This is the exact embedded text of the captured official document.
Snapshot b55d659b3b05 · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 1 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
General Zoning Ordinance
Of The
TOWN OF
FRANKLIN, MAINE
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 2 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Original Ordinance Enacted
March 18, 1974
Enacted/Accepted Amendments
1975
1986
1991
2001
2005
2006
2007
2008
2009
2011
2012
2013
2016
June 28, 2021
Special Town Meeting -- Amendments
June 24, 2024
Town Meeting Amendments
March 28, 2026
Attest and Certified By: ___________________________________
Deborah T Lurvey
Town Clerk, Franklin, Maine
Date: __________________________________
Pages: 53
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 3 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
TABLE OF CONTENTS
Article 1 -- GENERAL
1.1
Short Title
5
1.2
Purpose
5
1.3
Basic Requirements
5
1.4
Non-Conforming Uses
5
1.4.1
Purpose
5
1.4.2
General
5
1.4.3
Non-Conforming Structures
6
1.4.4
Non-Conforming Uses
7
1.4.5
Non-Conforming Lots
8
1.4.6
Restoration of Unsafe Property
8
1.4.7
Pending Application for Building Permit
8
1.5
Validity and Severability
9
1.6
Conflict with Other Ordinances
9
1.7
Amendment
9
1.8
Effective Date
9
1.9
Authority
9
1.10
Availability
10
Article 2 -- ESTABLISHMENT OF DISTRICT
2.1
Zoning Districts
11
2.2
Locations of District
11
2.3
Interpretation of District Boundaries
11
2.4
Division of Lots By District Boundaries
11
2.4.1
Extension of Regulations Across Boundaries
11
2.4.2
Extension of Use
11
Article 3 -- CONSTRUCTION OF LANGUAGE AND DEFINITIONS
3.1
Construction of Language
12
3.2
Definitions
12
Article 4 -- LAND USE DISTRICT REQUIREMENTS
4.1
General Purpose District
23
4.1.1
Purpose
23
4.1.2
Basic Requirements
23
4.1.3
Permitted uses
23
4.1.4
Special Exceptions
24
4.1.5
Prohibited uses
25
4.1.6
Dimensional Requirements
25
4.1.7
Performance Standards
27
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 4 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Article 5 -- PERFORMANCE STANDARDS
5.1
Land Use Provisions
28
5.2
Principal and Accessory Building Structures
28
5.3
Campgrounds
28
5.4
Individual Private Campsites
29
5.5
Filling, Grading, Lagooning, Dredging, or other Earth
Moving Activity
29
5.6
Mobile Homes and Mobile Homes Parks
32
5.7
Multi-Family Dwelling Units
32
5.8
Planned Unit Development and Other Cluster
Development
33
5.9
Sanitary Provisions
34
5.10
Water Quality Protection
36
5.11
Soils
36
5.12
Archaeological Sites
36
5.13
Opioid Treatment Programs
37
Article 6 -- ADMINISTRATION
6.1
Enforcement
38
6.2
Building or Use Permit
38
6.3
Plumbing Permit Required
39
6.4
Building Permit Fees
39
6.5
Enforcement Officer
40
6.6
Legal Action and Violations
40
6.7
Fines
41
6.8
Appeals and Special Permits
41
6.8.1
Procedure
41
6.8.2
Board of Appeals
41
6.8.3
Special Exception Permits
45
Appendix
Warrant Articles and Amendments
50
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 5 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
ARTICLE 1 -- GENERAL
1.1 Short Title
This Ordinance shall be known as the "Zoning Ordinance of the Town of Franklin,
Maine", and will be referred to herein as this "Ordinance."
1.2 Purpose
To further the maintenance of safe and healthful conditions and the general welfare, prevent
and control water pollution, protect spawning grounds, fish aquatic life, bird and other
wildlife habitat to control building sites, placement of structures and land uses, to protect
visual as well as actual points of access to inland and coastal waters and natural beauty; to
protect buildings and lands from flooding and-accelerated erosion; to protect archaeological
and historic resources, to protect commercial fishing and maritime industries, to conserve
open space, and to anticipate and respond to the impacts of development.
This Ordinance does not grant any property rights; it does not authorize any person to
trespass, infringe upon or injure the property of another; it does not excuse any person of the
necessity of complying with other applicable laws and regulations; it does not replace the
"Shoreland Zoning Ordinance for the Town of Franklin, Maine"
1.3 Basic Requirements
All buildings or structures hereinafter erected, reconstructed, enlarged, or moved, and uses of
premises in the Town of Franklin shall be in conformity with the provisions of this
Ordinance. No building, structure, land area shall be used for any purpose or in any manner
except as permitted within the district in which such building, structure, or land area is
located. No new lot shall be created except in conformity with all of the regulations herein
specified for the district in which it is located.
1.4 Non-conforming Uses
1.4.1 Purpose
It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance shall be
allowed to continue, subject to the requirements set forth in this section.
1.4.2 General
A. Transfer of Ownership: Non-conforming structures, lots, and uses may be
transferred, and the new owner may continue the non-conforming use or continue to
use the nonconforming structure or lot, subject to the provisions of this Ordinance.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 6 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
B. Repair and Maintenance: This Ordinance allows, without a permit, the normal
upkeep and maintenance of non-conforming uses and structures, including repairs and
renovations which do not involve expansion of the non-conforming use or structure,
and such other changes in a non-conforming use or structure as federal, state, or local
building and safety codes may require.
NOTE: See Article 3 for the definitions of non-conforming structures, nonconforming
uses and non-conforming lots.
1.4.3 Non-conforming Structures
A. Expansions: A non-conforming structure may be added to or expanded after
obtaining a permit from the same permitting authority as that for a new structure, if
such addition or expansion does not increase the nonconformity of the structure, and
is in accordance with the subparagraph below.
1. Legally existing non-conforming principal and accessory structures located fully
within the General District, and which do not meet the setback requirements may
be expanded or altered, as long as all other applicable standards contained in this
Ordinance are met.
B. Construction or enlargement of a foundation beneath the existing non-conforming
structure is not considered an expansion of the structure provided: that the structure
and new foundation are placed such that the setback requirement is met to the greatest
practical extent as determined by the Planning Board or it's designee, basing it's
decision on the criteria specified in paragraph C Relocation, below.
Note: The maximum allowable structure height is described in Section 4 of this
Ordinance.
C. Relocation: A non-conforming structure may be relocated within the boundaries of
the parcel on which the structure is located provided that the site of relocation
conforms to all setback requirements to the greatest practical extent as determined by
the Planning Board, and provided that the applicant demonstrates that the present
subsurface sewage disposal system meets the requirements of State law and the State
of Maine Subsurface Wastewater Disposal Rules (Rules), or that a new system can be
installed in compliance with the law and said Rules. In no case shall a structure be
relocated in a manner that causes the structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest
practical extent, the Planning Board shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and
on adjacent properties, the location of the septic systems, and the type and amount of
vegetation to be removed to accomplish the relocation.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 7 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
D. Reconstruction or Replacement: Any non-conforming structure which is located less
than the required setback and which is removed, damaged or destroyed by more than
fifty percent (50%) of the market value of the structure before such damage,
destruction or removal, may be reconstructed or replaced provided that a permit is
obtained within eighteen (18) months of the date of said damage, destruction, or
removal, and provided that such reconstruction or replacement is in compliance with
the setback requirement to the greatest practical extent as determined by the Planning
Board in accordance with the purposes of this Ordinance. In no case shall a structure
be reconstructed or replaced so as to increase its non-conformity.
Any non-conforming structure which is damaged or destroyed by fifty percent (50%)
or less of the market value of the structure, excluding normal maintenance and repair,
may be reconstructed in place, with a permit from the code enforcement officer.
E. Change of Use of a Non-conforming structure: The use of a non-conforming
structure may not be changed to another use unless the Planning Board, after
receiving a written application, determines that the new use will have no greater
adverse impact on the subject or adjacent properties and resources than the existing
use.
In determining that no greater adverse impact will occur, the Planning Board shall
require written documentation from the applicant, regarding the probable effects on
public health and safety, erosion and sedimentation, water quality, fish and wildlife
habitat vegetative cover, visual and actual points of, public access to waters, natural
beauty, flood plain management, archaeological and historic resources, and
commercial fishing and maritime activities, and other functionally water-dependent
uses.
1.4.4 Non-Conforming Uses
A. Expansions: Expansions of non-conforming uses are prohibited, except that non-
conforming residential uses may, after obtaining a permit from the Planning Board,
be expanded within existing residential structures or within expansions of such
structures as permitted in Section- 1.4.3. (E) above.
B. Resumption Prohibited: A lot, building or structure in or on which a non-
conforming use is discontinued for a period exceeding one year, or which is
superseded by a conforming use, may not again be devoted to a non-conforming use
except that the Planning Board may, for good cause shown by the applicant grant up
to a one year extension to that time period. This provision shall not apply to the
resumption of a use of a residential structure provided that the structure has been used
or maintained for residential purposes during the preceding five (5) year period.
C. Change of Use: An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on the
subject and adjacent properties and resources, including water dependent uses, than
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 8 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
the former use, as determined by the Planning Board. The determination of no
greater adverse impact shall be made according to criteria listed in Section 1.4.3. (E)
above.
1.4.5 Non-conforming Lots
A. Non-conforming Lots: A non-conforming lot of record as of the effective date of
this Ordinance or amendment thereto may be built upon without the need for a
variance, provided that such lot is in separate ownership and not contiguous with any
other lot in the same ownership, and that all provisions of this Ordinance except lot
area and frontage can be met. An accessory dwelling unit (ADU) may be built on a
non-conforming lot of record providing the ADU does not further increase non-
conformity except in lot area, and all other provisions of this ordinance are met.
Variances relating to setback or other requirements not involving lot area or frontage
shall be obtained by action of the Board of Appeals.
B. Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or
joint ownership of record at the time of adoption of this Ordinance, if all or part of the
lots do not meet the dimensional requirements of this Ordinance, and if a principal
use or structure exists on each lot, the non-conforming lots may be conveyed
separately or together, provided that the State Minimum Lot Size Law and Subsurface
Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the
effective date of this Ordinance, each may be sold on a separate lot provided that the
above referenced law and rules are complied with. When such lots are divided each
lot thus created must be as conforming as possible to the dimensional requirements of
this Ordinance. For the purposes of 1.4.5(B), a stand-alone ADU shall be considered
a principle structure.
C. Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or
parcels are in single or joint ownership of record at the time of or since adoption or
amendment of this ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent amendments, and if one or
more of the lots are vacant or contain no principal structure the lots shall be combined
to the extent necessary to meet the dimensional requirements.
1.4.6 Restoration of Unsafe Property
Nothing in this Ordinance shall prevent the strengthening or restoring to safe condition
any part of any building or structure declared unsafe by the Code Enforcement Officer.
1.4.7 Pending Application for Building Permits
Nothing in this Ordinance shall require any designated use for any building, structure or
part thereof for which application for building permit has been made or a building permit
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 9 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
has been issued or upon construction commenced prior to the adoption or amendment of
this Ordinance, provided construction shall start within 60 days after the issuance of such
permit.
1.5 Validity and Severability
Should any section or provision of this Ordinance be declared by the courts to be invalid,
such decision shall not invalidate any other section or provision of this Ordinance.
1.6 Conflict with Other Ordinances
This Ordinance shall not repeal, annul, or in any way impair or remove the necessity of
compliance with any other rule, regulation, by-law, permit or provision of law. Where this
ordinance imposes a greater restriction upon the use of land buildings or structures, the
provisions of this ordinance shall control.
1.7 Amendment
This Ordinance may be amended as follows:
1) By a majority vote of the governing body if the proposed amendment is
recommended by a majority vote of the Planning Board
2) By 2/3 majority vote of the governing body if the proposed amendment is not
recommended by the Planning Board.
In either case, the Planning Board shall hold a public hearing at least 30 days prior to the
meeting of the governing body. Notice of the hearing shall be posted in the Town Office at
least thirteen (13) days in advance of the Public Hearing. The notice shall be published at
least two (2) times in a newspaper that complies with Title 1, section 601 and that has a
general circulation in the municipality. The date of the first publication shall be at least
twelve (12) days before the hearing, and the date of the second publication must be at least
seven (7) days before the hearing.
Note: any proposed amendment(s) which would place a landowner's property into a
Resource Protection District requires additional notice and notifications under Title 30-A,
section 4352.
1.8 Effective Date
The effective date of this ordinance is March 26th, 2011.
1.9 Authority
This Ordinance has been prepared in accordance with State law.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 10 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
1.10 Availability
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at
reasonable cost at the expense of the person making the request. Notice of availability of
this Ordinance shall be posted.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 11 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
ARTICLE 2 - ESTABLISHMENT OF DISTRICTS
2.1 Zoning Districts
To implement the provisions of this Ordinance, the Town of Franklin is hereby divided into
the following Districts:
1) Resource Protection District
2) Shoreland District
3) General Purpose District
4) Stream Protection District
The Shoreland District, Resource Protection District and Stream Protection District are
managed under the provisions of the Shoreland Zoning Ordinance for the Town of Franklin,
Maine
2.2 Location of District
The General Purpose district is located and bounded as shown on the Official Zoning Map,
which is made a part of this Ordinance, entitled "Zoning Map of Franklin, Maine" dated and
on file in the Office of the Municipal Clerk, and includes all areas of the Town of Franklin
not within the Shoreland, Resource Protection or Stream Protection Districts. The Official
Map shall be signed by the Municipal Clerk and chairman of the Planning Board at the time
of adoption or amendment of the Ordinance certifying the date of such adoption or
amendment. Additional copies of this map may be seen in the Office of the Selectmen.
2.3 Interpretation of District Boundaries
Unless otherwise set forth in the Official Zoning Map, District boundary lines are property
lines, the centerlines of streets, roads and rights of way, and the boundaries of the Shoreland
Zone as defined herein. Where uncertainty exists as to exact location of District boundary
lines, the Board of Appeals shall be the final authority as to location.
2.4 Division of Lots by District Boundaries
2.4.1 Where a zoning district boundary line divides a lot or parcel of land of the same
ownership of record at the time such line is established by adoption or amendment of
this Ordinance, the regulations applicable to the less restricted portion of the lot may be
extended no more than fifty (50) feet into the more restricted portion of the lot. Less
restrictive district regulations shall not be extended into any Resource Protection
District.
2.4.2 Extension of use shall be considered special exception, subject to approval of the
Planning Board and in accordance with the criteria set forth in Paragraph 6.8.3(4) factors
applicable to special exceptions.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 12 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
ARTICLE 3 - CONSTRUCTION OF LANGUAGE AND DEFINITIONS
3.1 Construction of Language
In this Ordinance certain terms or words shall be interpreted as follows:
The word "person" includes a firm, association, organization partnership, trust company or
corporation. as well as an individual; the present tense includes the future tense, the singular
number includes the plural, and the plural includes the singular; the word "shall" is
mandatory, and the word "may" is permissive; the words "used" or "occupied' include the
words "intended", "designed" or "arranged to be used or occupied", the word "building",
includes the word "structure", and the word "dwelling" includes the word "residence", the
word "lot" includes the words "plot" or "parcel". In case of any difference of meaning or
implication between the text of this Ordinance and any map or illustration, the text shall
control.
Terms not defined shall have the customary dictionary meaning.
3.2 Definitions:
In this Ordinance the following terms shall have the following meanings unless a contrary
meaning is required by the context or is specifically prescribed.
Accessory Dwelling Unit: An "accessory dwelling unit' means a self-contained dwelling
unit containing cooking, sleeping and toilet facilities, and containing no more than two
bedrooms, and located within, attached to or detached from a single-family dwelling unit
located on the same parcel of land, and having a floor area of no more than seven hundred-
fifty (750) square feet or fifty percent (50%) of the floor area of the single family dwelling
unit on the same parcel, whichever is less.
Accessory Use or Structure: A use or structure of a nature customarily incidental and
subordinate to those of the principal use or structure.
Accessory uses, when aggregated shall not subordinate the principal use of the lot. A deck
or similar extension of the principal structure or a garage attached to the principal structure
by a roof or a common wall is considered part of the principal structure.
Aggrieved Party: An owner of land whose property is directly or indirectly affected by the
granting or denial of a permit or variance under this Ordinance, a person whose land abuts
land for which a permit or variance has been granted; or any other person or group of persons
who have suffered particularized injuries result of granting or denial of such permit or
variance.
Aquaculture: The growing or propagation of harvestable freshwater, estuarine, or marine
plant or animal species.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 13 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Automobile Graveyard: a yard, field or other outdoor area used to store three (3) or more
unregistered or uninspected motor vehicles, as defined in Title 29-A, section 101, subsection
42, or parts of the vehicles. "Automobile graveyard" includes an area used for automobile
dismantling, salvage and recycling operations.
Basement: A portion of the building partly underground but having less than half its clear
height below the average grade of the adjoining ground.
Billboard: A sign, structure or surface larger than six (6) square feet which is available for
advertising purposes for goods or services rendered off the premises, excluding directional
signs.
Boathouse: A non-residential structure designed for the purpose of protecting or storing
boats for non-commercial purposes.
Building: A structure built for the support or shelter of persons, animals, goods or property
of any kind.
Campground: Any premises established for overnight use for the purpose of temporary
camping and for which a fee is charged.
Cellar: A portion of the building partly underground, but having half or more of its clear
height below the average grade of the adjoining ground.
Channel: A natural or artificial watercourse with definite bed and banks to confine and
conduct continuously or periodically flowing water. Channel flow is water flowing within
the limits of the defined channel.
Code Enforcement Officer: A person appointed by the Municipal Officers to administer and
enforce this Ordinance. Reference to the Code Enforcement Officer shall be construed to
include Building inspector, Electrical Inspector, and the like where applicable.
Commercial Use: The use of lands, buildings, or structures, other than a "home
occupation," defined below, the intent and result of which activity is the production of
income from the buying and selling goods and/or services exclusive of rental of residential
buildings and/or dwelling units.
Conforming Use: A. use of building, structures or land which complies with all applicable
provisions in this Ordinance.
Constructed: Includes built, erected, reconstructed moved upon or any physical operations
on the premises which are required for construction excavation fill, drainage, and the like,
shall be considered a part of construction.
Dimensional Requirements: Numerical standards relating to spatial relationships including
but not limited to setback, lot area, frontage and height.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 14 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
District: A specified portion of the municipality delineated on the Official Zoning Map,
within which in regulations and requirements or various combinations thereof apply under
the provisions of this ordinance.
Driveway: A vehicle access-way less than five hundred (500) feet in length serving two lots
or less.
Dwelling: A fixed structure, containing one or more dwelling units.
Dwelling Unit: A room or group of rooms designed and equipped exclusively for use as living
quarters for only one family, including provisions for living, sleeping, cooking and eating. The term
shall include mobile homes, but shall not include trailers, recreational vehicles and accessory dwelling
units.
Emergency Operations: Operations conducted for the public health, safety or general
welfare, such as protection of resources from immediate destruction or loss, law enforcement
and operations to rescue human beings, property and livestock from the threat of destruction
or injury.
Essential Services: The construction, alteration or maintenance of gas, electrical or
communication facilities, steam, fuel, electric power or water transmission or distribution
lines, towers and related equipment; telephone cables or lines, poles and related equipment
gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection or supply
systems; and associated storage tanks. Such systems may include towers, poles, wires,
mains, drains, pipes, conduits, cables; fire alarms and police call boxes, traffic signals,
hydrants and similar accessories, but shall not include service drops or buildings which are
necessary for the furnishing of such services.
Excavation: Any removal of earth or material from its original position.
Expansion of a Structure: An increase in the floor area or volume of a structure, including
all extensions such as, but not limited to attached decks, garages, porches and greenhouses.
Expansion of Use: The addition of one or more weeks or months to a use's operating
season; additional hours of operation; or the use of more floor area or ground area devoted to
a particular use.
Family: One or more persons occupying a premises and living as a single housekeeping unit
as distinguished from a group occupying a boarding house, lodging house or hotel such unit
shall not exceed five (5) persons not related by blood or marriage.
Filling: Depositing or dumping any matter on or into, the ground or water.
Flood: A temporary rise in stream flow or tidal surge that results in water overtopping its
banks and inundating adjacent areas.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 15 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Flood Plain: The land adjacent to a water body which have been or may be covered by the
regional flood.
Floodway: The channel of a stream and those portions of the flood plain adjoining the
channel that are required to carry and discharge the flood water or flood flows of any river or
stream.
Floor area: The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls, plus the horizontal area of any unenclosed portions of a structure such as porches and
decks.
Forest Management Activities: Timber cruising and other forest resource evaluation
activities, pesticide or fertilizer application, management planning activities, timber stand
improvement, pruning, regeneration of forest stands, and other similar or associated
activities, exclusive of timber harvesting and the construction creation or maintenance of
roads.
Foundation: The supporting substructure of a building or other structure including but not
limited to basements, slabs, sifts, posts, or frost walls.
Height of a structure: The vertical distance between the mean original grade at the downhill
side of the structure and the highest point of the structure, excluding chimneys, steeples,
antennas, and similar appurtenances which have no floor area. Cupolas, domes, widow's
walks and similar features that are not inhabited, and are mounted on a building roof for
observation and/or decorative purposes are also excluded under the following conditions, all
of which must apply:
1. The feature is on a legally existing conforming structure.
2. The feature does not extend beyond the exterior walls of the existing structure.
3. The feature has a floor area of fifty-three (53) square feet or less.
4. The feature does not increase the height of the existing structure by more than seven
(7) feet.
Home Occupation: An occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses, and 2) which employs no
more than two (2) persons other than family members residing in the home. Home
occupation shall not include activities which do not necessitate permanent alteration and, to
structures on or about the premises.
Individual Private Campsite: An area of land which is not associated with a campground,
but which is developed for repeated camping by only one group not to exceed ten (10)
individuals and which involves site improvements which may include but not be limited to
gravel pads, parking areas, fire places, or tent platforms.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 16 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Industrial: The assembling, fabrication, finishing, manufacturing, packaging or processing
of goods, or the extraction of minerals.
Lot Area: The area of land enclosed within the boundary lines of a lot, minus areas beneath
roads serving more than two lots.
Lot Coverage: The percentage of the plot or lot covered by all buildings.
Lot Interior: Any lot other than a corner lot.
Lot Lines: The lines bounding a lot as defined below:
Front Lot line: On an interior lot, the line separating the lot from the street. On a
corner or through lot, the line separating the lot from either street.
Rear Lot line: The lot line opposite the front line. On a lot pointed at the rear, the rear
lot line shall be an imaginary line between the side lot lines, parallel to the front lot line,
not less than ten (10) feet long, lying farthest from the front lot line corner lot. The rear
lot line shall be opposite the front lot line of least dimensions.
Side Lot Line: Any lot line other than the front lot line or rear line.
Lot Width: The horizontal distance between the side lot lines, measured at the frontage
setback line.
Lot of Record: A parcel of land, the dimensions of which are shown on a document or map
on file with the County Register of Deeds or in common use by the Town or County
Officials.
Market Value: The estimated price a property will bring in the open market and under
prevailing market conditions in a sale between a willing seller and a willing buyer, both
conversant with the property and with prevailing general price levels.
Methadone Clinic: A program or facility operated for the purpose of providing treatment for
persons with heroin or other opiate addictions, when treatment provided includes
administration or prescription of methadone or other opiate replacements for either
detoxification or maintenance purposes. For the purposes of this ordinance, the term
"methadone clinic" includes but is not limited to substance abuse treatment programs
licensed by the State of Maine Department of Behavioral and Developmental Services Office
of Substance Abuse to provide opioid supervised withdrawal and maintenance treatment
services under 14-118 Code of Maine Regulations section 4.16.
Minimum Lot Width: The closest distance between the side lot lines of a lot.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 17 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Mineral Exploration: Hand sampling, test boring, or other methods of determining the
nature or extent of mineral resources which, create minimal disturbance to the land and
which include reasonable measures to restore the land to its original condition.
Mineral Extraction: Any operation within any twelve (12) month period which removes
more than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat,
or other like material from its natural location and to transport the product removed, away
from the extraction site.
Mobile Home: A structure designed as a dwelling unit for location on permanent
foundation, and containing sleeping accommodations, a toilet, a tub or shower bath, and
kitchen facilities, including major appliances and furniture, with plumbing and electrical
connections provided for attachment to outside systems; and designed to be transported after
fabrication on its own wheels. A mobile home shall contain not less than four hundred fifty
(450) square feet of gross floor area.
Mobile Home Park: A plot of land laid out to accommodate at least three (3) mobile homes.
Multi-unit Residential: A residential structure containing three (3) or more residential
dwelling units. For the purposes of this definition, accessory dwelling units are not counted
as residential dwelling units.
Non-Conforming Building or Use: A building, structure, use of land, or portion thereof
existing at the effective date of adoption or amendment of this Ordinance which does not
conform to all applicable provisions of this Ordinance.
Non-conforming Lot: A single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirement of the
district in which it is located.
Non-conforming Structure: A structure, which does not meet any one or more of the
following dimensional requirements: setback, height or lot coverage, but which is allowed
solely because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect.
Non-conforming Use: Use of buildings, structures, premises, land or parts thereof which is
not permitted in the district in which it is situated, but which is allowed to remain solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took
effect.
Open Space Use: A use not involving: A structure; earth-moving activity or the removal or
destruction of vegetative cover, spawning grounds, or fish, aquatic, life, bird and other
wildlife habitat.
Parking Space: A minimum area of two hundred (200) square feet, exclusive of drives,
aisles or entrances, fully accessible for the storage or parking of vehicles.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 18 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Person: An individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or other
legal entity.
Planned Unit Development: Land under unified management, planned and developed as a
whole according to comprehensive and detailed plans, including streets, utilities, lots or
building sites, site plans and design principles for all buildings intended to be located,
constructed, used and related to each other, and for other uses and improvements on the land.
Development may be a single operation or a programmed series of provisions for operation
and maintenance of such areas and improvements and facilities necessary for common use by
the occupants of the development.
Premises: One or more lots which are in the same ownership and are contiguous, separated
only by a road or water body including all buildings, structures and improvements.
Principal Building: The building in which the primary use of the lot is enclosed.
Principle Use: The primary use to which the premises are devoted, and the main purpose for
which the premises exist.
Public Facility: Any facility, including, but not limited to, buildings, property, recreation
areas, and roads, which are owned, leased, or otherwise operated, or funded by a
governmental body or public entity.
Public Utility: My person, firm, corporation, municipal department, board or commission
authorized to furnish gas, steam electricity, waste disposal, communication facilities,
transportation or water to the public.
Recent Flood Plain Soils: The following soil series as described and identified by the
National Cooperative Soil Survey:
Alluvial
Cornish
Charles
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational Facility: A place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
Recreational Vehicle: A vehicle or an attachment to a vehicle designed to be towed, and
designed for temporary sleeping or living quarters for one or more persons, and which may
include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor home. In order
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 19 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
to be considered as a vehicle and not as a structure, the unit must remain with its tires on the
ground; and must be registered with the State Division of Motor Vehicles.
Replacement System: A system intended to replace: 1) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the
structure or 2) any existing overboard wastewater discharge.
Residential Dwelling Unit: A room or group of rooms designed and equipped exclusively
for use as permanent seasonal or living quarters for only one family. The term shall include
mobile homes, but not recreational vehicles.
Residential Solar Collector: "Residential solar collector" is a device, structure or part of a
device or structure that is designed and used to transform solar energy into thermal, chemical or
electrical energy to meet the water heating, space heating, space cooling or electricity generation
requirements of one residential dwelling, as referenced in Maine Statute Title 33, Chapter 28-A,
§1421, as may be amended.
Riprap: Rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion
control and soil stabilization, typically used on ground slopes of two (2) units horizontal to
one (1) unit vertical or less.
Road: A route or track longer than five hundred (500) feet and serving more than two (2)
principle uses, consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles.
Service Drop: Any utility extension which does not cross or run beneath any portion of a
water body provided that:
1. In the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely
upon the premises of the customer requesting service or upon a roadway right-of-
way; and
b. the total length of the extension is less than one thousand (1000) feet.
2. In the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone
wires to existing utility poles, or
b. the extension requiring the installation of new utility poles or placement
underground is less than one thousand (1,000) feet in length.
Setback: The minimum horizontal distance from a lot line to the nearest part of a structure.
Shoreline: As defined in the "Shoreland Zoning Ordinance for the Town of Franklin,
Maine".
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 20 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Signs: A name, identification, description, display or illustration which is affixed to painted
or represented; directly or indirectly upon a building, structure; parcel or lot- and which
relates to an object, product, place, activity, person, institution, organization or public
business.
Solar Collector: "Solar Collector" means a device, structure or part of a device or structure
that is designed and used to transform solar energy into thermal, chemical or electrical
energy.
Solar Power Generating System: "Solar power generating system" means a device, structure
or part of a device or structure that is designed and used to transform solar energy into
thermal, chemical or electrical energy as a commercial enterprise and which does not meet
the definition of 'residential solar collector'.
Special Exception: A use permitted only after review and approval by the Planning Board.
A special exception is a use that would not be appropriate without restriction but which, if
controlled under the provisions of this Ordinance, would promote the purpose of this
Ordinance. Such uses may be permitted if specific provision for such special exceptions is
made in this Ordinance.
Special Exception Permit: A permit issued by the Planning Board for a special exception
use. A special exception permit may be issued only after the applicant has followed the
procedures of this Ordinance.
Structure: Anything built for the support, shelter or enclosure of persons, domestic animals,
goods or properly of any kind, together with anything constructed or erected with a fixed
location on or in the ground, exclusive of fences. The term includes structures temporarily
or permanently located, such as decks and satellite dishes.
Subdivision: A subdivision is the division of a tract or parcel of land into three (3) or more
lots within any five (5) year period as defined in MRSA 30A, Sec. 4401, whether
accomplished by sale, lease, development, building or otherwise, except when the division is
accomplished by inheritance, order of court or gift to a relative, unless the intent of such gifts
is to avoid the objectives of this section.
In determining whether a parcel of land is divided into three (3) or more lots, land retained by
the sub divider for his own use as a single family residence for a period of at least five (5)
years shall not be included.
No sale or lease of any lot or parcel shall be considered as being a part of subdivision if such
a lot or parcel is forty (40) acres or more in size, except where the intent of such sale or lease
is to avoid the objectives of this statute.
Substantial Start: Completion of thirty (30) percent of a permitted structure or use measured
as a percentage of estimated total cost.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 21 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Substantially Complete: the stage in the progress of construction or development of a
structure or use when all conditions of permit approval are in place and function as intended
by the Planning Board, and the structure or use can be legally occupied and/or operated for
its declared purpose.
Subsurface Sewage Disposal System: A collection of treatment tank(s), disposal area(s),
holding tank(s) and pond(s), surface spray system(s), cesspool(s), well(s), surface ditch(es)
alternative toilet(s), or other devices and associated piping designed to function as a unit for
the, purpose of disposing of wastes or wastewater on or beneath the surface of the earth.
The term shall not include any wastewater discharge system licensed under 38 MRSA
Section 414; any surface wastewater disposal system licensed under 38 MRSA Section 413
Subsection 1-A, or any public sewer. The term shall not include a wastewater disposal
system designed to treat wastewater which is in whole or in part hazardous wastes defined in
38 MASA Chapter 13, subchapter 1.
Sustained Slope: A change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Timber Harvesting: The cutting and removal of trees from their growing site, and the
attendant operation of cutting and skidding machinery but not the construction or creation of
roads. Timber harvesting does not include the clearing of land for approved construction.
Variance: A relaxation of the terms of this Ordinance where such variance would not be
contrary to the public interest and where, owing to conditions peculiar to the property and not
the result of the actions of the applicant, a literal enforcement of the Ordinance would result
in undue hardship. A financial hardship shall not constitute grounds for granting a variance.
The crucial points of variance are undue hardship and unique circumstances applying to the
property.
Vegetation: All live trees, shrubs, ground cover, and other plants including without
limitation, trees both over and under four (4) inches in diameter, measured at 4 1/2 feet above
ground level.
Volume of a Structure: The volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water Crossing: Any project extending from one bank to the opposite bank of a river or
stream, whether under, through, or over the water course. Such projects include but may not
be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cable as well as
maintenance work on these crossings.
Yard: The area of land on a lot not occupied by the principal building.
Yard Front: The area of land between the front lot line and the nearest part of the principal
building.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 22 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Yard Side: The area of land between the side lot line and nearest part of the principal
building.
Yard Rear: The area of land between the rear lot line and the nearest part of the principal
building.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 23 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
ARTICLE 4 - LAND USE DISTRICT REQUIREMENTS
4.1 General Purpose District
4.1.1 Purpose
To allow a maximum diversity of uses, while protecting the public health and safety,
environmental quality and economic well-being of the town, by imposing minimum
controls on those uses which, by virtue of their external effects (waste discharge, noise,
glare, fumes, smoke, dust, odors, or auto, truck, or rail traffic) could otherwise create
nuisances or unsafe or unhealthy conditions.
4.1.2 Basic Requirement
Permitted uses and special exceptions shall conform to all dimensional requirements and
other applicable requirements of this Ordinance. A Plumbing Permit and Building or
Use Permit shall be required for any buildings, uses, and sanitary facilities, according to
the provisions of Article 6 of this Ordinance.
4.1.3 Permitted Uses
The following uses are permitted in the General Purpose District:
(1) Rural
Open Space Use
Agriculture and Gardening
Sale of produce and plants raised on the premises, or seasonal public or private
recreation facilities including parks, playgrounds, golf courses, driving ranges,
and swimming pools, but excluding campgrounds
Accessory uses and structures
Timber harvesting
(2) Residential
Single family dwelling, including single camp, tent or mobile home
Accessory dwelling unit
Two family dwelling
Home Occupations
Accessory uses and structures
(3) Commercial and Industrial
Facilities having less than twenty-five hundred (2500) square feet of gross floor
area and employing less than five (5) full time employees or equivalent thereof.
Facilities offering food and beverages prepared on the premises and auto service
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 24 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
stations or repair garages are exempt from these limits, and may be located in the
General Purpose District.
Accessory uses and structures
(4) Public, Semi-Public, and Institutional
Church or other place of worship, parish house, rectory, convent and other
religious institutions
Public, private and parochial schools
Public buildings, such as libraries, museums, civic centers
Cemeteries
Accessory uses and structures.
Uses which are similar to the above uses
(5) Other
Filling, grading, lagooning, dredging or other earth-moving activity operated in
accordance with State laws
Signs
(6) General Purpose District Subdivision
The subdivision shall be divided into lots of no less than forty thousand (40,000)
square feet, with the minimum frontage of not less than one hundred (100) feet.
4.1.4 Special Exceptions
The following uses may be allowed only upon the granting of a special exception permit
by the Planning Board, in accordance with the provisions of Article 6:
(1) Rural
Campgrounds
Accessory uses and structures
Uses which are similar to the above uses
(2) Residential
Multi-family dwelling
Planned Unit Development or Cluster Development
Mobile home park
Accessory uses and structures
Uses which are similar to the above uses
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 25 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
(3) Commercial and Industrial
Commercial and Industrial facilities not meeting the criteria for permitted uses
Automobile graveyards and Junkyards operated in accordance with State law
(note: also requires a permit from the Board of Selectmen)
Waste processing or disposal facility
Accessory uses and structures
(4) Public, Semi-Public, and Institutional
Utilities, including sewage collection and treatment facilities
Waste processing or disposal facilities other than sewage collection and treatment
facilities
Accessory uses and structures
Uses which are similar to the above uses
(5) Other
Filling, grading, lagooning, dredging, or other earth-moving activity which does
not meet the criteria for permitted filling, grading, lagooning, dredging, or other
earth-moving activity including extractive uses such as gravel pits, quarries,
mines and dredging operations
Billboards
Accessory uses and structures
Uses which are similar to the above uses
4.1.5 Prohibited Uses
The following uses are prohibited in the General Purpose District:
Uses and structures which would create a public nuisance, endanger the public health,
safety, or welfare, result in substantial environmental deterioration or threaten the quality
of any lake, pond, river, stream, tidal water, or ground water.
Any fill, deposit, obstruction, excavation storage of materials or structure which acting
alone or in combination with existing or future similar works could adversely affect the
efficiency or the capacity of the floodway or adversely affect existing drainage courses or
facilities
Uses which are specifically prohibited by Federal or State law, or Municipal Ordinance
4.1.6 Dimensional Requirement
(1) Lots In the General Purpose District shall meet or exceed the following minimum
dimensional requirements unless additional area is required by other provisions of
this Ordinance.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 26 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Minimum Yard Dimensions (ft.).
Without
With
Front
Lot Coverage
Sanitary
Sanitary
Frontage
Side
Rear
(%)
Sewers (sq/ft) Sewers (sq/ft) (ft.)
(setback)
20,000
10,000
100
10
10
20
a. A lot abutting a public road shall have a minimum road-frontage of one hundred
(100) feet.
b. A front yard abutting a public road shall have a minimum setback depth of
seventy-five (75) feet from the center line of that road.
(2) Principal Building
If more than one principal building is constructed on a single lot, all dimensional
requirements shall be met separately for each such principal building.
(3) Accessory Dwelling Unit
Accessory dwelling units shall have a minimum floor area of 190 square feet.
Accessory dwelling units shall have a maximum floor area of seven hundred-fifty
(750) square feet or fifty percent (50%) of the floor area of the single-family dwelling
unit on the same parcel, whichever is less.
(4) Required Yard Spaces Shall Serve Only One Lot
No part of the yard or other open space required on any lot for any building shall be
included as part of the yard or open space similarly required for another building or
lot.
(5) Building Height
No building shall exceed 2 1/2 stories or thirty-five (35) feet in height.
(a) Features of buildings and structures, such as chimneys, towers, ventilators, and
spires may exceed thirty-five (35) feet in height, but shall be set back from the
nearest lot line distance not less than the height of such a feature or structure,
unless a greater setback is required by other provisions of this Ordinance.
(b) Cupolas, domes, widow's walks and similar features that are not inhabited, and
are mounted on a building roof for observation and/or decorative purposes are
also excluded under the following conditions, all of which must apply:
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 27 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
1. The feature is on a legally existing, conforming or non-conforming structure.
2. The feature does not extend beyond the exterior walls of the existing structure.
3. The feature has a floor area of fifty-three (53) square feet or less.
4. The feature does not increase the height of the existing structure by more than
seven (7) feet.
Note: See Section 3.2, Definitions, Height of a structure, for additional information on
allowable features.
4.1.7 Performance Standards
Permitted uses and uses permitted by special exceptions shall conform to the performance
standards delineated in Article 5 of this Ordinance.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 28 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
ARTICLE 5 - PERFORMANCE STANDARDS
5.1 All land use activities within the General District shall conform with the following:
(A) Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on
both sides thereof after September 22, 1971.
(B) If more than one residential dwelling unit or more than one principal commercial
structure is constructed on a single parcel, all dimensional requirements shall be met for
each additional dwelling unit or principal structure, except an accessory dwelling unit
subordinate to a principle structure is exempt from additional lot area and lot frontage
requirements. For additional accessory dwelling units on that parcel, all dimensional
requirements shall be met for each addition accessory dwelling unit.
5.2 Principal and Accessory Structures
(1) No principal structure, garage or other accessory building shall be located in a required
front yard. When located to the rear of the main building, the accessory building shall
be set back at least 10 (ten) feet from the side or rear lot lines.
(2) Principal or accessory structures and expansions of existing structures shall not exceed
thirty-five (35) feet in height. This provision shall not apply to structures such as
transmission towers, windmills, antennas, and similar structures having no floor area.
(3) The first floor elevation or openings of all buildings and structures including basements
shall be elevated at least one foot above the elevation of the 100 year flood as defined by
soil types identified as recent flood plain soils. The applicant shall prove that all
structures and fill do not encroach on the 100 year flood plain.
(4) Front and Side Yard Requirements
A front yard abutting a public road shall have a minimum depth of fifty (50) feet from the
right of way line or seventy-five (75) feet from the center line whichever distance is
greater. The depth of any yard abutting a public road or any water body shall conform to
the front yard requirements. Combined width of both side yards shall be twenty (20)
feet.
Required Yard Spaces Shall Serve Only One Lot
No part of the yard or other open space required on any lot for any building shall be
included as part of the yard or open space similarly required for another building or lot.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 29 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
5.3 Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
(1) Recreational vehicle and tenting areas containing approved water-carried sewage
facilities shall meet the following criteria:
a. Each recreational vehicle, tent, or shelter site shall contain a minimum of five
thousand (5000) square feet, not including roads and driveways.
b. A minimum of two hundred (200) square feet of off-street parking plus
maneuvering space shall be provided for each recreational vehicle, tent, or shelter
site,
c. Each recreational vehicle, tent, or shelter site shall be provided with a picnic table,
trash receptacle, and fireplace.
(2) The area intended for placement of the recreational vehicle, tent, or shelter and utility and
service buildings, shall be set back a minimum of one hundred (100) feet from the
exterior lot lines of the camping area.
5.4 Individual Private Campsites
Individual, private campsites not associated with campgrounds are permitted provided the
following conditions are met:
(1) When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year all requirements for residential structures shall be
met including the installation of a subsurface sewage disposal system in compliance with
the State of Maine Subsurface Wastewater Disposal Rules unless served by public
sewage facilities.
5.5 Filling, Grading, Lagooning, Dredging, or other Earth-Moving Activity
(1) General
The following shall apply to Filling, Grading, Lagooning, Dredging, excavation,
processing and storage of soil, earth, loam, sand, gravel, rock, and other mineral deposits.
Filling, grading, lagooning, dredging, and other earth-moving activity which would result
in erosion, sedimentation, or impairment of water quality or fish and aquatic life is
prohibited.
(2) Earth-Moving Not Requiring a Special Exception Permit
The following earth-moving activity shall be allowed in the General Purpose District
without a special exception permit from the Planning Board:
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 30 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
a. The removal or filling of less than two hundred (200) cubic yards of material from or
on any lot in any one (1) year
b. The removal or filling of material incidental to construction, alteration or repair of a
building or in the grading and landscaping incidental thereto and
c. The removal of filling or transfer of material incidental to construction alteration or
repair of a public or private way or essential services.
All other earth moving processing and storage shall require a special exception permit
issued by the Planning Board.
In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
(3) Application for Special Exception Permit
Application for a permit from the Planning Board for excavation, processing and storage
of soil, loam, and sand, gravel, rock, and other mineral deposits shall be required.
a. The name and current address of the owner of the property involved;
b. The location and boundaries of the lot for which the permit is requested:
c. The existing contours of the land within and extending beyond the above boundaries
for two hundred (200) feet interval not to exceed five (5) feet referred to Mean Sea
Level;
d. The contours as proposed following completion of the operation at intervals not to
exceed five (5) feet referred to Mean Sea Level;
e. The location of all proposed access roads and temporary structures;
f. The proposed provisions for drainage and erosion control, including drainage
calculations; and
g. Other information necessary to indicate the physical characteristics of the proposed
operation.
(3) Conditions of Permit
The Planning Board may issue a permit providing the following conditions shall be met:
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 31 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
a. The smallest amount of bare ground shall be exposed for the shortest time feasible.
The Planning Board shall set a specific date after which bare ground shall not be
exposed.
b. Temporary ground cover such as mulch shall be used. The Planning Board shall set a
specific date by which permanent ground cover shall be planted.
c. Diversions, silting basins, terraces and other methods to trap sediment shall be used.
d. Lagooning shall be conducted in such a manner as to avoid creation of fish trap
conditions. The applicant shall submit written approval from the Dept. of Sea and
Shore Fisheries or Inland Fish and Game, as applicable, prior to consideration by the
Planning Board.
e. The extent and type of fill shall be appropriate to the use intended. The applicant shall
specify the type and amount of fill to be used.
f. Fill shall not restrict a floodway, channel, or natural drainage.
g. To prevent slumping and erosion, sides of cuts, fills, channels, or artificial water
courses, except where ledge is present, shall be constructed with side slopes of two
(2) units horizontal distance, and one unit vertical or flatter, unless bulkheads,
retaining walls, or rip-rapping are provided.
h. No below-grade excavation except for drainage ways shall be allowed within fifty
(50) feet of any lot line or public road;
i. Topsoil or loam shall be restored to a depth of not less than four (4) inches.
(5) Optional Conditions of Permit
The Planning Board may impose reasonable conditions to safeguard the neighborhood
and the Municipality which may include those relating to:
a. methods of removal or processing;
b. hours of operation;
c. type and location of temporary structures:
d. routes for transporting material;
e. area and depth of excavations;
f. provision of temporary or permanent drainage;
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 32 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
g. disposition of stumps, brush and boulders, and,
h. cleaning, repair and/or resurfacing of streets used in removal activity which have
been adversely affected by said activity.
5.6 Mobile Homes and Mobile Home Parks
(1) Mobile Homes Not in a Mobile Home Park
Mobile homes not in a mobile home park shall meet all to the requirements of this
Ordinance for single family dwellings.
(2) Mobile Home Parks
Mobile home Parks shall meet State requirements for mobile home parks and all of the
following criteria:
a. Mobile home parks shall conform to M.R.S.A. 30-A Sec 4358, and all applicable
State laws and local ordinances.
b. All mobile homes in a mobile home park shall be connected to a sanitary sewer
system if available, or to a central collection and treatment system, in accordance
with the sanitary provisions of this Ordinance.
5.7 Multi-family Dwelling Units
(1) Two-Family Dwelling Units
Lots for two family dwelling shall meet all of the dimensional requirements for single
family units, except that the lot area and road frontage shall be equal to that required for
an equivalent number of single-family dwelling units.
(2) Multi-Family Dwelling Units
Multi-family (3 or more) dwelling units shall meet all of the following criteria:
a. Lot area shall be equal to that required for the equivalent number of single-family
dwelling units.
b. The minimum road frontage shall be two hundred (200) feet.
c. Lots for multi-family dwelling units shall meet all other dimensional requirements for
single-family dwellings.
d. No building shall contain more than ten (10) dwelling units.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 33 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
e. All multi-family dwelling units shall be connected to a public sewer system if
available or to a central collection and treatment system in accordance with the
sanitary provisions of this Ordinance.
f. No parking area shall be located within the required yard area.
5.8 Planned Unit Development and Cluster Development
(1) Purpose
The purpose of these provisions is to allow for new concepts of housing development
where maximum variations of design may be allowed, provided that the net residential
density shall be no greater than is permitted in the District in which the development is
proposed.
(2) Basic requirements
Planned unit developments and cluster developments shall meet all of the following
criteria:
a. All planned unit developments, and cluster developments shall meet all requirements
for residential subdivision.
b. The minimum area of land in a planned unit development or cluster development
shall be ten (10) acres.
c. Any lot abutting an accepted road shall have a frontage and area no less than that
normally required in the General Purpose District. On other than accepted roads, lot
area and road frontage may be reduced by not more than thirty percent (30%) from
the requirements of the General Purpose District, provided that:
1) No building lot shall have an area of less than ten thousand (10,000) square feet.
2) All lots except those abutting a circular turn-around shall have a minimum
frontage of seventy-five (75) feet. The frontage of lots abutting a circular turn-
around may be reduced to fifty (50) feet, provided that the minimum lot width at
the face of the building shall be seventy-five (75) feet.
d. In no case shall frontage be reduced below the minimum frontage normally required
in the district.
e. Lots in a planned unit development or cluster development shall meet all other
dimensional requirements for the General Purpose District.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 34 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
f. The total area of common land within the development shall equal or exceed the sum
of the areas by which any building lots are reduced below the minimum lot area
normally required in the General Purpose District.
g. Every building lot that is reduced in area below the amount normally required shall
abut such common land for a distance of at least fifty (50) feet.
h. All common land for recreational or conservation purposes only, shall be owned
jointly or in common by the owners of the building lots: by a trust or association
which has as its principal purpose the conservation or preservation of land in
essentially its natural conditions or by the Municipality.
i. Further subdivision of common land or its use for other than non-commercial
recreation or conservation, except for easements for underground utilities, shall be
prohibited. Structures and buildings accessory to noncommercial recreational or
conservation uses may be erected on the common land.
j. All residential structures in a planned unit development or cluster development shall
be connected to a public sewer system, if available or to a central collection and
treatment system in accordance with the sanitary provisions of this Ordinance.
k. Buildings shall be oriented with respect to scenic vistas, natural landscape features,
topography, and natural drainage area, in accordance with an overall plan for site
development.
5.9 Sanitary Provisions
(1) Purpose
To promote health, safety and general welfare, and to protect ground and surface waters
and public and private water supplies from contamination or nutrient enrichment, the
following provisions shall be applicable to the installation of sanitary waste disposal
facilities in all Districts.
(2) Connection to Public Facilities
All plumbing shall be connected to public collection and treatment facilities when such
facilities are available.
(3) Subsurface Sewage Disposal
a. The installation of all subsurface disposal systems shall be accomplished in
accordance with the Maine State Plumbing Code.
b. Setbacks
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 35 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
The minimum setback for underground sewage disposal facilities is listed in Section
(6) a. below. Where daily sewage flows exceed two thousand (2,000) gallons, the
minimum setback shall be three hundred (300) feet from any shoreline. Setbacks
from shorelines for all subsurface sewage disposal facilities shall not be reduced by
variance.
(4) Privies
Privies may be permitted in areas not served by community sewer facilities and where
other means of sewage disposal are not feasible under the following conditions:
a. No plumbing of any kind shall be connected to or discharge into the privy.
b. The privy shall be located at minimum horizontal distances of:
1) Twenty-five (25) feet from the nearest property line
2) One hundred (100) feet from a private well
c. The bottom of the privy pit shall be at least (2) two feet above bedrock and the
ground water table at its highest point or have a watertight vault.
d. Privies shall not be permitted in areas subject to frequent flooding.
(5) Other systems of sanitary waste disposal may be permitted in the General Purpose
District as a special exception only after approval by the Planning Board.
a. Alternative systems shall be presented to the Planning Board on a plan prepared by a
registered engineer and shall be subject to review and approval of the Maine
Department of Environmental Protection and/or the Maine Department of Health and
Welfare.
(6) Setbacks
a. Underground sewage disposal facilities, where permitted, shall be subjected to the
following additional setback provisions.
Daily sewage flow
less than 2,000 gallons
Daily sewage flow in
excess of 2,000 gallons
Components:
Septic
Tank
Feet
Disposal
Trench
Feet
Septic
Tank
Feet
Disposal
Trench
Feet
Property
10
10
20
20
Buildings
8
20
20
40
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 36 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Well or spring used as a domestic
water supply
100
100
100
100
Well or spring used as a domestic
water supply with a daily water use
in excess of 2000 gallons
100
300
100
300
Water supply line
10
10
10
25
b. Setbacks from shorelines and water supplies for all subsurface sewage disposal
facilities shall not be reduced by variance.
5.10
Water Quality Protection
No activity shall locate, store, discharge, or permit the discharge of any treated, untreated, or
inadequately liquid, gaseous, or solid materials of such nature, quantity obnoxiousness,
toxicity, or temperature that run off, seep; percolate, or wash into surface or ground waters so
as to contaminate, pollute, or harm such waters or cause nuisances, such as objectionable
shore deposits, floating or submerged debris, oil or scum, color, odor, taste, or unsightliness
or harmful to human, animal, plant, or aquatic life. No activity shall by itself or in
combination with other activities impair designated uses or the water classification of a
waterbody.
5.11
Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or
industrial development and other similar, intensive land uses, shall require a soils report
based on an on-site investigation and be prepared by state-certified professionals. Certified
persons may include Maine Certified Soil Scientists, Maine Registered Professional
Engineers, Maine State Certified Geologists and other persons who have training and
experience in the recognition and evaluation of soil properties. The report shall be based
upon the analysis of the characteristics of the soil and surrounding land and water areas,
maximum ground water elevation, and presence of ledge, drainage conditions, and other
pertinent data which the evaluator deems appropriate. The soils report shall include
recommendations for a proposed use to counteract soil limitations where they exist.
5.12
Archaeological Sites
Any proposed land use, activity involving structural development or soil disturbance on or
adjacent to sites listed on or eligible to be listed on the national Register of Historic Places, as
determined by the permitting authority shall be submitted by the applicant to the Maine
Historic Preservation Commission for review and comment, at least twenty (20) days prior to
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 37 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
5.13
Opioid Treatment Programs (i.e. Methadone Clinics)
Any opioid treatment program (OTP) registered under 21 U.S.C. 823(g) shall comply with
the following requirements:
1. Approved by the Planning Board as a Conditional Use regardless of size;
2. Be part of an acute care hospital's main campus (hospital based clinic);
3. Be only one OTP per acute care hospital:
4. Be restricted to a maximum of five (5) patients- active case load at any one time for the
entire OTP;
5. OTP cannot operate in part, or in whole out of a mobile unit;
6. May only be located in the General District;
7. Must be at least one thousand (1000) feet from the nearest public or private school
serving minors.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 38 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
ARTICLE 6 - ADMINISTRATION
6.1 Enforcement
This ordinance shall be enforced by a Code Enforcement Officer appointed annually by July
1st, by the Municipal Officers.
6.2 Building or Use Permit
(1) All applications for building or use permits shall be submitted in writing to the Code
Enforcement Officer on forms provided for the purpose.
All applications shall be signed by the owner or owners of the property or other person
authorizing the work, certifying that the information in the applications is complete and
correct. If the person signing the application is not the owner or lessee of the property
then that person shall submit a letter of authorization from the owner or lessee.
All applications shall be dated and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
(2) Within seven days of the filing of a complete an application for a building or use permit,
the Code Enforcement Officer shall approve, deny, or refer to the Planning Board for
special exception, all such applications. His decision shall be in writing on a form
designed for the purpose and communicated directly to the applicant. One copy of the
Code Enforcement Officer's decision shall be filed in the municipal office. In cases
where the Code Enforcement Officer deems that a special exception permit is required,
he shall also provide a copy of his decision to the Planning Board.
(3) No building permit for a building or structure on any lot shall be issued except to the
owner of record thereof; or his authorized agent, until the proposed construction or
alteration of a building or structure, shall comply in all respects with the provisions of
this Ordinance or with a decision rendered by the Board of Appeals or the Planning
Board. Any application for such a permit shall be accompanied by a plan, accurately
drawn to scale, showing the actual shape and dimensions of the lot to be built upon, the
exact location and size of all buildings or structures already on the lot, the location of
new buildings to be constructed together with the lines within which all buildings and
structures are to be constructed, the existing and intended use of each building or
structure and such other information as may be necessary to provide for the execution and
enforcement of this Ordinance.
(4) Applications for permits with their accompanying plans and building permits shall be
maintained as a permanent record by the Municipal Officers or the Code Enforcement
Officer.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 39 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
(5) Following the issuance of a permit, if no substantial start is made in construction within
one year of the date of the permit, the permit shall lapse and become void. A one (1)
year permit extension may be obtained from the Code Enforcement Officer prior to lapse
of the original permit.
(6) Any increase in habitable living space shall require a building permit.
(7) Any change of use shall require a building permit.
6.3 Plumbing Permit Required
No building permit shall be issued for any structure or use involving the construction,
installation or alteration of plumbing facilities unless a valid plumbing permit or a Complete
Non-engineered Subsurface Waterwater Disposal System has been secured by the applicant
or his authorized agent in conformance with the sanitary provisions of this Ordinance.
6.4 Fee
No building permit or use permit shall be issued without payment of a fee according to the
following schedule:
a. Applicants for building permits, change of use permits, special exception permits and/or
variances, shall submit a fee to the Code Enforcement Officer at the time of submission
of application forms. The fees shall serve as renumeration for the services of the Code
Enforcement Officer and as a source of funds for the administration of this Ordinance.
1. Change of use permits, and permits not for a structure shall require the payment of a
fee, which shall be $30.00; said fee being apportioned $20.00 for the Code
Enforcement Officer and $10.00 for administration.
2. Permits for structures shall require the payment of a fee, which shall be $.05 per
square foot of floor area, to be retained by the Code Enforcement Officer, plus $10.00
for administration. For the calculation of this fee, floor area shall be considered the
total vertical footprint of the structure, not the sum of the floors.
3. Use permits issued by the Code Enforcement Officer as described in Table 1 Land
Uses and within the Shorelands, Resource Protection, and Stream Protection Districts,
shall be $100.00; said fee apportioned $50.00 to the Code Enforcement Officer and
$50.00 for administration.
4. Applicants for a special exception permit shall submit a fee to the Code Enforcement
Officer of $250.00, said fee being apportioned $20.00 to the Code Enforcement
Officer and $230.00 for administration.
5. After-the-Fact Permits; applicants seeking a permit for a use, activity or construction,
which was begun prior to application, shall submit a fee equal to three (3) times the
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 40 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
regular fee for that permit, apportioned at the same percentages as the regular fee for
that permit. After-the-fact permits shall not be issued for any use, activity, or
construction which violated any section of this Ordinance at the time the use, activity
or construction was begun, other than timeliness of application.
6. Permit extensions shall require the payment of a fee equal to fifty percent (50%) the
original permit fee; the Code Enforcement Officer shall retain said fee as
renumeration.
b. The subdivision application fee shall be $250.00 plus $25.00 per lot created by the
subdivision.
c. The application fee for an administrative or variance appeal shall be three hundred fifty
dollars ($350.00), for administration.
6.5 Enforcement Officer
A. Any violation of this Ordinance shall be deemed to be a nuisance.
B. It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he shall notify in writing the person responsible for such
violation, indicating the nature of the violation and ordering the action necessary to
correct it. He shall order discontinuance of illegal use of land, buildings or structures,
removal of illegal buildings, structures additions or work being done, or abatement of
nuisance conditions or shall take any other action authorized by this Ordinance to ensure
compliance with or to prevent violation of its provisions. A copy of such notification
shall be submitted to the municipal officers and be maintained as a permanent record.
C. The Code Enforcement Officer shall conduct on-site inspections to insure compliance
with all applicable laws and conditions attached to permit approvals and extensions. The
Code Enforcement Officer shall also investigate all complaints of alleged violations of
this Ordinance
D. The Code Enforcement Officer shall keep a complete record of all essential transactions
of the office, including applications submitted, permits granted or denied, variances
granted or denied, revocation actions, revocation of permits, appeals, court actions,
violations investigated, violations found, and fees collected.
6.6 Legal Action and Violations
When any violation of any provision of this Ordinance shall be found to exist, the Municipal
attorney, as designated by the Municipal Officers, either on his own initiative, or upon notice
from the Code Enforcement Officer, is hereby authorized and directed to institute any and all
actions and proceedings, either legal or equitable, that may be appropriate or necessary to
enforce the provisions of this Ordinance in the name of the Municipality.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 41 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
The municipal officers, or their authorized agent are hereby authorized to enter into
administrative consent agreements for the purpose of eliminating violations of this Ordinance
and recovering fines without Court action. Such agreements shall not allow an illegal
structure or use to continue unless there is clear and convincing evidence that the illegal
structure or use was constructed or conducted as a direct result of erroneous advice given by
an authorized municipal official and there is no evidence that the owner acted in bad faith, or
unless the removal of the structure or use will result in a threat or hazard to public health and
safety or will result in substantial environmental damage.
6.7 Fines
Any person, including but not limited to a landowner, a landowner's agent or a contractor,
who violates any provision or requirement of this Ordinance shall be penalized in accordance
with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per
violation for each day that the violation continues. However, in the Resource Protection
District the maximum penalty is increased to $5000 (38 M.R.S.A. section 4452).
6.8 Appeals and Special Permits
6.8.1 Procedure
a. All appeals or applications for special exception permits shall be based upon a written
decision from the Code Enforcement Office.
b. Administrative appeals and variance appeals shall be heard and decide upon by the
Board of Appeals in accordance with the provisions of this ordinance.
c. Applications for special exception permits shall be heard and decided upon by the
Planning Board in accordance with the provisions of this Ordinance.
d. Appeals shall lie from the decision of the Code Enforcement Officer to the Board of
Appeals and from the Board of Appeals to the Superior Court according to state law.
e. Special exception shall lie from the decision of the Code Enforcement Officer to the
Planning Board and from the Planning Board to the Superior Court according to state
law.
6.8.2 Board of Appeals
(1) Establishment
A Board of Appeals is hereby established in accordance with state law and the provisions
of this Ordinance.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 42 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
(2) Appointment and Composition
a. The Board of Appeals shall be appointed by the Municipal Officers and shall
consist of 5 members, all of whom shall be legal residents of the municipality,
serving staggered terms of 5 years. Initial appointments shall be for 1,2,3,4, and
5 years respectively. The Board shall elect annually a chairman from its
membership. Minutes shall be kept of the proceedings of the Board of Appeals,
which shall show the vote of each member upon each question. All minutes of
the Board shall be public record.
A quorum shall consist of 3 members.
b. A Municipal Officer may not serve as a member.
c. Any question of whether a particular issue involves a conflict of interest sufficient
to disqualify a member from voting thereon shall be decided by a majority vote of
the members, except the member who is being challenged.
d. A member of the Board may be dismissed for cause by the Municipal Officers
upon written charges and after public hearing.
(3) Powers and Duties of the Board of Appeals.
The Board of Appeals shall have the following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an
appellate basis, where it is alleged by an aggrieved party that there is an error in
any order, requirement, decision, or determination made by, or failure to act by,
the Planning Board in the administration of this Ordinance; and to hear and decide
administrative appeals on a de novo basis where it is alleged by an aggrieved
party that there is an error in any order, requirement, decision or determination
made by, or failure to act by, the Code Enforcement Officer in his or her review
of and action on a permit application under this Ordinance. Any order,
requirement, decision or determination made, or failure to act, in the enforcement
of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set
forth in this Ordinance.
(4) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not
limited to, lot width, structure height, percent of lot coverage, and setback
requirements.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 43 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
(b) Variances shall not be granted for establishment of any uses otherwise prohibited
by this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of this Ordinance
except for the specific provision which has created the non-conformity and
from which relief is sought; and
(ii) The strict application of the terms of this Ordinance would result in undue
hardship. The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a
variance is granted;
b. That the need for a variance is due to the unique circumstances of the
property and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the
locality; and
d. That the hardship is not the result of action taken by the applicant or a
prior owner.
(d) Notwithstanding 6.8.2(4)(c)(ii) above, the Board of Appeals may grant a variance
to an owner of a residential dwelling for the purpose of making that dwelling
accessible to a person with a disability who resides in or regularly uses the
dwelling. The board shall restrict any variance granted under this subsection
solely to the installation of equipment or the construction of structures necessary
for access to or egress from the dwelling by the person with the disability. The
board may impose conditions on the variance, including limiting the variance to
the duration of the disability or to the time that the person with the disability lives
in the dwelling. The term "structures necessary for access to or egress from the
dwelling" shall include railing, wall or roof systems necessary for the safety or
effectiveness of the structure.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in
order to ensure conformance with the purposes and provisions of this Ordinance
to the greatest extent possible, and in doing so may impose such conditions to a
variance as it deems necessary. The party receiving the variance shall comply
with any conditions imposed.
(5) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the
Board of Appeals shall hold a "de novo" hearing. At this time the Board may
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 44 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
receive and consider new evidence and testimony, be it oral or written. When acting
in a "de novo" capacity the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of evidence and the law, and reaching its
own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an
appellate hearing, and may reverse the decision of the Planning Board only upon
finding that the decision was contrary to specific provisions of the Ordinance or
contrary to the facts presented to the Planning Board. The Board of Appeals may
only review the record of the proceedings before the Planning Board. The Board of
Appeals shall not receive or consider any evidence which was not presented to the
Planning Board, but the Board of Appeals may receive and consider written or oral
arguments. If the Board of Appeals determines that the record of the Planning Board
proceedings is inadequate, the Board of Appeals may remand the matter to the
Planning Board for additional fact finding.
(6) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by
an aggrieved party from any decision of the Code Enforcement Officer or the
Planning Board, except for enforcement-related matters as described in 6.5B
above. Such an appeal shall be taken within thirty (30) days of the date of the
official, written decision appealed from, and not otherwise, except that the
Board, upon a showing of good cause, may waive the thirty (30) day
requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a
written notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why
the appeal or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings
and structures and other physical features of the lot pertinent to the relief
sought.
c. An application fee of three hundred fifty dollars ($350.00).
(iii) Upon receiving an application for an administrative appeal or a variance, the
Code Enforcement Officer or Planning Board, as appropriate, shall transmit to
the Board of Appeals all of the papers constituting the record of the decision
appealed from.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 45 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal
or a request for a variance within thirty (30) days of its receipt of a complete
written application and fee, unless this time period is extended by the parties.
The applicant shall also be responsible for any notification, filing and/or
mailing costs required for the appeal or variance request.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a
quorum for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals
within thirty (30) days after the close of the hearing, and shall issue a written
decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision,
including a statement of the facts found and conclusions reached by the
Board. The Board shall cause written notice of its decision to be mailed or
hand-delivered to the applicant. Copies of written decisions of the Board of
Appeals shall be given to the Planning Board, Code Enforcement Officer, and
the municipal officers.
(7) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F),
any aggrieved party who participated as a party during the proceedings before the
Board of Appeals may take an appeal to Superior Court in accordance with State laws
within forty-five (45) days from the date of any decision of the Board of Appeals.
(8) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board
of Appeals may reconsider any decision within forty-five (45) days of its prior
decision. A request to the Board to reconsider a decision must be filed within ten
(10) days of the decision that is being reconsidered. A vote to reconsider and the
action taken on that reconsideration must occur and be completed within forty-five
(45) days of the date of the vote on the original decision. Reconsideration of a
decision shall require a positive vote of the majority of the Board members originally
voting on the decision, and proper notification to the landowner, petitioner, planning
board, code enforcement officer, and other parties of interest, including abutters and
those who testified at the original hearing(s). The Board may conduct additional
hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15)
days after the decision on reconsideration.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 46 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
6.8.3 Special Exception Permits
(1) Authorization
The Planning Board is hereby authorized to hear and decide upon applications for special
exception permits in accordance with state law and the provisions of this Ordinance.
(2) Powers and Duties: The Planning Board shall hear and approve with modifications or
conditions, or disapprove all applications for special exception permits. No special
exception permit shall be granted unless specific provision for such special exception
is made in this Ordinance.
(3) Application Procedure
a. A person informed by the Code Enforcement Officer that he requires a special
exception permit shall file an application for the permit with the Planning Board
on forms provided for the purpose.
b. A non-refundable application fee of $250 shall be paid to the C.E.O. and a copy
or a receipt for the same shall accompany each application, in addition all costs
incurred by the Planning Board under Article 6, Section 6.8.3 subsection (3)
paragraphs c. and e. shall be paid by the applicant. An additional fee may be
charged if the C.E.O. and/or the Board of Appeals needs the assistance of a
professional engineer or other expert. The experts fee shall be paid in full by the
applicant within ten (10) days after the town submits a bill for payment Failure to
pay the bill shall constitute a violation of the ordinance and be grounds for
issuance of a stop work order. An expert shall not be hired at the expense of an
applicant until the applicant has either consented to such hiring in writing or been
given an opportunity to be heard on the subject. An applicant who is dissatisfied
with a decision of the Code Enforcement Officer may appeal that decision to the
Board of Appeals.
c. Before taking action on any application, the Planning Board shall hold a public
hearing. The Board shall notify by certified mail, the owners of all property
within five hundred (500) feet of the property involved, at least ten (10) days in
advance of the hearing, of the nature of the application and of the time and place
of the public hearing.
d. The owners of property shall be considered to be those against whom taxes are
assessed. Failure of any property owner to receive a notice of public hearing
shall not necessitate another hearing or invalidate any action by the Planning
Board.
e. Following the filing of an application, the Planning Board shall hold a public
hearing on the application within thirty (30) days. The Planning Board shall
notify the Code Enforcement officer, Municipal Officers, and the Board of
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 47 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Appeals, at least twenty (20) days in advance, of the time and place of the
hearing. Notice of the hearing shall be posted in the Town Office at least thirteen
(13) days in advance of the Public hearing. The notice shall be published at least
two (2) times in a newspaper that complies with Title 1, section 601 and that has a
general circulation in the municipality. The date of the first publication shall be
at least twelve (12) days before the hearing, and the date of the second publication
must be at least seven (7) days before the hearing.
f. At any hearing a party may be represented by agent or attorney. Hearings shall
not be continued to other times except for good cause.
g. The Code Enforcement Officer or his designated assistant shall attend all hearings
and may present to the Planning Board all plans, photographs, or other material he
deems appropriate for an understanding of the application.
h. The applicant's case shall be heard first, to maintain orderly procedure; each side
shall proceed without interruption. Questions may be asked through the Chair.
All persons at the hearing shall abide by the order of the Chairman.
i. Within thirty (30) days of the public hearing, or within such other time limit as
may be mutually agreed to, the Planning Board shall reach a decision on a special
exception and shall inform, in writing, the applicant, the Code Enforcement
Officer and Municipal Officers of its decision.
j. Upon notification of the decision of the Planning Board the Code Enforcement
Officer as instructed shall: immediately issue, issue with conditions prescribed by
the Planning Board, or deny a building permit.
No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any
other local Ordinance or regulation or any State law which the municipality is
responsible for enforcing.
k. A special exception permit secured under the provision of this Ordinance by vote
of the Planning Board shall expire if the work or change involved is not
commenced within one (1) year of the date on which the special exception is
granted, and if the work or change is not substantially complete within two (2)
years of the date on which the special exception is granted. Permit extensions
may be granted for commencement of the work or change, or for substantial
completion.
l. The applicant shall have the burden of proving that the proposed land use activity
is in conformity with the purposes and provisions of this Ordinance
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 48 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
(4) Factors applicable to Special Exceptions
a. In passing upon a special exception permit the Planning Board shall evaluate the
immediate and long-range effects of the proposed use upon:
1) The maintenance of safe and healthful conditions.
2) The prevention and control of water pollution and sedimentation
3) The control of building sites, placement of structures, and land uses.
4) The protection of spawning grounds, fish, aquatic life, bird, and other wildlife
habitat.
5) The conservation of visual as well as actual points of access to inland and
coastal waters, and natural beauty.
6) Archaeological historic resources as designated in the comprehensive plan.
7) Existing commercial fishing or maritime activities.
b. The Planning Board shall also consider the following factors:
1) The compatibility of the proposed use with adjacent land use.
2) The need of a particular location for the proposed use.
3) Access to the site from, existing or proposed roads.
4) The location of the site with respect to flood plains and floodways of rivers or
streams.
5) The amount and type of wastes to be generated by the proposed use and the
adequacy of the proposed disposal systems.
6) The impact of the proposed use, on the land and adjacent water bodies and the
capability of the land and water to sustain such use without degradation.
7) Existing topographic and drainage features and vegetative cover on the site.
8) The erosion potential of the site based upon degree and direction of slope, soil
type, and vegetative cover.
9) The impact of the proposed use on transportation facilities.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 49 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
10) The impact of the proposed use on local population and community facilities.
11) The impact of the proposed use on local water supplies.
12) The proposed use in conformance with Article 5, Performance standards,
(5) Conditions Attached to Special Exceptions
a. Upon consideration of the factors listed above, the Planning Board may attach
such conditions, in addition to those required elsewhere in this Ordinance, that it
finds necessary to further the purposes of this Ordinance. Violation of any of
these conditions shall be a violation of this Ordinance. Such conditions may
include, but not be limited to, specifications for type of vegetation; increased
setbacks and yards; specified sewage disposal and water supply facilities;
landscaping and planting screens; period of operation; operational controls;
professional inspection and maintenance; sureties; deed restrictions; restrictive
covenants; locations of parking and signs; type of construction; or any other
conditions necessary to fulfill the purposes of this Ordinance.
b. In order to secure information upon which to base its determination, the Planning
Board may require the applicant to furnish, in addition to the information required
for a special exception permit, the following information:
1) A plan of the area showing contours at intervals to be determined by the
Planning Board and referred to Mean Sea Level, high-water
elevation,
groundwater conditions, bedrock slope and vegetative cover.
2) A soils report identifying the soils boundaries and names in the proposed
development with the soils information super-imposed upon the plot plan in
accord with the USDA Soil Conservation Service National Cooperative Soil
Classification.
3) Location of existing and proposed buildings, parking areas, traffic access,
driveways, walkways, piers, open spaces, and landscaping.
4) Plans of buildings, sewage disposal facilities, and water supply systems.
5) Other pertinent information necessary to determine if the proposed use meets
the provisions of this Ordinance. In evaluating each application, the Planning
Board may request the assistance of the Regional Planning Commission,
County Soil and Water Conservation District and any other State or Federal
agency which can provide technical assistance.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 50 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Appendix - Warrant Articles
Town Meeting - March 18, 1974 -- Adopted
Motioned to accept the article as written. Motion Passed.
Special Town Meeting - June 24, 2024
Article # 9 - Zoning Ordinance - Amendments for ADU
Article was Motioned and Passed
Shall the following Proposed Amendments to the "Zoning Ordinance of the Town of Franklin,
ME be enacted?"
Note: New language is in italics and deleted language is struck though, ie.
To read:
The following amendments are proposed to the existing ordinance entitled
"Zoning Ordinance of the Town of Franklin, Me".
Section 1: Amend Section 1.4.5(A), Nonconforming Lots, by adding the following:
Non-conforming Lots: A non-conforming lot of record as of the effective date of this Ordinance
or amendment thereto may be built upon without the need for a variance, provided that such lot is
in separate ownership and not contiguous with any other lot in the same ownership, and that all
provisions of this Ordinance except lot area and frontage can be met. An accessory dwelling unit
(ADU) may be built on a non-conforming lot of record providing the ADU does not further
increase non-conformity except in lot area, and all other provisions of this ordinance are met.
Variances relating to setback or other requirements not involving lot area or frontage shall be
obtained by action of the Board of Appeals.
Section 2: Amend Section 3.2, Definitions, by adding the following:
Accessory Dwelling Unit: An "accessory dwelling unit" means a self-contained dwelling unit
containing cooking, sleeping and toilet facilities, and containing no more than two bedrooms, and located
within, attached to or detached from a single-family dwelling unit located on the same parcel of land, and
having a floor area of no more than seven hundred-fifty (750) square feet or fifty percent (50%) of the
floor area of the single family dwelling unit on the same parcel, whichever is less.
Section 3: Amend Section 3.2, Definitions, by adding the following:
Dwelling Unit: A room or group of rooms designed and equipped exclusively for use as living quarters
for only one family, including provisions for living, sleeping, cooking and eating. The term shall include
mobile homes, but shall not include trailers, and recreational vehicles and accessory dwelling units.
Section 4: Amend Section 3.2, Definitions, by adding the following:
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 51 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
Multi-unit Residential: A residential structure containing three (3) or more residential dwelling
units. For the purposes of this definition, accessory dwelling units are not counted as residential
dwelling units.
Section 5: Amend Section 1.4.5(B), Contiguous Built Lots, by adding the following:
Contiguous Built Lots: ....
If two or more principal uses or structures existed on a single lot of record on the effective date
of this Ordinance, each may be sold on a separate lot provided that the above referenced law and
rules are complied with. When such lots are divided each lot thus created must be as conforming
as possible to the dimensional requirements of this Ordinance. For the purposes of 1.4.5(B), a
stand-alone ADU shall be considered a principle structure.
Section 6: Amend 4.1.3(2), Permitted Uses- Residential, by adding the following:
(2)
Residential
Single family dwelling, including single camp, tent or mobile home
Accessory dwelling unit
Two family dwelling
Home Occupations
Accessory uses and structures
Section 7: Amend 4.1.6, Dimensional Requirements, by adding the following:
(3) Accessory Dwelling Unit
Accessory dwelling units shall have a minimum floor area of 190 square feet. Accessory
dwelling units shall have a maximum floor area of seven hundred-fifty (750) square feet
or fifty percent (50%) of the floor area of the single-family dwelling unit on the same
parcel, whichever is less.
-and renumbering the other sections in 4.1.6 for consistency.
Section 8: Amend Section 5.1(B) in Performance Standards, by adding the following:
(B) If more than one residential dwelling unit or more than one principal commercial
structure is constructed on a single parcel, all dimensional requirements shall be met for
each additional dwelling unit or principal structure, except an accessory dwelling unit
subordinate to a principle structure is exempt from additional lot area and lot frontage
requirements. For additional accessory dwelling units on that parcel, all dimensional
requirements shall be met for each addition accessory dwelling unit.
Section 9: Amend Section 5.7(1), Two-Family Dwelling Units, to the following:
(1)Two-Family Dwelling Units
Lots for two family dwellings shall meet all of the dimensional requirements for single
family units, except that the lot area and shoreline road frontage shall be equal to that
required for an equivalent number of single-family dwelling units., and the road frontage
shall exceed by fifty percent (50%) the requirement for an equivalent number of single
family dwelling units.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 52 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
This section also corrects an error which occurred during the 2009 separation of Shoreland
Zoning language from the General Zoning Ordinance, (i.e., shoreline).
Purpose: To amend the General Zoning Ordinance of the Town of Franklin, Maine to be
consistent with the requirements of Title 30-A, §4301 & §4364-B, which require permitting of
Accessory Dwelling Units.
The above proposed amendment was recommended by the Franklin Planning Board at the May
16, 2024 meeting, by a vote of six (6) in favor and zero (0) opposed.
Town Meeting - March 28, 2026
Article # 30 - General Zoning Ordinance
Article was Motioned and Passed
"Shall the document entitled 'Proposed Amendment to the 'General Zoning Ordinance of the
Town of Franklin, ME', as posted with the warrant and made available for inspection at the
Town Office, be enacted?"
Note: New language is in italics and deleted language is struck though, ie.
To read:
The following amendments are proposed to the existing ordinance entitled "General Zoning
Ordinance of the Town of Franklin, ME".
Section 1: Amend Section 6.4, Fee, by adding the following new language:
c. The application fee for an administrative or variance appeal shall be three-hundred fifty
dollars ($350.00), for administration.
Section 2: Amend Section 6.8.2, Board of Appeals, subsection (6)(a)(ii) by adding the
following new language:
c. An application fee of three hundred fifty dollars ($350.00).
Section 3: Amend Section 6.8.2, Board of Appeals, subsection (6)(a)(iv), Making an Appeal, by
adding the following:
The Board of Appeals shall hold a public hearing on an administrative appeal or a request for a
variance within thirty (30) days of its receipt of a complete written application and fee, unless
this time period is extended by the parties. The applicant shall also be responsible for any
notification, filing and/or mailing costs required for the appeal or variance request.
Purpose: This article will assign an application fee for administrative and variance appeals as
used within this ordinance to cover costs.
TOWN OF FRANKLIN, MAINE
ORDINANCE
Ordinance - General Zoning
Page 53 of 53
Ordinance Original - 03/18/1974
Ordinance Revision - 03/28/2026
The above proposed amendments were recommended by the Franklin Planning Board at the
02/19/2026 meeting, by a vote of six (6) in favor and none (0) opposed.
The amendments for the years stated on page 2 are being researched and will be added to this
document when complete.