CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 1
ARTICLE 9 - SHORELAND MANAGEMENT AREA USES, DIMENSIONS, AND STANDARDS
9.1.
ALLOWED USES
Key to Table 9A:
A=allowed without permit;
N=not allowed;
C=requires CEO permit, no Planning Board review;
P=requires CEO permit following Planning Board review;
L=requires plumbing permit; RS refers to the Residential Standards found in Article 8;
SS refers to Shoreland Standards found in this Article.)
TABLE 9A: USES AND ACTIVITIES IN THE SHORELAND MANAGEMENT AREA
LAND USE ACTIVITY
SHORELAND DISTRICTS
RESOURCE
PROTECTION
LIMITED
RESIDENTIAL
1. Agriculture
P
A
2. Aquaculture
P
P
3. Campgrounds
N
P13
4. Clearing or removal of vegetation for activities other
than timber harvesting
C1
A
5. Conversions of seasonal residences to year-round
residences
L
L
6. Emergency operations
A
A
7. Essential services
A. Roadside distribution lines (34.5kV and lower)
C6
A12
B. Non-roadside or cross-country distribution lines
involving ten poles or less in the shoreland zone
P6
C
C. Non-roadside or cross-country distribution lines
involving eleven or more poles in the shoreland zone
P6
P
D. Other essential services
P6
P
8. Filling and earth moving of <10 cubic yards
C
A
9. Filling and earth moving of >10 cubic yards
P
C
10. Fire prevention activities
A
A
11. Forest management activities except for timber
harvesting & land management roads
A
A
12. Home Occupations Level 1
N
P
13. Home Occupations Level 2
N
P
14. Individual, private campsites
C
C
15. Land management roads
P
A
16. Marinas
N
P
17. Mineral exploration
A 2
A 2
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 2
18. Mineral extraction including sand and gravel
extraction
P3
P
19. Motorized vehicular traffic on existing roads and
trails
A
A
20. Non-intensive recreational uses not requiring
structures such as hunting, fishing and hiking
A
A
21. Parking facilities / areas
N
P
22. Piers, docks, wharfs, bridges and other
structures and uses extending over or below the
normal high-water line or within a wetland
a. Temporary
b. Permanent
C11
P
C11
P
23. Principal structures and uses
A. One and two family residential, including
driveways
P9
P
B. Multi-unit residential
N
P
C. Commercial
N
P 10
D. Industrial
N
N
E. Governmental and institutional
N
P
F. Small non-residential facilities for educational,
scientific, or nature interpretation purposes
P
C
24. Private sewage disposal systems for allowed uses
L
L
25. Public and private recreational areas involving
minimal structural development
P
P
26. Road construction
N8
P
27. Service drops, as defined, to allowed uses
A
A
28. Signs
A
A
29. Soil and water conservation practices
A
A
30. Structures accessory to allowed uses
P 4
C
31. Surveying and resource analysis
A
A
32. Timber harvesting
C
A
33. Wildlife management practices
A
A
34. Uses similar to uses allowed without a permit
A
A
35. Uses similar to uses requiring a CEO permit
C
C
36. Uses similar to uses requiring a PB permit
P
P
NOTES TO TABLE 9A:
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds,
except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in
total, is disturbed. Mineral exploration is not allowed within 75 feet, horizontal distance, of the normal
high-water line of a stream.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 3
3In RP not allowed in areas so designated because of wildlife value. Not allowed within 75 feet,
horizontal distance, of the normal high-water line of a stream.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5 N/A
6See further restrictions in SS 9.2.
7N/A
8Except as provided in SS 16.3.
9Single family residential structures may be allowed by special exception only according to the
provisions of SS 20.0, Special Exceptions. Two-family residential structures are prohibited.
10Only for commercial uses otherwise listed in this Table, such as marinas and campgrounds that are
allowed in the respective district.
11Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required but must file a written "notice of intent to construct" with CEO.
13 As provided in SS 4.0.
NOTE: A person performing any of the following activities shall require a permit from the Department of
Environmental Protection, pursuant to 38 MRSA § 480-C, if the activity occurs in, on, over or adjacent
to any freshwater wetland, great pond, river, stream or brook and operates in such a manner that
material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
9.2.
DIMENSIONAL REQUIREMENTS IN THE SHORELAND MANAGEMENT AREA
In addition to any dimensional requirements that apply to a parcel due to the underlying growth
management area, lots in the Shoreland Management Area shall conform to the Minimum Lot
Standards of SS 12.0.
Principal and accessory structures shall conform to the setback requirements and height requirements
of SS 15.0, Principal and Accessory Structures.
Proposed uses and activities involving non-conforming lots, uses and structures shall conform with all
applicable provisions of Article 16, Non-conformity Provisions.
Many of the land use activities in the Shoreland Management Area addressed by this Ordinance have
shore setback restrictions and other dimensional requirements. Landowners in the Shoreland
Management Area are advised to become familiar with the Shoreland Standards that follow.
In all cases where other provisions of this Ordinance apply to a land use in addition to the Shoreland
Standards, the most restrictive requirement shall apply.
9.3.
SHORELAND STANDARDS (SS)
All land use activities within two hundred fifty feet (250') of the normal high-water line of any great pond,
within two hundred fifty feet (250') of the upland edge of a freshwater wetland, or within seventy-five
feet (75') of the high-water line of a stream or tributary stream, and also any structure built on, over or
abutting a dock, wharf or pier, or other structure extending or located below the normal high-water line
of a water body or within a wetland, shall conform with the following provisions, if applicable.
Descriptions of the Districts and Areas within the Shoreland Management Area are found in Article 3
and the Official Shoreland Management Map of Clifton shows the designated boundaries of those
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 4
Shoreland Districts and Areas.
SS 1.0 GENERAL STANDARD OF CONFORMANCE
After the submission of a complete Shoreland Management Area application to the Planning Board, the
Board shall approve an application or approve it with conditions if it makes a positive finding based on
the information presented that the proposed use:
SS 1.1. Will maintain safe and healthful conditions;
SS 1.2. Will not result in water pollution, erosion, or sedimentation to surface waters;
SS 1.3. Will adequately provide for the disposal of all wastewater;
SS 1.4. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
SS 1.5. Will conserve shore cover and visual, as well as actual, points of access to inland
waters;
SS 1.6. Will protect archaeological and historic resources as designated in the comprehensive
plan;
SS 1.7. Will avoid problems associated with floodplain development and use; and
SS 1.8. Is in conformance with all applicable provisions of the following Shoreland Standards
and all other applicable standards and requirements of this Ordinance.
SS 2.0 AGRICULTURE
SS 2.1. All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the Maine Department of Agriculture on November 1, 2001,
and the Nutrient Management Act (7 M.R.S.A. §4201-4209).
SS 2.2. Manure shall not be stored or stockpiled within one hundred feet (100'), horizontal
distance, of a great pond or within seventy-five feet (75') horizontal distance, of other water
bodies, tributary streams, or wetlands. All manure storage areas within the Shoreland
Management Area must be constructed or modified such that the facility produces no discharge
of effluent or contaminated storm water.
SS 2.3. Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area within the Shoreland Management Area shall require a Conservation Plan to
be filed with and approved by the Planning Board. Non-conformance with the provisions of said
plan shall be considered to be a violation of this Ordinance.
SS 2.4. There shall be no new tilling of soil within one hundred feet (100'), horizontal distance,
of the normal high-water line of a great pond; within seventy-five feet (75'), horizontal distance,
from other water bodies; nor within twenty-five feet (25'), horizontal distance, of tributary
streams, and freshwater wetlands. Operations in existence on the effective date of this
Ordinance and not in conformance with this provision may be maintained.
SS 2.5. Newly established livestock grazing areas shall not be permitted within one hundred
feet (100'), horizontal distance, of the normal high-water line of a great pond; within seventy-five
feet (75), horizontal distance of other water bodies, nor; within twenty-five feet (25'), horizontal
distance, of tributary streams, and freshwater wetlands. Livestock grazing associated with
ongoing farm activities, and which are not in conformance with the above setback provisions
may continue, provided that such grazing is conducted in accordance with a Conservation Plan.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 5
SS 3.0 ARCHAEOLOGICAL SITES
Please refer to GPS 2.0. Compliance with GPS 2.0 fulfills compliance with this requirement.
SS 4.0 CAMPGROUNDS
(Also see Article 14.2)
Campgrounds are allowed in the Limited Residential district and shall conform to the minimum
requirements imposed under State licensing procedures and the following:
SS 4.1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land area
per site.
SS 4.2. The areas intended for placement of a recreational vehicle, tent or shelter, and utility
and service buildings shall be set back a minimum of one hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA, and seventy-five (75)
feet, horizontal distance, from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland.
SS 5.0 CLEARING OR REMOVAL OF VEGETATION FOR ACTIVITIES OTHER THAN TIMBER
HARVESTING
SS 5.1. In the Great Pond Resource Protection Area, there shall be no cutting of vegetation
within the strip of land extending 75 feet, horizontal distance, inland from the normal high-water
line, except to remove safety hazards.
Elsewhere, in the Resource Protection District (in the Freshwater Wetland Resource Protection,
Stream Resource Protection and other areas designated as in the Resource Protection District
in Article 3), the cutting or removal of vegetation shall be limited to that which is necessary for
uses expressly authorized in the Resource Protection District.
SS 5.2. In the Limited Residential District, except to allow for the development of permitted
uses, within a strip of land extending one-hundred (100) feet, horizontal distance, inland from
the normal high-water line of a great pond, and seventy-five (75) feet, horizontal distance, from
any other water body, tributary stream, or the upland edge of a wetland, a buffer strip of
vegetation shall be preserved as follows:
SS 5.2.1. There shall be no cleared opening greater than 250 square feet in the forest canopy
(or other existing woody vegetation if a forested canopy is not present) as measured from the
outer limits of the tree or shrub crown. However, a footpath not to exceed six (6) feet in width as
measured between tree trunks and/or shrub stems is allowed provided that a cleared line of
sight to the water through the buffer strip is not created.
SS 5.2.2. Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
this subsection 2, a "well-distributed stand of trees" adjacent to a great pond or a stream
flowing to a great pond, shall be defined as maintaining a rating score of 24 or more in each
25-foot by 50-foot rectangular (1250 square feet) area as determined by the following rating
system.
Diameter of Tree at 4-1/2 feet Above
Points
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 6
Ground Level (inches)
2 < 4 in.
1
4 <8 in.
2
8 < 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand of
trees" is defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot
rectangular area.
The following shall govern in applying this point system:
SS 5.2.2.1. The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
SS 5.2.2.2. Each successive plot must be adjacent to, but not overlap a previous plot;
SS 5.2.2.3. Any plot not containing the required points must have no vegetation
removed except as otherwise allowed by this Ordinance;
SS 5.2.2.4. Any plot containing the required points may have vegetation removed down
to the minimum points required or as otherwise allowed by is Ordinance;
SS 5.2.2.5. Where conditions permit, no more than 50% of the points on any 25-foot by
50-foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of this subsection 2, "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not exist,
no woody stems less than two (2) inches in diameter can be removed until 5 saplings have
been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4)
inches or more in diameter, measured at 4 1/2 feet above ground level may be removed in
any ten (10) year period.
SS 5.2.3. In order to protect water quality and wildlife habitat, existing vegetation under
three (3) feet in height and other ground cover, including leaf litter and the forest duff layer,
shall not be cut, covered, or removed, except to provide for a footpath or other permitted
uses as described in SS 5.2 above.
SS 5.2.4. Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
SS 5.2.5. In order to maintain a buffer strip of vegetation, when the removal of storm-
damaged, diseased, unsafe, or dead trees results in the creation of cleared openings, these
openings shall be replanted with native tree species unless existing new tree growth is
present.
NOTE: SS 5.2 does not apply to those portions of public recreational facilities adjacent to public
swimming areas as long as cleared areas are limited to the minimum area necessary.
SS 5.3. In the Shoreland Management Area, at distances greater than one hundred (100) feet,
horizontal distance, from a great pond, and seventy-five (75) feet, horizontal distance, from the
normal high-water line of any other water body, tributary stream, or the upland edge of a
wetland, there shall be allowed on any lot, in any ten (10) year period, selective cutting of not
more than forty (40) percent of the volume of trees four (4) inches or more in diameter,
measured 4 1/2 feet above ground level. Tree removal in conjunction with the development of
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 7
permitted uses shall be included in the forty (40) percent calculation. For the purposes of these
standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the Shoreland Management Area or ten thousand (10,000) square
feet, whichever is greater, including land previously cleared.
SS 5.4. Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
SS 5.5. Fields and other cleared openings that have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of this requirement.
SS 6.0 COMMERCIAL AND INDUSTRIAL USES
The following new commercial and industrial uses are prohibited within the Shoreland Management
Area adjacent to great ponds classified GPA, and streams that flow to great ponds classified GPA:
SS 6.0.1. Auto washing facilities
SS 6.0.2. Auto or other vehicle service and/or repair operations, including body shops
SS 6.0.3. Chemical and bacteriological laboratories
SS 6.0.4. Storage of chemicals, including herbicides, pesticides or fertilizers, other than
amounts normally associated with individual households or farms
SS 6.0.5. Commercial painting, wood preserving, and furniture stripping
SS 6.0.6. Dry cleaning establishments
SS 6.0.7. Electronic circuit assembly
SS 6.0.8. Laundromats, unless connected to a sanitary sewer
SS 6.0.9. Metal plating, finishing, or polishing
SS 6.0.10. Petroleum or petroleum product storage and/or sale except storage on same
property as use occurs and except for storage and sales associated with marinas
SS 6.0.11. Photographic processing
SS 6.0.12. Printing
SS 7.0 CONVERSION OF SEASONAL DWELLINGS
Please refer to Article 8.6. Compliance with Article 8.6 fulfills compliance with this requirement.
SS 8.0 EROSION AND SEDIMENTATION CONTROL
(Also see GPS 7.0).
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 8
SS 8.1. All activities which involve filling, grading, excavation or other similar activities which
result in un-stabilized soil conditions and which require a permit under this Ordinance shall also
require a written soil erosion and sedimentation control plan. The plan shall be submitted to the
Code Enforcement Officer or Planning Board for approval, as required, and shall include, where
applicable, provisions for:
SS 8.1.1. Mulching and re-vegetation of disturbed soil.
SS 8.1.2. Temporary runoff control features such as hay bales, silt fencing or diversion
ditches.
SS 8.1.3. Permanent stabilization structures such as retaining walls or riprap.
SS 8.2. In order to create the least potential for erosion, development shall be designed to fit
with the topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as closely
as possible.
SS 8.3. Erosion and sedimentation control measures shall apply to all aspects of the proposed
project involving land disturbance, and shall be in operation during all stages of the activity. The
amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
SS 8.4. Any exposed ground area shall be temporarily or permanently stabilized within one (1)
week from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months of the
initial date of exposure. In addition:
SS 8.4.1. Where mulch is used, it shall be applied at a rate of at least one (1) bale per five
hundred (500) square feet and shall be maintained until a catch of vegetation is established.
SS 8.4.2. Anchoring the mulch with netting, peg, and twine or other suitable method may be
required to maintain the mulch cover.
SS 8.4.3. Additional measures shall be taken where necessary in order to avoid siltation
into the water. Such measures may include the use of staked hay bales and/or silt fences.
SS 8.5. Natural and man-made drainage ways and drainage outlets shall be protected from
erosion from water flowing through them. Drainage ways shall be designed and constructed in
order to carry water from a twenty-five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
SS 9.0 ESSENTIAL SERVICES
SS 9.1. Where feasible, the installation of essential services shall be limited to existing public
ways and existing service corridors.
SS 9.2. The installation of essential services, other than road-side distribution lines, is not
allowed in the Resource Protection District except to provide services to a permitted use within
said district, or except where the applicant demonstrates that no reasonable alternative exists.
Where allowed, such structures and facilities shall be located so as to minimize any adverse
impacts on surrounding uses and resources, including visual impacts.
SS 9.3. Damaged or destroyed public utility transmission and distribution lines, towers and
related equipment may be replaced or reconstructed without a permit.
SS 10.0
INDIVIDUAL PRIVATE CAMPSITES
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 9
See GPS 9.0 as well. Individual private campsites, not associated with campgrounds, are allowed
within the Shoreland Management Area provided the following conditions are met:
SS 10.1. One campsite per lot of record existing on the effective date of this Ordinance, or per
forty-three thousand five hundred and sixty (43,560) square feet of lot area within the Shoreland
Overlay Area, whichever is less dense, may be permitted.
SS 10.2. Campsite placement on any lot, including the area intended for a recreational vehicle
or tent platform, shall be set back one hundred feet (100'), horizontal distance, from the normal
high-water line of a great pond , and seventy-five feet (75), horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a wetland.
SS 10.3. Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle
shall not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shall be attached to the recreational vehicle.
SS 10.4. A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by the Local
Plumbing Inspector. Where disposal is off-site, written authorization from the receiving facility or
landowner is required.
SS 10.5. The clearing of vegetation for the siting of the recreational vehicle, tent or similar
shelter in the Resource Protection District shall be limited to one thousand (1000) square feet.
SS 10.6. When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be met,
including the installation of a subsurface sewage disposal system in compliance with the State
of Maine Subsurface Wastewater Disposal Rules.
SS 11.0
MINERAL EXPLORATION AND EXTRACTION
Mineral exploration to determine the nature or extent of mineral resources shall be accomplished by
hand sampling, test boring, or other methods which create minimal disturbance of less than one
hundred (100) square feet of ground surface. A permit from the Code Enforcement Officer shall be
required for mineral exploration, which exceeds the above limitation. All excavations, including test pits
and holes shall be immediately capped, filled, or secured by other equally effective measures to restore
disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions and in addition must comply with all
applicable provisions of Article 14.3.0:
SS 11.1. A reclamation plan shall be filed with, and approved by the Planning Board before a
permit is granted. Such plan shall describe, in detail, procedures to be undertaken to fulfill the
requirements of SS 11.3 below.
SS 11.2. No part of any extraction operation, including drainage and runoff control features
shall be permitted within one hundred feet (100'), horizontal distance, of the normal high-water
line of a great pond, and within seventy-five feet (75'), horizontal distance, of the normal high-
water line of any other water body, tributary stream, or the upland edge of a wetland. Extraction
operations shall not be permitted within seventy-five feet (75') of any property line, without
written permission of the owner of such adjacent property.
SS 11.3. Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred (100)
cubic yards of materials are removed in any consecutive twelve (12) month period, ground
levels and grades shall be established in accordance with the following:
SS 11.3.1. All debris, stumps, and similar material shall be removed for disposal in an
approved location, or shall be buried on-site. Only materials generated on-site may be
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 10
buried or covered on-site.
SS 11.3.2. The final graded slope shall be two to one (2:1) slope or flatter.
SS 11.3.3. Top soil or loam shall be retained to cover all disturbed land areas, which shall
be reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
SS 11.4. In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral extraction
operation on surrounding uses and resources, including but not limited to any reasonable form
of performance guarantee such as a performance bond.
SS 12.0 MINIMUM LOT STANDARDS
In addition to all applicable lot standards and requirements found elsewhere in this Ordinance:
SS 12.1. All lots within the Shoreland Management Area shall have the minimum lot size of the
underlying growth management area as set forth in this ordinance and have a minimum shore
frontage of two hundred feet (200').
SS 12.2. Land below the normal high-water line of a water body or upland edge of a wetland
and land beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
9.12.3. Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on both
sides thereof after September 22, 1971.
SS 12.4. The minimum width of any portion of any lot within one hundred feet (100'), horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
SS 12.5. If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed or established
on a single parcel, all dimensional requirements shall be met for each additional dwelling unit,
principal structure, or use.
SS 13.0 PARKING AREAS
SS 13.1. Parking areas shall meet the shoreline setback requirements established for
structures in SS 15.1. under PRINCIPAL AND ACCESSORY STRUCTURES and the setback
requirements for the growth management area in which such parking areas are located.
SS 13.2. Parking areas shall be adequately sized for the proposed use and shall be designed
to prevent storm water runoff from flowing directly into a water body, tributary stream or wetland
and, where feasible, to retain all runoff on-site.
SS 13.3. In determining the appropriate size of proposed parking facilities, the following shall
apply:
SS 13.3.1. Typical parking space: Approximately ten feet (10') wide and twenty feet (20')
long, except that parking spaces for a vehicle and boat trailer shall be forty feet (40') long.
SS 13.3.2. Internal travel aisles: Approximately twenty feet (20') wide.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 11
SS 14.0
PIERS, DOCKS, WHARFS, BRIDGES AND OTHER STRUCTURES AND USES
EXTENDING OVER OR BELOW THE NORMAL HIGH-WATER LINE OF A WATER BODY OR
WITHIN A WETLAND
SS 14.1. Access to the shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
SS 14.2. The location shall not interfere with existing developed or natural beach areas.
SS 14.3. The facility shall be located so as to minimize adverse effects on fisheries.
SS 14.4. The facility shall be no larger in dimension than necessary to carry on the activity and
be consistent with the surrounding character and uses of the area. A temporary pier, dock or
wharf shall not be wider than six feet.
SS 14.5. No new structure shall be built on, over or abutting a pier, wharf, dock, or other
structure extending below the normal high-water line of a water body or within a wetland unless
the structure requires direct access to the water body or wetland as an operational necessity.
SS 14.6. New permanent piers and docks shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a permit
has been obtained from the Department of Environmental Protection, pursuant to the Natural
Resources Protection Act.
SS 14.7. No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending below the normal high-water line of a water body or within a wetland shall be
converted to residential dwelling units in any Shoreland District.
SS 14.8. Structures built on, over or abutting a pier, wharf, dock or other structure extending
beyond the normal high-water line of a water body or within a wetland shall not exceed twenty
(20) feet in height above the pier, wharf, dock or other structure.
SS 15.0.
PRINCIPAL AND ACCESSORY STRUCTURES
SS 15.1. In the Limited Residential District, all new principal and accessory structures shall be
set back at least one hundred (100) feet, horizontal distance, from the normal high-water line of
great ponds classified GPA, and one hundred (100) feet, horizontal distance, from the upland
edge of a wetland, and seventy-five (75) feet, horizontal distance, from the normal high-water
line of other water bodies and tributary streams. In the Resource Protection District, the setback
requirement shall be two hundred fifty (250) feet, horizontal distance, from the normal high-
water line of great ponds classified GPA, or the upland edge of a wetland, and seventy-five (75)
feet, horizontal distance, from the normal high-water line of a stream, except for structures,
roads, or other regulated objects specifically allowed in that district in which case the setback
requirements specified above shall apply.
In addition:
SS 15.1.1. The water body, tributary stream, or wetland setback provision shall neither
apply to structures that require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
SS 15.1.2. On a non-conforming lot of record on which only a residential structure exists,
and it is not possible to place an accessory structure meeting the required water body,
tributary stream or wetland setbacks, the Code Enforcement Officer may issue a permit to
place a single accessory structure, with no utilities, for the storage of yard tools and similar
equipment. Such accessory structure shall not exceed eighty (80) square feet in area nor
eight (8) feet in height, and shall be located as far from the shoreline or tributary stream as
practical and shall meet all other applicable standards, including lot coverage and vegetation
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 12
clearing limitations. In no case shall the structure be located closer to the shoreline or
tributary stream than the principal structure.
SS 15.1.3. The Planning Board may increase the required setback of a proposed structure,
as a condition to permit approval, if necessary to accomplish the purposes of this ordinance.
Instances where a greater setback may be appropriate include, but are not limited to: areas
of steep slope; shallow or erodible soils; or where an adequate vegetative buffer does not
exist.
SS 15.2. Principal or accessory structures and expansions of existing structures which are
permitted in the Shoreland Management Area shall not exceed thirty-five (35) feet in height. This
provision shall not apply to structures such as transmission towers, windmills, antennas, and
similar structures having no floor area.
SS 15.3. The lowest floor elevation or openings of all buildings and structures, including
basements, shall be elevated at least one foot above the elevation of the 100 year flood, the flood
of record, or in the absence of these, the flood as defined by soil types identified as recent
floodplain soils; except that, accessory structures may be placed in accordance with the Flood
Hazard Management Area standards of this ordinance and need not meet the elevation
requirements of this paragraph.
SS 15.4. The total footprint area of all structures, parking lots and other non-vegetated surfaces,
within the Shoreland Management Area shall not exceed twenty (20) percent of the lot or a portion
thereof, located within the Shoreland Management Area, including land area previously
developed.
SS 15.5. Retaining walls that are not necessary for erosion control shall meet the structure
setback requirement, except for low retaining walls and associated fill provided all of the
following conditions are met:
SS 15.5.1. The site has been previously altered and an effective vegetated buffer does not
exist;
SS 15.5.2. The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-
water line of a water body, tributary stream, or upland edge of a wetland;
SS 15.5.3. The site where the retaining wall will be constructed is legally existing lawn or is
a site eroding from lack of naturally occurring vegetation, and which cannot be stabilized
with vegetative plantings;
SS 15.5.4. The total height of the wall(s), in the aggregate, is (are) no more than 24 inches;
SS 15.5.5. Retaining walls are located outside of the 100-year floodplain on rivers, streams,
wetlands, and tributary streams, as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood
of record, or in the absence of these, by soil types identified as recent floodplain soils.
SS 15.5.6. The area behind the wall is re-vegetated with grass, shrubs, trees, or a
combination thereof, and no further structural development will occur within the setback
area, including patios and decks; and
SS 15.5.7. A vegetated buffer area is established within 25 feet, horizontal distance, of the
normal high-water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following characteristics:
SS 15.5.7.1. The buffer must include shrubs and other woody and herbaceous
vegetation. Where natural ground cover is lacking the area must be supplemented with
leaf or bark mulch;
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 13
SS 15.5.7.2. Vegetation plantings must be in quantities sufficient to retard erosion and
provide for effective infiltration of storm water runoff;
SS 15.5.7.3. Only native species may be used to establish the buffer area;
SS 15.5.7.4. A minimum buffer width of 15 feet, horizontal distance, is required,
measured perpendicularly to the normal high-water line or upland edge of a wetland;
SS 15.5.7.5. A footpath not to exceed the standards in SS 5.0 may traverse the buffer;
SS 15.6. Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access in areas of
steep slopes or unstable soils provided: that the structure is limited to a maximum of four (4) feet
in width; that the structure does not extend below or over the normal high-water line of a water
body or upland edge of a wetland, (unless permitted by the Department of Environmental
Protection pursuant to the Natural Resources Protection Act, 38 MRSA. §480-C); and that the
applicant demonstrates that no reasonable access alternative exists on the property.
SS 16.0 ROADS AND DRIVEWAYS
The following standards shall apply to the construction of roads and/or driveways and drainage
systems, culverts, and other related features.
SS 16.1. Roads and driveways shall be set back at least one-hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA, at least one-hundred
feet, horizontal distance from the upland edge of a wetland and seventy-five (75) feet, horizontal
distance from the normal high-water line of other water bodies and tributary streams unless no
reasonable alternative exists as determined by the Planning Board. If no other reasonable
alternative exists, the road and/or driveway setback requirement shall be no less than fifty (50)
feet, horizontal distance, upon clear showing by the applicant that appropriate techniques will be
used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the effective use of
additional ditch relief culverts and turnouts placed so as to avoid sedimentation of the water body,
tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope above
twenty (20) percent.
This section does not apply to approaches to water crossings or to roads or driveways that
provide access to permitted structures and facilities located nearer to the shoreline or tributary
stream due to an operational necessity, excluding temporary docks for recreational uses.
Roads and driveways providing access to permitted structures within the setback area shall
comply fully with the requirements of this section except for that portion of the road or driveway
necessary for direct access to the structure.
SS 16.2. Existing public roads may be expanded within the legal road right of way regardless of
their setback from a water body, tributary stream or wetland.
SS 16.3. New roads and driveways are prohibited in the Resource Protection District except
that the Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the District. A road or driveway may also be approved by the Planning
Board in the Resource Protection District, upon a finding that no reasonable alternative route or
location is available outside the District. When a road or driveway is permitted in the Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 14
SS 16.4. Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one
(1) vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in SS 8.0.
SS 16.5. Road and driveway grades shall be no greater than ten (10) percent except for
segments of less than two hundred (200) feet.
SS 16.6. In order to prevent road and driveway surface drainage from directly entering water
bodies, tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an un-scarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal high-
water line of a water body, tributary stream, or upland edge of a wetland. Surface drainage
directed to an un-scarified buffer strip shall be diffused or spread out to promote infiltration of
the runoff and to minimize channelized flow of the drainage through the buffer strip.
SS 16.7. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto un-scarified buffer strips before the flow
gains sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
SS 16.7.1. Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road or driveway at intervals no greater than indicated in the following
table:
Grade (Percent)
Spacing (Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
SS 16.7.2. Drainage dips may be used in place of ditch relief culverts only where the grade
is ten (10) percent or less.
SS 16.7.3. On sections having slopes greater than ten (10) percent, ditch relief culverts
shall be placed at approximately a thirty (30) degree angle down slope from a line
perpendicular to the centerline of the road or driveway.
SS 16.7.4. Ditch relief culverts shall be sufficiently sized and properly installed in order to
allow for effective functioning, and their inlet and outlet ends shall be stabilized with
appropriate materials.
SS 16.7.5. Ditches, culverts, bridges, dips, water turnouts and other storm water runoff
control installations associated with roads and driveways shall be maintained on a regular
basis to assure effective functioning.
SS 16.7.6. Culverts shall be permitted and installed in compliance with GPS 4.0.
SS 17.0
SEPTIC WASTE DISPOSAL
All subsurface sewage disposal systems shall be installed in conformance with the State of Maine
Subsurface Wastewater Disposal Rules and the following:
SS 17.1. Clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet, horizontal
distance, from the normal high-water line of a water body or the upland edge of a wetland; and
SS 17.2. A holding tank is not allowed for a first-time residential use in the Shoreland
Management Area.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 15
SS 18.0
SIGNS
All signs in the Shoreland Management Area shall conform to the provisions of GPS 27.7:
SS 19.0
SOILS
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe erosion,
mass soil movement, and water pollution, whether during or after construction. Proposed uses requiring
subsurface waste disposal, and commercial or industrial development and other similar intensive land
uses, shall require a soils report based on an on-site investigation and be prepared by state-certified
professionals. Certified persons may include Maine Certified Soil Scientists, Maine Registered
Professional Engineers, Maine State Certified Geologists and other persons who have training and
experience in the recognition and evaluation of soil properties. The report shall be based upon the
analysis of the characteristics of the soil and surrounding land and water areas, maximum ground water
elevation, presence of ledge, drainage conditions, and other pertinent data which the evaluator deems
appropriate. The soils report shall include recommendations for a proposed use to counteract soil
limitations where they exist.
SS 20.0
SPECIAL EXCEPTIONS
In addition to meeting all other criteria specified in this Ordinance, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential structure in the
Resource Protection District provided that the applicant demonstrates that all of the following conditions
are met:
SS 20.1. There is no location on the property, other than a location within the Resource
Protection District, where the structure can be built.
SS 20.2. The lot on which the structure is proposed is undeveloped and was established and
recorded in the registry of deeds of the county in which the lot is located before the adoption of
the Resource Protection District.
SS 20.3. All proposed buildings, sewage disposal systems and other improvements are:
SS 20.3.1. Located on natural ground slopes of less than 20%; and
SS 20.3.2. Located outside the floodway of the 100-year floodplain along rivers and
artificially formed great ponds along rivers, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements, are
elevated at least one foot above the 100-year floodplain elevation; and the development is
otherwise in compliance with any applicable provisions of the Flood Plain Management
provisions of this Ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is
deemed to be 1/2 the width of the 100-year floodplain.
SS 20.4. The total ground-floor area, including cantilevered or similar overhanging extensions,
of all principal and accessory structures is limited to a maximum of 1,500 square feet. This
limitation shall not be altered by variance.
SS 20.5. All structures, except functionally water-dependent structures, are set back from the
normal high-water line of a water body, tributary stream or upland edge of a wetland to the
greatest practical extent, but not less than 75 feet, horizontal distance. In determining the
greatest practical extent, the Planning Board shall consider the depth of the lot, the slope of the
land, the potential for soil erosion, the type and amount of vegetation to be removed, the
proposed building site's elevation in regard to the flood-plain, and its proximity to moderate-
value and high-value wetlands.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 16
SS 21.0
STORM WATER RUNOFF
SS 21.1. All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing natural
runoff control features, such as berms, swales, terraces, and wooded areas shall be retained in
order to reduce runoff and encourage infiltration of storm waters.
SS 21.2. Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
SS 22.0.
TIMBER HARVESTING
Timber harvesting in the Shoreland Management Area shall be governed by the following:
SS 22.1. Within the Great Pond Resource Protection Area, timber harvesting shall be limited to
the following:
SS 22.1.1. Within the strip of land extending 75 feet, horizontal distance, inland from the
normal high-water line, there shall be no timber harvesting except to remove safety
hazards.
SS 22.1.2. Beyond the 75 foot strip referred to above, timber harvesting is permitted in
except that in no case shall the average residual basal area of trees over 4 and ½ feet
above ground level be reduced to less than 30 square feet per acre.
SS 22.2. Except in areas as described in SS 22.1, timber harvesting shall conform with the
following provisions:
SS 22.2.1. Selective cutting of no more than forty percent (40%) of the total volume of trees
four (4) inches or more in diameter measured at four and one-half feet (4 1/2') above ground
level on any lot in any ten (10) year period is permitted. In addition:
SS 22.2.1.1. Within one-hundred (100) feet, horizontal distance, of the normal high-
water line of a great pond classified GPA, and within seventy-five (75) feet, horizontal
distance, of the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland, there shall be no clear cut openings and a well-distributed
stand of trees and other vegetation, including existing ground cover, shall be maintained.
SS 22.2.1.2. At distances greater than one-hundred (100) feet, horizontal distance, of a
great pond, and greater than seventy-five (75) feet, horizontal distance, of the normal
high-water line of other water bodies or the upland edge of a wetland, harvesting
operations shall not create single clear cut openings greater than ten-thousand (10,000)
square feet in the forest canopy. Where such openings exceed five-thousand (5000)
square feet they shall be at least one hundred (100) feet, horizontal distance, apart.
Such clear-cut openings shall be included in the calculation of total volume removal.
Volume may be considered to be equivalent to basal area.
SS 22.3. Timber harvesting exceeding the 40% limitation in SS 22.1, may be allowed by the
Planning Board upon a clear showing, including a forest management plan signed by a Maine
licensed professional forester, that such exception is necessary for good forest management
and will be carried out in accordance with the purposes of this Ordinance. The Planning Board
shall notify the Commissioner of the Department of Environmental Protection of each exception
allowed, within fourteen (14) days of the Planning Board's decision.
SS 22.4. No accumulation of slash shall be left within fifty feet (50'), horizontal distance, of the
normal high-water line of a water body. In all other areas slash shall either be removed or
disposed of in such a manner that it lies on the ground and no part thereof extends more than
four feet (4') above the ground. Any debris that falls below the normal high-water line of a water
body or tributary stream shall be removed.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 17
SS 22.5. Timber harvesting equipment shall not use stream channels as travel routes except
when:
SS 22.5.1. Surface waters are frozen; and
SS 22.5.2. The activity will not result in any ground disturbance.
SS 22.6. All crossings of flowing water shall require a bridge or culvert, except in areas with low
banks and channel beds which are composed of gravel, rock, or similar hard surface which
would not be eroded or otherwise damaged.
SS 22.7. Skid trail approaches to water crossings shall be located and designed so as to
prevent water runoff from directly entering the water body or tributary stream. Upon completion
of timber harvesting, temporary bridges and culverts shall be removed and areas of exposed
soil re-vegetated.
SS 22.8. Except for water crossings, skid trails, and other sites, where the operation of
machinery used in timber harvesting results in the exposure of mineral soil, the operation shall
be located such that an un-scarified strip of vegetation of at least seventy-five feet (75'),
horizontal distance, in width for slopes up to ten percent (10%) shall be retained between the
exposed mineral soil and the normal high-water line of a water body or upland edge of a
wetland. For each ten percent (10%) increase in slope, the un-scarified strip shall be increased
by twenty feet (20'), horizontal distance. The provisions of this paragraph apply only to a face
sloping toward the water body or wetland, provided, however, that no portion of such exposed
mineral soil on a back face shall be closer than twenty-five feet (25'), horizontal distance, from
the normal high-water line of a water body or upland edge of a wetland.
SS 23.0
TIMBER HARVESTING - STATEWIDE STANDARDS [Effective on effective date
established in Article 1, Section 9]
SS 23.1. Shoreline integrity and sedimentation. Persons conducting timber harvesting and
related activities must take reasonable measures to avoid the disruption of shoreline integrity,
the occurrence of sedimentation of water, and the disturbance of water body and tributary
stream banks, water body and tributary stream channels, shorelines, and soil lying within water
bodies, tributary streams and wetlands. If, despite such precautions, the disruption of shoreline
integrity, sedimentation of water, or the disturbance of water body and tributary stream banks,
water body and tributary stream channels, shorelines, and soil lying within water bodies,
tributary streams and wetlands occurs, such conditions must be corrected.
SS 23.2. Slash treatment. Timber harvesting and related activities shall be conducted such
that slash or debris is not left below the normal high-water line of any water body or tributary
stream, or the upland edge of a wetland. This requirement does not apply to minor, incidental
amounts of slash that result from timber harvesting and related activities otherwise conducted in
compliance with this section.
SS 23.2.1. Slash actively used to protect soil from disturbance by equipment or to stabilize
exposed soil, may be left in place, provided that no part thereof extends more than 4 feet
above the ground.
SS 23.2.2. Adjacent to great ponds, rivers and wetlands:
SS 23.2.2.1. No accumulation of slash shall be left within 50 feet, horizontal distance, of
the normal high-water line or upland edge of a wetland; and
SS 23.2.2.2. Between 50 feet and 250 feet, horizontal distance, of the normal high-water
line or upland edge of a wetland, all slash larger than 3 inches in diameter must be
disposed of in such a manner that no part thereof extends more than 4 feet above the
ground.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 18
SS 23.3. Timber harvesting and related activities must leave adequate tree cover and shall be
conducted so that a well-distributed stand of trees is retained. This requirement may be
satisfied by following one of the following three options:
SS 23.3.1. Option 1 (40% volume removal), as follows:
SS 23.3.1.1. Harvesting of no more than 40 percent of the total volume on each acre of
trees 4.5 inches DBH or greater in any 10 year period is allowed. Volume may be
considered to be equivalent to basal area;
SS 23.3.1.2. A well-distributed stand of trees which is wind firm, and other vegetation
including existing ground cover, must be maintained; and,
SS 23.3.1.3. Within 75 feet, horizontal distance, of the normal high-water line of rivers,
streams, and great ponds, and within 75 feet, horizontal distance, of the upland edge of
a wetland, there must be no cleared openings. At distances greater than 75 feet,
horizontal distance, of the normal high-water line of a river or great pond or upland edge
of a wetland, timber harvesting and related activities must not create single cleared
openings greater than 14,000 square feet in the forest canopy. Where such openings
exceed 10,000 square feet, they must be at least 100 feet, horizontal distance, apart.
Such cleared openings will be included in the calculation of total volume removal.
Volume may be considered equivalent to basal area.
SS 23.3.2. Option 2 (60 square foot basal area retention), as follows:
SS 23.3.2.1. The residual stand must contain an average basal area of at least 60
square feet per acre of woody vegetation greater than or equal to 1.0 inch DBH, of which
40 square feet per acre must be greater than or equal to 4.5 inches DBH;
SS 23.3.2.2. A well-distributed stand of trees which is wind firm, and other vegetation
including existing ground cover, must be maintained; and,
SS 23.3.2.3. Within 75 feet, horizontal distance, of the normal high-water line of water
bodies and within 75 feet, horizontal distance, of the upland edge of wetlands, there
must be no cleared openings. At distances greater than 75 feet, horizontal distance, of
the normal high-water line of a river or great pond, or upland edge of a wetland, timber
harvesting and related activities must not create single cleared openings greater than
14,000 square feet in the forest canopy. Where such openings exceed 10,000 square
feet, they must be at least 100 feet, horizontal distance, apart. Such cleared openings
will be included in the calculation of the average basal area. Volume may be considered
equivalent to basal area.
SS 23.3.3. Option 3 (Outcome based), which requires: An alternative method proposed in
an application, signed by a Licensed Forester or certified wildlife professional, submitted by
the landowner or designated agent to the State of Maine Department of Conservation's
Bureau of Forestry (Bureau) for review and approval, which provides equal or better
protection of the Shoreland Overlay Area than this rule.
Landowners must designate on the Forest Operations Notification form required by 12
MRSA chapter 805, subchapter 5 which option they choose to use. If landowners choose
Option 1 or Option 2, compliance will be determined solely on the criteria for the option
chosen. If landowners choose Option 3, timber harvesting and related activities may not
begin until the Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is
retained through a field procedure that uses sample plots that are located randomly or
systematically to provide a fair representation of the harvest area.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 19
SS 23.4. Skid trails, yards, and equipment operation. This requirement applies to the
construction, maintenance, and use of skid trails and yards in the Shoreland Overlay Area.
SS 23.4.1. Equipment used in timber harvesting and related activities shall not use river,
stream or tributary stream channels as travel routes except when surface waters are frozen
and snow covered, and the activity will not result in any ground disturbance.
SS 23.4.2. Skid trails and yards must be designed and constructed to prevent sediment and
concentrated water runoff from entering a water body, tributary stream, or wetland. Upon
termination of their use, skid trails and yards must be stabilized.
SS 23.4.3. Setbacks:
SS 23.4.3.1. Equipment must be operated to avoid the exposure of mineral soil within
25 feet, horizontal distance, of any water body, tributary stream, or wetland. On slopes
of 10 percent or greater, the setback for equipment operation must be increased by 20
feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5
percent increase in slope above 10 percent. Where slopes fall away from the resource,
no increase in the 25-foot setback is required.
SS 23.4.3.2. Where such setbacks are impracticable, appropriate techniques shall be
used to avoid sedimentation of the water body, tributary stream or wetland. Such
techniques may include the installation of sump holes or settling basins, and/or the
effective use of additional ditch relief culverts and ditch water turnouts placed to avoid
sedimentation of the water body, tributary stream, or wetland. If, despite such
precautions, sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
SS 23.5. Land Management Roads. Land management roads, including approaches to
crossings of water bodies, tributary stream channels, and wetlands, ditches and other related
structures, must be designed, constructed, and maintained to prevent sediment and
concentrated water runoff from directly entering the water body, tributary stream or wetland.
Surface water on or adjacent to water crossing approaches must be diverted through vegetative
filter strips to avoid sedimentation of the watercourse or wetland. Because roadside ditches may
not extend to the resource being crossed, vegetative filter strips must be established in
accordance with the setback requirements in SS 23.7 Slope Table.
SS 23.5.1. Land management roads and associated ditches, excavation, and fill must be
set back at least:
SS 23.5.1.1. 100 feet, horizontal distance, from the normal high-water line of a great
pond, river or wetland;
SS 23.5.1.2. 50 feet, horizontal distance, from the normal high-water line of streams;
and
SS 23.5.1.3. 25 feet, horizontal distance, from the normal high-water line of tributary
streams.
SS 23.5.2. The minimum 100 foot setback specified in SS 23.5.1.1 above may be reduced
to no less than 50 feet, horizontal distance, and the 50 foot setback specified in SS 23.5.1.2
above may be reduced to no less than 25 feet, horizontal distance, if, prior to construction,
the landowner or the landowner's designated agent demonstrates to the Planning Board's
satisfaction that no reasonable alternative exists and that appropriate techniques will be
used to prevent sedimentation of the water body, tributary stream, or wetland. Such
techniques may include, but are not limited to, the installation of settling basins, and/or the
effective use of additional ditch relief culverts and turnouts placed to avoid sedimentation of
the water body, tributary stream or wetland. If, despite such precautions, sedimentation or
the disruption of shoreline integrity occurs, such conditions must be corrected.
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 20
SS 23.5.3. On slopes of 10 percent or greater, the land management road setback must be
increased by at least 20 feet, horizontal distance, plus an additional 10 feet, horizontal
distance, for each 5 percent increase in slope above 10 percent.
SS 23.5.4. New land management roads are not allowed within the shoreland area along
Significant River Segments as identified in 38 MRSA §437, nor in a Resource Protection
District, unless, prior to construction, the landowner or the landowner's designated agent
makes a clear demonstration to the Planning Board's satisfaction that no reasonable
alternative route exists outside the shoreland zone, and that the new road must be set back
as far as practicable from the normal high-water line and screened from the river by existing
vegetation.
SS 23.5.5. Ditches, culverts, bridges, dips, water turnouts and other water control
installations associated with roads must be maintained on a regular basis to assure effective
functioning. Drainage structures shall deliver a dispersed flow of water into an un-scarified
filter strip no less than the width indicated in the setback requirements in SS 23.7 Slope
Table. Where such a filter strip is impracticable, appropriate techniques shall be used to
avoid sedimentation of the water body, tributary stream, or wetland. Such techniques may
include the installation of sump holes or settling basins, and/or the effective use of additional
ditch relief culverts and ditch water turnouts placed to avoid sedimentation of the water
body, tributary stream, or wetland. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions must be corrected.
SS 23.5.6. Road closeout and discontinuance. Maintenance of the water control
installations required in SS 23.5.5 must continue until use of the road is discontinued and
the road is put to bed by effective installation of water bars or other adequate road drainage
structures at appropriate intervals, constructed to avoid surface water flowing over or under
the water bar, and extending a sufficient distance beyond the traveled way so that water
does not reenter the road surface.
SS 23.5.7. Upgrading existing roads. Extension or enlargement of presently existing roads
must conform to the provisions of SS 23.0. Any nonconforming existing road may continue
to exist and to be maintained, as long as the nonconforming conditions are not made more
nonconforming.
SS 23.5.8. Exception. Extension or enlargement of presently existing roads need not
conform to the setback requirements of SS 23.5.1 if, prior to extension or enlargement, the
landowner or the landowner's designated agent demonstrates to the Planning Board's
satisfaction that no reasonable alternative exists and that appropriate techniques will be
used to prevent sedimentation of the water body, tributary stream, or wetland. Such
techniques may include, but are not limited to, the installation of settling basins, and/or the
effective use of additional ditch relief culverts and turnouts placed to avoid sedimentation of
the water body, tributary stream, or wetland. If, despite such precautions, sedimentation or
the disruption of shoreline integrity occurs, such conditions must be corrected.
Additional measures. In addition to the foregoing minimum requirements, persons
undertaking construction and maintenance of roads and river, stream and tributary stream
crossings must take reasonable measures to avoid sedimentation of surface waters.
SS 23.6. Crossings of water bodies. Crossings of rivers, streams, and tributary streams must
allow for fish passage at all times of the year, must not impound water, and must allow for the
maintenance of normal flows.
SS 23.6.1. Determination of flow. Provided they are properly applied and used for the
circumstances for which they are designed, methods including but not limited to the
following are acceptable as a means of calculating the 10 year and 25 year frequency water
flows and thereby determining water crossing sizes as required in SS 23.0: The United
States Geological Survey (USGS) Methods; specifically: Hodgkins, G. 1999; Estimating the
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 21
Magnitude of Peak Flows for Streams in Maine for Selected Recurrence Intervals. U.S.
Geological Survey. Water Resources Investigations Report 99-4008. 45 pp.
SS 23.6.2. Upgrading existing water crossings. Extension or enlargement of presently
existing water crossings must conform to the provisions of SS 23.0. Any nonconforming
existing water crossing may continue to exist and be maintained, as long as the
nonconforming conditions are not made more nonconforming; however, any maintenance or
repair work done below the normal high-water line must conform to the provisions of SS
23.0.
SS 23.6.3. Other Agency Permits. Any timber harvesting and related activities involving the
design, construction, and maintenance of crossings on water bodies other than a river,
stream or tributary stream may require a permit from the Land Use Regulation Commission,
the Department of Environmental Protection, or the US Army Corps of Engineers.
SS 23.6.4. Any timber harvesting and related activities involving the design, construction,
and maintenance of crossings of wetlands identified by the Department of Inland Fisheries
and Wildlife as essential wildlife habitat require prior consultation with the Department of
Inland Fisheries and Wildlife.
SS 23.6.5. Notice to Bureau of Forestry. Written notice of all water crossing construction
maintenance, alteration and replacement activities in shoreland areas must be given to the
Bureau prior to the commencement of such activities. Such notice must contain all
information required by the Bureau, including:
SS 23.6.5.1. a map showing the location of all proposed permanent crossings;
SS 23.6.5.2. the GPS location of all proposed permanent crossings;
SS 23.6.5.3. for any temporary or permanent crossing that requires a permit from state
or federal agencies, a copy of the approved permit or permits; and
SS 23.6.5.4. a statement signed by the responsible party that all temporary and
permanent crossings will be constructed, maintained, and closed out in accordance with
the requirements of this Section.
SS 23.6.6. Water crossing standards. All crossings of rivers require a bridge or culvert sized
according to the requirements of SS 23.6.7 below. Streams and tributary streams may be
crossed using temporary structures that are not bridges or culverts provided:
SS 23.6.6.1. concentrated water runoff does not enter the stream or tributary stream;
SS 23.6.6.2. sedimentation of surface waters is reasonably avoided;
SS 23.6.6.3. there is no substantial disturbance of the bank, or stream or tributary
stream channel;
SS 23.6.6.4. fish passage is not impeded; and,
SS 23.6.6.5. water flow is not unreasonably impeded.
Subject to SS 23.6.6.4 above, skid trail crossings of streams and tributary streams when
channels of such streams and tributary streams are frozen and snow-covered or are
composed of a hard surface which will not be eroded or otherwise damaged are not required
to use permanent or temporary structures.
SS 23.6.7. Bridge and Culvert Sizing. For crossings of river, stream and tributary stream
channels with a bridge or culvert, the following requirements apply:
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 22
SS 23.6.7.1. Bridges and culverts must be installed and maintained to provide an
opening sufficient in size and structure to accommodate 10 year frequency water flows
or with a cross-sectional area at least equal to 2 1/2 times the cross-sectional area of the
river, stream, or tributary stream channel.
SS 23.6.7.2. Temporary bridge and culvert sizes may be smaller than provided in SS
23.7.1 if techniques are effectively employed such that in the event of culvert or bridge
failure, the natural course of water flow is maintained and sedimentation of the water
body or tributary stream is avoided. Such crossing structures must be at least as wide as
the channel and placed above the normal high-water line. Techniques may include, but
are not limited to, the effective use of any, a combination of, or all of the following:
SS 23.6.7.2.1. use of temporary skidder bridges;
SS 23.6.7.2.2. removing culverts prior to the onset of frozen ground conditions;
SS 23.6.7.2.3. using water bars in conjunction with culverts;
SS 23.6.7.2.4. using road dips in conjunction with culverts.
SS 23.6.7.3. Culverts utilized in river, stream and tributary stream crossings must:
SS 23.6.7.3.1. be installed at or below river, stream or tributary stream bed
elevation;
SS 23.6.7.3.2. be seated on firm ground;
SS 23.6.7.3.3. have soil compacted at least halfway up the side of the culvert;
SS 23.6.7.3.4. be covered by soil to a minimum depth of 1 foot or according to the
culvert manufacturer's specifications, whichever is greater; and
SS 23.6.7.3.5. have a headwall at the inlet end which is adequately stabilized by
riprap or other suitable means to reasonably avoid erosion of material around the
culvert.
SS 23.6.7.4. River, stream and tributary stream crossings allowed under SS 23.0, but
located in flood hazard areas (i.e. A zones) as identified on a community's Flood
Insurance Rate Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must be
designed and constructed under the stricter standards contained in that community's
National Flood Insurance Program (NFIP). For example, a water crossing may be
required to pass a 100-year flood event.
SS 23.6.7.5. Exception. Skid trail crossings of tributary streams within shoreland areas
and wetlands adjacent to such streams may be undertaken in a manner not in
conformity with the requirements of the foregoing subsections provided persons
conducting such activities take reasonable measures to avoid the disruption of shoreline
integrity, the occurrence of sedimentation of water, and the disturbance of stream banks,
stream channels, shorelines, and soil lying within ponds and wetlands. If, despite such
precautions, the disruption of shoreline integrity, sedimentation of water, or the
disturbance of stream banks, stream channels, shorelines, and soil lying within ponds
and wetlands occurs, such conditions must be corrected.
SS 23.6.8. Skid trail closeout. Upon completion of timber harvesting and related activities, or
upon the expiration of a Forest Operations Notification, whichever is earlier, the following
requirements apply:
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 23
SS 23.6.8.1. Bridges and culverts installed for river, stream and tributary stream crossings
by skid trails must either be removed and areas of exposed soil stabilized, or upgraded to
comply with the closeout standards for land management roads in SS 23.6.9 below.
SS 23.6.8.2. Water crossing structures that are not bridges or culverts must either be
removed immediately following timber harvesting and related activities, or, if frozen into the
river, stream or tributary stream bed or bank, as soon as practical after snowmelt.
SS 23.6.8.3. River, stream and tributary stream channels, banks and approaches to
crossings of water bodies and tributary streams must be immediately stabilized on
completion of harvest, or if the ground is frozen and/or snow-covered, as soon as practical
after snowmelt. If, despite such precautions, sedimentation or the disruption of shoreline
integrity occurs, such conditions must be corrected.
SS 23.6.9. Land management road closeout. Maintenance of the water control features must
continue until use of the road is discontinued and the road is put to bed by taking the following
actions:
SS 23.6.9.1. Effective installation of water bars or other adequate road drainage structures
at appropriate intervals, constructed to reasonably avoid surface water flowing over or
under the water bar, and extending sufficient distance beyond the traveled way so that
water does not reenter the road surface.
SS 23.6.9.2. Water crossing structures must be appropriately sized or dismantled and
removed in a manner that reasonably avoids sedimentation of the water body or tributary
stream.
SS 23.6.9.3. Any bridge or water crossing culvert in roads to be discontinued shall satisfy
one of the following requirements:
SS 23.6.9.3.1. it shall be designed to provide an opening sufficient in size and structure
to accommodate 25 year frequency water flows;
SS 23.6.9.3.2. it shall be designed to provide an opening with a cross-sectional area at
least 3 1/2 times the cross-sectional area of the river, stream or tributary stream channel;
or
SS 23.6.9.3.3. it shall be dismantled and removed in a fashion to reasonably avoid
sedimentation of the river, stream or tributary stream.
If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
SS 23.7. Slope Table
Filter strips, skid trail setbacks, and land management road setbacks must be maintained as specified
in SS 23.0, but in no case shall be less than shown in the following table.
Average slope of land between exposed mineral
soil and the shoreline (percent)
Width of strip between exposed mineral soil and
shoreline (feet along surface of the ground)
0
25
10
45
20
65
30
85
40
105
50
125
60
145
70
165
CLIFTON LAND USE ORDINANCE 7 November 2017
SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9 - 24
SS 24.0.
UTILITIES - INSTALLATION OF PUBLIC UTILITY SERVICE
No public utility, water district, sanitary district or any utility company of any kind may install services to
any new structure located in the Shoreland Management Area unless written authorization attesting to
the validity and currency of all local permits required under this or any previous Ordinance, has been
issued by the appropriate municipal officials. Following installation of service, the company or district
shall forward the written authorization to the municipal officials, indicating that installation has been
completed.
SS 25.0.
WATER QUALITY
No activity shall deposit on or into the ground or discharge to the waters of the State, any pollutant that,
by itself or in combination with other activities or substances will impair designated uses or the water
classification of the water body, tributary stream or wetland.