TOWN OF FARMINGTON
Soil Erosion Control & Storm Water Runoff
Management Ordinance
ENACTED:
November 18, 1999
CERTIFIED BY: Leanne E. Pinkham
Town Clerk
Town of Farmington
Chapter 11 - Land Use
Table of Contents
Article 9 - Soil Erosion Control & Storm Water Management Ordinance
11 - 9.1
Title
1
11 - 9.2
Authority & Administration
1
11 - 9.3
Purpose
1
11 - 9.4
Applicability
1
11 - 9.5
Conflicts with Other Ordinances
1
11 - 9.6
Effective Date
1
11 - 9.7
Validity
2
11 - 9.8 Definitions
2
11 - 9.9
Permit Required
2
11 - 9.10
Exemptions
3
11 - 9.11
Application Procedure
4
11 - 9.12
Enforcement
9
11 - 9.13
Appeals
11
11 - 9.14
Amendments
11
1
Town of Farmington
Soil Erosion Control & Storm Water Management Ordinance
Chapter 11
Land Use
11 - 9.1 Title:
This Ordinance shall be known and cited as the Town of Farmington Soil Erosion
Control & Storm Water Management Ordinance and will be referred to herein as "this
Ordinance" and prescribes definitions of earthmoving; provides for permitting and
regulation.
11 - 9.2 Authority and Administration:
This Ordinance is adopted pursuant to the enabling of Article VIII, Part 2, Section 1, of
the Maine Constitution and the provisions of Title 30-A MRSA Section 3001 et. seq.
(Home Rule) and Section 4312 et. seq. (Planning and Land Use).
11 - 9.3 Purpose:
The purpose of this Ordinance is to conserve soil resources, protect water, maintain
public health and safety by regulating earth-moving and other activities resulting in the
exposure of soils, and to address the affects of development on both the quantity and
quality of storm water runoff.
11 - 9.4 Applicability:
This Ordinance shall not exempt any property owner from obtaining other permits or
meeting any requirements of any other Town Ordinances, State or federal laws or
regulations. Where requirements or conditions of any such permits, ordinances, laws or
regulations differ from the provisions of these performance standards, the stricter shall
apply.
11 - 9.5 Conflicts with Other Ordinances:
Whenever a provision of this Ordinance conflicts with or is inconsistent with another
provision of this Ordinance or of any other ordinance, regulation or statute, the more
restrictive provision shall apply.
11 - 9.6 Effective Date:
The effective date of this Ordinance shall be the date this Ordinance is adopted by the
voters at Town Meeting.
2
11 - 9.7 Validity:
If any part of this Ordinance is found to be invalid, the remainder of these performance
standards shall remain in effect.
11 - 9.8 Definitions:
Earth-Moving Activities. Earth-moving activities means any activity in which earth is
moved from one location on a site to a different location on the site, in which earth is
removed from a site, or in which earth is brought onto a site, including, but not limited to,
any stripping of vegetation or topsoil, or any grading, excavation, filling or storage or
disposal of earth or soil.
Permit. Permit means a soil erosion control/storm water management permit issued
pursuant to this Ordinance.
Shoreland Zone. All areas as definded in the Town of Farmington Shoreland Zoning
Ordinance.
Soil. Soil means sand, silt, clay, gravel, rock, or any combination of any of the
foregoing.
11 - 9.9 Permit Required:
No person may engage in any earth-moving activity, as defined in this Ordinance, or
perform any activity resulting in exposure of soils, without first obtaining a Soil Erosion
Control/Storm Water Management Permit. This Ordinance provides for certain
exemptions (see Article 9.10).
A. Code Enforcement Officer's Authority. The Code Enforcement Officer
(CEO) shall have the authority to act on soil erosion control/storm water
management permit applications for the following earth-moving activities:
1. Any earth-moving activity of ten (10) cubic yards or less within a
Shoreland Zone.
2. Any earth-moving activity of greater than twenty-five (25) cubic yards but not
exceeding fifty (50) cubic yards outside a Shoreland Zone.
B. Planning Board Authority. The Planning Board shall have the authority
to act on soil erosion control/storm water management permit applications
for the following earth-moving activities:
1. Any earth-moving activity of greater than ten (10) cubic yards within a
Shoreland Zone.
3
2. Any earth-moving activity of greater than fifty (50) cubic yards outside of
a Shoreland Zone.
3. Clearing of lots for commercial sale or commercial development.
(NOTE: The Site Review Ordinance includes additional requirements
with regards to clearing of trees, vegetation and/or soil).
11 - 9.10 Exemptions:
The following activities DO NOT require a soil erosion control/storm water management
permit:
A. Any earth-moving activity of twenty-five (25) cubic yards or less outside
the Shoreland Zone. (For earth-moving activity of greater than twenty-five
(25) cubic yards outside the Shoreland Zone see Articles 9.9 A 2 and
9.9 B 2).
B. Any earth-moving activity relating to the construction of a single family
dwelling or private, residential use projects of less than 5,000 square feet
of ground surface area, provided the earth-moving activity is not within the
Shoreland Zone and does not adversely impact abutters.
C. Any earth-moving activity required for the installation of any approved
subsurface waste-water disposal system (less than 2,000 GPD in capacity)
or sewer connection. (The disturbed area shall be loamed, seeded and
mulched within one week from the time it was last actively worked. Per
Best Management Practices (BMP's), dormant seeding to be used in the
fall.)
D. Any earth-moving activity for approved solid waste disposal facilities.
E. Cemetery graves.
F. Tilling of gardens.
G. Agricultural activities such as plowing, earth-moving, tilling, and seeding
provided the person(s) involved follow appropriate BMP's as described in
the manual entitled State of Maine Strategy for Managing Nonpoint Source
Pollution from Agricultural Sources and Best Management System
Guidelines published by the Nonpoint Source Agricultural Task Force
dated October 9, 1991. At least three (3) copies shall be kept on file with
the Code Enforcement Office and available for public use, inspection and
examination.
H. Forestry activities, including cutting, logging, thinning, planting, burning,
trail and road building, and harvesting, if the person(s) involved follow
4
appropriate BMP's as described in the Erosion and Sediment Control
Handbook for Maine Timber Harvesting Operations dated February 1991
and issued by the Maine Forest Service. At least three (3) copies shall be
kept on file with the Code Enforcement Office and available for public use,
inspection and examination.
I. Any earth-moving activities or exposure of soils required in an emergency
response involving public health or safety. Subsequent soil stabilization
activities at emergency sites are the responsibility of the landowner or the
individual or entity responsible for the emergency situation where
appropriate.
11 - 9.11 Application Procedures:
A. Code Enforcement Officer Application: (See Article 9.9 A)
The application package must include all of the following items:
1. A completed application form.
2. A general site location map.
3. A site plan including a landscaping plan, existing vegetation
preservation, and buffer areas.
4. A soil erosion control plan and a storm water management plan, which
may be presented in a written narrative form without a map.
5. All appropriate fees.
B. Planning Board Application: (See Article 9.9 B)
The application package must include all of the following items:
1. A completed application form.
2. A general site location map.
3. A site plan including a landscaping plan, existing vegetation
preservation, and buffer areas.
4. A topographical map.
5. A soil map.
6. A detailed soil erosion control plan and a storm water management plan
including a map and a written narrative.
5
7. A detailed description of the development plan.
8. All appropriate fees.
C. Soil Erosion Control Standards: The soil erosion control plan submitted
with an application for a soil erosion control/storm water management
permit must include appropriate practices as described in Maine Erosion
and Sediment Control Handbook for Construction - Best Management
Practices (BMP's) dated March 1991, and published by the Cumberland
County Soil and Water Conservation District and the Maine Department of
Environmental Protection. At least three (3) copies of this handbook shall
be kept on file with the Code Enforcement Office and available for public
use, examination and inspection.
Erosion of soil and sedimentation of watercourses and waterbodies shall
be minimized by employing the following standards in accordance with the
above referenced BMP's:
1. Stripping of vegetation, soil removal, and regrading or other
development shall be accomplished in such a way as to minimize
erosion.
2. Except for surplus topsoil from road construction, parking areas, and building
excavations, topsoil is not to be removed from a development site.
3. The duration of exposure of the disturbed area shall be kept to a
practical minimum.
4. Temporary vegetation and/or mulching shall be used to protect exposed
erodable areas during development.
5. Permanent (final) vegetation and mechanical erosion control measures
shall be installed as soon as feasible after construction ends.
6. Until a disturbed area is stabilized, sediment in run-off water shall be
trapped by the use of debris basins, sediment basins, silt traps, or other
acceptable methods.
7. The top of a cut or the bottom of a fill section shall not be closer than
ten (10) feet to an adjoining property, unless otherwise specified by the
Planning Board.
8. During grading operations, methods of dust control shall be employed
wherever appropriate.
D. Storm Water Management Standards: The storm water management
6
plan submitted with an application for a soil erosion control/storm water
management permit must conform to the standards and practices
delineated in the Storm Water Management Best Management Practices
(BMP's) as established by the Maine Department of Environmental
Protection. At least three (3) copies of the BMP's shall be kept on file with
the Code Enforcement Office and available for public use, examination
and inspection.
If the estimated post-development peak rate of storm water runoff from the
affected land is calculated to be greater than the pre-development peak
runoff peak rates, in any watershed within the boundaries of the affected
land during any phase of development, then a detention basin or other
acceptable engineered disbursement system shall be designed and
constructed to maintain pre-development runoff peak rates from the site.
If the outflow is to be conveyed into a man-made piped or open
drainage system, the applicant shall demonstrate by hydraulic analysis
that the downstream channel or system capacity is sufficient to carry the
flow without adverse effects. The design of piped or open channel
systems shall be based on a 25-year flow frequency without surcharge or
flooding of areas not specifically planned for such flooding.
Storm water runoff systems shall be fully cognizant of upstream runoff
which must pass over or through the site to be developed. The system
shall be designed to pass upstream flows generated by a 25-year
frequency through the proposed development without surcharging the
system or flooding areas not specifically planned for such flooding.
Storm water runoff systems shall be designed to assure provision of both
major and minor components which will serve the combined objectives of
access convenience, property protection, erosion control, and pollution
control.
E. Fees:
1. $50.00 - permit application fee*
2. These fees shall be doubled for after-the-fact permits.
*The Town of Farmington shall be exempt from the application fee.
F. Performance Guarantee: The Planning Board may require a
performance guarantee based on the projected complexity of the
proposed erosion control and/or storm water management measures
required of the project, and/or the potential for significant cost to the Town
and/or other landowners if the erosion control and/or storm water
7
management measures are not adequately installed. The performance
guarantee may be in the form of a bond issued by a reputable bonding
company, or a letter of credit, or cash from the applicant in an amount to
cover the estimated cost of installing and completing all erosion control
measures specified in the application. Any performance guarantee
required by the Planning Board shall remain in place and in effect until all
temporary erosion control and/or storm water management measures are
removed and permanent erosion and sediment control and/or storm water
management measures have been installed and found by the CEO to
be operating satisfactorily.
G. Application Procedure:
1. Submitting an Application: The review process by the CEO or Planning
Board begins with the receipt of a completed application form,
application fee, and with all the required plans and maps. Within thirty
(30) days from the receipt of an application, the Planning Board will
notify the applicant in writing whether the application is complete or, if
incomplete, which additional information is needed to complete the
application.
2. Complete Application: After the CEO or Planning Board has determined that
the application is complete, the CEO or Planning Board shall begin review of
the permit application to determine its conformance with the provisions of this
Ordinance.
3. Public Hearing: The Planning Board may at its discretion, decide to hold a
public hearing on an application for a soil erosion control/storm water
management permit. In the event that the Planning Board determines to hold
a public hearing on a permit application, such a public hearing shall be held
within thirty (30) days after receiving a complete application. The Planning
Board shall give notice of the date, time and place of such hearing to the
applicant and shall publish in a newspaper of general circulation in the town at
least two times, the date of the first publication to be at least ten (10) days
prior to the hearing. Public hearings will not be held on permit applications
reviewed by the CEO.
Within forty-five (45) days after the CEO or the Planning Board
determines that it has received a completed application, the CEO or
Planning Board shall, in writing, (a) approve the permit application and
issue the permit; (b) approve the permit application subject to conditions
and issue the permit subject to these conditions; or, (c) disapprove the
permit application, indicating the deficiencies. The applicant shall
comply with all terms of the application.
8
4. The CEO or the Planning Board shall approve an application for a soil
erosion control/storm water management permit when it finds that:
a. The proposed earth-moving activity will:
1. be conducted in accordance with soil erosion control and storm
water management plans consistent with the requirements of this
Ordinance; and
2. be conducted in accordance with the standards set forth in Maine
Erosion and Sediment Control Handbook for Construction: Best
Management Practices, dated March 1991, or latest version
thereof, and published by the Cumberland County Soil and Water
Conservation District and the Maine Department of
Environmental Protection; and
3. be conducted in accordance with the standards and practices
delineated in the Storm Water Management Best Management
Practices as established by the Maine Department of
Environmental Protection; and
4. not cause unreasonable erosion of earth or soil or unreasonable
adverse impacts on water quality; and
5. be done by an applicant who has the financial capacity and
an agent/contractor who has the technical ability to conduct the
earth-moving activity in accordance with the approved soil
erosion control plan.
b. The applicant has filed an acceptable landscape, existing
vegetation preservation, and buffer areas plan which is in
compliance with the Landscape Performance Standards of the
Zoning Ordinance of the Town of Farmington.
c. Any aggrieved party wishing to submit additional information, not
previously presented, may file a new application.
H. Other Requirements: The CEO or the Planning Board may request
additional information deemed necessary to meet the provisions of this
Ordinance. The requested evidence or documentation, such as the
services of a consulting engineer, geologist, or the Franklin County
Soil & Water Conservation District (FCSWCD) shall be secured and
submitted by the applicant.
The notice of request shall include the reasons justifying the request for the
9
additional evidence or documentation. The Planning Board in a written
agreement from the applicant and at the applicant's expense, may secure a
consultant, the District's engineer (FCSWCD), or other qualified person for
all or part of the review process. The applicant shall provide the additional
information within forty-five (45) days unless agreed otherwise. All costs
associated with such review, including the costs of any consultants, hired by
the Planning Board will be paid by the applicant prior to issuance of a soil
erosion control/storm water management permit.
In the event that the CEO or Planning Board determines that the review of
an application requires additional evidence or documentation, the Planning
Board shall notify the applicant in writing within ten (10) days following the
determination that a complete application has been filed.
I. Permit Duration: Any work authorized by this permit shall be completed
within one (1) year of the date of the permit unless otherwise specified in the
permit. The CEO or the Planning Board may, upon a showing of reasonable
cause, renew a soil erosion permit for one (1) additional period, not to
exceed one (1) year, provided that the plans have not been substantially
changed since the original application, and provided that the applicant has
complied with the applicable soil erosion control and storm water
management plans and all conditions of the original permit.
11 - 9.12 Enforcement:
A. Responsibility: The CEO shall inspect the project area at any time as
necessary to insure compliance with the application, permit, and this
Ordinance. The applicant shall notify the CEO promptly once
the project area has been finally stabilized. Upon notification of final
stabilization, the CEO shall inspect the project area and issue a certificate
of final inspection upon determination of full compliance with the
application, the permit, and this Ordinance.
B. Violations: It shall be a violation of this Ordinance for any person:
1. to engage in any activity requiring an erosion control/storm water
management permit without first obtaining a permit;
2. to fail to comply with the terms of an erosion control/storm water
management permit or any permit conditions; or
3. to utilize improperly designed or installed erosion controls or
storm water management components.
Upon detection of a violation, the CEO shall require immediate measures
to temporarily correct the violation. Once such temporary measures have
10
been completed, the CEO may negotiate an agreement to permanently
correct the violation. If a permit has not been obtained, the violator must
immediately apply for an after-the-fact permit. The CEO may issue a stop
work order if conditions warrant, at which time all earth-moving activities
must cease. The violator shall make immediate corrective measures as
outlined by the CEO.
When a violator fails to voluntarily correct a violation, the CEO shall send
written notification to the violator, stating:
1. what the violation is;
2. the penalties for the violation;
3. means by which to come into compliance and;
4. a deadline for compliance.
Copies of this letter will be sent to the Town Manager and Town Attorney.
If the deadline passes without correction, the CEO shall contact Town
officials for assistance in pursuing enforcement through legal action.
Each day during which any violation of any of the provisions of this
Ordinance is committed or continue shall constitute a separate
civil violation. In addition to any other penalty authorized by this section,
any person violating any of the provisions of this Ordinance shall be
required to restore the site to the condition existing prior to commencement
of the violation, or to bear the expense of such restoration. In addition, any
other penalty authorized with this section, the Town may seek injunctive
relief including restoration of the site to the condition existing prior to the
commencement of the violation.
C. Penalties: Any person, including but not limited to a landowner, a
landowner's agent or a contractor, who orders or conducts any activity in
violation of this Ordinance, or upon failure to comply with any of its
requirements, shall be penalized in accordance with Title 30-A MRSA
Section 4452.
D. Inadequate Erosion & Sediment Control and/or Storm Water
Management Plans: The CEO may order the submission of supplemental
plans and implementation of additional erosion and sediment control and/or
storm water management measures deemed necessary to correct conditions
or problems not adequately addressed by a previous application or permit.
These plans must be submitted to the Planning Board if the Board issued the
permit. The permits shall be modified or conditions added as necessary to
meet the standards of this Ordinance.
11
11 - 9.13 Appeals:
Any person aggrieved by the action of the Code Enforcement Officer or Planning Board
may appeal to the Board of Appeals by filing a notice of appeal within thirty (30) days
after receipt of the Code Enforcement Officer's or Planning Board's notification.
Administrative appeals submitted under this Ordinance shall be subject to the standards
and procedures established by the Town of Farmington Board of Appeals Ordinance.
11 - 9.14 Amendments:
A. Initiation of Amendments: An amendment to this Ordinance may be
initiated by:
1. The Board of Selectmen, provided a majority of the Board of Selectmen has
so voted;
2. Written petition of a number of voters equal to at least 10% of the number of
votes cast in the municipality at the last gubernatorial elections.
B. Public Hearing: The Board of Selectmen shall hold a public hearing on the
proposed amendment . Notification of the hearing shall be posted and advertised
in a newspaper of general circulation in the municipality at least seven (7) days
prior to the hearing.
C. Adoption of Amendment: An amendment of this Ordinance shall be
adopted by a majority vote of a Town Meeting.