1
Subdivision Ordinance
Town of Freeport, Maine
August 4, 2015
Amended December 21, 2021
Amended October 3, 2023
Amended January 23, 2024
Amended June 18, 2024
Amended January 21, 2025
2
TABLE OF CONTENTS
ARTICLE 1 - PURPOSES ....................................................................................................................... 5
ARTICLE 2 - AUTHORITY AND ADMINISTRATION .................................................................... 6
2.1 AUTHORITY. ................................................................................................................................. 6
2.2 ADMINISTRATION & APPLICABILITY. ........................................................................................... 6
2.3 AMENDMENTS. ............................................................................................................................. 6
2.4 REPEAL OF PRIOR ORDINANCE. .................................................................................................... 6
ARTICLE 3 - DEFINITIONS ................................................................................................................. 7
3.1 MEANING OF WORDS.................................................................................................................... 7
3.2 DEFINITIONS. ................................................................................................................................ 7
ARTICLE 4 - ADMINISTRATIVE PROCEDURES ......................................................................... 14
4.1 ADMINISTRATIVE PROCEDURES.................................................................................................. 14
4.2 DEVELOPMENT REVIEW FEE....................................................................................................... 14
ARTICLE 5 - PREAPPLICATION PROCEDURES {AMENDED 06/06/17} .................................. 15
5.1 PURPOSE. ...................................................................................................................................... 15
5.2 PROCEDURE. ................................................................................................................................. 15
5.3 PREAPPLICATION CONFERENCE, AND STAFF SITE VISIT. .............................................................. 15
5.4 SUBMISSION OF COMBINED SITE INVENTORY MAP, SITE ANALYSIS AND CONCEPTUAL SKETCH
PLAN. ......................................................................................................................................... 15
5.5 SUBMISSION COMPLETENESS........................................................................................................ 16
5.6 SITE INVENTORY, ANALYSIS AND CONCEPTUAL SKETCH PLAN PROCEDURES. ............................ 16
ARTICLE 6 - MINOR SUBDIVISIONS .............................................................................................. 18
6.1
GENERAL. .............................................................................................................................. 18
6.2
PROCEDURE. .......................................................................................................................... 18
6.3
SUBMISSIONS. ........................................................................................................................ 19
6.4
FINAL APPROVAL AND FILING. .............................................................................................. 20
ARTICLE 7 - PRELIMINARY PLAN FOR MAJOR SUBDIVISION ............................................ 21
7.1 PROCEDURE. ............................................................................................................................... 21
7.2 SUBMISSIONS. ............................................................................................................................. 22
ARTICLE 8 - FINAL PLAN FOR MAJOR SUBDIVISION ............................................................. 24
8.1 PROCEDURE. ............................................................................................................................... 24
8.2 SUBMISSIONS. ............................................................................................................................. 26
8.3 FINAL APPROVAL AND FILING. ................................................................................................... 26
ARTICLE 9 - REVISIONS TO APPROVED PLANS........................................................................ 28
9.1 PROCEDURE. ............................................................................................................................... 28
9.2 SUBMISSIONS. ............................................................................................................................. 28
Please note: The Table of Contents will be updated as needed to reflect ordinance sections and
pages.
3
9.3 SCOPE OF REVIEW. ..................................................................................................................... 28
ARTICLE 10 - INSPECTIONS AND ENFORCEMENT .................................................................. 29
10.1
INSPECTION OF REQUIRED IMPROVEMENTS ........................................................................... 29
10.2
VIOLATIONS AND ENFORCEMENT. ......................................................................................... 31
ARTICLE 11 - APPROVAL STANDARDS ........................................................................................ 32
11.1
POLLUTION ............................................................................................................................ 32
11.2
SUFFICIENT WATER. .............................................................................................................. 33
11.3
IMPACT ON EXISTING MUNICIPAL WATER SUPPLIES. ............................................................ 35
11.4 SOIL EROSION. ........................................................................................................................... 35
11.5
TRAFFIC CONDITIONS. ........................................................................................................... 36
11.6
SEWAGE DISPOSAL. ............................................................................................................... 48
11.7
SOLID WASTE. ....................................................................................................................... 49
11.8 IMPACT ON NATURAL BEAUTY, AESTHETICS, HISTORIC SITES, WILDLIFE HABITAT, RARE
NATURAL AREAS, OR PUBLIC ACCESS TO THE SHORELINE. ........................................................ 50
11.9
CONFORMANCE WITH ZONING ORDINANCE AND OTHER LAND USE ORDINANCES. ............... 53
11.10 FINANCIAL AND TECHNICAL CAPACITY. .................................................................................. 53
11.11 IMPACT ON WATER QUALITY OR SHORELINE. .......................................................................... 54
11.12 IMPACT ON GROUND WATER QUALITY OR QUANTITY. ............................................................ 55
11.13 FLOODPLAIN MANAGEMENT. ................................................................................................... 56
11.14 IDENTIFICATION OF FRESHWATER WETLANDS. ........................................................................ 57
11.15 IDENTIFICATION OF FARMLANDS. ............................................................................................. 57
11.16 RIVERS, STREAMS, AND BROOKS. ............................................................................................ 58
11.17 STORM WATER MANAGEMENT. ............................................................................................... 58
11.18 SPAGHETTI LOTS. ..................................................................................................................... 60
11.19 PHOSPHORUS IMPACTS ON GREAT PONDS. ............................................................................... 61
11.20 IMPACTS ON ADJOINING MUNICIPALITIES. ............................................................................... 61
11.21 LAND IMPACTED BY TIMBER HARVESTING. ............................................................................. 61
ARTICLE 12 - PERFORMANCE GUARANTEES ........................................................................... 63
12.1 TYPES OF GUARANTEES. ............................................................................................................ 63
12.2 CONTENTS OF GUARANTEE. ....................................................................................................... 63
12.3 ESCROW ACCOUNT. .................................................................................................................... 63
12.4 LETTER OF CREDIT. .................................................................................................................... 63
12.5
PHASING OF DEVELOPMENT. ................................................................................................. 64
12.6
DURATION OF GUARANTEE ................................................................................................... 64
12.7
RELEASE OF GUARANTEE. ..................................................................................................... 64
12.8
DEFAULT. .............................................................................................................................. 64
12.9
IMPROVEMENTS GUARANTEED. ............................................................................................. 64
ARTICLE 13 - WAIVERS ..................................................................................................................... 65
13.1
WAIVERS OF SUBMISSION REQUIREMENTS AUTHORIZED. ..................................................... 65
13.2
WAIVERS OF STANDARDS AUTHORIZED. ............................................................................... 65
13.3
CONDITIONS. ......................................................................................................................... 65
13.4
WAIVERS TO BE SHOWN ON THE RECORDING PLAN. ............................................................. 65
ARTICLE 14 - CONDITIONS OF APPROVAL ............................................................................... 66
14.1
STANDARD CONDITION OF APPROVAL .................................................................................. 66
4
ARTICLE 15 - APPEALS ..................................................................................................................... 67
15.1
ADMINISTRATIVE APPEALS ................................................................................................... 67
15.2
APPEALS TO SUPERIOR COURT. ............................................................................................. 67
APPENDIX A .......................................................................................................................................... 68
FOUR-STEP DESIGN PROCESS ............................................................................................................. 68
APPENDIX B .......................................................................................................................................... 70
SITE INVENTORY MAP, SITE ANALYSIS AND CONCEPTUAL SKETCH PLAN SUBMISSION
REQUIREMENTS .......................................................................................................................... 70
APPENDIX C .......................................................................................................................................... 72
RECORDING PLAN REQUIREMENTS .................................................................................................... 72
APPENDIX D .......................................................................................................................................... 74
MINOR SUBDIVISION SUBMISSION REQUIREMENTS ............................................................................ 74
APPENDIX E .......................................................................................................................................... 77
ADDITIONAL INFORMATION MAY BE REQUESTED - MAJOR AND MINOR SUBDIVISIONS ................... 77
APPENDIX F .......................................................................................................................................... 79
PRELIMINARY PLAN SUBMISSION REQUIREMENTS FOR MAJOR SUBDIVISIONS .................................. 79
APPENDIX G ......................................................................................................................................... 82
COMMUNITY ASSOCIATION DOCUMENTS AND CONSERVATION OWNERSHIP AND MANAGEMENT PLAN
SUBMISSION REQUIREMENTS ...................................................................................................... 82
APPENDIX H ......................................................................................................................................... 84
THE FINAL MAJOR SUBDIVISION PLAN SUBMISSION REQUIREMENTS SHALL INCLUDE AT LEAST THE
FOLLOWING INFORMATION: ........................................................................................................ 84
APPENDIX I ........................................................................................................................................... 87
REFERENCED MANUALS AND STANDARDS ......................................................................................... 87
5
ARTICLE 1 - PURPOSES
The purposes of this subdivision ordinance are:
1.1
To provide for the expeditious, equitable, and efficient review of proposed subdivisions;
1.2 To establish standards for the application of the approval criteria of the State Subdivision
Law, found in 30-A M.R.S. §4401 et seq.;
1.3 To ensure that development in the Town of Freeport meets the goals and conforms to the
policies of the adopted Comprehensive Plan;
1.4
To ensure the comfort, convenience, safety, health, and welfare of the people of the Town
of Freeport;
1.5 To protect the environment and conserve the natural and cultural resources identified in the
adopted Comprehensive Plan as important to the community;
1.6
To promote the use of open space subdivision design to protect interconnected networks
of open space and establish substantial buffers along boundaries with existing protected
land;
1.7 To ensure that an adequate level of services and facilities are available to the residents of
new subdivisions and that lots in subdivisions can support the proposed uses and
structures;
1.8 To minimize the potential impacts from new subdivisions on neighboring properties
and on the municipality including, but not limited to Rural Management Areas, where
rural atmosphere, landscape and natural resources are at risk; and
1.9
To promote the development of an economically sound and stable community.
6
ARTICLE 2 - AUTHORITY AND ADMINISTRATION
2.1
Authority.
A.
This ordinance has been adopted and amended in accordance with the provisions
of 30-A M.R.S. §4403(2).
B.
This ordinance shall be known and may be cited as the "Subdivision Ordinance of
the Town of Freeport, Maine."
2.2
Administration & Applicability.
A.
The Project Review Board of the Town of Freeport, hereinafter called the Board,
shall administer this ordinance.
B.
The provisions of this ordinance shall apply to all land and buildings proposed for
subdivision within the boundaries of the Town of Freeport except for subdivisions
that are exempt from review pursuant to 30-A M.R.S. § 4402(6).
2.3
Amendments.
A.
This ordinance may be amended by vote of the Town Council of the Town of
Freeport upon a public hearing held and a recommendation made by the Planning
Board.
B.
The Planning Board shall hold a public hearing prior to the adoption of any
amendments to this ordinance. Notice of the public hearing shall be provided at
least seven days in advance of the hearing.
2.4
Repeal of Prior Ordinance.
Upon adoption of this Ordinance, any prior Subdivision Ordinance (including any
amendments) is repealed.
7
ARTICLE 3 - DEFINITIONS
3.1 Meaning of Words.
Words and terms used in this ordinance shall have the meanings set forth in Section 3.2 below.
Words and terms which are not defined in Section 3.2 but are defined in the Zoning Ordinance
shall have the meanings set forth in the Zoning Ordinance. Words and terms which are not defined
in either Section 3.2 or in the Zoning Ordinance shall have their customary dictionary meanings.
Where the definitions set forth in Section 3.2 of this ordinance include regulations, restrictions,
limitations, prohibitions, criteria, or standards, the definitions constitute enforceable requirements
of this ordinance.
3.2 Definitions.
Accessory Dwelling Unit (ADU): See Section 104 of the Zoning Ordinance.
Affordable Housing Development: See Section 104 of the Zoning Ordinance.
Applicant: The person or entity with sufficient right, title, or interest to submit an application for a
subdivision approval under this Ordinance.
Average Daily Traffic (ADT): The average number of vehicles per day that enter or exit the
premises or travel over a specific section of road.
Average Lot Area: average lot area shall be calculated by adding up the area of all of the lots
within a subdivision and dividing by the number of lots. Open spaces and rights-of-ways
shall not be included in this calculation.
Base Flood - See Section 104 of the Zoning Ordinance.
Buffer Area: A part of a property or an entire property, which is not built upon and is specifically
intended to separate and thus minimize the effects of a land-use activity (e.g., noise, dust,
visibility, glare, etc.) on adjacent areas.
Capital Improvements Program (CIP): The municipality's proposed schedule of future projects
listed in order of construction priority, together with cost estimates and the anticipated
means of financing each project.
Capital Investment Plan: The portion of the Comprehensive Plan that identifies the projects for
consideration for inclusion within the capital improvements program, together with an
estimate of the order of magnitude for the cost of each project.
8
Comparable Sewer System: See Section 104 of the Zoning Ordinance.
Complete Application: An application shall be considered complete upon submission of the required
fee and all information required by these regulations, or by a vote of the Project Review
Board to waive the submission of required information. The Town Planner shall issue a
written statement to the applicant upon the determination that an application is complete.
Comprehensive Plan: The Town of Freeport Comprehensive Plan, as such may be amended from
time to time.
Conceptual Sketch Plan: A plan showing the major features of the site and the preliminary,
generalized layout of proposed required open space, roads, lots, locations of suitable septic
sites if applicable, and other improvements. This plan shall be prepared by a landscape
architect or a professional engineer with expertise in civil/site engineering. Engineering
details of any proposed improvements are not required and will not be accepted for review
or consideration at this stage.
Conservation Area - Primary (Unbuildable land): See Section 104 of the Zoning Ordinance.
Conservation Area - Secondary: See Section 104 of the Zoning Ordinance.
Conservation Easement: A nonpossessory interest in real property imposing limitations or
affirmative obligations on a piece of land as defined by 33 M.R.S. §476 as amended from
time to time.
Conservation Land: The portion of required open space to be set aside as part of an open space
subdivision, expanded open space subdivision, village open space subdivision or
commercial open space subdivision. For open space subdivisions, fifty percent (50%) of
the net residential acreage shall be conservation land. For expanded open space
subdivisions, sixty- five percent (65%) of the net residential acreage shall be conservation
land. For village open space subdivisions, thirty percent (30%) of the net residential
acreage shall be conservation land. For commercial open space subdivisions, twenty
percent (20%) of net residential acreage shall be conservation land. {Amended, effective
09/03/19}
Dead-end Road - A road with a single common ingress and egress that connects with another major
or minor road. For the purposes of measuring the length of a dead-end road, it is the
longest continuous route of travel.
a. Required turnarounds such as cul-de-sacs and hammerheads are not included in the
length if there are no driveway or road connections;
b. If a dead-end road has a "Y", "T" or other configuration, the length is measured by
adding all of the different segments of road for the longest continuous length of road;
c. If a road in a development has more than one entrance, with a dead-end road coming
off of that road, the length of the dead-end road is from the point where the dead-end
connects to the road with more than one entrance. {Amended 06/06/17}
Density: The number of dwelling units per acre of land.
9
Developed Area: Any area on which a site improvement or change is made, including buildings,
landscaping, parking areas, and streets.
Disturbed Area: All land areas that are stripped, graded, grubbed, filled or excavated at any time
during the site preparation for, or construction of, a project. Cutting of trees, without
grubbing, stump removal, disturbance, or exposure of soil is not considered Disturbed
Area. Disturbed Area does not include routine maintenance but does include
redevelopment and new Impervious Areas. "Routine maintenance" is maintenance
performed to maintain the original line and grade, hydraulic capacity, and original purpose
of the facility. Paving impervious gravel surfaces provided that an applicant or permittee
can prove the original line and grade and hydraulic capacity shall be maintained and
original purpose of the gravel surface remains the same is considered routine maintenance.
Replacement of a building is not considered routine maintenance of the building and is
therefore considered Disturbed Area.
Driveway: A vehicular accessway serving two (2) dwelling units or fewer.
Engineered Subsurface Wastewater Disposal System: A subsurface wastewater disposal system
designed, installed, and operated as a single unit to treat and dispose of two thousand
(2,000) gallons of wastewater or more per day or any system designed to be capable of
treating wastewater with higher BOD (Biochemical Oxygen Demand) and total suspended
solids concentrations than domestic wastewater.
Farmland: A parcel consisting of five (5) or more acres of land that is:
(a) classified as prime farmland, unique farmland or farmland of statewide or local
importance by the Natural Resources Conservation Service within the United States
Department of Agriculture; or
(b) used for the production of agricultural products as defined in 7 M.R.S. § 152(2)
Forested Wetland: A freshwater wetland dominated by woody vegetation that is six (6) meters
(approximately twenty (20) feet) tall or taller.
Freeport Village Design Standards: See Section 104 of the Zoning Ordinance.
Freeport Village Overlay District (FVOD): The Freeport Village Overlay District as adopted and
shown on Addendum 1 of the Freeport Zoning Ordinance, "Freeport Village Overlay
District."
Freshwater Wetland:
"Freshwater wetland" means freshwater swamps, marshes, bogs and similar areas which
are:
A. Inundated or saturated by surface or ground water at a frequency and for a
duration sufficient to support, and which under normal circumstances do
support, a prevalence of wetland vegetation typically adapted for life in
saturated soils; and
B. Not considered part of a great pond, coastal wetland, river, stream or brook.
Frontage-Shore: See Section 104 of the Zoning Ordinance.
Frontage-Road: See Section 104 of the Zoning Ordinance.
10
High Intensity Soil Survey: A map prepared by a professional consultant, such as a Licensed Soil
Scientist, Professional Engineer, Licensed Geologist, or a Licensed Site Evaluator,
identifying the soil types down to 1/8 acre at a scale equivalent to the subdivision plan
submitted according to the "Guidelines for Maine Certified Soil Scientists for Soil
Identification and Mapping", (Maine Association of Professional Soil Scientists, March
2009). The map shall show the location of all test pits used to identify the soils, and shall
be accompanied by a log of each sample point identifying the textural classification and
the depth to seasonal high-water table or bedrock at that location. Single soil test pits and
their evaluation for suitability for subsurface wastewater disposal systems shall not be
considered to constitute high intensity soil surveys.
Impervious Surfaces: See Section 104 of the Zoning Ordinance.
Initiate Construction: The completion of a portion of the improvements which represents no less
than thirty (30) percent of the costs of the proposed improvements within an approved
subdivision. For the purposes of this ordinance, improvements shall mean roads,
sidewalks, utilities, stormwater facilities, and erosion control measures. If the subdivision
is to consist of individual lots to be sold or leased by the subdivider, the cost of construction
of buildings on those lots shall not be included.
Level of Service: A description of the operating conditions a driver will experience while traveling
on a particular street or highway calculated in accordance with the provisions of the
Highway Capacity Manual, published by the National Academy of Sciences, Engineering,
and Medicine, 2022., There are six (6) levels of service ranging from Level of Service A,
with free traffic flow and no delays, to Level of Service F, with forced flow and congestion
resulting in complete failure of the roadway.
Medium Intensity Soil Survey: A map identifying the soil types down to mapping units of three
(3) acres at a scale equivalent to the subdivision plan submitted. The soils shall be
identified in accordance with the National Cooperative Soil Survey.
Multifamily Development: A subdivision that contains three (3) or more dwelling units on land in
common ownership, such as apartment buildings, condominiums, Affordable Housing
Developments, or mobile home parks.
Net Residential Acreage: See Section 104 of the Zoning Ordinance.
Net Residential Density: See Section 104 of the Zoning Ordinance.
Normal high-water line (non-tidal waters): That line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in
11
vegetation, and which distinguishes between predominantly aquatic and predominantly
terrestrial land.
Potable: See Section 104 of the Zoning Ordinance.
Project Review Board: The Project Review Board of the Town of Freeport, which serves as the
Municipal Reviewing Authority for purposes of 30-A M.R.S.§ 4403(1).
Preliminary Plan: The preliminary drawings showing the proposed layout of the subdivision to be
submitted to the Project Review Board for its consideration.
Professional Engineer: A professional engineer, registered in the State of Maine.
Public Water System: "Centrally Managed Water System," as defined in Section 104 of the Zoning
Ordinance.
Record Drawings: Scaled detailed drawings or plans of the completed or encountered existing
infrastructure within a public right-of-way or easement. The plans shall be prepared and
organized in a form that is consistent with the design plans submitted for Project Review
Board review during the subdivision approval process or engineering review by the
Town's Peer Review Engineer. The plans shall be drawn and noted with field
measurements, i.e., three-way ties, made by the contractor installing the infrastructure.
The plans shall note the infrastructure materials, widths, diameters, elevations, service
connection locations at the main and the right-of-way line, ledge profile, permanent
reference benchmark, and other appropriate data necessary to show the completed or
encountered existing infrastructure. The record drawing plan set shall include a copy of
the signed plat.
Recording Plan: An original of the final plan, suitable for recording at the Cumberland County
Registry of Deeds, that shows only information relevant to the transfer of an interest in the
property including property lines with dimensions, easements, wetlands, and the location
of test pits, as well as documentation of any waivers, conditions of approval, or other
pertinent notes. The recording plan shall not show other information presented on the
subdivision plans such as topography, grading, sewer and water line locations and sizes,
culverts, and building lines.
Required Open Space: The sum of the land area of conservation land and unbuildable land (primary
conservation areas) as defined in net residential acreage. This land is within a subdivision
with uses as permitted in Sec. 504A, Sec. 504.B and 504.D of the Zoning Ordinance and
which is permanently restricted from future development. Subsurface wastewater disposal
systems, or individual wells serving units within an open space or expanded open space
subdivision may be located within the required open space if approved by the Project
Review Board. {Amended, effective 09/03/19}
12
Sight Distance: The length of an unobstructed view from a particular access point to the farthest
visible point of reference on a roadway. Sight distances shall be measured from the driver's
seat of a vehicle standing on that portion of the exit with the front of the vehicle a minimum
of ten (10) feet behind the curb line or edge of shoulder, with the height of the eye three
and one-half (3.5) feet, to the top of an object four and one-quarter (4.25) feet above the
pavement.
Site Inventory Map, Site Analysis and Conceptual Sketch Plan: Inventory maps, renderings, and
supporting data describing the site proposed to be subdivided and analyzing the
opportunities and constraints for open space preservation, subdivision, and development.
The inventory and analysis are submitted for initial review prior to submitting a formal
application for subdivision approval.
Stormwater Best Management Practices (BMP's): Methods, techniques, designs, practices, and
other means to control the quality and quantity of stormwater that are approved by the
Maine Department of Environmental Protection. Stormwater BMP's are identified in
"Maine Stormwater Management Design Manual" which is published periodically by the
Maine Department of Environmental Protection, dated 2016, or most recent version.
Story: That portion of a building included between the upper surface of a floor and the upper
surface of the floor or roof next above. A story is measured as the vertical distance from
top to top of two successive tiers of beams or finished floor surfaces and, for the topmost
story, from the top of the floor finish to the top of the ceiling joists or, where there is not
a ceiling, to the top of the roof rafters. {Amended, effective 09/03/19}
Street: For the purposes of this Ordinance and for determining minimum road frontage requirements,
a street is considered to be any public way maintained by public authority, except a limited
access highway, or a private right-of-way fifty (50) feet in width, or a private road shown
on a recordable plan, approved by the Project Review Board. Approval of a subdivision
containing a private road or minimum road frontage requirements shall in no way be
construed to imply acceptance by the Town of Freeport for purposes of public
maintenance, improvements, or other Town services.
Subdivision: As defined by 30-A M.R.S. §4401 (4), , except that a lot of forty (40) acres or more
shall be counted as a lot.
Subdivision - Commercial Open Space: a higher-density residential development in a Commercial
Districts that permits higher density residential units with reduced road frontage, setbacks
and lot sizes, and that maintains open space. The area of the required open space shall be
equal or exceed the sum of the unbuildable land (primary conservation areas) as defined
by net residential acreage plus twenty percent (20%) of the net residential acreage. The
required open space must meet the standards of Section 504.D of Chapter 21, Freeport
Zoning Ordinance. {Amended, effective 09/03/19}
Subdivision - Open Space: A residential development design that permits reduced lot sizes, road
frontage, and setbacks, and that maintains required open space. The area of the required
open space shall equal or exceed the sum of the unbuildable land (primary conservation
areas) as defined by net residential acreage plus fifty percent (50%) of the net residential
acreage.
13
Subdivision - Expanded Open Space: A residential development design that permits reduced lots
sizes, road frontage, and setbacks, and that maintains required open space. The area
of the required open space shall equal or exceed the sum of the unbuildable land (primary
conservation areas) as defined by net residential acreage plus sixty-five percent (65%) of
the net residential acreage.
Subdivision - Large Lot: A residential development design that requires lot sizes be at least double
the minimum lot size of the district in which the subdivision is located. The net residential
density of a large lot subdivision shall be fifty percent (50%) less than an open space
subdivision. A note on the plan and a deed restriction forbidding further subdivision of
these lots unless the appropriate density requirement for a large lot subdivision can be met
must be provided.
Subdivision - Village Open Space: A residential development design that permits reduced lot
sizes, road frontage, and setbacks, and that maintains open space within the Freeport
Village Overlay District. The area of the required village open space shall equal or
exceed the sum of the unbuildable land (primary conservation areas) as defined by net
residential acreage plus thirty percent (30%) of the net residential acreage. The required
village open space may be met with either land, a fee in lieu of land, or a combination of
both land and a fee in lieu of land as further described in Section 504B of this Ordinance.
Subdivision, Major: Any subdivision containing eleven (11) or more lots or sixteen (16) or more
units that are connected to the public water and sewer system, or six (6) or more lots or
dwelling units that are not connected to the public water and sewer system.
Subdivision, Minor: Any subdivision containing ten (10) or fewer lots or fifteen (15) or fewer units
that are connected to the public water and sewer system, or five (5) or fewer lots or
dwelling units for lots or units that are not connected to the public water and sewer system.
Town's Peer Review Engineer: Any registered professional engineer hired or retained by the Town,
either as staff or on a consulting basis.
Town Planner: The staff person responsible for the direction of the Planning Department, their
designee, or other person designated by the Town Manager to be responsible for
development review.
Tract or Parcel of Land: As defined by 30-A M.R.S. §4401, as such may be amended from time to
time.
Zoning Ordinance: The Zoning Ordinance of the Town of Freeport, Maine, as such may be amended
from time to time.
14
ARTICLE 4 - ADMINISTRATIVE PROCEDURES
4.1
Administrative Procedures.
To establish an orderly, equitable, and expeditious procedure for reviewing subdivisions and to
avoid unnecessary delays in processing applications for subdivision review, the Project Review
Board shall adopt procedures governing the handling of application submissions including the
establishment of a submittal deadline for being placed upon the Board's agenda. The Town
Planner shall prepare a written agenda for each regularly scheduled meeting. The agenda shall
be prepared in advance of the meeting, distributed to the Board members and any applicants
appearing on the agenda, and posted at the municipal offices. Except for good cause shown and
as otherwise permitted by law, the Board shall take no action on any application not appearing
on the Board's written agenda.
4.2
Development Review Fee.
The Town may use contracted staff such as the Town's Peer Review Engineer or Town Attorney
or outside consultants to review those aspects of a subdivision proposal that are outside of the
expertise of Town staff. The cost of this outside review shall be borne by the applicant. To cover
the cost of this outside review, an applicant shall deposit a development review fee with the
Planning Department at the time of the submission of a minor subdivision application or at the
time of the submission of the preliminary application and the final application for a major
subdivision. The Town shall use this fee to pay for outside review services. The Planning
Department shall maintain a project account for each subdivision showing the amounts of the
deposits and the charges incurred for review of the subdivision proposal. The initial deposit shall
be the full estimated cost for the review by all consultants. If the project account is drawn down
to twenty-five percent (25%) or less of the amount originally deposited, the Planning Department
shall notify the applicant that they must replenish it to the twenty-five percent (25%) amount.
The Department shall continue to notify the applicant and require the additional deposits
whenever the balance of the account is drawn down by twenty-five percent (25%) or less of the
amount originally deposited. Any balance in the account remaining after a decision on the final
plan application by the Board, shall be returned to the applicant. Payment of this fee may only
be waived by the Freeport Town Council upon good cause shown. The development review fee
is a cost of review is not contingent on plan approval.
15
ARTICLE 5 - PREAPPLICATION PROCEDURES {Amended 06/06/17}
5.1 Purpose.
The purpose of the preapplication process is for the applicant to present general information
regarding the proposed subdivision to the Town staff and Board and receive the staff's and
Board's preliminary comments prior to the expenditure of substantial sums of money on
surveying and engineering by the applicant.
5.2 Procedure.
The preapplication phase consists of the following four activities:
A.
A preapplication conference
B.
Staff site inspection (optional)
C.
The submission and review by the Board of a Site Inventory Map and Site Analysis and
Conceptual Sketch Plan
D.
The classification of the project as a Minor or Major Subdivision
5.3 Preapplication Conference, and Staff Site Visit.
All applicants for subdivision review shall schedule a preapplication conference with the
Town Planner prior to scheduling a meeting with the Project Review Board. The purpose of
this activity is to familiarize the applicant with the Town's procedures and requirements and
the Four-Step Design Process (see Appendix A), and to familiarize the Town staff with the
nature of the project.
As part of the meeting, the Town representative(s) and the applicant may schedule a visit the
proposed site. At this meeting, the applicant shall be prepared to discuss their plans for the
development in a general nature.
Such conference or site visit shall not cause the project to be a pending application or
proceeding under 1 M.R.S. §302. No decisions relative to the project, other than the
determination of the required contour interval, shall be made at this conference or site visit.
5.4 Submission of combined Site Inventory Map, Site Analysis and Conceptual Sketch
Plan.
After the preapplication conference, the applicant shall submit a combined Site Inventory Map,
Site Analysis and Conceptual Sketch Plan to the Town Planner.
16
5.5 Submission Completeness.
Upon receipt of the combined Site Inventory Map, Site Analysis and Conceptual Sketch
Plan, the Town Planner shall give the applicant a dated receipt. Within ten (10) days of the
receipt of a combined Site Inventory Map, Site Analysis and Conceptual Sketch Plan, the
Town Planner shall review the material and determine whether the submission is complete.
If the submission is determined to be incomplete, the Planner shall notify the applicant in
writing of this finding, shall specify the additional material required to make the submission
complete, and shall advise the applicant that the application will not be considered by the
Board until the additional information is submitted. These steps shall be repeated until the
application is found to be complete. Appeals shall lie from the decision of the Town Planner
to the Freeport Project Review Board. When the submission is determined to be complete,
the Town Planner shall place the item on the agenda for review by the Project Review
Board, and distribute copies of the submission to the Town's Peer Review Engineer, Codes
Enforcement Officer, Director of Public Works, Police Chief, and Fire Rescue Chief.
5.6 Site Inventory, Analysis and Conceptual Sketch Plan Procedures.
The site inventory and analysis phase is intended to provide the applicant, the Project
Review Board, and the staff with a better understanding of the site and the opportunities
and constraints imposed on its use by both the natural and built environments. It is
anticipated that this analysis will result in a subdivision plan that reflects the conditions of
the site; those areas most suitable for conservation and open space will be preserved to the
maximum extent possible; and those areas most suitable for the proposed use will be
utilized. Therefore, the submission requirements provide that the applicant submit basic
information about the site.
The combined Site Inventory Map, Site Analysis and Conceptual Sketch Plan and a fully
executed and signed copy of the Planning Department application (on form provided by the
Town) along with the appropriate application and abutter fees shall be submitted to the
Town Planner. The submission must contain, at a minimum, the required information
included in Appendix B. Upon request by the applicant, Project Review Board may either
waive, in whole or in part, the requirement to submit the combined Site Inventory Map,
Site Analysis and Conceptual Sketch Plan for the proposed revision of previously approved
plans or for Minor Subdivisions upon a finding that the information is not necessary due
to the scale of the project and the absence of any significant natural resources or
development constraints on the site. Requests for waivers from a submission requirement
must be submitted in writing by the applicant. Unless waived by the Board, this review
must be completed prior to the preparation and submission of a subdivision application and
supporting documentation. The Board shall review the combined Site Inventory Map, Site
Analysis, and Conceptual Sketch Plan with the applicant and shall authorize the submission
of the formal application when the site analysis phase is complete.
Upon receipt of a complete sketch plan application, the Town Planner shall notify all
property owners within five hundred (500) feet of the property to be subdivided of the
pending application and the date, time, and place of the meeting at which the Project Review
Board will review the Site Inventory Map, Site Analysis and Conceptual Sketch Plan.
17
The Town Planner shall prepare a vertical aerial photograph enlarged to a scale not less
detailed than 1 inch = 400 feet, to show the relationship of the proposed subdivision to
adjacent properties. The aerial photograph shall include property boundaries in the area,
locations and names of existing streets, boundaries and designations of zoning districts,
public land, and land known to be protected under conservation easements and/or owned
by a land and/or conservation trust.
Within forty-five (45) days of the first Project Review Board meeting at which the combined
Site Inventory Map, Site Analysis and Conceptual Sketch Planapplication is discussed or
within another time limit as may be otherwise mutually agreed to by the Board and the
applicant, the Board shall determine whether the appropriate areas have been determined
identified for development and for conservation or open space.
The Project Review Board may schedule an on-site inspection of the site to review the
existing conditions, field verify the information submitted, and investigate the development
proposal. If a review is pending during a period when there is snow cover, the deadline by
which the Project Review Board shall take action on the completion of the review of the
combined Site Inventory Map, Site Analysis and Conceptual Sketch Plan may be extended,
however, such extension shall not exceed thirty (30) days after the Board is able to conduct
an on-site inspection.
The Board may review the submission to determine if the information submitted provides
a clear understanding of the site and identifies opportunities and constraints that help
determine how it should be used, areas that are appropriate for conservation areas, and areas
that are appropriate for development. The Board shall also consider any input received
from the staff. The outcome of the review process shall be the identification by the Board
of the issues and constraints that must be addressed in the formal subdivision application
and the classification by the Board of the project as a Major or Minor Subdivision (which
classification may later be revised if the scope of the project changes). The Board shall also
act on any requests for waivers at this time, except that the Board may postpone action on
a request for a waiver if the Board has determined that additional information is needed.
Review of the Site Inventory Map, Site Analysis and Conceptual Sketch Plan shall be
considered complete upon a finding by the Project Review Board that the appropriate areas
have been determined for development and for conservation or open space.
18
ARTICLE 6 - MINOR SUBDIVISIONS
6.1 General.
An application for a Minor Subdivision shall be reviewed in accordance with the following
procedures. In addition, the Project Review Board may require that a Minor Subdivision comply
with some or all of the submission requirements for a Major Subdivision when the Project Review
Board finds that additional information is necessary to decide if the criteria for approval in 30-
A M.R.S. §4404, or the standards of Article 11 of this ordinance have been met.
6.2 Procedure.
A.
After the Project Review Board has completed its review of the Site Inventory Map and
Site Analysis and Conceptual Sketch Plan, the applicant shall submit subdivision plans
and supporting documentation, as outlined in Appendix D of this Ordinance to the
Planning Department. Failure to submit the application within six (6) months may require
resubmission of the combined Site Inventory Map, Site Analysis and Conceptual Sketch
Plan to the Board. The final plan shall reflect the opportunities and constraints identified
in the combined Site Inventory Map, Site Analysis and Conceptual Sketch Plan and
address any issues identified by the Project Review Board in the site inventory and analysis
and conceptual plan phase.
B.
Upon receipt of an application, the Planning Department shall issue the applicant a dated
receipt for the application.
C.
Within ten (10) days of the receipt of the submission, the Town Planner shall determine
whether the submission is complete. If the submission is not complete, the Town Planner
shall notify the applicant of the specific additional material needed to complete the
submission and that the submission will not be considered by the Board until the additional
information is provided. Appeals shall lie from the decision of the Town Planner to the
Freeport Project Review Board.
D.
When the submission is determined to be complete, the Town Planner shall:
1.
Schedule a public hearing for the next available scheduled meeting of the Project
Review Board for which the appropriate and timely notification can be given, but in no
event more than thirty (30) days after the submission is deemed complete. Prior to the
hearing, the Board shall publish a notice of the date, time, and place of the hearing in a
newspaper of general circulation in the municipality at least two (2) times. The date of
the first publication shall be at least seven (7) days prior to the hearing. A copy of the
notice shall besent to the applicant.
2.
Distribute the application to the Town's Peer Review Engineer, Codes Enforcement
Officer, Director of Public Works, Police Chief, and Fire Rescue Chief for their review
and comments.
19
3.
Notify all owners of property within five hundred (500) feet of the proposed subdivision
in writing that an application for subdivision approval has been submitted, specifying
the location of the proposed subdivision including a general description of the project,
and advising the abutters of the date, time, and location of the public hearing at which
the application will be considered by the Board. Property owners within five hundred
(500) feet of the property shall be notified in writing of all subsequent Project Review
Board meetings at which the application is reviewed.
4.
Notify the Town Clerk and the municipal reviewing authority of the neighboring
municipality if any portion of the subdivision abuts or crosses the municipal boundary.
In such case, meetings and hearings to review the application shall be held in accordance
with 30-A M.R.S. §4403(1-A).
E.
The applicant, or their duly authorized representative, shall attend the meetings and
hearings of the Board to present the minor subdivision plan. Failure to attend the
meeting to present the final plan shall result in a delay of the Board's consideration of
the plan until the next meeting that the applicant attends.
F.
Within thirty (30) days from the public hearing or within another time limit as may be
otherwise mutually agreed to by the Board and the applicant, the Board shall make
findings of fact and conclusions of law relative to the criteria contained in 30-A
M.R.S. §4404 and the standards of Article 11. If the Board finds that all the criteria
of the Statute and the standards of Article 11 have been met, the Board shall approve
the minor subdivision plan. If the Board finds that any of the criteria of the statute or
the standards of Article 11 have not been met, the Board shall either deny the
application or approve the application with conditions to ensure all of the criteria and
standards will be met by the subdivision and to ensure that the public's health, safety,
and general welfare is protected and preserved. The Board shall issue a written notice
of its decision to the applicant, including findings, conclusions, and any reasons for
denial or conditions of approval.
6.3 Submissions.
The application for a Minor Subdivision shall consist of the following items:
A.
The required development review fees.
B.
The Final Subdivision Plan, two (2) full-size plan sets (at 24 by 36 inches in size) and
one (1) 11" x 17" copy containing the information outlined in Appendix D, Recording
Plan (See Appendix C), and supporting documentation consisting of one or more maps
or drawings drawn to a scale of not more detailed than 1 inch = 100 feet and supporting
documentation bound in a single report shall be submitted for final review.
Prior to the meeting at which action on the plan is anticipated to be taken, the applicant
shall submit two (2) full-sized (at 24 by 36 inches in size) rolled paper copies of the
recording plan, one to be recorded at the Cumberland County Registry of Deeds, the
other to be filed at the municipal office. The rolled paper copies shall be embossed
and printed with the seal of the individual responsible for preparation of the plan.
20
6.4 Final Approval and Filing.
A.
No plan shall be approved by the Board if the applicant(s) or any other entity in which
the applicant(s) or the principals or controlling shareholders of the applicant have a
substantial interest is in violation of the provisions of a previously approved plan
within the municipality.
B.
Upon findings of fact and determination that all standards in 30-A M.R.S. §4404, and
in this Ordinance have been met, and upon voting to approve the subdivision, the
Board shall sign the recording plan. One copy of the signed recording plan shall be
retained by the Board as part of its permanent records. Any subdivision plan not
recorded in the Cumberland County Registry of Deeds within ninety (90) days of the
date upon which the plan is signed by the Board shall become null and void.
C.
[RESERVED]
D.
No changes, erasures, modifications, or revisions shall be made in any final plan after
approval has been given by the Board and endorsed in writing on the plan, unless the
revised final plan is first submitted and the Board approves any modifications, except
in accordance with Article 10. The Board shall make findings that the revised plan
meets the criteria of 30-A M.R.S. §4404, and the standards of these regulations. In
the event that a Plan is recorded without complying with this requirement, it shall be
considered null and void, and the Board shall institute proceedings to have the plan
stricken from the records of the Cumberland County Registry of Deeds. All recording
plans must comply with 30-A M.R.S. §4406.
E.
The approval by the Board of a subdivision plan shall not be deemed to constitute or
be evidence of any acceptance by the municipality of any street, easement, or other
open space shown on such plan. When a park, playground, or other recreation area
shall have been shown on the plan to be dedicated to the municipality, approval of the
plan shall not constitute an acceptance by the municipality of such areas. The Board
shall require the plan to contain appropriate notes to this effect. The Board may also
require the filing of a written agreement between the applicant and the municipal
officers covering future deed and title dedication, and provision for the cost of
grading, development, equipment, and maintenance of any such dedicated area.
F.
Failure to initiate construction of the subdivision within two (2) years of the date of
approval shall render the plan null and void unless the applicant has requested in
writing and received an extension and has provided for the continuation of any
performance guarantees for the period of the extension prior to the expiration of the
two (2) year period. Upon determining that a subdivision's approval has expired
under this paragraph, the Board shall have a notice placed in the Cumberland County
Registry of Deeds to that effect.
21
ARTICLE 7 - PRELIMINARY PLAN FOR MAJOR SUBDIVISION
7.1
Procedure.
A.
After the Project Review Board has completed its review of the Site Inventory Map and
Site Analysis and Conceptual Sketch Plan, the applicant shall submit an application for
approval of the preliminary plan for a Major Subdivision to the Planning Department.
Failure to submit an application within six (6) months after the Project Review Board has
completed its review of the Site Inventory Map and Site Analysis and Conceptual Sketch
Plan, or a substantial change to the plan such as a major relocation of a road(s) or lots or
the previously unforeseen need for a waiver may require re-submission of the Site Inventory
Map and Site Analysis and Conceptual Sketch Plan to the Board. The preliminary plan
shall reflect the opportunities and constraints identified in the Site Inventory and Analysis
and address any issues identified by the Project Review Board in the site inventory and
analysis phase.
B.
Within ten (10) days of the receipt of the preliminary plan submission, the Town Planner
shall determine whether the submission is complete. If the submission is not complete, the
Town Planner shall notify the applicant of the specific additional material needed to
complete the submission and that the submission will not be considered by the Board until
the additional information is provided. Appeals shall lie from the decision of the Town
Planner to the Freeport Project Review Board.
C.
When the submission is determined to be complete, the Town Planner shall:
1.
Schedule a public hearing for the next regularly scheduled meeting of the Project
Review Board for which the appropriate notification can be given. The Board shall
publish a notice of the date, time, and place of the hearing in a newspaper of general
circulation in the municipality at least two (2) times. The date of the first publication
shall be at least seven (7) days prior to the hearing. A copy of the notice shall be
sent to the applicant.
2.
Distribute the application to theTown's Peer Review Engineer, Codes Enforcement
Officer, Director of Public Works, Police Chief, and Fire Rescue Chief for their
review and comment.
3.
Property owners within five hundred (500) feet of the proposed subdivision shall be
notified in writing of all Project Review Board meetings at which the application is
reviewed.
4.
Notify the Town Clerk and the municipal reviewing authority of the neighboring
municipality if any portion of the subdivision abuts or crosses the municipal
boundary.
D.
The applicant, or their duly authorized representative, shall attend the meetings of the Board
to present the preliminary plan. Failure to attend the meeting to present the plan
22
shall result in a delay of the Board's consideration of the plan until the next meeting which
the applicant attends.
E.
Within thirty (30) days from the public hearing or within another time limit as may be
otherwise mutually agreed to by the Board and the applicant, the Board shall make findings
of fact on the application, and approve, approve with conditions, or deny the preliminary
plan application. The Board shall specify in writing its findings of facts and reasons for
any conditions or denial.
F.
When granting approval of a preliminary plan, the Board shall state the conditions of such
approval, if any, with respect to:
1.
The specific changes which it will require in the final plan;
2.
The preservation of conservation areas;
3.
The character and extent of the required improvements for which waivers may have
been requested and which the Board finds may be waived without jeopardy to the
public health, safety, and general welfare; and
4.
The construction items for which cost estimates will be required as prerequisite to
the approval of the final plan.
G.
Approval of a preliminary plan shall not constitute approval of the final plan or intent to
approve the final plan, but rather it shall be deemed an expression of approval of the design
of the preliminary plan as a guide to the preparation of the final plan. The final plan shall
be submitted for approval by the Board upon fulfillment of the requirements of these
regulations and the conditions of preliminary approval, if any. Prior to the approval of the
final plan, the Board may require that additional information be submitted and changes in
the plan be made as a result of further study of the proposed subdivision or as a result of
new information received.
7.2
Submissions.
The preliminary plan application shall consist of the following items:
A.
The required development review fees.
B. Two (2) full-size copies (at 24 by 36 inches in size) and one (1) 11" x 17" copy of the Site
Inventory Map and Site Analysis and Conceptual Sketch Plan reflecting if any new or
updated information developed since the inventory and analysis phase.
C. Two (2) Two (2) full-size copies (at 24 by 36 inches in size) and one (1) 11" x 17" copy of
the 24" x 36" copies and one (1) 11' x 17' copy of a Preliminary Plan and supporting
documentation as listed in Appendix F, and also Appendix E if required by the Project Review
Board:
23
The Board may require that information as listed in Appendix E be submitted where
necessary to determine whether the preliminary plan is likely to result in a final plan that
meets the criteria of 30-A M.R.S. §4404 and Article 11.
D.If the proposal includes any commonly owned open space or other land, facilities, or
improvements (such as roads) that are proposed to be owned in common by the residents of the
subdivision, or if the proposal is for an Affordable Housing Development, one (1) copy of draft
Community Association Documents and a Conservation Ownership and Management Plan
which include the information listed in Appendix G. The Project Review Board may find that
additional information is necessary due to unusual or special circumstances.
24
ARTICLE 8 - FINAL PLAN FOR MAJOR SUBDIVISION
8.1
Procedure.
A.
Within six (6) months after the approval of the preliminary plan, the applicant shall submit
a submission for approval of the final plan to the Planning Department. If the submission
for the final plan is not submitted within six (6) months after preliminary plan approval, the
Board may require re-submission of the preliminary plan, except as stipulated below. The
final plan shall approximate the layout shown on the preliminary plan and shall incorporate
any changes required by the Board.
If an applicant cannot submit the final plan within six (6) months, the applicant may request
an extension. Such a request for an extension to the filing deadline shall be submitted, in
writing, to the Town Planner prior to the expiration of the filing period. In considering the
request for an extension, the Board shall make findings that the applicant has made due
progress in preparation of the final plan and in pursuing approval of the plans before other
agencies, and that municipal ordinances or regulations which may impact on the proposed
development have not been amended.
B.
Prior to submittal of the final plan submission, the following approvals shall be obtained in
writing, where applicable:
1. Maine Department of Environmental Protection (MeDEP), under a) the Site Location of
Development Act, or b) Natural Resources Protection Act, or other permits as may be
required by the MeDEP.
2. Maine Department of Transportation, if a highway access or traffic movement permit is
required.
3. Maine Department of Health and Human Services, if the applicant proposes to provide a
community water system.
4. Maine Water Company, if the applicant proposes to use either of the public water systems.
5. Freeport Sewer District if the applicant proposes to use the public sewer system.
6. Maine Department of Health and Human Services, or other qualified professional, if an
engineered subsurface wastewater disposal system(s) is to be utilized.
7. U.S. Army Corps of Engineers, if a permit under Section 404 of the Clean Water Act is
required.
8. Maine Historic Preservation Commission that the property does not include any historic,
prehistoric, or archeological features of importance.
C.
Within ten (10) days of the receipt of the final plan submission, the Town Planner shall
determine whether the submission is complete. If the submission is not complete, the Town
25
Planner shall notify the applicant of the specific additional material needed to complete the
submission and that the submission will not be considered by the Board until the additional
information is provided.
D.
Once the Town Planner has determined that the submission is complete, the Town Planner
shall:
1.
Place the item on the agenda for the next meeting of the Project Review Board for
which the appropriate notification can be given.
2.
Distribute the application to the Town's Peer Review Engineer, Codes Enforcement
Officer, Director of Public Works, Police Chief, and Fire Rescue Chief for their
review and comment.
3.
Property owners within five hundred (500) feet of the proposed subdivision shall be
notified in writing of all Project Review Board meetings at which the application is
reviewed.
4.
Notify the Town Clerk and the municipal reviewing authority of the neighboring
municipality if any portion of the subdivision abuts or crosses the municipal
boundary.
F.
The applicant, or their duly authorized representative, shall attend the meetings of the Board
to present the final plan. Failure to attend the meeting to present the final plan shall result
in a delay of the Board's consideration of the plan until the next meeting which the applicant
attends.
G.
At the initial meeting on the final plan, the Board shall determine whether to hold a public
hearing on the final plan application.
H.
If the Board decides to hold a public hearing, it shall hold the hearing within thirty (30) days,
notify the applicant, publish a notice of the date, time and place of the hearing in a newspaper
of local circulation at least two (2) times, and notify abutters of the hearing. The date of the
first publication shall be at least seven (7) days before the hearing.
I.
Within thirty (30) days from the public hearing or, if no hearing is held, within sixty (60)
days of the Town Planner's determination that the submission is complete, or within another
time limit as may be otherwise mutually agreed to by the Board and the applicant, or at the
initial meeting for final plan review, the Board shall make findings of fact, and conclusions
of law relative to the criteria for approval contained in 30-A M.R.S. §4404 and the standards
contained in this Ordinance. If the Board finds that all the criteria of the statute and the
standards of these regulations have been met, they shall approve the final plan. If the Board
finds that any of the criteria of the statute or the standards of these regulations have not been
met, the Board shall either deny the application or approve the application with conditions
to ensure all of the standards will be met by the subdivision. The Board shall issue a written
notice of its decision to the applicant, including findings, conclusions, and any reasons for
denial or conditions of approval.
26
8.2
Submissions.
The final plan submission shall consist of the items:
A.
Outstanding development review fees.
B.
A letter of good standing from a lending institution demonstrating that the applicant
has the financial capacity, in the amount of the estimated cost of sitework,to
complete the project.
C.
Two (2) 24" x 36" copies and one (1) 11" x 17" copy of the Final Subdivision Plan
(Appendix H), Recording Plan (Appendix C) and supporting documentation
consisting of one or more maps or drawings drawn to a scale of not more detailed
than 1 inch = 100 feet and supporting documentation combined in a single report.
D.
Two (2rolled paper copies of the recording plan, one to be recorded at the
Cumberland County Registry of Deeds, the other to be filed at the municipal office.
The rolled paper copies shall be embossed and printed with the seal of the individual
responsible for preparation of the plan.
8.3
Final Approval and Filing.
A.
No plan shall be approved by the Board if the applicant(s) or any other entity in which the
applicant(s) or the principals or shareholders of the applicant have a substantial interest is
in violation of the provisions of a previously approved Subdivision or Site Plan within the
municipality.
B.
Upon findings of fact and determination that all standards in 30-A M.R.S. §4404, and these
regulations have been met, and upon voting to approve the subdivision, the Board shall sign
the final plan. One copy of the signed plan shall be retained by the Board as part of its
permanent records. Any subdivision plan not recorded in the Cumberland County Registry
of Deeds within ninety (90) days of the date upon which the plan is signed by the Board
shall become null and void.
C.
At the time the Board grants final plan approval, it may permit the Plan to be divided into
two (2) or more sections subject to any conditions the Board deems necessary in order to
ensure the orderly development of the plan.
D.
[RESERVED]
E.
No changes, erasures, modifications, or revisions shall be made in any final plan after
approval has been given by the Board and endorsed in writing on the plan, unless the revised
final plan is first submitted and the Board approves any modifications, except in accordance
with Article 10. The Board shall make findings that the revised plan meets the criteria of
30-A M.R.S. §4404, and the standards of these regulations. In the event that a plan is
recorded without complying with this requirement, it shall be considered null and void, and
the Board shall institute proceedings to have the plan stricken from the records of the
Cumberland County Registry of Deeds.
27
F.
The approval by the Board of a subdivision plan shall not be deemed to constitute or be
evidence of any acceptance by the municipality of any street, easement, or other open space
shown on such plan. When a park, playground, or other recreation area shall have been
shown on the plan to be dedicated to the municipality, approval of the plan shall not
constitute an acceptance by the municipality of such areas. The Board shall require the plan
to contain appropriate notes to this effect. The Board may also require the filing of a written
agreement between the applicant and the municipal officers covering future deed and title
dedication, and provision for the cost of grading, development, equipment, and
maintenance of any such dedicated area.
G.
Unless otherwise specified by the Project Review Board in connection with an approved
subdivision plan, failure to initiate construction of the subdivision within two (2) years of
the date of approval shall render the plan null and void unless the applicant has requested
in writing and received an extension and has provided for the continuation of any
performance guarantees for the period of the extension prior to the expiration of the two (2)
year period. A phased subdivision plan may be approved by the Board for no more than
two years per phase. Upon determining that a subdivision's approval has expired under
this paragraph, the Board shall have a notice placed in the Cumberland County Registry of
Deeds to that effect.
28
ARTICLE 9 - REVISIONS TO APPROVED PLANS
9.1 Procedure.
An application for a revision to a previously approved plan shall be submitted to the Town
Planner. The Town Planner shall review the application and determine the procedure to be used
in reviewing the application. The Town Planner shall place the application on the agenda of the
Project Review Board in accordance with the procedures of this Ordinance as appropriate. If the
revision involves only modifications of the approved plan, without the creation of additional lots
or dwelling units, the procedures for a Minor Subdivision shall be followed. If the application
involves the creation of additional lots or dwelling units, the Town Planner shall determine if the
procedures for a Minor or Major Subdivision shall be followed based upon the scale of the
amendment.
9.2
Submissions.
The applicant shall submit one (1)11" x 17" copy of the approved plan as well as two (2) full-size
set plans (24 x 36 inches in size) and one (1) 11" x 17" copy of the proposed revisions. The
application shall also include the appropriate supporting information to allow the Board to make a
determination that the proposed revisions meet the standards of this Ordinance and the criteria of
30-A M.R.S. §4404, as such may be amended from time to time. The revised plan shall indicate that
it is the revision of a previously approved and recorded plan and shall show the original name of the
subdivision and the book and page or cabinet and sheet on which the original plan is recorded at the
Cumberland County Registry of Deeds.
9.3 Scope of Review.
The Board's scope of review shall be limited to those portions of the plan which are proposed to be
changed and the impacts and effects of such changes.
29
ARTICLE 10 - INSPECTIONS AND ENFORCEMENT
10.1 Inspection of Required Improvements.
A.
Prior to the recording of the approved plan in the Cumberland County Registry of Deeds
and at least five (5) days prior to commencing construction of required improvements, the
subdivider or builder shall:
1.
Notify the Town's Peer Review Engineerin writing of the time when the developer proposes
to commence construction of such improvements, so that the Engineer can schedule a
preconstruction meeting and arrange for inspections to assure that all municipal
specifications, requirements, and conditions of approval are met during the construction of
required improvements, and to ensure the satisfactory completion of improvements and
utilities required by the Board.
2.
Deposit with the Town an inspection fee in the amount of two percent (2%) of the estimated
costs of the required improvements. If, upon satisfactory completion of construction and
cleanup, there are funds remaining, the surplus shall be refunded to the subdivider or builder
as appropriate.
B.
No construction of site improvements, including clearing and grubbing, shall be started
until a preconstruction meeting is held. The Town's Peer Review Engineershould hold the
preconstruction meeting with the applicant and their contractor to review the construction
process, conditions of approval, and procedures for inspection of any improvements. This
meeting shall include the Town's Peer Review Engineer and the Director of Public Works..
C.
The Town's Peer Review Engineer shall inspect any road construction and other
improvements at appropriate points in the construction. At a minimum, an inspection shall
be conducted at the following times:
1.
Upon completion of the clearing and grubbing
2.
Upon completion of the excavation of the roadway
3.
During the installation of drainage improvements and structures
4.
Upon installation of the road subbase
5.
Prior to the installation of any paving or other improvements
6.
During the paving of the road
7.
Upon the completion of the improvements
8.
Following loaming and seeding and cleanup
30
9.
Upon receipt of a written request for the acceptance of the road as a public street by
the Town
D.
If the road or other improvements are constructed in phases, each phase shall be inspected
separately.
At the close of each construction season, the Town shall, at the expense of the subdivider,
have the site inspected by the Town's Peer Review Engineer.
E.
If the Town's Peer Review Engineer finds upon inspection of the improvements that any of
the required improvements have not been constructed in accordance with the plans and
specifications filed by the subdivider, the Town's Peer Review Engineer shall so report in
writing to the Town Planner, Codes Enforcement Officer and the applicant/subdivider and
contractor. The Town shall take any steps necessary to ensure compliance with the
approved plans.
F.
If at any time it appears necessary or desirable to modify the required improvements before
or during the construction of the required improvements, the Town's Peer Review Engineer
is authorized to approve minor modifications due to unforeseen circumstances such as
encountering hidden outcrops of bedrock, natural springs, etc. The Town's Peer Review
Engineer shall issue any approval under this section in writing and shall transmit a copy of
the approval to the Town Planner. Revised plans documenting the changes shall be filed
with the Planning Department and endorsed by the Town Planner. For major modifications,
the applicant shall obtain approval from the Board to modify the plans in accordance with
Article 9. Major modifications requiring Project Review Board approval include, but are
not limited to, changes such as the relocation of rights-of-way, or revisions to property
boundaries.
G.
Prior to the sale of any lot, the applicant shall provide the Town Planner with a letter from
a Professional Land Surveyor, stating that all monumentation shown on the plan have been
installed in accordance with the requirements of the approved plan and 30-A M.R.S. §4406
(2).
H.
Upon completion of the construction of a public street and prior to any vote by the Town
Council to accept a proposed public way, a written certification signed by the Town's Peer
Review Engineer shall be submitted to the Town Manager certifying that the proposed
public way meets or exceeds the design and construction requirements of these regulations.
If there are any underground utilities, the servicing utility shall certify in writing that they
have been installed in a manner acceptable to the utility. The subdivider shall submit record
drawings to the Town Planner and the Town's Peer Review Engineer prior to the Town's
acceptance of any street.
I.
The applicant/subdivider shall be required to maintain all improvements, provide for
snow removal on streets and sidewalks, and pay for any street lighting until acceptance of
the improvements by the municipality or control is placed with a lot owners' association.
The subdivider shall file a performance guarantee with the Town Planner upon completion
of the public improvements in an amount and form acceptable to the Town Manager
assuring that this obligation shall be met. The performance guarantee shall remain in force
as long as the subdivider retains this maintenance responsibility.
31
10.2 Violations and Enforcement.
A.
No plan of a division of land within the municipality which would constitute a subdivision
shall be recorded in the Cumberland County Registry of Deeds until a final plan has been
approved by the Project Review Board in accordance with This Ordinance and 30-A
M.R.S. §4406 et seq.
B.
A person shall not convey, offer, or agree to convey any land in a subdivision which has
not been approved by the Board and recorded in the Cumberland County Registry of
Deeds.
C.
No person shall sell, lease, or otherwise convey any land in an approved subdivision which
is not shown on the plan as a separate lot.
D.
No public utility, water district, sanitary district, or any utility company of any kind shall
serve any lot in a subdivision for which a final plan has not been approved by the Board.
E.
Development of a subdivision without Project Review Board approval or in violation of
any terms or conditions of Project Review Board approval shall be a violation of this
Ordinance. Development includes, but is not limited to, grading or construction of roads,
grading of land or lots, or construction of buildings.
F.
Violations of any provisions of this Ordinance shall be punished in accordance with the
provisions of 30-A M.R.S. §4452, and as otherwise provided by law.
G.
This Ordinance shall be enforced by the Town of Freeport Codes Enforcement Officer in
the same manner as the Zoning Ordinance. Appeals shall lie from the decision of the
Codes Enforcement Officer to the Board of Appeals and from the Board of Appeals to the
Superior Court according to the provisions of the Maine revised statutes.
32
ARTICLE 11 - APPROVAL STANDARDS
The State Subdivision Law establishes criteria to be used in reviewing applications for the approval of
a subdivision. 30-A M.R.S. §4404 provides that the Project Review Board shall consider these criteria
in the review of a subdivision and find that the proposal meets these criteria. The performance standards
in this article are intended to clarify and expand upon the criteria for approval found within the
subdivision statute. In reviewing a proposed subdivision, the Board shall review the application for
conformance with the State standards and the following performance standards and make findings that
each standard has been met prior to the approval of a final plan. Compliance with the design guidelines
of this section shall be considered to be evidence of meeting the appropriate performance standards.
Proposed subdivisions not in compliance with the design guidelines may be considered, but the
applicant shall provide clear and convincing evidence that the proposed design will meet the statutory
criteria for approval, and the performance standards. In all instances, the burden of proof shall be upon
the applicant to present adequate information to indicate the statutory criteria for approval and
performance standards have been or will be met.
11.1 Pollution.
A.
State Standard
Pollution. The proposed subdivision will not result in undue water or air pollution. In making
the determination, the Board shall at least consider:
1.
The elevation of the land above sea level and its relation to the flood plains;
2.
The nature of soils and subsoils and their ability to adequately support waste disposal;
3.
The slope of the land an its effect on effluents;
4.
The availability of streams for disposal of effluents; and
5.
The applicable state and local health and water resources rules and regulations.
B.
Performance Standards
1.
The proposed subdivision shall not discharge wastewater to a water body without a
license from the Maine Department of Environmental Protection.
2.
Discharges of stormwater shall be treated to remove oil, grease, and sediment prior to
discharge into surface water bodies.
33
11.2 Sufficient Water.
A.
State Standard
Sufficient water. The proposed subdivision has sufficient water available for the reasonably
foreseeable needs of the subdivision.
B.
Performance Standards
1. Water Supply.
a.
When practical, any Major or Minor Subdivision shall make provisions for connection
to the public water system if the Maine Water Company or South Freeport Water District
indicates that it can provide water service.
b.
When a subdivision will be served by the public water system, the complete supply
system within the subdivision, including fire hydrants, shall be installed at the expense
of the applicant. The size and location of mains, gate valves, hydrants, and service
connections shall be reviewed and approved in writing by the servicing water utility and
the Fire Rescue Chief. The system shall be designed by a professional engineer
registered in the State of Maine.
c.
When a proposed subdivision will not be served by the public water system, water supply
shall be from individual wells or a private community water system.
1)
Individual wells shall be sited and constructed to prevent infiltration of
surface water and contamination from subsurface wastewater disposal
systems and other sources of potential contamination.
2)
Lot design shall permit placement of wells, subsurface wastewater disposal
areas, and where required, reserve sites for subsurface wastewater disposal
areas in compliance with the Maine Subsurface Wastewater Disposal Rules
(10-144 CMR 241) effective 2023, the Well Drillers and Pump Installers
Rules (144 CMR 232), effective 1994, amended 2012, and the Chapter 11,
Building Code Ordinance for the Town of Freeport, Maine.
3)
If a central water supply system is provided by the applicant, the location and
protection of the source and the design, construction, and operation of the
system shall conform to the standards of the State of Maine Rules Relating to
Drinking Water (10-144A C.M.R. 231), effective 2016.
4)
In areas where the Project Review Board determines, based upon the written
recommendation of the Fire Rescue Chief or their designee, that a reliable
water supply for fire fighting purposes is not available within one-half mile
of the site, the subdivider shall be responsible for providing adequate fire
protection water supply. Subdivisions shall provide adequate fire protection
water supply in accordance with the National Fire Protection Association
(NFPA) Fire Code 1- 2018 Edition and Chapter 13, "Fire Prevention Code
for the Town of Freeport, Maine" Acceptable methods include, but are not
34
limited to, fire ponds with an approved dry hydrant, other water sources with
an approved dry hydrant, participation in the town's plans to reclaim existing
fire ponds, or approved residential sprinkler systems in each principal
building. An easement shall be granted to the Town for access to and
maintenance of dry hydrants or reservoirs where necessary.
5)
The construction of water lines shall include the construction of laterals to the
property line of each lot created.
6)
Open space subdivisions may place independent water supply systems in the
open space.
2.
Water Quality.
Water supplies shall meet the primary drinking water standards contained in the Maine
Rules Relating to Drinking Water. If existing water quality contains contaminants in
excess of the secondary drinking water standards in the Maine Rules Relating to
Drinking Water, that fact shall be disclosed in a note on the plan to be recorded in the
Cumberland County Registry of Deeds.
C.
Design Guidelines
1.
Well Construction.
a.
Dug wells shall not be constructed within one hundred (100) feet of the edge of the
pavement of any street, if located downhill from the street, or within fifty (50) feet of
the edge of the pavement of any street, if located uphill of the street. This restriction
shall be included as a note on the plan and included in deed restrictions for the affected
lots.
b.
Within one (1) year of the date of purchase, each lot owner shall be guaranteed by the
subdivider access to a supply of potable water of at least three hundred and fifty (350)
gallons/day, or the purchase price shall be refunded.
2.
Fire Protection.
a.
If fire hydrants connected to a public water supply system are provided, they shall be located
in accordance with the standards of the Fire Rescue Department and each location shall be
approved in writing by the Fire Rescue Chief or their designee.
b.
Where fire ponds are built for fire protection, a minimum storage capacity of ten thousand
(10,000) gallons plus additional storage of two thousand (2,000) gallons
per lot or principal building or such other amount as required by the Fire Rescue Chief shall
be provided. The Project Review Board may approve an alternate storage capacity based on
the fire flow calculation of NFPA 1231 and as approved by the Fire Rescue Chief. Where
fire ponds are proposed for water storage, the capacity of the pond shall be calculated based
on the lowest projected water level less an equivalent of three (3) feet of ice. A detailed plan
of the required pond, dry hydrant, piping, and/or access road shall be submitted as part of
35
the application. The Town's Peer Review Engineer and Fire Rescue Chief shall approve the
design of all storage facilities.
c.
Hydrants or other provisions for fire protection water supply shall meet the specifications of
the Fire Department and the National Fire Protection Association (NFPA) Fire Code 1- 2018
Edition . The design of hydrants shall be approved by the Fire Rescue Chief or their
designee. The minimum pipe size connecting dry hydrants to ponds or underground storage
shall be eight (8) inches.
d.
Where a dry hydrant or other water source is not within the right-of-way of a proposed or
existing public street, an easement shall be provided to the Town for access to, maintenance,
and use of the dry hydrant or reservoir. A suitable accessway to the hydrant or other water
source shall be constructed by the applicant. It shall be built to standards approved by the
Town's Peer Review Engineer and the Fire Rescue Chief. Once the hydrant is constructed
and the easement accepted by the Town, the Town shall be responsible for the maintenance
of the accessway and hydrant.
e.
The applicant shall be responsible for the maintenance of the fire protection water supply
for a period of one (1) year following its installation and shall be responsible for any
improvements determined to be necessary by the Fire-Rescue Chief during this period to
provide the required storage capacity and flows.
f.
Individual sprinkler systems shall meet the specifications of the Fire Department and NFPA
1231.
11.3 Impact on Existing Municipal Water Supplies.
A.
State Standard
Municipal water supply. The proposed subdivision will not cause an unreasonable burden on
an existing water supply, if one is to be used.
B.
Performance Standards
A proposed subdivision shall not generate a demand on the source, treatment facilities, or
distribution system of the Maine Water Company or the South Freeport Water District beyond
the capacity of those system components, considering improvements that are planned to be in
place prior to occupancy of the subdivision. The applicant shall be responsible for paying the
costs of improvements to the supplier's system as necessary to alleviate any deficiencies or
expand the capacity of the system needed to service the subdivision.
11.4 Soil Erosion.
A.
State Standard
36
Erosion. The proposed subdivision will not cause unreasonable soil erosion or a reduction in the
land's capacity to hold water so that a dangerous or unhealthy condition results.
B. Performance Standards
1.
The proposed subdivision shall prevent soil erosion from entering water bodies, wetlands,
and adjacent properties.
2.
The procedures outlined in the erosion and sedimentation control plan shall be implemented
during the site preparation, construction, and clean-up stages.
3.
Topsoil shall be considered part of the subdivision and shall not be removed from the site
except for surplus topsoil from roads, parking areas, and building excavations unless the
removal has received site plan approval in accordance with the extraction provisions of the
Zoning Ordinance.
11.5 Traffic Conditions.
A.
State Standards
Traffic. The proposed subdivision will not cause unreasonable highway or public road congestion
or unsafe conditions with respect to the use of the highways or public roads existing or proposed
and, if the proposed subdivision requires driveways or entrances onto a state or state aid highway
located outside the urban compact area of an urban compact municipality as defined by 23 M.R.S.
§ 754, the Department of Transportation has provided documentation indicating that the driveways
or entrances conform with 23 M.R.S. § 704 and any rules adopted under that statute.
B.
Performance Standards
1.
At a minimum, provision shall be made for vehicular access to the subdivision and
circulation within the subdivision in such a manner as to:
a.
Safeguard against hazards to traffic and pedestrians on existing streets and within the
subdivision;
b.
Avoid traffic congestion on any street; and
c.
Provide safe and convenient circulation on adjacent public streets and within the
subdivision.
2.
More specifically, access and circulation shall also conform to the following standards:
a.
The street providing access to the subdivision and neighboring streets and the first
intersection(s), or an intersection within two thousand (2,000) feet of the street
providing access to the subdivision, whichever is less, which can be expected to
carry traffic generated by the subdivision shall have the capacity or be suitably
37
improved to accommodate that traffic and avoid unreasonable congestion.
Intersections on major access routes to the site which are functioning at a Level of
Service C (see definition) or better prior to the development will function at a
minimum of Level of Service C after development. If any intersection is functioning
at a Level of Service D or lower prior to the development, the project will not reduce
the current level of service. (See Freeport Comprehensive Transportation Study
2005, for a levels of service at major intersections)
The Project Review Board may approve a subdivision not meeting this requirement if
the applicant demonstrates that:
1)
A public agency has committed funds to construct improvements
necessary to bring or maintain the level of service at this standard,
or
2)
The applicant will assume the financial responsibility for the
improvements necessary to maintain or bring the level of service to
this standard and will assure the completion of the improvements
with a financial guarantee acceptable to the Town.
b.
All new road construction shall be subject to a Pavement Maintenance Impact fee
per Chapter 52, Town of Freeport Impact Fee Ordinance and the amount of the fee
shall be established by order of the Town Council.
c.
Where necessary to safeguard against hazards to traffic and pedestrians and/or to
avoid traffic congestion, provision shall be made for turning lanes, traffic directional
islands, frontage roads, sidewalks, bicycle ways, and traffic controls within existing
public streets consistent with accepted highway design standards.
d.
Accessways to subdivisions shall be designed to avoid queuing of entering vehicles
on any street. Left-lane storage capacity maybe provided as needed to meet
anticipated demand. A study or analysis to determine the need for a left-turn storage
lane may be done.
e.
Where site conditions allow, provision shall be made for the extension of streets to
connect with nearby streets and to provide access to adjoining lots of similar existing
or potential use. Such interconnected streets shall be designed to discourage use by
through traffic.
3.
Streets shall be named in accordance with Chapter 7Street Numbering Ordinance, as
amended from time to time. The developer shall either install street name, traffic safety,
and control signs meeting Town specifications or reimburse the Town for the costs of their
installation. Street lighting shall be installed by the developer as approved by the Board.
4.
Following street construction, the developer or contractor shall conduct a thorough clean-
up of stumps and other debris from the entire street right-of-way. If on-site disposal of the
stumps and debris is proposed, the site shall be indicated on the plan, and be suitably
covered with fill and topsoil, limed, fertilized, and seeded and identified on the record
drawings.
38
C.
Design Guidelines
1.
Standards for Public Streets.
Any street intended to be accepted as by the Town Council as a public street shall conform
to the standards of Chapter 26, Street Acceptance and Standards Ordinance of the Town of
Freeport, Maine..
2.
Standards for Private Roads.
Private roads shall conform to the following standards:
a.
Access Control.
Where a lot has frontage on two (2) or more streets, the access to the lot shall be provided
across the frontage and to the street where there is lesser potential for traffic congestion and
for hazards to traffic and pedestrians. This restriction shall appear as a note on the plan and
as a deed restriction for the affected lot.
b.
Sight Distances.
Streets and other accesses shall be located and designed in profile and grading to provide
adequate sight distance measured in each direction. Sight distances shall be measured from
the driver's seat of a vehicle standing on that portion of the exit with the front of the vehicle a
minimum of ten (10) feet behind the curb line or edge of shoulder, with the height of the eye
three and one-half (3.5) feet, to the top of an object four and one-quarter (4.25 feet) above the
pavement. A minimum sight distance of ten (10) feet for each mile per hour of the posted
speed limit shall be provided. The Project Review Board may require a more or less stringent
standard for sight distances depending on the condition of the road, the volume of traffic on a
road or other circumstances unique to the property. A more or less stringent standard may be
allowed or required only if recommended by a traffic engineer or other qualified professional.
c.
Vertical Alignment.
Accesses shall be designed to prevent surface water from draining across the intersection.
Accesses shall slope upward or downward from the gutter line at a maximum slope of three
percent (3%) for at least seventy-five (75) feet. The maximum grade over the entire length
shall not exceed ten percent (10%). Accesses shall be flat enough to prevent the dragging of
any vehicle undercarriage.
d.
Access Layout and Design.
The layout and design of the intersection of a proposed street or other access with an existing
or proposed public street shall be appropriate for the anticipated use and traffic volume. Any
access with a peak hour traffic volume of more than one hundred and fifty (150) passenger
car equivalent trips shall be designed based on a site specific traffic analysis prepared by a
traffic engineer.
39
e.
Access Location and Spacing.
1)
Minimum Corner Clearance.
Corner clearance shall be measured from the point of tangency of the corner to the point
of tangency of the access. Unsignalized intersections shall provide fifty (50) feet of
corner clearance; signalized intersections shall provide one hundred and fifty (150) feet
of corner clearance.
2)
Access Spacing.
Accesses and street intersections shall be separated from adjacent accesses; streets, by at
least one hundred (100) feet from other residential access and street intersections, and
two hundred (200) feet from other commercial accesses and intersections. All access
and street intersections shall be at least ten (10) feet from a property line.
f.
Number of Accesses.
The maximum number of accesses shall conform to Section 512 of the Zoning Ordinance.
g.
Curb Requirements.
All accesses entering a curbed street shall be curbed with materials matching the street curbing
to a point recommended by the Town's Peer Review Engineer. Sloped curbing is required
around all raised channelization islands or medians.
h.
Street Design and Construction Standards.
1) Where the applicant proposes improvements within existing public streets, the proposed
design and construction details shall be approved in writing by the Town's Peer Review
Engineer or the Maine Department of Transportation, as appropriate.
2) The following notes shall appear on the recorded plan:
(a) "The Town of Freeport shall not be responsible for the maintenance, repair, plowing, or
similar services for the private road(s) shown on this plan."
(b) "Any private road shown on this plan shall not be accepted as a public street by the
Town of Freeport unless the way complies with the standards for public streets
included in Chapter 26, Street Acceptance and Standards Ordinance of the Town of
Freeport, Maine.
i.
Street Design Standards.
1)
These design guidelines shall control the roadway, shoulders, curbs, sidewalks, drainage
systems, culverts, and other appurtenances associated with the private road, and shall be
met unless the applicant can provide clear and convincing evidence that an alternate
design is good engineering practice and will meet the performance standards of Article
11.5 of this Ordinance.
40
2)
Reserve strips controlling access to streets shall be prohibited except where their control
is placed with the municipality.
3)
Adjacent to areas zoned and designed for commercial use, or where a change of zoning
to a zone which permits commercial uses is contemplated by the municipality, the street
right-of-way and/or pavement width shall be increased on each side by one-half of the
amount necessary to bring the road into conformance with the standards for commercial
streets in these regulations.
4)
Where a subdivision borders an existing narrow street (not meeting the right-of-way
width requirements of the standards for streets in these regulations), or when the
Comprehensive Plan indicates plans for realignment or widening of a road that would
require use of some of the land in the subdivision, the plan shall indicate reserved areas
for widening or realigning the road marked "Reserved for Road Realignment (Widening)
Purposes." Land reserved for such purposes may not be included in computing lot area
or setback requirements of the Zoning Ordinance. When such widening or realignment
is included in the Capital Investment Plan, the reserve area shall not be included in any
lot.
5)
Any subdivision except Commercial Open Space Subdivisions, containing more than
fifteen (15) dwelling units or lots, whichever is less, shall have at least two (2) street
connections with existing public streets, streets shown on an Official Map, or streets on
an approved subdivision plan for which performance guarantees have been filed and
accepted. In Village Open Space Subdivisions this section may be met by reserving
right-of-way for future connections and offering the right-of-way to the town for
acceptance as a public way. {Amended, effective 09/03/19}
6)
To the extent possible, the centerline of the roadway shall be the centerline of the right-
of-way.
7)
Where street lengths exceed one thousand (1,000) feet between intersections with other
streets, the Project Review Board may require a utility/pedestrian easement, at least
twenty (20) feet in width, to provide for underground utility crossings and/or a pedestrian
pathway of at least five (5) feet in width, constructed in accordance with design standards
in this section. Maintenance obligations of the easement shall be included in the written
description of the easement.
8)
Dead-End Roads. {Amended, effective 09/03/19}
In addition to the design standards in Table 11.5-1 of this Ordinance, dead-end roads
shall be constructed to provide a cul-de-sac turnaround or other turnaround approved by
the Town's Peer Review Engineer. Where a turning circle is used, it shall meet the
following requirements for radii:
Property line:
eighty-five (85) feet
Outer edge of pavement:
seventy-five (75) feet
Inner edge of pavement:
fifty (50) feet
41
The Project Review Board may require larger radii for turning circles on a commercial
street. The island in the circle shall be landscaped in a manner requiring low
maintenance. Where the turning circle is in a wooded area prior to development, a stand
of trees shall be maintained within the center of the circle if possible. The Board shall
require the reservation of a twenty (20) foot easement in line with the street to provide
continuation of pedestrian traffic or utilities to the next street. The Board may also
require the reservation of a fifty (50) foot easement in line with the street to provide
continuation of the road where future subdivision is possible. If a hammerhead or T-
turnaround is approved, no driveways shall enter onto the turnaround. In all subdivisions
except Commercial Open Space
Subdivisions, a dead-end road shall be limited to a maximum of fifteen (15) dwelling
units (not including corner lots that gain their access from another street). The length of
a dead-end road shall not exceed two-thousand five hundred (2,500) feet.
1. The Project Review Board may allow more than fifteen (15) lots provided the net
residential density allows the additional lots and subject to the following limitations:
(a) If the parcel is greater than eighty (80) acres of undeveloped land, three
(3) additional lots are allowed. In calculating whether a lot has more than
eighty (80) undeveloped acres, 2.5 acres shall be deducted from the total
acreage for every existing dwelling unit(s) on the property; and/or
(b) If access to trails for the general public and/or parking is provided in any
one of the following ways:
i. One (1) additional lot is allowed for every one-half mile of trail
easement over an existing trail. A trail easement shall be at least
twenty (20) feet wide and shall be in locations that avoid wetlands,
stream crossing or other environmentally sensitive areas. Any trail
easement proposed in a wetland, stream crossing or other
environmentally sensitive area shall not be included in calculating
the length of an easement to be eligible for an additional lot. To be
eligible for additional lot(s), the trail must have a tread width of at
least eighteen inches (18") and a cleared area (this includes scrub
and shrub vegetation and trees less than four inches in diameter) of
at least three feet (3') on both sides of the tread, and a cleared height
of at least eight feet (8'). Additionally, any erosion on existing trails
must be corrected including the reason for the erosion and all stream
crossings must be above the flood area and in good repair. Existing
trails not meeting these standards must be brought up to that
standard for the full length of the trail. The trail must have access
to a public road, a private road that allows the public the right to use
the road, or another well-established trail system. If new trails are
required to meet this standard, see subsection (ii) below. Before
any development is eligible for additional lot(s) under this
subsection, to have maximum input, the Project Review Board is
authorized request a recommendation from a public, private or non-
profit entity that owns conservation land in the area to determine if
the easement is in an appropriate location for a connection to
42
another trail system either existing or possible in the future, if any
improvements to the trail(s) are necessary, or if the trail easement
provides a public benefit. Any required easement must be accepted
by the Freeport Town Council or other entity that can accept
easements for public use and recorded in the Cumberland County
Registry of Deeds before any additional lots allowed pursuant to
this subsection (i) are offered for sale; and/or
ii. One (1) additional lot is allowed for every one-quarter mile of trail
that is built by the applicant as either a connection to an existing
trail system, as a relocation or reconstruction of an existing system,
or as a new system. The constructed trail must have a tread width
of at least eighteen inches (18)" and a cleared area (this includes
scrub and shrub vegetation and trees less than four inches in
diameter) of at least three feet (3') on both sides of the tread, and a
cleared height of at least eight feet (8'). A new trail must include a
trail easement that is at least twenty feet wide (20') and shall be in
locations that avoid wetlands, stream crossing or other
environmentally sensitive areas. Any trail easement proposed in a
wetland, stream crossing or other environmentally sensitive area
shall not be included in calculating the length of a trail that is
eligible for an additional lot(s). The trail must have access to a
public road, a private road that allows the public the right to use the
road, or another well-established trail system. Before any trail
system is eligible for additional lot(s), to have maximum input, the
Project Review Board is authorized request a recommendation from
a public, private or non-profit entity that own conservation land in
the area to determine if the easement is in an appropriate location
for a connection to another trail system either existing or possible
in the future, and/or if the trail easement provides a public benefit.
Any required easement must be accepted by the Freeport Town
Council or other entity that can accept easements for public use and
recorded in the Cumberland County Registry of Deeds and all trail
construction must be completed according to the plans before any
additional lots allowable pursuant to this section ii are offered for
sale. The cost of constructing the trails shall be included in the
performance guarantee for the subdivision, and/or
iii. One (1) additional lot is allowed for trail construction and trail
easement that provides access to tidal areas or other water body
regardless of length in addition to allowable lots as a result of
subsections (i) and/or (ii) above, and/or
iv. One (1) additional lot is allowed for the construction of at least three
parking spaces for a trail or trail system. The parking spaces must
meet the standards of Section 514.B.8(e) (parking areas for open
spaces) of the Zoning Ordinance. The cost of constructing the
parking spaces shall be included in the performance guarantee for
the subdivision. All parking space construction must be completed
43
according to the plan before any additional lots allowable as a result
of this subsection iv are offered for sale and/or
v. No more than four (4) additional lots may be allowed for any
subdivision because of these Sections 11.5.C.8.b.i - iv of this
Ordinance.
vi. Any trails or parking areas that are proposed for public use pursuant
to Sections 11.5.C.8.b.i-iv of this Ordinance must include a
mechanism for stewardship and maintenance.
2. The Project Review Board may allow a road longer than two-thousand and five
hundred ( 2,500) feet, but in no case any longer than three-thousand and five
hundred (3,500) feet, if:
a. The shape or configuration of the parcel makes a longer dead end
road necessary for the preservation of open space or
environmentally sensitive areas.
b. Dead-end roads longer than two-thousand and five hundred (2,500)
shall have a pavement width of twenty (20) feet with four foot
shoulders for the entire length of the road.
9) Sidewalks.
In the Freeport Village Overlay District, sidewalks shall be provided as described in the
Freeport Village Design Standards.
Sidewalks are required if connection to an existing sidewalk is feasible. The Project
Review Board may permit sidewalks on one side of the street or may waive the
requirement for sidewalks if the Board finds that there are adequate alternative provisions
for pedestrians outside of the roadway or the right-of-way or that the scale of the project
makes sidewalks unnecessary on one or both sides.
(a)
Sidewalk construction shall be in conformance with the Sidewalk Specifications
of the Freeport Policy Manual,
(b)
The Project Review Board may approve the use of alternative materials for
sidewalk construction with the approval of the Town's Peer Review Engineer. The
applicant shall be responsible for demonstrating that the alternative material is an
acceptable equivalent.
10) Bicycle lanes and Trails.
In the Freeport Village Overlay District, bicycle lanes and trails shall be
provided as described in the Freeport Village Design Standards.
44
11) Curbs shall be installed wherever needed to control stormwater drainage or vehicle
movement. The specified traveled way width shall be measured between the curbs.
Table 11.5-1 Street Design Guidelines
Description
Private Road-
dead-end
Private Road -
all others
Minimum Right-of-Way Width
50 ft.
50 ft.
Minimum Traveled Way
(Pavement) Width
18 ft.
22 ft.
Sidewalk Width*
4 ft.
5 ft.
Minimum Grade if curbing is used
1
1%
Maximum Grade**
8%
8%
Minimum Centerline Radius
190 ft.
285 ft.
- with superelevation
- without superelevation
Roadway Crown***
¼"/ft.
¼"/ft.
Minimum width of Shoulders (gravel or paved)
2'
2'
Minimum angle of street intersections****
60º
60º
Maximum grade within 75 ft. of intersection
3%
3%
Minimum curb radii at intersections
15 ft.
20 ft.
Minimum pavement radii at intersections
Design Speed - mph
20 ft.
25
30 ft.
35
*
Sidewalks required if connection to existing sidewalk is feasible.
** Maximum grade may be exceeded for a length of one-hundred (100) feet or less.
*** Roadway crown is per foot of lane width.
**** Street intersection angles shall be as close to 90° as feasible but no less than the
listed angle.
j. Street Construction Standards.
Private roads shall be constructed according to the performance standards of the Maine Department
of Transportation. The Project Review Board may waive or modify these standards with the approval
of the Town's Peer Review Engineer if it finds that the alternative will be equivalent.
45
1) The minimum thickness of material after reaching ninety-five percent (95%) of modified
Proctor maximum density shall meet the specifications in Table 11.5-2 of this Ordinance.
Table 11.5-2 Minimum Pavement Materials Thicknesses
Private Road
Private Road
dead-end
all others
Aggregate Subbase Course
12"
15"
(Max. sized stone 6")
Crushed Aggregate Base Course
3"
4"
Hot Bituminous Pavement
Total Thickness
3"
3"
Surface Course
1"
1"
(MeDOT 403.210 Superpave
Mix 3/8" [9.5mm])
Base Course
2"
2"
(MeDOT 403.207 Superpave Mix ¾" [19mm])
2)
Bases and Pavement.
(a) Bases/Subbase.
i. The Aggregate Subbase Course shall be sand or gravel of hard durable
particles free from vegetative matter, lumps, or balls of clay and other
deleterious substances. The gradation of the part that passes a three-
inch (3") square mesh sieve shall meet the grading requirements of
Table 11.5-3 of this Ordinance.
Aggregate for the subbase shall contain no particles of rock exceeding
six (6) inches in any dimension.
Table 11.5-3 Aggregate Subbase Grading Requirements
Sieve Designation
Percentage by Weight Passing
Square Mesh Sieves
1/4 inch
25-70%
46
ii. An Aggregate Base Course shall be placed on top of the
subbase course. The Aggregate Base Course shall be screened
or crushed gravel of hard durable particles free from vegetative
matter, lumps, or balls of clay and other deleterious substances.
The gradation of the part that passes a three-inch (3") square
mesh sieve shall meet the grading requirements of Table 11.5-4
of this Ordinance.
Aggregate for the base shall contain no particles of rock
exceeding two (2) inches in any dimension.
Table 11.5-4 Base Course Grading Requirements
Sieve Designation
Percentage by Weight Passing
Square Mesh Sieves
3/8 inch
45-70%
1/4 inch
30-55%
No. 50
0-20%
No. 200
0-5%
(b)
Pavement Joints.
Where pavement joins an existing pavement, the existing pavement shall be cut
along a smooth line to form a neat, even, vertical joint.
(c)
Pavements.
i. Minimum standards for the base layer of pavement shall be the Maine
Department of Transportation Specification 403.207 for Superpave mix 3/4"
(18mm). The pavement may be placed when the air temperature in the shade at the
paving location is 35°F or higher and the surface to be paved is not frozen or
unreasonably wet.
ii. Minimum standards for the surface layer of pavement shall be
the Maine Department of Transportation Specification 403.210 for Superpave mix
3/8". The pavement may be placed when the air temperature in the shade at the
paving location is 50°F or higher.
No. 40
0-30%
No. 200
0-7%
47
(d)
Gravel Surfaces.
Private ways in the Rural Residential 1 and 2 (RR 1 & 2) and the Resource Protection 2
(RP 2) Districts that are less than seven hundred (700) feet in length may have gravel
surfaces provided the road grade is less than four percent (4%), and the road doesn't cross
any streams. Surface gravel shall be placed on top of the aggregate subbase and shall have
no stones larger than two (2) inches in size and meet the grading requirements of Table
11.5-5 of this Ordinance.
Table 11.5-5 Surface Gravel Grading Requirements
Percentage by Weight Passing
Sieve Designation
Square Mesh Sieves
2 inches
95-100%
½ inches
30-65%
No. 200
7-12%
k.
Utilities.
Utilities serving subdivisions shall be installed underground. The Project Review Board may
approve overhead utilities when the applicant provides evidence that the increased costs of
underground utilities will raise the costs of the housing beyond the market in that location. When
utilities are installed underground, the subdivider shall install appropriate signs indicating the
location of such utilities.
l.
Monuments.
1)
Stone or precast reinforced concrete monuments shall be set at all street
intersections and points of curvature, but no further than seven hundred and
fifty (750) feet apart along all street lines.
2)
Stone or precast reinforced concrete monuments shall be set at all corners and
angle points of the subdivision boundaries where the interior angle of the
subdivision boundaries is one hundred and thirty-five (135) degrees or less.
3)
Stone or precast reinforced concrete monuments shall be a minimum of four
(4) inches square at the top and four (4) feet in length, and set in the ground at
final grade level. If site conditions prohibit the installation of a four (4) foot
monument, the Town's Peer Review Engineer may approve alternative
provisions for permanent monumentation. After they are set, a drill hole one-
half inch deep
shall locate the point or points described above.
4)
All other subdivision boundary corners and angle points, as well as all lot
boundary corners and angle points shall be marked by suitable
48
monumentation, as required by the Maine Board of Licensure for Professional
Land Surveyors.
11.6 Sewage Disposal.
A.
State Standard
Sewage disposal. The proposed subdivision will provide for adequate sewage waste disposal
and will not cause an unreasonable burden on municipal services if they are utilized.
B.
Performance Standards
1.
Public System.
a.
When practical, any Major or Minor Subdivision shall make provisions for
connection to the public sewer system if the Freeport Sewer District indicates that
it can provide sewer service.
b.
The Freeport Sewer District shall certify that providing service to the proposed
subdivision is within the capacity of the system's existing collection and treatment
system or improvements planned to be complete prior to the construction of the
subdivision.
c.
All components of the sanitary sewerage system must be designed by a
professional engineer registered in the State of Maine. The Sewer District shall
review and approve the construction drawings for the sewerage system. The size
and location of laterals, collectors, manholes, and pump stations shall be reviewed
and approved in writing by the District. All components of the system shall be
tested for full compliance with the design specifications and construction practices
established by the District.
d.
The construction of sewer lines shall include the construction of laterals to the
property line of each lot created.
e.
Upstream sewage flows shall be accommodated by an adequately sized system
through the proposed subdivision for existing conditions and potential
development in the upstream area or areas tributary to the proposed development.
2.
Private Systems.
a. The applicant shall submit evidence of site suitability for subsurface sewage disposal
prepared by a Maine Licensed Site Evaluator in full compliance with the
49
requirements of the State of Maine Subsurface Wastewater Disposal Rules (10-
144 CMR 241), effective 2023.
1)
The site evaluator shall certify in writing that all test pits which meet the
requirements for a new system represent an area large enough for a
disposal area on soils which meet the Disposal Rules.
2)
A second site with suitable soils shall be shown as a reserve area for future
replacement of the disposal area if the limiting factor has been identified
as being within fifteen (15) inches of the surface, and if all of the following
conditions are met: if the lot is less than one acre in size or is located in a
subdivision that has a net residential density of more than one unit per acre;
and if the lot is located outside of the existing and likely future service area
of the public water system; and if the lot includes a natural resource such
as, but not limited to, being located over a mapped sand and gravel aquifer,
or being in a shoreland area, or being within one hundred (100) horizontal
feet of a high value wetland. The reserve area shall be shown on the plan
and restricted so as not to be built upon.
3)
In no instance shall a disposal area be on a site which requires a New
System Variance from the State of Maine Subsurface Wastewater Disposal
Rules (10-144 CMR 241), effective 2023. The Board may waive this
standard only in instances where no other reasonable alternative exists. In
determining the granting of a waiver, the Board may require the applicant
to submit a list of alternatives prepared by a Licensed Site Evaluator.
b. In open space subdivisions, individual subsurface wastewater disposal systems may
be located within the required open space provided that an appropriate easement
granting the lot owner this right is created and the location and easement are
approved by the Project Review Board. In approving such easements, the Project
Review Board may require that reasonable standards be established to assure that
the natural resource value of the required open space will not be reduced.
11.7 Solid Waste.
A.
State Standard
Municipal solid waste disposal. The proposed subdivision will not cause an unreasonable
burden on the municipality's ability to dispose of solid waste, if municipal services are to be
utilized.
B.
Performance Standards
50
The Project Review Board shall require the applicant to make arrangements for the disposal of
the solid waste in accordance with Chapter 28, Solid Waste Disposal Ordinance. The alternate
arrangements shall be at a disposal facility which is in compliance with its license.
11.8 Impact on Natural Beauty, Aesthetics, Historic Sites, Wildlife Habitat, Rare Natural
Areas, or Public Access to the Shoreline.
A.
State Standard
Aesthetic, cultural, and natural values. The proposed subdivision will not have an undue
adverse effect on the scenic or natural beauty of the area, aesthetics, historic sites, significant
wildlife habitat identified by the Department of Inland Fisheries and Wildlife or the municipality,
rare and irreplaceable natural areas, or any public rights for physical or visual access to the
shoreline.
B.
Performance Standards
If the subdivision is designed as an open space subdivision or a village open space subdivision in
conformance with the provisions of the Zoning Ordinance, the plan shall provide for the
conservation of the highest value resources on the site. All subdivisions shall conform to the
following:
1.
Preservation of Natural Beauty and Aesthetics.
a.
The plan shall, by notes on the final plan and deed restrictions, limit the clearing of
trees to those areas designated on the plan.
b.
The subdivision shall be designed to minimize the visibility of buildings from
existing public roads to the extent possible.
2.
Retention of Open Spaces and Natural, Historic, or Archeological Features.
a.
If any portion of the subdivision is located within an area designated as a unique
natural area by the Comprehensive Plan, or a significant village open space
identified on the Village Open Space Map 1 or could provide a trail connection or
link to or between civic destinations or the employment destination as shown on
Village Open Space Map 2 (see Addendum 2 of the Zoning Ordinance) the plan
shall indicate appropriate measures for the preservation of the values which qualify
the site for such designation.
b.
If any portion of the subdivision is designated as a site of historic, prehistoric, or
archeological importance by the Comprehensive Plan or the Maine Historic
51
Preservation Commission, appropriate measures for the protection of the historic,
prehistoric, or archeological resources shall be included in the plan.
3.
Protection of Significant Wildlife Habitat.
If any portion of a proposed subdivision lies within areas identified and mapped by the
Maine Department of Inland Fisheries and Wildlife (MDIFW) as containing rare,
endangered, threatened, and special concerned species; designated essential and
significant wildlife habitat; or fisheries habitat concern, the applicant shall demonstrate
that there shall be minimal impacts on the habitat and species it supports. The plan shall
provide for protection of the identified resource in a manner acceptable to the MDIFWor
in accordance with the recommendations of a wildlife biologist with demonstrated
experience with the wildlife resource being impacted and approved by the Project Review
Board. In the latter situation, the report prepared by the wildlife biologist shall assess the
potential impact of the subdivision on the significant habitat and adjacent areas that are
important to the maintenance of the affected species and shall describe appropriate
mitigation measures to ensure that the subdivision will have minimal impacts on the
habitat and the species it supports. These areas include:
a.
Habitat for species appearing on the official state or federal lists of endangered or
threatened species;
b.
High and moderate value waterfowl habitats, including nesting and feeding areas;
or
c.
A high or moderate value deer wintering area or wetland.
4.
Shoreline Access.
Any existing public rights of access to the shoreline of a water body shall be maintained
by means of easements or rights-of-way, or should be included in the required open space
with provisions made for continued public access.
C.
Design Guidelines
1.
Preservation of Natural Beauty and Aesthetics.
a.
Subdivisions within the Rural Residential Districts shall maintain any existing
vegetated buffer along existing roads. The buffer may be broken only for
driveways and streets.
b.
Where practical the subdivision shall be designed to encourage locating buildings
within forested areas and to discourage locating buildings in open fields visible
from existing public roads.
2.
Retention of Natural or Historic Features.
52
Proposed subdivisions which include or are adjacent to buildings, sites, or districts on
the National Register of Historic Places or which the Comprehensive Plan has identified
as being of historical significance shall be designed in such a manner as to minimize the
impacts on the historic features. When the historic features to be protected include
buildings, the placement and the architectural design of new structures in the subdivision
shall be compatible with the historic structures. The Board shall seek the advice of the
Maine Historic Preservation Commission in reviewing such plans.
3.
Protection of Significant Wildlife Habitat and Important Habitat Areas.
The following guidelines are designed to protect the significant wildlife resources
identified in the municipality. The Board recognizes that wildlife management must take
into account many site-specific variables. Applicants proposing to subdivide land within
identified wildlife resources must consult with the Maine Department of Inland Fisheries
and Wildlife (MDIFW) or a qualified wildlife biologist and provide their written
comments to the Board. The guidelines of this section shall apply to only those
subdivisions which include significant wildlife habitat or resources identified in Section
11.8.B.3.
a.
Protection of Habitat of Endangered or Threatened Species.
1)
The habitat of species appearing on the official state or federal lists of
endangered or threatened species shall be maintained in the required open
space.
2)
Deed restrictions and notes on the plan shall reflect standards from the
MDIFW for removal of vegetation within two hundred and fifty (250) feet
of the habitat for species appearing on the list of endangered or threatened
species unless the Department of Inland Fisheries and Wildlife has
approved cutting of vegetation in writing.
b.
Protection of Waterfowl Habitat.
1)
There shall be no cutting of vegetation within the strip of land extending
seventy-five (75) feet inland from the normal high-water line of high and
moderate value waterfowl habitats, including nesting and feeding areas.
2)
This restriction shall appear as a note on the plan and as a deed restriction
to the affected lots.
c.
Protection of Deer Wintering Areas.
The report prepared by a wildlife biologist, selected or approved by the Project
Review Board, shall include a management plan for deer wintering areas.
d.
Protection of Shoreland Areas.
53
1)
All areas subject to Shoreland Zoning shall comply with the relevant
standards.
2)
These restrictions shall appear as notes on the plan and as deed restrictions
to the affected lots.
e. If the proposed subdivision includes other important wildlife habitat as identified
by the MDIFW or the Comprehensive Plan, the restrictions on activities in and
around these areas shall be reviewed by the MDIFW or a qualified wildlife
biologist, and their comments presented in writing to the Project Review Board.
11.9 Conformance with Zoning Ordinance and Other Land Use Ordinances.
A.
State Standard
Conformity with local ordinances and plans. The proposed subdivision conforms with a duly
adopted subdivision ordinance, zoning ordinance, floodplain ordinance, the comprehensive plan,
and other ordinances included in the municipal code as appropriate. In making this
determination, the municipal reviewing authority may interpret these ordinances and plans.
B.
Performance Standards
The proposed subdivision shall meet all applicable performance standards or design
criteria from this Ordinance, the Zoning Ordinance, the Floodplain Management
Ordinance, the Loitering, Curfew,Noise and Nuisance Lighting Ordinance, and all other
applicable land use regulations. If there is a conflict between the requirements of this
ordinance and any other ordinance or between the requirements of other ordinances, the
more stringent requirement shall apply. {Amended, effective 12/21/21}
C.
Design Guidelines
For lots in large lot subdivisions, and other lots greater than twice the minimum lot area,
deed restrictions and notes on the plan shall either prohibit future divisions of the lots or
specify that any future division shall constitute a revision to the plan and shall require
approval from the Project Review Board based upon the criteria of the subdivision statute
at the time of the revision, the standards of the Town's Subdivision Ordinance then in
effect, and any conditions placed on the original approval.
11.10 Financial and Technical Capacity.
A.
State Standard
54
Financial and technical capacity. The subdivider has adequate financial and technical capacity
to meet the standards of this section.
B.
Performance Standards
1.
Financial Capacity.
The applicant shall have adequate financial resources to construct the proposed
improvements and meet the criteria of the statute and the standards of these regulations.
When the applicant proposes to construct the buildings as well as the subdivision
improvements, the applicant shall have adequate financial resources to construct the total
development. In making the above determinations, the Project Review Board shall
consider the proposed time frame for construction and the effects of inflation.
2.
Technical Ability.
a.
The applicant shall retain qualified contractors and consultants to supervise,
construct, and inspect the required improvements in the proposed subdivision.
b.
In determining the applicant's technical ability, the Project Review Board shall
consider the applicant's previous experience, the experience and training of the
applicant's consultants and contractors, and the existence of violations of previous
approvals involving the applicant, consultants, contractors, or other agents of the
applicant.
11.11 Impact on Water Quality or Shoreline.
A.
State Standard
Surface waters; outstanding river segments. Whenever situated entirely or partially within the
watershed of any pond or lake or within two hundred and fifty (250) feet of any wetland, great
pond, or river as defined in 38 M.R.S. § 436-A, the proposed subdivision will not adversely affect
the quality of that body of water or unreasonably affect the shoreline of that body of water. When
lots in a subdivision have frontage on an outstanding river segment, the proposed subdivision
plan must require principal structures to have a combined lot shore frontage and setback from the
normal high-water line of five hundred (500) feet.
1.
To avoid circumventing the intent of this provision, whenever a proposed subdivision
adjoins a shoreland strip narrower than two hundred and fifty (250) feet which is not
lotted, the proposed subdivision shall be reviewed as if lot lines extended to the shore.
2.
The frontage and setback provisions of this paragraph do not apply either within areas
zoned as general development or its equivalent under shoreland zoning as defined in 38
M.R.S. § 436-A, or within areas designated by ordinance as densely developed. The
determination of which areas are densely developed must be based on a finding that
55
existing development met the definitional requirements of 30-A M.R.S. §4401(1), on
September 23, 1983.
B.
Performance Standards
The application shall demonstrate that the cutting or removal of vegetation along water bodies
will not increase water temperature, or result in shoreline erosion or sedimentation of water
bodies. It shall also demonstrate compliance with the shoreland zoning performance standards
where applicable.
C.
Design Guidelines
These restrictions shall appear as notes on the plan and as deed restrictions to the affected
lots.
11.12 Impact on Ground Water Quality or Quantity.
A.
State Standard
Ground water. The proposed subdivision will not, alone or in conjunction with existing
activities, adversely affect the quality or quantity of ground water.
B.
Performance Standards
1.
Ground Water Quality.
a.
No subdivision shall increase any contaminant concentration in the ground water
to more than one-half of the Primary Drinking Water Standards. No subdivision
shall increase any contaminant concentration in the ground water to more than the
Secondary Drinking Water Standards.
b.
If ground water contains contaminants in excess of the primary standards, and the
subdivision is to be served by on-site ground water supplies, the applicant shall
demonstrate how water quality will be improved or treated.
c.
If ground water contains contaminants in excess of the secondary standards, the
subdivision shall not cause the concentration of the parameters in question to
exceed one hundred and fifty percent (150%) of the ambient concentration.
d.
When a hydrogeologic assessment is submitted, the assessment shall contain at
least the following information:
1)
A map showing the basic soils types.
56
2)
The depth to the water table at representative points throughout the
subdivision.
3)
Drainage conditions throughout the subdivision.
4)
Data on the existing ground water quality, either from test wells in the
subdivision or from existing wells on neighboring properties.
5)
An analysis and evaluation of the effect of the subdivision on ground water
resources. In the case of residential developments, the evaluation shall, at
a minimum, include a projection of post-development nitrate-nitrogen
concentrations at any wells within the subdivision, or at the subdivision
boundaries; or at a distance of one-thousand (1,000) feet from potential
contamination sources, whichever is a shortest distance.
6)
A map showing the location of any subsurface wastewater disposal
systems and drinking water wells within the subdivision and within two
hundred (200) feet of the subdivision boundaries.
e.
Projections of ground water quality shall be based on the assumption of drought
conditions (assuming sixty percent (60%) of annual average precipitation).
f.
Subsurface wastewater disposal systems and drinking water wells shall be
constructed as shown on the map submitted with the assessment. If construction
standards for drinking water wells or other measures to reduce ground water
contamination and protect drinking water supplies are recommended in the
assessment, those standards shall be included as a note on the final plan, and as
restrictions in the deeds to the affected lots.
2.
Ground Water Quantity.
Ground water withdrawals by a proposed subdivision utilizing a community well shall
not lower the water table beyond the boundaries of the subdivision as allowed by Section
523.B Groundwater Protection of the Zoning Ordinance.
11.13 Floodplain Management.
A.
State Standard
Flood areas. Based on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps, and information presented by the applicant
whether the subdivision is in a flood-prone area. If the subdivision, or any part of it, is in such
an area, the subdivider shall determine the one hundred (100-) year flood elevation and flood
hazard boundaries within the subdivision. The proposed subdivision plan must include a
57
condition of plan approval requiring that principal structures in the subdivision will be
constructed with their lowest floor, including the basement, at least one foot above the one
hundred (100-)year flood elevation.
B.
Performance Standards
When any part of a subdivision is located in a special flood hazard area as identified by the
Federal Emergency Management Agency:
1.
All public utilities and facilities, such as sewer, gas, electrical and water systems shall be
located and constructed to minimize or eliminate flood damages.
2.
All building shall be in accordance with Chapter 16, Freeport Floodplain Management
Ordinance as amended from time to time.
3.
If restrictions are necessary, they shall be included in any deed, lease, purchase and sale
agreement, or document transferring or expressing an intent to transfer any interest in real
estate or structure, including but not limited to a time-share interest. The statement shall
clearly state that the municipality will enforce the construction requirements and that fact
shall also be included in the deed or any other document previously described.
11.14 Identification of Freshwater Wetlands.
A.
State Standard
Freshwater wetlands. All freshwater wetlands within the proposed subdivision have been
identified on any maps submitted as part of the application, regardless of the size of these
wetlands. Any mapping of freshwater wetlands may be done with the help of the local soil and
water conservation district.
B.
Performance Standards
Freshwater wetlands, including forested wetlands, shall be identified and mapped in accordance
with the 1987 Corps of Engineers Wetland Delineation Manual, published by the United States
Army Corps of Engineers.
11.15 Identification of Farmlands.
A.
State Standard
58
Farmland. All farmland within the proposed subdivision has been identified on maps submitted
as part of the application. Any mapping of farmland may be done with the help of the local soil
and water conservation district.
B.
Performance Standards
The subdivision plan shall show all farmland located within or abutting the subdivision.
11.16 Rivers, Streams, and Brooks.
A.
State Standard
River, stream or brook. Any river, stream or brook within or abutting the proposed subdivision
has been identified on any maps submitted as part of the application. For purposes of this section,
"river, stream or brook" has the same meaning as in Title 38, Section 480-B, Subsection 9.
B.
Performance Standards
The final subdivision plan shall show all rivers, streams, and brooks that are located within the
subdivision or abut the subdivision.
11.17 Storm Water Management.
A.
State Standard
Storm water. The proposed subdivision will provide for adequate storm water management.
B.
Performance Standards
1.
Adequate provision shall be made for the management of the quantity and quality of all
stormwater generated within the subdivision, and any drained ground water through a
management system using practices equivalent to those described in the Maine
Stormwater Management Design Manual, published by the Maine Department of
Environmental Protection, dated 2016, or most recent revision. In the Freeport Village
Overlay District the standards may be met on-site or off-site; where off-site facilities are
used, the applicant must submit documentation that the off-site facilities will be dedicated
to providing stormwater management for the subdivision by easement, covenant, or other
appropriate legal instrument. The stormwater management system shall be designed to
meet the following standards:
a.
Quantity.
59
1)
Peak discharge rates shall be limited to the predevelopment levels for the
two- (2-) year, ten- (10-) year, and twenty-five- (25-) year frequency,
twenty-four (24-) hour duration storm unless stormwater from the
subdivision will drain directly into the Atlantic Ocean or other large water
body approved by the Town's Peer Review Engineer as having adequate
capacity to absorb the increased runoff without adverse impacts.
2)
Stormwater management provisions shall use stormwater BMP's that
provide for the infiltration of surface runoff into the ground and that
minimize the total volume of runoff from the site.
b.
Quality.
1)
The quality of stormwater flows offsite shall be addressed. Stormwater
best management practices (BMP's) appropriate for the site and type of
activity must be used to meet the standards specified in this section.
Preference shall be given to the use of nonstructural BMP's where feasible.
Retention of the first one-half inch of runoff from a storm event for twenty-
four (24) hours may be required.
2.
Where necessary to achieve the above standards, there shall be provided easements or
drainage rights-of-way with swales, culverts, catch basins, or other means of channeling
surface water within the subdivision and over other properties. Whenever elements of
the storm drainage system are not within the right-of-way of a public street and the
facilities will not be offered to the Town for acceptance as public facilities, perpetual
easements not less than thirty (30) feet in width, conforming substantially with the lines
of existing natural drainage, shall be provided to the municipality allowing maintenance
and improvement of the system. If there are elements of the stormwater system serving
more than one lot that require future maintenance to remain effective that are located
outside of the right-of-way of a proposed public street, the Project Review Board may
require that the applicant offer to give these to the Town with a condition of approval that
the Town be permitted to assess the lot owners on a pro rata basis for the costs of the
future maintenance of these stormwater facilities. A note relative to this condition of
approval shall appear on the approved plan and an indication of the condition of approval
shall be placed in the deed of each lot subject to the condition. When an offer of dedication
is required by the Project Review Board, the applicant shall be responsible for the
maintenance of these stormwater facilities until they are accepted by the Town.
c.
In addition to any other applicable requirements of this Ordinance and the Freeport
Subdivision Ordinance, any development which would require a stormwater management
permit from the Maine Department of Environmental Protection (DEP) under 38 M.R.S.
420-D shall comply with the rules adopted by DEP under 38 M.R.S. 420-D(1), as the
same may be amended from time to time, and the applicant shall document such
compliance to the Project Review Board. Where the standards or other provisions of such
stormwater rules conflict with municipal ordinances, the stricter (more protective)
standard shall apply.
60
d.
Subdivisions requiring stormwater management facilities shall enter into a Maintenance
Agreement with the Town.
C.
Design Guidelines
1.
The design of best management practices shall be substantially equivalent to those
described in the Maine Stormwater Management Design Manual, published by the Maine
Department of Environmental Protection, dated 2016, or most recent revision.
2.
The minimum pipe size for any storm drainage pipe shall be fifteen (15) inches for
driveway entrances and eighteen (18) inches for cross culverts. The minimum pipe size
between drainage structures and at inlets and outfalls shall be fifteen (15) inches.
Maximum trench width at the pipe crown shall be the outside diameter of the pipe plus
two (2) feet. Pipe shall be bedded in a fine granular material reaching a minimum of six
(6) inches below the bottom of the pipe and extending to six (6) inches above the top of
the pipe. The material shall contain no stones larger than three (3) inches, lumps of clay,
or organic matter.
3.
Catch basins shall be installed where necessary and when located within a street shall be
located at the curb line.
4.
Storm Drainage Construction Standards.
a.
Materials.
1)
Storm drainage pipes shall conform to the requirements of Maine
Department of Transportation materials specifications Section 706 for
non-metallic pipe and Section 707 for metallic pipe. Bituminous-coated
steel pipes shall not be used.
2)
Where the storm drainage pipe is to be covered by ten (10) feet or more of
fill material, pipe material with a fifty-(50-)year life shall be used. These
materials include concrete pipe, polymer coated galvanized corrugated
steel pipe, polyvinyl-chloride (PVC) pipe, plastic polyethylene pipe, and
corrugated aluminum alloy pipe.
b.
Manholes shall be provided at all changes in vertical or horizontal alignment and
at all junctions. On straight runs, manholes shall be placed at a maximum of four
hundred (400) foot intervals.
5.
Upon completion, each catch basin or manhole shall be cleaned of all accumulation of
silt, debris, or foreign matter and shall be kept clean until final acceptance.
11.18 Spaghetti Lots.
61
A.
State Standard
Spaghetti lots prohibited. If any lots in the proposed subdivision have shore frontage on a river,
stream, brook, great pond, or coastal wetland as these features are defined in Title 38, §480-B,
none of the lots created within the subdivision have a lot depth to shore frontage ratio greater
than five (5) to one (1).
B.
Performance Standards
Any lot that has shore frontage on a river, stream, brook, or great pond as defined by 38 M.R.S.
§480-B, shall not have a lot depth to shore frontage ratio greater than five (5) to one
(1). (See definition of Frontage - Shore in Section 104. Definitions of the Zoning Ordinance)
11.19 Phosphorus Impacts on Great Ponds.
A.
State Standard
Lake phosphorus concentration. The long-term cumulative effects of the proposed subdivision
will not unreasonably increase a great pond's phosphorus concentration during the construction
phase and life of the proposed subdivision.
11.20 Impacts on Adjoining Municipalities.
A.
State Standard
Impact on adjoining municipality. For any proposed subdivision that crosses municipal
boundaries, the proposed subdivision will not cause unreasonable traffic congestion or unsafe
conditions with respect to the use of existing public ways in an adjoining municipality in which
part of the subdivision is located.
B.
Performance Standards
If the subdivision is located in two (2) or more municipalities, the applicant shall demonstrate
that the project will meet the standards of 11.5 of this Ordinance relating to traffic conditions for
all roads impacted by the subdivision regardless of in which municipality the impacted roads are
located.
11.21 Land Impacted by Timber Harvesting.
A.
State Standard
62
Lands subject to liquidation harvesting. Timber on the parcel being subdivided has not been
harvested in violation of rules adopted pursuant to Title 12 M.R.S. §8869 (14). If a violation of
rules adopted by the Maine Forest Service to substantially eliminate liquidation harvesting has
occurred, the municipal reviewing authority must determine prior to granting approval for the
subdivision that five (5) years have elapsed from the date the landowner under whose ownership
the harvest occurred acquired the parcel.
For the purposes of this subsection, "liquidation harvesting" has the same meaning as in Title 12
M.R.S. §8868 (6) and "parcel" means a contiguous area within one municipality, township or
plantation owned by one person or a group of persons in common or joint ownership. This
subsection takes effect on the effective date of rules adopted pursuant to Title 12 M.R.S. §8869
(14).
B. Performance Standards
If it appears that the land has been harvested within the past five (5) years the applicant shall
provide written documentation certified from the Maine forest service by a forester licensed
pursuant to 32 M.R.S. Chapter 76, demonstrating that a violation of 12 M.R.S. §8869 (14) has
not occurred.
63
ARTICLE 12 - PERFORMANCE GUARANTEES
12.1 Types of Guarantees.
With submittal of the application for final plan approval, the applicant shall provide one of the
following performance guarantees for an amount adequate to cover the total construction costs
of all required improvements, taking into account the time span of the construction schedule and
the inflation rate for construction costs:
A.
An escrow account funded by cash or a certified check payable to the Town of Freeport
and governed by an escrow agreement in a form reviewed by the Town Attorney and
acceptable by the Town Manager.
B.
An irrevocable letter of credit from a financial institution in a form acceptable to the Town
of Freeport.
C.
Any other performance guarantee reviewed by the Town Attorney as to form and
specifically approved by the Freeport Town Council, provided that, in the opinion of the
Town Council, such performance guarantees provides security substantially equivalent to
an escrow account or an irrevocable letter of credit.
The conditions and amount of the performance guarantee shall be determined by the
Project Review Board with the advice of the Town's Peer Review Engineer, Director of
Public Works, municipal officers, and/or Town Attorney.
12.2 Contents of Guarantee.
The performance guarantee shall be based on a construction schedule, including cost estimates
for each major phase of construction, taking into account inflation, and provisions for inspections
of each phase of construction. The performance guarantee instrument must specify a date after
which the applicant will be in default and the Town shall have access to the funds to finish
construction. The performance guarantee may, in the discretion of the Town, provide for partial
releases of the performance guarantee amount as specific portions of the required improvements
are completed.
12.3 Escrow Account.
A cash payment for the establishment of an escrow account shall be made by either a certified
check payable to the Town of Freeport or direct deposit into a bank account opened in the name
of the Town of Freeport as escrow agent. Any interest earned on the escrowed funds shall be
retained by the Town.
12.4 Letter of Credit.
An irrevocable letter of credit from a bank or other lending institution shall be in a form
acceptable to the Town of Freeport.
64
12.5 Phasing of Development.
The Board may approve plans to develop a Major Subdivision in separate and distinct phases.
This may be accomplished by limiting final approval to those lots abutting that section of the
proposed subdivision street which is covered by a performance guarantee. When development
is phased, road construction shall commence from an existing public way. Final approval of lots
in subsequent phases shall be given only upon satisfactory completion of all requirements
pertaining to previous phases.
12.6 Duration of Guarantee.
The performance guarantee shall remain in force for the entire period during which development
of the subdivision occurs (or in the case of default, while the Town pursues its remedies for
default) until the guarantee is released by the Town in accordance with 12.7. If the time frame
for constructing the improvements covered by the guarantee is extended, the performance
guarantee shall also be extended.
12.7 Release of Guarantee.
Prior to the release of any part of the performance guarantee, the Town Planner shall determine
to their satisfaction that the proposed improvements meet or exceed the design and construction
requirements for that portion or phase of the subdivision for which the release is requested. The
decision of the Town Planner shall be based upon the report of the Town's Peer Review Engineer
and any other agencies and departments who may be involved.
12.8 Default.
If, upon inspection, the Town's Peer Review Engineer finds that any of the required
improvements have not been constructed in accordance with the plans and specifications filed as
part of the application, or have not been completed within any time limit for completion
established by the Project Review Board, they shall so report in writing to the Director of Public
Works, Town Planner, Town Manager, and the applicant or builder. The Town Manager shall
take any steps necessary to preserve the Town's rights.
12.9 Improvements Guaranteed.
Performance guarantees shall be tendered for all improvements required to meet the standards of
these regulations and for the construction of the streets, monumentation, utilities, stormwater
management facilities, public sewage collection or disposal facilities, public water systems,
pedestrian and bicycle trails, landscaping in open spaces, and erosion and sedimentation control
measures, all as determined by the Project Review Board.
65
ARTICLE 13 - WAIVERS
13.1 Waivers of Submission Requirements Authorized.
Where the Project Review Board determines there are special circumstances relating to a
particular parcel proposed to be subdivided, it may waive portions of the submission
requirements, except any submission requirements as to which the Ordinance specifically
prohibits waiver. For a waiver to be granted, the applicant must demonstrate that the Project
Review Board can evaluate the proposed subdivision under the standards of 30-A M.R.S. §4404
and of this Ordinance without the information contained in the submissions for which the
applicant requests a waiver.
13.2 Waivers of Standards Authorized.
Where the Project Review Board makes written findings of fact that, due to special circumstances
of a particular parcel proposed to be subdivided, the provision of certain required improvements
is not required to provide for the public health, safety, or welfare, or is inappropriate because of
inadequate or nonexistent connecting facilities adjacent to or in proximity of the proposed
subdivision, where the Project Review Board makes written findings of fact that, due to special
circumstances of a particular parcel proposed to be subdivided, compliance with certain of the
standards of 30-A M.R.S. §4404 or of this Ordinance is not required, the Board may waive such
requirement or standard, subject to appropriate conditions, provided the waivers do not have the
effect of nullifying the intent and purpose of the Comprehensive Plan, the Zoning Ordinance, or
this Ordinance, and provided that the public health, safety, and welfare will not be compromised
by the waiver.
13.3 Conditions.
Waivers may only be granted in accordance with Sections 13.1 and 13.2. When granting waivers,
the Board may set conditions so that the purposes of these regulations are met.
13.4 Waivers to Be Shown on the Recording Plan.
When the Project Review Board grants a waiver from any of the improvements required by this
Ordinance or from any of the standards of 30-A M.R.S. §4404 or this Ordinance, the recording
plan, to be recorded at the Cumberland County Registry of Deeds, shall indicate the waivers
granted and the date on which they were granted.
66
ARTICLE 14 - CONDITIONS OF APPROVAL
14.1 Standard Condition of Approval
The following note shall appear on the recording plat of every plan:
"The property shown on this plan may be developed and used only as depicted on this
approved plan. All elements and features of the plan and all representations made by the
applicant concerning the development and use of the property which appear in the record of
the Project Review Board approval are conditions of approval. No change from the
conditions of approval is permitted unless an amended plan is submitted and approved under
the provisions of this Ordinance governing revisions to approved plans."
67
ARTICLE 15 - APPEALS
15.1 Administrative Appeals
a.
Any person who has participated in the review process before the Project Review Board
and can demonstrate particularized injury may appeal the final decision of the Project
Review Board on a subdivision application to the Board of Appeals within thirty (30)
days after the Project Review Board has issued its written decision. The appeal must be
in writing and must be accompanied by a filing fee which shall be established by the
Town
Council
b.
The Board of Appeals shall consider the appeal at a meeting held within sixty (60) days
of receipt of the written request for an appeal. The Board of Appeals shall publish the
time, date, and place of the meeting in a newspaper of area-wide circulation a minimum
of 7 days prior to the meeting. Written notice of the meeting shall be sent to all owners
of property within two hundred (200) feet from the property which is the subject of the
appeal a minimum of 10 days prior to the meeting. The meeting is a public proceeding
as defined by law.
c.
The Board of Appeals shall not conduct a de novo hearing, but shall review the record
of the proceeding before the Project Review Board in appellate capacity. If the Board
of Appeals finds the Project Review Board record to be insufficient, the Board of
Appeals may remand the matter to the Project Review Board for findings and
conclusions or for further proceedings, findings and conclusions.
d.
The Board of Appeals may allow persons to present legal argument orally or in writing,
based on the record of the proceedings before the Project Review Board. The Board of
Appeals shall not receive new evidence, including testimony or exhibits, which is not
part of the record of the proceedings before the Project Review Board.
e.
The Board of Appeals may reverse the decision of the Project Review Board, in whole
or in part, only upon a finding that the decision contains an error of law, is contrary to
the provisions of this Ordinance, or is unsupported by substantial evidence in the
record.
f.
The decision of the Board of Appeals shall be in writing and shall contain findings and
conclusions that clearly state, on all relevant factual and legal issues, the action taken by
the Board and the reasons for such action. The Board of Appeals shall adopt its written
decision within twenty one (21) days of the meeting, unless the Board makes a finding
that it is unable to do so, or unless an extension has been agreed upon amongst the
parties.
15.2 Appeals to Superior Court.
Appeals of decisions of the Board of Appeals under this Ordinance shall be to Superior Court
according to the provisions of the Maine Rule of Civil Procedure 80B.
68
APPENDIX A
Four-Step Design Process
This process is intended to allow the developer the full potential of the legally allowable number of
lots, while at the same time preserving valuable open space for the Town of Freeport. The
Ordinance requires that a landscape architect or a professional engineer experienced in Civil/site
engineering prepares a Site Analysis and Conceptual Sketch Plan on behalf of the applicant using
the process outlined below.
Step 1: Delineation of Conservation Lands (does not apply to large lot subdivisions)
A.
Calculate the net residential density of the development by determining the net
residential acreage of a tract or parcel. The net residential density formula for an open
space, expanded open space, large lot subdivision, village open space subdivision or
commercial open space subdivision is provided in the Zoning Ordinance for the zoning
district in which a tract or parcel is located. For all other subdivisions, the net residential
density is calculated by dividing the net residential acreage by the minimum lot area (or
minimum land area for Duplex and Multifamily Dwellings) in the Zoning District in
which the tract or parcel is located. {Amended, effective 09/03/19}
B.
Calculate the area of required open space (conservation land plus unbuildable land as
defined in net residential acreage) in accordance with the provisions of this ordinance
and of the Zoning Ordinance.
C.
Designate proposed location of open space(s) on the Site Analysis and Conceptual
Sketch Plan, using the Comprehensive Plan and the Open Space and Public Access Plan
(dated July 1999), identifying Primary Conservation Areas, and areas of significant
natural resource or community value. Consider Secondary Conservation Areas,
prioritizing natural and cultural resources on the tract from highest to least suitability for
inclusion in the proposed required open space. Primary conservation areas within
individual building lots should be avoided; however, the Project Review Board may
approve a lot that contains a primary conservation area if there is provision for protecting
that portion of the lot from being developed.
D.
Indicate the proposed open space using as a basis practical considerations related to the
tract's configuration, its context to resource areas on neighboring properties, the
priorities listed above for identifying open space areas, and the applicant's subdivision
objectives.
69
Step 2: Location of House Sites
Potential house sites shall be tentatively located using the proposed open space as a base, as
well as other relevant data from the Site Analysis Map, such as topography and soils. House sites
should generally be located not closer than one hundred (100) feet from Primary Conservation
Areas and fifty (50) feet from Secondary Conservation Areas, taking into consideration the
potential negative impacts of residential development on such areas, as well as the potential
positive benefits of such locations to provide attractive views and visual settings for residences.
Step 3: Alignment of Streets
Upon designating the house sites, a street plan shall be designed to provide vehicular access to
each house and bearing a logical relationship to topographic conditions. Impacts of the street
plan on proposed conservation lands shall be minimized, particularly with respect to crossing
environmentally sensitive areas such as wetlands and traversing slopes exceeding twenty percent
(20%). Street connections shall generally be encouraged to minimize the number of new cul-de-
sacs and to facilitate access to and from homes in different parts of the tract (and adjoining
parcels).
Step 4: Drawing in the Lot Lines
Upon completion of the preceding three (3) steps, lot lines shall be drawn as required to delineate
the boundaries of individual residential lots. Wherever possible, lot lines shall be perpendicular
to the street. If a lot on one side of the road fails to meet the minimum requirements for lot area,
it may not be combined with a lot on the other side of the road to meet the minimum lot area.
Applicants shall submit a plan which is the end result of this process, but may be asked by the
Project Review Board to submit four (4) separate sketch maps indicating the findings of each
step of the design process. In deciding whether it is necessary to submit separate sketch maps
for each of the steps listed above, the Board shall consider the area of the parcel or if a significant
amount of environmentally sensitive areas are on the site.
70
APPENDIX B {Amended 06/06/17}
Site Inventory Map, Site Analysis and Conceptual Sketch Plan Submission Requirements
The submission must contain, at a minimum, the following information:
A.
A completed application form (on forms provided by the Town).
B.
Two (2) full-size copies (at 24 by 36 inches in size) and one (1) 11" x 17" copy of an
accurate scale combined Site Inventory Map, Site Analysis and Conceptual Sketch Plan
of the parcel at a scale of not more detailed than 1" = 50 feet, showing as a minimum:
1.
The proposed name of the development, north arrow, date, and scale.
2.
The boundaries of the parcel based upon a standard boundary survey prepared by
a professional land surveyor and giving the bearings and distances of all property
lines.
3.
The topography of the site at a contour interval of either two (2) or five (5) feet
depending on the nature of the use and character of the site as determined by the
Town Planner.
4.
The major natural features of the site, including wetlands, vernal pools, streams,
ponds, floodplains, groundwater aquifers, significant wildlife habitats, or other
important natural features.
5.
The soils on the site through a class C medium intensity soil survey.
6.
Vegetative cover conditions on the property according to general cover type.
7.
Ridgelines and watershed boundaries.
8.
Geologic formations including rock outcrops, cliffs, etc., based upon published
data or more detailed on-site analysis.
9.
Existing buildings, structures, or other improvements on the site including streets,
driveways, stone walls, etc. (if none, so state).
10.
Locations of all historically or archaeologically significant building or sites.
11.
Existing restrictions or easements on the site (if none, so state).
12.
The location and size of existing utilities or improvements servicing the site (if
none, so state).
71
13.
Any potential sources of fire protection water supply within one-half mile of the
site including public water mains, existing fire ponds, or possible sources of water
supply.
14.
Acceptable septic system location for each lot or unit if applicable.
C.
Three (3) copies of a detailed narrative describing the existing conditions of the site, the
required open space potential of the site, the proposed development, and the constraints
and opportunities created by the site. This submission should include a narrative
description of the existing road system that will provide access to the project and any
issues related to traffic capacity, safety, sight distances, or other traffic considerations,
together with any preliminary studies done relative to the site including wetland
delineations, traffic studies, market studies, or other information that will help the Board
understand the project.
D.
The Site Inventory Map, Site Analysis and Conceptual Sketch Plan should highlight the
opportunities and constraints of the site. This plan shall be prepared by a landscape
architect or a professional engineer with expertise in civil/site engineering and should
enable the Project Review Board to determine: which areas are well suited for proposed
use and which are unsuitable; where the property is unsuitable for on-site sewage disposal
if public sewerage is not available; primary and secondary conservation areas; which
areas have potential open space value (scenic areas, aquifers, streambed corridors,
wildlife habitat, natural drainage courses, farmland, significant forest stands, and land
abutting existing public open spaces, etc.); and which areas may be subject to off-site
conflicts or concerns (noise, lighting, traffic, etc.). In addition, this plan shall show a
conceptual rendering of the layout of lots and roads in accordance with the Four-Step
Design Process described in Appendix A. For greater clarity, the Project Review Board
may request that the Site Analysis and Conceptual Sketch be presented in two (2) separate
plans.
E.
Written requests for any waivers from the Minor Subdivision or preliminary Major
Subdivision submission requirements or development standards of Article 12.
72
APPENDIX C
Recording Plan Requirements
The Recording Plan shall show only the information relevant to the transfer of an interest in the property
including:
1.
The proposed name of the subdivision or identifying title, the name of the municipality,
and the assessor's map and lot number.
2.
The names and addresses of the record owner, applicant, and individual or company who
prepared the plan, and adjoining property owners.
3.
The date the plan was prepared, north point, and graphic map scale.
4.
The zoning district in which the proposed subdivision is located and the location of any
zoning boundaries affecting the subdivision.
5.
A standard boundary survey of the parcel, giving complete descriptive data by bearings
and distances, made and certified by aprofessional land surveyor. The corners of the parcel
shall be located on the ground and marked by monuments. The plan shall indicate the type
of monument found or to be set at each lot corner.
6.
The layout of lots, existing and proposed easements, streets including the location, names,
and present widths of existing streets, and required open spaces. The plan shall contain
sufficient data to allow the location, bearing and length of every street line, lot line, and
boundary line to be readily determined and be reproduced upon the ground. These lines
shall be tied to reference points previously established.
7.
The location of wetlands and vernal pools.
8.
The location of all soil test pits including an indication of which pits are suitable for the
installation of a subsurface wastewater disposal system.
9.
Whenever a subdivision is exempt from 38 M.R.S. §§481-489-E, because of the
operation of 38 M.R.S. § 488 (5), that fact must be expressly noted on the face of the
recording plan. The developable land, as defined in 38 M.R.S. § 488 (5) must be
indicated on the plan.
10.
Any additional information required by the Cumberland County Registry of Deeds
The recording plan shall also include space for the approval of the Project Review Board including a
signature block, a record of any waivers granted from the submission requirements or approval standards,
any conditions of approval imposed by the Project Review Board, the net residential acreage calculation,
and any other pertinent notes or information. The recording plan shall not include information on
73
topography, grading, site improvements, water and sewer facilities, drainage improvements, and the like.
This information should be contained in the Subdivision Plan and related documentation.
74
APPENDIX D
Minor Subdivision Submission Requirements
The Subdivision Plan and supporting documentation shall include at least the following information:
1.
A copy of the most recently recorded deed for the parcel. A copy of all deed restrictions,
easements, rights-of-way, or other encumbrances currently affecting the property.
2.
The information shown on the recording plan.
3.
Evidence of right, title, or interest in the property.
4.
A copy of any deed restrictions intended to cover all or part of the lots or dwellings in the
subdivision.
5.
The number of acres within the proposed subdivision, location of property lines, existing
buildings, vegetative cover type, and other essential existing physical features. On
wooded sites, the plan shall indicate the area where clearing for lawns and structures shall
be permitted and/or any restrictions to be placed on clearing existing vegetation.
6.
The location of all rivers, streams, and brooks within or adjacent to the proposed
subdivision.
7.
If any portion of the subdivision is in a flood-prone area, the boundaries of any flood
hazard areas and the base flood elevation, as depicted on the municipality's Flood
Insurance Rate Map, shall be delineated on the plan.
8.
Areas within or adjacent to the proposed subdivision which have been identified as high
or moderate value wildlife habitat by the Maine Department of Inland Fisheries and
Wildlife or within the Comprehensive Plan. If any portion of the subdivision is located
within an area designated as a critical natural area by the Comprehensive Plan or the
Maine Natural Areas Program, the plan shall indicate appropriate measures for the
preservation of the values which qualify the site for such designation.
9.
Contour lines at the interval specified by the Town's Peer Review Engineer, showing
elevations in relation to mean sea level.
10.
The location and size of existing and proposed sewers, water mains, culverts, and
drainage ways on or adjacent to the property to be subdivided.
11.
An indication of the type of sewage disposal to be used in the subdivision.
a.
When sewage disposal is to be accomplished by connection to the public sewer, a
written statement from the Freeport Sewer District, stating that the District has the
capacity to collect and treat the wastewater, shall be provided.
75
b.
When sewage disposal is to be accomplished by subsurface wastewater disposal
systems, test pit analyses, prepared by a Licensed Site Evaluator, shall be provided.
A test pit log and a map at the same scale as the subdivision plan showing the
location of all test pits dug on the site shall be submitted.
12.
An indication of the type of water supply system(s) to be used in the subdivision.
a.
When water is to be supplied by public water supply, a written statement from the
Maine Water Company or the South Freeport Water District shall be submitted,
indicating that there is adequate supply and pressure for the subdivision and that the
supplier approves the plans for extensions where necessary. Where the supplier's
supply line is to be extended, a written statement from the Fire Rescue Chief, stating
approval of the location of fire hydrants, if any, and a written statement from the
supplier approving the design of the extension shall be submitted.
b.
When water is to be supplied by private wells, evidence of adequate ground water
supply and quality shall be submitted by a well driller or a hydrogeologist familiar
with the area.
13.
The width and location of any streets, public improvements, or required open space
shown upon the official map and the Comprehensive Plan, if any, within the subdivision.
14.
If a street will be constructed, applicants shall submit to the Board, as part of the final
plan, detailed construction drawings showing a plan view, profile, and typical cross-
section of the proposed public and private streets and existing streets within three hundred
(300) feet of any proposed intersections. The plan view shall be at a scale of one inch
equals no more than fifty (50) feet. The vertical scale of the profile shall be one inch
equals no more than five (5) feet. The plans shall include the following information:
a.
Date, scale, and north arrow, indicating magnetic or true north.
b.
Intersections of the proposed street with existing streets.
c.
Roadway and right-of-way limits including edge of pavement, edge of shoulder,
sidewalks, and curbs.
d.
Kind, size, location, material, profile, and cross-section of all existing and proposed
drainage structures and their location with respect to existing natural waterways and
proposed drainage ways.
e.
Complete curve data for all horizontal and vertical curves.
f.
Turning radii at all intersections.
g.
Centerline gradients.
76
h.
Size, type, and locations of all existing and proposed overhead and underground
utilities including, but not limited to, water, sewer, electricity, telephone, lighting,
and cable television.
15.
If a private street is constructed, a road maintenance agreement shall be submitted
outlining maintenance and financial responsibilities of lot owners using the road. The
road maintenance agreement shall be reviewed and approved by the Town Attorney.
16.
The location of any open space to be preserved and a description of proposed
improvements and its management.
17.
All parcels of land proposed to be dedicated to public use and the conditions of such
dedication. Written offers to convey title to the municipality of all public open spaces
shown on the plan, and copies of agreements or other documents showing the manner in
which open spaces to be retained by the applicant or lot owners are to be maintained, shall
be submitted. If open space or other land is to be offered to the municipality, written
evidence that the municipal officers are satisfied with the legal sufficiency of the written
offer to convey title shall be included.
18.
The location and method of disposal for land clearing and construction debris.
19.
For subdivisions that disturb between five-thousand (5,000) and forty three thousand, five
hundred and fifty-nine (43,559) square feet of land, an erosion and sediment control plan
prepared in accordance with the Maine Erosion and Sediment Control Practices, Field
Guide for Contractors published by the Maine Department of Environmental Protection,
dated 2014 or most recent revision and approved by theTown's Peer Review Engineer.
20.
For subdivisions that disturb one or more acres of land, including phased subdivisions
where all disturbance exceeds one or more acres even if no single phase will disturb one
or more acres of land, the Erosion and Sediment Control Plan associated with the Maine
Department of Environmental Protection Chapter 500 application or Maine Construction
General Permit Application.
77
APPENDIX E
Additional Information May Be Requested - Major and Minor Subdivisions
The Board may require additional information including, but not limited to, the following, to be
submitted where it finds it necessary in order to determine whether the criteria of 30-A M.R.S.
§4404 and Article 11 are met:
1.
A high intensity soil survey by a professional consultant, such as a Licensed Soil Scientist,
Professional Engineer, Licensed Geologist, or a Licensed Site Evaluator.
2.
A hydrogeologic assessment prepared by a Licensed Geologist or Registered Professional
Engineer, experienced in hydrogeology. The Board may require a hydrogeologic
assessment when the subdivision is not served by public sewer and,
a.
Any part of the subdivision is located over a mapped sand and gravel aquifer, or
b.
The subdivision has an average density of more than one dwelling unit per one
hundred thousand (100,000) square feet, or
c.
In other cases where site considerations or development design indicate greater
potential of adverse impacts on ground water quality, such as extensive areas of
shallow to bedrock soils, cluster developments in which the average density is less
than one dwelling unit per one hundred thousand (100,000) square feet but the
density of the developed portion is in excess of one dwelling unit per eighty thousand
(80,000) square feet, or the use of shared or common subsurface wastewater disposal
systems.
The hydrogeologic assessment shall be conducted in accordance with the provisions of
Section 11.12.A.1.
3.
An estimate of the amount and type of vehicular traffic to be generated on a daily basis and
at peak hours. Trip generation rates used shall be taken from Trip Generation Manual,
published by the Institute of Transportation Engineers (ITE) Trip generation rates from
other sources may be used if the applicant demonstrates to the Project Review Board's
satisfaction that these sources better reflect local conditions.
4.
A traffic-impact analysis. The Board may require an analysis for projects involving forty
(40) or more parking spaces or projected to generate more than four hundred (400) vehicle
trips per day based upon the ITE Trip Generation Manual. The traffic-impact analysis shall
be prepared by a Registered Professional Engineer with experience in traffic engineering.
The analysis shall indicate the expected average daily vehicular trips, peak hour volumes,
access conditions at the site, distribution of traffic, types of vehicles expected, effect upon
the level of service of the street giving access to the site and neighboring streets which may
be affected, and recommended improvements to maintain
the desired level of service on the affected streets.
78
5.
A stormwater management plan, prepared by a registered professional engineer in
accordance with the Maine Stormwater Management Design Manual, published by the
Maine Department of Environmental Protection, dated 2016, or most recent revision.
79
APPENDIX F
Preliminary Plan Submission Requirements for Major Subdivisions
1.
Proposed name of the subdivision and the name of the municipality in which it is located,
plus the assessor's map and lot numbers.
2.
The names and addresses of the record owner, applicant, and individual or company who
prepared the plan, and adjoining property owners.
3.
The date the plan was prepared, north point, and graphic map scale.
4.
The zoning district in which the proposed subdivision is located, and the location of any
zoning boundaries affecting the subdivision.
5.
Verification of right, title, or interest in the property.
6.
A copy of the most recently recorded deed for the parcel. A copy of all deed restrictions,
easements, rights-of-way, or other encumbrances currently affecting the property.
7.
A copy of any deed restrictions intended to cover all or part of the lots or dwellings in the
subdivision.
8.
A standard boundary survey of the parcel, giving complete descriptive data by bearings and
distances, made and certified by a professional land surveyor. The corners of the parcel
shall be located on the ground and marked by monuments.
9.
Historic resources and significant natural features, including topography, areas of steep
slope, wetlands, vernal pools, areas at or below base flood elevation, swales, rock
outcroppings, vegetation, existing utilities, and other site features, as indicated on the Site
Analysis Map.
10. Existing and approximate proposed lot lines, lot areas, any existing easements, and rights-
of-way. The boundaries of conservation lands shall be indicated.
11. Approximate location, alignment, width, and tentative names of all existing and proposed
streets and street rights-of-way, including all street extensions or spurs that are reasonably
necessary to provide adequate street connections and facilities to adjoining development or
undeveloped areas.
12. Approximate location of proposed swales, drainage easements, and stormwater and other
management facilities.
13. Where public sewage service is to be provided, the conceptual layout of proposed sewage
systems, including but not limited to, the tentative locations of sewer mains, together with
80
a written statement from the Freeport Sewer District stating that it has the capacity to collect
and treat the sewage generated.
14. Where public water service is to be provided, the conceptual layout of proposed water
distribution facilities including water mains, fire hydrants, storage tanks, and, where
appropriate, wells or other water sources, together with a written statement from the utility
providing the service indicating that there is adequate supply and pressure for the
subdivision and that the supplier approves the plans for extensions where necessary. Where
the supplier's supply line is to be extended, a written statement from the Fire Rescue Chief,
stating approval of the location of fire hydrants, if any, and a written statement from the
supplier approving the design of the extension shall be submitted. When water is to be
supplied by private wells, evidence of adequate ground water supply and quality shall be
submitted by a well driller or a hydrogeologist familiar with the area.
15. Location of all soil tests pits as may be required under this ordinance, including all failed
test sites or pits, as well as those approved. All approved sites shall be clearly distinguished
from unapproved sites.
16. Limit-of-disturbance line (must be exact in relation to the retention of existing trees
proposed to be saved).
17. Approximate location and dimensions of proposed playgrounds, public buildings, public
areas, and parcels of land proposed to be dedicated or reserved for public or private open
space.
18. If land to be subdivided lies partly in or abuts another municipality, the applicant shall
submit information concerning the location and conceptual design of streets, layout, and
area of lots and provisions of public improvements on land subject to applicant's control
within the adjoining municipalities. The design of public improvements shall provide for
a smooth, practical transition where specifications vary between municipalities. Evidence
of approval of this information by appropriate officials of the adjoining municipalities also
shall be submitted.
19. Where installation of the improvements is proposed to be done in phases, the applicant shall
submit with the Conceptual Preliminary Plan a delineation of the proposed sections and a
schedule of deadlines within which applications for final approval of each section is
intended to be filed.
20. Typical street cross-section drawing(s) for all proposed streets shall be shown, including
details relating to thickness, crowning, and construction materials.
21. The exact locations of existing utility easements and approximate locations of proposed
utility easements.
22. Approximate locations of existing vegetation to be retained.
81
23. For subdivisions that disturb between 5,000 and 43,559 square feet of land, an erosion and
sediment control plan prepared in accordance with the Maine Erosion and Sediment Control
Practices Field Guide for Contractors published by the Maine Department of
Environmental Protection, dated 2014 or most recent revision and approved by the Town's
Peer Review Engineer
24. For subdivisions that disturb one or more acres of land, including phased subdivisions
where all disturbance exceeds one or more acres even if no single phase will disturb one or
more acres of land, the Erosion and Sediment Control Plan associated with the Maine
Department of Environmental Protection Chapter 500 application or Maine Construction
General Permit Application.
82
APPENDIX G
Community Association Documents and Conservation Ownership and Management Plan
Submission Requirements
1.
A description of all lands and facilities to be owned by the Community Association. This
description shall include a map of the proposal, highlighting the precise location of those
lands and facilities.
2.
Statements setting forth the powers, duties, and responsibilities of the Community
Association, including the services to be provided.
3.
A Declaration of Covenants, Conditions, and Restrictions, giving perpetual easement to the
lands and facilities owned by the Community Association. The Declaration shall be a legal
document that also provides for automatic Association membership for all owners in the
subdivision or land development and shall describe the mechanism by which owners
participate in the Association, including voting, elections, and meetings. Furthermore, it
shall give power to the Association to own and maintain the common property and to make
and enforce rules.
4.
Statements prescribing the process by which Community Association decisions are reached
and setting forth the authority to act.
5.
Statements requiring each owner within the subdivision or land development to become a
member of the Community Association. Statements setting cross covenants or contractual
terms binding each owner to all other owners for mutual benefit and enforcement.
6.
Requirements for all owners to provide a pro rata share of the cost of the operations of the
Community Association.
7.
A process of collection and enforcement to obtain funds from owners who fail to comply.
8.
A process for transition of control of the Community Association from the developer to the
unit owners.
9.
Statements describing how the lands and facilities of the Community Association will be
insured, including limit of liability.
10.
Provisions for the dissolution of the Community Association, in the event the Association
should become enviable.
11.
The boundaries, acreage, and proposed ownership of all proposed conservation areas and
provisions for the management of open space detailing the entities responsible for
maintaining various elements of the property and describing management objectives and
techniques for each part of the property.
83
12.
In addition, any proposed Affordable Housing Development must meet the requirements of
Section 536 of the Zoning Ordinance.
84
APPENDIX H
The Final Major Subdivision Plan Submission Requirements shall include at least the
following information:
1.
The information shown on the recording plan.
2.
If different from those submitted with the preliminary plan, a copy of any proposed deed
restrictions intended to cover all or part of the lots or dwellings in the subdivision.
3.
The number of acres within the proposed subdivision, location of property lines, existing
buildings, watercourses, and other essential existing physical features.
4.
The boundaries of any flood hazard areas and the base flood elevation as depicted on the
municipality's Flood Insurance Rate Map, shall be delineated on the plan.
5.
An indication of the type of sewage disposal to be used in the subdivision. When sewage
disposal is to be accomplished by connection to the public sewerage system, a written
statement from the Freeport Sewerage District shall be submitted indicating the district has
reviewed and approved the sewerage design.
6.
An indication of the type of water supply system(s) to be used in the subdivision. When
water is to be supplied by Maine Water or the South Freeport Water District, a written
statement from the supplier shall be submitted indicating the supplier has reviewed and
approved the water system design, together with a written statement from the Fire Rescue
Chief approving all hydrant locations or other fire protection measures deemed necessary.
7.
The location and size of existing and proposed sewers, water mains, culverts, and drainage
ways on or adjacent to the property to be subdivided.
8.
All parcels of land proposed to be dedicated to public use and the conditions of such
dedication. Written offers to convey title to the municipality of all public ways and open
spaces shown on the plan, and copies of agreements or other documents showing the
manner in which open spaces to be retained by the developer or lot owners are to be
maintained shall be submitted. If proposed streets and/or open spaces or other land is to
be offered to the municipality, written evidence that the Municipal Officers are satisfied
with the legal sufficiency of the written offer to convey title shall be included.
9.
Street plans shall include detailed construction drawings showing a plan view, profile, and
typical cross-section of the proposed public and private streets and existing streets within
three hundred (300) feet of any proposed intersections. The plan view shall be at a scale
of one inch equals no more than fifty (50) feet. The vertical scale of the profile shall be
one inch equals no more than five (5) feet. The plans shall include the following
information:
85
a.
Date, scale, and north arrow, indicating magnetic or true north.
b.
Intersections of the proposed street with existing streets.
c.
Roadway and right-of-way limits, including edge of pavement, edge of shoulder,
sidewalks, and curbs.
d.
Kind, size, location, material, profile, and cross-section of all existing and proposed
drainage structures and their location with respect to existing natural waterways
and proposed drainage ways.
e.
Complete curve data for all horizontal and vertical curves.
f.
Turning radii at all intersections.
g.
Centerline gradients.
h.
Size, type, and locations of all existing and proposed overhead and underground
utilities including, but not limited to, water, sewer, electricity, telephone, lighting,
and cable television.
10.
If a private street is constructed, a road maintenance agreement shall be submitted outlining
maintenance and financial responsibilities of lot owners using the road. The road
maintenance agreement shall be reviewed and approved by the Town Attorney.
11.
A stormwatermanagement plan, prepared by a registered professional engineer in
accordance with Maine's Stormwater Best Management Practices, published by the Maine
Department of Environmental Protection, latest edition. The Board may not waive
submission of the stormwater management plan unless the subdivision is not in the
watershed of a great pond, the proposed subdivision will not involve grading which
changes drainage patterns, and the addition of impervious surfaces is less than five percent
(5%) of the area of the subdivision.
12.
An erosion and sedimentation control plan prepared in accordance with the latest edition
of the Maine Erosion and Sedimentation ControlPractices, Field Guide for Contractors
manuals, published by the Maine Department of Environmental Protection, dated 2014, or
most recent revision. The Board may waive submission of the erosion and sedimentation
control plan if: 1) The project will not involve grading which changes drainage patterns,
and 2) The addition of impervious surfaces is less than five percent (5%) of the area of
the subdivision.
13.
The width and location of any streets or public improvements or open space shown upon
the official map and the Comprehensive Plan, if any, within the subdivision.
14.
A list of construction items, with cost estimates, that will be completed by the applicant
prior to the sale of lots, and evidence that the applicant has financial commitments or
resources to cover these costs.
86
15.
The location and method of disposal for land clearing and construction debris.
87
APPENDIX I
Referenced Manuals and Standards
The following standards are adopted by reference in this Ordinance, and a copy of each is on file in the
office of the Town Clerk and is available for public use, inspection, and examination:
Corps of Engineers Wetland Delineation Manual (United States Army Corps of
Engineers, 1987)
Guidelines for Maine Certified Soil Scientists for Soil Identification and Mapping
(Maine Association of Professional Soil Scientists, March 2009).
Highway Capacity Manual (National Academy of Sciences, Engineering, and
Medicine, 2022)
Maine Erosion and Sediment Control Practices, Field Guide for Contractors
(Maine Department of Environmental Protection, dated 2014, or most recent
revision)
Maine's Stormwater Best Management Practices (Maine Department of
Environmental Protection, latest edition)
Maine Stormwater Management Design Manual (Maine Department of
Environmental Protection, dated 2016, or most recent revision)
National Fire Protection Association (NFPA) Fire Code 1 (National Fire Protection
Association, 2018 Edition as adopted and amended by the State of Maine)
State of Maine Rules Relating to Drinking Water (10-144A C.M.R. 231),
(Department of Health & Human Services Maine Center For Disease Control &
Prevention Division Of Environmental Health Drinking Water Program, amended
2016)
State of Maine Subsurface Wastewater Disposal Rules (10-144 CMR 241)
(Department of Health and Human Services, Maine Center for Disease Control and
Prevention, Division of Environmental Health, 2023)
Trip Generation Manual (Institute of Transportation Engineers)
Well Drillers and Pump Installers Rules, (144 CMR 232) (Maine Department of
Health and Human Services, effective 1994, amended 2012)