TOWN OF BROWNVILLE
SOLAR ENERGY SYSTEM ORDINANCE
1. Title
A. This Ordinance shall be known as the "Brownwille Solar Energy System Ordinance" and will be
referred to herein as the "Ordinance"
2. Authority
A. This Ordinance is adopted pursuant to the Hame Rule Powers as provided for in Article VIII of the
Maine Constitution and under the authority granted to the Town by the Maine Revised Statutes,
including of 30-A M.R.S. § 2101, et seq.
B. To the extent that any provision of this Ordinance is deerned invalid by a court of competent
jurisdiction, such provision shall be removed from the Ordinance and the balance of the Ordinance
shall remain valid.
C. This Ordinance shall be administered by the Town's Planning Board and enforced by the Town's
Code Enforcement Officer and/or the Board of Selectpersons.
3. Purpose
A. Establish clear guidelines and standards for the Town to regulate Solar Energy Systems.
B. Permit the Town to fairly and responsibly protect public health, safety, and welfare.
C. Minimize any potential adverse effect of solar development on surrounding land use.
D. Provide far the decommissioning/removal of panel and associated utility structures that are no
longer being used for energy generation and transmission purposes.
4, Applicability
A. A Solar Energy System (SES) approved for construction prior to the effective date of this Ordinance
shall not be required to meet the terms and conditions of this Ordinance. Any physical modification
to any existing SES, whether or not existing prior to the effective date of this Ordinance that
expands or relocates the footprint of the SES, shall require a new application under this Ordinance.
Routine maintenance or replacements in kind do not require a permit. Solar Energy Farms are not
permitted in the Town of Brownville.
5. Definitions
A. Solar Energy Systems (SES): A solar photovoltaic cell, module, or array, or solar hot air or water
collective device, including all Solar Related Equipment, which relies upon solar radiation as an
energy source for collection, inversion, storage, and distribution of solar energy for electricity
generation or transfer of stored heat.
B. Solar Energy System, Ground-Mounted: A Solar Energy System that is structurally mounted to the
ground and is not roof-mounted.
C. Solar Energy System, Roof-Mounted: A Solar Energy System that is mounted on the roof of a
building or structure.
D. Solar Energy Farm: A Solar Energy System, of any size, placed solely to generate electricity to feed
power into an electrical grid or other commercial purpose.
E. Solar Energy System, Private Use: A Solar Energy System whose physical size based on total
airspace projected over the ground is less than 3,000 square feet and/or that generates a
nameplate capacity of less than 20 KW. Such a system may consist of one or more freestanding
ground, or roof-mounted, solar arrays, or solar related equipment. The primary purpose of a
Private Use System is to reduce on-site consumption of utility power or fuels, not to feed into an
electrical grid.
Page 1 of 3
F. Solar Array: A grouping of multiple solar modules with the purpose of harvesting solar energy.
G. Solar Energy: Radiant energy (direct, diffuse and/or reflective) received from the sun.
H. Solar Related Equipment: Items including a solar photovoltaic cell, module, or array, or solar hot air
or water collector device panels, lines, pumps, batteries, mounting brackets, framing, fencing,
foundations, or other structures used or intended for collection and management of solar energy.
6. Permit Required
A permit approved by the Code Enforcement Officer shall be required for all Private Use Solar Energy
Systems. All Solar Energy Systems shall conform to the requirements of this Ordinance and other
applicable provisions of the Town of Brownville Ordinances. Whenever the requirements of this
Ordinance are in conflict with the requirements of any other lawfully adopted rule, regulation, or
ordinance, the more restrictive provision shall apply.
7. Application Fee
A. Solar Energy System, Private Use: The application fee is the standard Building Permit fee.
8. Specific Application Requirements
A. An application for a Private Use Solar Energy System must include the following:
1. Adescription of the panels to be installed, including make and model, and associated system
components;
2. Fora roof-mounted system, the owner shall provide evidence that the roof is capable of
supporting the collateral load of the SES;
3. For aroof-mounted system, a minimum three-foot buffer zone is required from the ridge and
one edge of the roof or parapet for firefighter access;
4. A Suilding/Demolition Permit Application.
9. Standard for Approval
A. The following standards must be met:
1. Private Use Ground-Mounted Solar Energy Systems:
a. Lots: All SES shall be designed and located to ensure solar and physical access without
reliance on and/or interference to/from adjacent properties.
b. Setback and Height: Structures within a SES shall be setback a minimum of 20 feet from
the side and rear property lines and meet the front setback requirements for roads. Any
solar photovoltaic cells or arrays shall be subject to a maximum height of 12 feet above the
ground surface.
c. Prohibited Locations: Components of a ground-mounted SES shall not be placed within any
legal easement or right-of-way location, or be placed within any stormwater conveyance
system, or in any other manner that would alter or impede stormwater runoff from
collecting in a constructed stormwater conveyance system.
d. Signage is not allowed on any solar energy systems.
e. Glare: All SES shall be situated to eliminate concentrated glare onto nearby structures or
roadways.
f. Safety: Solar Energy System installations are regulated through, and must be in compliance
with the National Fire Protection Association NFPA 850 and NFPA 70 Electrical Code.
2. Private Use Roof-Mounted Solar Energy Systems:
a. SES mounted on roofs of any building shall be subject to a maximum height regulation of
35 feet.
b. Glare: All SES shall be situated to eliminate concentrated glare onto nearby structures or
roadways.
Page 2 of 3
c. Safety: Solar Energy Systems installations are regulated through, and must be in
compliance with the National Fire Protection Association MFPA 850 and NFPA 70 Electrical
Code.
3. Solar Energy Farms:
a. Solar Energy Farms, of any size, placed solely to generate electricity to feed power into an
electrical grid or other commercial purpose are not permitted within Town limits.
10. Decommissioning and Removal
A. Any Solar Energy System that has reached the end of its useful life, ceases to generate power or
has been abandoned shall be removed pursuant to a plan approved by the Cade Enforcement
Officer during the application process. The landowner, or SES owner or operator shall physically
remove the installation no more than 180 days after the date of discontinued operations. The
owner or operator shall notify the Code Enforcement Officer by certified mail, return receipt
requested, of the proposed date of the discontinued operations and plans for removal.
B. Decommissioning shall consist of:
1. Physical remova! of all solar energy systems, structures, equipment, security barriers and
transmission lines form the site;
2. Disposal of all solid and hazardous waste in accordance with Local, State and Federal waste
disposal regulations; and
3. Stabilization or revegetation of the site as necessary to minimize erosion. The Code
Enforcement Officer may allow the owner or operator to leave landscaping or designated
below-grade foundations to minimize erosion and disruptions te vegetation.
11. Modifications
A. Any physical modification to any existing SES, whether or not existing prior to the effective date of
this Ordinance, shall require review and approval under this Ordinance.
8. Any modifications to a Private Use Solar Energy System made after issuance of the required town
permit(s) shall require approval by the Code Enforcement Officer.
C. Application fees for modifications shail be consistent with the standard Building/Demolition Permit
fee.
12. Effective Date and Duration
A. This Ordinance shall take effect on July 18, 2023 upon enactment by the Town of Brownville unless
otherwise provided and shall remain in effect until it is amended or repealed.
13. Appeals
A. The Board of Appeals, as established in the Town of Brownville, shall hear appeals relative to this
Ordinance.
14, Enforcement of Violations and Penalties
A. This ordinance shall be enforced by the Code Enforcement Officer or the Municipal Officers or their
designee. Violations of this Ordinance shall be subject to the enforcement and penalty provisions
of 30-A, M-R.S. § 4452.
Adopted by the Town of Brownville on July 18, 2023
nner Ole