, or which is
superseded by a conforming use, may not again be devoted to a non-
conforming use except that the Planning Board may, for good cause shown by
the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure
OO | |
provided that the structure has been used or maintained for residential purposes
during the preceding five (5) year period.
C) 3. Change of Use: An existing non-conforming use may be chan ged to another
-- non-conforming use provided that the proposed use has no greater adverse
impact on the subject and adjacent properties and resources, including water
dependent uses in the CFMA district, than the former use, as determined by the
Planning Board. The determination of no greater adverse impact shall be made
according to criteria listed in Section 12(C)(4) above,
E. Non-conforming Lots
, 1, Non-conforming Lots: A non-conforming lot of record as of the effective date
of this Ordinance or amendment thereto may be built upon, without the need for
a variance, provided that such lot is in Separate ownership and not contiguous
with any other lot in the same ownership, and that all provisions of this
Ordinance except lot area, lot width and shore frontage can be met. Variances
relating to setback or other requirements not involving lot area, lot widthor_. ==
shore frontage shalt be obtained by action of the Board of Appeals.
2. Contiguous Built Lots: If two or more contiguous lots or parcels are in a
single or joint ownership of record at the time of adoption of this Ordinance, if
all or part of the lots do not meet the dimensional requirements of this
Ordinance, and if a principal use or-structure exists on each lot, the non-
conforming lots may be conveyed separately or together, provided that the State
; Minimum Lot Size Law (12 M/S.R.A. sections 4807-A through 4807-D and the
C) _ State of Maine Subsurface Wastewater Disposal Rules are complied with. If
two or more principal uses or structures existed on a single lot of record on the
effective date of this ordinance, each may be sold on a separate lot provided that
the above referenced law and rules are complied with. When such lots are
divided, each lot thus created must be as conforming as possible to the
dimensional requirements of this Ordinance.
3. Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots
or parcels are in single or joint ownership of record at the time of or since
_ adoption or amendment of this ordinance, if any of these lots do not individually
meet the dimensional requirements of this Ordinance or subsequent
, amendments, and if one or more of the lots are vacant or contain no principal
structure, the lots shall be combined to the extent necessary to meet the
'dimensional requirements.
Section 13. Establishment of Districts
A. Resource Protection District
() |
10
The Resource Protection District includes areas in which development would adversely
affect water quality, productive habitat, biological ecosystems, or scenic and natural
values. This district shall include the following areas when they occur within the
C) limits of the shoreland zone, exclusive of the Stream Protection District, except that
areas which are currently developed and areas which meet the criteria for the Limited
Commercial, General Development I or Commercial Fisheries/Maritime Activities
Districts need not be included within the Resource Protection District.
. 1. Areas within 250 feet, horizontal distance, of the upland edge of freshwater
wetlands, salt marshes and salt meadows, and wetlands associated with great
ponds and rivers, which are rated "moderate" or "high" value waterfowl and
wading bird habitat, including nesting and feeding areas, by the Maine
, Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a
Geographic Information System (GIS) data layer maintained by either
MDIF&W or the Department. Coastal wetland ratings are mapped as of
January 1, 1973. Freshwater wetland ratings are mapped as of May 1, 2006.
For the purposes of this paragraph "wetlands associated with great ponds and
rivers" shall mean areas characterized by non-forested wetland vegetation and
hydric soils that are contiguous with a great pond or river, and have a surface
elevation at or below the water level of the great pond or river during the period
: of normal high water. "Wetlands associated with great ponds or rivers" are
considered to be part of that great pond or river.
NOTE: The Natural Resources Protection Act, Title 38 M.S.R.A.
sections 480-A thru 480-Z requires the Department of Environmental Protection
C) to designate areas of "Significant wildlife habitat". Significant wildlife habitat
NN includes:
. © habitat for species appearing on the official state or federal lists of
endangered or threatened species;
¢ high and moderate value deer wintering areas and travel corridors as.
defined by the Department of Inland Fisheries and Wildlife:
¢ high and moderate value waterfowl and wading bird habitats, including
nesting and feeding areas as defined by the Department of Inland .
Fisheries and Wildlife:
e critical spawning and nursery areas for Atlantic sea run salmon as
. defined by the Atlantic Sea Run Salmon Commission:
e and shorebird nesting, feeding and staging areas and seabird nesting _---
islands as defined by the Department of Inland Fisheries and Wildlife.
2. Floodplains along rivers and floodplains along artificially formed great ponds
oO along rivers, definéd by the 100 year floodplain as designated on the Federal ~
Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or
Flood Hazard Boundary Maps, or the flood of record, or in the absence of these,
by soil types identified as recent floodplain soils. This district shall also include
100 year floodplains adjacent to tidal waters as shown on FEMA's Flood
Insurance Rate maps or Flood Hazard Boundary Maps.
()
11
3. Areas of two (2) or more contiguous acres with sustained slopes of 20% or
. greater.
C) 4. Areas of two (2) or more contiguous acres supporting wetland vegetation and
\ hydric soils, which are not part of a freshwater or coastal wetland as defined,
and which are not surficially connected to a water body during the period of
normal high water.
. NOTE: These areas usually consist of forested wetlands abutting water bodies
and non-forested wetlands,
5, Land areas along rivers, subject to severe bank erosion, undercutting, or river
, bed movement, and lands adjacent to tidal waters which are subject to severe
erosion or mass movement, such as steep coastal bluffs.
This district may also include:
6. Areas supporting other significant wildlife habitat, as identified in the
comprehensive plan.
7. Significant archaeological and historic sites deserving of long-term protection as
determined by the municipality after consultation with the Maine Historic
_ Preservation Commission.
C) B. Limited Residential District
The Limited Residential-Recreational District includes those areas suitable for
residential and recreational development. It includes areas other than those in the
Resource Protection District, or Stream Protection District, and areas which are used
_ less intensively than those in the Limited Commercial District, the General . 7
Development Districts, or the Commercial F isheries/Maritime Activities District.
C. Limited Commercial District
. The Limited Commercial District includes areas of mixed, light commercial and
residential uses, exclusive of the Stream Protection district, which should not be
developed as intensively as the General Development Districts. This district includes
areas of two or more contiguous acres in size devoted to a mix of residential and low
intensity business and commercial uses. Industrial uses are prohibited. :
D. General Development I District. |
The General Development I District includes the following types of existing,
intensively developed areas:
12
(1) Areas of two or more contiguous acres devoted to commercial, industrial or
. intensive recreational activities, or a mix of such activities, including but not
limited to the following:
() (a) Areas devoted to manufacturing, fabricating or other industrial activities;
-- (b). Areas devoted to wholesaling, warehousing, retail trade and service
activities, or other commercial activities; and
(c) Areas devoted to intensive recreational development and activities, such as,
- but not limited to amusement parks, race tracks and fairgrounds.
(2.) Areas otherwise discernable as having patterns of intensive commercial,
. industrial or recreational uses,
E. General Development II District.
The General Development II District includes the same types of areas as those listed for
the General Development I District. The General Development II District, however,
shall be applied to newly established General Development Districts where the pattern
of development at the time of adoption is undeveloped, or not as intensively developed
. as that of the General Development I District.
Portions of the General Development District I or I may also include residential
development. However, no area shall be designated as a General Development I or IF
. District based solely on residential use.
F. Commercial Fisheries/Maritime Activities District.
C) The Commercial Fisheries/ Maritime Activities District includes areas where the
existing predominant pattern of development is consistent with the allowed uses for this
district as indicated in the Table of Land Uses, Section 14, and other areas which are
suitable for functionally water-dependent uses, taking into consideration such factors
as:
(1) -- Shelter from prevailing winds and waves;
(2) Slope of the land within 250 feet, horizontal distance, of the shoreline;
(3) Depth of the water within 150 feet, horizontal distance, of the shoreline;
, (4) Available support facilities including utilities and transportation facilities;
(5) Compatibility with adjacent upland uses, 7 oe .
_ G. Stream Protection District
| The Stream Protection District includes all land areas within seventy-five (75) feet,
horizontal distance, of the normal hi gh-water line of a stream, exclusive of those areas
within two-hundred and fifty (250) feet, horizontal distance of the normal high-water
la line of a river, or within two hundred and fifty (250) feet, horizontal distance, of the
13
upland edge of a freshwater or coastal wetland. Where a stream and its associated
shoreland area is located within two-hundred and fifty (25 0) feet, horizontal distance, |
of the above water bodies or wetlands, that land area shall be regulated under the terms
C) of the shoreland district associated with that water body or wetland.
KL :
Section 14. Table of Land Uses.
All land use activities, as indicated in Table I, Land Uses in the Shoreland Zone, shall
conform with all of the applicable land use standards in Section 15. The district designation
for a particular site shall be determined from the Official Shoreland Zoning Map. a
Key to Table 1: -
Yes- Allowed (no permit required but the use must comply with all applicable
land use standards.)
No- Prohibited
PB- = Allowed with permit issued by the Planning Board,
CEO - Allowed with. permit issued by the Code Enforcement Officer.
LPI- Allowed with permit issued by the Local Plumbing Inspector. .
. Abbreviations:
C) RP- Resource Protection GD- General Development! and 7
; . a General Development II
LR- Limited Residential CFMA-Commercial Fisheries/ Maritime Activities
| LC- Limited Commercial SP- Stream Protection
C) |
| 14
TABLE 1. LAND USES IN THE SHORELAND ZONE
Land Uses DISTRICT
SP RP LR Lc GD CFMA
1. Non-intensive recreational uses not requiring
structures such as hunting, fishing and hiking yes yes yes yes yes yes
2. Motorized vehicular traffic on existing roads and yes yes yes yes -syes yes
trails
3. Forest management activities except for timber ;
harvesting & land management roads yes yes yes yes yes yes
___REPEALED Pursuant to Section 4B
4. Timber harvesting REPEALED Pursuant to yes CEO yes yes yes yes
Section 4B
5. Clearing or removal of vegetation for activities
other than timber harvesting. CEO CEO1 CEO CEO CEO CEO
6. Fire prevention activities yes yes yes yes yes yes
7. Wildlife management practices yes "yes yes yes yes yes
8. Soil and water conservation practices yes yes yes yes yes yes
oe 9. Mineral exploration no- yes2 yes2 yes2 yes2 yes2
. 10. Mineral extraction including sand and gravel no PB3 PB PB PB PB
extraction _
11. Surveying and resource analysis yes yes yes yes yes yes
: 12. Emergency operations yes yes yes yes yes yes
13. Agriculture yes PB yes yes yes yes
14. Aquaculture PB PB PB yes yes yes
15. Principal structures and uses
A. One and two family residential, including pPp4 PBg PB PB PB no
driveways
B. Multi-unit residential no no _ PB PB PB no
D. Industrial no no "no" no PB PBS. |
E. Governmental and institutional no no PB PB PB ppd
F. Small non-residential facilities for educational,
scientific, or nature interpretation purposes Ppp4 PB PB PB PB PBS
16. Structures accessory to allowed uses PB4 PB PB PB PB PB
. 45
17. Piers, docks, wharfs, breakwaters, marinas,
causeways, bridges and other structures
and uses extending over or below the
normal high-water line or within a wetland.
() A. Temporary PB PB PB PB PB PB
~- B. Permanent PB PB PB PB PB PBS
Land Uses _ DISTRICT :
SP RP LR LC GD CFMA
#8. USRESE TAG tr BSS SOR ea ESC y oat fae ERP FP ERS ERP fee
35. Uses Similar io uses requiring a PB permit PB PB PB PB PB PB
~49--Heme-cecupations Sse > Bp Ap 5B AB BB BB
20. Private sewage disposal systems for LPI LPI LPI LPI LP] LPI
allowed uses
21. Essential services
A. Roadside distribution lines (34.5kV and CEO® CEO® yes" yes" yes" yes"
lower) ;
B. Non-roadside or cross-country distribution PB PB CEO CEO CEO CEO
lines involving ten poles or jess in the
shoreland zone
C. Non-roadside or cross-country distribution PB PB PB PB PB PB
lines involving eleven or more poles inthe -
shoreland zone
C) D. Other essential services PB PB PB PB PB PB
22. Service drops, as defined, to allowed uses yes yes yes yes yes yes
23. Public and private recreational areas PB PB PB PB PB ppd
involving minimal structural development -
24. Individual, private campsites CEO CEO CEO CEO CEO CEO
25. Campgrounds no no? PB PB PB no
26. Road construction PB no& PB PB PB pgs
27. Land management roads yes PB yes yes yes yes
Repealed Pursuant to Section 4B
28. Parking facilities no no? PB PB PB PBS
_ 29. Marinas PB no PB PB. . PB .. PB -
30. Filling and earth moving of <10 cubic yards CEO CEO yes yes yes yes
31. Filling and earth moving of >10 cubic yards PB PB PB PB PB PB
32. Signs no no PB PB PB PB
33. Uses similar to allowed uses CEO CEO CEO CEO CEO CEO
. 16
C) 1 in RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, -
-- except to remove safety hazards. Note: Brooklin has no Great Ponds.
2 Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in
total, is disturbed,
3 In RP not allowed in areas so designated because of wildlife value.
4 Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5 Functionally water-dependent uses and uses accessory to such water dependent uses only.
6 See further restrictions in Section 15(L)(2).
7 Except when area is zoned for resource protection due to floodplain criteria in which case a permit is
required from the PB.
8 Except as provided in Section 15(H)(4).
9 Single family residential structures may be allowed by special exception only according to the
provisions of Section 16(E), Special Exceptions. Two-family residential structures are prohibited.
10 Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that
are allowed in the respective district. .
C)
NX "1 Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12 Permit not required' but must file a written "notice of intent to construct" with CEO.' .
NOTE: A person performing any of the following activities shall require a permit from the Department of
Environmental Protection, pursuant to 38 M.R.S.A. section 480-C, if the activity occurs in, On, Over or
adjacent to any freshwater or coastal wetland, great pond, river, stream or brook and operates in
such a manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
C) Section 15. Land Use Standards
All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
A. Minimum Lot Standards
Minimum Lot Minimum
Area (sq. ft.) Shore
Frontage (ft.)
(1) (a) Residential per dwelling unit
(i) Within the Shoreland Zone _
Adjacent to Tidal Areas 43,560 150
(ii) Within the Shoreland Zone .
Adjacent.to Non-tidal Areas 43,560 200
(b) Governmental, Institutional, Commercial or Industrial per principal
structure
(i) Within the Shoreland Zone
Adjacent to Tidal Areas Exclusive 7 |
C) of those areas Zoned for
Commercial Fisheries and . .
Maritime Activities 43,560 200 ,
. (ii) Within the Shoreland Zone ~
Adjacent to Tidal Areas Zoned
for Commercial Fisheries and
Maritime Activities NONE NONE
(ili) Within the Shoreland Zone
Adjacent to Non-Tidal Areas 60,000 300 .
(c) Public and Private Recreational Facilities
(i) Within the Shoreland Zone |
Adjacent to Tidal and .
Non-Tidal Areas 43,560 200
OO |
18 .
(2) Land below the normal high-water line of a water body or upland edge of a
wetland and land beneath roads serving more than two (2) lots shall not be
included toward calculating minimum lot area.
O (3) Lots located on opposite sides of a public or private road shall be considered
each a separate tract or parcel of land unless such road was established by the
owner of land on both sides thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high-water line of a water body or upland
edge of a wetland shail be equal to or greater than the shore frontage
requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed
or established on a single parcel, all dimensional requirements shall be met for
each additional dwelling unit, principal structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back seventy-five (75)
feet, horizontal distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland, except that in the General
Development I District the setback from the normal high-water line shall be at
C) least twenty-five (25) feet, horizontal distance, and in the Commercial Fisheries/
: Maritime District there shall be no minimum setback. In the Resource
Protection District the setback requirement shall be 250 feet, horizontal
distance, except for structures, roads, parking spaces or other regulated objects
specifically allowed in that district in: which case the setback requirements
specified above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither
. apply to structures which require direct access to the water body or wetland as
an operational necessity, such as piers, docks and retaining walls, nor to other
functionally water-dependent uses.
(b) For principal structures, water and wetland setback measurements shall be
taken from the top of a coastal bluff that has been identified on Coastal Bluff
maps as being "highly unstable" or "unstable" by the Maine Geological Survey
pursuant to its "Classification of Coastal Bluffs" and published on the most
recent Coastal bluff map. If the applicant and the permitting official(s) are in
disagreement as to the specific location of a "highly unstable" or "unstable"
bluff, or where the top of the bluff is located, the applicant may at his or her
expense, employ a Maine Registered Professional Engineer, a Maine Certified
soil scientist, a Maine State Geolo gist, or other qualified individual to make a
OO)
19
determination. If agreement is still not reached, the applicant may appeal the
matter to the board of appeals.
©
(c) On a non-conforming lot of record on which only a residential structure
exists, and it is not possible to place and accessory structure meeting the
required water body, tributary stream or wetland setbacks, the code enforcement
officer may issue a permit to place a single accessory structure with no utilities,
for the storage of yard tools and similar equipment. Such accessory structure
shall not exceed eighty (80) square feet in area nor eight (8) feet in height, and
shall be located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and vegetation
clearing limitations. In no case shall the structure be located closer to the
shoreline or tributary stream than the principal structure.
(d) The Planning Board may increase the required setback of a proposed
'Structure, as a condition to permit approval, if necessary to accomplish the
purposes of this ordinance. Instances where a greater setback may be
appropriate include, but are not limited to: areas of steep slope; shallow or
erodible soils; or where an adequate vegetative buffer does not exist.
NOTE: All tidal land which is subject to tidal action during the highest annual tide is
coastal wetland.
NOTE: A tributary stream may be perennial or intermittent. Where a tributary stream.is
C) present within the shoreland zone, setback standards from that tributary stream are
applicable.
(2) Principal or accessory structures and expansions of existing structures which are
' permitted in the Resources Protection, Limited Residential, Limited
Commercial, and Stream Protection Districts, shall not exceed thirty-five (35)
feet in height. This provision shall not apply to structures such as transmission |
towers, windmills, antennas, and similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and structures, including
basements, shall be elevated at least two feet above the elevation of the 100 year
flood, the flood of record, or, in the absence of these, the flood as defined by
soil types identified as recent floodplain soils. Brooklin has adopted the April
. 2005 version of the Floodplain Management Ordinance as of April 4, 2007.
| Accessory structures may be placed in accordance with the standards of that
_ ordinance and need not meet the elevation requirements of this paragraph.
(4) The total footprint area of all structures, parking lots and other non-vegetated
surfaces, within the shoreland zone shall not exceed twenty (20) percent of the
lot or a portion thereof, located within the shoreland zone, including land area
previously developed, except in the General Development District adjacent to
tidal waters and rivers, and in the Commercial Fisheries/ Maritime Activities
District, where lot coverage shall not exceed seventy (70) percent.
CO) | ,
20 .
(5) Retaining walls that are not necessary for erosion control shall meet the
structure setback requirement, except for low retaining walls and associated fill
C) provided all of the following conditions are met:
| (a) The site has been previously altered and an effective vegetated buffer does
not exist;
-- (b) The walls(s) is (are) at least 25 feet, horizontal distance, from the normal
high-water line of a water body, tributary stream, or upland edge of a wetland; ,
(c) The site where the retaining wall will be constructed is legally existing lawn
or is a site eroding from lack of naturally occurring vegetation, and which
cannot be stabilized with vegetative plantings; ,
(d) The total height of the wall(s), in the aggregate, is (are) no more than 24
inches;
(e) Retaining walls are located outside of the 100-year floodplain on rivers, |
streams, coastal wetlands, and tributary streams, as designated on the Federal
Emergency Management Agency's (F EMA) Flood Insurance Rate Maps or
Flood Hazard Boundary Maps, or the flood of record, or in the absence of these,
: by soil types identified as recent floodplain soils.
(f) The area behind the wall is re-vegetated with grass, shrubs, trees, or a .
C) combination thereof, and no further structural development will occur within the
setback area, including patios and decks; and
; (g) A vegetated buffer area is established within 25 feet, horizontal distance, of
the normal high-water line of a water body, tributary stream, or upland edge of a
wetland when a natural buffer area does not exist. The buffer area must meet
the following characteristics: |
(i) The buffer must include shrubs and other woody and herbaceous
vegetation. Where natural ground cover is lacking, the area must be
supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard
erosion and provide for effective infiltration of storm water runoff;
; (iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required,
measured perpendicularly to the normal high-water line or upland edge
of a wetland; .
(v) A footpath not to exceed the standards in Section 15 (P)(2)(a), may
co traverse the buffer; : ,
= | |
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal
distance, of a water body, tributary stream or coastal wetland, a permit pursuant
C) to the Natural Resource Protection Act is required from the Department of
NL Environmental Protection,
(6) Notwithstanding the requirements stated above, stairways or similar structures
may be allowed with a permit from the Code enforcement Officer, to provide
shoreline access in areas of steep slopes or unstable soils provided: that the
Structure is limited to a maximum of four (4). feet in width; that the structure
does not extend below or over the normal high-water line of a water body or
upland edge of a wetland, (unless permitted by the Department of
Environmental Protection pursuant to the Natural Resources Protection Act, 38
M.R.S.A.,, section 480-C; and that the applicant demonstrates that no
reasonable access alternative exists on the property.
Cc. Piers, Docks, Wharves, Breakwaters, Causeways, Marinas, Bridges and Other
Structures and Uses Extending Over or Below the Normal High-Water Line of a
Water Body or Within a Wetland.
In addition to Federal or State permits which may be required for such structures and
uses, they shall conform to the following:
(1) Access from shore shall be developed on soils appropriate for such use and |
constructed so as to control erosion.
O (2) ~ The location shall not interfere with developed beach areas.
(3) The facility shall be located so as to minimize adverse effects on fisheries.
(4) The facility shall be no larger in dimension than necessary to carry on the
activity and be consistent with the surrounding character and uses of the area.
A temporary pier, dock or wharf in non-tidal waters shall not be wider than Six
feet for non-commercial uses, -
. | (5) No new structure shall be built on, over or abutting a pier, wharf, dock or other ,
structure extending below the normal high-water line of a water body or within
a wetland unless the structure requires direct access to the water body or
wetland as an operational necessity.
- (6) New permanent piers and docks on non-tidal waters shall not be permitted
unless it is clearly demonstrated to the Planning Board that a temporary pier or
dock is not feasible, and a permit has been obtained from the Department of
Environmental Protection, pursuant to the Natural Resources Protection Act,
(7) No existing structures built on, over or abutting a pier, dock, wharf or other -
. ; structure extending below the normal high-water line of a water body or within
a wetland shall be converted to residential dwelling units in any district.
O | |
22
(8) Except in the General Development Districts and Commercial
C ) Fisheries/Maritime Activities District, structures built on, Over or abutting a
\ _ pier, wharf, dock or other Structure extending below the normal high-water
line of a water body or within a wetland shall not exceed twenty (20) feet in
height above the pier, wharf, dock or other structure. ,
, (9) Beach construction on any river, stream, or coastal wetland
requires a permit pursuant to the Natural Resource Protection Act from the
. Department of Environmental Protection.
(10) Before any Planning Board Review of any application for new permanent
structures, and expansions thereof, projecting into or over water bodies, the
applicant shall obtain and present at the time of application to the Planning
Board the permit required from the Department of Environmental Protection
pursuant to the Natural Resources Protection Act, 38 M.R.S.A.section 480-C.
Permits may also be required from the Army Corps of Engineers if the new
permanent structure or expansion thereof is located in navj gable waters and
must be presented before any Planning Board review of the application.
D. Campgrounds .
Campgrounds shall conform to the minimum requirements imposed under State
, licensing procedures and the following:
_ (1) Campgrounds shall contain a minimum of five thousand (5000) square feet of
land, not including roads and driveways for each site. Land supporting wetland
vegetation, and land below the normal hi gh-water line of a water body shall not be
included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and
utility and service buildings shall be set back seventy-five (75) feet, horizontal
distance, from the normal high-water line of water bodies, tributary streams,
or the upland edge of a wetland.
| E. --_ Individual Private Campsites | :
Individual private campsites not associated with campgrounds are allowed provided the
following conditions are met:
23
(1) One campsite per lot existing on the effective date of this Ordinance, or forty
. three thousand five hundred sixty (43,560) square feet of lot area within the
shoreland zone, whichever is less, may be permitted.
c
CO) (2) Campsite placement on any lot, including the area intended for a recreational
vehicle or tent platform, shall be set back seventy-five (75) feet, horizontal
distance, from the normal high-water line of water bodies, tributary streams, or
the upland edge of a wetland.
(3) Only one recreational vehicle shall be allowed on a campsite. The recreational
vehicles shall not be located on any type of permanent foundation except for a
gravel pad, and no structure except a canopy shall be attached to the recreational
vehicle.
(4) 'The clearing of vegetation for the siting of the recreational vehicle, tent or
similar shelter in a Resource Protection District shall be limited to one thousand
(1000) square feet.
(5) A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by
the Local Plumbing Inspector. Where disposal is off-site, written authorization
from the receiving facility or land owner is required.
(6) When a recreational vehicle, tent or similar shelter is placed on-site for more
than one hundred and twenty (120) days per year, all requirements for
C) residential structures shall be met, including the installation of a subsurface
- sewage disposal system in compliance with the State of Maine Subsurface
Wastewater Disposal Rules unless served by public sewage facilities,
F. Commercial and Industrial Uses (bordering great ponds)
Intentionally left blank as this deals with shoreland zoning around great ponds and
Brooklin has no great ponds. .
G.. _ Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback
requirements for structures for the district in which such areas are located,
except that in the Commercial.F isheries/Maritime Activities District parking
areas shall be set back at least twenty-five (25) feet, horizontal distance, from
the shoreline. The setback requirement for parking areas serving public boat
launching facilities, in Districts other than the General Development I District
and Commercial Fisheries/Maritime Activities District shall be no less than fifty
(50) feet, horizontal distance, from the shoreline or tributary stream if the
Planning Board finds that no other reasonable alternative exists further from the
- shoreline or tributary stream.
| 24 |
(2) Parking areas shall be adequately sized for the proposed use and shall be ;
designed to prevent stormwater runoff from flowing directly into a water body,
C) tributary stream or wetland and where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following
shall apply:
. (a) Typical parking space: Approximately ten(1 Q) feet wide and twenty (20) _
. feet long, except that parking spaces for a vehicle and boat trailer shall
be forty(40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways
The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least seventy-five (75) feet, horizontal
. distance from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland unless no reasonable alternative exists
as determined by the Planning Board. Ifno other reasonable alternative exists,
the road and/or driveway setback requirement shall be no less than fifty(50)
feet, horizontal distance, upon clear showing by the applicant that appropriate
C) techniques will be used to prevent sedimentation of the water body, tributary ©
Stream, or wetland. Such techniques may include, but are not limited to, the
installation of settling basins, and/or the effective use of additional ditch relief
. culverts and turnouts placed so as to avoid sedimentation of the water body,
. - tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback
shall be increased by ten (10) feet, horizontal distance, for each five (5) percent
increase in slope above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures, and facilities located
nearer to the shoreline or tributary stream due to an operational necessity,
excluding temporary docks for recreational uses. Roads and driveways
providing access to permitted structures within the setback area shall comply.
fully with the requirements of Section 15 (E)(1) except for that portion of the
road or driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way
regardless of their setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District .
oN except that the Planning Board may grant a permit to construct a road or
25
driveway to provide access to permitted uses within the district. A road or
driveway may also be approved by the Planning Board in a Resource Protection
District, upon a finding that no reasonable alternative route or location is
C) . available outside the district. When a road or driveway is permitted in a
; Resource Protection District the road and/or driveway shall be set back as far as
practicable from the normal high-water line of a water body, tributary stream, or
upland edge of a wetland.
(4) -- Road and driveway banks shall be no steeper than a slope of two (2) horizontal
to one (1) vertical, and shall be graded and stabilized in accordance with the
provisions for erosion and sedimentation control contained in Section 15Q.
(5) Road and driveway grades shall be no greater than ten (10) percent except for
segments of less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering
water bodies, tributary streams or wetlands, roads and driveways shall be
designed, constructed, and maintained to empty onto an unscarified buffer strip
at least fifty (50) feet plus two times the average slope, in width between the
outflow point of the ditch or
culvert and the normal high-water line of a water body, tributary stream, or
, upland edge of a wetland. Surface drainage which is directed to an unscarified
buffer strip shall be diffused or spread out to promote infiltration of the runoff
. and to minimize channelized flow of the drainage through the buffer strip.
C) (7) __ Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto unscarified buffer _.
strips before the flow gains sufficient volume or head to erode the road, .
a driveway, or ditch. To accomplish this, the following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road, or driveway at intervals no greater than indicatedin
the following table:
: TABLE 2.
SPACING CHART
Grade . Spacing .
(Percent) _ (Feet) .
0-20 250
3-5 . 200-135
a 6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
26
(b) Drainage dips may be used in place of ditch relief culverts only where the
. gtade is ten (10) percent or less.
C) (c) On sections having slopes greater than ten(10) percent, ditch relief
culverts shall be placed at approximately a thirty (30) degree angle downslope
from a line perpendicular to the centerline of the road or driveway.
. (d) Ditch relief culverts shall be sufficiently sized and properly installed in
order to allow for effective functioning, and their inlet and outlet ends shall
. be stabilized with appropriate materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff
control installations associated with roads and driveways shall be maintained on __-
a regular basis to assure effective functioning.
I. Signs
The following provisions shall govern the use of signs in the Resource Protection,
Stream Protection, Limited Residential-Recreational and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed,
provided that such signs shall not exceed (6) square feet in area and shall not
exceed two (2) signs per premises. In the Limited Commercial District, however,
such signs shall not exceed sixteen (16) square feet in area. Signs relating to goods
or services not sold or rendered on the premises shall be prohibited.
C) (2) Name signs are allowed provided such signs shall not exceed two (2) signs per a
premises, and shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in
| area relating to the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to
- number provided that no such sign shall exceed two (2) square feet in area.
(5S) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm
water runoff from the site in excess of the natural pre-development conditions.
Where possible, existing natural runoff control features, such as berms, swales,
27
. terraces and wooded areas, shall be retained in order to reduce runoff and
encourage infiltration of storm waters. ,
() (2) Storm water runoff control systems shall be maintained as necessary to
ensure proper functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full
permit to be obtained from the DEP prior to construction of a project consisting of
20,000 square feet or more of impervious area or 5 acres or more of a developed area in
an urban impaired stream watershed or most-at-risk lake watershed. A permit by rule is
necessary for a project with one acre or more of disturbed area but less than 1 acre of
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams)
and less than 5 acres of developed area. Furthermore, a Maine Construction General
Permit is required if the construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal |
(1) All subsurface sewage disposal systems shall be installed in conformance with
the State of Maine Subsurface Wastewater Disposal Rules, and the following:
(a) Clearing or removal of woody vegetation necessary to site a new system
and any associated fill extensions, shall not extend closer than seventy-five (75)
feet, horizontal distance, from the normal hi gh-waterline of a water body or the
C) upland edge of a wetland and
(b) A holding tank is not allowed for a first-time residential use in the
shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding
fill extensions, to be constructed no less than one hundred (100) horizontal feet from
the normal high water-line of a perennial water body. The minimum setback distance
for a new subsurface disposal system may not be reduced by variance.
L. Essential Services
- ~ (1) - Where feasible, the installation of essential services shall be limited to . |
existing public ways and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is
not allowed in a Resource Protection or Stream Protection District, except to
provide services to a permitted use within said district, or except where the
applicant demonstrates that no reasonable alternative exists. Where allowed
28
such structures and facilities shall be located so as to minimize any adverse
impacts on Surrounding uses and resources, including visual impacts.
C) (3) Damaged or destroyed public utility transmission and distribution lines, towers
\ and related equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall
_be accomplished by hand sampling, test boring, or other methods which create
minimal disturbance of less than one hundred (100) square feet of ground surface. A
permit from the Code Enforcement Officer shall be required for mineral exploration
which exceeds the above limitation, All excavations, including test pits and holes, shall
be immediately capped, filled or secured by other equally effective measures, to restore
. disturbed areas and to protect the public health and safety. .
- Mineral extraction may be permitted under the following conditions:
(1) = A reclamation plan shall be filed with, and approved, by the Planning
Board before a permit is granted. Such plan shall describe in detail
procedures to be undertaken to fulfill the requirements of Section 15(M)(3)
below. ; .
C) (2) No part of any extraction operation, including drainage and runoff control
features, shall be permitted within seventy-five (75) feet, horizontal distance, of
the normal high-water line of any water body, tributary stream, or the upland
. edge of a wetland. Extraction operations shall not be permitted within
seventy-five (75) feet, horizontal distance, of any property line, without written
permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at
any extraction site, which operations shall be deemed complete when less than
one hundred (100) cubic yards of materials are removed in any consecutive
twelve (12) month period, ground levels and grades shall be established in
accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an
approved location, or shall be buried on-site. Only materials generated on-site
: may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.S.R.A., section 1301 and the solid waste
management rules, Chapters 400-419 of the Department of Environmental Protection's
regulations may contain other applicable provisions regarding disposal of such
materials. .
S (b) The final graded slope shall be two and one-half to one (2:1) slope or flatter,
{
. 29
(c) Top soil or loam shail be retained to cover all disturbed land areas, which
shall be reseeded and stabilized with vegetation native to the
C) area. Additional topsoil or loam shall be obtained from off-site
sources if necessary to complete the stabilization project.
(4) In keeping with the purposed of this Ordinance, the Planning Board may impose
such conditions as are necessary to minimize the adverse impacts associated
with mineral extraction operations on surrounding uses and resources.
N. Agriculture |
(1) All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the Maine Department of Agriculture on
November 1, 2001, and the Nutrient Management Law (7 M.R.S.A.sections
. 4201-4209),
(2) Manure shall not be stored or stockpiled within one-hundred (100) feet,
, . horizontal distance, of water bodies, tributary streams, or wetlands. All manure
storage areas within the shoreland zone must be constructed or modified such
that the facility produces no discharge of effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty
thousand (40,000) square feet in surface area, within the shoreland zone shall
require a Conservation Plan to be filed with the Planning Board. Non-
C) conformance with the provisions of said plan shall be considered to be a
violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, from water bodies and coastal wetlands nor within twenty-five (25)
. feet, horizontal distance, of tributary streams, and freshwater wetlands.
Operations in existence on the effective date of this ordinance and not in
conformance with this provision may be maintained.
. (5) Newly established livestock grazing areas shall not be permitted within one
hundred (100) feet, horizontal distance, from water bodies and coastal wetlands,
nor within twenty-five (25) feet, horizontal distance, of tributary streams and
freshwater wetlands. Livestock grazing associated with ongoing farm activities,
and which are not in conformance with the above setback provisions may
continue, provided that such grazing is conducted in accordance with a
Conservation Plan. -- oo -
oO. Timber Harvesting (REPEALED PURSUANT TO SECTION 4B )
NOTE: The following entire Section 15 (O) "Timber Harvesting" will be repealed on the
statutory date established under 38 M.R.S.A. section 438-A (5) when the state-wide
timber harvesting standards take effect. The Planning Board of Brooklin recommends
oo that the Town allow the State Bureau of F orestry to administer the Timber Harvesting
30
Rules. The Repeal Language for Section 4 Part B has been added. Meanwhile, the
present Section 15(O) of this Ordinance with minor state additions and deletions,
bringing it up to date, will be in effect, The definition of the statutory date is in
C) Section 4B .
\
(1) Ina Resource Protection District abutting a great pond, timber harvesting,
shall be limited to the following:
(a) Within the strip of land extending 75 feet, horizontal distance,
inland from the normal high-water line, timber harvesting may be
conducted when the following conditions are met:
(1) The ground is frozen; . a
(2) There is no resultant soil disturbance
(3) The removal of trees is accomplished using a cable or boom and
there is no entry of tracked or wheeled vehicles into the 75-foot strip of
land;
_ (4) There is no cutting of trees less than 6 inches in diameter, no more
than 30% of the trees 6 inches or more in diameter, measured at 4% feet: ~
above ground level, are cut in any 10 year period; and a well-distributed
stand of trees and other natural vegetation remains; and
(S) A licensed professional forester has marked the trees to be
harvested prior to a permit being issued by the municipality.
(b) Beyond the 75 foot strip referred to in Section 15(O)(1)(a) above,
C) timber harvesting is permitted in accordance with Section 15(O0)(2) below,
except that in no case shall the average residual basal area of trees over 4%
inches in diameter at 4 % feet above ground level be reduced to less than 30 ©
square feet per acre.
NOTE: The Town of Brooklin has no great ponds to regulate under Section
15(O)(1)(a & b) above.
(2) Except in areas as described in Section 15 (O)(1) above, dealing with great
ponds, timber harvesting shall conform with the following provisions:
; (a) Selective cutting of no more than forty (40) percent of the total volume of
trees four (4) inches or more inches in diameter measured at 4% feet above
ground level on any lot in any ten (10) year period is permitted.
~~ Inaddition: ~ .
(i) Within seventy-five (75) feet, horizontal distance, of the normal
. high-water line of water bodies, tributary streams, or the upland edge of ;
a wetland, there shall be no clearcut openings and a well-distributed
stand of trees and other vegetation, including existing groundcover, shall
be maintained.
| | 31 |
: (ii) At distances greater than seventy-five (75) feet, horizontal distance,
of the normal high-water line of water bodies, or the upland edge of a
wetland, harvesting operations shall not create single clearcut openings
C) greater than seven thousand five hundred (7,500) square feet in the
\ a, forest canopy. Where such openings exceed five-thousand (5000)
square feet, they shall be at least one hundred (100) feet, horizontal
a distance, apart. Such clearcut openings shall be included in the
calculation of total volume removal. Volume may be considered to be
- €quivalent to basal area.
(b) _ Timber harvesting operations exceeding 40% limitation in Section
15(O)(2)(a) above, may be allowed by the planning board upon a clear showing,
including a forest management plan signed by a Maine licensed professional
forester, that such an exception is necessary for good forest management and
will be carried out in accordance with the purposes of this Ordinance. The
planning board shall notify the Commissioner of the Department of
Environmental Protection of each exception allowed, within fourteen(14) days
of the planning board's decision.
(c) No accumulation of slash shall be left within seventy-five (75) feet, |
horizontal distance, of the normal high-water line of any river, or stream or of .
the upland edge of a wetland as defined. In all other areas slash shall either be
removed or disposed of in such a manner that it lies on the ground and no part
thereof extends more than four (4) feet above the ground. Any debris that falls
below the normal high-water line of a water body or tributary stream shall be
C) removed.
(d) -- Timber harvesting equipment shall not use stream channels as travel
routes except when:
(i) Surface waters are frozen; and
, (ii)The activity will not result-in any ground disturbance.
(e) All crossings of flowing water shall require a bridge or culvert, except .
in areas with low banks and channel beds which are composed of gravel, rock or
similar hard surface which would not be eroded or otherwise damaged.
(f) Skid trail approaches to water crossings shall be located and designed
So as to prevent water runoff from directly entering the water body or tributary
stream. Upon completion of timber harvesting, temporary bridges and culverts
shall be removed and areas of exposed soil revegetated.
(g) Except for water crossings, skid trails and other sites where the'
operation of machinery used in timber harvesting results in the exposure of
mineral soil shall be located such that an unscarified strip of vegetation of at
least seventy-five (75) feet, horizontal distance; in width for slopes up to ten
(10) percent shall be retained between the exposed mineral soil and the normal
high-water line of a water body or upland edge of a wetland. For each ten(10)
, +) percent increase in slope, the unscarified strip shall be increased by twenty (20)
32
, feet, horizontal distance. The provisions of this paragraph apply only to a face
sloping toward the water body or wetland, provided, however, that no portion of
such exposed mineral soil on a back face shall be closer than twenty five (25)
C) feet, horizontal distance, from the normal high-water line of a water body or
~ upland edge of a wetland.
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting
(1) In any Resource Protection District, the cutting or removal of vegetation shall
be limited to that which is necessary for uses expressly authorized in that ;
District.
(2) Except in areas as described in Section P(1), above, and except to allow for the
development of permitted uses, within a strip of land extending seventy-five
(75) feet, horizontal distance, from any water body, tributary stream, or the
upland edge of a wetland, a buffer strip of vegetation shall be preserved as
follows:
(a) There shall be no cleared opening greater that 250 square feet in the forest
. canopy (or other existing woody vegetation if a forested canopy is not present)
as measured from the outer limits of the tree or shrub crown. However, a
footpath not to exceed six (6) feet in width as measured between tree trunks
and/or shrub stems is allowed provided that a cleared line of sight to the water
through the buffer strip is not created.
C) (b) Selective cutting of trees within the buffer strip is allowed provided that a
: well-distributed stand of trees and other natural vegetation is maintained. For
_ the purposes of Section 15(P)(2)(b), a "well-distributed stand of trees" shall be
defined as maintaining a rating score of 16 or more in each 25 foot by 50 foot
rectangular (1250 square feet) area as determined by the following rating
system.
TABLE 3. .
POINTS ASSIGNED FOR "WELL-DISTRIBUTED
STAND OF TREES" .
Diameter of Tree a 4 % feet Above Points
Ground Level(inches)
2 to <4 in. 1
4 to <8 in. 2
8 to<12 in. 4
12 in. or greater 8 .
NOTE: As an example, adjacent to a stream, if a 25 foot X 50 foot plot contains four
(4) trees between 2 and 4 inches in diameter, two trees between 4 and 8 inches in
diameter, three trees between 8 and 12 inches in diameter, and two trees over 12 inches
ao in diameter, the rating score is:
)
33
(4x1) + (2x2) + (3x4) + (2x8) = 36 points
Thus, the 25 foot by 50 foot plot contains trees worth 36 points. Trees totaling 20
points (36-16 = 20) may be removed from the plot provided that no cleared openings
C) are created. End of NOTE. .
The following shall govern in applying this point system:
. (i) The 25 foot by 50 foot rectangular plots must be established where
the landowner or lessee proposes clearing within the required buffer:
(ii) Each successive plot must be adjacent to, but not overlap a
previous plot:
(iii) Any plot not containing the required points must have no
vegetation removed except as otherwise allowed by this Ordinance:
(iv) Any plot containing the required points may have vegetation -
removed down to the minimum points required or as otherwise allowed
, by this Ordinance:
(v) Where conditions permit, no more than 50% of the points on any
25 foot by 50 foot rectangular area may consist if trees greater than 12
; inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is
defined as retaining existing vegetation under three (3) feet in height and.
other ground cover and retaining at least five (5) saplings less than two
(2) inches in diameter at four and one half (4 4) feet above ground level
C) for each'25 foot by 50 foot rectangle area. If five saplings do not exist,
~ no woody stems less than two (2) inches in diameter can be removed
until 5 saplings have been recruited into the plot. ;
Notwithstanding the above provisions, no more than 40% of the total
volume of trees four (4) inches or more in diameter, measured at 4 %
. feet above ground level may be removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat existing
vegetation under three(3) feet in height and other ground cover,
. including leaf litter and the forest duff layer, shall not be cut, covered, or .
removed except to provide for a footpath or other permitted uses as
described in Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed. _-
(e) In order to maintain a buffer strip of vegetation, when the removal of storm
damaged, diseased, unsafe or dead trees results in the creation of cleared
openings, these openings shall be replanted with native tree species unless
existing new tree growth is present.
OO)
34
Section 15 (P)(2) does not apply to those portions of public recreational
facilities adjacent to public swimming areas as long as cleared areas are limited
to the minimum area necessary.
\. (3) At distances greater than seventy five (75) feet, horizontal distance, from the
normal high-water line of any water body, tributary stream, or the upland edge
of a wetland, there shall be allowed on any lot, in any ten (10) year period,
selective cutting of not more than forty (40) percent of the volume of trees four
(4) inches or more in diameter, measured 4 % feet above ground level. Tree
removal in conjunction with the development of permitted uses shall be
included in the forty (40) percent calculation. For the purposes of these
standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including, but not limited to,
principal and accessory structures, driveways, lawns and sewage disposal areas,
exceed, in the aggregate, 25% of the lot area within the shoreland zone or ten
thousand (10,000) square feet, whichever is greater, including land previously
cleared. This provision shall not apply to the General Development or
Commercial Fisheries/Maritime Activity Districts,
(4) Legally existing nonconforming cleared openings may be maintained, but shall
not be enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, ,
trees, or other woody vegetation shall be regulated under the provisions of
< -) , Section 15(P): .
| Q. Erosion and Sedimentation Control
. (1) All activities which involve filling, grading, excavation or other similar
activities which result in unstabilized soil conditions and which require a
permit shall also require a written soil erosion and sedimentation control plan.
The plan shall be submitted to the permitting authority for approval and shall
include, where applicable, provisions for: .
, (a) Mulching and re-vegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or
- diversion ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) lorder to create the least potential for erosion, development shall be
designed to fit with the topography and soils of the site. Areas of steep slopes
where high cuts and fills may be required shail be avoided wherever possible,
and natural contours shall be followed as closely as possible. ,
(3) Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all
) |
35
stages of the activity. The amount of exposed soil at every phase of
construction shall be minimized to reduce the potential for erosion.
C) (4) Any exposed ground area shall be temporarily or permanently stabilized within
XN one (1) week from the time it was last actively worked, by use of rip-rap, sod,
seed, and mulch, or other effective measures. In all cases permanent
stabilization shall occur within nine (9) months of the initial date of exposure.
In addition:
(a) Where mulch is used, it shall be applied at a rate of at least
one (1) bale per five hundred (500) square feet and shall be maintained until a
catch of vegetation is established,
(b) Anchoring the mulch with netting, peg and twine or other suitable method
may be required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid
siltation into the water. Such measures may include the use of staked nay bales
and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected
from erosion caused by water flowing through them. Drainage ways shall be
designed and constructed in order to carry water from a twenty-five (25) year
storm or greater, and shall be stabilized with vegetation or lined with rip-rap.
C) R. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts,
including severe erosion, mass soil movement and water pollution, whether during or
after construction. Proposed uses requiring subsurface waste disposal, and commercial
or industrial development and other similar intensive land uses, shall require a soils
report based on an on-site investigation and be prepared by state-certified professionals.
Certified persons may include Maine Certified Soil Scientists, Maine Registered
Professional Engineers, Maine State Certified Geologists and other persons who have
training and experience in the reco gnition and evaluation of soil properties. The report
shall be based upon the analysis of the characteristics of the soil and surrounding land
and water areas, maximum ground water elevation, presence of ledge, drainage
conditions, and other pertinent data which the evaluator deems appropriate. The soils
report shall include recommendations for a proposed use to counteract soil limitations
where they exist.
S. Water Quality --
No activity shall deposit on or into the ground or discharge to the waters of the State
any pollutant that, by itself or in combination with other activities or substances, will
impair designated uses or the water classification of the water body, tributary stream or
_ Wetland.
O
36
"7, Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on
C) or adjacent to sites listed on, or eligible to be listed on the National Register of Historic
\ Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty
(20) days prior to action being taken by the permitting authority. The permitting
authority shall consider comments received from the Commission prior to rendering a
decision on the application.
Section 16. Administration
- A. Administering Bodies and Agents
. (1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or .
. reappointed annually by July 1™ by the Municipal Officers,
(2) Board of Appeals. There is hereby created the Board of Appeals of the-Town of
Brooklin pursuant to the provisions of State law, 30-A M.R.S.A. section 2691
(3) Planning Board. A: Planning Board shall be created in accordance with the
provisions of State law.
| B. Permits Required
C) After the effective date of this Ordinance no person shall, without first obtaining a
permit, engage in any activity or use of land or structure requiring a permit in the
district in which such activity or use would occur; or expand, change, or replace an
existing use or structure; or renew a discontinued nonconforming use. A person who is
issued a permit pursuant to this Ordinance shall have a copy of the permit on site while
the work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert
as long as:
(a)The replacement culvert is not more than 25% longer than the culvert
being replaced;
(b)The replacement culvert is not longer than 75 feet; and .
(c)Adequate erosion control measures are taken to prevent sedimentation of
the water, and the crossing does not block fish passage in the water-course.
(2) A permit is not required for an archaeological excavation as long as the
excavation is conducted by an archaeologist listed on the State Historic
Preservation Officer's level 1 or level 2 approved list, and unreasonable erosion
37
; and sedimentation is prevented by means of adequate and timely temporary and
permanent stabilization measures.
. C) (3) Any permit required by this Ordinance shall be in addition to any other permit
. required by other law or ordinance.
Cc, Permit Application.
(1) Every applicant for a permit shall submit a written application, including a a
scaled site plan, on a form provided by the municipality, to the appropriate
official as indicated in Section 14.
(2) All applications shall be signed by an owner or individual who can show
. evidence of right, title or interest in the property or by an agent, representative,
tenant, or contractor of the owner with authorization from the owner to
apply for a permit hereunder, certifying that the information in the application
. is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning
Board, as appropriate, shall note upon each application the date and time of its
receipt.
OC) (4) If the property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation
approved by the Plumbing Inspector, shall be submitted whenever the nature of
the proposed structure or use would require the installation of a subsurface
sewage disposal system.
D. Procedure for Administering the Permits (Approval of Permits) |
Within 35 days of the date of receiving a written application, the Planning Board or
Code Enforcement Officer, as indicated in Section 14, shall notify the applicant in
writing either that the application is a complete application, or, if the application is
incomplete, that specified additional material is needed to make the application
complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall
approve, approve with conditions, or deny all permit applications in writing within 35° ,
days of receiving a completed application. However, if the Planning Board hasa
waiting list of applications, a decision on the application shall occur within 35 days
after the first available date on the Planning Board's agenda following receipt of the
completed application, or within 35 days of the public hearing, if the proposed use or
structure is found to be in conformance with the purposes and provisions of this
Ordinance. -
38
; The applicant shall have the burden of proving that the Proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
C) After the submission of a complete application to the Planning Board, the Board shall
approve an application or approve it with conditions if it makes a positive finding based
on the information presented that the proposed use:
(1) Will maintain safe and healthful conditions; |
, (2) Will not result in water pollution, erosion, or sedimentation to surface waters;
. 3) Will adequately provide for the disposal of all wastewater.
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or
other wildlife habitat;
. (5) Will conserve shore cover and visual, as well as actual points of access to inland
and coastal waters.
(6) -- Will protect archaeological and historic resources as designated in the
comprehensive plan;
(7) = Will not adversely affect existing commercial fishing or maritime activities in a
Commercial Fisheries/Maritime Activities District;
aD (8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
(10) Will conserve water views as viewed from public facilities.
If a permit is either denied or approved with conditions, the reasons as well as
. conditions shall be stated in writing. No approval shall be granted for an application
involving a structure if the structure would be located in an unapproved subdivision or
would violate any other local ordinance, or regulation or statute administered by the
municipality.
E. Special Exceptions
In addition to the criteria specified in Section 16(D) above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential
structure in a Resource Protection District provided that the applicant demonstrates that
all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource a,
Protection District, where the structure can be built.
WO) :
. 39
(2) The lot on which the structure is proposed is undeveloped and was established
and recorded in the Hancock County Registry of Deeds, before the adoption of
O the Resource Protection District.
. (3) All proposed buildings, sewage disposal systems and other improvements are:
. (a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the 100 year floodplain along rivers and
outside the velocity zone in areas subject to tides, based on detailed flood
; insurance studies and as delineated on the Federal Emergency Management
Agency's.flood Boundary and Floodway Maps and Flood Insurance Rate Maps;
all buildings, including basements, are elevated at least one foot above the 100
year floodplain elevation; and the development is otherwise in compliance with
any applicable municipal floodplain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency
Maps, it is deemed to be % the width of the 100-year floodplain.
| (4) The total ground-floor area, including cantilevered or similar overhanging
_ €xtensions, of all principal and accessory structures is limited to a maximum
of 1,500 square feet. This limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from
the normal high-water line of a water body, tributary stream or upland edge of a
C) wetland to the greatest practical extent, but not less than (seventy-five) 75 feet,
"-- horizontal distance. In determining the greatest practical extent, the Planning
Board shall consider the depth of the lot the slope of the land, the potential for
soil erosion, the type and amount of vegetation to be removed, the proposed
; building site's elevation in regard to the floodplain, and its proximity to
moderate-value and high-value wetlands.
F. Expiration of Permit .
: Permits shall expire one (1) year from the date of issuance if a substantial start is not
; made in construction or in the use of the property during that period. If a substantial
start is made within one year of the issuance of the permit, the applicant shall have one
additional year to complete the project, at which time the permit shall expire.
- G. Installation of Public Utility Service -- _ . .
A public utility, water district, sanitary district or any utility company of any kind may
not install services to any new structure located in the shoreland zone unless written
authorization attesting to the validity and currency of all local permits required under
this or any previous Ordinance has been issued by the appropriate municipal officials or
other written arrangements have been made between the municipal officials and the
(>) utility.
40
H. Appeals and Variances
C) (1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have
the following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an
appellate basis, where it is alleged by an aggrieved party that there is an error in
any order, requirement, decision, or determination made by, or failure to act by,
the Planning Board in the administration of this Ordinance; and to hear and
decide administrative appeals on a de novo basis where it is alleged by an
aggrieved party that there is an error in any order, requirement, decision or
determination made by, or failure to act by, the Code Enforcement Officer in his
or her review of and action on a permit application under this Ordinance. Any
order, requirement, decision or determination made, or failure to act, in the
enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the
limitations set forth in this Ordinance.
(2) Variance Appeals: Variances may be granted only under the following
conditions:
(a) Variances may be granted only from dimensional requirements including,
but not limited to, lot width, structure hei ght, percent of lot coverage, and
O setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise
prohibited by this Ordinance.
. (c) The Board shall not grant a vatiance unless it finds that: .
(i) The proposed structure or use would meet the provisions of Section
15 except for the specific provision which has created the non-
conformity and from which relief is sought; and
(ii) The strict application of the terms of this Ordinance would result in
undue hardship. The term "undue hardship" shall mean:
| a. That the land in question cannot yield a reasonable return
; unless a variance is granted; .
b. That the need for a variance is due to the unique
circumstances of the property and not to the general conditions in
the neighborhood; ;
c. That the granting of a-variance will not alter the essential
_ character of the locality; and
4]
; d. That the hardship is not the result of action taken by the
applicant or a prior owner.
O) (d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals
may grant a variance to an owner of a residential dwelling for the purpose of
making that dwelling accessible to a person with a disability who resides in or
. regularly uses the dwelling. The board shall restrict any variance granted under
this subsection solely to the installation of equipment or the construction of
Structures necessary for access to or egress from the dwelling by the person with
the disability. The board may impose conditions on the variance, including
limiting the variance to the duration of the disability or to the time that the ,
person with the disability lives in the dwelling. The term "structures necessary
for access to or egress from the dwelling" shall include railing, wall or roof
systems necessary for the safety or effectiveness of the structure.
(ce) The Board of Appeals shall limit any variances granted as strictly as
possible in order to ensure conformance with the purposes and provisions of
this Ordinance to the greatest extent possible, and in doing so may impose such
conditions to a variance as it deems necessary. The party receiving the variance
. shall comply with any conditions imposed.
( A copy of each variance request, including the application and all
supporting information supplied by the applicant, shall be forwarded by the
municipal officials to the Commissioner of the Department of Environmental
C) Protection at least twenty (20) days prior to action by the Board of Appeals.
\ Any comments received from the Commissioner prior to the action by the
. _ Board of Appeals shall be made part of the record and shall be taken into
consideration by the Board of Appeals. ;
(3) _ Administrative Appeals
When the Board of Appeals reviews.a decision of the Code Enforcement
Officer, the Board of Appeals shall hold a "de novo" hearing. At this time the
, Board may receive and consider new evidence and testimony, be it oral or
written. When acting in a "de novo" capacity the Board of Appeals shall hear
and decide the matter afresh, undertaking its own independent analysis of
evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold
. anrappellate hearing, and may revetse the decision of the Planning Board only |
upon finding that the decision was contrary to specific provisions of the
Ordinance or contrary to the facts presented to the Planning board. The Board
of Appeals shall not receive or consider any evidence which was not presented
to the Planning Board, but the Board of Appeals may receive and consider
written or oral arguments. If the Board of Appeals determines that the record of
the Planning Board proceedings are inadequate, the Board of Appeals may
cy remand the matter to the Planning Board for additional fact finding.
42 ,
(4) Appeal Procedure
C} (a) Making an Appeal
- (i) An administrative or variance appeal may be taken to the Board of
Appeals by an aggrieved party from any decision of the Code
Enforcement Officer or the Planning Board, except for enforcement-
related matters as described in Section 16(H)(1)(a) above. Such an appeal
shall be taken within thirty (30) days of the date of the official, written
decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
_ (ii) Applications for appeals shall be made by filing with the Board of
, Appeals a written notice of appeal which includes:
a. A concise written statement indicating what relief is requested
and why the appeal or variance should be granted. .
b. A sketch drawn to scale showing lot lines, location of
existing buildings, and structures and other physical features of
the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a
variance, the Code Enforcement Officer or Planning Board, as
appropriate, shall transmit to the Board of Appeals all of the papers
C) constituting the record of the decision appealed from.
; (iv) The Board of Appeals shall hold a public hearing on an
administrative appeal or a request for a variance within thirty-five (35)
days of its receipt of a complete written application, unless this time
period is extended by the parties.
(b) Decision by Board of Appeals
G) A majority of the full voting membership of the Board shall
constitute a quorum for the purpose of deciding an appeal.
. (ii) The person filing the appeal shall have the burden of proof.
. (iii) The Board shall decide all administrative appeals and variance
appeals within thirty-five (35) days after the close of the hearing, and
. shall issue a written decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its .
decision, including a statement of the facts found and conclusions to be
mailed or hand-delivered to the applicant and to the Department of
. _Environmental Protection within seven (7) days of the Board's decision.
43
Copies of written decisions of the Board of Appeals shall be given to the
Planning Board, Code Enforcement Officer, and the municipal officers,
~ (5) Appeal to Superior Court.
Except as provided by 30-A M.R.S.A. section 2697(3)(F), any aggrieved party
who participated as a party during the proceedings before the Board of Appeals
may take an appeal to Superior Court in accordance with State laws within
forty-five (45) days from the date of any decision of the Board of Appeals.
(6) Reconsideration. .
In accordance with 30-A M.R.S.A. section 2691 (3)(F), the Board of Appeals
may reconsider any decision within forty-five (45) days of its prior decision. A
request to the board to reconsider a decision must be filed within ten (10) days
of the decision that is being reconsidered. A vote to reconsider and the action
taken on that reconsideration must occur and be completed within forty-five
(45) days of the date of the vote on the original decision. Reconsideration of a
, decision shall require a positive vote of the majority of the Board members
originally voting on the decision, and proper notification to the landowner, .
petitioner, planning board, code enforcement officer, and other parties of
interest, including abutters and those who testified at the original hearing(s).
The Board may conduct additional hearings and receive additional evidence and
testimony.
Appeal of a reconsidered decision to Superior Court must be made within
C » fifteen (15) days after the decision on reconsideration. ,
. = Enforcement
(1) Nuisances . .
Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer | .
(a) It shall be the duty of the Code Enforcement Officer to enforce the
provisions of this Ordinance. If the Code Enforcement Officer shall find that
any provision of this Ordinance is being violated, he or she shall notify in
writing the person responsible for such violation, indicating the nature of the
violation and ordering the action necessary to correct it, including =
_ discontinuance of illegal use of land, buildings or structures, or work being
'done, removal of illegal buildings or structures, and abatement of nuisance --
conditions. A copy of such notices shall be submitted to the municipal officers
, and be maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to ensure
compliance with all applicable laws and conditions attached to permit
fc
: 44 |
. ; approvals. The Code Enforcement Officer shall also investigate all complaints
of alleged violations of this Ordinance.
f ») (c) The Code Enforcement Officer shall keep a complete record of all essential
N transactions of the office, including applications submitted, permits granted or
denied, variances granted or denied, revocation actions, revocation of permits,
appeals, court actions, violations investigated, violations found, and fees
collected. On a biennial basis, a summary of this record shall be submitted to
the Director of the Bureau of Land and Water Quality within the Department of
Environmental Protection.
(3) Legal Actions,
When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the
Code Enforcement Officer, are hereby directed to institute any and all actions
and proceedings, either legal or equitable, including seeking injunctions of
violations and the imposition of fines, that may be appropriate or necessary to
enforce the provisions of this Ordinance in the name of the municipality. The
municipal officers, or their authorized agent, are herby authorized to enter into
; administrative consent agreements for the purpose of eliminating violations of
this Ordinance and recovering fines without Court action. Such agreements
shall not allow an illegal structure or use to continue unless there is clear and
C) convincing evidence that the illegal structure or use was constructed or
Ne conducted as a direct result of erroneous advice given by an authorized
municipal official and there is no evidence that the owner acted in bad faith, or
unless the removal of the structure or use will result in a threat or hazard to
public health and safety or will result in substantial environmental damage.
(4) Fines.
Any person, including but not limited to a landowner, a landowner's agent ora
contractor, who violates any provision or requirement of this Ordinance shall be
penalized in accordance with 30-A M.R.S.A. subsection 4452,
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per
violation for each day that the violation continues. However, in a Resource
Protection District the maximum penalty is increased to $5000 (38 M.R.S.A.
ne - - section 4452), mo oo oo
45
Section 17. Definitions. |
Accessory structure or use - a use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated, shall not subordinate the principal .
use of the lot. A deck or similar extension of the principal structure or a garage attached to the
principal structure by a roof or a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the:
granting or denial of a permit or variance under this Ordinance;a person whose land abuts land
for which a permit or variance has been granted; or any other person or group of persons who
C) have suffered particularized injury as a result of the granting or denial of such permit or
variance.
-Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or
animals, including but not limited to: forages and sod crops; grains and seed crops; dairy
. animals and dairy products; poultry and poultry products; livestock; fruits and vegetables; and
ornamental and greenhouse products. Agriculture does not include forest management and
timber harvesting activities.
_ Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant
or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and
inclusive of bark.
Basement - any-portion of a structure with a floor-to-ceiling height of 6 feet or more and oo
having more than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for
vehicles and trailers,
46
Campground - any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles or other shelters.
C) Canopy -- the more or less continuous cover formed by tree crowns in a wooded area.
. Coastal wetland - all tidal and subtidal lands; all lands with vegetation present that is tolerant
of salt water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh,
bog, beach, flat or other contiguous low land that is subject to tidal action during the highest
tide level for the year in which an activity is proposed as identified in tide tables published by
the National Ocean Service. Coastal wetlands may include portions of coastal sand dunes.
NOTE: All areas below the hi ghest annual tide level are coastal wetlands. These areas
may consist of rocky ledges, sand and cobble beaches, niud flats, etc., in addition to salt
marshes and salt meadows.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation,"
_ defined below, the intent and result of which activity is the production of income from the
buying and selling of goods and/or services, exclusive of rental of residential buildings and/or
dwelling units.
Development -- a change in land use involving alteration of the land, water or vegetation, or
the addition or alteration of structures or other construction not naturally occurring.
- Dimensional requirements - numerical standards relating to spatial relationships including
but not limited to setback, lot area, shore frontage and height.
C) 'Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental .
: condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
F . illness; and also includes the physical or mental condition of a person which constitutes a
'substantial handicap as determined by a physician or in the case of mental handicap, by a .
t psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
| Driveway - a vehicular access-way less than five hundred (500) feet in length serving two |
single-family dwellings or one two-family dwelling, or less. . ,
Emergency operations -- Emergency operations conducted for the public health, safety or
general welfare, such as protection of resources from immediate destruction or loss, law
. enforcement, and operations to rescue human beings, property and livestock from the threat of
destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or
water transmission or distribution lines, towers and related equipment; telephone cables or
__ lines, poles and related equipment; gas, oil, water, slurry or other similar pipelines; municipal
sewage lines, collection or supply systems; and associated storage tanks. Such systems may
include towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call
boxes, traffic signals, hydrants and similar accessories, but shall not include service drops or
_ buildings which are necessary for the furnishing of such services.
OO)
47
Expansion of a structure - an increase in the floor area or volume of a structure, including all
extensions such as, but not limited to: attached decks, garages, porches and greenhouses.
O Expansion of use - the addition of one or more weeks or months to a use's operating season;
additional hours of operation, or the use of more floor area or ground area devoted to a
particular use.
Family - one or more persons occupying a premise and living as a single housekeeping unit.
Floodway -- the channel of a river or other watercourse and adjacent land areas that must be
reserved in order to discharge the 100-year flood without cumulatively increasing the water
surface elevation by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls, plus the horizontal area of any unenclosed portions of a structure such as porches and
decks.
Forest management activities (WILL BE REPEALED PURSUANT TO SECTION 4B) -
timber cruising and other forest resource evaluation activities, pesticide or fertilizer
application, management planning activities, timber stand improvement, pruning, regeneration
of forest stands, and other similar or associated activities, exclusive of timber harvesting and
the construction, creation or maintenance of roads.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters
C) tall (approximately twenty (20) feet) or taller. ,
: -Foundation - the supporting substructure of a building or other structure, excluding wooden .
"sills and post supports, but including basements, slabs, frost walls, or other base consisting of
concrete, block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested .
wetlands, which are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state,
the combined surface area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence
of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not
7 _.. conform to the criteria of this definition... Lo - Se oe
Functionally water-dependent uses -- those uses that require, for their primary purpose,
location on submerged lands or that require direct access to, or location in, coastal or inland
waters and that can not be located away from these waters. The uses include, but are not
limited to, commercial and recreational fishing and boating facilities, excluding recreational
boat storage buildings, finfish and shellfish processing, fish storage and retail and wholesale
oS fish marketing facilities, waterfront dock and port facilities, shipyards and boat building
48
facilities, marinas, navigation aids, basins and channels, retaining walls, industrial uses
dependent upon water-borne transportation or requiring large volumes of cooling or processing
water that can not reasonably be located or operated at an inland site, and uses that primarily
C) provide general public access to coastal or inland waters,
Great pond - any inland body of water which in a natural state has a surface area in excess of
ten acres, and any inland body of water artificially formed or increased which has a surface
area in excess of thirty (30) acres except for the purposes of this Ordinance, where the
artificially formed or increased inland body of water is completely surrounded by land held by
a single owner. NOTE: Brooklin has no great ponds. .
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article
4- A Section 465-A. This classification includes some, but not all impoundments of rivers that
are defined as great ponds. NOTE: Brooklin has no great ponds
Ground cover -- small plants, fallen leaves, needles and twi gs, and the partially decayed - ,
organic matter of the forest floor.
Height of a structure - the vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding
chimneys, steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the .
residential use of the property and surrounding residential uses; and 2) which employs no more
C) than two (2) personis other than family members: residing in the home.
Le
Increase in nonconformity of a structure - any change in a structure or property which
'causes further deviation from the dimensional standard(s) creating the nonconformity such as,
'but not limited to, reduction in water body, tributary stream or wetland setback distance,
increase in lot coverage, or increase in height of a structure. Property changes or structure
expansions which either meet the dimensional standard or which cause no further increase in
the linear extent of nonconformance of the existing structure shall not be considered to increase
nonconformity. For example, there is no increase in nonconformity with the setback
; requirement for water bodies, wetlands, or tributary streams if the expansion extends no further
into the required setback area than does any portion of the existing nonconforming structure, .
Hence, a structure may be expanded laterally provided that the expansion extends no closer to
the water body, tributary stream, or wetland than the closest portion of the existing structure
from that water body, tributary stream, or wetland. Included in this allowance are expansions .
which in-fill irregularly shaped structures. .
. Individual private campsite - an area of land which is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10) individuals
and which involves site improvements which may include but not be limited to a gravel pad,
. parking area, fire place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of =.
la goods, or the extraction of minerals.
49
Institutional -- a non-profit or quasi-public use, or institution such as a church, library, public
or private schoo], hospital, or municipally owned or operated building, structure or land used
C) for public purposes.
Land Management Road (WILL BE REPEALED PURSUANT TO SECTION 4B) - a
route or track consisting of a bed of exposed mineral soil, gravel, or other surfacing materials
constructed for, or created by, the passage of motorized vehicles and used primarily for timber
harvesting and related activities, including associated log yards, but not including skid trails or
skid roads.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads
serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also
provide accessory services such as boat and related sales, boat repair and construction, indoor
and outdoor storage of boats and marine equipment, bait and tackle shops and marine fuel
service facilities.
Market value - the estimated price a property will bring in the open market and under
prevailing market conditions in a sale between a willing seller and a willing buyer, both
C) conversant with the property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature
'or extent of mineral resources which create minimal disturbance to the land and which include
. -reasonable measures to restore the land to its original condition. .
Mineral extraction - any operation within any twelve ( 12) month period which removes more
than. one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or
other like material from its natural location and to transport the product removed, away from
_ the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two
lot lines extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential
dwelling units. _ -
Native -- indigenous to the local forests. .
Non-conforming condition -- non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment took
effect.
50
Non-conforming lot - a single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirements of the
district in which it is located.
O - Non-conforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, hei ght, or lot coverage, but which is allowed solely because
it was in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it
was in lawful existence at the time this Ordinance or subsequent amendments took effect.
Normal high-water line (non-tidal waters) - that line which is apparent from visible
markings, changes in the character of soils due to prolonged action of the water or changes:in
vegetation, and which distinguishes between predominantly aquatic and predominantly
terrestrial land.
Areas contiguous with rivers and great ponds that support non-forested wetland vegetation and
hydric soils and that are at the same or lower elevation as the water level of the river or great
pond during the period of normal high-water are considered part of the river or great pond.
NOTE: Adjacent to tidal waters, setbacks are measured from the upland edge of the
"coastal wetland."
Outlet stream- Any perennial or intermittent stream, as shown on the most recent edition of
the 7.5 minute series topographic map, or if not available, a 15-minute series topographic map
C) produced by the United States Geological Survey, that flows from a freshwater wetland. This
definition does not include the term "stream" or "tributary stream" as defined elsewhere in this
Ordinance.
'Person - an individual, corporation, governmental agency, municipality, trust, estate,
"partnership, association, two or more individuals having a joint or common interest, or other
legal entity.
Piers, Docks, Wharves, Breakwaters, Causeways, Marinas, Bridges and other structures
and uses extending over or below the normal high-water line or within a wetland.
Temporary: Structures which remain in or over the water for less than
seven (7) months in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or
more in any period of twelve (12) consecutive months.
-- Principal structure - a building other.than.one which is used.for. purposes wholly incidental-or ~
accessory to the use of another building or use on the same premises.
Principal use - a use other than one which is wholly incidental or accessory to another use on
the same premises.
. 51
. Public facility - any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental body
or public entity.
f
O Recent flood plain soils - the following soil series as described and identified by the National
Cooperative Soil Survey: a
Alluvial Cornish Charles
Fryeburg Hadley - Limerick
Lovewell Medomak Ondawa
Podunk Rumney Saco
Suncook Sunday Winooski.
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and
designed for temporary sleeping or living quarters for one or more persons, and which may
include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor home. In order to
be considered as a vehicle and not as a structure, the unit must remain with its tirés on the
ground, and must be registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
C) malfunctioning or being upgraded with no si gnificant change of design flow or use of the
structure, or 2.) any existing overboard wastewater discharge.
'Residential dwelling unit - a room or group of rooms designed and equipped exclusively for
'us€ as permanent, seasonal, or temporary living quarters for only one family at a time, and
containing cooking, sleeping and toilet facilities. The term shall include mobile homes, and
rental units that contain cooking, sleeping, and toilet facilities regardless of the time-period
rented. Recreational vehicles are not residential dwelling units. oS
Residual basal area (WILL BE REPEALED PURSUANT TO SECTION 4B) - the average
of the basal area of trees remaining on a harvested site. ,
_ Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion -
control and soil stabilization, typically used on ground slopes of two (2) units horizontal to one
(1) unit vertical or less. ,
River - a free-flowing body of water including its associated floodplain wetlands from that
point at which it provides drainage for a watershed of twenty five (25) square miles to its
O mouth,
-, 52
NOTE: The portion of a river that is subject to tidal action is a coastal wetland.
OC) 'Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Salt Marsh- Areas of coastal wetland (most often along coastal bays) that support salt tolerant
species, and where at average high tide during the growing season, the soil is irregularly
inundated by tidal waters. The predominant species is saltmarsh cordgrass (Spartina
alterniflora). More open areas often Support widgeon grass, eelgrass, and Sago pondweed.
Salt meadow -- Areas of a coastal wetland that support salt tolerant plant species bordering the
landward side of salt marshes or open coastal water, where the soil is saturated during the
growing season but which is rarely inundated by tidal water. Indi genous plant species include
salt meadow cordgrass (Spartina patens) and black rush; common threesquare occurs in fresher
areas.
Service drop - any utility line extension which does not cross or run beneath any portion of a
water. body provided that:
1. in the case of electric service
a, the placement of wires and/or the installation of utility poles is located
C) entirely upon the premises of the customer requesting service or upon a
\ Toadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
. a. the extension, regardless of length, will be made by the installation of
. telephone wires to existing utility poles, or
b. the extension requiring the installation of new utility poles or placement
underground is less than one thousand (1,000) feet in length.
. Setback - the nearest horizontal distance from the normal high-water line of a water body or
tributary stream, or upland edge of a wetland, to the nearest part of a structure, road, parking
space or other regulated object or area,
Shore frontage - the length of a lot bordering on a water body or wetland measured in a
straight line between the intersections of the lot lines with the shoreline.
| Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal |
distance, of the normal high-water line of any river; within 250 feet, horizontal distance, of the
. upland edge of a coastal wetland, including all areas affected by tidal action; within 250 feet of
the upland edge of a freshwater wetland rated high or moderate value by the Department of
Inland Fisheries and Wildlife; within seventy-five (75) feet, horizontal distance, of the upland
edge of a freshwater wetland rated low value or not rated by the Department of Inland
e Fisheries and Wildlife within seventy-five (75) feet, horizontal distance of the normal high-
53
water line of an outlet stream; or within seventy-five(75) feet, horizontal distance, of the
normal high-water line of a stream. |
C) Shoreline -- the normal high-water line, or upland edge of a freshwater or coastal wetland.
Slash (WILL BE REPEALED PURSUANT TO SECTION 4B) - the residue, e.g., treetops
_ and branches, left on the ground after a timber harvest.
Stream - a free-flowing body of water from the confluence of two (2) perennial streams as
depicted on the most recent edition of a United States Geological Survey 7.5 minute series
topographic map, or if not available, a 15-minute series topographic map, to the point where
the body of water becomes a river or flows to another water body or wetland within the
shoreland area,
Structure - anything built for the support, shelter or enclosure of persons, animals, goods or
property of any kind, together with anything constructed or erected with a fixed location on or
in the ground, exclusive of fences, and poles, wiring and other aerial equipment normally
associated with service drops as well as guying and guy anchors. The term includes structures
temporarily or permanently located, such as decks, patios, and satellite dishes.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured
as a percentage of estimated total cost.
Subsurface sewage disposal system -- any system designed to dispose of waste or waste water
on or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal .
C) fields; grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture,
N mechanism, or apparatus used for those purposes; does not include any discharge system
licensed under 38 M.R.S.A. section 414, any surface waste water disposal system, or any
municipal or quasi-municipal sewer or waste water treatment system.
'Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tidal waters -- all waters affected by tidal action during the hi ghest annual tide.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of trees in the shoreland zone on a lot that
has less than two (2) acres within the shoreland zone shall not be considered timber harvesting.
Such cutting or removal of trees shall be regulated pursuant to Section 15 (P), Clearing or
Removal of Vegetation for Activities Other Than Timber Harvesting.
Tributary stream - means a channel between defined banks created by the action of surface
water, which is characterized by the lack of terrestrial vegetation or by the presence of a bed,
devoid of topsoil, containing waterborne deposits or exposed soil, parent material or bedrock;
and which is connected hydrologically with other water bodies. "Tributary stream" does not
include rills or gullies forming because of accelerated erosion in disturbed soils where the
natural vegetation cover has been removed by human activity. This definition does not include
aN the term "stream"or "outlet stream" as defined elsewhere in this Ordinance, and only applies to
CO)
54
that portion of the tributary stream located within the shoreland zone of the receiving water
. body or wetland.
C) NOTE: Water setback requirements apply to tributary streams within the shoreland
NS zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a
coastal wetland, this boundary is the line formed by the landward limits of the salt tolerant
vegetation and/or the hi ghest annual tide level, including all areas affected by tidal action. For
purposes of a freshwater wetland, the upland edge is formed where the soils are not saturated
for a duration sufficient to support wetland vegetation; or where the soils support the growth of
wetland vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) foot) tall or taller, ,
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over
and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Velocity zone - an area of special flood hazard extending from offshore to the inland limit of .
the primary frontal dune along an open coast and any other area subject to high velocity wave
action from storms or seismic sources.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river, outlet stream or stream.
o) Water crossing - any project extending from one bank to the opposite bank of a river, stream,
outlet stream, tributary stream, or wetland whether under, throu gh, or over the water or
wetland. Such projects include but may not be limited to roads, fords, bridges, culverts, water
lines, sewer lines, and cables as well as maintenance work on these crossings. This definition
includes crossings for timber harvesting equipment and related activities.
Wetland - a freshwater or coastal wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs. ;
55