This is the exact embedded text of the captured official document.
Snapshot cd792b268e81 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
1
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird
and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to
protect archaeological and historic resources; to protect freshwater wetlands; to control building sites,
placement of structures and land uses; to conserve shore cover, and visual as well as actual points of
access to inland waters; to conserve natural beauty and open space; and to anticipate and respond to
the impacts of development within the Town of Dedham.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 Sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within the Town of Dedham, including land
area within 250 feet horizontal distance, of the normal high-water line of any great pond or river;
within 250 feet, horizontal distance of the upland edge of a freshwater wetland; and all land area
within 100 feet, horizontal distance, of the normal high-water line of a stream. This Ordinance also
applies to any structure built on, over or abutting a dock, wharf or pier, or other structure extending or
located below the normal high-water line of a water body or within a wetland.
4. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was adopted by
the municipal legislative body on June 14, 1994, shall not be effective unless approved by the
Commissioner of the Department of Environmental Protection. A certified copy of the Ordinance,
attested and signed by the Municipal Clerk, shall be forwarded to the Commissioner for approval. If
the Commissioner fails to act on the Ordinance or Ordinance Amendment within forty-five (45) days
of his/her receipt of the Ordinance and Ordinance Amendment and it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period shall
be governed by the terms of this Ordinance or Ordinance Amendment, if the Ordinance or Ordinance
Amendment, is approved by the Commissioner.
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at reasonable
cost at the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute
administered by the municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of
the Department of Environmental Protection following adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on
any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
2
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
9. Districts and Zoning Map
A. Official Dedham Zoning Map. The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Dedham Zoning Map(s) which is
(are) made a part of this Ordinance:
1. Resource Protection
Environmentally sensitive areas
2. Growth I
Residential and Home Occupation
3. Growth II-A
Mixed Use
4. Growth II-B
Commercial Development
5. RR
Rural Residential-Home Occupation
B. Scale of Map. The Official Dedham Zoning Map shall be drawn at a scale of not less than: 1
inch = 2000 feet. District boundaries shall be clearly delineated and a legend indicating the
symbols for each district shall be placed on the map
C. Certification of Official Dedham Zoning Map. The Official Dedham Zoning Map shall be
certified by the attested signature of the Municipal Clerk and shall be located in the municipal
office. In the event the municipality does not have a municipal office, the Municipal Clerk shall
be the custodian of the map.
D. Changes to the Official Dedham Zoning Map. If amendments, in accordance with Section 8,
are made in the district boundaries or other matter portrayed on the Official Dedham Zoning Map,
such changes shall be made on the Official Dedham Zoning Map within thirty (30) days after the
amendment has been approved by the Commissioner of the Department of Environmental
Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Dedham Zoning
Map, district boundary lines are property lines, the centerlines of streets, roads and rights of way, and
the boundaries of the shoreland area as defined herein. Where uncertainty exists as to the exact
location of district boundary lines, the Board of Appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in conformity with
all of the regulations herein specified for the district in which it is located, unless a variance is
granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except as
otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
3
B. General
(1)
Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred,
and the new owner may continue the non-conforming use or continue to use the non-
conforming structure or lot, subject to the provisions of this Ordinance.
(2)
Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep
and maintenance of non-conforming uses and structures including repairs or renovations
that do not involve expansion of the non-conforming use or structure, and such other
changes in a non-conforming use or structure as federal, state, or local building and safety
codes may require.
C. Non-conforming Structures
(1)
Expansions. A non-conforming structure may be added to or expanded after obtaining a permit
from the same permitting authority as that for a new structure, if such addition or expansion
does not increase the non-conformity of the structure, and is in accordance with subparagraphs
(a), and (b) below.
(a) Legally existing non-conforming principal and accessory structures that do not meet the water
body tributary stream or wetland setback requirements may be expanded or altered as follows,
as long as all other applicable standards contained in this Ordinance are met.
i.
Expansion of any portion of a structure within 25 feet horizontal distance of the normal high-
water line of a water body, tributary stream or upland edge of a wetland is prohibited, even if
the expansion will not increase nonconformity with the water body, tributary stream or wetland
setback requirement.
ii. Expansion of an accessory structure that is located closer to the normal high-water line of a
water body, tributary stream or upland edge of a wetland than the principal structure is
prohibited, even if the expansion will not increase nonconformity with the water body, tributary
stream or wetland setback requirement.
iii. For structures located less than 75 feet horizontal distance, from the normal high-water line of a
water body, tributary stream or upland edge of a wetland, the maximum combined total floor
area for all portions of those structures within that 75-foot distance is 1,000 square feet, and the
maximum height of any portion of a structure that is within 75 feet, horizontal distance, of a
water body, tributary stream or upland edge of a wetland is 20 feet or the height of the existing
structure, whichever is greater.
iv For structures located less than 100 feet horizontal distance, from the normal high-water line of
a great pond classified as GPA, the maximum combined total floor area for all portions of those
structures within the 100-foot distance is 1,500 square feet, and the maximum height of any
portion of a structure that is within 100 feet, horizontal distance, of a great pond is 25 feet or
the height of the existing structure, whichever is greater, except that any portion of those
structures located less than 75 feet, horizontal distance from the normal high-water line of a
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
4
water body, tributary stream or the upland edge of a wetland must meet the floor area and
height limits of division (iii).
For the purpose of Section 12(C) (1) (a), a basement is not counted toward floor area.
(b) Whenever a new, enlarged, or replacement foundation is constructed under a non-
conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 12(C)(2)
Relocation, below. If the completed foundation does not extend beyond the exterior
dimensions of the structure and the foundation does not cause the structure to be elevated
by more than three (3) additional feet, as measured from the uphill side of the structure, it
shall not be considered to be an expansion of the structure.
(1-A) Special expansion allowance. Existing principal and accessory structures that exceed
the floor area or height limits set in Section 12(C)(1)(a)(iii) and Section 12(C)(1)(a)(iv)
above may not be expanded, except that the limits may be exceeded by not more than 500
square feet provided that all of the following requirements are met.
(a) The principal structure is set back at least 50 feet horizontal distance from the normal
high-water line of a water body, tributary stream or upland edge of a wetland.
(b) A well-distributed stand of trees and other natural vegetation as defined in Section
15(Q)(2)(b), extends at least 50 feet horizontal distance in depth as measured from the
normal high-water line or upland edge for the entire width of the property.
If a well-distributed stand of trees and other vegetation meeting the requirements of
Section 15 (Q)(2)(b) is not present, the 500 square foot special expansion allowance may
be permitted only in conjunction with a written plan, including a scaled site drawing, by
the property owner, and approved by the Planning Board or its designee, to reestablish a
buffer of trees, shrubs, and other ground cover within 50 feet horizontal distance of the
shoreline or tributary stream.
(c)
Adjacent to great ponds classified GPA and rivers flowing to great ponds classified GPA,
except for the allowable footpath, there exists complete natural ground cover, consisting of
forest duff, shrubs and other woody and herbaceous vegetation within 50 feet horizontal
distance of the normal high-water line. Where natural ground cover is lacking the area
must be supplemented with leaf or bark mulch and plantings of native shrubs, and other
woody and herbaceous vegetation in quantities sufficient to retard erosion and provide for
effective infiltration of stormwater.
(d) A written plan by the property owner, including a scaled site drawing, is approved by the
Planning Board and is developed, implemented, and maintained to address the following
mitigation measures for the property within the shoreland zone.
(i) Unstabilized areas resulting in soil erosion must be mulched, seeded, or otherwise
stabilized and maintained to prevent further erosion and sedimentation to water
bodies, tributary streams and wetlands.
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
5
(ii) Roofs and associated drainage systems, driveways, parking areas, and other
nonvegetated surfaces must be designed or modified, as necessary, to prevent
concentrated flow of storm water runoff from reaching a water body, tributary stream
or wetland. Where possible, runoff must be directed through a vegetated area or
infiltrated into the soil through the use of a dry well, stone apron, or similar device.
(1-B) Planting requirements. Any planting or revegetation required as a condition to the
Special Expansion Allowance must be in accordance with a written plan drafted by a
qualified professional, be implemented at the time of construction, and be designed to
meet the rating scores and the ground cover requirements of Section 15 (Q)(2)(b)when the
vegetation matures within the 50 foot strip. At a minimum, the plan must provide for the
establishment of a well-distributed planting of saplings spaced so that there is at least one
sapling per 80 square feet of newly established buffer. Planted saplings may be no less
than three (3) feet tall for coniferous species and no less than six feet tall for deciduous
species. The planting plan must include a mix of at least three native tree species found
growing in adjacent areas, with no one species making up more than 50% of the number
of saplings planted unless otherwise approved by the Planning Board or its designee,
based on adjacent stand comparison. All aspects of the implemented plan must be
maintained by the applicant and future owners.
(1-C) Filing and reporting requirements: Written plans required pursuant to this section must
be filed with the Penobscot County Registry of Deeds. A copy of all permits issued
pursuant to this section must be forwarded by the municipality to the Department of
Environmental Protection within 14 days of the issuance of the permit.
(2) Relocation. A non-conforming structure may be relocated within the boundaries of the parcel
on which the structure is located provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the Planning Board, or its
designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board shall consider the size of the lot, the slope of the land, the
potential for soil erosion, the location of other structures on the property and on adjacent
properties, the location of the septic system and other on-site soils suitable for septic systems,
and the type and amount of vegetation to be removed to accomplish the relocation. When it is
necessary to remove vegetation within the water or wetland setback area in order to relocate a
structure, the Planning Board shall require replanting of native vegetation to compensate for
the destroyed vegetation. In addition, the area from which the relocated structure was
removed must be replanted with vegetation. Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with a least one native
tree, three (3) feet in height, for every tree removed. If more then five (5) trees are planted,
no one species of tree shall make up more the 50% of the number of trees planted. Replaced
trees must be planted no further from the water or wetland then the trees that were removed.
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
6
Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed in
order to relocate a structure must be re-established. An area at least the same size as the area
where vegetation and/or ground cover was disturbed, damaged, or removed must be
reestablished within the setback area. The vegetation and/or ground cover must consist of
similar native vegetation and/or ground cover that was disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees, or a
combination thereof.
(3) Reconstruction or Replacement. Any non-conforming structure which is located less than the
required setback from a water body, tributary stream, or a wetland and which is removed, or
damaged or destroyed, regardless of the cause, by more than 50% of the market value of the
structure before such damage, destruction or removal, may be reconstructed or replaced
provided that a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in compliance
with the water body, tributary stream or wetland setback requirement to the greatest practical
extent as determined by the Planning Board or its designee in accordance with the purposes of
this Ordinance. In no case shall a structure be reconstructed or replaced so as to increase its non-
conformity. If the reconstructed or replaced structure is less then the required setback it shall not
be any larger then the original structure, except as allowed pursuant to Section 12 (C)(1) above,
as determined by the non-conforming floor area of the reconstructed or replaced structure at its
new location. If the total amount of floor area of the original structure can be relocated or
reconstructed beyond the required setback area, no portion of the relocated or reconstructed
structure shall be replaced or constructed less then the setback requirement of a new structure.
When it is necessary to remove vegetation in order to replace or reconstruct a structure,
vegetation shall be replanted in accordance with Section 12 (C)(2) above.
Any non-conforming structure which is located less then the required setback from a water body,
tributary stream, or wetland and which is removed by 50% or less of the market value, or
damaged or destroyed by 50% or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the water setback to
the greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12 (C)(2) above, the physical condition and type of foundation present, if any.
(4) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may not
be changed to another use unless the Planning Board after receiving a written application
determines that the new use will have no greater adverse impact on the water body, tributary
stream or wetland or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require written
documentation from the applicant, regarding the probable effects on public health and safety,
erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover, visual and
actual points of public access to waters, natural beauty, floodplain management, archaeological
and historic resources, and other functionally water-dependent uses.
D. Non-conforming Uses
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
7
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1)(a) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning Board may, for
good cause shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure provided that the
structure has been used or maintained for residential purposes during the preceding Five (5)
year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-conforming
use provided that the proposed use has no greater adverse impact on the subject and adjacent
properties and resources, including water-dependent uses in the CFMA district, than the
former use, as determined by the Planning Board. The determination of no greater adverse
impact shall be made according to criteria listed in Section 12 (C) (4) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record established prior to the effective date
of this Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width and shore frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure exists
on each lot, the non-conforming lots may be conveyed separately or together, provided that
the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the
State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be as
conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are in
single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
This provision shall not apply to two (2) or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on the effective date of this Ordinance and
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
8
recorded in the registry of deeds if the lot is served by a public sewer or can accommodate a
subsurface sewage disposal system in conformance with the State of Maine Subsurface
Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot
area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12 (E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
9
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
the limits of the shoreland zone, except that areas which are currently developed and areas which
meet the criteria for the Growth II-A and Growth II-B Districts need not be included within the
Resource Protection District.
(1) Areas within 100 feet, horizontal distance of the normal high-water line of any great pond.
(2) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetland and
wetland associated with great ponds and rivers, which are rated "moderate" or "high" value
waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine Department
of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic Information
System (GIS) data layer maintain by either MDIF&W or the Department as of December 31,
2008. For the purposes of this paragraph "wetlands associated with great ponds and rivers " shall
mean areas characterized by non-forested wetland vegetation and hydric soils that are contiguous
with a great pond or river, and have a surface elevation at or below the water level of the great
pond or river during the period of normal high water. "Wetland associated with great ponds or
rivers" are considered to be part of the great pond or river.
(3) Flood plains along rivers and floodplains along artificially formed great ponds along rivers,
defined by the 100 year floodplain as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood
of record, or in the absence of these, by soil types identified as recent floodplain soils. This
district shall also include 100 year floodplains adjacent to tidal waters as shown on FEMA's
Flood Insurance Rate Maps or Flood Hazard Boundary Maps.
(4) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(5) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater or coastal wetland as defined, and which are not surficially
connected to a water body during normal high water.
(6) Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement.
(7) Islands situated in bodies of water within the Town, and land areas owned by the
Lucerne Village Corporation known as Sunset Rock.
(8) Areas within 100 feet, horizontal distance, of the normal high-water line of any stream.
B. Growth 1: Residential and Home Occupation.
Growth areas where residential development and home occupations will be encouraged to
be located are:
1. An area bounded by Mann Brook (outside of shoreland zone) and the west side of Rt. 1A, to
the Ellsworth town line, to a depth of 1500 feet from the middle of Rt. 1A
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
10
2. An area on the west side of South Rd. (a.k.a. Miller rd.) between the Bucksport and Holden
town line.
C.
Growth 2A: Mixed use including Residential, Mobile Home Park, Retail, and more
intensive commercial uses.
The area approximately bounded by Green Lake (outside of shoreland zone), Mann Brook
(outside of shoreland zone) and Rt. 1A and Ellsworth is designated for Mixed Use.
The interpretive soil maps indicate that these soils are particularly suited for development.
D. Growth 2B: Commercial Area.
The land bordering east side of Route 1-A starting at Map 11 Lot 51 now or formerly of Philip
and Joanne Johnson, southerly to the Lucerne-in-Maine Village boundaries. The land bordering
the west side of Rt.1A.starting at Map 8 Lot 11 now or formerly of Vivian Cross, southerly to
Map 8 Lot 3 (AKA Lucerne Hill Golf Course.), and the land on both sides of Rt. 1A from Mann
Brook (outside of shoreland zone) southerly to the Ellsworth town line for a depth of 500 feet.
Note:
To encourage clustering less restrictive lot sizes will be required for multiple businesses within
the same building lot. However, due to the special nature of the visual resources of the Town, any
commercial development will have to meet design standards which ensure that the development
will not have a visual impact or degrade the visual character of the setting. Even though this will
be the primary growth / commercial areas, it is important to protect the rural character of the area.
Please see implementation pages 4,6 and 8 for guidelines.
E. Rural Residential / Home Occupation:
This category includes all other areas in Dedham not previously described and not used as
intensively as G1, G2-A, G2-B
Note:
Residential development, including affordable housing and home occupation which meets all
ordinance restrictions in this area will be allowed. Clustering and open space preservation will be
mandatory and standards which preserve the rural character should apply. This area includes the
shoreland zone of all lakes except where the shoreland zone falls into the Resource Protection
area. Development in this area will be encouraged by land use regulations that maintain the rural
atmosphere of Dedham.
A Note about Shoreland Areas:
The development review proposed by the strategies in this section should be adequate for
residential development in shoreland areas. Therefore, in most cases, the shoreland zone is not
delineated separately on the land use plan.
Dedham Maine
Land Use Ordinance
Adopted at Town Meeting June 20, 2009
11
14. Table of Land Uses. All land use activities, as indicated in Table 1, Schedule of Uses, shall conform
to all of the applicable land use standards in Section 15. The district designation for a particular site
shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes -
Allowed (no permit required but the use must comply with all applicable land use
standards.)
No -
Prohibited
PB -
Requires permit issued by the Planning Board
CEO - Requires permit issued by the Code Enforcement Officer
LPI -
Requires permit issued by the Local Plumbing Inspector
Abbreviation:
RP
Resource Protection
G1
Growth 1
G2A
Growth 2A
G2B
Growth 2B
RR
Rural Residential
Dedham Maine
Land Use Ordinance
- 12 -
SCHEDULE OF USES
LAND USES
RP
G1
G2A
G2B
RR
1. Non-intensive recreation uses not requiring structures such as hunting,
fishing and hiking
YES
YES
YES
YES
YES
2. Forest management activities except for timber harvesting & land
management roads.
YES
YES
YES
YES
YES
3. Timber Harvesting
CEO
YES
YES
YES
YES
4. Clearing or removal of vegetation for activities other then
timber harvesting
CEO YES
YES
YES
YES
5. Fire Prevention Activities
YES
YES
YES
YES
YES
6. Wildlife management practices
YES
YES
YES
YES
YES
7. Soil and Water conservation practices
YES
YES
YES
YES
YES
8. Mineral Exploration
NO
YES-2 YES-2 YES-2YES-2
9. Mineral Extraction/ sand/ gravel
NO
PB
PB
PB
PB
10. Surveying and Resource Analysis
YES
YES
YES
YES
YES
11. Emergency Operations
YES
YES
YES
YES
YES
12. Agriculture
NO
YES
YES
YES
YES
13. Aquaculture
NO
PB
PB
PB
PB
14. Principal Structures
A. One and Two Family Residential including driveways
NO
CEO
CEO
CEO
CEO
B. Multi-unit Residential
NO
PB
PB
PB
PB
C. Light Commercial (two employees)
NO
CEO
CEO
CEO
CEO
D. Heavy Commercial (>two employees)
NO
NO
PB
PB
NO
E. Industrial
NO
NO
NO
PB
NO
F. Governmental & Institutional
NO
NO
PB
PB
PB
G. Small non residential facilities for educational/ scientific or nature
interpretation purposes
PB
PB
CEO
CEO
CEO
15. Structures accessory to allowed uses
PB
PB
CEO CEO
CEO
Dedham Maine
Land Use Ordinance
- 13 -
LAND USES
RP
G1
G2A
G2B
RR
16. Piers, Dock, Wharves, Bridges and other structures and uses
extending over or below the normal high-water line.
A. Temporary
CEO CEO CEO CEO CEO
B. Permanent
PB
PB
PB
PB
PB
17. Conversion of seasonal residential
LPI
LPI
LPI
LPI
LPI
18. Home Occupation
PB
CEO
CEO
CEO
CEO
19. Sewage Disposal Systems
LPI
LPI
LPI
LPI
LPI
20. Essential services
PB-3
YES-3 YES-3 YES-3 YES-3
21. Service drops
YES
YES
YES
YES
YES
22. Public and Private recreational area with
minimal structural development
PB
CEO
CEO
CEO
CEO
23. Individual, private campsites
NO
CEO
CEO
CEO
CEO
24. Campgrounds
NO
PB
PB
PB
PB
25. Road construction
PB-1 CEO
CEO
CEO
CEO-4
26. Land management roads
PB
YES
YES
YES
YES
27. Parking facilities
NO
CEO
CEO
CEO
CEO
28. Marinas
NO
PB
PB
PB
PB
29. Filling or earth moving of <10 cubic yards
CEO
YES
YES
YES
YES
30. Filling or earth moving of > 10 cubic yards
PB
CEO
CEO
CEO
CEO
31. Herbicide application
NO
YES
YES
YES
YES
32. Uses similar to allowed uses
CEO/PB CEO/PB CEO/PB CEP/PB
CEO/PB
33. Uses similar to uses requiring CEO permit
CEO
CEO
CEO
CEO
CEO
34. Uses similar to uses requiring PB permit
PB
PB
PB
PB
PB
1. Only as provided in Section 15 (I) (4)
2. Requires a permit from the CEO if more then 100 sq. feet of surface area is disturbed.
3. Requires a permit from the Planning Board if within the shoreland zone and see further restrictions in Section
15 (M).
4. Only as provided in Section 15 (I) (3)
Dedham Maine
Land Use Ordinance
- 14 -
Section 15. Land Use Standards:
A.
Lot Standards:
1.
All lots shall meet or exceed the following minimum requirements as applicable per dwelling unit, and
per principle governmental, institutional, commercial or industrial structure:
Districts
Minimum lot area
Minimum Shore Frontage/Lot Width *
a. RP
50,000 sq. ft
200 ft
b. G1
40,000 sq. ft
200 ft
c. G2A, residential
40,000 sq. ft
200 ft
non-residential 60,000 sq. ft
200 ft
d. G2B**
40,000 sq. ft
100 ft
e. RR
65,340 sq. ft
200 ft
*
Note: The lots, regardless of shape, must meet or exceed the minimum lot width. Any structure located on the
lot must be accessible to emergency vehicles.
**
Note: Commercial lots in the Growth Area II B Zone shall have a minimum of 40,000 sq. ft for the first business
on each lot. One business shall have 5 parking spaces for retail business or 3 parking spaces for a
professional business in addition to employee parking spaces. These parking standards shall increase by 2
for each additional business in retail and by 1 for each additional professional business.
( See Section 15 paragraph H. for parking space standards.)
2.
Setbacks: The placement of structures on lots shall meet or exceed the following requirements:
a.
100 foot setback from the shoreline of all water bodies and wetland, except those
zoned Resource Protection.
b.
40 foot setback from edge of rite-of-way for residential and commercial structures.
c.
10 foot setback from edge of rite-of way for all other structures.
d.
10 foot setback from edge of railroad rite-of-way for all structures.
e.
10 foot setback from property lines.
f.
250 foot setback from shoreline of a water body or wetland and 100 foot setback from shoreline
of a stream zoned as Resource Protection District.
g.
75 foot setback from a tributary stream.
3.
If more then one residential dwelling unit or principle non-residential structure or use, or combination
thereof, is constructed, established or placed, on a single parcel, all dimensional requirements shall be met
for each additional residential dwelling unit, principle non-residential structure or use.
4. The applicable shore frontage/minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for the proposed use.
5.
Lots located on opposite sides of a public or private road shall be considered each separate tract
or parcel of land unless such road was established by the owner of land on both sides thereof
after September 22, 1971.
Dedham Maine
Land Use Ordinance
- 15 -
6.
Land below the normal high-water line of a water body or upland edge of a wetland and land
beneath roads serving more then two lots shall not be included towards calculating minimum lot
area.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back in conformance with Section 15 (A)(2) above.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to structures which
require direct access to the water body or wetland as an operational necessity, such as piers, docks and
retaining walls, nor to other functionally water-dependent uses.
(b) On a non-conforming lot of record on which only a residential structure exists, and it is not possible
to place an accessory structure meeting the required water body, tributary stream or wetland
setback, the Code Enforcement Officer may issue a permit to place a single accessory structure,
with no utilities, for storage of yard tools and similar equipment. Such accessory structures shall
not exceed eighty (80) square feet in area nor eight (8) feet in height, and shall be located as far
from the shoreline, tributary stream or wetland as practical and shall meet all other applicable
standards, including lot coverage and vegetation clearing limitations. In no case shall the structure
be located closer to the shoreline, tributary stream or wetland then the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are permitted in any districts
shall not exceed thirty-five (35) feet in height. This provision shall not apply to structures such as
transmission towers, windmills, antennas, and similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and structures including basements shall be elevated at
least one foot above the elevation of the 100 year flood, the flood of record, or in the absence of these, the
flood as defined by soil types identified as recent floodplain soils.
(4) The total footprint area of all structures, parking lots and other non-vegetated surfaces, within the shoreland
zone shall not exceed twenty (20) percent of the lot or a portion thereof, located within the shoreland zone,
including land area previously developed.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback requirement, except
for low retaining walls and associated fill provided all of the following conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water line of
a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on rivers, streams, wetlands, and
tributary streams, as designated on the Federal Emergency Management Agency's (FEMA) Flood
Dedham Maine
Land Use Ordinance
- 16 -
Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the absence of
these, by soil types identified as recent floodplain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination thereof, and no
further structural development will occur within the setback area, including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal high-water line of
a water body, tributary stream, or upland edge of a wetland when a natural buffer area does not exist. The
buffer area must meet the following characteristics:
(i)
The buffer must include shrubs and other woody and herbaceous vegetation. Where natural ground
cover is lacking the area must be supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide for effective
infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured perpendicularly to the
normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(Q)(2)(a), may traverse the buffer.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed with a permit
from the Code Enforcement Officer, to provide shoreline access in areas of steep slopes or unstable soils
provided: that the structure is limited to a maximum of four (4) feet in width; that the structure does not
extend below or over the normal high-water line of a water body or upland edge of a wetland, (unless
permitted by the Department of Environmental Protection pursuant to the Natural Resources Protection Act,
Title 38, Section 480-C); and that the applicant demonstrates that no reasonable access alternative exists on
the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the Normal High-
Water Line of a Water Body or Within a Wetland.
(1) Access from shore shall be developed on soils appropriate for such use and constructed so as to control
erosion.
(2) The location shall not interfere with existing developed or natural beach areas.
(3) The facility shall be located so as to minimize adverse effects on fisheries.
(4) The facility shall be no larger in dimension than necessary to carry on the activity and be consistent with the
surrounding character and use of the area. A temporary pier, dock or wharf shall not be wider than six feet.
(5) No structure shall be built on, over or abutting a pier, wharf, dock or other structure extending below the
normal high-water line of a water body or within a wetland unless the structure requires direct access to the
water as an operational necessity, in which case the structure shall not exceed twenty (20) feet in height above
the pier, wharf, dock or other structure.
Dedham Maine
Land Use Ordinance
- 17 -
(6) New permanent piers and docks shall not be permitted.
(7) No existing structures built on, over or abutting a pier, dock, wharf or other structure extending below the
normal high-water line of a water body or within a wetland shall be converted to residential dwelling units in
any district.
(8) All temporary docks, piers and floats shall be removed from below the shoreline or from within the wetland
by November 1st so as not to extend into the water body or wetland in such a way to be hazardous during the
winter months.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including roads and
driveways, for each site. Land supporting wetland vegetation, and land below the normal high-water line of a
water body shall not be included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and service buildings
shall be set back a minimum of one hundred (100) feet, horizontal distance from the normal high-water line of
a great pond classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance from the normal high-water line of other water bodies, tributary streams, or the upland
edge of a wetland.
E. Individual-Private Campsites. Individual, private campsites not associated with campgrounds are allowed
provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand (30,000) square feet
of lot area within the shoreland zone, whichever is less, may be permitted.
(2) Campsite placement on any lot, including the area intended for a recreational vehicle or tent platform, shall be
set back one hundred (100) feet, horizontal distance from the normal high-water line of a great pond classified
GPA or river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance from the
normal high-water line of other water bodies, tributary streams, or the upland edge of a wetland.
(3) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall not be located on
any type of permanent foundation except for a gravel pad, and no structure except a canopy shall be attached
to the recreational vehicle.
(4) The clearing of vegetation for the sitting of the recreational vehicle, tent or similar shelter in a Resource
Protection District shall be limited to one thousand (1000) square feet.
(5) A written sewage disposal plan describing the proposed method and location of sewage disposal shall be
required for each campsite and shall be approved by the Local Plumbing Inspector. Where disposal is off-
site, written authorization from the receiving facility or land owner is required.
(6) When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred and twenty
(120) days per year, all requirements for residential structures shall be met, including the installation of a
subsurface sewage disposal system in compliance with the State of Maine Subsurface Wastewater Disposal
Rules unless served by public sewage facilities.
Dedham Maine
Land Use Ordinance
- 18 -
F. Commercial and Industrial Uses:
All commercial and industrial uses within 250 feet, horizontal distance, of the normal high-water line of any
great pond or river; within 250 feet, horizontal distance, of the upland edge of a freshwater wetland; and within
100 feet, horizontal distance, of the normal high-water line of a stream, are prohibited.
G. Home Occupations and Professional Offices:
Home Occupations and Professional Offices shall be carried on wholly within the principal residential
structure or a structure accessory to the principal residential structure and shall conform to the following
standards:
1.
No more the two persons who are not occupants of the residence shall be
employed in the home occupation.
2.
There shall be no exterior storage of materials.
3.
There shall be no nuisance, noise, vibration, smoke, dust, orders, heat or glare generated by the
home occupation.
4.
Sufficient off street parking shall be provided for all vehicles associated with home occupation.
5.
Anything not meeting the above shall be considered a commercial use.
H. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for structures for the district
in which such areas are located. The setback requirement for parking areas serving public boat launching
facilities shall be no less than fifty (50) feet horizontal distance from the shoreline and tributary stream if the
Planning Board finds that no other reasonable alternative exists further from the shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent stormwater
runoff from flowing directly into a water body, tributary stream or wetland and where feasible, to retain all
runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except that parking
spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
I. Roads and Driveways. The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance from the normal
high-water line of a great pond classified GPA or a river that flows to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance from the normal high-water line of other water bodies, tributary
Dedham Maine
Land Use Ordinance
- 19 -
streams, or the upland edge of a wetland unless no reasonable alternative exists as determined by the Planning
Board. If no other reasonable alternative exists the road and/or driveway setback requirement shall be no less
than fifty (50) feet, horizontal distance upon clear showing by the applicant that appropriate techniques will
be used to prevent sedimentation of the water body, tributary stream or wetland. Such techniques may
include, but are not limited to, the installation of settling basins, and/or the effective use of additional ditch
relief culverts and turnouts placed so as to avoid sedimentation of the water body, tributary stream, or
wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be increased by ten (10)
feet, horizontal distance for each five (5) percent increase in slope above twenty (20) percent.
Section 15 (I)(1) does not apply to approaches to water crossings nor to roads or driveways that provide
access to permitted structures, and facilities located nearer to the shoreline due to an operational necessity,
excluding temporary docks of recreational uses. Roads and driveways providing access to permitted structures
within the setback area shall comply fully with the requirements of Section 15 (I)(1) except for that portion of
the road or driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right-of-way regardless of their setback from a
water body, tributary stream or wetland
(3) New permanent roads are not allowed within the RR zone except:
(a) To provide access to structures or facilities within the zone; or
(b) When the applicant demonstrates that no reasonable alternative route exists outside the shoreland zone.
When roads must be located within the shoreland zone they shall be set back as far as practicable from the
normal high-water line and screened from the river by existing vegetation.
(4) New roads and driveways are prohibited in a Resource Protection District except that the Planning Board may
grant a permit to construct a road or driveway to provide access to permitted uses within the district. A road or
driveway may also be approved by the Planning Board in a Resource Protection District, upon a finding that
no reasonable alternative route or location is available outside the district. When a road or driveway is
permitted in a Resource Protection District the road and/or driveway shall be set back as far as practicable
from the normal high-water line of a water body, tributary stream, or upland edge of a wetland.
(5) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1) vertical, and shall
be graded and stabilized in accordance with the provisions for erosion and sedimentation control contained in
Section 15 (R).
(6) Road and driveway grades shall be no greater than ten (10) percent except for segments of less than two
hundred (200) feet.
(7) In order to prevent road and driveway surface drainage from directly entering water bodies, tributary stream
or wetland roads and driveway shall be designed, constructed, and maintained to empty onto an unscarified
buffer strip at least (50) feet plus two times the average slope, in width between the outflow point of the ditch
or culvert and the normal high-water line of a water body, tributary stream, or upland edge of a wetland.
Surface drainage which is directed to an unscarified buffer strip shall be diffused or spread out to promote
infiltration of the runoff and to minimize channelized flow of the drainage through the buffer strip.
Dedham Maine
Land Use Ordinance
- 20 -
(8) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a manner effective
in directing drainage onto unscarified buffer strips before the flow gains sufficient volume or head to erode
the road, or driveway, or ditch. To accomplish this, the following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along the road or
driveway at intervals no greater than indicated in the following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten (10) percent or
less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be placed at
approximately a thirty (30) degree angle downslope from a line perpendicular to the centerline of the road
or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for effective
functioning and their inlet and outlet ends shall be stabilized with appropriate materials.
(9) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control installations associated
with roads and driveways shall be maintained on a regular basis to assure effective functioning.
J. Signs. The following provisions shall govern the use of signs in the shoreland zone.
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such signs shall not
exceed six (6) square feet in area and shall not exceed two (2) signs per premises. Signs relating to goods or
services not sold or rendered on the premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and shall not exceed
twelve (12) Sq Ft in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to the sale, rental, or
lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number provided that no
such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
Dedham Maine
Land Use Ordinance
- 21 -
(7) Signs may be illuminated only by shielded, non-flashing lights.
The following provisions shall govern the use of on-premise signs in all other areas of the Town of Dedham:
l.
On-premise signs on any one property shall not exceed five (5) in number nor exceed a
combined total of 50 square feet. No one sign shall exceed 25 square feet. In the case of more
than one business, facility or point of interest being conducted on one property, signs for each
business, facility or point of interest shall not exceed five (5) in number, a combined total of 50
square feet, nor shall any one sign exceed 25 square feet in size.
2.
On-premise signs shall be located within 1,000 feet of the principal building where the business
or facility is carried on or practiced or within 1,000 feet of the point of interest. Storage areas,
warehouses and other auxiliary structures and fixtures are not deemed to be buildings where the
business, facility, or point of interest is carried on or practiced.
3.
No on-premise sign may be permitted which is erected or maintained upon trees or painted or
drawn upon rocks or other natural features.
4.
The maxim height of on-premise signs shall be 25 feet above the ground level of land upon
which it is located or if the sign is affixed to or is part of a building, the maximum is 10 feet
above the roof of the building.
5.
Any business or facility whose principal building, or a point of interest, which is located on a
private way more than 1,000 feet from the nearest public way, or is not visible to traffic from the
nearest public way, may erect no more than two (2) approach signs with a total surface area not
to exceed 50 square feet per sign. These signs are to be located outside the public right-of-way
limits within 300 feet of the junction of the public and private ways.
6.
No on-premise signs may be permitted within 33 feet of the center line of any public way if the
highway is less than 66 feet in width; within 20 feet from the outside edge of the paved portion
of any public way with more than two (2) travel lanes and a total paved portion in excess of 24
feet in width; or within the full width of the right-of-way of any public way.
7.
An on-premise sign shall be prohibited if it:
a.
Attempts or appears to attempt to direct the movement of traffic or which
interferes with, imitates or resembles any official traffic sign, signal or devise;
b.
Prevents the driver of a vehicle from having a clear and unobstructed view of official
signs and approaching or merging traffic;
c.
Contains, includes or is illuminated by a flashing, intermittent or moving light or lights;
d.
Uses lighting in any way unless the light is effectively shielded as to prevent beams or
rays of light from being directed at any portion of the public way or is of such intensity or
brilliance as to cause glare or impair the vision of the operator of any motor vehicle or as
to otherwise interfere with any driver's operation of a motor vehicle; or
Dedham Maine
Land Use Ordinance
- 22 -
e.
Moves or has any animated or moving parts.
Off Premise Signs
In all other areas of the Town of Dedham the use of off-premise signs shall be governed by the
Maine Department of Transportation's Official Business Directional Sign (OBDS) Regulation.
K. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff from the site in
excess of the natural predevelopment conditions. Where possible, existing natural runoff control features,
such as berms, swales, terraces and wooded areas, shall be retained in order to reduce runoff and encourage
infiltration of storm waters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper functioning.
L. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of Maine Subsurface
Wastewater Disposal Rules and the following:
a) clearing or removal of woody vegetation necessary to site a new system and any associated fill extension,
shall not extend closer then seventy-five (75) feet, horizontal distance, from the normal high-water line of
a water body or the upland edge of a wetland and
b) A holding tank is not allowed for a first time residential use in the Shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill extensions, to be
constructed no less than one hundred (100) horizontal feet from the normal high-water line of a perennial water
body. The minimum setback distance for a new subsurface disposal system may not be reduced by variance.
M. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways and existing
service corridors.
(2) The installation of essential services other then road-side distribution lines is not allowed in a Resource
Protection District, except to provide services to a permitted use within said district, or except where the
applicant demonstrates that no reasonable alternative exists. Where allowed, such structures and facilities
shall be located so as to minimize any adverse impacts on surrounding uses and resources, including visual
impacts.
N. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of mineral
resources shall be accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from the Code Enforcement
Officer shall be required for mineral exploration which exceeds the above limitation. All excavations, including
Dedham Maine
Land Use Ordinance
- 23 -
test pits and holes shall be immediately capped, filled or secured by other equally effective measures, so as to
restore disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved by the Planning Board before a permit is granted. Such
plan shall describe in detail procedures to be undertaken to fulfill the requirements of Section 15(N) (4)
below.
(2) No part of any extraction operation, including drainage and runoff control features shall be permitted within
one hundred (100) feet horizontal distance of the normal high-water line of a great pond classified GPA or a
river flowing to a great pond classified GPA, and within seventy-five (75) feet horizontal distance of the
normal high-water line of any other water body, tributary stream, or the upland edge of a wetland. Extraction
operations shall not be permitted within seventy-five (75) feet horizontal distance of any property line,
without written permission of the owner of such adjacent property.
(3) Developers of new gravel pits along Significant River Segments shall demonstrate that no reasonable mining
site outside the shoreland zone exists. When gravel pits must be located within the zone, they shall be set
back as far as practicable from the normal high-water line and no less than seventy-five (75) feet and screened
from the river by existing vegetation.
(4) Within twelve (12) months following the completion of extraction operations at any extraction site, which
operations shall be deemed complete when less than one hundred (100) cubic yards of materials are removed
in any consecutive twelve (12) month period, ground levels and grades shall be established in accordance with
the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved location, or shall be
buried on-site. Only materials generated on-site may be buried or covered on-site.
(b) The final graded slope shall be two and one half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be reseeded and stabilized
with vegetation native to the area. Additional topsoil or loam shall be obtained from off-site sources if
necessary to complete the stabilization project.
(5) In keeping with the purposes of this Ordinance, the Planning Board may impose such conditions as are
necessary to minimize the adverse impacts associated with mineral extraction operations on surrounding uses
and resources.
O. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization Guidelines
published by the Maine Department of Agriculture on November 1, 2001, and the Nutrient Management Law
(7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, of a great pond
classified GPA or a river flowing to a great pond, classified GPA, or within seventy-five (75) feet horizontal
distance, of other water bodies, tributary streams, or wetlands. All manure storage areas within the shoreland
zone must be constructed or modified such that the facility produces no discharge of effluent or contaminated
storm water.
Dedham Maine
Land Use Ordinance
- 24 -
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet in surface area,
within the shoreland zone shall require a Conservation Plan to be filed with the Planning Board. Non-
conformance with the provisions of said plan shall be considered to be a violation of this Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available through the local Soil and Water
Conservation District office.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of the normal high-
water line of a great pond classified GPA; within seventy-five (75) feet, horizontal distance, from other water
bodies; nor within twenty-five (25) feet, horizontal distance, of tributary streams and freshwater wetlands.
Operations in existence on the effective date of this ordinance and not in conformance with this provision may
be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA; within seventy-five (75) feet,
horizontal distance of other water bodies, nor within twenty-five (25) feet, horizontal distance, of tributary
streams and freshwater wetlands. Livestock grazing associated with ongoing farm activities, and which are
not in conformance with the above setback provisions may continue, provided that such grazing is conducted
in accordance with a Conservation Plan.
P.
Timber Harvesting
(1) In a Resource Protection District abutting a great pond, timber harvesting shall be limited to the following:
(a) Within the strip of land extending 75 feet inland from the normal high-water line in a shoreland area
zoned for resource protection abutting a great pond there shall be no timber harvesting except to
remove safety hazards.
(b) Beyond the 75 foot strip referred to in Section 15 (P)(1)(a) above, timber harvesting is permitted in
accordance with paragraph 2 below except that in no case shall the average residual basal area of trees
over 4 1/2 inches in diameter at 4 1/2 feet above ground level be reduced to less than 30 square feet per
acre.
(2) Except in areas as described in Section 15 (P)(1) above, timber harvesting shall conform with the following
provisions:
(a) Selective cutting of no more than forty (40) percent of the total volume of trees four (4) inches or more in
diameter measured at 4 1/2 feet above ground level on any lot in any ten (10) year period is permitted. In
addition:
(i) Within one-hundred (100) feet, horizontal distance of the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, and within seventy-five (75) feet,
horizontal distance, of the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland, there shall be no clearcut openings and a well-distributed stand of trees and
other vegetation, including existing ground cover, shall be maintained.
(ii) At distances greater than one-hundred (100) feet, horizontal distance, of a great pond classified GPA
or a river flowing to a great pond classified GPA, and greater than seventy-five (75) feet, horizontal
distance, of the normal high-water line of other water bodies or the upland edge of a wetland,
Dedham Maine
Land Use Ordinance
- 25 -
harvesting operations shall not create single clearcut openings greater than ten-thousand (10,000)
square feet in the forest canopy. Where such openings exceed five-thousand (5000) square feet they
shall be at least one hundred (100) feet apart. Such clearcut openings shall be included in the
calculation of total volume removal. Volume may be considered to be equivalent to basal area.
(b) Timber harvesting operations exceeding the 40% limitation in Section 15(P)(2) above, may be allowed by
the planning board upon a clear showing, including a forest management plan signed by a Maine licensed
professional forester, that such an exception is necessary for good forest management and will be carried
out in accordance with the purposes of this Ordinance. The planning board shall notify the Commissioner
of the Department of Environmental Protection of each exception allowed, within fourteen (14) days of
the planning board's decision.
(c) No accumulation of slash shall be left within fifty (50) feet, horizontal distance of the normal high-water
line of a water body. In all other areas slash shall either be removed or disposed of in such a manner that
it lies on the ground and no part thereof extends more than four (4) feet above the ground. Any debris
that falls below the normal high-water line of a water body or tributary stream shall be removed.
(d) Timber harvesting equipment shall not use stream channels as travel routes except when:
(i) Surface waters are frozen; and
(ii) The activity will not result in any ground disturbance.
(e) All crossings of flowing water shall require a bridge or culvert, except in areas with low banks and
channel beds which are composed of gravel, rock or similar hard surface which would not be eroded or
otherwise damaged.
(f) Skid trail approaches to water crossings shall be located and designed so as to prevent water runoff from
directly entering the water body or tributary stream. Upon completion of timber harvesting, temporary
bridges and culverts shall be removed and areas of exposed soil revegetated.
(g) Except for water crossings, skid trails and other sites where the operation of machinery used in timber
harvesting results in the exposure of mineral soil shall be located such that an unscarified strip of
vegetation of at least seventy-five (75) feet, horizontal distance, in width for slopes up to ten (10) percent
shall be retained between the exposed mineral soil and the normal high-water line of a water body or
upland edge of a wetland. For each ten (10) percent increase in slope, the unscarified strip shall be
increased by twenty (20) feet horizontal distance. The provisions of this paragraph apply only to a face
sloping toward the water body or wetland, provided, however, that no portion of such exposed mineral
soil on a back face shall be closer than twenty five (25) feet horizontal distance from the normal high-
water line of a water body or upland edge of a wetland.
P-1. Timber Harvesting: Section 15(P) is repealed on the statutory date established under 38 M.R.S.A. section 438-
B(5), at which time Section 15(P-1) shall become effective, Until such time as Section 15(P) is repealed, Section
15(P-1) is not in effect.
(1) Shoreline integrity and sedimentation. Persons conducting timber harvesting and related activities must take
reasonable measures to avoid the disruption of shoreline integrity, the occurrence of sedimentation of water, and the
disturbance of water body and tributary stream banks, water body and tributary stream channels, shorelines, and soil lying
within water bodies, tributary streams and wetlands. If, despite such precautions, the disruption of shoreline integrity,
Dedham Maine
Land Use Ordinance
- 26 -
sedimentation of water, or the disturbance of water body and tributary stream banks, water body and tributary stream
channels, shorelines, and soil lying within water bodies, tributary streams and wetlands occurs, such conditions must be
corrected.
(2) Slash treatment. Timber harvesting and related activities shall be conducted such that slash or debris is not left below
the normal high-water line of any water body or tributary stream or the upland edge of a wetland. Section 15(P-1)(2) does
not apply to minor, incidental amounts of slash that result from timber harvesting and related activities otherwise
conducted in compliance with this section.
(a) Slash actively used to protect soil from disturbance by equipment or to stabilize exposed soil, may be left in place,
provided that no part thereof extends more than 4 feet above the ground.
(b) Adjacent to great ponds, rivers and wetlands:
(i) No accumulation of slash shall be left within 50 feet, horizontal distance, of the normal high-water line or
upland edge of a wetland; and
(ii) Between 50 feet and 250 feet, horizontal distance, of the normal high-water line or upland edge of a wetland,
all slash larger than 3 inches in diameter must be disposed of in such a manner that no part thereof extends more
than 4 feet above the ground.
(3)Timber harvesting and related activities must leave adequate tree cover and shall be conducted so that a well-
distributed stand of trees is retained. This requirement may be satisfied by following one of the following three options.
(a) Option 1 (40% volume removal), as follows:
(i) Harvesting of no more than 40 percent of the total volume on each acre of trees 4.5 inches DBH or greater in any 10
year period is allowed. Volume may be considered to be equivalent to basal area;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including existing ground cover, must be
maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of rivers, streams, and great ponds, and within 75
feet, horizontal distance, of the upland edge of a freshwater or coastal wetlands, there must be no cleared openings. At
distances greater than 75 feet, horizontal distance, of the normal high-water line of a river or great pond or upland edge of
a wetland, timber harvesting and related activities must not create single cleared openings greater than 14,000 square feet
in the forest canopy. Where such openings exceed 10,000 square feet, they must be at least 100 feet, horizontal distance,
apart. Such cleared openings will be included in the calculation of total volume removal. Volume may be considered
equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as follows:
(i) The residual stand must contain an average basal area of at least 60 square feet per acre of woody vegetation greater
than or equal to 1.0 inch DBH, of which 40 square feet per acre must be greater than or equal to 4.5 inches DBH;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including existing ground cover, must be
maintained; and,
(iii)Within 75 feet, horizontal distance, of the normal high-water line of water bodies and within 75 feet, horizontal
distance, of the upland edge of wetlands, there must be no cleared openings. At distances greater than 75 feet, horizontal
distance, of the normal high-water line of a river or great pond, or upland edge of a wetland, timber harvesting and related
activities must not create single cleared openings greater than 14,000 square feet in the forest canopy. Where such
openings exceed 10,000 square feet, they must be at least 100 feet, horizontal distance, apart. Such cleared openings
will be included in the calculation of the average basal area. Volume may be considered equivalent to basal area.
(c) Option 3 (Outcome based), which requires: An alternative method proposed in an application, signed by a Licensed
Forester or certified wildlife professional, submitted by the landowner or designated agent to the State of Maine
Department of Conservation's Bureau of Forestry (Bureau) for review and approval, which provides equal or better
protection of the shoreland area than this rule. Landowners must designate on the Forest Operations Notification form
required by 12 M.R.S.A. chapter 805, subchapter 5 which option they choose to use. If landowners choose Option 1 or
Option 2, compliance will be determined solely on the criteria for the option chosen. If landowners choose Option 3,
timber harvesting and related activities may not begin until the Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is retained through a field procedure
that uses sample plots that are located randomly or systematically to provide a fair representation of the harvest area.
Dedham Maine
Land Use Ordinance
- 27 -
(4) Skid trails, yards, and equipment operation. This requirement applies to the construction, maintenance, and use of skid
trails and yards in shoreland areas.
(a) Equipment used in timber harvesting and related activities shall not use river, stream or tributary stream channels as
travel routes except when surface waters are frozen and snow covered, and the activity will not result in any ground
disturbance.
(b) Skid trails and yards must be designed and constructed to prevent sediment and concentrated water runoff from
entering a water body, tributary stream, or wetland. Upon termination of their use, skid trails and yards must be stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of mineral soil within 25 feet, horizontal distance, of any water
body, tributary stream, or wetland. On slopes of 10 percent or greater, the setback for equipment operation must be
increased by 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5 percent increase in
slope above 10 percent. Where slopes fall away from the resource, no increase in the 25-foot setback is required.
(ii) Where such setbacks are impracticable, appropriate techniques shall be used to avoid sedimentation of the water body,
tributary stream or wetland. Such techniques may include the installation of sump holes or settling basins, and/or the
effective use of additional ditch relief culverts and ditch water turnouts placed to avoid sedimentation of the water body,
tributary stream, or wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(5) Land Management Roads. Land management roads, including approaches to crossings of water bodies, tributary
stream channels, and freshwater wetlands, ditches and other related structures, must be designed, constructed, and
maintained to prevent sediment and concentrated water runoff from directly entering the water body, tributary stream or
wetland. Surface water on or adjacent to water crossing approaches must be diverted through vegetative filter strips to
avoid sedimentation of the watercourse or wetland. Because roadside ditches may not extend to the resource being
crossed, vegetative filter strips must be established in accordance with the setback requirements in Section 15(P-1)(7) of
this rule.
(a) Land management roads and associated ditches, excavation, and fill must be set back at least:
(i) 100 feet, horizontal distance, from the normal high-water line of a great pond, river or freshwater or coastal wetland;
(ii) 50 feet, horizontal distance, from the normal high-water line of streams; and
(iii) 25 feet, horizontal distance, from the normal high-water line of tributary streams
(b) The minimum 100 foot setback specified in Section 15(P-1)(5)(a)(i) above may be reduced to no less than 50 feet,
horizontal distance, and the 50 foot setback specified in Section 15(P-1)(5)(a)(ii) above may be reduced to no less than 25
feet, horizontal distance, if, prior to construction, the landowner or the landowner's designated agent demonstrates to the
Planning Board's satisfaction that no reasonable alternative exists and that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may include, but are not limited to, the
installation of settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed to avoid
sedimentation of the water body, tributary stream or wetland. If, despite such precautions, sedimentation or the disruption
of shoreline integrity occurs, such conditions must be corrected.
(c) On slopes of 10 percent or greater, the land management road setback must be increased by at least 20 feet, horizontal
distance, plus an additional 10 feet, horizontal distance, for each 5 percent increase in slope above 10 percent.
(d) New land management roads are not allowed within the shoreland area along Significant River Segments as identified
in 38 M.R.S.A. section 437, nor in a Resource Protection District, unless, prior to construction, the landowner or the
landowner's designated agent makes a clear demonstration to the Planning Board's satisfaction that no reasonable
alternative route exists outside the shoreland zone, and that the new road must be set back as far as practicable from the
normal high-water line and screened from the river by existing vegetation.
(e) Ditches, culverts, bridges, dips, water turnouts and other water control installations associated with roads must be
maintained on a regular basis to assure effective functioning. Drainage structures shall deliver a dispersed flow of water
into an unscarified filter strip no less than the width indicated in the setback requirements in Section 15(P-1)(7). Where
such a filter strip is impracticable, appropriate techniques shall be used to avoid sedimentation of the water body, tributary
stream, or wetland. Such techniques may include the installation of sump holes or settling basins, and/or the effective use
of additional ditch relief culverts and ditch water turnouts placed to avoid sedimentation of the water body, tributary
Dedham Maine
Land Use Ordinance
- 28 -
stream, or wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
(f) Road closeout and discontinuance. Maintenance of the water control installations required in Section 15(P-1)(5)(e)
must continue until use of the road is discontinued and the road is put to bed by effective installation of water bars or other
adequate road drainage structures at appropriate intervals, constructed to avoid surface water flowing over or under the
water bar, and extending a sufficient distance beyond the traveled way so that water does not reenter the
road surface.
(g) Upgrading existing roads. Extension or enlargement of presently existing roads must conform to the provisions of
Section 15(P-1). Any nonconforming existing road may continue to exist and to be maintained, as long as the
nonconforming conditions are not made more nonconforming.
(h) Exception. Extension or enlargement of presently existing roads need not conform to the setback requirements of
Section 15(P-1)(5)(a) if, prior to extension or enlargement, the landowner or the landowner's designated agent
demonstrates to the Planning Board's satisfaction that no reasonable alternative exists and that appropriate techniques will
be used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques may include, but are not
limited to, the installation of settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed
to avoid sedimentation of the water body, tributary stream, or wetland. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions must be corrected.
(i) Additional measures. In addition to the foregoing minimum requirements, persons undertaking construction and
maintenance of roads and river, stream and tributary stream crossings must take reasonable measures to avoid
sedimentation of surface waters.
(6) Crossings of water bodies. Crossings of rivers, streams, and tributary streams must allow for fish passage at all times
of the year, must not impound water, and must allow for the maintenance of normal flows.
(a) Determination of flow. Provided they are properly applied and used for the circumstances for which they are designed,
methods including but not limited to the following are acceptable as a means of calculating the 10 year and 25 year
frequency water flows and thereby determining water crossing sizes as required in Section 15(P-1): The United States
Geological Survey (USGS) Methods; specifically: Hodgkins, G. 1999. Estimating the Magnitude of Peak Flows for
Streams in Maine for Selected Recurrence Intervals. U.S. Geological Survey. Water Resources Investigations Report 99-
4008. 45 pp.
(b) Upgrading existing water crossings. Extension or enlargement of presently existing water crossings must conform to
the provisions of Section 15(P-1). Any nonconforming existing water crossing may continue to exist and be maintained,
as long as the nonconforming conditions are not made more nonconforming; however, any maintenance or repair work
done below the normal high-water line must conform to the provisions of Section 15(P-1).
(c) Other Agency Permits. Any timber harvesting and related activities involving the design, construction, and
maintenance of crossings on water bodies other than a river, stream or tributary stream may require a permit from the
Land Use Regulation Commission, the Department of Environmental Protection, or the US Army Corps of Engineers.
(d) Any timber harvesting and related activities involving the design, construction, and maintenance of crossings of
freshwater wetlands identified by the Department of Inland Fisheries and Wildlife as essential wildlife habitat require
prior consultation with the Department of Inland Fisheries and Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water crossing construction maintenance, alteration and
replacement activities in shoreland areas must be given to the Bureau prior to the commencement of such activities. Such
notice must contain all information required by the Bureau, including:
(i) a map showing the location of all proposed permanent crossings;
(ii) the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires a permit from state or federal agencies, a copy of the approved
permit or permits; and
(iv) a statement signed by the responsible party that all temporary and permanent crossings will be constructed,
maintained, and closed out in accordance with the requirements of this Section.
Dedham Maine
Land Use Ordinance
- 29 -
(f) Water crossing standards. All crossings of rivers require a bridge or culvert sized according to the requirements of
Section 15(P-1)(6)(g)) below. Streams and tributary streams may be crossed using temporary structures that are not
bridges or culverts provided:
(i) concentrated water runoff does not enter the stream or tributary stream;
(ii) sedimentation of surface waters is reasonably avoided;
(iii) there is no substantial disturbance of the bank, or stream or tributary stream channel;
(iv) fish passage is not impeded; and,
(v) water flow is not unreasonably impeded. Subject to Section 15(P-1)(6)(f)(i-v) above, skid trail crossings of streams
and tributary streams when channels of such streams and tributary streams are frozen and snow-covered or are composed
of a hard surface which will not be eroded or otherwise damaged are not required to use permanent or temporary
structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and tributary stream channels with a bridge or culvert, the
following requirements apply:
(i) Bridges and culverts must be installed and maintained to provide an opening sufficient in size and structure to
accommodate 10 year frequency water flows or with a cross-sectional area at least equal to 2 1/2 times the cross-sectional
area of the river, stream, ortributary stream channel.
(ii) Temporary bridge and culvert sizes may be smaller than provided in Section 15(P-1)(6)(g)(i) if techniques are
effectively employed such that in the event of culvert or bridge failure, the natural course of water flow is maintained and
sedimentation of the water body or tributary stream is avoided. Such crossing structures must be at least as
wide as the channel and placed above the normal high-water line. Techniques may include, but are not limited to, the
effective use of any, a combination of, or all of the following:
1. use of temporary skidder bridges;
2. removing culverts prior to the onset of frozen ground conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii) Culverts utilized in river, stream and tributary stream crossings must:
1. be installed at or below river, stream or tributary stream bed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of the culvert;
4. be covered by soil to a minimum depth of 1 foot or according to the culvert manufacturer's specifications, whichever is
greater; and
5. have a headwall at the inlet end which is adequately stabilized by riprap or other suitable means to reasonably avoid
erosion of material around the culvert.
(iv)River, stream and tributary stream crossings allowed under Section 15(P-1), but located in flood hazard areas (i.e. A
zones) as identified on a community's Flood Insurance Rate Maps (FIRM) or Flood Hazard Boundary Maps (FHBM),
must be designed and constructed under the stricter standards contained in that community's National Flood
Insurance Program (NFIP). For example, a water crossing may be required to pass a 100- year flood event.
(v) Exception. Skid trail crossings of tributary streams within shoreland areas and wetlands adjacent to such streams may
be undertaken in a manner not in conformity with the requirements of the foregoing subsections provided persons
conducting such activities take reasonable measures to avoid the disruption of shoreline integrity, the occurrence of
sedimentation of water, and the disturbance of stream banks, stream channels, shorelines, and soil lying within ponds and
wetlands. If, despite such precautions, the disruption of shoreline integrity, sedimentation of water, or the disturbance of
stream banks, stream channels, shorelines, and soil lying within ponds and wetlands occurs, such conditions must be
corrected.
(h) Skid trail closeout. Upon completion of timber harvesting and related activities, or upon the expiration of a Forest
Operations Notification, whichever is earlier, the following requirements apply:
(i) Bridges and culverts installed for river, stream and tributary stream crossings by skid trails must either be removed and
areas of exposed soil stabilized, or upgraded to comply with the closeout standards for land management roads in
Section15(P-1)(6)(i) below.
Dedham Maine
Land Use Ordinance
- 30 -
(ii) Water crossing structures that are not bridges or culverts must either be removed immediately following timber
harvesting and related activities, or, if frozen into the river, stream or tributary stream bed or bank, as soon as practical
after snowmelt.
(iii) River, stream and tributary stream channels, banks and approaches to crossings of water bodies and tributary streams
must be immediately stabilized on completion of harvest, or if the ground is frozen and/or snow-covered, as soon as
practical after snowmelt. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(i) Land management road closeout. Maintenance of the water control features must continue until use of the road is
discontinued and the road is put to bed by taking the following actions:
(i) Effective installation of water bars or other adequate road drainage structures at appropriate intervals, constructed to
reasonably avoid surface water flowing over or under the water bar, and extending sufficient distance beyond the traveled
way so that water does not reenter the road surface.
(ii) Water crossing structures must be appropriately sized or dismantled and removed in a manner that reasonably avoids
sedimentation of the water body or tributary stream.
(iii) Any bridge or water crossing culvert in roads to be discontinued shall satisfy one of the following requirements:
1. it shall be designed to provide an opening sufficient in size and structure to accommodate 25 year frequency water
flows;
2. it shall be designed to provide an opening with a cross-sectional area at least 3 ½ times the cross-sectional area of the
river, stream or tributary stream channel; or
3. it shall be dismantled and removed in a fashion to reasonably avoid sedimentation of the river, stream or tributary
stream. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(7) Slope Table Filter strips, skid trail setbacks, and land management road setbacks must be maintained as specified in
Section 15(P-1), but in no case shall be less than shown in the following table.
Average slope of the land between exposed mineral
Width of stripe between exposed mineral soil and
Soil and shoreline (percent)
shoreline (feet along surface of the ground)
0_____
25
10____________________________________
45
20
65
30___________________________________________________________
85
40
105
50____
125
60
145
70
165
Q.
Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting.
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation within the strip
of land extending 75 feet, horizontal distance inland from the normal high-water line, except to remove safety
hazards.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be limited to that
which is necessary for uses expressly authorized in that district.
Dedham Maine
Land Use Ordinance
- 31 -
(2) Except in areas as described in Section 15(Q)(1), above, and except to allow for the development of permitted
uses, within a strip of land extending one-hundred (100) feet, horizontal distance, inland from the normal
high-water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and seventy-
five (75) feet, horizontal distance, from any other water body, tributary stream, or the upland edge of a
wetland, a buffer strip of vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy or other existing
woody vegetation if a forested canopy is not present as measured from the outer limits of the tree or shrub
crown. However, a footpath not to exceed six (6) feet in width as measured between tree trunks and/or
shrub stems is allowed provided that a cleared line of sight to the water through the buffer strip is not
created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well distributed stand of trees
and other natural vegetation is maintained.
For the purposes of Section 15(Q)(2)(b) a "well-distributed stand of trees" adjacent to a great pond
classified GPA or a river or stream flowing to a great pond classified GPA, shall be defined as
maintaining a rating score of 24 or more in any 50-foot by 25-foot rectangular (1250 square feet) area as
determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 <4 in.
1
4 <8 in.
2
8 < 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand of trees" is
defined as maintaining a minimum rating score of 16 per 50-foot by 25 foot rectangular area.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner or lessee
proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed except as
otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to the minimum
points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50- foot
rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(Q)(2)(b) "other natural vegetation" is defined as retaining existing
vegetation under three (3) feet in height and other ground cover and retaining at least five (5) saplings less
than two (2) inches in diameter at four and one half (4 ½) feet above ground level for each 25-foot by 50-
foot rectangle area. If five saplings do not exist, no woody stems less than two (2) inches in diameter can
be removed until 5 saplings have been recruited into the plot.
Dedham Maine
Land Use Ordinance
- 32 -
Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4) inches or
more in diameter, measured at 4 1/2 feet above ground level may be removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three (3) feet in height and
other ground cover, including leaf litter and the forest duff layer, shall not be cut, covered or removed,
except to provide for a footpath or other permitted uses as described in Section 15(Q) paragraphs (2) and
(2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree, is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, diseased, unsafe, or
dead trees results in the creation of cleared openings, these openings shall be replanted with native tree
species unless existing new tree growth is present.
Section 15(Q)(2) does not apply to those portions of public recreational facilities adjacent to public swimming
areas as long as cleared areas are limited to the minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond classified GPA or a
river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of any other water body, tributary stream, or the upland edge of a wetland there shall be
allowed on any lot, in any ten (10) year period, selective cutting of not more than forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground level. Tree removal in
conjunction with the development of permitted uses shall be included in the forty (40) percent calculation.
For the purposes of these standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose development, including but not limited to principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate, 25% of the lot
area within the Shoreland zone or ten thousand (10,000) square feet, whichever is greater, including land
previously cleared. This provision shall not apply to any of the Growth II-B District.
(4) Legally existing nonconforming cleared opening may be maintained, but shall not be enlarged, except as
allowed by this Ordinance.
(5) Fields or other cleared openings which have reverted to primarily shrubs, trees, or other woody vegetation
shall be regulated under the provisions of Section 15(Q).
R. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which result in unstabilized
soil conditions and which require a permit shall require a written soil erosion and sedimentation control plan.
The plan shall be submitted to the permitting authority for approval and shall include, where applicable,
provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or riprap.
Dedham Maine
Land Use Ordinance
- 33 -
(2) In order to create the least potential for erosion, development shall be designed to fit with the topography and
soils of the site. Areas of steep slopes where high cuts and fills may be required shall be avoided wherever
possible, and natural contours shall be followed as closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project involving land
disturbance, and shall be in operation during all stages of the activity. The amount of exposed soil at every
phase of construction shall be minimized to reduce the potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week from the time it
was last actively worked, by use of riprap, sod, seed, and mulch, or other effective measures. In all cases
permanent stabilization shall occur within nine (9) months of the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred (500) square feet
and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be required to maintain
the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the water. Such
measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion from water flowing
through them. Drainage ways shall be designed and constructed in order to carry water from a twenty five
(25) year storm or greater, and shall be stabilized with vegetation or lined with riprap.
S. Soils.
All land uses shall be located on soils in or upon which the proposed uses or structures can be established or
maintained without causing adverse environmental impacts, including severe erosion, mass soil movement,
improper drainage, and water pollution, whether during or after construction. Proposed uses requiring subsurface
waste disposal, and commercial or industrial development and other similar intensive land uses, shall require a
soils report based on an on-site investigation and be prepared by state-certified professionals. Certified persons
may include Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified
Geologists and other persons who have training and experience in the recognition and evaluation of soil
properties. The report shall be based upon the analysis of the characteristics of the soil and surrounding land and
water areas, maximum ground water elevation, presence of ledge, drainage conditions, and other pertinent data
which the evaluator deems appropriate. The soils report shall include recommendations for a proposed use to
counteract soil limitations where they exist.
T. Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State any pollutant that, by itself
or in combination with other activities or substances, will impair designated uses or the water classification of the
water body, tributary stream or wetland.
U. Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on or adjacent to sites listed
on, or eligible to be listed on the National Register of Historic Places, as determined by the permitting authority,
Dedham Maine
Land Use Ordinance
- 34 -
shall be submitted by the applicant to the Maine Historic Preservation Commission for review and comment, at
least twenty (20) days prior to action being taken by the permitting authority. The permitting authority shall
consider comments received from the Commission prior to rendering a decision on the application.
V. Fences
Fences shall be constructed of such materials and in such a manner as to have minimal adverse effect on the
environment. The fence as constructed will not obstruct fire fighting equipment, road maintenance crews or
emergency crews in the proper performance of their duties, or present an undue hazard or nuisance to innocent
passerby or abutting land owners. The Code Enforcement Officer will have the authority to order the removal or
modification of any fence, regardless of when constructed, whenever it presents any of the above hazardous or
nuisance conditions. Fences shall be set back from all property lines and/or right of ways a distance of two feet,
unless the abutter agrees in writing to placement of fence on property line.
W.
Mobile Homes, which are considered structures as defined:
All mobile homes must be certified to conform to the Federal Construction and Safety Standards Act of
1974.
All placement or removal of a mobile home will require a permit and inspection form the C.E.O. /Building
Inspector and Local Plumbing Inspector.
All mobile homes must be placed on a concrete or gravel pad, be tied down or blocked to insure a safe
and
secure placement and to prevent any unnecessary movement of home.
All mobile homes must have an appropriate skirting in place that will allow access under the home.
X.
Damage to Town Property.
Any and all damages caused by the land/home owner or contractor to any Town Property or Town Roads will be
the responsibility of the land /home owner to repair.
Dedham Maine
Land Use Ordinance
- 35 -
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed annually by July
1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of 30-A M.R.S.A.
section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first obtaining a permit,
engage in any activity or use of land or structure requiring a permit in the district in which such activity or use
would occur; or expand, change, or replace an existing use or structure; or renew a discontinued nonconforming
use. A person who is issued a permit pursuant to this Ordinance shall have a copy of the permit on site while the
work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25 % longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and the crossing does
not block fish passage in the water course.
(2) A permit is not required for an archaeological excavation as long as the excavation is conducted by an
archaeologist listed on the State Historic Preservation Officer's level 1 or level 2 approved lists, and
unreasonable erosion and sedimentation is prevented by means of adequate and timely temporary and
permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permits required by other law or
ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan, a picture of the
area of the property for which the permit is submitted, including any plumbing permits needed for the
proposed construction, on a form provided by the municipality to the appropriate official as indicated in
Section 14. Any state permit forms may be required with the application for a permit. These forms must be
submitted to the Code Enforcement Officer at least one (1) week before the Planning Board meeting for
review of completeness
(2) All applications shall be signed by an owner or individual who can show evidence of right, title or interest in
the property or by an agent, representative, tenant or contractor of the owner with authorization from the
owner to apply for a permit hereunder, certifying that the information in the application is complete and
correct.
Dedham Maine
Land Use Ordinance
- 36 -
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as appropriate, shall
note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed application for a
plumbing permit, including the site evaluation approved by the Plumbing Inspector, shall be submitted
whenever the nature of the proposed structure would require the installation of a subsurface sewage disposal
system.
D. Procedure for Administering Permits. Within 35 days of the date of the application, the Planning board or
Code Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either that the
application is a complete application, or, if the application is incomplete, that specified additional material is
needed to make the application complete. The Planning Board or the Code Enforcement Officer, as appropriate,
shall approve, approve with conditions, or deny all permit applications in writing within 35 days of receiving a
completed application. However, if the Planning Board has a waiting list of applications, a decision on the
application shall occur within 35 days after the first available date on the Planning Board's agenda following
receipt of the completed application, or within 35 days of the public hearing, if the proposed use or structure is
found to be in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in conformity with the
purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an application or
approve it with conditions if it makes a positive finding based on the information presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will avoid problems associated with floodplain development and use; and
(8) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be stated in
writing. No approval shall be granted for an application involving a structure if the structure would be located in
an unapproved subdivision or would violate any other local ordinance or regulation or any State law which the
municipality is responsible for enforcing.
E. Expiration of Permit. Permits shall expire one year from the date of issuances if substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made within one year of the
issuance of the permit, the applicant shall have one additional year to complete the project, at which time the permit
shall expire.
Dedham Maine
Land Use Ordinance
- 37 -
F. Fees. Fees for permits will be reviewed and set by the Board of Selectmen on a yearly basis.
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any utility company of
any kind may not install services to any new structure located in the shoreland zone unless written authorization
attesting to the validity and currency of all local permits required under this or any previous Ordinance, has been
issued by the appropriate municipal officials or other written arrangements have been made between the
municipal officials and the utility.
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis, where it is
alleged by an aggrieved party that there is an error in any order, requirement, decision, or determination
made by, or failure to act by, Planning Board or Code Enforcement Officer in the administration of this
Ordinance. Any order, requirement, decision or determination made, or failure to act, by the Code
Enforcement Officer in the enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements, including but not limited to, lot width,
structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the specific
provision which has created the non-conformity and from which relief is sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship. The term "undue
hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is granted;
b. That the need for a variance is due to the unique circumstances of the property and not to the
general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality; and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Not withstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals may grant a variance to an owner
of a residential dwelling for the purpose of making that dwelling accessible to a person with a disability
who resides in or regularly uses the dwelling. The board shall restrict any variance granted under this
subsection solely to the installation of equipment or the construction of structures necessary for access to
Dedham Maine
Land Use Ordinance
- 38 -
or egress from the dwelling by the person with the disability. The board may impose conditions on the
variance, including limiting the variance to the duration of the disability or to the time that the person
with the disability lives in the dwelling. The term "structures necessary for access to or egress from the
dwelling" shall include railing, wall or roof systems necessary for the safety or effectiveness of the
structure.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to insure
conformance with the purposes and provisions of this Ordinance to the greatest extent possible, and in
doing so may impose such conditions to a variance as it deems necessary. The party receiving the
variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information supplied by the
applicant, shall be forwarded by the municipal officials to the Commissioner of the Department of
Environmental Protection at least twenty (20) days prior to action by the Board of Appeals. Any
comments received from the Commissioner prior to the action by the Board of Appeals shall be made part
of the record and shall be taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals hears a decision of the Planning Board or Code enforcement Officer, it shall
hold an appellate hearing, and may reverse the decision of the Planning Board or Code Enforcement
Officer only upon finding that the decision was contrary to specific provisions of the Ordinance or
contrary to the facts presented to the Planning Board or Code Enforcement Officer. The Board
of Appeals may only review the record of the proceedings before the Planning Board or Code
Enforcement Officer. The Board Appeals shall not receive or consider any evidence which was not
presented to the Planning Board or Code Enforcement Officer, but the Board of Appeals may receive and
consider written or oral arguments. If the Board of Appeals determines that the records of the Planning
Board or Code Enforcement Officer proceedings are inadequate, the Board of Appeals may remand
the matter to the Planning Board or Code Enforcement Officer for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved party
from any decision of the Code Enforcement Officer or the Planning Board, except for enforcement-
related matters as described in Section 16(H)(1)(a) above. Such an appeal shall be taken within thirty
(30) days of the date of the official written decision appealed from, and not otherwise, except that the
Board, upon a showing of good cause, may waive the thirty (30) day requirement.
(ii) Application for appeals shall be made by filing with the Board of Appeals a written notice of appeal
which includes:
a. A concise written statement indicating what relief is requested and why the appeal or variance
should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and structures and other
physical features of the lot pertinent to the relief sought.
Dedham Maine
Land Use Ordinance
- 39 -
(iii) Upon receiving an application for an administrative appeal or variance, the Code Enforcement Officer
or Planning Board, as appropriate, shall transmit to the Board of Appeals all of the papers constituting
the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a request for a
variance within thirty-five (35) days of its receipt of a complete written application, unless this time
period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the board shall constitute a quorum for the purpose
of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within thirty five (35)
days after the close of the hearing, and shall issue a written decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a statement of
the facts found and conclusions reached by the Board. The Board shall cause written notice of its
decision to be mailed or hand-delivered to the applicant and to the Department of Environmental
Protection within seven (7) days of the Board's decision. Copies of written decisions of the Board
of Appeals shall be given to the Planning Board, Code Enforcement Officer, and the municipal
officers. All decisions shall become a part of the record and shall include a statement of findings
and conclusions as well as the reasons or basis therefore, and the appropriate order, relief or
denial thereof.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take an appeal to Superior
Court in accordance with State laws within forty-five (45) days from the date of any decision of the Board of
Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may reconsider
any decision within forty-five (45) days of its prior decision.
A request to the Board to reconsider a decision must be filed within ten (10) days of the
decision that is being reconsidered. A vote to reconsider and the action taken on that
reconsideration must occur and be completed within forty-five (45) days of the date of the
vote on the original decision. Reconsideration of a decision shall require a positive vote of the
majority of the Board members originally voting on the decision, and proper notification to
the landowner, petitioner, planning board, code enforcement officer, and other parties of
interest, including abutters and those who testified at the original hearing(s). The Board may
conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
Dedham Maine
Land Use Ordinance
- 40 -
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance. If the
Code Enforcement Officer shall find that any provision of this Ordinance is being violated, he or she shall
notify in writing the person responsible for such violation, indicating the nature of the violation and
ordering the action necessary to correct it, including discontinuance of illegal use of land, buildings or
structures, or work being done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal officers and be maintained as a
permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to ensure compliance with all applicable
laws and conditions attached to permit approvals. The Code Enforcement Officer shall also investigate
all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of the office,
including applications submitted, permits granted or denied, variances granted or denied, revocation
actions, revocation of permits, appeals, court actions, violations investigated, violations found, and fees
collected. On a biennial basis, a summary of this record shall be submitted to the Director of the Bureau
of Land and Water Quality within the Department of Environmental Protection.
(3) Legal Actions. When the above action does not result in the correction or abatement of the violation or
nuisance condition, the Municipal Officers, upon notice from the Code Enforcement Officer, are hereby
directed to institute any and all actions and proceedings, either legal or equitable, including seeking
injunctions of violations and the imposition of fines, that may be appropriate or necessary to enforce the
provisions of this Ordinance in the name of the municipality. The municipal officers, or their authorized
agent, are hereby authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such agreements shall not allow an
illegal structure or use to continue unless there is clear and convincing evidence that the illegal structure or
use was constructed or conducted as a direct result of erroneous advice given by an authorized municipal
official and there is no evidence that the owner acted in bad faith, or unless the removal of the structure or use
will result in a threat or hazard to public health and safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a contractor, who
violates any provision or requirements of this Ordinance shall be penalized in accordance with 30-A,
M.R.S.A. section 4452.
Dedham Maine
Land Use Ordinance
- 41 -
17. Definitions.
Accessory structure or use - a use or structure which is incidental and subordinate to the principal use or structure.
Accessory uses, when aggregated shall not subordinate the principal use of the lot. A deck or similar extension of the
principal structure or a garage attached to the principal structure by a roof or a common wall is considered part of the
principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or denial of a
permit or variance under this Ordinance; a person whose land abuts land for which a permit or variance has been
granted; or any other person or group of persons who have suffered particularized injury as a result of the granting or
denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals, including but not
limited to: forages and sod crops; grains and seed crops; dairy animals and dairy products; poultry and poultry
products; livestock; fruits and vegetables; and ornamental and green house products. Agriculture does not include
forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more than 50% of its
volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft, and which may
include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau - State of Maine Department of Conservation's Bureau of Forestry.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living quarters,
including, but not limited to tents, recreational vehicles or other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined below, the intent
and result of which activity is the production of income from the buying and selling of goods and/or services,
exclusive of rental of residential buildings and/or dwelling units.
Cross-sectional area - the cross-sectional area of a stream or tributary stream channel is determined by multiplying
the stream or tributary stream channel width by the average stream or tributary stream channel depth. The stream or
tributary stream channel width is the straight line distance from the normal high-water line on one side of the channel
to the normal high-water line on the opposite side of the channel. The average stream or tributary stream channel
\ depth is the average of the vertical distances from a straight line between the normal high-water lines of the stream or
tributary stream channel to the bottom of the channel.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
Development - a change in land use involving alteration of the land, water or vegetation, or the addition or alteration
of structures or other construction no naturally occurring.
Dedham Maine
Land Use Ordinance
- 42 -
Dimensional requirements - numerical standards relating to spatial relationships including but not limited to setback,
lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental condition caused by
bodily injury, accident, disease, birth defect, environmental conditions or illness; and also includes the physical or
mental condition of a person which constitutes a substantial handicap as determined by a physician or in the case of
mental handicap, by a psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
Disruption of shoreline integrity - the alteration of the physical shape, properties, or condition of a shoreline at and
location by timber harvesting and related activities. A shoreline where shoreline integrity has been disrupted is
recognized by compacted, scarified and/or rutted soil, an abnormal channel or shoreline cross-section, and in the case
of flowing waters, a profile and character altered from natural conditions.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-family dwelling or
one two-family dwelling or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such as protection of
resources from immediate destruction or loss, law enforcement, and operations to rescue human beings, property and
livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water transmission or
distribution lines, towers and related equipment; telephone cables or lines, poles and related equipment; gas, oil,
water, slurry or other similar pipelines; municipal sewage lines, collection or supply systems; and associated storage
tanks. Such systems may include towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police
call boxes, traffic signals, hydrants and similar accessories, but shall not include service drops or buildings which are
necessary for the furnishing of such services.
Expansion of a structure - an increase in the floor area or volume of a structure, including all extensions such as, but
not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of more floor area or
ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls, plus the
horizontal area of any unenclosed portions of a structure such as porches and decks.
Forest management activities - timber cruising and other forest resource evaluation activities, pesticide or fertilizer
application, management planning activities, timber stand improvement, pruning, regeneration of forest stands, and
other similar or associated activities, exclusive of timber harvesting and the construction, creation or maintenance
of roads.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meter tall (approximately
twenty (20) feet) or taller.
Dedham Maine
Land Use Ordinance
- 43 -
Forest Stand - a contiguous group of trees sufficiently uniform in age class distribution, composition,
and structure, and growing on a site of sufficiently uniform quality, to be a distinguishable unit.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills and post supports,
but including basements, slabs, frostwalls or other base consisting of concrete, block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested wetlands, which are:
1.
Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a surface water body,
excluding any river, stream or brook, such that in a natural state, the combined surface area is in excess of
10 acres; and
2.
Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to support,
and which under normal circumstances do support, a prevalence of wetland vegetation typically adapted
for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the criteria of
this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on submerged lands
or that require direct access to, or location in, coastal or inland waters and that can not be located away from these
waters. The uses include, but are not limited to commercial and recreational fishing and boating facilities, excluding
recreational boat storage buildings, finfish and shellfish processing, fish storage and retail and wholesale fish
marketing facilities, waterfront dock and port facilities, shipyards and boat building facilities, marinas, navigation
aids, basins and channels, retaining walls, industrial uses dependent upon water-borne transportation or requiring
large volumes of cooling or processing water that can not reasonably be located or operated at an inland site, and uses
that primarily provide general public access to coastal or inland waters.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten (10) acres, and any
inland body of water artificially formed or increased which has a surface area in excess of thirty (30) acres except for
the purposes of this Ordinance, where the artificially formed or increased inland body of water is completely
surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to Title 38 Article 4-A Section 465-A. This
classification includes some, but not all impoundments of rivers that are defined as great ponds.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic matter of the forest
floor.
Harvest Area - the area where timber harvesting and related activities, including the cutting of trees, skidding,
yarding, and associated road construction take place. The area affected by a harvest encompasses the area within the
outer boundaries of these activities, excepting unharvested areas greater than 10 acres within the area affected by a
harvest.
Height of a structure - the vertical distance between the mean original (prior to construction) grade at the downhill
side of the structure to the highest point of the structure, excluding chimneys, steeples, antennas, and similar
appurtenances that have no floor area.
Dedham Maine
Land Use Ordinance
- 44 -
Increase in nonconformity of a structure - any change in a structure or property which causes further deviation
from the dimensional standard(s) creating the nonconformity such as, but not limited to, reduction in water body,
tributary stream or wetland setback distance, increase in lot coverage, or increase in height of a structure. Property
changes or structure expansions which either meet the dimensional standard or which cause no further increase in the
linear extent of nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies, wetlands, or tributary
streams if the expansion extends no further into the required setback area than does any portion of the existing
nonconforming structure. Hence, a structure may be expanded laterally provided that the expansion extends no closer
to the water body, tributary stream or wetland than the closest portion of the existing structure from that water body,
tributary stream or wetland. Included in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which is developed for
repeated camping by only one group not to exceed ten (10) individuals and which involves site improvements which
may include but not be limited to a gravel pad, parking area, fire place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods, or the
extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for public
purposes.
Land Management Road - a route or track consisting of a bed of exposed mineral soil, gravel, or other surfacing
materials constructed for, or created by, the passage of motorized vehicles and used primarily for timber harvesting
and related activities, including associated log yards, but not including skid trails or skid roads.
Licensed Forester - a forester licensed under 32 M.R.S.A. Chapter 76.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal high-water line
of a water body or upland edge of a wetland and areas beneath roads serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use, providing for hire
offshore moorings or docking facilities for boats, and which may also provide accessory services such as boat and
related sales, boat repair and construction, indoor and outdoor storage of boats and marine equipment, bait and tackle
shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under prevailing market conditions in
a sale between a willing seller and a willing buyer, both conversant with the property and with prevailing general
price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or extent of mineral
resources which create minimal disturbance to the land and which include reasonable measures to restore the land to
its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than one hundred
(100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from its natural location
and to transport the product removed, away from the extraction site.
Dedham Maine
Land Use Ordinance
- 45 -
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lots lines extend into the
Shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment of this Ordinance,
does not meet the area, frontage, or width requirements of the district in which it is located.
Non-conforming structure - a structure which does not meet any one or more of the following dimensional
requirements; setback, height, or lot coverage, but which is allowed solely because it was in lawful existence at the
time this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not allowed in the district
in which it is situated, but which is allowed to remain solely because it was in lawful existence at the time this
Ordinance or subsequent amendments took effect.
Normal high-water line - that line which is apparent from visible markings, changes in the character of soils due to
prolonged action of the water or changes in vegetation, and which distinguishes between predominantly aquatic and
predominantly terrestrial land. Areas contiguous with rivers and great ponds that support non-forested wetland
vegetation and hydric soils and that are at the same or lower elevation as the water level of the river or great pond
during the period of normal high-water are considered part of the river or great pond. In the case of wetlands adjacent
to rivers and great ponds.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership, association, two or
more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or below the normal high-water
line or within a wetland.
Temporary:
Structures which remain in or over the water for less than seven (7) months in any period of
twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or more in any period of
twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes wholly incidental or accessory to the use
of another building or use on the same premises.
Principal use - a use other than one which is wholly incidental or accessory to another use on the same premises.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and roads, which are
owned, leased, or otherwise operated, or funded by a governmental body or public entity.
Dedham Maine
Land Use Ordinance
- 46 -
Recent floodplain soils - the following soil series as described and identified by the National Cooperative Soil
Survey:
Fryeburg
Haley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time activities, and other
customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for temporary
sleeping or living quarters for one or more persons, and which may include a pick-up camper, travel trailer, tent
trailer, camp trailer, and motor home. In order to be considered as a vehicle and not as a structure, the unit must
remain with its tires on the ground, and must be registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace:
1.) an existing system which is either malfunctioning or being upgraded with no significant change of design flow or
use of the structure.
2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as permanent,
seasonal, or temporary living quarters for only one family at a time, and containing cooking, sleeping, and toilet
facilities. The term shall include mobile homes and rented units that containing cooking, sleeping, and toilet facilities
regardless of the time-period rented. Recreational vehicles are not residential dwelling units.
Residual basal area - the average of the basal area of trees remaining on a harvested site.
Residual Stand - a stand of trees remaining in the forest following timber harvesting and related activities
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and soil
stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that point at which it provides
drainage for a watershed of twenty five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing material
constructed for or created by the repeated passage of motorized vehicles, excluding a driveway as defined.
Service drop - any utility line extension which does not cross or run beneath any portion of a water body provided
that:
1. In the case of electric service.
a. the placement of wires and/or the installation of utility poles is located entirely upon the premises of the
customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
Dedham Maine
Land Use Ordinance
- 47 -
2.In the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to existing utility poles,
or
b. the extension requiring the installation of new utility poles or placement underground is less than one
thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary stream, or
upland edge of a wetland, to the nearest part of a structure, road, parking space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line between the
intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance, of the normal
high-water line of any great pond or river; within 250 feet, horizontal distance, of the upland edge of a freshwater
wetland; or within one hundred (100) feet horizontal distance of the normal high-water line of a stream.
Shoreline - the normal high-water line or upland edge of a freshwater wetland.
Significant River Segments - See 38 M.R.S.A. Section 437.
Skid Road or Skid Trail - a route repeatedly used by forwarding machinery or animal to haul or drag forest products
from the stump to the yard or landing, the construction of which requires minimal excavation.
Slash - the residue, e.g., treetops and branches, left on the ground after a timber harvest.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2) perennial streams
as depicted on the most recent edition of a United States Geological Survey 7.5 minute series topographic map, or if
not available, a 15-minute series topographic map, to the point where the body of water becomes a river or flows to
another water body or wetland within the shoreland area.
Structure - anything built for the support, shelter or enclosure of persons, animals, goods or property of any kind,
together with anything constructed or erected with a fixed location on or in the ground, exclusive of fences, and poles,
wiring and other aerial equipment normally associated with service drops as well as guying and guy anchors. The
term includes structures temporarily or permanently located, such as decks , patios, and satellite dishes.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a percentage of
estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered cesspools;
holding tanks; pretreatment filter, piping, or any other fixture, mechanism, or apparatus used for those purposes; does
not include any discharge system licensed under 38 M.R.S.A. section 414, any surface waste water disposal system, or
any municipal or quasi-municipal sewer or waste water treatment system.
Sustained slope - a change in elevation where the referenced percent grade is substantially maintained or exceeded
throughout the measured area.
Dedham Maine
Land Use Ordinance
- 48 -
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or processing forest
products. The cutting or removal of trees in the shoreland zone on a lot that has less than two (2) acres within the
shoreland zone shall not be considered timber harvesting. Such cutting or removal of trees shall be regulated pursuant
to Section 15 (Q), Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
Timber harvesting and related activities - timber harvesting, the construction and maintenance of roads used
primarily for timber harvesting and other activities conducted to facilitate timber harvesting.
Tributary stream -- means a channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing waterborne
deposits or exposed soil, parent material or bedrock; and which is connected hydrologically with other water bodies.
Tributary stream" does not include rills or gullies forming because of accelerated erosion in disturbed soils where the
natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only applies to that
portion of the tributary stream located within the shoreland zone of the receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a freshwater wetland, the
upland edge is formed where the soils are not saturated for a duration sufficient to support wetland vegetation; or
where the soils support the growth of wetland vegetation, but such vegetation is dominated by woody stems that are
six (6) meter (approximately twenty (20) feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including, without limitation, trees both over and under 4 inches in
diameter, measured at 4 1/2 feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed exterior walls as
measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream
Water crossing - any project extending from one bank to the opposite bank of a river, stream, tributary stream, or
wetland whether under, through, or over the water or wetland. Such projects include but may not be limited to roads,
fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these crossings. This
definition includes crossings for timber harvesting equipment and related activities.
Wetland - a freshwater wetland.
Windfirm - the ability of a forest stand to withstand strong winds and resist windthrow, wind rocking,
and major breakage.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
Note: If a definition is not found within this Ordinance, refer to the Webster Collegiate Dictionary.