This is the exact embedded text of the captured official document.
Snapshot d3cdf90d5f14 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 1
TABLE OF CONTENTS
ARTICLE 1 ORDINANCE ESTABLISHMENT
1.1
Title
1.2
Authority
1.3
Purpose
1.3.1 Establishment Of Fair And Uniform Procedures And Standards
1.3.2 Reduction of Negative Fiscal Impact
1.3.3 Balancing of Property Rights
1.3.4 Preservation of the Town Character
1.3.5 United Nations Conference On Environmental And Development (UNCED) Agenda 21
1.3.6 Protection of the Environment
1.3.7 Promotion of Community Development
1.3.8 Promotion of the General Welfare
1.3.9 Comprehensive Plan Implementation
1.3.10 Establishing and Maintaining Local Control
1.4
Applicability
1.5
Conflict with other Ordinances
1.6
Severability
1.7
Amendments to Ordinance and Maps
1.7.1 Initiation
1.7.2 Public Hearing
1.7.3 Initiation and Amendment Review
1.7.4 Town Meeting Vote
1.7.5 Notification of State
1.8
Annual Administrative Review
1.9
Effective Date
1.10
Availability of Ordinance
1.11
Repeal of Prior Ordinances
ARTICLE 2 ADMINISTRATION, ENFORCEMENT, VIOLATIONS AND PENALTIES
2.1
Administration and Enforcement Bodies and Agents
2.1.1 Code Enforcement Officer
2.1.2 Planning Board
2.1.3 Board of Appeals
2.2
Establishment of Parties
2.3
Enforcement, Violations and Penalties
2.3.1 Nuisances
2.3.2 Enforcement Procedure
2.3.3 Enforcement in the Flood Hazard Area
2.3.4 Legal Action
2.3.5 Fines
2.3.6 Appeals of Planning Board Decisions
ARTICLE 3 ESTABLISHMENT OF GROWTH MANAGEMENT AREAS
3.1
Commitment to Growth Management
3.1.1 Statement Of Commitment To Growth Management
3.1.2 Statement Of Commitment To Growth Management Areas
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 2
3.1.3 Statement Of Commitment To Sustainable Use Of Natural Resources And Open Space
3.2
Establishment of Growth Management Areas
3.2.1 Establishment Of Growth Management Area 1A (GMA 1A)
3.2.2 Establishment Of Growth Management Area Two (GMA 2)
3.2.3 Establishment Of Growth Management Area Three (GMA 3)
3.2.4 Establishment Of The Shoreland Management Area (SMA)
3.2.5 Flood Hazard Management Area (FHMA)
3.2.6 Establishment Of Special Protection Management Areas
3.3
Criteria for the Adoption by Amendment of Development Overlay Areas
3.3.1 Defining Development Overlay Areas
3.3.2 Provision FOR TWO DEVELOPMENT OVERLAY AREAS WITHIN THIS ORDINANCE
3.3.3 Provision For Development Overlay Areas To Be Adopted By Amendment
3.3.4 General Provisions For The Development Overlay Areas
3.4
Incentives for the Preservation of Natural Resources and Open Space
3.4.1 Residential Cluster Development Incentive Provision
3.4.2 Establishment Of A Conservation Subdivision Incentive Provision
3.4.3 Establishment Of A Non-Residential Cluster (Planned) Development Option
3.5
Establishment of Official Land Use Ordinance Maps
3.5.1 Official Land Use Ordinance Maps
3.5.2 Interpretation Of Management Area Boundaries
3.5.3 Resolution of Management Area Boundary Disputes
ARTICLE 4 GROWTH MANAGEMENT STRATEGY
4.1
Establishing a Growth Management Strategy
4.2
Designating Categories of Uses
4.3
Designating Uses in the Growth Management Areas
4.3.1 Allowed Residential Uses
4.3.2 Allowed Non-Residential Uses
4.3.3 Allowed Uses In The Development Overlay Areas
4.3.4 Allowed Uses In The Special Protection Areas
4.3.5 Allowed Transportation and Utility Uses
4.4
Designating Dimensional Requirements
4.4.1 Designating Dimensional Requirements In The Growth Management Areas
4.4.2 Designating Net Developable Acreage Requirements
4.4.3 Designating Net Residential Density Requirements
4.4.4 Designating Net Non-Residential Density Requirements
4.5
Requiring Compliance with Land Use Standards
4.5.1 Compliance and Burden of Proof
4.5.2 Required Standards For Site Plan Review And Subdivision Applications
4.5.3 Required General Performance Standards (GPS)
4.5.4 Required Residential Standards (RS)
4.5.6 Required Flood Hazard Standards
4.5.7 Significant Aquifer Standards
4.5.8 Specific Project Standards
4.5.9 Major Development Standards
ARTICLE 5 PERMITTING PROCEDURE
5.1
Permitting Required
5.2
Permitting and Review
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 3
5.2.1 Roads, Driveways, And Culverts
5.2.2 Moving Or Demolition Activities
5.2.3 Change of Use
5.2.4 Uses Involving Non-Conforming Lots, Uses, Or Structures
5.3
Permitting Exemptions
5.4
Land Use Activities requiring a Certificate from the Code Enforcement Officer
5.5
Permit Application
5.5.1 Application Form
5.5.2 Authorization
5.5.3 Application To Be Dated
5.5.4 Plumbing Permit
5.5.5 Application Fee
5.6
Procedure for Administering Permits
5.6.1 Determination Of Complete Application For Action Of The CEO
5.6.2 On-Site Inspection
5.6.3 CEO Permits
5.6.4 Referrals
5.6.5 Written Notice
5.6.6 Records
5.6.7 Burden of Proof
5.6.8 Compliance With Land Use Standards
5.6.9 On-Site Copy
5.6.10 Expiration of Permits
5.7
Substantially Similar Uses
5.8
Schedule of fees
5.8.1 Select Board to Set Schedule of Fees
5.8.2 Permit Fees
5.8.3 Experts Fee
5.9
Operational Permitting
5.9.1 Operational Permitting Required
5.9.2 Special Exemptions For Legally Existing Non-Conforming Operations
5.9.3 Permit Application
5.9.4 Permit Processing
5.9.5 Public Hearing Option
5.9.6 Issuance of Initial Operational Permit
5.9.7 Non-Transferability of Operational Permit
5.9.8 Standards for Denial
5.9.9 Display/Availability Of Operational Permit And Names Of Owners Or Officers
5.9.10 Expiration And Renewal Of An Operational Permit
5.9.11 Standards For Suspension Or Revocation Of An Operational Permit
5.9.12 Minimum Vote Requirement
5.9.13 Appeal
ARTICLE 6 SITE PLAN AND SUBDIVISION REVIEW
6.1
Activities requiring site plan or subdivision review by the Planning Board
6.1.1 From the Tables of Permitting and Approval
6.1.2 Additional Applications Requiring Planning Board Approval
6.2
Administrative Procedure
6.3
Submission Requirements
6.3.1 Application Submittal
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 4
6.3.2 Evidence of Fee Payment
6.3.3 Plan Submittals And Map Scale
6.3.4 Existing Site Conditions Plan(s)
6.3.5 Proposed Site Conditions Plan(s)
6.3.6 Written Supporting Information
6.3.7 Submission of a Comprehensive Impact Statement
6.3.8 Waivers of Submission Requirements
6.4
Application Process
6.4.1 Economic Development and Pre-Application Confidentitality
6.4.2 Pre-Application Conference
6.4.3 Vesting Rights
6.4.4 On-Site Inspection
6.4.5 Non-Residential Impact Assessment and Clarification of Procedural Issues
6.4.6 Plan Submittal and Review Process
6.4.7 Planning Board Deliberation and Decision
6.4.8 Project Commencement and Completion
6.4.9 Submission of As-Built Plans
6.4.10 Other Required Permits
6.5
Fees
6.5.1 Application Fee
6.5.2 Professional Review and Assistance
6.5.3 Establishment of Fees
6.6
Performance Guarantees
6.6.1 Types of Guarantees
6.6.2 Contents of Guarantee
6.6.3 Escrow Account
6.6.4 Performance Bond
6.6.5 Letter of Credit
6.6.6 Phasing of Development
6.6.7 Release of Guarantee
6.6.8 Default
6.7
Specific Site Plan and Subdivision Review Standards
6.7.1 Compatible Use
6.7.2 Buffering of Adjacent Uses
6.7.3 Buffering of Residential Uses
6.7.4 Conformance to Town Road Plans and Standards
6.7.5 Conformance to Future Land Use Plan and Provision for Open Space
6.7.6 Easements
6.7.7 Exterior Lighting
6.7.8 Hazardous Waste
6.7.9 Landscaping
6.7.10 Large Parcels
6.7.11 Lots
6.7.12 Monuments
6.7.13 Noise
6.7.14 Material Storage
6.7.15 Road Sign Names
6.7.16 Subdivision or Site Plan Names
6.8
Statutory Review Criteria
6.8.1 Pollution
6.8.2 Sufficient Water
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 5
6.8.3 Municipal Water Supply
6.8.4 Erosion
6.8.5 Traffic
6.8.6 Sewage Disposal
6.8.7 Municipal Solid Waste Disposal
6.8.8 Aesthetic, Cultural, and Natural Values
6.8.9 Conformity with Local Ordinances and Plans
6.8.10 Financial and Technical Capability
6.8.11 Surface Waters: Outstanding River Segments
6.8.12 Groundwater
6.8.13 Flood Areas
6.8.14 Freshwater Wetlands
6.8.15 River, Stream, or Brook
6.8.16 Storm Water
6.8.17 Spaghetti Lots Prohibited
6.8.18 Lake Phosphorous Concentration
6.8.19 Impact on Adjoining Property
6.8.20 Lands Subject to Liquidation Harvesting
ARTICLE 7 GENERAL PERFORMANCE STANDARDS
GPS 1.0
Access and Driveways
GPS 2.0
Archeological Sites
GPS 3.0
Buffering and Screening (Non-Residential)
GPS 4.0
Culverts Within the Right-of-Way of Town-Maintained Roads
GPS 5.0
Damage to Town Property
GPS 6.0
Dust, Fumes, Gases, Odors, Glares, Explosives
GPS 7.0
Erosion and Sedimentation Control
GPS 8.0
Groundwater Protection
GPS 9.0
Individual Private Campsites
GPS 10.0 Lighting (Non-Residential)
GPS 11.0 Mineral Exploration
GPS 12.0 Multiple Principle Structures on a Single Lot
GPS 13.0 Multiple Uses on a Single Lot
GPS 14.0 Municipal Services
GPS 15.0 Net Developable Acreage
GPS 16.0 Net Residential Density
GPS 17.0 Noise (Non-Residential)
GPS 18.0 Off-Street Loading/Unloading (Non-Residential)
GPS 19.0 Off-Street Parking (Non-Residential)
GPS 20.0 Oil and Chemical Storage
GPS 21.0 On-Site Circulation (Non-Residential)
GPS 22.0 Outdoor Storage and Display of Goods (Non-Residential)
GPS 23.0 Pollution Levels
GPS 24.0 Preservation of the Landscape
GPS 25.0 Private Right-of-Ways
GPS 26.0 Septic Waste Disposal
GPS 27.0 Signs
GPS 28.0 Site Conditions
GPS 29.0 Soils
GPS 30.0 Special Events (Non-Residential)
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 6
GPS 31.0 Stormwater Management / Storm Water Runoff
GPS 32.0 Temporary Storage Enclosures (Non-Residential)
ARTICLE 8 RESIDENTIAL USES, DIMENSIONS AND STANDARDS
8.1
Allowed uses and activities - Table 8A Permitting and Approval
8.2
Dimensional Requirements - Table 8B Residential Dimensional Requirements
8.3
Accessory Residential Uses (including home businesses)
8.3.1 Accessory Residential Units
8.3.2 Bed and Breakfast
8.3.3 Home Occupation Level 1
8.3.4 Home Occupation Level 2
8.4
Conversion to Multi-Family Dwelling
8.5
Mobile and Modular Homes
8.5.1 Mobile Home Manufacturing Date
8.5.2 Moving Permit Required
8.5.3 Written Application
8.5.4 Fee Required
8.5.5 Zone Certification
8.5.6 Site Consideration
8.5.7 Clearance
8.5.8 Ventilation and Access of Under Floor Areas
8.5.9 Skirting Required
8.5.10 Plumbing Permit Required
8.5.11 Exterior Mechanical Equipment
8.5.12 Water Supply
8.6
Conversion of Seasonal Dwelling to Year-Round
8.7
Residential Back-Lot Development
ARTICLE 9 SHORELAND MANAGEMENT AREA USES, DIMENSIONS AND STANDARDS
9.1
Allowed Uses and Activities - Table 9A Permitting and Approval
9.2
Dimensional Requirements in the Shoreland Management Area
9.3
Shoreland Standards
SS 1.0
General Standard of Conformance
SS 2.0
Agriculture
SS 3.0
Archeological Sites
SS 4.0
Campgrounds (Also see SPS 2.0)
SS 5.0
Clearing or Removal of Vegetation for Activities other than Timber Harvesting
SS 6.0
Commercial and Industrial Uses
SS 7.0
Conversion of Seasonal Dwellings (Refer to RS 3.0)
SS 8.0
Erosion and Sedimentation Control (Also see GPS 7.0)
SS 9.0
Essential Services
SS 10.0
Individual Private Campsites (Also see GPS 9.0)
SS 11.0
Mineral Exploration and Extraction (Also see GPS 11.0 and SPS 3.0)
SS 12.0
Minimal Lot Standards
SS 13.0
Parking Areas
SS 14.0
Piers, Docks, Wharves, Bridges
SS 15.0
Principal and Accessory Structures
SS 16.0
Roads and Driveways
SS 17.0
Septic Waste Disposal
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 7
SS 18.0
Signs
SS 19.0
Soils
SS 20.0
Special Exceptions
SS 21.0
Storm Water Runoff
SS 22.0
Timber Harvesting
SS 23.0
Timber Harvesting - Statewide Standards
SS 24.0
Utilities - Installation of Public Utilities Services
SS 25.0
Water Quality
ARTICLE 10 FLOOD HAZARD AREA DEVELOPMENT
10.1
Purpose and Establishment
10.2
Permit Required
10.3
Application for a Permit
10.4
Application Fee and Expert's Fee
10.5
Review Standards for Flood Hazard Development Permit Applications
10.6
Flood Hazard Development Standards
10.7
Certificate of Compliance
10.8
Review of Subdivision and Development Proposals in the Flood Hazard Area
10.9
Appeals and Variances
10.10
Enforcement and Penalties
ARTICLE 11 SPECIAL PROTECTION AREAS
11.1
Significant Aquifer Overlay Area
11.2
Bangor Water District Overlay Area
11.3
Shipley Conservation Easement Overlay Area
ARTICLE 12 NON-RESIDENTIAL IMPACT ASSESSMENT AND DIMENSIONAL REQUIREMENTS
12.1
Assessing Impact and Assigning Tier Classification
12.2
Impact Assessment - Table 12A Assessment of Impact
12.3
Determination of Project Classification - Table 12 B Classification Worksheet
12.4
Dimensional Requirements for Tier 2 Uses - Table 12 C Tier 2 Dimensional
Requirements
12.5
Dimensional Requirements for Tier 3 Uses - Table 12 D Tier 3 Dimensional
Requirements
ARTICLE 13 NON-RESIDENTIAL ALLOWED USES TABLES
13.1
Organizing Non-residential Uses and Activities
13.2
General Commercial Uses and Activities - Table 13 A Permitting and Approval
13.3
General Institutional Uses and Activities - Table 13 B Permitting and Approval
13.4
General Industrial Uses and Activities - Table 13 C Permitting and Approval
13.5
Transportation and Utilities Uses and Activities - Table 13 D Permitting and Approval
13.6
Resource-Based Uses and Activities - Table 13 E Permitting and Approval
ARTICLE 14 SPECIFIC PROJECT STANDARDS
14.1
Adult Businesses
14.1.1 Purpose and Intent
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 8
14.1.2 Site Plan Approval and Operational Permit Required
14.1.3 Site Plan Review of the Adult Business
14.1.4 Signs and Exterior Layout
14.1.5 Operational Permitting
14.2
Campgrounds and Travel Trailer Parks
14.2.1 Minimum Campsite
14.2.2 Fire Standards
14.2.3 Service Facilities
14.2.4 Existing Non-Conforming Campgrounds and Travel Trailer Parks
14.3
Extractive Industries
14.3.1 Operational Permit
14.3.2 Reclamation Plan
14.3.3 Property Boundary
14.3.4 Permit Renewal
14.3.5 Posting of Performance Bond
14.3.6 Imposition of Conditions
14.3.7 Additional Requirements
14.3.8 Existing Non-Conforming Extractive Industries
14.3.9 Enforcement of State Laws Regarding Extractive Industries
14.4
Junkyards, Auto Graveyards and Auto Recycling Businesses
14.4.1 Purpose and Intent
14.4.2 Setbacks
14.4.3 Screening
14.4.4 Buffer
14.4.5 Safety Measures
14.4.6 Active Processing Operation
14.4.7 Best Management Practices
14.4.8 Operational Permitting
14.4.9 Violations
14.4.10 Abandonment and Removal
14.5
Mobile Home Parks
14.5.1 Application Requirements
14.5.2 Minimum Location Standards
14.5.3 Minimum General Standards
14.5.4 Minimum Street Standards
14.5.5 Operational Permitting
14.5.6 Existing Non-Conforming Mobile Home Parks
14.6
Telecommunications Towers
14.6.1 Development Classification
14.6.2 Appearance
14.6.3 Setbacks and Buffers
14.6.4 Landscaping
14.6.5 Lighting
14.6.6 Access
14.6.7 Security Fencing
14.6.8 Height Restrictions
14.6.9 Abandonment and Removal
14.6.10 Operational Permitting
14.7
Small Wind Power Systems
14.7.1 Allowed Accessory Use and Operational Permitting
14.7.2 Use Standards for Small Wind Energy Systems
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 9
14.7.3 Meteorological Towers (MET Towers)
14.8
Large Wind Energy Facilities
14.8.1 Applicability
14.8.2 Purpose and Intent
14.8.3 Site Plan Approval, Operational Permit and Burden of Compliance
14.8.4 Application Procedure
14.8.5 Submission Requirements
14.8.6 Wind Energy Facility Standards
14.8.7 Natural Areas and Wildlife Habitat
14.8.8 Design Standards
14.8.9 Construction Standards
14.8.10 NOT USED
14.8.11 Decommissioning Standard
14.8.12 Modifications of and Changes to an Approved Wind Energy Facility Site Plan
14.8.13 Additional Submissions for an Operational Permit
14.8.14 Inspections, Violations, Complaints, Penalties, and Appeals
14.8.A
Sound Assessment Protocol (Appendix A)
14.8.A.1 Context of References
14.8.A.2 Introduction
14.8.A.3 Instrumentation
14.8.A.4 Pre-Construction Ambient Sound and Predictive Sound Assessment
14.8.A.5 Post-Construction Sound Measurement and Assessment
14.8.A.6 Compliance with the Sound Level Limits
14.8.A.7 Reporting of Compliance Measurement Data
14.8.B
Community Complaint Evaluation and Response Procedure (Appendix B)
14.8.B.1 Method of Complaint
14.8.B.2 Background
14.8.B.3 Site Visit, Interview and Initial Complaint Screening
14.8.B.4 Qualitative Screening Process
14.8.B.5 Complaint Assessment
14.9
Medical Marijuana Registered Dispensaries and Medical Marijuana Cultivation Facilities
14.9.1 Purpose and Intent
14.9.2 Location and Zoning
14.9.3 Site Access and Structure Sizing
14.9.4 Signs and Visible Advertising
14.9.5 On-Site Activities
14.9.6 Security
14.9.7 Employees
14.9.8 No Food Products
14.9.9 Compliance With Other Laws and Standards
14.9.10 Bi-Annual Renewal
14.10
Drug Treatment Centers
14.10.1 Purpose and Intent
14.10.2 Location and Zoning
14.10.3 Site Access and Structure Sizing
14.10.4 Site Security
14.10.5 Compliance with Other Laws and Standards
14.10.6 Bi-Annual Renewal
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 10
ARTICLE 15 MAJOR DEVELOPMENT STANDARDS
15.1
Cluster Residential Development Standards
15.1.1 Cluster Development
15.1.2 Allowable Reduction in Requirements
15.1.3 Basic Standards for Cluster Development
15.2
Cluster Conservation Development Standards
15.2.1 Cluster Conservation Development
15.2.2 Allowable Reduction in Requirements
15.2.3 Basic Standards for Cluster Conservation Development
15.2.4 Cluster and Conservation Diagrams
15.3
Cluster Non-Residential Development Standards
15.3.1 Cluster Non-Residential Development
15.3.2 Allowable Reduction in Requirements
15.3.3 Basic Standards for Cluster Non-Residential Development
15.4
Common or Open Space Standards
15.4.1 Retention of Common or Open Space
15.4.2 Dedication of Common or Open Space
15.4.3 Maintenance of Common or Open Space
15.5
Road Design and Construction Standards
15.5.1 General Requirements
15.5.2 Road Standards
15.5.3 Road Names, Signs, and Lighting
15.5.4 Driveway Culverts
15.6
Storm Drainage Design and Construction Standards
15.6.1 General Provisions
15.6.2 Design Standards
15.6.3 Construction Standards
15.7
Utilities/ Sewage Disposal/ Waste Disposal / Water Supply
15.7.1 Utilities
15.7.2 Sewage Disposal
15.7.3 Waste Disposal
15.7.4 Water Supply
ARTICLE 16 NON-CONFORMITY PROVISIONS
16.1
Non-Conformity Defined
16.2
General Provisions
16.2.1 Normal Repair and Maintenance
16.2.2 Transfer of Ownership
16.2.3 Illegal Non-Conformity
16.2.4 Burden of Proof
16.2.5 Conversion to Conformity
16.2.6 Reversion to Non-Conformity
16.3
Non-Conforming Structures
16.3.1 Expansion of Non-Conforming Structures
16.3.2 Relocation of Non-Conforming Structures
16.3.3 Reconstruction or Replacement of Non-conforming Structures
16.3.4 Change of Use of a Non-conforming Structure
CLIFTON LAND USE ORDINANCE EFFECTIVE 7 November 2017 (FINAL)
TABLE OF CONTENTS
TOC - 11
16.4
Non-Conforming Uses
16.4.1 Expansion
16.4.2 Resumption Prohibited
16.4.3 Change of Use
16.5
Non-Conforming Lots of Record
16.5.1 Non-Conforming Lots of Record
16.5.2 Contiguous Built Lots
16.5.2 Contiguous - Vacant or Partially Built
ARTICLE 17 ESTABLISHMENT OF A BOARD OF APPEALS
17.1
Establishment and Organization
17.2
Powers and Duties
17.2.1 Administrative Appeals
17.2.2 Variance Appeals
17.2.3 Enforcement Appeals
17.3
Variance Appeals
17.4
Administrative Appeals
17.5
Flood Plain Management Variances
17.6
Appeals Procedure
17.6.1 Time Limit
17.6.2 Written Notice
17.6.3 Record of Case
17.6.4 Public Hearing
17.6.5 Decision by the Board of Appeals
17.6.6 Reconsideration
17.7
Appeal to Superior Court
ARTICLE 18 DEFINITIONS
18.1
General Terminology
18.2
Definitions of Words and Terms
LAND USE ORDINANCE MAPS
Primary Growth Management Areas with Development Overlay Areas
Primary Growth Management Areas
Development Overlay Areas
Flood Hazard Management and other Special Protection Overlay Areas
Shoreland Management Overlay Area