Floodplain Management Ordinance, Town of Clifton

Clifton, Maine · summary & facts

This is the exact embedded text of the captured official document. Snapshot 8998b871a16d · verified 2026-09-22 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

FLOODPLAIN MANAGEMENT ORDINANCE CONTENTS ARTICLE PAGE I. PURPOSE AND ESTABLISHMENT 2 II. PERMIT REQUIRED 2 II, APPLICATION FOR PERMIT 2 IV. APPLICATION FEE AND EXPERT'S FEE 4 V. REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT APPLICATIONS 4 VI. DEVELOPMENT STANDARDS 5 VIL. CERTIFICATE OF COMPLIANCE 11 VII. REVIEW OF SUBDIVISIONS AND DEVELOPMENT PROPOSALS 11 IX. APPEALS AND VARIANCES 12 X. ENFORCEMENT AND PENALTIES 14 XI. WALIDITY AND SEVERABILITY 14 XII. CONFLICT WITH OTHER ORDINANCES 14 XIll. DEFINITIONS 14 XIV. ABROGATION 19 2 60.3(c) DFIRM Rev. 6/22 Prepared on 1/2023 by DACF/JP 3 ARTICLE I - PURPOSE AND ESTABLISHMENT Certain areas of the Town of Clifton, Maine are subject to periodic flooding, causing serious damages to properties within these areas. Relief is available in the form of flood insurance as authorized by the National Flood Insurance Act of 1968. Therefore, the Town of Clifton, Maine has chosen to become a participating community in the National Flood Insurance Program and agrees to comply with the requirements of the National Flood Insurance Act | of 1968 (P.L. 90-488, as amended) as delineated in this Floodplain Management Ordinance. It is the intent of the Town of Clifton, Maine to require the recognition and evaluation of flood hazards in all official actions relating to land use in the floodplain areas having special flood hazards. The Town of Clifton has the legal authority to adopt land use and control measures to reduce future flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352, 4401-4407, and Title 38 MRSA, Section 440. The National Flood Insurance Program, established in the aforesaid Act, provides that areas of the Town of Clifton having a special flood hazard be identified by the Federal Emergency Management Agency and that floodplain management measures be applied in such flood hazard areas. This Ordinance establishes a Flood Hazard Development Permit system and review procedure for development activities in the designated flood hazard areas of the Town of Clifton, Maine. | The areas of special flood hazard, Zones A and AE, for the Town of Clifton, Penobscot County, Maine, identified by the Federal Emergency Management Agency in a report entitled "Flood Insurance Study -- Penobscot County, Maine," dated July 19, 2023, with accompanying "Flood Insurance Rate Maps, Penobscot County, Maine" dated July 19, 2023, are hereby adopted by reference and declared to be a part of this Ordinance. ARTICLE II - PERMIT REQUIRED The Planning Board shall be designated as the local Floodplain Administrator. The Floodplain Administrator shall have the authority to implement the commitment made to administer and enforce the requirements for participation in the National Flood Insurance Program. Before any construction or other development (as defined in Article XIII), including the placement of manufactured homes, begins within any areas of special flood hazard established in Article I, a Flood Hazard Development Permit shall be obtained from the Planning Board. This permit shall be in addition to any other permits which may be required pursuant to the codes and ordinances of the Town of Clifton, Maine. ARTICLE III - APPLICATION FOR PERMIT The application for a Flood Hazard Development Permit shall be submitted to the Planning Board and shall include: A. The name, address, and phone number of the applicant, owner, and contractor; B. An address and a map indicating the location of the construction site; 4 C. A site plan showing location of existing and/or proposed development, including but not limited to structures, sewage disposal facilities, water supply facilities, areas to be cut and filled, and lot dimensions; D. A statement of the intended use of the structure and/or development; E. A statement of the cost of the development including all materials and labor; F. A statement as to the type of sewage system proposed; G. Specification of dimensions of the proposed structure and/or development; [Items H-K.2. apply only to new construction and substantial improvements. ] H. The elevation in relation to the National Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD), or to a locally established datum in Zone A only, of the: 1. base flood at the proposed site of all new or substantially improved structures, which is determined: a. in Zones AE, from data contained in the "Flood Insurance Study - Penobscot County, Maine," as described in Article 1; or, b. in Zone A: (1) from any base flood elevation data from federal, state, or other technical sources (such as FEMA's Quick-2 model, FEMA 265), including information obtained pursuant to Article VI.M. and VIIE.D.; or, (2) in the absence of all data described in Article III.H.1.b.(1), information to demonstrate that the structure shall meet the elevation requirement in Article VI.H.2.b., Article VLI.2.a. or b., or Article VI.J.2.b. 2. highest and lowest grades at the site adjacent to the walls of the proposed building; 3. lowest floor, including basement; and whether or not such structures contain a basement, 4. lowest machinery and equipment servicing the building; and, 5. level, in the case of non-residential structures only, to which the structure will be floodproofed. I, A description of an elevation reference point established on the site of all developments for which elevation standards apply as required in Article VI; J. A written certification by a Professional Land Surveyor, registered professional engineer or architect, that the base flood elevation and grade elevations shown on the application are accurate; K. The following certifications as required in Article VI by a registered professional engineer or architect: 5 1. aFloodproofing Certificate (FEMA Form 81-65, as amended), to verify that the floodproofing methods for any non-residential structures will meet the floodproofing criteria of Article VL.I.; and other applicable standards in Article VI; 2. aHydraulic Openings Certificate to verify that engineered hydraulic openings in foundation walls will meet the standards of Article VI.N.2.a.; 3. acertified statement that bridges wili meet the standards of Article VI.O.; 4. acertified statement that containment walls will meet the standards of Article VI.P. L. A description of the extent to which any water course will be altered or relocated as a result of the proposed development; and, M. A statement of construction plans describing in detail how each applicable development standard in Article VI will be met. ARTICLE IV - APPLICATION FEE AND EXPERT'S FEE A non-refundable application fee of $50.00 shall be paid to the Town Clerk and a copy of a receipt for the same shall accompany the application. An additional fee may be charged if the Code Enforcement Officer, Planning Board, and/or Board of Appeals needs the assistance of a professional engineer or other expert. The expert's fee shall be paid in full by the applicant within 10 days after the town submits a bill to the applicant. Failure to pay the bill shall constitute a violation of the ordinance and be grounds for the issuance of a stop work order. An expert shall not be hired by the municipality at the expense of an applicant until the applicant has either consented to such hiring in writing or been given an opportunity to be heard on the subject. An applicant who is dissatisfied with a decision to hire expert assistance may appeal that decision to the Board of Appeals. ARTICLE V - REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT APPLICATIONS The Planning Board shall: A. Review all applications for the Flood Hazard Development Permit to assure that proposed developments are reasonably safe from flooding and to determine that all pertinent requirements of Article VI (Development Standards) have been, or will be met; B. Utilize, in the review of all Flood Hazard Development Permit applications: 1. the base flood and floodway data contained in the "Flood Insurance Study - Penobscot County, Maine," as described in Article I; 2. in special flood hazard areas where base flood elevation and floodway data are not provided, the Planning Board shall obtain, review, and reasonably utilize any base flood elevation and floodway data from federal, state, or other technical sources, including information obtained pursuant to Article III.H.1.b.(1); Article VI.M.; and Article VIII.D., in order to administer Article VI of this Ordinance; and, 6 3. when the community establishes a base flood elevation in a Zone A by methods outlined in Article III.H.1.b.(1), the community shall submit that data to the Maine Floodplain Management Program. C. Make interpretations of the location of boundaries of special flood hazard areas shown on the maps described in Article I of this Ordinance; D. Inthe review of Flood Hazard Development Permit applications, determine that all necessary permits have been obtained from those federal, state, and local government agencies from which prior approval is required by federal or state law, including but not limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1344; E. Notify adjacent municipalities, the Department of Environmental Protection, and the Maine Floodplain Management Program prior to any alteration or relocation of a water course and submit copies of such notifications to the Federal Emergency Management Agency; F. Ifthe application satisfies the requirements of this Ordinance, approve the issuance of one of the following Flood Hazard Development Permits based on the type of development: 1. A two part Flood Hazard Development Permit for elevated structures. Part I shall authorize the applicant to build a structure to and including the first horizontal floor only above the base flood level. At that time the applicant shall provide the Code Enforcement Officer with an "under construction" Elevation Certificate completed by a Professional Land Surveyor, registered professional engineer or architect based on the Part I permit construction for verifying compliance with the elevation requirements of Article VI, paragraphs H., I., or J. Following review of the Elevation Certificate data, which shall take place within 72 hours of receipt of the application, the Code Enforcement Officer shall issue Part II of the Flood Hazard Development Permit. Part II shall authorize the applicant to complete the construction project; or, 2. A Flood Hazard Development Permit for Floodproofing of Non-Residential Structures that are new construction or substantially improved non-residential structures that are not being elevated but that meet the floodproofing standards of Article VI.1.1. The application for this permit shall include a Floodproofing Certificate signed by a registered professional engineer or architect; or, 3. A Flood Hazard Development Permit for Minor Development for all development that is not new construction or a substantial improvement, such as repairs, maintenance, renovations, or additions, whose value is less than 50% of the market value of the structure. Minor development also includes but is not limited to: accessory structures as provided for in Article VI.L., mining, dredging, filling, grading, paving, excavation, drilling operations, storage of equipment or materials, deposition or extraction of materials, public or private sewage disposal systems or water supply facilities that do not involve structures; and non-structural projects such as bridges, dams, towers, fencing, pipelines, wharves, and piers. G. Maintain, as a permanent record, copies of all Flood Hazard Development Permit Applications, corresponding Permits issued, and data relevant thereto, including reports of the Board of Appeals on variances granted under the provisions of Article IX of this Ordinance, and copies of Elevation Certificates, Floodproofing Certificates, Certificates of Compliance, and certifications of design standards required under the provisions of Articles III, VI, and VII of this Ordinance. ARTICLE VI - DEVELOPMENT STANDARDS All developments in areas of special flood hazard shall meet the following applicable standards: 7 A. All Development - All development shall: 1. be designed or modified and adequately anchored to prevent flotation (excluding piers and docks), collapse or lateral movement of the development resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy; 2. use construction materials that are resistant to flood damage; 3. use construction methods and practices that will minimize flood damage; and, 4. use electrical, heating, ventilation, plumbing, and air conditioning equipment, and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during flooding conditions. B. Water Supply - All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the systems. C. Sanitary Sewage Systems - All new and replacement sanitary sewage systems shall be designed and located to minimize or eliminate infiltration of flood waters into the system and discharges from the system into flood waters. D. On Site Waste Disposal Systems - On site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during floods. E. Watercourse Carrying Capacity - All development associated with altered or relocated portions of a watercourse shall be constructed and maintained in such a manner that no reduction occurs in the flood carrying capacity of the watercourse. F, Utilities - New construction or substantial improvement of any structure (including manufactured homes) located within __Zones A and AE, shall have the bottom of all electrical, heating, plumbing, ventilation and air conditioning equipment, permanent fixtures and components, HVAC ductwork and duct systems, and any other utility service equipment, facilities, machinery, or connections servicing a structure, elevated to at least one foot above the base flood elevation. G. Physical Changes to the Natural Landscape - Certain development projects, including but not limited to, retaining walls, sea wall, levees, berms, and rip rap, can cause physical changes that affect flooding conditions. 1. All development projects in Zones AE and VE that cause physical changes to the natural landscape shall be reviewed by a Professional Engineer to determine whether or not the project changes the base flood elevation, zone, and/or the flood hazard boundary line. a. Ifthe Professional Engineer determines, through the use of engineering judgement, that the project would not necessitate a Letter of Map Revision (LOMR), a certified statement shall be provided. b. Ifthe Professional Engineer determines that the project may cause a change, a hydrologic and hydraulic analysis that meets current FEMA standards shall be performed. 8 2. Ifthe hydrologic and hydraulic analysis performed indicates a change to the base flood elevation, zone, and/or the flood hazard boundary line, the applicant may submit a Conditional Letter of Map Revision (C-LOMR) request to the Federal Emergency Management Agency for assurance that the as-built project will result in a change to the Flood Insurance Rate Map. Once the development is completed, a request for a Letter of Map Revision (LOMR) shall be initiated. 3. Ifthe hydrologic and hydraulic analysis performed show a change to the base flood elevation, zone, and/or the flood hazard boundary line, as soon as practicable, but no later than 6 months after the completion of the project, the applicant shall submit the technical data to FEMA in the form of a Letter of Map Revision request. H. Residential - New construction or substantial improvement of any residential structure located within: 1. Zone AE shall have the lowest floor (including basement) elevated to at least one foot above the base flood elevation. 2. Zone A shall have the lowest floor (including basement) elevated: a. to at least one foot above the base flood elevation utilizing information obtained pursuant to Article III.H.1.b.(1); Article V.B.; or Article VIII.D.; or, b. in the absence of all data described in Article VI.H.2.a., to at least two feet above the highest adjacent grade to the structure. I. Non-Residential - New construction or substantial improvement of any non-residential structure located within: 1. Zone AE shall have the lowest floor (including basement) elevated to at least one foot above the base flood elevation, or together with attendant utility and sanitary facilities shall: a. be floodproofed to at least one foot above the base flood elevation so that below that elevation the structure is watertight with walls substantially impermeable to the passage of water; b. have structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy; and, c. be certified by a registered professional engineer or architect that the floodproofing design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this section. Such certification shall be provided with the application for a Flood Hazard Development Permit, as required by Article ITI.K. and shall include a record of the elevation above mean sea level to which the structure is floodproofed. 2. Zone A shall have the lowest floor (including basement) elevated: a. to at least one foot above the base flood elevation utilizing information obtained pursuant to Article III.H.1.b.(1); Article V.B.; Article VIII.D.; or, 9 b. in the absence of all data described in Article VI.I.2.a., to at least two feet above the highest adjacent grade to the _ structure; or, c. together with attendant utility and sanitary facilities meet the floodproofing standards of Article VI.I.1.a., b., and c. J. Manufactured Homes - New or substantially improved manufactured homes located within: 1. Zone AE shall: a. be elevated such that the lowest floor (including basement) of the manufactured home is at least one foot above the base flood elevation; b. be ona permanent foundation, which may be poured masonry slab or foundation walls, with hydraulic openings, or may be reinforced piers or block supports, any of which support the manufactured home so that no weight is supported by its wheels and axles; and, | c. be securely anchored to an adequately anchored foundation system to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to: (1) over-the-top ties anchored to the ground at the four corners of the manufactured home, plus two additional ties per side at intermediate points (manufactured homes less than 50 feet long require one additional tie per side); or by, (2) frame ties at each corner of the home, plus five additional ties along each side at intermediate points (manufactured homes less than 50 feet long require four additional ties per side). (3) All components of the anchoring system described in Article VI.J.1.c.(1) & (2) shall be | capable of carrying a force of 4800 pounds. 2. Zone A shall: a. be elevated on a permanent foundation, as described in Article VI.J.1.b., such that the lowest floor (including basement) of the manufactured home is at least one foot above the base flood elevation utilizing information obtained pursuant to Article III.H.1.b.(1); Article V.B.; Article VIILD.; or, b. in the absence of all data as described in Article VI.J.2.a., to at least two feet above the highest adjacent grade to the structure; and, c. meet the anchoring requirements of Article VI.J.1.c. K. Recreational Vehicles - Recreational Vehicles located within: 1, Zones A and AE shall either: a. beon the site for fewer than 180 consecutive days; and, b. be fully licensed and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions; or, 10 c. be permitted in accordance with the elevation and anchoring requirements for "manufactured homes" in Article VI.J.1. L. Accessory Structures - New construction or substantial improvement of Accessory Structures, as defined in Article XIII, shall be exempt from the elevation criteria required in Article VLH. & I. above, if all other requirements of Article VI and all the following requirements are met. 1. Accessory Structures located in Zones A and AE shall: a. meet the requirements of Article VI.A.1. through 4., as applicable; b. be limited in size to a one-story two car garage; c. have unfinished interiors and not be used for human habitation; d. have only ground fault interrupt electrical outlets. The electric service disconnect shall be located above the base flood elevation and when possible outside the Special Flood Hazard Area. e. be located outside the floodway; f. when possible be constructed and placed on the building site so as to offer the mimimum resistance to the flow of floodwaters and be placed further from the source of flooding than is the primary structure; and, g. have hydraulic openings, as specified in Article VI.N.2., in at least two different walls of the accessory structure. M. Floodways - 1. In Zone AE riverine areas, encroachments, including fill, new construction, substantial improvement, and other development shall not be permitted within a regulatory floodway which is designated on the community's Flood Insurance Rate Map, unless a technical evaluation certified by a registered professional engineer is provided demonstrating that such encroachments will not result in any increase in flood levels within the community during the occurrence of the base flood discharge. 2. In Zones A and AE, riverine areas for which no regulatory floodway is designated, encroachments, including fill, new construction, substantial improvement, and other development shall not be permitted in the floodway as determined in Article VI.M.3. unless a technical evaluation certified by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing development and anticipated development: a. will not increase the water surface elevation of the base flood more than one foot at any point within the community; and, b. is consistent with the technical criteria contained in FEMA's guidelines and standards for flood risk analysis and mapping. 3. In Zones A and AE riverine areas, for which no regulatory floodway is designated, the regulatory floodway is determined to be the channel of the river or other water course and the adjacent land 11 areas to a distance of one-half the width of the floodplain as measured from the normal high water mark to the upland limit of the floodplain. N. Hydraulic Openings/Flood Vents - New construction or substantial improvement of any structure in Zones A and AE that meets the development standards of Article VI, including the elevation requirements of Article VI, paragraphs H., I., or J. and is elevated on posts, columns, piers, piles, or crawlspaces may be enclosed below the base flood elevation requirements provided all the following criteria are met or exceeded: 1. Enclosed areas are not "basements" as defined in Article XIII; 2. Enclosed areas shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of flood water. Designs for meeting this requirement must either: a. be engineered and certified by a registered professional engineer or architect; or, b. meet or exceed the following minimum criteria: (1) a minimum of two openings having a total net area of not less than one square inch for every square foot of the enclosed area; (2) the bottom of all openings shall be below the base flood elevation and no higher than one foot above the lowest grade; and, (3) openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the entry and exit of flood waters automatically without any external influence or control such as human intervention, including the use of electrical and other non-automatic mechanical means; 3. The enclosed area shall not be used for human habitation; and, 4. The enclosed areas are usable solely for building access, parking of vehicles, or storage. O. Bridges - New construction or substantial improvement of any bridge in Zones A and AE shall be designed such that: 1. when possible, the lowest horizontal member (excluding the pilings, or columns) is elevated to at least one foot above the base flood elevation; and, 2. aregistered professional engineer shall certify that: a. the structural design and methods of construction shall meet the elevation requirements of this section and the floodway standards of Article VI.M.; and, b. the foundation and superstructure attached thereto are designed to resist flotation, collapse and lateral movement due to the effects of wind and water loads acting simultaneously on all structural components, Water loading values used shall be those associated with the base flood. 12 P. Containment Walls - New construction or substantial improvement of any containment --_ wall located within: 1. Zones A and AE shall: a. have the containment wall elevated to at least one foot above the base flood elevation; b. have structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy; and, c. be certified by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this section. Such certification shall be provided with the application for a Flood Hazard Development Permit, as required by Article ITI.K. Q. Wharves, Piers, and Docks - New construction or substantial improvement of wharves, piers, and docks are permitted in Zones A and AE, in and over water and shall comply with all applicable local, state, and federal regulations. ARTICLE VII - CERTIFICATE OF COMPLIANCE No land in a special flood hazard area shall be occupied or used and no structure which is constructed or substantially improved shall be occupied until a Certificate of Compliance is issued by the Planning Board subject to the following provisions: A. For New Construction or Substantial Improvement of any elevated structure the applicant shall submit to the Planning Board an Elevation Certificate completed by a Professional Land Surveyor, registered professional engineer, or architect, for compliance with Article VI, paragraphs H., I., or J. B. The applicant shall submit written notification to the Planning Board that the development is complete and complies with the provisions of this ordinance. C. Within 10 working days, the Planning Board shall: 1. review the Elevation Certificate and the applicant's written notification; and, 2. upon determination that the development conforms with the provisions of this ordinance, shall issue a Certificate of Compliance. ARTICLE VIII - REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS The Planning Board shall, when reviewing subdivisions and other proposed developments that require review under other federal law, state law, or local ordinances or regulations, and all projects on 5 or more disturbed acres, or in the case of manufactured home parks divided into two or more lots, assure that: A. All such proposals are consistent with the need to minimize flood damage. B. All public utilities and facilities, such as sewer, gas, electrical, and water systems are located and constructed to minimize or eliminate flood damages. C. Adequate drainage is provided so as to reduce exposure to flood hazards. 13 D. All proposals include base flood elevations, flood boundaries, and, in a riverine floodplain, floodway data. These determinations shall be based on engineering practices recognized by the Federal Emergency Management Agency. E. Any proposed development plan must include a condition of plan approval requiring that structures on any lot in the development having any portion of its land within a Special Flood Hazard Area are to be constructed in accordance with Article VI of this ordinance. Such requirement will be included in any deed, lease, purchase and sale agreement, or document transferring or expressing an intent to transfer any interest in real estate or structure, including but not limited to a time-share interest. The condition shall clearly articulate that the municipality may enforce any violation of the construction requirement and that fact shall also be included in the deed or any other document previously described. The construction requirement shall also be clearly stated on any map, plat, or plan to be signed by the Planning Board or local reviewing authority as part of the approval process. ARTICLE IX - APPEALS AND VARIANCES The Board of Appeals of the Town of Clifton may, upon written application of an aggrieved party, hear and decide appeals where it is alleged that there is an error in any order, requirement, decision, or determination made by, or failure to act by, the Code Enforcement Officer or Planning Board in the administration or enforcement of the provisions of this Ordinance. The Board of Appeals may grant a variance from the requirements of this Ordinance consistent with state law and the following criteria: A. Variances shall not be granted within any designated regulatory floodway if any increase in flood levels during the base flood discharge would result. B. Variances shall be granted only upon: 1. ashowing of good and sufficient cause; and, 2. a determination that should a flood comparable to the base flood occur, the granting of a variance will not result in increased flood heights, additional threats to public safety, public expense, or create nuisances, cause fraud or victimization of the public, or conflict with existing local laws or ordinances; and, 3. ashowing that the issuance of the variance will not conflict with other state, federal, or local laws or ordinances; and, 4. adetermination that failure to grant the variance would result in "undue hardship," which in this sub-section means: a. that the land in question cannot yield a reasonable return unless a variance is granted; and, b. that the need for a variance is due to the unique circumstances of the property and not to the general conditions in the neighborhood; and, c. that the granting of a variance will not alter the essential character of the locality; and, d. that the hardship is not the result of action taken by the applicant or a prior owner, 14 C. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief, and the Board of Appeals may impose such conditions to a variance as it deems necessary. D. Variances may be issued for new construction, substantial improvements, or other development for the conduct of a functionally dependent use provided that: 1. the criteria of Article IX.A. through C. and Article VI.M. are met; and, 2. the structure or other development is protected by methods that minimize flood damages during the base flood and create no additional threats to public safety. E. Variances may be issued for the repair, reconstruction, rehabilitation, or restoration of Historic Structures upon the determination that: 1. the development meets the criteria of Article IX.A. through C.; and, 2. the proposed repair, reconstruction, rehabilitation, or restoration will not preclude the structure's continued designation as a Historic Structure and the variance is the minimum necessary to preserve the historic character and design of the structure. F. Variances may be issued for new construction and substantial improvement of Agricultural Structures being used for the conduct of agricultural uses provided that: 1. the development meets the criteria of Article [IX.A. through C.; and, 2. the development meets the criteria of Article VI.M. and Article VLN. G. Any applicant who meets the criteria of Article IX.A. through C. and Article IX.D., E., or F. shall be notified by the Board of Appeals in writing over the signature of the Chairman of the Board of Appeals that: 1. the issuance of a variance to construct a structure below the base flood level will result in greatly increased premium rates for flood insurance up to amounts as high as $25 per $100 of insurance coverage; and, 2. such construction below the base flood level increases risks to life and property; and, 3. the applicant agrees in writing that the applicant is fully aware of all the risks inherent in the use of land subject to flooding, assumes those risks and agrees to indemnify and defend the municipality against any claims filed against it that are related to the applicant's decision to use land located in a floodplain and that the applicant individually releases the municipality from any claims the applicant may have against the municipality that are related to the use of land located in a floodplain. H. Appeal Procedure for Administrative and Variance Appeals 1. An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved party within thirty days after receipt of a written decision of the Code Enforcement Officer or Planning Board. 15 2. Upon being notified of an appeal, the Code Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of Appeals all of the documents constituting the record of the decision appealed from. 3. The Board of Appeals shall hold a public hearing on the appeal within thirty-five days of its receipt of an appeal request. 4. The person filing the appeal shall have the burden of proof. 5. The Board of Appeals shall decide all appeals within thirty-five days after the close of the hearing and shall issue a written decision on all! appeals. 6. The Board of Appeals shall submit to the Planning Board a report of all variance actions, including justification for the granting of the variance and an authorization for the Planning Board to issue a Flood Hazard Development Permit, which includes any conditions to be attached to said permit. 7. Any aggrieved party who participated as a party during the proceedings before the Board of Appeals may take an appeal to Superior Court in accordance with State laws within forty-five days from the date of any decision of the Board of Appeals. ARTICLE X - ENFORCEMENT AND PENALTIES A. Itshall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance pursuant to Title 30-A MRSA § 4452. B. The penalties contained in Title 30-A MRSA § 4452 shall apply to any violation of this Ordinance. C. In addition to any other actions, the Code Enforcement Officer, upon determination that a violation exists, may submit a declaration to the Administrator of the Federal Insurance Administration requesting a denial of flood insurance. The valid declaration shall consist of: 1. the name of the property owner and address or legal description of the property sufficient to confirm its identity or location; 2. aclear and unequivocal declaration that the property is in violation of a cited State or local law, regulation, or ordinance; 3. aclear statement that the public body making the declaration has authority to do so and a citation to that authority; 4. evidence that the property owner has been provided notice of the violation and the prospective denial of insurance; and, 5. aclear statement that the declaration is being submitted pursuant to Section 1316 of the National Flood Insurance Act of 1968, as amended. ARTICLE XI - VALIDITY AND SEVERABILITY If any section or provision of this Ordinance is declared by the courts to be invalid, such decision shall not invalidate any other section or provision of this Ordinance. ARTICLE XII - CONFLICT WITH OTHER ORDINANCES 16 This Ordinance shall not in any way impair or remove the necessity of compliance with any other applicable rule, ordinance, regulation, bylaw, permit, or provision of law. Where this Ordinance imposes a greater restriction upon the use of land, buildings, or structures, the provisions of this Ordinance shall control. ARTICLE XIII - DEFINITIONS Unless specifically defined below, words and phrases used in this Ordinance shall have the same meaning as they have at common law and to give this Ordinance its most reasonable application. Words used in the present tense include the future, the singular number includes the plural, and the plural number includes the singular. The word "may" is permissive; "shall" is mandatory and not discretionary. Accessory Structure - a structure which is on the same parcel of property as a principal structure and the use of which is incidental to the use of the principal structure. Adjacent Grade - the natural elevation of the ground surface prior to construction next to the proposed walls of a structure. Agricultural Structure - structures that are used exclusively for agricultural purposes or uses in connection with the production, harvesting, storage, raising, or drying of agricultural commodities and livestock. Structures that house tools or equipment used in connection with these purposes or uses are also considered to have agricultural purposes or uses. Area of Special Flood Hazard - the land in the floodplain having a one percent or greater chance of flooding in any given year, as specifically identified in the Flood Insurance Study cited in Article I of this Ordinance. Base Flood - a flood having a one percent chance of being equaled or exceeded in any given year, commonly called the 100-year flood. Basement - any area of the building having its floor subgrade (below ground level) on all sides. Building - see Structure. Certificate of Compliance - A document signed by the Code Enforcement Officer stating that a structure is in compliance with all of the provisions of this Ordinance. Code Enforcement Officer - A person certified under Title 30-A MRSA, Section 4451 (including exceptions in subsection 4451, paragraph 1) and employed by a municipality to enforce all applicable comprehensive planning and land use laws and ordinances. Containment Wall - a wall surrounding all sides of an above ground tank to contain any spills or leaks. Development - any man made change to improved or unimproved real estate. This includes, but is not limited to, buildings or other structures; mining, dredging, filling, grading, paving, excavation, drilling operations or storage of equipment or materials; and the storage, deposition, or extraction of materials. Digital Flood Insurance Rate Map (DFIRM) - an official digital map of a community, on which the Federal Insurance Administrator has delineated both the special hazard areas and the risk premium zones applicable to the community. 17 Elevated Building - a non-basement building that is: a. built, in the case of a building in Zones A or AE, to have the top of the elevated floor elevated above the ground level by means of pilings, columns, posts, piers, or shear walls; and, b. adequately anchored so as not to impair the structural integrity of the building during a flood of up to one foot above the magnitude of the base flood. In the case of Zones A or AE, Elevated Building also includes a building elevated by means of fill or solid foundation perimeter walls with hydraulic openings sufficient to facilitate the unimpeded movement of flood waters, as required in Article VIN. Elevation Certificate - an official form (FEMA Form 81-31, as amended) that: a. is used to verify compliance with the floodplain management regulations of the National Flood Insurance Program; and, b. is required for purchasing flood insurance. Existing Manufactured Home Park or Subdivision - a manufactured home park or subdivision that was recorded in the deed registry prior to the adoption date of the community's first floodplain management regulations. Flood or Flooding - a. A general and temporary condition of partial or complete inundation of normally dry land areas from: 1. The overflow of inland or tidal waters. 2. The unusual and rapid accumulation or runoff of surface waters from any source. b. The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in paragraph a.l, of this definition. Flood Elevation Study - an examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations. Flood Insurance Rate Map (FIRM) - an official map of a community, on which the Federal Insurance Administrator has delineated both the special hazard areas and the risk premium zones applicable to the community. Flood Insurance Study - see Flood Elevation Study. Floodplain or Flood-prone Area - any land area susceptible to being inundated by water from any source (see Flood or Flooding). 18 Floodplain Management - the operation of an overall program of corrective and preventive measures for reducing flood damage, including but not limited to emergency preparedness plans, flood control works, and floodplain management regulations. Floodplain Management Regulations - zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as a floodplain ordinance, grading ordinance, and erosion control ordinance), and other applications of police power. The term describes such state or local regulations, in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction. Floodproofing - any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures, and contents. Floodway - see Regulatory Floodway. Floodway Encroachment Lines - the lines marking the limits of floodways on federal, state, and local floodplain maps. Freeboard - a factor of safety usually expressed in feet above a flood level for purposes of floodplain management. Freeboard tends to compensate for the many unknown factors, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions. Functionally Dependent Use - a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities. Historic Structure - any structure that is: a. Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; b. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary of the Interior to qualify as a registered historic district; c. Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or, d. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: 1. By an approved state program as determined by the Secretary of the Interior, or, 2. Directly by the Secretary of the Interior in states without approved programs. Locally Established Datum - for purposes of this ordinance, an elevation established for a specific site to which all other elevations at the site are referenced. This elevation is generally not referenced to the National Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD), or any other 19 established datum and is used in areas where Mean Sea Level data is too far from a specific site to be practically used. Lowest Floor - the lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area other than a basement area is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements described in Article VIN. of this ordinance. Manufactured Home - a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes the term manufactured home also includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than 180 consecutive days. Manufactured Home Park or Subdivision - a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale. Mean Sea Level - for purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD), or other datum to which base flood elevations shown on a community's Flood Insurance Rate Map are referenced. Minor Development - all development that is not new construction or a substantial improvement, such as repairs, maintenance, renovations, or additions, whose value is less than 50% of the market value of the structure. It also includes but is not limited to: accessory structures as provided for in Article VI.L., mining, dredging, filling, grading, paving, excavation, drilling operations, storage of equipment or materials, deposition or extraction of materials, public or private sewage disposal systems or water supply facilities that do not involve structures; and non-structural projects such as bridges, dams, towers, fencing, pipelines, wharves, and piers. National Geodetic Vertical Datum (NGVD) - the national vertical datum, whose standard was established in 1929, which is used by the National Flood Insurance Program (NFIP). NGVD was based upon mean sea level in 1929 and also has been called "1929 Mean Sea Level (MSL)". New Construction - structures for which the "start of construction" commenced on or after the effective date of the initial floodplain management regulations adopted by a community and includes any subsequent improvements to such structures. North American Vertical Datum (NAVD) - the national datum whose standard was established in 1988, which is the new vertical datum used by the National Flood Insurance Program (NFIP) for all new Flood Insurance Rate Maps. NAVD is based upon the vertical datum used by other North American countries such as Canada and Mexico and was established to replace NGVD because of constant movement of the earths crust, glacial rebound and subsidence, and the increasing use of satellite technology. 100-year flood - see Base Flood. Recreational Vehicle - a vehicle which is: a. built ona single chassis; b. 400 square feet or less when measured at the largest horizontal projection, not including slideouts; c. designed to be self-propelled or permanently towable by a motor vehicle; and, 20 d. designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. Regulatory Floodway - a. the channel of a river or other water course and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height, and, b. when not designated on the community's Flood Insurance Rate Map, it is considered to be the channel of a river or other water course and the adjacent land areas to a distance of one-half the width of the floodplain, as measured from the normal high water mark to the upland limit of the floodplain. Riverine - relating to, formed by, or resembling a river (including tributaries), stream, brook, etc. Special Flood Hazard Area - see Area of Special Flood Hazard. t Start of Construction - the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wail, ceiling, floor, or other structural part of a building, or modification of any construction element, whether or not that alteration affects the external dimensions of the building. Structure - for floodplain management purposes, a walled and roofed building. A gas or liquid storage tank that is principally above ground is also a structure. Substantial Damage - damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damage condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. Substantial Improvement - any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the start of construction of the improvement. This term includes structures which have incurred substantial damage, regardless of the actual repair work performed. The term does not, however, include either: a. Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions; or, b. Any alteration of a Historic Structure, provided that the alteration will not preclude the structure's continued designation as a historic structure, and a variance is obtained from the community's Board of Appeals. Variance - a grant of relief by a community from the terms of a floodplain management regulation. 21 Violation - the failure of a structure or development to comply with a community's floodplain management regulations. ARTICLE XIV - ABROGATION This ordinance repeals and replaces any municipal ordinance previously enacted to comply with the National Flood Insurance Act of 1968 (P.L. 90-488, as amended). ARTICLE XVI - DISCLAIMER OF LIABILITY The degree of flood protection required by the ordinance is considered reasonable but does not imply total flood protection. 22 2007 Amendments to Maine Floodplain Management Model Ordinances 60.3 (c & d) Zones Additions are underlined and deletions are strikethrough. I. Recreational Vehicles - Recreational Vehicles located within: 1. Zones A, Al-30, AE, and AH shall either: a. be on the site for fewer than 180 consecutive days, ARTICLE XIII or XIV - DEFINITIONS (The Article number depends on which version of the model is in effect for your community) Elevation Certificate - An official form (FEMA Form 81-31, 67/00, 2/06, as amended) that: a. is used to verify compliance with the floodplain management regulations of the National Flood Insurance Program; and, b. is required for purchasing flood insurance. ] 2005 Amendments to All Maine Floodplain Management Model Ordinances Additions are underlined and deletions are strikethrough ARTICLE I - PURPOSE AND ESTABLISHMENT (4"" paragraph) The (Town/City) of has the legal authority to adopt land use and control measures to reduce future flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352, and 4401-4407, and Title 38 MRSA, Section 440. ARTICLE IIF --- APPLICATION FOR PERMIT K. The following certifications as required in Article VI by a registered professional engineer or architect: 1. aFloodproofing Certificate (FEMA Form 81-65, 98/99 01/03, as amended), to verify... ARTICLE IV - APPLICATION FEE AND EXPERT'S FEE (optional language change) A non-refundable application fee of $ for all minor development and $ for all new construction or substantial improvements shall be paid to the (Town/City) Clerk or Code Enforcement Officer and a copy of a receipt for the same shall accompany the application. ARTICLE V - REVIEW STANDARDS FOR FLOOD HAZARD DEVEOPMENT PERMIT APPLICATIONS B. Utilize, in the review of all Flood Hazard Development Permit applications: 1. the base flood and floodway data contained in the "Flood Insurance Study - (Town/City) of , Maine," as described in Article L; 2. in special flood hazard areas where base flood elevation and floodway data are not provided, the shall obtain, review and reasonably utilize any base flood elevation and floodway data from federal, state, or other technical sources, including information obtained pursuant to Article II].H.1.b.; Article VI.K.; and Article IX.D., in order to administer Article VI of this Ordinance; and... ARTICLE VI - DEVELOPMENT STANDARDS (coastal ordinances with V Zones only) P. Coastal Floodplains - 5. The enclesed areas below the lowest floor shall may-be used solely for parking vehicles, building access, and storage. ARTICLE XIII or XIV - DEFINITIONS (The article number depends on which version of the model ordinance is in effect for your community) Code Enforcement Officer - A person certified under Title 30- A MRSA, Section 4451 (including exceptions in Section 4451, paragraph 1) and employed by a municipality to enforce all applicable comprehensive planning and land use laws and ordinances. Development - means any man made change eaused-by-individuals-or-entities to improved or unimproved real estate, including but not limited to the construction-of buildings or other structures; . Mining, dredging, filling, grading, paving, excavation, drilling operations or storage of equipment or materials.; (The new wording of this definition is directly from the FEMA regulations at 44 CFR 59.1) Elevation Certificate - An official form (FEMA Form 81-31, 07/06 01/03, as amended) that: a. is used to verify compliance with the floodplain management regulations of the National Flood Insurance Program; and, b. is required for purchasing flood insurance. 2002 Amendments to All Maine Floodplain Management Model Ordinances Additions are underlined and deletions are strikethrough. ARTICLE V - REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT APPLICATIONS D. In the review of Flood Hazard Development Permit applications, determine that all necessary permits have been obtained from those federal, state, and local government agencies from which prior approval is required by federal or state law, including but not limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 4334 1344; ARTICLE IX or X - APPEALS AND VARIANCES (The Article number depends on which version of the model is in effect for your community) The Board of Appeals of the (Town/City) of may, upon written application of an aggrieved party, hear and decide appeals where it is alleged that there is an error in any order, requirement, decision, or determination made by, or failure to act by, the Code Enforcement Officer or Planning Board in the administration or enforcement of the provisions of this Ordinance. ARTICLE XIII or XIV - DEFINITIONS (The Article number depends on which version of the model is in effect for your community) Elevation Certificate - An official form (FEMA Form 81-31, 68/99 07/00, as amended) that: a. is used to verify compliance with the floodplain management regulations of the National Flood Insurance Program; and, b. is required for purchasing flood insurance. ARTICLE VI - DEVELOPMENT STANDARDS (This change needs to be made to ordinances in communities with mapped V Zones only.) P. Coastal Floodplains - 2. New construction or substantial improvement of any structure located within Zones V1-30 or VE shall: c. require a registered professional engineer or architect to: (1) develop or review the structural design, specifications, and plans for the construction, which must meet or exceed the technical criteria contained in the Coastal Construction Manual, (FEMA-55/February1986 June, 2000); and, CONTENTS ARTICLES CONTAINING CHANGES PAGE V. REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT VII. REVIEW OF SUBDIVISIONS AND DEVELOPMENT PROPOSALS... 60.3 (c&d) Rev. 6/00 1 ARTICLE III - APPLICATION FOR PERMIT The application for a Flood Hazard Development Permit shall be submitted to the and shall include: H. The elevation in relation to the National Geodetic Vertical Datum (NGVD), or to a locally established datum in Zone A only, of the: 1. base flood at the proposed site of all new or substantially improved structures, which is determined: a. in Zones Al-30, AE, AO, and AH, from data contained in the "Flood Insurance Study - (Town/City) of , Maine," as described in Article I; or, b. in Zone A; te-be the elevation of the ground-at-the intersection ofthe- qd) from any base flood elevation data from federal, state, or other technical sources (such as FEMA's Quick-2 model, FEMA 265/July 1995), including information obtained pursuant to Article VLK. and VIILD.; (2) from the contour elevation extrapolated from a best fit analysis of the floodplain boundary when overlaid onto a USGS Quadrangle Map or other topographic map prepared by a Professional Land Surveyor or registered professional engineer, if the floodplain boundary has a significant correlation to the elevation contour line(s); or, in the absence of all other data, G) to be the elevation of the ground at the intersection of the floodplain boundary and a line perpendicular to the shoreline which passes along the ground through the site of the proposed building. I. A description of an elevation reference point established on the site of all newer substantially impreved-struetures developments for which elevation standards apply as required in Article VI; J. Pelee als enaerctes coco paki tenet. 6t A written certification by a Professional Land Surveyor, registered professional engineer or architect, that the base flood elevation and grade elevations shown on the application are accurate; 2 K. The following certifications as required in Article VI by a registered professional engineer or architect that: 1. a Floodproofing Certificate (FEMA Form 81-65, 08/99, as amended), to verify that the floodproofing methods for any non-residential structures will meet the floedproofing criteria of Article ITI.H.4.; Article VI.G.; and other applicable standards in Article VI; 2. a Hydraulic Openings Certificate to verify that engineered hydraulic openings in foundation walls will meet the standards of Article VI.L.2.a.; 3. a certified statement that bridges will meet the standards of Article VI.M.; 4. a certified statement that containment walls will meet the standards of Article VLN.; ARTICLE IV - APPLICATION FEE AND EXPERT'S FEE A non-refundable application fee of $ shall be paid to the (Town/City) Clerk and a copy of a receipt for the same shall accompany the application. An additional fee may be charged if the ss and/or Board of Appeals needs the assistance of a professional engineer or other expert. The expert's fee shall be paid in full by the applicant within 10 days after the town submits a bill to the applicant. Failure to pay the bill shall constitute a violation of the ordinance and be grounds for the issuance of a stop work order. An expert shall not be hired by the municipality at the expense of an applicant until the applicant has either consented to such hiring in writing or been given an opportunity to be heard on the subject. An applicant who is dissatisfied with a decision ef te to hire expert assistance may appeal that decision to the Board of Appeals. ARTICLE V - REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT APPLICATIONS The shall: A. Review all applications for the Flood Hazard Development Permit to assure that proposed developments are reasonably safe from flooding and to determine that all pertinent requirements of Article VI (Development Standards) have been, or will be met; B. Utilize, in the review of all Flood Hazard Development Permit applications; : L the base flood data contained in the "Flood Insurance Study - (Town/City) of _, Maine," as described in Article I; 2. in special flood hazard areas where base flood elevation data are not provided, the shall obtain, review and reasonably utilize any base flood 3 elevation and floodway data from federal, state, or other technical sources, including information obtained pursuant to Article III.H.1.b.; Article VI.K.; and Article VIILD., in order to administer Article VI of this Ordinance; and, 3. when the community establishes a base flood elevation in a Zone A by methods outlined in Article IIJ.H.1.b., the community shall submit that data to the Maine Floodplain Management Program in the State Planning Office. F. Issue If the application satisfies the requirements of this Ordinance, approve the issuance of one of the following Flood Hazard Development Permits based on the type of development: l. Issue A two part Flood Hazard Development Permit for elevated structures. Part I shall authorize the applicant to build a structure to and including the first horizontal floor only above the base flood level. At that time the applicant shall provide the Code Enforcement Officer with a second Elevation Certificate completed by a Professional Land Surveyor, registered professional engineer or architect based on the Part I permit construction , "as built", for verifying compliance with the elevation requirements of Article VI, paragraphs F, G, or H. Following review of the Elevation Certificate data, which shall take place within 72 hours of receipt of the application, the Code Enforcement Officer shall issue Part II of the Flood Hazard Development Permit. Part IT shall authorize the applicant to complete the construction project; or, 2. Issue A Flood Hazard Development Permit for Floodproofing of Non-Residential Structures that are new construction or substantially improved non-residential structures that are not being elevated but that meet the floodproofing standards of Article VI.G.1.a.,b., and c. The application for this permit shall include a Floodproofing Certificate signed by a registered professional engineer or architect; or, 3, Issue A Flood Hazard Development Permit for Minor Development for all development that is not new construction or a substantial improvement, such as repairs, maintenance, renovations, or additions, whose value is less than 50% of the market value of the structure. Minor development also includes, but is not limited to: accessory structures as provided for in Article VI.J., mining, dredging, filling, grading, paving, excavation, drilling operations, storage of equipment or materials, deposition or extraction of materials, public or private sewage disposal systems or water supply facilities that do not involve structures; and non-structural projects such as bridges, dams, towers, fencing, pipelines, wharves and piers. ARTICLE VI - DEVELOPMENT STANDARDS All developments in areas of special flood hazard shall meet the following applicable standards: K. Floodways - 4 1. In Zones A1-30 and AE riverine areas, encroachments, including fill, new construction, substantial improvement, and other development shall not be permitted in riverine-areas, within a regulatory floodway fer which a+regulatery- fleedway is designated on the community's "Flood Insurance Rate Map" or "Flood Boundary and Floodway Map," unless a technical evaluation certified by a registered professional engineer is provided demonstrating that such encroachments will not result in any increase in flood levels within the community during the occurrence of the base flood discharge. L. Enclosed Areas Below the Lowest Floor - New construction or substantial improvement of any structure in Zones A1-30, AE, AO, AH, and A that meets the development standards of Article VI, including the elevation requirements of Article VI, paragraphs F, G, or H and is elevated on posts, columns, piers, piles, "stilts," or crawlspaces may be enclosed below the base flood elevation requirements provided ail the following criteria are met or exceeded: 1. Enclosed areas are not "basements" as defined in Article XIII; 2. Enclosed areas shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of flood water. Designs for meeting this requirement must either: a, be engineered and certified by a registered professional engineer or architect; or, b, meet or exceed the following minimum criteria: (1) a minimum of two openings having a total net area of not less than one square inch for every square foot of the enclosed area; (2) the bottom of all openings shall be below the base flood elevation and no higher than one foot above the lowest grade; and, (3) openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the entry and exit of flood waters automatically without any external influence or control such as human intervention, including the use of electrical and other non-automatic mechanical means; 3. The enclosed area shall not be used for human habitation; and, 4. The enclosed areas are usable solely for building access, parking of vehicles, or storage. ARTICLE VII - CERTIFICATE OF COMPLIANCE No land in a special flood hazard area shall be occupied or used and no structure which is 5 constructed or substantially improved shall be occupied until a Certificate of Compliance is issued by the subject to the following provisions: A. For New Construction or Substantial Improvement of any elevated structure the applicant shall submit to the , an Elevation Certificate completed by a Professional Land Surveyor, registered professional engineer, or architect, for compliance with Article VI, paragraphs F, G, or H. ARTICLE VIH - REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS The Planning Board shall, when reviewing subdivisions and other proposed developments that require review under other federal law, state law or local ordinances or regulations and all projects on 5 or more disturbed acres, or in the case of manufactured home parks divided into two or more lots, assure that: ARTICLE IX - APPEALS AND VARIANCES The Board of Appeals of the (Town/City) of may, upon written application of an aggrieved party, hear and decide appeals fromdeterminatiens-of the where it is alleged that there is an error in any order, requirement, decision, or determination made by, or failure to act by, the -------------- Code Enforcement Officer or Planning Board in the administration of the provisions of this Ordinance. The Board of Appeals may grant a variance from the requirements of this Ordinance consistent with state law and the following criteria: C, Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief,_and the Board of Appeals may impose such conditions to a variance as it deems necessary. G. Appeal Procedure for Administrative and Variance Appeals 1 An administrative or variance appeal may be taken to the Board of Appeals by an agerieved party within thirty days after receipt of a written decision of the Code Enforcement Officer or Planning Board. 2. Upon being notified of an appeal, the Code Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of Appeals all of the papers constituting the record of the decision appealed from. 3. The Board of Appeals shall hold a public hearing on the appeal within thirty-five days of its receipt of an appeal! request. 4. The person filing the appeal shall have the burden of proof. 3. The Board of Appeals shall decide all appeals within thirty-five days after the close of the hearing, and shall issue a written decision on all appeals. 6 6. The Board of Appeals shall submit to the a report of all variance actions, including justification for the granting of the variance and an authorization for the to issue a Flood Hazard Development Permit, which includes any conditions to be attached to said permit. 7. Any aggrieved party who participated as a party during the proceedings before the Board of Appeals may take an appeal to Superior Court in accordance with State laws within forty-five days from the date of any decision of the Board of Appeals. ARTICLE XIII - DEFINITIONS Elevated Building - means a non-basement building a. built, in the case of a building in Zones A1-30, AE, A, AO, or AH, to have the top of the elevated floor elevated above the ground level by means of pilings, columns, post, piers, or "stilts;" and b. adequately anchored so as not to impair the structural integrity of the building during a flood of up to one foot above the magnitude of the base flood. In the case of Zones A1-30, AE, A, AO, or AH, Elevated Building also includes a building elevated by means of fill or solid foundation perimeter walls with hydraulic openings sufficient to facilitate the unimpeded movement of flood waters, as required in Article VI.L.. Elevation Certificate - An official form (FEMA Form 81-31, 93/97 08/99, as amended) that: a. is used to verify compliance with the floodplain management regulations of the National Flood Insurance Program; and, b. is required for purchasing flood insurance. Lowest Floor - means the lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable non- elevation design requirements described in Article VILL. of this ordinance. New Construction - means structures for which the "start of construction" commenced on or after the effective date of the initial floodplain management regulations adopted by a community and includes any subsequent improvements to such structures. Start of Construction - means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. 7 Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, or modification of any construction element, whether or not that alteration affects the external dimensions of the building. 60.3 (c&d) 8 FLOODPLAIN MANAGEMENT ORDINANCE UPDATE - 1997 A revised State Model Floodplain Management Ordinance was introduced at the February 1997 Floodplain Management Workshops presented by the State Floodplain Management Coordinator, in conjunction with the Code Enforcement Officer Training and Certification Program. Over the years the model ordinance has not been a static document. It has frequently required changes or additions to keep pace with changes in Federal or State regulations. In other instances changes have been made based on feedback we receive from local officials who, in using the ordinance, can offer recommendations for the improvement of its administration or enforcement. Lastly, the staff of the Floodplain Management Program has continued to identify areas where the ordinance can be improved to more effectively address the Federal and State goals of sound floodplain management. The Federal Emergency Management Agency and the State Coordinator's Office recognize the effort required on the part of communities to keep abreast of the changes in the model ordinance. There is no demand for immediate action, or a date by which all communities must update their ordinances. Instead, the adoption process will be initiated when a community is notified by the staff of the Maine Floodplain Management Program that their ordinance must be revised to meet the new standards. The state maintains three different model ordinances due to the different level of mapping detail contained on community's flood maps. Communities with more detail on their maps have more complex ordinances which contain paragraphs that are not found in the ordinances of communities with less detailed maps. It has been necessary to accommodate for these differences in this article. For this reason, there will occasionally be an alternate numbering reference, indicated in brackets, for particular sections of the ordinance. The following list highlights the most recent changes and their rationale. (There are a few minor corrections or changes that have been made to some of the ordinances that are not reflected in this listing.) This document should assist communities in their review process by indicating the areas of significant change. Article I - Purpose and Establishment: The previous preface page entitled "Statement of Purpose and Intent" is now included within Article I. [Change based on opinion of Attorney General's office that the community's legal authority to administer and enforce the ordinance is stronger if stated within an Article of the ordinance and not in a preface.] Article III - Application: Paragraph A. is expanded; D. has been amended; there is a new E.; the old E. - L. are amended to be F. - M.; G. and I. have been amended. 1 Important Note: Due to the "renumbering" of items within this Article, all past references to Article HI.G. have been changed throughout the new ordinance to Article III.H., and references to Article III.J. have been changed to Article III.K. [Changes based on recommendations of local officials and Program staff who recognize the need for the new information requested. There is now a better correlation between the information required under Article II and the questions asked on the Flood Hazard Development Permit Application.] Article V - Review of Permit: 1). Paragraph F. has been expanded into three parts to more clearly specify which type of Flood Hazard Development Permit to use for different types of development. [Previously, Article V. only addressed the two part permit required for the new construction or substantial improvement of elevated structures. However, Article IH. has always required permits for all development. Local officials and the Program staff felt the ordinance should specifically address the permitting criteria for minor development and floodproofing projects.] 2). Paragraph G. has also been expanded to specify additional documents which must be maintained, as a permanent record, by the community. [Some changes based on requirements of the NFIP and others made in support of Program's goals for effective administration of the ordinance by community officials. Accurate and complete record keeping encourages and supports accountability ] Article VI - Development Standards: 1). The standards specified in Paragraph A.1.-4. now apply to all development, not just to new construction or substantial improvements. The end of the first line should now read " ... of any structure and all other development shall:" [This change is in support of the Maine Floodplain Management Program's goal to reduce the risk of flood damage by applying the most basic development standards to all types of development in special flood hazard areas.] 2). The ending of the last sentence in Paragraph G.1.c. (or G.3. if your community has no Flood Insurance Study and a (b) model ordinance] has been corrected to read: *.above mean sea level to which the structure is floodproofed." [This change corrects the wording to be consistent with the requirements of the NFIP.] 3). Subsections within Paragraph H. have been reformatted. Previously there were four anchoring requirements which have been condensed into three. { Change eliminated duplicative language.] 2 4). The FEMA publication "Flood Insurance Study - Guidelines and Specifications for Study Contractors" referenced in Paragraph J.2.b. [or 1.2. if your community has no Flood Insurance Study and a (b) model ordinance] has recently been revised, resulting in the need to correct the chapter reference and edition date. [Change based on FEMA's revision of referenced publication.] 5.) For communities which have a Flood Insurance Study, Paragraph J.3. has been amended to include Zones A1-30 and AE. [Change clarifies the determination of the regulatory floodway when none is officially designated on the Flood Insurance Rate Map or Flood Boundary and Floodway Map. This supports the Maine Floodplain Management Program's goal to reduce the risk of flood damage by applying the NFIP's regulatory floodway standards to all riverine floodplains. (The definition of Regulatory Floodway in Article XTII has been amended to be consistent with the above change.}] 6). The previous standard contained in Paragraph K.1. [or J.1. if your community has no Flood Insurance Study and a (b) model ordinance] regarding the 3' supporting wall restriction has been removed. [Local officials and Program staff supported the removal of this restriction which has never been a requirement of the National Flood Insurance Program (NFIP).] Article VII - Certificate of Compliance: 1). Paragraph A.2. has been eliminated as the flood- proofing certificate containing the necessary elevation information must be submitted during the application process as stated in Article V.F.2. [Change based on requirements of the NFIP] 2). The previous requirement in Paragraph B. for an application for a Certificate of Compliance has been replaced with a requirement for a written notification. 3). Paragraph C. has been reworded based on the changes in Paragraph B. [Changes based on the efforts of the Program staff to make this Article consistent with the format and requirements of other land use ordinances which contain similar Certificate of Occupancy or Certificate of Compliance sections. ] Article IX - Appeals and Variances: 1). Paragraph E., which addresses Historic Structures, has been rewritten and made more restrictive. [Program staff, with the assistance of legal council, determined that the previous model ordinance was inconsistent with NFIP regulations and needed to be amended.] 3 2). The initial sentence in Paragraph F. has been extended to say "... in writing over the signature of the Chairman of the Board of Appeals that:" [Change based on requirement of the NFIP] Article XII - Definitions: The formatting throughout this article has been corrected to make it consistent with the rest of the document. 1). Breakaway Wall - this definition can be deleted in communities that do not have Coastal High Hazard Areas (V Zones) delineated on their Flood Insurance Rate Maps. [Change based on standards for breakaway walls only being contained in coastal (e) ordinances. ] 2). Elevated Building - this definition no longer contains the 3' supporting wall restriction. [This change was necessitated by the removal of the same restriction from Article VI_K. (discussed above). ] 3). Minor Development - this is a new definition and corresponds to the new permitting section outlined in Article V.F.3. (discussed above). [This was added after the Program staff carefully considered the many requests received from local officials for the ordinance to give a specific name to development that was previously referred to as "not new construction or substantial improvement". The name of the permit for this type of development has also been changed to "Permit for Minor Development". Development that falls under this definition is not permitted any differently than it previously was { there are no new development standards).] 4.) Regulatory Floodway - For communities with a Flood Insurance Study, the beginning of Part b. of this definition has been amended to read: "when not designated on the community's Flood Insurance Rate Map or Flood Boundary and Floodway Map, it is considered to be the channel ..." [This definition has been amended to be consistent with the development standards for floodways contained in Article VI_J.3_] 5). Substantial Improvement - The exclusion previously afforded Historic Structures under this definition has been limited by the added requirement that a variance be obtained from the community's Board of Appeals. [This has been added in an effort to make the state model ordinance more consistent with the intent of the NFIP regulations.] 4 FLOODPLAIN MANAGEMENT ORDINANCE UPDATE 1987-1996 If your Floodplain Management Ordinance or the Floodplain Management regulations your community adopted to stay compliant with the National Flood Insurance Program (NFIP) were adopted in 1987 or earlier, there is a definite possibility that your ordinance is no longer compliant. If a community is found to be not in compliance with the NFIP requirements, it could be suspended from the program and those people in town who have flood insurance will lose their ability to purchase it. Furthermore, those who have floodprone property may experience extreme difficulty in seeking financing with a lending institution if the property can not be insured as part of a loan condition (A Federal Requirement). Federal Emergency Management Agency (FEMA) has initiated several changes to the NFIP Regulations since the big changes in 1987. They did not, however, force these changes on the local governments as a demand for immediate action. The basic rule is once your community has been notified by the State Flood Insurance Coordinator (in Maine it is Lou Sidell at the State Planning Office [SPO]), it must revise it's ordinance to meet the new standards. Here are the changes you should check for in your ordinance. For Coastal Communities there is a change in Article VI as shown below. In the old Article VI K.2(1) the statute references have changed. Article VI § K. Coastal Floodplains is now identified as Article VI. § L. It now should read as follows: (1} the area is zoned for general development or its equivalent, as defined in the Mandatory Shoreland Zoning guidelines adopted pursuant to 38 M.R.S.A. §438- A; or, (2} the area is designated as densely developed as defined in 38 M.R.S.A. §436-A, subsection 3. All ordinances should be changed to reflect the following language. Note: This language will not be found in ordinances for communities that do not have Base Flood Elevations (BFEs) shown on the flood map. In Article VI Development Standards, a new § I. is inserted in regard to Recreational Vehicles and the subsequent § are re-lettered. The new § I. reads as follows: L Recreational Vehicles located within: 1. Zones Al-A30, AH, and AE shall: [Zone AE will not be found on maps dated prior to 1985] I a. be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions; or, b. Meet the permit requirements of elevation and anchoring requirements for "manufactured home" in Article VI. H. a & b, In Article X Enforcement, the statute reference have been changed to read as follows: A. It shall be the duty of the to enforce the provisions of this Ordinance pursuant to 30A MRSA § 4452. B. The penalties contained in 30A MRSA § 4452 shall apply to any violation of this ordinance. The definition of Development in Article XIII has been changed by adding storage of equipment or materials to the list of items included in the definition. The underlined words were added. Development - means any change caused by individuals or entities to improved or unimproved real estate, including but not limited to the construction of buildings or other structures; the construction of additions or substantial improvements to buildings or other structures; mining, dredging, filling, grading, paving, excavation, drilling operations or storage of equipment or materials; and the storage, deposition, or extraction of materials, public or private sewage disposal systems or water supply facilities. The definition of Historic Structures was added to Article XIII. Historic Structure - means any structure that is: a. Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; b. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary of the Interior to qualify as a registered historic district; c. Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or d. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: 1) By an approved state program as determined by the Secretary of the Interior, or 2 2) Directly by the Secretary of the Interior in states without approved programs. The definition of New Construction in Article XIII has been changed by adding language to include subsequent improvements to post-FIRM buildings. The changes are as underlined below: New Construction - means structures for which the "start of construction" commenced on or after the effective date of floodplain management regulations adopted by a community and includes any subsequent improvements to such structures. The definition of Recreational Vehicles was added to Article XIII. Recreational Vehicle - means a vehicle which is: (a) built on a single chassis; (b) 400 square feet or less when measured at the largest horizontal projection; (c) designed to be self-propelled or permanently towable by a light duty truck; and (d) designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. The definition of Start of Construction in Article XIH has been changed by adding language to include rehabilitation and additions and subsequent improvements. The changes are as underlined below: Start of Construction - means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement or other improvement was with 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property o f accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. The Definition for Substantial Damage was added to Article XIII. Substantial Damage - means, damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damage condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. 3 The Definition for Substantial Improvement in Article XIII was rewritten to include Substantial Damage and to close some prior loopholes. Substantial Improvement - means any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the start of construction of the improvement. This term includes structures which have incurred substantial damage, regardless of the actual repair work performed. The term does not, however, include either: (1) Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions or (2) Any alteration of a historic structure, provided that the alteration will not preclude the structures's continued designation as a historic structure. If your ordinance does not reflect the same wording as the changes listed above, then it is not current with the National Flood Insurance Program (NFIP) and your community needs to implement the above changes as soon as possible. If you need assistance, please contact your Regional Planning Agency, or Lou Sidell, Bonnie Boulter, or Sue Baker at the Maine Floodplain Management Program in the State Planning Office. The phone number is 287-8050. 4