This is the exact embedded text of the captured official document.
Snapshot d2fa0f756efd · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
03-16-2026.pdf"
municipality_ids:
- gx-011158
content_type: "application/pdf"
captured_at: "2026-10-20T17:39:58+00:00"
normalize_method: "pdf-pymupdf"
normalize_version: "0.2"
needs_ocr: false
char_count: 223506
---
1789
Town of Cushing
Shoreland Zoning Ordinance
Date: March 16, 2026
This page intentionally left blank.
i
OVERVIEW
A Shoreland Zoning Ordinance (SZO) is a complex legal document. It implements State
regulation of coastal land use, development, and associated procedures. Each Maine shorefront
municipality is required to adopt an SZO consistent with guidelines of the State Department of
Environmental Protection (DEP).
The Planning Board and the Code Enforcement Officer (CEO) are the responsible bodies
overseeing compliance with the articles within this ordinance. Where a determination by the
Planning Board or CEO is required, a qualified designee may be appointed to investigate and
provide recommendations.
The Town of Cushing Shoreland Zone is basically all land within two hundred fifty (250) feet of
a water body or seventy-five (75) feet of a stream. Its precise definition is in the Definitions
Section of this document.
The word "district" in this document refers to the type of land use on a lot or lots There are six
districts in the Shoreland Zone:
- Resource Protection (RP)
- Limited Residential(LR)
- Limited Commercial (LC)
- Commercial Fisheries/ Maritime Activities(CFMA)
- Fishing Home Business (FHB)
- Stream Protection (SP)
Each district is defined in Section 13 of the SZO. Districts and lots are shown on the Official
Shoreland Zoning Map, on display at the Town Office, which is maintained and updated by the
Planning Board. No other maps may be used to determine boundaries as the Shoreland Zoning
Map is the baseline reference for all boundaries.
Table 14 provides an overview of mainly state-imposed land use restrictions. It enables lot-
owners to determine what is allowed , what requires a permit in each district and which entity
shall issue such a permit.
Sections
1.
PURPOSES ............................................................................................................................. 1
2.
AUTHORITY ......................................................................................................................... 1
3.
APPLICABILITY ................................................................................................................... 1
4.
EFFECTIVE DATE OF ORDINANCE AND ORDINANCE AMENDMENTS .................. 1
5.
AVAILABILITY .................................................................................................................... 2
6.
SEVERABILITY .................................................................................................................... 2
7.
CONFLICTS WITH OTHER ORDINANCES ...................................................................... 2
8.
AMENDMENTS .................................................................................................................... 2
9.
DISTRICTS AND ZONING MAP ......................................................................................... 2
10. INTERPRETATION OF DISTRICT BOUNDARIES ........................................................... 3
11. LAND USE REQUIREMENTS ............................................................................................. 5
12. NON-CONFORMANCE ........................................................................................................ 5
13. DESCRIPTION OF DISTRICTS ......................................................................................... 11
14. TABLE OF LAND USES ..................................................................................................... 13
15. LAND USE STANDARDS .................................................................................................. 19
16. ADMINISTRATION ............................................................................................................ 43
17. DEFINITIONS ...................................................................................................................... 56
APPENDIX A: SOILS OF CONCERN ....................................................................................... 68
Table of Contents .......................................................................................................................... 69
Certificate of Adoption ................................................................................................................. 80
PURPOSES
1
1. PURPOSES
The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other
wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect
archaeological and historic resources; to protect commercial fishing and maritime industries; to
protect freshwater and coastal wetlands; to control building sites, placement of structures and
land uses; to conserve vegetative cover and visual aspects, as well as actual points of access to
inland and coastal waters; to conserve natural beauty and open space; and to anticipate and
respond to the impacts of development in shoreland areas.
2. AUTHORITY
This Ordinance has been prepared in accordance with the provisions of Title 38 Sections 435-
449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. APPLICABILITY
This Ordinance applies to all land areas within two hundred fifty (250) feet horizontal distance of
the
- normal high-water line of any great pond or river,
- upland edge of a coastal wetland, including all areas affected by tidal action, or
- upland edge of a freshwater wetland, and to all land areas within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or
other structure extending beyond or located below the normal high-water line of a water body or
within a wetland.
4. EFFECTIVE DATE OF ORDINANCE AND ORDINANCE
AMENDMENTS
This Ordinance was adopted by the municipal legislative body on December 15, 1991. This
Ordinance and all subsequent Ordinance Amendments were approved by the Commissioner of
the Department of Environmental Protection. Any Ordinance Amendment shall become effective
on the date of its approval by the voters of the Town of Cushing, provided it is approved by the
Commissioner. On approval, a certified copy of any Ordinance Amendment, attested and signed
by the Municipal Clerk, shall be forwarded to the Commissioner for approval. If the
Commissioner fails to act on the Ordinance Amendment within forty-five (45) days of receipt of
the Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period
shall be governed by the terms of the un-amended Ordinance if the Amendment is not approved
by the Commissioner, or by the Amended Ordinance if the Amendment is approved by the
Commissioner.
AVAILABILITY
2
5. AVAILABILITY
A certified copy of this Ordinance shall be filed with the Town Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
6. SEVERABILITY
Should any Section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other Section or provision of the Ordinance.
7. CONFLICTS WITH OTHER ORDINANCES
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision
of this Ordinance or of any other ordinance, regulation or statute administered by the
municipality, the more restrictive provision shall control.
8. AMENDMENTS
This Ordinance may be amended by a majority vote of the municipal legislative body at a Town
Meeting. Copies of amendments, attested and signed by the Town Clerk, shall be submitted to
the Commissioner of the Department of Environmental Protection following adoption by the
municipal legislative body and shall not be effective unless approved by the Commissioner. If
the Commissioner fails to act on any amendment within forty-five (45) days of the
Commissioner's receipt of the amendment, the amendment is automatically approved. Any
application for a permit submitted to the municipality within the forty-five (45) day period shall
be governed by the terms of the amendment, if such amendment is approved by the
Commissioner.
Amendment of a zoning district designation on the Official Shoreland Zoning Map shall be
initiated as set forth in Section 16.C.
9. DISTRICTS AND ZONING MAP
A. Official Shoreland Zoning Map.
The areas to which this Ordinance are applicable are hereby divided into the following
districts as shown on the Official Shoreland Zoning Map, which is made a part of this
Ordinance:
- Resource Protection;
- Limited Residential;
- Limited Commercial;
- Commercial Fisheries/Maritime Activities;
- Fishing Home Business;
- Stream Protection.
INTERPRETATION OF DISTRICT BOUNDARIES
3
B. Scale of Map
The Official Shoreland Zoning map shall be drawn at a scale of not less than one (1) inch
= two hundred (200) feet. District boundaries shall be clearly delineated as accurately as
possible, and a legend indicating the symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map
The Official Shoreland Zoning Map shall be certified by the attested signature of the
Town Clerk and shall be located in the town office.
D. Changes to the Official Shoreland Zoning Map
If amendments, in accordance with Section 9 and Section 16.C, are made in the district
boundaries or other matter portrayed on the Official Shoreland Zoning Map, such
changes shall be made on the Official Shoreland Zoning Map within thirty (30) days after
the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
10. INTERPRETATION OF DISTRICT BOUNDARIES
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are
property lines, the centerlines of streets, roads and rights of way, and the boundaries of the
shoreland area as defined herein. Where uncertainty exists as to the exact location of district
boundary lines, the Board of Appeals shall be the final authority as to location.
[see Section 13 for description of Districts]
A. Boundaries
Boundary lines between the Limited Residential, Limited Commercial, Fishing Home
Business and Commercial Fisheries/Maritime Activities Districts are property lines
within the Shoreland Zone and are shown on the Official Shoreland Zoning Map.
The boundaries of Resource Protection Districts shall be depicted on application site
plans as illustrated on the Official Shoreland Zoning Map. When a boundary is defined
by a licensed professional as set forth below, that boundary shall also be depicted.
B. Boundaries By Water Features
Where district boundaries are defined by reference to water features and wetlands, the
Official Shoreland Zoning Map is illustrative rather than definitive, and subordinate to
the District descriptions in Section 13.
Boundaries of the Shoreland Zone around waters and wetlands protected by Sections 3
and 13.A shall be delineated and related to property lines in submittals as follows:
1) No effect.
If the Planning Board finds that the Shoreland Zone boundary has no effect on an
application, the boundary shall be depicted on its site plan as located on the
Official Shoreland Zoning Map.
INTERPRETATION OF DISTRICT BOUNDARIES
4
2) Upland edges.
Upland edges of coastal wetlands, stream banks and wetland edges shall be
located on-site by a professional trained in wetland delineation, using a
recognized wetland classification system and utilizing soil profiles, composition
of plant populations and site hydrology to determine wetland boundaries.
3) Features.
These features, and any seventy-five (75)-foot or one hundred (100) foot
restriction area, together with the site contours shall be plotted by a Professional
Engineer or Surveyor licensed in the State of Maine on the site plan of any
application to the Planning Board.
At the discretion of the Planning Board, for purposes of shoreland application review, the
Code Enforcement Officer may be authorized to make a determination of the normal
high-water line of tidal waters.
C. Boundary of any Flood Zone
The boundary of any flood zone is the contour line of the elevation shown on the FEMA
flood insurance rate map. It shall be shown and identified on the site plan. An applicant
may submit, or at its discretion the Planning Board may require that an applicant submit,
a plan by a Professional Engineer or Surveyor licensed in the State of Maine showing the
flood elevation contour on topography measured on the ground at contour intervals of
two feet or less.
D. Approximate Boundaries
Approximate boundaries of areas defined in Sections 13.A.3 (slopes) are depicted on the
Official Shoreland Zoning Map and are definitive unless more accurate data meeting the
requirements below is submitted.
More accurate data defining these areas or their boundaries and their relation to property
lines may be submitted, or at the discretion of the Planning Board, shall be required. To
take precedence over boundaries on the Official Shoreland Zoning Map, such data shall
be developed consistent with the following, as applicable:
1) Topography
Topography shall be surveyed and shown at contour intervals of two feet or less.
Topography measured on the ground shall be used where evergreen vegetation
predominates.
2) Steepness of slopes
Steepness of slopes shall be expressed as grades as defined in Section 17. In
determining the extent of contiguous slopes having grades of twenty percent
(20%) or greater, grades shall be measured at right angles to contour lines.
3) Slope measurements
Slope measurements and calculations of contiguous areas of sustained slopes
having grades twenty percent (20%) or greater shall be developed by a
Professional Engineer or Surveyor licensed in the State of Maine. These areas
shall be outlined on the site plan.
LAND USE REQUIREMENTS
5
E. Approximate Locations
Approximate locations of areas defined in Section 13.A.5 (unstable soils) are depicted on
the Official Shoreland Zoning Map. In these areas, a report shall be submitted by a
Professional Engineer licensed in the State of Maine with training and experience in
slope stability to define a Resource Protection District boundary, to assess the effect of
any instability on proposed development and to specify criteria for the safety of any
proposed structures.
F. Costs
All costs associated with the professional services outlined in Section 10.B through 10.E
shall be incurred by the applicant. These services may not be performed by a professional
who has a monetary interest in the subject property or project, or by a professional in
whose business an applicant or applicant's affiliate holds an ownership or monetary
interest, unless any such interests are disclosed. The Planning Board may at its discretion
retain, at the applicant's expense, independent professional assistance to evaluate
submittals.
G. Burden of Proof
An applicant shall bear the burden of proof with respect to any boundary determinations
sought pursuant to Sections 10.B through 10.E.
H. Acceptance
Once accepted by the Planning Board, these professionally determined boundaries will be
delineated on the official map as per Section 16.C.
11. LAND USE REQUIREMENTS
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all of the regulations
herein specified for the district in which it is located, unless a variance is granted.
12. NON-CONFORMANCE
A. Purpose
It is the intent of this Ordinance to promote land use conformities, except
that non-conforming conditions that existed before the effective date of this Ordinance or
amendments thereto shall be allowed to continue, subject to the requirements set forth in
Section 12. Except as otherwise provided in this Ordinance, a non-conforming condition
shall not be permitted to become more non-conforming.
NON-CONFORMANCE
6
B. General
1) Transfer of Ownership.
Non-conforming structures, lots, and uses may be transferred, and the new owner
may continue the non-conforming use or continue to use the non-conforming
structure or lot, subject to the provisions of this Ordinance.
2) Repair and Maintenance.
This Ordinance allows, without a permit, the normal upkeep and maintenance of
non-conforming uses and structures including repairs or renovations that do not
involve expansion of the non-conforming use or structure, and such other changes
in a non-conforming use or structure as federal, state, or local building and safety
codes may require.
NOTE: See Section 17 for the definitions of non-conforming lots, non-conforming
structures and non-conforming uses.
C. Non-conforming Structures
Any proposed change to a non-conforming structure made by expansion, relocation,
reconstruction or replacement as described in this Section, must meet all setback
requirements to the greatest practical extent as determined by the Planning Board based
on Sec. 12.C.3. The applicant shall bear the burden of proof for greatest practical extent
by submitting evidence of limiting conditions on the lot, if any exist. These features must
be depicted on the application plan.
1) Expansions.
All new principal and accessory structures, excluding functionally water-
dependent uses, must meet the water body, tributary stream, or wetland setback
requirements contained in Section 10. A non-conforming structure may be added
to or expanded after obtaining a permit from the same permitting authority as that
for a new structure, if such an addition or expansion does not increase the non-
conformity of the structure and is in accordance with subparagraphs a and b
below.
a. Expansion of any portion of a structure within twenty-five (25) feet of the
normal high-water line of a water body, tributary stream, or upland edge
of a wetland is prohibited, even if the expansion will not increase non-
conformity with the water body, tributary stream or wetland setback
requirement. Expansion of an accessory structure that is located closer to
the normal high-water line of a water body, tributary stream, or upland
edge of a wetland than the principal structure is prohibited, even if the
expansion will not increase non-conformity with the water body, tributary
stream, or wetland setback requirement.
b. Notwithstanding paragraph a above, if a legally existing non-conforming
principal structure is entirely located less than twenty-five (25) feet from
the normal high-water line of a water body, tributary stream, or upland
edge of a wetland, that structure may be expanded as follows, as long as
NON-CONFORMANCE
7
all other applicable municipal land use standards are met and the
expansion is not prohibited by Section 12.C.1.
i.
The maximum total footprint for the principal structure may not be
expanded to a size greater than eight hundred (800) square feet or
thirty percent (30%) larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of the
principal structure may not be made greater than the maximum
defined in Section 15.B.2 or the height of the existing structure,
whichever is greater.
c. All other legally existing non-conforming principal and accessory
structures that do not meet the water body, tributary stream, or wetland
setback requirements may be expanded or altered as follows, as long as
other applicable municipal land use standards are met and the expansion is
not prohibited by Section 12.C.1 or Section 12.C.1.a, above.
i.
For structures located less than seventy-five (75) feet from the
normal high-water line of a water body, tributary stream, or upland
edge of a wetland, the maximum combined total footprint for all
structures may not be expanded to a size greater than one thousand
(1,000) square feet or thirty percent (30%) larger than the footprint
that existed on January 1, 1989, whichever is greater. The
maximum structure height must comply with the provisions of
Section 15.B.2
ii.
For structures located less than one hundred (100) feet from the
normal high-water line of a great pond classified as GPA or a river
flowing to a great pond classified as GPA, the maximum combined
total footprint for all structures may not be expanded to a size
greater than one thousand five hundred (1,500) square feet or thirty
percent (30%) larger than the footprint that existed on January 1,
1989, whichever is greater. The maximum structure height must
comply with the provisions of Section 15.B.2.
iii.
In addition to the limitations in subparagraphs i and ii, for
structures that are legally non-conforming due to their location
within the Resource Protection District when located at less than
two hundred fifty (250) feet from the normal high-water line of a
water body or the upland edge of a wetland, the maximum
combined total footprint for all structures may not be expanded to
a size greater than one thousand five hundred (1,500)square feet or
thirty percent (30%) larger than the footprint that existed at the
time the Resource Protection District was established on the lot,
whichever is greater. The maximum structure height must comply
with the provisions of Section 15.B.2.
d. An approved plan for expansion of a non-conforming structure must be
recorded by the applicant with the registry of deeds, within ninety (90)
days of approval. The recorded plan must show the existing and proposed
footprint of the non-conforming structure, the existing and proposed
structure height, the footprint of any other structures on the parcel, the
NON-CONFORMANCE
8
shoreland zone boundary and evidence of approval by the municipal
reviewing authority.
2) Foundations
Whenever a new, enlarged, or replacement foundation is constructed under a non-
conforming structure, the structure and new foundation must be placed such that
the setback requirement is met to the greatest practical extent as determined by
the Planning Board, basing its decision on the criteria specified in Section 12.C.3.
Temporary relocation of the structure is permitted to provide safety and ease of
access to the foundation in order to make approved foundation modifications.
3) Relocation
A non-conforming structure may be relocated within the boundaries of the parcel
on which the structure is located, provided that the site of relocation conforms to
all setback requirements to the greatest practical extent as determined by the
Planning Board, and provided that the applicant demonstrates that the present
subsurface sewage disposal system meets the requirements of State law and the
State of Maine Subsurface Wastewater Disposal Rules, or that a new system can
be installed in compliance with the law and said Rules. In no case shall a
structure be relocated in a manner that causes the structure to be more non-
conforming.
In determining whether the building location meets the setback to the greatest
practical extent, the Planning Board or its designee shall consider the size of the
lot, the slope of the land, the potential for soil erosion, the location of other
structures on the property and on adjacent properties, the location of the septic
system and other on-site soils suitable for septic systems, and the type and amount
of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback
area in order to relocate a structure, the Planning Board shall require replanting of
native vegetation to compensate for the destroyed vegetation. In addition, the
area from which the relocated structure was removed must be replanted with
vegetation.
Replanting shall be required as follows:
a. Trees removed in order to relocate a structure must be replanted with at
least one (1) native tree, three (3) feet in height, for every tree removed. If
more than five (5) trees are planted, no one species of tree shall make up
more than fifty percent (50%) of the number of trees planted. Replaced
trees must be planted no further from the water or wetland than the trees
that were removed.
NON-CONFORMANCE
9
b. Other woody and herbaceous vegetation, and ground cover, that are
removed or destroyed in order to relocate a structure must be re-
established. An area at least the same size as the area where vegetation
and/or ground cover was disturbed, damaged, or removed must be re-
established within the setback area. The vegetation and/or ground cover
must consist of similar native vegetation and/or ground cover that was
disturbed, destroyed or removed.
c. Where feasible, when a structure is relocated on a parcel, the original
location of the structure shall be replanted with vegetation which may
consist of grasses, shrubs, trees, or a combination thereof.
4) Reconstruction or Replacement
Any non-conforming structure which is located less than the required setback
from the normal high-water line of a water body, tributary stream, or upland edge
of a wetland and which is removed, damaged or destroyed, regardless of cause, by
more than fifty percent (50%) of the market value of the structure before such
damage, destruction or removal, may be reconstructed or replaced provided that a
permit is obtained within eighteen months of the date of said damage, destruction,
or removal, and provided that such reconstruction or replacement is in compliance
with the water body, tributary stream or wetland setback requirement to the
greatest practical extent as determined by the Planning Board in accordance with
the purposes of this Ordinance.
In no case shall a structure be reconstructed or replaced so as to increase its non-
conformity. If the reconstructed or replacement structure is less than the required
setback it shall not be any larger than the original structure, except as allowed
pursuant to Section 12.C.1 above, as determined by the non-conforming footprint
of the reconstructed or replaced structure at its new location.
If the total amount of footprint of the original structure can be relocated or
reconstructed beyond the required setback area, no portion of the relocated or
reconstructed structure shall be replaced or constructed at less than the setback
requirement for a new structure. When it is necessary to remove vegetation in
order to replace or reconstruct a structure, vegetation shall be replanted in
accordance with Section 12.C.3 above.
Any non-conforming structure which is located less than the required setback
from a water body, tributary stream or wetland and which is removed by fifty
percent (50%) or less of the market value, or damaged or destroyed by fifty
percent (50%) or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from
the Code Enforcement Officer within one (1) year of such damage, destruction or
removal.
NON-CONFORMANCE
10
In determining whether the building reconstruction or replacement meets the
water setback to the greatest practical extent the Planning Board shall consider in
addition to the criteria in Section 12(.C.2 above, the physical condition and type
of foundation present, if any.
5) Change of Use of a Non-conforming Structure
The use of a non-conforming structure may not be changed to another use unless
the Planning Board, after receiving a written application, determines that the new
use will have no greater adverse impact on the water body, tributary stream or
wetlands or on the subject or adjacent properties and resources than the existing
use.
In determining that no greater adverse impact will occur, the Planning Board shall
require written documentation from the applicant, regarding the probable effects
on public health and safety, erosion and sedimentation, water quality, fish and
wildlife habitat, vegetative cover, visual aspects and actual points of public access
to waters, natural beauty, flood plain management, archaeological and historic
resources, and commercial fishing and maritime activities, and other functionally
water-dependent uses.
D. Non-conforming Uses
1) Expansions.
Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be
expanded within existing residential structures or within expansions of such
structures as allowed in Section 12.C.1 above.
2) Resumption Prohibited.
A lot, building or structure in or on which a non-conforming use is discontinued
for a period exceeding one year, or which is superseded by a conforming use, may
not again be devoted to a non-conforming use except that the Planning Board
may, for good cause shown by the applicant, grant up to a one (1) year extension
to that time period. This provision shall not apply to the resumption of a use of a
residential structure provided that the structure has been used or maintained for
residential purposes during the preceding five (5) year period.
3) Change of Use.
An existing non-conforming use may be changed to another non-conforming use
provided that the proposed use has no greater adverse impact on the subject and
adjacent properties and resources, including water dependent uses in the CFMA &
FHB districts, than the former use, as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria
listed in Section 12.C.5 above.
DESCRIPTION OF DISTRICTS
11
E. Non-conforming Lots
1) Lots not contiguous with any other lot in the same ownership.
A non-conforming lot of record as of the date of adoption of this Ordinance or
amendment thereto may be built upon, without the need for a variance, provided
that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot
width and shore frontage can be met. Variances relating to setback or other
requirements not involving lot area, lot width or shore frontage shall be obtained
by action of the Board of Appeals.
2) Contiguous lots with principal structures, in the same ownership.
If two (2) or more contiguous lots or parcels are in a single or joint ownership of
record as of the date of adoption of this Ordinance or amendment thereto, and if
all or part of the lots do not meet the dimensional requirements of this Ordinance,
and if a principal use or structure exists on each lot, the non-conforming lots may
be conveyed separately or together, provided that the State Minimum Lot Size
Law (12 M.R.S.A. Sections 4807-A through 4807-D) and the State of Maine
Subsurface Wastewater Disposal Rules are complied with.
3) A lot with more than one principal structure or use.
If two (2) or more principal uses or structures existed on a single lot of record as
of the date of adoption of this ordinance, each may be sold on a separate lot
provided that the above referenced law and rules are complied with. When such
lots are divided, each lot thus created must be as conforming as possible to the
dimensional requirements of this Ordinance.
4) Contiguous lots, vacant or partially built, in the same ownership.
If two (2) or more contiguous lots or parcels are in single or joint ownership of
record at the time of or since adoption of this Ordinance, if any of these lots do
not individually meet the dimensional requirements of this Ordinance, and if one
or more of the lots are vacant or contain no principal structure, the lots shall be
combined to the extent necessary to meet the dimensional requirements.
This provision shall not apply to two (2) or more contiguous lots, at least one (1)
of which is non-conforming, owned by the same person or persons on Devember
15th, 1991 and recorded in the registry of deeds if the lot is served by a public
sewer or can accommodate a subsurface sewage disposal system in conformance
with the State of Maine Subsurface Wastewater Disposal Rules; and
a. Each lot contains at least one hundred fifty (150) feet of shore frontage
and at least forty thousand (40,000) square feet of lot area; or
b. Any lots that do not meet the frontage or lot size requirements of Section
12.E.4.a are reconfigured or combined so that each new lot contains at
least one hundred fifty (150) feet of shore frontage and forty thousand
(40,000) square feet of lot area.
13. DESCRIPTION OF DISTRICTS
[See Section 10 for interpretation of District boundaries]
DESCRIPTION OF DISTRICTS
12
A. Resource Protection District
The Resource Protection District includes areas in which development would adversely
affect water quality, productive habitat, biological ecosystems, or scenic and natural
values. This district shall include the following areas when they occur within the limits of
the Shoreland Zone, exclusive of the Stream Protection District, except that areas which
are currently developed, and areas which meet the criteria for the Commercial
Fisheries/Maritime Activities Districts are not included within the Resource Protection
District.
1) Wetlands, Marshes and Wet Meadows
Areas within 250 feet, horizontal distance, of the upland edge of freshwater and/or
coastal wetlands, which are rated "moderate" or "high" value waterfowl and
wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W). These areas are
generally depicted on a Geographic Information System (GIS) data layer.
2) Flood Plains
Flood-plains are defined by the one hundred (100) year flood-plain as designated on
the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps or
Flood Hazard Boundary Maps, or defined by the flood of record, or in the absence of
these, by soil types identified as recent flood-plain soils.
This district includes one hundred (100) year flood plains adjacent to tidal waters as
shown on FEMA's Flood Insurance Rate Maps or Flood Hazard Boundary Maps.
3) Two plus (2+) Acre Lots with greater than twenty percent (>20%) Sustained
Slopes
Areas of two or more contiguous acres with sustained slopes of 20% or greater.
4) Two plus (2+) Acre Lots supporting wetland vegetation and hydric soils
Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric
soils, which are not part of a freshwater or coastal wetland as defined, and which are
not surficially connected to a water body during the period of normal high water.
NOTE: these areas usually consist of forested wetlands abutting water bodies and
non-forested wetlands.
5) Land areas along rivers subject to severe bank erosion
Land areas along rivers subject to severe bank erosion, undercutting, or river bed
movement and lands adjacent to tidal waters which are subject to severe erosion or
mass movement, such as steep coastal bluffs.
NOTE: These areas usually consist of forested wetlands abutting water bodies and
non-forested wetlands.
B. Limited Residential District
The Limited Residential District includes those areas suitable for residential and non-
commercial recreational development. It does not include areas in the Resource
TABLE OF LAND USES
13
Protection District or Stream Protection District. Commercial uses are not permitted
except for home occupations, rentals and fishing home businesses.
C. Limited Commercial District
The Limited Commercial District includes areas of mixed light commercial and
residential uses, exclusive of the Stream Protection District and Resource Protection
District, which should not be intensively developed. This district includes areas of two
(2) or more contiguous acres in size devoted to a mix of residential and low intensity
business and commercial uses. Industrial uses are prohibited.
D. Commercial Fisheries/Maritime Activities District
The Commercial Fisheries/Maritime Activities District includes areas where the existing
predominant pattern of development is consistent with the allowed uses for this district as
indicated in the Table of Land Uses, Section 14, and other areas which are suitable for
functionally water-dependent uses, taking into consideration such factors as:
1) Shelter from prevailing wind and wave action;
2) Slope of the land within two hundred fifty (250) feet horizontal distance of the
shoreline;
3) Depth of water within 150 feet horizontal distance of the shoreline;
4) Available support facilities including utilities and transportation facilities;
5) Compatibility with adjacent upland uses.
E. Fishing Home Business District
Consistent with Title 38 Coastal Management policies giving preference to traditional
water-dependent livelihood over other uses, the Fishing Home Business district includes
coastal locations with both residential and resident-operated, for-profit, fishing, shell-
fishing or aquaculture uses on one lot.
F. Stream Protection District
The Stream Protection District includes all land areas within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream, exclusive of those areas
within two-hundred and fifty (250) feet, horizontal distance, of the normal high-water
line of a great pond, or river, or within two hundred and fifty (250) feet, horizontal
distance, of the upland edge of a freshwater or coastal wetland. Where a stream and its
associated shoreland area are located within two hundred fifty (250) feet, horizontal
distance, of the above water bodies or wetlands, that land area shall be regulated under
the terms of the shoreland district associated with that water body or wetland.
14. TABLE OF LAND USES
The Table shows for each district what is allowed, prohibited, and permitted subject to the Land
Use Standards of Section 15. The Table also shows whether the Code Enforcement Officer
(CEO), Planning Board (PB) or Local Plumbing Inspector (LPI) issues a required permit.
TABLE OF LAND USES
14
District designations are shown on the Official Shoreland Zoning Map. District descriptions are
located in Section 13.
A. Table of Land Uses Abbreviations
CFMA = Commercial Fisheries/Maritime Activities
FHB = Fishing Home Business
LR = Limited Residential
LC = Limited Commercial
RP = Resource Protection
SP = Stream Protection
A = Allowed. No permit required but the use must comply with land use standards of
Section 15.
N = Prohibited
PB = Allowed subject to the land use standards of Section 15 with permit issued by the
Planning Board.
CEO = Allowed subject to the land use standards of Section 15 with permit issued by the
Code Enforcement Officer.
LPI = Allowed subject to the land use standards of Section 15 with permit issued by the
Local Plumbing Inspector.
SA = Appropriate State agencies.
TABLE OF LAND USES
15
B. Table 14 - Table of Land Uses
Land
Uses
Principal
Standards
Zoning
Districts
SP
RP
LR
FHB
LC
CFMA
1. Non-intensive recreational uses not requiring
structures, such as hunting, fishing & hiking; no
structures
2. Motorized vehicular traffic on existing roads and
trails
State
A
A
A
A
A
A
A
A
A
A
A
A
3. Forest management activities, defined in Sec. 17
except timber harvesting & land management
roads
A
A
A
A
A
A
4. Timber harvesting
State
SA
SA
SA
SA
SA
SA
5. Clearing or removal of vegetation for activities
other than timber harvesting
Sec.15.P
CEO
1
CEO
CEO
CEO
CEO
CEO
6. Fire prevention activities
A
A
A
A
A
A
7. Wildlife management practices
A
A
A
A
A
A
8. Soil & water conservation practices
A
A
A
A
A
A
9. Mineral exploration
Sec.15.M
N
A 2
A 2
A 2
A 2
A 2
10. Mineral extraction, including sand & gravel
extraction
Sec.15.M
N
PB 3
PB
PB
PB
PB
11. Surveying & Resource Analysis
A
A
A
A
A
A
12. Emergency operations, defined in Section 17
A
A
A
A
A
A
13. Agriculture, defined in Section 17
Sec.15.N
A
PB
A
A
A
A
14. Aquaculture
State
SA
SA
SA
SA
SA
SA
15. Principal Structures, ADUs, and uses
Sec.15.A, B
A. One & Two-Family Residential, including
driveways
1. New Construction
Sec.15.A, B
PB 5
PB 9
CEO
CEO
CEO
N 8
2. Non-Conforming Lot New Construction
Sec.15.A, B
PB 5
PB 9
PB
PB
PB
N 8
3. Expansions
Sec.12.C.1
PB
PB
PB
PB
PB
N
4. Relocations
Sec.12.C.3
PB
PB
PB
PB
PB
N
5. Reconstruction or Replacement
Sec.12.C.4
PB
PB
PB
PB
PB
N
B. Multi-unit residential buildings, including
driveways
Sec.15.A, B
N
N
PB
N
PB
N
TABLE OF LAND USES
16
Land
Uses
Principal
Standards
Zoning
Districts
SP
RP
LR
FHB
LC
CFMA
C. Multi-unit rental apartments, including
driveways
Sec.15.A, B
N
N
N
N
PB
N
D. Mobile home park
N
N
N
N
N
N
E. Fishing home business accessory structures
used for lobstering, fishing & aquaculture
Sec.15.A, B
PB 5
N 8
PB
PB
PB
PB
F. Boatyards & shops for construction, sale,
repair, storage or maintenance of boats up to
50 feet in length
Sec.15.A, B
N
N 8
N 8
N
PB
PB
G. Other commercial, defined in Section 17
Sec.15.D
N
N
N
N
PB
N
H. Industrial, defined in Section 17
Sec.13.C
N
N
N
N
N
N
I.
Bed & breakfast, defined in Section 17
Sec.16.D
N
N
PB
PB
PB
N
J.
Hotel & motel
N
N
N
N
N
N
K. Governmental & Institutional, defined in
Sec.17
Sec.15.A, D
N
N
N
N
PB
N
L. Facilities 800 square feet or less for
educational, scientific or nature
interpretation purposes
PB 5
PB
CEO
N
CEO
N
16. Structures Accessory to Allowed Uses
Sec.15.B
PB 5
PB
CEO
CEO
CEO
CEO
17. Portions of piers, docks, wharves, and
bridges in wetlands or above the high-water line
Structures thereon, as defined in Section 3
Sec. 15.C
PB
PB
PB
PB
PB
PB
Permanent pier or wharf, as defined in
Section 17
Sec. 15.C
CEO
CEO
CEO
CEO
CEO
CEO 4
Temporary pier or wharf, as defined in
Section 17
Sec. 15.C
CEO
CEO
CEO
CEO
CEO
CEO
18. Marine commercial, defined in Section 17
Sec.15.D
N
N
N
N
PB
PB
19. Conversions of seasonal residences to year-round
residences
Sec. 15.C.8
LPI
LPI
LPI
LPI
LPI
N
20. Home occupations-as defined in Section 17
A
A
A
A
A
A
21. Private sewage disposal systems for allowed uses
Sec.15.K
LPI
LPI
LPI
LPI
LPI
LPI
22. Essential Services
Sec.15.L
A. Roadside distribution lines (=< 34.5kV)
Sec.15.L
CEO
CEO
A 10
A 10
A 10
A 10
TABLE OF LAND USES
17
Land
Uses
Principal
Standards
Zoning
Districts
SP
RP
LR
FHB
LC
CFMA
B. Non-roadside or cross-country distribution
lines involving ten poles or fewer in the
Shoreland Zone
Sec.15.L
PB
PB
PB
CEO
CEO
CEO
C. Non-roadside or cross-country distribution
lines involving eleven poles or more in the
Shoreland Zone
Sec.15.L
PB
PB
PB
PB
PB
PB
D. Other essential services
Sec.15.L
PB
PB
PB
PB
PB
PB
23. Public & private recreational facilities involving
minimal structural development
Sec.15.A
PB
PB
PB
N
CEO
N
24. Individual private campsites
Sec.15.E
CEO
CEO
CEO
CEO
CEO
CEO
25. Campgrounds
Sec.15.D
N 6
N 6
PB
N
PB
N
26. Road construction
Sec.15.H
PB
N 7
PB
PB
PB
PB
27. Land management roads, defined in Section 17
PB
PB
A
A
A
A
28. Parking areas
Sec.15.G
N
N 6
PB
PB
PB
PB 4
29. Filling & earthmoving of less than 10 cubic
yards.
CEO
CEO
A
A
A
A
30. Filling & earthmoving of more than 10 cubic
yards.
PB
PB
CEO
CEO
CEO
CEO
31. Signs
Sec.15.L
A
A
A
A
A
A
32. Uses similar to allowed uses
CEO
CEO
CEO
CEO
CEO
CEO
33. Uses similar to uses requiring CEO permit
CEO
CEO
CEO
CEO
CEO
CEO
34. Uses similar to uses requiring PB permit
PB
PB
PB
PB
PB
PB
TABLE OF LAND USES
18
C. Land Use Table notes
1) In RP not allowed within seventy-five (75) feet horizontal distance of normal high-
water line of great ponds, except to remove safety hazards.
2) Requires permit from CEO if more than one hundred (100) square feet of surface area,
in total, is disturbed
3) In RP not allowed in areas so designated because of wildlife value.
4) Functionally-dependent water uses and uses accessory to such water-dependent uses
only.
5) Provided that a variance from the setback requirement is obtained from the Board of
Appeals.
6) Except when an area is zoned RP based on flood plain, in which case a PB permit is
required.
7) Except as provided in Section 15.G.
8) Except that all uses existing on the effective date of this Ordinance are conforming.
9) Single family residential structures may be allowed by special exception only
according to the provisions of Section 16.G. Two-family residential structures are
prohibited.
10) Permit not required but must file a written "Notice of Intent" with CEO thirty (30)
days prior to commencing the on-site activity.
11) The Code Enforcement Officer may refer any item to the Planning Board.
D. General notes
An applicant performing any of the following activities shall first obtain any required
permits from the:
- Dept. of Environmental Protection, pursuant to Title 38 M.R.S.A. Section 480-C
- US Army Corps of Engineers, and
- any other relevant state or Federal authority,
if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great
pond, river, stream or brook and operates in such a manner that material or soil may be
washed into them:
1) Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
2) Draining or otherwise de-watering;
3) Filling, including adding sand or other material to a sand dune; shoreland stabilization;
4) Any construction or alteration of any permanent structure; or,
5) Construction of piers, wharfs, docks, breakwaters, bridges and other structures.
E. Review of applications for cluster, multi-unit or commercial use
Standards and submittal requirements in the Town of Cushing Subdivision Regulations
will also apply. The Planning Board may require a groundwater extraction impact
assessment.
LAND USE STANDARDS
19
15. LAND USE STANDARDS
All land use activities within the Shoreland Zone shall conform with the following provisions, if
applicable:
A. Minimum Lot Standards*
1).
All Properties Within the Shoreland Zone
Minimum
Lot Area (sq. ft.)
Minimum Shore
Frontage (ft.)
1. Residential and Fishing Home Business, per dwelling unit:
Adjacent to Tidal Areas
40,000
150
Adjacent to Non-Tidal Areas
40,000
200
2. Accessory Dwelling Unit, per dwelling unit:
Adjacent to Tidal Areas
40,000
150
Adjacent to Non-Tidal Areas
40,000
200
3. Governmental, Institutional, or Commercial per principal structure:
A. Adjacent to Tidal Areas Exclusive Of those Areas
Zoned for Commercial Fisheries and Maritime
Activities
40,000
200
B. Adjacent to Tidal Areas zoned for Commercial
Fisheries and Maritime Activities
NONE
NONE
C. Adjacent to Non-tidal Areas
60,000
300
4. Public and Private Recreational Facilities
Adjacent to Tidal and Non-Tidal Areas
40,000
200
NOTE: The zoning district designation of a lot shall reflect the use of land and structures
thereon, irrespective of whether structures are within or without the Shoreland Zone. For
example, a lot would be Limited Residential even though the dwelling is outside the
Shoreland Zone.
2)
Land below the normal high-water line of a water body or upland edge of a
wetland and land beneath roads serving more than two (2) lots shall not be included
toward calculating minimum lot area.
3)
Lots located on opposite sides of a public or private road shall be considered each
a separate tract or parcel of land unless such road was established by the owner of land on
both sides thereof after September 22, 1971.
4)
The minimum width (dimension parallel to the waterline) of any portion of any
lot within one hundred (100) feet horizontal distance of the normal high-water line of a
LAND USE STANDARDS
Principal Structures, Accessory Dwelling Units and
Accessory Structures
20
water body or upland edge of a wetland shall be equal to or greater than the shore
frontage requirement for a lot with the proposed use.
5)
If more than one (1) residential dwelling unit, principal governmental,
institutional, or commercial structure or use or combination thereof is constructed or
established on a single parcel, all dimensional requirements shall be met for each
additional dwelling unit or principal structure or use
B. Principal Structures, Accessory Dwelling Units and Accessory Structures
1) All new principal and accessory structures set back
All new principal and accessory structures shall be set back at least one hundred
(100) feet, horizontal distance, from the normal high-water line of great ponds
classified GPA and rivers that flow to great ponds classified GPA, and seventy-
five (75) feet, horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland. Additionally, the
setback distance shall be sufficient to preclude the location of any new structure
within the one hundred (100) year flood hazard areas described in Section 13.A.2.
In the Commercial Fisheries/Maritime Activities District there shall be no
minimum setback for water-dependent structures and uses. In the Fishing Home
Business district, the setback shall not apply to fishing-related accessory
structures. In the Resource Protection district the setback shall be two hundred
fifty (250) feet, horizontal distance, except for structures, roads, parking spaces or
other regulated objects specifically allowed in that district, in which case the
setback requirements specified above shall apply.
NOTE: The Natural Resources Protection Act, 38 M.R.S.A. Sections 480-A
through 480-HH, requires the Department of Environmental Protection to
designate areas of "significant wildlife habitat".
Permitting under the Natural Resources Protection Act for activities adjacent to
significant wildlife habitat areas may require greater setbacks. Contact your local
Department of Environmental Protection office to see if additional permitting is
required.
In addition:
a. The water body, tributary stream or wetland setback provision shall
neither apply to structures which require direct access to the water body or
wetland as an operational necessity, such as piers, docks and retaining
walls, nor to other functionally water-dependent uses.
b. The Planning Board may increase the required setback of a proposed
structure, as a condition of approval, if necessary to accomplish the
purposes of this ordinance. Instances where greater setbacks may be
appropriate include, but are not limited to areas of steep slopes, shallow or
erodible soils, or where an adequate vegetative buffer does not exist.
c. For Principal Structures and Accessory Dwelling Units, water and wetland
setback measurements shall be taken from the top of a coastal bluff that
LAND USE STANDARDS
Principal Structures, Accessory Dwelling Units and
Accessory Structures
21
has been identified on Coastal Bluff maps as being "highly unstable" or
"unstable" by the Maine Geological Survey pursuant to its "Classification
of Coastal Bluffs" and published on the most recent Coastal Bluff map. If
the applicant and the permitting official(s) are in disagreement as to the
specific location of a "highly unstable" or "unstable" bluff, or where the
top of the bluff is located, the applicant may at his or her expense, employ
a Maine Registered Professional Engineer, a Maine Certified Soil
Scientist, a Maine State Geologist, or other qualified individual to make a
determination. If agreement is still not reached, the applicant may appeal
the matter to the Board of Appeals.
d. On a non-conforming lot of record on which only a residential structure
exists, and it is not possible to place an accessory structure meeting the
required water body, tributary stream or wetland setbacks, the Code
Enforcement Officer may issue a permit to place a single accessory
structure, with no utilities, for the storage of yard tools and similar
equipment. Such accessory structure shall not exceed eighty (80) square
feet in area nor eight (8) feet in height, and shall be located as far from the
shoreline or tributary stream as practical and shall meet all other
applicable standards, including lot coverage and vegetation clearing
limitations. In no case shall the structure be located closer to the shoreline
or tributary stream than the principal structure.
NOTE: A tributary stream may be perennial or intermittent. Where a tributary
stream is present within the shoreland zone, setback standards from that tributary
stream are applicable.
2) Principal or accessory structures height
Principal or accessory structures and expansions of existing structures which are
permitted in the Resource Protection, Limited Residential, Limited Commercial
and Stream Protection districts shall not exceed thirty-five (35) feet in height.
This provision shall not apply to structures such as transmission towers,
windmills, antennas, and similar structures having no footprint; however, other
Town regulations may apply. Cupolas, domes, widow's walks, or other similar
features are exempt from the overall height requirement above.
3) Minimum abutter clearance
For all buildings, the minimum distance between a new building wall and any
property line abutting another lot shall be not less than five (5) feet.
4) The lowest floor elevation or openings
The lowest floor elevation or openings of all buildings and structures, including
basements, shall be elevated at least one foot above the elevation of the one
hundred (100) year flood, the flood of record, or in the absence of these, the flood
as defined by soil types identified as recent flood-plain soils. In those
municipalities that participate in the National Flood Insurance Program and have
adopted the April 2005 version, or later version, of the Floodplain Management
LAND USE STANDARDS
Principal Structures, Accessory Dwelling Units and
Accessory Structures
22
Ordinance, accessory structures may be placed in accordance with the standards
of that ordinance and need not meet the elevation requirements of this paragraph.
5) Total Areas
The total area of all structures, parking lots and other non-vegetated surfaces,
within the Shoreland Zone shall not exceed twenty percent (20%) of the lot or a
portion there of, located within the Shoreland Zone, including land area
previously developed, except in the Commercial Fisheries/Maritime Activities
District, where lot coverage shall not exceed seventy percent (70%), and in the
Fishing Home Business District, where lot coverage shall not exceed thirty-five
percent (35%).
6) Calculating Lot Coverage
For the purposes of calculating lot coverage, non-vegetated surfaces include, but
are not limited to the following: structures, driveways, parking areas and other
areas from which vegetation has been removed. Naturally occurring ledge and
rock outcroppings are not counted as non-vegetated surfaces when calculating lot
coverage for lots of record on March 24, 1990 and in continuous existence since
that date.
7) Retaining Walls
Retaining walls that are not necessary for erosion control shall meet the structure
setback requirement, except for low retaining walls and associated fill provided
all of the following conditions are met:
a. The site has been previously altered and an effective vegetated buffer does
not exist;
b. The wall(s) is(are) at least twenty-five (25) feet, horizontal distance, from
the normal high-water line of a water body, tributary stream, or upland
edge of a wetland;
c. The site where the retaining wall will be constructed is legally existing
lawn or is a site eroding from lack of naturally occurring vegetation, and
which cannot be stabilized with vegetative plantings;
d. The total height of the wall(s), in the aggregate, are no more than 24
inches;
e. Retaining walls are located outside of the one hundred (100) year
floodplain on rivers, streams, coastal wetlands, and tributary streams, as
designated on the Federal Emergency Management Agency's (FEMA)
Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood
of record, or in the absence of these, by soil types identified as recent
flood plain soils.
f. The area behind the wall is revegetated with grass, shrubs, trees, or a
combination thereof, and no further structural development will occur
within the setback area, including patios and decks; and
g. A vegetated buffer area is established within twenty-five (25) feet,
horizontal distance, of the normal high-water line of a water body,
tributary stream, or upland edge of a wetland when a natural buffer area
does not exist. The buffer area must meet the following characteristics:
LAND USE STANDARDS
Piers, Docks, Wharves, Bridges and Other structures
23
i.
The buffer must include shrubs and other woody and herbaceous
vegetation. Where natural ground cover is lacking the area must be
supplemented with leaf or bark mulch
ii.
Vegetation plantings must be in quantities sufficient to retard
erosion and provide for effective infiltration of stormwater runoff;
iii.
Only native species may be used to establish the buffer area;
iv.
A minimum buffer width of fifteen (15) feet, horizontal distance, is
required, measured perpendicularly to the normal high-water line
or upland edge of a wetland;
v.
A footpath not to exceed the standards in Section 15.P.2.a, may
traverse the buffer;
8) Stairways or similar structures may be allowed
Notwithstanding the requirements stated above, stairways or similar structures
may be allowed with a permit from the Code Enforcement Officer, to provide
shoreline access in areas of steep slopes or unstable soils provided: that the
structure is limited to a maximum of four (4) feet in width; that the structure does
not extend below or over the normal high-water line of a water body or upland
edge of a wetland (unless permitted by the Department of Environmental
Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A. Section
480-C); and that the applicant demonstrates that no reasonable access alternative
exists on the property.
C. Piers, Docks, Wharves, Bridges and Other structures
Piers, Docks, Wharves, Bridges and Other structures and Uses extending Over or Beyond
the Normal high-water line of a body or within a wetland.
1) No more than one pier, dock, wharf or similar structure
No more than one (1) pier, dock, wharf or similar structure extending or located
below the normal high-water line of a water body or within a wetland is allowed
on a single lot; except that when a single lot contains at least twice the minimum
shore frontage as specified in Section 15.A, a second structure may be allowed
and may remain as long as the lot is not further divided.
2) Access from shore
Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
3) Location shall not interfere
The location shall not interfere with existing developed or natural beach areas.
4) No adverse effects on fisheries
The facility shall be located so as to minimize adverse effects on fisheries.
5) No larger in dimension than necessary
The facility shall be no larger in dimension than necessary to carry on the activity
and be consistent with the surrounding character and uses of the Town. A
temporary pier, dock or wharf in non-tidal waters shall not be wider than six feet
for non-commercial uses.
LAND USE STANDARDS
Campgrounds
24
6) No new structure shall be built on, over or abutting
No new structure shall be built on, over or abutting a pier, wharf, dock or other
structure extending beyond the normal high-water line of a water body or within a
wetland unless the structure requires direct access to the water as an operational
necessity.
NOTE: A structure constructed on a float or floats is prohibited unless it is designed to
function as, and is registered with the Maine Department of Inland Fisheries and Wildlife
as a watercraft and has any appropriate Army Corps of Engineers permit.
7) Piers and docks on non-tidal waters
New permanent piers and docks on non-tidal waters shall not be permitted unless
it is clearly demonstrated to the Planning Board that a temporary pier or dock is
not feasible, and a permit has been obtained from the Department of
Environmental Protection pursuant to the Natural Resources Protection Act.
8) No conversion to residential dwelling
No existing structures built on, over or abutting a pier, wharf, dock or other
structure extending beyond the normal high-water line of a water body or within a
wetland shall be converted to residential dwelling units in any district.
9) Not to exceed twenty (20) feet in height
Except in the Commercial Fisheries/Maritime Activities district, structures built
on, over or abutting a pier, wharf, dock or other structure extending beyond the
normal high-water line of a water body or within a wetland shall not exceed
twenty (20) feet in height above the pier, wharf, dock or other structure.
NOTE: New permanent structures and expansions thereof projecting into or over water
bodies shall require a permit from the Department of Environmental Protection pursuant
to the Natural Resources Protection Act, 38 M.R.S.A. Section 480-C. Permits may also be
required from the Army Corps of Engineers if located in navigable waters.
D. Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
1) Minimum size
Campgrounds shall contain a minimum of five thousand (5,000) square feet of
land, not including roads and driveways, for each site. Land supporting wetland
vegetation and land below the normal high-water line of a water body shall not be
included in calculating land area per site.
2) Setbacks
The areas intended for placement of a recreational vehicle, tent or shelter, and
utility and service buildings shall be set back a minimum of one-hundred (100)
feet horizontal distance from the normal high-water line of a great pond classified
GPA or river flowing to a great pond classified GPA, and seventy-five (75) feet
horizontal distance from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland.
LAND USE STANDARDS
Individual Private Campsites
25
E. Individual Private Campsites
Individual, private campsites for use for no more than seven (7) months per year and not
associated with campgrounds are allowed provided the following conditions are met:
1) One campsite per lot
One campsite per lot existing on the effective date of this ordinance, or thirty
thousand (30,000) square feet of lot area within the Shoreland Zone, whichever is
less, may be permitted.
2) Minimum dimensions of lot
When an individual private campsite is proposed on a lot that contains another
principal use and/or structure, the lot must contain the minimum lot dimensional
requirements for the principal structure and/or use, and the individual private
campsite separately.
3) Placement on any lot
Campsite placement on any lot, including the area intended for recreational
vehicle or tent platform, shall be set back one hundred (100) feet horizontal
distance from the normal high-water line of a great pond classified GPA or river
flowing to a great pond classified GPA, and seventy-five (75) feet horizontal
distance from the normal high-water line of other water bodies, tributary streams,
or the upland edge of a wetland.
4) One recreational vehicle shall be allowed on a campsite
Only one recreational vehicle shall be allowed on a campsite. The recreational
vehicle shall not be located on any type of permanent foundation except for gravel
pad, and no structure except a canopy shall be attached to the recreational vehicle.
5) Clearing of vegetation
The clearing of vegetation for the siting of the recreational vehicle, tent or similar
shelter in a Resource Protection District shall be limited to one thousand (1,000)
square feet.
6) Sewage disposal plan
A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by the
Local Plumbing Inspector. Where disposal is off-site, written authorization from
the receiving facility or land owner is required.
7) Usage beyond one hundred twenty (120) days per year
When a recreational vehicle, tent or similar shelter is placed on-site for more than
one hundred twenty (120) days per year, all requirements for residential structures
shall be met, including the installation of a subsurface sewage disposal system in
compliance with the State of Maine Subsurface Wastewater Disposal Rules unless
served by public sewage facilities.
F. Commercial Uses
The following new commercial uses are prohibited within the Shoreland Zone adjacent to
great ponds classified GPA and rivers and streams which flow to great ponds classified
GPA.
1) Auto washing facilities
LAND USE STANDARDS
Parking Areas
26
2) Auto or other vehicle service and/or repair operations, including body
shops
3) Chemical and bacteriological laboratories
4) Storage of chemicals, including herbicides, pesticides or fertilizers, other
than amounts normally associated with individual households or farms
5) Commercial painting, wood preserving, and furniture stripping
6) Dry cleaning establishments
7) Electronic circuit assembly
8) Laundromats, unless connected to a sanitary sewer
9) Metal plating, finishing, or polishing
10) Petroleum or petroleum product storage and/or sale except storage on
same property as use occurs and except for storage and sales associated
with marinas
11) Photographic processing
12) Printing.
G. Parking Areas
Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located, except that in the Commercial
Fisheries/Maritime Activities district, parking areas shall be set back at least twenty-five
(25) feet horizontal distance from the shoreline. The setback requirement for parking
areas serving public boat launching facilities in districts other than the Commercial
Fisheries/Maritime Activities and Home Fishing districts shall be no less than fifty (50)
feet horizontal distance from the shoreline or tributary stream unless the Planning Board
finds that no other reasonable location satisfying the district setback exists.
1) Adequately sized
Parking areas shall be adequately sized for the proposed use and shall be designed
to prevent storm water runoff from flowing directly into a water body, tributary
stream or wetland and where feasible, to retain all runoff on-site.
2) Size considerations
In determining the appropriate size of proposed parking facilities, the following
shall apply:
a. Typical parking space: Ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be ten (10)
feet wide and forty (40) feet long.
b. Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways
The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
1) Location
Roads and driveways shall be located, constructed and maintained in such manner
that minimal erosion hazard results. Adequate provisions shall be made to prevent
soil erosion and sedimentation of surface waters.
LAND USE STANDARDS
Roads and Driveways
27
2) Setback
Roads and driveways shall be set back at least one-hundred (100) feet horizontal
distance from the normal high-water line of a great pond classified GPA or a river
that flows to a great pond classified GPA, and seventy-five (75) feet horizontal
distance from the normal high-water line of other water bodies, tributary streams,
or the upland edge of a wetland unless no reasonable location satisfying the
setback exists as determined by the Planning Board. If no such location exists,
the road and/or driveway setback requirement shall be no less than fifty (50) feet
horizontal distance upon clear showing by the applicant that appropriate
techniques will be used to prevent sedimentation of the water body, tributary
stream or wetland. Such techniques may include, but are not limited to, the
installation of settling basins, and/or the effective use of additional ditch relief
culverts and turnouts be placed so as to avoid sedimentation of the water body,
tributary stream, or wetland.
On slopes of greater than twenty percent (20%) the road and/or driveway setback
shall be increased by ten (10) feet horizontal distance for each five (5) percent
increase in slope above twenty percent (20%).
This Section does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures, and facilities located nearer
to the shoreline or tributary stream due to an operational necessity, excluding
temporary docks for recreational uses. Roads and driveways providing temporary
access to permitted structures within the setback area shall comply fully with the
requirements of this Section except for that portion of the road or driveway
necessary for direct access to the structure.
3) Expanding existing public roads
Existing public roads may be expanded within the legal road right-of-way
regardless of its setback from a water body, tributary stream, or wetland.
4) Resource Protection District restrictions
New roads and driveways are prohibited in a Resource Protection District except
that the Planning Board may grant a permit to construct a road or driveway to
provide access to permitted uses within the district upon a finding that no
reasonable alternative route or location is available outside the district. When a
road or driveway is permitted in a Resource Protection District, the road and/or
driveway shall be set back as far as practicable from the normal high-water line of
a water body, tributary stream, or upland edge of a wetland.
5) Bank slopes
Road and driveway banks shall be no steeper than a slope of two (2) horizontal to
one (1) vertical and shall be graded and stabilized in accordance with the
provisions for erosion and sedimentation control contained in Section 15.T.
6) Grades
Road and driveway grades shall be no greater than ten percent (10%) except for
segments of less than two hundred (200) feet.
7) Surface drainage
In order to prevent road and driveway surface drainage from directly entering
water bodies, tributary streams or wetlands, roads and driveways shall be
designed, constructed, and maintained to empty onto an unscarified buffer strip of
LAND USE STANDARDS
Signs
28
at least fifty (50) feet plus two times the average slope, in width between the
outflow point of the ditch or culvert and the normal high-water body, tributary
stream, or upland edge of a wetland. Surface drainage which is directed to an
unscarified buffer strip shall be diffused or spread out to promote infiltration of
the runoff and to minimize channelized flow of the drainage through the buffer
strip.
8) Ditches, culverts, dips and turnouts
Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto unscarified buffer strip
before the flow gains sufficient volume or head to erode the road, driveway or
ditch. To accomplish this, the following shall apply:
a. Spacing
Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road or driveway at intervals no greater than indicated in
the following table:
Grade (Percent)
Spacing (Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21+
40
b. Drainage dips may be used in place of ditch relief culverts only where the
grade is ten percent (10%) or less
c. On Sections having slopes greater than ten percent (10%), ditch relief
culverts shall be placed at approximately a thirty percent (30%) angle
down slope from a line perpendicular to the center line of the road or
driveway.
d. Ditch relief culverts shall be sufficiently sized and properly installed in
order to allow for effective functioning, and their inlet and outlet ends
shall be stabilized with appropriate materials.
9) Assure effective functioning
Ditches, culverts, bridges, dips, water turnouts and other storm water runoff
control installations associated with roads and driveways shall be maintained on a
regular basis to assure effective functioning.
I. Signs
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, Limited Residential and Limited Commercial Districts:
LAND USE STANDARDS
Storm Water Management
29
1) Signs relating to goods and services
Signs relating to goods and services sold on the premises shall be allowed,
provided that such signs shall not exceed six (6) square feet in area and shall not
exceed two (2) signs per premises. In the Limited Commercial District, however,
such signs shall not exceed sixteen (16) square feet in area. Signs relating to
goods or services not sold or rendered on the premises shall be prohibited.
2) Name signs
Name signs are allowed, provided such signs shall not exceed two (2) signs per
premises, and shall not exceed twelve (12) square feet in the aggregate.
3) Residential signs
Residential users may display a single sign not over three (3) square feet in area
relating to the sale, rental, or lease of the premises.
4) Trespassing and hunting
Signs relating to trespassing and hunting shall be allowed without restriction as to
number provided that no such sign shall exceed two (2) square feet in area.
5) Public safety
Signs relating to public safety shall be allowed without restriction.
6) Height
No sign shall extend higher than twenty (20) feet above the ground.
7) Illumination
Exterior signs may be illuminated only by non-flashing lights.
J. Storm Water Management
1) New construction and development
All new construction and development shall be designed to minimize storm water
runoff from the site in excess of the natural predevelopment conditions. Where
possible, existing natural runoff control features, such as berms, swales, terraces
and wooded areas shall be retained in order to reduce runoff and encourage
infiltration of storm water.
2) Maintenance
Storm water runoff control systems shall be maintained as necessary to ensure
proper functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. Section 420-D) requires a full
permit to be obtained from the DEP prior to construction of a project consisting of
twenty thousand (20,000) square feet or more of impervious area or five (5) acres or
more of a developed area in an urban impaired stream watershed or most-at-risk lake
watershed, or a project with one (1) acre or more of developed area in any other stream,
coastal or wetland watershed. A permit-by-rule is necessary for a project with one (1)
acre or more of disturbed area but less than one (1) acre impervious area twenty
thousand (20,000) square feet for most-at-risk lakes and urban impaired streams) and
less than five (5) acres of developed area. Furthermore, a Maine Construction General
Permit is required if the construction will result in one (1) acre or more of disturbed
area.
LAND USE STANDARDS
Septic Waste Disposal
30
K. Septic Waste Disposal
All subsurface sewage disposal systems shall be installed in conformance with the State
of Maine Subsurface Wastewater Disposal Rules, and the following:
1) Clearing or removal of woody vegetation
Clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet,
horizontal distance, from the normal high-water line of a water body or the upland
edge of a wetland and
2) Holding tanks
A holding tank is not allowed for a first-time residential use in the Shoreland
Zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems,
excluding fill extensions, to be constructed no less than one hundred (100) horizontal feet
from the normal high-water line of a perennial water body. The minimum setback
distance for a new subsurface disposal system may not be reduced by variance.
L. Essential Services
1) Installation limitations
Where feasible, the installation of essential services shall be limited to existing
public ways and existing service corridors.
2) Installation in Resource or Stream Protection District
The installation of essential services other than roadside distribution lines is not
allowed in a Resource or Stream Protection District except to provide services to
a permitted use within said district, or except where the applicant demonstrates
that no reasonable alternative exists. Where allowed, such structures and facilities
shall be located so as to minimize any adverse impacts on surrounding uses and
resources, including visual impacts.
3) Replacement or reconstruction of public utility infrastructure
Damaged or destroyed public utility transmission and distribution lines, towers
and related equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from
the Code Enforcement Officer shall be required for mineral exploration which exceeds
the above limitation. All excavations, including test pits and holes shall be immediately
capped, filled or secured by other equally effective measures, to restore disturbed areas
and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
LAND USE STANDARDS
Agriculture
31
1) Reclamation plan
A reclamation plan shall be filed with, and approved by the Planning Board
before a permit is granted. Such plan shall describe in detail procedures to be
undertaken to fulfill the requirements of Paragraph 3 below.
2) Setbacks and permissions
No part of any extraction operation, including drainage and runoff control features
shall be permitted within one hundred (100) feet, horizontal distance, of the
normal high-water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and within seventy-five (75) feet, horizontal distance, of the
normal high-water line of any other water body, tributary stream, or the upland
edge of a wetland. Extraction operations shall not be permitted within fifty (50)
feet, horizontal distance, of any property line without written permission of the
owner of such adjacent property.
3) Reestablishment upon completion
Within twelve (12) months following the completion of extraction operations at
any extraction site, which operations shall be deemed complete when less than
one hundred (100) cubic yards of materials are removed in any consecutive
twelve (12) month period, ground levels and grades shall be established in
accordance with the following:
a. All debris, stumps, and similar material shall be removed for disposal in
an approved location, or shall be buried on-site. Only materials generated
on-site may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, Title 38, Maine Revised Statutes
Annotated, Section 1301 and Chapter 400-419 of the Department of
Environmental Protection's regulations may contain other applicable
provisions regarding disposal of such materials.
b. The final graded slope shall be two and one-half to one (2.5 : 1) slope or
flatter.
c. Top soil or loam shall be retained to cover all disturbed land areas, which
shall be re-seeded and stabilized with vegetation native to the area.
Additional topsoil or loam shall be obtained from off-site sources, if
necessary, to complete the stabilization project.
4) Planning Board may impose conditions
In keeping with the purposes of this ordinance, the Planning Board may impose
such conditions as are necessary to minimize the adverse impacts associated with
mineral extraction operations on surrounding uses and resources.
N. Agriculture
1) Spreading of manure
All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the former Maine Department of Agriculture
on November 1, 2001, and the Nutrient Management Law (7 M.R.S.A. Sections
4201-4209).
LAND USE STANDARDS
Timber Harvesting
32
2) Storing of manure
Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal
distance, of a great pond classified GPA or a river flowing to a great pond,
classified GPA, or within seventy-five (75) feet horizontal distance, of other water
bodies, tributary streams, or wetlands. All manure storage areas within the
Shoreland Zone must be constructed or modified such that the facility produces
no discharge of effluent or contaminated storm water.
3) Tillage of soil
Agricultural activities involving tillage of soil greater than forty thousand
(40,000) square feet in surface area, within the Shoreland Zone shall require a
Conservation Plan to be filed with the Planning Board. Non-conformance with
the provisions of said plan shall be considered to be a violation of this ordinance.
NOTE: Assistance in preparing a soil and water conservation plan may be
available through the local Soil and Water Conservation District office.
4) New tillage
There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA; within
seventy-five (75) feet, horizontal distance, from other water bodies and coastal
wetlands; or within twenty-five (25) feet, horizontal distance, of tributary streams
and freshwater wetlands. Operations in existence on the effective date of this
ordinance and not in conformance with this provision may be maintained.
5) New livestock grazing areas
Newly established livestock grazing areas shall not be permitted within one
hundred (100) feet, horizontal distance, of the normal high-water line of a great
pond classified GPA; within seventy-five (75) feet, horizontal distance of other
water bodies and coastal wetlands, nor within twenty-five (25) feet, horizontal
distance, of tributary streams and freshwater wetlands. Livestock grazing
associated with ongoing farm activities and which are not in conformance with
the above setback provisions may continue; provided that such grazing is
conducted in accordance with a Conservation Plan that has been filed with the
Planning Board.
O. Timber Harvesting
Title 38 M.R.S.A. Section 438-A provides that, notwithstanding other provisions of the
Mandatory Shoreland Zoning Act, the regulation of timber harvesting and timber
harvesting activities in shoreland areas must be in accordance with Section 438-B and
rules adopted by the Maine Forest Bureau pursuant to Title 12, Section 8867-B.
In accordance with Title 38 M.R.S.A. Section 438-B Option 1, the Maine Forest Bureau
shall administer the statutes and regulations related to timber harvesting in the shoreland
zone.
LAND USE STANDARDS
Clearing or Removal of Vegetation for Activities other than
Timber Harvesting
33
P. Clearing or Removal of Vegetation for Activities other than Timber
Harvesting
1) Resource Protection district limitations
In a Resource Protection district abutting a great pond, there shall be no cutting of
vegetation within the strip of land extending seventy-five (75) feet, horizontal
distance, inland from the normal high-water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the cutting or removal of
vegetation shall be limited to that which is necessary for uses expressly authorized
in that district, and as shown on the site plan, noted as "Limits of Disturbance".
2) Opening canopy or clearings
Except in areas as described in Section 15.P.1 above, and except to allow for the
development of permitted uses within a strip of land extending one-hundred (100)
feet, horizontal distance, inland from the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, or within a strip
extending seventy-five (75) feet, horizontal distance, from any other water body,
tributary stream, or the upland edge of a wetland, a buffer strip of vegetation shall
be preserved as follows:
a. There shall be no cleared opening greater than two hundred fifty (250)
square feet in the forest canopy (or other existing woody vegetation if a
forested canopy is not present) as measured from the outer limits of the
tree or shrub crown. However, a footpath not to exceed six (6) feet in
width as measured between tree trunks and/or shrub stems is allowed for
accessing the shoreline provided that a cleared line of sight to the water
through the buffer strip is not created.
b. Selective cutting of trees within the buffer strip is allowed provided that a
well-distributed stand of trees and other natural vegetation is maintained.
For the purposes of this Section, a "well-distributed stand of trees"
adjacent to a great pond classified GPA or a river or stream flowing to a
great pond classified GPA, shall be defined as maintaining a rating score
of twenty-four (24) or more in each twenty-five (25) foot by fifty (50) foot
rectangular (one thousand two hundred fifty (1250) square feet) area as
determined by the following rating system:
Diameter of Tree at 4-1/2 feet
Above ground level (inches)
Points
2-<4 in.
1
4-<8 in.
2
8-<12 in.
4
12 in. or greater
8
LAND USE STANDARDS
Clearing or Removal of Vegetation for Activities other than
Timber Harvesting
34
Adjacent to other water bodies, tributary streams, and wetlands, a "well-
distributed stand of trees" is defined as maintaining a minimum rating
score of sixteen (16) per twenty-five (25) foot by fifty (50) foot
rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot
contains four (4) trees between 2 and 4 inches in diameter, two (2) trees between
4 and 8 inches in diameter, three (3) trees between 8 and 12 inches in diameter,
and two (2) trees over 12 inches in diameter, the rating score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 12
points (36- 24 =12) may be removed from the plot provided that no cleared
openings are created.
The following shall govern in applying this point system:
i.
The twenty-five (25) foot by fifty (50) foot rectangular plots must
be established where the landowner or lessee proposes clearing
within the required buffer;
ii.
Each successive plot must be adjacent to but not overlap a previous
plot;
iii.
Any plot not containing the required points must have no
vegetation removed except as otherwise allowed by this
Ordinance;
iv.
Any plot containing the required points may have vegetation
removed down to the minimum points required or as otherwise
allowed by this Ordinance.
v.
Where conditions permit, no more than fifty percent (50%) of the
points on any twenty-five (25) foot by fifty (50) foot rectangular
area may consist of trees greater than twelve (12) inches in
diameter.
For the purposes of this Section "other natural vegetation" is defined
as retaining existing vegetation under three (3) feet in height and other
ground cover and retaining at least five (5) saplings less than two (2)
inches in diameter at four and one-half (4.5) feet above ground level
for each twenty-five (25) foot by fifty (50) foot rectangular area. If
five (5) saplings do not exist, no woody stems less than two (2) inches
in diameter can be removed until five (5) saplings have been recruited
into the plot.
Notwithstanding the above provisions, no more than forty percent
(40%) of the total volume of trees four (4) inches or more in diameter,
measured at four and one half (4.5) feet above ground level may be
removed in any ten (10) year period.
c. In order to protect water quality and wildlife habitat, existing vegetation
under three (3) feet in height and other ground cover, including leaf litter
LAND USE STANDARDS
Clearing or Removal of Vegetation for Activities other than
Timber Harvesting
35
and the forest duff layer, shall not be cut, covered or removed, except to
provide for a footpath or other permitted uses as described in Section
15.P.2.a above.
d. Pruning of tree branches, on the bottom one-third (1/3) of the tree is
allowed.
e. In order to maintain a buffer strip of vegetation, when the removal of
storm-damaged, diseased, unsafe, or dead trees results in the creation of
cleared openings, these openings shall be replanted with native tree
species unless existing new tree growth is present.
f. In order to maintain the vegetation in the shoreline buffer, clearing or
removal of vegetation for allowed activities, including associated
construction and related equipment operation, within or outside the
shoreline buffer, must comply with the requirements of Section 15.P.2.
g. Section 15.P.2 does not apply to those portions of public recreational
facilities adjacent to public swimming areas as long as cleared areas are
limited to the minimum necessary.
3) Selective cutting
At distances greater than one hundred (100) feet, horizontal distance, from a great
pond classified GPA or a river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of any
other water body, tributary stream, or the upland edge of a wetland, there shall be
permitted on any lot, in any ten (10) year period, selective cutting of not more
than forty percent (40%) of the volume of trees four (4) inches or more in
diameter, measured four and one half (4.5) feet above ground level. Tree removal
in conjunction with the development of permitted uses shall be included in the
forty percent (40%) calculation. For the purposes of these standards volume may
be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to,
principal and accessory structures, driveways, lawns, and sewage disposal areas
exceed in the aggregate twenty five percent (25%) of the lot area within the
Shoreland Zone or ten thousand (10,000) square feet, whichever is greater,
including land previously cleared, a total of fourteen thousand (14,000) sq ft. of
aggregated cleared openings is allowed on lots up to fifty-six thousand (56,000)
sq ft. This provision shall not apply to the Commercial Fisheries/Maritime
Activities and Fishing Home Business districts.
4) Legally existing non-conforming cleared openings may be maintained
Legally existing non-conforming cleared openings may be maintained, but shall
not be enlarged, except as allowed by this Ordinance.
5) Reverted areas
Fields and other cleared openings which have reverted to primarily shrubs, trees,
or other woody vegetation shall be regulated under the provisions of Section 15.P.
LAND USE STANDARDS
Hazard Trees, Storm-Damaged Trees, and Dead Tree
Removal
36
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
1) CEO consultation required
Hazard trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are
met:
a. Within the shoreline buffer, if the removal of a hazard tree results in a
cleared opening in the tree canopy greater than two hundred fifty (250)
square feet, replacement with native tree species is required, unless there
is new tree growth already present. New tree growth must be as near as
practicable to where the hazard tree was removed and be at least two (2)
inches in diameter, measured at four and one half (4.5) feet above the
ground level. If new growth is not present, then replacement trees shall
consist of native species and be at least four (4) feet in height, and be no
less than two (2) inches in diameter. Stumps may not be removed.
b. Outside of the shoreline buffer, when the removal of hazard trees exceeds
forty percent (40%) of the volume of trees four (4) inches or more in
diameter, measured at four and one half (4.5) feet above ground level in
any ten (10) year period, and/or results in cleared openings exceeding
twenty-five percent (25%) of the lot area within the shoreland zone, or ten
thousand (10,000) square feet, whichever is greater, replacement with
native tree species is required, unless there is new tree growth already
present. New tree growth must be as near as practicable to where the
hazard tree was removed and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level. If new
growth is not present, then replacement trees shall consist of native species
and be at least two (2) inches in diameter, measured at four and one half
(4.5) feet above the ground level.
c. The removal of standing dead trees, resulting from natural causes, is
permissible without the need for replanting or a permit, as long as the
removal does not result in the creation of new lawn areas, or other
permanently cleared areas, and stumps are not removed. For the purposes
of this provision dead trees are those trees that contain no foliage during
the growing season.
d. The Code Enforcement Officer may require the property owner to submit
an evaluation from a licensed forester or arborist before any hazard tree
can be removed within the shoreland zone.
e. The Code Enforcement Officer may require more than a one-for-one
replacement for hazard trees removed that exceed eight (8) inches in
diameter measured at four and one half (4.5) feet above the ground level.
2) Storm-damaged trees
Storm-damaged trees in the shoreland zone may be removed without a permit
after consultation with the Code Enforcement Officer if the following
requirements are met:
LAND USE STANDARDS
Exemptions to Clearing and Vegetation Removal
Requirements
37
a. Within the shoreline buffer, when the removal of storm-damaged trees
results in a cleared opening in the tree canopy greater than two hundred
fifty (250) square feet, replanting is not required, but the area shall be
required to naturally revegetate, and the following requirements must be
met:
i.
The area from which a storm-damaged tree is removed does not
result in new lawn areas, or other permanently cleared areas;
ii.
Stumps from the storm-damaged trees may not be removed;
iii.
Limbs damaged from a storm event may be pruned even if they
extend beyond the bottom one-third (1/3) of the tree; and
iv.
If after one growing season, no natural regeneration or regrowth is
present, replanting of native tree seedlings or saplings is required
at a density of one seedling per every eighty (80) square feet of lost
canopy.
b. Outside of the shoreline buffer, if the removal of storm damaged trees
exceeds forty percent (40%) of the volume of trees four (4) inches or more
in diameter, measured at four and one half (4.5) feet above the ground
level in any ten (10) year period, or results, in the aggregate, in cleared
openings exceeding twenty five percent (25%) of the lot area within the
shoreland zone or ten thousand (10,000) square feet, whichever is greater,
and no natural regeneration occurs within one growing season, then native
tree seedlings or saplings shall be replanted on a one-for-one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards
set forth in Section 15.P, provided that all other applicable requirements of this chapter
are complied with, and the removal of vegetation is limited to that which is necessary:
1) Maintenance of legally existing areas
The removal of vegetation that occurs at least once every two (2) years for the
maintenance of legally existing areas that do not comply with the vegetation
standards in this chapter, such as but not limited to cleared openings in the canopy
or fields. Such areas shall not be enlarged, except as allowed by this Section. If
any of these areas, due to lack of removal of vegetation every two (2) years,
reverts back to primarily woody vegetation, the requirements of Section 15.P
apply;
2) Removal from allowed structures or trees
The removal of vegetation from the location of allowed structures or allowed
uses, when the shoreline setback requirements of Section 15.B are not applicable;
3) Removal from public swimming areas
The removal of vegetation from the location of public swimming areas associated
with an allowed public recreational facility;
4) Removal associated with allowed agricultural uses
The removal of vegetation associated with allowed agricultural uses, provided
best management practices are utilized, and provided all requirements of Section
15.N are complied with;
LAND USE STANDARDS
Revegetation Requirements
38
5) Removal associated with brownfields or VRAP
The removal of vegetation associated with brownfields or Voluntary Response
Action Program (VRAP) projects provided that the removal of vegetation is
necessary for remediation activities to clean-up contamination on a site in a
Commercial Fisheries and Maritime Activities district or other equivalent zoning
district approved by the Commissioner that is part of a state or federal
brownfields program or a voluntary response action program pursuant 38
M.R.S.A. Section 343-E, and that is located along:
a. A coastal wetland; or
b. A river that does not flow to a great pond classified as GPA pursuant to 38
M.R.S.A. Section 465-A.
6) Removal of non-native invasive vegetation species
The removal of non-native invasive vegetation species, provided the following
minimum requirements are met:
a. If removal of vegetation occurs via wheeled or tracked motorized
equipment, the wheeled or tracked motorized equipment is operated and
stored at least twenty-five (25) feet, horizontal distance, from the
shoreline, except that wheeled or tracked equipment may be operated or
stored on existing structural surfaces, such as pavement or gravel;
b. Removal of vegetation within twenty-five (25) feet, horizontal distance,
from the shoreline occurs via hand tools; and
c. If applicable clearing and vegetation removal standards are exceeded due
to the removal of non-native invasive species vegetation, the area shall be
revegetated with native species to achieve compliance.
NOTE: An updated list of non-native invasive vegetation is maintained by the
Department of Agriculture, Conservation and Forestry's Natural Areas Program:
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
7) Removal associated with emergency response activities
The removal of vegetation associated with emergency response activities
conducted by the Department, the U.S. Environmental Protection Agency, the
U.S. Coast Guard, and their agents.
S. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set
forth in Section 15.P, to address the removal of non-native invasive species of vegetation,
or as a mechanism to allow for development that may otherwise not be permissible due to
the vegetation standards, including removal of vegetation in conjunction with a shoreline
stabilization project, the revegetation must comply with the following requirements.
1) Must submit a revegetation plan
The property owner must submit a revegetation plan, prepared with and signed by
a qualified professional, that describes revegetation activities and maintenance.
The plan must include a scaled site plan, depicting where vegetation was, or is to
be removed, where existing vegetation is to remain, and where vegetation is to be
planted, including a list of all vegetation to be planted.
LAND USE STANDARDS
Revegetation Requirements
39
2) Revegetation must occur along the same segment of shoreline
Revegetation must occur along the same segment of shoreline and in the same
area where vegetation was removed and at a density comparable to the pre-
existing vegetation, except where a shoreline stabilization activity does not allow
revegetation to occur in the same area and at a density comparable to the pre-
existing vegetation, in which case revegetation must occur along the same
segment of shoreline and as close as possible to the area where vegetation was
removed:
3) Revegetation shall occur before the expiration of the permit.
If part of a permitted activity, revegetation shall occur before the expiration of the
permit. If the activity or revegetation is not completed before the expiration of the
permit, a new revegetation plan shall be submitted with any renewal or new
permit application.
4) Revegetation activities requirements
Revegetation activities must meet the following requirements for trees and
saplings:
a. All trees and saplings removed must be replaced with native non-invasive
species;
b. Replacement vegetation must at a minimum consist of saplings;
c. If more than three (3) trees or saplings are planted, then at least three (3)
different species shall be used;
d. No one species shall make up fifty percent (50%) or more of the number
of trees and saplings planted;
e. If revegetation is required for a shoreline stabilization project, and it is not
possible to plant trees and saplings in the same area where trees or
saplings were removed, then trees or sapling must be planted in a location
that effectively reestablishes the screening between the shoreline and
structures; and
f. A survival rate of at least eighty percent (80%) of planted trees or saplings
is required for a minimum five (5) year period.
5) Woody revegetation requirements
Revegetation activities must meet the following requirements for woody
vegetation and other vegetation under three (3) feet in height:
a. All woody vegetation and vegetation under three (3) feet in height must be
replaced with native non-invasive species of woody vegetation and
vegetation under three (3) feet in height as applicable;
b. Woody vegetation and vegetation under three (3) feet in height shall be
planted in quantities and variety sufficient to prevent erosion and provide
for effective infiltration of stormwater;
c. If more than three (3) woody vegetation plants are to be planted, then at
least three (3) different species shall be planted;
d. No one species shall make up fifty percent (50%) or more of the number
of planted woody vegetation plants; and
LAND USE STANDARDS
Erosion and Sedimentation Control
40
e. Survival of planted woody vegetation and vegetation under three feet in
height must be sufficient to remain in compliance with the standards
contained within this chapter for a minimum of five (5) years
6) Revegetation ground vegetation and cover
Revegetation activities must meet the following requirements for ground
vegetation and ground cover:
a. All ground vegetation and ground cover removed must be replaced with
native herbaceous vegetation, in quantities and variety sufficient to
prevent erosion and provide for effective infiltration of stormwater;
b. Where necessary due to a lack of sufficient ground cover, an area must be
supplemented with a minimum four (4) inch depth of leaf mulch and/or
bark mulch to prevent erosion and provide for effective infiltration of
stormwater; and
c. Survival and functionality of ground vegetation and ground cover must be
sufficient to remain in compliance with the standards contained within this
chapter for a minimum of five (5) years.
T. Erosion and Sedimentation Control
1) Activities requiring a permit
All activities which involve filling, grading, excavation or other similar activities
which result in un-stabilized soil conditions and which require a permit shall also
require a written soil erosion and sedimentation control plan conforming to the
"Maine Erosion and Sediment Control Best Management Practices". The plan
shall be submitted to the permitting authority for approval and shall include,
where applicable, provisions for:
a. Mulching and revegetation of disturbed soil.
b. Temporary runoff control features such as hay bales, silt fencing or
diversion ditches.
c. Permanent stabilization structures such as retaining walls or rip-rap.
2) Development to fit topography
In order to create the least potential for erosion, development shall be designed to
fit with the topography and soils of the site. Areas of steep slopes where high cuts
and fills may be required shall be avoided wherever possible, and natural contours
shall be followed as closely as possible.
3) Protection of Resources minimum width buffer
For resource protection, the minimum width buffer between a building and a
resource protection area line shall be:
a. five (5) feet, undisturbed by runoff controls or construction equipment,
where the resource protection area supports trees over 4" diameter at
breast height, and the following width shall be added to accommodate
construction activity,
b. ten (10) feet where the intervening grade change is less than one (1) foot;
c. fifteen (15) feet where the intervening grade change is two (2) feet or less;
LAND USE STANDARDS
Soils
41
d. twenty (20) feet where the intervening grade change is three (3) feet or
less; and
e. five (5) feet more for each additional foot of increase in the intervening
grade change.
4) Finish grades
Finish grades in this area shall not exceed one (1) vertical to three (3) horizontal.
Proposed Limits of Disturbance shall be shown on plans and so staked in the
field.
5) Erosion and sedimentation control
Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all
stages of the activity. The amount of exposed soil at every phase of construction
shall be minimized to reduce the potential for erosion.
6) Exposed ground area
Any exposed ground area shall be temporarily or permanently stabilized within
one (1) week from the time it was last actively worked, by use of riprap, sod, seed
and mulch, or other effective measures. In all cases permanent stabilization shall
occur within nine (9) months of the initial date of exposure. In addition:
a. Where mulch is used, it shall be applied at a rate of at least one (1) bale
per five hundred (500) square feet and shall be maintained until a catch of
vegetation is established.
b. Anchoring the mulch with netting, peg and twine or other suitable method
may be required to maintain the mulch cover.
c. Additional measures shall be taken where necessary in order to avoid
siltation into the water. Such measures may include the use of staked hay
bales an/or silt fences.
7) Natural and man-made drainage ways and outlets
Natural and man-made drainage ways and drainage outlets shall be protected from
erosion from water flowing through them. Drainage ways shall be designed and
constructed in order to carry water from a twenty-five (25) year storm or greater,
and shall be stabilized with vegetation or lined with rip-rap.
U. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts,
including severe erosion, mass soil movement, improper drainage, and water pollution,
whether during or after construction. Proposed uses on soils listed in Appendix A and
uses requiring subsurface waste disposal, and commercial or industrial development or
other similar intensive land uses, shall require a soils report based on on-site
investigation, prepared by professionals certified to provide services in Maine. Certified
preparers may include Maine Certified Soil Scientists, Maine Registered Professional
Engineers, Maine State Certified Geologists and others who have training and experience
in the recognition and evaluation of soil properties. The soils report shall be based on
analysis of the characteristics of the soil, and surrounding land and water areas,
maximum ground water elevation, presence of ledge, drainage conditions, and other data
LAND USE STANDARDS
Water Quality
42
the evaluator deems appropriate. The report should include recommendations that would
enable the proposed use to cope with any soil limitations.
V. Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State, any
pollutant that, by itself or in combination with other activities or substances will impair
designated uses or the water classification of the water body, tributary stream or wetland.
W. Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic
Places as determined by the Planning Board shall be submitted by the applicant to the
Maine Historic Preservation Commission for review and comment, at least twenty (20)
days prior to action being taken by the Planning Board. The Planning Board shall
consider comments received from the Commission prior to rendering a decision on the
application.
NOTE: Municipal officials should contact the Maine Historic Preservation Commission
for the listing and location of Historic Places in their community.
ADMINISTRATION
Administering Bodies and Agents
43
16. ADMINISTRATION
A. Administering Bodies and Agents
1) A Code Enforcement Officer shall be appointed or re-appointed annually by July 1st.
2) A Board of Appeals shall be created in accordance with the provisions of State law.
3) A Planning Board shall be created in accordance with the provisions of State law.
B. Permits Required
After the date of adoption of this ordinance no person shall, without first obtaining a
permit,
1) initiate or commence any activity or use of land or structure(s) identified in Table
14 as requiring a permit in the district in which such activity or use would occur, or
2) (b) expand, change or replace an existing use or structure; or renew a discontinued
non-conforming use; nor shall any principal or accessory structure be built,
constructed, set, installed, established, expanded, substantially altered or relocated
without a permit.
Repairs and interior renovations and alterations which do not involve expanding footprint
do not require a permit.
A person who is issued a permit pursuant to this Ordinance shall have a copy of the
permit on site while the work authorized by the permit is performed.
1) Culvert permit exceptions
A permit is not required for the replacement of an existing road culvert as long as:
a. The replacement culvert is not more than twenty five percent (25%) longer
than the culvert being replaced;
b. The replacement culvert is not longer than seventy-five (75) feet; and
c. Adequate erosion control measures are taken to prevent sedimentation of
the water, and the crossing does not block fish passage in the watercourse.
2) Archaeological excavation permit exceptions
A permit is not required for an archaeological excavation as long as the
excavation is conducted by an archaeologist listed on the State Historic
Preservation Officer's level one (1) or level two (2) approved list, and
unreasonable erosion and sedimentation is prevented by means of adequate and
timely temporary and permanent stabilization measures.
3) All required permits to be displayed
Any permit required by this Ordinance shall be in addition to any other permit
required by other law or ordinance.
C. Official Shoreland Zone Map Changes
Any change in District designation of a property, or a change in Resource Protection
Boundaries, requires an amendment of the Official Shoreland Zone Map.
1) Public hearing
The Planning Board shall schedule a Public Hearing for any Shoreland Zone Map
change.
ADMINISTRATION
Permit Application
44
2) Applicant to notify abutting property owners
On receipt of an application that includes a map change, the Planning Board shall;
a. require the applicant to notify abutting property owners by registered
return-receipt-requested mail on a form provided by the Planning Board,
that an application specifying the Zoning District change or a Resource
Protection Boundary change has been submitted. The applicant shall
provide the Planning Board with the receipts, and;
b. within thirty-five (35) days, or within any other time limit that may be
mutually agreed upon by the Planning Board and the applicant, make a
finding that the property does or does not conform to all requirements for
the proposed Shoreland Zone Map Change, and shall within ten (10) days
thereafter inform the applicant of the finding.
3) Planning Board to schedule hearing
On finding that the applicant's property complies with the requirements of
Sections 10 and 13, the Planning Board shall within thirty (30) days;
a. schedule a Public Hearing for the Municipal Legislative Body to vote on
the proposed Map Change Amendment, as set forth in Sec.8 and
b. submit the Town approved Map Change to the DEP Commissioner for
approval in accordance with Sec. 8 and Sec. 9.D.
4) Map change approval must precede permit application
An application for a permit that requires a Map Change shall not be approved by
the Planning Board until an amendment of the Official Shoreland Zone Map has
been approved by both the Town and the DEP Commissioner.
D. Permit Application
1) Submission using municipal form(s)
Every applicant shall submit to the Town Clerk, by noon fourteen (14) days in
advance of the next scheduled Planning Board meeting, a written application on a
form provided by the municipality, together with eight (8) copies of a scaled site
plan, and any scheduled fee or escrow deposit. Both the form and the plan shall be
dated.
The applicant is required to provide to the municipal permitting authority
preconstruction photographs of the shoreline vegetation and development site and,
no later than 20 days after completion of the development, postconstruction
photographs of the shoreline vegetation and development site. (Pursuant to 38
M.R.S. §439-A(10))
2) Signed and show right of title
All applications shall be signed by an owner or individual who can show evidence
of right, title or interest in the property or by an authorized agent, representative,
tenant, or contractor of the owner with authorization from the owner to apply for a
permit hereunder, certifying that the information in the application is complete
and correct.
A copy of the deed and any deed restrictions or encumbrances affecting the
property shall be submitted.
ADMINISTRATION
Permit Application
45
3) Date and time recorded and receipts provided
The Town Clerk shall note on an application form and site plan the date and time
of their receipt by the Town, and shall provide the applicant a receipt for any fees
and escrow deposit received.
4) Code Enforcement Officer shall determine completeness
The Code Enforcement Officer shall determine whether an application form is
complete, including all required submittals, before issuing a dated receipt for a
complete application. The review on any application will only be scheduled based
on the issuance of this receipt.
5) Code Enforcement Officer shall inspect site
The Code Enforcement Officer shall inspect the site and maintain a digital
photographic record of site conditions before Planning Board review, during
approved work, and after its completion.
6) Valid septic system permit required
If the property is not served by a public sewer, a valid septic system permit or a
completed application for a septic system permit, including the site evaluation
approved by the Plumbing Inspector, shall be submitted whenever the nature of
the proposed structure would require the installation of a subsurface sewage
disposal system.
7) Building Permit issuance subject to sewage compliance
No building permit shall be issued for any structure or use involving the
construction, installation or alteration of sewage disposal facilities unless a
sewage disposal permit for such facilities has been secured by the applicant or
his/her authorized agent, according to the requirements of this Ordinance.
8) Previous violations to be resolved
No application shall be accepted from an applicant in violation of a plan
previously approved under this Ordinance until the time such violation is
resolved.
9) Abutter notification by applicant
When the Planning Board receives, at a regularly scheduled meeting, a complete
application for any of the following land uses (see Table 14) in or adjoining the
Limited Residential District, the Planning Board shall require the applicant to
notify abutting property owners by registered return-receipt-requested mail on a
form provided by the Planning Board that an application for the proposed use has
been submitted, and to provide the Planning Board with the receipts:
a. Land Uses;
i.
Multi-unit rental apartments, including driveways;
ii.
Boatyards and shops for construction, sale, repair, storage or
maintenance of boats up to 50 feet in length;
iii.
Marine commercial;
iv.
Other commercial;
v.
Bed and breakfast;
vi.
Governmental & Institutional;
b. Expansions of any of the above uses;
ADMINISTRATION
Fees and escrow funds
46
c. Non-roadside or cross-country distribution lines in the Shoreland Zone;
d. Commercial recreational facilities;
e. Campgrounds.
E. Fees and escrow funds
1) Schedule of fees and escrow funds
The Planning Board may, following a public hearing and approval by the
Selectmen, adopt a schedule of fees and escrow funds for administrative
procedures. All fees collected shall be applied to Planning Board expenses and
enforcement of land use ordinances and regulations. Fees and deposits shall be
made to the Town Clerk, payable to the Town of Cushing.
2) Escrow deposits
Each escrow deposit shall be placed in an account held solely for a given
application.
a. Funds held in escrow shall be used to defray the cost of independent
consulting services required by the Planning Board for review of technical
or legal aspects of an application; and for costs of notice, mailing, and
copying of documents or maps.
i.
The original deposit shall be restored whenever the balance of the
account goes below twenty five percent (25%) of the original
deposit. Whenever the balance in an escrow account is drawn
down by seventy five percent (75%), the Planning Board shall
notify the applicant of the amount of funds to be deposited to
restore the scheduled deposit.
ii.
The Planning Board shall furnish the applicant a record of the
nature and amount of any expenditure made from the account.
Unused funds shall be returned to the applicant within thirty (30)
days after the later of final Planning Board action on the
application, or satisfaction of escrow obligations.
3) Late or not received escrow funds
If a required fee or escrow deposit is not received prior to a meeting at which the
application is listed on the agenda, the application shall be tabled. If the required
fee or deposit is not received within fourteen (14) dates after that meeting, the
application shall be considered to have been withdrawn.
F. Procedure for Administering Permits
1) Permits issued by reviewing authority
Permits shall be issued by the reviewing authority noted in Table 14 or their
designee.
Within thirty-five (35) days of the Town Clerk's receipt of a written application,
the Code Enforcement Officer shall notify the applicant whether the application is
a complete application, or, if the application is incomplete, that specified
additional material is needed to make the application complete.
a. The Planning Board may decide that a Public Hearing is required for any
application. If so, the Planning Board shall give notice of its date, time and
ADMINISTRATION
Procedure for Administering Permits
47
place to be published twice in a local news outlet, with the date of first
publication at least fourteen (14) days prior to the hearing.
b. Unless an extension of time has been agreed with the applicant, or is
required for independent professional review, the reviewing authority shall
act within thirty-five (35) days of receiving a complete application to
approve, approve with conditions, or deny the application, and shall
communicate its decision to the applicant in writing. However, if the
Planning Board has a list of waiting applications, a decision on the
application shall occur within thirty-five (35) days after the first available
date on the Planning Board's agenda following receipt of the completed
application, or within thirty-five (35) days of the public hearing, if one is
held.
c. All materials which require Planning Board review shall be submitted to
the Town Clerk at least by noon fourteen days in advance of a regular or
special meeting, to allow sufficient time for consideration by the Planning
Board. The Town Clerk shall note the date and time of their receipt on all
such submittals.
2) Burden of proof for proposed use
The applicant has the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this ordinance, and that any
required State and Federal approvals have been obtained. The Application Packet
contains a Completeness Checklist that lists submittals and Ordinance Sections
that require them. Submittals shall provide required information such as the
following:
a. Location of property on the Official Tax and Shoreland Zoning Maps
i.
Boundary survey at one inch (1") = thirty feet (30') to one inch
(1") = fifty feet (50'), with topo at two feet (2') or five foot (5')
interval as determined by the Planning Board; roads; driveways;
easements and utility corridors; delineation of wetlands, resource
protection areas, and flood plains; seventy five (75) foot, one
hundred (100) foot and two hundred fifty (250) foot setbacks
associated with protected waters; existing and proposed buildings;
septic systems, and septic system improvements
ii.
Acreage of site, wetlands, and disturbed areas
iii.
Lot coverage as a percent of its total area
iv.
Sewage permit or approved evaluation & plan
v.
Soil suitability report
vi.
Maine Historic Preservation Commission (MHPC) report on
archaeological/historical features
vii.
Maine Department of Inland Fisheries & Wildlife (MDIFW) report
on significant wildlife habitat
viii.
Maine Department of Environmental Protection (MDEP) report on
protected natural areas
ix.
Stormwater management plan
ADMINISTRATION
Procedure for Administering Permits
48
x.
Erosion control plan
xi.
Fire protection plan
xii.
Required approved Local/State/Federal permits
xiii.
Additional information for commercial, cluster and multifamily
applications
xiv.
A statement on the plan that the lowest floor elevation or openings
of all buildings and structures including basements shall be
elevated at least one (1) foot above the elevation of the one
hundred (100) year flood, the flood of record, or in the absence of
these, the flood as defined by soil types identified as recent flood-
plain soils.
xv.
In review of applications for cluster, multi-unit or commercial use,
the Town of Cushing Subdivision Regulations standards and
submittal requirements for these uses will also apply, and the
Planning Board may require a groundwater extraction impact
assessment.
xvi.
Such other items as the Planning Board may require.
3) Approval or Approval with conditions
After the submittal of a complete application to the Planning Board, the Planning
Board shall approve an application or approve it with conditions if it makes a
positive finding based on the information presented that the proposed use:
a. Will maintain safe and healthful conditions;
b. Will not result in water pollution, erosion, or sedimentation to surface
waters;
c. Will adequately provide for the disposal of all wastewater;
d. Will not have an adverse impact on spawning grounds, fish, aquatic life,
bird or other wildlife habitat;
e. Will conserve shore vegetative cover and visual aspect, as well as actual,
points of access to inland and coastal waters;
f. Will protect archaeological and historic resources;
g. Will not adversely affect existing commercial fishing or maritime
activities in a Commercial Fisheries/Maritime Activities district;
h. Will avoid problems associated with flood plain development and use; and
i. Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is issued where a completion inspection or review is required, the
permit is conditional on that activity being completed.
4) Denial
If a permit is denied, or application approved with conditions, the reasons for the
denial as well as the conditions shall be stated in writing. No approval shall be
granted for an application involving a structure if the structure would be located
in an unapproved subdivision or would violate any other local ordinance or
regulation or statute administered by the municipality.
ADMINISTRATION
Special Exceptions
49
No permit will be issued until all application conditions have been met.
5) Reconsideration
The Planning Board may vote to reconsider any decision within forty-five (45)
days of its decision vote. Seven (7) days' notice of the reconsideration vote shall
be provided to the applicant, Code Enforcement Officer, and other parties of
interest, including abutters and those who testified at the original hearing(s). A
motion to reconsider may only be made by a member who voted in the majority
on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the
Planning Board members who voted on the original decision. The Planning Board
may receive additional evidence and testimony.
G. Special Exceptions
In addition to the criteria specified in Section 16.F above, excepting structure setback
requirements, the Planning Board may approve a permit for a single-family residential
structure in a Resource Protection District provided that the applicant demonstrates that
all of the following conditions are met:
1) Location within Resource Protection District
There is no location on the property, other than a location within the Resource
Protection District, where the structure can be built.
The lot on which the structure is proposed is undeveloped and was established
and recorded in the registry of deeds of the county in which the lot is located
before the adoption of the Resource Protection District on 12/15/1991.
2) Slopes and floodways
All proposed buildings, sewage disposal systems and other improvements are:
a. Located on natural ground slopes of less than twenty percent (20%); and
b. Located outside the floodway of the one hundred (100) year flood-plain
along rivers and artificially formed great ponds along rivers and outside
the velocity zone in areas subject to tides, based on detailed flood
insurance studies and as delineated on the Federal Emergency
Management Agency's Flood Boundary and Floodway Maps and Flood
Insurance Rate Maps; all buildings, including basements, are elevated at
least one foot above the one hundred (100) year flood-plain elevation; and
the development is otherwise in compliance with any applicable municipal
flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management
Agency Maps, it is deemed to be one-half (1/2) the width of the one
hundred (100) year flood-plain.
3) Total footprint
The total footprint, including cantilevered or similar overhanging extensions, of
all principal and accessory structures is limited to a maximum of one thousand
five hundred (1,500) square feet. This limitation shall not be altered by variance.
ADMINISTRATION
Expiration of Permit
50
4) Setback
All structures, except functionally water-dependent structures, are set back from
the normal high-water line of a water body, tributary stream or upland edge of a
wetland to the greatest practical extent, but not less than seventy-five (75) feet,
horizontal distance. In determining the greatest practical extent, the Planning
Board shall consider the depth of the lot, the slope of the land, the potential for
soil erosion, the type and amount of vegetation to be removed, the proposed
building site's elevation in regard to the flood-plain, and its proximity to
moderate-value and high-value wetlands.
H. Expiration of Permit
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made
within one year of the issuance of the permit, the applicant shall have one additional year
to complete the project, at which time the permit shall expire.
I. Installation of Public Utility Service
A public utility, water district, sanitary district or any utility company of any kind may
not install services to any new structure located in the Shoreland Zone unless written
authorization attesting to the validity and currency of all local permits required under this
or any previous Ordinance has been issued by the appropriate municipal officials, or
other written arrangements have been made between the municipal officials and the
utility.
Following installation of service, the company shall forward the written authorization to
the municipal officials, indicating that installation has been completed.
J. Appeals
1) Powers and Duties of the Board of Appeals.
The Board of Appeals shall have the following powers:
Administrative Appeals: To hear and decide administrative appeals, on an
appellate basis, where it is alleged by an aggrieved party that there is an error in
any order, requirement, written decision, or determination made by, or failure to
act by the Planning Board in the administration of this Ordinance, and to hear and
decide administrative appeals on a de novo basis where it is alleged by an
aggrieved party that there is an error in any order, requirement, written decision or
determination made by, or failure to act by, the Code Enforcement Officer in his
or her review of and action on a permit application under this Ordinance, or in the
enforcement of this Ordinance. Any order, requirement, decision or determination
made, or failure to act, in the enforcement of this ordinance is not appealable to
the Board of Appeals.
2) Variance Appeals.
Variance Appeals: To authorize variances upon appeal, within the limitations set
forth in this Ordinance.
ADMINISTRATION
Appeals
51
3) Variances may be granted only under the following conditions:
a. Variances may be granted only from dimensional requirements including,
but not limited to, lot width, structure height, percent of lot coverage, and
setback requirements.
b. Variances shall not be granted for establishment of any uses otherwise
prohibited by this Ordinance.
c. The Board of Appeals shall not grant a variance unless it finds that:
i.
The proposed structure or use would meet the provisions of
Section 15 except for the specific provision which has created the
non-conformity and from which relief is sought; and
ii.
The strict application of the terms of this Ordinance would result in
undue hardship. The term "undue hardship" shall mean:
iii.
That the land in question cannot yield a reasonable return unless a
variance is granted;
iv.
That the need for a variance is due to the unique circumstances of
the property and not to the general conditions in the neighborhood;
v.
That the granting of a variance will not alter the essential character
of the locality; and
vi.
That the hardship is not the result of action taken by the applicant
or a prior owner.
d. Notwithstanding Section J.2.c above, the Board of Appeals, or the Code
Enforcement Officer in accordance with 30-A M.R.S.A. Section 4353-A,
may grant a variance to an owner of a residential dwelling for the purpose
of making that dwelling accessible to a person with a disability who
resides in or regularly uses the dwelling. The Board of Appeals shall
restrict any variance granted under this subsection solely to the installation
of equipment or the construction of structures necessary for access to or
egress from the dwelling by the person with the disability. The board may
impose conditions on the variance, including limiting the variance to the
duration of the disability or to the time that the person with the disability
lives in the dwelling. The term "structures necessary for access to or
egress from the dwelling" shall include railing, wall or roof systems
necessary for the safety or effectiveness of the structure. Any permit
issued pursuant to this subsection is subject to Sections 16.J.2.f and
16.J.4.b.iv below.
e. The Board of Appeals shall limit any variances granted as strictly as
possible in order to ensure conformance with the purposes and provisions
of this Ordinance to the greatest extent possible, and in doing so may
impose such conditions to a variance as it deems necessary. The party
receiving the variance shall comply with any conditions imposed.
f. A copy of each variance request, including the application and all
supporting information supplied by the applicant, shall be forwarded by
the Board of Appeals to the Commissioner of the Department of
Environmental Protection at least twenty (20) days prior to action by the
Board of Appeals. Any comments received from the Commissioner prior
ADMINISTRATION
Appeals
52
to the action by the Board of Appeals shall be made part of the record and
shall be taken into consideration by the Board of Appeals.
4) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer,
the Board of Appeals shall hold a de novo hearing. At this time the Board of
Appeals may receive and consider new evidence and testimony, be it oral or
written. When acting in a de novo capacity, the Board of Appeals shall hear and
decide the matter afresh, undertaking its own independent analysis of evidence
and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold
an appellate hearing, and may reverse the decision of the Planning Board only
upon finding that the decision was contrary to specific provisions of the
Ordinance or contrary to the facts presented to the Planning Board. The Board of
Appeals may only review the record of the proceedings before the Planning
Board. The Board of Appeals shall not receive or consider any evidence which
was not presented to the Planning Board, but the Board of Appeals may receive
and consider written or oral arguments. If the Board of Appeals determines that
the records of the Planning Board proceedings are inadequate, the Board of
Appeals may remand the matter to the Planning Board for additional fact finding.
5) Appeal Procedure
a. Making an Appeal
i.
An administrative or variance appeal may be taken to the Board of
Appeals by an aggrieved party from any decision of the Code
Enforcement Officer or the Planning Board. Such an appeal shall
be taken within thirty (30) days of the date of the official, written
decision appealed from, except that if the Planning Board has
voted to reconsider its decision, such an appeal shall be taken
within thirty (30) days of the date of the subsequent official,
written decision appealed from; excepting further that the Board of
Appeals, upon a showing of good cause, may extend either time
requirement by an additional thirty (30) days.
ii.
Applications for appeals shall be made by filing a written notice of
appeal with the Board of Appeals which includes:
a. A concise written statement indicating what relief is
requested and why the appeal or variance should be granted.
b.A sketch drawn to scale showing lot lines, location of
existing buildings and structures and other physical features
of the lot pertinent to the relief sought.
iii.
Upon receiving an application for an administrative appeal or a
variance, the Chair of the Board of Appeals shall cause the Code
Enforcement Officer or Planning Board, as appropriate, to transmit
to the Board of Appeals all of the papers constituting the record of
the decision appealed from.
ADMINISTRATION
Appeals
53
iv.
The Board of Appeals shall hold a public hearing on an
administrative appeal or a request for a variance within thirty-five
(35) days of its receipt of a complete written application, unless
this time period is extended by the parties, and shall issue a written
decision on all appeals.
b. Decision by Board of Appeals
i.
A majority of the full voting membership of the Board of Appeals
shall constitute a quorum for the purpose of deciding an appeal.
ii.
The concurring vote of a majority of the members of the Board of
Appeals present and voting shall be necessary to reverse an order,
requirement, decision or determination of the Code Enforcement
Officer or Planning Board, or to decide in favor of the applicant on
any matter in which it is required to decide under this Ordinance,
or to affect any variation in the application of this Ordinance from
its stated terms.
The Board of Appeals may reverse the decision, or failure to act, of
the Code Enforcement Officer or Planning Board only upon a
finding that the decision, or failure to act, was clearly contrary to
specific provisions of this Ordinance.
iii.
The person filing the appeal shall have the burden of proof.
iv.
The Board of Appeals shall decide all administrative appeals and
variance appeals within thirty-five (35) days after the close of the
hearing, and shall issue a written decision on all appeals.
v.
The Board of Appeals shall state the reasons and basis for its
decision, including a statement of the facts found and conclusions
reached by the Board of Appeals. The Board of Appeals shall
cause written notice of its decision to be mailed or hand-delivered
to the applicant and to the Department of Environmental Protection
within seven (7) days of the Board of Appeals' decision. Copies of
written decisions of the Board of Appeals shall be given to the
Planning Board, Code Enforcement Officer and the municipal
officers.
6) Appeal to Superior Court.
In accordance with 30-A M.R.S.A. Section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may
take an appeal to Superior Court in accordance with State laws within forty-five
(45) days from the date of any decision of the Board of Appeals.
7) Reconsideration.
In accordance with 30-A M.R.S.A. Section 2691(3)(F), the Board of Appeals may
reconsider any decision within forty-five (45) days of its prior decision. A request
to the Board of Appeals to reconsider a decision must be filed within ten (10)
days of the decision that is being reconsidered. A vote to reconsider and the
action taken on that reconsideration must occur and be completed within forty-
five (45) days of the date of the vote on the original decision. Reconsideration of
a decision shall require a positive vote of the majority of the Board of Appeals
ADMINISTRATION
Enforcement
54
members originally voting on the decision, and proper notification to the
landowner, petitioner, Planning Board, Code Enforcement Officer, and other
parties of interest, including abutters and those who testified at the original
hearing(s). The Board of Appeals may conduct additional hearings and receive
additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen
(15) days after the decision on reconsideration.
K. Enforcement
1) Nuisances.
Any violation of this Ordinance shall be deemed to be a nuisance.
2) Code Enforcement Officer
a. It shall be the duty of the Code Enforcement Officer to enforce the
provisions of this Ordinance. If the Code Enforcement Officer shall find
that any provision of this Ordinance is being violated, he or she shall
notify in writing the person responsible for such violation, indicating the
nature of the violation and ordering the action necessary to correct it,
including discontinuance of illegal use of land, buildings or structures, or
work being done, removal of illegal buildings or structures, and abatement
of nuisance conditions. A copy of such notices shall be submitted to the
municipal officers and be maintained as a permanent record.
b. The Code Enforcement Officer shall conduct on-site inspections to ensure
compliance with all applicable laws and conditions attached to permit
approvals. The Code Enforcement Officer shall also investigate all
complaints of alleged violations of this Ordinance.
c. The Code Enforcement Officer shall keep a complete record of all
essential transactions of the office, including applications submitted,
permits granted or denied, variances granted or denied, revocation actions,
revocation of permits, appeals, court actions, violations investigated,
violations found, and fees collected.
3) Legal Actions.
When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the
Code Enforcement Officer, are hereby directed to institute any and all actions and
proceedings, either legal or equitable, including seeking injunctions of violations
and the imposition of fines, that may be appropriate or necessary to enforce the
provisions of this Ordinance in the name of the municipality. The municipal
officers, or their authorized agent, are hereby authorized to enter into
administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not
allow an illegal structure or use to continue unless there is clear and convincing
evidence that the illegal structure or use was constructed or conducted as a direct
result of erroneous advice given by an authorized municipal official and there is
no evidence that the owner acted in bad faith, or unless the removal of the
ADMINISTRATION
Enforcement
55
structure or use will result in a threat or hazard to public health and safety or will
result in substantial environmental damage.
4) Fines.
Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who orders or conducts an activity in violation of any provision or
requirement of this Ordinance shall be penalized in accordance with 30-A,
M.R.S.A. Section 4452.
NOTE: Current penalties include fines of not less than one hundred dollars ($100)
or more than two hundred fifty dollars ($250) per violation for each day that the
violation continues. However, in a resource protection district the maximum
penalty is increased to five thousand dollars ($5000) (38 M.R.S.A. Section 4452).
DEFINITIONS
56
17. DEFINITIONS
Accessory structure or use: A use or structure which is incidental and subordinate to the
principal use or structure (e.g. garages, woodsheds, and fish houses). Accessory uses, when
aggregated shall not subordinate the principal use of the lot. A deck or similar extension of the
principal structure or a garage attached to the principal structure by a roof or a common wall is
considered part of the principal structure.
Accessory structures, except those that require direct access to the water, must also meet all
setback requirements. A guest house without kitchen facilities for preparing, cooking and storing
food is an accessory structure.
Accessory Dwelling Unit (ADU): Accessory dwelling unit means a self-contained dwelling unit
located within, attached to or detached from a single-family dwelling unit located on the same
parcel of land.
ADU: see Accessory Dwelling Unit
Aggrieved party: An owner of land whose property is directly or indirectly affected by the
granting or denial of a permit or variance under this Ordinance; a person whose land abuts land
for which a permit or variance has been granted; or any other person or group of persons who
have suffered particularized injury as a result of the granting or denial of such permit or variance.
Agriculture: The production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops; grains and seed crops; trees, shrubs and
Christmas trees; dairy animals and dairy products; poultry and poultry products; livestock; fruits
and vegetables; and ornamental and green house products. Agriculture does not include forest
management and timber harvesting activities except the cultivation and harvesting of Christmas
trees.
Aquaculture: The growing or propagation of harvestable freshwater, estuarine, or marine plant
or animal species.
Basal area: The area of cross-section of a tree stem four and one half (4.5) feet above ground
level and inclusive of bark.
Basement: any portion of a structure with a floor-to-ceiling height of six (6) feet or more and
having more than fifty percent (50%) of its volume below the existing ground level.
Bed and breakfast: A single-family, proprietor-occupied dwelling in which lodging or lodging
and meals are offered to guests for compensation, consisting of no more than six (6) bedrooms
for lodging purposes.
DEFINITIONS
57
Boat launching facility: A facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for vehicles
and trailers.
Bureau of Forestry: State of Maine Department of Agriculture, Conservation, and Forestry,
Bureau of Forestry.
Campground: Commercial use of any area or tract of land to accommodate two (2) or more
parties in temporary living quarters, including, but not limited to tents, recreational vehicles or
other shelters.
Canopy: The more or less continuous cover formed by tree crowns in a wooded area.
Coastal wetland: All tidal and sub-tidal lands; all lands with vegetation present that is tolerant
of salt water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh,
bog, beach, flat or other contiguous low land that is subject to tidal action during the highest tide
level for the year in which the activity is proposed as identified in tide tables published by the
National Oceanic and Aeronautic Administration (NOAA). Coastal wetlands may include
portions of coastal sand dunes.
Note: All areas below the highest annual tide level are coastal wetlands. These areas may
consist of rocky ledges, sand and cobble beaches, mud flats, etc., in addition to salt marshes and
salt meadows.
Commercial use: The use of lands, buildings, or structures, other than a "home occupation" or
"fishing home business" defined below, the intent and result of which activity is the production
of income from the buying and selling of goods and/or services, exclusive of rental of residential
buildings and/or dwelling units.
Day: A calendar day.
Development: A change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements: Numerical standards relating to spatial relationships including but
not limited to setback, lot area, shore frontage and height.
Disability: Any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; also including the physical or mental condition of a person which constitutes a substantial
handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or
psychologist, as well as any other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
DEFINITIONS
58
District: (as used in this Ordinance, a zoning district): A sub-area of the Shoreland Zone listed in
Section 9, differing from other such areas in characteristics and boundaries defined in Sections
10 and 13.
Driveway: A vehicular access-way less than five hundred (500) feet in length serving two lots or
less.
Emergency operations: Operations conducted for the public health, safety or general welfare,
such as protection of resources from immediate destruction or loss, law enforcement, and
operations to rescue human beings, property and livestock from the threat of destruction or
injury.
Essential services: Gas, electrical or communication facilities; steam, fuel, electric power or
water transmission or distribution lines, towers and related equipment; telephone cables or lines,
poles and related equipment; gas, oil, water, slurry or other tanks. Such systems may include
towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes,
traffic signals, hydrants and similar accessories, but shall not include service drops or buildings
which are necessary for the furnishing of such services.
Expansion of a structure: An increase in the footprint or height of a structure, including all
extensions such as, but not limited to attached: decks, garages, porches and greenhouses.
Expansion of use: An increase of one or more months to a use's operating season, or the use of
more footprint or ground area devoted to a particular use.
Family: One or more persons occupying a premises and living as a single housekeeping unit.
Fishing home business: Fishing, lobstering, clamming or aquaculture business, including the
storage and maintenance of boats and gear used in a business conducted from a home on the
same lot, and which employs no more than three (3) persons other than family members residing
in the home.
Floodway: The channel of a river or other watercourse and adjacent land areas that must be
reserved in order to discharge the one hundred (100) year flood without cumulatively increasing
the water surface elevation by more than one (1) foot in height.
Floor area: The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls.
Footprint: The entire area of ground covered by the structure(s) on a lot, including but not
limited to cantilevered or similar overhanging extensions, as well as unenclosed structures, such
as patios and decks.
Forested wetlands: A freshwater wetland dominated by woody vegetation that is six (6) meters
tall (approximately twenty (20) feet) or taller.
DEFINITIONS
59
Foundation: The supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, sills, frost walls, or other base consisting of
concrete, block, brick or similar material.
Freshwater wetland: Freshwater swamps, marshes, bogs and similar areas other than forested
wetlands which are:
(1)
Of ten (10) or more contiguous acres; or of less than ten (10) contiguous acres and
adjacent to a surface water body, excluding any river, stream or brook, such that in a natural
state, the combined surface area is in excess of ten (10) acres; and
(2)
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of wetland
vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not
conform to the criteria of this definition.
Functionally water dependent uses: Those uses that require, for their primary purpose, location
on submerged lands or that require direct access to, or location in, coastal or inland waters and
which cannot be located away from these waters. The uses include, but are not limited to
commercial and recreational fishing and boating facilities, excluding recreational boat storage
buildings, fin fish and shell fish selling, processing and storage and retail and wholesale fish
marketing facilities, water front dock and port facilities, shipyards and boat building facilities,
marinas, navigation aids, basins and channels, shoreland structures necessary for erosion control
purposes, industrial uses dependent upon water-borne transportation or requiring large volumes
of cooling or processing water and which cannot reasonably be located or operated at an inland
site, and uses which primarily provide general public access to marine or tidal waters.
Grade: The slope of a surface, such as a lot or road, with a vertical rise or fall expressed as a
percentage of the horizontal distance; e.g., a three percent (3%) upgrade means a rise of three (3)
feet per one hundred (100) feet horizontal distance. [Source: American Congress on Surveying
and Mapping, Definitions of Surveying and Associated Terms.]
Great pond: Any inland body of water which in a natural state has a surface area in excess of
ten acres, and any inland body of water artificially formed or increased which has a surface area
in excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially
formed or increased inland body of water is completely surrounded by land held by a single
owner.
Great pond classified GPA: Any great pond classified GPA, pursuant to Title 38 Article 4-A
Section 465-A. This classification includes some, but not all impoundments of rivers that are
defined as great ponds.
Ground cover: Small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
DEFINITIONS
60
Hazard tree: A tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site exhibits a
high probability of failure and loss of a major structural component of the tree in a manner that
will strike a target. A normal range of environmental conditions does not include meteorological
anomalies, such as, but not limited to: hurricanes; hurricane-force winds; tornados; microbursts;
or significant ice storm events. Hazard trees also include those trees that pose a serious and
imminent risk to bank stability. A target is the area where personal injury or property damage
could occur if the tree or a portion of the tree fails. Targets include roads, driveways, parking
areas, structures, campsites, and any other developed area where people frequently gather and
linger.
Height of a structure: The vertical distance between the mean original grade at the downhill
side of the structure and the highest point of the structure, excluding chimneys, steeples,
antennas, and similar appurtenances which have no footprint.
Home occupation: An occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) which employs no more
than two (2) persons other than family members residing in the home.
Increase in non-conformity of a structure: Any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot
coverage, or increase in height of a structure. Property changes or structure expansions which
either meet the dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area
than does any portion of the existing non-conforming structure. Hence, a structure may be
expanded laterally provided that the expansion extends no closer to the water body, tributary
stream, or wetland than the closest portion of the existing structure from that water body,
tributary stream, or wetland. Included in this allowance are expansions which in-fill irregularly
shaped structures.
Individual private campsite: An area of land which is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10) individuals
and which involves site improvements which may include but are not limited to a gravel pad,
parking area, fire place, or tent platform.
Industrial: The assembling, fabrication, finishing, manufacturing, warehousing, packaging or
processing of goods or the extraction of minerals.
Institutional: A non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for
public purposes.
DEFINITIONS
61
Licensed forester: A forester licensed under 32 M.R.S.A. Chapter 76.
Lot area: The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads
serving more than two (2) lots.
Marina: A business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats.
Marine commercial: The use of lands, buildings, or structures, other than a home occupation or
fishing home business, the intent and result of which activity is the production of income from
the buying and selling of marine goods and/or services, including marinas and accessory services
such as boat and related sales, boat repair and construction, boat engine repair and service,
indoor and outdoor storage of boats and marine equipment, bait and tackle shops and marine fuel
service facilities.
Market value: The estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration: Hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction: Any operation within any twelve (12) month period which removes more
than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other
like material from its natural location and to transport the product removed, away from the
extraction site.
Minimum lot width: The closest distance between the side lot lines of a lot. When only two lot
lines extend into the Shoreland Zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential building: A residential structure containing three (3) or more dwelling
units owned individually.
Multi-unit rental apartment: A residential structure under single ownership containing three
(3) or more dwelling units for rent.
Native: Indigenous to the local forests.
Non-conforming condition: Non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment took
effect.
DEFINITIONS
62
Non-conforming lot: A single lot of record which, at the effective date of adoption or
amendment of this Ordinance, did not meet the area, frontage, or width requirements of the
district in which it is located.
Non-conforming structure: A structure which does not meet any one or more of the following
dimensional requirements; setback, height, or lot coverage or footprint, but which is allowed
solely because it was in lawful existence at the time this ordinance or subsequent amendments
took effect.
Non-conforming use: Use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it
was in lawful existence at the time this ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation: Species of vegetation listed by the Maine
Department of Agriculture, Conservation and Forestry as being invasive in Maine ecosystems
and not native to Maine ecosystems.
Normal high-water line (non-tidal waters): That line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation,
and which distinguishes between predominantly aquatic and predominately terrestrial land.
Areas contiguous with rivers and great ponds that support non-forested wetland vegetation and
hydric soils and that are at the same or lower elevation as the water level of the river or great
pond during the period of normal high-water are considered part of the river or great pond.
Note: Adjacent to tidal waters, setbacks are measured from the upland edge of the Coastal
Wetland.
Outlet stream: Any perennial or intermittent stream, as shown on the most recent highest
resolution version of the national hydrography dataset available from the United States
Geological Survey on the website of the United States Geological Survey or the national map,
that flows from a freshwater wetland.
Person: An individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or other
legal entity.
Piers, docks, wharfs, breakwaters, bridges and other structures and uses extending over or
beyond the normal high-water line or within a wetland, but limited to that portion that abuts the
shoreland to the mean high-water line:
a. Permanent: Structures which remain in or over the water for seven (7) months or
more in any period of twelve (12) consecutive months.
b. Temporary: Structures which remain in or over the water for less than seven (7)
months in any period of twelve (12) consecutive months.
DEFINITIONS
63
Principal structure: A building other than one which is used for purposes wholly incidental or
accessory to the use of another building or use on the same lot.
Principal structure maintenance: Any maintenance that does not change the size of the
structure, materially change its dimensions or conflict with any requirement of this ordinance.
Principal use: A use other than one which is wholly incidental or accessory to another use on
the same lit.
Public facility: Any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental body or
public entity.
Recent flood plain soils: The following soil series as described and identified by the National
Cooperative Soil Survey:
Alluvial
Cornish
Charles
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility: A place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
Recreational vehicle: A vehicle or an attachment to a vehicle designed to be towed, and
designed for temporary sleeping or living quarters for one or more persons, and which may
include a pickup camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be
considered as a vehicle and not as a structure, the unit must remain with its tires on the ground,
and must be registered with the State Division of Motor Vehicles.
Replacement system: A system intended to replace: 1) An existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the
structure, or 2) Any existing overboard wastewater discharge.
Residential dwelling unit: A room or group of rooms designed and equipped exclusively for use
as permanent, seasonal, or temporary living quarters for only one family at a time, and
containing cooking, sleeping and toilet facilities. The term shall include mobile homes and
rental units that contain cooking, sleeping and toilet facilities regardless of the time period
rented. Recreational vehicles are not residential dwelling units.
Riprap: Rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion
control and soil stabilization, typically used on ground slopes of two (2) units horizontal to one
(1) unit vertical or less.
River: A free flowing body of water including its associated flood plain wetlands from that point
at which it provides drainage for a watershed of twenty-five (25) square miles to its mouth.
DEFINITIONS
64
NOTE: The portion of a river that is subject to tidal action is a coastal wetland.
Road: A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Salt marsh: Areas of coastal wetland (most often along coastal bays) that support salt tolerant
species, and where at average high tide during the growing season, the soil is irregularly
inundated by tidal waters. The predominant species is salt marsh cord grass (Spartina
alterniflora). More open areas often support widgeon grass, eel grass, and sago pond weed.
Salt meadow: Areas of a coastal wetland that support salt tolerant plant species bordering the
landward side of marshes or open coastal water, where the soil is saturated during the growing
season but which is rarely inundated by tidal water. Indigenous plant species include salt
meadow cordgrass (Spartina patens) and black rush; common three square occurs in fresher
areas.
Sapling: A tree species that is less than two (2) inches in diameter at four and one half (4.5) feet
above ground level.
Seedling: A young tree species that is less than four and one half (4.5) feet in height above
ground level.
Service drop: Any utility line extension which does not cross or run beneath any portion of a
water body provided that:
A. In the case of electric service:
1). the placement of wires and/or the installation of utility poles is located entirely upon
the premises of the customer requesting service or upon a roadway right-of-way; and
2). the total length of the extension is less than one thousand (1,000) feet.
B. In the case of telephone service:
1) the extension, regardless of length, will be made by the installation of telephone wires
to existing utility poles, or
2) the extension requiring the installation of new utility poles or placement underground
is less than one thousand (1,000) feet in length.
Setback: The nearest horizontal distance from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland to the nearest part of a structure, road, parking
space or other regulated object, area or property boundaries.
Shore frontage: The dimension of a lot bordering on a water body or wetland measured in a
straight line between the intersections of the lot lines with the shoreline.
Shoreland Zone: The land area located within two hundred fifty (250) feet, horizontal distance,
of the normal high-water line of any great pond or river; within two hundred fifty (250) feet,
horizontal distance of the upland edge of a coastal wetland, including all areas affected by tidal
DEFINITIONS
65
action; within two hundred fifty (250) feet of the upland edge of a freshwater wetland; or within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream or brook.
Shoreline: The normal high-water line, or upland edge of a freshwater or coastal wetland.
Slope: The inclined surface of a hill, mountain, plateau, plain, or any part of the surface of the
earth. [Source: American Congress on Surveying and Mapping, Definitions of Surveying and
Associated Terms.]
Storm-damaged tree: A tree that has been uprooted, blown down, is lying on the ground, or that
remains standing and is damaged beyond the point of recovery as the result of a storm event.
Stream: A free-flowing body of water from the outlet of a great pond or the confluence of two
(2) perennial streams as depicted on the most recent, highest resolution version of the national
hydrography dataset available from the United States Geological Survey on the website of the
United States Geological Survey or the national map to the point where the stream becomes a
river or where the stream meets the shoreland zone of another water body or wetland. When a
stream meets the shoreland zone of a water body or wetland and a channel forms downstream of
the water body or wetland as an outlet, that channel is also a stream.
Structure: Anything temporarily or permanently located, built, constructed or erected for the
support, shelter or enclosure of persons, animals, goods or property of any kind or anything
constructed or erected on or in the ground. The term includes structures temporarily or
permanently located, such as decks, patios, and satellite dishes. Structure does not include
fences; poles and wiring and other aerial equipment normally associated with service drops,
including guy wires and guy anchors; subsurface waste water disposal systems as defined in Title
30-A, Section 4201, subsection 5; geothermal heat exchange wells as defined in Title 32, Section
4700-E, subsection 3-C; or wells or water wells as defined in Title 32, Section 4700-E,
subsection 8.
Substantial start: Completion of thirty (30) percent of a permitted structure or use measured as
a percentage of estimated total cost.
Subsurface sewage disposal system: Any system designed to dispose of waste or waste water
on or beneath the surface of the earth; including, but not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture,
mechanism, or apparatus used for those purposes; does not include any discharge system
licensed under 38 M.R.S.A. Section 414, any surface waste water disposal system, or any
municipal or quasi-municipal sewer or waste water treatment system.
Sustained slope: A change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tidal waters: All waters affected by tidal action during the highest annual tide.
DEFINITIONS
66
Timber harvesting: The cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of trees in the Shoreland Zone on a lot that
has less than two (2) acres within the Shoreland Zone shall not be considered timber harvesting.
Such cutting and removal of trees shall be regulated pursuant to Section 15.P, Clearing and
Removal of Vegetation for Activities other than Timber Harvesting.
Tree: A woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at
four and one half (4.5) feet above the ground, with a more or less definite crown, and reaching a
height of at least ten (10) feet at maturity.
Tributary stream: A channel between defined banks created by the action of surface water,
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil,
containing waterborne deposits on exposed soil, parent material or bedrock; and connected
hydrologically to other water bodies. "Tributary stream" does not include rills or gullies forming
because of accelerated erosion in disturbed soils where the natural vegetation cover has been
removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and
only applies to that portion of the tributary stream located within the Shoreland Zone of the
receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the Shoreland Zone.
Unstable soils: A portion of land surface or area which is prone to slipping, sloughing or
landslides.
Upland edge of a wetland: The boundary between upland and wetland. For purposes of a
coastal wetland, this boundary is the line formed by the landward limits of the salt tolerant
vegetation and/or the tide level for the year in which the activity is proposed as identified by tide
tables published by NOAA, including all areas affected by tidal action. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) foot) tall or taller.
Vegetation: All live trees, shrubs, and other plants including without limitation, trees both over
and under four (4) inches in diameter, measured at four and one half (4.5) feet above ground
level.
Velocity zone: An area of special flood hazard extending from offshore to the inland limit of the
primary frontal dune along an open coast and any other area subject to high velocity wave action
from storms or seismic sources.
Water body: Any great pond, river, stream or tidal area.
DEFINITIONS
67
Water crossing: Any project extending from one bank to the opposite bank of a river or stream
whether under, through, or over the watercourse. Such projects include but may not be limited to
roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work
on these crossings.
Wetland: A Freshwater Wetland or Coastal Wetland. See definitions above.
Woody vegetation: Live trees and woody, non-herbaceous shrubs.
Written Decision: A decision by the Code Enforcement Officer written by the Code
Enforcement Officer, or a decision by the Planning Board written by the Planning Board
chairperson, based on recorded minutes. A written Planning Board decision shall be issued
within fourteen (14) days of the decision vote.
APPENDIX A: SOILS OF CONCERN
68
APPENDIX A: SOILS OF CONCERN
The following soils are not recommended by the Knox & Lincoln County Soils Survey for:
1. Development due to flooding:
Charles, Lovewell, Medomak.
2. Development due to organic composition:
Borosaprists
3. Development due to high seasonal water table and poor drainage:
Brayton, Buxton, Charles, Eldridge, Marlow, Naumburg, Scantic, Searsport, Sheepscot,
Swanville.
4. Development due to erosive soils:
Biddeford, Boothbay, Buxton, Charles, Eldridge, Marlow, Naumburg, Scantic, Searsport,
Sheepscot, Swanville.
5. Stable slopes: Adams and Masardis 15-25% slopes, Allagash 8-15% slopes.
6. Buildings with basements, due to unstable subsoils:
Hermon, Madawaska, Masardis.
Table of Contents
69
Table of Contents
1.
PURPOSES ............................................................................................................................. 1
2.
AUTHORITY ......................................................................................................................... 1
3.
APPLICABILITY ................................................................................................................... 1
4.
EFFECTIVE DATE OF ORDINANCE AND ORDINANCE AMENDMENTS .................. 1
5.
AVAILABILITY .................................................................................................................... 2
6.
SEVERABILITY .................................................................................................................... 2
7.
CONFLICTS WITH OTHER ORDINANCES ...................................................................... 2
8.
AMENDMENTS .................................................................................................................... 2
9.
DISTRICTS AND ZONING MAP ......................................................................................... 2
A.
Official Shoreland Zoning Map. ......................................................................................... 2
-
Resource Protection; ....................................................................................................... 2
-
Limited Residential; ........................................................................................................ 2
-
Limited Commercial; ...................................................................................................... 2
-
Commercial Fisheries/Maritime Activities; .................................................................... 2
-
Fishing Home Business; ................................................................................................. 2
-
Stream Protection. ........................................................................................................... 2
B.
Scale of Map ....................................................................................................................... 3
C.
Certification of Official Shoreland Zoning Map ................................................................ 3
D.
Changes to the Official Shoreland Zoning Map ................................................................. 3
10. INTERPRETATION OF DISTRICT BOUNDARIES ........................................................... 3
A.
Boundaries .......................................................................................................................... 3
B.
Boundaries By Water Features ........................................................................................... 3
1)
No effect.......................................................................................................................... 3
2)
Upland edges. .................................................................................................................. 4
3)
Features. .......................................................................................................................... 4
C.
Boundary of any Flood Zone .............................................................................................. 4
D.
Approximate Boundaries .................................................................................................... 4
1)
Topography ..................................................................................................................... 4
2)
Steepness of slopes ......................................................................................................... 4
3)
Slope measurements........................................................................................................ 4
E.
Approximate Locations ....................................................................................................... 5
F.
Costs .................................................................................................................................... 5
G.
Burden of Proof................................................................................................................... 5
Table of Contents
70
H.
Acceptance .......................................................................................................................... 5
11. LAND USE REQUIREMENTS ............................................................................................. 5
12. NON-CONFORMANCE ........................................................................................................ 5
A.
Purpose ................................................................................................................................ 5
B.
General ................................................................................................................................ 6
1)
Transfer of Ownership. ................................................................................................... 6
2)
Repair and Maintenance. ................................................................................................ 6
C.
Non-conforming Structures ................................................................................................ 6
1)
Expansions. ..................................................................................................................... 6
2)
Foundations ..................................................................................................................... 8
3)
Relocation ....................................................................................................................... 8
4)
Reconstruction or Replacement ...................................................................................... 9
5)
Change of Use of a Non-conforming Structure ............................................................ 10
D.
Non-conforming Uses ....................................................................................................... 10
1)
Expansions. ................................................................................................................... 10
2)
Resumption Prohibited.................................................................................................. 10
3)
Change of Use. .............................................................................................................. 10
E.
Non-conforming Lots........................................................................................................ 11
1)
Lots not contiguous with any other lot in the same ownership..................................... 11
2)
Contiguous lots with principal structures, in the same ownership................................ 11
3)
A lot with more than one principal structure or use...................................................... 11
4)
Contiguous lots, vacant or partially built, in the same ownership. ............................... 11
13. DESCRIPTION OF DISTRICTS ......................................................................................... 11
A.
Resource Protection District ............................................................................................. 12
1)
Wetlands, Marshes and Wet Meadows ......................................................................... 12
2)
Flood Plains .................................................................................................................. 12
3)
Two plus (2+) Acre Lots with greater than twenty percent (>20%) Sustained Slopes 12
4)
Two plus (2+) Acre Lots supporting wetland vegetation and hydric soils ................... 12
5)
Land areas along rivers subject to severe bank erosion ................................................ 12
B.
Limited Residential District .............................................................................................. 12
C.
Limited Commercial District ............................................................................................ 13
D.
Commercial Fisheries/Maritime Activities District .......................................................... 13
E.
Fishing Home Business District........................................................................................ 13
F.
Stream Protection District ................................................................................................. 13
Table of Contents
71
14. TABLE OF LAND USES ..................................................................................................... 13
A.
Table of Land Uses Abbreviations ................................................................................... 14
B.
Table 14 - Table of Land Uses ......................................................................................... 15
C.
Land Use Table notes........................................................................................................ 18
D.
General notes .................................................................................................................... 18
E.
Review of applications for cluster, multi-unit or commercial use .................................... 18
15. LAND USE STANDARDS .................................................................................................. 19
A.
Minimum Lot Standards* ................................................................................................. 19
B.
Principal Structures, Accessory Dwelling Units and Accessory Structures ..................... 20
1)
All new principal and accessory structures set back ..................................................... 20
2)
Principal or accessory structures height ........................................................................ 21
3)
Minimum abutter clearance .......................................................................................... 21
4)
The lowest floor elevation or openings ......................................................................... 21
5)
Total Areas .................................................................................................................... 22
6)
Calculating Lot Coverage ............................................................................................. 22
7)
Retaining Walls ............................................................................................................. 22
8)
Stairways or similar structures may be allowed ........................................................... 23
C.
Piers, Docks, Wharves, Bridges and Other structures ...................................................... 23
1)
No more than one pier, dock, wharf or similar structure .............................................. 23
2)
Access from shore ......................................................................................................... 23
3)
Location shall not interfere ........................................................................................... 23
4)
No adverse effects on fisheries ..................................................................................... 23
5)
No larger in dimension than necessary ......................................................................... 23
6)
No new structure shall be built on, over or abutting ..................................................... 24
7)
Piers and docks on non-tidal waters.............................................................................. 24
8)
No conversion to residential dwelling .......................................................................... 24
9)
Not to exceed twenty (20) feet in height ....................................................................... 24
D.
Campgrounds .................................................................................................................... 24
1)
Minimum size ............................................................................................................... 24
2)
Setbacks ........................................................................................................................ 24
E.
Individual Private Campsites ............................................................................................ 25
1)
One campsite per lot ..................................................................................................... 25
2)
Minimum dimensions of lot .......................................................................................... 25
3)
Placement on any lot ..................................................................................................... 25
Table of Contents
72
4)
One recreational vehicle shall be allowed on a campsite ............................................. 25
5)
Clearing of vegetation ................................................................................................... 25
6)
Sewage disposal plan .................................................................................................... 25
7)
Usage beyond one hundred twenty (120) days per year ............................................... 25
F.
Commercial Uses .............................................................................................................. 25
G.
Parking Areas .................................................................................................................... 26
1)
Adequately sized ........................................................................................................... 26
2)
Size considerations........................................................................................................ 26
H.
Roads and Driveways ....................................................................................................... 26
1)
Location ........................................................................................................................ 26
2)
Setback .......................................................................................................................... 27
3)
Expanding existing public roads ................................................................................... 27
4)
Resource Protection District restrictions ...................................................................... 27
5)
Bank slopes ................................................................................................................... 27
6)
Grades ........................................................................................................................... 27
7)
Surface drainage............................................................................................................ 27
8)
Ditches, culverts, dips and turnouts .............................................................................. 28
9)
Assure effective functioning ......................................................................................... 28
I.
Signs .................................................................................................................................. 28
1)
Signs relating to goods and services ............................................................................. 29
2)
Name signs .................................................................................................................... 29
3)
Residential signs ........................................................................................................... 29
4)
Trespassing and hunting ............................................................................................... 29
5)
Public safety .................................................................................................................. 29
6)
Height ............................................................................................................................ 29
7)
Illumination ................................................................................................................... 29
J.
Storm Water Management ................................................................................................ 29
1)
New construction and development .............................................................................. 29
2)
Maintenance .................................................................................................................. 29
K.
Septic Waste Disposal....................................................................................................... 30
1)
Clearing or removal of woody vegetation .................................................................... 30
2)
Holding tanks ................................................................................................................ 30
L.
Essential Services.............................................................................................................. 30
1)
Installation limitations .................................................................................................. 30
Table of Contents
73
2)
Installation in Resource or Stream Protection District ................................................. 30
3)
Replacement or reconstruction of public utility infrastructure ..................................... 30
M.
Mineral Exploration and Extraction.............................................................................. 30
1)
Reclamation plan .......................................................................................................... 31
2)
Setbacks and permissions ............................................................................................. 31
3)
Reestablishment upon completion ................................................................................ 31
4)
Planning Board may impose conditions ....................................................................... 31
N.
Agriculture ........................................................................................................................ 31
1)
Spreading of manure ..................................................................................................... 31
2)
Storing of manure ......................................................................................................... 32
3)
Tillage of soil ................................................................................................................ 32
4)
New tillage .................................................................................................................... 32
5)
New livestock grazing areas ......................................................................................... 32
O.
Timber Harvesting ............................................................................................................ 32
P.
Clearing or Removal of Vegetation for Activities other than Timber Harvesting ........... 33
1)
Resource Protection district limitations ........................................................................ 33
2)
Opening canopy or clearings ........................................................................................ 33
3)
Selective cutting ............................................................................................................ 35
4)
Legally existing non-conforming cleared openings may be maintained ...................... 35
5)
Reverted areas ............................................................................................................... 35
Q.
Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal ...................................... 36
1)
CEO consultation required ............................................................................................ 36
2)
Storm-damaged trees .................................................................................................... 36
R.
Exemptions to Clearing and Vegetation Removal Requirements ..................................... 37
1)
Maintenance of legally existing areas ........................................................................... 37
2)
Removal from allowed structures or trees .................................................................... 37
3)
Removal from public swimming areas ......................................................................... 37
4)
Removal associated with allowed agricultural uses...................................................... 37
5)
Removal associated with brownfields or VRAP .......................................................... 38
6)
Removal of non-native invasive vegetation species ..................................................... 38
7)
Removal associated with emergency response activities.............................................. 38
S.
Revegetation Requirements .............................................................................................. 38
1)
Must submit a revegetation plan ................................................................................... 38
2)
Revegetation must occur along the same segment of shoreline ................................... 39
Table of Contents
74
3)
Revegetation shall occur before the expiration of the permit. ...................................... 39
4)
Revegetation activities requirements ............................................................................ 39
5)
Woody revegetation requirements ................................................................................ 39
6)
Revegetation ground vegetation and cover ................................................................... 40
T.
Erosion and Sedimentation Control .................................................................................. 40
1)
Activities requiring a permit ......................................................................................... 40
2)
Development to fit topography ..................................................................................... 40
3)
Protection of Resources minimum width buffer ........................................................... 40
4)
Finish grades ................................................................................................................. 41
5)
Erosion and sedimentation control................................................................................ 41
6)
Exposed ground area ..................................................................................................... 41
7)
Natural and man-made drainage ways and outlets ....................................................... 41
U.
Soils................................................................................................................................... 41
V.
Water Quality .................................................................................................................... 42
W.
Archaeological Sites ..................................................................................................... 42
16. ADMINISTRATION ............................................................................................................ 43
A.
Administering Bodies and Agents .................................................................................... 43
B.
Permits Required ............................................................................................................... 43
1)
Culvert permit exceptions ............................................................................................. 43
2)
Archaeological excavation permit exceptions .............................................................. 43
3)
All required permits to be displayed ............................................................................. 43
C.
Official Shoreland Zone Map Changes............................................................................. 43
1)
Public hearing ............................................................................................................... 43
2)
Applicant to notify abutting property owners ............................................................... 44
3)
Planning Board to schedule hearing ............................................................................. 44
4)
Map change approval must precede permit application ............................................... 44
D.
Permit Application ............................................................................................................ 44
1)
Submission using municipal form(s) ............................................................................ 44
2)
Signed and show right of title ....................................................................................... 44
3)
Date and time recorded and receipts provided .............................................................. 45
4)
Code Enforcement Officer shall determine completeness ............................................ 45
5)
Code Enforcement Officer shall inspect site ................................................................ 45
6)
Valid septic system permit required ............................................................................. 45
7)
Building Permit issuance subject to sewage compliance .............................................. 45
Table of Contents
75
8)
Previous violations to be resolved ................................................................................ 45
9)
Abutter notification by applicant .................................................................................. 45
E.
Fees and escrow funds ...................................................................................................... 46
1)
Schedule of fees and escrow funds ............................................................................... 46
2)
Escrow deposits ............................................................................................................ 46
3)
Late or not received escrow funds ................................................................................ 46
F.
Procedure for Administering Permits ............................................................................... 46
1)
Permits issued by reviewing authority .......................................................................... 46
2)
Burden of proof for proposed use ................................................................................. 47
3)
Approval or Approval with conditions ......................................................................... 48
4)
Denial ............................................................................................................................ 48
5)
Reconsideration............................................................................................................. 49
G.
Special Exceptions ............................................................................................................ 49
1)
Location within Resource Protection District ............................................................... 49
2)
Slopes and floodways ................................................................................................... 49
3)
Total footprint ............................................................................................................... 49
4)
Setback .......................................................................................................................... 50
H.
Expiration of Permit .......................................................................................................... 50
I.
Installation of Public Utility Service ................................................................................. 50
J.
Appeals ............................................................................................................................. 50
1)
Powers and Duties of the Board of Appeals. ................................................................ 50
2)
Variance Appeals. ......................................................................................................... 50
3)
Variances may be granted only under the following conditions: ................................. 51
4)
Administrative Appeals ................................................................................................ 52
5)
Appeal Procedure .......................................................................................................... 52
6)
Appeal to Superior Court. ............................................................................................. 53
7)
Reconsideration............................................................................................................. 53
K.
Enforcement ...................................................................................................................... 54
1)
Nuisances. ..................................................................................................................... 54
2)
Code Enforcement Officer ............................................................................................ 54
3)
Legal Actions. ............................................................................................................... 54
4)
Fines. ............................................................................................................................. 55
17. DEFINITIONS ...................................................................................................................... 56
Accessory structure or use .................................................................................................... 56
Table of Contents
76
Accessory Dwelling Unit (ADU).......................................................................................... 56
ADU ...................................................................................................................................... 56
Aggrieved party .................................................................................................................... 56
Agriculture ............................................................................................................................ 56
Aquaculture ........................................................................................................................... 56
Basal area .............................................................................................................................. 56
Basement ............................................................................................................................... 56
Bed and breakfast .................................................................................................................. 56
Boat launching facility .......................................................................................................... 57
Bureau of Forestry ................................................................................................................ 57
Campground:......................................................................................................................... 57
Canopy .................................................................................................................................. 57
Coastal wetland ..................................................................................................................... 57
Commercial use .................................................................................................................... 57
Day: ....................................................................................................................................... 57
Development ......................................................................................................................... 57
Dimensional requirements .................................................................................................... 57
Disability ............................................................................................................................... 57
District: ................................................................................................................................. 58
Driveway ............................................................................................................................... 58
Emergency operations ........................................................................................................... 58
Essential services .................................................................................................................. 58
Expansion of a structure........................................................................................................ 58
Expansion of use ................................................................................................................... 58
Family ................................................................................................................................... 58
Fishing home business .......................................................................................................... 58
Floodway............................................................................................................................... 58
Floor area .............................................................................................................................. 58
Footprint ................................................................................................................................ 58
Forested wetlands.................................................................................................................. 58
Foundation ............................................................................................................................ 59
Freshwater wetland ............................................................................................................... 59
Functionally water dependent uses ....................................................................................... 59
Grade ..................................................................................................................................... 59
Table of Contents
77
Great pond ............................................................................................................................. 59
Great pond classified GPA.................................................................................................... 59
Ground cover ........................................................................................................................ 59
Hazard tree ............................................................................................................................ 60
Height of a structure.............................................................................................................. 60
Home occupation .................................................................................................................. 60
Individual private campsite ................................................................................................... 60
Industrial ............................................................................................................................... 60
Institutional ........................................................................................................................... 60
Licensed forester ................................................................................................................... 61
Lot area ................................................................................................................................. 61
Marina ................................................................................................................................... 61
Marine commercial ............................................................................................................... 61
Market value ......................................................................................................................... 61
Mineral exploration ............................................................................................................... 61
Mineral extraction ................................................................................................................. 61
Minimum lot width ............................................................................................................... 61
Multi-unit residential building .............................................................................................. 61
Multi-unit rental apartment ................................................................................................... 61
Native .................................................................................................................................... 61
Non-conforming condition.................................................................................................... 61
Non-conforming lot .............................................................................................................. 62
Non-conforming structure ..................................................................................................... 62
Non-conforming use ............................................................................................................. 62
Non-native invasive species of vegetation ............................................................................ 62
Normal high-water line (non-tidal waters) ........................................................................... 62
Outlet stream ......................................................................................................................... 62
Person .................................................................................................................................... 62
Piers, docks, wharfs, breakwaters, bridges and other structures ........................................... 62
a.
Permanent: Structures ................................................................................................... 62
b.
Temporary ..................................................................................................................... 62
Principal structure ................................................................................................................. 63
Principal structure maintenance ............................................................................................ 63
Principal use .......................................................................................................................... 63
Table of Contents
78
Public facility ........................................................................................................................ 63
Recent flood plain soils ......................................................................................................... 63
Recreational facility .............................................................................................................. 63
Recreational vehicle .............................................................................................................. 63
Replacement system.............................................................................................................. 63
Residential dwelling unit ...................................................................................................... 63
Riprap .................................................................................................................................... 63
River ...................................................................................................................................... 63
Road ...................................................................................................................................... 64
Salt marsh.............................................................................................................................. 64
Salt meadow .......................................................................................................................... 64
Sapling .................................................................................................................................. 64
Seedling................................................................................................................................. 64
Service drop .......................................................................................................................... 64
Setback .................................................................................................................................. 64
Shore frontage ....................................................................................................................... 64
Shoreland Zone ..................................................................................................................... 64
Shoreline ............................................................................................................................... 65
Slope ..................................................................................................................................... 65
Storm-damaged tree .............................................................................................................. 65
Stream ................................................................................................................................... 65
Structure ................................................................................................................................ 65
Substantial start ..................................................................................................................... 65
Subsurface sewage disposal system ...................................................................................... 65
Sustained slope...................................................................................................................... 65
Tidal waters ........................................................................................................................... 65
Timber harvesting ................................................................................................................. 66
Tree ....................................................................................................................................... 66
Tributary stream .................................................................................................................... 66
Unstable soils ........................................................................................................................ 66
Upland edge of a wetland ..................................................................................................... 66
Vegetation ............................................................................................................................. 66
Velocity zone ........................................................................................................................ 66
Water body ............................................................................................................................ 66
Table of Contents
79
Water crossing ...................................................................................................................... 67
Wetland ................................................................................................................................. 67
Woody vegetation ................................................................................................................. 67
Written Decision ................................................................................................................... 67
APPENDIX A: SOILS OF CONCERN ....................................................................................... 68
Table of Contents .......................................................................................................................... 69
Certificate of Adoption ................................................................................................................. 80
Table of Contents
80