: FRIENDSHIP SITE PLAN REVIEW ORDINANCE 1999
(Replaces SITE PLAN REVIEW ORDINANCE |
for the ae
TOWN OF FRIENDSHIP, MAINE:
enacted June 22, 1988).
Amended March 21, 2005
' ' Enacted March 15, 1999
Certified : :
. ' BEg aE
Towne€lerk
: 'y
FRIENDSHIP SITE PLAN REVIEW ORDINANCE
Enacted March 15, 1999
Amended March 21, 2005
| TITLE and PURPOSE; APPLICABILITY PROVISIONS
SEC 1. TITLE and PURPOSE
This ordinance shall be known as the Friendship Site Plan Review Ordinance and will be referred to
herein as this Ordinance. The purposes of this ordinance are to protect the public health and safety,
promote the general welfare of the community of Friendship and conserve the economic environment,
character of the town, natural resources, and ecology upon which the town depends by assuring that
nonresidential construction is designed and developed in a manner which assures that adequate
provisions are made for traffic safety and access; emergency access; water supply; sewage disposal;
management of storm water, erosion, and sedimentation; protection of the groundwater; protection of the
environment, wildlife habitat, fisheries, and unique natural areas; protection of historic and
archaeological resources; minimizing the adverse impacts on adjacent properties and public waters; and
fitting the project harmoniously into the fabric of the community.
SEC 2 AUTHORITY, AMENDMENTS AND ADMINISTRATION
' 2.4 This ordinance is enacted pursuant to the Home Rule Powers of 30-A M.R.S.A. §3001.
2.2 The effective date of this ordinance shall be thirty (30) days after it is adopted by vote of a Town of
Friendship Town Meeting.
2.3 Amendments of this ordinance may be initiated by the Municipal Officers, the Planning Board, or as
specified in Title 20-A M.R.S.A.§2522. No proposed amendments to this ordinance shail be
referred to the Town Meeting until the Municipal Officers have held a public hearing on the
proposal, notice of which shall be posted at least fourteen (14) days prior to such hearing and
advertised in a newspaper of general circulation in the municipality at least two (2) times with the
date of first publication being at least fourteen (14) days prior to the hearing and the second at
least seven (7) days prior to the hearing. The proposed amendments shall be adopted by a
simple majority vote of the Town Meeting .
2.4 This ordinance shall in no way impair or remove the necessity to comply with any other rule,
regulation, by-law, permit or provision of law.
2.5 The Friendship Planning Board shall administered this ordinance.
SEC 3: APPLICABILITY OF SITE PLAN REVIEW
3. A. A person who has right, title, or interest in a parcel of land must obtain site plan approval prior to
commencing any of the following activities on the parcel, obtaining a building or plumbing
permit for the activities, or undertaking any alteration or improvement of the site including
grubbing or grading:
| 1
Fship Dev Plan Rev after editing by PB in Public Hearing Jan 27, 99 . ,
3.1 The construction or placement of any new building or structure for a nonresidential use, commercial, _
industrial, municipal, office, institutional or multi residential purposes, including accessory
buildings and structures;
3.2 The expansion of an existing nonresidential building or structure including accessory buildings that
increases the total floor area; , .
3.3 The conversion of an existing building, in whole or in part, from a residential use to a nonresidential
use;
3.4 The establishment of a new nonresidential use even if no buildings or structures are proposed,
. including uses such as gravel pits, cemeteries, golf courses, and other nonstructural
nonresidential uses; ~
3.5 The conversion of an existing nonresidential use, in whole or in part, to another nonresidential use if
the new use changes the basic nature of the existing use such that it increases the intensity of
' ON or Off-site impacts of the use subject to the standards and criteria of site plan review
described in Section9 of this ordinance;
3.6 The construction of a residential building containing three (3) or more dwelling units;
3.7 The modification or expansion of an existing residential structure that increases the number of
dwelling units in the structure by to three (3) or more;
3.8 The conversion of an existing nonresidential building or structure, in whole or in part, into three (3) or
more dwelling units;
_ 3.9 The construction or expansion of paved areas or other impervious surfaces, including walkways,
access drives, and parking lots involving an area of more than two thousand five hundred
(2,500) square feet. ~ :
3.B. The following features of projects may, alone or in combination, qualify a project to be reviewed by
the Board as a Quick Permit by Application. Certain of these activities will, however, require the owner
to obtain a building permit, plumbing permit or other state or local approvals:
3.B.1. Activities requiring site plan review but that make little impact on traffic, natural resources and
meet certain other standards activities may receive site plan approval by notifying the public
and filing an application with the Planning Board:
3.B.2. The expansion of an existing nonresidential building or structure, including accéssory buildings, if
the enlargement increases the total area for all floors by no more than twenty (20) percent of ;
the existing total floor area or five hundred (500) square feet, whichever is less; ;
3.B.3. The conversion of an existing building in which five hundred (500) or less more square feet of
total floor area are converted from residential to nonresidential use.
3 The following activities shall not require site plan approval. Certain of these activities will, however, |
require the owner to obtain a building permit, plumbing permit or other state or local approvals:
|
3.C.1 The construction, alteration, or enlargement of a single family or two-family dwelling, inciuding
accessory buildings and structures.
3.0.2 The placement, alteration, or enlargement of a single manufactured housing or mobile home
dwelling, including accessory buildings and structures on individually owned lots.
3.C.3 Agricultural activities, including agricultural buildings and structures.
3.C.4 Timber harvesting and forest management activities.
3.C.5 Activities involving nonresidential buildings or activities that are specifically excluded from review .
by the provisions of this section.
3.C.6. Uses existing when the Friendship Site Plan Ordinance was enacted, June 22, 1988.
3.C. 7. Home occupations.
SEC. 4. ADMINISTRATION AND ENFORCEMENT
This ordinance shall be administered by the Planning Board and enforced by a Code Enforcement
Officer (CEO) appointed by the Municipal Officers.. ;
It shall be the duty of the CEO or his/her agent to enforce the provisions of this ordinance. If the CEO or
his/her agent shall find that any provision of this ordinance is being violated, he/she shall notify in writing
the person responsible for such violation, indicating the nature of the violation and ordering the action
necessary to correct it. He/she shail order discontinuance of illegal use of buildings, structures, additions,
or work being done, or shall take any other action authorized by this ordinance to insure compliance with
or to prevent violation of its provisions.
The CEO is hereby authorized to institute or cause to be instituted, in the name of the municipality, any
and all actions, legal or equitable, that may be appropriate or necessary for the enforcement of this
ordinance; provided, however, that this section shall not prevent any person entitled to equitable relief
from enjoining any act contrary to the provisions of this ordinance.
Any person, firm, or corporation being the owner of or having control or use of any building or premises
who violated any of the provisions of this ordinance, shal! be fined in accordance with Title 30-A §4452.
Each day such a violation is permitted to exist after notification shall constitute a separate offense. The
municipal officers, or their authorized agent, are hereby authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this ordinance and recovering fines without court
action. Such agreements shall not atlow an illegal structure or use to continue unless there is clear and
convincing evidence that the illegal structure or use was constructed or conducted as.a direct result of
erroneous advice given by an authorized Municipal Official and there is no evidence that the owner acted
in bad faith, or unless the removal of the structure or use will result in a threat or hazard to public health
and safety or will result in substantial environmental damage.
SEC. 5. INTERPRETATION OF THE ORDINANCE .
The Planning Board shall be responsible for administering the provisions of this ordinance including
interpreting the provisions hereof.
Code Enforcement Officer (CEO) and in his/her responsibility of enforcing the provisions of this
ordinance must also interpret the provisions thereof.
Any person who believes that the CEO has made an error in the interpretation or application of the
provisions of this ordinance, may within 30 days appeal such determination to the Planning Board as an
administrative appeal. If the Planning Board finds that the CEO erred in his/her interpretation of the
3
ordinance, it shall modify or reverse the action accordingly.
Any person who believes that the Planning Board has made an error in the interpretation or application
of the provisions of this ordinance, may within 30 days appeal such determination to the Board of
Appeals as an administrative appeal. If the Board of Appeals finds that the Planning Board erred in its
interpretation of the ordinance, it shall modify or reverse the action accordingly.
SEC. 6. REVIEW AND APPROVAL AUTHORITY
The Planning Board is authorized to review and act on all site plans for development requiring site plan
review as defined above. ,
In considering site plans under this provision, the Planning Board may act to approve, disapprove, or
approve the project with conditions as are authorized by these provisions.
SEC, 7. REVIEW PROCEDURES
The Planning Board shall use the following procedures in reviewing applications for site plan review.
7.1. Preapplication ,
Prior to submitting a formal application, the applicant or his/her representative may request a
preapplication conference with the Planning Board. A preapplication conference is strongly
advised. The preapplication conference shall be informal and informational in nature. There
shall be no fee for a preapplication review, and such review shall not cause the plan to be a
pending application or proceeding under Title 1 M.R.S.A. §302. No decision on the substance of |
the plan shall be made at the preapplication conference.
7.1.1. Purpose
The purposes of the preapplication conference are to:
(1) Allow the Planning Board to understand the nature of the proposed use and the issues involved in
the proposal, ;
(2) Allow the applicant to understand the development review process and required submissions,
(3) Identify issues that need to be addressed in future submissions, and
(4) Make the applicant aware of any opportunities for coordinating the development with community
policies, programs, or facilities.
In addition, the Board may schedule a site inspection in accordance with subsection 7.2(5) if deemed
necessary and resolve any requests for waivers and variations from the submission requirements.
7.1.2. Information Required
There are no formal submission requirements for a preapplication conference. However, the applicant
should be prepared to discuss the following with the Board:
(1) The proposed site, including its location, size, and general characteristics,
(2) The nature of the proposed use. and potential development,
(3) Any issues or questions about existing municipal regulations and their applicability to the project, and
(4) Any requests for waivers from the submission requirements.
7.2. Application Submission and Review Procedures
The applicant must prepare and submit a site plan review application, including the development plan :
and supporting documentation, that meets the submission requirements set forth below. This
material must be submitted to the Planning Board.
(1) At the first meeting at which the application is considered, the Planning Board shall give a dated
receipt to the applicant and shail notify by maii all property owners within two hundred fifty (250)
feet of the parcel on which the proposed development is located. Written notice of the pending
application shall be mailed to the Selectmen, Fire Chief, Road Commissioner, CEO, Plumbing
Inspector, and other interested parties.
4
Fship Dev Plan Rev after editing by PB in Public Hearing Jan 27, 99
(2) Within thirty (30) days of the receipt of a formal site plan review application, the Planning Board shall ,
review the material and determine whether or not the submission is complete. if the application
is determined to be incomplete, the Board shall notify the applicant in writing of this finding,
shall specify the additional materials required to make the application complete and shall advise
the applicant that the application will not be considered by the Board until the additional
information is submitted to the Board. These steps, except the notification requirements, shall
be repeated until the application is found to be complete.
(3) As soon as the Board determines that the application is complete, the Board shall: notify the
applicant in writing of this finding, meet the notification requirements of subsection (4) below,
and place the item on the agenda for substantive review within thirty (30) days of this finding.
(4) The Planning Board shall give written notice of the date, time, and place of the meeting at which the
___ @pplication will be considered to the applicant and all persons who received the notice in (1).
(5) The Planning Board may hold an on-site inspection of the site to review the existing conditions, field
verify the information submitted and investigate the development proposal. The Board may
schedule this visit either before or after the first meeting at which the application is considered.
The Board may decide not to hold an on-site inspection when the site is snow covered. If an
~ application is pending during a period when there is snow cover, the deadline by which the
Planning Board shall take final action on the application as specified in (6) may be extended,
which extension shail not exceed thirty (30) days after the Board is able to conduct an on-site
inspection. Written notice of the on-site inspection shall be provided to all parties entitled to ,
notice under subsection (4).
(6) The Planning Board shall take final action on said application within thirty (30) days of determining
that the application is complete. The Board shall act to deny, to approve, or to approve the
application with conditions. The Board may impose such conditions as are deemed advisable to
assure compliance with the standards of approval.
In issuing its decision, the Planning Board shall make written findings of fact establishing that the
proposed development does or does not meet the standards of approval and other requirements of the
_ Town. The Board shall notify the applicant, all officials who received notice under (4), and all parties who
requested to be notified of the action of the Board, including the findings of fact, and any conditions of
approval. This requirement can be met through the distribution of minutes of the meeting containing the oO
findings of fact and decision of the Board. |
All time limits provided for in this section may be extended by mutual agreement of the applicant and
Planning Board.
7.3. Final Application Approval and Filing
[Comment, This is NOT approval of the Site Plan Review proposal, only that the application is complete. ] ;
Upon completion of the requirements of this Section and an approval vote by the majority of the
Planning Board, the application shall be deemed to have final approval and the site plan shall be signed
by a majority of the members of the Board and must be filed with the Code Enforcement Officer,
Assessors. Any plan not so filed within thirty (30) days of the date upon which such plan is approved and
signed by the Board shall become null and void. The Planning Board, by vote, may extend the filing
period for good cause. : :
Quick Permit by Application
7.4.1. A "quick permit by application" or QPA is a processing procedure for projects falling under this
ordinance but as described in Section 3.B of this ordinance. A QPA may be acted on at a regular Planning
Board meeting without a public hearing upon receipt of the application if the board finds the application to
be complete and meeting the QPA criteria . Fees shall not be required for projects the Board finds qualified
for QPA.
5
(1) When the application is submitted, the applicant shall have notified by mail,
. property owners within two hundred fifty (250) feet of the parcel on which the proposed
development is located no less than fourteen days prior to the Planning Board meeting. Written notice of
the pending application shal! also have been sent to the Selectmen, Fire Chief, Road Commissioner, CEO,
Plumbing Inspector, and other interested parties.
7.4.2. Application procedure and notification.
The applicant must file an application following the requirements of Section 8 of this ordinance including:
the general requirements of Sect. 8: .
Subsection 8.1 (1~ 8); for paragraph (3) include owners within 250 feet; for paragraph (7) reference to
deed book and page;
Subsection 8.2 (1 - 8) as stated but include the area within 100 feet of the proposed activity.
Subsection 8.3 (As applicable), and; Subsection 8.4
The notification form must be sent to the Board by certified mail, return receipt requested, or delivered to
the Town Office and have it dated and signed by the Town Officer at the Town Office.
7.4.3. Effective period
The QPA is generally effective for one year from the date of approval.
7.4.4 Fees waived for QPA
Fees shall not be required for projects the Board finds qualified for QPA.
7.5. Fees
7.5.1. Application Fee =
An application for site plan review must be accompanied by an application fee. This fee is intended to
cover the cost of the municipality's administrative processing of the application, including notification,
advertising, mailings, and similar costs. The fee shall not be refundable. This application fee must be
paid to the municipality and evidence of payment of the fee must be included with the application.
7.5.2. Technical Review Fee
In addition to the application fee, the applicant for site plan review must also pay a technical review fee
to defray the municipality's legal and technical costs of the application review. This fee must be paid to
the municipality and shall be deposited in the Development Review Trust Account, which shall be
separate and distinct from all other municipal accounts. The application will be considered incomplete
until evidence of payment of this fee is submitted to the Planning Board. The Board may reduce the
amount of the technical review fee or eliminate the fee if it determines that the scale or nature of the .
project will require little or no outside review.
The technical review fee may be used by the Planning Board to pay reasonable costs incurred by the
Board, at its discretion, which relate directly to the review of the application pursuant to the review i
criteria. Such services may include, but need not be limited to, consulting, engineering or other
professional fees, attorney fees, recording fees, and appraisal fees. The municipality shall provide the :
applicant, upon written request, with an accounting of his or her account and shall refund all of the --
remaining monies, including accrued interest, in the account after the payment by the Town of all costs :
and services related to the review. Such payment of remaining monies shai! be made no later than sixty
(60) days after the approval of the application, denial of the application, or approval with condition of the
application. Such refund shall be accompanied by a final accounting of expenditures from the fund. The
monies in such fund shall not be used by the Board for any enforcement purposes nor shail the applicant
be liable for costs incurred by or costs of services contracted for by the Board which exceed the amount
deposited to the trust account.
7.5.3. Establishment of Fees
6
The Municipal Officers may, from time to time and after consultation with the Board, establish the
appropriate application fees and technical review fees following posting of the proposed schedule of fees
and public hearing.
SEC. 8. SUBMISSION REQUIREMENTS
Applications for site plan review must be submitted on application forms provided by the municipality.
The complete application form, evidence of payment of the required fees, and the required plans and
related information must be submitted to the Planning Board. The submission must contain at least the
following exhibits and information unless specifically waived in writing. The Planning Board may waive
any of the submission requirements based upon a written request of the applicant. Such request must be
made at the time of the preapplication conference or at the initia! review of the application if no
preapplication conference is held. A waiver of any submission requirement may be granted only if the'
Board makes a written finding that the information is not required to determine compliance with the
'Standards. , ,
All applications for site plan réview must contain the following information:
(1) A fully executed and signed copy of the application for site plan review.
(2) Evidence of payment of the application and technical review fees.
(3) [Eight (8)] copies of written materials plus [eight (8)] sets of maps or drawings containing the
' information listed below. The written materials must be contained in a bound report. The maps
or drawings must be at a scale sufficient to allow review of the items listed under the approval
standards and criteria, but in no case shall be more than one hundred (100) feet to the inch for
that portion of the tract of land being proposed for development:
8.1. General Information
(1) record owner's name, address, and phone number and applicant's name, address and phone number
if different. -
(2) the location of all required building setbacks, yards, and buffers. ;
' (3) names and addresses of all property owners within five hundred (500) feet of any and all property
boundaries. -
(4) sketch map showing general location of the site within the municipality based upon a reduction of the
tax maps.
(5) boundaries of all contiguous property under the total or partial control of the owner or applicant .
regardless of whether all or part is being developed at this time.
(6) the tax map and lot number of the parcel or parcels on which the project is located.
(7) a copy of the deed to the property, an option to purchase the property or other documentation to
demonstrate right, title or interest in the property on the part of the applicant.
(8) the name, registration number, and seal of the person who prepared the plan, if applicable.
(9) evidence of the applicant's technical and financial capability to carry out the project as proposed.
8.2, Existing Conditions
(1) zoning classification(s), including overlay and/or subdistricts, of the property and the location of
zoning district boundaries if the property is located in two (2) or more zoning districts or F
subdistricts or abuts a different district. .
(2) the bearings and length of all property lines of the property to be developed and the source of this-
information. The Planning Board may waive this requirement of a boundary survey when
sufficient information is available to establish, on the ground, all property boundaries.
(3) location and size of any existing sewer and water mains, culverts and drains, on-site sewage disposal
systems, wells, underground tanks or installations, and power and telephone lines and poles on
the property to be developed, on abutting streets, or land that may serve the development, and
an assessment of their adequacy and condition to meet the needs of the proposed use.
Appropriate elevations or slope or contours or other indicators must be provided as necessary
to determine the direction of flow.
(4) location, names, and present widths of existing public and/or private streets and rights-of-way within
or adjacent to the proposed development.
7 :
(5) the location, and dimensions-and ground floor elevation of all existing buildings on the site.
(6) the location and dimensions of existing driveways, parking and loading areas, walkways, and
sidewalks on or immediately adjacent to the site.
(7) location of intersecting roads or driveways within two hundred (200) feet of the site.
(8) the location of open drainage courses, wetlands, stonewalls, graveyards, fences, stands of trees, and
other important or unique natural areas and site features, including but not limited to,
floodplains, deer wintering areas, significant wildlife habitats, scenic areas, habitat for rare and :
endangered plants and animals, unique natural communities and-natural areas, sand and gravel
aquifers, and historic and/or archaeological resources, together with a description of such
features.
{9) the direction of existing surface water drainage across the site.
; (10) the location, front view, dimensions, and lighting of existing signs.
_ °°' (41) location and dimensions of any existing easements and copies of existing covenants or
deed restrictions. :
(12) the location of the nearest fire hydrant, dry hydrant or other water supply for fire protection.
8.3. Proposed Development Activity :
(1) estimated demand for water supply and sewage disposal together with the location and dimensions
of ail provisions for water supply and wastewater disposal, and evidence of their adequacy for the
proposed use, including soils test pit data if on-site sewage disposal is proposed.
(2) the direction of proposed surface water drainage across the site and from the site, with an
assessment of impacts on downstream properties.
(3) provisions for handling all solid wastes, including hazardous and special wastes and the location and
proposed screening of any on-site collection or storage facilities.
(4) the location, dimensions, and materials to be used in the construction of proposed driveways, parking
and loading areas, and walkways and any changes in traffic flow onto or off-site.
(5) proposed landscaping and buffering.
_ (6) the location, dimensions, and ground floor elevation of all proposed buildings or building expansion :
proposed on the site.
(7) location, front view, materials, and dimensions of proposed signs together with the method for :
securing the sign.
(8) location and type of exterior lighting.
(9) the location of all utilities, including fire protection systems. -
(10) a general description of the proposed use or activity.
(11) an estimate of the peak hour and daily traffic to be generated by the project.
(12) stormwater calculations, erosion and sedimentation control measures, and water quality and/or
phosphorous export management provisions, if the project requires a stormwater permit from the Maine
Department of Environmental Protection or if the Planning Board determines that such information is
necessary based upon the scale of the project or the existing conditions in the vicinity of the project.
8.4, Approval Block
Space must be provided on the plan drawing for the signatures of the Planning Board and date together
with the following words, " Approved: Town of Friendship Planning Board." t
SEC. 9. APPROVAL STANDARDS AND CRITERIA
The following criteria shall be used by the Planning Board in reviewing applications for site plan review
and shall serve as minimum requirements for approval of the application. The application shall be
approved unless the Planning Board determines that the applicant has failed to meet one or more of
these standards. In all instances, the burden of proof shall be on the applicant who must produce
evidence sufficient to warrant a finding that all applicable criteria have been mei.
8
"~~ "94, Utilization of the Site '
The plan for the development must reflect the natural capabilities of the site to support development.
Buildings, iots, and support facilities must be clustered in those portions of the site that have the most :
suitable conditions for development. Environmentally sensitive areas, including but not limited to,
wetlands, steep slopes, floodplains, significant wildlife habitats, fisheries, scenic areas, habitat for rare
and endangered plants and animals, unique natural communities and natural areas, and sand and gravel ,
aquifers must be maintained and preserved to the maximum extent. Natural drainage areas must also be
preserved to the maximum extent. The development must include appropriate measures for protecting
these resources, including but not limited to, modification of the proposed design of the site, timing of
construction, and limiting the extent of excavation.
9.2. Adequacy of Road System --
Vehicular access to the site must be on roads which have adequate capacity to accommodate the |
additional traffic generated by the development. For developments which generate one hundred (100) or
more peak hour trips based on the latest edition of the Trip Generation Manual of the Institute of Traffic ;
Engineers, intersections on major access routes to the site within one (1) mile of any entrance road which
are functioning at a Level of Service of D or better prior to the development must function at a minimum
at Level of Service D after development. if any such intersection is functioning at a Level of Service E or
lower prior to the development, the project must not reduce the current level of service. This requirement
may be waived by the Planning Board if the project is located within a growth area designated in the
Town's adopted Comprehensive Plan and the Board determines that the project will not have an
unnecessary adverse impact on traffic flow or safety. .
A development not meeting this requirement may be approved if the applicant demonstrates that:
(1) A public agency has committed funds to construct the improvements necessary to bring the level of
access to this standard, or
. (2) The applicant will assume financial responsibility for the improvements necessary to bring the level
of service to this standard and will assure the completion of the improvements with a financial
guarantee acceptable to the municipality.
9.3. Access into the Site
Vehicular access to and from the development must be safe and convenient.
(1) Any driveway or proposed street must be designed so as fo provide the minimum sight distance
according to the Maine Department of Transportation standards, to the maximum extent
possible.
(2) Points of access and egress must be located to avoid hazardous conflicts with existing tuning
movements and traffic flows. ,
(3) The grade of any proposed drive or street must be not more than +3% for a minimum of two (2) car
lengths, or forty (40) feet, from the intersection.
(4) The intersection of any access/egress drive or proposed street must function: (a) at a Level of
Service of D following development if the project will generate one thousand (1,000) or more ,
vehicle trips per twenty-four (24) hour period: or (b) at a level which will allow safe access into
and out of the project if less than one thousand (1,000) trips are generated. :
(5) Where a lot has frontage on two (2) or more streets, the primary access to and egress from the lot
must be provided from the street where there is less potential for traffic congestion and for traffic
and pedestrians hazards. Access from other streets may be allowed if it is safe and does not
promote shortcutting through the site.
(6) Where it is necessary to safequard against hazards to traffic and pedestrians and/or to avoid traffic
congestion, the applicant shall be responsible for providing turning lanes, traffic directional
islands, and traffic controls within public streets.
(7) Accessways must be designed and have sufficient capacity to avoid queuing of entering vehicles on
any public street. '
9
(8) The following criteria must be used to limit the number of driveways serving a proposed project:
a. No use which generates less than one hundred (100) vehicle trips per day shall have more
than one (1) two-way driveway onto a single roadway. Such driveway must be no greater than
thirty (30) feet wide.
b. No use which generates one hundred (100) or more vehicle trips per day shall have more
than two (2) points of entry from and two (2) points of egress to a single roadway. The combined
width of all accessways must not exceed sixty (60) feet.
9.4. Accessway Location and Spacing
Accessways must meet the following standards:
(1) Private entrances/exits must be located at least fifty (60) feet from the closest unsignalized
- intersection and one hundred fifty (150) feet from the closest signalized intersection, as
measured from the point of tangency for the comer to the point of tangency for the accessway.
This requirement may be reduced if the shape of the site does not allow conformance with this
standard, ; . :
(2) Private accessways in or out of a development must be separated by a minimum of seventy-five (75) !
feet where possible.
9.5. Intemal Vehicular Circulation .
The layout of the site must provide for the safe movement of passenger, service, and emergency
vehicles through the site.
(1) Nonresidential projects that will be served by delivery vehicles must provide a clear route for such
, vehicles with appropriate geometric design to allow turning and backing for a minimum of WB-40
vehicles. a
(2) Clear routes of access must be provided and maintained for emergency vehicles to and around
buildings and must be posted with appropriate signage (fire lane - no parking).
(3) The layout and design of parking areas must provide for safe and convenient circulation of vehicles
throughout the fot.
(4) All roadways must be designed to harmonize with the topographic and natural features of the site
insofar as practical by minimizing filling, grading, excavation, or other similar activities which
result in unstable soi] conditions and soi! erosion, by fitting the devefopment to the natural
contour of the land and avoiding substantial areas of excessive grade and tree removal, and by
retaining existing vegetation during construction. The road network must provide for vehicular,
pedestrian, and cyclist safety, all season emergency access, snow storage, and delivery and
collection services.
9.6. Parking Layout and Design
Off-street parking must conform to the following standards:
(1) Parking areas with more than two (2) parking spaces must be arranged so that it is not necessary for
vehicles to back into the street.
(2) All parking spaces, access drives, and impervious surfaces must be located at least five (5) feet
from any side or rear lot line, except where standards for buffer yards require a greater distance. .
No parking spaces or asphalt type surface shall be located within five (5) feet of the front °
property line. Parking lots on adjoining lots may be connected by access ways not exceeding -
twenty-four (24) feet in width.
(3) Parking stalls and aisle layout must conform to the following standards.
Parking - Stall Skew Stall Aisle
Angle Width Width Depth Width
g0° _ 9-0" 18'-0" 24'-0" two way
60° 8'-6" 10'-6" 18'-0" 16'-0" one way only
45° 8'-6" 12'-9" 17'-6" {2'-0" one way only
30° 8'6" 17'-0" 17'-0" 12'-0" one way only
10
?
(4) In {ots utilizing diagonal! parking, the direction of proper traffic flow must be indicated by signs,
pavement markings or other permanent indications and maintained as necessary.
(5) Parking areas for nonresidential uses must be designed to permit each motor vehicle to proceed to
and from the parking space provided for it without requiring the moving of any other motor
vehicles. Double stack parking may be permitted for resident parking in conjunction with
residential uses if both spaces in the stack are assigned to the occupants of the same dwelling
unit.
(6) Provisions must be made to restrict the "overhang" of parked vehicles when it might restrict traffic
flow on adjacent through roads, restrict pedestrian or bicycle movement on adjacent walkways,
or damage landscape materials. |
9.7. Pedestrian Circulation ;
The site plan must provide for a system of pedestrian ways within the development appropriate to the
type and scale of development. This system must connect the major building entrances/exits with
. Parking areas and with existing sidewalks, if they exist or are planned in the vicinity of the project. The
pedestrian network may be located either in the street right-of-way or outside of the right-of-way in open
Space or recreation areas. The system must be designed to link the project with residential, recreational,
and commercial facilities, schools, bus stops, and existing sidewalks in the neighborhood or, when
appropriate, to connect with amenities such as parks or open space on or adjacent to the site.
9.8. Stormwater Management ;
Adequate provisions must be made for the collection and disposal of alt stormwater that runs off
proposed streets, parking areas, roofs, and other surfaces, through a stormwater drainage system and
maintenance plan, which must not have adverse impacts on abutting or downstream properties. .
(1) To the extent possible, the plan must retain stormwater on the site using the natural features of the
site. ,
. (2) Unless the discharge is directly to the ocean or major river segment, stormwater runoff systems must
detain or retain water such that the rate of flow from the site after development does not exceed
the predevelopment rate.
(3) The applicant must demonstrate that on- and off-site downstream channel or system capacity is .
sufficient to carry the flow without adverse effects, including but not limited to flooding and
erosion of shoreland areas, or that he/she will be responsible for whatever improvements are
needed to provide the required increase in capacity and/or mitigation.
(4) All natural drainage ways must be preserved at their natural gradients and must not be filled or
converted to a closed system unless approved as part of the site plan review.
(5) The design of the stormwater drainage system must provide for the disposal of stormwater without
damage to streets, adjacent properties, downstream properties, soils, and vegetation.
(6) The design of the storm drainage systems must be fully cognizant of upstream runoff which must
pass over or through the site to be developed and provide for this movement. ;
(7) The biological and chemical properties of the receiving waters must not be degraded by the
stormwater runoff from the development site. The use of oi! and grease traps in manholes, the
use of on-site vegetated waterways, and vegetated buffer strips along waterways and drainage
swales, and the reduction in use of deicing salts and fertilizers may be required, especially where
the development stormwater discharges into a gravel aquifer area or other water supply source,
or a great pond.
9.9. Erosion Control ;
All building, site, and roadway designs and layouts must harmonize with existing topography and
conserve desirable natural surroundings to the fullest extent possible such that filling, excavation and
earth moving activity must be kept to a minimum. Parking lots on sloped sites must be terraced to avoid
undue cut and fill, and/or the need for retaining walls. Natural vegetation must be preserved and
protected wherever possible.
Soil erosion and sedimentation of watercourses and water bodies will be minimized by an active
11 ;
. ' .? Py .
program meeting the requirements of the Maine Erosion and Sediment Control Handbook for
Construction: Best Management Practices, dated March 1991.
9.10. Water Supply
The development must be provided with a system of water supply that provides each use with an
adequate supply of water. '
If the project is to be served by a public water supply, the applicant must secure and submit a written
statement from the supplier that the proposed water supply system conforms with its design and ;
construction standards, will not result in an undue burden on the source or distribution system, and will be
installed in a manner adequate to provide needed domestic and fire protection flows.
9.11. Sewage Disposal . ;
The development must be provided with a method of disposing of sewage which is in compliance with
the State Plumbing Code. ;
(1) All sanitary sewage from new or expanded uses must be discharged into a public sewage collection
and treatment system when such facilities are currently available or can reasonably be made available at
the lot line and have adequate capacity to handle the projected waste generation.
(2) If the public collection system is not at the lot tine, but can be extended in the public right-of-way, the
collection system must be extended by the owner and the new or expanded use connected to the public
system. Such extension shail be required if the public system is within one hundred (100) feet of a new
use with a design sewage flow of less than five hundred (500) gallons per day or within three hundred
(300) feet of a new use with a design sewage flow of five hundred (500) or more gallons per day and the
system has adequate capacity to accommodate the additional flow. The Planning Board may waive this
requirement if the use is already served by a property functioning subsurface disposal system that is
'properly sized for the projected fiows, provided that connection to the public system will occur if and
when the subsurface system needs to be replaced.
(3) If the public system cannot serve or be extended to serve a new or expanded use, t The sewage must
be disposed of by an on-site sewage disposal system meeting the requirements of the Subsurface ;
- Wastewater Disposal Rules.
(4) When two (2) or more lots or buildings in different ownership share the use of a common subsurface
disposal system, the system must be owned and maintained in common by an owners' association.
Covenants in the deeds for each lot must require mandatory membership in the association and provide
for adequate funding of the association to assure proper maintenance of the system.
9.12. Utilities
The development must be provided with electrical, telephone, and telecommunication service adequate
to meet the anticipated use of the project. New utility lines and facilities must be screened from view to
the extent feasible. If the service in the street or on adjoining lots is underground, the new service must
be placed underground.
9.13. Natural Features
The landscape must be preserved in its natural state insofar as practical by minimizing tree removal, E
disturbance and compaction of soil, and by retaining existing vegetation insofar as practical during '
construction. Extensive grading and filling must be avoided as far as possible.
9.14. Groundwater Protection
The proposed site development and use must not adversely impact either the quality or quantity of
groundwater available to abutting properties or to public water supply systems. Projects requiring
on-site water supply
12
Applicants whose projects involve on-site water supply or sewage disposal systems with a capacity of
two thousand (2,000) gallons per day or greater must demonstrate that the groundwaier at the property
line will comply, following development, with the standards for safe drinking water as established by the
State of Maine.
9.15. Water Quality Protection
All aspects of the project must be designed so that:
(1) No person shall locate, store, discharge, or permit the discharge of any treated, untreated, or
inadequately treated liquid, gaseous, or solid materials of such nature, quantity, obnoxiousness, toxicity,
or temperature that may run off, seep, percolate, or wash into surface or groundwaters so as to
contaminate, pollute, or harm such waters or cause nuisances, such as objectionable shore deposits,
floating or submerged debris, oil or scum, color, odor, taste, or unsighiliness or be harmful to human,
animal, plant, or aquatic life.
(2) All storage facilities for fuel, chemicais, chemical or industrial wastes, and biodegradable raw
materials, must méet the standards of the Maine Department of Environmental Protection and the State
Fire Marshall's Office. . ;
(3) If the project is located within the watershed of a 'body of water most at risk from development' as
identified by the Maine Department of Environmental Protection (DEP), the project must comply with the
standards of the DEP with respect to the export of total suspended solids and/or phosphorous.
9.16. Hazardous, Special and Radioactive Materials
The handling, storage, and use of all materials identified by the standards of a federal or state agency as
hazardous, special or radioactive must be done in accordance with the standards of these agencies.
No flammabie or explosive liquids, solids or gases shall be stored in bulk above ground unless they are
- located at least seventy-five (75) feet from any lot line, or forty (40) feet in the case of underground
Storage. All materials must be stored in a manner and location which is in compliance with appropriate
rules and regulations of the Maine Department of Public Safety and other appropriate federal, state, and
local regulations.
9.17. Shoreland Relationship
The development must not adversely affect the water quality or shoreline of any adjacent water body.
The development plan must provide for access to abutting navigable water bodies for the use of the
occupants of the development as appropriate.
9.18. Technical and Financial Capacity
The applicant must demonstrate that he/she has the financial and technical capacity to carry out the
project in accordance with this ordinance and the approved plan.
9.19. Solid Waste Disposal
The proposed development must provide for adequate disposal of solid wastes. All solid waste must be :
disposed of at a licensed disposal facility having adequate capacity to accept the project's wastes.
9.20. Historic and Archaeological Resources'
If any portion of the site has been identified as containing historic or archaeological resources, the
development must include appropriate measures for protecting these resources, including but not limited
to, modification of the proposed design of the site, timing of construction, and limiting the extent of
excavation. :
13 ;
9.21. Floodplain Management
if any portion of the site is located within a special flood hazard area as identified by the Federal
Emergency Management Agency, all use and development of that portion of the site must be consistent
with the Town's Fioodpiain management provisions.
9.22. Lot Standard:
(1) The maximum iot coverage by structures and/or impervious surfaces Is twenty percent (20%).
(2) The maximum height of buildings, measured from the highest abutting grade, is 35 feet. :
(3) The minimum building setbacks are:
3.1.) Front yard - 50' from centerline of road.
. 3.2.) Side yard - 20° from property fine.
3.3.) Rear yard - 20' from property line.
3.4.) Shoreland - See Shoreland zoning ordinance.
9.23. Solar Access -- ,
No structure or use, permanent or temporary, fixed or mobile, shall unreasonably interfere with access to
direct sunlight for solar energy including normal, unengineered passive heating.
9.24 Comprehensive Plan and Ordinance
All aspects of the project are in conformance with all Friendship Ordinances, the Friendship
Comprehensive Plan and Land Use Plans.
9.25 Municipal Services
will not create an adverse fiscal impact on municipal services including road, fire, schools, and open
space.
9.26 Advertising Signs and Lighting :
The location, size and lighting of exterior signs shall not detract from surrounding properties. All exterior
lighting shall be non-flashing and designed to minimize their impact on surrounding property.
SEC. 10. POST APPROVAL ACTIVITIES
10.1. Limitation of Approval! .
Substantial construction of the improvements covered by any site plan approval must be commenced
within twelve (12) months of the date upon which the approval was granted. If construction has not been
substantially commenced and substantially completed within the specified period, the approval shall be
null and void. The applicant may request an extension of the approval deadline prior to the expiration of
the period. Such request must be in writing and must be made to the Planning Board. The Planning
Board may grant up to two (2), six (6) month extensions to the periods if the approved plan conforms to
the ordinances in effect at the time the extension is granted and any and all federal and state approvals
and permits are current.
10.2. Incorporation of Approved Plan
One copy of the approved site plan must be included with the application for the building permit for the
project and ail construction activities must conform to the approved plan, including any conditions of
14 ;
. approval and minor changes approved by the Code Enforcement Officer to address field conditions.
10.3. Recording of the Approved Plan , ,
10.4. improvement Guarantees
10.4.1. Application
(1) Improvement Guarantee - The Planning Board may require the posting of an Improvement
guarantee in such amount and form as specified in subsection 10.4.2. below as is reasonably necessary
to ensure the proper installation of all off-site improvements required as conditions of approval. The
nature and duration of the guarantee shall be structured to achieve this goal without adding unnecessary
costs to the applicant. --
(2) Upon substantial completion of.all required improvements, the developer must notify the Planning
Board of the completion or substantial completion of improvements, and must send a copy of such notice
to the appropriate Municipal Officials. The respective Municipal Officials shalt inspect all improvements
and must file a report indicating either approval, partial approval, or rejection of such improvements with .
a statement of reasons for any rejection.
(3) The Planning Board shall either approve, partially approve, or reject the improvements on the basis ;
of the report of the Municipal Officials.
(4) If the improvements are approved, the guarantee shall be released. Where partial approval is
granted, the developer shall be released from liability only for that portion of the improvements
approved.
10.4.2. Form of Guarantee
Performance guarantees may be provided by a variety of means including, but not limited to, the
following which must be approved as to form and enforceability by the Board of Selectmen.
(1) Security Bond - The applicant may obtain a security bond from a surety bonding company authorized
to do business in the state, ;
(2) Letter of Credit - The applicant may provide an irrevocable letter of credit from a bank or other
_ reputable lending institution.
(3) Escrow Account - The applicant may deposit cash, or other instruments readily convertible into cash
at face value, either with the municipality, or in escrow with a bank. Any such account must
require Town approval for withdrawal and must stipulate that the Town can withdraw the money
upon forty-eight (48) hour advance notice to the applicant to complete the guaranteed
improvements. . ,
10.5. Submission of As-Buiit Plans
Any project involving the construction of more than [twenty thousand (20,000)} square feet of gross floor
area or [fifty thousand (50,000)] square feet of impervious surface, must provide the Code Enforcement
Officer with a set of construction plans showing the building(s) and site improvements as actually
constructed on the site. These "as-built" plans must be submitted within thirty (30) days of the issuance
of a certificate of occupancy for the project or occupancy of the building.
10.6. Minor Changes to Approved Pians :
Minor changes in approved plans necessary to address field conditions may be approved by the Code
Enforcement Officer provided that any such change does not affect compliance with the standards or
alter the essential nature of the proposal. Any such change must be endorsed in writing on the approved
plan by the Code Enforcement Officer.
10.7. Amendments to Approved Plans
Approvals of site plans are dependent upon and limited to the proposals and plans contained in the
application and supporting documents submitted and affirmed to by the applicant. Any variation from the
plans, proposals, and supporting documents, except minor changes that do not affect approval
standards, is subject to review and approval.
15 ;
SEC. 11. APPEAL OF PLANNING BOARD ACTIONS
Appeal of any actions taken by the Planning Board with respect to this section shall be to the Superior
Court in accordance with the Maine Rules of Civil Procedure, Rule 808.
SEC.12. DEFINITIONS
12.1. Meaning of Words -
All words not defined herein shall carry their customary and usual meanings. Words used in the present
tense shall include the future. Words used in the singular shall include the plural. ;
12.2. Definitions ,
ABUTTING PROPERTY: Any lot which is physically contiguous with the subject lot even if only at a
point and any lot which is located directly across a street or right-of-way from the subject lot such thatthe
extension of the side lot lines of the subject lot would touch or enclose the abutting property.
ACCESSORY BUILDING: A detached, subordinate building, the use of which is clearly incidental and
related to that of the principal building or use of the land, and which is located on the same lot as that of
the principal building or use. , :
- ACCESSORY STRUCTURE OR USE: A use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated shall not subordinate the principal use of the
fot. A deck or similar extension of the principal structure or a garage attached to the principal structure by
a roof or a common wall is considered part of the principal structure.
_ AGGRIEVED PARTY: An owner of land whose property is directly or indirectly affected by the granting -
or denial of an approval under this ordinance; a person whose fand abuts land for which approval has
been granted; or any other person or group of persons who have suffered particularized injury as a result
of the granting or denial of such approval.
ARTERIAL: A controlled access road or a street or road with traffic signals at important intersections
and/or stop signs on side streets or which is functionally classified by the Maine Department of
. Transportation as an arterial.
BED AND BREAKFAST: A building or group of buildings, apportion of which is occupied by the owner
thereof as a permanent residence, and which building(s) is (are) designed or used for short-term rental of
not more than five (5) rooms to guests, and capable of including, as an accessory use the serving of
breakfast only, and exclusively to persons occupying the facility and their guests.
BUILDING: Any permanent structure, having one or more floors and a roof, which is used for the housing
or enclosure of persons, animals or property. When any portion thereof is separated by a division wall -
; without opening, then each such portion shall be deemed a separate building.
BUILDING FOOTPRINT: The area covered by a building measured from the exterior surface of the
exterior walls at grade level exclusive of cantilevered portions of the building. Where the building is
elevated above grade level on posts or similar devices, the building footprint is the area the building
would cover if it were located at ground level.
CHANGE FROM ONE CATEGORY OF NONRESIDENTIAL USE TO ANOTHER CATEGORY OF
NONRES!
DENTIAL USE: A change in the type of occupancy of a nonresidential building or structure, or a portion
thereof, such that the basic type of use is changed, such as from retail to office or storage to 4
restaurant, but not including a change in the occupants.
COLLECTOR STREET: A street that collects traffic from local streets and connects with arterials or a
street or road functionally classified as a collector by the Maine Department of Transportation.
CURB CUT: The opening along the curb line or street right-of-way line at which point vehicles may enter
or leave the street.
ENLARGEMENT OR EXPANSION OF A STRUCTURE: An increase of the building footprint and/or
increase in the height of the structure beyond its present highest point. Alterations of existing buildings
which are required in order to meet the requirements of the Americans with Disabilities Act (ADA) and/or
the State Fire Code are not considered to be enlargements or expansions of a structure and are not
required to meet otherwise applicable setback requirements, provided the alterations are the minimum
necessary to satisfy the ADA and/or State Fire Code.
16 .
ENLARGEMENT OR EXPANSION OF USE: Any intensification of use in time, volume, or function,
whether or not resulting from an increase in the footprint, height, floor area, iand area or cubic volume
occupied by a particular use. increases which are required in order to meet the requirements of the
Americans with Disabilities Act and/or the State Fire Code are not considered to be enlargements or
expansions of use. .
FISHERIES, SIGNIFICANT FISHERIES: Areas identified by a governmental agency such as the Maine
Department of iniand Fisheries and Wildlife, Atlantic Salmon Authority, or Maine Department of Marine
Resources as having significant value as fisheries and any areas so identified in the municipality's
comprehensive plan. :
FLOOR AREA: The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
GROUNDWATER: All of the water found beneath the surface of the ground. For purposes of aquifer
protection, this term refers to the subsurface water present in aquifers and recharge areas. .
HISTORIC OR ARCHAEOLOGICAL RESOURCES: Areas identified by a governmental agency such as
the Maine Historic Preservation Commission as having significant value as an historic or archaeological
resource and any areas identified in the municipality's comprehensive plan. .
HOME OCCUPATION: An occupation or profession which is customarily carried on in a dwelling unit or
structure accessory to a dwelling unit which is incidental to residential use and employs two or less full-
time equivalent outside employees.
IMPERVIOUS SURFACE: The area covered by buildings and associated constructed facilities, areas
which have been or will be covered by a low-permeability material, such as asphalt or concrete, and
areas such as gravel roads and unpaved parking areas, which have been or will be compacted through.
design or use to reduce their permeability. Common impervious surfaces include, but are not limited to,
roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphait paving, gravel
roads, packed earthen materials, and oiled, macadam, or other surfaces which similarly impede the
natural infiltration of stormwater. _ .
LOCAL STREET: A public street or road which is not identified as an arterial or collector. A local street
includes a proposed street shown on an approved and recorded subdivision. oo
' LOT AREA: The area of land enclosed within the boundary lines of a lot, minus land below the normal
high-water line of a water body or upland edge of a wetland and areas beneath roads serving more than
two lots.
NATURAL AREAS AND NATURAL COMMUNITIES, UNIQUE NATURAL AREAS AND NATURAL
COMMUNI
TIES: Areas identified by a governmental agency such as the Maine Department of Conservation Natural .
Areas Program as having significant value as a natural area and any areas identified in the municipality's
comprehen
sive plan. .
PRINCIPAL STRUCTURE: A building other than one which is used for purposes wholly incidental or
accessory to the use of another building or use on the same premises.
PRINCIPAL USE: A use other than one which is wholly incidental or accessory to another use on the
same premises. .
RECHARGE AREA: Area composed of permeable, porous material through which precipitation and
surface water infiltrate and directly replenish groundwater in aquifers. i
SETBACK, FRONT: An open area extending the entire width of a lot from lot sideline to lot sideline and
extending in depth at a right angle from the street right-of-way to such depth as specified. Such area
shall be unoccupied and unobstructed by any building from the ground upward.
SETBACK, REAR: An open area extending the entire width of a lot from lot sideline to lot sideline and
extending at a right angle from the rear property line of such lot to such depth as specified. Such area
shall be unoccupied and unobstructed by any building from the ground upward.
SETBACK, SIDE: An open area extending along each sideline of a lot between the front setback and the
rear setback on such fot and extending at a right angle from the sidelines of such lot to such depth as
specified. Such area shall be unoccupied and unobstructed by any building from the ground upward,
STRUCTURE: Anything constructed or erected, which requires location on the ground or attached to
something having a location on the ground, but not including a tent or vehicle.
SUBSTANTIALLY COMMENCED; SUBSTANTIALLY COMPLETED: Construction shail be considered
17
to be substantially commenced when any work beyond the state of excavation, including but not timited
to, the pouring of a slab or footings, the installation of piles, the construction of columns, or the
placement of a manufactured home on a foundation has begun. Construction shall be considered to be
substantially completed when it has been completed to the point where normal functioning, use, or
occupancy can occur without concern for the general health, safety, and welfare of the occupant and the
genera! public. At a minimum it shall include the completion of no less than [seventy (70)] percent of the
costs of the proposed improvements within a develop
ment and shall include permanent stabilization and/or revegetation of areas of the site that were
disturbed during construction.
USE: The purpose for which land or a building is arranged, designed, or intended, or for which either
land or a building is or may be occupied or maintained. ;
VEGETATION: All live trees, shrubs, ground cover, and other plants.
WILDLIFE HABITAT, SIGNIFICANT WILDLIFE HABITAT: Areas identified by a governmental agency
such as the Maine Department of Inland Fisheries and Wildlife as having significant value as habitat for
animals and any areas identified in the municipality's comprehensive plan |
SEC. 13. SEVERABILITY
The invalidity of any section or provision of this ordinance shall not be held to invalidate any other
section or provision of this ordinance. .
18 ;