This is the exact embedded text of the captured official document.
Snapshot 7260e6278eb5 · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
-i-
Shoreland Zoning
Ordinance
For The
Town of Franklin,
Maine
ADOPTED
MARCH 28th, 2009
AMENDED
2012
2013
2016
-ii-
SHORELANDS ZONING ORDINANCES FOR THE TOWN OF FRANKLIN, MAINE
TABLE OF CONTENTS
Page
1. Purposes ................................................................................................................................................. 1
2. Authority ................................................................................................................................................ 1
3. Applicability ........................................................................................................................................... 1
4. Effective Date ......................................................................................................................................... 1
A. Effective Date of Ordinance and Ordinance Amendments ............................................................... 1
5. Availability ............................................................................................................................................. 2
6. Severability ............................................................................................................................................. 2
7. Conflicts with Other Ordinances ............................................................................................................ 2
8. Amendments ........................................................................................................................................... 2
9. Districts and Zoning Map ....................................................................................................................... 2
A. Official Shoreland Zoning Map ....................................................................................................... 2
B. Scale of Map .................................................................................................................................... 3
C. Certification of Official Shoreland Zoning Map ............................................................................. 3
D. Changes to the Official Shoreland Zoning Map .............................................................................. 3
10. Interpretation of District Boundaries ..................................................................................................... 3
11. Land Use Requirements ......................................................................................................................... 3
12. Non-conformance ................................................................................................................................... 3
A. Purpose ............................................................................................................................................ 3
B. General ............................................................................................................................................. 3
C. Non-conforming Structures ............................................................................................................. 4
D. Non-conforming Uses ...................................................................................................................... 6
E. Non-conforming Lots....................................................................................................................... 7
13. Establishment of Districts ...................................................................................................................... 7
A. Resource Protection District ............................................................................................................ 7
B. Stream Protection District .............................................................................................................. 8
C. Shoreland District .............................................................................................8
14. Table of Land Uses ................................................................................................................................ 8
15. Land Use Standards ............................................................................................................................ 11
A. Minimum Lot Standards ................................................................................................................ 11
B. Principal and Accessory Structures ............................................................................................... 12
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Below the Normal High-Water Line of a Water body or Within a Wetland ................................. 15
D. Campgrounds ................................................................................................................................. 15
E. Individual Private Campsites ........................................................................................................ 16
F. Commercial and Industrial Uses .................................................................................................... 17
G. Parking Areas ................................................................................................................................. 17
H. Roads and Driveways ................................................................................................................... 18
I.
Signs............................................................................................................................................... 19
J. Storm Water Runoff .................................................................................................................... 20
K. Septic Waste Disposal .................................................................................... .. 20
L. Essential Services ......................................................................................................................... 21
M. Mineral Exploration and Extraction ............................................................................................. 21
N. Agriculture ..................................................................................................................................... 22
O. Timber Harvesting ........................................................................................................................ 22
-iii-
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ...................... 23
Q. Erosion and Sedimentation Control .............................................................................................. 25
R. Soils ............................................................................................................................................... 26
S. Water Quality ................................................................................................................................. 26
T. Archaeological Site ....................................................................................................................... 26
16. Administration ...................................................................................................................................... 26
A. Administering Bodies and Agents ................................................................................................ 26
B. Permits Required ........................................................................................................................... 27
C. Permit Application ......................................................................................................................... 27
D. Fees ............................................................................................................28
E. Procedure for Administering Permits .......................................................................................... 28
F. Special Exceptions ......................................................................................................................... 29
G. Expiration of Permit ...................................................................................................................... 30
H. Installation of Public Utility Service ............................................................................................ 30
I.
Appeals .......................................................................................................................................... 30
J. Enforcement ................................................................................................................................... 33
17. Construction of Language ................................................................................................................... 34
18. Definitions .........................................................................................................35
-1-
Shoreland Zoning Ordinance for the
_____________Town of Franklin, Maine_______________
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird
and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to
protect archaeological and historic resources; to protect commercial fishing and maritime industries;
to protect freshwater and coastal wetlands; to control building sites, placement of structures and land
uses; to conserve shore cover, and visual as well as actual points of access to inland and coastal
waters; to conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
normal high-water line of any great pond or river,
upland edge of a coastal wetland, including all areas affected by tidal action, or
upland edge of a freshwater wetland,
and all land areas within 75 feet, horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or
other structure extending or located below the normal high-water line of a water body or within a
wetland.
NOTE: Coastal wetlands, by definition, include all areas affected by tidal action, not just those areas
where salt marshes and salt meadows exist. Cobble and sand beaches, mudflats, and rocky
ledges, below the highest annual tide are all considered to be coastal wetlands.
4. Effective Date
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was
adopted by the municipal legislative body on March 28th, 2009, shall not be effective unless approved
by the Commissioner of the Department of Environmental Protection. A certified copy of the
Ordinance, or Ordinance Amendment, attested and signed by the Municipal Clerk, shall be forwarded
to the Commissioner for approval. If the Commissioner fails to act on this Ordinance or Ordinance
Amendment, within forty-five (45) days of his/her receipt of the Ordinance, or Ordinance
Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period shall
be governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or
Ordinance Amendment, is approved by the Commissioner.
-2-
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at reasonable
cost at the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute
administered by the Town of Franklin, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended as follows:
1) By a majority vote of the governing body if the proposed amendment is recommended by the
Planning Board, or
2) By 2/3 majority vote of the governing body if the proposed amendment is not recommended by the
Planning Board.
In either case, the Planning Board shall hold a public hearing at least 30 days prior to the meeting of
the governing body. Notice of the hearing shall be posted in the Town Office at least thirteen (13)
days in advance of the Public hearing. The notice shall be published at least two (2) times in a
newspaper that complies with Title 1, section 601 and that has a general circulation in the
municipality. The date of the first publication shall be at least twelve (12) days before the hearing,
and the date of the second publication must be at least seven (7) days before the hearing.
Copies of amendments, attested and signed by the Municipal Clerk, shall be submitted to the
Commissioner of the Department of Environmental Protection following adoption by the municipal
legislative body and shall not be effective unless approved by the Commissioner. If the
Commissioner fails to act on any amendment within forty-five (45) days of his/her receipt of the
amendment, the amendment is automatically approved. Any application for a permit submitted to the
municipality within the forty-five (45) day period shall be governed by the terms of the amendment,
if such amendment is approved by the Commissioner.
9. Districts and Zoning Map
A. Official Zoning Map. The areas to which this Ordinance is applicable are hereby divided into
the following districts as shown on the Official Zoning Map(s) which is (are) made a part of this
Ordinance:
(1) Resource Protection District
(2) Shoreland District
(3) Stream Protection District
-3-
B. Scale of Map. The Official Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000
feet. District boundaries shall be clearly delineated and a legend indicating the symbols for each
district shall be placed on the map.
C. Certification of Official Zoning Map. The Official Zoning Map shall be certified by the
attested signature of the Municipal Clerk and shall be located in the Office of the Town Clerk.
Additional copies of this map may be seen at the Office of the Selectmen.
D. Changes to the Official Zoning Map. If amendments, in accordance with Section 8, are made
in the district boundaries or other matter portrayed on the Official Zoning Map, such changes
shall be made on the Official Zoning Map within thirty (30) days after the amendment has been
approved by the Commissioner of the Department of Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Zoning Map,
district boundary lines are property lines, the centerlines of streets, roads and rights of way, and the
boundaries of the shoreland area as defined herein. Where uncertainty exists as to the exact location
of district boundary lines, the Board of Appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in conformity with
all of the regulations herein specified for the district in which it is located, unless a variance is
granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except
as otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and
the new owner may continue the non-conforming use or continue to use the non-conforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations that do
not involve expansion of the non-conforming use or structure, and such other changes in a
non-conforming use or structure as federal, state, or local building and safety codes may
require.
NOTE: See Section 18 for the definitions of non-conforming structures, non-conforming uses and non-
conforming lots.
-4-
C. Non-conforming Structures
(1) Expansions. A non-conforming structure may be added to or expanded after obtaining a permit
from the same permitting authority (see Land Use Table) as that for a new structure, if such
addition or expansion does not increase the non-conformity of the structure, and is in accordance
with subparagraphs (a), and (b) below.
(a)
Legally existing non-conforming principal and accessory structures that do not meet the
water body, tributary stream, or wetland setback requirements may be expanded or altered as
follows, as long as all other applicable standards contained in this Ordinance are met.
i.
Expansion of any portion of a structure within 25 feet, horizontal distance, of the normal
high-water line of a water body, tributary stream, or upland edge of a wetland is
prohibited, even if the expansion will not increase nonconformity with the water body,
tributary stream or wetland setback requirement.
ii. Expansion of an accessory structure that is located closer to the normal high-water line
of a water body, tributary stream, or upland edge of a wetland than the principal structure
is prohibited, even if the expansion will not increase nonconformity with the water body
or wetland setback requirement.
iii. For structures located less than 75 feet, horizontal distance, from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland, the maximum
combined total floor area for all portions of those structures within that 75-foot distance
is 1,000 square feet, and the maximum height of any portion of a structure that is within
75 feet, horizontal distance, of a water body, tributary stream or upland edge of a
wetland is 20 feet or the height of the existing structure, whichever is greater.
iv. For structures located less than 100 feet, horizontal distance, from the normal high-water
line of a great pond, the maximum combined total floor area for all portions of those
structures within that 100-foot distance is 1,500 square feet, and the maximum height of
any portion of a structure that is within 100 feet, horizontal distance, of a great pond is
25 feet or the height of the existing structure, whichever is greater, except that any
portion of those structures located less than 75 feet, horizontal distance from the normal
high-water line of a water body, tributary stream, or the upland edge of a wetland must
meet the floor area and height limits of division (iii).
For the purposes of Section 12(C)(1)(a), a basement is not counted toward floor area.
(b) Whenever a new, enlarged, or replacement foundation is constructed under a non-
conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 12(C)(2)
Relocation, below. If the completed foundation does not extend beyond the exterior
dimensions of the structure and the foundation does not cause the structure to be elevated
by more than three (3) additional feet, as measured from the uphill side of the structure,
it shall not be considered to be an expansion of the structure.
(2) Relocation. A non-conforming structure may be relocated within the boundaries of the
parcel on which the structure is located provided that the site of relocation conforms to all
-5-
setback requirements to the greatest practical extent as determined by the Planning Board or
its designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for septic
systems, and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation. In addition, the area from which the relocated
structure was removed must be replanted with vegetation. Replanting shall be required as
follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one native
tree, three (3) feet in height, for every tree removed. If more than five trees are planted,
no one species of tree shall make up more than 50% of the number of trees planted.
Replaced trees must be planted no further from the water or wetland than the trees that
were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged, or
removed must be reestablished within the setback area. The vegetation and/or ground
cover must consist of similar native vegetation and/or ground cover that was disturbed,
destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees,
or a combination thereof.
(3) Reconstruction or Replacement. Any non-conforming structure which is located less than
the required setback from a water body, tributary stream, or wetland and which is removed,
or damaged or destroyed, regardless of the cause, by more than 50% of the market value of
the structure before such damage, destruction or removal, may be reconstructed or replaced
provided that a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in
compliance with the water body, tributary stream or wetland setback requirement to the
greatest practical extent as determined by the Planning Board or its designee in accordance
with the purposes of this Ordinance. In no case shall a structure be reconstructed or replaced
so as to increase its non-conformity. If the reconstructed or replacement structure is less than
the required setback it shall not be any larger than the original structure, except as allowed
pursuant to Section 12(C)(1) above, as determined by the non-conforming floor area of the
reconstructed or replaced structure at its new location. If the total amount of floor area of the
original structure can be relocated or reconstructed beyond the required setback area, no
portion of the relocated or reconstructed structure shall be replaced or constructed at less
-6-
than the setback requirement for a new structure. When it is necessary to remove vegetation
in order to replace or reconstruct a structure, vegetation shall be replanted in accordance with
Section 12(C)(2) above.
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less of the market value,
or damaged or destroyed by 50% or less of the market value of the structure, excluding
normal maintenance and repair, may be reconstructed in place if a permit is obtained from
the Code Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(2) above, the physical condition and type of foundation present, if
any.
(4) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may
not be changed to another use unless the Planning Board, after receiving a written
application, determines that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent properties and resources than
the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and commercial fishing and maritime
activities, and other functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1)(a) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning Board may, for
good cause shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure provided that
the structure has been used or maintained for residential purposes during the preceding five
(5) year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-conforming
use provided that the proposed use has no greater adverse impact on the subject and adjacent
properties and resources than the former use, as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria listed in
Section 12(C)(4) above.
-7-
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width or shore frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure
exists on each lot, the non-conforming lots may be conveyed separately or together, provided
that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and
the State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on March 23rd,
1991, each may be sold on a separate lot provided that the above referenced law and rules are
complied with. When such lots are divided each lot thus created must be as conforming as
possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are in
single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
the limits of the shoreland zone, exclusive of the Stream Protection District, and areas that are
currently developed which are zoned Shorelands District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands, salt
marshes and salt meadows, and wetlands associated with great ponds, which are rated
"moderate" or "high" value waterfowl and wading bird habitat, including nesting and feeding
areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W) that are
depicted on a Geographic Information System (GIS) data layer maintained by either
MDIF&W or the Department as of May 1, 2006. For the purposes of this paragraph
"wetlands associated with great ponds" shall mean areas characterized by non-forested
wetland vegetation and hydric soils that are contiguous with a great pond, and have a surface
elevation at or below the water level of the great pond during the period of normal high
water. "Wetlands associated with great ponds" are considered to be part of that great pond.
-8-
(2) This district shall also include 100 year floodplains adjacent to coastal wetlands as shown on
FEMA's Flood Insurance Rate Maps or Flood Hazard Boundary Maps.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater or coastal wetland as defined, and which are not surficially
connected to a water body during the period of normal high water.
(5) Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement,
and lands adjacent to coastal wetlands which are subject to severe erosion or mass
movement, such as steep coastal bluffs.
B. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream, exclusive of
those areas within two-hundred and fifty (250) feet, horizontal distance, of the normal high-water
line of a great pond, or within two hundred and fifty (250) feet, horizontal distance, of the upland
edge of a freshwater or coastal wetland. Where a stream and its associated shoreland area are
located within two-hundred and fifty (250) feet, horizontal distance, of the above water bodies or
wetlands, that land area shall be regulated under the terms of the shoreland district associated
with that water body or wetland.
C. Shoreland District .
The Shoreland District includes all land areas within two-hundred and
fifty (250) feet, horizontal distance, of the normal high-water line of any great pond; within two-
hundred and fifty (250) feet, horitontal distance, of the upland edge of a coastal or freshwater
wetland; or within seventy-five (75) feet of the normal high water line of a stream, which are
suitable for residential and recreational development. It includes areas other than those in the
Resource Protection and Stream Protection Districts.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the Shoreland
Zone, shall conform with all of the applicable land use standards in Section 15. The district
designation for a particular site shall be determined from the Official Zoning Map.
Key to Table 1:
Yes -
Allowed (no permit required but the use must comply with all applicable land use
standards.)
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
-9-
LPI -
Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP -
Resource Protection
SP -
Stream Protection
SD-
Shoreland District
Table Notes
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses only.
6See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
8Except as provided in Section 15(H)(3).
9Single family residential structures may be allowed by special exception only according to the provisions of Section 16(F), Special
Exceptions. Two-family residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
11Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to
38 M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great pond, river, stream or
brook and operates in such a manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B.
Draining or otherwise dewatering;
C.
Filling, including adding sand or other material to a sand dune; or
D.
Any construction or alteration of any permanent structure.
- 10 -
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP
SD
1. Non-intensive recreational uses not requiring structures such as
hunting, fishing and hiking
yes
yes
yes
2. Motorized vehicular traffic on existing roads and trails
yes
yes
yes
3. Forest management activities except for timber harvesting
yes
yes
yes
4. Timber harvesting Contact Maine Forest Service Office
---
---
---
5. Clearing or removal of vegetation for activities other than timber harvesting
CEO
CEO1
yes
6. Fire prevention activities
yes
yes
yes
7. Wildlife management practices
yes
yes
yes
8. Soil and water conservation practices
yes
yes
yes
9. Mineral exploration
no
yes2
yes2
10. Mineral extraction including sand and gravel extraction
no
PB3
PB
11. Surveying and resource analysis
yes
yes
yes
12. Emergency operations
yes
yes
yes
13. Agriculture
yes
PB
yes
14. Aquaculture
PB
PB
PB
15. Principal structures and uses
A. One and two family residential, including driveways
PB4
PB9
CEO
B. Multi-unit residential
no
no
PB
C. Commercial
no10
no10
no10
D. Industrial
no
no
no
E. Governmental and institutional
no
no
PB
F.Small non-residential facilities for educational, scientific, or nature
interpretation purposes
PB4
PB
CEO
16. Structures accessory to allowed uses
PB4
PB
CEO
17.
Piers, docks, wharfs, bridges and other structures and uses extending over
or below the normal high-water line or within a wetland
a. Temporary
b. Permanent
CEO11
PB
CEO11
PB
CEO11
PB
18. Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
19. Home occupations
PB
PB
PB
20. Private sewage disposal systems for allowed uses
LPI
LPI
LPI
21. Essential services
A. Roadside distribution lines (34.5kV and lower)
CEO6
CEO6
yes12
B. Non-roadside or cross-country distribution lines involving ten poles or less in the
shoreland zone
PB6
PB6
CEO
C. Non-roadside or cross-country distribution lines involving eleven or more poles
in the shoreland zone
PB6
PB6
PB
D. Other essential services
PB6
PB6
PB
22. Service drops, as defined, to allowed uses
yes
yes
yes
23. Public and private recreational areas involving minimal structural development
PB
PB
PB
24. Individual, private campsites
CEO
CEO
CEO
25. Campgrounds
no
no7
PB
26. Road construction
PB
no8
PB
27. Parking facilities
no
no7
PB
28. Marinas
PB
no
PB
29. Filling and earth moving of <10 cubic yards
CEO
CEO
yes
30. Filling and earth moving of >10 cubic yards
PB
PB
CEO
31. Signs
yes
yes
yes
32. Uses similar to allowed uses
CEO
CEO
CEO
33. Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
34. Uses similar to uses requiring a PB permit
PB
PB
PB
- 11 -
15.
Land Use Standards. All land use activities within the shoreland zone shall conform with the
following provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
(1)
(a) Residential per dwelling unit
(i) Within the Shoreland Zone
Adjacent to Tidal Areas
30,000
150
(ii) Within the Shoreland Zone
Adjacent to Non-Tidal Areas
40,000
200
(iii) Within a subdivision in the
Shoreland Zone adjacent to
130,000
200
Tidal Areas
(b) Governmental, Institutional, Commercial or Industrial per principal structure
(i) Within the Shoreland Zone
Adjacent to Tidal Areas
40,000
200
(ii) Within the Shoreland Zone
Adjacent to Non-tidal Areas
60,000
300
(c) Public and Private Recreational Facilities
(i) Within the Shoreland Zone Adjacent
to Tidal and Non-Tidal Areas
40,000
200
(2) Land below the normal high-water line of a water body or upland edge of a wetland and land
beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(5)
If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed or
- 12 -
established on a single parcel, all dimensional requirements shall be met for each
additional dwelling unit, principal structure, or use.
(6) A lot abutting a public road shall have a minimum road frontage of one hundred (100) feet.
(7) A lot abutting a public road shall have a minimum setback depth of seventy-five (75) feet
from the center line of that road.
(8) Each property line setback shall be a minimum of ten (10) feet.
B.
Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high-water line of great ponds, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of other water bodies, tributary streams, or
the upland edge of a wetland. In the Resource Protection District the setback requirement shall
be 250 feet, horizontal distance, except for structures, roads, parking spaces or other regulated
objects specifically allowed in that district in which case the setback requirements specified
above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
(b) For principal structures, water and wetland setback measurements shall be taken from the
top of a coastal bluff that has been identified on Coastal Bluff maps as being "highly
unstable" or "unstable" by the Maine Geological Survey pursuant to its "Classification of
Coastal Bluffs" and published on the most recent Coastal Bluff map. If the applicant and
the permitting official(s) are in disagreement as to the specific location of a "highly
unstable" or "unstable" bluff, or where the top of the bluff is located, the applicant may at
his or her expense, employ a Maine Registered Professional Engineer, a Maine Certified
Soil Scientist, a Maine State Geologist, or other qualified individual to make a
determination. If agreement is still not reached, the applicant may appeal the matter to the
board of appeals.
(c) On a non-conforming lot of record on which only a residential structure exists, and it is not
possible to place an accessory structure meeting the required water body, tributary stream
or wetland setbacks, the code enforcement officer may issue a permit to place a single
accessory structure, with no utilities, for the storage of yard tools and similar equipment.
Such accessory structure shall not exceed eighty (80) square feet in area nor eight (8) feet
in height, and shall be located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and vegetation clearing
limitations. In no case shall the structure be located closer to the shoreline or tributary
stream than the principal structure.
- 13 -
NOTE: All tidal land which is subject to tidal action during the highest annual tide is coastal wetland.
NOTE: A tributary stream may be perennial or intermittent. Where a tributary stream is present within
the shoreland zone, setback standards from that tributary stream are applicable.
(2) Principal or accessory structures and expansions of existing structures which are permitted in
the Resource Protection, Shorelands and Stream Protection Districts, shall not exceed thirty-
five (35) feet in height.
(a) This provision shall not apply to structures such as transmission towers,
windmills, antennas, and similar structures having no floor area.
(b) The height of a structure shall exclude a non-habitable feature mounted on a
structure roof for observation purposes, such as a cupola, a dome, or a widow's
walk, provided the following conditions are met:
(i) the feature is being added to, or is part of, a conforming structure,
(ii) the structure is not located in a Resource Protection or Stream Protection
District,
(iii) the feature does not extend beyond the exterior walls of the structure,
(iv) the feature has a floor area of fifty-three (53) square feet or less, and
(v) the feature does not increase the height of the structure, as defined, more than
seven (7) feet.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of record,
or in the absence of these, the flood as defined by soil types identified as recent flood-plain
soils. The applicant shall prove that all structures and fill do not encroach on the 100 year flood
plain. While the Town of Franklin participates in the National Flood Insurance Program, and
maintains the adoption of the Floodplain Management Ordinance, accessory structures may be
placed in accordance with the standards of that ordinance and need not meet the elevation
requirements of this paragraph.
(4) The total footprint area of all structures, parking lots and other non-vegetated surfaces,
within the shoreland zone shall not exceed twenty (20) percent of the lot or a portion thereof,
located within the shoreland zone, including land area previously developed.
(5) Mobile Homes and Mobile Home Parks
(a)
Mobile Homes Not in a Mobile Home Park
Mobile homes not in a mobile home park shall meet all to the requirements of
this Ordinance for single family dwellings.
(b) Mobile Home Parks
Mobile home parks are prohibited in the Resource Protection, Shoreland, and
Stream Protection Districts.
- 14 -
(6) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a
site eroding from lack of naturally occurring vegetation, and which cannot be stabilized
with vegetative plantings;
(d)The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on streams, coastal
wetlands, and tributary streams, as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the
flood of record, or in the absence of these, by soil types identified as recent flood plain
soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the
normal high-water line of a water body, tributary stream, or upland edge of a wetland
when a natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation.
Where natural ground cover is lacking the area must be supplemented with leaf
or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and
provide for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required,
measured perpendicularly to the normal high-water line or upland edge of a
wetland;
(v)
A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse
the buffer;
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal distance, of a
water body, tributary stream or coastal wetland, a permit pursuant to the Natural
Resource Protection Act is required from the Department of Environmental Protection.
- 15 -
(7) Notwithstanding the requirements stated above, stairways or similar structures may be allowed
with a permit from the Code Enforcement Officer, to provide shoreline access in areas of steep
slopes or unstable soils provided: that the structure is limited to a maximum of four (4) feet in
width; that the structure does not extend below or over the normal high-water line of a water
body or upland edge of a wetland, (unless permitted by the Department of Environmental
Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C); and
that the applicant demonstrates that no reasonable access alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the
Normal High-Water Line of a Water Body or Within a Wetland.
(1) Access from shore shall be developed on soils appropriate for such use and constructed so as to
control erosion.
(2) The location shall not interfere with existing developed or natural beach areas.
(3) The facility shall be located so as to minimize adverse effects on fisheries.
(4) The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or
wharf in non-tidal waters shall not be wider than six feet for non-commercial uses.
(5) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure
extending below the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland as an operational necessity.
(6) New permanent piers and docks on non-tidal waters shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a permit
has been obtained from the Department of Environmental Protection, pursuant to the Natural
Resources Protection Act.
(7) No existing structures built on, over or abutting a pier, dock, wharf or other structure extending
below the normal high-water line of a water body or within a wetland shall be converted to
residential dwelling units in any district.
(8) Structures built on, over or abutting a pier, wharf, dock or other structure extending below the
normal high-water line of a water body or within a wetland shall not exceed twenty (20) feet in
height above the pier, wharf, dock or other structure.
NOTE:
New permanent structures, and expansions thereof, projecting into or over water bodies
shall require a permit from the Department of Environmental Protection pursuant to the
Natural Resources Protection Act, 38 M.R.S.A. section 480-C. Permits may also be
required from the Army Corps of Engineers if located in navigable waters.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
- 16 -
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land
area per site. The following shall also apply:
(a)
Each recreational vehicle, tent, or shelter site shallbe provided a minimum of two-
hundred (200) square feet of off-street parking, plus maneuvering space.
(b)
Each recreational vehicle, tent, or shelter site shall be provided with a picnic table,
trash receptacle, and fireplace.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds
are allowed provided the following conditions are met:
(1) One campsite per lot existing on the March 23rd, 1991, or thirty thousand (30,000) square
feet of lot area within the shoreland zone, whichever is less, may be permitted.
(2) Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet, horizontal distance, from the normal high-
water line of a great pond, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a wetland.
(3) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no structure
except a canopy shall be attached to the recreational vehicle.
(4) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a
Resource Protection District shall be limited to one thousand (1000) square feet.
(5) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or land
owner is required.
(6) When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with the
State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
- 17 -
F. Commercial and Industrial Uses. The following new commercial and industrial uses are
prohibited within the shoreland zone adjacent to great ponds, and streams which flow to great
ponds:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts
normally associated with individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10)
Petroleum or petroleum product storage and/or sale except storage on same property as
use occurs and except for storage and sales associated with marinas
(11)
Photographic processing
(12)
Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities shall be no less than fifty (50) feet,
horizontal distance, from the shoreline or tributary stream if the Planning Board finds that no
other reasonable alternative exists further from the shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and
where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except
that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
- 18 -
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond, and seventy-five (75) feet, horizontal distance
from the normal high-water line of other water bodies, tributary streams, or the upland edge of
a wetland unless no reasonable alternative exists as determined by the Planning Board. If no
other reasonable alternative exists, the road and/or driveway setback requirement shall be no
less than fifty (50) feet, horizontal distance, upon clear showing by the applicant that
appropriate techniques will be used to prevent sedimentation of the water body, tributary
stream, or wetland. Such techniques may include, but are not limited to, the installation of
settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed so
as to avoid sedimentation of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope above
twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways that
provide access to permitted structures and facilities located nearer to the shoreline or tributary
stream due to an operational necessity, excluding temporary docks for recreational uses. Roads
and driveways providing access to permitted structures within the setback area shall comply
fully with the requirements of Section 15(H)(1) except for that portion of the road or driveway
necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of their
setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route or
location is available outside the district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section 15(Q).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal
high-water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
- 19 -
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular
to the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning, and their inlet and outlet ends shall be stabilized with appropriate
materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
I
Signs. The following provisions shall govern the use of signs in the Resource Protection,
Stream Protection, and Shoreland Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such
signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. Signs relating to goods or services not sold or rendered on the premises shall be
prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and
shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
- 20 -
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full permit to
be obtained from the DEP prior to construction of a project consisting of 20,000 square
feet or more of impervious area or 5 acres or more of a developed area in an urban
impaired stream watershed or most-at-risk lake watershed, or a project with 1 acre or
more of developed area in any other stream, coastal or wetland watershed. A permit-by-
rule is necessary for a project with one acre or more of disturbed area but less than 1 acre
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams)
and less than 5 acres of developed area. Furthermore, a Maine Construction General
Permit is required if the construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following:
(a) Clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet, horizontal
distance, from the normal high-water line of a water body or the upland edge of a wetland.
(b) A holding tank is not allowed for a first-time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill
extensions, to be constructed no less than one hundred (100) horizontal feet from the normal
high-water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
- 21 -
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed in
a Resource Protection or Stream Protection District, except to provide services to a permitted
use within said district, or except where the applicant demonstrates that no reasonable
alternative exists. Where allowed, such structures and facilities shall be located so as to
minimize any adverse impacts on surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of
mineral resources shall be accomplished by hand sampling, test boring, or other methods which
create minimal disturbance of less than one hundred (100) square feet of ground surface. A
permit from the Code Enforcement Officer shall be required for mineral exploration which
exceeds the above limitation. All excavations, including test pits and holes, shall be immediately
capped, filled or secured by other equally effective measures to restore disturbed areas and to
protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(3) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall be
permitted within one hundred (100) feet, horizontal distance, of the normal high-water line of
a great pond, and within seventy-five (75) feet, horizontal distance, of the normal high-water
line of any other water body, tributary stream, or the upland edge of a wetland. Extraction
operations shall not be permitted within fifty (50) feet, horizontal distance, of any property
line without written permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred (100)
cubic yards of materials are removed in any consecutive twelve (12) month period, ground
levels and grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid waste
management rules, Chapters 400-419 of the Department of Environmental Protection's
regulations may contain other applicable provisions regarding disposal of such materials.
- 22 -
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the Maine Department of Agriculture on November 1, 2001, and the
Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance,
of a great pond, or within seventy-five (75) feet horizontal distance, of other water bodies,
tributary streams, or wetlands. All manure storage areas within the shoreland zone must be
constructed or modified such that the facility produces no discharge of effluent or
contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available through the local Soil and
Water Conservation District office.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond; within seventy-five (75) feet, horizontal distance,
from other water bodies and coastal wetlands; nor within twenty-five (25) feet, horizontal
distance, of tributary streams and freshwater wetlands. Operations in existence on the
effective date of this ordinance and not in conformance with this provision may be
maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high-water line of a great pond; within seventy-five
(75) feet, horizontal distance, of other water bodies and coastal wetlands, nor; within twenty-
five (25) feet, horizontal distance, of tributary streams and freshwater wetlands. Livestock
grazing associated with ongoing farm activities, and which are not in conformance with the
above setback provisions may continue, provided that such grazing is conducted in
accordance with a Conservation Plan.
O. Timber Harvesting
After January 1, 2013, all timber harvesting standards in the shoreland zone are administered by the
State of Maine Forest Service Office.
- 23 -
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of
vegetation within the strip of land extending 75 feet, horizontal distance, inland from the
normal high-water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, and except to allow for the development
of permitted uses, within a strip of land extending one-hundred (100) feet, horizontal
distance, inland from the normal high-water line of a great pond, and seventy-five (75) feet,
horizontal distance, from any other water body, tributary stream, or the upland edge of a
wetland, a buffer strip of vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from the
outer limits of the tree or shrub crown. However, a footpath not to exceed six (6) feet in
width as measured between tree trunks and/or shrub stems is allowed provided that a
cleared line of sight to the water through the buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to a great pond, or stream
flowing to a great pond, shall be defined as maintaining a rating score of 24 or more in
each 25-foot by 50-foot rectangular (1250 square feet) area as determined by the
following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2<4 in.
1
4<8 in.
2
8<12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot
rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot contains four (4)
trees between 2 and 4 inches in diameter, two trees between 4 and 8 inches in
diameter, three trees between 8 and 12 inches in diameter, and two trees over 12
inches in diameter, the rating score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
- 24 -
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 12
points (36- 24 =12) may be removed from the plot provided that no cleared openings
are created.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by this Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not
exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three (3)
feet in height and other ground cover, including leaf litter and the forest duff layer, shall
not be cut, covered, or removed, except to provide for a footpath or other permitted uses
as described in Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
diseased, unsafe, or dead trees results in the creation of cleared openings, these openings
shall be replanted with native tree species unless existing new tree growth is present.
Section 15(P)(2) does not apply to those portions of public recreational facilities adjacent to
public swimming areas as long as cleared areas are limited to the minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of any other
water body, tributary stream, or the upland edge of a wetland, there shall be allowed on any
lot, in any ten (10) year period, selective cutting of not more than forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground level.
Tree removal in conjunction with the development of permitted uses shall be included in the
- 25 -
forty (40) percent calculation. For the purposes of these standards volume may be
considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet,
whichever is greater, including land previously cleared.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(P).
Q. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which
result in unstabilized soil conditions and which require a permit shall also require a written
soil erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project
involving land disturbance, and shall be in operation during all stages of the activity. The
amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week
from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months of
the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred
(500) square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
- 26 -
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainageways shall be designed and constructed in order
to carry water from a twenty five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
R. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts, including
severe erosion, mass soil movement, improper drainage, and water pollution, whether during or
after construction. Proposed uses requiring subsurface waste disposal, and commercial or
industrial development and other similar intensive land uses, shall require a soils report based on
an on-site investigation and be prepared by state-certified professionals. Certified persons may
include Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State
Certified Geologists and other persons who have training and experience in the recognition and
evaluation of soil properties. The report shall be based upon the analysis of the characteristics of
the soil and surrounding land and water areas, maximum ground water elevation, presence of
ledge, drainage conditions, and other pertinent data which the evaluator deems appropriate. The
soils report shall include recommendations for a proposed use to counteract soil limitations
where they exist.
S. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of the
State any pollutant that, by itself or in combination with other activities or substances, will
impair designated uses or the water classification of the water body, tributary stream or wetland..
T. Archaeological Site. Any proposed land use activity involving structural development or soil
disturbance on or adjacent to sites listed on, or eligible to be listed on the National Register of
Historic Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty (20) days
prior to action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed
annually by July 1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of
30-A M.R.S.A. section 2691, and the most recent amended version of the Zoning Ordinance,
Town of Franklin, ME
- 27 -
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of
State law, and the most recent amended version of the Ordinance for the Establishment of the
Franklin Planning Board.
B. Permits Required. After the effective date of this Ordinance no person shall, without first
obtaining a permit, engage in any activity or use of land or structure requiring a permit in the
district in which such activity or use would occur; or expand, change, or replace an existing use
or structure; or renew a discontinued nonconforming use. A person who is issued a permit
pursuant to this Ordinance shall have a copy of the permit on site while the work authorized by
the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means of
adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in Section 14.
(2) All applications shall be signed by an owner or individual who can show written evidence of
right, title or interest in the property or by an agent, representative, tenant, or contractor of
the owner with authorization from the owner to apply for a permit hereunder, certifying that
the information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure or use would
require the installation of a subsurface sewage disposal system.
(5) After-the-fact permits shall not be issued for any use, activity, or construction which violated
any section of this Ordinance at the time the use, activity or construction was begun, other
than timeliness of application.
- 28 -
D. Fees
No building, use, subdivision, or special exception permit shall be issued without payment of a
fee according to the following schedule:
(1) Applicants for building permits, change of use permits, special exception permits and/or
variances, shall submit a fee to the Code Enforcement Officer at the time of submission of
application forms. The fees shall serve as renumeration for the services of the Code
Enforcement Officer and as a source of funds for the administration of this Ordinance.
(a) Change of use permits, and permits not for a structure shall require the payment of a fee,
which shall be $30.00; said fee being apportioned $20.00 for the Code Enforcement
Officer and $10.00 for administration.
(b) Permits for structures shall require the payment of a fee, which shall be $.05 per square
foot of floor area, to be retained by the Code Enforcement Officer, plus $10.00 for
administration. For the calculation of this fee, floor area shall be considered the total
vertical footprint of the structure, not the sum of the floors.
(c) Use permits issued by the Code Enforcement Officer as described in Table 1 Land Uses
and within the Shorelands, Resource Protection, and Stream Protection Districts, shall be
$100.00; said fee apportioned $50.00 to the Code Enforcement Officer and $50.00 for
administration.
(d) Applicants for a special exception permit shall submit a fee to the Code Enforcement
Officer of $100.00, said fee being apportioned $20.00 to the Code Enforcement Officer
and $80.00 for administration.
(e) After-the-Fact Permits; applicants seeking a permit for a use, activity or construction,
which was begun prior to application, shall submit a fee equal to three (3) times the
regular fee for that permit, apportioned at the same percentages as the regular fee for that
permit.
(f) Permit extensions shall require the payment of a fee equal to fifty percent (50%)
the original permit fee; the Code Enforcement Officer shall retain said fee as
renumeration.
(2) Applicants for subdivision permits shall follow the requirements set forth in The Subdivision
Ordinance of the Town of Franklin Maine.
E. Procedure for Administering Permits. Within 30 days of the date of receiving a written
application, the Planning Board or Code Enforcement Officer, as indicated in Section 14, shall
approve, deny, or refer to the Planning Board for special exception, all such applications. The
Code Enforcement Officer shall notify the applicant in writing, on a form designed for the
purpose either that the application is a complete application, or, if the application is incomplete,
that specified additional material is needed to make the application complete. The Planning
Board or the Code Enforcement Officer, as appropriate, shall approve, approve with conditions,
or deny all permit applications in writing within 30 days of receiving a completed application.
- 29 -
However, if the Planning Board has a waiting list of applications, a decision on the application
shall occur within 30 days after the first available date on the Planning Board's agenda following
receipt of the completed application, or within 30 days of the public hearing, if the proposed use
or structure is found to be in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an
application or approve it with conditions if it makes a positive finding based on the information
presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland and coastal
waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will not adversely affect existing commercial fishing or maritime activities;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be
stated in writing. No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
F. Special Exceptions. In addition to the criteria specified in Section 16(E) above, excepting
structure setback requirements, the Planning Board may approve a permit for a single family
residential structure in a Resource Protection District provided that the applicant demonstrates
that all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
- 30 -
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the velocity zone in areas subject to tides, based on detailed flood
insurance studies and as delineated on the Federal Emergency Management Agency's
Flood Boundary and Floodway Maps and Flood Insurance Rate Maps; all buildings,
including basements, are elevated at least one foot above the 100-year flood-plain
elevation; and the development is otherwise in compliance with any applicable municipal
flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is
deemed to be 1/2 the width of the 100-year flood-plain.
(4) The total ground-floor area, including cantilevered or similar overhanging extensions, of all
principal and accessory structures is limited to a maximum of 1,500 square feet. This
limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than 75 feet, horizontal distance. In determining the greatest
practical extent, the Planning Board shall consider the depth of the lot, the slope of the land,
the potential for soil erosion, the type and amount of vegetation to be removed, the proposed
building site's elevation in regard to the flood-plain, and its proximity to moderate-value and
high-value wetlands.
G. Expiration of Permit. Permits shall expire one year from the date of issuance if a substantial start
is not made in construction or in the use of the property during that period. If a substantial start is
made within one year of the issuance of the permit, the applicant shall have one additional year to
complete the project, at which time the permit shall expire.
H. Installation of Public Utility Service. A public utility, water district, sanitary district or any
utility company of any kind may not install services to any new structure located in the shoreland
zone unless written authorization attesting to the validity and currency of all local permits
required under this or any previous Ordinance has been issued by the appropriate municipal
officials or other written arrangements have been made between the municipal officials and the
utility.
I. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis,
where it is alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on a de
novo basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code Enforcement
- 31 -
Officer in his or her review of and action on a permit application under this Ordinance.
Any order, requirement, decision or determination made, or failure to act, in the
enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in
this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited
to, lot width, structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality;
and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(I)(2)(c)(ii) above, the Board of Appeals may grant a
variance to an owner of a residential dwelling for the purpose of making that dwelling
accessible to a person with a disability who resides in or regularly uses the dwelling. The
board shall restrict any variance granted under this subsection solely to the installation of
equipment or the construction of structures necessary for access to or egress from the
dwelling by the person with the disability. The board may impose conditions on the
variance, including limiting the variance to the duration of the disability or to the time that
the person with the disability lives in the dwelling. The term "structures necessary for
access to or egress from the dwelling" shall include railing, wall or roof systems necessary
for the safety or effectiveness of the structure.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
- 32 -
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider new
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board
of Appeals shall hear and decide the matter afresh, undertaking its own independent analysis of
evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the
decision was contrary to specific provisions of the Ordinance or contrary to the facts presented
to the Planning Board. The Board of Appeals may only review the record of the proceedings
before the Planning Board. The Board Appeals shall not receive or consider any evidence
which was not presented to the Planning Board, but the Board of Appeals may receive and
consider written or oral arguments. If the Board of Appeals determines that the record of the
Planning Board proceedings are inadequate, the Board of Appeals may remand the matter to
the Planning Board for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(I)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
- 33 -
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty (30) days of its receipt of a complete written
application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within
thirty (30) days after the close of the hearing, and shall issue a written decision on
all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant and to the Department of Environmental Protection within seven (7) days
of the Board's decision. Copies of written decisions of the Board of Appeals shall
be given to the Planning Board, Code Enforcement Officer, and the municipal
officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the Board of Appeals
may take an appeal to Superior Court in accordance with State laws within forty-five (45) days
from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals
may reconsider any decision within forty-five (45) days of its prior decision. A request to the
Board to reconsider a decision must be filed within ten (10) days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must occur and
be completed within forty-five (45) days of the date of the vote on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner, petitioner,
planning board, code enforcement officer, and other parties of interest, including abuttors and
those who testified at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
J. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing the person responsible for
- 34 -
such violation, indicating the nature of the violation and ordering the action necessary to
correct it, including discontinuance of illegal use of land, buildings or structures, or work
being done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal officers and be
maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted
or denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and proceedings,
either legal or equitable, including seeking injunctions of violations and the imposition of
fines, that may be appropriate or necessary to enforce the provisions of this Ordinance in the
name of the municipality. The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such agreements shall
not allow an illegal structure or use to continue unless there is clear and convincing evidence
that the illegal structure or use was constructed or conducted as a direct result of erroneous
advice given by an authorized municipal official and there is no evidence that the owner acted
in bad faith, or unless the removal of the structure or use will result in a threat or hazard to
public health and safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per violation for
each day that the violation continues. However, in the Resource Protection District the
maximum penalty is increased to $5000 (38 M.R.S.A. section 4452).
17.
Construction of Language
A. In this Ordinance certain terms or words shall be interpreted as follows:
The word "person" includes a firm, association, organization partnership, trust
company or corporation, as well as an individual; the present "tense includes" the
future tense, the singular number includes the plural, and the plural includes the
singular; the word "shall" is mandatory, and the word "may" is permissive; the words
"used" or "occupied' include the words "intended", "designed" or "arranged to be
used or occupied", the word "building", includes the word "structure", and the word
"dwelling" includes the word "residence", the word "lot" includes the words "plot" or
- 35 -
"parcel". In case of any difference of meaning or implication between the text of this
Ordinance and any map or illustration, the text shall control.
Terms not defined shall have the customary dictionary meaning.
18.
Definitions
Accessory structure or use - a use or structure which is incidental and subordinate to the principal use
or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A
deck or similar extension of the principal structure or a garage attached to the principal structure by a
roof or a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit
or variance has been granted; or any other person or group of persons who have suffered particularized
injury as a result of the granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy
products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and green-
house products. Agriculture does not include forest management and timber harvesting activities.
Appellate hearing - A hearing which reviews the prior record.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of
bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more
than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft,
and which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Campground - Any premises established for overnight use for the purpose of temporary
camping and for which a fee is charged.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Coastal wetland - all tidal and subtidal lands; all lands with vegetation present that is tolerant of salt
water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh, bog, beach, flat
or other contiguous low land that is subject to tidal action during the highest tide level for the year in
which an activity is proposed as identified in tide tables published by the National Ocean Service.
Coastal wetlands may include portions of coastal sand dunes.
- 36 -
NOTE: All areas below the highest annual tide level are coastal wetlands. These areas may consist of
rocky ledges, sand and cobble beaches, mud flats, etc., in addition to salt marshes and salt meadows.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling
of goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
De novo hearing - A new hearing of a matter, conducted as if the original hearing had not taken
place.
Development - a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or illness;
and also includes the physical or mental condition of a person which constitutes a substantial handicap
as determined by a physician or in the case of mental handicap, by a psychiatrist or psychologist, as
well as any other health or sensory impairment which requires special education, vocational
rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such as
protection of resources from immediate destruction or loss, law enforcement, and operations to rescue
human beings, property and livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection
or supply systems; and associated storage tanks. Such systems may include towers, poles, wires,
mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and
similar accessories, but shall not include service drops or buildings which are necessary for the
furnishing of such services.
Expansion of a structure - an increase in the floor area of a structure, including all extensions such as,
but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more weeks or months to a use's operating season; or the use
of more floor area or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
- 37 -
Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved
in order to discharge the 100-year flood without cumulatively increasing the water surface elevation
by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls,
plus the horizontal area of any unenclosed portions of a structure such as porches and decks.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills and
post supports, but including basements, slabs, frostwalls, or other base consisting of concrete, block,
brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1.
Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state, the
combined surface area is in excess of 10 acres; and
2.
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not
conform to the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal or inland waters and that can
not be located away from these waters. The uses include, but are not limited to commercial and
recreational fishing and boating facilities, excluding recreational boat storage buildings, finfish and
shellfish processing, fish storage and retail and wholesale fish marketing facilities, waterfront dock
and port facilities, shipyards and boat building facilities, marinas, navigation aids, basins and
channels, retaining walls, industrial uses dependent upon water-borne transportation or requiring
large volumes of cooling or processing water that can not reasonably be located or operated at an
inland site, and uses that primarily provide general public access to coastal or inland waters.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or
increased inland body of water is completely surrounded by land held by a single owner. This
classification includes Abrams Pond, Donnell Pond, Duck Pond, Georges Pond, Great Pond, and
Little Pond.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
- 38 -
Height of a structure - the vertical distance between the mean original (prior to construction) grade at
the downhill side of the structure and the highest point of the structure, excluding chimneys, steeples,
antennas, and similar appurtenances that have no floor area.
Note: See Section 15(B)(2) for additional exemptions on structure height.
Home occupation - an occupation or profession which is customarily conducted on or in a residential
structure or property and which is 1) clearly incidental to and compatible with the residential use of
the property and surrounding residential uses; and 2) which employs no more than two (2) persons
other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot
coverage, or increase in height of a structure. Property changes or structure expansions which either
meet the dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area than
does any portion of the existing nonconforming structure. Hence, a structure may be expanded
laterally provided that the expansion extends no closer to the water body, tributary stream, or wetland
than the closest portion of the existing structure from that water body, tributary stream, or wetland.
Included in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which is
developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods,
or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for public
purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal
high-water line of a water body or upland edge of a wetland and areas beneath roads serving more
than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
- 39 -
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot lines
extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Mobile home - a structure designed as a dwelling unit and containing sleeping accommodations, a
toilet, a tub or shower bath, and kitchen facilities, including major appliances and furniture, with
plumbing and electrical connections provided for attachment to outside systems; and designed to be
transported after fabrication on its own wheels. A mobile home shall contain not less than four-
hundred fifty (450) square feet of gross floor area.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment of
this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is
located.
Non-conforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, height, or lot coverage, but which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was in
lawful existence at the time this Ordinance or subsequent amendments took effect.
Normal high-water line (non-tidal waters) - that line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with rivers and great ponds that support non-forested wetland vegetation and hydric soils
and that are at the same or lower elevation as the water level of the river or great pond during the
period of normal high-water are considered part of the river or great pond.
NOTE: Adjacent to tidal waters, setbacks are measured from the upland edge of the "coastal
wetland."
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
- 40 -
Piers, docks, wharves, bridges and other structures and uses extending over or below the normal
high-water line or within a wetland -
Temporary:
Structures which remain in or over the water for less than seven (7) months in
any period of twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or more in any
period of twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes wholly incidental or
accessory to the use of another building or use on the same premises.
Principal use - a use other than one which is wholly incidental or accessory to another use on the
same premises.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public
entity.
Recent floodplain soils - the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time activities,
and other customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a
vehicle and not as a structure, the unit must remain with its tires on the ground, and must be
registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the structure,
or 2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as
permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
- 41 -
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and
soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical
or less.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a
driveway as defined.
Salt marsh - Areas of coastal wetland (most often along coastal bays) that support salt tolerant
species, and where at average high tide during the growing season, the soil is irregularly inundated by
tidal waters. The predominant species is saltmarsh cordgrass (Spartina alterniflora). More open
areas often support widgeon grass, eelgrass, and Sago pondweed.
Salt meadow - Areas of a coastal wetland that support salt tolerant plant species bordering the
landward side of salt marshes or open coastal water, where the soil is saturated during the growing
season but which is rarely inundated by tidal water. Indigenous plant species include salt meadow
cordgrass (Spartina patens) and black rush; common threesquare occurs in fresher areas.
Service drop - any utility line extension which does not cross or run beneath any portion of a water
body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b. the extension requiring the installation of new utility poles or placement underground is less
than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary
stream, or upland edge of a wetland, to the nearest part of a structure, road, parking space or other
regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line
between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance, of
the normal high-water line of any great pond or river; within 250 feet, horizontal distance, of the
upland edge of a coastal wetland, including all areas affected by tidal action; within 250 feet of the
upland edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the
normal high-water line of a stream.
Shoreline - the normal high-water line, or upland edge of a freshwater or coastal wetland.
- 42 -
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted by the most current National Hydrology Dataset maintained by the
United States Geological Survey, to the point where the stream meets the Shoreland sone of another
water body or wetland.
Structure - anything built for the support, shelter or enclosure of persons, animals, goods or property
of any kind, together with anything constructed or erected with a fixed location on or in the ground,
exclusive of fences, and poles, wiring and other aerial equipment normally associated with service
drops as well as guying and guy anchors. The term includes structures temporarily or permanently
located, such as decks, patios, and satellite dishes.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Substantially Complete: the stage in the progress of construction or development of a structure or
use when all conditions of permit approval are in place and function as intended by the Planning
Board, and the structure or use can be legally occupied and/or operated for its declared purpose.
Subsurface sewage disposal system - any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi-municipal
sewer or waste water treatment system..
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tidal waters - all waters affected by tidal action during the highest annual tide.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of trees in the shoreland zone on a lot that has
less than two (2) acres within the shoreland zone shall not be considered timber harvesting. Such
cutting or removal of trees shall be regulated pursuant to Section 15 (P), Clearing or Removal of
Vegetation for Activities Other Than Timber Harvesting.
Tributary stream - means a channel between defined banks created by the action of surface water,
which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of
topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is
connected hydrologically with other water bodies. "Tributary stream" does not include rills or
gullies forming because of accelerated erosion in disturbed soils where the natural vegetation cover
has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and
only applies to that portion of the tributary stream located within the shoreland zone of the
receiving water body or wetland.
- 43 -
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a coastal
wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or
the highest annual tide level, including all areas affected by tidal action. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland vegetation,
but such vegetation is dominated by woody stems that are six (6) meters (approximately twenty (20)
foot) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over and
under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Velocity zone - an area of special flood hazard extending from offshore to the inland limit of the
primary frontal dune along an open coast and any other area subject to high velocity wave action
from storms or seismic sources.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water body - any great pond or stream.
Water crossing - any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
as well as maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - a freshwater or coastal wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
Yard - The area of land on a lot not occupied by the principal building.
Yard Front - The area of land between the front lot line and the nearest part of the principal
building.
Yard Side - The area of land between the side lot line and nearest part of the principal
building.
Yard Rear - The area of land between the rear lot line and the nearest part of the principal
building.
- 44 -