Land Use Ordinance (2009) [superseded by 2023 Shoreland Zoning Ordinance]

Dedham, Maine · adopted 2009-06-20 · summary & facts

This is the exact embedded text of the captured official document. Snapshot cd792b268e81 · verified 2026-09-22 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 1 1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect archaeological and historic resources; to protect freshwater wetlands; to control building sites, placement of structures and land uses; to conserve shore cover, and visual as well as actual points of access to inland waters; to conserve natural beauty and open space; and to anticipate and respond to the impacts of development within the Town of Dedham. 2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 Sections 435-449 of the Maine Revised Statutes Annotated (M.R.S.A.). 3. Applicability. This Ordinance applies to all land areas within the Town of Dedham, including land area within 250 feet horizontal distance, of the normal high-water line of any great pond or river; within 250 feet, horizontal distance of the upland edge of a freshwater wetland; and all land area within 100 feet, horizontal distance, of the normal high-water line of a stream. This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or other structure extending or located below the normal high-water line of a water body or within a wetland. 4. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was adopted by the municipal legislative body on June 14, 1994, shall not be effective unless approved by the Commissioner of the Department of Environmental Protection. A certified copy of the Ordinance, attested and signed by the Municipal Clerk, shall be forwarded to the Commissioner for approval. If the Commissioner fails to act on the Ordinance or Ordinance Amendment within forty-five (45) days of his/her receipt of the Ordinance and Ordinance Amendment and it shall be automatically approved. Any application for a permit submitted to the municipality within the forty-five (45) day period shall be governed by the terms of this Ordinance or Ordinance Amendment, if the Ordinance or Ordinance Amendment, is approved by the Commissioner. 5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to any member of the public. Copies shall be made available to the public at reasonable cost at the expense of the person making the request. Notice of availability of this Ordinance shall be posted. 6. Severability. Should any section or provision of this Ordinance be declared by the courts to be invalid, such decision shall not invalidate any other section or provision of the Ordinance. 7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute administered by the municipality, the more restrictive provision shall control. 8. Amendments. This Ordinance may be amended by majority vote of the legislative body. Copies of amendments, attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of the Department of Environmental Protection following adoption by the municipal legislative body and shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is automatically approved. Any application for a permit submitted to the municipality within the forty- Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 2 five (45) day period shall be governed by the terms of the amendment, if such amendment is approved by the Commissioner. 9. Districts and Zoning Map A. Official Dedham Zoning Map. The areas to which this Ordinance is applicable are hereby divided into the following districts as shown on the Official Dedham Zoning Map(s) which is (are) made a part of this Ordinance: 1. Resource Protection Environmentally sensitive areas 2. Growth I Residential and Home Occupation 3. Growth II-A Mixed Use 4. Growth II-B Commercial Development 5. RR Rural Residential-Home Occupation B. Scale of Map. The Official Dedham Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000 feet. District boundaries shall be clearly delineated and a legend indicating the symbols for each district shall be placed on the map C. Certification of Official Dedham Zoning Map. The Official Dedham Zoning Map shall be certified by the attested signature of the Municipal Clerk and shall be located in the municipal office. In the event the municipality does not have a municipal office, the Municipal Clerk shall be the custodian of the map. D. Changes to the Official Dedham Zoning Map. If amendments, in accordance with Section 8, are made in the district boundaries or other matter portrayed on the Official Dedham Zoning Map, such changes shall be made on the Official Dedham Zoning Map within thirty (30) days after the amendment has been approved by the Commissioner of the Department of Environmental Protection. 10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Dedham Zoning Map, district boundary lines are property lines, the centerlines of streets, roads and rights of way, and the boundaries of the shoreland area as defined herein. Where uncertainty exists as to the exact location of district boundary lines, the Board of Appeals shall be the final authority as to location. 11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected, constructed, expanded, moved, or altered and no new lot shall be created except in conformity with all of the regulations herein specified for the district in which it is located, unless a variance is granted. 12. Non-conformance. A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non- conforming conditions that existed before the effective date of this Ordinance or amendments thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except as otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to become more non-conforming. Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 3 B. General (1) Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and the new owner may continue the non-conforming use or continue to use the non- conforming structure or lot, subject to the provisions of this Ordinance. (2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and maintenance of non-conforming uses and structures including repairs or renovations that do not involve expansion of the non-conforming use or structure, and such other changes in a non-conforming use or structure as federal, state, or local building and safety codes may require. C. Non-conforming Structures (1) Expansions. A non-conforming structure may be added to or expanded after obtaining a permit from the same permitting authority as that for a new structure, if such addition or expansion does not increase the non-conformity of the structure, and is in accordance with subparagraphs (a), and (b) below. (a) Legally existing non-conforming principal and accessory structures that do not meet the water body tributary stream or wetland setback requirements may be expanded or altered as follows, as long as all other applicable standards contained in this Ordinance are met. i. Expansion of any portion of a structure within 25 feet horizontal distance of the normal high- water line of a water body, tributary stream or upland edge of a wetland is prohibited, even if the expansion will not increase nonconformity with the water body, tributary stream or wetland setback requirement. ii. Expansion of an accessory structure that is located closer to the normal high-water line of a water body, tributary stream or upland edge of a wetland than the principal structure is prohibited, even if the expansion will not increase nonconformity with the water body, tributary stream or wetland setback requirement. iii. For structures located less than 75 feet horizontal distance, from the normal high-water line of a water body, tributary stream or upland edge of a wetland, the maximum combined total floor area for all portions of those structures within that 75-foot distance is 1,000 square feet, and the maximum height of any portion of a structure that is within 75 feet, horizontal distance, of a water body, tributary stream or upland edge of a wetland is 20 feet or the height of the existing structure, whichever is greater. iv For structures located less than 100 feet horizontal distance, from the normal high-water line of a great pond classified as GPA, the maximum combined total floor area for all portions of those structures within the 100-foot distance is 1,500 square feet, and the maximum height of any portion of a structure that is within 100 feet, horizontal distance, of a great pond is 25 feet or the height of the existing structure, whichever is greater, except that any portion of those structures located less than 75 feet, horizontal distance from the normal high-water line of a Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 4 water body, tributary stream or the upland edge of a wetland must meet the floor area and height limits of division (iii). For the purpose of Section 12(C) (1) (a), a basement is not counted toward floor area. (b) Whenever a new, enlarged, or replacement foundation is constructed under a non- conforming structure, the structure and new foundation must be placed such that the setback requirement is met to the greatest practical extent as determined by the Planning Board or its designee, basing its decision on the criteria specified in Section 12(C)(2) Relocation, below. If the completed foundation does not extend beyond the exterior dimensions of the structure and the foundation does not cause the structure to be elevated by more than three (3) additional feet, as measured from the uphill side of the structure, it shall not be considered to be an expansion of the structure. (1-A) Special expansion allowance. Existing principal and accessory structures that exceed the floor area or height limits set in Section 12(C)(1)(a)(iii) and Section 12(C)(1)(a)(iv) above may not be expanded, except that the limits may be exceeded by not more than 500 square feet provided that all of the following requirements are met. (a) The principal structure is set back at least 50 feet horizontal distance from the normal high-water line of a water body, tributary stream or upland edge of a wetland. (b) A well-distributed stand of trees and other natural vegetation as defined in Section 15(Q)(2)(b), extends at least 50 feet horizontal distance in depth as measured from the normal high-water line or upland edge for the entire width of the property. If a well-distributed stand of trees and other vegetation meeting the requirements of Section 15 (Q)(2)(b) is not present, the 500 square foot special expansion allowance may be permitted only in conjunction with a written plan, including a scaled site drawing, by the property owner, and approved by the Planning Board or its designee, to reestablish a buffer of trees, shrubs, and other ground cover within 50 feet horizontal distance of the shoreline or tributary stream. (c) Adjacent to great ponds classified GPA and rivers flowing to great ponds classified GPA, except for the allowable footpath, there exists complete natural ground cover, consisting of forest duff, shrubs and other woody and herbaceous vegetation within 50 feet horizontal distance of the normal high-water line. Where natural ground cover is lacking the area must be supplemented with leaf or bark mulch and plantings of native shrubs, and other woody and herbaceous vegetation in quantities sufficient to retard erosion and provide for effective infiltration of stormwater. (d) A written plan by the property owner, including a scaled site drawing, is approved by the Planning Board and is developed, implemented, and maintained to address the following mitigation measures for the property within the shoreland zone. (i) Unstabilized areas resulting in soil erosion must be mulched, seeded, or otherwise stabilized and maintained to prevent further erosion and sedimentation to water bodies, tributary streams and wetlands. Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 5 (ii) Roofs and associated drainage systems, driveways, parking areas, and other nonvegetated surfaces must be designed or modified, as necessary, to prevent concentrated flow of storm water runoff from reaching a water body, tributary stream or wetland. Where possible, runoff must be directed through a vegetated area or infiltrated into the soil through the use of a dry well, stone apron, or similar device. (1-B) Planting requirements. Any planting or revegetation required as a condition to the Special Expansion Allowance must be in accordance with a written plan drafted by a qualified professional, be implemented at the time of construction, and be designed to meet the rating scores and the ground cover requirements of Section 15 (Q)(2)(b)when the vegetation matures within the 50 foot strip. At a minimum, the plan must provide for the establishment of a well-distributed planting of saplings spaced so that there is at least one sapling per 80 square feet of newly established buffer. Planted saplings may be no less than three (3) feet tall for coniferous species and no less than six feet tall for deciduous species. The planting plan must include a mix of at least three native tree species found growing in adjacent areas, with no one species making up more than 50% of the number of saplings planted unless otherwise approved by the Planning Board or its designee, based on adjacent stand comparison. All aspects of the implemented plan must be maintained by the applicant and future owners. (1-C) Filing and reporting requirements: Written plans required pursuant to this section must be filed with the Penobscot County Registry of Deeds. A copy of all permits issued pursuant to this section must be forwarded by the municipality to the Department of Environmental Protection within 14 days of the issuance of the permit. (2) Relocation. A non-conforming structure may be relocated within the boundaries of the parcel on which the structure is located provided that the site of relocation conforms to all setback requirements to the greatest practical extent as determined by the Planning Board, or its designee, and provided that the applicant demonstrates that the present subsurface sewage disposal system meets the requirements of State law and the State of Maine Subsurface Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with the law and said Rules. In no case shall a structure be relocated in a manner that causes the structure to be more non-conforming. In determining whether the building relocation meets the setback to the greatest practical extent, the Planning Board shall consider the size of the lot, the slope of the land, the potential for soil erosion, the location of other structures on the property and on adjacent properties, the location of the septic system and other on-site soils suitable for septic systems, and the type and amount of vegetation to be removed to accomplish the relocation. When it is necessary to remove vegetation within the water or wetland setback area in order to relocate a structure, the Planning Board shall require replanting of native vegetation to compensate for the destroyed vegetation. In addition, the area from which the relocated structure was removed must be replanted with vegetation. Replanting shall be required as follows: (a) Trees removed in order to relocate a structure must be replanted with a least one native tree, three (3) feet in height, for every tree removed. If more then five (5) trees are planted, no one species of tree shall make up more the 50% of the number of trees planted. Replaced trees must be planted no further from the water or wetland then the trees that were removed. Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 6 Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed in order to relocate a structure must be re-established. An area at least the same size as the area where vegetation and/or ground cover was disturbed, damaged, or removed must be reestablished within the setback area. The vegetation and/or ground cover must consist of similar native vegetation and/or ground cover that was disturbed, destroyed or removed. (b) Where feasible, when a structure is relocated on a parcel the original location of the structure shall be replanted with vegetation which may consist of grasses, shrubs, trees, or a combination thereof. (3) Reconstruction or Replacement. Any non-conforming structure which is located less than the required setback from a water body, tributary stream, or a wetland and which is removed, or damaged or destroyed, regardless of the cause, by more than 50% of the market value of the structure before such damage, destruction or removal, may be reconstructed or replaced provided that a permit is obtained within eighteen (18) months of the date of said damage, destruction, or removal, and provided that such reconstruction or replacement is in compliance with the water body, tributary stream or wetland setback requirement to the greatest practical extent as determined by the Planning Board or its designee in accordance with the purposes of this Ordinance. In no case shall a structure be reconstructed or replaced so as to increase its non- conformity. If the reconstructed or replaced structure is less then the required setback it shall not be any larger then the original structure, except as allowed pursuant to Section 12 (C)(1) above, as determined by the non-conforming floor area of the reconstructed or replaced structure at its new location. If the total amount of floor area of the original structure can be relocated or reconstructed beyond the required setback area, no portion of the relocated or reconstructed structure shall be replaced or constructed less then the setback requirement of a new structure. When it is necessary to remove vegetation in order to replace or reconstruct a structure, vegetation shall be replanted in accordance with Section 12 (C)(2) above. Any non-conforming structure which is located less then the required setback from a water body, tributary stream, or wetland and which is removed by 50% or less of the market value, or damaged or destroyed by 50% or less of the market value of the structure, excluding normal maintenance and repair, may be reconstructed in place if a permit is obtained from the Code Enforcement Officer within one year of such damage, destruction, or removal. In determining whether the building reconstruction or replacement meets the water setback to the greatest practical extent the Planning Board or its designee shall consider, in addition to the criteria in Section 12 (C)(2) above, the physical condition and type of foundation present, if any. (4) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may not be changed to another use unless the Planning Board after receiving a written application determines that the new use will have no greater adverse impact on the water body, tributary stream or wetland or adjacent properties and resources than the existing use. In determining that no greater adverse impact will occur, the Planning Board shall require written documentation from the applicant, regarding the probable effects on public health and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover, visual and actual points of public access to waters, natural beauty, floodplain management, archaeological and historic resources, and other functionally water-dependent uses. D. Non-conforming Uses Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 7 (1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming residential uses may, after obtaining a permit from the Planning Board, be expanded within existing residential structures or within expansions of such structures as allowed in Section 12(C)(1)(a) above. (2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is discontinued for a period exceeding one year, or which is superseded by a conforming use, may not again be devoted to a non-conforming use except that the Planning Board may, for good cause shown by the applicant, grant up to a one year extension to that time period. This provision shall not apply to the resumption of a use of a residential structure provided that the structure has been used or maintained for residential purposes during the preceding Five (5) year period. (3) Change of Use. An existing non-conforming use may be changed to another non-conforming use provided that the proposed use has no greater adverse impact on the subject and adjacent properties and resources, including water-dependent uses in the CFMA district, than the former use, as determined by the Planning Board. The determination of no greater adverse impact shall be made according to criteria listed in Section 12 (C) (4) above. E. Non-conforming Lots (1) Non-conforming Lots: A non-conforming lot of record established prior to the effective date of this Ordinance or amendment thereto may be built upon, without the need for a variance, provided that such lot is in separate ownership and not contiguous with any other lot in the same ownership, and that all provisions of this Ordinance except lot area, lot width and shore frontage can be met. Variances relating to setback or other requirements not involving lot area, lot width and shore frontage shall be obtained by action of the Board of Appeals. (2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not meet the dimensional requirements of this Ordinance, and if a principal use or structure exists on each lot, the non-conforming lots may be conveyed separately or together, provided that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the State of Maine Subsurface Wastewater Disposal Rules are complied with. If two or more principal uses or structures existed on a single lot of record on the effective date of this ordinance, each may be sold on a separate lot provided that the above referenced law and rules are complied with. When such lots are divided each lot thus created must be as conforming as possible to the dimensional requirements of this Ordinance. (3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are in single or joint ownership of record at the time of or since adoption or amendment of this Ordinance, if any of these lots do not individually meet the dimensional requirements of this Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no principal structure the lots shall be combined to the extent necessary to meet the dimensional requirements. This provision shall not apply to two (2) or more contiguous lots, at least one of which is non- conforming, owned by the same person or persons on the effective date of this Ordinance and Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 8 recorded in the registry of deeds if the lot is served by a public sewer or can accommodate a subsurface sewage disposal system in conformance with the State of Maine Subsurface Wastewater Disposal Rules; and (a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot area; or (b) Any lots that do not meet the frontage and lot size requirements of Section 12 (E)(3)(a) are reconfigured or combined so that each new lot contains at least 100 feet of shore frontage and 20,000 square feet of lot area. Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 9 13. Establishment of Districts A. Resource Protection District. The Resource Protection District includes areas in which development would adversely affect water quality, productive habitat, biological ecosystems, or scenic and natural values. This district shall include the following areas when they occur within the limits of the shoreland zone, except that areas which are currently developed and areas which meet the criteria for the Growth II-A and Growth II-B Districts need not be included within the Resource Protection District. (1) Areas within 100 feet, horizontal distance of the normal high-water line of any great pond. (2) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetland and wetland associated with great ponds and rivers, which are rated "moderate" or "high" value waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic Information System (GIS) data layer maintain by either MDIF&W or the Department as of December 31, 2008. For the purposes of this paragraph "wetlands associated with great ponds and rivers " shall mean areas characterized by non-forested wetland vegetation and hydric soils that are contiguous with a great pond or river, and have a surface elevation at or below the water level of the great pond or river during the period of normal high water. "Wetland associated with great ponds or rivers" are considered to be part of the great pond or river. (3) Flood plains along rivers and floodplains along artificially formed great ponds along rivers, defined by the 100 year floodplain as designated on the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the absence of these, by soil types identified as recent floodplain soils. This district shall also include 100 year floodplains adjacent to tidal waters as shown on FEMA's Flood Insurance Rate Maps or Flood Hazard Boundary Maps. (4) Areas of two or more contiguous acres with sustained slopes of 20% or greater. (5) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils, which are not part of a freshwater or coastal wetland as defined, and which are not surficially connected to a water body during normal high water. (6) Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement. (7) Islands situated in bodies of water within the Town, and land areas owned by the Lucerne Village Corporation known as Sunset Rock. (8) Areas within 100 feet, horizontal distance, of the normal high-water line of any stream. B. Growth 1: Residential and Home Occupation. Growth areas where residential development and home occupations will be encouraged to be located are: 1. An area bounded by Mann Brook (outside of shoreland zone) and the west side of Rt. 1A, to the Ellsworth town line, to a depth of 1500 feet from the middle of Rt. 1A Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 10 2. An area on the west side of South Rd. (a.k.a. Miller rd.) between the Bucksport and Holden town line. C. Growth 2A: Mixed use including Residential, Mobile Home Park, Retail, and more intensive commercial uses. The area approximately bounded by Green Lake (outside of shoreland zone), Mann Brook (outside of shoreland zone) and Rt. 1A and Ellsworth is designated for Mixed Use. The interpretive soil maps indicate that these soils are particularly suited for development. D. Growth 2B: Commercial Area. The land bordering east side of Route 1-A starting at Map 11 Lot 51 now or formerly of Philip and Joanne Johnson, southerly to the Lucerne-in-Maine Village boundaries. The land bordering the west side of Rt.1A.starting at Map 8 Lot 11 now or formerly of Vivian Cross, southerly to Map 8 Lot 3 (AKA Lucerne Hill Golf Course.), and the land on both sides of Rt. 1A from Mann Brook (outside of shoreland zone) southerly to the Ellsworth town line for a depth of 500 feet. Note: To encourage clustering less restrictive lot sizes will be required for multiple businesses within the same building lot. However, due to the special nature of the visual resources of the Town, any commercial development will have to meet design standards which ensure that the development will not have a visual impact or degrade the visual character of the setting. Even though this will be the primary growth / commercial areas, it is important to protect the rural character of the area. Please see implementation pages 4,6 and 8 for guidelines. E. Rural Residential / Home Occupation: This category includes all other areas in Dedham not previously described and not used as intensively as G1, G2-A, G2-B Note: Residential development, including affordable housing and home occupation which meets all ordinance restrictions in this area will be allowed. Clustering and open space preservation will be mandatory and standards which preserve the rural character should apply. This area includes the shoreland zone of all lakes except where the shoreland zone falls into the Resource Protection area. Development in this area will be encouraged by land use regulations that maintain the rural atmosphere of Dedham. A Note about Shoreland Areas: The development review proposed by the strategies in this section should be adequate for residential development in shoreland areas. Therefore, in most cases, the shoreland zone is not delineated separately on the land use plan. Dedham Maine Land Use Ordinance Adopted at Town Meeting June 20, 2009 11 14. Table of Land Uses. All land use activities, as indicated in Table 1, Schedule of Uses, shall conform to all of the applicable land use standards in Section 15. The district designation for a particular site shall be determined from the Official Shoreland Zoning Map. Key to Table 1: Yes - Allowed (no permit required but the use must comply with all applicable land use standards.) No - Prohibited PB - Requires permit issued by the Planning Board CEO - Requires permit issued by the Code Enforcement Officer LPI - Requires permit issued by the Local Plumbing Inspector Abbreviation: RP Resource Protection G1 Growth 1 G2A Growth 2A G2B Growth 2B RR Rural Residential Dedham Maine Land Use Ordinance - 12 - SCHEDULE OF USES LAND USES RP G1 G2A G2B RR 1. Non-intensive recreation uses not requiring structures such as hunting, fishing and hiking YES YES YES YES YES 2. Forest management activities except for timber harvesting & land management roads. YES YES YES YES YES 3. Timber Harvesting CEO YES YES YES YES 4. Clearing or removal of vegetation for activities other then timber harvesting CEO YES YES YES YES 5. Fire Prevention Activities YES YES YES YES YES 6. Wildlife management practices YES YES YES YES YES 7. Soil and Water conservation practices YES YES YES YES YES 8. Mineral Exploration NO YES-2 YES-2 YES-2YES-2 9. Mineral Extraction/ sand/ gravel NO PB PB PB PB 10. Surveying and Resource Analysis YES YES YES YES YES 11. Emergency Operations YES YES YES YES YES 12. Agriculture NO YES YES YES YES 13. Aquaculture NO PB PB PB PB 14. Principal Structures A. One and Two Family Residential including driveways NO CEO CEO CEO CEO B. Multi-unit Residential NO PB PB PB PB C. Light Commercial (two employees) NO CEO CEO CEO CEO D. Heavy Commercial (>two employees) NO NO PB PB NO E. Industrial NO NO NO PB NO F. Governmental & Institutional NO NO PB PB PB G. Small non residential facilities for educational/ scientific or nature interpretation purposes PB PB CEO CEO CEO 15. Structures accessory to allowed uses PB PB CEO CEO CEO Dedham Maine Land Use Ordinance - 13 - LAND USES RP G1 G2A G2B RR 16. Piers, Dock, Wharves, Bridges and other structures and uses extending over or below the normal high-water line. A. Temporary CEO CEO CEO CEO CEO B. Permanent PB PB PB PB PB 17. Conversion of seasonal residential LPI LPI LPI LPI LPI 18. Home Occupation PB CEO CEO CEO CEO 19. Sewage Disposal Systems LPI LPI LPI LPI LPI 20. Essential services PB-3 YES-3 YES-3 YES-3 YES-3 21. Service drops YES YES YES YES YES 22. Public and Private recreational area with minimal structural development PB CEO CEO CEO CEO 23. Individual, private campsites NO CEO CEO CEO CEO 24. Campgrounds NO PB PB PB PB 25. Road construction PB-1 CEO CEO CEO CEO-4 26. Land management roads PB YES YES YES YES 27. Parking facilities NO CEO CEO CEO CEO 28. Marinas NO PB PB PB PB 29. Filling or earth moving of <10 cubic yards CEO YES YES YES YES 30. Filling or earth moving of > 10 cubic yards PB CEO CEO CEO CEO 31. Herbicide application NO YES YES YES YES 32. Uses similar to allowed uses CEO/PB CEO/PB CEO/PB CEP/PB CEO/PB 33. Uses similar to uses requiring CEO permit CEO CEO CEO CEO CEO 34. Uses similar to uses requiring PB permit PB PB PB PB PB 1. Only as provided in Section 15 (I) (4) 2. Requires a permit from the CEO if more then 100 sq. feet of surface area is disturbed. 3. Requires a permit from the Planning Board if within the shoreland zone and see further restrictions in Section 15 (M). 4. Only as provided in Section 15 (I) (3) Dedham Maine Land Use Ordinance - 14 - Section 15. Land Use Standards: A. Lot Standards: 1. All lots shall meet or exceed the following minimum requirements as applicable per dwelling unit, and per principle governmental, institutional, commercial or industrial structure: Districts Minimum lot area Minimum Shore Frontage/Lot Width * a. RP 50,000 sq. ft 200 ft b. G1 40,000 sq. ft 200 ft c. G2A, residential 40,000 sq. ft 200 ft non-residential 60,000 sq. ft 200 ft d. G2B** 40,000 sq. ft 100 ft e. RR 65,340 sq. ft 200 ft * Note: The lots, regardless of shape, must meet or exceed the minimum lot width. Any structure located on the lot must be accessible to emergency vehicles. ** Note: Commercial lots in the Growth Area II B Zone shall have a minimum of 40,000 sq. ft for the first business on each lot. One business shall have 5 parking spaces for retail business or 3 parking spaces for a professional business in addition to employee parking spaces. These parking standards shall increase by 2 for each additional business in retail and by 1 for each additional professional business. ( See Section 15 paragraph H. for parking space standards.) 2. Setbacks: The placement of structures on lots shall meet or exceed the following requirements: a. 100 foot setback from the shoreline of all water bodies and wetland, except those zoned Resource Protection. b. 40 foot setback from edge of rite-of-way for residential and commercial structures. c. 10 foot setback from edge of rite-of way for all other structures. d. 10 foot setback from edge of railroad rite-of-way for all structures. e. 10 foot setback from property lines. f. 250 foot setback from shoreline of a water body or wetland and 100 foot setback from shoreline of a stream zoned as Resource Protection District. g. 75 foot setback from a tributary stream. 3. If more then one residential dwelling unit or principle non-residential structure or use, or combination thereof, is constructed, established or placed, on a single parcel, all dimensional requirements shall be met for each additional residential dwelling unit, principle non-residential structure or use. 4. The applicable shore frontage/minimum width of any portion of any lot within one hundred (100) feet, horizontal distance, of the normal high-water line of a water body or upland edge of a wetland shall be equal to or greater than the shore frontage requirement for the proposed use. 5. Lots located on opposite sides of a public or private road shall be considered each separate tract or parcel of land unless such road was established by the owner of land on both sides thereof after September 22, 1971. Dedham Maine Land Use Ordinance - 15 - 6. Land below the normal high-water line of a water body or upland edge of a wetland and land beneath roads serving more then two lots shall not be included towards calculating minimum lot area. B. Principal and Accessory Structures (1) All new principal and accessory structures shall be set back in conformance with Section 15 (A)(2) above. In addition: (a) The water body, tributary stream, or wetland setback provision shall neither apply to structures which require direct access to the water body or wetland as an operational necessity, such as piers, docks and retaining walls, nor to other functionally water-dependent uses. (b) On a non-conforming lot of record on which only a residential structure exists, and it is not possible to place an accessory structure meeting the required water body, tributary stream or wetland setback, the Code Enforcement Officer may issue a permit to place a single accessory structure, with no utilities, for storage of yard tools and similar equipment. Such accessory structures shall not exceed eighty (80) square feet in area nor eight (8) feet in height, and shall be located as far from the shoreline, tributary stream or wetland as practical and shall meet all other applicable standards, including lot coverage and vegetation clearing limitations. In no case shall the structure be located closer to the shoreline, tributary stream or wetland then the principal structure. (2) Principal or accessory structures and expansions of existing structures which are permitted in any districts shall not exceed thirty-five (35) feet in height. This provision shall not apply to structures such as transmission towers, windmills, antennas, and similar structures having no floor area. (3) The lowest floor elevation or openings of all buildings and structures including basements shall be elevated at least one foot above the elevation of the 100 year flood, the flood of record, or in the absence of these, the flood as defined by soil types identified as recent floodplain soils. (4) The total footprint area of all structures, parking lots and other non-vegetated surfaces, within the shoreland zone shall not exceed twenty (20) percent of the lot or a portion thereof, located within the shoreland zone, including land area previously developed. (5) Retaining walls that are not necessary for erosion control shall meet the structure setback requirement, except for low retaining walls and associated fill provided all of the following conditions are met: (a) The site has been previously altered and an effective vegetated buffer does not exist; (b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water line of a water body, tributary stream, or upland edge of a wetland; (c) The site where the retaining wall will be constructed is legally existing lawn or is a site eroding from lack of naturally occurring vegetation, and which cannot be stabilized with vegetative plantings; (d) The total height of the wall(s), in the aggregate, are no more than 24 inches; (e) Retaining walls are located outside of the 100-year floodplain on rivers, streams, wetlands, and tributary streams, as designated on the Federal Emergency Management Agency's (FEMA) Flood Dedham Maine Land Use Ordinance - 16 - Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the absence of these, by soil types identified as recent floodplain soils. (f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination thereof, and no further structural development will occur within the setback area, including patios and decks; and (g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal high-water line of a water body, tributary stream, or upland edge of a wetland when a natural buffer area does not exist. The buffer area must meet the following characteristics: (i) The buffer must include shrubs and other woody and herbaceous vegetation. Where natural ground cover is lacking the area must be supplemented with leaf or bark mulch; (ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide for effective infiltration of stormwater runoff; (iii) Only native species may be used to establish the buffer area; (iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured perpendicularly to the normal high-water line or upland edge of a wetland; (v) A footpath not to exceed the standards in Section 15(Q)(2)(a), may traverse the buffer. (6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed with a permit from the Code Enforcement Officer, to provide shoreline access in areas of steep slopes or unstable soils provided: that the structure is limited to a maximum of four (4) feet in width; that the structure does not extend below or over the normal high-water line of a water body or upland edge of a wetland, (unless permitted by the Department of Environmental Protection pursuant to the Natural Resources Protection Act, Title 38, Section 480-C); and that the applicant demonstrates that no reasonable access alternative exists on the property. C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the Normal High- Water Line of a Water Body or Within a Wetland. (1) Access from shore shall be developed on soils appropriate for such use and constructed so as to control erosion. (2) The location shall not interfere with existing developed or natural beach areas. (3) The facility shall be located so as to minimize adverse effects on fisheries. (4) The facility shall be no larger in dimension than necessary to carry on the activity and be consistent with the surrounding character and use of the area. A temporary pier, dock or wharf shall not be wider than six feet. (5) No structure shall be built on, over or abutting a pier, wharf, dock or other structure extending below the normal high-water line of a water body or within a wetland unless the structure requires direct access to the water as an operational necessity, in which case the structure shall not exceed twenty (20) feet in height above the pier, wharf, dock or other structure. Dedham Maine Land Use Ordinance - 17 - (6) New permanent piers and docks shall not be permitted. (7) No existing structures built on, over or abutting a pier, dock, wharf or other structure extending below the normal high-water line of a water body or within a wetland shall be converted to residential dwelling units in any district. (8) All temporary docks, piers and floats shall be removed from below the shoreline or from within the wetland by November 1st so as not to extend into the water body or wetland in such a way to be hazardous during the winter months. D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State licensing procedures and the following: (1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including roads and driveways, for each site. Land supporting wetland vegetation, and land below the normal high-water line of a water body shall not be included in calculating land area per site. (2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance from the normal high-water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance from the normal high-water line of other water bodies, tributary streams, or the upland edge of a wetland. E. Individual-Private Campsites. Individual, private campsites not associated with campgrounds are allowed provided the following conditions are met: (1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand (30,000) square feet of lot area within the shoreland zone, whichever is less, may be permitted. (2) Campsite placement on any lot, including the area intended for a recreational vehicle or tent platform, shall be set back one hundred (100) feet, horizontal distance from the normal high-water line of a great pond classified GPA or river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance from the normal high-water line of other water bodies, tributary streams, or the upland edge of a wetland. (3) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall not be located on any type of permanent foundation except for a gravel pad, and no structure except a canopy shall be attached to the recreational vehicle. (4) The clearing of vegetation for the sitting of the recreational vehicle, tent or similar shelter in a Resource Protection District shall be limited to one thousand (1000) square feet. (5) A written sewage disposal plan describing the proposed method and location of sewage disposal shall be required for each campsite and shall be approved by the Local Plumbing Inspector. Where disposal is off- site, written authorization from the receiving facility or land owner is required. (6) When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred and twenty (120) days per year, all requirements for residential structures shall be met, including the installation of a subsurface sewage disposal system in compliance with the State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage facilities. Dedham Maine Land Use Ordinance - 18 - F. Commercial and Industrial Uses: All commercial and industrial uses within 250 feet, horizontal distance, of the normal high-water line of any great pond or river; within 250 feet, horizontal distance, of the upland edge of a freshwater wetland; and within 100 feet, horizontal distance, of the normal high-water line of a stream, are prohibited. G. Home Occupations and Professional Offices: Home Occupations and Professional Offices shall be carried on wholly within the principal residential structure or a structure accessory to the principal residential structure and shall conform to the following standards: 1. No more the two persons who are not occupants of the residence shall be employed in the home occupation. 2. There shall be no exterior storage of materials. 3. There shall be no nuisance, noise, vibration, smoke, dust, orders, heat or glare generated by the home occupation. 4. Sufficient off street parking shall be provided for all vehicles associated with home occupation. 5. Anything not meeting the above shall be considered a commercial use. H. Parking Areas (1) Parking areas shall meet the shoreline and tributary stream setback requirements for structures for the district in which such areas are located. The setback requirement for parking areas serving public boat launching facilities shall be no less than fifty (50) feet horizontal distance from the shoreline and tributary stream if the Planning Board finds that no other reasonable alternative exists further from the shoreline or tributary stream. (2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent stormwater runoff from flowing directly into a water body, tributary stream or wetland and where feasible, to retain all runoff on-site. (3) In determining the appropriate size of proposed parking facilities, the following shall apply: (a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except that parking spaces for a vehicle and boat trailer shall be forty (40) feet long. (b) Internal travel aisles: Approximately twenty (20) feet wide. I. Roads and Driveways. The following standards shall apply to the construction of roads and/or driveways and drainage systems, culverts and other related features. (1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance from the normal high-water line of a great pond classified GPA or a river that flows to a great pond classified GPA, and seventy-five (75) feet, horizontal distance from the normal high-water line of other water bodies, tributary Dedham Maine Land Use Ordinance - 19 - streams, or the upland edge of a wetland unless no reasonable alternative exists as determined by the Planning Board. If no other reasonable alternative exists the road and/or driveway setback requirement shall be no less than fifty (50) feet, horizontal distance upon clear showing by the applicant that appropriate techniques will be used to prevent sedimentation of the water body, tributary stream or wetland. Such techniques may include, but are not limited to, the installation of settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed so as to avoid sedimentation of the water body, tributary stream, or wetland. On slopes of greater than twenty (20) percent the road and/or driveway setback shall be increased by ten (10) feet, horizontal distance for each five (5) percent increase in slope above twenty (20) percent. Section 15 (I)(1) does not apply to approaches to water crossings nor to roads or driveways that provide access to permitted structures, and facilities located nearer to the shoreline due to an operational necessity, excluding temporary docks of recreational uses. Roads and driveways providing access to permitted structures within the setback area shall comply fully with the requirements of Section 15 (I)(1) except for that portion of the road or driveway necessary for direct access to the structure. (2) Existing public roads may be expanded within the legal road right-of-way regardless of their setback from a water body, tributary stream or wetland (3) New permanent roads are not allowed within the RR zone except: (a) To provide access to structures or facilities within the zone; or (b) When the applicant demonstrates that no reasonable alternative route exists outside the shoreland zone. When roads must be located within the shoreland zone they shall be set back as far as practicable from the normal high-water line and screened from the river by existing vegetation. (4) New roads and driveways are prohibited in a Resource Protection District except that the Planning Board may grant a permit to construct a road or driveway to provide access to permitted uses within the district. A road or driveway may also be approved by the Planning Board in a Resource Protection District, upon a finding that no reasonable alternative route or location is available outside the district. When a road or driveway is permitted in a Resource Protection District the road and/or driveway shall be set back as far as practicable from the normal high-water line of a water body, tributary stream, or upland edge of a wetland. (5) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1) vertical, and shall be graded and stabilized in accordance with the provisions for erosion and sedimentation control contained in Section 15 (R). (6) Road and driveway grades shall be no greater than ten (10) percent except for segments of less than two hundred (200) feet. (7) In order to prevent road and driveway surface drainage from directly entering water bodies, tributary stream or wetland roads and driveway shall be designed, constructed, and maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the average slope, in width between the outflow point of the ditch or culvert and the normal high-water line of a water body, tributary stream, or upland edge of a wetland. Surface drainage which is directed to an unscarified buffer strip shall be diffused or spread out to promote infiltration of the runoff and to minimize channelized flow of the drainage through the buffer strip. Dedham Maine Land Use Ordinance - 20 - (8) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a manner effective in directing drainage onto unscarified buffer strips before the flow gains sufficient volume or head to erode the road, or driveway, or ditch. To accomplish this, the following shall apply: (a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along the road or driveway at intervals no greater than indicated in the following table: Grade Spacing (Percent) (Feet) 0-2 250 3-5 200-135 6-10 100-80 11-15 80-60 16-20 60-45 21 + 40 (b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten (10) percent or less. (c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be placed at approximately a thirty (30) degree angle downslope from a line perpendicular to the centerline of the road or driveway. (d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for effective functioning and their inlet and outlet ends shall be stabilized with appropriate materials. (9) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control installations associated with roads and driveways shall be maintained on a regular basis to assure effective functioning. J. Signs. The following provisions shall govern the use of signs in the shoreland zone. (1) Signs relating to goods and services sold on the premises shall be allowed, provided that such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per premises. Signs relating to goods or services not sold or rendered on the premises shall be prohibited. (2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and shall not exceed twelve (12) Sq Ft in the aggregate. (3) Residential users may display a single sign not over three (3) square feet in area relating to the sale, rental, or lease of the premises. (4) Signs relating to trespassing and hunting shall be allowed without restriction as to number provided that no such sign shall exceed two (2) square feet in area. (5) Signs relating to public safety shall be allowed without restriction. (6) No sign shall extend higher than twenty (20) feet above the ground. Dedham Maine Land Use Ordinance - 21 - (7) Signs may be illuminated only by shielded, non-flashing lights. The following provisions shall govern the use of on-premise signs in all other areas of the Town of Dedham: l. On-premise signs on any one property shall not exceed five (5) in number nor exceed a combined total of 50 square feet. No one sign shall exceed 25 square feet. In the case of more than one business, facility or point of interest being conducted on one property, signs for each business, facility or point of interest shall not exceed five (5) in number, a combined total of 50 square feet, nor shall any one sign exceed 25 square feet in size. 2. On-premise signs shall be located within 1,000 feet of the principal building where the business or facility is carried on or practiced or within 1,000 feet of the point of interest. Storage areas, warehouses and other auxiliary structures and fixtures are not deemed to be buildings where the business, facility, or point of interest is carried on or practiced. 3. No on-premise sign may be permitted which is erected or maintained upon trees or painted or drawn upon rocks or other natural features. 4. The maxim height of on-premise signs shall be 25 feet above the ground level of land upon which it is located or if the sign is affixed to or is part of a building, the maximum is 10 feet above the roof of the building. 5. Any business or facility whose principal building, or a point of interest, which is located on a private way more than 1,000 feet from the nearest public way, or is not visible to traffic from the nearest public way, may erect no more than two (2) approach signs with a total surface area not to exceed 50 square feet per sign. These signs are to be located outside the public right-of-way limits within 300 feet of the junction of the public and private ways. 6. No on-premise signs may be permitted within 33 feet of the center line of any public way if the highway is less than 66 feet in width; within 20 feet from the outside edge of the paved portion of any public way with more than two (2) travel lanes and a total paved portion in excess of 24 feet in width; or within the full width of the right-of-way of any public way. 7. An on-premise sign shall be prohibited if it: a. Attempts or appears to attempt to direct the movement of traffic or which interferes with, imitates or resembles any official traffic sign, signal or devise; b. Prevents the driver of a vehicle from having a clear and unobstructed view of official signs and approaching or merging traffic; c. Contains, includes or is illuminated by a flashing, intermittent or moving light or lights; d. Uses lighting in any way unless the light is effectively shielded as to prevent beams or rays of light from being directed at any portion of the public way or is of such intensity or brilliance as to cause glare or impair the vision of the operator of any motor vehicle or as to otherwise interfere with any driver's operation of a motor vehicle; or Dedham Maine Land Use Ordinance - 22 - e. Moves or has any animated or moving parts. Off Premise Signs In all other areas of the Town of Dedham the use of off-premise signs shall be governed by the Maine Department of Transportation's Official Business Directional Sign (OBDS) Regulation. K. Storm Water Runoff (1) All new construction and development shall be designed to minimize storm water runoff from the site in excess of the natural predevelopment conditions. Where possible, existing natural runoff control features, such as berms, swales, terraces and wooded areas, shall be retained in order to reduce runoff and encourage infiltration of storm waters. (2) Storm water runoff control systems shall be maintained as necessary to ensure proper functioning. L. Septic Waste Disposal (1) All subsurface sewage disposal systems shall be installed in conformance with the State of Maine Subsurface Wastewater Disposal Rules and the following: a) clearing or removal of woody vegetation necessary to site a new system and any associated fill extension, shall not extend closer then seventy-five (75) feet, horizontal distance, from the normal high-water line of a water body or the upland edge of a wetland and b) A holding tank is not allowed for a first time residential use in the Shoreland zone. NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill extensions, to be constructed no less than one hundred (100) horizontal feet from the normal high-water line of a perennial water body. The minimum setback distance for a new subsurface disposal system may not be reduced by variance. M. Essential Services (1) Where feasible, the installation of essential services shall be limited to existing public ways and existing service corridors. (2) The installation of essential services other then road-side distribution lines is not allowed in a Resource Protection District, except to provide services to a permitted use within said district, or except where the applicant demonstrates that no reasonable alternative exists. Where allowed, such structures and facilities shall be located so as to minimize any adverse impacts on surrounding uses and resources, including visual impacts. N. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of mineral resources shall be accomplished by hand sampling, test boring, or other methods which create minimal disturbance of less than one hundred (100) square feet of ground surface. A permit from the Code Enforcement Officer shall be required for mineral exploration which exceeds the above limitation. All excavations, including Dedham Maine Land Use Ordinance - 23 - test pits and holes shall be immediately capped, filled or secured by other equally effective measures, so as to restore disturbed areas and to protect the public health and safety. Mineral extraction may be permitted under the following conditions: (1) A reclamation plan shall be filed with, and approved by the Planning Board before a permit is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the requirements of Section 15(N) (4) below. (2) No part of any extraction operation, including drainage and runoff control features shall be permitted within one hundred (100) feet horizontal distance of the normal high-water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and within seventy-five (75) feet horizontal distance of the normal high-water line of any other water body, tributary stream, or the upland edge of a wetland. Extraction operations shall not be permitted within seventy-five (75) feet horizontal distance of any property line, without written permission of the owner of such adjacent property. (3) Developers of new gravel pits along Significant River Segments shall demonstrate that no reasonable mining site outside the shoreland zone exists. When gravel pits must be located within the zone, they shall be set back as far as practicable from the normal high-water line and no less than seventy-five (75) feet and screened from the river by existing vegetation. (4) Within twelve (12) months following the completion of extraction operations at any extraction site, which operations shall be deemed complete when less than one hundred (100) cubic yards of materials are removed in any consecutive twelve (12) month period, ground levels and grades shall be established in accordance with the following: (a) All debris, stumps, and similar material shall be removed for disposal in an approved location, or shall be buried on-site. Only materials generated on-site may be buried or covered on-site. (b) The final graded slope shall be two and one half to one (2 1/2:1) slope or flatter. (c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be reseeded and stabilized with vegetation native to the area. Additional topsoil or loam shall be obtained from off-site sources if necessary to complete the stabilization project. (5) In keeping with the purposes of this Ordinance, the Planning Board may impose such conditions as are necessary to minimize the adverse impacts associated with mineral extraction operations on surrounding uses and resources. O. Agriculture (1) All spreading of manure shall be accomplished in conformance with the Manure Utilization Guidelines published by the Maine Department of Agriculture on November 1, 2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209). (2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, of a great pond classified GPA or a river flowing to a great pond, classified GPA, or within seventy-five (75) feet horizontal distance, of other water bodies, tributary streams, or wetlands. All manure storage areas within the shoreland zone must be constructed or modified such that the facility produces no discharge of effluent or contaminated storm water. Dedham Maine Land Use Ordinance - 24 - (3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed with the Planning Board. Non- conformance with the provisions of said plan shall be considered to be a violation of this Ordinance. NOTE: Assistance in preparing a Conservation Plan may be available through the local Soil and Water Conservation District office. (4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of the normal high- water line of a great pond classified GPA; within seventy-five (75) feet, horizontal distance, from other water bodies; nor within twenty-five (25) feet, horizontal distance, of tributary streams and freshwater wetlands. Operations in existence on the effective date of this ordinance and not in conformance with this provision may be maintained. (5) Newly established livestock grazing areas shall not be permitted within one hundred (100) feet, horizontal distance, of the normal high-water line of a great pond classified GPA; within seventy-five (75) feet, horizontal distance of other water bodies, nor within twenty-five (25) feet, horizontal distance, of tributary streams and freshwater wetlands. Livestock grazing associated with ongoing farm activities, and which are not in conformance with the above setback provisions may continue, provided that such grazing is conducted in accordance with a Conservation Plan. P. Timber Harvesting (1) In a Resource Protection District abutting a great pond, timber harvesting shall be limited to the following: (a) Within the strip of land extending 75 feet inland from the normal high-water line in a shoreland area zoned for resource protection abutting a great pond there shall be no timber harvesting except to remove safety hazards. (b) Beyond the 75 foot strip referred to in Section 15 (P)(1)(a) above, timber harvesting is permitted in accordance with paragraph 2 below except that in no case shall the average residual basal area of trees over 4 1/2 inches in diameter at 4 1/2 feet above ground level be reduced to less than 30 square feet per acre. (2) Except in areas as described in Section 15 (P)(1) above, timber harvesting shall conform with the following provisions: (a) Selective cutting of no more than forty (40) percent of the total volume of trees four (4) inches or more in diameter measured at 4 1/2 feet above ground level on any lot in any ten (10) year period is permitted. In addition: (i) Within one-hundred (100) feet, horizontal distance of the normal high-water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and within seventy-five (75) feet, horizontal distance, of the normal high-water line of other water bodies, tributary streams, or the upland edge of a wetland, there shall be no clearcut openings and a well-distributed stand of trees and other vegetation, including existing ground cover, shall be maintained. (ii) At distances greater than one-hundred (100) feet, horizontal distance, of a great pond classified GPA or a river flowing to a great pond classified GPA, and greater than seventy-five (75) feet, horizontal distance, of the normal high-water line of other water bodies or the upland edge of a wetland, Dedham Maine Land Use Ordinance - 25 - harvesting operations shall not create single clearcut openings greater than ten-thousand (10,000) square feet in the forest canopy. Where such openings exceed five-thousand (5000) square feet they shall be at least one hundred (100) feet apart. Such clearcut openings shall be included in the calculation of total volume removal. Volume may be considered to be equivalent to basal area. (b) Timber harvesting operations exceeding the 40% limitation in Section 15(P)(2) above, may be allowed by the planning board upon a clear showing, including a forest management plan signed by a Maine licensed professional forester, that such an exception is necessary for good forest management and will be carried out in accordance with the purposes of this Ordinance. The planning board shall notify the Commissioner of the Department of Environmental Protection of each exception allowed, within fourteen (14) days of the planning board's decision. (c) No accumulation of slash shall be left within fifty (50) feet, horizontal distance of the normal high-water line of a water body. In all other areas slash shall either be removed or disposed of in such a manner that it lies on the ground and no part thereof extends more than four (4) feet above the ground. Any debris that falls below the normal high-water line of a water body or tributary stream shall be removed. (d) Timber harvesting equipment shall not use stream channels as travel routes except when: (i) Surface waters are frozen; and (ii) The activity will not result in any ground disturbance. (e) All crossings of flowing water shall require a bridge or culvert, except in areas with low banks and channel beds which are composed of gravel, rock or similar hard surface which would not be eroded or otherwise damaged. (f) Skid trail approaches to water crossings shall be located and designed so as to prevent water runoff from directly entering the water body or tributary stream. Upon completion of timber harvesting, temporary bridges and culverts shall be removed and areas of exposed soil revegetated. (g) Except for water crossings, skid trails and other sites where the operation of machinery used in timber harvesting results in the exposure of mineral soil shall be located such that an unscarified strip of vegetation of at least seventy-five (75) feet, horizontal distance, in width for slopes up to ten (10) percent shall be retained between the exposed mineral soil and the normal high-water line of a water body or upland edge of a wetland. For each ten (10) percent increase in slope, the unscarified strip shall be increased by twenty (20) feet horizontal distance. The provisions of this paragraph apply only to a face sloping toward the water body or wetland, provided, however, that no portion of such exposed mineral soil on a back face shall be closer than twenty five (25) feet horizontal distance from the normal high- water line of a water body or upland edge of a wetland. P-1. Timber Harvesting: Section 15(P) is repealed on the statutory date established under 38 M.R.S.A. section 438- B(5), at which time Section 15(P-1) shall become effective, Until such time as Section 15(P) is repealed, Section 15(P-1) is not in effect. (1) Shoreline integrity and sedimentation. Persons conducting timber harvesting and related activities must take reasonable measures to avoid the disruption of shoreline integrity, the occurrence of sedimentation of water, and the disturbance of water body and tributary stream banks, water body and tributary stream channels, shorelines, and soil lying within water bodies, tributary streams and wetlands. If, despite such precautions, the disruption of shoreline integrity, Dedham Maine Land Use Ordinance - 26 - sedimentation of water, or the disturbance of water body and tributary stream banks, water body and tributary stream channels, shorelines, and soil lying within water bodies, tributary streams and wetlands occurs, such conditions must be corrected. (2) Slash treatment. Timber harvesting and related activities shall be conducted such that slash or debris is not left below the normal high-water line of any water body or tributary stream or the upland edge of a wetland. Section 15(P-1)(2) does not apply to minor, incidental amounts of slash that result from timber harvesting and related activities otherwise conducted in compliance with this section. (a) Slash actively used to protect soil from disturbance by equipment or to stabilize exposed soil, may be left in place, provided that no part thereof extends more than 4 feet above the ground. (b) Adjacent to great ponds, rivers and wetlands: (i) No accumulation of slash shall be left within 50 feet, horizontal distance, of the normal high-water line or upland edge of a wetland; and (ii) Between 50 feet and 250 feet, horizontal distance, of the normal high-water line or upland edge of a wetland, all slash larger than 3 inches in diameter must be disposed of in such a manner that no part thereof extends more than 4 feet above the ground. (3)Timber harvesting and related activities must leave adequate tree cover and shall be conducted so that a well- distributed stand of trees is retained. This requirement may be satisfied by following one of the following three options. (a) Option 1 (40% volume removal), as follows: (i) Harvesting of no more than 40 percent of the total volume on each acre of trees 4.5 inches DBH or greater in any 10 year period is allowed. Volume may be considered to be equivalent to basal area; (ii) A well-distributed stand of trees which is windfirm, and other vegetation including existing ground cover, must be maintained; and, (iii) Within 75 feet, horizontal distance, of the normal high-water line of rivers, streams, and great ponds, and within 75 feet, horizontal distance, of the upland edge of a freshwater or coastal wetlands, there must be no cleared openings. At distances greater than 75 feet, horizontal distance, of the normal high-water line of a river or great pond or upland edge of a wetland, timber harvesting and related activities must not create single cleared openings greater than 14,000 square feet in the forest canopy. Where such openings exceed 10,000 square feet, they must be at least 100 feet, horizontal distance, apart. Such cleared openings will be included in the calculation of total volume removal. Volume may be considered equivalent to basal area. (b) Option 2 (60 square foot basal area retention), as follows: (i) The residual stand must contain an average basal area of at least 60 square feet per acre of woody vegetation greater than or equal to 1.0 inch DBH, of which 40 square feet per acre must be greater than or equal to 4.5 inches DBH; (ii) A well-distributed stand of trees which is windfirm, and other vegetation including existing ground cover, must be maintained; and, (iii)Within 75 feet, horizontal distance, of the normal high-water line of water bodies and within 75 feet, horizontal distance, of the upland edge of wetlands, there must be no cleared openings. At distances greater than 75 feet, horizontal distance, of the normal high-water line of a river or great pond, or upland edge of a wetland, timber harvesting and related activities must not create single cleared openings greater than 14,000 square feet in the forest canopy. Where such openings exceed 10,000 square feet, they must be at least 100 feet, horizontal distance, apart. Such cleared openings will be included in the calculation of the average basal area. Volume may be considered equivalent to basal area. (c) Option 3 (Outcome based), which requires: An alternative method proposed in an application, signed by a Licensed Forester or certified wildlife professional, submitted by the landowner or designated agent to the State of Maine Department of Conservation's Bureau of Forestry (Bureau) for review and approval, which provides equal or better protection of the shoreland area than this rule. Landowners must designate on the Forest Operations Notification form required by 12 M.R.S.A. chapter 805, subchapter 5 which option they choose to use. If landowners choose Option 1 or Option 2, compliance will be determined solely on the criteria for the option chosen. If landowners choose Option 3, timber harvesting and related activities may not begin until the Bureau has approved the alternative method. The Bureau may verify that adequate tree cover and a well-distributed stand of trees is retained through a field procedure that uses sample plots that are located randomly or systematically to provide a fair representation of the harvest area. Dedham Maine Land Use Ordinance - 27 - (4) Skid trails, yards, and equipment operation. This requirement applies to the construction, maintenance, and use of skid trails and yards in shoreland areas. (a) Equipment used in timber harvesting and related activities shall not use river, stream or tributary stream channels as travel routes except when surface waters are frozen and snow covered, and the activity will not result in any ground disturbance. (b) Skid trails and yards must be designed and constructed to prevent sediment and concentrated water runoff from entering a water body, tributary stream, or wetland. Upon termination of their use, skid trails and yards must be stabilized. (c) Setbacks: (i) Equipment must be operated to avoid the exposure of mineral soil within 25 feet, horizontal distance, of any water body, tributary stream, or wetland. On slopes of 10 percent or greater, the setback for equipment operation must be increased by 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5 percent increase in slope above 10 percent. Where slopes fall away from the resource, no increase in the 25-foot setback is required. (ii) Where such setbacks are impracticable, appropriate techniques shall be used to avoid sedimentation of the water body, tributary stream or wetland. Such techniques may include the installation of sump holes or settling basins, and/or the effective use of additional ditch relief culverts and ditch water turnouts placed to avoid sedimentation of the water body, tributary stream, or wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected. (5) Land Management Roads. Land management roads, including approaches to crossings of water bodies, tributary stream channels, and freshwater wetlands, ditches and other related structures, must be designed, constructed, and maintained to prevent sediment and concentrated water runoff from directly entering the water body, tributary stream or wetland. Surface water on or adjacent to water crossing approaches must be diverted through vegetative filter strips to avoid sedimentation of the watercourse or wetland. Because roadside ditches may not extend to the resource being crossed, vegetative filter strips must be established in accordance with the setback requirements in Section 15(P-1)(7) of this rule. (a) Land management roads and associated ditches, excavation, and fill must be set back at least: (i) 100 feet, horizontal distance, from the normal high-water line of a great pond, river or freshwater or coastal wetland; (ii) 50 feet, horizontal distance, from the normal high-water line of streams; and (iii) 25 feet, horizontal distance, from the normal high-water line of tributary streams (b) The minimum 100 foot setback specified in Section 15(P-1)(5)(a)(i) above may be reduced to no less than 50 feet, horizontal distance, and the 50 foot setback specified in Section 15(P-1)(5)(a)(ii) above may be reduced to no less than 25 feet, horizontal distance, if, prior to construction, the landowner or the landowner's designated agent demonstrates to the Planning Board's satisfaction that no reasonable alternative exists and that appropriate techniques will be used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques may include, but are not limited to, the installation of settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed to avoid sedimentation of the water body, tributary stream or wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected. (c) On slopes of 10 percent or greater, the land management road setback must be increased by at least 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5 percent increase in slope above 10 percent. (d) New land management roads are not allowed within the shoreland area along Significant River Segments as identified in 38 M.R.S.A. section 437, nor in a Resource Protection District, unless, prior to construction, the landowner or the landowner's designated agent makes a clear demonstration to the Planning Board's satisfaction that no reasonable alternative route exists outside the shoreland zone, and that the new road must be set back as far as practicable from the normal high-water line and screened from the river by existing vegetation. (e) Ditches, culverts, bridges, dips, water turnouts and other water control installations associated with roads must be maintained on a regular basis to assure effective functioning. Drainage structures shall deliver a dispersed flow of water into an unscarified filter strip no less than the width indicated in the setback requirements in Section 15(P-1)(7). Where such a filter strip is impracticable, appropriate techniques shall be used to avoid sedimentation of the water body, tributary stream, or wetland. Such techniques may include the installation of sump holes or settling basins, and/or the effective use of additional ditch relief culverts and ditch water turnouts placed to avoid sedimentation of the water body, tributary Dedham Maine Land Use Ordinance - 28 - stream, or wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected. (f) Road closeout and discontinuance. Maintenance of the water control installations required in Section 15(P-1)(5)(e) must continue until use of the road is discontinued and the road is put to bed by effective installation of water bars or other adequate road drainage structures at appropriate intervals, constructed to avoid surface water flowing over or under the water bar, and extending a sufficient distance beyond the traveled way so that water does not reenter the road surface. (g) Upgrading existing roads. Extension or enlargement of presently existing roads must conform to the provisions of Section 15(P-1). Any nonconforming existing road may continue to exist and to be maintained, as long as the nonconforming conditions are not made more nonconforming. (h) Exception. Extension or enlargement of presently existing roads need not conform to the setback requirements of Section 15(P-1)(5)(a) if, prior to extension or enlargement, the landowner or the landowner's designated agent demonstrates to the Planning Board's satisfaction that no reasonable alternative exists and that appropriate techniques will be used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques may include, but are not limited to, the installation of settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed to avoid sedimentation of the water body, tributary stream, or wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected. (i) Additional measures. In addition to the foregoing minimum requirements, persons undertaking construction and maintenance of roads and river, stream and tributary stream crossings must take reasonable measures to avoid sedimentation of surface waters. (6) Crossings of water bodies. Crossings of rivers, streams, and tributary streams must allow for fish passage at all times of the year, must not impound water, and must allow for the maintenance of normal flows. (a) Determination of flow. Provided they are properly applied and used for the circumstances for which they are designed, methods including but not limited to the following are acceptable as a means of calculating the 10 year and 25 year frequency water flows and thereby determining water crossing sizes as required in Section 15(P-1): The United States Geological Survey (USGS) Methods; specifically: Hodgkins, G. 1999. Estimating the Magnitude of Peak Flows for Streams in Maine for Selected Recurrence Intervals. U.S. Geological Survey. Water Resources Investigations Report 99- 4008. 45 pp. (b) Upgrading existing water crossings. Extension or enlargement of presently existing water crossings must conform to the provisions of Section 15(P-1). Any nonconforming existing water crossing may continue to exist and be maintained, as long as the nonconforming conditions are not made more nonconforming; however, any maintenance or repair work done below the normal high-water line must conform to the provisions of Section 15(P-1). (c) Other Agency Permits. Any timber harvesting and related activities involving the design, construction, and maintenance of crossings on water bodies other than a river, stream or tributary stream may require a permit from the Land Use Regulation Commission, the Department of Environmental Protection, or the US Army Corps of Engineers. (d) Any timber harvesting and related activities involving the design, construction, and maintenance of crossings of freshwater wetlands identified by the Department of Inland Fisheries and Wildlife as essential wildlife habitat require prior consultation with the Department of Inland Fisheries and Wildlife. (e) Notice to Bureau of Forestry. Written notice of all water crossing construction maintenance, alteration and replacement activities in shoreland areas must be given to the Bureau prior to the commencement of such activities. Such notice must contain all information required by the Bureau, including: (i) a map showing the location of all proposed permanent crossings; (ii) the GPS location of all proposed permanent crossings; (iii) for any temporary or permanent crossing that requires a permit from state or federal agencies, a copy of the approved permit or permits; and (iv) a statement signed by the responsible party that all temporary and permanent crossings will be constructed, maintained, and closed out in accordance with the requirements of this Section. Dedham Maine Land Use Ordinance - 29 - (f) Water crossing standards. All crossings of rivers require a bridge or culvert sized according to the requirements of Section 15(P-1)(6)(g)) below. Streams and tributary streams may be crossed using temporary structures that are not bridges or culverts provided: (i) concentrated water runoff does not enter the stream or tributary stream; (ii) sedimentation of surface waters is reasonably avoided; (iii) there is no substantial disturbance of the bank, or stream or tributary stream channel; (iv) fish passage is not impeded; and, (v) water flow is not unreasonably impeded. Subject to Section 15(P-1)(6)(f)(i-v) above, skid trail crossings of streams and tributary streams when channels of such streams and tributary streams are frozen and snow-covered or are composed of a hard surface which will not be eroded or otherwise damaged are not required to use permanent or temporary structures. (g) Bridge and Culvert Sizing. For crossings of river, stream and tributary stream channels with a bridge or culvert, the following requirements apply: (i) Bridges and culverts must be installed and maintained to provide an opening sufficient in size and structure to accommodate 10 year frequency water flows or with a cross-sectional area at least equal to 2 1/2 times the cross-sectional area of the river, stream, ortributary stream channel. (ii) Temporary bridge and culvert sizes may be smaller than provided in Section 15(P-1)(6)(g)(i) if techniques are effectively employed such that in the event of culvert or bridge failure, the natural course of water flow is maintained and sedimentation of the water body or tributary stream is avoided. Such crossing structures must be at least as wide as the channel and placed above the normal high-water line. Techniques may include, but are not limited to, the effective use of any, a combination of, or all of the following: 1. use of temporary skidder bridges; 2. removing culverts prior to the onset of frozen ground conditions; 3. using water bars in conjunction with culverts; 4. using road dips in conjunction with culverts. (iii) Culverts utilized in river, stream and tributary stream crossings must: 1. be installed at or below river, stream or tributary stream bed elevation; 2. be seated on firm ground; 3. have soil compacted at least halfway up the side of the culvert; 4. be covered by soil to a minimum depth of 1 foot or according to the culvert manufacturer's specifications, whichever is greater; and 5. have a headwall at the inlet end which is adequately stabilized by riprap or other suitable means to reasonably avoid erosion of material around the culvert. (iv)River, stream and tributary stream crossings allowed under Section 15(P-1), but located in flood hazard areas (i.e. A zones) as identified on a community's Flood Insurance Rate Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must be designed and constructed under the stricter standards contained in that community's National Flood Insurance Program (NFIP). For example, a water crossing may be required to pass a 100- year flood event. (v) Exception. Skid trail crossings of tributary streams within shoreland areas and wetlands adjacent to such streams may be undertaken in a manner not in conformity with the requirements of the foregoing subsections provided persons conducting such activities take reasonable measures to avoid the disruption of shoreline integrity, the occurrence of sedimentation of water, and the disturbance of stream banks, stream channels, shorelines, and soil lying within ponds and wetlands. If, despite such precautions, the disruption of shoreline integrity, sedimentation of water, or the disturbance of stream banks, stream channels, shorelines, and soil lying within ponds and wetlands occurs, such conditions must be corrected. (h) Skid trail closeout. Upon completion of timber harvesting and related activities, or upon the expiration of a Forest Operations Notification, whichever is earlier, the following requirements apply: (i) Bridges and culverts installed for river, stream and tributary stream crossings by skid trails must either be removed and areas of exposed soil stabilized, or upgraded to comply with the closeout standards for land management roads in Section15(P-1)(6)(i) below. Dedham Maine Land Use Ordinance - 30 - (ii) Water crossing structures that are not bridges or culverts must either be removed immediately following timber harvesting and related activities, or, if frozen into the river, stream or tributary stream bed or bank, as soon as practical after snowmelt. (iii) River, stream and tributary stream channels, banks and approaches to crossings of water bodies and tributary streams must be immediately stabilized on completion of harvest, or if the ground is frozen and/or snow-covered, as soon as practical after snowmelt. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected. (i) Land management road closeout. Maintenance of the water control features must continue until use of the road is discontinued and the road is put to bed by taking the following actions: (i) Effective installation of water bars or other adequate road drainage structures at appropriate intervals, constructed to reasonably avoid surface water flowing over or under the water bar, and extending sufficient distance beyond the traveled way so that water does not reenter the road surface. (ii) Water crossing structures must be appropriately sized or dismantled and removed in a manner that reasonably avoids sedimentation of the water body or tributary stream. (iii) Any bridge or water crossing culvert in roads to be discontinued shall satisfy one of the following requirements: 1. it shall be designed to provide an opening sufficient in size and structure to accommodate 25 year frequency water flows; 2. it shall be designed to provide an opening with a cross-sectional area at least 3 ½ times the cross-sectional area of the river, stream or tributary stream channel; or 3. it shall be dismantled and removed in a fashion to reasonably avoid sedimentation of the river, stream or tributary stream. If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected. (7) Slope Table Filter strips, skid trail setbacks, and land management road setbacks must be maintained as specified in Section 15(P-1), but in no case shall be less than shown in the following table. Average slope of the land between exposed mineral Width of stripe between exposed mineral soil and Soil and shoreline (percent) shoreline (feet along surface of the ground) 0_____ 25 10____________________________________ 45 20 65 30___________________________________________________________ 85 40 105 50____ 125 60 145 70 165 Q. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting. (1) In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation within the strip of land extending 75 feet, horizontal distance inland from the normal high-water line, except to remove safety hazards. Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be limited to that which is necessary for uses expressly authorized in that district. Dedham Maine Land Use Ordinance - 31 - (2) Except in areas as described in Section 15(Q)(1), above, and except to allow for the development of permitted uses, within a strip of land extending one-hundred (100) feet, horizontal distance, inland from the normal high-water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and seventy- five (75) feet, horizontal distance, from any other water body, tributary stream, or the upland edge of a wetland, a buffer strip of vegetation shall be preserved as follows: (a) There shall be no cleared opening greater than 250 square feet in the forest canopy or other existing woody vegetation if a forested canopy is not present as measured from the outer limits of the tree or shrub crown. However, a footpath not to exceed six (6) feet in width as measured between tree trunks and/or shrub stems is allowed provided that a cleared line of sight to the water through the buffer strip is not created. (b) Selective cutting of trees within the buffer strip is allowed provided that a well distributed stand of trees and other natural vegetation is maintained. For the purposes of Section 15(Q)(2)(b) a "well-distributed stand of trees" adjacent to a great pond classified GPA or a river or stream flowing to a great pond classified GPA, shall be defined as maintaining a rating score of 24 or more in any 50-foot by 25-foot rectangular (1250 square feet) area as determined by the following rating system. Diameter of Tree at 4-1/2 feet Above Points Ground Level (inches) 2 <4 in. 1 4 <8 in. 2 8 < 12 in. 4 12 in. or greater 8 Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand of trees" is defined as maintaining a minimum rating score of 16 per 50-foot by 25 foot rectangular area. The following shall govern in applying this point system: (i) The 25-foot by 50-foot rectangular plots must be established where the landowner or lessee proposes clearing within the required buffer; (ii) Each successive plot must be adjacent to, but not overlap a previous plot; (iii) Any plot not containing the required points must have no vegetation removed except as otherwise allowed by this Ordinance; (iv) Any plot containing the required points may have vegetation removed down to the minimum points required or as otherwise allowed by is Ordinance; (v) Where conditions permit, no more than 50% of the points on any 25-foot by 50- foot rectangular area may consist of trees greater than 12 inches in diameter. For the purposes of Section 15(Q)(2)(b) "other natural vegetation" is defined as retaining existing vegetation under three (3) feet in height and other ground cover and retaining at least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet above ground level for each 25-foot by 50- foot rectangle area. If five saplings do not exist, no woody stems less than two (2) inches in diameter can be removed until 5 saplings have been recruited into the plot. Dedham Maine Land Use Ordinance - 32 - Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be removed in any ten (10) year period. (c) In order to protect water quality and wildlife habitat, existing vegetation under three (3) feet in height and other ground cover, including leaf litter and the forest duff layer, shall not be cut, covered or removed, except to provide for a footpath or other permitted uses as described in Section 15(Q) paragraphs (2) and (2)(a) above. (d) Pruning of tree branches, on the bottom 1/3 of the tree, is allowed. (e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, diseased, unsafe, or dead trees results in the creation of cleared openings, these openings shall be replanted with native tree species unless existing new tree growth is present. Section 15(Q)(2) does not apply to those portions of public recreational facilities adjacent to public swimming areas as long as cleared areas are limited to the minimum area necessary. (3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal high-water line of any other water body, tributary stream, or the upland edge of a wetland there shall be allowed on any lot, in any ten (10) year period, selective cutting of not more than forty (40) percent of the volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground level. Tree removal in conjunction with the development of permitted uses shall be included in the forty (40) percent calculation. For the purposes of these standards volume may be considered to be equivalent to basal area. In no event shall cleared openings for any purpose development, including but not limited to principal and accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate, 25% of the lot area within the Shoreland zone or ten thousand (10,000) square feet, whichever is greater, including land previously cleared. This provision shall not apply to any of the Growth II-B District. (4) Legally existing nonconforming cleared opening may be maintained, but shall not be enlarged, except as allowed by this Ordinance. (5) Fields or other cleared openings which have reverted to primarily shrubs, trees, or other woody vegetation shall be regulated under the provisions of Section 15(Q). R. Erosion and Sedimentation Control (1) All activities which involve filling, grading, excavation or other similar activities which result in unstabilized soil conditions and which require a permit shall require a written soil erosion and sedimentation control plan. The plan shall be submitted to the permitting authority for approval and shall include, where applicable, provisions for: (a) Mulching and revegetation of disturbed soil. (b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches. (c) Permanent stabilization structures such as retaining walls or riprap. Dedham Maine Land Use Ordinance - 33 - (2) In order to create the least potential for erosion, development shall be designed to fit with the topography and soils of the site. Areas of steep slopes where high cuts and fills may be required shall be avoided wherever possible, and natural contours shall be followed as closely as possible. (3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project involving land disturbance, and shall be in operation during all stages of the activity. The amount of exposed soil at every phase of construction shall be minimized to reduce the potential for erosion. (4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other effective measures. In all cases permanent stabilization shall occur within nine (9) months of the initial date of exposure. In addition: (a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred (500) square feet and shall be maintained until a catch of vegetation is established. (b) Anchoring the mulch with netting, peg and twine or other suitable method may be required to maintain the mulch cover. (c) Additional measures shall be taken where necessary in order to avoid siltation into the water. Such measures may include the use of staked hay bales and/or silt fences. (5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion from water flowing through them. Drainage ways shall be designed and constructed in order to carry water from a twenty five (25) year storm or greater, and shall be stabilized with vegetation or lined with riprap. S. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures can be established or maintained without causing adverse environmental impacts, including severe erosion, mass soil movement, improper drainage, and water pollution, whether during or after construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial development and other similar intensive land uses, shall require a soils report based on an on-site investigation and be prepared by state-certified professionals. Certified persons may include Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified Geologists and other persons who have training and experience in the recognition and evaluation of soil properties. The report shall be based upon the analysis of the characteristics of the soil and surrounding land and water areas, maximum ground water elevation, presence of ledge, drainage conditions, and other pertinent data which the evaluator deems appropriate. The soils report shall include recommendations for a proposed use to counteract soil limitations where they exist. T. Water Quality No activity shall deposit on or into the ground or discharge to the waters of the State any pollutant that, by itself or in combination with other activities or substances, will impair designated uses or the water classification of the water body, tributary stream or wetland. U. Archaeological Sites Any proposed land use activity involving structural development or soil disturbance on or adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as determined by the permitting authority, Dedham Maine Land Use Ordinance - 34 - shall be submitted by the applicant to the Maine Historic Preservation Commission for review and comment, at least twenty (20) days prior to action being taken by the permitting authority. The permitting authority shall consider comments received from the Commission prior to rendering a decision on the application. V. Fences Fences shall be constructed of such materials and in such a manner as to have minimal adverse effect on the environment. The fence as constructed will not obstruct fire fighting equipment, road maintenance crews or emergency crews in the proper performance of their duties, or present an undue hazard or nuisance to innocent passerby or abutting land owners. The Code Enforcement Officer will have the authority to order the removal or modification of any fence, regardless of when constructed, whenever it presents any of the above hazardous or nuisance conditions. Fences shall be set back from all property lines and/or right of ways a distance of two feet, unless the abutter agrees in writing to placement of fence on property line. W. Mobile Homes, which are considered structures as defined: All mobile homes must be certified to conform to the Federal Construction and Safety Standards Act of 1974. All placement or removal of a mobile home will require a permit and inspection form the C.E.O. /Building Inspector and Local Plumbing Inspector. All mobile homes must be placed on a concrete or gravel pad, be tied down or blocked to insure a safe and secure placement and to prevent any unnecessary movement of home. All mobile homes must have an appropriate skirting in place that will allow access under the home. X. Damage to Town Property. Any and all damages caused by the land/home owner or contractor to any Town Property or Town Roads will be the responsibility of the land /home owner to repair. Dedham Maine Land Use Ordinance - 35 - 16. Administration A. Administering Bodies and Agents (1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed annually by July 1st. (2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of 30-A M.R.S.A. section 2691. (3) Planning Board. A Planning Board shall be created in accordance with the provisions of State law. B. Permits Required. After the effective date of this Ordinance no person shall, without first obtaining a permit, engage in any activity or use of land or structure requiring a permit in the district in which such activity or use would occur; or expand, change, or replace an existing use or structure; or renew a discontinued nonconforming use. A person who is issued a permit pursuant to this Ordinance shall have a copy of the permit on site while the work authorized by the permit is performed. (1) A permit is not required for the replacement of an existing road culvert as long as: (a) The replacement culvert is not more than 25 % longer than the culvert being replaced; (b) The replacement culvert is not longer than 75 feet; and (c) Adequate erosion control measures are taken to prevent sedimentation of the water, and the crossing does not block fish passage in the water course. (2) A permit is not required for an archaeological excavation as long as the excavation is conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or level 2 approved lists, and unreasonable erosion and sedimentation is prevented by means of adequate and timely temporary and permanent stabilization measures. (3) Any permit required by this Ordinance shall be in addition to any other permits required by other law or ordinance. C. Permit Application (1) Every applicant for a permit shall submit a written application, including a scaled site plan, a picture of the area of the property for which the permit is submitted, including any plumbing permits needed for the proposed construction, on a form provided by the municipality to the appropriate official as indicated in Section 14. Any state permit forms may be required with the application for a permit. These forms must be submitted to the Code Enforcement Officer at least one (1) week before the Planning Board meeting for review of completeness (2) All applications shall be signed by an owner or individual who can show evidence of right, title or interest in the property or by an agent, representative, tenant or contractor of the owner with authorization from the owner to apply for a permit hereunder, certifying that the information in the application is complete and correct. Dedham Maine Land Use Ordinance - 36 - (3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as appropriate, shall note upon each application the date and time of its receipt. (4) If the property is not served by a public sewer, a valid plumbing permit or a completed application for a plumbing permit, including the site evaluation approved by the Plumbing Inspector, shall be submitted whenever the nature of the proposed structure would require the installation of a subsurface sewage disposal system. D. Procedure for Administering Permits. Within 35 days of the date of the application, the Planning board or Code Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either that the application is a complete application, or, if the application is incomplete, that specified additional material is needed to make the application complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall approve, approve with conditions, or deny all permit applications in writing within 35 days of receiving a completed application. However, if the Planning Board has a waiting list of applications, a decision on the application shall occur within 35 days after the first available date on the Planning Board's agenda following receipt of the completed application, or within 35 days of the public hearing, if the proposed use or structure is found to be in conformance with the purposes and provisions of this Ordinance. The applicant shall have the burden of proving that the proposed land use activity is in conformity with the purposes and provisions of this Ordinance. After the submission of a complete application to the Planning Board, the Board shall approve an application or approve it with conditions if it makes a positive finding based on the information presented that the proposed use: (1) Will maintain safe and healthful conditions; (2) Will not result in water pollution, erosion, or sedimentation to surface waters; (3) Will adequately provide for the disposal of all wastewater; (4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat; (5) Will conserve shore cover and visual, as well as actual, points of access to inland waters; (6) Will protect archaeological and historic resources as designated in the comprehensive plan; (7) Will avoid problems associated with floodplain development and use; and (8) Is in conformance with the provisions of Section 15, Land Use Standards. If a permit is either denied or approved with conditions, the reasons as well as conditions shall be stated in writing. No approval shall be granted for an application involving a structure if the structure would be located in an unapproved subdivision or would violate any other local ordinance or regulation or any State law which the municipality is responsible for enforcing. E. Expiration of Permit. Permits shall expire one year from the date of issuances if substantial start is not made in construction or in the use of the property during that period. If a substantial start is made within one year of the issuance of the permit, the applicant shall have one additional year to complete the project, at which time the permit shall expire. Dedham Maine Land Use Ordinance - 37 - F. Fees. Fees for permits will be reviewed and set by the Board of Selectmen on a yearly basis. G. Installation of Public Utility Service. A public utility, water district, sanitary district or any utility company of any kind may not install services to any new structure located in the shoreland zone unless written authorization attesting to the validity and currency of all local permits required under this or any previous Ordinance, has been issued by the appropriate municipal officials or other written arrangements have been made between the municipal officials and the utility. H. Appeals (1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following powers: (a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis, where it is alleged by an aggrieved party that there is an error in any order, requirement, decision, or determination made by, or failure to act by, Planning Board or Code Enforcement Officer in the administration of this Ordinance. Any order, requirement, decision or determination made, or failure to act, by the Code Enforcement Officer in the enforcement of this ordinance is not appealable to the Board of Appeals. (b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in this Ordinance. (2) Variance Appeals. Variances may be granted only under the following conditions: (a) Variances may be granted only from dimensional requirements, including but not limited to, lot width, structure height, percent of lot coverage, and setback requirements. (b) Variances shall not be granted for establishment of any uses otherwise prohibited by this Ordinance. (c) The Board shall not grant a variance unless it finds that: (i) The proposed structure or use would meet the provisions of Section 15 except for the specific provision which has created the non-conformity and from which relief is sought; and (ii) The strict application of the terms of this Ordinance would result in undue hardship. The term "undue hardship" shall mean: a. That the land in question cannot yield a reasonable return unless a variance is granted; b. That the need for a variance is due to the unique circumstances of the property and not to the general conditions in the neighborhood; c. That the granting of a variance will not alter the essential character of the locality; and d. That the hardship is not the result of action taken by the applicant or a prior owner. (d) Not withstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals may grant a variance to an owner of a residential dwelling for the purpose of making that dwelling accessible to a person with a disability who resides in or regularly uses the dwelling. The board shall restrict any variance granted under this subsection solely to the installation of equipment or the construction of structures necessary for access to Dedham Maine Land Use Ordinance - 38 - or egress from the dwelling by the person with the disability. The board may impose conditions on the variance, including limiting the variance to the duration of the disability or to the time that the person with the disability lives in the dwelling. The term "structures necessary for access to or egress from the dwelling" shall include railing, wall or roof systems necessary for the safety or effectiveness of the structure. (e) The Board of Appeals shall limit any variances granted as strictly as possible in order to insure conformance with the purposes and provisions of this Ordinance to the greatest extent possible, and in doing so may impose such conditions to a variance as it deems necessary. The party receiving the variance shall comply with any conditions imposed. (f) A copy of each variance request, including the application and all supporting information supplied by the applicant, shall be forwarded by the municipal officials to the Commissioner of the Department of Environmental Protection at least twenty (20) days prior to action by the Board of Appeals. Any comments received from the Commissioner prior to the action by the Board of Appeals shall be made part of the record and shall be taken into consideration by the Board of Appeals. (3) Administrative Appeals When the Board of Appeals hears a decision of the Planning Board or Code enforcement Officer, it shall hold an appellate hearing, and may reverse the decision of the Planning Board or Code Enforcement Officer only upon finding that the decision was contrary to specific provisions of the Ordinance or contrary to the facts presented to the Planning Board or Code Enforcement Officer. The Board of Appeals may only review the record of the proceedings before the Planning Board or Code Enforcement Officer. The Board Appeals shall not receive or consider any evidence which was not presented to the Planning Board or Code Enforcement Officer, but the Board of Appeals may receive and consider written or oral arguments. If the Board of Appeals determines that the records of the Planning Board or Code Enforcement Officer proceedings are inadequate, the Board of Appeals may remand the matter to the Planning Board or Code Enforcement Officer for additional fact finding. (4) Appeal Procedure (a) Making an Appeal (i) An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved party from any decision of the Code Enforcement Officer or the Planning Board, except for enforcement- related matters as described in Section 16(H)(1)(a) above. Such an appeal shall be taken within thirty (30) days of the date of the official written decision appealed from, and not otherwise, except that the Board, upon a showing of good cause, may waive the thirty (30) day requirement. (ii) Application for appeals shall be made by filing with the Board of Appeals a written notice of appeal which includes: a. A concise written statement indicating what relief is requested and why the appeal or variance should be granted. b. A sketch drawn to scale showing lot lines, location of existing buildings and structures and other physical features of the lot pertinent to the relief sought. Dedham Maine Land Use Ordinance - 39 - (iii) Upon receiving an application for an administrative appeal or variance, the Code Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of Appeals all of the papers constituting the record of the decision appealed from. (iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a request for a variance within thirty-five (35) days of its receipt of a complete written application, unless this time period is extended by the parties. (b) Decision by Board of Appeals (i) A majority of the full voting membership of the board shall constitute a quorum for the purpose of deciding an appeal. (ii) The person filing the appeal shall have the burden of proof. (iii) The Board shall decide all administrative appeals and variance appeals within thirty five (35) days after the close of the hearing, and shall issue a written decision on all appeals. (iv) The Board of Appeals shall state the reasons and basis for its decision, including a statement of the facts found and conclusions reached by the Board. The Board shall cause written notice of its decision to be mailed or hand-delivered to the applicant and to the Department of Environmental Protection within seven (7) days of the Board's decision. Copies of written decisions of the Board of Appeals shall be given to the Planning Board, Code Enforcement Officer, and the municipal officers. All decisions shall become a part of the record and shall include a statement of findings and conclusions as well as the reasons or basis therefore, and the appropriate order, relief or denial thereof. (5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any aggrieved party who participated as a party during the proceedings before the Board of Appeals may take an appeal to Superior Court in accordance with State laws within forty-five (45) days from the date of any decision of the Board of Appeals. (6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may reconsider any decision within forty-five (45) days of its prior decision. A request to the Board to reconsider a decision must be filed within ten (10) days of the decision that is being reconsidered. A vote to reconsider and the action taken on that reconsideration must occur and be completed within forty-five (45) days of the date of the vote on the original decision. Reconsideration of a decision shall require a positive vote of the majority of the Board members originally voting on the decision, and proper notification to the landowner, petitioner, planning board, code enforcement officer, and other parties of interest, including abutters and those who testified at the original hearing(s). The Board may conduct additional hearings and receive additional evidence and testimony. Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days after the decision on reconsideration. Dedham Maine Land Use Ordinance - 40 - I. Enforcement (1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance. (2) Code Enforcement Officer (a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance. If the Code Enforcement Officer shall find that any provision of this Ordinance is being violated, he or she shall notify in writing the person responsible for such violation, indicating the nature of the violation and ordering the action necessary to correct it, including discontinuance of illegal use of land, buildings or structures, or work being done, removal of illegal buildings or structures, and abatement of nuisance conditions. A copy of such notices shall be submitted to the municipal officers and be maintained as a permanent record. (b) The Code Enforcement Officer shall conduct on-site inspections to ensure compliance with all applicable laws and conditions attached to permit approvals. The Code Enforcement Officer shall also investigate all complaints of alleged violations of this Ordinance. (c) The Code Enforcement Officer shall keep a complete record of all essential transactions of the office, including applications submitted, permits granted or denied, variances granted or denied, revocation actions, revocation of permits, appeals, court actions, violations investigated, violations found, and fees collected. On a biennial basis, a summary of this record shall be submitted to the Director of the Bureau of Land and Water Quality within the Department of Environmental Protection. (3) Legal Actions. When the above action does not result in the correction or abatement of the violation or nuisance condition, the Municipal Officers, upon notice from the Code Enforcement Officer, are hereby directed to institute any and all actions and proceedings, either legal or equitable, including seeking injunctions of violations and the imposition of fines, that may be appropriate or necessary to enforce the provisions of this Ordinance in the name of the municipality. The municipal officers, or their authorized agent, are hereby authorized to enter into administrative consent agreements for the purpose of eliminating violations of this Ordinance and recovering fines without Court action. Such agreements shall not allow an illegal structure or use to continue unless there is clear and convincing evidence that the illegal structure or use was constructed or conducted as a direct result of erroneous advice given by an authorized municipal official and there is no evidence that the owner acted in bad faith, or unless the removal of the structure or use will result in a threat or hazard to public health and safety or will result in substantial environmental damage. (4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a contractor, who violates any provision or requirements of this Ordinance shall be penalized in accordance with 30-A, M.R.S.A. section 4452. Dedham Maine Land Use Ordinance - 41 - 17. Definitions. Accessory structure or use - a use or structure which is incidental and subordinate to the principal use or structure. Accessory uses, when aggregated shall not subordinate the principal use of the lot. A deck or similar extension of the principal structure or a garage attached to the principal structure by a roof or a common wall is considered part of the principal structure. Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit or variance has been granted; or any other person or group of persons who have suffered particularized injury as a result of the granting or denial of such permit or variance. Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals, including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and green house products. Agriculture does not include forest management and timber harvesting activities. Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or animal species. Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of bark. Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more than 50% of its volume below the existing ground level. Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft, and which may include an access ramp, docking area, and parking spaces for vehicles and trailers. Bureau - State of Maine Department of Conservation's Bureau of Forestry. Campground - any area or tract of land to accommodate two (2) or more parties in temporary living quarters, including, but not limited to tents, recreational vehicles or other shelters. Canopy - the more or less continuous cover formed by tree crowns in a wooded area. Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined below, the intent and result of which activity is the production of income from the buying and selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling units. Cross-sectional area - the cross-sectional area of a stream or tributary stream channel is determined by multiplying the stream or tributary stream channel width by the average stream or tributary stream channel depth. The stream or tributary stream channel width is the straight line distance from the normal high-water line on one side of the channel to the normal high-water line on the opposite side of the channel. The average stream or tributary stream channel \ depth is the average of the vertical distances from a straight line between the normal high-water lines of the stream or tributary stream channel to the bottom of the channel. DBH - the diameter of a standing tree measured 4.5 feet from ground level. Development - a change in land use involving alteration of the land, water or vegetation, or the addition or alteration of structures or other construction no naturally occurring. Dedham Maine Land Use Ordinance - 42 - Dimensional requirements - numerical standards relating to spatial relationships including but not limited to setback, lot area, shore frontage and height. Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental condition caused by bodily injury, accident, disease, birth defect, environmental conditions or illness; and also includes the physical or mental condition of a person which constitutes a substantial handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or psychologist, as well as any other health or sensory impairment which requires special education, vocational rehabilitation or related services. Disruption of shoreline integrity - the alteration of the physical shape, properties, or condition of a shoreline at and location by timber harvesting and related activities. A shoreline where shoreline integrity has been disrupted is recognized by compacted, scarified and/or rutted soil, an abnormal channel or shoreline cross-section, and in the case of flowing waters, a profile and character altered from natural conditions. Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-family dwelling or one two-family dwelling or less. Emergency operations - operations conducted for the public health, safety or general welfare, such as protection of resources from immediate destruction or loss, law enforcement, and operations to rescue human beings, property and livestock from the threat of destruction or injury. Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection or supply systems; and associated storage tanks. Such systems may include towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and similar accessories, but shall not include service drops or buildings which are necessary for the furnishing of such services. Expansion of a structure - an increase in the floor area or volume of a structure, including all extensions such as, but not limited to: attached decks, garages, porches and greenhouses. Expansion of use - the addition of one or more months to a use's operating season; or the use of more floor area or ground area devoted to a particular use. Family - one or more persons occupying a premises and living as a single housekeeping unit. Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls, plus the horizontal area of any unenclosed portions of a structure such as porches and decks. Forest management activities - timber cruising and other forest resource evaluation activities, pesticide or fertilizer application, management planning activities, timber stand improvement, pruning, regeneration of forest stands, and other similar or associated activities, exclusive of timber harvesting and the construction, creation or maintenance of roads. Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meter tall (approximately twenty (20) feet) or taller. Dedham Maine Land Use Ordinance - 43 - Forest Stand - a contiguous group of trees sufficiently uniform in age class distribution, composition, and structure, and growing on a site of sufficiently uniform quality, to be a distinguishable unit. Foundation - the supporting substructure of a building or other structure, excluding wooden sills and post supports, but including basements, slabs, frostwalls or other base consisting of concrete, block, brick or similar material. Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested wetlands, which are: 1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a surface water body, excluding any river, stream or brook, such that in a natural state, the combined surface area is in excess of 10 acres; and 2. Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to support, and which under normal circumstances do support, a prevalence of wetland vegetation typically adapted for life in saturated soils. Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the criteria of this definition. Functionally water-dependent uses - those uses that require, for their primary purpose, location on submerged lands or that require direct access to, or location in, coastal or inland waters and that can not be located away from these waters. The uses include, but are not limited to commercial and recreational fishing and boating facilities, excluding recreational boat storage buildings, finfish and shellfish processing, fish storage and retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and boat building facilities, marinas, navigation aids, basins and channels, retaining walls, industrial uses dependent upon water-borne transportation or requiring large volumes of cooling or processing water that can not reasonably be located or operated at an inland site, and uses that primarily provide general public access to coastal or inland waters. Great pond - any inland body of water which in a natural state has a surface area in excess of ten (10) acres, and any inland body of water artificially formed or increased which has a surface area in excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or increased inland body of water is completely surrounded by land held by a single owner, Great pond classified GPA - any great pond classified GPA, pursuant to Title 38 Article 4-A Section 465-A. This classification includes some, but not all impoundments of rivers that are defined as great ponds. Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic matter of the forest floor. Harvest Area - the area where timber harvesting and related activities, including the cutting of trees, skidding, yarding, and associated road construction take place. The area affected by a harvest encompasses the area within the outer boundaries of these activities, excepting unharvested areas greater than 10 acres within the area affected by a harvest. Height of a structure - the vertical distance between the mean original (prior to construction) grade at the downhill side of the structure to the highest point of the structure, excluding chimneys, steeples, antennas, and similar appurtenances that have no floor area. Dedham Maine Land Use Ordinance - 44 - Increase in nonconformity of a structure - any change in a structure or property which causes further deviation from the dimensional standard(s) creating the nonconformity such as, but not limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot coverage, or increase in height of a structure. Property changes or structure expansions which either meet the dimensional standard or which cause no further increase in the linear extent of nonconformance of the existing structure shall not be considered to increase nonconformity. For example, there is no increase in nonconformity with the setback requirement for water bodies, wetlands, or tributary streams if the expansion extends no further into the required setback area than does any portion of the existing nonconforming structure. Hence, a structure may be expanded laterally provided that the expansion extends no closer to the water body, tributary stream or wetland than the closest portion of the existing structure from that water body, tributary stream or wetland. Included in this allowance are expansions which in-fill irregularly shaped structures. Individual private campsite - an area of land which is not associated with a campground, but which is developed for repeated camping by only one group not to exceed ten (10) individuals and which involves site improvements which may include but not be limited to a gravel pad, parking area, fire place, or tent platform. Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods, or the extraction of minerals. Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or private school, hospital, or municipally owned or operated building, structure or land used for public purposes. Land Management Road - a route or track consisting of a bed of exposed mineral soil, gravel, or other surfacing materials constructed for, or created by, the passage of motorized vehicles and used primarily for timber harvesting and related activities, including associated log yards, but not including skid trails or skid roads. Licensed Forester - a forester licensed under 32 M.R.S.A. Chapter 76. Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal high-water line of a water body or upland edge of a wetland and areas beneath roads serving more than two lots. Marina - a business establishment having frontage on navigable water and, as its principal use, providing for hire offshore moorings or docking facilities for boats, and which may also provide accessory services such as boat and related sales, boat repair and construction, indoor and outdoor storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities. Market value - the estimated price a property will bring in the open market and under prevailing market conditions in a sale between a willing seller and a willing buyer, both conversant with the property and with prevailing general price levels. Mineral exploration - hand sampling, test boring, or other methods of determining the nature or extent of mineral resources which create minimal disturbance to the land and which include reasonable measures to restore the land to its original condition. Mineral extraction - any operation within any twelve (12) month period which removes more than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from its natural location and to transport the product removed, away from the extraction site. Dedham Maine Land Use Ordinance - 45 - Minimum lot width - the closest distance between the side lot lines of a lot. When only two lots lines extend into the Shoreland zone, both lot lines shall be considered to be side lot lines. Multi-unit residential - a residential structure containing three (3) or more residential dwelling units. Native - indigenous to the local forests. Non-conforming condition - non-conforming lot, structure or use which is allowed solely because it was in lawful existence at the time this Ordinance or subsequent amendment took effect. Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment of this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is located. Non-conforming structure - a structure which does not meet any one or more of the following dimensional requirements; setback, height, or lot coverage, but which is allowed solely because it was in lawful existence at the time this Ordinance or subsequent amendments took effect. Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not allowed in the district in which it is situated, but which is allowed to remain solely because it was in lawful existence at the time this Ordinance or subsequent amendments took effect. Normal high-water line - that line which is apparent from visible markings, changes in the character of soils due to prolonged action of the water or changes in vegetation, and which distinguishes between predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers and great ponds that support non-forested wetland vegetation and hydric soils and that are at the same or lower elevation as the water level of the river or great pond during the period of normal high-water are considered part of the river or great pond. In the case of wetlands adjacent to rivers and great ponds. Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership, association, two or more individuals having a joint or common interest, or other legal entity. Piers, docks, wharves, bridges and other structures and uses extending over or below the normal high-water line or within a wetland. Temporary: Structures which remain in or over the water for less than seven (7) months in any period of twelve (12) consecutive months. Permanent: Structures which remain in or over the water for seven (7) months or more in any period of twelve (12) consecutive months. Principal structure - a building other than one which is used for purposes wholly incidental or accessory to the use of another building or use on the same premises. Principal use - a use other than one which is wholly incidental or accessory to another use on the same premises. Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public entity. Dedham Maine Land Use Ordinance - 46 - Recent floodplain soils - the following soil series as described and identified by the National Cooperative Soil Survey: Fryeburg Haley Limerick Lovewell Medomak Ondawa Alluvial Cornish Charles Podunk Rumney Saco Suncook Sunday Winooski Recreational facility - a place designed and equipped for the conduct of sports, leisure time activities, and other customary and usual recreational activities, excluding boat launching facilities. Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for temporary sleeping or living quarters for one or more persons, and which may include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a vehicle and not as a structure, the unit must remain with its tires on the ground, and must be registered with the State Division of Motor Vehicles. Replacement system - a system intended to replace: 1.) an existing system which is either malfunctioning or being upgraded with no significant change of design flow or use of the structure. 2.) any existing overboard wastewater discharge. Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as permanent, seasonal, or temporary living quarters for only one family at a time, and containing cooking, sleeping, and toilet facilities. The term shall include mobile homes and rented units that containing cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational vehicles are not residential dwelling units. Residual basal area - the average of the basal area of trees remaining on a harvested site. Residual Stand - a stand of trees remaining in the forest following timber harvesting and related activities Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or less. River - a free-flowing body of water including its associated floodplain wetlands from that point at which it provides drainage for a watershed of twenty five (25) square miles to its mouth. Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing material constructed for or created by the repeated passage of motorized vehicles, excluding a driveway as defined. Service drop - any utility line extension which does not cross or run beneath any portion of a water body provided that: 1. In the case of electric service. a. the placement of wires and/or the installation of utility poles is located entirely upon the premises of the customer requesting service or upon a roadway right-of-way; and b. the total length of the extension is less than one thousand (1,000) feet. Dedham Maine Land Use Ordinance - 47 - 2.In the case of telephone service a. the extension, regardless of length, will be made by the installation of telephone wires to existing utility poles, or b. the extension requiring the installation of new utility poles or placement underground is less than one thousand (1,000) feet in length. Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary stream, or upland edge of a wetland, to the nearest part of a structure, road, parking space or other regulated object or area. Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line between the intersections of the lot lines with the shoreline. Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance, of the normal high-water line of any great pond or river; within 250 feet, horizontal distance, of the upland edge of a freshwater wetland; or within one hundred (100) feet horizontal distance of the normal high-water line of a stream. Shoreline - the normal high-water line or upland edge of a freshwater wetland. Significant River Segments - See 38 M.R.S.A. Section 437. Skid Road or Skid Trail - a route repeatedly used by forwarding machinery or animal to haul or drag forest products from the stump to the yard or landing, the construction of which requires minimal excavation. Slash - the residue, e.g., treetops and branches, left on the ground after a timber harvest. Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2) perennial streams as depicted on the most recent edition of a United States Geological Survey 7.5 minute series topographic map, or if not available, a 15-minute series topographic map, to the point where the body of water becomes a river or flows to another water body or wetland within the shoreland area. Structure - anything built for the support, shelter or enclosure of persons, animals, goods or property of any kind, together with anything constructed or erected with a fixed location on or in the ground, exclusive of fences, and poles, wiring and other aerial equipment normally associated with service drops as well as guying and guy anchors. The term includes structures temporarily or permanently located, such as decks , patios, and satellite dishes. Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a percentage of estimated total cost. Subsurface sewage disposal system - any system designed to dispose of waste or waste water on or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism, or apparatus used for those purposes; does not include any discharge system licensed under 38 M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi-municipal sewer or waste water treatment system. Sustained slope - a change in elevation where the referenced percent grade is substantially maintained or exceeded throughout the measured area. Dedham Maine Land Use Ordinance - 48 - Timber harvesting - the cutting and removal of timber for the primary purpose of selling or processing forest products. The cutting or removal of trees in the shoreland zone on a lot that has less than two (2) acres within the shoreland zone shall not be considered timber harvesting. Such cutting or removal of trees shall be regulated pursuant to Section 15 (Q), Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting Timber harvesting and related activities - timber harvesting, the construction and maintenance of roads used primarily for timber harvesting and other activities conducted to facilitate timber harvesting. Tributary stream -- means a channel between defined banks created by the action of surface water, which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is connected hydrologically with other water bodies. Tributary stream" does not include rills or gullies forming because of accelerated erosion in disturbed soils where the natural vegetation cover has been removed by human activity. This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only applies to that portion of the tributary stream located within the shoreland zone of the receiving water body or wetland. NOTE: Water setback requirements apply to tributary streams within the shoreland zone. Upland edge of a wetland - the boundary between upland and wetland. For purposes of a freshwater wetland, the upland edge is formed where the soils are not saturated for a duration sufficient to support wetland vegetation; or where the soils support the growth of wetland vegetation, but such vegetation is dominated by woody stems that are six (6) meter (approximately twenty (20) feet) tall or taller. Vegetation - all live trees, shrubs, and other plants including, without limitation, trees both over and under 4 inches in diameter, measured at 4 1/2 feet above ground level. Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed exterior walls as measured from the exterior faces of these walls and roof. Water body - any great pond, river or stream Water crossing - any project extending from one bank to the opposite bank of a river, stream, tributary stream, or wetland whether under, through, or over the water or wetland. Such projects include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these crossings. This definition includes crossings for timber harvesting equipment and related activities. Wetland - a freshwater wetland. Windfirm - the ability of a forest stand to withstand strong winds and resist windthrow, wind rocking, and major breakage. Woody Vegetation - live trees or woody, non-herbaceous shrubs. Note: If a definition is not found within this Ordinance, refer to the Webster Collegiate Dictionary.