This is the exact embedded text of the captured official document.
Snapshot bbfcf9c16620 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
FLOODPLAIN MANAGEMENT ORDINANCE
TOWN OF BROOKSVILLE, MAINE
ENACTED: _ Swe PS ee Le
Date
EFFECTIVE: --JUne 23,20 Mc
Date
CERTIFIED BY: LK i en
ignature a
CERRUISE ny Print Name iy
SHecTM AW
Title Affix Seal
FLOODPLAIN MANAGEMENT ORDINANCE
CONTENTS
ARTICLE PAGE
I, PURPOSE AND ESTABLISHMENT .......sscccscssscsscscssssecessscssssececececvavasavavaeavae 2
TT, -- PERMIT REQUIRED......ssscscecssssseseeestseseseseecsecssvevesesasucucesucacevacecececseavavaee 2
TIT. APPLICATION FOR PERMIT ......ccscscssssesesesesscscscsesscsvacuesessescaracsssevavavesesasae 2
IV. APPLICATION FEE AND EXPERT'S FEE .....scscscssssssesessesscscscacacscscscacacavacavaes 4
_-V.- REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS ....scsseseseescsescsesesescscaeutessssaeeesasssssesvasstseescatseatsacavavacavavacae 5
VI. DEVELOPMENT STANDARDS.......scssssscsesesesssescesescssssesssetstecereceseceascssssecses 6
VII. CONDITIONAL USE REVIEW ......s.cscscsssessssescssscssessecescasscerasecvasasseseseseeeeed3
VIII. CERTIFICATE OF COMPLIANCE ......cscssessscsesesescscesscecescsrscscavatasacsvssacsesesed
IX. REVIEW OF SUBDIVISIONS AND DEVELOPMENT PROPOSALS ...c.escecesseeeceeed4
X. APPEALS AND VARIANCES ......sscssesesssesssesescscsvscasecseesvssaracatssarsesssaseseseeesd 5
XI. ENFORCEMENT AND PENALTIES ...0...ccscssssscscsessssscscescstaracetacacassceterscsesesd 7
XII. VALIDITY AND SEVERABILITY ........sssesssssesesssscseessceseceecsratscarseasessrseseses8
XIII. CONFLICT WITH OTHER ORDINANCES ......cscccescssesesessescecatseeceassesesesesseees8
XIV. DEFINITIONS .....s.cscssseeecsesesssessseeeeeseseseesacscsssssssaeevaceatarstatassassessassesees8
MWe ABROGATION veanes.uesvernssesesoscaitstnipeseneeremacsansnvauneatsniacaviercecesyeranseanaenvend 3
1
ARTICLE I-PURPOSE AND ESTABLISHMENT
Certain areas of the Town of Brooksville, Maine are subject to periodic flooding, causing
serious damages to properties within these areas. Relief is available in the form of flood
insurance as authorized by the National Flood Insurance Act of 1968.
Therefore, the Town of Brooksville, Maine has chosen to become a participating community
in the National Flood Insurance Program, and agrees to comply with the requirements of
the National Flood Insurance Act of 1968 (P.L. 90-488, as amended) as delineated in this
Floodplain Management Ordinance.
It is the intent of the Town of Brooksville, Maine to require the recognition and evaluation of
flood hazards in all official actions relating to land use in the floodplain areas having special
flood hazards.
The Town of Brooksville has the legal authority to adopt land use and control measures to
reduce future flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352, 4401-
4407, and Title 38 MRSA, Section 440.
The National Flood Insurance Program, established in the aforesaid Act, provides that areas
of the Town of Brooksville having a special flood hazard be identified by the Federal
Emergency Management Agency and that floodplain management measures be applied in
such flood hazard areas. This Ordinance establishes a Flood Hazard Development Permit
system and review procedure for development activities in the designated flood hazard
areas of the Town of Brooksville, Maine.
The areas of special flood hazard, Zones A, AE, and VE for the Town of Brooksville,
Hancock County, Maine, identified by the Federal Emergency Management Agency in a
report entitled "Flood Insurance Study - Hancock County, Maine," dated July 20, 2016 with
accompanying "Flood Insurance Rate Map" dated July 20, 2016 with panels: 889D, 892D,
893D, 894D, 911D, 912D, 913D, 914D, 918D, 1102D, 1104D, 1106D, 1107D, 1108D,
1109D, 1112D, 1116D, 1117D, 1126D, 1127D, 1128D, 1129D, 1131D, 1133D, 1136D, and ;
1137D, derived from the county wide digital Flood Insurance Rate Map entitled "Digital
Flood Insurance Rate Map, Hancock County, Maine," are hereby adopted by reference and
declared to be a part of this Ordinance.
ARTICLE II - PERMIT REQUIRED
Before any construction or other development (as defined in Article XIV), including the
placement of manufactured homes, begins within any areas of special flood hazard
established in Article I, a Flood Hazard Development Permit shall be obtained from the Code
Enforcement Officer except as provided in Article VII. This permit shall be in addition to
any other permits which may be required pursuant to the codes and ordinances of the Town
of Brooksville, Maine. .
ARTICLE III - APPLICATION FOR PERMIT
The application for a Flood Hazard Development Permit shall be submitted to the Code
Enforcement Officer and shall include:
2
A. The name, address and phone number of the applicant, owner, and contractor;
B. An address and a map indicating the location of the construction site;
C. Asite plan showing location of existing and/or proposed development, including but not
limited to structures, sewage disposal facilities, water supply facilities, areas to be cut
and filled, and lot dimensions;
D. Astatement of the intended use of the structure and/or development;
E. A statement of the cost of the development including all materials and labor;
F. A statement as to the type of sewage system proposed;
G. Specification of dimensions of the proposed structure and/or development;
[Items H-K.3. apply only to new construction and substantial improvements. ]
H. The elevation in relation to the National Geodetic Vertical Datum (NGVD), North
American Vertical Datum (NAVD), or to a locally established datum in Zone A only, of
the:
1. base flood at the proposed site of all new or substantially improved structures, which
is determined:
a. in Zones AE and VE from data contained in the "Flood Insurance Study -
Hancock County, Maine," as described in Article I; or,
b. in Zone A:
(1) from any base flood elevation data from federal, state, or other technical
sources (such as FEMA's Quick-2 model, FEMA 265), including information
obtained pursuant to Article VI.K. and IX.D.;
(2) from the contour elevation extrapolated from a best fit analysis of the
floodplain boundary when overlaid onto a USGS Quadrangle Map or other
topographic map prepared by a Professional Land Surveyor or registered
professional engineer, if the floodplain boundary has a significant correlation
to the elevation contour line(s); or, in the absence of all other data,
(3) to be the elevation of the ground at the intersection of the floodplain
boundary and a line perpendicular to the shoreline which passes along the
ground through the site of the proposed building.
2. highest and lowest grades at the site adjacent to the walls of the proposed building;
3. lowest floor, including basement; and whether or not such structures contain a
basement; and,
3
4. level, in the case of non-residential structures only, to which the structure will be
floodproofed;
I. A description of an elevation reference point established on the site of all developments
for which elevation standards apply as required in Article VI;
J. A written certification by a Professional Land Surveyor, registered professional
engineer or architect, that the base flood elevation and grade elevations shown on the
application are accurate
K. The following certifications as required in Article VI by a registered professional
engineer or architect:
1. a Floodproofing Certificate (FEMA Form 81-65, as amended), to verify that the
floodproofing methods for any non-residential structures will meet the floodproofing
criteria of Article III.H.4.; Article VI.G.; and other applicable standards in Article VI;
2. aV-Zone Certificate to verify that the construction in coastal high hazard areas,
Zone VE, will meet the criteria of Article VI.P.; and other applicable standards in
Article VI;
3. a Hydraulic Openings Certificate to verify that engineered hydraulic openings in
foundation walls will meet the standards of Article VI.L.2.a.;
4. acertified statement that bridges will meet the standards of Article VI.M.;
5. acertified statement that containment walls will meet the standards of Article VI.N.;
L. A description of the extent to which any water course will be altered or relocated as a
result of the proposed development; and,
M. Astatement of construction plans describing in detail how each applicable development _ -
standard in Article VI will be met.
ARTICLE IV - APPLICATION FEE AND EXPERT'S FEE
A non-refundable application fee of $25.00 for all minor development and $ 50.00 for all
new construction or substantial improvements shall be paid to the Town and a copy of a
receipt for the same shall accompany the application.
An additional fee may be charged if the Code Enforcement Officer, Planning Board, and/or
Board of Appeals needs the assistance of a professional engineer or other expert. The ~
expert's fee shall be paid in full by the applicant within 10 days after the town submits a bill
to the applicant. Failure to pay the bill shall constitute a violation of the ordinance and be
grounds for the issuance of a stop work order. An expert shall not be hired by the
municipality at the expense of an applicant until the applicant has either consented to such
hiring in writing or been given an opportunity to be heard on the subject. An applicant who
4
is dissatisfied with a decision to hire expert assistance may appeal that decision to the
Board of Appeals.
ARTICLE V - REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
OS REE SAN PARVDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS
The Code Enforcement Officer shall: .
A. Review all applications for the Flood Hazard Development Permit to assure that
proposed developments are reasonably safe from flooding and to determine that all
pertinent requirements of Article VI (Development Standards) have been, or will be
met;
B. Utilize, in the review of all Flood Hazard Development Permit applications:
1. the base flood and floodway data contained in the "Flood Insurance Study -
Hancock County, Maine," as described in Article a.
2. in special flood hazard areas where base flood elevation and floodway data are not
provided, the Code Enforcement Officer shall obtain, review and reasonably utilize
any base flood elevation and floodway data from federal, state, or other technical
sources, including information obtained pursuant to Article III.H.1.b.; Article VI.K.;
and Article IX.D., in order to administer Article VI of this Ordinance; and,
3. when the community establishes a base flood elevation ina Zone A by methods
outlined in Article III.H.1.b., the community shall submit that data to the Maine
Floodplain Management Program.
C. Make interpretations of the location of boundaries of special flood hazard areas shown
on the maps described in Article I of this Ordinance;
D. In the review of Flood Hazard Development Permit applications, determine that all
necessary permits have been obtained from those federal, state, and local government
agencies from which prior approval is required by federal or state law, including but not
limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972,
33 U.S.C. 1344;
E. Notify adjacent municipalities, the Department of Environmental Protection, and the
Maine Floodplain Management Program prior to any alteration or relocation of a water
course and submit copies of such notifications to the Federal Emergency Management
Agency;
F. If the application satisfies the requirements of this Ordinance, approve the issuance
of one of the following Flood Hazard Development Permits, based on the type of
development:
5
1. A two-part Flood Hazard Development Permit for elevated structures. Part I shall
authorize the applicant to build a structure to and including the first horizontal floor
only above the base flood level. At that time the applicant shall provide the Code
Enforcement Officer with a Elevation Certificate completed by a Professional Land
Surveyor, registered professional engineer or architect based on the Part I permit
construction, "as built", for verifying compliance with the elevation requirements of
Article VI, paragraphs F, G, H, or P. Following review of the Elevation Certificate
data, which shall take place within 72 hours of receipt of the application, the Code
Enforcement Officer shall issue Part II of the Flood Hazard Development Permit.
Part II shall authorize the applicant to complete the construction project; or,
2. A Flood Hazard Development Permit for Floodproofing of Non-Residential Structures
that are new construction or substantially improved non-residential structures that
are not being elevated but that meet the floodproofing standards of Article
VI1.G.1.a., b., and c. The application for this permit shall include a Floodproofing
Certificate signed by a registered professional engineer or architect; or,
3. A Flood Hazard Development Permit for Minor Development for all development that
. is not new construction or a substantial improvement, such as repairs,
maintenance, renovations, or additions, whose value is less than 50% of the market
value of the structure. Minor development also includes, but is not limited to:
accessory structures as provided for in Article VI.J., mining, dredging, filling,
grading, paving, excavation, drilling operations, storage of equipment or materials,
deposition or extraction of materials, public or private sewage disposal systems or
water supply facilities that do not involve structures; and non-structural projects
such as bridges, dams, towers, fencing, pipelines, wharves, and piers.
For development that requires review and approval as a Conditional Use, as provided for in
this Ordinance, the Flood Hazard Development Permit Application shall be acted upon by
the Planning Board as required in Article VII.
G. Maintain, as a permanent record, copies of all Flood Hazard Development Permit
Applications, corresponding Permits issued, and data relevant thereto, including reports
of the Board of Appeals on variances granted under the provisions of Article X of this
Ordinance, and copies of Elevation Certificates, Floodproofing Certificates, Certificates of
Compliance and certifications of design standards required under the provisions of
Articles III, VI, and VIII of this Ordinance.
ARTICLE VI - DEVELOPMENT STANDARDS
All developments in areas of special flood hazard shall meet the following applicable
standards:
A. All Development - All development shall:
1. be designed or modified and adequately anchored to prevent flotation (excluding
piers and docks), collapse or lateral movement of the development resulting from
hydrodynamic and hydrostatic loads, including the effects of buoyancy;
6
2. use construction materials that are resistant to flood damage;
3. use construction methods and practices that will minimize flood damage; and
4. use electrical, heating, ventilation, plumbing, and air conditioning equipment, and
other service facilities that are designed and/or located to prevent water from
entering or accumulating within the components during flooding conditions.
B. Water Supply - All new and replacement water supply systems shall be designed to
minimize or eliminate infiltration of flood waters into the systems. ;
C. Sanitary Sewage Systems - All new and replacement sanitary sewage systems shall
be designed and located to minimize or eliminate infiltration of flood waters into the
system and discharges from the system into flood waters.
D. On Site Waste Disposal Systems - On-site waste disposal systems shall be located
and constructed to avoid impairment to them or contamination from them during
floods.
E, Watercourse Carrying Capacity - All development associated with altered or
relocated portions of a watercourse shall be constructed and maintained in such a
manner that no reduction occurs in the flood carrying capacity of the watercourse.
F. Residential - New construction or substantial improvement of any residential structure
located within:
1. Zones AE shall have the lowest floor (including basement) elevated to at least one
foot above the base flood elevation.
2. Zone A shall have the lowest floor (including basement) elevated to at least one
foot above the base flood elevation utilizing information obtained pursuant to Article
III.H.1.b.; Article V.B.; or Article IX.D.
3. Zone VE shall meet the requirements of Article VI.P.
G. Non Residential - New construction or substantial improvement of any non-
residential structure located within:
1. Zones AE shall have the lowest floor (including basement) elevated to at least one
foot above the base flood elevation, or together with attendant utility and sanitary
facilities shall: .
a. be floodproofed to at least one foot above the base flood elevation so that below
that elevation the structure is watertight with walls substantially impermeable
to the passage of water;
7
b. have structural components capable of resisting hydrostatic and hydrodynamic
loads and the effects of buoyancy; and,
c. be certified by a registered professional engineer or architect that the
floodproofing design and methods of construction are in accordance with
accepted standards of practice for meeting the provisions of this section. Such
certification shall be provided with the application for a Flood Hazard
Development Permit, as required by Article III.K. and shall include a record of
the elevation above mean sea level to which the structure is floodproofed.
2. Zone A shall have the lowest floor (including basement) elevated to at least one
foot above the base flood elevation utilizing information obtained pursuant to Article
III.H.1.b.; Article V.B.; or Article IX.D., or
a. together with attendant utility and sanitary facilities meet the floodproofing
standards of Article VI.G.1.
3. Zone VE shall meet the requirements of Article VI.P.
H. Manufactured Homes - New or substantially improved manufactured homes located
within:
1. Zone AE shall:
a. be elevated such that the lowest floor (including basement) of the manufactured
home is at least one foot above the base flood elevation;
b. be ona permanent foundation, which may be poured masonry slab or
foundation walls, with hydraulic openings, or may be reinforced piers or block
supports, any of which support the manufactured home so that no weight is
supported by its wheels and axles; and,
c. be securely anchored to an adequately anchored foundation system to resist
flotation, collapse, or lateral movement. Methods of anchoring may include, but
are not limited to:
(1) over-the-top ties anchored to the ground at the four corners of the
manufactured home, plus two additional ties per side at intermediate points
(manufactured homes less than 50 feet long require one additional tie per
side); or by, .
(2) frame ties at each corner of the home, plus five additional ties along each
side at intermediate points (manufactured homes less than 50 feet long
require four additional ties per side).
(3) all components of the anchoring system described in Article VI.H.1.c.(1) &
(2) shall be capable of carrying a force of 4800 pounds.
8
2. Zone A shall:
a. be elevated on a permanent foundation, as described in Article VI.H.1.b., such
that the lowest floor (including basement) of the manufactured home is at least
one foot above the base flood elevation utilizing information obtained pursuant
to Article III.H.1.b.; Article V.B; or Article IX.D.; and
b. meet the anchoring requirements of Article VI.H.1.c.
3. Zone VE shall meet the requirements of Article VI.P.
I. Recreational Vehicles - Recreational Vehicles located within:
1. Zones A and AE shall either:
a. be onthe site for fewer than 180 consecutive days,
b. be fully licensed and ready for highway use. A recreational vehicle is ready for
highway use if it is on its wheels or jacking system, is attached to the site only
by quick disconnect type utilities and security devices, and has no permanently
attached additions; or,
c. be permitted in accordance with the elevation and anchoring requirements for
"manufactured homes" in Article VI.H.1.
2. Zone VE shall meet the requirements of either Article VI.I.1.a. and b., or Article
VI.P.
J. Accessory Structures - Accessory Structures, as defined in Article XIV, located
within Zones A and AE, shall be exempt from the elevation criteria required in Article
VI.F. & G. above, if all other requirements of Article VI and all the following
requirements are met. Accessory Structures shall:
1. have unfinished interiors and not be used for human habitation;
2. have hydraulic openings, as specified in Article VI.L.2., in at least two different walls
of the accessory structure;
3. be located outside the floodway;
4. when possible be constructed and placed on the building site so as to offer the
minimum resistance to the flow of floodwaters and be placed further from the
source of flooding than is the primary structure; and,
5. have only ground fault interrupt electrical outlets. The electric service disconnect
shall be located above the base flood elevation and when possible outside the
Special Flood Hazard Area.
9
K. Floodways -
1. In Zone AE riverine areas, encroachments, including fill, new construction,
substantial improvement, and other development shall not be permitted within a
regulatory floodway which is designated on the community's Flood Insurance Rate
Map unless a technical evaluation certified by a registered professional engineer is
provided demonstrating that such encroachments will not result in any increase in
flood levels within the community during the occurrence of the base flood discharge.
2. In Zones AE and A riverine areas, for which no regulatory floodway is designated,
encroachments, including fill, new construction, substantial improvement, and other
development shall not be permitted in the floodway as determined in Article VI.K.3.
unless a technical evaluation certified by a registered professional engineer is
provided demonstrating that the cumulative effect of the proposed development,
when combined with all other existing development and anticipated development:
a. will not increase the water surface elevation of the base flood more than one
foot at any point within the community; and,
b. is consistent with the technical criteria contained in FEMA's guidelines and
standards for flood risk analysis and mapping.
3. In Zones AE and A riverine areas, for which no regulatory floodway is designated,
the regulatory floodway is determined to be the channel of the river or other water
course and the adjacent land areas to a distance of one-half the width of the
floodplain as measured from the normal high water mark to the upland limit of the
floodplain.
L. Enclosed Areas Below the Lowest Floor - New construction or substantial
improvement of any structure in Zones A and AE that meets the development standards
of Article VI, including the elevation requirements of Article VI, paragraphs F, G, or H
and is elevated on posts, columns, piers, piles, "stilts," or crawl spaces may be enclosed
below the base flood elevation requirements provided all the following criteria are met
or exceeded:
1. Enclosed areas are not "basements" as defined in Article XIV;
2. Enclosed areas shall be designed to automatically equalize hydrostatic flood forces
on exterior walls by allowing for the entry and exit of flood water. Designs for
meeting this requirement must either:
a. be engineered and certified by a registered professional engineer or architect;
or,
b. meet or exceed the following minimum criteria:
(1) a minimum of two openings having a total net area of not less than one
square inch for every square foot of the enclosed area;
10
(2) the bottom of all openings shall be below the base flood elevation and no
higher than one foot above the lowest grade; and,
(3) openings may be equipped with screens, louvers, valves, or other coverings
or devices provided that they permit the entry and exit of flood waters
automatically without any external influence or control such as human
intervention, including the use of electrical and other non-automatic
mechanical means;
3. The enclosed area shall not be used for human habitation; and,
4.The enclosed areas are usable solely for building access, parking of vehicles, or storage.
M. Bridges - New construction or substantial improvement of any bridge in Zones A, AE,
and VE shall be designed such that:
1. when possible, the lowest horizontal member (excluding the pilings, or columns) is
elevated to at least one foot above the base flood elevation; and
2. aregistered professional engineer shall certify that:
a. the structural design and methods of construction shall meet the elevation
requirements of this section and the floodway standards of Article VI.K.; and
b. the foundation and superstructure attached thereto are designed to resist
flotation, collapse and lateral movement due to the effects of wind and water
loads acting simultaneously on all structural components. Water loading values
used shall be those associated with the base flood.
N. Containment Walls - New construction or substantial improvement of any
containment wall located within:
1. Zones A, AE, and VE shall:
a. have the containment wall elevated to at least one foot above the base flood
elevation;
b. have structural components capable of resisting hydrostatic and hydrodynamic
loads and the effects of buoyancy; and,
c. be certified by a registered professional engineer or architect that the design
and methods of construction are in accordance with accepted standards of
practice for meeting the provisions of this section. Such certification shall be
provided with the application for a Flood Hazard Development Permit, as
required by Article III.K.
11
O. Wharves, Piers and Docks - New construction or substantial improvement of
wharves, piers, and docks are permitted in Zones A, AE, and VE, in and over water and
seaward of the mean high tide if the following requirements are met:
1. wharves, piers, and docks shall comply with all applicable local, state, and federal
regulations; and
2. for commercial wharves, piers, and docks, a registered professional engineer shall
develop or review the structural design, specifications, and plans for the
construction.
P. Coastal Floodplains -
1. All new construction located within Zones AE and VE shall be located landward of
the reach of mean high tide except as provided in Article VI.P.6.
2. New construction or substantial improvement of any structure located within Zone
VE shall:
a. be elevated on posts or columns such that:
(1) the bottom of the lowest horizontal structural member of the lowest floor
(excluding the pilings or columns) is elevated to one foot above the base
flood elevation;
(2) the pile or column foundation and the elevated portion of the structure
attached thereto is anchored to resist flotation, collapse, and lateral
movement due to the effects of wind and water loads acting simultaneously
on all building components; and,
(3) water loading values used shall be those associated with the base flood.
Wind loading values used shall be those required by applicable state and
local building standards.
b. have the space below the lowest floor:
(1) free of obstructions; or,
(2) constructed with open wood lattice-work, or insect screening intended to
collapse under wind and water without causing collapse, displacement, or
other structural damage to the elevated portion of the building or
supporting piles or columns; or,
(3) constructed to enclose less than 300 square feet of area with non-
supporting breakaway walls that have a design safe loading resistance of
' not less than 10 or more than 20 pounds per square foot.
c. require a registered professional engineer or architect to:
12
(1) develop or review the structural design, specifications, and plans for the
construction, which must meet or exceed the technical criteria contained in
the Coastal Construction Manual, (FEMA-55); and,
(2) certify that the design and methods of construction to be used are in
accordance with accepted standards of practice for meeting the criteria of
Article VI.P.2.
3. The use of fill for structural support in Zone VE is prohibited.
4. Human alteration of sand dunes within Zone VE is prohibited unless it can be
demonstrated that such alterations will not increase potential flood damage.
5. The area below the lowest floor shall be used solely for parking vehicles, building
access, and storage.
6. Conditional Use - Lobster sheds and fishing sheds may be located seaward of mean high
tide and shall be exempt from the elevation requirement in Article VI.G. only if
permitted as a Conditional Use following review and approval by the Planning Board, as
provided in Article VII, and if all the following requirements and those of Article VI.A.,
VI.K., and VI.L. are met:
a. The conditional use shall be limited to low value structures such as metal or wood
sheds 200 square feet or less and shall not exceed more than one story.
b. The structure shall be securely anchored to the wharf or pier to resist flotation,
collapse, and lateral movement due to the effect of wind and water loads acting
simultaneously on all building components.
c. The structure will not adversely increase wave or debris impact forces affecting
nearby buildings.
d. The structure shall have unfinished interiors and shall not be used for human ;
habitation.
e. Any mechanical, utility equipment and fuel storage tanks must be anchored and
either elevated or floodproofed to one foot above the base flood elevation.
f. All electrical outlets shall be ground fault interrupt type. The electrical service |
disconnect shall be located on shore above the base flood elevation and when
possible outside the Special Flood Hazard Area.
ARTICLE VII - CONDITIONAL USE REVIEW
The Planning Board shall hear and decide upon applications for conditional uses provided for
in this Ordinance. The Planning Board shall hear and approve, approve with conditions, or
disapprove all applications for conditional uses. An applicant informed by the Code
13
Enforcement Officer that a Conditional Use Permit is required shall file an application for the
permit with the Planning Board.
A. Review Procedure for a Conditional Use Flood Hazard Development Permit
1. The Flood Hazard Development Permit Application with additional information
attached addressing how each of the conditional use criteria specified in the
Ordinance will be satisfied, may serve as the permit application for the Conditional
Use Permit.
2. Before deciding any application, the Planning Board shall hold a public hearing on
the application within thirty days of their receipt of the application.
3. If the Planning Board finds that the application satisfies all relevant requirements of
the ordinance, the Planning Board must approve the application or approve with
conditions within 45 days of the date of the public hearing.
4. A Conditional Use Permit issued under the provisions of this Ordinance shall expire
if the work or change involved is not commenced within 180 days of the issuance of
the permit by the Planning Board.
5. The applicant shall be notified by the Planning Board in writing over the signature of
the Chairman of the Planning Board that flood insurance is not available for
structures located entirely over water or seaward of mean high tide.
B. Expansion of Conditional Uses
1. No existing building or use of premises may be expanded or enlarged without a
permit issued under this section if that building or use was established or
constructed under a previously issued Conditional Use Permit or if it is a building or
use which would require a Conditional Use Permit if being newly-established or
constructed under this Ordinance.
ARTICLE VIII - CERTIFICATE OF COMPLIANCE
No land in a special flood hazard area shall be occupied or used and no structure which is
constructed or substantially improved shall be occupied until a Certificate of Compliance is
issued by the Code Enforcement Officer subject to the following provisions:
A. For New Construction or Substantial Improvement of any elevated structure the
applicant shall submit to the Code Enforcement Officer:
1. an Elevation Certificate completed by a Professional Land Surveyor, registered
professional engineer, or architect, for compliance with Article VI, paragraphs F, G,
H, or P and,
14
2. for structures in Zone VE, certification by a registered professional engineer or
architect that the design and methods of construction used are in compliance with
Article VI.P.2.
B. The applicant shall submit written notification to the Code Enforcement Officer that the
development is complete and complies with the provisions of this ordinance.
C. Within 10 working days, the Code Enforcement Officer shall:
1. review the required certificate(s) and the applicant's written notification; and,
2. upon determination that the development conforms to the provisions of this
ordinance, shall issue a Certificate of Compliance.
ARTICLE IX - REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS
The Planning Board shall, when reviewing subdivisions and other proposed developments
that require review under other federal law, state law, local ordinances or regulations, and
all projects on 5 or more disturbed acres, or in the case of manufactured home parks
divided into two or more lots, assure that:
A. All such proposals are consistent with the need to minimize flood damage.
B. All public utilities and facilities, such as sewer, gas, electrical and water systems are
located and constructed to minimize or eliminate flood damages.
C. Adequate drainage is provided in order to reduce exposure to flood hazards.
D. All proposals include base flood elevations, flood boundaries, and, in a riverine
floodplain, floodway data. These determinations shall be based on engineering
practices recognized by the Federal Emergency Management Agency.
E. Any proposed development plan must include a condition of plan approval requiring that
structures on any lot in the development having any portion of its land within a Special
Flood Hazard Area, are to be constructed in accordance with Article VI of this ordinance.
Such requirement will be included in any deed, lease, purchase and sale agreement, or
document transferring or expressing an intent to transfer any interest in real estate or
structure, including but not limited to a time-share interest. The condition shall clearly
articulate that the municipality may enforce any violation of the construction
requirement and that fact shall also be included in the deed or any other document
previously described. The construction requirement shall also be clearly stated on any
map, plat, or plan to be signed by the Planning Board or local reviewing authority as
part of the approval process.
ARTICLE X - APPEALS AND VARIANCES
The Board of Appeals of the Town of Brooksville may, upon written application of an
aggrieved party, hear and decide appeals where it is alleged that there is an error in any
15
order, requirement, decision, or determination made by, or failure to act by, the Code
Enforcement Officer or Planning Board in the administration or enforcement of the
provisions of this Ordinance.
The Board of Appeals may grant a variance from the requirements of this Ordinance
consistent with state law and the following criteria:
A. Variances shall not be granted within any designated regulatory floodway if any
increase in flood levels during the base flood discharge would result.
B. Variances shall be granted only upon:
1. a showing of good and sufficient cause; and,
2. a determination that should a flood comparable to the base flood occur, the
granting of a variance will not result in increased flood heights, additional threats to
public safety, public expense, or create nuisances, cause fraud or victimization of
the public or conflict with existing local laws or ordinances; and,
3. a showing that the issuance of the variance will not conflict with other state, federal
or local laws or ordinances; and,
4. a determination that failure to grant the variance would result in "undue hardship,"
which in this sub-section means:
a. that the land in question cannot yield a reasonable return unless a variance is
granted; and,
b. that the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood; and,
c. that the granting of a variance will not alter the essential character of the
locality; and,
d. that the hardship is not the result of action taken by the applicant or a prior
owner.
C. Variances shall only be issued upon a determination that the variance is the minimum
necessary, considering the flood hazard, to afford relief, and the Board of Appeals may
impose such conditions to a variance as is deemed necessary.
D. Variances may be issued for new construction, substantial improvements, or other
development for the conduct of a functionally dependent use provided that:
1. other criteria of Article X and Article VI.K. are met; and,
2. the structure or other development is protected by methods that minimize flood
damages during the base flood and create no additional threats to public safety.
16
E. Variances may be issued for the repair, reconstruction, rehabilitation, or restoration of
Historic Structures upon the determination that:
1. the development meets the criteria of Article X, paragraphs A. through D. above;
and,
2. the proposed repair, reconstruction, rehabilitation, or restoration will not preclude
the structure's continued designation as a Historic Structure and the variance is the
minimum necessary to preserve the historic character and design of the structure.
F. Any applicant who meets the criteria of Article X, paragraphs A. through E. shall be
notified by the Board of Appeals in writing over the signature of the Chairman of the
Board of Appeals that:
1. the issuance of a variance to construct a structure below the base flood level will
result in greatly increased premium rates for flood insurance up to amounts as high
as $25 per $100 of insurance coverage;
2. such construction below the base flood level increases risks to life and property;
and,
3. the applicant agrees in writing that the applicant is fully aware of all the risks
inherent in the use of land subject to flooding, assumes those risks and agrees to
indemnify and defend the municipality against any claims filed against it that are
related to the applicant's decision to use land located in a floodplain and that the
applicant individually releases the municipality from any claims the applicant may
have against the municipality that are related to the use of land located in a
floodplain.
G. Appeal Procedure for Administrative and Variance Appeals
1. An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party within thirty days after receipt of a written decision of the Code
Enforcement Officer or Planning Board.
2. Upon being notified of an appeal, the Code Enforcement Officer or Planning Board,
as appropriate, shall transmit to the Board of Appeals all of the papers constituting
the record of the decision appealed from.
3. The Board of Appeals shall hold a public hearing on the appeal within thirty-five
days of its receipt of an appeal request.
4. The person filing the appeal shall have the burden of proof.
5. The Board of Appeals shall decide all appeals within thirty-five days after the close
of the hearing, and shall issue a written decision on all appeals.
17
6. The Board of Appeals shall submit to the Code Enforcement Officer a report of all
variance actions, including justification for the granting of the variance and an
authorization for the Code Enforcement Officer to issue a Flood Hazard
Development Permit, which includes any conditions to be attached to said permit.
7. Any aggrieved party who participated as a party during the proceedings before the
Board of Appeals may take an appeal to Superior Court in accordance with State
laws within forty-five days from the date of any decision of the Board of Appeals.
ARTICLE XI - ENFORCEMENT AND PENALTIES |
A. It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance pursuant to Title 30-A MRSA § 4452.
B. The penalties contained in Title 30-A MRSA § 4452 shall apply to any violation of this
Ordinance.
C. In addition to other actions, the Code Enforcement Officer may, upon identifying a
violation, submit a declaration to the Administrator of the Federal Insurance
Administration requesting a flood insurance denial. The valid declaration shall consist
of;
1. the name of the property owner and address or legal description of the property
sufficient to confirm its identity or location;
2. a Clear and unequivocal declaration that the property is in violation of a cited State
or local law, regulation, or ordinance;
3. a clear statement that the public body making the declaration has authority to do so
and a citation to that authority;
4. evidence that the property owner has been provided notice of the violation and the
prospective denial of insurance; and,
5. a Clear statement that the declaration is being submitted pursuant to Section 1316
of the National Flood Insurance Act of 1968, as amended.
ARTICLE XII - VALIDITY AND SEVERABILITY
If any section or provision of this Ordinance is declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of this Ordinance.
ARTICLE XIII - CONFLICT WITH OTHER ORDINANCES
This Ordinance shall not in any way impair or remove the necessity of compliance with any
other applicable rule, ordinance, regulation, bylaw, permit, or provision of law. Where this
Ordinance imposes a greater restriction upon the use of land, buildings, or structures, the
provisions of this Ordinance shall control.
18
ARTICLE XIV - DEFINITIONS
Unless specifically defined below, words and phrases used in this Ordinance shall have the
same meaning as they have at common law, and to give this Ordinance its most reasonable
application. Words used in the present tense include the future, the singular number
includes the plural, and the plural number includes the singular. The word "may" is
permissive; "shall" is mandatory and not discretionary.
Accessory Structure - a small detached structure that is incidental and subordinate to the
principal structure.
Adjacent Grade - the natural elevation of the ground surface prior to construction next to
the proposed walls of a structure.
Area of Special Flood Hazard - land in the floodplain having a one percent or greater
chance of flooding in any given year, as specifically identified in the Flood Insurance Study
cited in Article I of this Ordinance.
Base Flood - a flood having a one percent chance of being equaled or exceeded in any
given year, commonly called the 100-year flood.
Basement - area of a building that includes a floor that is subgrade (below ground level)
on all sides.
Breakaway Wall - a wall that is not part of the structural support of the building and is
intended through its design and construction to collapse under specific lateral loading
forces, without causing damage to the elevated portion of the building or supporting
foundation system.
Building - see Structure.
Certificate of Compliance - a document signed by the Code Enforcement Officer stating
that a structure is in compliance with all of the provisions of this Ordinance.
Code Enforcement Officer - a person certified under Title 30-A MRSA, Section 4451
(including exceptions in Section 4451, paragraph 1) and employed by a municipality to
enforce all applicable comprehensive planning and land use laws.
Conditional Use - a use that, because of its potential impact on surrounding areas and
structures, is permitted only upon review and approval by the Planning Board pursuant to
Article VII.
Containment Wall - wall used to convey or direct storm water or sanitary water from the
initial source to the final destination.
Development - a manmade change to improved or unimproved real estate. This includes,
but is not limited to, buildings or other structures; mining, dredging, filling, grading,
paving, excavation, drilling operations or storage of equipment or materials; and the
storage, deposition, or extraction of materials.
19
Digital Flood Insurance Rate Map (FIRM) - see Flood Insurance Rate Map
Elevated Building - a non-basement building that is: ;
a. built, in the case of a building in Zones A or AE, so that the top of the elevated floor, or
in the case of a building in Zone VE, to have the bottom of the lowest horizontal
structural member of the elevated floor, elevated above the ground level by means of
pilings, columns, post, piers, or "stilts;" and
b. adequately anchored to not impair the structural integrity of the building during a flood
of up to one foot above the magnitude of the base flood.
In the case of Zones A or AE, Elevated Building also includes a building elevated by
means of fill or solid foundation perimeter walls with hydraulic openings sufficient to
facilitate the unimpeded movement of flood waters, as required in Article VI.L. In the case
of Zone VE, Elevated Building also includes a building otherwise meeting the definition of
elevated building, even though the lower area is enclosed by means of breakaway walls, if
the breakaway walls meet the standards of Article VI.P.2.b.(3).
Elevation Certificate - an official form (FEMA Form 81-31, as amended) that:
a. is used to verify compliance with the floodplain management regulations of the
National Flood Insurance Program; and,
b. is required for purchasing flood insurance.
Flood or Flooding
a. Ageneral and temporary condition of partial or complete inundation of normally dry
land areas from:
1. The overflow of inland or tidal waters.
2. The unusual and rapid accumulation or runoff of surface waters from any source.
b. The collapse or subsidence of land along the shore of a lake or other body of water as a
result of erosion or undermining caused by waves or currents of water exceeding
anticipated cyclical levels or suddenly caused by an unusually high water level in a
natural body of water, accompanied by a severe storm, or by an unanticipated force of
nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and
unforeseeable event which results in flooding as defined in paragraph a.1. of this
definition.
Flood Elevation Study - an examination, evaluation and determination of flood hazards
and, if appropriate, corresponding water surface elevations.
20
Flood Insurance Rate Map (FIRM) - an official map of a community, on which the
Federal Insurance Administrator has delineated both the special hazard areas and the risk
premium zones applicable to the community.
Flood Insurance Study - see Flood Elevation Study.
Floodplain or Floodprone Area - land area susceptible to being inundated by water from
any source (see flooding).
Floodplain Management - means the operation of an overall program of corrective and
preventive measures for reducing flood damage, including but not limited to emergency
preparedness plans, flood control works, and floodplain management regulations.
Floodplain Management Regulations - zoning ordinances, subdivision regulations,
building codes, health regulations, special purpose ordinances (such as a floodplain
ordinance, grading ordinance, and erosion control ordinance) and other applications of
police power. The term describes such state or local regulations, in any combination
thereof, which provide standards for the purpose of flood damage prevention and reduction.
Floodproofing - any combination of structural and non-structural additions, changes, or
adjustments to structures which reduce or eliminate flood damage to real estate or
improved real property, water and sanitary facilities, structures and contents.
Floodway - see Regulatory Floodway.
Floodway Encroachment Lines - the lines marking the limits of floodways on federal,
state, and local floodplain maps.
Freeboard - a factor of safety usually expressed in feet above a flood level for purposes of
floodplain management. Freeboard tends to compensate for the many unknown factors,
such as wave action, bridge openings, and the hydrological effect of urbanization of the
watershed, which could contribute to flood heights greater than the height calculated for a
selected size flood and floodway conditions. .
Functionally Dependent Use - a use that cannot perform its intended purpose unless it is
located or carried out in close proximity to water. The term includes only docking facilities,
port facilities that are necessary for the loading and unloading of cargo or passengers, and
ship building and ship repair facilities, but does not include long-term storage or related
manufacturing facilities.
Historic Structure - means any structure that is:
a. Listed individually in the National Register of Historic Places (a listing maintained by the
Department of Interior) or preliminarily determined by the Secretary of the Interior as
meeting the requirements for individual listing on the National Register;
b. Certified or preliminarily determined by the Secretary of the Interior as contributing to
the historical significance of a registered historic district or a district preliminarily
determined by the Secretary of the Interior to qualify as a registered historic district;
21
c. Individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of the Interior; or
d. Individually listed on a local inventory of historic places in communities with historic '
preservation programs that have been certified either:
1. By an approved state program as determined by the Secretary of the Interior, or
2. Directly by the Secretary of the Interior in states without approved programs.
Locally Established Datum - for purposes of this ordinance, an elevation established for a
specific site to which all other elevations at the site are referenced. This elevation is
generally not referenced to the National Geodetic Vertical Datum (NGVD), North American
Vertical Datum (NAVD) or any other established datum and is used in areas where Mean
Sea Level data is too far from a specific site to be practically used.
Lowest Floor - the lowest floor of the lowest enclosed area (including basement). An
unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access
or storage in an area other than a basement area is not considered a building's lowest floor,
provided that such enclosure is not built so as to render the structure in violation of the
applicable non-elevation design requirements described in Article VI.L. of this Ordinance.
Manufactured Home -a structure, transportable in one or more sections, which is built on
a permanent chassis and is designed for use with or without a permanent foundation when
connected to the required utilities. For floodplain management purposes the term
manufactured home also includes park trailers, travel trailers, and other similar vehicles
placed on a site for greater than 180 consecutive days.
Manufactured Home Park or Subdivision - a parcel (or contiguous parcels) of land
divided into two or more manufactured home lots for rent or sale.
Mean Sea Level - when related to the National Flood Insurance Program, the National
Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD) or other
datum, to which base flood elevations shown on a community's Flood Insurance Rate Map
are referenced.
Minor Development - means all development that is not new construction or a substantial
improvement, such as repairs, maintenance, renovations, or additions, whose value is less
than 50% of the market value of the structure. It also includes, but is not limited to:
accessory structures as provided for in Article VI.J., mining, dredging, filling, grading,
paving, excavation, drilling operations, storage of equipment or materials, deposition or
extraction of materials, public or private sewage disposal systems or water supply facilities
that do not involve structures; and non-structural projects such as bridges, dams, towers,
fencing, pipelines, wharves, and piers.
National Geodetic Vertical Datum (NGVD) - the national vertical datum, a standard
established in 1929, which is used by the National Flood Insurance Program (NFIP). NGVD
is based upon mean sea level in 1929 and also has been called "1929 Mean Sea Level
(MSL)".
22
New Construction - structures for which the "start of construction" commenced on or
after the effective date of the initial floodplain management regulations adopted by a
community and includes any subsequent improvements to such structures.
North American Vertical Datum (NAVD)- means the national datum whose standard
was established in 1988, which is the new vertical datum used by the National Flood
Insurance Program (NFIP) for all new Flood Insurance Rate Maps. NAVD is based upon
vertical datum used by other North American countries such as Canada and Mexico and was
established to replace NGVD because of constant movement of the earths crust, glacial
rebound, and subsidence and the increasing use of satellite technology.
100-year flood - see Base Flood. ;
Recreational Vehicle - a vehicle that is:
a. built on a single chassis;
b. 400 square feet or less when measured at the largest horizontal projection, not
including slideouts;
c. designed to be self-propelled or permanently towable by a motor vehicle; and
d. designed primarily not for use as a permanent dwelling but as temporary living quarters
for recreational, camping, travel, or seasonal use.
Regulatory Floodway -
a. the channel of a river or other water course and the adjacent land areas that must be
reserved in order to discharge the base flood without cumulatively increasing the water
surface elevation more than one foot, and
b. when not designated on the community's Flood Insurance Rate Map, it is considered to
be the channel of a river or other water course and the adjacent land areas to a
distance of one-half the width of the floodplain, as measured from the normal high
water mark to the upland limit of the floodplain.
Riverine - relating to, formed by, or resembling a river (including tributaries), stream,
brook, etc.
Special Flood Hazard Area - see Area of Special Flood Hazard.
Start of Construction - the date the building permit was issued, provided the actual start
of construction, repair, reconstruction, rehabilitation, addition, placement, substantial
improvement or other improvement was within 180 days of the permit date. The actual
start means either the first placement of permanent construction of a structure on a site,
such as the pouring of slab or footings, the installation of piles, the construction of columns,
or any work beyond the stage of excavation; or the placement of a manufactured home on
a foundation. Permanent construction does not include land preparation, such as clearing,
grading and filling; nor does it include the installation of streets and/or walkways; nor does
it include excavation for basement, footings, piers, or foundations or the erection of
temporary forms; nor does it include the installation on the property of accessory buildings,
23
such as garages or sheds not occupied as dwelling units or not part of the main structure.
For a substantial improvement, the actual start of construction means the first alteration of
any wall, ceiling, floor, or other structural part of a building, or modification of any
construction element, whether or not that alteration affects the external dimensions of the
building.
Structure - means, for floodplain management purposes, a walled and roofed building. A
gas or liquid storage tank that is principally above ground is also a structure.
Substantial Damage - means, damage of any origin sustained by a structure whereby the
cost of restoring the structure to its before damage condition would equal or exceed 50
percent of the market value of the structure before the damage occurred.
Substantial Improvement - means any reconstruction, rehabilitation, addition, or other
improvement of a structure, the cost of which equals or exceeds 50 percent of the market
value of the structure before the start of construction of the improvement. This term
includes structures which have incurred substantial damage, regardless of the actual repair
work performed. The term does not, however, include either:
a. Any project for improvement of a structure to correct existing violations of state or local
health, sanitary, or safety code specifications which have been identified by the local
code enforcement official and which are the minimum necessary to assure safe living
conditions; or
b. Any alteration of a Historic Structure, provided that the alteration will not preclude the
structure's continued designation as a historic structure, and a variance is obtained
from the Board of Appeals.
Variance - means a grant of relief by a community from the terms of a floodplain
management regulation.
Violation - means the failure of a structure or development to comply with a community's
floodplain management regulations.
ARTICLE XV - ABROGATION
This ordinance repeals and replaces any municipal ordinance previously enacted to comply
with the National Flood Insurance Act of 1968 (P.L. 90-488, as amended).
KKK KK
60.3 (e) Rev. 01/16
Prepared by DACF/JP
24