TABLE OF CONTENTS
Section: 1
Title ----------------------------------------------------------------------------------- 4
Section: 2
Purpose ------------------------------------------------------------------------ 4
Section: 3
Authority --------------------------------------------------------------------- 4
Section: 4
Conflicts with Other
Ordinances, Laws and Regulations -------------------------------- 4
Section: 5
Validity and Severability ------------------------------------------------4
Section: 6
Effective Date ----------------------------------------------------------4
Section: 7
Applicability ----------------------------------------------------------------5
Section: 8
Permitting Authority ---------------------------------------------- 5
Section: 9
Cumulative Effect of Multiple Permits ------------------------ 5
Section: 10 Appeals ------------------------------------------------------------- 5
Section: 11 Professional Services ---------------------------------------------- 6
Section: 12 Classification of Wind Turbines
and Meteorological Towers --------------------------------------- 6
Section: 13 Fees ---------------------------------------------------------------- 8
Section: 14 Ethical Standards ----------------------------------------------------- 8
Section: 15 Jurisdiction -------------------------------------------------------- 10
Section: 16 WEF Permit Requirement --------------------------------------- 11
Section: 17 Permit Review Procedure ---------------------------------------- 11
Section: 18 Pre Application --------------------------------------------------- 14
Section: 19 Application Changes -------------------------------------------- 14
Section: 20 Site Visit Checklist ----------------------------------------------- 14
Section: 21 Notice of Application and Site Visit -------------------------- 14
Section: 22 Town Wide Notification ------------------------------------------ 14
Section: 23 Final Determination ---------------------------------------------- 15
Section: 24 WEF Submission Standards ------------------------------------ 15
Section: 25 Setback Standards ------------------------------------------------- 21
Section: 26 Sound Standards ------------------------------------------------------- 21
Section: 27 Shadow Flicker and
Blade Reflection Standard ----------------------------------- 22
Section: 28 Mitigation Waivers --------------------------------------------- 22
Section: 29 Financial Performance Standard ---------------------------- 23
Section: 30 General Standards -------------------------------------------------- 23
Section: 31 Appearance Standards --------------------------------------------- 24
Section: 32 Safety Standards ---------------------------------------------------- 25
Section: 33 Inspections ---------------------------------------------------------- 25
Section: 34 Liability Insurance ---------------------------------------------- 25
Section: 35 Environmental Impact Standards -------------------------- 25
Section: 36 Construction/Design Standards --------------------------- 29
Section: 37 Public Safety and Health Standards ------------------------ 30
Section: 38 Communications and Electromagnetic
Interference Standards -------------------------------------- 31
Section: 39 Ground Transportation Standards ------------------------- 32
Section: 40 Reporting Requirements ------------------------------------- 33
Section: 41 Sound Measurement Procedures ----------------------------- 34
Section: 42 Licensing ---------------------------------------------------------- 39
Section: 43 Decommissioning ------------------------------------------------ 42
Section: 44 Complaint / Violations ------------------------------------------- 43
Section: 45 Definitions --------------------------------------------------------- 48
Appendix A ----------------------------------------------------------------------- 56
Appendix B ----------------------------------------------------------------------- 59
Appendix C -----------------------------------------------------------------------62
Appendix D ----------------------------------------------------------------------- 63
Appendix E ----------------------------------------------------------------------- 64
2
TOWN OF BUCKFIELD
WIND ENERGY FACILITY ORDINANCE
Section 1 - Title
This Ordinance shall be known as the Town of Buckfield Wind Energy
Facility (WEF) Ordinance.
Section 2 - Purpose
The purpose of this Ordinance is to regulate Wind Energy Facilities to
protect and safeguard the health, safety, and general welfare of the
citizens of Buckfield by establishing reasonable and uniform regulations.
Section 3 - Authority
This Ordinance is adopted pursuant to the enabling provisions of
Article VIII, Part 2, Section 1 of the Maine Constitution (Municipal
Home Rule), the provisions of Title 30-A M.R.S.A. Section 3001 (Home
Rule), and the provisions of the Planning and Land Use Regulation Act,
Title 30-A M.R.S.A. Section 4312, etc. seq. (Comprehensive Planning and Land
Use Regulation, or "Growth Management Act").
Section 4 - Conflicts with Other Ordinances, Laws and Regulations
Whenever a provision of this Ordinance conflicts with or is inconsistent
with another provision of this Ordinance or of any other ordinance,
regulation or statute from any Town of Buckfield, State of Maine or
Federal regulation, the more restrictive provision shall control.
Section 5 - Validity and Severability
Should any section or provision of this Ordinance be declared by the
courts to be invalid such decisions shall not invalidate any other section
or provision of the Ordinance.
Section 6 - Effective Date
This Ordinance shall become effective upon the date of its Passage at
the June 26, 2010 Annual Town Meeting.
3
Section 7 - Applicability
This Ordinance applies to any wind turbine that is the subject of a
permit or license application pending before, or filed with the Town of
Buckfield, after the effective date of the Ordinance.
Section 8 - Permitting Authority
8.1 The Town of Buckfield Planning Board is authorized to
review all WEF applications and may approve, reject or
conditionally approve such applications in accordance with the
standards of the Ordinance.
8.2 The Maine Department of Environmental Protection (DEP)
may be required to review WEF applications. The Planning Board
shall consider, at a minimum and to the extent applicable,
pertinent findings in the DEP certification when making its
determination.
8.3 The following WEF's require authorization to participate in by
a vote of the residents of the Town of Buckfield:
8.3.1 Any WEF to be built on property owned by the Town
8.3.2 Any WEF partially or totally owned by the Town.
Section 9 - Cumulative Effect of Multiple Permits
The Town of Buckfield reserves the right to limit the total number of
WEF permits that are under review for approval at any given time.
The Permitting Authority will process no more than one application at
any one time, or the deadline for submission and review may be
modified correspondingly to reflect the increased workload of multiple
permits.
Section 10 - Appeals
10.1 All appeals of Planning Board decisions shall be filed with the
Oxford County Superior Court.
10.2 A final Town vote as outlined in Section 8.3 shall not be
subject to review.
4
Section 11 - Professional Services
In reviewing an application for compliance with this Ordinance, the
Permitting Authority may retain professional services as necessary to
assist with its review, including but not limited to those of an attorney,
engineer, biologist, or land use planner. Within fourteen (14) days of
filing an application the Applicant shall provide to the Town Clerk for
deposit into en escrow account funds in the amount of $25,000 as
partial payment for the appropriate Town expenses in hiring
consultants, experts, mailings, printing and advertising costs as the
Permitting Authority shall, at its discretion, deem necessary. If at any
time the balance of the fund falls below $5,000, the Applicant upon
notice shall submit an additional $25,000 so that the Town's full and
actual expenses of examining and verifying the data presented by the
Applicant can be paid. If at any time the balance of this fund falls
below $5000 for a period of 30 days after notification the application
shall be considered to have been withdrawn. The balance of the
account shall be returned to the Owner/operator after all expenses have
been paid, and after a permit is granted / denied or withdrawn.
Section 12 - Classification of Wind Turbines and Meteorological Towers
For the purpose of clarification, all WEFs are classified according to the
following definitions:
12.1 Wind Turbine Classifications
12.1.1 Type 1 -- Small Wind Turbine means a single wind
turbine with a nameplate capacity less than 10 kW, and a
turbine height less than 100 feet.
12.1.1.1 This classification must meet sections 1, 2, 3,
4, 5, 6, 7, 8, 9.10, 12, 13, 14.1, 14.3.7, 16.1.1, 17.1,
17.4, 17.5, 17.6, 17.9, 18, 23, 24.1.1, 24.2.1, 24.2.2,
24.2.4, 24.2.5, 24.2.12, 24.2.51, 26, 30.1, 30.2, 30.5,
31, 32, 35.1.1, 35.2.3, 35.2.4, 36.1, 37.1.1, 37.2, 38,
44, 45 of this ordinance as well as section 25.1 which
the Planning Board may reduce to one and one half
times the turbine height and 17.3 which shall only
require notification of the abutters until such time as the
Town of Buckfield adopts a separate Ordinance to
govern this class at which time section 12.1.1.1 shall be
automatically repealed.
5
12.1.2 Type 2 -- Intermediate Wind Turbine means a single
wind turbine with a nameplate capacity less than 100 kW,
and a turbine height less than 150 feet, and not requiring a
Site Location of Development permit from the Maine
Department of Environmental Protection (DEP).
12.1.2.1 This classification must meet sections 1, 2, 3,
4, 5, 6, 7, 8, 9.10, 12, 13,14.1, 14.3.7, 16.1.1, 17.1,
17.4, 17.5, 17.6, 17.9, 18, 23, 24.1.1, 24.2.1, 24.2.2,
24.2.4, 24.2.5, 24.2.12, 24.2.51, 26, 30.1, 30.2, 30.5,
31, 32, 35.1.1, 35.2.3, 35.2.4, 36.1, 37.1.1, 37.2, 38,
44, 45 of this ordinance as well as section 25.1 which
the Planning Board may reduce to one and one half
times the turbine height and 17.3 which shall only
require notification of the abutters until such time as the
Town of Buckfield adopts a separate Ordinance to
govern this class at which time section 12.1.2.1 shall be
automatically repealed.
12.1.3 Type 3 -- Large Wind Turbine means up to three wind
turbines with a nameplate capacity o f 1 0 0 k W t o 1 MW,
and a turbine height of 150 to 300 feet.
12.1.4 Type 4 -- Industrial Wind Turbine means one or more
wind turbines each with a nameplate capacity of greater than
1 MW, or a turbine height greater than 300 feet; or more than
three Type 3 Wind Turbines.
12.2 Meteorological Towers (MET Towers)
MET towers shall be permitted under this Ordinance, with no height
limitations, other than those imposed under State or Federal law. A
Setback of 150% of the tower height shall be required from the
nearest property line. A permit for a temporary MET tower shall
be valid for a maximum of two years after which a single
extension of up to one year may be granted. The site shall be
restored to a condition that will not create erosion problems within
30 days following removal of the tower. Application for a MET
Tower shall be submitted to the Town of Buckfield Code
Enforcement Officer and he/she may issue a permit for construction
after providing to the applicant a copy of this Ordinance and
verification that the setback distance will be adhered to. The Code
Enforcement Officer will have 45 days to inform the Planning Board
of the issuance of a MET Tower permit.
6
Section 13 - Fees
All fees for this ordinance shall be set by the Buckfield Board of
Selectmen and may be changed by them as they deem necessary. S e e
A p p e n d i x E f o r a f e e s c h e d u l e .
Section 14 - Ethical Standards
14.1 Transparency, Public Participation and Highest Ethical
Standards All public deliberations and decisions regarding WEFs
and Community Owned Wind shall be conducted in an open,
transparent manner that encourages the broadest public participation
and adherence to the highest ethical standards.
14.2 Public Access
14.2.1 All deliberations concerning WEFs and Community
Owned Wind, whether in writing or conducted verbally, by
the Planning Board, Selectmen, and any subcommittees or
working groups of the aforementioned bodies shall fully
comply with the letter and spirit of State law regarding
Freedom of Access pursuant to Title 1; Chapter 13; Subchapter
1. Specifically, all deliberations regarding WEFs between
members of the Planning Board, Selectmen, and any
subcommittees and working groups shall be conducted at
public meetings, which have been duly posted. Exceptions will
be made only for: 1) appropriately recorded and executed
executive sessions, and 2) communicating the minimal
information necessary to set up and facilitate public
meetings. Detailed minutes of deliberations and decisions
concerning WEFs and Community Owned Wind will be
recorded and posted. Copies of all correspondence and e-
mails will be made available to the public with the exception
of those publicly identified and disclosed as being subject to
"attorney-client privilege" by the Town attorney. All
documents, correspondence and e-mails generated by
consultants on behalf of the Planning Board, the Selectmen,
their subcommittees and working groups shall be part of the
public record.
14.3 Conflicts of Interest
14.3.1 The process to develop, permit and administer
WEFs or Community Owned Wind shall be governed by a
strict ethical code for conflicts of interest. No elected or
appointed Town official or Town employee, their immediate
family members, or their employees, who has a conflict of
7
interest shall be directly or indirectly involved in the
planning process or decision-making process for WEFs.
Conflicts of interest include but are not limited to:
14.3.1 Having a lease as a Participating Landowner for a
Wind Turbine or transmission right-of-way,
14.3.2 Having an identified financial arrangement with a wind
development company including a signed Mitigation Waiver
with financial remuneration,
14.3.3 Serving as a paid representative of a wind
development company, or a written or verbal promise for
future employment or contracts from a wind development
company;
14.3.4 Being directly or indirectly affiliated or related to an
Applicant with a pending application for a WEF, and,
14.3.5 Knowing there is a substantial opportunity to accept
bids, receive remuneration, or employment valued at
greater than $10,000 on behalf of a wind development
company or as a subcontractor or employee of the
Community Owned Wind.
14.3.6 Living within or having an immediate family member
living within the setback area.
14.3.7 All decision-makers must be free from bias and able
to evaluate an application in accordance with the
provisions of this ordinance.
14.4 Individuals with a conflict of interest must identify the conflict
of interest and recuse themselves from all direct and indirect
planning and decision making regarding WEFs or Community
Owned Wind, with the exception of voting and debating as a
private citizen at any public meetings and public hearings.
14.5 Bidding and Contracting
14.5.1 All bidding, contracts and employment for WEF's the
town has greater than 10% interest in or are being placed
on town owned property must be awarded through a
process of public notice and competitive bidding. The Town
of Buckfield reserves the right to require the design of the
bidding process to favor local contracts and local
employment.
8
14.6 Code of Ethics for Wind Companies and Municipal
Employees
14.6.1 Wind companies will not hire municipal employees or
their relatives, give gifts of more than $10 during a one-
year period, or provide any other form of compensation that
is contingent on any action before a municipal agency
14.6.2 Wind companies will not solicit, use, or knowingly
receive confidential information acquired by a municipal
officer in the course of his or her official d u t i e s .
14.6.3 Wind companies will submit to the Planning Board the
names of all municipal officers or their relatives who have a
financial stake in WEF development.
14.6.4 Wind companies will submit, in writing to the town
clerk for public inspection, the nature and scope of the
municipal officers' financial interest.
Section 15 - Jurisdiction Across Multiple Municipalities
This section addresses issues unique to the geography of the Town
of Buckfield and its neighboring towns with which it shares a common
boundary. In the event that potential sites for WEFs share multiple
municipal jurisdictions, project permits should be coordinated to the
fullest extent possible across town boundaries, while at the same time
maintaining each individual Town's right to individual Home Rule.
15.1 This Ordinance applies to WEFs located wholly or partially
in the Town of Buckfield to the fullest extent allowable by
municipal, state, and federal law.
15.2 Approval to build or operate a WEF applies only to that portion
of the WEF located within the boundaries of the Town of Buckfield.
However, the application must take into account the entire WEF
across municipal boundaries, including but not limited to the
total number of Wind Turbines, Turbine Height, Wind Turbine
location and all other relevant facts and data that may directly or
indirectly affect the operation and viability of that portion of the
WEF located in the Town of Buckfield.
15.3 Setback, Sound, Shadow Flicker and Mitigation Waiver
standards for WEFs located and operated in the Town of Buckfield
shall apply to property lines and roads irrespective of Town
boundaries. For the purpose of this section a resident of such
abutting towns is afforded the same protections as a resident of
Buckfield.
9
15.4 This subsection applies to WEFs that are located partially in
Buckfield and partially in neighboring Towns. The Applicant will
comply with all portions of this ordinance as they apply to the
portion within the town lines of Buckfield
15.5 The Town Clerk shall forward notice of WEF permit
applications within 10 days of receipt, and notice of hearings and
public meetings 14 days in advance, to the Selectmen and Planning
Boards of adjacent communities for all WEFs if the neighboring
community is located within a defined Setback of this Ordinance.
Section 16 - WEF Permit Requirement
16.1 Permit Requirement
16.1.1 A permit is required for each WEF built in the Town of
Buckfield after the effective date of this Ordinance.
16.1.2 With the exception of Projects that are separated by
substantial geographic distance, the Planning Board will
aggregate, to the fullest and most practical extent possible, all
Wind Turbines held under greater than 50% common or
related ownership into a single WEF permit application.
16.1.3 Receipt of a permit under this Ordinance does not
relieve the Owner/operator from the responsibility to obtain any
other such permits, licenses or approvals as required under
this or any other Town of Buckfield Regulations, Ordinance or
pursuant to other State or Federal jurisdiction.
16.2.1 Where an Applicant is applying for a new or amended
WEF Permit, the application for a WEF Operating License, or
amended license, shall be submitted to the Planning Board
in conjunction with the Permit application, and shall
include the application form and the separate fee specified
in Section 13.
Section 17 - Permit Review Procedure
17.1 Pre-application Meeting
10 copies of the pre-application shall be submitted to the Code
Enforcement Officer at least 14 days in advance of the regularly
scheduled monthly Planning Board meeting.
A pre-application meeting with the Planning Board will be scheduled
at a regularly scheduled public Planning Board meeting. At the
meeting the Applicant will review the type and scope of the project
and the Planning Board will review Ordinance Standards and
10
submission requirements. The Planning Board will establish an
application file at this time.
17.2 Site Inspection
Planning Board and Applicant will set a mutually agreeable time for
the Planning Board to inspect the site. The inspection will be
scheduled within 45 days of the pre-application meeting unless
rendered impractical due to seasonal conditions. Site visits will
normally be postponed if there is more than one foot of snow on
the ground. The site inspection will be treated as a public meeting
of the Planning Board with appropriate notices given to the
community. While the Planning Board may set additional
requirements for the site inspection at the pre-application meeting,
the Applicant shall, at minimum, flag the location of the proposed
WEF and relevant property boundaries. The Applicant or a
representative will accompany the Planning Board to describe the
project and answer any questions.
17.3 Notice to Abutters and residents within the Notification Area
In addition to any required public notices for the site inspection, the
Planning Board will prepare a notice to property owners and
residents within the Notification Area. The notice will briefly
describe the proposed WEF and notify the recipient of the dates,
times and places of the site inspection. The notice will be sent by
certified mail to abutters and first class mail to all others with mailing
costs paid for by the Applicant. The town will give residents no less
than 14 days' notice of such a meeting.
17.4 Determine Submission Requirements
Within 63 days of the site inspection the Planning Board shall
inform the Applicant in writing of a n y a d d i t i o n a l submission
requirements for the application. The minimum submission
requirements for WEFs are listed in Section 24. If the Applicant
wishes to have any of the submission requirements waived, the
Applicant must make the request in writing to the Planning Board.
The Planning Board will notify property owners and residents within
the Notification Area. The notice will be sent by certified mail to
abutters and first class mail to all others with mailing costs paid for
by the Applicant. The Planning Board will send the notice at least 14
days prior to the Planning Board meeting at which the Applicant's
request will be considered.
17.5 Application Submission
The Applicant has up to 180 days after the determination of
submission requirements to submit a completed application with the
required fees to the Code Enforcement Officer. The application
shall be deemed abandoned unless the application has been
11
received within 180 days of the determination of submission
requirements unless an extension time frame is agreed to by the
applicant and the Planning Board. The Code Enforcement Officer
will forward the application to the Planning Board.
17.6 Completeness Review
The Planning Board will notify the Applicant within 80 days from
the date of submission whether the application is complete. Specific
studies may be required for a consideration of completeness
including but not limited to sound studies, DEP certification and
permitting, and environmental impact studies. If the application is
deemed to be incomplete the Planning Board shall indicate the
additional information needed. The application shall be deemed
abandoned unless the Applicant provides the information
requested, demonstrates that additional time is needed to complete
required studies, or submits in writing the reason for any delay within
30 days from the date of notice indicating the application is
incomplete.
17.7 Public Hearing
The Planning Board shall schedule a public hearing to be held within
63 days of the determination of completeness of the Application for
the WEF.
17.8 Notice to Town of Buckfield
In addition to any required public notices for the public hearing, the
Planning Board will prepare a notice to all residents and property
owners in the Town of Buckfield and to property owners and
residents within the Notification Area. The notice will briefly
describe the proposed WEF and notify the recipient of the date,
time and place of the public hearing. The notice will be sent by
certified mail to all abutters and first class mail to all others with
mailing costs paid for by the Applicant. The town will give residents
no less than 14 days' notice of such a meeting.
17.9 Final Planning Board Determination
A decision to approve or reject the application, or to approve the
application with conditions, will be made by the Planning Board
within 63 days from the date of the public hearing.
17.10 Final Town Approval
Final Town approval is required if the WEF is located on Town
property or if the WEF is wholly or partially owned by the Town.
12
Section 18 - Application Changes
18.1 Throughout the permit process, the Applicant shall promptly
notify the Permitting Authority of any changes to the information
contained in the permit application.
18.2 Material changes may not be made to a WEF after an
application is determined to be complete,
without initiating a new application process. Material changes
include, but are not limited to, increasing the number of Wind
Turbines, increasing the nameplate capacity of the Wind
Turbines, increasing Turbine Height, changes to the location of
Wind Turbines, or material changes to Associated Facilities.
Non-material changes require a permit modification as
determined by the Permitting Authority. The Permitting Authority
shall have sole discretion for determining what is a material or
non-material change.
Section 19 - Pre Application
A completed Pre Application form must be submitted 14 days prior to the
Planning Boards regularly scheduled monthly meeting that an applicant
wishes to have it reviewed. The Pre application may be obtained from the
Town of Buckfield Code Enforcement Officer or see Appendix A.
Section 20 - Site Visit Checklist
The Planning Board will use the Site Visit Checklist found in Appendix B
to gather information about the site to assist them in determining their
needs in the application process.
Section 21 - Notification Area: Notice of Application and Site Visit
The Planning Board shall direct the Town Clerk to send out the notice as
described in 17.3 to the best of her/his ability to all property owners within
the Notification Area. This shall be accomplished by mailing a copy of the
notice (Appendix C) to the last known address recorded in the Town of
Buckfield Tax Assessment Records.
Section 22 - Town Wide Notification
The Planning Board shall direct the Town Clerk to send out the notice as
described in 17.8 to the best of her/his ability to all residents and property
owners. This shall be accomplished by mailing a copy of the notice
(Appendix D) to occupant and supplying the Post Office with enough
copies for each mailing address in the Town of Buckfield and preparing a
13
list of property owners that are not residents from the tax assessing
record and mailing a copy to them as well. Only one copy of the notice
must be mailed per address no matter the number of individuals living on
or having claim to any given property. Failure of some individuals to
receive notice in no way infringes on the review process of the
application.
Section 23 - Final Determination
The Planning Board will provide a written finding of fact based on the
requirements of the ordinance within 60 days of their final determination.
The finding of facts will show the recorded vote of each criteria and the
finding of facts associated with the criteria reviewed.
Section 24 - WEF Submission Standards and Fees
24.1 Fees and Bonds.
24.1.1 Application Fee: See Section 13
24.1.2 Professional Fees Escrow: See section 11
24.1.3 Decommissioning Bond: See Section 43.4
24.1.4 Road Damage Bond: See Section 39.3
24.2 Submission standards.
All information in this application, unless otherwise deemed
confidential in accordance with Maine's Freedom of Access Law,
will become part of the public record. Information submitted by
the Applicant must be continuously updated throughout the
application process as changes are made or new information
becomes available. The Applicant shall include a written
application, which shall include:
24.2.1 Applicant's name and contact information.
24.2.2 Legal Owner/operator and contact information
24.2.3 Description of the legal structure of the WEF.
24.2.4 Description of the proposed WEF that includes the
number of Wind Turbines, the nameplate capacity of each
Wind Turbine, Turbine Height and manufacturer's
specifications for each Wind Turbine, the aggregate
generating capacity of the entire project, and a description of
associated facilities.
14
24.2.5 Location map of the project showing the location of
the each Wind Turbine, associated facilities, all property
under partial or total control of Applicant including
easements and those under lease with Participating
Landowners, roads, municipal boundaries, proximity to all
Scenic or Special Resource features in the Town of
Buckfield and major geographical features.
24.2.6 Detailed site plan showing the location of each Wind
Turbine and Associated Facility and any of the following
features located within 1.5 times the required setback:
property boundaries, required setbacks, topographic
contour lines (maximum 20-foot interval), buildings
(identify use), roads, driveways, right-of-ways, overhead
utility lines, Scenic or Special Resources, tree cover,
wetlands, streams, water bodies, areas proposed to be
cleared of vegetation or re-graded, and areas proposed to be
significantly excavated or blasted.
24.2.7 Copies of all Participating Landowner agreements and
easement agreements.
24.2.8 Copies of any deeds or purchase agreements for land
owned or under option by the Owner/operator.
24.2.9 Proof of financing.
24.2.10 Reference list of all previous WEFs with which the
Owner/operator has been affiliated.
24.2.11 Proof of compliance with all required setbacks. The
Applicant shall work with the Permitting Authority to
complete a pre-construction sound study in accordance with
Sections 26 & 41. This study must be completed before the
permit can be approved.
24.2.12 A detailed sound prediction model for worst-case
sound scenarios based on wind speed and wind direction for
the WEFs. The study shall be projected onto a contour
map for a minimum of two miles from each Wind Turbine.
Worst-case scenarios for each property line within the 2-
mile radius, measured horizontally from the Project
Boundary, shall be reported in table form. The model will
address the unique mountainous terrain of the area. Sound
predictions will include both single source and line source
origination. All underlying assumptions and algorithms in
the model will be documented.
15
24.2.13 As part of the review process, the Applicant will
provide written demonstration that the sound standards in
this Ordinance will be met.
24.2.14 The Wind Turbine manufacturer's sound emission
specifications for each Wind Turbine model.
24.2.15 A shadow flicker and blade reflection model for the
proposed WEF. The model will provide a worst-case
scenario (100%) seasonal representation for each Occupied
Building within two miles of any Wind Turbine. The model
will calculate maximum hours of shadow flicker and blade
reflection in table form for each Occupied Building. A worst-
case scenario shall also be constructed for vehicle traffic.
24.2.16 Copies of all executed Mitigation Waiver agreements
concerning Setbacks, Sound and Shadow Flicker/Blade
Reflection.
24.2.17 Written demonstration that the Wind Turbine Plan is
consistent with all other Buckfield regulations, ordinances
and policies.
24.2.18 Documentation showing compliance with Section
35.1.1, both during construction and post construction.
24.2.19 Documentation showing compliance with Section
35.2 and with Section 35.2.3.
24.2.20 Documentation showing compliance with Section
35.2.4. Documentation must include a construction site
erosion plan and storm water runoff control plan that
minimizes potential adverse impacts on streams and
wetlands.
24.2.21 Documentation showing compliance with Section
35.2.5.
24.2.22 Documentation showing compliance with Section
35.2.6.
24.2.23 Written evidence that the Environmental
Coordinator of the Maine Department of Inland Fisheries
and Wildlife and the Maine Natural Areas Program have
both been notified of the pending application and the
location and Turbine Height of all proposed Wind Turbines.
16
24.2.24 A Location of Development permit from the Maine
Department of Environmental Protection (DEP) or proof
none is required
24.2.25 A visual impact assessment pursuant to Section 35.3
24.2.26 Photographs of existing conditions of each Wind
Turbine and associated facility site.
24.2.27 Sight line, photographic, and elevation information
shall be provided from: 1) each Occupied Building within
the Setback; 2) from any Scenic or Special Resource
location and other locations as the Permitting Authority
deems necessary.
24.2.27.1 A Sight Line Representation shall be drawn
that shows the lowest point to the Wind Turbine visible
from each location. Each sight line shall be depicted in
profile, drawn at one-inch equals 40 feet. The profiles
shall show all intervening trees and physical structures.
24.2.27.2 Each Sight Line shall be illustrated by one
four-inch by six-inch color photograph of the current
view.
24.2.27.3 Each of the existing condition photographs
shall have the proposed Wind Turbines superimposed
on it to accurately simulate the WEF when built.
24.2.27.4 Elevations of the tops of any structures on
the subject property relative to the elevation of the
Wind Turbines(s)
24.2.27.5 The height and elevation relative to the Wind
Turbine(s) of trees, both existing and proposed, that
are to provide visual buffering. In the case of trees to
be planted, the proposed height at the time of planting
as well as the projected mature height is to be
provided.
24.2.28 Demonstrate compliance with Section 30 Provide a
written description of emergency and normal shutdown
operations.
24.2.29 Demonstrate compliance with Section 31 Submit
required permits from the Federal Aviation Administration or
proof none are required.
17
24.2.30 Demonstrates compliance with Section 32
24.2.31 Submit contract with Maine licensed professional
engineer to conduct post construction structural and
operational inspection and written agreement by Applicant to
submit proof of successful inspection as a condition of
permitting before operating WEF
24.2.32 Proof of liability Insurance in the amount of one
million dollars ($1,000,000.00) per occurrence per turbine.
24.2.33 Time-line showing all aspects of the construction.
24.2.34 Photographs and detailed drawings of each Wind
Turbine, including foundation design. Details must be
provided of all significant excavation and blasting.
24.2.35 Demonstrate compliance with Section 36. A map
shall be provided showing all transmission lines and rights-
of-way that will need to be built or upgraded to
accommodate the WEF. Applicant shall submit copies of
signed letters of intent to grant easements, long term leases
or other property rights from involved landowners and any
governmental unit responsible for access, approval or
construction of electric transmission and distribution lines,
whether part of the WEF or part of the local electrical
distribution grid. The Applicant shall submit an affidavit
stating that no property will need to be taken by eminent
domain to facilitate transmission lines necessary to support
the project.
24.2.36 A geological report from a registered geotechnical
engineer demonstrating that the soils can support the Wind
Turbines and the underlying ground is geologically stable.
The report shall include a slope stability analysis and any
underlying fault zones.
24.2.37 A written summary of all routine operation and
maintenance procedures for the WEF.
24.2.38 Demonstrate compliance with Section 37. Provide an
estimate of required new equipment and training to be
provided.
24.2.39 Document all potential hazardous wastes that will be
used on the WEF, including but not limited to any chemicals
used to clean the Wind Turbine blades, and how these wastes
18
will be transported, handled, stored, cleaned up if spilled,
and disposed of during any phase of the project's life.
24.2.40 A communication/electromagnetic interference
study prepared by a registered professional engineer
showing that the proposed WEF will comply with Section 38.
The Owner/operator will sign an affidavit stating that the
owner /operator shall be responsible for the full cost of
remediation to remain in compliance with Section 38.
24.2.41 Demonstrate compliance with Section 39. Before
and after photographs or videos of the roadways, in a
format approved by the Permitting Authority, shall be
submitted as part of the documentation process.
24.2.42 A road and property use and risk assessment plan in
compliance with Sub-Section 39.6.
24.2.43 An affidavit agreeing to comply with all provisions in
Section 40.
24.2.44 An affidavit agreeing to comply with all provisions in
Section 44.
24.2.45 A decommissioning plan in compliance with Section
43.
24.2.46 Copies of all written agreements and disclosure of
all verbal promises, for contracts, subcontracts,
employment, consulting fees, gifts or other remuneration in
excess of $10 (cash or in-kind) to residents or businesses in
Buckfield, either previously made or contingent on
permitting of this project.
24.2.47 An Affidavit agreeing to comply with all provisions
of Section 14
24.2.48 Applicant shall deliver a letter by certified mail to
the owner of any property that the Applicant proposes to be
restricted by the permit. The letter will state that the
Applicant has filed an application, list future development
that will be restricted, and to what extent it will be
restricted, on abutting properties by virtue of the permit
being granted. Examples of restrictions include, but are not
limited to, building Occupied Buildings within the setback
area without a Mitigation Waiver, building structures (i.e.
Wind Turbines or cell towers that the WEF would interfere
19
with), zones in which future telecommunication installations
can expect interference from the WEF. Applicant must
provide fair compensation to any nonparticipating
landowners within the setback areas for restricting future
development of their property.
24.2.49 Proof that the Applicant has notified the following
agencies via certified mail and received any necessary
permits or permissions for the project:
24.2.49.1 Federal Aviation Administration.
24.2.49.2 Department of Defense facilities located
within 50 miles from the proposed WEF.
24.2.50 Other relevant studies, reports, certifications and
approvals as may be reasonably requested by the Permitting
Authority to ensure compliance with this Ordinance.
24.2.51 Signed affidavit from the Owner/operator that
Applicant has read the Town of Buckfield Wind Turbine
Ordinance and agrees to abide by its provisions, as may be
amended from time to time.
Section 25 - Setback Standards
25.1 Setback to Non-participating Landowner Property Lines is
the greater of one (1) mile or thirteen times the turbine height.
Property owners may waive this setback with a legally executed
written Mitigation Waiver. (See Section 28).
25.2 Setback to Public Roads is no less than 4 times the turbine
height, measured horizontally.
Section 26 - Sound Standards
For all WEF's, the primary guiding principle is that their operation
must not be disruptive at any time of day or night. Sound measurement
standards and procedures are described in Section 26 & 41
26.1 Sound Limits at Non-participating Property Lines
26.1.1 No WEF turbine shall be located so as to cause an
exceedance of the preconstruction/operation background
sound levels by more than 5 dBA or dBC for day and
evening (as defined in section 41.17.1 & 41.17.2) .
20
26.1.2 No WEF turbine shall be located so as to exceed
the preconstruction/operation background sound levels
by more than 3 dBA or dBC at night (as defined in
section 41.17.3)
26.2 Audible sound levels (dBA) due to wind turbine operation will
not exceed the pre-construction ambient sound as defined in 26.1
as measured at any property line. Property owners may waive this
sound restriction with a written Mitigation Waiver. (See Section 28)
26.3 Low frequency sound levels (dBC) due to wind turbine
operation as measured inside a n y o c c u p i e d s t r u c t u r e or at any
Property Line will not exceed:
26.3.1 Twenty (20) decibels (measured as dBC) above the pre-
development ambient sound level (measured as dBA). There is
a maximum not-to-exceed level of 50 dBC. Property
owners may waive this sound restriction with a written
Mitigation Waiver. (See Section 28.)
Section 27 - Shadow Flicker and Blade Reflection Standard
WEFs shall be designed and sited so that shadow flicker and/or blade
reflection will not fall on a receptor as defined in Section 45.
Exceptions to this standard may be made based on the following
condition only if the flicker or reflection does not exceed 10 hours per
year for any given receptor. Property owners may waive the Shadow
Flicker and Blade Reflection restriction with a written Mitigation Waiver.
(See Section 28)
Section 28 - Mitigation Waivers
Non-participating Landowners may modify or waive certain specified
protections in this Ordinance using a written, legally enforceable
Mitigation Waiver negotiated between the Applicant and the Non-
participating Landowner. Copies of executed Mitigation Waivers must be
included with the application. The Mitigation Waiver must be recorded in
the Register of Deeds office appropriate for the affected property. The
deed must advise all subsequent owners of the burdened property.
28.1 The requirements permitted in Mitigation Waivers are:
28.1.1 Property line setbacks -- Section 25
28.1.2 Audible sound levels -- Section 26
28.1.3 Low frequency sound levels -- Sub-Section 26.3
21
28.1.4 Shadow Flicker and Blade Reflection -- Section 27
28.1.5 No Mitigation Waivers on other requirements set forth in
this Ordinance are permitted.
28.2 The Mitigation Waiver must contain a separate paragraph for
each specific requirement being modified or waived. Each paragraph
must specify:
28.2.1 The requirement as set forth in this ordinance
28.2.2 The modified requirement to which the affected
property owner is now agreeing.
Section 29 - Financial Performance Standard
The Applicant must demonstrate that the WEF is financially viable and
that the Owner/operator has the financial ability to complete the
project.
Section 30 - General Standards
All WEFs applicants shall comply with the all standards unless waived by
the permitting authority. No WEF shall cause unreasonable health or
safety conditions.
30.1 Building Codes. All components of the WEF shall conform to
local, state and national building codes.
30.2 Electrical Components and Interconnections. All electrical
components of the Wind Turbine and WEF shall conform to
relevant and applicable local, state, and national codes.
30.3 Controls and Brakes. Each Wind Turbine shall be equipped
with a redundant braking system that includes both aerodynamic
over-speed controls (including variable pitch, tip, and other similar
systems) and mechanical brakes. Mechanical brakes shall operate in
fail-safe mode. Stall regulation shall not be considered a sufficient
braking system for over-speed protection.
30.4 Blade Clearance. The minimum distance between the ground
and all blades of a Wind Turbine shall be 100 feet as measured at
the lowest arc of the blades.
30.5 Signal Interference. WEFs will be designed and sited to prevent
the disruption or loss of radio, telephone, television, or similar
signals. (See Section 38.)
22
30.6 Guy Wires and Blade Feathering.
Monopole towers with no guy wires are preferred to minimize bat
and migratory bird fatalities, and bird fatalities in general. Bird
flight diverters must be installed on any tower with guy wires.
Section 31 - Appearance Standards
31.1 Wind Turbines shall be a non-obtrusive color such as white,
off-white or gray, or as may otherwise be required by another
governmental agency with jurisdiction over the WEF
31.1.2 The design of the buildings and related structures
shall, to the extent possible, use materials, colors, textures,
screening and landscaping that will blend the site to the
natural setting and existing environment.
31.1.3 Wind Turbines shall not be artificially lighted, except
to the extent consistent with Federal Aviation Administration
recommendations or other applicable authority that
regulates air safety or as is otherwise required by another
governmental agency with jurisdiction over the WEF.
Additional lighting standards must be met for Wind Turbines
(see Section 35.2.7).
31.1.4 Wind Turbines shall not be used to support signs and
shall not display advertising except for reasonable and
incidental identification of the turbine manufacturer, facility
owner and operator, emergency contact information, and for
any appropriate warnings.
31.1.5 Each Wind Turbine shall be located to reasonably
maximize the effectiveness of existing vegetation, structures
and topographic features to screen views of the Wind
Turbine(s) from Occupied Buildings of Non-participating
Land Owners, Scenic Resources and public roads.
31.1.6 When existing features do not screen views of a
Wind Turbine from Occupied Buildings of Non-participating
Landowners, Scenic Resources and public roads, screening
shall be provided, where feasible and effective, through
the planting of trees and/or shrubs. Generally, such
plantings should be of native varieties. In order to maximize
the screening effect and minimize wind turbulence near the
Wind Turbine, plantings should be situated as near as
possible to the Occupied Buildings, Scenic Resources and/or
public roads.
23
Section 32 - Safety Standards
32.1 Design. The design of the Wind Turbines and WEF shall
conform to applicable industry standards, including those of the
American National Standards Institute, (ANSI) and shall comply
with standards promulgated by Underwriters Laboratories, Det
Norske Veritas, Germanischer Lloyd Wind Energies or other
similar certifying organizations appropriate for the turbines' size
and classification.
32.2 Access. All ground-mounted electrical and control equipment
and all access doors to a Wind Turbine shall be labeled and
secured to prevent unauthorized access. A Wind Tower shall not
be climbable up to fifteen (15) feet above ground surface.
32.3 Warnings. A clearly visible warning sign concerning voltage
must be placed at the base of all pad-mounted transformers and
substations.
Section 33 - Inspections
Wind Turbines shall be inspected after construction is completed
but before becoming operational, and at least every year thereafter, for
structural and operational integrity by a Maine licensed professional
engineer and the Owner/operator shall submit a copy of the inspection
report to the Enforcing Authority. If such report recommends that
repairs or maintenance are to be conducted, the owner shall provide
the Enforcing Authority a written schedule for the repairs or
maintenance. Failure to complete the repairs or maintenance in
accordance with the schedule shall be deemed a violation of this
Ordinance.
S e c t i o n 3 4 - Liability Insurance
The Applicant shall maintain a current general liability policy for the
WEF that covers bodily injury and property damage in an amount
commensurate with the scope and scale of the Turbine or Project. The
Applicant or its designee shall provide certificates of insurance to the
Planning Board, and provide a copy of each annual renewal to the
Planning Board. (See Sub-Section 24.2.33.)
Section 35 - Environmental Impact Standards
35.1 Environmentally Sensitive Area.
35.1.1 The plan for the WEF will reflect the natural
capabilities of the site to support development.
24
Environmentally sensitive areas, including but not limited
to wetlands, steep slopes, watersheds, floodplains,
significant wildlife habitats, fisheries, habitat for rare or
endangered plants and animals, unique natural communities
and natural areas, sand and gravel aquifers will be
maintained and preserved to the maximum extent. The
Applicant shall demonstrate appropriate measures for
protecting these resources, including both during
construction and post construction.
35.1.2 Given that areas within the Town of Buckfield are
wildlife management areas and that protected bird species
and migratory birds are regularly observed within the
boundaries of the Town, the applicant must comply with
the "Guidelines for Wind Project Ecological Study" by the
Maine Department of Environmental Protection and Maine
Department of Inland Fisheries and Wildlife.
35.2 Wildlife Protection
35.2.1 The Applicant will demonstrate that the WEF will not
have a significant adverse effect on area wildlife and
wildlife habitat. Such analysis shall include but not be
limited to adverse effects to birds, bats, game animals, and
habitat fragmentation. In addition, the Applicant must
demonstrate that the WEF will have no significant adverse
effect on rare, threatened or endangered wildlife. The
wildlife and habitat analysis must include appropriate pre-
construction field studies and at least three sets of
corresponding post construction field studies conducted at
periodic intervals within 3 years after the Wind Turbines
become operational. These studies will be conducted by a
qualified wildlife biologist hired by the Town of Buckfield and
paid for by the Applicant.
35.2.2 If the post-construction field studies demonstrate
significant adverse effect to birds, bats, game animals or
habitat fragmentation, the Town, the Owner/operator and the
Maine Department of Inland Fisheries and Wildlife
(MDIFW) shall develop an appropriate mitigation plan. The
Owner/operator will be responsible for the full cost of
implementing the mitigation plan under the supervision of
MDIFW.
35.2.3 Raptor Habitat. To the extent practicable, the creation
of artificial habitat for raptors or raptor prey shall be
minimized. In making its determination under this subsection
25
the Planning Board shall consider comments and
recommendations, if any, provided by the Maine Department
of Inland Fisheries and Wildlife.
35.2.4 Erosion Control. The WEF will be designed,
constructed and maintained in accordance with accepted
erosion and sedimentation control methods. The acceptability
of the proposed methods will be judged utilizing the "Maine
Erosion Control Handbook for Construction: Best
Management Practices", March 2003 or as revised. Whenever
sedimentation is caused by stripping vegetation or grading it
shall be the responsibility of the Owner/operator to remove it
from all adjoining surfaces, drainage systems and
watercourses and to repair any damage at the
Owner/operator's expense as quickly as possible.
35.2.5 Groundwater Protection. The WEF will not adversely
affect the quality or quantity of groundwater. The Applicant
shall have to demonstrate to the Planning Board's
satisfaction that there are no unusual risks to the
groundwater, including underground rivers, created by the
project. The Board may require as a condition of permit
approval, that spill prevention and control measures be
installed, and that all activities involving potentially
permeable pollutants, including at delivery and transfer points,
be conducted under cover and over an impervious surface
surrounded by dikes. If a Wind Turbine foundation is
proposed in a bedrock area, a baseline of all wells, springs
and certified public water sources within a two-mile radius of
the foundation shall be established. If degradation or
contamination occurs, permanent remedies shall be the
responsibility of the Owner/operator.
35.2.6 Light Pollution. The WEF shall be designed to
minimize the amount of nighttime light pollution. The
Applicant shall provide a plan showing lighting on and
around all Wind Turbines and associated facilities. Lighting on
Wind Turbines shall be illuminated to Federal Aviation
Administration (FAA) minimal standards using only red rather
than white lights, if possible. The minimum number of Wind
Turbines will be illuminated, per FAA rules. Lighting shall be
shielded from ground view to FAA maximum standards.
35.2.7 Relation to DEP Certification and Permitting. If DEP
has issued a Site Location of Development Act permit for a
WEF there is a rebuttable presumption that the development
meets the requirements of Sub-Sections 35.2.2 and 35.2.3.
26
If a DEP Site Location of Development permit is required, the
Planning Board will require the permit to be issued before the
application is deemed complete and may take the
recommendations under advisement to determine compliance
with Sub-Sections 35.2.2 and 35.2.3.
35.3 Scenic or Special Resource Standards
35.3.1 Except as otherwise provided in this subsection, if a
WEF is proposed for a location in, or is visible from, a
Scenic or Special Resource, the Applicant shall provide the
Planning Board with a visual impact assessment that
addresses the evaluation criteria in subsection 35.3.3. There
is a rebuttable presumption that a visual impact assessment
is not required for those portions of a WEF that are located
more than 3 miles, measured horizontally, from a Scenic or
Special Resource. The Planning Board may require a visual
impact assessment for portions of the WEF located more
than 3 miles and up to 8 miles from a Scenic Resource if it
finds that a visual impact assessment is needed to determine
if there is the potential for significant adverse effects on the
Scenic or Special Resource. Any interested Person must
submit information intended to rebut the presumption to the
Planning Board within 30 days of acceptance of the
application as complete. The Planning Board shall determine
if the presumption is rebutted based on a preponderance of
evidence in the record.
35.3.2 The Planning Board shall determine, based on
consideration of the evaluation criteria in sub-section
35.3.3, whether the WEF significantly compromises views
from or of a Scenic or Special Resource such that the
proposed facility has an unreasonable adverse effect on the
scenic character or existing uses related to scenic character of
that Scenic or Special Resource.
35.3.3 In making its determination pursuant to sub-section
35.3.2, and in determining whether an Applicant for a WEF
located more than 3 miles from a Scenic Resource must
provide a visual impact assessment and the Planning Board
shall consider:
35.3.3.1 The significance of the potentially affected
Scenic or Special Resource;
35.3.3.2 The existing character of the surrounding
area;
27
35.3.3.3 The expectations of the typical viewer;
35.3.3.4 The WEF Project's purpose and the context
of the proposed activity;
35.3.3.5 The extent, nature and duration of potentially
affected public uses of the Scenic or Special Resource
and the potential effect on the public's continued use
and enjoyment of the Scenic or Special Resource; and
35.3.3.6 The scope and scale of the potential effect of
views of the WEF on the Scenic or Special Resource,
including but not limited to issues related to the number
and extent of Wind Turbines visible from the Scenic or
Special Resource, the distance from the Scenic or
Special Resource and the effect of prominent features
of the WEF Project on the landscape.
Section 36 - Construction/Design Standards
36.1 General Construction Standards. All Wind Turbines shall
be constructed in compliance with Good Utility Practice for Wind
Turbines. In the event that, after inspection by a qualified
expert in Good Utility Practice, the Town concludes that any of
the Wind Turbines were not constructed in compliance with Good
Utility Practice or constitutes a danger to persons or property,
then upon notice being provided, the Owner/operator shall have
90 days to bring the non-compliant Wind Turbine(s) into
compliance with such standards. If 90 days is insufficient time to
cure the non-compliance, the Owner/operator shall present a plan
to the Town describing the reason for the delay and the time frame
for the cure to be put in place.
36.2 Electrical Design Standard. On-site power and
transmission lines shall be placed in a manner consistent with
Good Utility Practices. Wind Turbines shall be engineered
according to Good Utility Practice to prevent transient ground
currents and stray voltage. The Applicant shall demonstrate that
there will be no significant adverse effect upon the environment
or individuals from transient ground currents and stray voltage.
36.3 Transmission Line Standards. The Applicant must, in
conjunction with the Maine Public Utility Commission (PUC),
prepare a written report documenting all anticipated changes,
modifications or upgrades to the public utility grid within the Town
of Buckfield due to the WEF. The written report must include
necessary approvals from the PUC, proof of leases or required
28
right of ways for transmission lines, and any alternatives to the
final plan considered. The report must document the residual
capacity remaining in the local utility grid that is available for use
by other local electrical generating projects.
36.4 Geological Stability. Wind Turbines shall not be constructed
on areas of geological instability. The Applicant shall demonstrate
that this standard is met.
Section 37 - Public Safety and Health Standards
37.1 Fire Protection. The Applicant shall prepare a plan in
consultation with the Town of Buckfield fire department as part
of the permitting process. The plan shall address all activities at
the WEF from the start of construction through the end of power
generation and the final removal and restoration of the site, and
shall describe a response plan to address all identified potential
fire, rescue and hazardous materials scenarios. The
Owner/operator shall ensure that the WEF complies with the
following control and prevention measures and assumes
responsibility for all associated incremental costs:
37.1.1 Use of fireproof or fire resistant building materials and
buffers or fire retardant landscaping around WEFs as
appropriate.
37.1.2 Incorporation of a self-contained fire protection system
to address nacelle fires including but not limited to redundant
fire quenching systems in the nacelle.
37.1.3 Maintenance of firebreak areas as appropriate
cleared of vegetation and maintained as a fire/fuel break as
long as the Wind Turbine is in operation.
37.1.4 Provision for any additional fire fighting or rescue
personnel, services, training, materials, or vehicles as may
be required to address any emergency related to the WEF
that is beyond the current capabilities and duties of the local
fire department.
37.2 Hazardous Wastes. The Owner/operator shall be
responsible for compliance with all ordinances, state regulations
and laws applicable to the generation, storage, cleanup, and
disposal of hazardous wastes generated during any phase of the
project's life. The Planning Board shall require that a plan be
29
submitted by the Applicant demonstrating the ability and intent to
meet such compliance.
37.3 Blasting. Owner/operator shall not undertake any blasting
in connection with the construction of the WEF unless Applicant
has notified the Town and submitted a blasting plan consistent
with applicable laws and regulations. The plan must be reviewed
and approved by the Planning Board before any blasting may take
place. No blasting shall be undertaken without 48 hour notification
to all residents within a two mile radius, measured horizontally,
from the blasting area. All blasting operations will cover the
blasting area with b l a s t m a t s to prevent debris from falling on
nearby properties.
Section 38 - Communications and Electromagnetic Interference
Standards
38.1 WEFs shall be sited and operated so that they do not
interfere with emergency (fire, police/sheriff, ambulance) radio
two-way communications (base stations, mobile, and hand held
radios, including digital) and/or paging, television, telephone
(including cellular and digital), microwave, satellite (dish),
navigational, internet or radio reception to neighboring areas. The
Owner/operator of the project shall be responsible for the full
cost of any remediation necessary to provide equivalent
alternate service or correct any problems, including relocation or
removal of the Wind Turbine, and any and all related transmission
lines, transformers, and other components related to the
interference.
38.2 The Owner/operator of the WEF shall respond within one
day to any request for communications interference investigation
by any emergency agency (fire, police/sheriff, ambulance).
Testing will commence within two days of the request. The
Owner/operator is responsible for mitigating within two days from
the determination of interference attributed to the operation of
the Wind Turbine.
38.3 The Owner/operator of the WEF shall respond within five
business days to any request for communications interference
investigation by a property owner or resident within a three-mile
radius, measured horizontally, of the WEF. Testing will commence
within five business days of the request. The owner/operator is
responsible for mitigating within ten business days from the
determination of interference attributed to the operation of the
Wind Turbine.
30
S e c t i o n 3 9 - Ground Transportation Standards
39.1 The Applicant shall identify all public ways to be used within
the Town of Buckfield to transport equipment and parts for
construction, operation or maintenance of the Wind Turbines.
39.2 A qualified third party engineer, hired by the Planning Board
and paid for by the Applicant, shall document town road
conditions prior to construction. The engineer shall document all
town road conditions again thirty (30) days after construction is
complete or as weather permits. The applicant will provide proof
that MDOT has given permission for travel over any State roads
39.3 The Town of Buckfield shall require the applicant to
purchase a bond for all town road(s) in compliance within state
regulations.
39.4 Any road damage caused by the Applicant or its contractors
shall be promptly repaired at the Owner/operators expense.
39.5 The Applicant shall demonstrate that it has appropriate
financial insurance to ensure the prompt repair of damaged roads.
39.6 Plan and Risk Assessment for Road and Property Use
39.6.1 An Application for a WEF Site Permit shall include a
road and property use and risk assessment plan containing
the following information and meeting the following
requirements.
39.6.1.1 A description and map of all public ways, and
other property, in the Town to be used or affected in
connection with the construction of the WEF,
including a description of how and when such ways
and property will be used or affected.
39.6.1.2 A description of the type and length of
vehicles and type, weight and length of loads to be
conveyed on all public ways in the Town.
39.6.1.3 A complete assessment of the proposed
use of public ways in the town in connection with the
construction of the WEF, including: the adequacy of
turning radii; the ability of the public ways to sustain
loads without damage; the need to remove or modify
(permanently or temporarily) signs, trees, utilities, or
anything else; any reasonably foreseeable damage to
31
public ways or other property, public or private; any
reasonably foreseeable costs that the town may incur
in connection with the use of property in the town,
including but not limited to costs relating to traffic
control, public safety, or damage to public ways, or to
other public or private property.
39.6.1.4 A traffic control and safety plan relating to the
use of public ways in the town in connection with the
construction of the WEF.
39.6.1.5 Any additional relevant information that the
Planning Board may request relating to the use of
public ways or other effects on public and private
property that may occur in connection with the
construction and operation of the WEF.
39.7 The Planning Board will evaluate the risk assessment plan
with assistance from such consultants that it deems appropriate,
including without limitation a third-party engineer chosen by the
Planning Board, the cost to be solely borne by the Applicant. The
Planning Board may document the condition of public ways and
other property to be used in connection with the construction of
the WEF in such manner as it deems appropriate. The Planning
Board may require changes to the risk assessment plan that it
deems to be appropriate to protect public safety, to protect public
and private property, and to address anticipated costs to the town
associated with construction of the WEF.
39.8 If the Applicant requires the temporary closure of any public
way, the Planning Board may require the Applicant to enter into
an agreement relating to the use of the public way.
39.9The Applicant shall be responsible for paying for any damage
to any public way. If the risk assessment anticipates damage to
any public way, the Planning Board may require the Applicant to
provide a surety in an amount that the Planning Board
determines appropriate to secure any obligation under the
agreement, including but not limited to any obligation relating to
alterations or modifications to public ways made in connection with
the Applicant's activities.
Section 40 - Reporting Requirements:
40.1 Extraordinary Events.. The Owner/operator shall notify the
Town of any extraordinary event within 24 hours of that event,
"Extraordinary events" shall include but not be limited to tower
collapse, catastrophic turbine failure, fires, leakage of hazardous
32
materials, unauthorized entry to the tower base, thrown blade or
hub, any injury to a Facility worker or other person that requires
emergency medical treatment, or other event that impacts the
public health and safety of the Town or its residents. For the
purpose of this section calling 911 is the same as notifying the town.
Additionally, the Owner/Operator will provide the Town and its
residents with a hotline phone number for reporting of any such
extraordinary events to a manned facility on call 24 hours a day, 365
days a year.
40.2 Change of Owner/operator. The Owner/operator will notify
the Town of Buckfield of a pending change of ownership in writing
30 days before the effective change. New owners will apply for a
transfer of permits to be reviewed by the Town Of Buckfield and
will assume all the obligations of the selling Owner/operator.
40.3 Reports from annual safety inspections pursuant to Section 30
and annual proof of liability insurance pursuant to Section 34 &
24.2.33.
Section 41 - Sound Measurement Procedures
41.1 A qualified independent acoustical consultant who is a Full
Member of the Institute of Noise Control Engineering (INCE) shall
conduct all sound studies. The acoustical consultant shall be
hired by and report to the Permitting Authority. The Applicant will
pay for the studies.
41.2 The WEF Applicant/Licensee shall provide all technical
information and wind farm data required by the qualified
independent acoustical consultant before, during, and/or after any
acoustical studies required by this document and for acoustical
measurements.
41.3 Sound level meters and calibration equipment must comply
with the latest version of the American National Standards
Institute "American Standard Specifications for General Purpose
Sound Level Meters" (ANSI Standard S1.4) and shall have been
calibrated at a recognized laboratory within one month prior to the
initiation of the study.
41.4 Except as specifically noted otherwise, measurements shall
be conducted in compliance with ANSI Standard S12.18-1994
"Outdoor Measurements of Sound Pressure".
33
41.4.1 Because WEFs operate 24/7 the background sound
levels of interest are those during the quieter periods
which are often the evening and night. Sounds from the
WEF of interest, near-by birds and animals or people must
be excluded from the background sound test data. Nearby
electrical noise from streetlights, transformers and cycling
AC units and pumps etc., must also be excluded from the
background sound test data.
Background sound level (dBA and dBC (as L90)) is the
sound level present 90% of the time during a period of
observation that is representative of the quiet time for the
soundscape under evaluation and with duration of ten (10)
continuous minutes. Several contiguous ten (10) minute
tests may be performed in one hour to determine the
statistical stability of the sound environment.
Measurement periods such as at dusk when bird and insect
activity is high or the early morning hours when the "dawn
chorus" is present are not acceptable measurement times.
Longer term sound level averaging tests, such as 24 hours
or multiple days are not at all appropriate since the purpose
is to define the quiet time background sound level. It is
defined by the LA90 and LC90 descriptors. It may be
considered as the quietest one (1) minute during a ten (10)
minute test. LA90 results are valid only when LA10 results
are no more than 10 dB above LA90 for the same period.
LC10 less LC90 are not to exceed 10 dB to be valid.
The background noise environment consists of a multitude
of distant sources of sound. When a new nearby source is
introduced the new background noise level would be
increased. The addition of a new source with a noise level
10 dB below the existing background would increase the
new background 0.4 dB. If the new source has the same
noise level as the existing background then the new
background is increased 3.0 dB. Lastly, if the new source is
3.3 dB above the existing background then the new
background would have increased 5 dB. For example, to
meet the requirement of L90A + 5 dB = 31 dBA if the
existing quiet nighttime background sound level is 26
dBA, the maximum wind turbine noise immission
contribution independent of the background cannot exceed
29.3 dBA Leq at a dwelling. When adding decibels, a 26
dBA background combined with 29.3 dBA from the
turbines (without background) results in 31 dBA. Further,
background L90 sound levels documenting the pre-
construction baseline conditions should be determined
when the ten (10) minute maximum wind speed is less
34
than 2 m/s (4.5 mph) near ground level/microphone
location 1.5 m height.
41.5 Along with information about the make, model, and name
plate capacity of all turbines potentially used in the proposed
WEF, the applicant will also supply their sound power levels (Lw)
for each 1/3 octave band from 6.3 Hz to 10k hz.
41.6 The applicant will also supply a sound propagation model
predicting the sound levels immitted into the community
computed using at minimum 1/1 octave band sound power levels
to compute the LCeq and LAeq levels to generate LAeq and LCeq
contours in 5 dB increments overlaying an aerial view and
property survey map from the WEF property out to a distance to
include all residential property lines within two (2) miles
measured horizontally from the Project Boundary.
41.7 Prior to permit application approval, a pre-construction
ambient sound level study shall be conducted at any property
line out side of the setback area identified by the qualified
independent sound engineer.
41.8 The tests shall be conducted using both an A-weighting scale
(dBA) and low frequency C-weighting scale (dBC).
41.9 Predictions shall be made at all property lines within and
outward for two (2) miles measured horizontally from the Project
Boundary for the wind speed, direction and operating mode that
would result in the worst case WEF nighttime sound emissions.
41.10 Tests shall be reflective of seasonal changes to vegetation
and atmospheric conditions. At a minimum one set of tests should
be performed during each of the four (4) calendar seasons of the
year.
41.11 All measuring points shall be located in consultation with the
property owners and such that no significant obstruction blocks
sound and vibration to the site.
41.12 Outdoor sound level measurements must be taken at 6 feet
above the ground and at least 15 feet from any reflective surface.
41.13 Duration of measurements shall be a minimum of ten
continuous minutes for each criteria at each location.
35
41.14 Measurements must be made when the wind levels are less
than 4.5 mph and with appropriate wind screening for the
recording device.
41.15 When conducting their pre-construction sound prediction
analysis, the Applicant shall make specific reference to: 1) the
unique aspects of the mountainous contours and terrain of the
area and its effect on sound predictability and; 2) line source
sound predictions (emanating from a line of Wind Turbines) in
addition to the traditional single point source predictions.
41.16 Measurements should be obtained during representative
weather conditions when the Wind Turbine sound is most
noticeable, including periods of temperature inversion most
commonly occurring at night.
41.17 Measurements shall be taken at each of the following three
time periods:
41.17.1 Day (10 a.m. -- 2p.m.)
41.17.2 Evening (7p.m. --11 p.m.)
41.17.3 Night (12 midnight -- 4 a.m.)
41.18 Each measurement shall be replicated during the same
time period over three different days within the same season for a
total of 9 measurements per location per season (e.g., three
daytime measurements in the winter, three evening measurements
in the winter, and three night time measurements in the winter).
The lowest of the three measurements per time period, per
season, will be used to determine the pre-construction ambient
sound for that time period and season.
41.19 For each measurement the following minimum criteria will
be recorded:
41.19.1 Lmax, Leq, L10 and L90 in dBA
41.19.2 Lmax, Leq, L10 and L90 in dBC
41.19.3 A narrative description of any intermittent sounds
registered during each measurement.
41.19.4 Wind speed and direction at time of measurement
41.19.5 Description of weather conditions at time of
36
measurement
41.19.6 Description of topography and contours relative to
proposed or actual Wind Turbines
41.20 A comparison of the expected sound levels from the
proposed WEF with the sound level limits of this regulation shall
be submitted. A written report comparing the expected sound
levels with the pre-development ambient sound levels will help
determine compliance with the standard.
41.21 A 5 dBA and/or a 5 dBC penalty shall be applied for
short duration repetitive sound or repetitive impulse sound. This
is a characteristic "thumping" or "whooshing" sometimes
exhibited by larger Wind Turbines.
41.22 A 5 dBA penalty shall be applied for tonal sound. This is a
single or limited frequency sound (vs. broadband sound) associated
with mechanical sound artifacts (i.e. high pitched whining,
screeching, buzzing).
41.23 For sites being measured with existing Wind Turbines two
sets of measurements are required:
1) one set with the Wind Turbine(s) off and; 2) one set with the
Wind Turbine(s) running.
41.24 For noise complaints after the Wind Turbines are
operational, the measurement points, season, time, and duration
of measurements shall be selected in consultation with the
affected property owner. If requested by the property owner,
continuous measurements may be taken for longer periods of
time to capture intermittent nuisance noise patterns.
41.25 Within twelve months of the date when the project is fully
operational, and within four weeks of the anniversary date of the
pre-construction background sound measurements, repeat the
existing sound environment measurements taken before the project
approval. Post-construction sound level measurements shall be
taken both with all WEF's running and with all WEF's off.
41.26 The post-construction measurements will be reported to
the Town of Buckfield (available for public review) using the same
format as used for the preconstruction sound studies. Post-
construction sound studies shall be conducted by a qualified
independent acoustical engineer contracted by the applicant and
paid for by the Owner/operator thru the town to preserve the
status of the engineer as a qualified independent consultant,
the town will at their discretion have the testing independently
37
reviewed.
41.27 Any sound level falling between two (2) whole decibels shall
be deemed the higher of the two.
41.28 When testing for WEF sound compliance, all measurements
at the test location must be the pre-turbine background sound
measurement location nearest to the home of the complainant in
line with the WEF and nearer to it. The time of day for the testing
and the wind farm operating conditions plus wind speed and
direction must replicate the conditions that generated the
complaint. Procedures of ANSI S12.9-Part 3 apply. The effect of
instrumentation limits for wind and other factors must be
recognized and followed.
Section 42 - Operational License Requirement
42.1 An Operational License is required for the operation of all
WEF. Applications for a WEF Operational License shall be
submitted to the Planning Board at least 14 days prior to the
regularly scheduled monthly meeting that they will be discussed.
42.1.1 Where an Applicant is applying for a new or amended
WEF Permit, the application for a WEF Operating License, or
amended license, shall be submitted to the Planning Board
in conjunction with the Permit application, and shall
include the application form and the separate fee specified
in Section 13
42.1.2 Where an Applicant is applying for a WEF Operational
License renewal, a new License as the result of transfer of
ownership or operation, or reinstatement or modification of
an Operational License, the Applicant shall submit an
application form, a copy of the existing WEF Permit and the
fee specified in Section 13.
42.1.3 An Operational License shall be valid for five years.
42.1.4 The granting of an Operational License is conditional
upon the following criteria:
42.1.4.1 Demonstration by the Applicant of compliance
with performance standards of the Ordinance.
42.1.4.2 For the initial Operational License, the Wind
Turbine Project must successfully pass an inspection
for structural and operational integrity conducted by
an independent Maine licensed professional engineer
38
chosen by the Planning Board and paid for by the
applicant. The inspection shall be conducted after
construction is completed but before operations begin.
Success will be demonstrated by submission of a copy
of the engineer's inspection report to the Planning
Board. If the report specifies that repairs,
maintenance or changes to safety procedures are
necessary, the owner shall provide the Enforcing
Authority with proof that the repairs have been
completed, a written schedule for any recommended
maintenance, and documentation of any updated
safety procedures.
42.1.4.3 For a renewal of an Operational License,
where there is no change of Ownership or operator,
the inspection procedure and criteria specified in
Section 42.1.4.2 shall be completed six months prior
to the expiration of the current Operational License at
the expense of the applicant.
42.1.5 Applications for Operational License renewals where
there is no change of ownership of operator shall be
submitted to the Planning Board 6 months prior to their
expiration.
42.1.6 An Operational License shall automatically
terminate upon transfer of ownership or operation of the
WEF. The proposed new owner or operator shall be
required to obtain a new Operational License, which must
be in place prior to the transfer of ownership or operation
of the WEF. The application for renewal of the Operational
License in the case of transfer of ownership or operation
shall include the following items:
42.1.6.1 The Applicant's name, address and phone
number, and the name, address and phone number of
the Owner/operator, if different
42.1.6.2 An emergency directory for the
Owner/operator sufficient to allow the Town to contact
the Owner/operator at any time
42.1.6.3 Evidence of the Applicant's technical and
financial ability to operate the WEF in accordance with
this Ordinance, any other Town of Buckfield ordinance,
and the Operational License
39
42.1.6.4 For any Project Parcel that is not owned by
the Applicant, a copy of any agreement(s) between the
owner of the Project Parcel and the Applicant
42.1.6.5 An updated safety plan in accordance with the
requirements of Section 32.
42.1.6.6 An updated fire prevention and emergency
response plan in accordance with the requirements of
Section 37;
42.1.6.7 An updated emergency shutdown plan in
accordance with the requirements of Section 44.4;
42.1.6.8 An updated decommissioning and site
restoration plan in accordance with the requirements of
Section 43;
42.1.6.9 Updated liability insurance information in
accordance with the requirements of Section 34;
42.1.6.10 A signed statement from the Applicant that
the Applicant agrees to assume full responsibility for
complying with the provisions of this Ordinance,
including agreeing to continue or complete any duties
and obligations of the former Operational License
holder under this Ordinance or former Operational
License, including, but not limited to, the
requirement for post-construction sound
measurements, post-construction stray voltage testing,
wind turbine inspections, and submission to
inspections.
42.1.7 An Operational License shall automatically terminate
upon any amendment to a permit.
42.2.8 Failure to comply with the provisions of this Ordinance
may result in the suspension or revocation of the Operational
License pursuant to Section 44
42.2.9 An Operational License shall be deemed abandoned if
the WEF's operation has ceased for twelve consecutive
months. An Operational License expires immediately upon
abandonment.
40
Section 43 - Decommissioning Standards
43.1 The Owner/operator shall, at its expense, complete
decommissioning of the WEF within: 1) twelve (12) months after
the end of the useful life of the WEF, or; 2) as specified in the
materials provided at the time of application or; 3) pursuant to
remedies described in Section 44.8 . The WEF will be presumed
to be at the end of its useful life if no electricity is generated
for a continuous period of twelve (12) months.
43.2 Decommissioning shall include removal of wind turbines,
towers, buildings, cabling, electrical components, roads, and any
other associated facilities that could be reasonably considered to
create a hazard unless, at the end of the Wind Turbine or WEF's
useful life, as determined in accordance with Section 43.1, the
Applicant provides written evidence of plans for continued
beneficial use of these components of the WEF, and this
evidence is approved by the Planning Board.
43.3 Except as otherwise provided by Section 43.2, disturbed earth
shall be graded and re-seeded, unless the Participating
Landowner of the affected land requests otherwise in writing.
43.4 The Owner /operator shall post and maintain
decommissioning funds in an amount equal to Net
Decommissioning Costs; provided that at no point shall
decommissioning funds be less than one hundred percent (100%)
of Decommissioning Costs. The decommissioning funds shall be
posted and maintained with a bonding company or Federal or
State-chartered lending institution chosen by the Owner/operator
and Participating Landowners posting the financial security,
provided that the bonding company or lending institution is
authorized to conduct such business within the State and is
approved by the Town of Buckfield. No work can begin on the
WEF before the decommissioning bond is issued and approved.
43.5 An independent and certified Professional Engineer shall be
retained to estimate the total cost of decommissioning without
regard to salvage value of the equipment ("Decommissioning
Costs"), and the cost of decommissioning including the salvage
value of the equipment ("Net Decommissioning Costs"). Said
estimates shall be submitted to the Town of Buckfield after the
first year of operation and every other year thereafter.
43.6 Decommissioning funds may be in the form of a performance
bond, surety bond, letter of credit, or other form of financial
41
assurance as may be acceptable to the Town of Buckfield.
43.7 If the Owner/operator fails to complete decommissioning
within the period prescribed by Section 43.1, then the
Participating Landowner shall have an additional six (6) months to
complete decommissioning.
43.8 If neither the Owner/operator, nor the Participating
Landowner completes decommissioning within the periods
prescribed by Sections 43.1 and 43.7 the Wind Turbine or WEF
shall be deemed to be in violation of this Ordinance and the
Town of Buckfield may take such measures as necessary,
including court action, to ensure the completion of
decommissioning. The entry into and submission of evidence of
a Participating Landowner agreement to the Town of Buckfield
shall constitute agreement and consent of the Parties to the
agreement, their respective heirs, successors and assigns that the
Town of Buckfield may take such action as necessary to
implement the decommissioning plan.
43.9 The escrow agent shall release the decommissioning funds
when the Owner/operator has demonstrated and the Enforcement
Authority concurs that the decommissioning has been satisfactorily
completed, or upon written approval of the Town in order to
implement the decommissioning plan.
Section 44 - Complaints/ Violations/ Enforcement
44.1 General Standard It shall be unlawful for any person, firm or
corporation to violate or fail to comply with or take any action that
is contrary to the terms of this Ordinance, or any permit or
Operational License issued under this Ordinance, or cause another
to violate or fail to comply or take any action which is contrary to
the terms of this Ordinance or any permit or Operational License
issued under this Ordinance.
44.2 Enforcing Authority the Town of Buckfield Code
Enforcement Officer (CEO) will serve as the Enforcing Authority
for WEFs. The Enforcing Authority will:
44.2.1 Have the authority to conduct investigations, resolve
complaints, ensure compliance with and enforce standards,
and levy penalties if required.
44.2.2 Appoint qualified representatives to investigate
complaints. The reasonable costs and fees for the qualified
representative will be paid by the Owner/operator and may
42
include engineers, consultants, and other professionals.
44.2.3 Recommend to the Planning Board amendments to
this Ordinance deemed necessary to address health or
safety concerns not currently addressed in this Ordinance.
44.2.4 Have access to Town legal counsel as required.
44.3 Enforcement. Standards in this Ordinance will be enforced
through a series of enforcement options including but not limited
to: 1) Emergency shutdown; 2) 5 day response to serious
violations with a 10 day mitigation period; 3) 30 day complaint
resolution with a 30 day mitigation period; 4) financial penalties;
and 5) other remedies.
44.4 Emergencies and Emergency Shutdown
The Owner/operator shall be required to immediately cease
operations for the duration of any emergency. Emergency shall
mean a proven condition or situation caused by the WEF that
presents an imminent physical threat of danger to life or
significant threat to property. A WEF that is found to present an
imminent physical threat of danger to life or significant threat of
damage to property shall be immediately shut down and repaired
or otherwise made safe and certified so by a professional
engineer in good standing prior to resumption of operation. The
Town shall have the right to access all Wind Turbines to verify
conditions and/or repair progress with reasonable notice to the
Wind Turbine owner/operator. Within 24 hours of an occurrence
of a tower collapse, turbine failure, property damage or
contamination, fires, thrown blade or hub, severely injured Wind
Turbine worker or private person as a result specific to being a
WEF site, the Owner/operator shall notify the Town of the
occurrence and proposed remedial action. For this section
calling 911 is considered notifying the town.
44.5 Serious Violations of Standards
The Owner/operator of the WEF shall respond within five
business days to any complaint or complaints deemed by the
Enforcing Authority to have merit. Testing, paid for by the
Owner/operator, will commence within ten working days of the
complaint. Except as noted for interference with emergency
communications, the Owner/operator is responsible for mitigating
the problem within ten business days from the final determination
of any cause attributed to the operation of the WEF. Pursuant to
Section 38, interference with emergency communications must be
responded to in one day and mitigated within 2 days.
43
44.6 Other Violations
If the Enforcing Authority determines that a violation of the
Ordinance or the permit has occurred, and the violation is
determined neither to be an emergency pursuant to Section 44.4,
nor a serious violation pursuant to Section 44.5 , the Enforcing
Authority shall provide written notice to the Owner/operator
alleged to be in violation of this Ordinance or permit. The
Enforcing Authority and the involved parties shall engage in good
faith negotiations to resolve the alleged violation. Such
negotiations shall be conducted within thirty (30) days of the
written notice of violation. The Owner/operator shall pay for any
necessary testing if the Owner/operator is subsequently
determined to be in non-compliance. The Owner/operator is
responsible for mitigating the problem within 30 days from the
final determination of any cause attributed to the operation of the
WEF. Mitigation involving significant construction or physical
modification may have up to 90 days to be completed pursuant to
Section 30.
44.7 Penalties
Any Person or Applicant who fails to comply with any provision
of this Ordinance by failing to reach agreement with the
Enforcing Authority, or after the expiration of the mitigation
periods defined in Section 44.5 and Section 44.6 , shall be fined
at least five hundred dollars ($500) but no more than one
thousand dollars ($1000) for each WEF. A separate offense shall
be deemed to be committed on each day during which a violation
occurs or continues to occur.
44.8 Other Remedies
If the Owner/operator has not corrected the violation within the
timeframes contained in Section 44.5 or Section 44.6, the
Enforcing Authority shall be authorized to institute a civil action
to seek a court order to make the WEF cease operation until the
WEF can prove compliance with the standards of this Ordinance.
At the discretion of the Enforcing Authority, penalties and fines
may continue to accrue during this period. If after 6 months of
being ordered to cease operations the Owner/operator has not
demonstrated good faith and significant effort in resolving the
issue, the Enforcing Authority shall seek through a civil action to
have the court order the applicant / owner to initiate the
decommissioning procedure pursuant to Section 43
.
44.9 Identifying Violations and Registering Complaints
44.9.1 Pursuant to Section 40.1, the Owner/operator will
44
report to the Town all extraordinary events within 24 hours
of their occurrence.
44.9.2 For Wind Turbines the Town will maintain, at the
Owner/operator's expense, a system for recording and
investigating all complaints related to the WEF. The system
must be able to receive complaints 24 hours a day, 365 days
a year. A permanent record of all complaints, investigations
and outcomes will be maintained. The Owner/operator will
designate a representative and method to receive and
respond to complaints from the town 24 hours a day, 365
days a year. Complaints for WEFs will be referred to the
Code Enforcement Officer in a timely manner.
44.10 Sound Regulations Compliance. A WEF shall be
considered in violation of the conditional use permit unless the
applicant demonstrates that the project complies with all sound
level limits using the procedures specified in this ordinance.
Sound levels in excess of the limits established in this ordinance
shall be grounds for the Town of Buckfield to order immediate
shut down of all non-compliant Wind Turbine units.
44.10.1 A serious noise violation is defined as three (3)
verified noise complaints attributed to the operation of a
Wind Turbine within a period of one month or less with a
measurable sound level greater than 10 dBA above pre-
construction ambient sound levels or 50 dBC inside or at an
Occupied Building.
44.10.1.1 For serious violations the Owner/operator
will respond within five (5) days of the complaint.
Testing, if necessary, will be conducted by a qualified
independent acoustical engineer contracted by the
applicant and paid for by the Owner/operator thru the
Town to preserve the status of the engineer as a
qualified independent consultant. The Town will at
their discretion have the testing independently
reviewed. Testing will commence within ten working
days of the complaint. Testing will be conducted for a
minimum of a one-month period according to the
measurement standards and procedures in Sections 26
& 41. The Owner/operator is responsible for
mitigating the problem within ten (10) days from a
final determination of any cause attributed to the
operation of the Wind Turbine. Failure to mitigate the
problem will result in the Wind Turbine being declared
unsafe and emergency shutdown procedures will be
45
implemented per Sections 44.4, 44.8 & 44.10.1.
44.10.1.2 Noise violations not determined to be an
emergency pursuant to Section 44.4 & 44.10, or not
determined to be a serious violation pursuant to
Section 44.10.1.1, shall be managed pursuant to
Section 44.6. Testing, if necessary, will be paid for by
the Owner/operator and hired independently by the
Town. Testing will be conducted for an appropriate
period of time and conducted according to the
measurement standards and procedures set forth in
Section 41. The Owner/operator is responsible for
mitigating the problem within 30 days from a final
determination of any cause attributed to the
operation of the WEF. Mitigation involving
significant construction or physical modification may
have up to 90 days to be completed pursuant to
Section 36.
44.11 Shadow Flicker or Blade Reflection Compliance
44.11.1 A serious shadow flicker or blade reflection violation
is defined as three (3) days of significant nuisance shadow
flicker or blade reflection, in any one month falling on a
receptor that, if annualized, will be estimated to be more
than 10 hours per year. The predictive annualized
calculation shall assume clear weather, but take into
account seasonal tracking of the sun. For serious
violations the Owner/operator will respond within five (5)
days of the complaint. The Owner/operator is responsible
for mitigating the problem within ten (10) days from a final
determination of any cause attributed to the operation of the
WEF. Failure to mitigate the problem will result in the WEF
being declared unsafe and emergency shutdown procedures
will be implemented per Section 4 4 . 4 o r 4 4 . 8
44.11.1.1 Shadow flicker and blade reflection not
determined to be a serious violation pursuant to
Section 44.11.1, shall be managed pursuant to
Section 44.6. Field verification and modeling, if
necessary, will be paid for by the Owner/operator and
hired independently by the Town. The Owner/operator
is responsible for mitigating the problem within 30 days
from a final determination of any cause attributed to the
operation of the WEF. Mitigation involving significant
construction or physical modification may have up to 90
days to be completed pursuant to Section 36.
46
Section 45 - Definitions
Aerodynamic Sound -- a sound that is caused by the flow of air over
and past the blades of a WEF.
Ambient Sound -- ambient sound encompasses all sound present in a
given environment, being usually a composite of sounds from many
sources near and far. It includes intermittent sound events, such as,
from aircraft flying over, dogs barking, wind gusts, mobile farm or
construction machinery, and the occasional vehicle traveling along a
nearby road. The ambient sound also includes insect and other nearby
sounds from birds and animals or people. The nearby and transient
events are part of the ambient sound environment but are not to be
considered part of the long-term background sound.
American National Standards Institute (ANSI) -- is a private non-profit
organization that oversees the development of voluntary consensus standards for
products, services, processes, systems, and personnel in the United States. The
organization also coordinates U.S. standards with international standards so that
American products can be used worldwide. For example, standards make sure that
people who own cameras can find the film they need for that camera anywhere around
the globe.
Anemometer -- a device for measuring the speed and direction of the
wind.
Applicant -- the legal entity, which includes an individual or business
entity and their successors and assigns that seeks to secure a Permit or
Operating License under this Ordinance.
A-Weighted Sound Level (dBA) -- a measure of over-all sound pressure
level designed to reflect the response of the human ear, which does not
respond equally to all frequencies. It is used to describe sound in a
manner representative of the human ear's response. It reduces the
effects of the low with respect to the frequencies centered around
1000 Hz. The resultant sound level is said to be "A-weighted" and the
units are "dBA". Sound level meters have an A-weighting network for
measuring A-weighted sound levels (dBA) meeting the characteristics
and weighting specified in ANSI Specifications for Integrating
Averaging Sound Level Meters, S1.43-1997 for Type 1 instruments, and
be capable of accurate readings (corrections for internal sound and
microphone response permitted) at 20 dBA or lower. In this document
dBA means LAeq unless specified otherwise.
47
Background Sound (L90) -- refers to the sound level present at least
90% of the time. Background sounds are those heard during lulls in the
ambient sound environment. That is, when transient sounds from flora,
fauna, and wind are not present. Background sound levels vary during
different times of the day and night.
Blade Passage Frequency (BPF) -- the frequency at which the blades
of a turbine pass a particular point during each revolution (e.g. lowest
point or highest point in rotation) in terms of events per second. A
three bladed turbine rotating at 17 rpm would have a BPF of 1.4 Hz. [E.g.
((3 blades times 17rpm)/60 seconds per minute = 1.4 Hz BPF)]
Blade Reflection -- the intermittent reflection of the sun off the surface
of the blades of a Wind Turbine.
C-Weighted Sound Level (dBC) -- similar in concept to the A-Weighted
sound Level (dBA) but C-weighting does not de-emphasize the
frequencies below 1k Hz as A-weighting does. It is used for
measurements that must include the contribution of low frequencies in
a single number representing the entire frequency spectrum. Sound
level meters have a C-weighting network for measuring C-weighted
sound levels (dBC) meeting the characteristics and weighting specified
in ANSI S1.43-1997 Specifications for Integrating Averaging Sound
Level Meters for Type 1 instruments. In this document dBC means LCeq
unless specified otherwise.
Decibel (dB) -- a dimensionless unit which denotes the ratio between
two quantities that are proportional to power, energy or intensity. One
of these quantities is a designated reference by which all other
quantities of identical units are divided. The sound pressure level (Lp)
in decibels is equal to 10 times the logarithm (to the base 10) of the
ratio between the pressure squared divided by the reference pressure
squared. The reference pressure used in acoustics is 20 MicroPascals.
DEP Certification -- a certification issued by the Department of
Environmental Protection pursuant to Title 35-A M.R.S.A. §3456 for a
WEF that is subject to this Ordinance.
Emission -- sound energy that is emitted by a sound source (WEF) is
transmitted to a receiver (dwelling) where it is immitted (see
"immission).
Enforcing Authority -- the Code Enforcement Officer (CEO)
designated by the Town of Buckfield. The CEO is responsible for
48
enforcing the standards of this Ordinance after a permit is granted to a
WEF.
Frequency -- the number of oscillations or cycles per unit of time.
Acoustical frequency is usually expressed in units of Hertz (Hz) where
one Hz is equal to one cycle per second.
Good Utility Practice -- any of the practices, methods and acts with
respect to the safe operation of the Wind Turbine or WEF engaged in
or approved by a significant portion of the electric utility industry
and, in particular, those portions of the industry with experience in
the construction, operation and maintenance of wind turbines during
the relevant period; or any of the practices, methods and acts which,
in the exercise of reasonable judgment in light of the facts known at the
time the decision was made, could have been expected to accomplish the
desired result at a reasonable cost consistent with good business
practices, reliability and safety.
Height -- the total distance measured from the grade of the property
as existed prior to the construction of the wind energy system, facility,
tower, turbine or related facility at the base to its highest point. (See
Turbine Height definition below)
Hertz (Hz) -- frequency of sound expressed by cycles per second.
Horizontal Measurement -- distance between two points in relation to
the horizon.
Ice Throw -- accumulated ice buildup on the blades of a Wind Turbine
that is or can be thrown during normal spinning or rotation.
Immediate Family -- Spouse, Mother, Father, Brother, Sister, Mother In-law,
Father In-law, Brother In-law, Sister In-law also includes all steps and halves.
Immission -- sound immitted at a receiver (dwelling) is transmitted
from sound source (WEF) that emitted sound energy (see "emission").
Immission spectra imbalance -- the spectra are not in balance when
the C-weighted sound level is more than 20 dB greater than the A-
weighted sound level. For the purposes of this requirement, the A-
weighted sound level is defined as the long-term background sound
level (LA90) +5 dBA. The C-weighted sound level is defined as the
LCeq measured during the operation of the wind turbine operated so
as to result in its highest sound output.
Infra-Sound -- sound with energy in the frequency range of 0-20 Hz is
49
considered to be infra-sound. It is normally considered to not be
audible for most people unless in relatively high amplitude. However,
there is a wide range between the most sensitive and least sensitive
people to perception of sound and perception is not limited to stimulus
of the auditory senses. The most significant exterior sound induced
dwelling vibration occurs in the frequency range between 5 Hz and 50
Hz. Moreover, levels below the threshold of audibility can still cause
measurable resonances inside dwelling interiors.
LAeq -- a pressure level measurement parameter Full form LAeq is
"Equivalent to continous A-weighted sound pressure level".
Low Frequency Noise (LFN) -- refers to sounds with energy in the
lower frequency range of 20 to 200 Hz.
Measurement Point (MP) -- location where sound measurements are
taken such that no significant obstruction blocks sound from the site. The
Measurement Point should be located so as to not be near large objects
such as buildings and in the line-of-sight to the nearest turbines.
Proximity to large buildings or other structures should be twice the largest
dimension of the structure, if possible. Measurement Points should be at
quiet locations remote from street lights, transformers, street traffic,
flowing water and other local sound sources.
Measurement of Wind Speed -- is the speed of wind, the movement of air or
other gases in an atmosphere. It is a scalar quantity, the magnitude of the vector of
motion. Wind speed Measurment is found using an Anemometer.
Mechanical Noise -- sound produced as a byproduct of the operation of
the mechanical components of a WEF(s) such as the gearbox, generator
and transformers.
Meteorological Tower (MET Tower) -- a meteorological tower used for
the measurement of wind speed.
Mitigation Waiver -- a legally enforceable, written agreement between
the Applicant and a Non-participating Landowner in which the landowner
waives certain setback, sound or other protections afforded in the
Ordinance.
Nacelle -- the frame and housing at the top of the tower that encloses
the gearbox and generator.
Nameplate Capacity -- the electrical power rating of an individual wind
turbine as certified by the manufacturer and normally expressed in watts,
kilowatts (kW), or megawatts (mW)
50
Noise -- any unwanted sound. Not all noise needs to be excessively loud
to represent an annoyance or interference.
Non-participating Landowner -- any landowner other than a
Participating Landowner.
Notification Area -- the entire land base within two (2) miles, measured
horizontally from the Project Boundary. All landowners with any part of
their property within the notification area or residents living within the
notification area must be notified as specified in the Ordinance.
Occupied Building -- any structure that is, or is likely to be, occupied
by persons or livestock. This includes, but is not limited to dwellings,
places of business, places of worship, schools and barns.
Operational License -- a license or a license renewal issued by the
Planning Board to operate a WEF in accordance with this Ordinance.
Owner/operator -- the person or entity with legal ownership of the
WEF, including successors and assigns, that has the authority and
responsibility to operate the WEF on a day-to-day basis. An
Owner/operator must have the legal authority to represent and bind.
Participating Landowner -- one or more persons that hold title in fee
to the property on which the WEF is proposed to be located pursuant to
an agreement with the development Owner/operator.
Permitting Authority -- the Planning Board, designated as responsible
for conducting the review of WEF applications.
Person -- an individual, corporation, partnership, firm, organization or
other legal entity.
Project Boundary -- represented on a plot plan view by a continuous
line encompassing all WEF(s) and related equipment associated with
the WEF project.
Property Line -- the recognized and mapped property parcel boundary
line.
Qualified Independent Acoustical Consultant -- qualifications for
persons conducting baseline and other measurements and reviews
related to the application for a WEF or for enforcement actions against
an operating WEF include, at a minimum, full membership in the
Institute of Noise Control Engineers (INCE). The Independent
51
Qualified Acoustical Consultant can have no financial or other
connection to a WEF developer or related company.
Scenic or Special Resource -- a scenic resource of state or national
significance, as defined in Title 35-A M.R.S.A. §3451(9), any site
registered in the National Registry of Historic Places or a scenic or
special resource of local significance identified as such.
Sensitive Receptor -- places or structures intended for human
habitation, whether inhabited or not, public parks, state and federal
wildlife areas, the manicured areas of recreational establishments
designed for public use, including but not limited to golf courses,
campgrounds and other nonagricultural state or federal licensed
businesses. These areas are more likely to be sensitive to the exposure
of the sound, shadow or flicker, etc. generated by a WEF. These areas
include, but are not limited to, schools, daycare centers, elder care
facilities, hospitals, places of seated assemblage, non-agricultural
businesses and residences.
Setback -- the minimal allowable horizontal distance as measured from
the Project Boundary to a defined point (e.g. a property line or a road).
Setback Area -- the entire land base that falls within a specified setback.
Setback Distance -- the larger of one mile or 13 times the Turbine
Height, measured horizontally from the Project Boundary to the nearest
property line.
Shadow Flicker -- alternating changes in light intensity caused by the
movement of wind turbine blades casting shadows on the ground or a
stationary object.
Shadow Flicker Receptor -- any Occupied Building on a Non-
participating Landowner's property plus an additional 100 foot boundary
surrounding the exterior of the Occupied Building, the entire outdoor
public area surrounding schools, churches and public buildings, and
public roads with a posted speed limit greater than 25 mph.
Sight Line Representation -- a line depicted in profile extending from
an observer's eye to the lowest point of a viewed tower.
Sound -- a fluctuation of air pressure which is propagated as a wave
through air.
Sound Power -- the total sound energy radiated by a source per unit
time. The unit of measurement is the watt. Abbreviated as Lw. This
information is determined for the WEF manufacturer under laboratory
52
conditions specified by IEC 61400-11 and provided to the local
developer for use in computer model construction.
Sound Pressure -- the instantaneous difference between the actual
pressure produced by a sound wave and the average or barometric
pressure at a given point in space.
Sound Pressure Level (SPL) -- 20 times the logarithm, to the base 10,
of the ratio of the pressure of the sound measured to the reference
pressure, which is 20 micronewtons per square meter. In equation
form, sound pressure level in units of decibels is expressed as SPL
(dB) = 20 log p/pr.
Spectru m -- the description of a sound wave's resolution into its
components of frequency and amplitude.
Statistical Noise Levels -- sounds that vary in level over time, such as
road traffic noise and most community noise, are commonly described in
terms of the statistical exceedance levels LNA, where LNA is the A-
weighted sound level exceeded for N% of a given measurement
period. For example, L10 is the sound level exceeded for 10% of the
time. Of particular relevance, are: LA10 and LC10 the sound level
exceeded for 10% of the ten (10) minute interval. This is commonly
referred to as the average maximum sound level. LA90 and LC90 are
the A-weighted and C-weighted sound levels exceeded for 90% of the
ten (10) minute sample period. The L90 sound level is defined by ANSI
as the long-term background sound level (i.e. the sounds one hears in
the absence of the sound source under consideration and without short
term or near-by sounds from other sources), or simply the
"background level." Leq is the A or C-weighted equivalent sound level
(the "average" sound level). It is defined as the steady sound level
that contains the same amount of acoustical energy as the
corresponding time-varying sound.
Structure -- the total footprint of all of the physical attributes of the
entire WEF as defined in Title 38 M.R.S.A. § 482.
Tonal Sound, Tonality or Tonal Audibility -- . A sound for which the
sound pressure is a simple sinusoidal function of the time, and
characterized by its singleness of pitch. Tonal sound can be simple or
complex.
Tower -- the freestanding structure on which the wind measuring or
energy conversion system is mounted.
Turbine Height -- the distance measured from the surface of the tower
foundation to the highest point of any turbine rotor blade measured at
53
the highest arc of the blade.
Wind Energy Facility (WEF) -- equipment that converts and then
transfers energy from the wind into usable forms of electrical energy.
and includes all related and supporting items including but not limited
to all buildings, structures, electrical equipment, substations,
transmission lines, access roads, parking lots, areas to be stripped or
graded and areas to be landscaped or screened.
Wind Turbine -- a wind energy conversion system that converts wind
energy into electricity through the use of a WEF, and includes the
nacelle, rotor, tower and pad transformer if any.
54
Appendix A
TOWN OF BUCKFIELD
PRE-APPLICATION FORM FOR WIND ENERGY FACILITY
SECTION I - APPLICANT INFORMATION
1. Name of Property Owner:________________________________________________
Address:_____________________________________________________________
Telephone Number:_______________ Fax Number:__________________________
Email Address:________________________________________________________
2. Name of Applicant (if other than owner):____________________________________
Address:______________________________________________________________
Telephone Number:______________ Fax Number:__________________________
Email Address:________________________________________________________
3. If applicant is a corporation, state whether the corporation is licensed to do
business in Maine. Yes_____ No_____ If yes, attach a copy of evidence from the Secretary
of State's office.
4. Name of Applicant's authorized Representative: ______________________________
5. Name, address, and number of Registered Professional Engineer:
_____________________________________________________________________
_____________________________________________________________________
6. Address to which all correspondence from the Planning Board should be sent:
___________________________________________________________________________
_______________________________________________________________
7. What interest does the applicant have in the parcel to be developed? (e.g. option to purchase,
land purchase contract, lease, joint ownership, fee ownership, etc.)
___________________________________________________________________
8. Does the applicant have an interest in any property abutting the parcel to be developed? If so,
please state the nature of the interest (as above).
___________________________________________________________________
___________________________________________________________________
55
SECTION II - INFORMATION ON PARCEL TO BE DEVELOPED
1. Physical Location of Property: ____________________________________________
2. Deed Reference(s) (from Registry of Deeds): Book________ Page_________
Book________ Page_________
3. Location of Property (from Assessor's Office):
Map #_______Block # __________Parcel # _________
3. Current zoning of property (Shoreland, Floodplain, or none): _________________
4. Acreage of parcel to be developed:_______________________________________
5. Please include with this application form a copy of the tax map showing all properties that
will fall within the one mile setback area and their owners. Indicate the nature of any
easements that will be needed from any abutters:
___________________________________________________________________________
___________________________________________________________________________
_________________________________________________________
SECTION III - INFORMATION ON WIND ENERGY FACILITY
1. Proposed name of development:___________________________________________
2. Number of turbines:____________________________________________________
3. Name Plate Capacity of each turbine:_____________________________________
4. Anticipated date of construction: _________________________________________
5. Anticipated date of completion: __________________________________________
6. Does this development require extension of the public infrastructure? ____Yes ___No
(If yes, check any/all of the categories below that apply.)
_____________Roads
_____________Storm drainage
_____________Water lines
_____________Fire protection equipment
_____________Other (describe) __________________________________________
_____________Other (describe) __________________________________________
56
7. Does the applicant propose to dedicate to the public any streets, recreational areas, or
common lands?
Street(s)
_____ Yes _____ No Estimated Length _________
Recreational Area(s)
_____ Yes _____ No Estimated Acreage _________
Common Land(s)
_____ Yes _____ No Estimated Acreage _________
8. Is the applicant aware of state and local erosion and sedimentation control laws and
standards and does he/she understand the requirement to control storm water run-off
from the proposed development? ______Yes ______No
9. Include a detailed depiction of the location of the Wind Energy Facility to include all
associated equipment, turbine location, access roads, and buildings within one mile of the
facility.
To the best of my knowledge, all information submitted on and with this application is true and
correct.
__________________________________ _________________________________
Signature of Applicant
Date
57
Appendix B
Buckfield Planning Board
Site Visit Checklist
This checklist is intended for use by the Planning Board during the preliminary visit to the
proposed wind energy facility site. The information gathered here may be incomplete. The data
may be refined, revised or amended as the application process proceeds.
Name of Owner_________________________________________________________________
Name of Applicant (if
different)_____________________________________________________
Location of Site Vist_____________________________________________________________
Map #
Lot #
Parcel #
Date of Site Visit_____________
Contour Interval specified by
Board____________________
List of Persons Present During the Site Walk
__________________________________________
______________________________________________________________________________
______________________________________________________________________________
Condition of Existing Access Road:
Road Type: State
Town
Private
Gravel
Paved
Description: Width _______________
Speed Limit ______________
Condition:
Excellent
Good
Fair
Poor
Best Management Practices:
yes
no
Existing Traffic Load:
Light
Moderate
Heavy
Variable (explain)
______________________________________________________________________________
Curb Cuts: # of existing curb cuts _______________ # of proposed curb cuts
______________
Line of Sight for Proposed Cuts: ____________ ____________ (speed limit X 10 required)
58
Comments on Access Road:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Existing Conditions of Areas to be Developed:
Steep Slope(s)
_____
__________________________________________
Wet Area(s)
_____
__________________________________________
Wetland(s)
_____
__________________________________________
Stream(s)
_____
__________________________________________
Drainage Area(s)
_____
__________________________________________
Historic Feature(s)
_____
__________________________________________
Cemetery/ies
_____
__________________________________________
Archeological Feature(s)
_____
__________________________________________
Soil Type(s) (if known)
_____
__________________________________________
Exposed Ledge(s)
_____
__________________________________________
Other Geologic Feature(s)
_____
__________________________________________
Soil Erosion
_____
__________________________________________
Buffer Areas
_____
__________________________________________
Wildlife Habitat
_____
__________________________________________
Area(s) to be Preserved
_____
__________________________________________
Other Feature(s)
_____
__________________________________________
59
Prior Use/Historical Use
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Additional Comments:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
60
Appendix C
NOTICE
WIND ENERGY FACILITY
APPLICATION & SITE VISIT
Month Date, Year
XXXXXXXXXXX
XXXXXXXXXXXXXXXXXX
XXXXXXX, ME 04XXX
Dear XXXXXXXXX:
Where you are within the notification area of a proposed Wind Energy
Facility, proposed to be located on Tax Map XXX-XXX-XXX, please accept
this letter as notice that an application to develop has been received and a
Site Visit has been scheduled for the Planning Board:
Day, Month Date, Year
TIME
Location to meet for Site Visit
The purpose of the Site Visit is to provide the Planning Board with
information, which will assist them in the Wind Energy Facility approval
process.
Should you have any questions, please feel free to contact me.
Sincerely,
XXXXXXXXXXXXX
Chairman
Buckfield Planning Board
61
Appendix D
NOTICE
WIND ENERGY FACILITY
PUBLIC HEARING
Month Date, Year
XXXXXXXXXXX
XXXXXXXXXXXXXXXXXX
XXXXXXX, ME 04XXX
Dear XXXXXXXXX:
Where you either are a resident of or a property owner within the Town of
Buckfield, please accept this letter as notice that an application to develop
a Wind Energy Facility has been received and found to be complete by the
Buckfield Planning Board and a Public Hearing has been scheduled to
receive public comment:
Day, Month Date, Year
TIME
Location of meeting
The purpose of the Public Hearing is to provide the Planning Board with
information, which will assist them in the Wind Energy Facility approval
process.
Should you have any questions, please feel free to contact me.
Sincerely,
XXXXXXXXXXXXX
Chairman
Buckfield Planning Board
62
63
Appendix E
Application Fee:
$100.00
(This fee is simply an application fee the revenue from which will placed in the miscellaneous
administrative revenue account)
Permit Fee:
$500.00 per turbine
(This fee is deposited into a general ledger account and used to offset general office expenses
attributed to the WEF permit process)
License Fee: $250.00
(This fee is simply an application fee the revenue from which will placed in the miscellaneous
administrative revenue account)
License renewal fee: $100.00
(This fee is simply an application fee the revenue from which will placed in the miscellaneous
administrative revenue account)
As revised by the Board of Selectmen at a meeting duly called on _______________
Selectman 1
Selectman 2
Selectman 3