This is the exact embedded text of the captured official document.
Snapshot 368dcadb3632 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
4-1
CHAPTER 4. PHOSPHORUS CONTROL ORDINANCE
___________________________________________________________________________
SECTION 1. PURPOSE
A. Purpose. To control the amount of phosphorus entering China Lake and Three Mile Pond
from all new development.
SECTION 2. APPLICABILITY
A. This Ordinance shall not apply to any existing residence, or to additions thereto, or to any other
existing structure or land use or to new accessory structures, or to additions of less than 1500
square feet to existing non-residential structures.
B. This Ordinance shall apply to the following uses and structures located in the watersheds of
China Lake and Three Mile Pond:
1) new or expanded portions of subdivisions; mobile home parks; campgrounds; commercial
(new development, or expansions of existing commercial structures in excess of 1500
square feet); hazardous or solid waste disposal facilities; and
2) all new principal structures requiring a permit under the Town of China Land Use
Ordinance except those structures and uses exempted in paragraph A.
SECTION 3. PHOSPHORUS EXPORT STANDARDS
Within the watershed of China Lake or Three Mile Pond, all uses and structures to which this
Ordinance applies shall meet the following phosphorus export standards:
Watershed
Phosphorus Export Standards
China Lake, East Basin -
.034 pounds of phosphorus/acre/year
China Lake, West Basin -
.057 pounds of phosphorus/acre/year
Three Mile Pond
- .031 pounds of phosphorus/acre/year
SECTION 4. SINGLE-FAMILY DWELLING, DUPLEX
In addition to the requirements of the Town of China Land Use Ordinance, the following provisions
shall apply to all new single-family dwellings and duplexes:
A. Phosphorus Control Requirement. Permit applicants must show how they will comply with the
phosphorus export standards of Section 3.
4-2
B. Buffer Strip. A new single-family dwelling or duplex shall be deemed to comply with the
phosphorus export standards of Section 3 if a permanent, vegetated buffer is located downhill
from the developed portion of the lot according to the requirements of Table 1 or Table 2 of this
Ordinance, whichever applies. On an existing lot of record that is smaller in size than what is
required in the table, the applicant shall meet the buffer width requirement to the maximum
extent possible.
C. DEP Phosphorus Control Methodology. As an alternative to Tables 1 and 2 of this Section, an
applicant may utilize the phosphorus control methodology contained in DEP's Phosphorus
Control Guide to calculate lot size or buffer width, or to design other phosphorus control
measures that meet the phosphorus export standard. A copy of supporting documents shall be
submitted with the application.
D. Maintenance and Use of Buffer Strips, Other Measures. Homeowners and occupants shall
maintain vegetated buffer strips and, if applicable, other phosphorus control measures in
accordance with the buffer maintenance requirements contained in Section 5.3 of DEP's
Phosphorus Control Guide.
TABLE 1
EAST BASIN CHINA LAKE, THREE MILE POND
Note: Lot sizes shown below are for lots with greater than 10,000 square feet of clearing per
lot. For lots with less than 10,000 square feet of clearing per lot, the lot sizes in parentheses
shall apply.
<-----Buffer Width----->
50 feet
100 feet
150 feet
Average
Slope
Lot Size
Acres
Lot Size
Acres
Lot Size
Acres
0-3%
3-8%
8-15%
15-30%
4.3 (2.5)
5.5 (3.25)
6.4 (3.75)
6.8 (4.0)
3.0 (1.75)
3.8 (2.25)
4.7 (2.75)
6.0 (3.5)
2.1 (1.25)
3.0 (1.75)
3.4 (2.0)
4.7 (2.75)
4-3
TABLE 2
WEST BASIN CHINA LAKE
Note: Lot sizes shown below are for lots with greater than 10,000 square feet of clearing per
lot. For lots with less than 10,000 square feet of clearing per lot, the lot sizes in parentheses
shall apply.
<-----Buffer Width----->
50 feet
100 feet
150 feet
Average Slope
Within Buffer
Lot Size
Acres
Lot Size
Acres
Lot Size
Acres
0-3%
3-8%
8-15%
15-30%
2.5 (1.5)
3.3 (2.0)
3.8 (2.25)
4.1 (2.5)
1.75 (1.0)
2.3 (1.25)
2.8 (1.75)
3.6 (2.0)
1.25 ( .75)
1.75 (1.0)
2.0 (1.25)
2.8 (1.75)
SECTION 5. SUBDIVISIONS
In addition to the requirements of the Town of China Subdivision Ordinance, the following
provisions shall apply to new or expanded portions of subdivisions.
A. Phosphorus Control Requirement. Applicants for subdivision approval must show how they
will comply with the phosphorus export standards of Section 3.
B. Fees. If, in the Planning Board's judgment, consulting services are required to evaluate the
phosphorus impact of the proposed subdivision application, an additional fee shall be required
based on the estimated costs of such consulting services. These funds may be used by the Town
for reasonable costs contracted for by the Town through the Planning Board which relate
directly to the review of the phosphorus impact of the subdivision application.
C. Application Requirement. All subdivision applications utilizing buffer strips to meet the
phosphorus export standards of Section 3 shall include:
1. Buffer Location. A plan showing the location and dimensions of vegetated buffer strips, and
classification of the buffer as wooded or non-wooded, to be designed and maintained in
accordance with the buffer-maintenance provisions contained in Section 5.3 of DEP's
phosphorus Control Guide.
2. Deed Restrictions. A copy of all covenants and deed restrictions, if any, to be placed on the
4-4
amount of clearing on individual lots and by which vegetated buffer strips are to be
permanently maintained.
3. Buffer Maintenance. A written plan for the maintenance of buffer strips.
D. Minor Subdivisions. Minor subdivisions shall be deemed to comply with the phosphorus export
standards of Section 3 if a permanent, vegetated buffer is located downhill from the developed
portion of the lot according to the requirements of Section 4, Table 1 or Table 2, whichever
applies. As an alternative to these tables, an applicant may prepare a phosphorus control plan as
set forth for major subdivisions in paragraph E.2 below.
E. Major Subdivisions. Applications for major subdivisions shall include:
1. An Erosion and Sedimentation Control Plan prepared in accordance with the "Maine
Erosion and Sediment Control Handbook for Construction: Best Management Practices,"
prepared by the Cumberland County Soil and Water Conservation District and Department
of Environmental Protection, March, 1991.
2. A Phosphorus Control Plan to meet the phosphorus export standard of Section 3 and
prepared in accordance with the methodology contained in DEP's Phosphorus Control
Guide. A copy of supporting documents shall be submitted with the application, including
the worksheets contained in DEP's Phosphorus Control Guide, engineering calculations, a
site plan showing drainage patterns and buffer locations, and detailed construction
specifications and diagrams for all structural measures. The Board shall require the use of
vegetated buffers, limits on clearing and minimizing road lengths, and shall encourage other
non-structural measures such as clustering and reduction in the number of lots, prior to
allowing the use of high-maintenance structural measures such as wet ponds and infiltration
systems.
F. Maintenance and Use of Buffer Strips, Other Measures. The applicant shall include provisions
for monitoring, inspecting and maintaining vegetated buffer strips and other phosphorus control
measures in accordance with DEP's Phosphorus Control Guide, including the buffer
maintenance provisions contained in Section 4.D.
SECTION 6. OTHER USES AND STRUCTURES.
In addition to requirements of the Town of China Land Use Ordinance, applicants for permits and
approvals for the following uses shall comply with all of the requirements of a major subdivision as
set forth in Sections 3 and 5 of this Ordinance:
1) new or expanded portions of: mobile home parks; campgrounds; commercial (new
development, or expansions of existing commercial structures in excess of 1500 square
feet); hazardous or solid waste disposal facilities; and
2) new principal structures, other than single-family dwellings and duplexes, requiring a permit
under the provisions of the Town of China Land Use Ordinance. Property owners shall
4-5
maintain vegetated buffer strips and other phosphorus control measures in accordance with
DEP's Phosphorus Control Guide, including the buffer maintenance requirements contained
in Section 5.3.
SECTION 7. ADMINISTRATION
Within the watersheds of China Lake and Three Mile Pond: no new or expanded portion of a
subdivision may be approved under the provisions of the Town of China Subdivision Ordinance
except in strict conformance with the provisions of this Ordinance; and no permit may be issued
under the provisions of the Town of China Land Use Ordinance for:
1) New or expanded portions of: mobile home parks, campgrounds, commercial (new
development, or expansions of existing commercial structures in excess of 1500 square
feet), hazardous or solid waste disposal facilities; or
2) New principal structures;
except in strict conformance with the provisions of this Ordinance, provided that this requirement
shall not apply to any existing residence or to any other existing structures or to new accessory
structures.