Town of Chebeague Island Zoning Ordinance (Code Ch. 17 Art. II)
Chebeague Island, Maine
· adopted 2024-06-08
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 63d13d796d19 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Town of Chebeague Island Code of Ordinances
Chapter 17 - Land Use & Planning
Article II - Zoning Districts & Enforcement
ZONING ORDINANCE
of the Town of Chebeague Island, Maine
Adopted by the Town Meeting:
July 1, 2007
Effective July 1, 2007
Amended: September 13, 2008
Amended: June 11, 2016
Amended: April 7, 2018
Amended: June 8, 2024
Attest:
Town Clerk
Seal:
2
i
TABLE OF CONTENTS
SECTION 100
TITLE, PURPOSE, DEFINITIONS
1
101
Title
1
102
Purpose
1
103
Authority
1
104
Intent
1
105
Land Use Requirements
1
106
Availability
2
107
Severability
2
108
Conflicts with Other Ordinances
2
109
Official Zoning Map (Appendix A)
2
110
Definitions
3
SECTION 200
ZONING DISTRICTS
28
201
Zoning Map and Districts
28
202
District Boundaries
28
202.1
28
202.2
28
203
District Objectives
28
203.1
28
203.2
28
203.3
29
204
District Regulations
29
204.1
Island Residential District (IR)
29
204.2
Island Business District (IB)
31
205
Lot Regulations
33
205.1
33
205.2
33
205.3
33
205.3A
33
205.3B
33
205.4
34
205.5
34
206
SITE PLAN REVIEW
34
206.1
Purpose
34
206.2
Applicability of Site Plan Review
34
206.2A
34
206.2B
34
206.2C
35
206.2D
35
206.2E
35
206.2F
35
ii
206.3
Review and Approval Authority
35
206.4
Classification of Projects
35
206.4A
35
206.4B
35
206.4C
35
206.5
Fees
36
206.5A
36
206.5B
36
206.5C
36
206.6
Review Procedures
37
206.6A
37
206.6B
37
206.6C
37
206.6D
38
206.6E
38
206.7
Site Plan Application Submission Requirements
42
206.7A
42
206.7B
44
206.8
Approval Standards and Criteria
50
206.8A
Utilization of the Site
50
206.8B
Traffic Access and Parking
51
206.8C
Accessway Location and Spacing Accessways must meet the
following standards
52
206.8D
Internal Vehicular Circulation
52
206.8E
Parking Layout and Design
53
206.8F
Pedestrian Circulation
54
206.8G
Stormwater Management
54
206.8H
Erosion Control
55
206.8I
Water Supply Provisions
56
206.8J
Sewage Disposal Provisions
56
206.8K
Utilities
56
206.8L
Groundwater Protection
56
206.8M
Water Quality Protection
57
206.8N
Capacity of the Applicant
57
206.8O
Historic and Archaeological Resources
57
206.8P
Floodplain Management
57
206.8Q
Exterior Lighting
57
206.8R
Buffering of Adjacent Uses
58
206.8S
Noise
58
206.8T
Storage of Materials
58
206.8U
Landscaping
58
206.8V
Building and Parking Placement
29
206.8W
Fire Protection
59
206.9
Limitation of Approval
59
206.10
Performance Guarantees
60
iii
206.10A
Performance Guarantee
60
206.10B
60
206.11
Submission of As-Built Plans
61
206.12
Minor Changes to Approved Plans
61
206.13
Appeal of Planning Board Actions
61
SECTION 300
AQUIFER PROTECTION
62
301
Purpose
62
302
Applicability
62
303
Regulations
62
SECTION 400
GENERAL REGULATIONS
64
401
Agriculture
64
401.1
64
401.2
64
401.3
64
401.4
64
402
Animals
64
402.1
65
402.2
65
402.3
65
402.4
65
402.5
65
403
Backlots
65
403.1
65
403.2
65
403.3
65
404
Campgrounds
65
404.1
65
404.2
66
405
Clustered and Traditional Residential Development
66
405.1
General
66
405.2
Clustered Residential Development
66
405.3
Traditional Residential Development
69
405.4
Net Residential Density
69
405.5
Criteria To Be Considered
69
405.6
Standards For Requiring Clustered Residential Development
69
405.7
Affordable Housing Developments
70
406
Multiplex Dwellings
73
407
Conversions
76
407.1
Accessory Apartments
76
407.2
Manor Houses
76
407.3
Condominium
77
408
Corner Clearance
77
iv
409
Day Care Centers and Nursery Schools
78
409.1
Purpose
78
409.2
Standards for Day Care Centers and Nursery Schools
78
410
Erosion and Sedimentation Control
79
410.1
79
411
Extraction of Earth Materials
79
411.1
79
411.2
Procedure
79
411.3
Standards
80
411.4
81
411.5
82
411.6
82
411.7
82
412
Guest Houses
82
413
Height Regulations
82
414
Home Occupations and Home-Based Occupations
83
414.1
83
414.2
84
415
Junk Yards
84
416
Manufactured Housing
84
417
Mobile Home Parks
86
417.1
86
417.2
Lot size, width and density
86
417.3
Lot setbacks
87
417.4
Lot coverage
87
417.5
Buffering
87
417.6
Roads
88
417.7
Utilities
89
417.8
Lighting
89
417.9
Storage
89
417.10
Administration
90
418
Outdoor Swimming Pools
90
419
Parking and Loading
92
419.1
Parking
92
419.2
92
419.3
Off-Street Loading
93
420
Private Airports and Private Heliports
93
421
Public Utilities
94
422
Residential Care Facilities
95
422.1
Review Procedures
96
422.2
Density and Living Area
96
422.3
Site and Building Requirements
96
422.4
Wastewater Disposal
98
422.5
Occupancy Guarantee and Conversions
98
422.6
Reserved Units
98
v
423
Street Construction
98
423.1
Private Streets
98
424
Sanitary Standards
99
425
Signs
100
425.1
Permits and Fees
100
425.2
General Regulations
101
425.3
Standards
103
425.4
Violations
104
425.5
Minimum Requirements
104
426
Soils
104
427
Telecommunication Facilities
105
427.1
Purpose
105
427.2
Exemptions
106
427.3
Submission Requirement
106
427.4
Space and Bulk Standards
109
427.5
Co-Location Requirements
110
427.6
Interest of Telecommunication Entity
110
427.7
Design Standards
110
427.8
Location
114
427.9
Additional Standards and Criteria
114
427.10
Waiver Provision
114
427.11
Amendments
115
427.12
Removal of Abandoned Wireless Communication Facility
115
427.13
Inspections
116
428
Temporary Sawmill Operations
117
429
Temporary Structures
117
430
Water Extraction and Storage
117
430.1
Conditions of Approval
117
430.2
The application together with site plan shall include the following
additional information
118
430.3
119
431
Water Quality Protection
119
432
Individual Private Campsites
120
SECTION 500
NON-CONFORMING USES, BUILDINGS, STRUCTURES
AND LOTS
121
501.1
Non-conforming Buildings
121
501.2
Non-conforming Uses
121
SECTION 600
ADMINISTRATIVE PROVISIONS
124
601
Code Enforcement Officer
124
602
Permits and Fees
124
602.1
Building Permit
125
602.2
Use Permit
125
602.3
Demolition Permits
125
vi
602.4
Excavation of Land and Removal of Earth Products
125
602.5
125
602.6
125
602.7
Belated Permits
126
603
Board of Adjustment and Appeals
126
603.1
126
603.2
The Board shall have the following powers and duties
127
603.3
Hearings
130
603.4
Appeal Procedure
131
603.5
Successive Appeals
132
603.6
Expiration Rights
132
603.7
Legal Actions
132
603.8
Fines
132
604
Savings Clause
133
605
Changes and Amendment
133
606
Contract Zoning
134
606.1
134
606.2
Standards
134
606.3
Conditions
134
606.4
Notice Requirements and Procedures
135
607
Violations
136
607.1
Warning
136
607.2
Enforcement Actions
136
607.3
Penalties
136
608
Outside Consulting Fees
136
609
Effective Date
138
Appendix A
Zoning Map
Appendix B
Flood Insurance Rate Map (FIRM)
Appendix C
Aquifer Protection Map
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
1
SECTION 100 TITLE, PURPOSE, DEFINITIONS
Sec. 101
Title
This ordinance shall be known and may be cited as the "Zoning Ordinance
of the Town of Chebeague Island, Maine."
Sec. 102
Purpose
The purpose of this Ordinance is to promote public health, safety, and
general welfare; to encourage the most appropriate use of land throughout
the Town of Chebeague Island (the "Town"); to promote traffic safety; to
provide safety from fire and other elements; to provide adequate light and
air; to prevent overcrowding of real estate; to provide a wholesome home
environment; to prevent housing development in unsanitary areas; to
provide an adequate street system; to promote the coordinated
development of unbuilt areas; to encourage the formation of community
units; and to provide an allotment of land area in new developments
sufficient for all public services.
This Ordinance reflects land use regulations imposed by the Town of
Chebeague Island. Additional Federal and/or State approvals, permits,
and/or licenses, including from the State of Maine Department of
Environmental Protection, United States Environmental Protection
Agency, and the United States Army Corps of Engineers, may be required.
Sec. 103
Authority
This ordinance is enacted pursuant to Article VIII, Second Part of the
Constitution of the State of Maine and the laws of the State of Maine,
including, but not limited to 30-A M.R.S. and 38 M.R.S. §435, et seq.
103.1
Table of Contents and Index
The Table of contents and index developed for this Ordinance are not a
part of the Ordinance and may be changed by the Planning Board to better
clarify the location of sections of the Code. Footnotes are not part of the
Ordinance. They are added for reference and commentary only.
Sec. 104
Intent
Unless otherwise specified, it is the intent of this ordinance that any use
not specifically allowed as a permitted use or a special exception use is
prohibited.
Sec. 105
Land Use Requirements
Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof
shall hereafter be erected, constructed, expanded, moved, or altered and no
new lot shall be created except in conformity with all of the regulations
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
2
herein specified for the district in which it is located, unless a variance is
granted.
Sec. 106
Availability
A certified copy of this Ordinance shall be filed with the Municipal Clerk
and shall be accessible to any member of the public. Copies shall be made
available to the public at reasonable cost at the expense of the person
making the request. Notice of availability of this Ordinance shall be
posted.
Sec. 107
Severability
Should any section or provision of this Ordinance be declared by the
courts to be invalid, such decision shall not invalidate any other section or
provision of the Ordinance.
Sec. 108
Conflicts with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent
with another provision of this Ordinance or of any other ordinance,
regulation or statute administered by the municipality, the more restrictive
provision shall control.
Sec. 109
Official Zoning Map (Appendix A)
The zoning map officially entitled "Town of Chebeague Island Zoning
Map" dated April 7, 2018 (Appendix A), and on file in the office of the
Town Clerk and filed with the Cumberland County Registry of Deeds is
hereby adopted as part of this ordinance. Regardless of the existence of
other printed copies of the zoning map, the said zoning map on file and as
officially adopted by the Town of Chebeague Island Town Meeting shall
be the final authority as to the location of zoning districts in the Town;
provided, however, that notwithstanding said zoning map, the entire
surface area of the following islands is contained within the Resource
Protection district: Bangs Island, Little Chebeague Island, Stockman
Island, Jewel Island, Little Jewel Island, West Brown Cow Island, Crow
Island, Broken Cove Island, Goosenest Island, Rogues Island, Upper
Green Islands, and Sand Island.
The Town of Chebeague Island Zoning Map divides the Town into the
following Shoreland Zoning Overly districts:
Shoreland Resource Protection Overlay (RP)
Resource Protection/Floodplain Overlay (RP/FP)
Limited Residential Overlay (LR)
Limited Commercial Overlay District (LC)
Commercial Fisheries/Maritime Activities Overlay (CFMA)
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
3
The Town of Chebeague Island Zoning Map shall be drawn at a scale of
not less than: 1 inch = 2000 feet. District boundaries shall be clearly
delineated and a legend indicating the symbols for each district shall be
placed on the map.
The Town of Chebeague Island Zoning Map shall be certified by the
attested signature of the Municipal Clerk and shall be located in the
municipal office. In the event the municipality does not have a municipal
office, the Municipal Clerk shall be the custodian of the map.
If amendments, in accordance with Section 605, are made in the district
boundaries or other matters in the Shoreland Districts portrayed on the
Official Zoning Map, such changes shall be made on the Official Zoning
Map within thirty (30) days after the amendment has been approved by the
Commissioner of the Department of Environmental Protection.
Sec. 110
Definitions
The word "person" includes an individual, corporation, governmental
agency, municipality, trust, estate, partnership, association, two or more
individuals having a joint or common interest, or other legal entity; the
present tense includes the future tense, the singular number includes the
plural, and the plural includes the singular; the word "shall" is mandatory,
and the word "may" is permissive; the words "used" or "occupied" include
the words "intended", "designed", or "arranged to be used or occupied",
the word "building" includes the word "structure", and the word
"dwelling" includes the word "residence", the word "lot" includes the
words "plot" or "parcel". Terms not defined shall have their customary
dictionary meaning. Other terms shall be defined as follows:
Accessory Building or Use
Accessory Building or Use shall mean subordinate building or use
customarily incidental to, and located on the same lot with, the main
building or use, including farm markets for the sale of agricultural and
similar products where at least 60% of the gross receipts are derived from
the sales of products produced or grown, or where some ingredients of
products are grown or produced, on the lot. Accessory uses, when
aggregated, shall not subordinate the principal use of the lot. A deck or
similar extension of the principal structure or a garage attached to the
principal structure by a roof or a common wall is considered part of the
principal structure.
Acre
An acre means a unit of area measure consisting of 43,560 square feet.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
4
Aggrieved party
Aggrieved Party shall mean an owner of land whose property is directly or
indirectly affected by the granting or denial of a permit or variance under
this Ordinance; a person whose land abuts land for which a permit or
variance has been granted; or any other person or group of persons who
have suffered particularized injury as a result of the granting or denial of
such permit or variance.
Agriculture
Agriculture shall mean the use of a tract of land for commercial purposes
for cultivation and the production of crops, truck gardening, nurseries or
greenhouses, or any allied industry, but exclusive of animal husbandry and
exclusive of private gardens less than 1/2 acre. Agriculture does not
include forest management and timber harvesting activities.
Airport, Private, Personal Use
Airport, Private, Personal Use shall mean an airstrip restricted to use by
the airstrip owner or lessee, and on an occasional basis, by his invited
guests.
Alternative Tower Structure
Alternative Tower Structure shall mean clock towers, bell steeples, light
poles and water towers, and similar alternative-design mounting structures
that camouflage or conceal the presence of antennas or towers.
Animal Husbandry
Animal Husbandry is the keeping of animals for commercial purposes,
including dairying, stock raising, poultry raising, and breeding.
Antenna
Antenna shall mean any structure or device used for the purpose of
wireless transmitting or receiving electromagnetic waves, digital signals,
analog signals, radio frequencies (excluding radar signals), wireless
telecommunication signals, including but not limited to directional
antennas, such as panels, microwave dishes, and satellite dishes, and
omni-directional antennas, such as whip antennas.
Antenna Array
Antenna Array shall mean a set of antennas for one carrier or service that
are placed on a mount at a given height, and spaced so as to avoid internal
interference.
Aquifer
Aquifer shall mean geologic formation composed of rock or sand and
gravel that stores and transmits significant quantities of recoverable water.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
5
Aquaculture
Aquaculture shall mean the growing or propagation of harvestable
freshwater, estuarine, or marine plant or animal species.
Aquifer Recharge Area
Aquifer Recharge Area shall mean land area composed of soil or rock that
is significantly permeable to allow infiltration and percolation of surface
water into an aquifer.
Auto Repair Service Garage
Auto Repair Service Garage shall mean a business establishment engaged
in general repair, engine rebuilding, parts replacement, rebuilding or
reconditioning of motor vehicles, body, frame or fender straightening and
repair, painting and undercoating, but where no engine fuels are sold.
Backlot
Backlot shall mean a lot which does not abut or front on a street, and
where access to the road is by a private right-of-way.
Basement
Basement shall mean any portion of a structure with a floor-to-ceiling
height of 6 feet or more and having more than 50% of its volume below
the existing ground level.
Bed and Breakfast Inn
Bed and Breakfast Inn shall mean single family dwelling in which the
resident or residents of the dwelling provide overnight lodging to paying
guests in a maximum of six guest bedrooms located within the dwelling or
permitted attached structures. Total sleeping accommodations shall be for
twelve (12) or fewer guests. Breakfast shall be the only meal served to
guests and shall be limited to overnight guests. Rentals for more than one
month in a calendar year to the same guest(s) are prohibited. The inn shall
function as a private home with house guests.
In addition to any other review required under this ordinance, a bed &
breakfast inn shall be considered a home occupation and shall be allowed
under the conditions and regulations applicable to home occupations
subject to Site Plan Review and approval by the Planning Board if
providing four or more guest bedrooms.
A structure shall not be used or occupied as a bed & breakfast inn until the
Town of Chebeague Island Fire Chief certifies the structure to be in
compliance with applicable sections of the most recent edition of the
NFPA 101 Life Safety Code including but not limited to Chapters 20 &
22, all necessary State approvals have been received, and a certificate of
use and occupancy has been issued by the Code Enforcement Officer.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
6
Boarding Care Facility
Boarding Care Facility shall mean a house or other place having more than
two residents which, for consideration, is maintained wholly or partly for
the purpose of boarding and caring for the residents. For the purposes of
the Town of Chebeague Island Zoning Ordinance, "boarding care facility"
shall include only those facilities which have been certified, or which will
be certified prior to the issuance of any use permits under this ordinance,
by the State of Maine as meeting all licensing and operation regulations
for boarding care facilities as promulgated by the Maine Department of
Health and Human Services.
Boarding kennel
Boarding kennel shall mean any place, building, tract of land or abode in
which more than three privately owned dogs or other pets, or both, are
kept at any one time for their owners in return for a fee.
Boat Launching Facility
Boat Launching Facility shall mean a facility designed primarily for the
launching and landing of watercraft, and which may include an access
ramp, docking area, and parking spaces for vehicles and trailers.
Building
Building shall mean any structure used or intended for supporting or
sheltering any use or occupancy.
Building Area
Building Area shall mean a total of areas taken on a horizontal plane at the
main finished grade level of the principal building and all accessory
buildings, exclusive of uncovered porches, terraces and steps. All
dimensions shall be measured between exterior faces of walls.
Building Height
Building Height shall mean the vertical distance between the mean
original (prior to construction) grade at the downhill side of the structure
and the highest point of the structure, excluding chimneys, steeples,
antennas, and similar appurtenances that have no floor area.
Bureau of Forestry
State of Maine Department of Agriculture, Conservation, and Forestry, Bureau of
Forestry.
Campground
Campground shall mean any area or tract of land to accommodate two (2)
or more parties in temporary living quarters, including, but not limited to
tents, recreational vehicles or other shelters.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
7
Canopy
Canopy shall mean the more or less continuous cover formed by tree
crowns in a wooded area.
Cellar
Cellar shall mean that portion of a building that is partly or completely
below grade and having at least one-half its height below grade.
Clinic
Clinic shall mean an office building used by members of the medical
professions for the diagnosis and outpatient treatment of human ailments.
Cluster System
Cluster System shall mean a subsurface sewage disposal system that
receives the effluent from two or more house units, individual homes, or
systems in excess of 400 gallons per day.
Clustered Residential Development
Cluster Residential Development shall mean a type of development where
building lots are smaller with lot frontages that are shorter than those in a
traditional subdivision, are grouped on certain portions of the site that are
best suited for development, and other areas remain open and free from
development. The homes may or may not be connected to the public
sewer system.
Co-location
Co-location shall mean the location of more than one telecommunications
facility (use) on a tower or alternative tower structure.
Commercial Fishing
Commercial Fishing shall mean activities directly related to commercial
fishing and those commercial activities commonly associated with or
supportive of commercial fishing, such as the manufacture or sale of ice,
bait and nets, and the sale, manufacture, installation or repair of boats,
engines and other equipment commonly used on boats.
Commercial Use
Commercial Use shall mean the use of lands, buildings, or structures,
other than a "home occupation," defined below, the intent and result of
which activity is the production of income from the buying and selling of
goods and/or services, exclusive of rental of residential buildings and/or
dwelling units.
Community Living Use
Community Living Use shall mean a state-approved, authorized, certified
or licensed group home, or intermediate care facility for mentally retarded
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
8
group home, for eight or fewer mentally handicapped or developmentally
disabled persons.
Condominium
Condominium shall mean a type of real estate ownership in which
individual units are owned separately and all of the rest of the property is
owned in common by all of the owners of individual units.
Congregate Housing
Congregate Housing shall mean residential housing consisting of private
living quarters, with or without cooking facilities, within which a
supportive services program is provided to functionally impaired residents
who have difficulty living independently without assistance, yet who do
not require the level of service available at a nursing home or boarding
care facility as herein defined. For the purposes of the Town of
Chebeague Island Zoning Ordinance, "congregate housing" shall include
only those facilities which have been certified, or which will be certified
prior to the issuance of any use permits under this Ordinance, by the State
of Maine as meeting all regulations governing the administration of
congregate housing services programs for the elderly.
Construction Operations
Construction Operations shall mean the use of a tract of land for the
storage of construction equipment and materials used in residential and
commercial construction. This use does not include the manufacturing or
processing of concrete and/or asphalt, or the extraction or processing of
earth materials.
Continuing Care Retirement Community
Continuing Care Retirement Community shall mean a residential care
facility, with or without guaranteed lifetime care, which provides any
combination of nursing home, boarding care, and congregate housing
services as defined herein. For the purposes of the Town of Chebeague
Island Zoning Ordinance, "continuing care retirement community" shall
include only those facilities which have been certified, or which will be
certified prior to the issuance of any use permits under this Ordinance, by
the State of Maine as meeting all applicable regulations for nursing homes,
boarding care facilities, and congregate housing as promulgated by the
Maine Department of Health and Human Services.
Coverage
Coverage shall mean that percentage of the lot area covered by the
building area.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
9
Day Care Home
Day Care Home shall mean a house or other place conducted or
maintained by anyone who provides, on a regular basis and for
consideration, care and protection which is required to be licensed by the
State, for three to twelve unrelated persons for any part of a day. Any
facility, the chief purpose of which is to provide education, shall not be
considered to be day care home.
In addition to any other review required under this ordinance, a day care
home shall be considered a home occupation and shall be allowed under
the conditions and regulations applicable to home occupations.
Day Care Center
Day Care Center shall mean a house or other place conducted or
maintained by anyone who provides, on a regular basis and for
consideration, care and protection for 13 or more children under 16 years
of age, except children related to the operator by blood, marriage or
adoption, who are unattended by parents or guardians, for any part of a
day, except that any facility the chief purpose of which is to provide
education, shall not be considered to be a day care center.
Development
Development shall mean a change in land use involving alteration of the
land, water or vegetation, or the addition or alteration of structures or other
construction not naturally occurring.
Dimensional requirements
Dimensional requirements shall mean numerical standards relating to
spatial relationships including but not limited to setback, lot area, shore
frontage and height.
Disability
Disability
shall
mean
any
disability,
infirmity,
malformation,
disfigurement, congenital defect or mental condition caused by bodily
injury, accident, disease, birth defect, environmental conditions or illness;
and also includes the physical or mental condition of a person which
constitutes a substantial handicap as determined by a physician or in the
case of mental handicap, by a psychiatrist or psychologist, as well as any
other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
Disruption of shoreline integrity
Disruption of shoreline integrity shall mean the alteration of the physical
shape, properties, or condition of a shoreline at any location by timber
harvesting and related activities. A shoreline where shoreline integrity has
been disrupted is recognized by compacted, scarified and/or rutted soil, an
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
10
abnormal channel or shoreline cross-section, and in the case of flowing
waters, a profile and character altered from natural conditions.
District
District shall mean a section or sections of the Town of Chebeague Island
for which regulations governing the use of buildings and premises, the size
of yards, and intensity of use are uniform.
Driveway
Driveway shall mean a vehicular access-way less than five hundred (500)
feet in length serving two single-family dwellings or one two-family
dwelling, or less.
Duplex
Duplex shall mean a building used or intended for residential use
containing two attached dwelling units.
Dwelling, Attached
Dwelling, Attached shall mean a dwelling which shares a common wall
with one or more other dwellings, and which has independent outside
access.
Dwelling, Detached
Dwelling, Detached shall mean a dwelling which is physically separate
from any other building, including manufactured housing which is
composed of two or more sections joined lengthwise, with the exception
of accessory buildings.
Dwelling Unit
Dwelling unit shall mean a group of rooms forming a habitable unit for
one family with facilities used or intended to be used for living, sleeping,
cooking and eating, the total floor area for which is not less than 600
square feet.
Emergency Operations
Emergency operations shall include operations conducted for the public
health, safety, or general welfare, such as protection of resources from
immediate destruction or loss, law enforcement, and operations to rescue
human beings and livestock and property from the threat of destruction or
injury.
Essential services
Essential services shall include gas, electrical, communication facilities,
steam, fuel or water supply, transmission, or distribution systems.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
11
Expansion of a Structure
Expansion of a Structure shall mean an increase in the footprint of a
structure, including all extensions such as, but not limited to: attached
decks, garages, porches and greenhouses.
Expansion of Use
Expansion of Use shall mean the addition of one or more months to a use's
operating season; or the use of more footprint of a structure or ground area
devoted to a particular use.
Family
Family shall mean one or more persons occupying a dwelling unit and
living as a single housekeeping unit, whether or not related to each other
by birth, adoption or marriage, but no unrelated group shall consist of
more than 5 persons, as distinguished from a group occupying a boarding
house, lodging house, or hotel.
Floodway
Floodway shall mean the channel of a river or other watercourse and
adjacent land areas that must be reserved in order to discharge the 100-
year flood without cumulatively increasing the water surface elevation by
more than one foot in height.
Floor Area
Floor Area shall mean the sum of the gross horizontal area of the floors of
a building, enclosed by exterior walls, excluding basement floor areas. All
dimensions shall be measured between interior faces of walls.
Footprint
The entire area of ground covered by the structure(s) on a lot, including but not
limited to cantilevered or similar overhanging extensions, as well as unenclosed
structures, such as patios and decks.
Foundation
Foundation shall mean the supporting substructure of a building or other
structure, excluding wooden sills and post supports, but including
basements, slabs, frostwalls, or other base consisting of concrete, block,
brick or similar material.
Freshwater Wetland
Freshwater Wetland shall mean freshwater swamps, marshes, bogs and
similar areas, other than forested wetlands, which are:
A.
Of ten (10) or more contiguous acres, or of less than ten (10)
contiguous acres and adjacent to a surface water body,
excluding any river or stream or brook, such that, in a natural
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
12
state, the combined surface area is in excess of ten (10) acres;
and
B.
Inundated or saturated by surface or groundwater at a
frequency and for a duration sufficient to support, and which
under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of
land that do not conform to the criteria of this subsection.
Gasoline Station
Gasoline Station shall mean a building or land that is used for the sale of
motor fuel, oil, and motor vehicle accessories, and servicing motor
vehicles, and which may include facilities for lubricating or washing, but
not including painting, major repairs, storage of vehicles or sales of
vehicles.
Grade
Grade shall mean a reference plane representing the mean original (prior
to construction) average of finished ground level adjoining the building at
all exterior walls.
Ground Cover
Ground Cover shall mean small plants, fallen leaves, needles and twigs,
and the partially decayed organic matter of the forest floor.
Groundwater
Groundwater shall mean all water found beneath the surface of the earth.
Guest House
Guest House shall mean a separate single-family dwelling intended for the
private use of the property owner and located on the same parcel as the
principal residential structure. A guest house shall not be leased or rented
to a non-family member.
Hazardous Waste
Hazardous Waste shall mean any substance or materials which are
gaseous, liquid, semi-solid or solid, and which are designated as hazardous
by the United States Environmental Protection Agency in regulations
which have been proposed or finally promulgated pursuant to the United
States Resource and Recovery Conservation Act, Public Law 94-580 and
amendments to the Act.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
13
Height of a Tower
The Height of a Tower shall mean, when referring to a tower, the distance
measured from ground level to the highest point on the tower, even if said
point is an antenna.
Heliports, Private, Personal Use
Heliports, Private, Personal Use shall mean a heliport restricted to use by
helipad owner or lessee, and on an occasional basis, by his invited guests.
Home Occupations
Home Occupations shall mean an occupation performed or conducted
within a dwelling or an accessory structure by the residents thereof, which:
A.
Is accessory to a residential use, and;
B.
Is clearly incidental and secondary to the residential use of the
dwelling unit, and;
C.
Does not change the character of the dwelling.
Home occupations may include, but are not necessarily limited to, arts and
crafts work, dressmaking, tutoring, music teaching, the use of a portion of
a dwelling as a bed and breakfast inn, a day care home, professional
offices such as those of a physician, dentist, lawyer, engineer, architect,
hairdresser, barber, real estate broker, insurance agent or accountant, or
similar uses.
Home-based Occupations
Home-based Occupation shall mean an occupation based or located within
a dwelling or an accessory structure which is performed or conducted at a
location or locations remote from the dwelling and which:
A.
Is accessory to a residential use; and
B.
Is clearly incidental and secondary to the residential use of the
dwelling unit; and
C.
Does not change the character of the dwelling.
Hotel
A building containing individual sleeping rooms or suites, each having a
private bathroom attached thereto, for the purpose of providing overnight
lodging facilities to the general public for compensation, and in which
access to all rooms is made through an inside office or lobby.
Impervious Surface
Structures and other man-made improvements to land and materials
covering the land which substantially reduce the infiltration of water.
Impervious surfaces shall include, but are not limited to, roofs, paved
areas, parking lots and driveways, regardless of surface materials.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
14
Increase in nonconformity of a structure
Any change in a structure or property which causes further deviation from
the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback
distance, increase in lot coverage, or increase in height of a structure.
Property changes or structure expansions which either meet the
dimensional standard or which cause no further increase in the linear
extent of nonconformance of the existing structure shall not be considered
to increase nonconformity. Included in this allowance are expansions
which in-fill irregularly shaped structures.
Industrial
The assembling, fabrication, finishing, manufacturing, packaging or
processing of goods, or the extraction of minerals.
Institutional
A non-profit or quasi-public use, or institution such as a church, library,
public or private school, hospital, or municipally owned or operated
building, structure or land used for public purposes.
Junk Yard
A yard, field, or other area used as a place for storage for more than thirty
days for three or more unserviceable, discarded, worn-out, or junk motor
vehicles. Also a yard, field, or other area used as a place of storage for
(a) discarded, worn-out, or junk plumbing, heating supplies, household
appliances or furniture and/or (b) discarded, scrapped, or junk lumber
and/or (c) old scrap copper, brass, rope, rags, batteries, paper trash, rubber
debris, waste, and/or scrap metal.
Landscaping Services
The business location of a person engaged in the commercial practice of
landscaping and who performs or furnishes the labor, and/or materials
necessary to maintain or beautify land by contract or consent of the land
owner, including, but not limited to; lawn care, planting and care of trees
and shrubs, and winter maintenance such as snow removal; but not
including retail sales of landscaping materials or tools.
Leachable Material
Liquid or solid materials including solid wastes, sludge, and agricultural
wastes that are capable of releasing water-borne contaminants into the
groundwater.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
15
Light Manufacturing
An establishment which is engaged in the mechanical transformation of
materials into new products, including the assembling of component parts,
and which has the following characteristics:
A.
Does not create any offensive smoke, dust, odor, or other
unhealthy or offensive air-borne discharge;
B.
Does not create any offensive noise or vibration;
C.
Does not include any outdoor storage of equipment or material;
and
D.
Is designed so that the external appearance of any building is
compatible with the neighborhood in which it is located.
Lodging House
A building used for temporary occupancy of individuals who are lodged
with or without meals and in which bathroom facilities may be shared.
Lot
A tract or parcel of land, in the same ownership, provided that parcels
located on opposite sides of a public or private road shall be considered
each a separate tract or parcel unless such road was established by the
owner of the parcels on both sides thereof.
Lot Area
Total horizontal area within the property lines excluding any part thereof
lying within the boundaries of a public street, or proposed public street
and excluding land below the normal high-water line of a water body or
upland edge of a wetland.
Lot Corner
A lot which has an interior angle of less than 135 degrees at the
intersection of two streets. A lot abutting a curved street shall be
considered a corner lot if the tangents to the curve at the points of
intersection of the side lot lines intersect at an interior angle less than 135
degrees.
Lot Frontage
For residential uses, the distance measured along a, street or public right-
of-way, for all other uses the distance measured along a Street.
Lot Line
Property line bounding a lot.
A.
Lot line, front: The lot line separating a lot from a street or
other right-of-way providing access to the lot.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
16
B.
Lot line, rear: The lot line opposite and most distant from the
front lot line. In the case of a triangular or otherwise
irregularly shaped lot, a line ten feet in length that is located
entirely within the lot and is parallel to and at a maximum
distance from the front lot line. On a lot that abuts more than
one street, the rear lot line shall be that line opposite the
shortest front lot line. Where all front lot lines are the same
length, the rear lot line shall be designated by the owner as part
of the first application for a building permit submitted for the
lot after the effective date of this section.
C.
Lot line, side: Any lot line other than a front or rear lot line.
Manufactured Housing
This term shall be as defined in 30-A M.R.S. § 4358, as amended from
time to time, and shall include both "mobile homes" and "modular homes"
as defined therein.
Marina
A business establishment having frontage on navigable water and, as its
principal use, providing for hire offshore mooring or docking facilities for
boats, and which may also provide accessory services such as boat and
related sales, boat repair and construction, indoor and outdoor storage of
boats and marine equipment, bait and tackle shops and marine fuel service
facilities.
Market Value
The estimated price a property will bring in the open market and under
prevailing market conditions in a sale between a willing seller and a
willing buyer, both conversant with the property and with prevailing
general price levels.
Mineral Exploration
Hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land
and which include reasonable measures to restore the land to its original
condition.
Mineral extraction
Any operation within any twelve (12) month period which removes more
than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel,
clay, rock, peat, or other like material from its natural location and to
transport the product removed, away from the extraction site.
Minimum Lot Width
The closest distance between the side lot lines of a lot.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
17
Mobile Home Park
Mobile home park means a parcel of land under unified ownership
approved by the municipality for the placement of 3 or more manufactured
homes.
Mobile Home Park Lot
Mobile home park lot means the area of land on which an individual home
is situated within a mobile home park and which is reserved for use by the
occupants of that home.
Multiplex
A multiplex shall mean an existing single-family dwelling converted to a
dwelling containing more than two attached dwelling units.
Municipal Uses or Buildings
Municipal uses or buildings shall mean any use or building maintained by
the Town of Chebeague Island.
Net Residential Acreage
Net residential acreage shall be determined by subtracting from gross
acreage available the following:
A.
15% for roads and parking.
B.
Land which is cut off from the main parcel by a road, existing
land uses, a utility easement or right-of-way or major stream so
as to serve as a major barrier to common use, or so that it is
isolated and unavailable for building purposes. (Final
determination by Planning Board.)
C.
Other areas which are difficult to develop in their natural state
because of topography, drainage or subsoil conditions.
Specific conditions include but are not limited to:
1. Slopes in excess of 20% sustained for 30,000 square feet or
more;
2. Wetlands as defined in the Federal Manual for Identifying
and Delineating Jurisdictional Wetlands dated 1/10/89 and
as amended from time to time;
3. Land shown to be in a 100 year flood zone as shown on the
Flood Insurance Rate Map (FIRM) (Appendix B);
4. Land in rights-of-way or easements, but not including land
in open space easements under Sec.406;
5. Resource Protection Districts.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
18
Non-conforming condition
Non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent
amendment took effect.
Non-conforming lot
A single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width
requirements of the district in which it is located.
Non-conforming structure
A structure which does not meet any one or more of the following
dimensional requirements; setback, height, lot coverage or footprint, but
which is allowed solely because it was in lawful existence at the time this
Ordinance or subsequent amendments took effect.
Non-conforming use
Use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to
remain solely because it was in lawful existence at the time this Ordinance
or subsequent amendments took effect.
Nursery School
A house or other place in which a person or combination of persons
maintains or otherwise carries out for consideration, during the day, a
regular program which cares for three or more children, provided that:
A.
No session conducted for the children is longer than 3 1/2
hours in length;
B
No more than 2 sessions are conducted per day;
C.
Each child in attendance at the nursery school attends only one
session per day; and
D.
No hot meal is served to the children.
The term does not include any facility operated as a day care center, a
summer camp established solely for recreational and educational purposes
or a public or private school in the nature of a kindergarten approved by
the Commissioner of Educational and Cultural Services, in accordance
with State statute as amended from time to time.
Outdoor Recreational Facility
A place designed and equipped primarily for the conduct of non-motorized
outdoor sports, leisure time activities, and other customary and usual
recreational activities, excluding boat launching facilities, amusement
parks, campgrounds, and which has the following characteristics:
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
19
A.
the total area of all buildings and structures, parking lots and
other non vegetated surfaces not exceed 10% of the total lot
area.
B.
exterior lighting shall be used for the purposes of ensuring safe
movement of people and vehicles, but not to provide
illumination for nighttime use of the outdoor activity
The above notwithstanding, nothing in this definition may be read to
prohibit the continued use by snowmobiles of existing snowmobile trails.
Parking Lot
An off-street area for more than three cars.
Parking Space
Off-street space used for the temporary location of one licensed motor
vehicle, which is at least nine feet wide and twenty-two feet long, not
including access driveway, and have direct access to a street or alley.
Permitted Use
A use specifically allowed in a zoning district, excluding non-conforming
uses and special exceptions.
Personal Services
Businesses providing services of a personal nature, such as barber,
hairdresser, beauty parlor, shoe repair, shoe shine, laundry, or
photographic studio.
Piggery
A building or portion thereof, or an enclosure, used or designed for the
keeping of more than five pigs more than six months old.
Practical Difficulty
Practical difficulty shall mean that the strict application of the ordinance to
the property precludes the ability of the petitioner to pursue a use
permitted in the zoning district in which the property is located and results
in significant economic injury to the petitioner. An applicant for a
practical difficulty variance must show compliance with the following
standards:
A.
The need for a variance is due to the unique circumstances of
the property and not to the general condition of the
neighborhood;
B.
The granting of a variance will not produce an undesirable
change in the character of the neighborhood and will not
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
20
unreasonably detrimentally affect the use or market value of
abutting properties;
C.
The practical difficulty is not the result of action taken by the
petitioner or a prior owner;
D.
No other feasible alternative to a variance is available to the
petitioner;
E.
The granting of a variance will not unreasonably adversely
affect the natural environment; and
F.
The property is not located in whole or in part within the
shoreland areas as described in 38 M.R.S. § 435.
For the purposes of this section, "dimensional standards" means and is
limited to ordinance provisions relating to lot coverage, frontage and
setback requirements.
Principal structure
A structure other than one which is used for purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
Principal use
A use other than one which is wholly incidental or accessory to another
use on the same lot.
Private Club
Building or use catering exclusively to club members and their guests for
recreational purposes, and not operated primarily for profit.
Private kennel
Any premises used for the harboring of more than three dogs under one
ownership that are more than 6 months old.
Privy
A pit in the ground into which human excrement is disposed.
Professional Office
A building singularly used for the individual or group practice of doctors,
lawyers, dentists, optometrists, architects, engineers, accountants, realtors,
insurance agents, or a building used for the branch office of a bank.
Public Facility
Any facility, including, but not limited to, buildings, property, recreation
areas, and roads, which are owned, leased, or otherwise operated, or
funded by a governmental body or public entity.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
21
Recent Flood Plain Soils
The following soils series as described and identified by the National
Cooperative Soil Survey:
Alluvial
Cornish
Charles
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational Facility
A recreational facility is a place designed and equipped for the conduct of
sports, leisure time activities, and other customary and usual recreational
activities, excluding boat launching facilities.
Recreational vehicle
A recreational vehicle is a vehicle or an attachment to a vehicle designed
to be towed, and designed for temporary sleeping or living quarters for
one or more persons, and which may include a pick-up camper, travel
trailer, tent trailer, camp trailer, and motor home. In order to be
considered as a vehicle and not as a structure, the unit must remain with its
tires on the ground, and must be registered with the State of Maine Bureau
of Motor Vehicles.
Religious Institution
Includes church, temple, parish house, convent, or seminary.
Replacement System
A subsurface wastewater disposal system intended to replace: (1) an
existing system which is either malfunctioning or being upgraded with no
significant change of design flow or use of the structure, or (2) any
existing overboard wastewater discharge.
Residential Care Facility
A facility defined herein as a boarding care facility, congregate housing,
community living use, or continuing care retirement facility.
Retail Store
Any shop or store for the retail sale of goods or personal services,
excluding any drive-up service, free-standing retail stand, gasoline service
and motor vehicle repair service, new and used car sales and service,
trailer and mobile home sales and service.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
22
Riding Stable
Any place at which horses or ponies are kept for hire either with or
without instructions in riding.
Rip-rap
Rocks, irregularly shaped, and at least six (6) inches in diameter, used for
erosion control and soil stabilization, typically used on ground slopes of
two (2) units horizontal to one (1) unit vertical or less.
Right-of-way
A legally created public or private right to pass over the property of
another. A private right-of-way is one that is created through a deed; a
public right-of-way may be created through a deed, through dedication
and acceptance, through laying out and taking or by public prescriptive
use. A street right-of-way shall include all land within the lines of the
street, whether improved or unimproved.
Road
A route or track consisting of a bed of exposed mineral soil, gravel,
asphalt, or other surfacing material constructed for or created by the
repeated passage of motorized vehicles excluding a driveway as defined.
School
A public or private kindergarten, elementary or secondary school,
approved as such by the State of Maine, including accessory uses thereto,
and providing instructional services to more than ten students.
Service drop
Any utility line extension which does not cross or run beneath any portion
of a water body provided that:
A.
in the case of electric service
1. the placement of wires and/or the installation of utility
poles is located entirely upon the premises of the customer
requesting service or upon a roadway right-of-way; and
2. the total length of the extension is less than one thousand
(1,000) feet.
B.
in the case of telephone service
1. the extension, regardless of length, will be made by the
installation of telephone wires to existing utility poles, or
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
23
2. the extension requiring the installation of new utility poles
or placement underground is less than one thousand (1,000)
feet in length.
Setback
The shortest horizontal distance between a lot line and any structure on a
lot. A street or other right-of-way, other than a driveway that serves no
more than two (2) residential lots, that is or may be utilized for motor
vehicle access or a street shown on a subdivision plan recorded in the
Registry of Deeds in which the Town of Cumberland (prior to July 1,
2007) or the Town of Chebeague Island (on or after July 1, 2007) has
reserved its right under the provisions of 23 M.R.S. § 3032 shall not be
included within a setback. Where a street or other right-of-way that is or
may be used for motor vehicle access, other than a driveway that serves no
more than two residential lots, is located within the boundaries of a
property, the required setback shall be measured from the nearest edge of
the street or right-of-way rather than the property line.
Signs
The display of a word or words, lettering, parts of letters, figures,
numerals, phrases, sentences, emblems, devices, pictures, trade names,
trade marks by which anything is made known, and/or combination of
these shall be deemed signs.
Special Exception
A use that would not be appropriate generally or without restriction
throughout a zoning district by which, if controlled as to number, areas,
location or relation to the neighborhood, would promote the public health,
safety, order, comfort, convenience, appearance, prosperity, or general
welfare. Such uses may be permitted in a zoning district by the Board of
Adjustment and Appeals, if specific provision for such special exceptions
is made in this Zoning Ordinance.
Story
That portion of a building including between the upper surface of a floor
and the upper surface of the floor or roof next above.
Stream
The confluence of two (2) perennial streams as depicted on the most
recent, highest resolution version of the national hydrography dataset
available from the United States Geological Survey on the website of the
United States Geological Survey or the national map to the point where
the stream becomes a river or where the stream meets the shoreland zone
of another water body or wetland. When a stream meets the shoreland
zone of a water body or wetland and a channel forms downstream of the
water body or wetland as an outlet, that channel is also a stream.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
24
Streets
Any vehicular right-of-way that is (1) an existing Town, state or county
road: (2) shown upon a subdivision plat approved by the Planning Board;
(3) accepted or laid out and taken through action of the Town Meeting;
(4) a private right-of-way approved by the Town in accordance with the
provisions of Section 423 of this Ordinance; or (5) a street shown on a
subdivision plan in which the Town of Cumberland (prior to July 1, 2007)
or the Town of Chebeague Island (on or after July 1, 2007) has reserved
rights under the provisions of 23 M.R.S. § 3032.
Structure
Anything built for the support, shelter, or enclosure of persons, animals,
goods, or property of any kind, together with anything constructed or
erected on or in the ground, exclusive of fences, and poles, wiring and
other aerial equipment normally associated with service drops as well as
guying and guy anchors. The term includes structures temporarily or
permanently located, such as decks, patios, and satellite dishes.
Structural Alteration:
Any change to a structure, other than simple replacement in the supporting
members, such as posts, columns, plates, joists, or girders.
Substantial Start
Completion of thirty (30) percent of a permitted structure or use measured
as a percentage of estimated total cost.
Subsurface Sewage Disposal System
Any system designed to dispose of waste or waste water on or beneath the
surface of the earth; includes, but is not limited to: septic tanks; disposal
fields; grandfathered cesspools; holding tanks; pretreatment filter, piping,
or any other fixture, mechanism, or apparatus used for those purposes;
does not include any discharge system licensed under 38 M.R.S. § 414,
any surface waste water disposal system, or any municipal or quasi-
municipal sewer or waste water treatment system.
Sustained Slope
A change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Telecommunications Facility
Telecommunications facility shall mean any structure, antenna, tower, or
other device which provides radio/television transmission, tele-
communications services, or any other spectrum-based transmissions/
receptions, together with the facility's associated antennas, microwave
dishes, horns, cables, wires, conduits, ducts, lightning rods, electronic and
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
25
other types of equipment for the transmission, receipt, distribution or
offering of such services.
Tower
Tower shall mean any structure, whether freestanding or in association
with a building or other permanent structure, that is designed and
constructed primarily for the purposes of supporting one or more antennas,
including self-supporting lattice towers, guy towers, or monopole towers.
The term includes radio and television transmission towers, microwave
towers, common-carrier towers, cellular telephone towers, alternative
tower structures, and similar structures.
Traditional Residential Development or Subdivision
A type of development where building lots are at least the minimum lot
size for the district in which it is located. A small portion of the lot may
remain open and free from development
Trailer
A vehicular portable structure designed as a temporary dwelling for travel
or recreational uses, not more than eight feet in body width and thirty-two
(32) feet in body length.
Tree
A woody perennial plant with a well-defined trunk(s) at least two (2)
inches in diameter at four and one half (4.5) feet above the ground, with a
more or less definite crown, and reaching a height of at least ten (10) feet
at maturity.
Tributary stream
Tributary stream means a channel between defined banks created by the
action of surface water, which is characterized by the lack of terrestrial
vegetation or by the presence of a bed, devoid of topsoil, containing
waterborne deposits or exposed soil, parent material or bedrock; and
which is connected hydrologically with other water bodies. "Tributary
stream" does not include rills or gullies forming because of accelerated
erosion in disturbed soils where the natural vegetation cover has been
removed by human activity.
Undue Hardship
For any sign or height variance or for any structure that is located on a lot
that is in whole or in part in a shoreland area, undue hardship shall mean:
A.
The land in question cannot yield a reasonable return unless a
variance is granted;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
26
B.
The need for a variance is due to the unique circumstances of
the property and not to the general conditions in the
neighborhood;
C.
The granting of a variance will not alter the essential character
of the locality; and
.D The hardship is not the result of action taken by the applicant
or a prior owner
Upland Edge
Upland edge of a wetland - the boundary between upland and wetland.
For purposes of a coastal wetland, this boundary is the line formed by the
landward limits of the salt tolerant vegetation and/or the Highest
Astronomical Tide level, including all areas affected by tidal action. For
purposes of a freshwater wetland, the upland edge is formed where the
soils are not saturated for a duration sufficient to support wetland
vegetation; or where the soils support the growth of wetland vegetation,
but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) feet) tall or taller.
[Note: The Highest Astronomical Tide is the elevation of the highest
observed astronomical tide over the current or most recent 19-year
National Tidal Datum Epoch (1983 to 2001]
Variance
A relaxation of the terms of this Zoning Ordinance where such variance
will not be contrary to the public interest and where, owing to conditions
peculiar to the property and not the result of the actions of the applicant, a
literal enforcement of the ordinance would result in unnecessary and
undue hardship. As used in this ordinance, a variance is authorized only
for height, area, and size of structure or size of setbacks and lot coverage
and/or the size of signs; establishment or expansion of a use otherwise
prohibited shall not be allowed by variance, nor shall a variance be
granted because of the presence of nonconformities in the zoning district
or uses in an adjoining zoning district.
For Shoreland Areas a variance shall also be authorized for percent of lot
coverage, lot width, lot area, setbacks, substantial expansions and water
frontage requirements.
Vegetation
All live trees, shrubs, and other plants including without limitation, trees
both over and under 4 inches in diameter, measured at 4 1/2 feet above
ground level.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
27
Velocity zone
An area of special flood hazard extending from offshore to the inland limit
of the primary frontal dune along an open coast and any other area subject
to high velocity wave action from storms or seismic sources.
Volume of a Structure
The volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water Crossing
Any project extending from one bank to the opposite bank of a river,
stream, tributary stream or wetland whether under, through, or over the
water or wetland. Such projects include but may not be limited to roads,
fords, bridges, culverts, water lines, sewer lines, and cables as well as
maintenance work on these crossings. This definition includes crossings
for timber harvesting equipment and related activities.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
28
SECTION 200 ZONING DISTRICTS
Sec. 201
Zoning Districts
The Town of Chebeague Island Zoning Map divides the Town into the
following districts:
Island Residential
(IR)
Island Business
(IB)
Sec. 202
District Boundaries
Where uncertainty exists with respect to the boundaries of the various
zones as shown on the official zoning map, the following rules shall apply:
202.1
Unless otherwise indicated, district boundaries shown within the lines of
roads, streams and transportation rights of way shall be deemed to follow
center lines. The abandonment or non-use of roads shall not affect the
location of such district boundaries. Development of property which is in
more than one zoning district shall be controlled by the classification of
the area to be used.
202.2
The Shoreland Zoning Overlay Districts depicted on the Official Zoning
Map shall be controlled by the "Shoreland Zoning Ordinance of
Chebeague Island" under a separate ordinance. Whenever there is a
conflict between this Ordinance and the Shoreland Zoning Ordinance the
more restrictive provision shall control.
Sec. 203
District Objectives
203.1
No building shall hereafter be erected or altered to house a greater number
of families, or to have a smaller setback, or to occupy a smaller lot, than is
specified herein for the district in which such building is located.
203.2
No use of land or buildings shall be allowed, nor shall any building be
erected or altered for a use, which use is not specifically allowed within
the district in which it is located, except as permitted under Section 500,
Nonconforming Uses.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
29
203.3
No parcel of land shall be subdivided into lots smaller than the minimum
lot size specified for the district in which the parcel is located, except as
allowed under Section 205, Lot Regulations.
Sec. 204
District Regulations
204.1
Island Residential District (IR)
A.
The following uses are permitted in the IR district:
1. Single family detached dwellings and duplex dwellings,1
2. Manufactured housing and mobile home parks as defined in
30-A M.R.S. § 4358(1);
3. Agriculture;
4. Uses related to commercial fishing, including storage and
repair of traps, seines, boats and other equipment, the
keeping and cooking of fish for sale at retail on the
premises, and fish processing as a home occupation;
5. Private Heliport for Personal Use, subject to Site Plan
Review and to the provisions of Section 420;
6. Antennas as defined in Sec. 110, subject to Site Plan
Review, and Section 427;
7. Uses and buildings accessory to those above.
B.
The following uses are allowed as special exceptions in the IR
district, requiring the approval of the Board of Adjustment and
Appeals:
1. Home occupations;
2. Above ground utility lines not located in a public way;
3. Private kennels;
4. Temporary sawmill, subject to the provisions of Sec. 428;
5. Excavation of lands, subject to the provisions of Sec. 411;
6. Animal husbandry;
7. Municipal buildings and uses, subject to Site Plan Review;
8. Accessory structures of public utilities, subject to Site Plan
Review;
9. Cemeteries, subject to Site Plan Review;
10. Private clubs, subject to Site Plan Review;
11. Religious institutions, subject to Site Plan Review;
12. Funeral homes, subject to Site Plan Review;
1 Accessory apartments and "manor houses" are also allowed in the IR district. They are defined and
regulated under Sec. 407: Conversions.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
30
13. Any use permitted in Island Business (IB), subject to Site
Plan Review;
14. Boat building, storage, or marina, subject to Site Plan
Review;
15. Private schools, subject to Site Plan Review;
16. Boarding kennels, subject to Site Plan Review;
17. Riding stable, subject to Site Plan Review;
18. Professional office building, subject to Site Plan Review;
19. Campgrounds;
20. Extraction and/or bulk storage of ground water subject to
the provisions of Sec. 430;
21. Day care centers and nursery schools, subject to the
provisions of Sec. 409 and Site Plan Review;
22. Uses and buildings accessory to those above.
C.
The following lot standards shall apply to all lots within the IR
district created on August 1, 1975 or later:
1. 1.5 acre minimum lot size;
2. In the case of duplex development, there shall be no less
than 0.94 acres of lot area per dwelling unit;
3. There shall be no less than 150 feet of lot frontage.
D.
The following minimum setbacks are required for all structures
in the IR district that are more than 1.5 acres in size or that
were created on or after August 1, 1975, except that sheds and
driveways are permitted to a minimum setback of fifteen (15)
feet from the side and rear lot lines:
1. Front: 55 feet;
2. Rear: 65 feet;
3. Side: 30 feet - combined width at least 65 feet;
4. Shoreland setbacks shall be as required by the Shoreland
Zoning Ordinance.
E.
The following minimum setbacks are required for all lots in the
IR district that are less than 1.5 acres and that were created on
or before July 31, 1975, except that sheds and driveways are
permitted to a minimum setback of fifteen (15) feet from the
side and rear lot lines:
1. Front: 25 feet;
2. Rear: 20 feet;
3. Side: 20 feet;
4. Shoreland setbacks shall be as required by the Shoreland
Zoning Ordinance.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
31
204.2
Island Business District (IB)
Site plan review and approval by the Planning Board is required for all
permitted uses and special exceptions, with the exception of single-family
dwellings, day care homes, bed & breakfast inns with three or fewer guest
bedrooms, home occupations, agriculture, and animal husbandry and uses
related to commercial fishing as allowed in 204.2.A.4 below.
A
The following uses are permitted within the IB District:
1. Single family detached dwellings and duplex dwellings;
2. Manufactured housing and mobile home parks as defined
in 30-A M.R.S. § 4358(1);
3. Retail stores;
4. Uses related to commercial fishing, including, but not
limited to, storage and repair of boats and equipment, the
keeping and cooking of fish for retail sale on the premises,
and fish processing as a home occupation;
5. Marinas, and other facilities for building and storage of
boats;
6. Personal services;
7. Private clubs;
8. Restaurants;
9. Private schools;
10. Municipal buildings and uses;
11. Religious institutions;
12. Private Heliport, Personal Use, subject to Site Plan
Review and to the provisions of Sec. 420;
13. Home occupations (special exception not required
notwithstanding Sec. 414);
14. Auto repair service garage;
15. Residential Care Facility;
16. Agriculture;
17. Public Facility;
18. Business/professional offices;
19. Uses and buildings accessory to those above.
B.
The following uses are allowed in the IB District as special
exceptions, requiring the approval of the Board of Adjustment
Appeals:
1. Accessory structures of public utilities;
2. Above ground utility lines not located in a public way;
3. Gasoline stations, and other facilities for the retail sale and
storage of petroleum products;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
32
4. Funeral homes;
5. Day care centers and nursery schools, subject to the
provisions of Sec. 409and Site Plan Review;
6. Residential care facilities,
7. Animal husbandry
8. Telecommunications Facilities, subject to Site Plan Review
and the provisions of Sec. 427,
9. Uses and buildings accessory to those above.
C
The following lot standards shall apply to all lots within the IB
District created on August 1, 1975 or later:
1. 1.5 acre minimum lot size for single family detached
dwellings;
2. In the case of duplex development, there shall be no less
than 0.94 acres of lot area per dwelling unit;
3. There shall be no less than 150 feet of lot frontage on a
public right-of-way.
D. The following setbacks are required for all structures in the IB
District that are more than 1.5 acres in size or that were created
on or after August 1, 1975, except that sheds and driveways are
permitted to a minimum setback of fifteen (15) feet from the
side and rear lot lines,.
1. Front: 55 feet;
2. Rear: 65 feet;
3. Side: 30 feet - combined width at least 65 feet;
4. Shoreland setbacks shall be as required by the Shoreland
Zoning Ordinance.
E.
The following minimum setbacks are required for all lots in the
IB district that are less than 1.5 acres and that were created on
or before July 31, 1975, except that sheds and driveways are
permitted to a minimum setback of fifteen (15) feet from the
side and rear lot lines:
1. Front: 25 feet;
2. Rear: 20 feet;
3. Side: 20 feet
4. Shoreland setbacks shall be as required by the Shoreland
Zoning Ordinance.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
33
Sec. 205
Lot Regulations
205.1
Lots which abut on more than one street shall provide the required front
setbacks along each and every public street on which that lot abuts, unless
a public street was created and built by someone other than the owner of
the lot or the subdivider of the land from which the lot was created after
the issuance of a building permit for the lot.
205.2
No structures, whether attached to the principal structure or not, and,
whether open or enclosed, including porches, carports, balconies, or
platforms above normal grade level, shall project beyond the setbacks
provided in this Ordinance.
205.3
In any district, notwithstanding limitations imposed by other provisions of
this Ordinance, a single lot of record at the effective date of adoption of
this Ordinance may be built upon subject to the following conditions:
A.
Such a lot must be in a separate and distinct ownership from
adjacent lots on said date. This provision shall apply even
though such lots fail to meet the minimum requirements for
area or width, or both, that are generally applicable in the
district, provided that yard dimensions of the lot shall conform
to the requirements for the district in which the lot is located.
Variance of setback requirements shall be obtained only
through action of the Board of Adjustment and Appeals.
B.
If two or more lots or combinations of lots and portions of lots
with continuous frontage are in single ownership at the time of
the passage or amendment of this Ordinance, and if all or part
of the lots do not meet the requirements for lot width and area
as established by this Ordinance, the lands involved shall be
considered to be an individual parcel for the purpose of this
Ordinance and no portion of said parcel shall be used or sold
which does not meet lot width and area requirements
established by this Ordinance, nor shall any division of the
parcel be made which leaves remaining any lot width or area
below the requirements stated in this Ordinance.
205.4
In the IR and IB districts, notwithstanding limitations imposed by other
provisions of this Ordinance, a lot containing at least 20,000 square feet,
as shown on a plan of a subdivision duly approved and recorded in the
Cumberland County Registry of Deeds on or before July 31, 1975, and
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
34
irrespective of whether said lot was in separate and distinct ownership
from adjacent lots on said date, may be built upon subject to the conditions
in sec 204.1.C, D, and E, or sec. 204.3.C, D, and E. [Amended Sept. 13
2008]
205.5
No lot shall be reduced in size by conveyance of a portion thereof unless
both of the following standards are met: (a) the remaining land is in
conformance with the minimum lot size provided for the zoning district in
which that land is located, and (b) unless the land conveyed is in
conformance with said minimum lot size, or is conveyed to the owner of
the abutting property.
Sec. 206
SITE PLAN REVIEW
206.1
Purpose
The site plan review provisions set forth in this section are intended to
protect the public health and safety, promote the general welfare of the
community, and conserve the environment by assuring that non-residential
construction is designed and developed in a manner which assures that
adequate provisions are made for traffic safety and access; emergency
access; water supply; sewage disposal; management of stormwater;
erosion; and sedimentation; protection of the groundwater; protection of
the environment; wildlife habitat; fisheries; and unique natural areas;
protection of historic and archaeological resources; minimizing the
adverse impacts on adjacent properties; and fitting the project
harmoniously into the fabric of the community.
206.2 Applicability of Site Plan Review
A person who has right, title, or interest in a parcel of land must obtain site
plan approval prior to commencing any of the following activities on the
parcel, obtaining a building or plumbing permit for the activities, or
undertaking any alteration or improvement of the site including grubbing
or grading:
A.
The construction or placement of any new building or structure
for a use identified in Sec. 204 District Regulations, or the
construction,
placement,
or
alteration
of
any
telecommunications facility.
B.
The expansion of an existing nonresidential building or
structure including accessory buildings that increases the total
floor area.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
35
C.
The conversion of an existing building, in whole or in part,
from a residential use to any non-residential use included in
Section 204 District Regulations of this Ordinance.
D.
The establishment of a new use even if no buildings or
structures are proposed, including uses such as gravel pits,
cemeteries,
golf
courses,
and
other
non-structural
nonresidential uses.
E.
The conversion of an existing nonresidential use, in whole or in
part, to another nonresidential use if the new use changes the
basic nature of the existing use such that it increases the
intensity of on - or off-site impacts of the use subject to the
standards and criteria of site plan review described in Section
206.8.
F.
The construction or expansion of paved areas or other
impervious surfaces, including access drives, and parking lots.
206.3 Review and Approval Authority
The Planning Board is authorized to review and act on site plans
for both minor developments and major developments as defined
below. In considering site plans under this section, the Planning
Board may act to approve, disapprove, or approve the project with
conditions as are authorized by these provisions.
206.4 Classification of Projects
A.
The Town Administrator shall classify each project as a major
or minor development. Minor developments are smaller scale,
less complex projects for which a less complex review process
is adequate to protect the Town's interest. Major developments
are larger, more complex projects for which a more detailed
review process and additional information are necessary.
B.
Minor developments shall include those projects involving the
construction or addition of fewer than five thousand (5,000)
square feet of gross nonresidential floor area or projects
involving only the installation of impervious surfaces, or
projects involving the conversion of existing buildings or
structures from one use to another without enlargement of the
gross floor area.
C.
Major developments shall include projects involving the
construction or addition of five thousand (5,000) or more
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
36
square feet of gross nonresidential floor area, or other projects
requiring review which are not classified as minor
developments.
206.5 Fees
A.
Application Fee
Any application for minor or major site plan review must be
accompanied by an application fee set by order of the Board of
Selectmen. This fee is intended to cover the cost of the
municipality's administrative processing of the application,
including notification, advertising, mailings, staff review, and
similar costs. The fee shall not be refundable.
B.
Site Inventory and Analysis Fees
All site plan applications for major developments are subject to
Site Inventory and Analysis review. Prior to submitting a site
inventory and analysis for a major development, the applicant
must pay a processing fee in an amount as set by order of the
Board of Selectmen. The fee is intended to cover the cost of
the municipality's administrative processing of the application,
including notification, advertising, mailings, staff review, and
similar costs.
C.
Technical Review Fee
In addition to the application fee, the applicant for site plan
review must also pay a technical review fee to defray the
municipality's legal and technical costs of the application
review. This fee must be paid to the municipality and shall be
deposited in an escrow account, which shall be separate and
distinct from all other municipal accounts. The application will
be considered incomplete until evidence of payment of this fee
is submitted to the Planning Board. The Board may reduce the
amount of the technical review fee or eliminate the fee if it
determines that the scale or nature of the project will require
little or no outside review.
The technical review fee may be used by the Planning Board to
pay reasonable costs incurred by the Board, at its discretion,
which relate directly to the review of the application pursuant
to the review criteria. Such services may include, but need not
be limited to, consulting engineering or other professional fees,
attorney fees, recording fees, and appraisal fees. The
municipality shall provide the applicant, upon written request,
with an accounting of his or her account and shall refund all of
the remaining monies, in the account after the payment by
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
37
Town of all costs and services related to the review, provided,
however, that where the cost of technical reviews exceeds the
amount of monies in the escrow account the applicant shall pay
to the Town prior to the issuance of any building permit the
amount by which the technical reviews exceed the amount of
monies in the escrow account.
206.6
Review Procedures
The Planning Board shall use the following procedures in reviewing
applications for site plan review.
A.
Pre-application
Prior to submitting a formal application, the applicant or
his/her representative may request a pre application conference
with the Planning Board. The pre application conference shall
be informal and informational in nature. There shall be no fee
for a pre application review, and such review shall not cause
the plan or any related application to be a pending application
or proceeding under 1 M.R.S. § 302. No decisions on the
substance of the plan shall be made at the pre-application
conference.
B.
Purpose
1. Allow the Board to understand the nature of the proposed
use and the issues involved in the proposal,
2. Allow the applicant to understand the development review
process and required submissions,
3. Identify issues that need to be addressed in future
submissions, and
4. Make the applicant aware of any opportunities for
coordinating the development with community policies,
programs, or facilities.
C.
Site Inspection
The Board may schedule a site inspection if deemed necessary,
and offer guidance on any requests for waivers and variations
from the submission requirements.
A written notice for such site inspections shall be posted at the
Town Office and published at least once in a newspaper of
general circulation in the community, and the date of the
publication shall be at least seven (7) days prior to the site
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
38
inspection. Notice shall also be sent by first class mail to all
property owners of record within five hundred (500) feet of the
parcel on which the proposed development is located.
D.
Information Required
There are no formal submission requirements for a pre
application conference. However, the applicant should be
prepared to discuss the following with the Board.
1. The proposed site, including its location, size, and general
characteristics,
2. The nature of the proposed use and potential development,
3. Any issues or questions about existing municipal
regulations and their applicability to project, and
4. Any
requests
for
waivers
from
the
submission
requirements.
E.
Application Submission and Review Procedures
1. Minor Development Submission Procedure
Projects classified as minor developments shall go through
a simplified review process. Applicants shall not be
required to submit a site inventory and analysis and may
proceed directly to preparing and submitting a formal site
plan review application including the development plan and
supporting
documentation
meeting
the
submission
requirements. This material must be submitted to the
Planning Board. The Planning Board shall have the
authority to waive any review standards if it finds they are
inapplicable to a minor site plan application.
2. Major Development Submission Procedure
a.
Applicants with projects classified as major
developments must submit a site inventory and
analysis for Planning Board review. This review
must be completed prior to the preparation and
submission of a site plan review application and
supporting documentation. The Board shall review
the site inventory and analysis with the applicant
and shall authorize the submission of the formal
application when the site analysis is complete. The
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
39
site inventory and analysis must be submitted to the
Planner.
b.
Upon receipt of a site inventory and analysis, the
Town Administrator shall give a dated receipt to the
applicant. Within thirty (30) days of the receipt of a
site inventory and analysis submission for a major
development, the Town Administrator shall review
the material and determine whether or not the
submission is complete. If the submission is
determined to be incomplete, the applicant shall be
notified in writing of this finding, which shall
specify the additional material required to make the
submission complete, and shall advise the applicant
that the application will not be reviewed until the
additional information is submitted. When the
submission is determined to be complete, the
applicant shall be notified in writing of this finding
and the item placed on the agenda for informal
review by the Board.
c.
The Planning Board may hold an on-site inspection
of the site to review the existing conditions, field
verify the information submitted and investigate the
development proposal. The Board may schedule
this visit either before or after the first meeting at
which the application is considered. A written
notice for such site inspections shall be posted at the
Town Office and published at least once in a
newspaper of general circulation in the community,
and the date of the publication shall be at least
seven (7) days prior to the site inspection. Notice
shall also be sent by first class mail to all property
owners of record within five hundred (500) feet of
the parcel on which the proposed development is
located.
d.
Within forty-five (45) days of the finding that the
site inventory and analysis submission is complete,
the Board shall complete its review of the
submission and notify the applicant in writing of its
findings.
3. Site
Inventory
and
Analysis
Review
Procedure
(Major developments only)
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
40
The review of the site inventory and analysis shall be
informational and shall not result in any formal approval or
disapproval of the project by the Planning Board. The
parties identified in section 206.6.E.4.a below shall be
notified of the time, date, and place of the Board meeting at
which the site inventory and analysis will be reviewed.
The Board shall review the submission to determine if the
information provides a clear understanding of the site and
identifies opportunities and constraints that help determine
how it should be used and developed. The outcome of the
review process shall be a determination by the Board of the
issues and constraints that must be addressed in the formal
site plan review application. The Board shall also act on
any requests for waivers.
4. Site Plan Application Review Procedure
(Minor and Major Developments)
a.
Upon receipt of a formal site plan review
application, the Town Administrator shall give a
dated receipt to the applicant and shall notify by
first-class mail all property owners of record within
five hundred (500) feet of the parcel on which the
proposed
development
is
located.
The
determination of the names and owners shall be
based upon the records of the local Assessor's
records. The notice shall specify the location of the
proposed development and provide a general
description of the project. Written notice of the
pending application shall be mailed to a newspaper
or newspapers in general circulation and posted at
the Town Office.
b.
Within thirty (30) days of the receipt of a formal
development review application, the Planning
Board shall review the material and determine
whether or not the submission is complete. If the
application is determined to be incomplete, the
applicant shall be notified in writing of this finding,
which shall specify the additional materials required
to make the application complete, and shall advise
the applicant that the application will not be
reviewed until the additional information is
submitted. Failure to submit the additional
information within six months shall be deemed an
abandonment of the application.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
41
c.
As soon as the application is determined to be
complete, the applicant shall be notified in writing
of this finding. The notification requirements of
subsection (4) below shall be met and the item
placed on the agenda for substantive review within
thirty (30) days of this finding.
d.
The Planning Board shall give written notice of the
date, time, and place of the public hearing at which
the application will be considered, to the applicant,
and to those who received notice in section
206.6.E.4.a above. A notice of the hearing shall be
posted at the Town Office and published in a
newspaper of general circulation in the community
at least once, the date of publication shall be at least
seven (7) days prior to the hearing.
e.
Failure of any property owner to receive notice
under this section for any reason shall not
necessitate a new hearing and shall not invalidate
any action by the Planning Board.
5. Procedure for Public Hearing of an Application
(Minor and Major Developments)
a.
The purpose of the public hearing is to allow the
applicant and affected property owners to provide
information as part of the record that the Board will
use in considering its action on the application.
Testimony presented at the hearing should be
related to factual information about the application
and
related
submissions
and
the
project's
compliance with the review standards and other
regulations and requirements of this ordinance or
other municipal ordinances.
b.
The Chair shall provide the applicant or his/her
representative with an opportunity to make any
statement or presentations at the beginning of the
hearing. The Chair shall then allow the members of
the Board to ask questions of the applicant and for
the applicant to answer those questions. Following
Board questions, the Chair shall open the public
hearing to the public for statements, information
submissions, or questions about the project. At the
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
42
close of the public comment period, the Chair shall
afford the applicant an opportunity to answer any
questions raised by the public, rebut any statements
or information submitted, and cross-examine
anyone offering testimony on the application. The
Chair may allow the applicant this opportunity after
each member of the public testifies if that is deemed
to be desirable. At the conclusion of the applicant's
response, the hearing shall be closed.
6. Procedure
for
Final
Action
on
an
Application
(Minor and Major Developments)
a.
The Planning Board shall take final action on said
application within thirty (30) days of the public
hearing. The Board shall act to deny, to approve, or
to approve the application with conditions. The
Board may impose such conditions as are deemed
advisable to assure compliance with the standards
of approval and performance standards of this
ordinance.
b.
In issuing its decision, the Board shall make written
findings of fact that establish whether the proposed
development does or does not meet the standards of
approval,
performance
standards,
and
other
requirements of this Ordinance.
c.
The Board shall notify the applicant, of the action of
the Board, including the findings of fact and any
conditions of approval.
7. Time Limitations
All time limits provided for in this section may be extended
by mutual agreement of the applicant and Board.
206.7
Site Plan Application Submission Requirements
A.
Submission Requirements for Site Inventory and Analysis
(Major developments only)
The site inventory and analysis is intended to provide both the
applicant and the Planning Board with a better understanding
of the site and the opportunities and constraints imposed on its
use by both the natural and built environment. It is anticipated
that this analysis will result in a development plan that reflects
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
43
the conditions of the site; those areas most suitable for the
proposed use will be utilized, while those that are not suitable
or present significant constraints will be avoided to the
maximum extent possible. Therefore, the submission
requirements provide that the applicant submit basic
information about the site and an analysis of that information.
All submission requirements shall be submitted to the Town
Administrator at least twenty-one (21) days prior to the
meeting at which it is to be considered. If the application is
found to be deficient all additional information must be
submitted no later fourteen (14) days prior to the meeting at
which it is to be considered. The site inventory and analysis
submission must contain, at a minimum, the following
information:
1. The names, addresses, and phone numbers of the record
owner and the applicant.
2. The names and addresses of all consultants working on the
project.
3. Evidence of right, title, or interest in the property.
4. Evidence of payment of the site inventory and analysis fee.
5. Eleven (11) copies of an accurate scale inventory plan of
the parcel at a scale of not more than one hundred (100)
feet to the inch showing as a minimum
a.
the name of the development, north arrow, date and
scale;
b.
the boundaries of the parcel;
c.
the relationship of the site to the surrounding area;
d.
the topography of the site at an appropriate contour
interval depending on the nature of the use and
character of the site;
e.
the major natural features of the site and within two
hundred (200) feet of the site, including wetlands,
streams, ponds, floodplains, groundwater aquifers,
significant wildlife habitats or other important
natural features;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
44
f.
existing buildings, structures, or other
improvements on the site;
g.
existing restrictions or easements on the site;
h.
the location and size of existing utilities or
improvements servicing the site;
i.
a class D medium intensity soil survey; and
j.
if a private sewage disposal system will be used,
a suitable location for a system.
6. Eleven (11)) copies of a narrative describing the existing
conditions of the site, the proposed use and the constraints
or opportunities created by the site. This submission
should include any traffic studies, utility studies, market
studies or other preliminary work that will assist the
Planning Board in understanding the site and the proposed
use.
7. Eleven (11) copies of any requests for waivers from the
submission requirements for the site plan review
application.
B
Submission Requirements for Site Plan Review Applications
(Minor and Major developments)
Applications for site plan review must be submitted on
application forms provided by the Town. The complete
application form, evidence of payment of the required fees, and
the required plans and related information must be submitted to
the Town Administrator. Applications for major developments
will not be received until the review of the site inventory and
analysis is completed. All submission requirements shall be
submitted to the Town Administrator at least twenty-one (21)
days prior to the meeting at which it is to be considered. If the
application is found to be deficient all additional information
must be submitted no later fourteen (14) days prior to the
meeting at which it is to be considered. The submission must
contain at least the exhibits and information specified in this
section, unless specifically waived in writing.
1. All applications for site plan review must contain the
following information:
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
45
a.
a fully executed and signed copy of the application
for development review;
b.
evidence of payment of the application and
technical review fees; and
c.
eleven (11) copies of written materials plus fifteen
(15) sets of maps or drawings containing the
information listed in Sections 206.7.B.2, 3, 4, 5, and
6 below. The maps or drawings must be at a scale
sufficient to allow review of the items listed under
approval criteria: forty (40) feet to the inch is
preferred, but in no case shall the scale exceed one
hundred (100) feet to the inch for that portion of the
tract of land being proposed for development.
2. General Information (Minor and Major developments)
a.
record owner's name, address, and phone number
and applicant's name, address and phone number, if
different;
b.
the location of all required building setbacks, yards,
and buffers;
c.
names and addresses of all property owners within
five hundred (500) feet of any and all property
boundaries;
d.
sketch map showing general location of the site
within the municipality based upon a reduction of
the tax maps;
e.
boundaries of all contiguous property under the
total or partial control of the owner or applicant
regardless of whether all or part is being developed
at this time;
f.
the tax map and lot number of the parcel or parcels
on which the project is to be located;
g.
a copy of the deed to the property, an option to
purchase the property or other documentation to
demonstrate right, title or interest in the property on
the part of the applicant;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
46
h.
the name, registration number and seal of the person
who prepared the plan, if applicable; and
i.
evidence of the applicant's technical and financial
capability to carry out the project as proposed;
3. Existing Conditions Plan (Minor and Major developments)
a.
zoning classification(s), including overlay districts,
of the property and the location of zoning district
boundaries if the property is located in two (2) or
more zoning districts or abuts a different district;
b.
the bearings and length of all property lines of the
property to be developed and the source of this
information. The Planning Board may waive this
requirement of a boundary survey when sufficient
information is available to establish, on the ground,
all property boundaries;
c.
location and size of any existing culverts and drains,
on-site
sewage
disposal
systems,
wells,
underground tanks or installations, and power and
telephone lines and poles on the property to be
developed and on abutting streets or land that may
serve the development and an assessment of their
adequacy and condition to meet the needs of the
proposed use. Appropriate elevations must be
provided as necessary to determine the direction of
flow;
d.
location, names, and present widths of existing
public and/ or private streets and rights - of-way
within or adjacent to the proposed development;
e.
the location, dimensions and ground floor elevation
of all existing buildings on the site;
f.
the location and dimensions of existing driveways,
parking and loading areas, walkways, and sidewalks
on or immediately adjacent to the site;
g.
location of intersecting roads or driveways within
two hundred (200) feet of the site;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
47
h.
the location of open drainage courses, wetlands,
stonewalls, graveyards, fences, stands of trees, and
other important or unique natural areas and site
features, including but not limited to, floodplains,
deer wintering areas, significant wildlife habitats,
scenic areas, habitat for rare and endangered plants
and animals, unique natural communities and
natural areas, sand and gravel aquifers, and historic
and/ or archaeological resources, together with a
description of such features;
i.
the direction of existing surface water drainage
across the site, and any off-site drainage facilities
that will be used;
j.
the location, front view, dimensions, and lighting of
existing signs;
k.
location and dimensions of any existing easements
and copies of existing
covenants
or deed
restrictions; and
l.
the location of the nearest fire hydrant or other
water supply for fire protection.
4. Proposed Development Activity (Minor and Major
developments)
a.
estimated demand for water supply and sewage
disposal, together with the location and dimensions
of all provisions for water supply and wastewater
disposal, and evidence of their adequacy for the
proposed use, including soils test pit data if on-site
sewage disposal is proposed;
b.
the direction of proposed surface water drainage
across the site, and from the site, with an
assessment of impacts on downstream properties;
c.
provisions for handling all solid wastes, including
hazardous and special wastes, and the location and
proposed screening of any on-site collection or
storage facilities;
d.
the location, dimensions, and materials to be used in
the construction of proposed driveways, parking
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
48
and loading areas, and walkways and any changes
in traffic flow onto or off-site;
e.
proposed landscaping and buffering;
f.
the location, dimensions, and ground floor elevation
of all proposed buildings or building expansion
proposed on the site;
g.
location, of proposed signs together with the
method for securing the sign;
h.
location and type of exterior lighting;
i.
the location of all utilities, including fire protection
systems;
j.
a general description of the proposed use or activity;
k.
an estimate of the peak hour and daily traffic to be
generated by the project; and,
l.
stormwater calculations, erosion and sedimentation
control measures,
and water quality and/or
phosphorous export management provisions.
5. Additional
Submission
Requirements
for
Major
Developments
In addition to the information required for all applicants, an
application for a major development must contain eleven
(11) copies of the following information:
a.
a narrative and/ or plan describing how the
proposed development plan relates to the site
inventory and analysis;
b.
a grading plan showing the existing and proposed
topography of the site at two (2) foot contour
intervals, or such other interval as the Planning
Board may determine; and
c.
a stormwater drainage and erosion control program
showing:
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
49
1. the existing and proposed method of handling
stormwater runoff;
2. the direction of flow of the runoff, through the
use of arrows;
3. the location, elevation, and size of all catch
basins, dry wells, drainage ditches, swales,
retention basins, and storm sewers;
4. engineering calculations used to determine
drainage requirements based upon the 25-year
24-hour storm frequency; this is required only if
the project will significantly alter the existing
drainage pattern due to such factors as the
amount of new impervious surfaces being
proposed; and
5. methods of controlling erosion and sedimentation
during and after construction.
d.
A groundwater impact analysis prepared by
groundwater hydrologist for projects involving on-
site water supply or sewage disposal facilities with a
capacity of two thousand (2,000) gallons or more
per day.
e.
The name, registration number, and seal of the
architect, engineer, landscape architect and/ or
similar professional who prepared the plan.
f.
A utility plan showing, in addition to provisions for
water supply and wastewater disposal, the location
and nature of electrical, telephone and any other
utility services to be installed on the site.
g.
A planting schedule keyed to the site plan indicating
the general varieties and sizes of trees, shrubs, and
other vegetation to be planted on the site, as well as
information pertaining to provisions that will be
made to retain and protect existing trees, shrubs,
and other vegetation.
h.
A traffic impact analysis demonstrating the impact
of the proposed project on the capacity, level of
service and safety of adjacent streets, if the project
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
50
or expansion will provide parking for fifty (50) or
more vehicles or generate more than one hundred
(100) trips during the a.m. or p.m. peak hour based
upon the latest edition of the trip generator manual
of the Institution of Traffic Engineers.
i.
Cost of the proposed development and evidence of
the applicant's financial capacity to complete it.
This evidence should be in the form of a letter from
a bank or other source of financing indicating the
name of the project, amount of financing proposed
or available, and individual's or institution's interest
in financing the project or in the form of a letter
from a certified accountant or annual report
indicating that the applicant has adequate cash flow
to cover anticipated costs.
6. Waiver of the Submission Requirements
The Planning Board may waive any of the submission
requirements based upon a written request of the applicant.
Such request must be made at the time of the pre
application conference or at the initial review of the
application if no pre application conference is held. A
waiver of any submission requirement may be granted only
if the Board finds that the information is not required to
determine compliance with the standards and criteria. The
application must contain eleven (11) copies of all waiver
requests as part of the application.
206.8
Approval Standards and Criteria
The following criteria shall be used by the Planning Board in reviewing
applications for site plan review and shall serve as minimum requirements
for approval of the application. The application shall be approved unless
the Planning Board determines that the applicant has failed to meet one or
more of these standards. In all instances, the burden of proof shall be on
the applicant who must produce evidence sufficient to warrant a finding
that all applicable criteria have been met.
A.
Utilization of the Site
Utilization of the Site - The plan for the development,
including buildings, lots, and support facilities, must reflect the
natural capabilities of the site to support development.
Environmentally sensitive areas, including but not limited to,
wetlands, steep slopes, floodplains, significant wildlife
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
51
habitats, fisheries, scenic areas, habitat for rare and endangered
plants and animals, unique natural communities and natural
areas, and sand and gravel aquifers must be maintained and
preserved to the maximum extent. The development must
include appropriate measures for protecting these resources,
including but not limited to, modification of the proposed
design of the site, timing of construction, and limiting the
extent of excavation.
B.
Traffic Access and Parking
Vehicular access to and from the development must be safe and
convenient.
1. Any driveway or proposed street must be designed so as to
provide the minimum sight distance according to the Maine
Department of Transportation standards, to the maximum
extent possible.
2. Points of access and egress must be located to avoid
hazardous conflicts with existing turning movements and
traffic flows.
3. The grade of any proposed drive or street must be not more
than +3% for a minimum of two (2) car lengths, or forty
(40) feet, from the intersection.
4. The intersection of any access/egress drive or proposed
street must function: (a) at a Level of Service D, or better,
following development if the project will generate one
thousand (1,000) or more vehicle trips per twenty-four (24)
hour period; or (b) at a level which will allow safe access
into and out of the project if less than one thousand (1,000)
trips are generated.
5. Where a lot has frontage on two (2) or more streets, the
primary access to and egress from the lot must be provided
from the street where there is less potential for traffic
congestion and for traffic and pedestrians hazards. Access
from other streets may be allowed if it is safe and does not
promote short cutting through the site.
6. Where it is necessary to safeguard against hazards to traffic
and pedestrians and/ or to avoid traffic congestion, the
applicant shall be responsible for providing turning lanes,
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
52
traffic directional islands, and traffic controls within public
streets.
7. Accessways must be designed and have sufficient capacity
to avoid queuing of entering vehicles on any public street.
8. The following criteria must be used to limit the number of
driveways serving a proposed project:
a. No use which generates less than one hundred (100)
vehicle trips per day shall have more than one (1) two-
way driveway onto a single roadway. Such driveway
must be no greater than thirty (30) feet wide.
b. No use which generates one hundred (100) or more
vehicle trips per day shall have more than two (2)
points of entry from and two (2) points of egress to a
single roadway. The combined width of all
accessways must not exceed sixty (60) feet.
C.
Accessway Location and Spacing Accessways must meet the
following standards:
1. Private entrance / exits must be located at least fifty (50)
feet from the closest unsignalized intersection and one
hundred fifty (150) feet from the closest signalized
intersection, as measured from the point of tangency for the
corner to the point of tangency for the accessway. This
requirement may be reduced if the shape of the site does
not allow conformance with this standard.
2. Private accessways in or out of a development must be
separated by a minimum of seventy-five (75) feet where
possible.
D.
Internal Vehicular Circulation
The layout of the site must provide for the safe movement of
passenger, service, and emergency vehicles through the site.
1. Projects that will be served by delivery vehicles must
provide a clear route for such vehicles with appropriate
geometric design to allow turning and backing.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
53
2. Clear routes of access must be provided and maintained for
emergency vehicles to and around buildings and must be
posted with appropriate signage (fire lane - no parking).
3. The layout and design of parking areas must provide for
safe and convenient circulation of vehicles throughout the
lot.
4. All roadways must be designed to harmonize with the
topographic and natural features of the site insofar as
practical by minimizing filling, grading, excavation, or
other similar activities which result in unstable soil
conditions and soil erosion, by fitting the development to
the natural contour of the land and avoiding substantial
areas of excessive grade and tree removal, and by retaining
existing vegetation during construction. The road network
must provide for vehicular, pedestrian, and cyclist safety,
all season emergency access, snow storage, and delivery
and collection services.
E.
Parking Layout and Design
Off street parking must conform to the following standards:
1. Parking areas with more than two (2) parking spaces must
be arranged so that it is not necessary for vehicles to back
into the street.
2. All parking spaces, access drives, and impervious surfaces
must be located at least fifteen (15) feet from any side or
rear lot line, except where standards for buffer yards
require a greater distance. No parking spaces or asphalt
type surface shall be located within fifteen (15) feet of the
front property line. Parking lots on adjoining lots may be
connected by accessways not exceeding twenty-four (24)
feet in width.
3. Parking stalls and aisle layout must conform to the
following standards:
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
54
Parking
Stall
Skew
Stall
Aisle
Angle
Width
Width
Depth
Width
90°
9'-0"
18'-0"
24'-0" 2-way
60°
8'-6"
10'-6"
18'-0"
16'-0" 1-way
45°
8'-6"
12'-9"
17'-6"
12'-0" 1-way
30°
8'-6"
17'-0"
17'-0"
12'-0" 1 way
4. In lots utilizing diagonal parking, the direction of proper
traffic flow must be indicated by signs, pavement markings
or other permanent indications and maintained as
necessary.
5. Parking areas must be designed to permit each motor
vehicle to proceed to and from the parking space provided
for it without requiring the moving of any other motor
vehicles.
6. Provisions must be made to restrict the "overhang" of
parked vehicles when it might restrict traffic flow on
adjacent through roads, restrict pedestrian or bicycle
movement on adjacent walkways, or damage landscape
materials.
F.
Pedestrian Circulation
The site plan must provide for a system of pedestrian ways
within the development appropriate to the type and scale of
development. This system must connect the major building
entrances/ exits with parking areas and with existing sidewalks,
if they exist or are planned in the vicinity of the project. The
pedestrian network may be located either in the street right-of-
way or outside of the right-of-way in open space or recreation
areas. The system must be designed to link the project with
residential, recreational, and commercial facilities, schools, bus
stops, and existing sidewalks in the neighborhood or, when
appropriate, to connect the amenities such as parks or open
space on or adjacent to the site.
G.
Stormwater Management
Adequate provisions must be made for the collection and
disposal of all stormwater that runs off proposed streets,
parking areas, roofs, and other surfaces, through a stormwater
drainage system and maintenance plan, which must not have
adverse impacts on abutting or downstream properties.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
55
1. To the extent possible, the plan must retain stormwater on
the site using the natural features of the site.
2. Unless the discharge is directly to the ocean, stormwater
runoff systems must detain or retain water such that the rate
of flow from the site after development does not exceed the
predevelopment rate.
3. The applicant must demonstrate that on - and off-site
downstream channel or system capacity is sufficient to
carry the flow without adverse effects, including but not
limited to, flooding and erosion of shoreland areas, or that
he / she will be responsible for whatever improvements are
needed to provide the required increase in capacity and / or
mitigation.
4. All natural drainage ways must be preserved at their natural
gradients and must not be filled or converted to a closed
system unless approved as part of the site plan review.
5. The design of the stormwater drainage system must provide
for the disposal of stormwater without damage to streets,
adjacent properties, downstream properties, soils, and
vegetation.
6. The design of the storm drainage systems must be fully
cognizant of upstream runoff which must pass over or
through the site to be developed and provide for this
movement.
7. The biological and chemical properties of the receiving
waters must not be degraded by the stormwater runoff from
the development site. The use of oil and grease traps in
manholes, the use of on-site vegetated waterways, and
vegetated buffer strips along waterways and drainage
swales, and the reduction in use of deicing salts and
fertilizers may be required, especially
where the
development stormwater discharges into a gravel aquifer
area or other water supply source, or a great pond.
H.
Erosion Control
1. All building, site, and roadway designs and layouts must
harmonize with existing topography and conserve desirable
natural surroundings to the fullest extent possible, such that
filling, excavation and earth moving activity must be kept
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
56
to a minimum. Parking lots on sloped sites must be
terraced to avoid undue cut and fill, and / or the need for
retaining walls. Natural vegetation must be preserved and
protected wherever possible.
2. Soil erosion and sedimentation of watercourses and water
bodies must be minimized by an active program meeting
the requirements of the Maine Erosion and Sediment
Control Handbook for Construction: Best Management
Practices, dated March 1991, and as amended from time to
time.
I.
Water Supply Provisions
The development must be provided with a system of water
supply that provides each use with an adequate supply of
water. If the project is to be served by a multi-house water
supply, the applicant must secure and submit a written
statement from the supplier that the proposed water supply
system conforms with its design and construction standards,
will not result in an undue burden on the source of distribution
system, and will be installed in a manner adequate to provide
needed domestic flows
J.
Sewage Disposal Provisions
The development must be provided with a method of disposing
of sewage which is in compliance with the State Plumbing
Code. Proposed on-site waste disposal systems must conform
to the Subsurface Wastewater Disposal Rules.
K.
Utilities
The development must be provided with electrical, telephone,
and telecommunication service adequate to meet the
anticipated use of the project. New utility lines and facilities
must be screened from view to the extent feasible. If the
service in the street or on adjoining lots is underground, the
new service must be placed underground.
L.
Groundwater Protection
The proposed site development and use must not adversely
impact either the quality or quantity of groundwater available
to abutting properties or to the public water supply systems.
Applicants whose projects involve on-site water supply or
sewage disposal systems with a capacity of two thousand
(2,000) gallons per day or greater must demonstrate that the
groundwater at the property line will comply, following
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
57
development, with the standards for safe drinking water as
established by the State of Maine.
M.
Water Quality Protection
All aspects of the project must be designed so that:
1. No person shall locate, store, discharge, or permit the
discharge of any treated, untreated, or inadequately treated
liquid, gaseous, or solid materials of such nature, quantity,
obnoxious, toxicity, or temperature that may run off, seep,
percolate, or wash into surface or groundwaters so as to
contaminate, pollute, or harm such waters or cause
nuisances, such as objectionable shore deposits, floating or
submerged debris, oil or scum, color, odor, taste, or
unsightliness or be harmful to human, animal, plant, or
aquatic life.
2. All storage facilities for fuel, chemicals, chemical or
industrial wastes, and biodegradable raw materials, must
meet the standards of the Maine Department of
Environmental Protection and the State Fire Marshall's
Office.
N.
Capacity of the Applicant
The applicant must demonstrate that he / she has the financial
and technical capacity to carry out the project in accordance
with this ordinance and the approved plan.
O.
Historic and Archaeological Resources
If any portion of the site has been identified as containing
historic or archaeological resources, the development must
include appropriate measures for protecting these resources,
including but not limited to, modification of the proposed
design of the site, timing of construction, and limiting the
extent of excavation.
P.
Floodplain Management
If any portion of the site is located within a special flood
hazard area as identified by the Federal Emergency
Management Agency, all use and development of that portion
of the site must be consistent with the Town's Floodplain
Management Ordinance.
Q.
Exterior Lighting
The proposed development must have adequate exterior
lighting to provide for its safe use during nighttime hours, if
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
58
such use is contemplated. All exterior lighting must be
designed and shielded to avoid undue glare, adverse impact on
neighboring properties and rights - of way, and the unnecessary
lighting of the night sky.
R.
Buffering of Adjacent Uses
The development must provide for the buffering of adjacent
uses where there is a transition from one type of use to another
use and for the screening of mechanical equipment and service
and storage areas. The buffer may be provided by distance,
landscaping, fencing, changes in grade, and / or a combination
of these or other techniques.
S.
Noise
The development must control noise levels such that it will not
create a nuisance for neighboring properties.
T.
Storage of Materials
1. Exposed nonresidential storage areas, exposed machinery,
and areas used for the storage or collection of discarded
automobiles, auto parts, metals or other articles of salvage
or refuse must have sufficient setbacks and screening (such
as a stockade fence or a dense evergreen hedge) to provide
a visual buffer sufficient to minimize their impact on
abutting residential uses and users of public streets.
2. All dumpsters or similar large collection receptacles for
trash or other wastes must be located on level surfaces
which are paved or graveled. Where the dumpster or
receptacle is located in a yard which abuts a residential or
institutional use or a public street, it must be screened by
fencing or landscaping.
3. Where a potential safety hazard to children is likely to
arise, physical screening sufficient to deter small children
from entering the premises must be provided and
maintained in good condition.
U.
Landscaping
Landscaping must be provided as part of site design. The
landscape plan for the entire site must use landscape materials
to integrate the various elements on site, preserve and enhance
the particular identity of the site, and create a pleasing site
character. The landscaping should define street edges, break
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
59
up parking areas, soften the appearance of the development,
and protect abutting properties.
V.
Building and Parking Placement
1. The site design should avoid creating a building surrounded
by a parking lot. Parking should be to the side and
preferably in the back. In rural, uncongested areas
buildings should be set well back from the road so as to
conform with the rural character of the area. If the parking
is in front, a generous, landscaped buffer between road and
parking lot is to be provided. Unused areas should be kept
natural, as field, forest, wetland, etc.
2. Where two or more buildings are proposed, the buildings
should be grouped and linked with sidewalks; tree planting
should be used to provide shade and break up the scale of
the site. Parking areas should be separated from the
building by a minimum of five (5) to ten (10) feet.
Plantings should be provided along the building edge,
particularly where building facades consist of long or
unbroken walls.
W.
Fire Protection
The site design must comply with the Fire Protection
Ordinance. The Fire Chief shall issue the applicant a
"Certificate of Compliance" once the applicant has met the
design requirements of the Town's Fire Protection Ordinance.
206.9
Limitation on Approval
Construction of the improvements covered by any site plan approval must
be substantially commenced within twelve (12) months of the date upon
which the approval was granted. If construction has not been substantially
commenced and substantially completed within the specified period, the
approval shall be null and void. The applicant may request an extension
of the approval deadline prior to expiration of the period. Such request
must be in writing and must be made to the Planning Board. The Planning
Board may grant up to two (2), six (6) month extensions to the periods if
the approved plan conforms to the ordinances in effect at the time the
extension is granted and any and all federal and state approvals and
permits are current.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
60
206.10 Performance Guarantees
A. Performance Guarantee
The Planning Board may require the posting of a performance
guarantee in such amount and form as specified in subsections 1 to 4
below as is reasonably necessary to ensure the proper installation of
all off-site improvements required as conditions of approval. The
nature and duration of the guarantee shall be structured to achieve
this goal without adding unnecessary costs to the applicant.
Performance guarantees may be provided by a variety of means
including, but not limited to, the following which must be approved
as to form and enforceability by the Town Attorney.
1. Security Bond. The applicant may obtain a security
bond from a surety bonding company authorized to do
business in the state.
2. Letter of Credit. The applicant may provide an
irrevocable letter of credit from a bank or other
reputable lending institution.
3. Escrow Account. The applicant may deposit cash, or
other instruments readily convertible into cash at face
value, either with the municipality, or in escrow with a
bank. Any such account must require Town approval
for withdrawal and must stipulate that the Town can
withdraw the money upon forty-eight (48) hour
advance notice to the applicant to complete the
guaranteed improvements.
4. Surety Bonds. The applicant may provide a surety
bond given by the contractor to the developer,
provided the town is included in the bond as an
additional named insured and that the bond states that
the amount provided for in the bond cannot be reduced
without prior written approval of the town.
B.
Upon substantial completion of all required improvements, the
developer must notify the Planning Board of the completion or
substantial completion of improvements, and must send a copy
of such notice to the appropriate municipal officials. The
respective municipal officials shall inspect all improvements
and shall file a report indicating either approval, partial
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
61
approval, or rejection of such improvements with a statement
of reasons for any rejection.
206.11 Submission Of As-Built Plans
Plans must be submitted for any project involving the construction of
more than twenty thousand (20,000) square feet of gross floor area or fifty
thousand (50,000) square feet of improvements as actually constructed on
the site. These "as built" plans must be submitted within thirty (30) days
of the issuance of a certificate of occupancy for the project or occupancy
of the building.
206.12 Minor Changes To Approved Plans
Minor changes in approved plans necessary to address field conditions
may be approved by the Code Enforcement Officer provided that any such
change does not affect compliance with the standards or alter the essential
nature of the proposal.
206.13 Appeal Of Planning Board Actions
Appeal of any actions taken by the Planning Board with respect to this
section shall be to the Superior Court in accordance with Rule 80B of the
Maine Rules of Civil Procedure.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
62
SECTION 300 - AQUIFER PROTECTION
Sec. 301
Purpose
The purposes of this section are to protect the health, safety, and general
welfare of the residents of the Town of Chebeague Island by protecting the
quality of the Town's groundwater through the regulation of activities and
land use practices.
Sec. 302
Applicability
The requirements of Section 300 shall apply to all areas designated as
Aquifer Protection (AP) on the official aquifer protection map (Appendix
C) dated July 1, 2007 which shall be adopted as part of this Zoning
Ordinance and on file in the office of the Town Clerk and filed with the
Cumberland County Registry of Deeds. Aquifer Protection areas shall be
determined on the basis of the most recent data available from the United
States Geological Survey and Maine Geological Survey and other public
sources.
Sec. 303
Regulations
303.1
Disposal of hazardous waste materials is prohibited.
303.2
The following uses shall only be allowed upon a positive finding by the
Planning Board that the proposed use, with any conditions imposed by the
Board, will not adversely affect the quality of groundwater:
A.
Disposal of solid waste, other than brush or stumps;
B.
Storage of road salt or other de-icing agents;
C.
Animal feedlots which hold more than three (3) animals per
acre, or in the case of poultry, which holds more than 150
animals per acre;
D.
Manure piles or storage pits in excess of 50 cubic yards, or in
the case of poultry manure in excess of 20 cubic yards; manure
shall otherwise be disposed in accordance with the provisions
of Sec. 401.1;
E.
Storage of petroleum or other refined petroleum products, with
the exception of petroleum products used for household
purposes;
F.
Disposal of other leachable materials, with the exception of
single-family and two-family residential septic systems;
G.
Extraction of earth materials;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
63
H.
Any residential, commercial, industrial, institutional, or
governmental development, including subdivision, which
occupies a land or water area in excess of 20 acres.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
64
SECTION 400 GENERAL REGULATIONS
Sec. 401
Agriculture
401.1
All spreading of manure shall be accomplished in conformance with
Manure Utilization Guidelines published by the former Maine Department
of Agriculture on November 1, 2001. Manure shall not be stored or
stockpiled within seventy-five (75) feet horizontal distance, of tributary
streams, or wetlands.
401.2
Agricultural activities involving tillage of soil greater than forty thousand
(40,000) square feet in surface area within the shoreland zone shall require
a Conservation Plan to be filed with the Planning Board. Non-
conformance with the provisions of said plan shall be considered to be a
violation of the Ordinance.
401.3
There shall be no new tilling of soil within seven-five (75) feet, horizontal
distance, from coastal wetlands; nor within twenty-five (25) feet,
horizontal distance, of tributary streams, and freshwater wetlands.
Operations in existence on the effective date of this ordinance and not in
conformance with provision may be maintained.
401.4
Newly established livestock grazing areas shall not be permitted within
seventy-five (75) feet, horizontal distance of coastal wetlands, nor; within
twenty-five (25) feet, horizontal distance, of tributary streams, and
freshwater wetlands. Livestock grazing associated with ongoing farm
activities, and which are not in conformance with the above setback
provisions may continue, provided that such grazing is conducted in
accordance with a Conservation Plan to be filed with the Planning Board.
Sec. 402
Animals
402.1
Household pets are allowed in all districts.
402.2
Horses may be kept provided that there shall be at least one (1) acre of
containment area for the first horse to be kept on the premises, and 10,000
square feet of containment area for each horse thereafter.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
65
402.3
Animals other than horses or household pets may be kept for personal use
and enjoyment in all districts.
402.4
The free range of poultry is prohibited;
402.5
No chicken house and no piggery shall be permitted nearer than 100 feet
to any property line.
Sec. 403
Backlots
Single-family dwellings and duplex dwellings shall be permitted on
backlots provided they are served by a private street meeting the
standards of Sec. 423 of this Ordinance subject to the following
provisions:
403.1
The creation of a lot which does not have the required lot frontage on a
public right-of-way shall require twice the minimum lot size for the
district in which it is located, and shall require a right-of-way no less than
fifty (50) feet wide, except that in no case shall such private right-of-way
be required to be wider than the public street which it intersects. Where a
lot is in existence and is provided access by a private right-of-way
recorded at the Cumberland County Registry of Deeds prior to the
adoption of this ordinance, these provisions shall not apply.
403.2
The Board of Adjustment and Appeals may allow a reduction of these
standards upon a finding that backlots will be provided with safe access
and that the proposed reduction in requirements is otherwise in
conformance with Sec. 603.2.E.
403.3
Any dwelling unit erected on a back lot shall not be located within two-
hundred feet of an existing public street.
Sec. 404
Campgrounds
Campgrounds shall conform to the minimum requirements imposed under
State licensing procedures and the following:
404.1
Campgrounds shall contain a minimum of five thousand (5,000) square
feet of land, not including roads and driveways, for each site. Land
supporting wetland vegetation, and land below the Highest Astronomical
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
66
Tide elevation of a water body shall not be included in calculating land
area per site.
404.2
The areas intended for placement of a recreational vehicle, tent or shelter,
and utility and service buildings shall be set back a minimum of seventy-
five (75) feet, horizontal distance from the Highest Astronomical Tide
elevation of tributary streams, or the upland edge of a wetland.
Sec. 405
Clustered and Traditional Residential Development
405.1
General:
In reviewing applications for major subdivision approval involving a
residential development consisting of four or more single family
residences and/or duplex dwellings in the Island Residential and Island
Business zoning districts, the Planning Board shall be authorized to
require that the residential development be designed and constructed as a
clustered residential development or a traditional residential development,
based on the standards and criteria set forth in this Section, except that
developments with four or fewer lots may be designed as a clustered
development upon a positive finding by the Planning Board that the intent
of the Ordinance listed below can be met. Such developments are subject
to Section 4.4 of the Subdivision Ordinance. All such residential
developments shall conform to the requirements of this Ordinance as well
as the Subdivision Ordinance of the Town of Chebeague Island and all
other applicable Ordinances of the Town of Chebeague Island and the
Town of Chebeague Island Comprehensive Plan. The intention of this
section of the Ordinance is to assure that residential developments are
designed in such a way as to assure protection of wells and groundwater
from contamination; prevent adverse impacts on existing wells on
adjoining properties and on wells to be created within the new residential
development; avoid septic contamination or interference within the new
residential development and with respect to surrounding properties;
minimize the cost of constructing and maintaining public utilities and
improvements including streets, water lines, sewer lines, electric lines, gas
lines, telephone lines, and other utilities; protect and preserve existing
farms and farmland; protect areas in resource protection districts; protect,
preserve and improve existing recreational areas and trails; protect and
preserve sensitive wildlife habitats and other natural areas; and protect and
preserve public access to water bodies.
405.2
Clustered Residential Development:
Clustered residential developments are residential developments in which
groups or clusters of dwelling units may be located on adjoining
individual building lots which may be smaller than the required minimum
lot size for the zoning district in which they are located but within which
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
67
land is set aside as open space so long as the following requirements are
satisfied:
A.
Minimum lot size: The minimum lot size for each single family
dwelling shall be 60,000 square feet (1.37 ac.) and for each
duplex dwelling shall be 80,000 square feet (1.83 ac.).
B. Setback: Setback requirements for a clustered residential
development shall be the same as those required in the zoning
district in which the residential development is located.
C.
Frontage: Each lot shall have no less than 75 feet of lot
frontage on a street.
D. Buffering: A buffer area at least 75 feet in depth shall be
established between the clustered residential development and
abutting tracts or parcels of land and between the clustered
residential development and existing streets and roads
adjoining or abutting the clustered residential development.
Such buffer shall be designed to eliminate potential adverse
impacts (including glare, noise, and unsightly views of service
areas). Buffering shall consist of trees landscaping, fencing,
grading, or a combination of some or all of these techniques.
Where possible, existing trees and vegetation shall be
preserved in buffer areas.
E. Open space. At least 25% of the total area of the tract or parcel
of land being developed must be maintained as open space and
not included in the individual building lots. Such open space
shall consist of land which has one or more of the following
characteristics:
1.
Active farmland or land adjoining active farmland.
2.
An active trail system or which provides a link to an
existing trail system.
3.
Land which provides a buffer around a sensitive wildlife
habitat or other natural area.
4.
Land which provides physical or visual access to a water
body including the ocean, pond, stream or brook.
5.
Land which is in Resource Protection.
6.
Land which is suitable for active recreation.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
68
7.
Land which abuts or adjoins and existing public open
space.
F.
Land set aside as open space may be held as common open
space by the individual lot owners of the proposed residential
development and in such cases the developer shall be required
to establish a homeowner's association consisting of individual
lot owners which shall include the following:
1.
Covenants shall be included in each deed from the
developer to an individual lot owner which shall require
mandatory membership in the association and shall set
forth the owner's rights, interests, privileges, and
obligations in the association and in the common open
space including the association's responsibility and
obligation to maintain the common open space and any
recreational facilities located therein.
2. The association shall develop a system to levy and collect
annual charges against any and all lot owners to defray
expenses connected with the maintenance of common
open space and recreational facilities located therein and
this system shall be set forth in the deed covenants or
other legal instrument binding upon the lot owner and
running with the land.
3.
The developer shall be responsible for its maintenance
until at least 75% of the lots have been sold to individual
lot owners after which time the association shall be
responsible for such maintenance and this requirement
shall be set forth in the deed covenants or other legal
instrument binding upon the lot owner and running with
the land.
4.
All proposed deed covenants and legal documents
relating to such common open space shall be reviewed by
the town attorney and the planning board and, if
approved, shall be recorded in the Cumberland County
Registry of Deeds and included or referred to in the deed
of each lot.
G.
Some or all of the open space may be dedicated to the Town of
Chebeague Island, subject to acceptance by the Board of
Selectmen. Any such dedication shall be accomplished by
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
69
deeds or other appropriate legal instruments acceptable to the
town attorney.
H. Some or all of the open space may be conveyed to a non-profit
tax exempt land trust or similar organization for conservation,
passive recreation, or active recreational purposes. Any such
conveyance shall be accomplished by deeds or other
appropriate legal instruments acceptable to the town attorney.
405.3
Traditional Residential Development:
Traditional residential developments are residential developments in
which the dwelling units are located on individual building lots which
conform to the minimum lot size for the zoning district in which they are
located. A traditional residential development may but is not required to
include land set aside as open space, as provided in Section 7.5 of the
Subdivision Ordinance.
405.4
Net Residential Density:
The maximum number of dwelling units permitted on the tract or parcel of
land proposed for any type of residential development shall be determined
by dividing the net residential acreage of the tract or parcel by the zoning
district minimum lot size for the zone in which the project is located. In
no event shall the number of residential units exceed the density
requirement of the zoning district in which it is located.
405.5
Criteria To Be Considered:
In determining whether a proposed residential development shall be
constructed as a clustered residential development or a traditional
residential development the Planning Board shall consider the following
criteria as required by 30-A M.R.S. § 4404 and the Town of Chebeague
Island Subdivision Ordinance:
405.6
Standards
For
Requiring
Clustered
Residential
Development:
The Planning Board shall require that a residential development be
designed as a clustered residential development if the following standards
are met:
A.
If the Planning Board determines that adequate wells can be
established for each residential unit without risk of
contamination
or interference with
existing
wells
or
groundwater on abutting properties and wells to be located
within the proposed residential development;
B.
If the Planning Board determines that adequate on site septic
systems can be established for each residential unit without risk
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
70
of contamination or interference with existing wells, ground
water and septic systems on abutting properties and within the
proposed residential development;
C.
If the tract or parcel of land to be developed contains one or
more of the following types of open space:
1. Land which is active farmland or which adjoins or abuts
active farmland;
2. Land which contains an existing trail system used by the
public or which can provide a link to existing trails;
3. Land which contains or adjoins a significant wildlife
habitat or other rare and irreplaceable natural area as
determined by the Department of Inland Fisheries and
Wildlife or the Town of Chebeague Island;
4. Land which may provide physical or visual access to
waterbodies including the ocean, ponds, streams, and
brooks;
5. Land which contains or adjoins a Resource Protection
district as shown on the official zoning map of the Town of
Chebeague Island;
6. Land which adjoins or abuts an existing parcel of land
which constitutes public open space;
7. Land which is suitable for active recreational activities.
405.7
Affordable Housing Developments:
Notwithstanding the foregoing requirements of this section and the
requirements applicable to the underlying zoning district, the Town, at
Town Meeting, may by contract or conditional rezoning pursuant to
Section 606 of this Ordinance, allow a clustered residential development
of single family residential lots that is developed as an affordable housing
development in any zoning district in which residential uses are permitted
and which has access to public water and sewer subject to the following
requirements:
A.
"Affordable housing" shall mean residential dwelling units
such that the persons eligible to purchase such residential
dwellings shall have annual incomes which fall within income
guidelines established by the Town of Chebeague Island Board
of Selectmen.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
71
B.
Minimum lot size: 10,000 square feet per single family
dwelling unit.
C.
Setback: Front: 25 feet
Rear: 30 feet
Side: 10 feet
D.
Frontage: Each lot shall have no less than 100 feet of lot
frontage on a street.
E.
Buffering: A buffer area at least 75 feet in depth shall be
established between the affordable residential development and
abutting tracts or parcels of land and between the affordable
residential development and existing streets and roads
adjoining or abutting the affordable residential development.
Such buffer shall be designed to eliminate potential adverse
impacts (including glare, noise, and unsightly views of service
areas). Buffering shall consist of trees landscaping, fencing,
grading, or a combination of some or all of these techniques.
Where possible, existing trees and vegetation shall be
preserved in buffer areas.
F.
Open space. At least 25% but no more than 50% of the total
area of the tract or parcel of land being developed must be
maintained as open space and not included in the individual
building lots. Such open space shall consist of land which has
one or more of the following characteristics:
1. Active farmland or land adjoining active farmland.
2. An active trail system or which provides a link to an
existing trail system.
3. Land which provides a buffer around a sensitive wildlife
habitat or other natural area
4. Land which provides physical or visual access to a water
body including the ocean, lake, pond, river, stream or
brook.
5. Land which is in Resource Protection.
6. Land which is suitable for active recreation.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
72
7. Land which abuts or adjoins and existing public open
space.
G. Land set aside as open space may be held as common open
space by the individual lot owners of the proposed residential
development and in such cases the developer shall be required
to establish a homeowner's association consisting of individual
lot owners which shall include the following:
1. Covenants shall be included in each deed from the
developer to an individual lot owner which shall require
mandatory membership in the association and shall set
forth the owner's rights, interests, privileges, and
obligations in the association and in the common open
space including the association's responsibility and
obligation to maintain the common open space and any
recreational facilities located therein.
2. The association shall develop a system to levy and collect
annual charges against any and all lot owners to defray
expenses connected with the maintenance of common open
space and recreational facilities located therein and this
system shall be set forth in the deed covenants or other
legal instrument binding upon the lot owner and running
with the land.
3. The developer shall be responsible for its maintenance until
at least 75% of the lots have been sold to individual lot
owners after which time the association shall be responsible
for such maintenance and this requirement shall be set forth
in the deed covenants or other legal instrument binding
upon the lot owner and running with the land.
4. All proposed deed covenants and legal documents relating
to such common open space shall be reviewed by the town
attorney and the planning board and, if approved, shall be
recorded in the Cumberland County Registry of Deeds and
included or referred to in the deed of each lot.
H.
Some or all of the open space may be dedicated to the Town of
Chebeague Island, subject to acceptance by the Town Meeting.
Any such dedication shall be accomplished by deeds or other
appropriate legal instruments acceptable to the town attorney.
I.
Some or all of the open space be conveyed to a non-profit tax
exempt land trust or similar organization for conservation,
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
73
passive recreation, or active recreational purposes. Any such
conveyance shall be accomplished by deeds or other
appropriate legal instruments acceptable to the town attorney.
Sec. 406
Multiplex Dwellings
406.1
General:
The conversion of an existing single-family dwelling or duplex dwelling
into a multiplex dwelling shall comply with the following standards and
the Planning Board shall review a proposed multiplex dwelling
development for compliance with these standards:
A.
The number of multiplex dwelling units allowed on a tract or
parcel shall be calculated by dividing the net residential
acreage of the tract or parcel by the minimum lot area per
dwelling unit required by the appropriate zoning district for
multiplex development.
B.
On any tract or parcel, the maximum number of attached
dwelling units per structure shall be six (6). The distance
between the foundations of any two principal structures, shall
be no less than the height of the taller of the two buildings, but
in no event shall a building separation of less than 25 feet be
permitted.
C.
A tract or parcel developed under this Section shall be held
either in single or common ownership, and shall have the same
amount of lot frontage on a public right-of-way as is required
by the underlying District.
D.
Setbacks. The following minimum setbacks are required for
front, rear or side yards that adjoin a boundary line of the tract
or parcel or a street:
1. Front: The same as in the underlying District except that
this shall be twice that required when the tract or parcel has
any frontage along a collector street as defined in the
Subdivision Ordinance.
2. Side: The same as in the underlying District.
3. Rear: The same as in the underlying District.
E.
A buffer shall be established between the multiplex housing
and any dwelling on abutting tracts or parcels, which buffer
shall be sufficient to minimize any potential nuisance,
including but not limited to headlights, noise, storage areas and
solid waste storage. This buffering shall consist of landscaping,
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
74
fencing or grading or a combination of some or all of these
techniques.
F.
No dwelling unit shall have less than 600 square feet of
finished living area, exclusive of common hallways, basements
and unimproved attic areas.
G.
The scale and surface area of parking areas, driveways and
paved areas shall be compatible with adjacent structures, must
be properly screened and must provide for parking in
accordance with the requirements of Sec. 420 of this
Ordinance.
H.
Open Space. The amount of open space that shall be required
shall be required shall be at least 50%.
1. This open space shall be usable for recreational,
agricultural or other outdoor living purposes and for
preserving natural features including, but not limited to,
large trees, tree groves, woods, ponds, streams, glens, rock
outcrops, natural plant life and wildlife cover, deer yards,
and to the greatest extent possible, shall be contiguous open
space. The use of any such open space may be further
limited or regulated by the imposition of reasonable
conditions at the time of final subdivision approval by the
Planning Board where necessary to protect adjacent
properties or uses, or the open space itself.
2. If any or all of the open space is to be reserved by the
individual unit owners as common open space, each unit
owner shall own a fractional interest in the common open
space and the developer shall be required prior to final
subdivision plan approval to incorporate a homeowners'
association consisting of the individual unit owners, which
incorporation must comply with the following:
a.
Proposed covenants shall be placed in each deed
from the developer to the individual unit owner,
which deed covenants shall require mandatory
membership in the homeowners' association, and
shall set forth the unit owners' rights, interests,
privileges and obligations in the association and in
the common open space, including the homeowners
association's
responsibility
and
obligation
to
maintain the common open space and any
recreational facilities located therein.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
75
b.
The homeowners' association shall develop a
system to levy and collect annual charges against
any and all individual lot owners to defray any
expense connected with the maintenance of
common open space and any recreational facilities
located therein, and this system shall be described
in said deed covenant or by some other legal
instrument made binding upon the individual unit
owner and running with the land.
c.
The developer shall maintain control of the
common open space and be responsible for its
maintenance until 75% of the multiplex dwelling
units in the subdivision have been sold, at which
time, the homeowners' association shall be
responsible for such maintenance, and this
obligation shall be described in said deed covenant
or by some other legal instrument made binding
upon the individual dwelling unit owner and
running with the land.
d.
All such proposed deed covenants and other legal
documents pertaining to common open space shall
be reviewed by the town attorney, and, if approved
by the planning board, shall be recorded in the
Cumberland County Registry of Deeds, and
included or referred to in the deed to each unit.
3. At the option of the Town, some or all of the open space
may be dedicated to the Town of Chebeague Island, subject
to acceptance by the Town Meeting.
4. Some or all of the open space may be dedicated to a non-
profit land trust for conservation, passive recreation
purposes or active recreation purposes.
5. Any dedication under subsection 406.1.H.3 or406.1.H.4
above must be made through appropriate legal instruments,
reviewed by the Town Attorney.
6. The open space(s) shall be shown on the subdivision plan
with appropriate notation on the face thereof to indicate
that it shall not be used for future buildings or structures.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
76
7. All legal documents required under this subsection must be
submitted with the final subdivision plan application.
Sec. 407
Accessory Dwelling Units (ADU's) and Duplexes
407.1 Accessory Dwelling Units:
An Accessory Dwelling Unit (ADU) shall mean a group of rooms forming a
habitable unit with facilities intended to be used for living, sleeping, cooking,
eating, and bathroom purposes. Its living area shall be no smaller than 190 square
feet and no larger than 1100 square feet, and neither the living area of one ADU
nor the combined living areas of two ADUs may exceed that of the existing
primary residence. ADUs may be attached to, detached from, or contained within
the primary residence.
407.2 Duplexes:
A duplex shall mean a residential structure that contains two similar sized
dwelling units, either stacked or side by side, with separate entrances. The lot and
the duplex structure shall be held under single or common ownership, and any
duplex-containing lot less than three acres in area shall not be subdivided.
407.3 Lot Rules for ADUs and Duplexes:
The following rules shall apply for all lots created on August 1, 1975 or later that
are at least 1.5 acres in size and have at least 150 feet of frontage on a street, as
well as for lots of record as of August 1, 1975 that are smaller than 1.5 acres and
are not subject to the lot merger requirements of Section 205.3 of this Ordinance:
A. A single family residence or duplex may be built on such an
undeveloped lot;
B. A lot with an existing single family dwelling may also accommodate:
1. One ADU (accessory dwelling unit) built within the existing
dwelling, or;
2. One ADU attached to the existing dwelling, or;
3. One ADU detached from the existing dwelling, or;
4. One ADU within and one ADU attached to the existing
dwelling, or;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
77
5. One ADU within and one ADU detached from the existing
dwelling, or;
6. One ADU attached to and one detached from the existing
dwelling.
7. Placing two ADUs within a primary structure shall render that
structure a "multiplex", subject to the rules in Section 406 of this
Ordinance.
8. Any allowable ADU that is detached from the primary dwelling
may be either contained within or attached to an existing accessory
structure;
C. All setbacks under section 204, all building code specifications,
driveway and shed setbacks, and subsurface waste system and freshwater
well setbacks and requirements must be met;
D. The rules in Sections 205 and 500 of this ordinance governing "Non-
conforming Uses, Buildings, Structures, and Lots" shall apply to the
permissibility of constructing ADUs and duplexes on lots with existing
non-conforming buildings or uses.
Sec. 408
Corner Clearance
No building, structure, or foliage shall be erected or maintained greater
than three and one-half (3 1/2) feet above the curb height within an area
defined by a line connecting the points twenty (20) feet distant of the
intersection of street lines at intersecting streets and roads.
Sec. 409
Day Care Centers and Nursery Schools
409.1
Purpose:
It is the intent of these provisions to allow the location of day care centers
and nursery schools in healthy and safe environments in a manner that will
not be disruptive to neighborhoods. Such uses should be considered
integral components of neighborhood life.
409.2
Standards for Day Care Centers and Nursery Schools:
In addition to state requirements and the requirements of any other
ordinance, including the special exception and site plan review ordinances,
the following standards shall apply to the review of day care centers and
nursery schools:
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
78
A.
No Day Care Center or Nursery School shall be located on a lot
less than twenty-four thousand (24,000) square feet in area.
B.
Day Care Centers and Nursery Schools shall have at least one
thousand (1,000) square feet of lot area per child received into
the home, including the operator's own children under sixteen
(16) years of age.
C.
Day Care Centers and Nursery Schools shall be subject to the
provisions of Sec. 7.15 - Sewage Disposal - of the Town of
Chebeague Island Subdivision Ordinance. At a minimum, the
applicant must present the approval of the Town's local
plumbing inspector that the proposed Day Care Center or
Nursery School's sewage disposal system can accommodate the
proposed use.
D.
There shall be a fifteen-foot setback for outdoor play areas in
side and rear yards, which set-back shall be enforced by
fencing and/or plantings. Outdoor play areas shall not be
permitted in front yards or yards adjacent to a street.
E.
There shall be one (1) off-street parking space for each
employee and volunteer worker not living at the site, and the
parking area shall be designed to provide a safe location for
vehicular ingress and egress and for the loading and unloading
of children.
F.
The Planning Board and/or the Board of Adjustment and
Appeals may attach additional conditions directly related to
screening and buffering, hours of operation, vehicular access
restrictions, off-street parking, traffic volume, wastewater
disposal, and barriers and other safety devices.
Sec. 410
Erosion and Sedimentation Control
410.1
Filling, grading, lagooning, dredging, earth-moving activities, and other
land use activities shall be conducted in such manner to prevent to the
maximum extent possible, erosion and sedimentation of surface waters.
To this end, all construction shall be accomplished in conformance with
the erosion prevention provisions of Environmental Quality Handbook
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
79
Erosion and Sediment Control, published by the Maine Soil and Water
Conservation Commission.
Sec. 411
Extraction of Earth Materials
411.1
Top soil, rock, sand, gravel and similar earth materials may be removed
from locations where permitted under the terms of this Ordinance only
after the granting of a one year, annually renewable special permit for
such operations as may be issued by the Board of Adjustment and Appeals
and under such terms and conditions as may be approved and provided for
by the Board and as provided for in this Ordinance.
411.2
Procedure:
A.
The applicant shall present a site plan with detailed information
of the proposed extraction operation as required under Section
206, Site Plan Review, and a written report describing the
method of extraction, duration of the operation, traffic
generation, measures to be taken to control erosion and
stormwater runoff, and other information requested by the
Board of Adjustment and Appeals.
B.
The site plan, written report, and fee as required in Sec. 602.4
shall be submitted to the Code Enforcement Officer at least
thirty (30) days prior to the next available meeting date of the
Board of Adjustment and Appeals, and shall be forwarded to
the Planning Board for their review and advisory opinion.
C.
After receipt of the advisory recommendations of the Planning
Board and all other required materials, the Board of
Adjustment and Appeals shall decide whether, and under what
conditions, the proposed extraction operation may be permitted
consistent with the provisions of Section 411.3, below:
411.3
Standards:
A.
The operation shall be shielded from surrounding property by
an adequate buffer area of not less than two hundred (200) feet
from the top of the final grade to the property line, except that
the Board of Adjustment and Appeals may reduce the buffer
area from the minimum requirement of two hundred (200) feet
to a minimum requirement of not less than one hundred (100)
feet provided that any excavated property remaining will be
left in a condition more useful for some future purpose
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
80
conforming to the district requirements in which the excavation
site is located.
B.
An applicant may specifically apply as a part of his application
for the excavation and removal of lands to the Board of
Adjustment and Appeals for waiver of the requirement of the
two hundred (200) foot buffer strip when the protective barrier
serves only to separate two existing gravel pits. The Board of
Adjustment and Appeals may only grant a waiver from this
requirement of the Ordinance if (1) the protective buffer zones
exist only between two existing gravel pits, (2) the owner of
the respective properties mutually and voluntarily consent to
the removal of the buffer zone, and (3) the Board of
Adjustment and Appeals find that it shall not have a
detrimental effect upon adjoining properties.
C.
Specific plans shall be established to avoid hazards from
excessive slopes and/or standing water. In no case may soils
be removed or excavated to closer than within five (5) feet of
the seasonal high water table as may be determined by a
competent authority. Where an embankment must be left upon
the completion of operations, it shall be at a slope of not
steeper than one (1) foot vertical to three (3) feet horizontal,
except that where the required buffer area has been reduced to
100 feet the slope of the edge of the excavation area shall not
exceed one (1) foot vertical to four (4) feet horizontal.
D.
No standing water shall be allowed to remain longer than two
consecutive calendar weeks unless specifically provided for by
the Board of Adjustment and Appeals.
E.
In the case of any excavation to a depth of more than 20 feet
below the surface there shall be constructed a substantial fence
with suitable gates completely enclosing the property or area in
which the excavation is located. No portion of such fence shall
be located closer than forty feet to the edge of such excavation.
However, this condition shall not apply in the case of an
excavation or removal of lands adding a slope of one foot
vertical to greater than 3 feet horizontal.
F.
No excavation shall be extended below the grade of adjacent
streets unless a two hundred (200) foot buffer strip shall be
provided from the edge of the right-of-way except in cases
where a specific condition has been made with the consent of
the Board of Adjustment and Appeals and other involved
parties such as the Town of Chebeague Island Public Works
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
81
Director and other property owners for the reconstruction of
the right-of-way and street at a different level.
G.
Provision shall be made for the control of stormwater runoff to
prevent on-site erosion, and to ensure that stormwater runoff
leaves the site at the same location and is not significantly
increased.
H.
Sufficient topsoil shall be retained on the site or otherwise
provided sufficient to cover all disturbed areas with an average
depth of not less than two (2) inches. All disturbed areas
resulting from the excavation and removal of lands or soils
shall be graded and sloped to conform to the provisions of this
Ordinance, reloamed and seeded with grasses indigenous to the
area and such trees as the Board of Adjustment and Appeals
may require and otherwise restored to a natural condition. In
the case of topsoil removal, the upper six inches of topsoil shall
be stockpiled and restored to a depth of six (6) inches
throughout the site.
I.
Loaded vehicles shall be suitably covered to prevent dust and
contents from spilling or blowing from the load.
J.
All access roads leading from the extraction site to public ways
shall be treated with stone, calcium or other suitable materials
to reduce mud and dust.
411.4
A surety bond shall be posted with the Town Treasurer by the applicant in
an amount and form approved by the Board of Adjustment and Appeals
with the advice of the Town Administrator sufficient to guarantee
performance and conformity with the provisions of this Ordinance and
approval of the special permit for the excavation and removal of lands.
411.5
The foregoing provisions shall not apply to any lawful use of land for the
removal of sand or gravel and the quarrying of stone, existing at the time
of adoption of this Ordinance provided, however (a) that no such existing
operation shall expand closer to or within two hundred feet to any
adjoining property line or to the line of any existing public way, (b) that
no such existing operation which may be within two hundred feet to any
such adjoining property line or the line of any existing public right-of-way
shall be permitted to expand closer to such line or lines, and (c) existing
restrictions as may have been previously provided for previous approvals
shall continue in full force and effect, and (d) further provided the Board
of Adjustment and Appeals shall have the authority to approve
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
82
applications for the expansion of such existing pits or quarries into such
areas, under the same terms and conditions as it may approve applications
for new gravel pits and quarries for the excavation and removal of lands
pursuant to the provisions of this ordinance.
411.6
This subsection shall not apply to (a) extraction necessarily incidental to
construction, alteration, excavation, or grading for which a building permit
has been issued, (b) to extraction from one portion of a lot for use on
another portion of the same lot, or contiguous lot of the same owner, or (c)
removal of topsoil from a site that is less than one acre in area during a
one-year period.
411.7
Violations of this section of the Ordinance shall be punishable by a fine as
established by order of the Board of Selectmen. Each day such violations
are permitted to continue to exist shall constitute a separate violation.
Sec. 412
Guest Houses
A guest house may be constructed provided the lot standards and setback
requirements for the district in which it is located are met for each guest
house.
Sec. 413
Height Regulations
Height limitations for all districts shall be thirty-five (35) feet, except that
the Board of Adjustment and Appeals may allow a greater height as a
variance upon a finding that the proposed height will not adversely affect
other property in the same district and neighborhood, that the granting of
such approval by the Board will not substantially depart from the intent
and purposes of this ordinance where it is consistent with the objectives of
the Comprehensive Plan, and is in a scale with its environs. These
regulations shall not apply to silos for the storage of feed crops, nor to
steeples.
Sec 414
Home Occupations and Home-Based Occupations
414.1
Any home occupation or home-based occupation may be approved as a
special exception by the Board of Adjustment and Appeals if:
A.
The occupation is owned or operated by a member of the
family residing within the dwelling unit, and;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
83
B.
In the case of a home occupation, no more than two employees
who are not members of the family are employed in the
occupation, and;
B. In the case of a home-based occupation, the number of non-
family employees is limited to three, provided that off-street
parking is available for all employees, in addition to parking
provided for customers, [amended Sept. 13, 2008] and;
C.
Objectionable or unreasonable noise, vibration, smoke, dust,
electrical disturbance, odors, heat, or glare will not be
detectable beyond the property limits, and;
E.
No traffic in substantially greater volumes than would be
normally expected in the neighborhood will be generated, and;
F.
Off-street parking spaces are provided in an amount to be
determined by the Board to avoid street congestion, and;
G.
Exterior displays, exterior storage of materials, and exterior
indications of the home occupation or home-based occupation,
including signs, are inconspicuous.
A home occupation or home-based occupation does not require approval
as a special exception if the seven (7) conditions above are met and it does
not result in any exterior indications (including, without limitation, any
visual, sound, odor, or traffic indications outside of the dwelling or
accessory structure) of the existence of the home occupation or home-
based occupation, and does not pose any potential threat to public health,
safety, or welfare.
414.2
The granting of a special exception approval for a home occupation or
home-based occupation shall apply to the applicant only while the
applicant resides at the property.
Sec. 415
Junk Yards
Before granting special exception approval for a junk yard, the Board of
Adjustment and Appeals shall find that the following conditions have been
met:
415.1
The proposed junk yard is shown to have no detrimental effect on adjacent
land uses;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
84
415.2
The proposed junk yard site is not visible from a public road or street;
415.3
The proposed junk yard shall be entirely enclosed by a solid wall or fence
with access only through solid gates, and such fence or wall shall be kept
in good repair and neatly painted;
415.4
The contents of the proposed junk yard shall not be placed higher than the
fence or wall herein required;
415.5
The proposed junk yard is in conformance with the Ordinance and any
other ordinances of the Town of Chebeague Island pertaining to the
protection of the quality of surface and ground water.
Sec. 416
Manufactured Housing
Manufactured housing as defined and allowed under this Ordinance to be
placed or erected on individual house lots on undeveloped lots where
single family dwellings are allowed shall be required to meet the
following design standards.
416.1
There shall be a pitched roof having a pitch of 4 in 12 or greater covered
with roofing shingles;
416.2
The exterior walls shall be covered with materials similar to traditional
site-built houses. These materials may include clapboards, simulated
clapboards such as conventional vinyl or metal siding, wood shingles or
shakes or similar materials, but shall not include smooth, ribbed or
corrugated metal or plastic panels;
416.3
The minimum horizontal dimension shall be fourteen (14) feet and the
minimum floor area shall be seven hundred fifty (750) square feet;
416.4
The house will be anchored on a permanent frost wall foundation;
416.5
Any fuel storage tanks shall be enclosed. Fuel storage tanks may not be
buried [amended Sept. 13, 2008] ;
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
85
416.6
All plumbing and utility connections shall comply with local, State and
National codes.
416.7
The unit shall be sited on the lot so that it is within thirty (30) degrees of
being parallel to the front property line of the lot (or the chord connecting
the two points where the side lot lines meet the front line if the front
property line is curved). This requirement shall not apply if the width of
the front building face is more than twenty-four (24) feet. The width of
the front building face shall include the width of the manufactured housing
unit plus the width of any permanent addition; all such additions shall
meet the following criteria:
A.
The addition is of a similar architectural design and constructed
of similar materials as the manufactured housing unit;
B.
The addition is permanently attached to the unit to create one
integral structure; and
C.
The addition is placed on a permanent frost wall foundation.
416.8
All disturbed areas of the site, not otherwise revegetated, shall be loamed,
fertilized and seeded.
416.9
All exterior doors shall be provided with steps of a suitable design and
construction to provide all-season access.
Outdoor lighting shall be provided to adequately illuminate internal streets
and pedestrian walkways. Lights shall be sized and directed to adverse
impact on adjacent properties.
Sec. 417
Mobile Home Parks
417.1
Except as otherwise provided below, mobile home parks shall comply
with all applicable State laws and municipal ordinances and regulations
and shall meet the requirements of the subdivision law. In addition to any
other reviews that may be required, any proposed mobile home park
development, expansion or amendment shall be reviewed by the Planning
Board for compliance with the requirements of this section. No mobile
home park development shall be permitted unless the Planning Board
finds it will be in compliance with this section.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
86
417.2 Lot size, width and density
Notwithstanding the dimensional requirements in Sec. 204 of this
ordinance, lots in a mobile home park shall meet the following lot size,
width and density requirements.
A.
Lots served by individual subsurface waste disposal systems:
1.
Minimum lot size
20,000 square feet
2.
Minimum lot width
100 feet
B.
Lots served by a central subsurface waste water disposal
system approved by the Maine Dept. of Human Services:
1.
Minimum lot size
12,000 square feet
2.
Minimum lot width
75 feet
C.
The overall density of any mobile home park served by a
central subsurface waste water disposal system shall not exceed
one dwelling unit per twenty thousand (20,000) square feet of
total mobile home park area.
D.
Mobile home park lots located within a shoreland zoning
district shall meet the dimensional requirements for that
district.
E.
The overall area of a mobile home park shall be no greater than
the combined area of its mobile home park lots plus:
1.
The area required for road rights-of-way;
2.
The area required for buffer strips, if any;
3.
The area within any setbacks required in the shoreland
zoning districts.
417.3
Lot setbacks
Notwithstanding the setback requirements in Sec. 204 of this ordinance,
lots in a mobile home park shall meet the following lot setback
requirements:
A.
For lots twelve thousand (12,000) square feet in area or larger,
structures shall meet the following setbacks:
1.
Front setback:
20 feet;
2.
Side setback:
20 feet;
3.
Rear setback:
10 feet.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
87
B.
Notwithstanding sections 417.3.A.1 and 417,3.A.2 above,
structures on a mobile home park lot that is adjacent to a public
road shall be set back from the public road the same distance
applicable to other residential developments.
C.
Notwithstanding 417.3.A and 417.3.B above, mobile home
park lots located within a shoreland zoning district shall meet
the setbacks for that district.
D.
A minimum twenty (20) foot separation shall be maintained
between all manufactured homes in all directions.
417.4
Lot coverage
A.
All structures on the lot, including manufactured housing and
accessory structures, but excluding open decks and parking
spaces, shall not cover more than 50% of the lot area.
417.5
Buffering
A.
A fifty (50) foot wide buffer strip shall be provided along any
mobile home park boundary that abuts land used for residential
use if the per-acre density of homes within the mobile home
park is at least two times greater than:
1. The density of residential development on immediately
adjacent parcels of land, or
2. If the immediately adjacent parcels of land are
undeveloped, the maximum net residential density
permitted by applicable municipal ordinances or State law.
B.
No structures, streets or utilities may be placed in the buffer
strip, except that utilities may cross the buffer strip to provide
services to the mobile home park.
417.6
Roads
A.
Streets within a mobile home park that are to be dedicated to
the Town for acceptance as town ways shall be designed and
constructed in accordance with the standards contained in
Sec. 8 of the Town's Subdivision Ordinance;
B.
Streets within a mobile home park that are to be privately
owned roads shall be built according to acceptable engineering
standards, shall be designed by a professional engineer
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
88
registered in the State of Maine, and shall meet the following
design standards:
1. Right of way width, 23 feet
2. Width of paved traveled way, 20 feet
3. Privately owned roads within a mobile home park that
intersect with public ways adjacent to the mobile home
park shall meet the following standards:
a. The desired angle of intersection shall be 90 degrees,
and the minimum angle of intersection shall be seventy-
five (75) degrees.
b. The maximum permissible grade within seventy-five
(75) feet of the intersection shall be 2 %.
c. The minimum sight distance shall be ten (10) feet for
every mile per hour of posted speed limit on the
existing public way. Sight distances shall be measured
from the driver's seat of a vehicle that is ten (10) feet
behind the curb or edge of shoulder line with the height
of 3 1/2 feet above the pavement and the height of
object 4 1/4 feet. Where the Planning Board finds it
necessary, the mobile home park land bordering the
intersection shall be cleared of all growth and sight
obstructions to achieve the required visibility.
d. The centerline of any privately owned road within a
park intersecting an existing public way shall be at least
one hundred twenty-five (125) feet from the centerline
of any other street intersecting that public street.
C.
On-street parking shall be prohibited on privately owned roads
in a mobile home park.
D.
No mobile home park lot shall have direct vehicular access
onto an existing public way.
E.
Any mobile home park expected to generate average daily
traffic of two hundred (200) trips per day or more shall have at
least two street connections with existing public ways.
F.
The Planning Board shall require a traffic impact analysis if the
mobile home park will generate more than five hundred (500)
trips per day.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
89
417.7
Utilities
The Planning Board shall not require electrical utilities and telephone lines
to be located underground within a mobile home park. A developer may
install utilities anywhere within the mobile home park.
417.8
Lighting
Outdoor lighting shall be provided to adequately illuminate internal streets
and pedestrian walkways. Lights shall be sized and directed to adverse
impact on adjacent properties.
417.9
Storage
At least three hundred (300) cubic feet of enclosed tenant storage shall be
conveniently provided on or near each mobile home lot for the storage of
materials and equipment.
417.10 Administration
A.
Mobile home park lots must be designated on the subdivision
plan for the proposed mobile home park.
B.
A person proposing development or expansion of a mobile
home park has the burden of proving that development will not
pollute a public water supply or aquifer or violate any State law
relating to land development, subdivision or use.
1. Ground water impact assessment. Accompanying the
application for Planning Board approval of any mobile
home park, which is not served by public sewer, shall be an
analysis of the impacts of the proposed mobile home park
on ground water quality. The hydrogeologic assessment
shall be prepared by a Certified Geologist or Registered
Professional Engineer, experienced in hydrogeology, and
shall contain at least the following information:
a. A map showing the basic soils types.
b. The depth to the water table at representative points
throughout the mobile home park.
c. Drainage conditions throughout the mobile home park.
d. Data on the existing ground water quality, either from
test wells in the mobile home park or from existing
wells on neighboring properties.
e. An analysis and evaluation of the effect of the mobile
home park on ground water resources. The evaluation
shall, at a minimum, include a projection of post
development nitrate-nitrogen concentrations at any
wells within the mobile home park, at the mobile home
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
90
park boundaries and at a distance of one thousand
(1000) feet from potential contamination sources,
whichever is a shorter distance. For mobile home parks
within the watershed of a lake, projections of the
developments impact on groundwater phosphate
concentrations shall also be provided.
f. A map showing the location of any subsurface
wastewater disposal systems and drinking water wells
within the mobile home park and within two hundred
(200) feet of the mobile home park boundaries.
2. Standards for Acceptable Ground Water Impacts.
a. Projections of ground water quality shall be based on
the assumption of drought conditions (assuming 60% of
annual average precipitation).
b. No mobile home park shall result in existing
groundwater quality exceeding 50% of the physical,
biological, chemical and radiological levels for raw and
untreated drinking water supply sources specified in the
Maine State Drinking Water Regulations pursuant to 22
M.R.S.A. § 2601 et seq. If existing groundwater
quality is inferior to Maine State Drinking Water
Regulations, the applicant shall not degrade the water
quality any further. This criteria shall apply to the
property boundaries existing and proposed water supply
wells and springs. If groundwater assessment under
Section 2.a above shows that the effect of the
development or use of land will be to exceed whichever
of these groundwater quality standards applies, that will
be the basis for denial of the application.
3. No mobile home park approved under this section may be
converted to another use without Planning Board approval
and without meeting the appropriate district dimensional
and setback requirements. The subdivision plan for the
mobile home park development, expansion or amendment
shall include the following note:
"This subdivision plan is approved solely as a 'mobile
home park' as defined in 30-A M.R.S. § 4358; the area
of each lot of this subdivision is lawfully less than the
minimum lot size otherwise required under the Town's
Zoning Ordinance solely because of its status as a lot
within a mobile home park. If any or all of the lots
depicted upon this subdivision plan cease to be used as
a mobile home park as so defined, this subdivision plan
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
91
must first be revised to comply with the Town's then-
current land use ordinances."
Sec. 418
Outdoor Swimming Pools
418.1
An outdoor swimming pool shall be any artificially confined body of
water greater than twenty-four (24) inches in depth in any portion which
may or may not require recirculation and filtering equipment for the
maintenance of water quality.
418.2
Any swimming pool which is not located entirely within a building shall
comply with the following requirements:
A.
The pool shall not encroach upon the setback or yard
requirements of the District in which it is located. For the
purposes of this regulation, this shall not include aprons or
approaches to the swimming pool but shall include all filtering
facilities and buildings accessory to the swimming pool as well
as the swimming pool itself.
B.
The pool shall be completely enclosed by a fence or a wall not
less than four feet in height, with appropriate doors and/or
gates, and so constructed as to reasonably prohibit the
unsupervised entrance of young children. The wall of a
building or the pool itself may be used as a part of such an
enclosure. This regulation shall apply to below ground and
above ground pools.
C.
These requirements shall not apply to so-called farm ponds or
fire ponds.
418.3
No outdoor swimming pool shall be constructed until a building permit
has been issued by the Code Enforcement Officer.
Sec. 419
Parking and Loading
419.1
Parking
Off-street parking spaces shall be provided in accordance with the
specifications in this section in any district whenever any use is
established.
USE
PARKING SPACES REQUIRED (MINIMUM)
Commercial Accommodations
1.2 for each lodging unit
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
92
Residential
2.5 per dwelling unit
Church and School
1 per 3 seats in principal assembly room
Private Club or Lodge
1 per 4 members
Theater
1 per 4 seats
Residential Care Facilities
See Sec. 422.3.F.
Professional Offices &
Business services, medical
clinics and retail business in
Commercial Districts
1 for every 250 square feet of gross leasable area
Retail Businesses & Personal
Service Establishment
1 for each 180 square feet of gross leasable sales
area
Eating & drinking estab.
1 for every 3 seats
Industrial
1 for each 1.2 employees, based on the highest
expected average employee occupancy
Funeral Homes
1 for each 75 square feet of floor in slumber rooms,
parlors, and individual service rooms
Bed and Breakfast Inn
Residential parking space requirement and 1 per
guest bedroom
Day Care Center and Nursery
School
See Sec. 409.2.E.
419.2
The use of any land in a residential district for a parking lot, with or
without charge, for the purpose of serving a public beach or other area
open to the public may be permitted as a special exception by the Board of
Adjustment and Appeals. The Board shall impose such restrictions
concerning hours of operation, lighting, landscaping, buffering and traffic
circulation so as not to cause undue adverse effect on the use of the other
property in the area.
419.3
Off-Street Loading:
Logically and conveniently located space for bulk pick-ups and deliveries,
scaled to delivery vehicles expected to be used, and accessible to such
vehicles when required off-street parking spaces are filled, shall be
provided for all commercial and industrial uses. Required off-street
loading space is not to be included as off-street parking space in
computation of required off-street parking space. Off-street loading shall
not face residential uses on abutting property without provision for a one
hundred (100) foot visual buffer measured from the edge of the access
area of dense vegetation sufficient to substantially screen the loading area
or a buffer of not less than fifty (50) feet when a solid fence is to be used.
Sec. 420
Private Airports and Private Heliports
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
93
420.1
Recognizing the growing development of and need for private aircraft
service in the Town of Chebeague Island, it has been deemed appropriate
to adopt provisions which provide for the safe and orderly development of
Private Airports and Private Heliports within designated zones of the
Town.
420.2
Private Airports and Private Heliports, as defined herein, shall be allowed
at locations where permitted under this ordinance, subject to approval by
the Planning Board under Site Plan Review and subject to the following
provisions:
A.
The private airport or private heliport shall be limited to the
basing of only one (1) aircraft which shall be owned by and
registered to or leased by the airport or heliport owner;
B.
No commercial operations or activities shall be permitted on or
from the airport or heliport;
C.
No more than three (3) aircraft shall be permitted at the airport
or heliport at any one time;
D.
Flight activities shall be prohibited from one-half hour prior to
sunset to one-half hour after sunrise;
E.
Guest usage shall not be considered occasional if the guest
aircraft utilizes the airport or heliport for more than seven days
in any one month or twelve days in any calendar year;
F.
The minimum runway length of the airstrip shall be one
thousand five hundred (1,500) feet;
G.
Operations at airports and heliports shall be restricted to
aircraft of gross weights not exceeding three thousand (3,000)
pounds and rotorcraft of gross weights not exceeding three
thousand five hundred (3,500) pounds;
H.
The minimum setbacks required for parcels containing an
airport shall be four hundred (400) foot minimum setbacks to
either side of the center line of the runway, and seven hundred
fifty (750) foot minimum setbacks from either end of the
runway;
I.
Heliports shall require designated landing areas of fifty (50)
feet by fifty (50) feet, with setbacks from all sides of the
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
94
designated landing area of not less than one hundred fifty (150)
feet from the property perimeter;
J.
Temporary landing areas for rotorcraft in use for three (3) days
or less in any calendar year are exempt from the provisions of
this Ordinance;
K.
The Planning Board may request an evaluation of the air safety
aspects of the site plan from the Division of Aeronautics of the
Maine Department of Transportation;
L.
No airport or heliport, other than a private airport for personal
use or a private heliport for personal use, shall be permitted.
Sec. 421
Public Utilities
421.1
Nothing in this Ordinance shall be deemed to prevent erection,
construction, alteration or maintenance in any district of distribution lines
of any utility, such as electrical and telephone lines, within the limits of a
public way and all necessary statutory permits and licenses have been
obtained, and further provided that such transmission or distribution lines,
if located in a subdivision requiring the approval of the Planning Board
shall be subject to the Subdivision Ordinance as now enacted or as
hereafter amended. For the purposes of this section, a telecommunications
facility is not considered a public utility.
421.2
No underground transmission lines, not located in a public way, shall be
permitted in any district unless allowed by the Board of Adjustment and
Appeals as a special exception. In addition to the other criteria contained
in this ordinance to be followed by said Board in granting or denying
requests for special exceptions, the Board shall take into consideration the
effect of the location of the underground lines upon other development in
the area, the materials used in the construction of such lines, the size
thereof, and the proposed treatment of the surface of the land within the
work limits and/or the right of way for such lines.
421.3
No above ground transmission lines, not located in a public way, shall be
permitted in any district unless allowed by the Board of Adjustment and
Appeals as a special exception. In addition to the other criteria contained
in this Ordinance to be followed by said Board in granting or denying
requests for special exceptions, the Board shall take into consideration the
effect the location of the above ground lines upon other development in
the area, the materials used in the construction of such lines, the size
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
95
thereof, and the proposed treatment of the surface of the land within the
work limits and/or the right of way for such lines, and also any proposed
screening of such above-ground facilities by plantings or otherwise to
minimize the distracting visual effects upon users of any public ways in
the area and on the users of residential properties in the area.
421.4
Accessory structures, including power substations and standpipes, but
excluding sewer pumping stations, may be permitted in any district as
special exceptions by the Board of Adjustment and Appeals, with review
requirements as listed in the district requirements. These structures shall
further be subject to site plan review by the Planning Board. District
dimensional requirements as regard lot sizes, setback and lot coverage
shall not apply to said accessory structures except that as a part of the
special exception review, the Board of Adjustment and Appeals shall
assure that said facilities are located on a site of sufficient size to provide
any screening or other necessary buffering from any residential
neighborhood.
421.5
Primary, non-accessory buildings of a public utility, including those
designed for the production or generation or relay of the service offered by
the utility may be permitted in any district where the same is listed as a
special exception by the Board of Adjustment. Business offices of a
public utility shall not be subject to the provisions of this subsection, but
shall be subject to the general requirements of this Ordinance applying to
Professional Offices.
Sec. 422
Residential Care Facilities
Residential care facilities as defined herein shall be allowed where
permitted under this ordinance, subject to the following conditions:
422.1
Review Procedures:
All residential care facilities shall be subject to approval by the Planning
Board under the Site Plan Review provisions of this Ordinance. In
addition, all residential care facilities, except for Community Living Uses
and for Boarding Care Facilities with eight (8) or fewer residents, must
meet the submissions requirements and review standards contained in the
Town of Chebeague Island Subdivision Ordinance under Sections 1, 3, 5,
6, 7 (except for Sec. 7.8 and 7.9), 8, 9, 10, and Appendix D; provided,
however, such subdivision submissions and review standards may be
waived by the Planning Board if otherwise addressed under the Site Plan
Review Ordinance. For the purposes of this ordinance, the words
"residential care facility" should be substituted for "subdivision" when
referring to the Subdivision Ordinance provisions listed above.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
96
A.
Review Fees: Residential care facilities subject to review
under the Subdivision Ordinance provisions above shall be
assessed review fees as specified by order of the Board of
Selectmen.
422.2
Density and Living Area:
Except in the Shoreland Zone, the minimum lot size of the zoning district
in which the residential care facility is proposed shall apply to the facility
as a whole and not to dwelling units, beds, or residents. The maximum
size of a facility for a given site shall instead be limited by the
requirements contained in Sec. 422.3 below and by applicable Special
Exception, Subdivision and/or Site Plan Review standards. Residential
care facilities shall in all events provide at least sufficient living area per
resident to comply with applicable State licensing or certification
requirements.
422.3
Site and Building Requirements:
A.
Minimum Lot Size: The minimum lot size shall be that
required for the zoning district in which the facility is
proposed.
B.
Site Coverage: The facility, as measured by the area of the
building footprint of all structures, shall not cover more than
10% of any site's gross acreage. This limitation on site
coverage applies only to structures and does not apply to
drives, parking areas, walkways, and gardens.
C.
Open Space: At least 50% of the gross site acreage shall be
devoted to vegetated open space. The open space may include
lawn areas, forest areas, areas with a vegetative cover, and
gardens. Open space shall not include areas covered by
structures, parking areas, drives, walkways, swimming pools,
tennis courts, or similar improvements.
D.
Setbacks: The setbacks below shall apply to new structures
upon which construction commences after the effective date of
this amendment, additions thereto, additions to structures upon
which construction commenced prior to the effective date of
this amendment, parking areas, swimming pools, tennis courts
and similar improvements.
SETBACK SCHEDULE
(Total Square Footage of All Structures, Existing and
Proposed New Structures and any Additions, added Together)
Greater than 10,000
5,000 to 10,000
Less than 5,000 Square
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
97
Square Feet
Square Feet
Feet
Front
100 feet
75 feet
Same
as
otherwise
required under Sec. 204
"District Regulations"
Rear
75 feet
75 feet
Each Side
100 feet
75 feet
In cases involving expansions of or additions to existing
structures which result in an increase in the square footage of a
residential care facility sufficient to cause the facility as a
whole to become subject to an increased setback requirement
pursuant to the foregoing schedule, the existing structure, if in
compliance with the applicable setback requirement at the time
of its construction, shall be deemed to conform to the setback
schedule. The addition or expansion shall be subject to the
increased setback requirement except that the Planning Board
in a site plan review may grant approval to permit the setback
requirement applicable to the original structure to apply to the
addition on finding that compliance with the increased setback
requirement would cause undue hardship and that the proposed
addition or expansion will not result in any noise, glare, dust,
fumes, storm water runoff, air or water pollution or similar
condition having a detrimental effect on adjoining properties.
The Board may, as a condition of such approval, require
buffering or screening sufficient to protect the privacy of
residents of the facility and adjoining properties.
E.
Height: The maximum building height shall not exceed that
which is permitted for residential construction in accordance
with the provisions of this ordinance.
F.
Parking: Off-street parking spaces shall be provided in the
amount of a minimum of one parking space for each residential
unit, except that for nursing homes one parking space for every
four beds and for hospitals one for every three beds shall be
provided. In addition, employee parking spaces that equal the
highest number of employees on duty during any one shift shall
be provided.
G.
Buffering: Adequate landscaping and screening shall be
provided in accordance with the standards for landscaping and
buffering contained in the Site Plan Review section of this
ordinance and, if required under Section 421.4 above, in the
applicable sections of the Subdivision Ordinance.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
98
422.4
Wastewater Disposal:
All proposed residential care facilities shall be subject to the submission
requirements and standards contained in Sec. 7.15--Sewage Disposal of
the Town of Chebeague Island Subdivision Ordinance.
422.5
Occupancy Guarantee and Conversions:
All residential care facilities shall be licensed or certified by the State of
Maine and shall be restricted to occupancy by elderly, handicapped, or ill
persons as specified by the license or certification. The conversion of a
residential care facility to another use shall require site plan review and
approval in addition to any other applicable provisions of this ordinance.
422.6
Reserved Units:
A proposed residential care facility shall be required to reserve at least
10% of its units for lower income people. "Lower income" is defined as
the full range of incomes at or below 80% of the median household
income as determined by the Department of Economic and Community
Development. Any applicant seeking a variance from the requirement of
this subsection must, in addition to the other variance standards under this
ordinance, demonstrate that the Town has achieved a level of 10% or more
of new residential development, including units in residential care
facilities, based on the most recent five-year historical average of
residential development in the Town, which meets the definition of
housing for lower income persons as defined herein.
Sec. 423
Street Construction
423.1
Private Streets
Private streets meeting the following standards, as determined by the Code
Enforcement Officer, may be used to satisfy the lot frontage requirement
for residential uses.
A.
In the IR and IB zones, an applicant shall submit to the Code
Enforcement Officer an application for a private right-of-way
required to provide access to a structure located within that
zone. The application shall specify the location of the
proposed right-of-way, the proposed width, the materials to be
utilized in the construction of the road, grades, provisions for
drainage, and sight distances at any turning radius. The Code
Enforcement Officer shall approve any plan that makes
adequate provision for these items, provided that the Fire Chief
approves the application for sufficiency of access for
emergency vehicles.
Sec. 424
Sanitary Standards
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
99
424.1
All subsurface sewage disposal systems shall be constructed in
conformance with the State of Maine Subsurface Waste Disposal Rules,
except where the requirements of this section differ from the Rules, the
requirements of this section govern.
424.2
The minimum setback for underground sewage disposal facilities from the
normal high water mark of a waterbody shall be no less than one hundred
(100) horizontal feet. Where daily sewage flow exceeds two thousand
(2,000) gallons, the minimum setback shall be three hundred (300) feet
from any shoreline. All other setback requirements of the Subsurface
Waste Disposal Rules shall be met in full. Setbacks from shorelines for all
subsurface sewage disposal facilities shall not be reduced by variance.
424.3
The following soils are unsuitable for construction of subsurface sewage
disposal systems due to their very severe limitations of drainage, flooding
and organic nature: Chocorua, Whately, Sebago, Saco-Limerick,
Borohemists, Borosaprists, Sulfihemists.
424.4
Except for a lot of record in the Cumberland County Registry of Deeds
created before May 26, 1987, the minimum separation between any
subsurface sewage disposal system and a dug well or spring shall be two
hundred (200) feet. An applicant may obtain a waiver of the two hundred
(200) foot separation from the Town Plumbing Inspector, if the applicant
demonstrates by appropriate engineering data that the proposed action will
not adversely affect water quality, but in no event shall separation be less
than one hundred (100) feet. For purposes of this section, "not adversely
affecting water quality" shall mean that no development or use of land
shall result in existing groundwater quality exceeding fifty (50) percent of
the physical, biological, chemical and radiological levels for raw and
untreated drinking water supply sources specified in the Maine State
Drinking Water Regulations, pursuant to 22 M.R.S. § 601. If existing
groundwater quality is inferior to the State Drinking Water Regulations,
the developer or land owner will not degrade the water quality any further.
This criterion shall apply to any existing or proposed water supply source.
As a minimum, the direction and rate of groundwater movement shall be
determined and a projection made by analytical methods of groundwater
quality at any well location. Where necessary in order to demonstrate
compliance with the above waiver standard, the investigation shall
include: soil borings, installing groundwater observation wells,
measurement of groundwater elevation at wells, estimation of the rate and
direction
of
groundwater
movement,
measurement
of
existing
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
100
groundwater quality, and identification of existing water supply wells or
springs on abutting properties. If the hydrogeologic evaluation and
projection of groundwater and/or surface water quality show that the effect
of the development or use of land will be to exceed the above groundwater
quality standards, that will be the basis for denial of the waiver.
424.5
In the shoreland zone clearing or removal of woody vegetation necessary
to site a new system and any associated fill extensions, shall not extend
closer than seventy-five (75) feet, horizontal distance, from the Highest
Astronomical Tide elevation of a water body or the upland edge of a
wetland and
424.6
A holding tank is not allowed for a first-time residential use in the
shoreland zone.
Sec. 425
Signs
Purpose: It is the intent of these regulations to provide for attractive,
coordinated, informative and efficient signs with the express purpose of
protecting property values, and enhancing the physical appearance of the
town.
425.1
Permits and Fees:
A.
No sign or outdoor display structure shall be erected, attached,
suspended or altered, until a permit has been issued by the
Code Enforcement Officer to the person or owner in control of
the sign. This Ordinance does not apply to temporary or
permanent State or municipal signs, historical designation
signs, contractor's signs, and temporary signs for the sale of a
single-family residence nor to signs relating to or controlling
the use of private property. Except as otherwise provided in
this Ordinance, a "temporary" sign is one that is erected for six
(6) months or less and a "historic designation" sign is a sign
that gives notice that a property is of an historic nature as
determined by a State, federal or local government agency.
B.
A person who wishes to erect or have erected a sign within the
Town shall make application on a prescribed application and
submit same to the Town Office for each location where a sign
is desired. A fee as established by order of the Board of
Selectmen per sign shall be submitted with each application,
except as indicated in Section 425.3.H.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
101
C.
The Code Enforcement Officer shall approve the application
within two weeks if it meets the requirements of this
Ordinance, otherwise the application shall be denied with a
statement of the reason given.
D.
Any person aggrieved by the decision regarding an application
may appeal to the Board of Adjustment and Appeals which
shall consider said appeal within thirty (30) days or at their
next regularly scheduled meeting, whichever event occurs
later, and the Board of Adjustment and Appeals decision shall
be final.
425.2
General regulations:
A.
No sign shall be painted upon or otherwise directly affixed to
any rock, ledge, or other natural feature except for signs
reading "No Trespassing", "No Hunting", or other signs of
similar import relating to controlling the use of private
property.
B.
No sign shall be erected at any location where, by reasons of
position, shape, wording or color, it interferes with or obstructs
the view of pedestrian or vehicular traffic, or which may be
confused with any other traffic signs, signal, or device.
C.
Permanent signs, other than municipal shall not be erected
within the right-of-way of any street or approved sight
easements, nor shall any sign, including temporary signs, be
located so as to constitute a traffic hazard.
D.
All signs and their supporting structures shall be properly
maintained to prevent rust, rot, peeling, or similar deterioration.
E.
Whenever a sign shall become structurally unsafe or endanger
the safety of a building or the public, the Building Inspector
shall order such sign to be made safe or removed. Such order
shall be complied with within ten (10) days of the receipt
thereof by the person owning or using the sign, or by the
owners of the building or premises on which such sign is
affixed or erected.
F.
Any sign which advertises, identifies or pertains to an activity
no longer in existence shall be removed by the owner of the
sign or the property or person otherwise responsible within
thirty (30) days from the time the activity ceases existence.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
102
This provision does not apply to seasonal activities during the
regular periods in which they are closed.
Where due written notification has been given by the Building
Inspector and compliance has not been made within the
required thirty (30) day period, the town may cause removal of
such sign and charge the cost of such removal to the owner.
G.
No sign shall have visible moving parts or have blinding,
moving or glaring illumination or consist of banners, pennants,
ribbons, streamers or similar devices.
H.
No animated, flashing, apparently moving, or portable signs
shall be permitted.
I.
Signs attached to a principal structure shall not extend above
the roof line or the parapet.
J.
No sign shall be closer than fifteen (15) feet to any lot line, or
five (5) feet from the edge of any public way as may be
determined by a lawful authority or otherwise encroach over in
the airspace of any public right-of-way.
K.
No advertising or identification sign, whether permanent or
temporary, shall be erected on any premises other than the
premises where the activity to which the sign pertains is
located, other than those permitted under Section 425.3.B or
Section 425.2.O.
L.
A sign may be illuminated provided it identifies the premises
on which it is displayed. Illuminated signs may only be lighted
during the daylight hours or those hours during which the
premises may be opened to the public.
M.
In all residential districts the source of light of an illuminated
sign shall be shielded or concealed. In all other districts the
use of an illuminated sign with unshielded light shall be subject
to a finding by the Board of Adjustment and Appeals that such
a sign will not adversely affect adjacent properties.
N.
Signs which are not visible from a public way are not subject to
this Ordinance.
O.
Signs advertising the sale of fresh fruit and vegetable crops are
allowed as permitted.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
103
425.3
Standards
A.
The number of permanent or temporary identification signs
which may be displayed on any lot in any zone must not
exceed three (3).
B.
The number of permanent or temporary advertising signs
which may be displayed on any lot only in the Island Business
zone must not exceed four (4). Advertising signs in all other
zones are prohibited except for signs advertising the sale of real
estate and except as may be specifically provided for by the
Board of Adjustment and Appeals in its granting of a use and
of a corresponding temporary advertising sign by special
exception. Signs associated with home occupations or one day
sales such as yard/garage/tag sales are permitted in all zones.
Such specific provisions shall not violate the intent and
purpose of this Ordinance.
C.
No individual sign shall contain more than twenty-five (25)
square feet.
D.
No individual sign shall have a height greater than twenty-five
(25) feet above the ground level of land upon which it is
located and as may be measured from the highest point on the
sign.
E.
The top of free-standing signs shall not exceed the height limit
of principal structures in the zone where located or twenty-five
(25) feet, whichever is less.
F.
The area surrounding free-standing signs shall be kept neat,
clean and landscaped.
G.
A temporary sign used to provide directional instructions to a
single-family residence that is for sale shall not exceed four (4)
square feet in size, shall be limited to four (4) in number at any
one time relative to a single house, and shall be so located as
not to interfere with traffic or otherwise cause a public
nuisance. Temporary signs for the sale of real estate other than
a single-family residence shall not exceed twenty-five (25)
square feet in area and a renewal permit shall be required after
the expiration of the first six (6) months that such a sign is
posted; such renewal permit shall be valid for up to six (6)
months.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
104
H.
Temporary political campaign signs which do not individually
exceed sixteen square feet may be erected in any zone provided
they conform with the conditions of this Ordinance and only
after obtaining a permit for the display of such signs from the
Code Enforcement Officer and payment of a refundable
application fee as established by order of the Board of
Selectmen. Applications for such political campaign signs
shall be made on forms provided for by the Code Enforcement
Officer. If following the election the Code Enforcement Officer
finds that all such political advertising signs pertaining to an
individual applicant have been removed, he may refund the
application fee. No temporary political campaign signs may be
erected more than thirty (30) days prior to the election for
which such signs pertain. All such temporary political
campaign signs shall be removed within 7 days following the
election or the deposit fee shall be forfeited to the Town.
425.4
Violations
Any violation of this Ordinance shall constitute a nuisance and the owner,
person or firm having control or use of any premises or sign violating any
provisions hereof shall be fined as established by order of the Board of
Selectmen for each day such violation is permitted to exist after
notification in writing from the Town.
425.5
Minimum Requirements:
The provisions of this Ordinance are minimum requirements. Whenever
the requirements of this Ordinance are at a variance with the requirements
of any other lawfully adopted statute, rule, regulation, ordinance, deed
restriction or covenant, the most restrictive or that imposing the highest
standard shall govern.
Sec. 426
Soils
All land uses shall be located on soils in or upon which the proposed uses
or structures can be established or maintained without causing adverse
environmental impacts, including severe erosion, mass soil movement,
improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and
commercial or industrial development and other similar intensive land
uses, shall require a soils report based on an on-site investigation and be
prepared by state-certified professionals. Certified persons may include
Maine Certified Soil Scientists, Maine Registered Professional Engineers,
Maine State Certified Geologists and other persons who have training and
experience in the recognition and evaluation of soil properties. The report
shall be based upon the analysis of the characteristics of the soil and
surrounding land and water areas, maximum ground water elevation,
presence of ledge, drainage conditions, and other pertinent data which the
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
105
evaluator deems appropriate. The soils report shall include
recommendations for a proposed use to counteract soil limitations where
they exist.
Sec. 427
Telecommunication Facilities
427.1
Purpose
The purpose of this Section is to provide a uniform and comprehensive set
of performance standards and requirements to be used by the Planning
Board during the site plan review process when it reviews an application
for the placement and construction of wireless telecommunication
facilities. These standards and requirements are intended to regulate the
location and installation of such facilities in order to:
A.
Protect and promote public health safety and welfare from
potential problems examples of which are falling ice,
telecommunication wave interference and attractive nuisance
of towers to children.
B.
Protect and preserve the aesthetic quality of the Town of
Chebeague Island as set forth in the goals, policies and
objectives of the adopted Comprehensive Plan, examples of
which are the protection of scenic vistas, rural character and
important historical areas, and the regulations of the Town of
Chebeague Island Zoning Ordinance, including but not limited
to buffering requirements, by carefully regulating siting and
design of wireless telecommunication facilities.
C.
Protect adjacent properties from potential damage from tower
failure and falling ice through careful siting regulations and
engineering requirements:
D.
Facilitate and encourage the managed development of
telecommunications infrastructure while at the same time not
unduly
restricting
the
development
of
needed
telecommunications facilities, including important amateur
radio installations and
E.
Encourage co-location on existing and future wireless
telecommunication towers and maximize the use of existing
and approved towers and other existing structures such as
utility poles, water towers and buildings to accommodate new
wireless telecommunication antennas in order to reduce the
number of new towers needed to serve the community's needs.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
106
427.2
Exemptions
The following uses are exempt from these regulations:
A.
A ground, building or tower-mounted antenna, operated by a
federally licensed amateur radio operator as part of the
Amateur Radio Service, which is no higher than thirty-five (35)
feet in height, and is not licensed or used for any commercial
purpose. The Code Enforcement Officer may permit additional
height up to a maximum of seventy-five (75) feet only if, a)
engineering documentation substantiating the need for the
excess height is submitted to and is acceptable to the Codes
Enforcement Officer, and b) the CEO determines that a height
in excess of thirty-five (35) feet is technically necessary to
successfully engage in this activity.
B.
Radio or television satellite dish antenna for the sole use of the
resident occupying a residential parcel on which the satellite
dish is located.
C.
A single ground or building-mounted receive-only radio or
television antenna including any mast, for the sole use of the
occupant of a residential parcel on which the radio or television
antenna is located, with an antenna height not exceeding thirty-
five (35) feet.
D.
A ground or building-mounted citizens band radio or two-way
FM antenna including any mast, if the height (post, and
antenna and support structure is not on the ground) does not
exceed thirty-five (35) feet.
E.
A municipal, public safety or public works wireless
telecommunication facility up to a minimum height of 100 feet,
the 100 feet height limitation shall not include the height of any
building that the TCF may sit upon.
427.3
Submission Requirement
In addition to all of the relevant site plan review submission requirements
listed in Sec. 206, the following submissions shall be required unless
waived by the Planning Board.
A.
A report from a Registered Professional Engineer in the State
of Maine that describes the tower, the technical reasons for the
tower design and the capacity of the tower, including the
number(s), type(s), and volume(s) of antenna(s) that it can
accommodate and the basis for the calculation of capacity.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
107
B.
Written approval by all applicable state and federal agencies,
including
but
not
limited
to
the
Federal
Aviation
Administration
(FAA)
and
Federal
Communications
Commission (FCC), including a description of any conditions
or criteria for the approval, or a statement from the agency that
no approval is required.
C.
A letter of intent that commits the tower owner and his or her
successors in interest to:
1. respond in a timely, comprehensive manner to a request for
information from a potential co-location applicant.
2. negotiate in good faith for shared use by third parties that
have received an FCC license or permits:
3. allow shared use if an applicant agrees in writing to pay
reasonable charges.
D.
Proof of financial capacity to build, maintain, and remove the
proposed tower.
E.
An inventory of all of the provider's existing and approved
towers, antennas or sites within the Town of Chebeague Island
and locations in surrounding communities where wireless
telecommunications are proposed to be utilized in conjunction
with the facility proposed in the application.
F.
Photos showing site vegetation, existing and adjacent
structures, views of and from the proposed site, topography,
and land uses on the proposed parcel and on abutting
properties.
G.
Landscaping plan reflecting location of proposed screening and
fencing, planting areas, proposed plantings, existing plant
materials to be retained and trees or shrubs to be removed.
H.
Elevation drawings, cross-sectional area or silhouette of the
facility, drawn to scale, and showing all measurements, both
linear and volumetric, showing front, sides and rear of the
proposed facility including all fencing, supporting system for
transmission cables running between the tower and accessory
structures, control panels, antennas, and existing structures and
trees.
The
submission
shall
reference
any
design
characteristics that have the effect of reducing or eliminating
visual obtrusiveness.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
108
I.
Detail of the tower base or method of attachment to a structure.
If the facility will be attached to an existing building or
structure, provide measurements and elevations of the
structure.
J.
A visual analysis, which may include photo montage, field
mock up, or other techniques, which identifies the potential
visual impacts, at design capacity, of the proposed facility.
Consideration shall be given to views from public areas as well
as from private residences and from archaeological and historic
resources including but not limited to the National Register of
Historic Places or those that are eligible for such listing. The
analysis of the impact on historical and archaeological
resources shall meet the requirements of the Maine State
Historic Preservation Officer in his/her review capacity for the
FCC. The overall analysis shall assess the cumulative impacts
of the proposed facility and other existing and foreseeable
communication facilities in the area, and shall identify and
include all feasible mitigation measures consistent with the
technological requirements of the proposed communication
service.
K.
Identify any other telecommunication facilities existing or
proposed on the site.
L.
Details of all accessory structures including buildings, parking
areas, utilities, gates, access roads, etc.
M.
Structural requirements:
1. Telecommunication towers shall be designed and installed
in accordance with the most current standards of the
Electronic
Industries
Association
(EIA)
Structural
Standards for Steel Antenna Towers and Antenna
Supporting Structures.
2. The applicant's engineer shall provide documentation
showing that the proposed transmission tower meets or
exceeds the most current standards of the American
National Standards Institute ANSI/EIA/TIA-222 for
Cumberland County relative to wind and 1/2" ice loads
when the tower is fully loaded with antennas, transmitters,
and other equipment as described in the submitted plan.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
109
3. For towers or antennas placed on buildings or alternative
tower structures (ATS), the applicant shall also provide
written certification that the building or ATS itself is
structurally capable of safely supporting the tower or
antennas and their accompanying equipment.
427.4
Space and Bulk Standards
A.
Tower Height
Towers shall not exceed a height of one hundred (100) feet. In
the Island Business district, where evidence of acceptable
design and co-location is provided, the Planning Board may
approve an additional twenty-five (25) feet of tower height per
each additional wireless communication service co-locator, not
to exceed one hundred seventy-five (175) feet.
B.
Antennas
1. Height
Installing antennas on alternative tower structures is
permitted, provided the resulting alternative tower structure
height does not exceed one hundred (150) feet.
2. Mounting and dimensions
The mass and dimensions of antennas on a tower or
alternative tower structure shall be governed by the
following criteria:
a. Whip antennas shall not exceed twenty (20) feet in
length for an individual antenna and shall be limited to
two (2) per mount, with no more than three (3) mounts
at a given level.
b. Microwave dish antennas. The aggregate diameters of
microwave dish antennas mounted within a twenty (20)
foot vertical section of a tower may not exceed twenty-
four (24) inches, with no single dish being more than
eight (8) inches in diameter and five (5) feet in depth,
unless otherwise required per the path reliability and/or
tower structural studies.
c. Panel antennas. The horizontal centerline of all panel
antennas of a single carrier must be aligned in the same
horizontal plane, with each antenna not to exceed eight
(8) feet in length nor two (2) feet in width.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
110
C.
Lot Area
A new wireless telecommunications tower shall not be
constructed on a lot that does not conform to the minimum lot
area required in the zoning district even if such lot is a lawful
non-conforming lot of record.
D.
Setbacks
1. All wireless communications towers shall be set back from
any lot lines a distance equal to at least 125% of the tower
height.
2. Equipment facilities shall meet the required District
setbacks.
3. If more than one tower is proposed on a single lot or parcel,
they shall be clustered as closely together as technically
possible.
4. Notwithstanding the height and setback limitations within a
zoning district, in order to accommodate the co-location of
an additional antenna, a tower, existing as of July 1, 2007
may be modified or rebuilt to a taller height, not to exceed
a total maximum of thirty (30) feet more than the tower's
height as of July 1, 2007 but only if that additional height
will not require any lighting or obstruction painting. The
additional tower height shall not require increased lot
setbacks.
5. There shall be setback requirements for antennas mounted
on alternative tower structures. The standard District
setbacks shall continue to apply for alternative tower
structures and equipment facilities, where applicable.
427.5
Co-Location Requirements
A.
On existing towers
1. Applicants for site plan review for a new wireless
communication tower must send written notice by pre-paid
first class United States mail to all other such tower and
alternative tower structure owners and licensed wireless
communication providers in the Town utilizing existing
towers and alternative tower structures and to owners of
such towers and alternative structures within a one (1) mile
search radius of the proposed tower, stating their needs and/
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
111
or co-location capabilities. Evidence that this notice
requirement has been fulfilled shall be submitted to the
Planning Board and shall include a name and address list,
copy of the notice which was sent, and a statement, under
oath, that the notices were sent as required. An application
for a new tower must include evidence that existing or
previously approved towers and alternative tower structures
within the Town and search area cannot accommodate the
communications equipment (antennas, cables, etc.) planned
for the proposed tower. Such evidence shall be
documentation from a qualified and licensed professional
engineer that:
a. Planned necessary equipment would exceed the
structural capacity of existing and approved towers and
alternative tower structures, considering the existing
and planned use of those towers and alternative tower
structures, and the existing and approved towers cannot
be reinforced to accommodate planned or equivalent
equipment at a reasonable cost;
b. Planned
equipment
will
cause
electromagnetic
frequency interference with other existing or planned
equipment for that tower or alternative tower structure,
and the interference cannot be prevented at a reasonable
cost:
c. Existing or approved towers and alternative tower
structures do not have space on which planned
equipment can be placed so it can function effectively
and at least in parity with other similar equipment place
or approved; or
d. Other documented reasons that make it technically or
financially unfeasible to place the equipment planned
by the applicant on existing and approved towers and
alternative tower structures.
2. Shared use shall be conditioned on the applicant's
agreement to pay a reasonable fee and costs of adapting
existing facilities to the proposed use.
3. Once
the
Planning
Board
has
determined
that
telecommunications equipment proposed by the applicant
cannot be accommodated on an existing or approved tower
or alternative tower structure, each tower or alternative
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
112
tower structure so determined is presumed unable to
accommodate similar equipment that may be proposed in
the future unless the Board determines after additional
information is provided, that new technology or other
considerations enables the existing or approved tower or
alternative tower structure to accommodate the equipment.
4. The Planning Department will maintain a list of existing
and approved towers and alternative tower structures,
including the name and address of owner(s), within the
Town of Chebeague Island.
B.
Construction of new towers
A proposal to construct a new co-located communication tower
taller than the maximum height permitted for a single wireless
communication service must include evidence that the tower
can structurally support a minimum of three (3) antenna arrays
for each anticipated co-locating entity. (See Section 427.4 on
Tower Height).
Prior to the issuance of any building permits for a co-located
tower in excess of the height of a single user tower, the
applicant will submit to the Code Enforcement Officer
executed agreements documenting commitments to co-locate
from the number of co-locators approved by the Planning
Board.
427.6
Interest Of Telecommunication Entity
A proposal to construct or modify a wireless communication tower must
include evidence of a commitment from a duly licensed entity to utilize
the tower to provide wireless communication services. All wireless
communication entities which are contracted to locate on the tower must
join as applicants.
427.7
Design Standards
A.
Wireless communication facilities:
1. Except where dictated by federal or state requirements, the
Planning Board may require that a proposed tower be
camouflaged or designed to blend with its surroundings.
This may include, but not be limited to, having a
galvanized finish, being painted "flat" blue gray or in a
skytone above the top of surrounding trees and earthtone
below treetop level.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
113
2. Equipment facilities shall be adjacent to the tower base
unless an alternate location will be less visually obtrusive
or topographic considerations require an alternative
location.
3. Equipment facilities shall be no taller than one story in
height and shall be treated to look like a building or facility
typically found in the area.
4. No obstruction painting or any lighting shall be permitted
on any towers, except where dictated by federal or state
requirements. If lighting is required, the Planning Board
may review the available lighting alternatives and approve
the design that would cause the least disturbance to the
surrounding properties and views.
5. Manually operated or motion detecting security lighting is
permitted.
6. The Planning Board may require special design of the
facilities where findings of particular sensitivity are made
(e.g., proximity to historic or aesthetically significant
structures, views and / or community features).
7. Sufficient anti-climbing measures and other security
measures preventing access to the site shall be incorporated
into the facility as needed, to reduce the potential for
trespass and injury.
B.
Antenna arrays
Antenna arrays located on an existing structure or alternative
tower structure shall be placed in such a manner so as to not be
visible from a ground level view adjacent to the structure. If,
however, circumstances do not permit such placement, the
antenna array shall be placed and colored to blend into the
architectural detail and coloring of the host structure.
427.8
Location
A.
Wireless telecommunication facilities shall not be sited in areas
of high visibility unless the Planning Board finds that no other
location is technically feasible. For purposes of this section
high visibility shall mean areas with no visual clutter such as
trees and buildings. If the facility is to be sited above the
ridgeline it must be designed to minimize its profile by
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
114
blending with the surrounding existing natural and man-made
environment.
B.
No facility shall be located so as to create a significant threat to
the health or survival of rare, threatened or endangered plant or
animal species.
427.9
Additional Standards and Criteria
A.
Mitigation measures have been utilized to screen antennas and
towers from view from public rights-of-way or scenic vistas,
either via landscaping, fencing or other architectural screening.
B.
Creative design measures have been employed to camouflage
facilities by integrating them with existing buildings and
among other uses.
C..
Other technically feasible sites have been investigated and, if
available, the proposed facility has been relocated in order to
minimize the effect of the location on visually sensitive areas
such as residential communities, historical areas and open
space areas.
427.10 Waiver Provision
The Planning Board, in its sole discretion, may modify or waive any of the
submission requirements, application procedures, or standards of this
Section 427.3 of this ordinance when it determines that, because of the
type or size of the project or circumstances of the site, such requirements
would not be applicable or would be unnecessary to determine compliance
with the approval standards. The Planning Board must additionally
determine that such modification or waiver would not adversely affect
properties in the vicinity or the general safety and welfare of the Town.
The burden of proof regarding any such modification or waiver rests
solely with the applicant and must be shown to be consistent with federal
and state law.
Notwithstanding the authority of the Planning Board to grant a waiver, in
no instance may the height of a new tower exceed two hundred fifty (250)
feet or may the height of an alternative tower structure be increased to
more than two hundred fifty (250) feet.
427.11 Amendments
Any change to existing, previously approved and proposed towers requires
site plan approval as noted in the definitions of major and minor
development. Changes include, but are not limited to, modifications to
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
115
approved height and to approved attachments such as antennas and dishes
as well as requests for additional attachments.
427.12 Removal Of Abandoned Wireless Communication Facility
A.
The owner of a telecommunication facility (TCF) shall notify
the Town Administrator of the date of cessation of use of the
facility or any component(s) thereof within one month from the
date of such cessation. If the owner fails to give the notice
required by this paragraph, the Code Enforcement Officer shall
make a determination of such date, which determination shall
be conclusive.
B.
Any TCF or component thereof that is not operated for a
continuous period of twelve (12) months shall be considered
abandoned. The owner of abandoned TCF or component
thereof shall remove it within ninety (90) days of receipt of
notice from the Code Enforcement Officer of determination of
abandonment.
All above ground structures, equipment, foundations, guy
anchors, utilities and access roads or driveways specifically
constructed to service the tower, structures equipment or
utilities shall be removed, and the land returned to a condition
as near to the original pre-construction condition as possible.
C.
At the time of approval, the applicant for a new tower shall
post a performance guarantee in the form of a continuous
corporate surety bond, an irrevocable letter of credit, or an
escrow account in favor of the Town equal to 125% of the
estimated demolition and removal cost of the tower and
associated facilities if abandoned at any time by the applicant.
Such performance guarantee shall be satisfactory to the Town
Administrator as to the issuer, form, sufficiency, surety and
manner of execution. All performance guarantees shall be on a
continuous basis, with any provision for cancellation to include
that a minimum thirty (30) day notice of cancellation or non-
renewal be sent by certified mail to the Town of Chebeague
Island.
D.
If there are two or more users of a single tower or TCF, then
this provision shall not apply until all users cease using the
tower or TCF.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
116
E.
If all antennas above a manufactured connection on a tower are
removed, the resulting unused portions of the tower shall
subsequently be removed within six (6) months.
F.
The replacement of all or portions of a TCF previously
removed requires a new site plan approval.
427.13 Inspections
A.
Inspection of towers by a Registered Professional Engineer in
the State of Maine shall be performed to insure structural
integrity, such inspections shall be performed as follows:
1. Monopole towers - at least once every seven (7) years
following completion of construction. The inspection shall
take place between the sixth and seventh year of the repeat
sequence.
2. Self-supporting towers - at least once every five (5) years
following completion of construction. The inspection shall
take place between the fourth and fifth year of the repeat
sequence.
3. Guyed towers - at least once every three (3) years following
completion of construction. The inspection shall take place
between the second and third year of the repeat sequence.
B.
The inspection report shall be submitted to the Town Engineer
within thirty (30) days of its receipt by the tower owner. Based
upon the results of the inspection, the CEO, upon
recommendation by the Town Administrator, may require
repair or demolition of the tower.
C.
The cost of such inspections, reports, repairs or demolition
required under this Section of the Ordinance shall be borne
entirely by the tower owner. Required repairs shall be
completed within ninety (90) days or less as required by the
Code Enforcement Officer and agreement by the Town
Administrator for safety reasons.
D.
Failure to provide required inspection reports in the required
time schedule shall be deemed primae facie evidence of
abandonment.
Sec. 428
Temporary Sawmill Operations
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
117
The Board of Adjustment and Appeals before granting special exceptions
in Districts where a temporary sawmill operation is permitted as a special
exception shall first determine that the proposed operation will meet the
following requirements:
428.1
It shall not be located within five hundred (500) feet of any dwelling,
school or religious institution.
428.2
The operators thereof shall file with the Town of Chebeague Island a bond
in an amount to be determined by the Board of Adjustment and Appeals
sufficient to ensure that upon conclusion of the operation the appearance
of the area will not have an adverse effect upon neighboring properties by
reason of abandoned piles of sawdust and/or other debris and ruination of
vegetation to cause excessive soil erosion.
428.3
The operation of a temporary sawmill shall be completed within a twelve-
month period.
428.4
The Board may impose such other restrictions as it deems necessary to
protect the health, safety, and welfare of the public and adjoining
properties.
Sec. 429
Temporary Structures
Temporary structures including mobile units used in conjunction with
construction work shall be permitted only during the period that
construction work is in progress. Permits for temporary structures may be
issued by the Building Inspector for up to a six month period. Fees for the
permit shall be set by order of the Board of Selectmen. The basement of a
structure shall not be used for residential purposes before the completion
of the total structure. Sanitary facilities shall be provided in construction
facilities and shall be completely self-contained with holding tanks.
Sec. 430
Water Extraction and Storage
Ground water or spring water may be pumped, extracted and/or bulk
stored for wholesale commercial purposes at locations where permitted
under this ordinance, subject to the approval of the Board of Adjustment
and Appeals. Notwithstanding the provisions of Sec. 206.1, the Board of
Adjustment and Appeals shall receive the recommendations of the
Planning Board under Site Plan Review, and shall grant final approval if it
finds that the proposal with any reasonable conditions, will conform with
the additional requirements of Sec. 430.1, below.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
118
430.1
Conditions of approval:
A.
The quantity of water to be taken from ground water sources
will not substantially lower the ground water table to the
detriment of public and private wells on adjacent properties,
cause salt water intrusion, cause undesirable changes in ground
water flow patterns, or cause unacceptable ground subsidence,
based on the conditions of a drought with a probability of
occurrence of once in ten years.
B.
The proposed facility will not cause water pollution or other
diminution of the quality of the aquifer from which the water is
to be extracted.
C.
Safe and healthful conditions will be maintained at all times
within and about the proposed use.
D.
The proposed use will not cause sedimentation or erosion.
E.
The proposed facility is not within the defined aquifer recharge
area of a public water supply, unless notice is given to the
operator thereof and the Board has considered any information
supplied by the operator and finds that no adverse effect on a
public water supply will result.
F.
The operator shall make monthly operating records of the
quantity of water extracted, stored and removed from the site
available to the Board of Selectmen or its designee.
430.2
The application together with site plan shall include the
following additional information:
A.
Statement of the quantity of ground water to be extracted,
expressed as the annual total, the maximum monthly rate by
month, and the maximum daily rate;
B.
A letter from the Maine Department of Health and Human
Services approving the facility as proposed;
C.
Where appropriate, letters from the Maine Department of
Transportation when access approval is required, and from the
Department of Environmental Protection when the site location
law is applicable or a discharge permit is required;
D.
Applicants shall present a written report of a hydrogeologic
investigation conducted by a certified professional geologist or
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
119
registered professional engineer, except for spring water
extraction facilities which meet the following conditions; this
spring enhancement will not increase the combined spring's
catchment capacity by removing more than four (4) cubic yards
of earth and not increase this spring's depth by more than four
(4) feet, where the discharge drain is no lower than the existing
spring water level, where gravity alone (without the aid of a
siphon) is used to withdraw the spring water to other facilities
on site, and where other improvements do not threaten ground
water levels. This report shall include the following
information:
1. A map of the aquifer tributary to the spring(s) or well(s)
from which water is to be extracted in sufficient detail to
support a calculation of sustained yield during a drought
with a probability of one in ten years, as well as an estimate
of any potential interaction between this aquifer and
adjacent aquifers.
2. The results of the investigation shall establish the aquifer
characteristics, the rates of draw down and rebound, the
sustainable yearly, monthly (by month), and daily
extraction rates, the cone of depression which may develop
about the proposed facility, and other impacts on the water
table in the tributary aquifer and such other private or
public wells within 1000 feet of the proposed extraction
facilities shall be assessed.
430.3
Nothing in this procedure, and no decision by the Board of Adjustment
and Appeals shall be deemed to create ground water rights other than
those rights which the applicant may have under Maine Law.
Sec. 431
Water Quality Protection
No activity shall locate, store, discharge, or permit the discharge of any
treated, untreated, or inadequately treated liquid, gaseous, or solid
materials of such nature, quantity, obnoxiousness, toxicity, or temperature
that run off, seep, percolate, or wash into surface or ground waters
including any water body, tributary stream or wetland, so as to impair
designated uses or the water classification of the water body, contaminate,
pollute, or harm such waters or cause nuisances, such as objectionable
shore deposits, floating or submerged debris, oil or scum, color, odor,
taste, or unsightliness or be harmful to human, animal, plant, or aquatic
life.
Sec. 432
Individual Private Campsites
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
120
Individual private campsites not associated with campgrounds are allowed
provided the following conditions are met:
A. One campsite per lot existing on the effective date of this Ordinance may
be permitted.
B. When an individual private campsite is proposed on a lot that contains
another principal use and/or structure, the lot must contain the minimum
lot dimensional requirements for the principal structure and/or use, and the
individual private campsite separately.
C. Campsite placement on any lot, including the area intended for a
recreational vehicle or tent platform, shall be set back seventy-five (75)
feet, horizontal distance, from the Highest Astronomical Tide elevation of
water bodies, tributary streams, or the upland edge of a wetland.
D. Only one recreational vehicle shall be allowed on a campsite. The
recreational vehicle shall not be located on any type of permanent
foundation except for a gravel pad, and no structure except a canopy shall
be attached to the recreational vehicle.
E. The clearing of vegetation for the siting of the recreational vehicle, tent or
similar shelter in a Resource Protection District shall be limited to one
thousand (1,000) square feet.
F. A written sewage disposal plan describing the proposed method and
location of sewage disposal shall be required for each campsite and shall
be approved by the Local Plumbing Inspector. Where disposal is off-site,
written authorization from the receiving facility or land owner is required.
G. When a recreational vehicle, tent or similar shelter is placed on-site for
more than one hundred -twenty (120) days per year, all requirements for
residential structures shall be met, including the installation of a
subsurface sewage disposal system in compliance with the State of Maine
Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
121
SECTION 500 NON-CONFORMING USES, BUILDINGS, STRUCTURES AND
LOTS
Sec. 5012
The use of any building, structure or land which is made non-conforming
by reason of the enactment of this Ordinance, or which shall be made non-
conforming by reason of a subsequent amendment, may be continued
subject to the following provisions:
501.1
Non-conforming Buildings
A.
Repairs and Alterations: A nonconforming building or
structure may be repaired, altered, improved, or reconstructed.
A non-conforming building or structure may be added to or
expanded after obtaining a permit from the same permitting
authority as that for a new structure, if such addition or
expansion does not increase the non-conformity of the structure
or expand the area of a non-conforming use. The number of
square feet of floor area devoted to the nonconforming use may
not be increased, unless the Board of Adjustment and Appeals
finds that the proposed expansion of the nonconforming use
will not adversely affect other property in the same district and
neighborhood and that the granting of such approval by the
Board will not substantially depart from the intended purposes
of this ordinance.
B.
Rebuilding: A nonconforming building or structure, damaged
or destroyed by fire, explosion, or act of God may be rebuilt,
provided the rebuilding is begun within twelve (12) months of
the disaster. The number of square feet of floor area devoted to
nonconforming use shall not be increased, unless in the opinion
of the Board of Adjustment and Appeals, such increase will not
be detrimental to adjacent properties.
501.2
Non-conforming Uses
A.
Extension of Use: A nonconforming use of a building or
structure shall not be extended, nor shall a nonconforming use
of a part of a building or structure be extended to other parts of
the building or structure unless those parts were manifestly
arranged or designed for such use prior to the enactment of this
Ordinance
or
of
any
amendment
making
such
use
nonconforming, provided, however, that non-conforming
residential uses may be expanded within existing residential
buildings or structures or with expansions of such structures
that have been permitted.
2 Non-conforming lots, not in the Shoreland Zone, are covered in sec. 205.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
122
B.
Where a non-conforming structure is added to or expanded as
permitted by Section 501.1.A of this Ordinance, a non-
conforming use may not be extended into the area of such
addition or expansion. A non-conforming use of land may not
be extended.
C.
Change of Use: A nonconforming use of a building or
structure or piece of land may be changed to another
nonconforming use only when the Board of Adjustment and
Appeals finds that the new use is not objectionable or
detrimental to adjacent properties; provided, however, that a
non-conforming use of a building or structure or piece of land
located within the shoreland areas may be changed to another
non-conforming use only upon a determination by the Board of
Adjustment and Appeals that the proposed use has no greater
adverse impact upon the subject and adjacent properties and
resources than does the existing use.
D.
Abandonment: The nonconforming use of any building,
structure, or piece of land, which has been abandoned shall not
thereafter be resumed. A nonconforming use shall be
considered abandoned:
1. When it has been replaced by a conforming use;
2. When it has been discontinued for a period of one year; or,
upon the death of the owner when it has been discontinued
for eighteen (18) months; or
3. When it has been changed to another nonconforming use
pursuant to the approval of the Board of Adjustment and
Appeals.
E
Change of Use of a Non-conforming Structure:
The use of a non-conforming building or structure may not be
changed to another use unless the Planning Board after
receiving a written application determines that the new use will
have no greater adverse impact on the water body, tributary
stream or wetland, or on the subject or adjacent properties and
resources than the existing use.
In determining that no greater adverse impact will occur, the
Planning Board shall require written documentation from the
applicant regarding each of the criteria listed herein and shall
determine whether the proposed use has a greater adverse
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
123
impact upon the public health and safety, erosion and
sedimentation, water quality, fish and wildlife habitat,
vegetative cover, visual and actual points of public access to
waters, natural beauty, flood plain management, archaeological
and historic resources, and commercial fishing maritime
activities, and other functionally water-dependent uses than the
existing use.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
124
SECTION 600 - ADMINISTRATIVE PROVISIONS
Sec. 601
Code Enforcement Officer
601.1
It shall be the duty of the Code Enforcement Officer to enforce the
provisions of this Ordinance. The Selectmen and Town Administrator
shall assist the Code Enforcement Officer by reporting to him any new
construction or use of land, and apparent violations of this Ordinance.
601.2
If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing the person
responsible for such violation, indicating the nature of the violation and
ordering the action necessary to correct it, including discontinuance of
illegal use of land, buildings or structures, or work being done, removal of
illegal buildings or structures, and abatement of nuisance conditions. A
copy of such notices shall be submitted to the municipal officers and be
maintained as a permanent record.
601.3
The Code Enforcement Officer shall conduct on-site inspections to insure
compliance with all applicable laws and conditions attached to permit
approvals. The Code Enforcement Officer shall also investigate all
complaints of alleged violations of this Ordinance.
601.4
The Code Enforcement Officer shall keep a complete record of all
essential transactions of the office, including application submitted,
shoreland zoning permits granted or denied, variances granted or denied,
revocation actions, revocation of shoreland zoning permits, appeals, court
actions, violations investigated, violations found, and fees collected. On
an biennial basis, a summary of this record shall be submitted to the
Director of the Bureau of Land and Water Quality within the Department
of Environmental Protection.
Sec. 602
Permits and Fees
602.1
Building Permit:
No building or part thereof shall be erected, structurally altered, enlarged,
or moved unless a building permit for such action has been issued by the
Code Enforcement Officer.
A.
Application for a building permit shall be accompanied by a
fee as established by order of the Board of Selectmen.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
125
B.
Each application to the Code Enforcement Officer for a permit
to erect a new building or structure or to enlarge or to move an
existing one shall be accompanied by a site plan showing the
measurements of the lot and of all buildings, yards, and parking
spaces, existing and proposed. The intended use or uses of
land and building shall be indicated clearly.
602.2
Use Permit:
The fee for a use permit shall be established by order of the Board of
Selectmen. It shall be paid by the applicant unless a fee for a building
permit has previously been paid.
A.
No building or part thereof that has been erected, altered,
enlarged or relocated, shall be occupied or used unless a use
permit has been issued by the Code Enforcement Officer;
B.
A temporary use permit may be issued by the Code
Enforcement Officer for a period of six months during the
completion of work, provided that such temporary permits may
require such conditions and safeguard as will protect the health,
safety, and welfare of the occupants and the public;
C.
The establishment of an office or home occupation within a
dwelling shall require a use permit.
602.3
Demolition Permits:
The fee for a permit for the demolition of a building or structure shall be
established by order of the Board of Selectmen. No permit shall be issued
until notice of the application has been posted in the Town Office for at
least ten (10) days.
Before a building can be demolished or removed, the owner or agent shall
notify all utilities having service connections within the building such as
water, electric, gas, sewer, and other connections.
602.4
Excavation of Land and Removal of Earth Products:
An application to the Board of Adjustment and Appeals for a permit to
excavate land or remove earth products shall be accompanied by a fee as
established by order of the Board of Selectmen. Outside consulting fees
shall be charged in accordance with Section 608. Upon annual renewal of
the application for the excavation of land and the removal of earth
products, such application shall be accompanied by an application fee as
established by order of the Board of Selectmen.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
126
602.5
Any other application for a building permit, and any application for a use
permit, shall be accompanied by a description of the intended use or uses
of the land and buildings and such further details as the Code Enforcement
Officer may reasonably require for a clear understanding of the case.
602.6
A person who is issued a permit pursuant to this Ordinance shall have a
copy of the permit on site while the work authorized by the permit is
performed.
602.7
Belated Permits:
In addition to the cost of a permit, all belated permits will be subject to a
fine as established by order of the Board of Selectmen.
Sec. 603
Board of Adjustment and Appeals
603.1
There is hereby created a Board of Adjustment and Appeals to assist in the
administration of this Ordinance. Such Board shall serve as a Board of
Appeals pursuant to 30-A M.R.S. § 2691, and may perform such other
functions as may be delegated to it by other ordinances.
1.
The Board shall consist of five (5) members appointed by the
Board of Selectmen. They shall serve without compensation.
Appointments to the Board shall be for terms of three years,
provided, however, that initial appointments to the Board shall
be as follows: two members shall be appointed for terms of
three years each, two members for two year terms and one
member for a one year term. The Board shall elect annually a
Chairman and Secretary from its membership. When there is a
vacancy on the Board, the Board of Selectmen shall appoint a
person to serve for the balance of the unexpired term.
2.
Neither a Selectman, a member of the Planning Board, nor his
or her spouse may be a member of the Board.
3.
Any question of whether a particular issue involves a conflict
of interest sufficient to disqualify a member from voting
thereon shall be decided by a majority vote of the members,
except the member who is being challenged.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
127
4.
Vacancies may occur by reason of resignation, death or
removal from the Town, and, when certified to the Council by
a majority of the members of the Board, by failure to attend at
least 75% of the Board meetings, regular or special, during any
twelve (12) month period. A member may also be removed for
cause, after notice and hearing, by the Board of Selectmen.
Vacancies shall be filled by the Board of Selectmen for the
unexpired term
5.
Three members of the Board shall constitute a quorum for the
hearing of appeals. If less than a quorum be present, the
hearing may be adjourned for a period not exceeding two
weeks at any one time, and the clerk to the Board shall in
writing notify all members of the next date of the hearing to be
rescheduled. Any hearing at which a quorum is present may
also be adjourned in like manner by a majority of those present
for such time or upon such call as is determined by vote with
the same written notification by the clerk. The clerk shall also
give notice of adjourned hearing to all other interested parties
as shall be directed in the vote of adjournment.
6.
The Board shall be guided in its procedures by the provisions
of 30-A M.R.S. § 2691, and 1 M.R.S. §§ 401, et seq.
603.2
The Board shall have the following powers and duties:
A.
Interpretation. Upon appeal by from a decision of the Code
Enforcement Officer where it is alleged by an aggrieved party
that there is an error in any order, requirement, decision or
determination made by, or failure to act by the Code
Enforcement Officer the Board shall determine whether the
decisions of the Code Enforcement Officer are in conformity
with the provisions of this Ordinance, and interpret the
meaning of the Ordinance in cases of uncertainty.
B.
Variances
1. Upon appeal from a decision of the Code Enforcement
Officer, the Board shall have the power to vary the
dimensional requirements of this Ordinance that relate to
size and height of structures, setback distances, and size of
signs. A variance shall only be granted where such
variance will not be contrary to public health, safety or
general welfare. For any sign or height variance, the Board
must find that a literal enforcement of this Ordinance
would result in unnecessary and undue hardship, and that
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
128
such hardship arises out of conditions peculiar to the
property and is not the result of any action of the applicant
or a prior owner. A variance shall not be granted for the
establishment or expansion of a use otherwise prohibited.
The
presence
of
other
non-conformities
in
the
neighborhood or zoning district shall not constitute grounds
for a variance.
2. Disability Variance. The Board may grant a variance to an
owner of a dwelling for the purpose of making that
dwelling accessible to a person with a disability who
resides in or regularly uses the dwelling. The Board shall
restrict any variance granted under this subsection to the
installation of equipment or the construction of structures
necessary for access to or egress from the dwelling by the
person with the disability. The Board may impose
conditions on the variance, including limiting the variance
to the duration of the disability or the time that the person
with the disability lives in the dwelling. For the purposes
of this subsection, a disability has the same meaning as a
physical or mental handicap under 5 M.R.S.A. § 4553, and
the term "structures necessary for access to or egress from
the dwelling" is defined to include railing, wall or roof
systems necessary for the safety or effectiveness of the
structure.
C.
Special Exception
The Board shall have the power and duty to approve, deny or
approve with conditions special exceptions only where such
approval is specifically required. Where an advisory report
from the Planning Board is required, the Code Enforcement
Officer shall refer the application to the Planning Board for its
review and recommendations at least thirty (30) days prior to
the meeting of the Board of Adjustment and Appeals; however,
where site plan or subdivision review is required, the applicant
shall apply to the Board of Adjustment and Appeals for special
exception approval prior to the submission of a detailed site
plan for Planning Board approval, but any conditions imposed
by the Board of Adjustment and Appeals shall be binding upon
the applicant and upon the Planning Board. The applicant shall
have the burden of proving that his application is in compliance
with the requirements of this Ordinance. After the submission
of a complete application, the Board shall approve a special
exception application or approve it with conditions if it makes
a positive finding based on the information presented that the
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
129
proposed use, with any conditions attached, meets the
following standards:
1. The proposed use will not create hazards to vehicular or
pedestrian traffic on the roads and sidewalks serving the
proposed use as determined by the size and condition of
such roads and sidewalks, lighting, drainage, intensity of
use by both pedestrians and vehicles and the visibility
afforded to pedestrians and the operators of motor vehicles;
2. The proposed use will not cause water pollution,
sedimentation, erosion, contaminate any water supply nor
reduce the capacity of the land to hold water so that a
dangerous, aesthetically unpleasant, or unhealthy condition
may result;
3. The proposed use will not create unhealthful conditions
because of smoke, dust, or other airborne contaminants;
4. The proposed use will be compatible with the uses that are
adjacent to and neighboring the proposed location, as
measured in terms of its physical size, intensity of use,
visual impact, and proximity to other structures and the
scale and bulk of any new structures for the proposed use
shall be compatible with structures existing or permitted to
be constructed on neighboring properties;
5. The proposed use will not create nuisances to neighboring
properties because of odors, fumes, glare, hours of
operation, noise, vibration or fire hazard or restrict access
of light and air to neighboring properties;
6. The proposed location for the use has no peculiar physical
characteristics due to its size, shape, topography, or soils
which will create or aggravate adverse environmental
impacts on surrounding properties;
7. The proposed use has no unusual characteristics atypical of
the generic use in the neighborhood, which proposed use
will depreciate the economic value of surrounding
properties;
D.
Other Permits
The Board shall also have the power and duty to pass upon the
issuing of certain permits or approvals where expressly
authorized by this Ordinance.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
130
E.
Conditions for Approval
In granting appeals or special exception approvals under this
Section, the Board of Adjustment and Appeals may impose
such conditions as it deems necessary in furtherance of the
intent and purpose of this Ordinance, to assure that there will
be no adverse effects on adjacent properties, and to assure that
the proposed use or modification will be compatible with other
uses in the neighborhood or district. Such conditions for
approval may be imposed based upon the following factors:
1. The location of buildings, drives, parking areas, lighting,
signs, and other outdoor storage areas;
2. Access to the site for vehicular and pedestrian traffic, and
emergency access;
3. Sight distance at access points;
4. Fences, screening and buffering;
5. Landscaping and storm drainage;
6. Garbage storage and snow storage areas;
7. Any other factors relating to the impact of the proposed use
on neighboring properties or on the public health, safety
and welfare.
The concurring votes of at least three members of the Board
shall be required for the approval of any appeal or application.
603.3
Hearings:
A.
For all appeals from decisions of the Code Enforcement
Officer, and for the consideration of all applications for
variances, special exceptions, or other permits requiring
approval of the Board, the Board shall hold a public hearing as
prescribed herein. At least seven (7) days before the hearing,
the clerk of the Board of Adjustment and Appeals shall notify
by mail the owners of properties located within five hundred
(500) feet of the lot line of the property for which the appeal or
application shall be made. In addition to the notice by mail, the
clerk to the Board of Adjustment and Appeals shall also post
the notice publicly at the Town Office, and cause it to be
published, at least seven days before the hearing, in a
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
131
newspaper of general circulation in the Town, a notice
summarizing the nature of the appeal and the time and place of
the hearing.
B.
Failure of a property owner to receive notice by mail shall not
invalidate actions taken by the Board. Property owners as
listed on the assessor's records shall be deemed to be the
persons to whom such notice should be mailed.
C.
The Code Enforcement Officer, unless prevented by illness or
absence from the State, shall attend all hearings and shall
present to the Board all plans, photographs, or other factual
materials which are appropriate to an understanding of matters
before the Board.
D.
Written notice of the decision of the Board shall be sent to the
appellant and to the Code Enforcement Officer within seven
(7) days of the date of the hearing in accordance with 30-A
M.S.R. § 2691.
603.4
Appeal Procedure:
A.
Any person with standing or equity aggrieved by a decision of
the Code Enforcement Officer, may appeal such decision to the
Board of Adjustment and Appeals within thirty (30) days
inclusive of the date of such decision.
B.
Within thirty (30) days of the date of the decision of the Code
Enforcement Officer, the appeal shall be entered at the Office
of the Town Clerk upon forms to be approved by the Board of
Adjustment and Appeals. The appellant shall set forth on said
form the ground of his appeal and shall refer to the specific
provisions of the Zoning Ordinance, Building Code, State
Regulation, Private or Special Law, Case law Statute and
Amendments thereto whichever may be involved. The
appellant in such case shall pay a fee as established by order of
the Board of Selectmen. Outside consulting fees may be
assessed as provided in Section 608 only where necessary to
protect the public health, safety or welfare.
C.
Following the receipt of any appeal, the Town Clerk shall
notify the Code Enforcement Officer and the Chairman of the
Board of Adjustment and Appeals of the appeal. The
Chairman shall then fix the date for a hearing within thirty (30)
days of the appeal. The notice to the Board shall be in order
for hearing at a meeting of the Board following by at least
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
132
seven (7) days any publication of notice and the mailing of
notices as prescribed above.
D.
An aggrieved party may appeal from the decision of the Board
to the Superior Court, as provided for by Statute.
603.5
Successive Appeals:
After a decision has been made by the Board of Adjustment and Appeals,
a new appeal of similar import concerning the same property shall not be
entertained by the Board until one (1) year shall have elapsed from the
date of said decision, except that the Board may entertain a new appeal if
the Chairman believes that, owing to a mistake of law or misunderstanding
of fact, an injustice was done, or if he believes that a change has taken
place in some essential aspect of the case sufficient to warrant a
reconsideration of the appeal.
603.6
Expiration of Rights:
Rights granted by the Board of Adjustment and Appeals shall expire if the
work or change authorized is not begun within six months or substantially
completed within one year of the date of vote by the Board.
603.7
Legal Actions
When the above action does not result in the correction or abatement of
the violation or nuisance condition, the Municipal Officers, upon notice
from the Code Enforcement Officer, are hereby directed to institute any
and all actions and proceedings, either legal or equitable, including
seeking injunctions of violations and the imposition of fines, that may be
appropriate or necessary to enforce the provisions of this Ordinance in the
name of the municipality. The municipal officers, or their authorized
agent, are hereby authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this Ordinance and
recovering fines without Court action. Such agreements shall not allow an
illegal structure or use to continue unless there is clear and convincing
evidence that the illegal structure or use was constructed or conducted as a
direct result of erroneous advice given by an authorized municipal official
and there is no evidence that the owner acted in bad faith, or unless the
removal of the structure or use will result in a threat or hazard to public
health and safety or will result in substantial environmental damage.
603.8
Fines
Any person, including but not limited to a landowner, a landowner's agent
or a contractor, who violates any provision or requirement of this
Ordinance shall be penalized in accordance with 30-A M.R.S. § 4452.
Each day that a violation continues is a separate violation.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
133
Sec. 604
Savings Clause
If any section, subsection, paragraph, sentence, clause or phrase of this
Ordinance should be declared invalid for any reason whatsoever, such
decision shall not affect the remaining portions of this Ordinance, which
shall remain in full force and effect; and to this end the provisions of the
Ordinance are hereby declared to be severable.
Sec. 605
Changes and Amendments
605.1
Amendments to this Ordinance may be initiated by the Planning Board,
the Board of Selectmen, by any landowner or his authorized agent or by a
person having a written agreement to purchase the property, and submitted
to Town Meeting.
605.2
Any proposed amendment or change, unless initiated by the Planning
Board, shall be submitted to the Planning Board for public hearing and
advisory recommendation; public notice of such hearing shall be given by
posting at the Town office and publication in a newspaper of general
circulation within the Town at least ten (10) days prior to the date thereof,
except that public notice of a Planning Board public hearing on a contract
or conditional rezoning agreement shall comply with the requirements set
forth in 30-A M.R.S. § 4352(8) or its successor.
605.3
Amendments to the text or the zoning map shall be consistent with the
adopted Comprehensive Plan, if any, and shall be consistent with the
purpose of this Ordinance as stated in Sec. 102.
605.4
Proposals for change of zone shall include a site plan for the proposed use
drawn in compliance with Sec. 206, Site Plan Review, and shall also
include a location map showing the existing and proposed zone
classification and zone boundaries. If a petitioner fails to begin
construction in a substantial manner in accordance with an approved plan
within one year from the effective date of the rezoning, the Planning
Board shall initiate rezoning to the original zone classification. No request
for change of zone shall be considered within one year from the date of
any Town Meeting denial of the same request.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
134
Sec. 606
Contract Zoning
606.1
In consideration of a request for change in zoning classification for a
particular property or group of properties under the provisions of Sec. 605,
the Town, at Town Meeting, may impose certain restrictions on the use of
the property where it finds that such conditions are necessary to protect the
public health, safety, and general welfare, and to advance desired land use
objectives consistent with the Comprehensive Plan.
606.2
Standards
A. Any zone change adopted pursuant to this section shall be
subject to a contractual agreement executed by authorized
representatives of both the property owner and the Town,
providing for the implementation and enforcement of the
conditions of the agreement;
B. The agreement shall only include conditions which relate to the
physical development or operation of the property;
C. Any zone change permitted under this section shall be
consistent with the Comprehensive Plan of the Town and shall
establish a rezoned area that is consistent with the existing and
permitted uses within the original zones.
D. The proposed contract zoning agreement shall clearly describe
the extent of variation (if any) from the lot standards and
permitted uses for the zone in which the parcel is located.
606.3
Conditions:
In formulating recommendations to the Town for conditions
for approving a zone change under these provisions, the Board
of Selectmen may consider the following factors:
A.
Limitations of the number and type of permitted uses of the
property;
B.
The height and lot coverage of any structure;
C.
The setback of any structure;
D.
The lot standards.
E.
The hours of operation for the proposed use.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
135
F.
The installation, operation and maintenance of physical
improvements such as parking lots, traffic control devices,
fencing, shrubbery and screening;
G.
The creation of open space areas or buffer zones;
H.
The dedication of property for public purposes, such as streets,
parks, utility systems, and conservation easements.
606.4
Notice Requirements and Procedures
A.
In accordance with 30-A M.R.S. § 4352(8) for contract
rezoning, the Planning Board shall hold a public hearing in the
manner prescribed by this ordinance, shall send a notice of the
public hearing to the property owners and all abutters within a
five hundred (500) foot radius and shall post the notice at the
Town Office.
The notice shall include a map of the property and all the
proposed terms, conditions and restrictions of the contract
zoning proposal.
B.
The Planning Board shall make a recommendation to the Board
of Selectmen and Town on the proposal and its conformance
with the Town's Comprehensive Plan and land use goals.
C.
The Board of Selectmen shall hold a public hearing, and
following the hearing may recommend that the contract or
conditional rezoning application be denied, approved, or
approved with modifications at Town Meeting.
D.
The recommendations of the Planning Board and Board of
Selectmen are advisory in nature; the Town, at Town Meeting,
may act independently of said recommendations.
E.
The term of the contract or conditional rezoning agreement
shall be set forth in the contract agreement. Any violation of a
rezoning agreement shall be considered a violation of the
Town's Zoning Ordinance and shall be subject to enforcement
under the provisions of 30-A M.R.S. § 4452. The rezoning
agreement may include additional provisions concerning
enforcement of specific provisions of the agreement.
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
136
Sec. 607
Violations
607.1
Warning
It shall be the duty of the Code Enforcement Officer to warn any person,
firm, or corporation of violations of this Ordinance by them. The Code
Enforcement Officer shall notify in writing the party responsible for such
violation, indicating the nature of the violation, ordering the action
necessary to correct it, and informing the party of their right to seek a
variance or other relief from the Board of Adjustment and Appeals.
607.2
Enforcement Actions
When the above action does not result in the correction or abatement of
the violation, the Board of Selectmen, upon notice from the Code
Enforcement Officer, shall institute or cause to be instituted in the name of
the Town, any and all actions legal and equitable, that shall be appropriate
or necessary for the enforcement of the provisions of this Ordinance in the
name of the municipality. The municipal officers, or their authorized
agent, are hereby authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this Ordinance and
recovering fines and attorney's fees without Court action. Such
agreements shall not allow an illegal structure or use to continue unless
there is clear and convincing evidence that the illegal structure or use was
constructed or conducted as a direct result of erroneous advice given by an
authorized municipal official and there is no evidence that the owner acted
in bad faith, or unless the removal of the structure or use will result in a
threat or hazard to public health and safety or will result in substantial
environmental damage.
607.3
Penalties
Any person, firm or corporation, having been issued a building permit for,
or being the owner or occupant of, or having control or the use of, or being
engaged in the construction, alteration or repair of, any building or land or
part thereof, found to violate any of the provisions of this ordinance, shall
be guilty of a misdemeanor, and upon conviction thereof, shall be
punished by a fine as established by order of the Board of Selectmen.
Each day such violation is permitted to exist after notification thereof by
the Code Enforcement Officer shall constitute a separate offense.
Sec. 608
Outside Consulting Fees
Notwithstanding any other ordinance provision to the contrary and in
addition to such fees as are otherwise specified by law, the Town shall
assess a fee to cover one hundred (100) percent of its costs for outside
engineering, planning, legal and similar professional consulting services.
Such fees shall be subject to the following limitations:
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
137
608.1
They must be expressly provided by ordinance;
608.2
The ordinance must require review which is beyond the expertise of Town
staff members;
608.3
They must be reasonable in amount based upon the time involved and the
complexity of the review;
608.4
The results shall be available for public review, but shall be deemed to
have been made solely for the benefit of the Town and shall remain its
property;
608.5
They shall be assessed for the privilege of review and so be payable
without regard to their results or the outcome of the application;
608.6
Any dispute, regarding the application of this section or the amount
required to be paid either in advance or upon completion, may be appealed
in writing within 10 days to the Town Administrator who may, after due
notice and investigation and for good cause shown, affirm, modify or
reverse the disputed decision or reduce the amount assessed. Until the
Town Administrator has resolved the dispute, no portion of the project
review for which the consulting fee is in dispute may go forward unless
the applicant has paid or otherwise made satisfactory provision therefore,
and no portion of the project review may go forward; and
608.7
Where the amount of such fee may exceed $1,000, reasonable provision
must be made in advance to guarantee payment. If the balance in the
special account shall be drawn down by 75%, the Town shall notify the
applicant, require that an additional amount be deposited to cover the
remaining work, and no portion of the project review, for which the
additional consulting fee is required, may go forward unless the applicant
has paid or otherwise made satisfactory provision therefore. The Town
shall continue to notify the applicant and require an additional amount be
deposited as necessary whenever the balance of the account is drawn
down by 75% of the original deposit. Any excess amount deposited in
advance shall be promptly refunded after final action on the application.
This section shall be administered initially by the Town employee or
board responsible for enforcing the ordinance under which review is
Town of Chebeague Island Code
Ch. 17, Art. II, Zoning Districts & Enforcement
138
sought. If any person, or any entity or corporation in which said person is
a principal owes the Town any amount for fees assessed under this section
for any project under this ordinance or the Subdivision Ordinance, such
person shall not be issued any building permit or certificate of occupancy,
or have a subdivision plat released for any other building or development
in Town until all such outstanding amounts have been paid in full. An
appeal under this section may be brought to the Board of Adjustment and
Appeals. No building permit or certificate of occupancy may be issued,
nor subdivision plat released for recording until all fees hereunder have
been paid in full.
Sec. 609
Effective Date
This Ordinance shall take effect immediately upon its adoption by the