TOWN OF FARMINGTON
Site Review Ordinance
ENACTED:
August 2, 1995
AMENDED: March 11, 2002
November 22, 2016
December 12, 2023
CERTIFIED BY: Diane L. Dunham
Town Clerk
Town of Farmington
Chapter 11 - Land Use
Table of Contents
Article 5 - Site Review
11-5.1 Title
1
11-5.2 Authority, Administration and Applicability
1
11-5.3 Purposes
2
11-5.4 Conflicts with Other Ordinances
2
11-5.5 Effective Date
2
11-5.6 Validity and Severability
2
11-5.7 Definitions
3
11-5.8 Levels of Review and Review Procedures
4
11-5.9 Approval, Conditions, Findings, Denial
12
11-5.10 Site Plan Revision
12
11-5.11 Expiration and Extension of Approval and Completion Date
12
11-5.12 Fees
13
11-5.13 Site Review Application Requirements
14
11-5.14 Performance Standards
21
11-5.15 Appeals
28
11-5.16 Amendments
29
11-5.17 Enforcement
29
1
Town of Farmington
Site Review Ordinance
11-5.1. Title
This Ordinance, which repeals and replaces the Site Review Ordinance adopted on
August 2, 1995, shall be known and cited as the Town of Farmington Site Review
Ordinance and will be referred to as "this Ordinance". This Ordinance establishes a
process for review and approval of uses of land or structures, and construction,
alteration or expansion of structures; prescribes application and approval criteria;
implements the Town of Farmington Zoning Ordinance; and provides for additional
performance standards.
11-5.2. Authority, Administration and Applicability
WHEREAS, the residents of the Town, desiring to preserve, maintain and promote
the viability, sustainability and quality of life which are characteristic of the Town,
adopted a Site Review Ordinance and subsequently wrote and adopted the
Comprehensive Plan as a guide to the growth and development of the Town; and
WHEREAS, the residents of the Town, recognizing that the particular use of land or
structures in a particular location may impact on community and/or individual goals,
adopted the Zoning Ordinance, thereby implementing one of the strategies set forth in
the Comprehensive Plan and directed the Planning Board to administer this Ordinance;
and
WHEREAS, there is a recognized need to balance implementation of the Zoning
Ordinance, the rights of landowners and their abutters, and the protection of that which
is held in common by all residents; and
NOW THEREFORE, this Ordinance is adopted pursuant to the enabling provisions
of Article VIII, part 2 section 1, of the Maine Constitution; the provisions of 30-A M.R.S.
§3001 (Municipal Home Rule Authority) and the provisions of 30-A M.R.S. §4312 et.
seq. (Planning and Land Use Regulation Act).
The Planning Board of the Town of Farmington, herein referred to as "the Board", shall
administer this Ordinance.
This Ordinance shall apply to all proposals regarding the use of land and/or structures,
alteration of land, and all construction of structures including erection, relocation,
alteration or expansion of such within the Town of Farmington.
Persons or entities wishing to change the use of land or structures as defined above,
must first obtain approval from the Code Enforcement Officer, herein after referred to as
the "CEO", or the Board and shall be subject to the provisions of this Ordinance and
2
other applicable ordinances. This approval must be received before any building
construction activity, or site preparation may commence.
11-5.3. Purposes
The purposes of this Ordinance are to:
A. Provide local review of projects, which may or may not be governed by State law or
regulation, that potentially impact the community or residents of the community and
to assure consistency with the goals and policies of the Comprehensive Plan;
B. Protect public health and safety, and promote the general welfare and quality of life
of the Town;
C. Maintain and protect the rural, agricultural character of the Town by fitting projects
harmoniously into the fabric of the community;
D. Conserve the natural resources of the Town and protect the environment and those
resources held in common by the public from exploitation, abuse and degradation;
E. Protect historical, archeological, and recreational resources of the Town;
F. Balance the rights of landowners and/or tenants with the corresponding rights of
abutting and neighboring landowners and/or tenants and minimize adverse impacts
on adjacent property; and
G. Identify potential problems created by a particular project and seek alternatives that
minimize the impact on municipal services.
11-5.4. Conflict with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with other
provisions of this Ordinance, or of any other ordinance, regulation or standard, the more
restrictive provision shall apply.
11-5.5 Effective Date
The effective date of this Ordinance shall be August 2, 1995. (To be updated after
amendments are approved at Town Meeting.)
11-5.6. Validity and Severability
Should any section or provision of this Ordinance be declared by any court to be invalid,
such decision shall not invalidate any other section or provision.
3
11-5.7. Definitions
In general, words and terms used in these regulations shall have their customary
dictionary meanings. More specifically, certain words and terms used herein are
defined below. Additional definitions maybe found in the Zoning Ordinance or in the
various referenced Town Ordinances. Definitions from all Town Ordinances are
collated in the Town of Farmington Lexicon for ease of reference.
Abutter. Abutter shall mean the owner(s) of record of property sharing a common
boundary with a given piece of property, whether or not these properties are separated
by a public or private street or right-of-way.
Agent. Agent shall mean a person empowered to act for another.
Applicant. Applicant shall mean the person seeking approval to change the use of land
and/or structures, alter land, or construct structures including erection, relocation,
alteration or expansion of such.
Aquifer. Aquifer shall mean a geological formation composed of rock, sand, gravel or
any other permeable bedrock or surficial geological formation that stores and transmits
significant quantities of recoverable water.
Campground. Campground shall mean a plot of ground upon which two or more
campsites are located, established, or maintained for occupancy by camping units of
the general public for recreational use as transient living quarters.
Commercial. Commercial shall mean any connection with the buying or selling of
goods or services on or away from the premises including the provision of facilities for a
fee.
Hazardous Materials. Hazardous Materials shall mean any waste as designated by
the Maine Board of Environmental Protection in Chapter 850 of their Rules under the
authority of 38 M.R.S. §1301, et. seq.
Historic or Archaeological Resources. Historic or Archaeological Resources shall
mean areas identified by a governmental agency such as the Maine Historic
Preservation Commission as having significant value as an historic or archaeological
resource and any areas identified in the Comprehensive Plan.
Home Occupation. Home Occupation shall mean an occupation or profession which is
customarily carried on in a dwelling unit or structure accessory to a dwelling unit which
is incidental to residential use and employs no more than one full-time
equivalent outside employee. The home occupation must be carried on by the owner of
the home, who is living in the dwelling.
4
Major Projects. Major Projects shall mean the construction of any new structures or
structure expansion or building addition having a total floor area of ten thousand
(10,000) square feet or more; and/or the construction of any surface parking area(s) for
more than ten thousand (10,000) square feet; and/or a change in the use of a total floor
area of ten thousand (10,000) square feet.
Owner of Record. Owner of Record shall mean the party, individual, entity,
corporation, trust or business which is currently listed at the Franklin County Registry of
Deeds as the owner of a subject parcel, lot or property.
Person. Person shall mean an individual, corporation, governmental agency,
municipality, trust, estate, partnership, association, two or more individuals having a
joint or common interest, or other legal entity.
Public Street. Public Street shall mean a street or road maintained by the Town of
Farmington or the State of Maine.
Vicinity. Vicinity shall mean an area which encompasses the property and people who
live in close proximity to one another and share a common landscape with its inherent
sounds, noises, fumes, odors and other characteristics of a neighborhood.
Wetlands. As defined by 38 M.R.S. §480 B.4
11-5.8 Levels of Review and Review Procedures
A. General Provisions
1.
All changes of the use of land (as defined in the Zoning Ordinance Table of
Uses) and/or structure(s), alteration of land, and all construction of structures
including the erection, relocation, alteration or expansion of such within the Town
shall be reported to the Code Enforcement Office before they are commenced.
2.
All proposals must comply with all applicable standards of this Ordinance, the
Zoning Ordinance and other applicable land use ordinances.
3.
The Zoning Ordinance Table of Uses establishes the appropriateness of specific
land uses in six (6) defined zones. This Ordinance establishes the process and
standards by which review is conducted. As such, proposed uses in certain
categories under the Table of Uses may only require reporting to the CEO.
Proposed uses in certain categories may be reviewed and approved by the CEO
if properly documented to prove minimal or no impact on abutting properties or
resources. All other proposed uses must be reviewed and approved by the
Board.
5
4.
Certain proposed uses, because of the nature of the activities associated with the
use, may have more than one applicable use category in the Table of Uses. In
such cases the more restrictive category shall apply.
5.
Proposed commercial or industrial uses not specifically listed in the Zoning
Ordinance Table of Uses or that would not be generally recognized by the CEO
as a subset of an existing category shall be referred to the Zoning Board for
interpretation, clarification and decision of where the proposed use fits in the
Table of Uses.
6.
Overlay Districts and Subdivisions
a.
Proposals within certain overlay districts and proposals for subdivisions must
first be reviewed and approved subject to application requirements and
performance standards set forth in the applicable ordinance or regulations.
1) Shoreland Zoning Ordinance (11-1)
2) Floodplain Management Ordinance (11-2)
3) Wellhead Protection Ordinance (11-7)
4) Subdivision Ordinance (11-10)
b.
In addition, the proposal may require review and approval subject to
application requirements and performance standards contained in this
Ordinance, the Zoning Ordinance and/or other applicable land use
ordinances, when determined to be applicable by the CEO or the Board.
B. Levels of Review
1.
Uses Not Requiring Approval
a.
The following uses, when listed as (Y) "Yes, permitted, subject to land use
standards" in the Zoning Ordinance Table of Uses do not require CEO or the
Board's approval.
1) Construction of detached single-family and two-family dwellings and
accessory structures.
2) The normal and customary practices of agriculture and agricultural
management activities. These practices shall be conducted, where
applicable, according to and described in the State of Maine Strategy for
Managing Nonpoint Source Pollution from Agricultural Sources and Best
Management System Guidelines published by the Nonpoint Source
Agricultural Task Force and dated October 9, 1991 and as amended
thereafter.
6
Construction of accessory structures or expansion of existing structures
used for normal and customary agricultural practices not exceeding five
thousand (5,000) sq. ft. in new construction or not exceeding twenty five
percent (25%) expansion of any existing building in area.
3) The normal and customary practices of forestry activities. These activities
shall be conducted, where applicable, according to and described in the
Erosion and Sediment Control Handbook for Maine Timber Harvesting
Operations dated February 1991 and issued by the Maine Forest Service
and as amended thereafter.
4) The relocation of an existing retail or service business within the Town of
Farmington which is in compliance with all local and State laws and
regulations providing that the relocation meets the following criteria:
a) The relocated business will be located within existing structures,
currently used for retail or service business and there will be no new
buildings, demolitions, or building additions; and
b) The relocated business will not require any new curb cuts, driveways,
or parking areas; and
c) The relocated business will not require any additional Town services.
5) Home Occupations that meet the following criteria:
a) The primary activity associated with the Home Occupation is listed as
(Y) "Yes, permitted, subject to land use standards" in the Zoning
Ordinance Table of Uses;
b) The home occupation meets all of the performance standards
contained in 11-8.11.B of the Zoning Ordinance; and
c) The proposal does not seek to expand the dwelling or accessory
structure, or seek to construct a new structure to accommodate the
home occupation.
6) Telecommunication facilities exempted in 11-11.9 of the Wireless
Telecommunication Facility Siting Ordinance.
7) Earthmoving activities exempted in 11-9.10 of the Soil Erosion &
Stormwater Runoff Management Ordinance.
8) Extraction activities exempted in 11-8.11C. Extractive Industry
performance standard in the Zoning Ordinance.
7
b.
Although the uses listed above (11-5.8.B1a.) do not require the CEO's or the
Board's approval, they remain subject to and must comply with applicable
standards of Town land use ordinances. The CEO shall make available
information necessary to comply with applicable standards.
c.
When the use does not require CEO or the Board's approval, the applicant
must complete a Registration Form with the Code Enforcement Office stating
the name, address and phone number of owner; name, address and phone
number of property owner (if different); and, if a business, the name, location
and nature of the business.
2.
CEO Review and Approval
Uses listed as (Y) "Yes, permitted subject to land use standards" in the Table of
Uses means that the generic use category is acceptable in the zoning district,
however a specific proposal for change to a permitted use or expansion of a
current use, must be reviewed and approved by the CEO. Before approving
such proposal, the CEO must find that the specific proposal conforms to the
standards and criteria of this and other applicable ordinances and meets the
following criteria:
a.
The use will not require alteration of existing land or the natural environment
beyond the parameter of the CEO's authority under the Town's Shoreland
Zoning, Floodplain and Soil Erosion Control/Storm Water Management
Ordinances;
b.
The use will not require the addition of new structures or expansion of an
existing structure which seeks to expand by more than one thousand (1,000)
sq. ft. or twenty-five percent (25%) in area (which ever is lesser) in any ten
(10) year period, regarding (but not limited to) floor space, parking area,
seating capacity, outdoor storage area or other facilities;
c.
The use will not create health, safety or municipal resource problems;
d.
The use will not have adverse impacts on the subject property or abutting
properties;
A proposal not meeting the criteria stated above and/or a proposal the CEO
feels he/she cannot approve will, at the request of the applicant, be processed
for review by the Board.
The Board and abutting landowners will be notified of all CEO determinations.
8
3.
Board Review and Approval
a.
Proposals for use not meeting the criteria set forth in 11-5.8.B.2. above,
proposals the CEO feels they cannot approve, proposals subject to review
under 11-5.8.B.2. that a member of the Board requests Board consideration
and/or an abutter has requested review.
b.
Uses listed as (Y*) "permitted subject to land use standards and Planning
Board approval" means that the generic use category is acceptable in the
zoning districts, however a specific proposal in a particular location must be
developed in accordance with a detailed plan reviewed and approved by the
Board. Before approving such uses the Board must find that the specific
proposal in the particular location conforms to the standards and criteria of
this and other applicable ordinances.
c.
Uses listed as (*) "permitted on a site specific basis, subject to land use
standards and Planning Board approval" in the Table of Uses means that the
generic use category is not generally acceptable in the zoning district, but that
a specific proposal in a particular location developed in accordance with a
detailed plan reviewed and approved by the Board may be allowed. In
addition to providing all the submissions required for site review, an applicant
for such a use must submit a detailed statement describing the probable
impacts of the use with reference to the criteria listed below. The applicant
must demonstrate to the Board that the specific proposal in the particular
location conforms to the standards and criteria of this and other applicable
ordinances and meets the following criteria:
1) The use will be developed, implemented and operated in a way which is
consistent with the Comprehensive Plan and with the stated purpose of
the zoning district in which the use is to be located;
2) The use will be developed, implemented and operated in a way which will
not have adverse impacts on the subject property and on nearby
properties which are greater in degree or different in kind from the impacts
of permitted uses existing in the vicinity of the proposed use;
3) The use will be developed, implemented and operated in a way which will
not alter the essential character of the area in which it is located;
4) The use will be developed, implemented and operated in a way which will
not substantially reduce the value of or impair the reasonable use of
adjoining properties;
5) Sounds, noises, odors, fumes, vibrations, smoke, dust and discharges to
the air which will be generated by the proposed use shall not be greater in
degree, either in number of occurrences or magnitude (levels) or
9
concentration, or different in kind than those generated by permitted uses
existing in the vicinity of the proposed use. If detectable at or beyond the
boundary of the property, the use will be developed, implemented and/or
operated in such a way that the change in ambient conditions, existing at
the time, will not adversely impact residents in the vicinity of the proposed
use;
6) The hours of operation of the proposed use will be compatible with those
of permitted uses existing in the vicinity of the proposed use;
7) The use will be developed, implemented and operated in a way which will
not create public health, safety or municipal resource problems greater in
degree or different in kind from those connected with permitted uses
existing in the vicinity of the proposed use;
8) The proposed use will not create erosion and sedimentation problems,
water quality problems or problems associated with floodplain
development; and
9) The proposed use will not have unreasonable adverse impacts on natural
resources and archaeological or historic resources.
4.
Additional Review Considerations
a.
Notice to Abutters
1) CEO Review
Abutting property owners shall be notified by certified mail, by the Town, of
an application which the CEO determines is ready for approval by the
CEO. Abutters will have a fifteen (15) day period (from date of CEO's
determination) to request consideration by the Board. The cost of
notification shall be borne by the applicant.
2) Board Review
Abutting property owners shall be notified by certified mail, by the Town, at
least fifteen (15) days prior to initial Board consideration, of a pending
application for Site Review. This notice shall indicate the time, date and
place of Board consideration of the application. The cost of notification
shall be borne by the applicant.
a) Onsite Visit
All applications shall have an onsite visit by the CEO. An additional
site visit(s) may be scheduled by the Board.
10
b) Public Hearing
If the Board decides to hold a public hearing, it shall publish notice of
the day, time and place of the hearing in a newspaper of general
circulation in the municipality at least twice, the date of the first
publication to be at least fifteen (15) days prior to the hearing. The
cost of advertising shall be borne by the applicant.
Notice of the public hearing shall be sent through regular mail to all
abutters of the proposed development fifteen (15) days prior to the
hearing by the Town of Farmington.
c) Professional Review
i.
Professional Services
The Board may require that a fully qualified consultant(s) review
one or more submissions of an application and report as to
compliance or noncompliance with this Ordinance and recommend,
if possible, procedures which will result in compliance. The
consultant(s) shall be determined by the Board to be competent in
a field germane to the issue under consideration and shall be
mutually acceptable to the Board and the applicant. The consultant
shall estimate the cost of such review and the applicant shall
deposit with the Town the full estimated cost which the Town shall
place in an escrow account. The Town shall pay the consultant
from the escrow account and reimburse the applicant if funds
remain after payments are completed. If escrowed funds are
insufficient, the applicant shall deposit additional funds with the
Town, based on the consultant's estimate, sufficient for completion
(if said completion is still desired).
ii.
Additional Studies
The Board may require the applicant to undertake any study which
the Board deems necessary to ensure that the requirements of the
Ordinance are met. The costs of all such studies shall be borne by
the applicant.
d) Departmental Notification and Review
The application shall be forwarded to applicable department heads for
their comments and recommendations. All comments and
recommendations shall be received within fifteen (15) days unless an
extension is requested by the department head.
11
C. Review Procedures
1.
The CEO shall review all proposals to determine if CEO or the Board's approval
is required and within seven (7) days make his/her determination and notify the
applicant.
2.
Where the CEO's or the Board's approval is required, the CEO shall provide the
applicant with all necessary application forms, advise the applicant of review
criteria and performance standards contained in any applicable Town land use
ordinances, and inform the applicant of any other submissions they feel are
necessary to deem the application complete for initial review.
3.
Where CEO approval is required, a second meeting will be scheduled for final
review of the completed application and required submissions. Within seven (7)
days the CEO shall notify the Board and the applicant of his determination.
An application which the CEO determines is ready for approval by the CEO will
be considered finally approved after a fifteen (15) day period (from the date of the
CEO's determination) unless consideration by the Board has been requested by
a Board member or an abutter.
If such consideration has been requested the Board shall, at its next meeting,
determine if further Board review and approval is required.
4.
Where the Board's approval is required, the CEO shall review the application and
required submissions to determine if all requested information has been provided
and required fees, reimbursements, and deposits have been received. Upon
completion of this review the applicant shall be placed upon the next available
Board agenda for Initial Review allowing for a fifteen (15) day processing and
notification period. The CEO shall forward the application to the Board along
with any written comments and commendations from applicable department
heads provided that the proposal is not known to be in violation of any Town land
use ordinances.
a.
Initial Review
The applicant, or his duly authorized agent, shall attend the meeting of the
Board to discuss the proposal. The Board shall provide the applicant with a
dated receipt of the Site Review initial application at the Board meeting where
the application is first presented and heard by the Board. If the applicant or
agent is not present, the Board shall table the review of the application.
Review of the application shall be rescheduled at a subsequent meeting of
the Board at the request of the applicant. Absence of the applicant at a
second Board meeting shall result in the nullification of the application and will
require resubmission of the application.
12
b.
Complete Application
Within fifteen (15) days of the Board's receipt of a Site Review initial
application, the Board shall notify the applicant in writing that the application
is complete, or what additional submissions and/or additional studies are
required for a complete application. The Board shall determine whether to
hold a public hearing and/or conduct an additional onsite visit once the
application is determined by the Board to be a complete application.
c.
Subsequent Review
If additional submissions, additional studies, public hearing(s), or an
additional onsite visit, were required as a result of the initial review, a final
review will be scheduled by the Board to consider these additional findings
and to determine that the application is complete. The Board reserves the
right to require professional review of any submission in which compliance or
noncompliance with the standards of this ordinance or any other applicable
land use ordinance exists.
11-5.9. Approval, Conditions, Findings, Denial
Within thirty (30) days of a public hearing, or within sixty (60) days of receipt of a
complete application, if no hearing is held, or within another time limit as may be
otherwise mutually agreed to by the Board and the applicant, the Board shall make
findings of fact on the application and approve, approve with conditions, or deny the
application. The Board may attach conditions to the proposal approval to ensure
conformity with the standards and criteria of this Ordinance and/or other applicable
ordinances. The Board shall specify, in writing, its findings of facts and reasons for any
conditions or denial.
11-5.10. Site Plan Revision
The site shall be developed and maintained as depicted in the site plan and the written
submission of the applicant. Modification of any approved site plan or alteration of a
parcel which was the subject of site plan approval shall require approval of the revised
site plan by the CEO or the Board, whichever is applicable.
11-5.11. Expiration and Extension of Approval and Completion Date
A. Expiration of Approval
All Site Review approvals shall expire within one (1) year of the date of issuance unless
work thereunder is commenced. Normally, if work is not completed within two (2) years
from the date of issuance, a new application must be made (See C. Extension of
Completion Date). The CEO shall make determinations regarding commencement and
completion.
13
1.
In determining commencement, the CEO shall consider:
a.
Surveying;
b.
Land work (to include but not be limited to clearing, grading, erosion and
storm water runoff control and access road preparation); and
c.
Foundation work if applicable.
2.
In determining completion the CEO shall consider:
a.
Final grading;
b.
Completion of access roads to include final surfacing, culverts, and ditches;
c.
Permanent erosion and storm water runoff control;
d.
External building completion; and
e.
Finished landscaping and seeding of appropriate areas.
B. Extension of Approval
Proposal approvals may be extended for one (1) year from the date of issuance by the
CEO for projects not commencing within one (1) year of initial Board approval. Written
extension requests must be submitted to the CEO at least forty-five (45) days before the
one (1) year expiration.
Proposal approvals which are granted a one (1) year extension from the date of
issuance shall also have their completion date extended by one (1) year.
Before extending an approval, the CEO must determine that extenuating circumstances
beyond the control of the applicant exist. Extenuating circumstances may include but
are not limited to procurement of financing, legal issues, availability of materials,
availability of qualified contractors, and adverse weather conditions.
C. Extension of Completion Date
The CEO may extend the completion date of a commenced proposal by one (1) year
beyond the allotted two (2) years.
In determining this extension, the CEO shall consider factors such as, but not limited to,
financial hardship, legal difficulties, site condition problems, contract delay, disruption in
supply of labor and/or materials, or personal issues (illness, injury, death in the family,
etc.)
11-5.12. Fees
A. All applications must be accompanied by the appropriate application fee that shall be
set by the Select Board.
14
B. All applicable fees including but not limited to postage reimbursement, advertising
fees, consultant fees, will be the responsibility of the applicant and must be paid
before receiving written confirmation of approval by the CEO or the Board.
11-5.13. Site Review Application Requirements
A. General Requirements
1.
If the applicant and the property owner of record are not one in the same, the
applicant shall provide evidence of consent to the proposal by the property
owner. A statement signed by the property owner, shall delegate to the applicant
the right to develop and implement the proposal in accordance with a complete
Site Review Application approved by the Board. This shall include any changes
or conditions required by the Board. (Remove spacing)
2.
If another person(s) is/are to represent the applicant in dealings with the Board
that person(s) shall be designated as an agent, in writing, by the applicant.
3.
All applications for Site Review shall be submitted on application forms provided
by the Code Enforcement Office. The required fees, fifteen (15) sets of the
application form, and fifteen (15) sets of the required plans, maps and
supplemental information shall be submitted to the Code Enforcement Office.
4.
Maps, plans or other drawings must be of a scale sufficient to allow for review of
the proposal under the performance standards of this Ordinance and other
applicable ordinances. In no case shall the scale be more than one hundred
(100) feet to the inch for that portion of the tract of land being proposed for the
project.
B. Submission Requirements for a Complete Site Review Application
A complete site review application shall contain the following:
1.
A fully executed and signed Town of Farmington Site Review Application form;
2.
A signed Site Review Check List of required submissions;
3.
Property owner's statement if owner and applicant are not one in the same;
4.
Statement designating agents(s) if applicable;
5.
Letter(s) of Review from applicable Town departments;
6.
Copy of deed;
7.
Evidence of payment of application fee;
15
8.
A site plan if applicable (See 11-5.13.C1);
9.
A detailed narrative appropriate to the project describing the proposed
development activity;
10. Building plans showing, as a minimum, the first floor footprint and all elevations;
11. Required supplemental information or additional studies; and
12. Copies of all applicable local, State and federal approvals and permits, provided,
however, that the Board may approve site plans subject to the issuance of
special local, State and federal licenses and permits in cases where it determines
that it is not feasible for the applicant to obtain them at the time of site review.
C. Site Plan Requirements
1.
A basic Site Plan shall, for new construction and/or land alteration (not for
change of use within an already permitted structure) be sufficient to allow review
of the following items:
a.
Dimensions of all lot lines (including street frontage) and total square footage
of the lot;
b.
The location of all required setbacks;
c.
The location, dimensions and first floor area (sq.ft.) and height of all existing
and proposed buildings;
d.
Location and width of proposed streets, curbs, driveways, sidewalks, bike
paths, if any;
e.
Location of existing and/or proposed fences, retaining walls, parking spaces,
loading areas, open spaces, stands of trees, open drainage courses, service
areas and easements (rights-of-way, drainage, utility and grading, etc);
f.
Location of wells and septic systems on site (planned or existing);
g.
Plan scale and orientation to North; and
h.
Location, dimensions, and character of all existing and/or proposed signs and
exterior lighting.
2.
Major projects or any projects involving significant grading or the construction of
roadways, utilities, stormwater drainage facilities, or similar items shall have a
site plan prepared by a professional licensed to practice site design and/or
engineering in the State of Maine.
16
3.
When an architect, engineer, surveyor, geologist, soil scientist or other
professionals licensed or certified and issued a seal by the State of Maine,
prepared the plan, the preparer's seal shall be affixed to the plan.
4.
An approval block must be provided on the plan drawing for the signatures of the
Planning Board and date together with the following words, "Approved: Town of
Farmington Planning Board".
D. Supplemental Information
All applications shall contain at least a detailed narrative appropriate to the project
describing the existing conditions of the site and proposed development activities.
Depending on the size, complexity and/or nature of the proposal, the CEO and/or the
Board may require sufficient information on one or more of the following to allow for
review of the proposal under the performance standards of this Ordinance and other
applicable ordinances.
Supplemental information may be in the form of a detailed narrative, reports, studies,
surveys, charts, maps, plans or other drawings.
1.
Existing Conditions
To allow for a thorough understanding of existing conditions on the proposed
site, information on one or more of the following may be required:
a.
Location of zoning district boundaries of the property if located in two or more
zoning districts and/or overlay districts;
b.
Boundaries of all contiguous property under the control of the owner or
applicant regardless of whether all or part is being developed at this time;
c.
The bearings and distances of all property lines and the source of this
information. A formal boundary survey may not be required when sufficient
information is available to establish all property boundaries on the ground;
d.
The location of existing buildings within fifty (50) feet of the parcel to be
developed and the location of intersection roads or driveways within two-
hundred (200) feet of the parcel;
e.
All existing contours and proposed grade elevations of the entire site.
Contour intervals shall be twenty (20) feet or as specified by the Board;
f.
Locations and size of any existing sewer and water mains, culverts and drains
on the property to be developed and of any that will serve the development
from abutting streets or land;
17
g.
Location, names and present widths of existing streets and rights-of-way
within or adjacent to the proposed development; and
h.
Location, dimensions and ground floor elevations of all existing buildings on
the site.
2.
Proposed Development Activities
To allow for a thorough review of the proposal, information on one or more of the
following maybe required:
a.
Location, dimensions and materials to be used in the construction of
proposed driveways, parking and loading areas and walkways;
b.
A utility plan showing provisions for water supply and wastewater disposal
including the size and location of all piping, holding tanks, leach fields, etc;
c.
Location and nature of electrical, telephone and any other utility services to
be installed on the site;
d.
A landscaping schedule keyed to the site plan and indicating the varieties and
sizes of trees, shrubs, and other vegetation to be planted on the site;
e.
Locations of all existing and/or proposed easements (rights-of-way, drainage,
utility, grading, etc.) and other legal restrictions that may affect the premises;
f.
An on-site soils investigation report by a Maine Department of Health and
Human Services licensed Site Evaluator for sites not served by Town sewer.
The report shall identify the types of soil, location of test pits, and proposed
location and design for the subsurface disposal system; and
g.
An Access Management Plan containing, as a minimum, the information
listed below:
1) Site description - A description of the site, including, as applicable, the
locations of driveways and streets located on any property immediately
adjacent to the site and across the street or road in the immediate vicinity
of the project driveway(s);
2) Overall use of the parcel - A description of the existing and proposed uses
of the site;
3) Traffic distribution - A description and diagram of the anticipated
distribution of traffic entering and exiting the site;
4) Vehicular circulation system within the parcel - A description and diagram
of the anticipated distribution of traffic within the lot and the parking;
18
5) Trip distribution description and diagram - A description and diagram of
the anticipated distribution of traffic entering and exiting the site, to include
the relationship of all driveways and intersecting roads exiting onto the
roadway in terms of angle and grade;
6) Driveway volume - Accompanying the Access Management Plan shall be
a letter that shall certify the number of peak hour vehicle trips that the
proposed land use will generate (according to the Trip Generation Manual,
6th Edition, published by the Institute of Transportation Engineers or any
subsequent adopted revision);
7) Minimum sight distance for all exiting driveways in both directions -
Measurement shall be from the driver's seat of a vehicle that is ten (10)
feet behind the curb (or edge of shoulder) line with the height of eye three
and one-half (3½) feet above the pavement and the height of object four
and one-quarter (4¼) feet; and
8) Driveway spacing - Spacing between the development's driveway and
driveways on contiguous lots.
3.
Impacts of the Proposed Development Activities
To allow for a thorough review of the potential impacts of the proposal on
adjacent properties, the community or the environment, information on one or
more of the following may be required:
a.
Assessment of all machinery, processes and activities likely to generate air
pollution, fumes/odors, sound or noise, to include type, size, location and
potential impacts beyond the lot lines;
b.
The provision for handling all solid wastes, including hazardous and special
wastes and the location and proposed screening of any on-site collection or
storage facilities; and
c.
Traffic Impact Study
1) If the project meets a) or b) below, the developer shall provide a full traffic
impact study at their own expense:
a) Volume: During any one (1) hour period, traffic (inbound or outbound)
attributable to the development equals or exceeds one hundred (100)
passenger car equivalents per hour at the project driveway(s).
19
b) Safety or capacity deficiencies: The Board determines that a traffic
impact study must be conducted because of traffic safety or capacity
deficiencies in the vicinity of the development.
2) In general, the Traffic Impact Study shall include a description of the traffic
movement to be generated by the development, including types and peak
hour, average daily vehicle trips, travel routes, and duration of traffic
movement both during and following construction. The study shall
contain, as a minimum, the information listed below:
a) Site description - A description of the site, including, as applicable, the
locations of driveways and streets located on any property immediately
adjacent to the site and across the street or road in the immediate vicinity
of the project driveway(s);
b) Use description (site) - A description of the existing and proposed uses
of the site;
c) Regional map - A regional map showing the site, and roads in the
vicinity of the development, and other proposed projects in the vicinity
of the development;
d) Description of traffic increases - A description of any traffic increases
that are likely to occur in the vicinity of the development during the
study period. The Developer shall include, as applicable, projects that
are: under construction and not fully occupied; are pending State or
local approval; or have State or local approval, but are not constructed
or fully occupied;
e) Trip generation calculation and summary table - The study shall
include a calculation of the trip generation for the development and
other likely traffic increases, including a summary table listing each
type of land use, the size involved, the average trip generation used,
and the resultant total trips generated;
f) Trip distribution description and diagram - The study shall include a
description and diagram of the anticipated distribution of traffic entering
and exiting the site; and
g) Definition of the study area - The study shall include a definition of the
study area, including all links and intersections using the following
threshold criteria:
i.
The study area shall include the first major intersection to either
side of the project driveway(s);
20
ii.
The study area shall be expanded beyond the first major
intersection(s) to either side of the project driveway to include those
links and intersections for which, during any one (1) -hour peak
period, traffic attributable to the development equals or exceeds the
following at any intersection in the vicinity of the development:
- Twenty-five (25) vehicles in a left-turn only lane;
- Thirty-five (35) vehicles in a through lane, right-turn lane, or a
combined through and right-turn lane; or
- Thirty-five (35) vehicles (multiplying the left-turn lane volume by
1.5) in a combined left-turn, through and right-turn lane;
iii.
Capacity analysis of signalized intersections located outside of the
study area may be required, if these signals are, or should be,
interconnected with an intersection located within the study area.
The study area may need to be extended, if signal progression on a
signal interconnect system is changed.
h) Use description and diagram (roads) - The study shall include a
description and diagram of an anticipated utilization of roads and
intersections in the vicinity of the development.
i) Diagram/documentation of traffic volume - The study shall include a
diagram and appropriate documentation of the traffic volume on roads
and intersections in the vicinity of the development for both the
estimated annual average daily traffic and the AM/PM peak hour traffic
(including turns during the peak hour). The study shall show the
following on the traffic diagrams:
i.
Existing traffic volume based on actual counts;
ii.
Traffic attributable to other projects that are proposed or approved;
iii.
Traffic attributable to the development assuming full build-out and
full occupancy;
iv.
Projected traffic volume for the design hour at the time the
development will begin operation, assuming full build-out and full
occupancy of the development; and
v.
Left-turn lane/right-turn lane warrant analysis.
j) Capacity analysis - The study shall include a capacity analysis for
determination of the level of service for each road and intersection in
21
the vicinity of the development. Capacity analyses must be performed
for all intersections that are currently operated or will be operated as
part of a signal interconnect system. The analysis shall report whether
or not length of storage for through or turning lanes is adequate.
k) Traffic signal analysis - The study shall include an analysis of the need
for new traffic signals in the vicinity of the development. The "Manual
of Uniform Traffic Control Devices" shall be used as the basis to
analyze the need for construction or elimination of traffic signals, as
appropriate.
l) Sight distance determination - The study shall include a determination
of the available sight distance in all directions at each intersection in
the vicinity of the development.
m) Inventory and analysis of accidents - The study shall include an
inventory and analysis of traffic accidents in the vicinity of the
development during the most recent three (3) year period. A collision
diagram shall be provided for all links and intersections found to meet
MDOT criteria for "High Accident Locations."
n) Description of improvements - The study shall include a description of
recommendations for improvements to deficient roads or intersections,
and the results of implementation of the recommendations.
d.
Assessment of stormwater runoff and potential effect on ground water and
contiguous soils.
e.
Assessment of proposed exterior lighting and its impact on adjacent properties.
E. Performance Guarantee
The Board may require the posting of an improvement guarantee in such amount as is
reasonably necessary to ensure the proper installation and maintenance of all offsite
improvements, and onsite improvements with offsite impacts, required as a condition of
approval. The nature and duration of the guarantee shall be structured to achieve this
goal without adding unnecessary costs to the applicant.
In the event that a development is abandoned, the performance guarantee may be
utilized to stabilize, secure, and/or restore the site as may be necessary, including, but
not limited to, re-vegetation of areas, grading and fencing.
11-5.14. Performance Standards
The following criteria and standards shall be utilized by the Board in reviewing
applications for Site Plan Review approval.
22
A. Landscaping
The landscape shall be preserved in its natural state and enhanced insofar as
practicable by minimizing tree removal, disturbance of soil, and retaining existing
vegetation during construction, and/or placing new plantings as specified in
Landscaping Standards of the Town of Farmington's Zoning Ordinance (11-8.11 E).
Environmentally sensitive areas such as wetlands, steep slopes, floodplains and unique
natural features, and natural drainage areas will be maintained and preserved to the
maximum extent as delineated in the Town of Farmington's Floodplain Management
Ordinance and by State and federal law.
B. Historic and Archaeological Resources
If any portion of the site has been identified or is found to contain historic or
archaeological resources, the Maine Historic Preservation Commission must be notified
and requested to make an evaluation of the site and include subsequent measures for
protecting these resources.
C. Relation to Proposed Buildings to Existing Environment
Proposed structures shall be related harmoniously to existing buildings which represent
the historic character of the community and that have a visual relationship to the
proposed structures, so as to have a minimally adverse affect on the aesthetic qualities
of the developed and neighboring areas.
D. Vehicular Access and Parking
The proposed development shall provide safe access to and from public and private
roads. Safe access shall be assured by providing an adequate number and location of
access points, with respect to sight-distances, intersections, schools and other traffic
generators.
E. Off-Street Parking
A use shall not be extended, and no structure shall be constructed or enlarged unless
sufficient off-street automobile parking space is provided. The location of parking to the
side or rear of buildings is encouraged. (See the Town of Farmington's Zoning
Ordinance 11-8.11.D.)
F. Soil Erosion Control & Storm Water Management
Adequate provisions shall be made to minimize soil erosion and to allow for storm water
runoff so that the removal of surface waters will not adversely affect neighboring
properties, downstream conditions, or the public storm drainage. All activities must be
23
in compliance with the Town of Farmington Soil Erosion Control & Storm Water Runoff
Management Ordinance.
In addition, all erosion and sedimentation controls shall be completed in conformance
with the Best Management Practices (BMP'S) as described in:
The Maine Forest Service - Erosion and Sediment Control Handbook for Maine Timber
Harvesting Operations Best Management Practices. Maine Forest Services. June,
1991 and as amended thereafter;
State of Maine Strategy for Managing Nonpoint Source Pollution from Agricultural
Sources and Best Management System Guidelines. NPS Agricultural Task Force.
October, 1991 and as amended thereafter; and
Maine Erosion & Sediment Control Handbook for Construction Best Management
Practices. Cumberland County SWCD/Maine Department of Environmental Protection.
March 1991 and as amended thereafter.
G. Site Conditions
1.
Within thirty (30) days of completion of building, developed areas shall be cleared
of all stumps, litter, rubbish, brush, weeds, dead and dying trees, roots and
debris and excess or scrap building materials shall be removed.
2.
Final sitework must be completed within two (2) years from the date of issuance
(see 11-5.10 A).
3.
No significant change shall be made in the elevation or contour of any lot or site
by the removal of earth to another lot or site other than as shown on the
approved Site Review Plan.
H. Advertising Features
The size, location, design, lighting and materials of all exterior signs and outdoor
advertising structures or features shall not detract from the design of proposed buildings
and structures and the surrounding properties and must be in compliance with the Town
of Farmington Sign Ordinance.
I. Hours of Operation
The hours of operation of the proposed development will not have an unreasonable
adverse effect on prevailing conditions in the vicinity due to noise during otherwise quiet
hours of the day, excessive lighting during the nighttime hours, conditions conducive to
loitering, disorderly conduct or public safety problems, or other conditions in the nature
of a nuisance. If the prevailing character in the vicinity of the development is rural or
residential, operation during certain nighttime, weekend and holiday hours shall be
24
presumed to have an adverse impact but may be allowed by the Board if the applicant
demonstrates that the proposed development can be operated in ways which will not
create adverse impacts during those hours. These certain nighttime, weekend and
holiday hours shall be determined on a site-specific basis by the Board.
J. Special Features
Exposed storage areas, exposed machinery installations, service areas, truck loading
areas, utility buildings and structures, and similar accessory areas and structures, shall
be subject to such setbacks, screen plantings, or other screening methods deemed
reasonable, practicable and required by the Board (see 11-8.9 E. and 11-8.11 E. of the
Town of Farmington Zoning Ordinance).
K. Exterior Lighting
All exterior lighting shall be designed to encourage energy efficiency, to ensure safe
movement of people and vehicles, and to minimize adverse impact on neighboring
properties and public ways. Lighting shall be arranged to minimize glare and reflection
on adjacent properties and the traveling public (see 11-8.11F. of the Town of
Farmington Zoning Ordinance).
L. Emergency Vehicle Access
Provisions shall be made for providing and maintaining convenient and safe emergency
vehicle access to all buildings and structures. Fire lanes shall be not less than twenty
(20) feet of unobstructed width, able to withstand live loads of fire apparatus and have a
minimum of 13 ft. 6 in. of vertical clearance. An approved turnaround for fire apparatus
shall be provided where an access road is a dead end and is in excess of one hundred
fifty (150) feet in length; the turnaround shall have a minimum centerline radius of fifty
(50) feet.
M. Public Services
The development will not have an unreasonable adverse impact on the public services
including municipal road systems, fire department, police department, sewer
department, and other municipal services and facilities.
N. Ground Water
The proposed development shall not result in a reduction of the quality or a substantial
reduction in the quantity of ground water. In making this determination, the Board shall
consider the location of aquifers and aquifer recharge areas and the nature of the
proposed development and its potential threat to ground water resources. The Board
may place conditions upon an application to minimize potential impacts to the Town's
ground water resources.
25
1.
The use will not decrease the quantity of ground water available on nearby
properties below that needed to support existing uses, potential expansions of
existing uses or allowable uses. Projects anticipating the use of more than the
State average yield of five (5) gallons per minute (7,200 gallons per day) from
bedrock wells and the State average minimum high yield of ten (10) gallons per
minute (14,400 gallons per day) from wells in sand and gravel aquifers will
require evaluation by a State licensed hydrogeologist.
2.
The use will not increase the contaminant concentration in the ground water to
more than eighty percent (80%) of the State and federal Primary and Secondary
Drinking Water Standards.
3.
For above ground fuel storage, and chemicals or industrial wastes and potentially
harmful raw materials, an impermeable diked area shall be provided. The diked
area must be sized to contain the total volume of fuel tanks and piping; roofed to
prevent accumulation of rainwater in the diked area and shall be properly vented.
There shall be no drains in the facility. All concrete, whether walls or pads, shall
be reinforced concrete and shall be designed by a Professional Engineer
registered in the State of Maine when required by the Board. All such storage
structures must be approved by the State Fire Marshal's Office.
4.
Underground petroleum tanks shall be installed in accordance with the standards
promulgated by the Maine Board of Environmental Protection.
O. Air Pollution
The applicant must demonstrate that the proposed development shall not create
emission levels of dust, dirt, fly ash, vapors, or gases which could lower ambient air
quality, at any point beyond the lot line of the commercial or industrial establishment
creating that emission. All such activities shall also comply with applicable federal and
State regulations.
P. Fumes/Odors
The applicant must demonstrate that the proposed development will not produce
offensive, harmful or unhealthy fumes or odors, that are greater in degree, or different in
kind than those generated by permitted uses existing in the vicinity of the proposed use.
If detectable at or beyond the boundary of the property, the use will be developed,
implemented and/or operated in such a way that the change in ambient conditions,
existing at the time, will not adversely impact residents in the vicinity of the proposed
use and/or development.
An exception to this standard will exist when the Board and residents of the vicinity of
the proposed development are generally in agreement that the change in the ambient
26
environment is acceptable. Such an exception pre-supposes that there will be a
recognizable change in the ambient environment.
Q. Noise (unwanted sound)
The applicant must demonstrate that the nature of sound emanations from the proposed
development, regardless of sound pressure level, duration and intensity will not be
inconsistent with and will not be abhorrent to the ambient sound environment (nature of
sound emanations) generally experienced in the vicinity in which the development is
proposed.
An exception to the performance standard for noise will exist when the Planning Board
and residents of the vicinity of the proposed development are generally in agreement
that the proposed change in the sound environment is acceptable. Such an exception
pre-supposes that there will be a recognizable change to the ambient sound
environment.
R. Sound Pressure
The proposed development must not exceed federal and State mandated maximum
sound pressure levels at or beyond the boundaries of the development.
1.
Sound Level Measurement
Sound pressure levels shall be measured with a sound level meter with a
frequency weighting network manufactured according to standards prescribed by
the American National Standards Institute (ANSI) or its successor body. All
measuring meters must be calibrated by a certified laboratory and certificates of
calibration shall be made available to the Board upon their request.
Measurements shall be made at all abutting lot lines of the site, at a height of at
least four (4) feet above the ground surface.
In measuring sound pressure levels under this sections, sounds with a
continuous duration of less than sixty (60) seconds shall be measured by the
maximum reading on a sound level meter set to the A weighted scale and the
fast meter response (L maxfast).
Sounds with a continuous duration of sixty (60) seconds or more shall be
measure on the basis of the energy average sound level over a period of sixty
(60) seconds equivalent sound level (LEQ).
2.
Maximum Permissible Sound Pressure Levels
The maximum permissible sound pressure level at or beyond the boundaries of
the development of any continuous, regular or frequent source of sound
produced by an activity shall be as follows:
27
a.
Sixty (60) dBA between the hours of 7:00 A.M. and 10:00 P.M. as measured
at or within the boundaries of any residential zone.
b.
Fifty (50) dBA between the hours of between the hours of 10:00 P.M. and
7:00 A.M. as measured at or within the boundaries of any residential zone.
c.
In addition to the sound pressure level standards established above, best
practicable sound abatement techniques shall be employed to minimize noise
impacts.
S. Sewage Disposal
The development shall provide for suitable sewage disposal. All individual on-site
systems will be designed by a licensed Site Evaluator in full compliance with the Maine
Subsurface Wastewater Disposal Rules.
All installation and connection of building sewers and the discharge of waters and
wastes into the public sewer system shall be done in compliance with the Town of
Farmington Sewer Use Ordinance.
T. Waste Disposal
The proposed development will provide for adequate disposal of solid and hazardous
wastes in a timely manner. All disposal activities shall be done in compliance with the
Town of Farmington Solid Waste Ordinance and all applicable State and federal laws.
1.
All solid and hazardous wastes will be disposed of at a licensed disposal facility
having adequate capacity to accept the project's wastes.
2.
All hazardous waste will be disposed of at a licensed hazardous waste disposal
facility and evidence of a contractual arrangement with the licensed facility and/or
licensed hauler shall be submitted.
U. Setbacks
The proposed development will provide adequate setbacks and shall be done in
compliance with the Town of Farmington Zoning Ordinance (See Sections 11-8.9 E).
V. Screening and Buffering
No industrial or commercial buildings or uses shall be established in, or adjacent to, a
residential use, or an existing agricultural use unless a landscaped buffer strip is
provided to create a visual screen between the uses. Where no natural vegetation can
be maintained or due to varying site conditions, the landscaping screen may consist of
fences, walls, tree plantings, hedges or combinations thereof. The buffering shall be
sufficient to minimize the impacts of any kind of potential use such as; loading and
unloading operations, outdoor storage areas, vehicle parking, mineral extraction, waste
28
collection and disposal areas. Where a potential safety hazard to small children would
exist, physical screening or barriers shall be used to deter entry to such premises. The
buffer areas shall be maintained and vegetation replaced to insure continuous year-
round screening.
W. Connectivity
1.
Highway Connectivity:
The Board may determine that a proposed commercial retail and/or service
business project is best served by utilization of an existing abutting retail and/or
service businesses' highway access driveway versus a curb-cut for the
construction of a new additional highway opening to service the applicant's site.
In these instances, the Board may require that an applicant submit an alternative
access plan after discussing same with said abutter. It is understood that
accomplishing such a joined/shared highway access road requires negotiation
and agreement, and likely deeded easements and compensation for same.
The feasibility of such alternative access plans will be determined by the Board
and applicant jointly, based on factors such as financial, legal, physical, and
compatibility. The goal is to reduce the number of curb-cuts to increase highway
safety, enabling in-fill development of properties that otherwise might not be
viable.
2.
Background Connectivity:
The Board may determine that a proposed commercial retail and/or service
business project is best served by utilization of a background connector to an
existing abutting retail and/or service businesses in addition to a new curb-cut for
the construction of a highway opening to service the applicant's site. In these
instances, the Board may require that an applicant submit a background
connection plan after discussing same with said abutter. It is understood that
accomplishing such a joined/shared connector requires negotiation and
agreement, and likely deeded easements.
The feasibility of such background connection plans will be determined by the
Board and applicant jointly, based on factors such as financial, legal, physical,
and compatibility. The goal is to allow and increase access to more businesses
via background connectors thereby reducing the number of vehicles having to re-
enter the highway to access abutting and neighboring businesses.
11-5.15. Appeals
Any person aggrieved by the final action of the CEO or the Board may appeal to the
Board of Appeals by filing a notice of appeal within thirty (30) days after receipt of the
CEO's or the Board's notification. The CEO determination under §11-5.8C.3 that an
29
application is ready for approval by the CEO is not a final, appealable action until 15
(fifteen) days have passed from the date of such determination and no abutter or
Planning Board member has requested Planning Board review. Administrative appeals
submitted under this Ordinance shall be subject to the standards and procedures
established by the Town of Farmington Board of Appeals Ordinance.
11-5.16. Amendments
A. Initiation of Amendments
An amendment to this Ordinance may be initiated by:
1.
The Select Board, provided a majority of the Select Board Municipal Officers has
so voted.
2.
Written petition of a number of voters equal to at least ten percent (10%) of the
number of votes cast in the municipality at the last gubernatorial elections;
B. Public Hearing
The Select Board shall hold a public hearing on the proposed amendment. Notification
of the hearing shall be posted and advertised in a newspaper of general circulation in
the municipality at least seven (7) days prior to the hearing.
11-5.17. Enforcement
A. Violations
1.
Any violation of this Ordinance, including failure to comply with any condition,
shall be deemed to be a violation of 30-A §4452. Every day a violation exists
constitutes a separate violation.
2.
Commencement of any project without the Board's or CEO's approval shall be
considered a violation of this Ordinance. Any party committing such a violation
shall immediately cease project operations, whether of a construction, renovation
or business nature, upon notification by the CEO per B.1. below or upon self-
discovery of the violation. In such cases, an after-the-fact (ATF) application for
Site Review must be immediately filed with the CEO. The ATF application fee
will be double the normal application fee and must be paid prior to Planning
Board or CEO review. Payment of this ATF application fee does not preclude the
Town from pursuing fines and/or penalties under 30-A M.R.S. §4452 (per A. 1.
above and D. below) or preclude the Town from negotiating and executing an
administrative consent agreement to recover fines without court action (per C.
below).
30
B. Code Enforcement Officer
1.
It shall be the duty of the CEO to enforce the provisions of this Ordinance. If the
CEO finds that any provision of this Ordinance is being violated, he/she shall
notify in writing the person responsible for such violation, indicating the nature of
the violation and ordering the action necessary to correct it, including
discontinuance of illegal use of land, buildings or structures, or work being done,
removal of illegal buildings or structures, and abatement or mitigation of
violations. A copy of such notices shall be submitted to the municipal officers
and be maintained as a permanent record.
2.
The CEO shall conduct on-site inspections to ensure compliance with all
applicable laws and conditions attached to permit approvals. The CEO shall also
investigate all complaints of alleged violations of the Ordinance.
3.
The CEO shall keep a complete record of all essential transactions of the CEO,
including applications submitted, permits granted or denied, variances granted or
denied, revocation actions, revocation of permits, appeals, court actions,
violations investigated, violations found and fees collected.
C. Legal Actions
When the above action does not result in the correction or abatement of the violation,
the Municipal Officers, upon receiving written notification from the CEO, shall institute
any and all actions and proceedings, either legal or equitable, including injunctions of
violations and the impositions of penalties and/or fines in order to enforce the provisions
of this Ordinance. The Municipal Officers or their authorized agent are hereby
authorized to enter into administrative consent agreements for the purpose of
eliminating violations of this Ordinance and recovering fines without court action.
D. Penalties/Fines
Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who orders or conducts any activity in violation of this Ordinance, or upon
failure to comply with any of its requirements, shall be penalized in accordance with 30
M.R.S. §4452. The owner or tenant of any building, structure, premises, or part thereof
and any architect, builder, contractor, agent, or other person who commits, participates
in, or maintains such violation may be found guilty of a separate offense and be subject
to the penalties herein provided.