Approved March 19, 2011
5-1
CHAPTER 5. FLOODPLAIN MANAGEMENT ORDINANCE
______________________________________________________________________________
SECTION 1. PURPOSE AND ESTABLISHMENT
Certain areas of the Town of China, Maine are subject to periodic flooding, causing serious
damages to properties within these areas. Relief is available in the form of flood insurance as
authorized by the National Flood Insurance Act of 1968.
Therefore, the Town of China, Maine has chosen to become a participating community in the
National Flood Insurance Program, and agrees to comply with the requirements of the National
Flood Insurance Act of 1968 (P.L. 90-488, as amended) as delineated in this Floodplain
Management Ordinance.
It is the intent of the Town of China, Maine to require the recognition and evaluation of flood
hazards in all official actions relating to land use in the floodplain areas having special flood
hazards.
The Town of China has the legal authority to adopt land use and control measures to reduce
future flood losses pursuant to Title 30-A M.R.S.A. § 3001-3007, § 4352, §4401-4407, and Title
38 M.R.S.A. § 440.
The National Flood Insurance Program, established in the aforesaid Act, provides that areas of
the Town of China having a special flood hazard be identified by the Federal Emergency
Management Agency and that floodplain management measures be applied in such flood hazard
areas. This Ordinance establishes a Flood Hazard Development Permit system and review
procedure for development activities in the designated flood hazard areas of the Town of China,
Maine.
The areas of special flood hazard, Zones A and AE for Town of China, Maine, Kennebec County
Maine, identified by the Federal Emergency Management Agency in a report entitled "Flood
Insurance Study - Kennebec County with accompanying "Flood Insurance Rate Map" dated
June 16, 2011 with the following Community Panels:
380, 385, 390, 395, 405, 415, 555, 560, 600
derived from the county wide digital flood insurance rate map entitled "Digital Flood Insurance
Rate Map, Kennebec County," which are hereby adopted by reference and declared to be a part
of this Ordinance.
SECTION 2. PERMIT REQUIRED
Before any start of construction or other development (as defined in the China Land
Development Code, Chapter 11, Definitions), including the placement of manufactured homes,
begins within any areas of special flood hazard established in Section 1, a Flood Hazard
Development Permit shall be obtained from the Planning Board. This permit shall be in addition
to any other permits which may be required pursuant to the codes and ordinances of the Town of
China, Maine.
Approved March 19, 2011
5-2
SECTION 3. APPLICATION FOR PERMIT
The application for a Flood Hazard Development Permit shall be submitted to the Planning
Board and shall include:
A. The name, address and phone number of the applicant, owner, and contractor;
B. An address and a map indicating the location of the construction site;
C. A site plan showing location of existing and/or proposed development, including but not
limited to structures, sewage disposal facilities, water supply facilities, areas to be cut and
filled, and lot dimensions;
D. A statement of the intended use of the structure and/or development;
E. A statement of the cost of the development including all materials and labor;
F. A statement as to the type of sewage system proposed;
G. Specification of dimensions of the proposed structure and/or development;
[Items H-K(2) apply only to new construction and substantial improvements.]
H. The elevation in relation to the National Geodetic Vertical Datum (NGVD), North American
Vertical Datum (NAVD) or to a locally established datum in Zone A only, of the:
1. base flood at the proposed site of all new or substantially improved structures, which is
determined:
a. in Zones AE, from data contained in the "Flood Insurance Study - Kennebec County,
Maine" as described in Section 1; or,
b. in Zone A:
(1) from any base flood elevation data from federal, state, or other technical sources
(such as FEMA's Quick-2 model, FEMA 265/July 1995), including information
obtained pursuant to Section 6(K) and Section 8(D);
(2) from the contour elevation extrapolated from a best fit analysis of the floodplain
boundary when overlaid onto a USGS Quadrangle Map or other topographic map
prepared by a Professional Land Surveyor or registered professional engineer, if
the floodplain boundary has a significant correlation to the elevation contour
line(s); or, in the absence of all other data,
(3) to be the elevation of the ground at the intersection of the floodplain boundary and
a line perpendicular to the shoreline which passes along the ground through the
site of the proposed building.
2. highest and lowest grades at the site adjacent to the walls of the proposed building;
Approved March 19, 2011
5-3
3. lowest floor, including basement; and whether or not such structures contain a basement;
and,
4. level, in the case of non-residential structures only, to which the structure will be
floodproofed;
I. A description of an elevation reference point established on the site of all developments for
which elevation standards apply as required in Section 6;
J. A written certification by a Professional Land Surveyor, registered professional engineer or
architect, that the base flood elevation and grade elevations shown on the application are
accurate;
K. The following certifications as required in Section 6 by a registered professional engineer or
architect:
1. a Floodproofing Certificate (FEMA Form 81-65, 03/09, as amended), to verify that the
floodproofing methods for any non-residential structures will meet the floodproofing
criteria of Section 3(H)(4); Section 6(G).; and other applicable standards in Section 6;
2. a Hydraulic Openings Certificate to verify that engineered hydraulic openings in
foundation walls will meet the standards of Section 6(L)(2)(a);
3. a certified statement that bridges will meet the standards of Section 6(M);
4. a certified statement that containment walls will meet the standards of Section 6(N);
L. A description of the extent to which any water course will be altered or relocated as a result
of the proposed development; and,
M. A statement of construction plans describing in detail how each applicable development
standard in Section 6 will be met.
SECTION 4. APPLICATION FEE AND EXPERT'S FEE
A non-refundable application fee as shown on the fee schedule set by the Board of Selectmen
shall be paid to the Town Clerk and a copy of a receipt for the same shall accompany the
application.
An additional fee may be charged if the Planning Board and/or Board of Appeals needs the
assistance of a professional engineer or other expert. The expert's fee shall be paid in full by the
applicant within 10 days after the town submits a bill to the applicant. Failure to pay the bill
shall constitute a violation of the ordinance and be grounds for the issuance of a stop work order.
An expert shall not be hired by the municipality at the expense of an applicant until the applicant
has either consented to such hiring in writing or been given an opportunity to be heard on the
subject. An applicant who is dissatisfied with a decision to hire expert assistance may appeal
that decision to the Board of Appeals.
Approved March 19, 2011
5-4
SECTION 5. REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS
The Planning Board shall:
A. Review all applications for the Flood Hazard Development Permit to assure that proposed
developments are reasonably safe from flooding and to determine that all pertinent
requirements of Section 6 (Development Standards) have been, or will be met;
B. Utilize, in the review of all Flood Hazard Development Permit applications:
1. the base flood and floodway data contained in the "Flood Insurance Study - Kennebec
County, Maine," as described in Section 1;
2. in special flood hazard areas where base flood elevation and floodway data are not
provided, the Planning Board shall obtain, review and reasonably utilize any base flood
elevation and floodway data from federal, state, or other technical sources, including
information obtained pursuant to Section 3(H)(1)(b); Section 6(K); and Section 8(D), in
order to administer Section 6 of this Ordinance; and,
3. when the community establishes a base flood elevation in a Zone A by methods outlined
in Section 3(H)(1)(b), the community shall submit that data to the Maine Floodplain
Management Program in the State Planning Office.
C. Make interpretations of the location of boundaries of special flood hazard areas shown on the
maps described in Section I of this Ordinance;
D. In the review of Flood Hazard Development Permit applications, determine that all necessary
permits have been obtained from those federal, state, and local government agencies from
which prior approval is required by federal or state law, including but not limited to Section
404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1344;
E. Notify adjacent municipalities, the Department of Environmental Protection, and the Maine
Floodplain Management Program in the State Planning Office prior to any alteration or
relocation of a water course and submit copies of such notifications to the Federal
Emergency Management Agency;
F. If the application satisfies the requirements of this Ordinance, approve the issuance of one of
the following Flood Hazard Development Permits based on the type of development:
1. A two part Flood Hazard Development Permit for elevated structures. Part one shall
authorize the applicant to build a structure to and including the first horizontal floor only
above the base flood level. At that time the applicant shall provide the Code
Enforcement Officer with an Elevation Certificate completed by a Professional Land
Surveyor, registered professional engineer or architect based on the Part one permit
construction , "as built", for verifying compliance with the elevation requirements of
Section 6, paragraphs F, G, or H. Following review of the Elevation Certificate data,
which shall take place within 72 hours of receipt of the application, the Code
Enforcement Officer shall issue Part II of the Flood Hazard Development Permit. Part
two shall authorize the applicant to complete the construction project; or,
Approved March 19, 2011
5-5
2. A Flood Hazard Development Permit for Floodproofing of Non-Residential Structures
that are new construction or substantially improved non-residential structures that are not
being elevated but that meet the floodproofing standards of Section 6(G)(1)(a), (b), and
(c). The application for this permit shall include a Floodproofing Certificate signed by a
registered professional engineer or architect; or,
3. A Flood Hazard Development Permit for Minor Development for all development that is
not new construction or a substantial improvement, such as repairs, maintenance,
renovations, or additions, whose value is less than 50% of the market value of the
structure. Minor development also includes, but is not limited to: accessory structures as
provided for in Section 6.J., mining, dredging, filling, grading, paving, excavation,
drilling operations, storage of equipment or materials, deposition or extraction of
materials, public or private sewage disposal systems or water supply facilities that do not
involve structures; and non-structural projects such as bridges, dams, towers, fencing,
pipelines, wharves and piers.
G. Maintain, as a permanent record, copies of all Flood Hazard Development Permit
Applications, corresponding Permits issued, and data relevant thereto, including reports of
the Board of Appeals on variances granted under the provisions of the China Land
Development Code, Chapter 9, Appeals, and copies of Elevation Certificates, Floodproofing
Certificates, Certificates of Compliance and certifications of design standards required under
the provisions of Sections 3, 6, and 7 of this Ordinance.
SECTION 6. DEVELOPMENT STANDARDS
All developments in areas of special flood hazard shall meet the following applicable standards:
A. All Development
All development shall:
1. be designed or modified and adequately anchored to prevent flotation (excluding piers
and docks), collapse or lateral movement of the development resulting from
hydrodynamic and hydrostatic loads, including the effects of buoyancy;
2. use construction materials that are resistant to flood damage;
3. use construction methods and practices that will minimize flood damage; and,
4. use electrical, heating, ventilation, plumbing, and air conditioning equipment, and other
service facilities that are designed and/or located so as to prevent water from entering or
accumulating within the components during flooding conditions.
B. Water Supply
All new and replacement water supply systems shall be designed to minimize or eliminate
infiltration of flood waters into the systems.
C. Sanitary Sewage Systems
Approved March 19, 2011
5-6
All new and replacement sanitary sewage systems shall be designed and located to minimize
or eliminate infiltration of flood waters into the system and discharges from the system into
flood waters.
D. On Site Waste Disposal Systems
On site waste disposal systems shall be located and constructed to avoid impairment to them
or contamination from them during floods.
E. Watercourse Carrying Capacity
All development associated with altered or relocated portions of a watercourse shall be
constructed and maintained in such a manner that no reduction occurs in the flood carrying
capacity of the watercourse.
F. Residential
New construction or substantial improvement of any residential structure located within:
1. Zones AE, shall have the lowest floor (including basement) elevated to at least one foot
above the base flood elevation.
2. Zone A shall have the lowest floor (including basement) elevated to at least one foot
above the base flood elevation utilizing information obtained pursuant to Section
3(H)(1)(b); Section 5(B); or Section 8(D).
G. Non Residential
New construction or substantial improvement of any non-residential structure located within:
1. Zones AE, shall have the lowest floor (including basement) elevated to at least one foot
above the base flood elevation, or together with attendant utility and sanitary facilities
shall:
a. be floodproofed to at least one foot above the base flood elevation so that below that
elevation the structure is watertight with walls substantially impermeable to the
passage of water;
b. have structural components capable of resisting hydrostatic and hydrodynamic loads
and the effects of buoyancy; and,
c. be certified by a registered professional engineer or architect that the floodproofing
design and methods of construction are in accordance with accepted standards of
practice for meeting the provisions of this section. Such certification shall be
provided with the application for a Flood Hazard Development Permit, as required by
Section 3.K. and shall include a record of the elevation above mean sea level to which
the structure is floodproofed.
Approved March 19, 2011
5-7
2. Zone A shall have the lowest floor (including basement) elevated to at least one foot
above the base flood elevation utilizing information obtained pursuant to Section
3(H)(1)(b); Section 5(B); or Section 8(D), or
a. together with attendant utility and sanitary facilities meet the floodproofing standards
of Section 6(G)1.
H. Manufactured Homes
New or substantially improved manufactured homes located within:
1. Zones AE, shall:
a. be elevated such that the lowest floor (including basement) of the manufactured home
is at least one foot above the base flood elevation;
b. be on a permanent foundation, which may be poured masonry slab or foundation
walls, with hydraulic openings, or may be reinforced piers or block supports, any of
which support the manufactured home so that no weight is supported by its wheels
and axles; and,
c. be securely anchored to an adequately anchored foundation system to resist flotation,
collapse, or lateral movement. Methods of anchoring may include, but are not limited
to:
(1) over-the-top ties anchored to the ground at the four corners of the manufactured
home, plus two additional ties per side at intermediate points (manufactured
homes less than 50 feet long require one additional tie per side); or by,
(2) frame ties at each corner of the home, plus five additional ties along each side at
intermediate points (manufactured homes less than 50 feet long require four
additional ties per side).
(3) all components of the anchoring system described in Section 6(H)(1)(c)(1 and 2)
shall be capable of carrying a force of 4800 pounds.
2. Zone A shall:
a. be elevated on a permanent foundation, as described in Section 6.H.1.b., such that the
lowest floor (including basement) of the manufactured home is at least one foot above
the base flood elevation utilizing information obtained pursuant to Section 3(H)(1)(b);
Section 5(B); or Section 8(D).; and
b. meet the anchoring requirements of Section 6(H)(1)(c).
I. Recreational Vehicles
Recreational Vehicles located within:
1. Zones A and AE, shall either:
Approved March 19, 2011
5-8
a. be on the site for fewer than 180 consecutive days,
b. be fully licensed and ready for highway use. A recreational vehicle is ready for
highway use if it is on its wheels or jacking system, is attached to the site only by
quick disconnect type utilities and security devices, and has no permanently attached
additions; or,
c. be permitted in accordance with the elevation and anchoring requirements for
"manufactured homes" in Section 6(H)(1).
J. Accessory Structures
Accessory Structures, as defined in Section XIII, located within Zones A and AE, shall be
exempt from the elevation criteria required in Section 6(F) & Section 6(G) above, if all other
requirements of Section VI and all the following requirements are met. Accessory Structures
shall:
1. be 500 square feet or less and have a value less than $3000;
2. have unfinished interiors and not be used for human habitation;
3. have hydraulic openings, as specified in Section 6(L)(2), in at least two different walls of
the accessory structure;
4. be located outside the floodway;
5. when possible be constructed and placed on the building site so as to offer the minimum
resistance to the flow of floodwaters and be placed further from the source of flooding
than is the primary structure; and,
6. have only ground fault interrupt electrical outlets. The electric service disconnect shall
be located above the base flood elevation and when possible outside the Special Flood
Hazard Area.
K. Floodways
1. In Zones AE riverine areas, encroachments, including fill, new construction, substantial
improvement, and other development shall not be permitted within a regulatory floodway
which is designated on the community's Digital Flood Insurance Rate Map, Kennebec
County unless a technical evaluation certified by a registered professional engineer is
provided demonstrating that such encroachments will not result in any increase in flood
levels within the community during the occurrence of the base flood discharge.
2. In Zones AE and A riverine areas for which no regulatory floodway is designated,
encroachments, including fill, new construction, substantial improvement, and other
development shall not be permitted in the floodway as determined in Section 6(K)(3)
unless a technical evaluation certified by a registered professional engineer is provided
Approved March 19, 2011
5-9
demonstrating that the cumulative effect of the proposed development, when combined
with all other existing development and anticipated development:
a. will not increase the water surface elevation of the base flood more than one foot at
any point within the community; and,
b. is consistent with the technical criteria contained in Chapter 5 entitled "Hydraulic
Analyses," Flood Insurance Study - Guidelines and Specifications for Study
Contractors, (FEMA 37/ January 1995, as amended).
3. In Zones AE and A riverine areas for which no regulatory floodway is designated, the
regulatory floodway is determined to be the channel of the river or other water course and
the adjacent land areas to a distance of one-half the width of the floodplain as measured
from the normal high water mark to the upland limit of the floodplain.
L. Enclosed Areas Below the Lowest Floor
New construction or substantial improvement of any structure in Zones AE and A that meets
the development standards of Section 6, including the elevation requirements of Section 6,
paragraphs F, G, or H and is elevated on posts, columns, piers, piles, "stilts," or crawlspaces
may be enclosed below the base flood elevation requirements provided all the following
criteria are met or exceeded:
1. Enclosed areas are not "basements" as defined in the China Land Development Code,
Chapter 11, Definitions;
2. Enclosed areas shall be designed to automatically equalize hydrostatic flood forces on
exterior walls by allowing for the entry and exit of flood water. Designs for meeting this
requirement must either:
a. be engineered and certified by a registered professional engineer or architect; or,
b. meet or exceed the following minimum criteria:
(1) a minimum of two openings having a total net area of not less than one square
inch for every square foot of the enclosed area;
(2) the bottom of all openings shall be below the base flood elevation and no higher
than one foot above the lowest grade; and,
(3) openings may be equipped with screens, louvers, valves, or other coverings or
devices provided that they permit the entry and exit of flood waters automatically
without any external influence or control such as human intervention, including
the use of electrical and other non-automatic mechanical means;
3. The enclosed area shall not be used for human habitation; and,
4. The enclosed areas are usable solely for building access, parking of vehicles, or storage.
M. Bridges
Approved March 19, 2011
5-10
New construction or substantial improvement of any bridge in Zones AE and A shall be
designed such that:
1. when possible, the lowest horizontal member (excluding the pilings, or columns) is
elevated to at least one foot above the base flood elevation; and
2. a registered professional engineer shall certify that:
a. the structural design and methods of construction shall meet the elevation
requirements of this section and the floodway standards of Section 6(K); and
b. the foundation and superstructure attached thereto are designed to resist flotation,
collapse and lateral movement due to the effects of wind and water loads acting
simultaneously on all structural components. Water loading values used shall be
those associated with the base flood.
N. Containment Walls
New construction or substantial improvement of any containment wall located within:
1. Zones AE and A shall:
a. have the containment wall elevated to at least one foot above the base flood elevation;
b. have structural components capable of resisting hydrostatic and hydrodynamic loads
and the effects of buoyancy; and,
c. be certified by a registered professional engineer or architect that the design and
methods of construction are in accordance with accepted standards of practice for
meeting the provisions of this section. Such certification shall be provided with the
application for a Flood Hazard Development Permit, as required by Section 3(K).
O. Wharves, Piers and Docks
New construction or substantial improvement of wharves, piers, and docks are permitted in
Zones AE and A, in and over water and seaward of the mean high tide if the following
requirements are met:
1. wharves, piers, and docks shall comply with all applicable local, state, and federal
regulations; and
2. for commercial wharves, piers, and docks, a registered professional engineer shall
develop or review the structural design, specifications, and plans for the construction.
Approved March 19, 2011
5-11
SECTION 7. CERTIFICATE OF COMPLIANCE
No land in a special flood hazard area shall be occupied or used and no structure which is
constructed or substantially improved shall be occupied until a Certificate of Compliance is
issued by the Code Enforcement Officer subject to the following provisions:
A. For New Construction or Substantial Improvement of any elevated structure the applicant
shall submit to the Code Enforcement Officer, an Elevation Certificate completed by a
Professional Land Surveyor, registered professional engineer, or architect, for compliance
with Section 6, paragraphs F, G, or H.
B. The applicant shall submit written notification to the Code Enforcement Officer that the
development is complete and complies with the provisions of this ordinance.
C. Within 10 working days, the Code Enforcement Officer shall:
1. review the Elevation Certificate and the applicant's written notification; and,
2. upon determination that the development conforms with the provisions of this ordinance,
shall issue a Certificate of Compliance.
SECTION 8. REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS
The Planning Board shall, when reviewing subdivisions and other proposed developments that
require review under other federal law, state law or local ordinances or regulations and all
projects on 5 or more disturbed acres, or in the case of manufactured home parks divided into
two or more lots, assure that:
A. All such proposals are consistent with the need to minimize flood damage.
B. All public utilities and facilities, such as sewer, gas, electrical and water systems are located
and constructed to minimize or eliminate flood damages.
C. Adequate drainage is provided so as to reduce exposure to flood hazards.
D. All proposals include base flood elevations, flood boundaries, and, in a riverine floodplain,
floodway data. These determinations shall be based on engineering practices recognized by
the Federal Emergency Management Agency.
E. Any proposed development plan must include a condition of plan approval requiring that
structures on any lot in the development having any portion of its land within a Special Flood
Hazard Area, are to be constructed in accordance with Section 6 of this ordinance. Such
requirement will be included in any deed, lease, purchase and sale agreement, or document
transferring or expressing an intent to transfer any interest in real estate or structure,
including but not limited to a time-share interest. The condition shall clearly articulate that
the municipality may enforce any violation of the construction requirement and that fact shall
also be included in the deed or any other document previously described. The construction
requirement shall also be clearly stated on any map, plat, or plan to be signed by the Planning
Board or local reviewing authority as part of the approval process.