Town of Greene Land Use Ordinance
Greene, Maine
· adopted 2001-03-03
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 96356752eb48 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Adopted: March 3, 2001
Amended: March 8, 2003
Amended: March 6, 2004
Amended: January 23, 2006
Amended: March 7, 2009
Amended: March 6, 2010
Amended: March 5, 2011
Amended: September 13, 2021
Amended: June 18, 2022
Amended August 5, 2023
Amended August 3, 2024
Amended August 2, 2025
Amended April 11, 2026
Carol Buzzell, Town aa oer
2
TOWN OF GREENE LAND USE ORDINANCE
TABLE OF CONTENTS
PADECN Tice cece cence eee cette teteeeeeeeeeeseetseseessseeeeseaasseecsserssececseesussenisecsisessesccsssscssecventsevssesessststessssessecesss, 121
T1014 GO era nnn... eee cece eeeeeeceeeeeeeeeeeeeeeeseseeeseeascseeacsscecesesseseeueasesesseceseesesevsaseeveresenneverssetsteversessesseesteee P21
1-101.1 Authority 2... ccc cee eeceseceeceeeceseeeseenseeeaeesseceeecesaeseseesaseaesesesestesseesteeseetcsetetersees 121
1-101.2 PULPOSE ooo. cece ccc eceeeceeeeeeeeeeeeeseccseeeessenaeecasecsaeessceceseateresasecsteststeseectectesteisesecseeee 124
1-101.3 Applicability 2.000000 ceecccccececccccceeccecnsseecersaseeueesassecussseesenssseeserssesueriseeetssetecsecerses 121
1-101.4 Effective Date oo... cece cee ceetee sen eeeeeaseceescceceerssseseecrtreserisevtertsseseveversene 41
1-101.5 Validity and Severability 00.0.0. cece cceeceseceeceescceseceeecsesesteestesseestveessessetteterseee 121
1-101.6 AMO@NAMEeNt 2.0... eeecceceeccececeecsececceateesecceeeesesseececensteesnseetenssserecsessseevsstesesststssveseseeens 122
1-101.7 Conflicts with Other Ordinances 00... ccc cece ccc ceseeesceseseseeeseteeesesessessessestesesseenee 122
CHADS 2... icicle cect cscs ecneeteseeeaeeeessseeeseeeaesesseseseccaecaesesesesusecaseesssesssesesscessensessssesssscsstesscissttsecsererevseesss 2-4
2-101 Non-Conformance o.oo... eeceececcceeccccceceeeeeeeceeeceeceeseecesscesetecseeeseeeessesueessecessestenssenseessecnseersterstasvsvessessses Qe
2-101.1 PUPPOSE ooo. cece ccc cecc eee ceteneaecesesececeneceeceecseccueaueessesassstesstececensrssevstecerssseecsisrsseeresees 204
2-101.2 GOMOLl o.oo. eee e cece eeenee eens eeescssceesaeceeeeesaeeecsuessecescessseessseessesnesserneseetesstitsessesersee 201
2-101.3 Nonconforming Structures 2000.00.00 cccccccccccceecececceccaeesesccesseccseeeesssersevetseenaeensteseaseeesen 201
2-101.4 Nonconforming US@S 0.0.2... cceccccccecscccesceceseeeesuesseseccesseseusesessecesseereserseeenssesentenseesenes 209
2-101.5 Nonconforming Lots of RECOM 0.0.0... ccc cccceceeceecscesenectecscecnssceeseeeessesteteensesetetesenns 204
CRADECL 3... cece ccc eeececeeeeeeeseeesesceecesecaeessasesasseseesceeescaesvasesseesasesseussesssersserssessensesvivectisssssscvssesstsesessessesenes B24
3-101 Land Use Performance Standards........0....0cccccecccccecccccecssceeessecenseseessecesecesivecssecenseesnasecsisesstrettseseeeeerens O91
3-101.1 GOMOTAl oe cccecceececcceceneceeceeceneceesaeesusaeesscecccseeccssecesseecseceesresersatecsetsrneertssteesseeess OW
3-101.2 District Uses and Dimensional Requirement .........0...0..ccccccescceesseeceseeenscceesttcsevsneseennees O91
3-101.3 Use Of Backlots 20... ceccccccceseceenseceseensaeeescesscececerseceecsseecersseteseestecsntsseessssesseaeese Qe
3-101.4 Lots of Record Served by Nonconforming Rights-of-Ways and/or Streets ....................3-8
3-101.5 CAMPQFOUNS 00... eee eee eceeececesecescececesescseeecseecenseecsuesesteersssectreterstestsseeneenseeeseserses OO
3-101.6 Erosion and Sedimentation Control ........0.ccceccccccceesecnscceeseeeessescssetcseserseecettsttitserses G98
3-101.7 Multi-family Structures o.oo... ccc ccccccceccessececcesseeeecnseeeeensaeeesersssescrstesecstcestentesaeees OG
3-101.8 Off Street Parking and Loading... ccc ccc ceceeecceteeeseeeeseseetcsseesseseesesecsseteereeser O10
3-101.9 Sanitary Provisions oo... ccc cccecceceeeeeeeeseesseesaeeeseeeseseseeeseeesseesseecstesatecscessssesseersee O24
3-101.10 SIGNS ANd BilDOAAS 2... cece cette eeeteeceeeeeeeteteeeeetssseeestessescestseeseseeecsterseeeesenss GOT
3-101.11 Water Quality Protection 2.0.00. ccccccccccctececceseeceensseesecssseceecstsateetstseesmtenerteeersee G42
3-101.12 HOMe@ OCCUPATIONS... cece cecceeeeeceeeeeeeeeeeeseeeeeecesseceseeteseeessseeeesaecssseccsstccstetsseeenese G42
3-101.13 Filling, Earth Moving and Storage of Minerals ..0......0....0.cccccceceeee cece teens cectecteeenensenenns O14
3-101.14 Apartment Conversions............ceccceccccccccecceeeneeceneeeceeeceesecetsceecseesensteesiecetssessiesterensene, G14
3-101.15 Elder Cottage Housing Opportunity (ECHO) Units ..0....0 eee cette e tec ceeteeeeeern O14
3-101.16 Accessory Dwelling Unit ....0. 000i eee tence rete tet ete ttt tte rece ttete neces G14
3-101.17 Individual Lot Phosphorous Management ..............cecccceeeseeeetteeeeeeteeccstsetceetereenere ee O15
3-101.18 Lots Created After 3/08/03 Served by Existing Private Nonconforming Rights of Way
ANG/Or ROAKS 20. eee eee ceececcecceeecesnnneeesaeeasasaaaaaaasaseeensaceeeeeeccecseeeeeeestcestesecctrerseeeee Qed?
3-101-19 Adult Book Video Stores and Adult Entertainment Facilities 00.00... ccc ceeeeeeeeee O18
3-101.20 RESCIVEM 0... eee ecccceeeeeeeeeeceeeeeeeeeeeeeeessceeecnsseeesersseeeessseeesensetessssecesstreeesssseteeeeesessees O18
3-101.21 Shoreland ZONES 20.0... ceccccceceeeceeeecseesesaseeeeesseccessaescccsssesscsssesssetsseesesseeesecseesee O18
CHAD 4 oe cece cteeeceneeeteeeeeseeeeseeeesneeesneeeeseceessseessessseeecessesessecetssecssessesssesssteesseectscstessscetsecersecertecesersees 409
4-101 Administration and Enforcement ............ccccccccccc cece cecccessecccseeenseeeceseecsseeeseesesscccssrtscssesessecerseecsteaceseneeree 4e]
4-101. Building or Use Permit Required. oo... ceccccccccccceecetecteceeststssseeeesesenstsstetesersserereessess 4e4
4-101.2 Plumbing Permit Required ............. cece eeeececcececeeeeneeeceeeeeeeensaeeeeseseseessttetecsssstereserecsers 402
4-101.3 Occupancy Permit Required .....0.. cece cece cee ceeeceeenececestsetecnssstesesseseccssecesesssenerers, 402
4-201 Violation, Enforcement and Fines... ccecccceecececccccccceeeecececereccecenececsscaeeeeeeeeseeeasssessaeeeecttecscscesess 402
4-201.1 Violations and Enforcement ............cccccccccceeeecccceeeeeeeenceeeeeeseeetaceeeeesesssssstesesssttetsseeesseses 40d
CHADS Dooce c ect cceeeee cece cence cece eae eccet nets eeteeeeee ee aaeeeeeedaeecceeesescesaesectiaaesscsssseccessesesessececeeststessrisseseesitievsresees OF
5-101 Street Construction Standards 2.00.2... ccccccccc cece cee ceee cece eseteeecesesescestesesiseseuseseteetesscesssestciteeseens Dd
5-101.1 Applicability 22.00.00... ccecccccccccceeeeeeeececeeeeeesessaseeeeeeecessaeeeeeeseesssseeeeeeesesssseessessstetsreceseeses DOT
5-102 Administration... cece cece ceecneeceeeecceceeeeeeseeeesaeesccssescesessseescessesessaeeeeessereecersreeseeteccttsteteseessens Do
5-102.1 AGO 7... ee eececceceeeeceeeeeee eee ceetescecceseeeeccesaeeeesnaeeceseasetecnseeesetssateessteeeessseesttsseessees DOT
5-102.2 Pre-application Meeting ........ ccc eceecceeneceneceseeeeeeeeeeaeesteeeesaeeenseeesseeeetiseesirsetettenreeesen D* 1
5-102.3 Application in Writing... cece eeccecneeceereeeeeeseeeeseeaneeesnneeesntteteessteectttsteeseeseeeees DOT
5-102.4 Street PlANS oo... eee cece cee cceceeeeeeeececeecaeecesseceecesseeseeesaeececseeeesetasesecssecscssssseceeseesensses DOD
§-102.5 Additional Studies 2.0.0... ccccccceececc cee cecesneceeeceeeeseeeececssssaeeeeceecerssssseeeecesssrtesseesssseess D2
5-102.6 NOTICE ccc cece eee e ee eee eee eee e este eee eee ceeeceeeeeeeeesseceeeesseasicassaaaasassssaaessssssseecccnrsseeesess DOO
3
5-102.7 Financial Guarantee o.oo... 2... cece ee eceeccece cece ceceetaece cee teseeeeeteeesssteeeetesectstsseeeeseeesteeeees O72
5-102.8 CONITIONS ooo... ccc cee cee e cece eee ee cee tt se ceeeeeeteseeesesseesassaeeessseetetiseeeseestttttttssserees O78
5-102.9 Expiration of Approvals .00..000000. ccc ccce cece cece eeececeeeteseeeeeeeescettseettsssstesisasiiceeceee DOO
5-102.10 Submission Requirements and Procedures 00.00.00... ccceccecescseeeceeeeececessetteetetteeeeeteereereees DOD
5-102.11 Public Acceptance of Streets oo... ccc cece ee eeeeeceteeteeeeeeeteteeeeeeistietessesssseeeeess OPO
5-201 Street Design Standards ........... cece cece cece cccseeeneseeeeeseeeseeeeeeeeeeseeeeeeeestttteceeeecsseeeees OG
5-201.1 Street Design Standards ........ 0. cece cescere cece cece eeeeeeeeeseteeeeeetteeecctstteccecerseseee DOO
5-301 Street Construction Standards ......0000. ccc eee eeceeeeeeeeteeseeseeeeeseetetetsssesesssssseeees OG
5-301.1 Street Construction Standards ..............c ccc ccccccc cece cceeeeeeseeesteeceestttsstsecstssssseteesesiees DY
tore 10 RAN 0) 6) \-| inns ren nnrrrrer > ro 16)
CHADS Boo... eee eee EEE EEE EE EEE EEE EEE e ee ee Eee e eee EEE EEE dE EEE Eee ad bbtteeeetetteeteettttnattiettsetettsaesstsesanetsesscsessss, OWT
6-101 Site Plan Review for Non-Residential Development Proposals «0.0.0.0... ccceccccecsetettesseecesetreeeeee B91
6-101.1 PULPOSE oo... cece cece cece cece cece cece eee e tetas bebe ecee test ces ua nasa nneeseeeteetesetuaasttessteteettreteteees O71
6-101.2 Applicability 0000000000 cccc cc cce cece ee eeneeeeseesecesseaseeseeeeseseeescestessssreteeeteesetstessatsees. 071
6-201 AdMimistration 2.2.2... cee cece ctt teeta eee e ceases eee ee cece eases eeeeeeeeeeeeseeeesesceecetceccsetttttttttttsteetssssasieseeee, OF
6-201.1 Code Enforcement Officer Site Plan Review Approval.....0..0000...ccccccecceceeeseccceeeeetenseeee B49
6-202.1 Planning Board Site Plan Review Approval ..........000....cccccccceccecceeeecectetteteesteeeeteeeteeeeee OW2
6-202.2 AGO o.oo cece cece cece eeeeeeeeeee ee eeeeee cette eee ee cece see eeeeneeeeeeteeeeeceeeesteetetetsssssesstsseeeseesssasseeeeess, OOD
6-202.3 Pre-application Meeting 200000000 cc cece cette ceeecebeeeesceteretettrrieetetetetesstrreeesersnerse, O72
6-202.4 Application Procedure 2.0.0... ccc cee seeceeeeeeeeceeteeteetescetteetetttttttttttttstteteerrsiisees O78
6-202.5 Applications in Writing «2.2... ccc ccc ce cece cece cesta ereeeeeeeteeseasesrasaasetteetestettastete O78
6-202.6 Development Plan ....... occ ccc cceeeeeeeeeeseesseeeaeeeceeeseseseeeesssteasaeeeeestetteesetssteetre O78
6-202.7 Additional Studies 2.0.0.0... cecccecccecccceeceeeeeeeeeeeeeeeeeeeeeteeeeteeeeesstsssssssssssssesseeeseseesteeeeeees OOO
6-202.8 NOtiCe oo... c eee cece cece cece cece cee teeeeeeeecteeaseaeeeceecescssaseeeteseasaseeeetessstsesececsssteteseteeeserseses, O74
6-202.9 Financial Guarantee ........ ec ccccc ccc cece eee e eee ee cee eee eee ceeceeeeeeeeeetccetcsteteesettttistaessassaaeseees OF4
6-202.10 CONMILIONS ooo ccc ccc eee c cece cee eeeeeeeseeeeeseteestcccecetsettseesessatsevsusaessseeetereeserrertiesseress O04
6-202.11 Expiration of Approvals ......00.0...0cc cece ccececeettteeeceescetteateeeeseeettestecectetteetetteteeseseree O-4
6-202.12 Minor Changes to Approved Plans ...........ccceccccceeeccc cette sett teeetteeeeectitttttetestetteeeseees O-4
6-301 RESCPVE oo... ieee cceeeeeeeeeeeeecee cece eee eee eee cette eee e ee teeeEEEEEEEEEEEEEEEEEEEEEEEEEE EEF Seb ft bd Sobtsadtatsaaaeattuneteeeceeteetettersseess OOF
6-401 Site Plan Review Application Requirements... cece e etter tet ettttttssseeseteeetsetseestettttesseeee OF
6-401.1 SUDMISSIONS 00.0.2... eee c cece cece e eect tebe eee teeeeeeeeeettttteessseasaseeeeeteteetetestetetttteteteeterte OO
6-501 General Review Standards . 2.0.0.0... cccccccccccccceececceeeceeeeeeenneeeeeeeeeeccsssseeeeseeeetsseseseststtstteteettttettssesesses On
6-501.1 Standards 2.0... cece cece cece ee eee eee e beeen nee eeeeeecesaeeeesesesccttseseeeeetttsseteetstessttteeeerse OOF
6-601 Specific Standards 0... cc ceccceeeeeeeeeeseeseeeeeeeeteensaeeeeeeeeecnsteteeeessstestssetesestssssssesetsteseeeseeterseee, O15
6-601.1 Ground Water Protection .............0c cece cece eee e cece cece cece et ttte tee a tess eeateseseestatetieeteeeteeeeerereee O15
6-701 WAIVElS 022... ieee ccc ceeeeeeen cece eee eee e eee EEE EEE EEE EEE EEE EEE ELLE ELLE EEE EE EEE EEE eee Ee be bb ttt tf ttt te tsaeetaeaeeetaeeteteeettceteeeteeeees O17
6-801 Appeals o.oo... cece eee eeeeeeeeeeeneeneeeee eee eeeee eee eaeeeeeeeeeeeeeceeeeeeeeeseeeeeeceseeseesseceeeesstteesstisstttsteeeeetstssseeeee O17
CADE Looe cece eee nee EE ELLE E EEE E ATEN L LEED HALLE EEE EEE EEEC EE GG EEE E eda EEEE cd eeEEce edd eeetesessesttessttessstinstsetssssssettasecsesstses Dod
7-101 Subdivision Standards ....... ccc cece cece cece eee e ee eeeeeeeeeeeseeceeseaaesessaaaasaseseseeeeceeteeeteescetseseseserseeee Lod
7-101.1 PUIPOSES 0... e cece cece eee e eee eeceeeeececeeeeeeeaeeeceeeeeseesssssesaeeeeseeteeesessssstssttetteteeteeteesesesersseee Lod
7-101.2 Applicability 0.0.2... eeeceeeccccceceeccsneeeeeeeeeeeeensaeeeeeecseseseeseeeeetisettesesststssssesessesssseseeees Do
7-201 ACMINIStration 2... ccc c cece eeeee cece eect ee eeeeeseasseeeeeeeesaaaseteeeeeceeeeseeaassttteeesceeteestesetsstssttisssecessstn bol
7-201.1 PAXC[-1 60 [- rr ccc rr eer rrr Co
7-201.2 Pre-application Meeting 2.0.0.0... cece eeeecceeeeeeeceeteceeteeeteetettettteettsttsttsteteesssseeeee Dvd
7-201.3 JOInt Meetings 0. cece eee ne cece cece cent aeaceeeesesteaseeeeeeeseststeeeeettesssseeeeessstssttstecesseee P72
7-301 Minor Subdivisions (five [5] lots or leSS) 0.0.0... cece cece cette tease ae sa ssaaesseseeeeeeetseettescteeeecstetectenne L72
7-301.1 GENET EEE eee eco tooo cetbttidbebettttittttttttttettttecetseteteeee D2
7-301.2 PLOCCCUIE oo... eee e cece cece cece cece cece ee ene teeta e eee en teens ctetaaaaaaaaseaeeeeeaeeaeeeseeeeeceeesecsesttetetessseteeseeees E72
7-301.3 SUBMISSIONS 0000.0 c cece cece eee eee e eee ee cette eeeeecceeecesetettssceetetetsttststttssstseseesessstassssesees [td
7-401 Preliminary Plan for Major Subdivision (More than five [5] lots or containing a proposed street) ..........7-4
7-401.1 PLOCECUIC 200k e cece cece cence cece eect cee tt ee tet tote aed tteeeteteet tees ead ttettttteeeteteeeteetetetteeteteeeesess P74
7-401.2 SUDMISSIONS ©... ooo cece eee cece cee eee be cece eee e tebe ead eebeeteetetetecetteessessteetssettsee ETO
7-501 Final Plan for Major Subdivision... eect cect eeeee ten ttnt ae ae eeeeeesaasaeeeeseseetetetetttetteetetetesceee £76
7-501.1 PLOCECUIE oo... eee ee cece cette eee ee teteete cece eaaaeaeaesaeeassesssteesessesesssteeteeseetsetseterseess E76
7-501.2 SUDMISSIONS 000000... ccc cece eee e eter e eee ee cece tbe e tte ttentbttetentettesasseesesttseetecceceeetteeeee bol
7-601 Final Approval and Filing....... 0... cece cece eee cece eceeeneeeeeeeeeeneceeevaeaaaaaaesaeessaaesaeseeseeceeeeteetesctsestetteesecseee E78
7-601.2 REVISIONS 000.0... occ c cece cece cece cence e eet e eee ttn bec ct cette et taceeeteeteeteeteeetesteteesteeetetsesteeees EB :
7-601.3 Acceptance of Street, Easement or Open Space .......... 0... e ce tette tet teettetteee 1B
7-601.4 Construction of Necessary Improvement .......... cece c stent a teeteetteeriresseeesee LQ
7-701 Performance Standards ........0.....0cccccccccc cece cece cece eect ee etee eee cece tetnenentsttteeessstttesestasssseteeesetsssstssseseeee 1G
4
7-701.1 Conformance with Comprehensive Plan ............0.000.ccccccecccsesecesesscecenseseesnersevtsvesereeces, P98
7-701.2 Buffer Provisions ........ 2... eeccccecccccc cence ceene cece se eeeseeeeeeesceeececscesesasersetentiteneterertrtcerees P78
7-701.3 LOES occ eee ec eee cece ee veeeeeeeeeeceaeeceseesnaeeccessecesseesessetssesetsessuesetsecensesstssetsesccsstseceercerses 128
7-701.4 Water Supply 0.2... cece cece cece cceececeesenaeeeesecesecsesaeeeesaeececsceauesessscescecsstcrsecteteeeeees £99
7-701.5 Sewage Disposal ........ eee cece cece cesceseecesecsseecesseeeesensceseesssecesesssssestssseesesertssssetsseses PQ
7-701.6 Surface Drainage 2.0.0... ceeec ccc ceececeenaceeceeceseseeecseeecsseccasscecesenesseetssenteteensetsvsessesssee PQ
7-701.7 LAN FEAtUreS 200... cece cc eececcecee cee ceeseeecesesseeeeceseeecetsececnsseesecsreesecsetesertisesttessteereesee £29
7-701.8 PhHOSPhOrous Export... cece ccceeeceeeecscscceeseeeaccecensecesensceeeesseecesersssecststttssstrteneecsees PQ
7-701.9 Construction in Flood Hazard Areas ..........cccccc ccc ccteeeeeectetscceeeceesceenscteseensesnssnreeeeeesee 2210
7-701.10 Mobile Home Parks .00......0 occ cece cee ce cccseteeneeeececcsaececesesesenssesesettssetestrevesteseeseeeess F210
7-701.11 Multi-Family Residential 0.00.0... cceccceseceeeceeseeecseeeccseceeseeecscetssstesssteesessssteeeessses F242
7-701.12 Municipal Services 200.0... cece ce ccceececeeceseesecssaescrtscscenserececsseeeseseeteessateestesseesceessee £212
7-701.13 Open Space Subdivisions .......... ccc cccccceeceeeececeessserensseecessseeecssseeectatesesevsseees L213
7-701.14 Access Control and Traffic Impacts 200.0000... ccc ceceeceesecesteeeessssessesetsetesstettteesee £216
7-701.15 Ground Water Quality .....0.0.00 ccc ccccccce cece cceneeeceescersseecsaecesseceseserseevsteenevsteseseeeene PAV
7-201.16 Protection of Significant Wildlife Habitat ..0000000 ccc cececccccteceeestretertrertesseeseees L217
7-701.17 SCENIC LOCATIONS oo... eee cece ccc cece cee e ce ceneeecesseccsaeeenseesesesecssesersesesatestseesstecnstvreseeseeeee 2218
7-701.18 Archaeological Sites... ieee cecccccccescseeeceseceeeessaseeeesssecccsseceetsseeeseiseestsestersesersees £218
7-701.19 Historic LOCALIONS 00... cece cce cc ceete cee eeenceeeeeceeesessseteccassesecsssceetstesscesssettstestteerseee F918
7-701.20 Endangered and Threatened Species 2.0.0.0... ccc ccecccceecteceeccsteesencsectecstseettteteseeeeees £218
7-701.21 SOND Waste oo... eee cccceceecccenseceeeeesseeeeesseeesseeecsseccsseeessseessscesssssesstescsaterstecssceatsatseeceres P48
7-801 Street and Storm Drainage Design and Construction Standards .....0....000..00.cecccecccceeceeesseeeseecseesvssevssses 7218
7-801.1 Street Standards... ceececesc cesses eesecceeseeessecesssecessscesasessseccsseeersecsttsteatereeeree L218
7-801.2 Storm Water Management Design Standards .............cccccccccesccsseecsteseeteteesscestestsseesenes F248
7-901 Performance Guarantee ........ ccc ececcccccenceceessssceccesseecenseseeescenseecceastesserscessesrscsessseseestsseserssessvsessereees F219
7-901.1 Types of Guarantees o.oo... ccc cccccccccccsnsesecesceeeecsseecessseeecessstecetsseesstssaseetsstttteeeseeee 219
7-901.2 Contents of Guarantee 2... ieee ceceneccccecccectesseeceeessesenssaesecssarseetsteteetssetieseeseses PANG
7-901.3 Phasing of Development. 2.0.0... ccc ccc ececcscccesnssecessseeeeeeseeeeetsetesetsttesttsteeeeeees 2219
7-901.4 Release of Guarantee ooo... ccceeceecteeeeseseccssesececsssseecsseesetsseteerssstsstststeseseeee LOG
7-901.5 Default o.oo... eecccceeeeneeeeceneceeeeeteeeeseaeeesessaaseeeeesseseesaseeersssecssesseceststesesttssteettsseeeeeee L919
. 7-901.6 Privately-Owned Streets oo... cece cece eeeccneeeeeesesceneeensesnesssesisessseestetssteeeteseeees L219
ATTO WAIVELS ooo. eee eee eee ce cece cence eee eetaeeeeeeeeceeecseecesesaeeeecsssseesesseecesssseseessstecssaeesersseesessateettesseseseees F720
7-110.1 WAIVETS occ ccc ceeceeceeeenceeeeeenseeeesaeeeeeeeseeeeeecsseescsseeesccssseceeesseestssisecststeesetsscestesersses 720
7-110.2 REQUIFEMENES ....... cece ce ceeececceeeeeeeteececeeteseeeseeecesetsasescsssacescctitessttisesersseeeessteitesesersees "20
7-110.3 RECOIING «0... eee cecceccececeece eee eeeeeeeetaeeeeeecscseecetseesccssetesesstesctteececsseteetssesesssesseseses L820
7-111 Inspection and Enforcement ......00.. ccc cccccccccccccccescecceensseeeceesaeesecseeeseessccserssseeeessaseeerssteteeetettesesssseees 1220
7-111.1 inspection of Required Improvement ............. cc cceceececceeceeeeetteeeeteetetttsseeestttteeteeesseees 1220
7-111.2 Violations and Enforcement. .......... ccc ccecccccccceeeececceeseeeecesensseeeeeseettsssseeeecstseesesssseees 1720
7-712 APP als oe... eeececceencececcceeaeeeeesaeeeeeeseseeeeeseeeeceseeeseesaeeeesesseeescsseesccsssecctssseecceseteestteeeeettsateiesesas Pe
CHEDCL Boose c ccc et net eee tee tee eecnne eee eeeneeceeeteeeeeeenteeeeeeeaeeeeseeseeseeceeeceeeateetesseessissesecssstecstseesecstseerttrtssessees OOF
B-101 Appeals oo... ieee cenccceeeeessaeeeeeeeeeeeeceaeeesesseseneeeesessuceceecsseeeecsseccesaeeecesssssesesseesersseeeecssttisserseesseses O14
8-101.1 Board of Appeals .......... ee cceccecceccececeeeceeeeeeceeeseeeeeescetsaeeeeeeccessssseseserttttseseeeeseettsseessseees On
8-101.2 Powers and Duties 2000.0... c cece cece cc cceeeeeeeeeeeeeetcsassaasaasaasaueeaeeaeaasssseseseeccnecesssesess OF"
8-101.3 Appeal Procedures... ccc ccc ceceececeeceeesseseeseesesseseeeaeeeeecaaeeeeeeceeeeeccccccseessesscrersiaeees Ol
CHADS O..o. ec cccc cece cette eeeseceeecesssteeeesneeeeseeaeeeesenseeesesaacestaeeetessceeesuseetenssseseststeecetsetessststesessssecssstcssecteeseree GF
9-101 Building Standards for the Town of Greene... cee cceeseeeneceeaeeeeeeseaeeesteeceaeeesteeeestteetsesetestcstesseses God
9-101.1 PULPOSE ooo... eee cece eee cece ence cece ee eesecceeeeeeeceseesaaeeeeeeceesaseeeeeectsttsseeteceesssssesetetettiestesseeess G1
9-101.2 SCOPE oo ecceeccceecceceecenenaeeeeeeeeenacaeeeeeeeeceeneaeeeeeeesessnaceeceeeesesseeeeeseeetessseeesscseerssescesees God
9-101.3 Building Inspector/Code Enforcement Officer 2.000... cc eee eeeeeeeeceeeeteeeetttteeeeeeeeeeeee G1
9-201 Permit... cece cc ceeenc cece ceeeeeeeeeeneeeecesaeeeeeseeeceeeeesesseeceseeseeeeesesessetesecsssseeesttestestssesertteseeseesees OWI
9-201.1 APPliCation eee cece eee ceeseceeeesesennneeeeeeeseseteeeeeeesesttceeerersesiteteeteeetsstsssesessseee, Oo
9-201.2 Permit Approval ............cccceeeecceceeeeneeeeeceecececeeeeeessaceeeseaseecssaseceeeeceeenssseceetstetecttessesereesees D1
9-201.3 Life Of Permit 0... ccc cc cece ce eeeeeetessseceeeeeeeensseeeteseeeesseseeesecesestisccercettirecesseeenee O41
9-201.4 Display of Permit. 20.0... c ce eecccce cece ee eeeeeeeeeeeeeesaaaeeeeeeseessaceeeseestessseeeeeeetteereesseeses Goo
9-201.5 FOCS cece ccecceccceccceceeeceeeeseeeeeceeeseusceeeeeeeeseeetseeeceeseeesetsscessestetseeeeseeeestssseeseecssetesseseeesse GOD
9-301 Installation of Public Utility Service ooo... cece cece ceeeeenceceeeeeeeeenaeceeeeseesssseeeeeeetettssessescetsteeseesseeeree G72
9-401 Standards ooo... eee c ec cceccceeeaeeececaeeceeceeeeceececessaeesecesseeeseesseeessasccssseeesecseesessseecsestetesstseessssees G2
9-401.1 FOUNCATIONS 220... c cece eee eeeeeeeeeeeeeeeeeeeeecccceedseennsssasaaaaaaascessceeeesesssetentessssceesecsess OQ
9-401.2 Minimum Construction Standards .20......... ccc cceccccccececccseeeeceesseseeeeeessssessseateesenensneeesses GeO
9-401.3 Exterior Finish 2.0.2... cccccccccccccccccceceeeeeeeeceeeeeeeeeeeeeessscstencseeeeeeeseeseseeeteeeeeseeeeteectcrstsssesees GeO
9-401.4 ROOF COVETING 20... ce eeccceeceenecceeeeeeeeeseaeeceeeeneeetcsseceeecaaeeccaceeesenaceecteeecesetisesstttessserseesee, GO
5
9-401.5 CHIMNCYS 20. ccc ccc cece eee nen eee be esac ceed eee ecebeseseeececesceseesaaaetetetetessestesessseseeeeee GOD
9-401.6 VONt PIPES ooo. c cece ce eeenneteneeneeceeeeeeea eee seseseceececceeseaasssesteeeeeceseeessssseaesecessecsssss: O72
9-501 VIOLATIONS «000. c cece ccc neeec ene eceeaeeseae esses esta seseceeseessaeesauseeacesecesssaeceeeuaesesssetssensteeessirersersevererserseessses O72
9-501.1 Pemallty ooo... ceececceeeececcccccececeseeeeeeeeeeseseeseeeeseeeeeeeeeeeescseesseeessssesetsesessstttesssseseesseeeees 2
CRapter 10... ccc eee eke ee nee kee eee cece ene EE Ete ecb bec e tbe ddd estted be detteueeeeseesetsseestseersettstssetstsstiseestesscetseeseeee 10-9
10-101 FOOS o.oo. cece ccc ecc cece cece cee ee teeeceeeeeeceecececeeceusaeeceecesueseeesaceeeceesueesecesssaeseeeteesesecesssststssssecesstsesessssseeses TO°4
10-101.1 GOEL A ooo ceee cece cee ceeeueeccaeuaaeeeeeceeceucusseeescessescescecsesesssssaaeesseesessscssssaeecsssseseses TO°1
10-201 Fee Schedule ........ ccc ccec ccc ce sce eeceeseeeecescuuesececceusevesesesaueseesacsecessauseeescessereeeesssaeseesssenesessecsestesssaees 10-4
10-201.1 Building Permit 0.000000. iee cece cee cc cee neerececeeceseessuusassateetseeetesesessssntesteteesssseseeee 10°19
10-201.2 Street Construction/Alteration .....000..0 occ ce eee ccc c cece ensceseceeeeeeccceeessssetectestsecsesssaetessssesees 10*1
10-201.3 Home OCCUPATIONS 2.00... cece cece cece cece cece sseeeeeesseessaseeeseseetesssseccrtersteteersstessreeeee 10-1
10-201.4 Site Plan R@VIOW 2.0.0.0... cccce cc cecc ccc eeeccce cee eeeccuueesecseeueuecscesvenesesscsauescessunerecssterterarseeeeeess 10-1
10-201.5 SUbIVISION REVIEW 2000... ccc cece ccc cccee cece ce eeccscuueeeeeccsuneseeeeesaeeeccsesaneesestaneterteserssesssseeees 1Q°2
10-201.6 TAN 0) 0) = 5-00 12
10-201.7 RESCIVE oo... ceccc cece eee cece ee beceeesuseueeeeeseeeeteseueeesesessantesessssecesstesseesesssatresteseeessssseseees 102
10-201.8 Individual Lot Phosphorous Management Permit........00.00000000..ccecsceseeeececeeeceessaeeesseeeeee 10-2
10-201.9 Other Permits and Approvals .......0.0.0.00.0ccccccccccc ce ceeseecececceeeesesssessaaeeeeeseesertettettatesteteeeeeee, 10-2
Caper 11... ccc ccc ccc ccc cece cece eee e keene e eee ELLER EEE E EEE LESH GEESE E Edd DEEEEeeAb dda SEstb cd estetdeeettcsseeeaeetessaeeetecesseesterssstsetssteeesseeseee 1907
41-101 Temporary, Mobile Vendor Permits 000.000.000.000 eect eee te eee te tite ttetttttttteettcccreeee PTA
11-101.1 PULPOSE ooo ccc ccc cc ccc cc cece ce eeecececeecceceeeeeeeuuneesecseeesaetssaaeersteeeeseseeerssssssseseteesstessaseesssseeeee E191
11-101.2 FAN 6) ©)| (er= 19) ||| een 0 Ei
11-102 Administration ....0.0.... 000i ccccee ccc cc cca eccesuueccesseeeeceeccecuuneceecaaeeesscueecesessuaeeesssssseuscsseceetesessntsesecseeccrsesseeee P1°4
11-102 .1 Code Enforcement Officer... ooo. e cc ceeeccccceecccccscuuececcesuaececsecuaeecsssanesesceseeccenaenseeeeee 1151
11-202 Application REQUIFEMENtS ©2000... ccc c cece cece cent ee cee eeeeeeeeeeeseusseeaacseeceeeeeetectecsceeeteesssssssseetetteesseeees D1°1
11-203 Standards ............cccc ccc cccccc ccc cecccceccuaueecescscuueseuuueccesuesssuusecevececeeecauueesecsaeesecsesauaesesssseaeecssavecssessseeseateseevecseea D191
11-204 Appeals oo... ccc ccc cece cece ce ne ce cee ene ec eee e nese cecbsaeeeeeeceuaesseesseccccseneeseessssessceesetanseeserseesecsssstseeteseessecereses 14-2
CHADS 12 ooo cece e cece eee EEE EEE E EEE E EEE EEE EEE DEEEE EEA EEE eed cee ceeded ddd deeeeeeeeeteessdeteceetteesestestsstssstesteseteetsestsssssssssssseee 12°17
12-101 DePINItIONS ..00.. oo cece cece eee e eee ceeccueeceeueeeceueesseueseueeseeueeccaeeseerssevesecsesesevaeccsaesesaessesaeseteessteeessee 1291
12-101.1 Construction of Language ................00c cece eect eect cee eeeceeeeeceeceeeeseteeetttetteteseteseetsseeee 12°1
12-101.2 DeFINITIONS «20 eee cccccecccceceececcececeeseeuaeeetectceceeuaeausaaeeeeecsteseseserassteeteseeesreastereseeee 12°14
6
TOWN OF GREENE
LAND USE ORDINANCE
Chapter 1
1-101 General
1-101.1 Authority
This Ordinance has been adopted pursuant to Article VII-A, 2nd Part of the Maine Constitution, Title 30-A M.R.S.A. Section
3001, Title 30-A M.R.S.A. Section 4312 et. seq. and Title 38 M.R.S.A. section 435 et.seq.
1-101.2 Purposes
The purpose ofthis Ordinance, made pursuant to the comprehensive plan for the development ofthe Town, is to promote the
health, safety, and welfare of the residents of the Town, to protect the environment and to regulate the growth of the Town
in an orderly manner to protect the essentially rural character of the Town; to prevent and control water pollution: to protect
fish spawning grounds, aquatic life, bird and other wildlife habitat; to protect buildings and lands from flooding and
accelerated erosion; to protect archaeological and historic resources; to protect freshwater wetlands; to control building
sites, placement of structures and land uses; to conserve shore cover; and visual as well as actual points of access to inland
waters; to conserve natural beauty and open space.
1-101.3 Applicability
The provisions of this Ordinance shall govern all land and structures within the boundaries of the Town of Greene including
those areas within 250 feet, horizontal distance, of the normal high-water line of any great pond or river, within 250 feet
horizontal distance of the upland edge of a freshwater wetland; and within 75 feet horizontal distance of the normal high-
water line of a stream and outlet stream. These Standards also apply to any structure built on, over, or abutting a dock, wharf,
or pier, or other structure extending beyond the normal high-water line of a water body or within a wetland.
- 1-101.4 Effective Date
A. The effective date of this Ordinance is March 3, 1979, and the effective date(s) of any amendments. Ordinance
provisions relating to the Shoreland Zone shall not be effective unless approved by the Commissioner of the
Department of Environmental Protection. A certified copy of the Ordinance, or Ordinance amendment, attested and
signed by the Municipal Clerk, shall be forwarded to the Commissioner of the Department of Environmental
Protection for approval. If the Commissioner of theDepartment of Environmental Protection fails to act on Shoreland
Zone Standards within forty-five (45)days of receipt of the Standards, they shall be deemed approved.
Any application for a permit in the Shoreland Zone submitted within the forty-five (45) day period shall be governed
by the terms of this Ordinance, or Ordinance amendment if the Shoreland Zoning Standards are approved by the
Commissioner of the Department of Environmental Protection.
B. Repeal of Municipal Timber Harvesting Regulation.
The municipal regulation of timber harvesting activities is repealed on the statutory date established under 38
M.R.S.A. section 438-8(5), at which time the State of Maine Department of Conservation's Bureau of Forestry shail
administer timber harvesting standards in the shoreland zone. On the date established under 38 M.R.S.A section
438-8(5), the following provisions of this Ordinance are repealed:
e Section 3-101.2.F Table of Land Uses, Column 2 (Forest management activities except for timber harvesting) and
Column 3 (Timber harvesting);
e Section 3-101.21.G in its entirety; and Section 12-101.2. Definitions, the definitions of "forest management
activities" and "residual basal area".
1-101.5 Validity and Severability
'hould any section or provision of this Ordinance be declared by the courts to be invalid, such decision shail not invalidate
"any other section or provision of this Ordinance.
7
1-101.6 Amendments
A. Onwritten petition of a number of voters equal to at least 10% of the number of votes cast in the municipality atthe
last gubernatorial election, or onrecommendation ofthe Planning Board, or on their motion, the Board of Selectme
may present warrants for consideration by the Town to amend, supplement, or repeal the regulations and provisior,
of this Ordinance.
B. After a public hearing on proposed amendmeni(s), this Ordinance may only be amended by a majority vote of a
Town Meeting.
C. Copies of amendments within the Shoreland Zone, attested and signed by the Municipal Clerk, shall be submitted
to the Commissioner of the Department of Environmental Protection following adoption by the municipal legislative
body and shall not be effective unless approved by the Commissioner of the Department of Environmental
Protection. Ifthe Commissioner fails to act on any amendment within forty-five (45) days of the Commissioner's
receipt of the amendment, theamendment is automatically approved. Any application for a permit submitted to the
municipality within the forty-five (45) day period shall be governed by the terms of the amendment, if such
amendment is approved by the Commissioner.
1-101.7 Conflicts with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of this Ordinance or of any
other ordinance, regulation or statute administered by the municipality, the more restrictive provision shall control.
AMENDED: March 8, 2003
Amendments prepared 10.29.08
AMENDED: March 7, 2009
AMENDED: March 6, 2011
AMENDED: June 18, 2022
8
Chapter 2
2-101 Non-Conformance
1101.1 Purpose
it is the intent of this Chapter to promote land use conformities, except that nonconforming conditions that existed
before the effective date of this Ordinance shall be allowed to continue subject to the requirements of this Chapter.
2-101.2 General
A. Transfer of Ownership
Nonconforming lots and structures may be transferred, and the new owner may continue to use thenonconforming
lot or structure, subject to the provisions of this Chapter.
B. Repair and Maintenance
This Chapter allows the normal upkeep and maintenance of nonconforming structures including repairs and
renovations that do not involve expansion of the nonconforming structure.
2-101.3 Nonconforming Structures
A. Expansions
All new principal and accessory structures, excluding functionally water-dependent uses, must meet the water body,
tributary stream, or wetland setback requirements contained in Section 3-101.2.F. A nonconforming structure may be added
to or expanded after obtaining a permit from the same permitting authority as that for a new structure if such addition or
expansion does not increase the nonconformity of the structure and is in accordance with subparagraphs (a) and (b) below.
- (a) Expansion of any portion of a structure within 25 feet of the normal high-water line of a water body,
tributary stream, or upland edge of a wetland is prohibited, even if the expansion will not increase
nonconformity with the water body, tributary stream or wetland setback requirement. Expansion of an
accessory structure that is located closer to the normal high-water line of a water body, tributary stream,
or upland edge of a wetland than the principal structure is prohibited, even if the expansion will not
increase nonconformity with the water body, tributary stream, or wetland setback requirement.
(b) Notwithstanding paragraph (a), above, if a legally existing nonconforming principal structure is entirely
located less than 25 feet from the normal high-water line of a water body, tributary stream, or upland edge
of a wetland, that structure may be expanded as follows, as long as all other applicable municipal land
use standards are met, and the expansion is not prohibited by Section 2-101.3.A.
(i) The maximum total footprint for the principal structure may not be expanded to a size greater than
800 square feet. The maximum height of the principal structure may not be made greater than 15 feet or
the height of the existing structure, whichever is greater.
(c) All other legally existing nonconforming principal and accessory structures that do not meet the
water body, tributary stream, or wetland setback requirements may be expanded or altered as
follows, as long as other applicable municipal land use standards are met and the expansion is
not prohibited by Section 2-101.3.A or Section 2-101.3.A(a), above.
(i) For structures located less than 75 feet from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland, the maximum combined total footprint for all
structures may not be expanded to a size greater than 1,000 square feet. The maximum height
of any structure may not be made greater than 20 feet or the height of the existing structure,
whichever is greater.
(ii) For structures located less than 100 feet from the normal high-water line of a great pond
Se classified as GPA or a river flowing to a great pond classified as GPA, from any portion of the
structure, the maximum combined total footprint for all structures may not be expanded to a size
greater than 1,500 square feet. The maximum height of any structure may not be made greater
9
than 25 feet or the height of the existing structure, whichever is greater. If any portion of a
structure is located less than 75 feet from the normal high-water line of a water body, tributary
stream, or upland edge of a wetland the entire structure must meet the footprint and height limits
in Section 2-101.3.A(b)(i) and Section 2-101.3.A(c)(i).
(iii) In addition to the limitations in subparagraphs (i) and (ii), for structures that are legally
nonconforming due to their location within the Resource Protection District when located at less
than 250 feet from the normal high-water line of a water body or the upland edge of a wetland,
the maximum combined total footprint for all structures may not be expanded to a size greater
than 1,500 square feet. The maximum height of any structure may not be made greater than 25
feet or the height of the existing structure, whichever is greater.
(d) An approved plan for expansion of a nonconforming structure must be recorded by the applicant
with the registry of deeds, within 90 days of approval. The recorded plan must show the existing
and proposed footprint of the nonconforming structure, the existing and proposed structure height,
the footprint of any other structures on the parcel, the shoreland zone boundary and evidence of
approval by the municipal review authority.
(e) Photographic record required. Pursuant to Title 38 §439.A.10 Applicant will provide pre-
construction photographs and, no later than 20 days after completion of the development, post-
construction photographs of the shoreline vegetation and development site.
B. Foundations
Whenever a new, enlarged, or replacement foundation is constructed under a non-conforming structure, the structure
and new foundation must be placed such that the setback requirement is met to the greatest practical extent as
determined by the Planning Board or its designee, basing its decision on the criteria specified in Section
2-101.3.C, Relocation, below.
C. Relocation
A nonconforming structure may be relocated within the boundaries of the parcel on which the structure is located provideu
that the site of relocation conforms to all setback requirements to the greatest practical extent as determined by the Code
Enforcement Officer and provided that the applicant demonstrates that the present subsurface sewage disposal system
meets the requirements of State law and the State of Maine Subsurface Wastewater Disposal Rules (Rules), or that a new
system can be installed in compliance with the law and said Rules. In no case shall a structure be relocated in a manner
that causes the structure to be more nonconforming.
In determining whether the building relocation meets the setback to the greatest practical extent, the Code
Enforcement Officer shail consider the size of the lot, the slope ofthe land, the potential for soil erosion, the location
of other structures on the property and on adjacent properties, the location of the septic system and other on-site
soils suitable for septic systems, and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order to relocate a structure,
the Planning Board shall require replanting of native vegetation to compensate for the destroyed vegetation. In
addition, the area from which the relocated structure was removed must be replanted with vegetation. Replanting
shall be required as follows:
a. Trees removed in order to relocate a structure must be replanted with at least one native tree, three (3) feet in
height, for every tree removed. If more than five trees are planted, no one species of tree shall make up more
than 50% of the number of trees planted. Replaced trees must be planted no further from the water or wetland
than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed in order to relocate
a structure must be re-established. An area at least the same size as the area where vegetation and/or ground
cover was disturbed, damaged, or removed must be re-established within the setback area. The
vegetation and/or ground cover must consistof similar native vegetation and/or ground cover that was
disturbed, destroyed, or removed.
b. Where feasible, when a structure is relocated on a parcel the original location of the structure shall be
replanted with vegetation which may consist of grasses, shrubs, trees, ora combination thereof.
10
D. Reconstruction or Replacement
a. Any nonconforming structure which is located less than the required setback from a water body, tributary
stream or wetland and which is removed, damaged or destroyed regardless of the cause, by more than 50%
of the market value of the structure before such damage, destruction or removal, may be reconstructed or
replaced provided that a permit is obtained within eighteen months of the date of said damage or destruction
or removal and providedthat such reconstruction or replacement is in compliance with the water body, tributary
stream, or wetland setback requirement to the greatest practical extent as determined by the Planning Board
in accordance with the purposes of this Chapter. In no case shall the structure be reconstructed or replaced
so as to increase its non-conformity. If the reconstructed or replacement structure is less than the required
setback it shall not be anylarger than the original structure, except as allowed pursuant to Section 2-101.3.C
above, as determined by the nonconforming floor area of the reconstructed or replaced structureat its new
location. If the total amount of floor area of the original structure can be relocated or reconstructed beyond the
required setback area, no portion of the relocated orreconstructed structure shall be replaced or constructed
at less than the setback requirement for a new structure. When it is necessary to remove vegetation in order
to replace or reconstruct a structure, vegetation shall be replanted in accordance with Section2-101.3.D) above.
Any nonconforming structure which is located less than the required setback from water body,
tributary stream, or wetland and which is removed by 50% or less of the marketvalue, or damaged
or destroyed by 50% or less of the market value of the structure, excluding normal maintenance
and repair, may be reconstructed in place if a permit isobtained from the Code Enforcement Officer
within one year of such damage, destruction, or removal.
in determining whether the building reconstruction or replacement meets the water setback to the
greatest practical extent the Planning Board shall consider, in addition to the criteriain Chapter 2,
Section 101.3.D, the physical condition and type of foundation present, if any.
b. Any nonconforming structure which is located more than the required setback from the normal high-water line
' of a water body, tributary stream or upland edge of a wetland and which is removed, damaged or destroyed
Se by fire, lightning, wind or other natural disaster, it may be rebuilt provided that construction Is commenced within
two (2) years after the destruction of the building or structure and is substantially completed within three (3)
years after such destruction.
2-101.4 Nonconforming Uses
A. Expansion: Expansion of nonconforming uses may be allowed, except as prohibited in Section 2 below,
provided the Planning Board after reviewing written application determines that no greater adverse impacts
would occur as the result of the expansion as defined in Section C. below and the following:
1. The expansion of a nonconforming use will be in accordance with any applicable
Performance Standards set forth in Chapters 3 and 6.
2. Within the Shoreland Zone the expansion of nonconforming uses are prohibited, except that
nonconforming residential uses may, after obtaining a permit from the Planning Board, be expanded
within the existing residential structures or within expansions of such structures as permitted in Chapter
2 Section 101.3.C. The expansions of the nonconforming use will not encroach further on the
required water body or upland edge setback.
3. The expansion is permitted by Section 2-101.3.
B. Resumption Prohibited: A lot, building or structure in or on which a nonconforming use is discontinued for a
period of two (2) years, or which is superseded by a conforming use, may not again be devoted to a
nonconforming use except that the Planning Board may, for good cause shown by the applicant, grant up to
a one-year extension to that time period. This provision shallnot apply to the resumption of a use of a residential
structure provided that the structure has been used or maintained for residential purposes during the preceding
five-(5) year period.
C. Change of Use: An existing nonconforming use may be changed to another nonconforming use provided that
(a) the proposed use has no greater adverse impact on the subject and adjacent properties and resources
11
than the former use; as determined by the Planning Board and (b) applicable performance standards
contained in Chapter 3 are complied with and (c) approval is obtained pursuant to Chapter 6 if applicable. The
determination of no greater adverse impact shall be made according to criteria listed below.
1. That the proposed use is of the same character or less noxious than the current nonconforming
use.
2. Thatthe proposed use willnot create a traffic hazard nor increase an existing traffic hazard; and
3. That the amount of parking required to meet the minimum requirements for the proposed use exists on
the site or will be otherwise provided in accordance with Section 4 of this Ordinance; and
4, That the amount of noise, odors, vibrations, smoke, dust, and air discharges of the proposed use
shail be equal to or less than the present use; and
5. That the rate of surface water run-off from the site will not be increased; and
6. That the hours of operation of the proposed use will be compatible with the existing, surrounding
land uses; and
D. Change of Use of a Nonconforming Structure: The use of a nonconforming structure may not be changed
to another nonconforming use unless the Planning Board, after reviewing written application, determines that
the new use is equally or more appropriate to the district than the existing use of the nonconforming structure
and will have no greater adverse impacts than the existing use.
The determination of no greater adverse impact shall be made according to the criteria contained in Subsection
C above.
The change in use shall comply with any applicable Performance Standards set forth in Chapter 3 and approval
is obtained pursuant to Chapter 6 if applicable.
2-101.6 Nonconforming Lots of Record
A. A nonconforming lot of record as of the effective date of this Ordinance or amendment thereto may be built
upon, without the need for a variance, provided that such lot is in separate ownership and not contiguous with
any other vacant lot in the same ownership, and that all provision of thisOrdinance except lot size and
frontage can be met. Variances relating to set back or other requirements not involving lot size or frontage
shall be obtained by action of the Board of Appeals.
B. Contiguous Lots of Record: If two or more contiguous lots or parcels are in single ownership of record at
the time of adoption of this Ordinance, if all or parts of the lots do not meet dimensional requirements of this
Ordinance, and if a principal use or structure exists on each lot, the non-conforming lots may be conveyed
separately or together, provided that the State Minimum Lot Size Law for Subsurface Wastewater Disposal
Rules" are complied with.
If two (2) or more principal uses or structures existed ona single lot of record on the effective date of this
Ordinance, each may be sold on a separate lot provided that the above referenced law and rules are complied
with. When such lots are divided, each lot that is created must be as conforming as possible to the dimensional
requirements of this Ordinance and the State Minimum Lot Size Law and Subsurface Wastewater Disposal
Rules are complied with.
C. Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are in single ownership of
record at the time of or since adoption or amendment of this Ordinance, if any of these lots do not individually meet
the dimensional requirements of this Ordinance or subsequent amendments, and if one or more of the lots are
vacant or contain no principal structures the lots shall be combined to the extent necessary to meet the dimensional
requirements. This section shall not be deemed to require contiguous lots in a subdivision approved by the
Planning Board and recorded in The Androscoggin County Registry of Deeds after March 31, 1976 to bo
combined.
12
AMENDED: March 8, 2003
AMENDED: March 7, 2009
AMENDED: March 6, 2010
- AMENDED: June 18, 2022
MENDED: August 5, 2023
13
14
Chapter 3
3-101 Land Use Performance Standards
3-101.1 General
The performance standards contained in this Chapter shall apply to all uses and activities, unlessotherwise
specified, whether or not specific approval or a permit is required.
3-101.2 District Uses and Dimensional Requirements
A. Official Land Management District Map
The areas to which these Standards are applicable are hereby divided into the following districts as shown on
the Official Land Management District Map which is made a part of this Ordinance:
1. General Development
2. Village | 5
3. Village Il
4. Residential
5. Rural
6. Stream Protection
7. Limited Residential
8. Resource Protection
B. Location of Districts
Said districts are located and bounded as shown on the Official Land Management District Map, entitled "Land
Management District Map of Greene, Maine," and on file in the Office ofthe Municipal Clerk. The official map
' shall be signed by the Municipal Clerk at the time of adoption or amendment of this Ordinance certifying the
' date of such adoption or amendment.
C. Interpretation of District Boundaries
Unless otherwise set forth on the Official Land Management District Map, district boundary lines are lines of
property fines, the centerline of streets, roads or rights-of-way, and the boundaries of the Shoreland Zone as
defined herein. Where uncertainty exists as to the location of district boundary lines, the Board of Appeals shall
be the final authority.
D. Division of Lots by District Boundaries
Where a land management district boundary line divides a lot or parcel of land of the same ownership of
record at the time such line is established by adoption or amendment of this Ordinance, the regulations
applicable to the less restricted portion of the lot may be extended not more than 50 feet into the more restricted
portion of the lot provided that the other portion of the lot is not inthe Shoreland Zone.
E. Establishment of Land Management Districts
1. General Development
The General Development District includes those areas suited to mixture of land uses including commercial,
service, manufacturing, and residential.
2. Village |
The Village | District includes the historic village area of Greene. Uses should provide a continuation of current
land use patterns and new uses that are compatible with the characteristics that make the district unique.
15
3. Village Il
The Village || District includes those areas where a mixture of land uses are suited for a village type setting
4. Residential
The Residential District provides for a primarily residential area and other land uses that are compatible with
residential areas.
5. Rural
The Rural District provides for the continuation of agriculture and forestry while accommodating residential
development and other activities for which a rural location is appropriate.
6. Stream Protection District
The Stream Protection District includes all land areas within seventy-five (75) feet, horizontal distance, of the
normal high-water line of a stream, exclusive of those areas within two-hundred and fifty (250) feet, horizontal
distance, of the normal high-water line of a great pond, or river, or within two-hundred and fifty (250) feet
horizontal distance, of the upland edge of a freshwater wetland. Where the stream and its associated Shoreland
Zone is located within two-hundred and fifty (250) feet, horizontal distance, of the above water bodies or
wetlands, that land area shall be regulated under the terms of the shoreland district associated with that body
of water or wetland.
7. Limited Residential District
The Limited Residential District includes those areas within two-hundred and fifty (250) feet, horizontal
distance, of the normal high-water line of a great pond, river, or upland edge of a wetland suitable for
residential and recreational development.
8. Resource Protection District
The Resource Protection District includes areas in which development would adversely affect water quality,
productive habitat, biological ecosystems, or scenic and natural values. This district shall include the
following areas, except those areas which are currently developed and areas in other districts need not be
included.
a. Areas within 250 feet, horizontal distance, of the upland edge of freshwater and/or coastal wetlands, which
are rated "moderate" or "high" value waterfowl and wading bird habitat, including nesting and feeding areas,
by the Maine Department of Inland Fisheries and Wildlife (MDIF&W). These areas are generally depicted
on a Geographic Information System (GIS) data layer.
b. Floodplains within two-hundred and fifty (250) feet, horizontal distance, of the normal high-water line along
rivers, defined by the 100-year floodplain as designated on the Federal Emergency Management Agency's
(FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the
absence of these, by soil types identified as recent flood plain soils and/or local knowledge.
Areas within two-hundred and fifty (250) feet, horizontal distance, of the normalltigh-water line
along rivers and great ponds of two or more contiguous acres with sustained slopes of 20 percent
or greater.
c. Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils, which
are not surficially connected to a water body during the periodof normal high water.
d. Land areas along rivers subject to severe bank erosion, undercutting, or riverbed movement.
F. Table of Land Uses
All land use activities, as indicated in Table 1, Table of Land Uses, shall conform with all of the applicable land
use standards in Chapter 3-101. The district designation for a particularsite shall be determined from the Official
Land Management District Map.
16
-» Key to table:
YES Allowed (no permit required but must comply with all applicable performance standards
contained In Chapter 3-101
NO Prohibited
PB Requires Permit form the Planning Board
PBSD Requires subdivision approval from the from the Planning Board
PBSR Requires Site Plan Review approval from the Planning Board
CEO Requires a permit from the Code Enforcement Officer
LPI Requires a permit from the Local Plumbing Inspector
Abbreviations:
GD General Development
V-l Village |
V-Il Village II
RES Residential
R Rural
SP Stream Protection
LR Limited Residential
RP Resource Protection
LAND USES
DISTRICTS
ranpeses [oo [wT vi [res | rk [ # [ R [RP |
Non-intensive recreational uses not
1 requiring structures such as hunting, YES YES YES YES YES YES YES YES
. fishing, or hiking
( Clearing or removal of vegetation for
2 activities other than timber harvesting YES YES YES YES YES CEO YES CEO (1)
Fire prevention activities
Wildlife management practices
Soil and water conservation practices
| 6 | Mineral exploration YES (2)_| __YES (2)
Mineral extraction, including sand and
9 | Emergency operations
Agriculture
Confined Feeding Operations | no | no { no | no | pasR {| NO | NO | NO |
Aquiculture PBSR PBSR PBSR | PBSR | PBSR PBSR PBSR PBSR
Principal structures and uses
13 | One-and two-family residential,
Neighborhood commercial PBSR PBSR PBSR PBSR / no | no | no | no |
17
D USE PO istics s--sSYT
FAND USES | coo f wef f vi [res 7 oR [| sp. [ir [RP
13H Natural resource-based PBSR Sno | PBSR NO | PBSR NO »
processing/manufacturing
Agricultural-related sales/service PBSR PBSR PBSR_ | NO | PBSR
Automotive Graveyards/Junkyards PBsR_| NO | No | NO | PasR_| NO [| NO | NO |
Small nonresidential facilities for
13L educational, scientific, or nature CEO CEO CEO CEO CEO PB (4) me
interpretation purposes
PBsR_ | No | No | NO | PasR_| NO | NO | NO |
| 13N | Campgrounds | SCNO | ONO | ONO | ~=NO | _PBSR PBSR__| PBSR (8)
PBSR_ | NO | NO | PBSR PBSR_ | NO [| NO [| NO |
Child Care Homes | ceo | ceo | ceo | ceo | ceo | No | CEO(i0) | CEO (10)
PBSR_ | NO | PBSR_[| NO | NO | NO [| NO [ NO |
Store
Adult Entertainment Facilit PesR_ | NO | NO [| NO | NO | NO | NO | NO |
Day Care Facilities PBSR PBSR PBSR PBSR PBsR_ | NO | NO. | NO |
Accessory Structure to allowed uses CEO (4)
15 Conversions of season residences LPI LP} LP} LPI LPI LPI LPI LPI
Piers, docks, wharfs, bridges, and e444 4.8...
16 | other structures and uses extending | ee .§
CEO (14) | CEO (14) | CEO (14) | CEO (14) | CEO (14) [| CEO (14) | CEO (14) | CEO (14)
| 16B | Permanent = CC] SPB OT SPB] SPB COT SPBCO| SPOTS O|SOPBCd| SPB
allowed uses
pag) | 8 | PB)
poles or more in the shorelandzone | oe oo oe
Other essential services PB(7) | PB | PB(7)
20 | Service drops, as defined, to YES YES YES YES YES YES YES
allowed uses
Public and private recreational areas
21 | involving minimum structural PBSR PBSR PBSR PBSR PBSR PBSR PBSR PBSR
development
Filli d earthmovi
27 | |g and earthmoving YES YES YES YES YES CEO CEO
<10 cubic yards (11)
18
LAND USES DISTRICTS
[eo [vi [vi [res [ ak] s [| in | Ap
a lsmasaray [oe | ee [oe [oe [oo [| [o
[a1 | SolarEnergy System SES)----*|_PaSR_| NO | NO | PBsR | PBSR | NO | NO | NO
[32 [Accessory Dweling Unt _----+(|_ceo| No | ceO | ceo | ceo | No | ceo | NO
CEO
Uses similar to uses requiring a PB
ss] sememeevereenmenrs | re | me | ome [ore [ore | oe | ome |
NOTES:
i, In RP not permitted within 75 feet horizontal distance of the normal high-water line of great ponds, except
to remove safety hazards.
i. Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total Is
disturbed.
iti. in RP, not permitted in are.as so designated because of wildlife value.
(4) Provided that a variance from the setback requirement is obtained from the Board of Appeals.
(5) Single-family residential structures may be allowed by a special exception only according to the provisions
contained in Chapter 3-101.21.J. Two-family residential structures are prohibited.
(6) For further limitations see Chapter 3-101.12
(7) See further restrictions in Chapter 3-101.21.L
(8) Except when area Is zoned for resource protection due to floodplain criteria, in which case a permit is
: required from the P.B.
. (9) Except to provide access to permitted uses within the district, or where no reasonable alternative route is
located outside the RP area.
(10) In existing structures only.
(11) The limits on filling and earth moving shall relate to a single project or activity.
(12) Temporary structures shall require payment of a permit fee for the first installation only, except that the
structure may not be expanded without filing of a new application and permit fee.
(13) Only services that have less than 1,500 square feet of floor area and are either intended to serve nearby
residential customers or are office space where clients or customers coming to the site are an occasional
occurrence.
(14) Excluding bridges and other crossings not involving earthwork, in which case no permit is needed.
(15) Permit not required but must file a written "notice of intent to construct with CEO
19
Lots for residential, commercial, industrial, and institutional structures and/or uses shall meet or exceed the
following minimum requirements:
Space and Bulk Standards
. Shoreland Zone : p
Minimum Lot wemum Minimum Minimum Minimum Minimum | Minimum wexinn ex
District Size/Densit Frontage Shore Front Setback/Normal High- Side Rear Surface Heiaht
¥ nag Frontage | Setback (1) Water Line/Upland Setback | Setback g
(continuous) Edae/Wetland (percent) (2) (8)
General 100 ft/pond
ft 250 ft 250 ft 25 ft 2 9
100 ft/pond
Village | ft 200 ft 200 ft 35 ft 15 ft 15 ft 709
100 ft/pond
Vi ft (3 200 ft 200 ft 25 25 ft 709
100 ft/pond
Residential ) ft 250 ft 250 ft 35 ft ft 509 ft
100 ft/pond
00 sq ft 250 ft 250 ft 35 ft 25 ft 409 ft
rotection
Limited 100 ft/pond 4
Residential 80,000 sq ft 250 ft 250 ft 35 ft 75 ftlother (5) 25 ft 25 ft 20% (7) 30 ft
Resource
250 ft 9
i 250 ft in RP oe
ee Development oe
NOTES:
(1) Measured from edge of the right of way.
(2) Egress window sill height shall not exceed twenty-three (23) feet from the ground.
(3) Lot sizes for a new development may be required to exceed 40,000 sq. ft. depending upon soil characteristics
for subsurface sewage disposal.
(4) Side and rear setbacks for secondary structures associated with multi family structures shall be a minimum of
seventy-five (75) feet.
(5) includes rivers, streams, and upland edge of wetlands as defined.
(6) Parking lots/areas, accessory structures and storage shall not be located in the required setbacks except as
provided for herein.
(7) The total area of all structures, parking lots and other non-vegetated surfaces within the Limited Residential
and Resource Protection District shall not exceed 20 percent of the lot or portion of the lot located in the District
including land area previously developed.
(8) See Section 3-101.2.0 for additional height standards.
(9) The setback requirements in the General Development District adjacent to the freshwater wetland on Map 2
G. REPEALED.
H. No lot may be divided or reduced in size in any manner unless each lot, so created, meets minimum area,
frontage, and setback provisions. Except as provided for in Section 2-101.5.
l. Corner lots and lots bounded by more than one street shall meet front setbacks for all streets and have at least
two hundred fifty (250) feet continuous frontage on one street.
J. Lots shall be of sufficient size and shape to allow a circle having a diameter equal to ninety
(90) percent of the required street frontage to fit within their boundaries.
20
K. All secondary structures, such as garages, shall meet the same setback requirements as those required for
principal structures.
L. New building lots located on cul-de-sacs or along curves in a street where the radius of the curve at the front
lot line is less than ninety (90) feet, may. be designed so that they have a minimum of thirty-five (35) feet of
street frontage along the front lot line, so long as lo width at the location where the principal building is to be
constructed is at least equal to the distance normally required for street frontage in that district.
M. If more than one principal structure is constructed on a single parcel of land, the "minimum lot area" requirement
shall apply to each structure, and each structure shall meet the front, side, and rear setback and street frontage
requirements.
N. All setbacks shall be measured from the property line to the nearest part of the structure except as may be
provided for in other provisions of this Ordinance.
O. Height Limits of thirty (30) feet may be exceeded for structures, other than those located in the Shoreland Zone,
not intended for human habitation upon review and approval of the Greene Fire Chief. In approving a height
greater than thirty (30) feet, the Fire Chief shall consider the type of structure, the structure's Susceptibility to
ire and the capacity of the fire department to effectively Suppress a fire in or on the structure. In the Shoreland
Zone the Board of Appeals may grant a variance to height limits upon determination that the applicant meets
the undue hardship criteria contained in Chapter 8 Section 101.2.B.1. In no case shall egress windowsill height
exceed twenty-three (23) feet from the ground.
P. Lots for duplexes shall require a minimum lot size of one hundred twenty thousand (120,000) square feet and
a minimum street frontage of three hundred twenty-five {325) feet.
Q. Front, side, rear, and height of secondary structures shall comply with Section 3-102.
R. The minimum width of any portion of any lot within one hundred (100) feet, horizontal distance, of the normal
high-water line of a water body or upland edge of a wetland shall be equal or greater than the shore frontage
requirement for a lot with the proposed use.
S. Land below the normal high-water line of a water body or upland edge of a wetland and land beneath roads
serving more than two (2) lots shall not be included toward calculating minimum lot area.
3-101.3 Use of Backlots
Back lots may be developed for principal structures including lots in a subdivision if they are or can be provided with
a right-of way that connects with a public street or a privately-owned street which privately- owned street meets the
standards contained in Chapter 5, Street Construction Standards, of this Ordinance and which complies with the
following provisions:
A. Ifa back lot is accessible only by a legally enforceable right-of-way, it may be used if the following
conditions are met:
1. The right-of-way must be conveyed by deed recorded in the Androscoggin County Registry of
Deeds to the owner of the back lot and be a minimum of sixty (60) feet in width.
2. A legal description of the right-of-way by metes and bounds shall be attached to any building
permit application for construction on the back lot.
3. Except lots recorded prior to the effective date of this Ordinance, the right-of-way deed must
be recorded in the Androscoggin County Registry of Deeds at the time the back lot is first
deeded out as a separate parcel.
4. Creation of the right-of-way to serve the back lot shall not create a non-conforming front lot by
reducing such lots required street frontage below the minimum, or, if the front lot is already
nonconforming, with respect to street frontage, reduce its street frontage at all. Where the right-
of-way is conveyed by easement or irrevocable license, or some grant less than a fee ;
interest, the land over which such servitude is placed may not be counted toward meeting
street frontage requirements for the front lot.
5. The right-of-way may serve only one (1) single-family dwelling or one principal use unless the
following provisions are met:
. a. The right-of-way may serve two single-family dwellings if a common driveway meeting the
standards contained in the Chapter-5-201.1.J of this Ordinance is constructed.
21
b. The right-of-way may serve more than two single-family dwellings provided that a street
constructed in accordance with Chapter 5, Street Construction Standards, is provided.
6. No more than one (1) right-of-way for back lot development may be created out of a single lot fronting on .
a state or town maintained street or private street unless each subsequent right-of-way is created out of
at least an additional frontage as required in Chapter 3-101.2 and the right-of-way entrances to such street
are at least the required frontage plus haif of the right of way width.
7. -- If the right-of-way is brought up to the street standards as set forth in Chapter 5 of this Ordinance, further
dwellings may be constructed on a back lot with Planning Board approval provided all other space and
bulk requirements are met for each such dwelling. For purposes of such approval, the sale or lease of
additional lots or the construction of an additional dwelling or dwellings served by the right-of-way shall be
considered in the same manner and under the same restrictions and requirements as if such division or
construction were a subdivision
8. Each single-family dwelling on a back lot shall be located within an area defined by acircle with a minimum
diameter of two hundred twenty-five (225) feet.
3-101.4 Lots of Record Served by Nonconforming Rights-of-Ways and/or Streets
A lot of record which could otherwise be legally built upon but that is served by a nonconforming right-of- way and/or
nonconforming street and that does not comply with Section 3-101.3 of this Ordinance may be used for a single-family
dweiling with CEO approval. No other use either requiring a permit or not permitted shall occur on such lots. Lots
created after the effective date of this amendment shall comply with Section 3-101.3 of this Ordinance. The CEO shall
require the following before approval may be granted.
A. Acopy of the deed or other legal instrument that grants use of the right-of-way and the description of the right-
of-way;
B. The names and addresses of all others granted use of the right-of-way;
C. Assurance in such form as the CEO may require that all other applicable state laws and regulations and local
ordinances will be complied with; and
D. Astatement in recordable form signed by the applicant that if conversion of summer camps or the erection of
new dwellings accessed by the nonconforming rig Lof-way and/or nonconforming street occurs, then maintenance
and plowing are the responsibility of the lot awners using the right of way or street that, because the private right of
way or street is not constructed to town street standards, the travel of personal. service, emergency and
maintenance vehicles over the access street may be hindered Nothing contained within shall be construed as
requiring the Town to provide additional services to properties on noncanforming rights-of-way and/or
nonconforming streets not already receiving those services or to accept such nonconforming rights-of-way and/or
nonconforming streets as public streets.
3-101.5 Campgrounds
Campgrounds shail conform to the minimum requirements imposed under State licensing procedures andthe following:
A. Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including roads and
driveways, for each site. Land supporting wetland vegetation, and landbelow the normal! high-water line of a
water body shall not be included in calculating land area per site.
B. The areas intended for placement of a recreational! vehicle, tent or shelter, and utility and service buildings shall
be set back a minimum of one hundred (100) feet trom the norma! high-water line of a great pond, and seventy-
five (75) feet from the normal high-water line ofother water bodies, tributary streams, or the upland edge of a
wetland.
C. No expansion of an existing campground shall be permitted unless the Planning Board finds that corrective
measures will be taken to minimize erosion and sediment problems and maximize the use of buffers at the existing
campground. The Planning Board and the Androscoggin Valley Soil and Water Conservation District. the Maine
Department of Environmental Protection or other agencies shall inspect and evaluate existing conditions and
require necessary corrective measures to minimize erosion and sediment problems.
22
3-101.6 Erosion and Sedimentation Control
A. All activities which involve filling, grading, excavation, or other similar activities which result in unstabilized soil
conditions and which require a permit shall require a written soil erosion and sedimentation control plan. The plan
, shall be submitted to the permitting authority for approval and shall include, where applicable, provisions for:
1. Mulching and revegetation of disturbed soil.
2. Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
3. Permanent stabilization structures such as retaining walls or riprap.
B. In order to create the least potential for erosion, development shall be designed to fit with the topography and soils
of the site. Areas of steep slopes where high cuts and fills may be required shall be avoided wherever possible, and
natural contours shall be followed as closely as possible.
C. Erosion and sedimentation control measures shall apply to all aspects of the proposed project involving land
disturbance, and shall be in operation during all stages of the activity. The amount of exposed soil at every phase
of construction shall be minimized to reduce the potential for erosion.
D. Any exposed ground area shall be temporarily or permanently stabilized within one (1) week from the time it was
last actively worked, by use of riprap, sod, seed, and mulch, or other effective measures. In all cases permanent
stabilization shall occur within nine {9) months of the initial date of exposure. In addition:
1. Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred {500) square
feet and shall be maintained until a catch of vegetation is established.
2. Anchoring the mulch with netting, peg and twine or other suitable method may be required to maintain
the mulch cover.
3. Additional measures shall be taken where necessary in order to avoid siltation into the water. Such
measures may include the use of staked hay bales and/or silt fences.
7 E. Natural and manmade drainage ways, drainage outlets shall be protected from erosion from water flowing through
8, them and shall be stabilized with vegetation or riprap as warranted by the drainage characteristics. Culvert inlets
and outlets shall be protected from erosion by riprap.
3-101.7 Multi-family Structures
A. Lots for multi-family structures except those located in the Shoreland Zone (structures containing three (3) or more
dwelling units) shall contain one hundred twenty thousand (120,000) for the first three dwelling units and an
additional forty thousand (40,000) square feet for each additional unit beyond three (3) units. Street frontage shall
be a minimum of three hundred fifty feet for the first three (3) dwelling units and have an additional one hundred
{100) feet for each unit beyond three (3). Front setbacks for Primary, Secondary and Accessory structures shall be
one hundred (100) feet; side and rear setbacks shall be seventy-five (75) feet for Primary and Secondary Structures
and ten (10) feet for Accessory Structures.
B. Elderly Housing Complexes
1. For each elderly housing unit contained in a housing complex located in the Village |, Village Il and Residential
Districts there shall be provided a minimum lot area of 20,000 square feet and a minimum street frontage equal
to or exceeding that required for two (2) single-family dwellings in the District.
2. For each elderly housing unit contained in a housing complex located in all other Districts the provisions of 3-
101.7A shall be met.
C. Congregate Housing
1. For each congregate housing unit contained in a congregate housing complex located in the Village |, Village
Il, Residential or General Development Districts, there shall be provided a minimum lot area of 10,000 square
feet.
= 2. Minimum street frontage shall equal or exceed that required for two (2) single-family dwellings in the District.
3. For each congregate housing unit contained in a housing complex located in ail other Districts, the
23
provisions of 3-107.7.A shall be met.
4. In no case shall the minimum lot size be less than that required for proper on-site sewage disposal in
accordance with the State Minimum Lot Size Law, 12 M.R.S.A. 4807, et. seq. a
3-101.8 Off Street Parking and Loading
A. A.use shall not be extended, and no structure shall be constructed or enlarged unless sufficient off-street
vehicle parking space is provided. The location of parking to the side or rear of buildings Is encouraged.
B. Parking areas with more than two (2) parking spaces on all non-residential uses shall be arranged so that
it is not necessary for vehicles to back into the street.
C. Where the development will abut an existing or potential parking area, provisions shall be made for
internal vehicular connections.
D. Required off-street parking for all land uses shall be located on the same lot as the principal building or facility.
The Planning Board may allow the required or provided off-street parking to be located within three hundred
(300) feet measured along lines of public access. Such off-lot parking areas shall be held in fee simple by the
owner of the use served or in such other tenure as assures continued availability for parking as long as the
particular land will be needed for such use provided that if tenure is other than ownership in fee simple, the fem,
of tenure shall be approved by the Selectmen before the request is considered by the Board. Evidence of fee
simple ownership or approved tenure shall be required.
E. The joint use of a parking facility by two or more principal buildings or uses may be approved by the
Planning Board where it Is clearly demonstrated that said parking facilities would substantially meet the
intent of the requirements by reason of variation in the probable time of maximum use by patrons or
employees of such establishments.
F. Access to parking stalls should not be from major interior travel lanes and shall not be immediately
accessible from any public way.
G. Parking areas shall be designed to permit each motor vehicle to proceed to and from the parking space
provided for it without requiring the moving of any other motor vehicles.
H. Parking aisles should be oriented perpendicular to stores or businesses for easy pedestrianaccess and
visibility.
|. In paved parking areas, painted stripes shall be used to delineate parking stalls. Stripes should be a
minimum of four (4) inches in width. Where double lines are used, they should be separated a minimum
of 1'0" on center.
J. In aisles utilizing diagonal parking, arrows should be painted on the pavement to indicate proper traffic
flow.
K. Bumpers or wheel stops shall be provided where overhang of parked cars might restrict traffic flow on
adjacent through streets, restrict pedestrian movement on adjacent walkways, or damage landscape
materials.
L. Off-street parking spaces shall comply with the following standards:
1. Except as provided below, each parking space shall contain a rectangular area at least eighteen (18)
feet long and nine (9) feet wide. Lines demarcating parking spaces may be drawn at various angles
in relation to curbs or aisles, so long as the parking spaces so created contain within them the
rectangular area required by this Chapter.
2. Up to twenty (20) percent of required parking spaces may contain a rectangular area of only eight (8)
feet in width by fifteen (15) feet in length. If such spaces are provided, they shall be conspicuous .
designated as reserved for small or compact cars only.
M. Handicapped Parking spaces shall comply with the Americans with Disability Act.
24
N. Off-street parking spaces shall be provided to conform with the number required in the following schedule:
| _ Library, Museum, Art Gallery
|
NOTES:
1. Where the calculation of the parking spaces results in a fractional part of a complete parking space the parking
spaces required shall be construed to be the next highest number.
2. The above are recommended standards; and the Planning Board may require more or allow fewer spaces based
on documentation from existing similar uses and national standards. The Planning Board shall require adequate
parking spaces to insure that uses will not require on-street parking.
3. Where floor space is to be used in calculating the number of required parking stalls, gross floor area shall be used
unless otherwise noted.
3-101.9 Sanitary Provisions
No Building or Use Permit shall be issued until any and all Disposal System Permits and plumbing permits (if applicable)
from the Local Plumbing Inspector have been issued.
3-101.10 Signs and Billboards
A. All signs and billboards shall conform to Title 23 M.R.S.A. Sections 1913-A and 1914. No sign shall block a
clear line of site at access and egress points or intersections.
B. Political signs, those announcing candidates seeking public office, political parties, and/or political and public issues
contained on a ballot, shall conform to Title 23 M.R.SA actions 1913-A and 1914 and the following.
1. No more than four political signs per candidate, party or issue shall be displayed in a 100-foot length of
. roadway.
: 2. Political signs may be placed no more than thirty days before an election and shall be removed within 48 hours
after the election.
3. The sign may have up to 32 square feet for single sided sign or 16 square feet on each side of double-faced
25
sign.
4. Signs shall not be placed in road right-of-way and shall be at least ten feet back from all intersections and
access and egress points. Signs shall not be more than 3 1/2 feet high and shall not block visibility.
C. Changeable signs, shall conform to Title 23 M.R.S.A. Sections 1913-A and 1914 and the following:
1. May be changed no more than once every 5 seconds.
2. "Changeable signs" means an on-premises sign created, designed, manufactured or modified in such a
way that its message may be electronically, digitally or mechanicallyaltered by the complete substitution
or replacement of one display by another on each side.
3-101.11 Water Quality Protection
No activity in connection with the use of any land or structure shall discharge or permit the discharge of any untreated or
inadequately treated liquid, gaseous, or solid materials that run off, seep, percolate, or wash into surface or ground waters
so as to pollute or harm such water, or cause a nuisance such as objectionable shore deposits, floating or submerged
debris, oil or scum, color, taste, or unsightliness or to harm human, plant, or aquatic life. '
3-101.12 Home Occupations
Home occupations shall comply with the following.
A. Home Occupations which meet the following conditions do not require a Code Enforcement Officer or Planning
Board Permit:
1. Do not employ any persons who do not make the residence their permanent home;
2. Donot display any exterior signs, exterior exhibits, exterior storage of materials or any other exterior indications
of the home occupation or variation from the residential character of the principal dwelling or accessory building:
3. Do not generate any nuisance, waste discharge, offensive noise, vibration smoke, dust, odors, heat, glare,
radiation, fumes, or electrical interference detectable to the normal senses or which interferes with normal radio
or television reception, or causes other nuisances which extend beyond the limits of the subject property; and
4. Are not likely to generate regular daily or seasonal traffic.
5. Under this section, no home occupations are allowed that requires any increases in the floor space of any
structures on the property.
6. Notice and description of the Home Occupation shall be given to the Code Enforcement Officer within
fourteen (14) days prior of start-up.
B. Home occupations that do not meet the provisions of Section A.1-5 above shall obtain a permit from the Code
Enforcement Officer and comply with the following condition
1. Not more than one (1) person, who does not make the residence their permanent home may be employed
(including part-time workers);
2. The appearance of the structure or accessory structure may not be altered, except as provided under
subsection 3. below or the occupation within the residence must be conducted in a manner that would not cause
the residence to differ from its residential character by means of colors, lights or sounds;
3. Additions to the residence, secondary or accessory structures for the express purpose of a home occupation
shall be constructed and finished in the same manner as the original structure such that the character and
appearance of the principal structure is maintained;
4. The area devoted to the home occupation shall not exceed thirty (30) percent of the area used for the resident.
structure.
5. There is adequate off-street parking on the premises for customers or clients use;
26
6. There is no objectionable increase in commercial vehicle traffic over that traffic: normal for the neighborhood.
a 7. It does not adversely affect any natural resource or environmentally sensitive area including, but not limited to
a wetlands, aquifer, watercourse or water body. The home occupation shall not use chemicals not commonly
found in a residence and shall not use any chemicals in quantities not commonly used in a residence.
8. The home occupation shall not generate any nuisance, waste discharge, offensive noise, vibration,
smoke, dust, odors, heat, glare, radiation, fumes or electrical interference detectable to the normal
senses or which interferes with normal radio or television reception or causes other nuisances which
extend beyond the limits of the subject property. All waste material from the home occupation shall
be removed promptly from the premises, according to state laws and local ordinances and not go to
Transfer Station.
9. Signage shall be limited to one (1) sign with a surface area not greater than four (4) square feet.
10. The Home Occupation Permit does not preclude the requirement to comply with all State and local
regulations.
C. Home Occupations that do not meet the provisions of Section A and B above shall obtain apermit from
the Planning Board and comply with the following conditions:
1. No more than one (1) person who does not make the residence his or her home may be employed;
2. Accessory structures or attached additions to the principal structure must be compatible with the
residential character of the neighborhood;
3. Except as provided in Subsection C.2, the appearance of the structure is not to be altered, and the
occupation within the residence shall be conducted in a manner that would not cause the residence
to differ from its residential character by means of colors and lights and sounds;
: 4. There is no objectionable Increase in traffic over that which is normal for the neighborhood;
5. If the home occupation attracts any regular customer or client traffic, there shall be at least two (2) but not
more than three (3} off-street parking spaces specifically designated for use by the employee and any
customers of the home occupation. Such parking shall not be located between the house and the street as
defined by a line drawn parallel to the street which touches the point of the house nearest to the street.
Such parking areas shall be set back at least ten feet from side and rear lot lines.
6. There shall be no public display of goods or wares or machinery used in the home occupation visible from
any public or private way or adjacent properties.
7. \tdoes not adversely affect any natural resource or environmentally sensitive area including, but not limited
to wetlands, aquifer, watercourse, or water body. The home occupation shall not use chemicals not
commonly found in a residence and shall not use any chemicals in quantities not commonly used in a
residence.
8. The home occupation shall not generate any nuisance, waste discharge, offensive noise, vibration, smoke,
dust, odors, heat, glare, radiation, fumes or electrical interference detectable to the nomtal senses or which
interferes with normal radio or television reception, or causes other nuisances which extend beyond the limits
of the subject properly. All waste material from the home occupation shall be removed promptly from the
premises, according to state laws and local ordinances and not go to Transfer Station.
9. Signage shall be limited to one (1) sign with a surface area not greater than four (4) square feet.
10. The Home Occupation Permit does not preclude the requirement to comply with all State and local
regulations.
D. Home Occupations not meeting the above standards shall be considered a commercial use requiring full
oe Planning Board review under Chapter 6 of this Ordinance.
27
3-101.13 Filling, Earth Moving and Storage of Minerals
The filling earth moving and/or storage, when such storage is proposed for the first time, of topsoil loam rock, sand, gravel
or other similar materials of more than one hundred (100) cubic yards from or onto any lot in any one (1) year period she"
require a permit from the Code Enforcement Officer. This section shall not apply if the activity is undertaken as part of a.
approved construction project, approved site plan review or is part of normal farming operations. All filling, earth moving
and/or storage shall be undertaken to minimize erosion and sedimentation.
3-101 .14 Apartment Conversions
A. Purpose
The purpose of these standards is to provide less expensive rental units make housing units available to
lower income households who might otherwise have difficulty finding housing in Greene and to protect
property values and traditional residential characteristics.
B. General requirements. The conversion of single-family dwellings, except dwellings in the Shoreland Zone legally
existing on March 3, 2001, and lacated on lots which othenwise would not meet the dimensional requirements for
a duplex may be converted to a duplex with a permit issued by the Code Enforcement Officer provided that the
following are met:
1. Such conversion shall not create more than two (2) dwelling units in any structure including the original
dwelling unit.
2. The additional dwelling unit shall be complete, separate house-keeping unit that is isolated from the
original unit.
3. The additional dwelling unit shall be designed so that the appearance of the structure remains that of a
single-family dwelling with the exception of emergency egress, if so required.
4. The design and size of the additional dwelling units conform to all applicable standards in the Town o,
Greene Building Code and all other applicable codes.
5. Adequate off-street parking shall be provided.
6. Subsurface sewage disposal shall comply with all provisions of the State of Maine Subsurface Wastewater
Disposal Rules
3-101.15 Elder Cottage Housing Opportunity (ECHO) Units
A. Purpose
The purpose of these standards is to provide for the temporary habitation of a dwelling unit, to be occupied
by an older person(s), on lots where single-family dwellings exist, except in the Shoreland Zone, so that
adult children may care for aging parents or certain persons with a disability.
B. General Requirements
The construction or placement of an "ECHO" unit on a lot which a single-family dwelling is located may be
allowed by a permit granted by the Code Enforcement Officer regardless of lot size and frontage, except in
the Shoreland Zone, if the following are met.
1. The owner of the principal structure must reside in either the principal structure or the "ECHO" unit.
2. The owner of the principal structure shall be related to occupants by blood, marriage, or adoption.
3. The occupants of the "ECHO" unit must be at least 62 years of age or be unable to live independently .
due to a disability.
4. The number of occupants of the "ECHO" unit shall be limited to two persons.
28
5. All setbacks and lot coverage requirements contained In Chapter 3-101.2.G of this ordinance shall be met.
Wherever possible, the unit shall be placed to the side or rear of existing structures.
: 6. There shall be a separation of a minimum of fifteen (15) feet between the principal dwelling and the
"ECHO" unit.
7. The maximum size of the "ECHO" unit shall be 600 square feet of floor area and shall be limited in size to
accommodate one (1) bedroom. The "ECHO" unit shall be constructed of similar materials and
architectural style as the principal structure. Mobile homes shall not be allowed.
8. The subsurface sewage disposal system on the property shall be functioning properly and be of sufficient
size to accommodate the additional flow. In addition, there shall be sufficient land area for an expansion
or replacement system which is in compliance with the State of Maine Subsurface Wastewater Disposal
Rules. if needed.
9. The parking requirements of the performance standards contained herein shall apply.
10. Proper ingress and egress shall be provided to an ECHO unit.
11. Prior to the issuance of a building permit for the placement or construction of an ECHO unit by the Code
Enforcement Officer, the owner of the property shall sign a binding agreement limiting the approval of an
ECHO unit for the purposes set forth in this subsection, and that ECHO unit must be removed or converted
to a non-habitable accessory structure within ninety (90) days from the date of occupancy cessation or
when no qualified person lives within.
3-101.16 Accessory Dwelling Unit
A. Purpose
/ To meet the requirements set forth by the state of Maine in 30-A M.R.S.A. §4364
B. Applicability of Standards
a. All dimensional and setback requirements, as set forth in 3-101.2.F apply.
b. The accessory dwelling unit must meet all state subsurface waste water disposal rules.
c. One accessory dwelling unit permitted per qualifying lot.
d. A common driveway meeting the requirements of 5-201.1.J shall be utilized to access the primary
structure and accessory structure, unless it can be demonstrated that a separate driveway will create
a safer entrance.
e. The accessory dwelling unit shall have its own utilities, separate from the primary structure.
3-101.17 Individual Lot Phosphorous Management
A. Purpose
The purposes of these standards are to maintain the water quality of lakes and ponds in Greene and
those it shares with adjacent communities by controlling the transport of phosphorous from their direct
watersheds.
B. Applicability of Standards
1. The following development activities shall require a Phosphorous Management Control Permit issued by
the Code Enforcement Officer whenever located within the direct watershed of a lake or pond. For the
purposes of this standard, Gulf Island Pond shall not be considered as a pond.
f. New commercial, retail, industrial, institutional, and recreational structures and uses that have not
oe received approval by the Planning Board that included a Phosphorous Export Analysis.
g. New residential structures and uses that have not received approval by the Planning Board that included a
29
Phosphorous Export Analysis.
h. Expansions in any five (5) year period of any residential, commercial, retail, industrial institutional or
recreational structures and uses that will result in morethan six hundred twenty-four (624) square fe
of impervious surface that have not received approval by the Planning Board that included a Phosphorou.
Export Analysis.
2. The following are exempt from this Section:
b. Legally existing buildings and uses as they existed on March 3, 2001: and
c. Land development activities related to Subdivision and Site Plan Review activities when they are
in conformance with an approved application by the Planning Board to limit phosphorus export
pursuant to Phosphorus Control in Lake Watersheds: A Technical Guide to Evaluating New
Develoement: (Maine Department of Environmental Protection et al., September 1989 with
revisions to Chapter 4, May 1990 and as amended).
C. Application Procedure
Before issuing a Building or Use Permit the Code Enforcement Officer shall review and approve an
application for Phosphorus Management Control.
1. Submission Requirements
a. The tax map and lot number of the lot and the name of the direct lake/pond watershed in which it is
located.
b. A Site Map of the proposed activity drawn at a scale of one (1) inch equals fifty (50) feet unless
otherwise approved by the Code Enforcement Officer showing:
[1] The location and dimensions of all existing and proposed structures and driveways;
[2] Existing ground cover (woods, fields, lawns, etc.);
[3] Areas to be cleared for construction or landscaping;
[4] Present or proposed location of Subsurface Wastewater Disposal System;
[5] Drainage Patterns.
c. A photograph of the project site.
2. Application Review
The Code Enforcement Officer shall review and approve a Phosphorus Management Control Permit based
on one of the following methods:
a) Point System
The Code Enforcement Officer shall issue a Phosphorus Management Control Permit if the applicant
meets or exceeds thirty (30) points based on the following schedule:
{1] 10 points for correcting an existing erosion problem on the project site.
[2] 10 points for a clearing limitation of 15,000 square feet and less.
[3] 15 points for a clearing limitation of 10,000 square feet and less.
[4] 15 points for the installation of rock-lined drip edges or other infiltrationsystem to serve the new
construction.
[5] 20 points for a 50-foot wide buffer located downslope of the developedarea.
[6] 25 points for 75-foot wide buffer located downslope of the developed area.
[7] 30 points for a 100-foot wide buffer located downslope of the developed area.
b) Technical Analysis
The Code Enforcement Officer shail issue a Phosphorus Export Transport Permit if the applicant does nur
exceed the Phosphorus Export Per Acre as identified in the Section 6-501.1.H.
30
exceed the Phosphorus Export Per Acre as identified in the Section 6-501.1.H.
D. Performance Standards
1. Erosion
Existing erosion problems shall be corrected according to the Maine Erosion and Control Handbook
for Construction Best Management Practices (March 1991 and asamended).
2. Clearing Limitations
Clearing limitation shall be determined based on the area where the natural vegetation is to be removed
and converted to structures, gravel or paved surfaces and lawns.
3. Rocked-lined Drip Edges and/or Gutter Drains
A trench 6 to 8 inches in depth and 12 to 16 inches in width, lined with filter fabric filled with 0.75-inch crushed
stone, centered beneath the roof edge drip line and/or gutter drain.
4. Other infiltration Systems
Other infiltration systems shall be designed according to the Maine Erosion and Control Handbook for
Construction Best Management Practices, (March 1991 and as amended).
5. Buffers
a. Existing Buffers
Existing buffers will be located and maintained according to Phosphorus Control in Lake Watersheds: A
; Technical Guide for Evaluating New Development (Chapter 5 Maine DEP al., September 1989 with
revision in 1992 and as amended).
b. Created Buffers
[1] Natural Occurring
The natural occurring buffer shall be created by allowing the natural progressing of vegetation to
develop by the lack of mowing.
[2] Pianted Buffers
Any planting or revegetation required must be in accordance with a written Plan draftee by a
qualified professional, be implemented at the time of construction, and be designed to meet the
rating scores contained in paragraph 5-104.3.A.2.b and the ground cover requirements of
paragraph 5-104.3.A.2.c when the vegetation matures within the fifty (50) foot strip. Ata
minimum, the Plan must provide for the establishment of a well-distributed planting of saplings
spaced so that there is at least one sapling per eighty (80) square feet of newly established
buffer Planted saplings may be no less than three J3) feet tall for coniferous species and no
less than six (6) feet tall for deciduous species. The Planting Plan must include a mix of at least
three (3) native tree species found growing in adjacent areas with no one species making up
more than fifty (50) percent of the number of saplings planted unless otherwise approved by the
Planning Board or its designee based on adjacent stand comparison. All aspects of the
implemented Plan must be maintained by the applicant and future owners.
[3] Ground Cover
Where natural ground cover is lacking, the area must be supplemented with leaf or bark mulch
and plantings of native shrubs, and other wood and herbaceous vegetation in quantities
N sufficient to retard erosion and provide for effective infiltration of stormwater while the area is
returning to its natural state.
31
3-101.18 Lots Created After 3/08/03 Served by Existing Private Nonconforming Rights of Way and/or Roads ;
Any lot created after 3/08/2003 requesting to use frontage on an existing private nonconforming right-of-way or
street as road frontage must meet the following criteria.
A. The existing private street must meet the criteria in the table in Section 5-201.1.F. The street
shall meet the criteria from its point of intersection with the nearest conforming public or private
road or 50 feet beyond the proposed driveway location or end of the existing right-of-way.
B. Brush, tree limbs and other protuberances shall be removed to allow easy access by emergency
vehicles and to create clear lines of sight at intersections, subject to CEO inspection/approval.
C. The drainage system and erosion control shall conform to recognized management practices.
Reference may be made to the Maine Erosion and Sediment Control Handbook for Construction:
Best Management Practices produced by the Cumberland County S011 and Water Conservation
District, to the Camp Roads Maintenance Manual: A Guide to
Landowners produced by the Kennebec Valley Soil and Water Conservation District, and to the
Basic Erosion Control Guidelines for Road Ditch Maintenance produced by Androscoggin Valley
Council of Governments.
D. Aprofessional civil engineer, registered in the State of Maine, shall review the plan for conformity
before a permit may be issued.
E. Only one single-family dwelling shall be built on any parcel created under compliance with this
section.
F. Extension of a Nonconforming Private Road, Street, or Right-of-Way shall meet the criteria and
standards for a Private Street as presented in Chapter 5.
G. If land on an existing private road is being subdivided, then the Road, Street or Right-of-Way
shall meet the criteria and standards contained in Chapter 5, for public roads (minor street) or
Privately Owned Streets from its intersection with a conforming street.
3-101.19 Adult Book Video Stores and Adult Entertainment Facilities
The standards for Adult Book, Video and Entertainment Stores and Adult Entertainment Facilities are:
> to regulate the density of such uses to ensure that they will not become overly concentrated in
neighborhoods or areas to the detriment of other uses.
o to regulate the potential impact on the community, especially the potential impact on minors and
negative secondary affects.
o to ensure that activities that violate state laws are not conducted on the premises.
A. The minimum distance between such uses and other such uses shall be a minimum of one thousand
(1,000) feet as measured along the shortest straight line between the main entrance of each business,
B. Such uses shall not be located within one thousand (1,000) feet of a school, church, playground, park,
or other area where minors congregate.
C. Such uses shall not be located within five hundred (500) feet of a residence.
3-101.20 Reserved
3-101.21 Shoreland Zones
This Subchapter shall apply only to land areas within 250 feet, horizontal distance, of the normal high-
waterline of great ponds and rivers; within 250 feet, horizontal distance, of the upland edge of a freshwater
32
A. Multiple dwelling/structures. If more than one residential dwelling unit, principal governmental
institutional, commercial, or industrial structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met for each additional dwelling
unit, principal structure, or use.
B. Stairways or similar structures may be allowed with a permit from the Code Enforcement Officer, to
provide shoreline access in areas of steep slopes or unstable soils provided; that the structure is limited
to a maximum of four (4) feet in width; that the structure does not extend below or over the normal high-
water line of a water body or upland edge of a wetland, (unless permitted by the Department of
Environmental Protection pursuant to the Natural, Resources Protection Act, Title 38, Section 480-C);
and that the applicant demonstrates that no reasonable access alternative exists on the property.
C. Piers, Docks, Wharfs, Bridges, and Other Structures and Uses Extending Over or Below the Normal
High-Water Line of a Water Body or Within a Wetland.
1. Access from shore shall be developed on soils appropriate for such use and constructed so as to
control erosion.
2. The location shall not interfere with existing developed or natural beach areas.
3. The facility shall be located so as to minimize adverse effects on fish habitat.
4. The facility shall be no larger in dimension than necessary to carry on the activity and be consistent
with the surrounding character, uses, of the area. A temporary pier, dock or wharf shall not be wider
than six feet for non-commercial uses.
5. No new structure shall be built on, over or abutting a pier, wharf, dock, or other structure extending
beyond the normal high-water line of a water body or within a wetland unless the structure requires
direct access to the water body or wetland as an operational necessity.
\ 6. New permanent piers and docks shall not be permitted unless it is clearly demonstrated to the
Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained from
the Department of Environmental Protection, pursuant to the Natural Resource Protection Act.
7. No existing structures built on, over or abutting a pier, dock, wharf or other structure extending beyond
the normal high-water line of a water body or within a wetland shall be converted to residential
dwelling units in any district.
D. Roads and Driveways: The following standards shall apply to the construction of roads and/or driveways
and drainage systems, culverts, and other related features. VWWhere these standards conflict with Chapter
5, Street Construction Standards, the more restrictive shall apply.
1. Roads and driveways shall be set back at least one hundred (100) feet, horizontal distance, from the
normal high-water line of a great pond, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a wetland unless no
reasonable alternative exists as determined by the Planning Board. If no other reasonable alternative
exists. road and/or driveway setback requirement shall be no less than fifty (50) feet, horizontal
distance, upon clear showing by the applicant that appropriate techniques will be used to prevent
sedimentation of the water body tributary stream, or wetland. Such techniques may include, but are
not limited to, the installation of settling basins, and/or the effective use of additional ditch relief
culverts and turnouts placed so as to avoid sedimentation of the water body, tributary stream, or
wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be increased
by ten (10) feet, horizontal distance, for each five (5) percent increase in slope above twenty percent.
Section 3-101.21.D.1 does not apply to approaches to water crossings or to roads or driveways that
os provide access to permitted structures, and facilities located nearer to the shoreline or tributary stream
due to an operational necessity, excluding temporary docks for recreational uses. Roads and
driveways providing access to permitted structures within the setback area shall comply fully with the
33
requirements of Section 3-101.21.D.1 except for that portion of the road or driveway necessary for
direct access to the structure.
2. Existing public roads may be expanded within the legal road right-of-way regardless of their setbac
from a water body, tributary stream, or wetland.
3. New roads and driveways are prohibited in a Resource Protection District except that the Planning
Board may grant a permit to construct a road or driveway to provide access to permitted uses within
the district. A road or driveway may also be approved by the Planning Board in a Resource Protection
District, upon a finding that no reasonable alternative route or location is available outside the district.
When a road or driveway is permitted in a Resource Protection District the road and/or driveway shall
be set back as far as practicable from the normal high-water line of a water body, tributary stream, or
upland edge of a wetland.
4. Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one vertical and
shall be graded and stabilized in accordance with the provisions for erosion and sedimentation control
contained in Section 3.101.6.
5. Road and driveway grades shall be no greater than ten (10) percent except for segments of less than
two hundred (200) feet.
6. In order to prevent road and driveway surface drainage from directly entering water bodies, tributary
streams or wetlands, roads and driveways shall be designed, constructed, and maintained to empty
onto an unscarified buffer strip, at least (50) feet plus two times the average slope, in width between
the outflow point of the ditch or culvert and the normal high-water line of a water body, tributary
stream, or upland edge of a wetland. Surface drainage which is directed to an unscarified buffer strip
shall be diffused or spread out to promote infiltration of the runoff and to minimize channelized flow
of the drainage through the buffer strip.
7. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a manner
effective in directing drainage onto unscarified buffer strips before the flow gains sufficient volume
head to erode the road, driveway, or ditch. To accomplish this, the following shall apply:
a. Ditch relief culverts drainage dips and associated water turnouts shall be spaced along the road
or driveway at intervals no greater than indicated in the following table:
Grade Spacing
percent feet
200-135
100-800
11-15 80-60
16-20 60-45
b. Drainage dips may be used in place of ditch relief culverts only where the grade is ten {10) percent
or less.
c. On sections having slopes greater than ten (10) percent, ditch relief culverts shall be placed
across the road at approximately a thirty (30) degree angle downslope from a line perpendicular
to the centerline of the road or driveway with proper riprap aprons applied.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for effective
functioning, and their inlet and outlet ends shall be stabilized with appropriate materials.
8. Ditches, culverts, bridges, dips, water turnouts, and other storm water runoff control installatior
associated with roads and driveways shall be maintained on a regular basis to assure effecti ©
functioning.
E. Reserved
34
F. Agriculture
- 1. All spreading of manure shall be accomplished in conformance with the Manure Utilization Guidelines
published by the Maine Department of Agriculture on November 1, 2002, and the Nutrient
Management Law (7 M.R.S.A. section 201-4209.
2. Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, of a great
pond classified GPA, or within seventy-five (75) feet horizontal distance, of other water bodies,
tributary streams, or wetlands. All manure storage areas within the shoreland zone must be
constructed or modified such that the facility produces no discharge of effluent or contaminated storm
water.
3. Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet in
surface area, within the shoreland zone shall require a Conservation Plan to be filed with the Planning
Board Non-conformance with the provisions of said plan shall be considered to be a violation of these
Standards.
4. There shall be no new tilling of soil within one hundred (100) feet horizontal distance of the normal
high-water line of a great pond classified GPA; within seventy-five (75) feet, horizontal distance, from
other water bodies, nor within twenty-five feet, horizontal distance, of tributary streams, and
freshwater wetlands. Operations in existence on the effective date of these Standards and not in
conformance with this provision may be maintained.
5. Newly established livestock grazing areas shall not be permitted within one hundred (100) feet,
horizontal distance, of the normal high-water line of a great pond; within seventy-five (75) feet
horizontal distance of other water bodies, nor; within twenty-five (25) feet, horizontal distance, of
tributary streams, and freshwater wetlands. Livestock grazing associated with ongoing farm activities,
and which are not in conformance with the above setback provisions may continue, provided that
such grazing is conducted in accordance with a Conservation Plan.
f
: G. Repealed
H. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
1. In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation within the
strip of land extending 75 feet, horizontal distance, from the normalhigh-water line, except to remove safety
hazards.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall belimited to that which is
necessary for uses expressly authorized in that district.
2. Except in areas as described in Paragraph 1, above, and except to allow for the development of permitted
uses, within a strip of land extending one-hundred (100) feet, horizontal distance, inland from the normal high-
water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and seventy-five
(75) feet, horizontal distance, from any other water body, tributary stream, or the upland edge of a wetland,
a buffer strip of vegetation shall be preserved as follows:
a. There shall be no cleared opening greater than 250 square feet in the forest canopy (or other existing
woody vegetation if a forested canopy is not present) as measured from the outer limits of the tree or
shrub crown. However, a footpathnot to exceed six (6) feet in width as measured between tree trunks
and/or shrub stems is allowed provided that a cleared line of sight to the water through the buffer strip
is not created.
b. Selective cutting of trees within the buffer strip is allowed provided that a well- distributed stand of
trees and other natural vegetation is maintained. For the purposes of this section a "well-distributed
stand of trees" adjacent to a great pond classified GPA or a river or stream flowing to a great pond
classified GPA,shall be defined as maintaining a rating score of 24 or more in each 25-foot by 50-foot
~ rectangular (1250 square feet) area as determined by the following rating system.
35
Diameter of Tree at 4.5 feet Points
Above Ground Level (inches)
12 or greater | 8 |
NOTE: Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand of trees" is defined as
maintaining a minimum rating score of 16 per 25-foot by 50-foot rectangular area.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner or lessee proposes
clearing within the required buffer:
(ii) Each successive plot must be adjacent to, but not overlap a previous plot:
(iti) Any plot not containing the required points must have no vegetation removed except as otherwise
allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to the minimum points
required or as otherwise allowed by this Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25- foot by 50-foot rectangular area may
consist of trees greater than 12 inches in diameter.
For the purposes of Section 3-101.21.H.2.b "other natural vegetation is defined as retaining existing vegetation
under three (3) feet in height and other ground cover and retaining at least five (5) saplings less than two (2)
inches in diameter at four and one-half (4.5) feet above ground level for each 25-foot by 50-foot rectangle
area. lf five saplings do not exist, no woody stems less than two (2) inches in diameter can be removed unti
saplings have been recruited to the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4) inches or more in
diameter, measured at 4 1/2 feet above ground level may beremoved in any ten (10) year period.
c. In order to protect water quality and wildlife habitat, existing vegetation under three (3) feet in height
and other ground cover, including leaf litter-and the forest duff layer, shallnot be cut, covered, or
removed, except to provide for a footpath or other permitted usesas described in Section (2)(a) above.
d. Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
e. In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, diseased,
unsafe, or dead trees results in the creation of cleared openings, these openings shall be replanted
with native tree species unless existing new tree growth is present.
The provisions contained in paragraph 2 above shall not apply to those portions of public recreational facilities
adjacent to public swimming areas as tong as cleared areas are limited to the minimum area necessary.
3. Atdistances greater than one hundred (100) feet, horizontal distance, from a great pond classified GPA or
a river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance, from the
normal high-water line of any other water body, tributary stream, or the upland edge of a wetland, there shall
be allowed on any lot, in any ten (10) year period, selective cutting of not more than forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground level. Tree removal in
conjunction with the development of permitted uses shall be included in the forty (40) percent calculation. For
the purposes of these standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and accessory structures,
driveways, lawns, and sewage disposal areas, exceed in the aggregate, 25% of the lot area within the shoreland
zone or ten thousand (10,000) square feet, whichever is greater, including land previously cleared.
36
zone or ten thousand (10,000) square feet, whichever is greater, including land previously cleared.
4. Legally existing nonconforming cleared openings may be maintained, but shall not be enlarged, except as
allowed by this Ordinance.
5. Fields and other cleared openings which have reverted to primarily shrubs, trees, or other woody vegetation
shall be regulated under the provisions of this section.
|. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
(1) Hazard trees in the shoreland zone may be removed without a permit after consultation with the Code
_ Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in the tree canopy
greater than two hundred and fifty (250) square feet, replacement with native tree species is required,
unless there is new tree growth already present. New tree growth must be as near as practicable to where
the hazard tree was removed and be at least two (2) inches in diameter, measured at four and one half
(4.5) feet above the ground level. If new growth is not present, then replacement trees shall consist of native
species and be at least four (4) feet in height and be no less than two (2) inches in diameter. Sturnps may
not be removed.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet above ground
level in any ten (10) year period, and/or results in cleared openings exceeding twenty-five (25) percent of
the lot area within the shoreland zone, or ten thousand (10,000) square feet, whichever is greater,
replacement with native tree species is required, unless there is new tree growth already present. New tree
growth must be as near as practicable to where the hazard tree was removed and be at least two (2) inches
in diameter, measured at four and one haif (4.5) feet above the ground level. If new growth is not present,
then replacement trees shall consist of native species and be at least two (2) inches in diameter, measured
at four and one half (4.5) feet above the ground level.
(c) The removal of standing dead trees, resulting from natural causes, is permissible without the need for
replanting or a permit, as long as the removal does not result in the creation of new lawn areas, or other
permanently cleared areas, and stumps are not removed. For the purposes of this provision dead trees are
those trees that contain no foliage during the growing season.
(d) The Code Enforcement Officer may require the property owner to submit an evaluation from a licensed
forester or arborist before any hazard tree can be removed within the shoreland zone.
(e) The Code Enforcement Officer may require more than a one-for-one replacement for hazard trees
removed that exceed eight (8) inches in diameter measured at four and one half (4.5) feet above the ground
level.
(2) Storm-damaged trees in the shoreland zone may be removed without a permit after consultation with the Code
Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared opening in
the tree canopy greater than two hundred and fifty (250) square feet, replanting is not required, but the area
shall be required to naturally revegetate, and the following requirements must be met:
(i) The area from which a storm-damaged tree is removed does not result in new lawn areas, or other
permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed;
(iii) Limbs damaged from a storm event may be pruned even if they extend beyond the bottom one-third
(1/3) of the tree; and
(iv) If after one growing season, no natural regeneration or regrowth is present, replanting of native tree
seedlings or saplings is required at a density of one seedling per every eighty (80) square feet of lost
~ canopy.
37
(b) Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40% of the volume of
trees four (4) inches or more in diameter, measured at four and one half (4.5) feet above the ground level ;
in any ten (10) year period, or results, in the aggregate, in cleared openings exceeding 25% of the lot area
within the shoreland zone or ten thousand (10,000) square feet, whichever is greater, and no natural
regeneration occurs within one growing season, then native tree seedlings or saplings shall be replanted
on a one-for-one basis.
J. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth in Section
3-101.21.G, provided that all other applicable requirements of this chapter are complied with, and the removal of
vegetation is limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two (2) years for the maintenance of legally existing
areas that do not comply with the vegetation standards in this chapter, such as but not limited to cleared openings
in the canopy or fields. Such areas shall not be enlarged, except as allowed by this section. If any of these areas,
due to lack of removal of vegetation every two (2) years, reverts back to primarily woody vegetation, the
requirements of Section 3-101.21.G apply;
(2) The removal of vegetation from the location of allowed structures or allowed uses, when the shoreline setback
requirements of section 15(B) are not applicable;
(3) The removal of vegetation from the location of public swimming areas associated with an allowed public
recreational facility;
(4) The removal of vegetation associated with allowed agricultural uses, provided best management practices are
utilized, and provided all requirements of section 3-101.21.F are complied with;
(5) The removal of vegetation associated with brownfields or voluntary response action program (VRAP) projects
provided that the removal of vegetation is necessary for remediation activities to clean-up contamination on a site
in a general development district, commercial fisheries and maritime activities district or other equivalent zoning
district approved by the Commissioner that is part of a state or federal brownfields program or a voluntary response
action program pursuant 38 M.R.S.A section 343-E, and that is located along:
(a) A coastal wetland; or
(b) A river that does not flow to a great pond classified as GPA pursuant to 38 M.R.S.A section 465-A.
(6) The removal of non-native invasive vegetation species, provided the following minimum requirements are met:
(a) If removal of vegetation occurs via wheeled or tracked motorized equipment, the wheeled or tracked
motorized equipment is operated and stored at least twenty-five (25) feet, horizontal distance, from the
shoreline, except that wheeled or tracked equipment may be operated or stored on existing structural
surfaces, such as pavement or gravel:
(b) Removal of vegetation within twenty-five (25) feet, horizontal distance, from the shoreline occurs via
hand tools; and
({c) If applicable clearing and vegetation removal standards are exceeded due to the removal of non-native
invasive species vegetation, the area shall be revegetated with native species to achieve compliance.
NOTE: An updated list of non-native invasive vegetation is maintained by the Department of Agriculture, Conservation and
Forestry's Natural Areas Program: hitp./Avww.maine.gov/dact/mnap/features/invasive_plants/invasives.html
(7) The removal of vegetation associated with emergency response activities conducted by the Department, the
U.S. Environmental Protection Agency, the U.S. Coast Guard, and their agents.
K. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth in this Chapter to address
the removal of non-native invasive species of vegetation, or as a mechanism to allow for development that may
38
a shoreline stabilization project, the revegetation must comply with the following requirements.
(1) The property owner must submit a revegetation plan, prepared with, and signed by a qualified professional, that
_ describes revegetation activities and maintenance. The plan must include a scaled site plan, depicting where vegetation
was, or is to be removed, where existing vegetation is to remain, and where vegetation is to be planted, including a list
of all vegetation to be planted.
(2) Revegetation must occur along the same segment of shoreline and in the same area where vegetation was removed
and at a density comparable to the pre-existing vegetation, except where a shoreline stabilization activity does not allow
revegetation to occur in the same area and at a density comparable to the pre-existing vegetation, in which case
revegetation must occur along the same segment of shoreline and as close as possible to the area where vegetation
was removed:
(3) If part of a permitted activity, revegetation shail occur before the expiration of the permit. If the activity or revegetation
is not completed before the expiration of the permit, a new revegetation plan shall be submitted with any renewal or
new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must at a minimum consist of saplings;
(c) lf more than three (3) trees or saplings are planted, then at least three (3) different species shall be used;
(d) No one species shall make up 50% or more of the number of trees and saplings planted;
(e) If revegetation is required for a shoreline stabilization project, and it is not possible to plant trees and saplings
in the same area where trees or saplings were removed, then trees or sapling must be planted in a location that
effectively reestablishes the screening between the shoreline and structures; and
. (f) Asurvival rate of at least eighty (80) percent of planted trees or saplings is required for a minimum five (5) years
period.
(5) Revegetation activities must meet the following requirements for woody vegetation and other vegetation under three
(3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced with native noninvasive
species of woody vegetation and vegetation under three (3) feet in height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in quantities and variety
sufficient to prevent erosion and provide for effective infiltration of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3) different species shall
be planted;
(d) No one species shall make up 50% or more of the number of planted woody vegetation plants; and
(e) Survival of planted woody vegetation and vegetation under three feet in height must be sufficient to remain in
compliance with the standards contained within this chapter for minimum of five (5) years
(6) Revegetation activities must meet the following requirements for ground vegetation and ground cover:
(a) All ground vegetation and ground cover removed must be replaced with native herbaceous vegetation, in
quantities and variety sufficient to prevent erosion and provide for effective infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, an area must be supplemented with a minimum four
(4) inch depth of leaf mulch and/or bark mulch to prevent erosion and provide for effective infiltration of stormwater;
and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to remain in compliance
with the standards contained within this chapter for minimum of five (5) years.
39
L. Commercial and Industrial Uses
The following new commercial and industrial uses are prohibited within the shoreland zone as defined adjacent '
Allen, Berry, Hooper and Sabattus Ponds and streams which flow to these ponds. .
a. Auto washing facilities
b. Auto or other vehicle service and/or repair operations, including body shops
c. Chemical and bacteriological laboratories
d. Storage of chemicals, including herbicides, pesticides, or fertilizers other than amounts normally associated
with individual households or farms
e. Commercial painting\wood preserving, and furniture stripping
f. Dry cleaning establishments
g. Electronic circuit assembly
h. Laundromats, unless connected to a sanitary sewer
i. Metal plating, finishing, or polishing
j. Petroleum or petroleum product storage and/or sale except storage on same property as use occurs and
except for storage and sales associated with marinas
k. Photographic processing
|. Printing
M. Single-family Homes/Resource Protection District
The Planning Board may issue a permit for a single-family residence in the ResourceProtection District if the applicant
demonstrates that all of the following criteria are met.
a. There is no location on the property, other than a location within the Resource Protection District where the
structure can be built.
b. The lot on which the structure is proposed is undeveloped and was established and recorded in the
Androscoggin County Registry of Deeds before the adoption of the Resource Protection District.
c. Allbuildings, sewage disposal systems, and other improvements are:
a. Located on natural ground slopes of less than 20%; and
b. Located outside the floodway of the 100-year floodplain along rivers based on detailed flood insurance studies
and as delineated on the Federal Emergency Management Agency's Flood Boundary and Floodway Maps
and Flood Insurance Rate Maps; all buildings, including basements, are elevated at least one foot above the
100-year floodplain elevation; and the development is otherwise in compliance with the Floodplain
Management Ordinance for the town of Greene, Maine. If the floodway is not shown on the Federal Emergency
Management Agency maps it is deemed to be half the width of the 100-year floodplain.
d. The total ground floor area, including cantilevered or similar overhanging extensions of all principal and accessory
structures is limited to 1,500 square feet. This limitation shall not be altered by variance.
e. All structures, except functionally water-dependent structures, are set back from the normal high-waterline
of a water body, tributary stream, or upland edge of a wetland to the greatest practical extent, but not less
than 75 feet, horizontal distance. In determining the greatest practical extent, the Planning Board shall
consider the depth of the lot, the slope of the land, the potential for soil erosion, the type and amount of
vegetation to be removed, the proposed building site's elevation in regard to the floodplain and its proximity
to moderate-value and high-value wetlands.
N. Signs
The following provisions shall govern the use of signs in the Resource Protection, Stream Protection, and
Limited Residential Districts: ;
a. Signs relating to goods and services sold on the premises shall be allowed, provided that such signs
shail not exceed six (6) square feet in area and shall not exceed two (2)signs per premises. Billboards
40
and signs relating to goods or services not sold or rendered on the premises shall be prohibited.
b. Name signs are permitted, provided such signs shall not exceed two (2} signs per premises, and shall
not exceed twelve (12) square feet in the aggregate.
c. Residential users may display a single sign not over three (3) square feet in area relating to the sale,
rental, or lease of the premises.
d. Signs relating to trespassing and hunting shall be allowed without restriction as to number provided that
no such sign shall exceed two (2) square feet in area.
e. Signs relating to public safety shall allowed be without restriction.
f. No sign shall extend higher than twenty (20) feet above the ground.
g. Signs may be illuminated only by shielded, non-flashing lights.
O. Storm Water Runoff
a. All new construction and development shall be designed to minimize storm water runoff from the site in
excess of the natural predevelopment conditions. Where possible existing natural runoff control features,
such as berms, swales, terraces, and wooded areas shall be retained in order to reduce runoff and
encourage infiltration of stormwaters.
b. Storm water runoff control systems shall be maintained as necessary to ensure proper functioning.
P. Septic Waste Disposal
All subsurface sewage disposal systems shall be installed in conformance with the State of Maine Subsurface
Wastewater Disposal Rules, and the following:
a. Clearing or removal of woody vegetation necessary to site a new system and any associated fill
extensions, shall not extend closer than seventy-five (75) feet, horizontal distance, from the normal high-
water line of a water body or the upland edge of a wetland and;
b. A holding tank is not allowed for a first-time residential use in the shoreland zone.
Q. Essential Services
a. Where feasible, the installation of essential services shall be limited to existing public ways and
existing service corridors.
b. The installation of essential services, other than road-side distribution lines, is not allowed in a
Resource Protection or Stream Protection District, except to provide services to a permitted use
within said district, or except where the applicant demonstrates that no reasonable alternative exists.
Where allowed, such structures and facilities shall be located so as to minimize any adverse impacts
on surrounding uses and resources, including visual impacts.
c. Damaged or destroyed public utility transmission and distribution lines, towers and related equipment
may be replaced or reconstructed without a permit.
R. Parking Areas
1. Parking areas shall meet the shoreline and tributary stream setback requirements for structures for the
district in which such areas are located. The setback requirement for parking areas serving public boat
launching facilities, in Districts other than the General Development District shall be no less than fifty (50)
feet horizontal distance, from the shoreline or tributary stream if the Planning Board finds that no other
\ reasonable alternative exists further from the shoreline or tributary stream.
2. Parking areas shall be adequately sized for the proposed use and shall be designed toprevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and where
41
feasible, to retain all runoff on-site.
3. In determining the appropriate size of proposed parking facilities, the following shail apply:
a. Typical parking space: Approximately nine (9) feet wide and eighteen (18) feet long, except th.
parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
b. Internal travel aisles: Approximately twenty (20) feet wide.
S. Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing procedures and the
following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including roads
and driveways, for each site. Land supporting wetland vegetation, and land below the normal high-water
line of a water body shall not be included in calculating land area per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter, and utility. and service buildings
shall be set back a minimum of one hundred (100) feet, horizontal distance, from the normal high-water
line of a great pond, and seventy-five (75) feet, horizontal distance, from the normal high-water line of
other water bodies, tributary streams, or the upland edge of a wetland:
3. No expansion of an existing campground shall be permitted unless the Planning Board finds that corrective
measures will be taken to minimize erosion and sediment problems and maximize the use of buffers at
the existing campground. The Planning Board and the Androscoggin Valley Soil and Water Conservation
District, the Maine Department of Environmental, Protection or other agencies shall Inspect and evaluate
existing conditions and require necessary corrective measures to minimize erosion and sediment
problems.
T. Individual Private Campsites
Individual, private campsites not associated with campgrounds are allowed provided the followiny
conditions are met:
1. One campsite per lot existing on the effective date of this Ordinance, or thirty thousand (30,000) square
feet of lot area within the shoreland zone, whichever is less, may be permitted.
2. Campsite placement on any lot, including the area intended for a recreational vehicle or tent platform, shall
be set back one hundred (100} feet, horizontal distance from the normal high-water line of a great pond,
and seventy-five (75) feet, horizontal distance from the normal high-water line or other water bodies,
tributary streams, or the upland edge of a wetland.
3. Only one recreational vehicle shall be allowed per campsite. The recreational vehicles shall not be located
on any type of permanent foundation except for a gravel pad and no structure except a canopy shall be
attached to the recreational vehicle.
4. The clearing of vegetation for the sitting of the recreational vehicle, tent or similar shelter in a Resource
Protection District shall be limited to one thousand (1000) square feet.
5. Awritten sewage disposal plan describing the proposed method and location of sewage disposal shall be
required for each campsite and shall be approved by the Code Enforcement Officer. Where disposal is
off-site, written authorization from the receiving facility or landowner is required.
6. When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred and twenty
(120) days per year, all requirements for residential structures shall be met, including the installation of a
subsurface sewage disposal system in compliance with the State of Maine Subsurface Wastewater
Disposal Rules unless served by public sewage facilities.
7. When an individual private campsite is proposed on a lot that contains another principal use and/or
structure, the lot must contain the minimum lot dimensional requirements for the principal structure and/or
use, and the individual private campsite separately.
42
use, and the individual private campsite separately.
U. Mineral Exploration and Extraction
NOTE: This includes mining of topsoil and loam.
Mineral exploration to determine the nature or extent of mineral resources shall be accomplished by hand
sampling, test boring, or other methods which create minimal disturbance of less than one hundred (100)
square feet of ground surface. A permit from the Code Enforcement Officer shall be required for mineral
exploration which exceeds the above limitation. All excavations, including test pits and holes shall be
immediately capped, filled, or secured by other equally effective measures, to restore disturbed areas
and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
1. Areclamation plan shall be filed with and approved by the Planning Board before a permit is granted.
Such plan shall describe m detail procedures to be undertaken to fulfill the requirements of paragraph
3 below.
2. No part of any extraction operation including drainage and runoff control features shall be permitted
within one hundred 100) feet, horizontal distance, of the normal high- water line of a great pond, and
wit in seventy-five (75) feet, horizontal distance, of the normal high-water line of any other water body,
tributary stream, or the upland edge of a wetland. Extraction operations shall not be permitted within
fifty (50) feet, horizontal distance, of any property line, without written permission of the owner of such
adjacent property.
3. Within twelve (12) months following the completion of extraction operations at any extraction site,
which operations shall be deemed complete when less than one hundred (100) cubic yards of
materials are removed in any consecutive twelve (12) month period, ground levels and grades shall
be established in accordance with the following:
a. All debris, stumps, and similar material shall be removed for disposal in an approved location or
shall be buried on-site. Only materials generated on-site may be buried or covered on-site.
b. The final graded slope shall be two and one-half to one (2.5:1) slope or flatter.
c. Topsoil or loam shall be retained to cover all disturbed land areas, which shall be reseeded and
stabilized with vegetation native to the area. Additional topsoil or loam shall be obtained from off-
site sources if necessary to complete the stabilization project.
4. In keeping with the purposes of this Ordinance, the Planning Board may impose such conditions as
are necessary to minimize the adverse impacts associated with mineral extraction operations on
surrounding uses and resources.
U. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can be established
or maintained without causing adverse environmental impacts, including severe erosion, mass soil
movement, improper drainage, and water pollution, whether during or after construction. Proposed uses
requiring subsurface waste disposal, and commercial or industrial development and other similar
intensive land uses, shall require a soils report based on an on-site investigation and be prepared by
state-certified professionals. Certified persons may include Maine Certified Soll Scientists, Maine
Registered Professional Engineers, Maine State Certified Geologists, and other persons who
have training and experience in the recognition and evaluation of soil properties. The report shall be
based upon the analysis of the characteristics of the soil and surrounding land and water areas, maximum
ground water elevation, presence of ledge, drainage conditions, and other pertinent data which the
evaluator deems appropriate. The soils report shall include recommendations for a proposed use to
counteract soil limitations where they exist.
43
V. Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on or adjacent to sites =
listed on, or eligible to be listed on the National Register of Historic Places, as determined by the
permitting authority shall be submitted by the applicant to the Maine Historic Preservation Commission
for review and comment, at least twenty (20) days prior to action being taken by the permitting authority.
The permitting authority shall consider comments received from the Commission prior to rendering a
decision on the application.
W. Additional Standards
In addition to the standards contained elsewhere in the Ordinance, the Planning Board shall consider the
following in the Shoreland Zone as defined.
1. Will maintain safe and heaithful conditions;
2. Will not result in water pollution, erosion, or sedimentation to surface waters;
3. Will adequately provide for disposal of all wastewater,
4, Will not have an adverse impact on spawning grounds, fish, aquatic life, bird, or other wildlife habitat:
5. Will conserve shore cover and visual, as well as actual, points of access to inland waters;
6. Will protect archaeological and historic resources as designated in the comprehensive plan;
7. Will avoid problems associated with flood plain development and use.
AMENDED: March 8, 2003
AMENDED: March 7, 2009
AMENDED: March 6, 2010
AMENDED: June 18, 2022
AMENDED: August 5, 2023
AMENDED: August 2, 2025
AMENDED: April 11, 2026
44
Chapter 4
4-101 Administration and Enforcement
4-101.1 Building or Use Permit Required
A. Prior to construction of a building exceeding one hundred (100) square feet in floor area or the initiation of any use
covered in Chapter 6 or changing the size or shape of an existing building, a Building or Use Permit shall be required.
The provisions of this Chapter shall apply to new constructions, manufactured homes set up after March 7, 1990,
additions and relocation of any dwelling or part thereof, and swimming pools.
1. This Chapter shall be administered by the Building Inspector/Code Enforcement Officer who shall be appointed
by the municipal officers.
2. The Building Inspector/Code Enforcement Officer shall inspect all buildings being constructed or relocated
that require a permit under this Ordinance for the purpose ofenforcing the provisions of this Ordinance and
all other local and State laws governing the construction of buildings.
3. The Building Inspector/ Code Enforcement Officer, or his or her assistant, in performanceof his or her duties,
may enter any building for the purpose of making the inspection required by this Ordinance
B. The application for the permit shall be in writing and shall be made in such form as the Building Inspector/Code
Enforcement shall prescribe and shall contain a description of the proposed new or relocated building. For any
permit that involves plumbing and/or the installation of a subsurface wastewater disposal system a valid Plumbing
Permit issued by the Local Plumbing Inspector must accompany the application. The soil evaluation test must meet
the requirements of the State of Maine Subsurface wastewater Disposal Rules and must be performed by a State of
Maine Licensed Soil Evaluator. No building permit for a dwelling shall be issued without soilevaluation test.
The application shall be filed with the Board of Assessors.
©. No Building Permit or Change of Use Permit for a building or use shall be issued until the proposed use or
construction or alteration of a building complies in all respects with the provisions of this Ordinance or with a decision
rendered by the Board of Appeals or the Planning Board pursuant to this Ordinance. Any application for such a
permit shall be accompanied by a plan, accurately drawn to scale, showing the actual shape and dimensions of the
lo to be built upon, the exact location and size of all buildings or structures already on the lot, the location of new
buildings to be constructed, together with the lines within which all buildings and structures are to be constructed, the
existing and intended use of each building or structure and such other information as may be necessary to provide
forthe execution and enforcement of this Ordinance.
D. No Building Permit or Change of Use Permit shall be issued without payment of applicable fees.
E. Building Permits or Change of Use Permit shall only be issued to the owner of record or his or her authorized agent.
F, Within seven (7) days of the filing of a complete application for a Building Permit or Change of Use Permit, the
Building Inspector/Code Enforcement Officer shall approve, deny, or refer the applicant to the Planning Board. His
or her decision shall be in writing on a form designated for the purpose and communicated directly to the applicant.
One copy of the Building Inspector's decision shall be filed in the Municipal Office.
G. Applications for permits with their accompanying plans and Building Permit shall be maintained as a permanent
record by the Building Inspector. Application plans filed with the Planning Board shall be maintained as a permanent
record by the Planning Board and need not be maintained by the Building Inspector/Code Enforcement Officer.
H. A Building Permit or Change of Use Permit secured under the provisions of this Ordinance shall expire if the work
or change there under has not reached a substantial start within one (1) year of the date on which the permit is
granted, and if the work or change of use is not substantially completed within two (2) years of the date on which
the permit is granted.
|. A public utility or any utility company of any kind may not install services to any new structure located in the
Mee shoreland zone unless written authorization attesting to the validity and currency of all local permits required under
this Ordinance, has been issued by the appropriate municipal officials or other written arrangements have been
made between the municipal officials and the utility.
45
4-101.2 Plumbing Permit Required
No Building Permit shall be issued for any structure or use involving the construction, installation, or alteration |
plumbing facilities unless a valid State Plumbing Permit has been secured by the applicant or his or her authorize °
agent.
4-101.3 Occupancy Permit Required
A. Occupancy Permit Required: No newly constructed, placed, relocated, enlarged, or renovated structure or use,
shall be occupied, or used until an Occupancy Permit has been issued by the Building Inspector/Code Enforcement
Officer in accordance with the following.
1. Within five (5) working days of the receipt of a request of an Occupancy Permit, the Building Inspector/Code
Enforcement Officer shall inspect the property, structure and/or use to determine that the work is Substantially
Complete and that it is in compliance with (a) a Building Permit, (b) Chapter 9 of this ordinance or the Land Use
Ordinance that was in effect at the time the permit was issued, and (c) any Code Enforcement Officer or
Planning Board approval granted under this ordinance or the Land Use Ordinance that was in effect at the time
the permit was issued, as applicable. The Building Inspector/Code Enforcement Officer shall also determine
that an adequate means of sewage and wastewater disposal has been provided and that the subsurface
wastewater disposal system, if required, has been installed, inspected, and approved by the Local Plumbing
Inspector.
2. Upon finding compliance with the requirements of 1 above, the Building Inspector/Code Enforcement Officer
shall issue an Occupancy Permit.
3. Nothing in this section shall preclude the occupancy of an existing dwelling unit or structure from habitation or
use during renovation, alteration, or enlargement, provided, in the case of a non-residential unit, that the
Building Inspector/Code Enforcement Officer finds that the work will not create unsafe or unhealthy conditions
for the owner, employees, or patrons of the use. Where a building has been occupied or used during the period
of work, the owner shall request the Building Inspector and/or Code Enforcement Officer to inspect the w«
and issue an Occupancy Permit upon completion of the work for which a permit or approval was obtained. --
4-201 Violation, Enforcement and Fines
4-201.1 Violations and Enforcement
A. The Code Enforcement Officer upon a finding that any provision of this Ordinance or the condition(s) of a permit
issued under this Ordinance is being violated is authorized to institute legal proceedings to enjoin violations of this
Ordinance. Any structure constructed or work performed in violation of the provisions of this Ordinance shall be
considered a nuisance.
B. Enforcement Procedure
1. Upon detecting a violation of this Ordinance, the Code Enforcement Officer shall give oral notice to the violator
informing the violator of the nature of the violation and the steps necessary to correct it. Should the Code
Enforcement Officer not be able to give oral notice a stop work order shall be posted.
2. Within twenty-four (24) hours of oral notice of a violation or the posting of a stop work order the Code
Enforcement Officer shall send a written notice to the violator and the landowner should the landowner be
different from the violator, by certified mail return receipt requested. The notice shall include reference to the
oral notice, a description of the violation, the ordinance provision(s) being violated, corrective measures to be
undertaken, a deadline for complying with corrective measures, penalties, and appeal procedures.
3. Should after inspection of the property in violation reveal that the actions specified in the first notice of
violation have not been undertaken the Code Enforcement Office shall send a second written notice, to the
violator and the landowner should the landowner be different from the violator, by certified mail return recei,
requested. This notice shall state that the Code Enforcement Officer gave previous notice of the violation(s)
and the date of the notice, a description of the violation, the ordinance provision(s) being violated, that the Code
Enforcement Officer has inspected the property and the violation(s) still exist, that corrective measures to be
46
undertaken, a deadline for complying with corrective measures and if the violation continues after that date the
Selectmen will be notified with a recommendation of legal action.
Cc. Consent Agreements
The Municipal Officers, or their authorized agent, are hereby authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this Ordinance and collecting fines without court action.
Consent agreements shall, when appropriate, include a corrective action and fine.
1. Corrective actions, when appropriate, shall include applying for an after-the-fact permit or approval
as the case may be, remedial action to comply with the standard or standards that have been
violated, or other corrective measures to minimize the negative Impacts of the violation.
2. Monetary fines shall be based upon the severity of the violation in relation to public health, safety
and welfare and the violator's assumed knowledge of the ordinance, standard or approval violated.
a. A fine up to $500.00 may be imposed for those violations that have minimal impact on the
public health, safety, and welfare and/or the violator could reasonably be expected to not be
aware of the ordinance or standard violated.
b. A fine of up to $2,500 may be imposed for those violations that have a significant impact on
the public health, safety, and welfare and/or the violator could reasonably be expected to be
aware of the ordinance, permit or standard violated.
D. Legal Actions
When the above action does not result in the complete correction or abatement of the violation or nuisance
condition, the Municipal Officers, upon notice from the Code Enforcement Officer, are hereby directed to
institute any and all actions and proceedings, either legal or equitable, including seeking injunctions of
violations and imposition of fines, that may be appropriate or necessary to enforce the provisions of this
f Ordinance in the name of the municipality.
E. Fines
A person including but not limited to a landowner, a landowner's agent or a contractor who orders or conducts
an activity. that violates the provisions of this Ordinance or the condition(s) of apermit shall be guilty of a civil
violation and on conviction shall be fined based on the fines, penalties and costs imposed by 30-A M.R.SA,
ss 4452. Each day that such violation continues shall constitute a separate violation. Such persons shail
also be liable for court costs and reasonable attorney fees incurred by the municipality. A person including but
not limited to a landowner, a landowner's agent or a contractor failing to obtain a Building Permit prior to
the start of construction shall be subject to the above lines.
E. Alternative Citation Procedure
1. Citation. Following the Notice of Violation procedure in 4-201.1.B, if corrective action has not occurred, the
Code Enforcement Officer may, at his/her discretion, issue a citation to the violator.
2. Content. The citation shall be in writing, describe the nature of the violation(s) including the ordinance sections
violated, the date by which the violations were to have been corrected, that a civil penalty has been imposed
for the violation, the date by which the penalty must be paid and to whom, and the consequences of failure to
pay within the period stated. Corrective action to be taken and the time period for such corrective action must
occur. The citation shall also advise the violator of the right to request an extension of time to correct the
violation. The citation shall state that additional civil penalties may by imposed and that further citations may
issue if the violation has not been corrected within the time specified.
3. Service of Citation. Citations may be delivered in hand to the violator or left with a person of suitable age and
discretion residing in the same household. If the violator is a corporation, the citation may be served upon any
authorized official, or, if none is available, upon any employee of the corporation. Citations may be served by
we certified mail return receipt requested. If the return receipt is not signed, the citation shall be presumed to have
been served, if also sent by ordinary mail which has not been returned by the post office as undeliverable.
47
4. Penalties. The penalties for violations shall be as follows:
1% citation - $50.00
2"4 citation - $100.00
3 citation - $250.00
4" citation - $500.00
Fines shall be cumulative.
5. Extension of time to correct. In any case in which the violator asserts there is good cause for extending the time
period the violation can be corrected, the violator may request such an extension from the Code Enforcement
Office in writing setting forth the reason for the request. The request shall not suspend the running of the time
limit specified. The Code Enforcement Office shall reply to the request within 2 days of receipt. The decision of
the Code Enforcement Office shall be final.
6. Appeals. Appeals to the violation may be taken to review with the Town of Greene Board of Appeals by following
the procedure set forth in 8-101.3
AMENDED: March 7, 2009
AMENDED: June 18, 2022
48
Chapter 5
5-101 Street Construction Standards
-101.1 Applicability
This Chapter shall apply to all land areas in Greene.
A. New Construction: This Section shall apply to the construction of all new streets and lengthening of existing streets
within the Town whether public or private. No street whether newly constructed or existing shall be accepted as a
town way unless it meets the provisions of this Chapter.
B. Reconstruction: Reconstruction of public and private streets shall be consistent with Sections 5-102.12 and 13,
except for right-of-way widths.
C. Higher Design and Construction Standard: Nothing in this Chapter shall be construed to prevent the design and
construction of streets that meet higher standards, use improved methods, or higher quality materials.
D. Persons wishing to construct a new street, or the reconstruction of a street, shall make application to the Planning
Board for review and approval of construction/reconstruction prior to undertaking any work on such street. The
Town and State agencies shall be exempt from the application, review, and approval process.
5-102 Administration
§-102.1 Agenda
To avoid unnecessary delays in processing applications, the Planning Board shall prepare an agenda for each regularly
scheduled meeting. Applicants for both sketch plan and full application shall request to be placed on the Planning Board's
agenda no less than fourteen (14) days in advance of a regularly scheduled meeting bycontacting the Chairperson in writing.
Applicants who attend a meeting but who are not on the agenda may be heard but only after all agenda items have been
) ampleted and then only ifa majority of the Planning Board so votes.
5-102.2 Pre-application Meeting
Applicants shall schedule a meeting with the Planning Board prior to formal submission, to present a sketch plan and make
a verbal presentation regarding the proposed street.
A. Submission
The Pre-application Sketch Plan shall show, in simple sketch form, the proposed street, the area that is to be located,
and other features in relation to existing conditions. The Sketch Plan, which may be a freehand penciled sketch, should
be supplemented with general information to describe or outline the existing conditions of the site. It is recommended
that the sketch plan be superimposed on or accompanied by a copy of the Assessor's Map(s) on which the land is
located.
B. On Site inspection.
Within thirty (30) days of the pre-application meeting, the Planning Board shall conduct an on-site inspection of the
property.
C. Ownership Interest.
The applicant will furnish written evidence showing right, title or interest (option, contract for sale, etc.) in the property on
which the street is to be located to the Planning Board.
49
§-102.3 Application in Writing
A. The applicant shall request to be placed on the Planning Board's agenda at least fourteen (14) days in advance
the meeting by contacting the Chairman. After being placed on the agenda, one copy of the application and
plan(s) and all accompanying information shall be mailed to each Planning Board member postmarked no later
than 7 days before the scheduled meeting.
B. Allapplications for street construction approval shall be made in writing on forms provided for this purpose.
Applications shall be received by the Planning Board in order filed and when the Board agenda permits.
C. Allapplications shall be made by the owner inthe property or his agent, as designated in writing or person which
shows evidence of right, title or interest.
5-102.4 Street Plans
Plans meeting the standards of this Chapter shall be submitted to and reviewed by the Planning Board andshall be
approved by the Planning Board before construction commences
A. The applicant, or his duly authorized representative, shall attend the meeting of the Planning Board to discuss the
Plan. The Planning Board shall provide the applicant a dated receipt of a Street Construction application at the
Planning Board meeting where the application Is first presented.
B. Within thirty (30} days of receipt of a Street Construction application form and fee, the Planning Board shall notify
the applicant in writing whether or not the application is complete, and what, if any, additional submissions are
required for a complete application. No application shail be considered complete, nor shall application be in order
for review or approval if the subject parcel Is known to be in violation of any ordinance. The Planning Board may
request the applicant to provide additional information necessary for the Planning Board review after a determination
that a complete application has been received. The Planning Board shall determine whether to hold a public hearing.
C. Ifthe Planning Board decides to hold a public hearing, it shall hold the hearing within thirty (30) days after findin:
has received a complete application and shall publish notice of the date, time ana place of the hearing in a
newspaper of general circulation in the municipality at least two times, the date of the first publication to be at least
seven days prior to the hearing. Notice of the public hearing shall be mailed to all notified on subsection B above
that the proposed street will be located on or adjacent to at least seven days prior to the hearing by the Town of
Greene.
Within thirty (30) days after the record is closed of a public hearing, or within sixty (60) days of receipt of a complete
application if no hearing is held, or within another time limit as may be otherwise mutually agreed to by the Planning
Board and the applicant, the Planning Board shall issue an order and approve, approve with conditions, or deny
the application. The Planning Board shall specify, in writing, its findings of facts and reasons for any conditions or
denial.
§-102.5 Additional Studies
The Planning Board may require the applicant to undertake any study that it deems reasonable and necessary to
demonstrate that the requirements of the Ordinance are met. The costs to all such studies shall be borne by the
applicant.
§-102.6 Notice
With the filing of an application, property owners within one hundred (100) feet of the edge of the applicant's property
lines shall be notified by Certified Mail, Return Receipt Requested, of a pending application for Street Construction
approval by the Town of Greene. Notification forms and the names and addresses shall be obtained from the Town
Office. This notice shail indicate the time, date, and place of the Planning Board's first consideration of the
application. Should the meeting of the first consideration of the application not be held for any reason renotificatton
shall be provided by Certified Mail, Return Receipt requested of the new date of the meeting. In the case of strec*
construction or reconstruction by the Town of Greene notice of such shall be posted at least ten (10) day prior *
the start of construction or reconstruction
50
§-102.7 Financial Guarantee
Prior to final approval or any Street Construction application, the Planning Board shall require an escrow agreement
or letter of credit in such amount as is approved by the Planning Board. This amount shall be sufficient
to ensure completion of all improvements required as conditions of approval and in such form as approved by the
Planning Board and Selectmen. The Town shail have access to the site at all times to review the progress of the
work.
§-102.8 Conditions
The Planning Board may attach reasonable conditions to Street Construction approvals to ensure conformity with
the standards and criteria of this Chapter and Ordinance.
§-102.9 Expiration of Approvals
AllStreet Construction approvals shall expire two (2) years after the date of issuance unless a substantial start of work
thereunder is commenced. If work Is not completed within three (3) years from the date of approval the approval
lapses and a new application must be made and approved subject to all ordinances and standards then in-
effect. There will be no additional charge for application review provided the application Isunchanged.
5-102.10 Submission Requirements and Procedures
A. Submission Requirements
1. The name(s) of the applicant(s);
2. The name(s} of the owner(s) on record of the land upon which the proposed street is to be located;
/ 3. A statement of any legal encumbrances of the land upon which the proposed street is to be located;
4. The anticipated starting and completion date of each major phase of street construction; and
5. A statement indicating the nature and volume of traffic expressed in Average Daily Traffic expected to
use the proposed street.
B. Plans: The plans and illustrations submitted as part of the application shall be prepared by a Registered Land
Surveyor or Professional Engineer to include the following information.
1. The scale of the plan. (All streets and roadway plan and profile drawings shall be drawn to a scale 1" =
50' horizontal and 1" = 5' vertical);
2. The direction of magnetic north;
3. Aplan profile and typical cross section views of all proposed streets showing line, grade, culvert and ditch
locations and elevations;
4. The starting and ending point with relation to established roads, streets, or ways and any planned or
anticipated future extensions of the streets. (All terminal points and the center line alignment shall be
identified by survey stationing.);
5. The roadway and roadway limits with relation to existing buildings and established landmarks;
6. Dimensions, both lineal and angular, necessary for locating boundaries and necessary for locating
subdivisions, lots, easements, and building lines;
7. The lots, if any, as laid out and numbered on said street showing the names of all owners of abutting
ms property;
8. All natural waterways and watercourses in or on land contiguous to the said streets or ways;
51
9. The kind, size, location, profile, and cross-section of all existing and proposed drainage ways and
structures and their relationship to existing natural waterways;
10. A soil erosion and sedimentation control plan showing interim and final control provisions;
11. Curve data for all horizontal and vertical curves shall be the center line radius, arc length, beginning of
curve, and end of curve points;
12. All center line gradients shall be shown and expressed as a percent;
13. All curve and property line radii of intersections;
, 14. The limits and location of any proposed sidewalks and curbing;
15. The location ofall existing and proposed overhead and underground utilities to Include, but not limited to) the
following: (Note: When a location, in the case of any underground utility, is an approximate, it shallbe noted on
the plan as such.}
a. Storm drains:
b. Telephone line poles or underground vaults;
c. Electrical power line poles or underground vaults;
d. Streetlights.
16. The name(s) of each proposed new street.
17. Lines or dots in the center line of the proposed street at intervals of every fifty (50) feet beginning at the
intersection with the existing street.
18. A plan to control dust and traffic movement during construction.
C. Upon receipt of plans for a proposed public street, the Board shall forward one copy to the Municipal Office
and one copy to the Road Commissioner for review and comment. Plans for streets which are not proposeu
to be accepted by the municipality shall be sent to the Road Commissioner for review and comment.
D. Streets Within Proposed Subdivisions: Streets proposed as part of a subdivision as defined shall be submitted
to the Planning Board as an integral part of the Subdivision Application.
E. Application Fee: The application fee shall be as required in Chapter 10 The application fee shall be waived if
the street Is being reviewed as an element of a subdivision application
F. Submission Waivers: Where the Planning Board makes written findings of fact that there are special
circumstances of a particular application, it may waive portions of the submission requirements unless
otherwise indicated in this Chapter, provided that the applicant has demonstrated that the standards of this
Ordinance have been or will be met; the public health, safety and welfare are protected, and provided the
waivers do not have the effect a nullifying the intent and purpose of the Comprehensive Plan, this Chapter and
this Ordinance.
G. Existing Private Streets: When an applicant is required to upgrade an existing private road in order to obtain
a building permit, the applicant shall submit an application and sketch plan at an approximate scale of
1" =50' or smaller. The plan shall cover the length from 50 feet beyond the furthest driveway to be located, the
lot being created or the parent lot, whichever is further, to the nearest road that currently meets the standards
contained in 5-201. The submittal shall be inaccordance with the other submittal requirements of this section
and shall contain the following information.
1. Name, address, and phone number of Applicant.
2. Magnetic north.
3. Existing and proposed buildings located or to be located on the existing private road.
4. Current road layout including travel way, culverts, ditches, natural drainage ways and water bodies within 100
52
feet of the road. The sketch shall contain the size and length of existing culverts and the width and depth of
existing ditches.
om 5. The improved travel way with shoulders, new or improved culverts, new or improved drainage ways, and any
other new or improved drainage structures.
6. Atypical cross section showing the road and all drainage ways.
7. Erosion control plans for the construction process and for final erosion control.
8. The location of all existing and proposed overhead and underground utilities.
5-102.11 Public Acceptance of Streets
The approval by the Planning Board of a proposed public street shall not be deemed to constitute or be
evidence of any acceptance by the Town of Greene of the street. Final acceptance of a proposed public street
shall be by an affirmative vote at a Town Meeting.
5-201 Street Design Standards
5-201.1 Street Design Standards
A. These design standards shall be met by all streets and shall control the roadway, shoulderscurbs,
sidewalks, drainage systems, culverts, and other appurtenances.
B. Streets shall be designed to discourage through traffic within a residential subdivision.
C. The character, extent, width, and grade of all streets shall be considered in their relation toexisting or
planned streets.
| D. Any street serving fifteen (15) dwelling units or more shall have at least two (2) street connectionswith existing
, public streets.
E. Any privately-owned street serving four (4) dwelling units or less will not require pavement. The following
design standards apply according to street classification:
F. The following design standards apply according to street classification:
Privately ae . . ,
as . Existing Private Industrial/ Mobile Home
oe . Lot of record
Minimum right-of-way 60 ft 60 ft 60 ft ROW 60 ft 26 ft
Minimum pavement width
0.5 percent 0.5 percent 0.5 percent 0.5 percent 0.5 percent
Minimum centerline radius 200 ft 150 ft 150 ft 800 ft 150 ft
Minimum tangent between
curves of reverse alignment 200 ft 100 ft 100 ft 300 ft 100 ft
1/4" per foot 1/4" per foot 1/4" per foot 1/4" per foot 1/4" per foot 1/4" per foot
Roadway shoulders 4/2" per foot 4/2" per foot 1/2" per foot 1/2" per foot 1/2" per foot 1/2" per foot
Minimum angle of street
90 degrees 90 degrees 90 degrees 90 degrees 90 degrees
Maximum grade within 75
Minimum curb radii at
|
Minimum R.O.W. radii at
53
Minimum width of shoulders Aft 3 ft | 3K 2 ft 5 ft 15 ft
(each side)
NOTES:
1. Standards for Privately-owned streets in Open Space Subdivisions as provided for in Chapter 7-707.
of this Ordinance shall not be required to meet minimum right-of-way width or minimum paveme.-
width/travel way width contained herein.
2. The Planning Board may require a greater pavement width up to 24 feet if deemed necessary for fire
protection and safety, including transportation of school children. In making the determination, the Board
shall consider at a minimum the number of dwelling units, size of lots, availability of sidewalks and plan
and profile of the road.
G. Where natural conditions allow the centerline of the roadway shall be the centerline of the right-of-way
(R.O.W.).
H. Dead End Streets: In addition to the design standards above, dead-end streets shall be constructed to provide
a cul-de-sac turnaround with the following requirements for radii. Property line sixty-five (65) feet; outer edge
of pavement fifty (50} feet. The use of a hammerhead (also called a T or L) turnaround may be permitted as
an alternative to a cul-de-sac turnaround where, in the opinion of the Planning Board, such a turnaround may
provide for improved environmental protection, future extension of the street, future connection to another
subdivision or subdivision expansion, or access to common land or facilities. In the case of a hammer-head
turnaround, the street shall extend 125 feet beyond the furthest edge of the last driveway with a travel way
width equal to that of the street. The centerline of the hammerhead or L portion of the turnaround shall be
located 65 feet beyond the furthest edge of the last driveway and 60 feet from the end of the street. The width
of the travel way of the hammerhead (L portion of the turnaround) shall be thirty (30} feet and the hammerhead
shall be sixty (60) feet long measured from the center line of the street. (See sketch at end of Chapter). The
width of the right of way for the hammerhead portion of the turnaround shall be 60 feet, minimum.
The Board may require the reservation of an easement the width of which will be determined bythe Planning
Board but no wider than sixty (60) feet, in line with the street or the hammerhead to provide continuation of the
street, connection with another existing or potential future street, pedestrian traffic, or utilities or to provi
access to trails or common land.
|. Grades, Intersections, and Sight Distances
1. Grades of all streets shall conform to general to the terrain so that cut and fill is minimized while
maintaining the grade standards above.
2. All changes in grade shall be connected by vertical curves to provide for the minimum sitedistances below.
3. Where new street intersections or driveway curb-cuts are proposed, site distances, as measured along
the street onto which traffic will be turning, shall be based upon the posted speed limit and conform to the
table below.
Posted Speed limit (MPH)
Where necessary, corner lots shall be cleared of all growth and site obstructions including ground excavation
to achieve the required visibility.
J. Common Driveways
1. Common driveways may serve two (2) single-family dwelling units. The Code Enforcement Officer shall
review and approve all plans for common driveways.
2. The following design and construction standards shall apply to common driveways:
Minimum travel width... eee 16 feet
Minimum angle of street Intersections ...........0.0.00.0..........75 degrees
Maximum grade within thirty (30) feet of intersections.....2 percent
54
3. Erosion and sedimentation Control: Adequate provisions shall be undertaken to minimize erosion and
sedimentation.
4. Common driveway entrances shall comply with Chapter 6-501.1.C.2 to the greatest extent practical as
determined by the Building Inspector.
K. Sidewalks
Basing its decision on the location, the amount of current and future foot traffic, the Planning Board with advice
from the Road Commissioner may require the installation of sidewalks. Where installed, sidewalks shall meet
the following minimum requirements.
1. Sidewalks may be located adjacent to the curb or shoulder, but it is recommended that sidewalks be a
minimum of 2 1/2 feet from the curb facing or edge of shoulder if the street is not curbed.
2. Where utilities and other appurtenances are present within five (5) feet of the curb the sidewalk shall be a
minimum of seven (7) feet m width. Where no utilities are present, the minimum width shall be five (5 feet.)
3. Bituminous Sidewalks
a. The sub-base aggregate course shall be no less than twelve (12) inches thick after compaction.
b. The hot bituminous pavement surface shall be no less than two (2) inches after compaction.
4. Portland Cement Concrete Sidewalks
a. The sub-base aggregate shail be no less than twelve (12) inches after compaction.
. b. The Portland cement concrete shall be reinforced with six (6) inch square number ten (#10) wire mesh
A and shall be no less than four (4) inches thick.
5-301 Street Construction Standards
§-301.1 Street Construction Standards
A. Minimum thickness of material after compaction:
. Existing . .
ar Privately ; Industrial/ Mobile
| sewion [tet ni) tt | a | ratty) Sat,
base course
Crushed
aggregate base 3" 3" 3" N/A 4" 3"
course
Hot bituminous
pavement
| Basecourse | oT OT
B. Preparation
1. Before any clearing has started on the right-of-way, the centerline and side lines of the new street shall be
staked or flagged at fifty (50) foot intervals.
2. Before grading is started, the entire right-of-way, width necessary for travel way, shoulders sidewalks,
a drainage ways, and utilities shall be cleared of all stumps, roots, brush, and other objectionable material.
All shallow ledge, large boulders, and tree stumps protruding above the natural profile of the land shall
be removed from the travel way, shoulders, sidewalks, and drainageways.
55
3. Allorganic materials shall be removed to a depth of two (2) feet below the subgrade of the roadway. Rocks
exceeding twelve (12) inches in any dimension shall also be removed to a depth of two (2) feet below the
subgrade of the roadway. On soils that have been identified as not suitable for roadways, the subsoil sr
be removed from the street site to a depth of two (2) feet below the subgrade and replaced with mater.
meeting the specifications for gravel aggregate sub-base below.
4. Side slopes shall be no steeper than a slope of three (3) feet horizontal to one (1) foot vertical and shall
be graded, limed, fertilized, and seeded according to the specifications of the erosion and sedimentation
control plan.
5. All underground utilities shall be installed prior to having to avoid cuts in the pavement. Building sewers
and water service connections shall be installed to the edge of the right-of- way prior to paving.
C. Bases and Pavement
1. Sub-base
a. The Aggregate Sub-base Course shall be sand or gravel of hard durable particles free from vegetative
matter, lumps, orballs of clay and other deleterious substances.
The gradation of the part that passes a four (4) inch square mesh sieve shall meet the following
grading requirements.
Square Mesh Percentage of
Sieves Weight Passing
0.25 inch 25-70
No. 200
Aggregate for the sub-base shall contain no particles of rock exceeding six (6) inches in any dimension.
2. Base
a. The Aggregate Base Course shall be sand or gravel of hard durable particles free from vegetative matter,
lumps, or balls of clay and other deleterious substances. The gradation of the part that passes a 11/2-inch
square mesh sieve shall meet the following grading requirements.
Sieve Designation | Percentage of
Square Mesh Weight
Sieves Passing
45-70
0.25 inch
No. 200
Aggregate for the base shall contain no particles of rock exceeding three (3) inches in any dimension.
3. Culvert Installation and Drainageway (Roadside Ditch) Construction
a. Culverts shall be Installed in a trench a minimum width of 2 1/2 times the outside diameter of the culvert. In
no case shall trenches be less than three {3) feet on each side to allow for compaction. Back fill material
56
G- 30): |
shail be in six (6) to eight (8) inch lifts and compacted. The area just outside the culvert end shall
be lined with rip rap stone in a 5' linear direction.
b. Roadside ditches shall be constructed wherever necessary to collect runoff from the road and divert it away
from adjacent property and/or collect runoff from adjacent property so that it would not flow onto the road
or otherwise damage the road, its base, or appurtenant structures.
c. Drainage Ways (Ditches): Drainage ways shall have a rounded {parabolic) cross section. Ditches shall be
of sufficient depth to provide capacity for the anticipated stormwater flows, protection of the road and road
sub-base, and diversion of surfaceand groundwater flows (approximately 18" deep). The ditch shall
have sufficient width such that a line drawn from the center of the ditch to either edge of the ditch shall
have a slope of no greater than three (3) horizontal to one (1) vertical.
4. Pavements
a. Minimum standards for the base layer of pavement shail be the MDOT specifications for plant mix grade B
with an aggregate size no more than 3/4 inch maximum.
b. Minimum standards for the surface layer of pavement shall meet the MDOT specifications for plant mix
grade C with an aggregate size no more than 1/2-inch maximum.
e c. Allintersections shall have Hot Bituminous Pavement, meeting the standards set forth in Section
5-101.13.A, in each direction extending 50 feet from the edge of the intersecting travel way.
D. Additional Improvements and Requirements
1. Erosion Control: The procedures outlined in the erosion and sedimentation control plan shall be
implemented during the site preparation, construction, and clean up stages.
2. Cleanup: Following street construction the developer or contractor shall conduct a thorough cleanup of
{ stumps and other debris from the entire street right-of-way. If on-site disposal of the stumps and debris is
a proposed, the site shall be indicated on the Plan and shall be suitably covered with fill and topsoil, limed,
fertilized, and seeded.
3. Street Names, Signs, and Lighting: Streets that join and are in alignment with streets of abutting or
neighboring properties shall bear the same name. Names of new streets shall not duplicate, nor bear
phonetic resemblance to the names of existing streets within the municipality and shall be subject to the
approval of the 911 Addressing Officer. The developer shall reimburse the Municipality for the costs of
installing street name sign, traffic safety signs and speed limit control signs. Street lighting shall be installed
as approved by the Annual own Meeting.
E. Waivers
Where the Board makes written findings of fact that due to special circumstances ofa particular application, certain
required improvements or standards of this Chapter are not necessary to provide for the public health, safety or
welfare, or are inappropriate because of inadequate or lacking connecting facilities adjacent to or in proximity of the
proposed development, it may waive the requirement for such improvements, subject to appropriate conditions,
provided the waivers do not have the effect of nullifying the intent and purpose of the comprehensive plan or this
Chapter and further provided the performance standards of this ordinance have been or will be met. In granting
waivers, the Planning Board shall require such conditions as will assure the purpose of these regulations are met.
F. Certification of Construction
Upon completion of street construction and prior to a vote by the Municipal Officers to submit a proposed public
street to the legislative body, a written certification signed by the inspecting official shall be submitted to the
Municipal Officers certifying that the proposed street meets orexceeds the design and construction requirements
of this Chapter.
~- G._ Privately-Owned Streets
Where streets are to remain privately-owned streets, the following words shall appear on the recorded plan.
57
"All streets shall remain private; maintained by the developer or the lot owners and shall not be accepted or
maintained by the Town."
H. Inspection :
1. Notification of Construction/Reconstruction: At least five (5) days prior to commencing street construction
or reconstruction of a street the applicant shall:
a. Notify the Road Commissioner in writing of the time when he/she proposes to commence construction so
that the municipal officers can arrange for inspection to be made. The inspecting official shall assure that
all municipal specifications requirements and conditions of approval shall be met during the construction
and shall assure the satisfactory completion of improvements required by the Planning Board.
b. Deposit with the Municipal Officers a check for two (2) percent of the estimated costs of construction and
improvements to pay for the costs of inspection. If upon satisfactory completion of construction and cleanup
funds are remaining, the surplus funds shall be refunded to the applicant within thirty (30) days. If the
inspection account shall be drawn down by ninety (90) percent, the applicant shall deposit an additional
one (1) percent of the estimated costs of construction and improvements.
"All streets shall remain private; maintained by the developer or the lot owners and shall not be accepted or
maintained by the Town."
2. Noncompliance with Plan: Upon finding that the improvements have not been constructed in accordance
with the approved plans and specifications, the inspector shall so report in writing to the Municipal Officers,
Planning Board, Road Commissioner, and applicant. The Municipal Officers shall take any steps
necessary to assure compliance with approved Plans.
3. Modification During Construction: If at any time it appears necessary or desirable to modify the required
improvements before or during construction of the required improvements, the inspecting official is
authorized to approve minor modifications due to unforeseen circumstances such as encountering hidden
outcrops of bedrock, natural springs, etc. The inspecting official shall issue any approval under this secti
in writing and shall transmit a copy of the approval to the Municipal Officers, Planning Board and Roau
Commissioner. Revised plans shall be filed with the Planning Board for the record. For major
modifications, such as relocation of rights-of-way, changes in grade by more than one (1) percent, etc.,
the applicant shall submit to the Planning Board an amended application or review and approval.
5-401 Appeals
An aggrieved party may appeal any decision of the Planning Board under this Chapter to the Board of Appeals
within thirty (30) days of the date the Planning Board issues a written order of its decision.
AMENDED: March 8, 2003
AMENDED: March 6, 2010
AMENDED: March 5, 2011
AMENDED: June 18, 2022
AMENDED: August 3, 2024
58
Hammerhead Turnaround
Width Same
' as Street
60" 60" ---->
1257 | 30'
i Primary
; Proposed or
H | Existing Street
To Edge of
Last Driveway
(Either Side of Street)
59
60
Chapter 6
6-101 Site Plan Review for Non-Residential Development Proposals
104.1 Purpose
The purposes of this chapter are:
A. To provide municipal review of projects that potentially could affect the environment and community;
B. To promote and protect the health, welfare and safety of the residents of the Town of Greene;
C. Toprovide local protection from those particular nuisances that are not governed by State Law or regulation;
D. To balance the rights of landowners to use their land with the corresponding right of abutting and neighboring
landowners to live without undue disturbance from noise, smoke, fumes, dust, odor, glare, traffic, storm water
runoff or the pollution of ground or surface waters;
E. To reduce the off-site external problems created by developments thereby decreasing the cost of maintaining
or improving municipal services;
F. To conserve the Town's natural beauty and visual character by ensuring that structures, signs and other
improvements and uses of land are sited and developed with due regard to the aesthetic qualities of the
natural terrain and that proper attention is given to exterior appearances of structures, signs, other
improvements and uses of land; and
G. To implement the policies of the comprehensive plan.
6-101.2 Applicability
: A. Site Plan Review approval by the Code Enforcement Officer or Planning Board in conformity with the criteria
5 and standards of this Chapter shall be required for the following including projects located within the area
governed by the Shoreland Zoning Ordinance, Town of Greene.
1. Proposals for new commercial, retail, industrial and institutional structures and uses.
2. Achange in use of or to a commercial, retail, industrial or institutional structure or use.
3. Substantial enlargement to a commercial, retail, industrial or institutional structure or use.
4. Resumption of commercial, retail, industrial or institutional structure or use that has been discontinued
for two years which require review if being newly established.
B. Site plan approval is not required for the following:
1. The normal and customary practices associated with the agricultural and forest management activities.
2. Detached single-and two-family dwelling units.
3. Childcare homes.
4. Home occupations except 3.101.12C.
6-201 Administration
6-201.1 Code Enforcement Officer Site Plan Review Approval
* A. The Code Enforcement Officer shall review and approve, approve with conditions or deny all applications for
site plan approval involving new construction, change in use, substantial enlargement and the resumption of
a use as Set forth in Section 6-101.2.A.1-4 that encompass up to a combined total of 5,000 square feet of
61
gross floor, land and parking areas. If in any two {2) year period, site plan approval is needed for new
construction, change in use, substantial enlargement and the resumption of a use as set forth in Section
6-101.2.A.1-4 such that the total combines a gross floor, land and parking areas exceed 5,000 square feet,
then such application(s) shall be reviewed by the Planning Board. The CEO may refer any applicatir
submitted under this Section to the Planning Board if the CEO finds that the application is more complex the ~
his/her expertise qualifies him/her to review or if the CEO finds that the public has a significant interest in the
development and should be afforded the opportunity for formal input.
B. The Code Enforcement Officer shall utilize the following procedures for Code Enforcement Officer review of
Site Plan Review Applications.
1. An applicant for a Code Enforcement Officer Site Plan Review Approval shall submit two (2) copies of
a Development Plan, a fully executed and signed copy of the application for Site Plan Review and the
application information contained in Section 6-104. to the Code Enforcement Officer. Upon receiving
a Development Plan and application for Code Enforcement Officer review the Code Enforcement
Officer shall issue the applicant a dated receipt.
2. With seven (7) days of receiving a Development Plan and application, the Code Enforcement Officer
shall notify the property owners within one hundred (100) feet of the edge of the applicant's property
lines by Certified Mail, Return Receipt Requested, of a pending application for Site Plan Review.
Notification-forms and the names and addresses shall be obtained from the Town Office. This notice
shall indicate that an application has been received and how further information can be obtained.
3. Within ten (10) days from the receipt of a site plan review application, the Code Enforcement
Officer may schedule an on-site inspection of the property that shall be jointly attended by the applicant
or a duly authorized representative and the Code Enforcement Officer.
4. Within fifteen (15) days from the receipt of a site plan review application, the Code Enforcement Officer
shall notify the applicant in writing either that the application is complete, or if it is incomplete, the
specific sections and provisions of this Chapter that need to be addressed to make a complete site
plan application.
5. Upon receipt of additional information and determination that a complete application has been
submitted for review, The Code Enforcement Officer shallissue a dated notice to the applicant.
6. Within thirty (30) days of the receipt of a complete application, or within another time limit as may be
otherwise mutually agreed to by the Code Enforcement Officer and the applicant, The Code
Enforcement Officer after considering the standards contained in Section 6-501 and 6-601 shall
approve, approve with conditions, or deny the application and issue a written decision and findings of
fact to the applicant.
6-202.1 Planning Board Site Plan Review Approval
6-202.2 Agenda
To avoid unnecessary delays in processing applications, the Planning Board shall prepare an agenda for each
regularly scheduled meeting. Applicants shall request to be placed on the Planning Board's agenda no less
than fourteen (14) days in advance of a regularly scheduled meeting by contacting the Code Enforcement
Officer. Applicants who attend a meeting but who are not on the agenda may be heard but only after all agenda
items have been completed and then only if a majority of the Planning Board so votes.
§-202.3 Pre-application Meeting
Applicants shall schedule a meeting with the Planning Board prior to formal submission, to present a sketch plan
and make a verbal presentation regarding the site and the proposed project.
A. Submission
The Pre-application Sketch Plan shall show, in simple sketch form, the proposed development area, and
other features in relation to existing conditions. The Sketch Plan, which may be a freehand penciled sketch,
should be supplemented with general information to describe or outline the existing conditions of the site and
62
the proposed development. It is recommended that the sketch plan be superimposed on or accompanied by
a copy ofthe Assessor's Map(s) on which the land is located.
_ B. Contour Interval and On-Site Inspection.
Within thirty (30) days of the pre-application meeting, the Planning Board shall determine and inform the
applicant, in writing, of the required contour interval on the development plan and conduct an on-site inspection
of the property.
C. Ownership Interest
The applicant will furnish written evidence showing right, title or interest (option, contract for sale, etc.) in the property
to be developed to the Planning Board.
6-202.4 Application Procedure
6-202.5 Applications in Writing
All applications for site plan approval shall be made in writing on forms provided for this purpose. Applications
shall be received by the Planning Board in order filed and when the Board agenda permits.
All applications shall be made by the owner in the property or agent, as designated in writing or person that
shows evidence of right, title or interest.
6-202.6 Development Plan
A Development Plan meeting the standards of this Chapter shall be submitted to and reviewed by the Code
Enforcement Officer or Planning Board and shall be approved by the Code Enforcement Officer or Planning Board
before any construction is begun or building permit issued. In the case of proposed resumptions of uses that have
been discontinued for at least two years, Code Enforcement Officer or Planning Board approval shall be required
7 before such uses may be resumed if such a use requires review if being newly established.
A. The applicant, or his duly authorized representative, shall attend the meeting of the Planning Board to discuss
the Development Plan. The Planning Board shall provide the applicant a dated receipt of a Site Plan Review
application at the Planning Board meeting where the application is first presented.
B. Within thirty (30) days of receipt of a Site Plan Review application form and fee, the Planning Board shall notify
the applicant in writing whether or not the application is complete, and what, if any, additional submissions are
required for a complete application. The Planning Board may request the applicant to provide additional
information necessary for the Planning Board review after a determination that a complete application has
been received. No application shall be considered complete, nor shall application be in order for review or
approval if the subject parcel is known to be in violation of any ordinance. The Planning Board shail determine
whether to hold a public hearing.
C. Ifthe Planning Board decides to hold a public hearing, it shall hold the hearing within thirty (30) days after finding it
has received a complete application and shall publish notice of the date, time, and place of the hearing in a
newspaper of general circulation in the municipality at least two times, the date of the first publication to be at least
seven days prior to the hearing. Notice of the public hearing shall be mailed to all notified in Section 6.202.8 of the
proposed development at least seven days prior to the hearing by the Town of Greene.
Within thirty (30) days after the record is closed of a public hearing, or within sixty (60) days of receipt of a complete
application. if no hearing is held, or within another time limit as may be otherwise mutually agreed to by the Planning
Board and the applicant, the Planning Board shall issue an order and approve, approve with conditions, or deny
the development plan. The Planning Board shall specify, in writing, its findings of facts and reasons for any
conditions or denial.
6-202.7 Additional Studies
~ The Code Enforcement Officer or Planning Board may require the applicant to undertake any study that it deems
reasonable and necessary to demonstrate that the requirements of this Chapter and Ordinance are met. The costs
of all such studies shall be borne by the applicant.
63
6 202.8 Notice
With the filing of an application, property owners within one hundred (100) feet of the edge of the applicant's property
lines shall be notified by Certified Mail, Return Receipt Requested, of a pending application for Site Plan Review! -
the Town of Greene. Notification forms and the names and addresses shall be obtained from the Town Office. Th.
notice shall indicate the time, date, and place of the Planning Board's first consideration of the application. Should
the meeting of the first consideration of the application not be held for any reason renotification shall be provided
by Certified Mail, Return Receipt Requested of the new date of the meeting. The costs of such mailings to be borne
by the applicant.
6-202.9 Financial Guarantee
Prior to final approval or any Site Plan Review application, the Code Enforcement Officer or Planning Board may
require the posting of a bond, escrow agreement or letter of credit in such amount as is approved by the Planning
Board. This amount shall be sufficient to ensure completion of all improvements required as conditions of approval
of such plan in such form as approved by the Planning Board and Municipal Officers. The Town shall have access
to the site at all times to review the progress of the work.
6-202.10 Conditions
The Code Enforcement Officer or Planning Board may attach reasonable conditions to the Site Plan Review
approvals to ensure conformity with the standards ana criteria of this Chapter and Ordinance.
6-202.11 Expiration of Approvals
All Site Plan Review approvals shall expire two (2) years after the date of issuance unless a substantial start of
work thereunder is commenced. If work is not completed within three (3) years from the date of approval, the
approval lapses and a new application must be made and approved subject to all current Ordinances and standards
in effect. There will be no additional charge for application review provided the application is unchanged.
6-202.12 Minor Changes to Approved Plans
Minor changes in approved plans necessary to address field conditions or structure orientation may be authorized
oy the Code Enforcement Officer provided that any such change does not affect the standards of this Chapter or
alter the intent of the approval. A request for a minor change to an approved plan shall be in writing to the Code
Enforcement Officer. In making the determination to approve a minor change to an approved plan the Code
Enforcement Officer shall consult with the Planning Board Chair or the Chair's designee. All approvals for minor
changes to approved plans shall be in writing by the Code Enforcement Officer. A copy of the written approval and
revised site plan shall be filed with the Planning Board within thirty (30) days from the date of the written approval.
Approvals of site plans are dependent upon and limited to the proposals and plans contained in the application and
supporting documents submitted and affirmed by the applicant. Any variation from the plans, proposals and
supporting documents, except minor changes as permitted in 6.202.6 above, is subject to review and approval by
the Planning Board.
6-301 Reserved
6-401 Site Plan Review Application Requirements
Applications for Site Plan Review shall be submitted on application forms provided by the Town. The completed
application form, required fees, and the required plans and related information shall be submitted to the Code
Enforcement Officer no less than fourteen (14) days prior to meeting.
The applicant shall provide 10 copies of the plan(s) and all accompanying information delivered to the Code
Enforcement Officer. The Code Enforcement Officer shall provide the Fire Chief and Road Commissioner with a
copy of the site plan no less than fourteen (14) days prior to the meeting. The Code Enforcement Officer shall
request that the Fire Chief and the Road Commissioner provide the Planning Board with official comments upo"
the adequacy of their department's existing capacity to service the proposed development priorto the Planni:_-- -
Board site plan review.
64
6-401.1 Submission ,
The submission shall contain at least the following exhibits and information:
A. The Development Plan shail consist of two reproducible, stable base transparent original and one paper copy,
to be filed at the Town Office, drawn at a scale of not smaller than 50 feet to the inch or other scale as
determined by the Planning Board. Space shall be provided on the development Plan for the signatures of the
Board and date with the following words. Approved: Town of Greene Planning Board
B. A fully executed and signed copy of the application for Site Plan Review.
C. General information:
1. Name of owner(s) of record and address and applicant's name and address, if different:
2. The name of the proposed development;
3. Names and addresses of all property owners within 100 feet of the edge of the property line:
4. Sketch map showing general location of the site within the Town;
5. Boundaries of all contiguous property under the control of the owner or applicant regardless of
whether all or part is being developed at this time;
6. The tax map and lot number of the parcel or parcels;
7. A copy of the deed to the property, option to purchase the property or other documentation to
demonstrate right, title or interest in the property on the part of the applicant; and
a 8. The name, registration number and embossed seal of the land surveyor, architect, engineer and/or
person who prepared the plan.
D. Existing Conditions
1. Land Management classification(s) of the property if any, location of Land Management District
boundaries if the property is in two or more Land Management Districts or abuts a different district;
2. The bearings and distances of all property lines of the property to be developed and the source of
this information. The Planning Board may require a formal boundary survey when sufficient
information is not available to establish, on the ground, all property boundaries;
3. Location and size of any existing sewer and water mains, culverts and drains on the property to be
developed and of any that will serve the development from abutting streets or land;
4. Location, names and present widths of existing streets and rights-of-way within or adjacent to the
proposed development;
5. The location, dimensions, and ground floor elevations of all existing buildings on the site:
6. The location and dimensions of existing driveways, streets and parking and loading areas and
walkways on the site;
7. Location of intersecting streets or driveways within two hundred (200) feet of the site;
8. The location of open drainage courses, streams, significant wildlife habitat, known or potential
archaeological resource, historic buildings and sites, significant scenic areas mapped sand and gravel
aquifers, rare and endangered species, other important natura1 features with a description of how
~ such features will be maintained or impacts upon them minimized;
9. The direction of existing surface water drainage across the site;
65
10. If any portion of the property is in the 100-year floodplain, its elevation shall be delineated on the plan;
11. The location and dimensions of existing and proposed signs;
12. Location and dimensions of any existing easements and copies of existing covenants or deed
restrictions; and
13. Location of freshwater wetlands or forested wetlands, and potential significant vernal pools as defined
by MDEP.
E. Proposed Development Activity
1. The location, dimensions, design and exterior materials of all proposed buildings and structures.
2. An existing and proposed setback dimensions.
3. The size, location and direction and intensity of illumination and method of installation of all major
outdoor lighting apparatus.
4. The type, size, and location of all incineration devices.
5. The type, size, and location of all machinery likely to generate appreciable noise at the lot lines.
6. An on-site soils investigation report by a Maine Department of Human Services licensed Site
Evaluator. The report shall identity the types of soil, location of test pits, and proposed location and
design for the subsurface wastewater disposal system.
7. The type and location of water supply to be used
8. The amount and type of any raw, finished or waste materials to be stored outside roofed buildin
including their physical and chemical properties, if appropriate,
9. All existing contours and proposed finished grade elevations of the entire site and the system of
drainage proposed to be constructed. Contour intervals shall be specified by the Board.
10. The location, type and size of all curbs, sidewalks, driveways, fences, retaining walls, parking space
areas, and the layouts thereof, with their dimensions.
11. Landscape plan showing all landscaped areas, fencing and size and type of plant material proposed
to be retained or planted with special emphasis placed on front setback areas.
12. All existing or proposed rights-of-way, easements and other legal restrictions which may affect the
premises in question.
13. The property lines of all properties abutting the proposed development, including those properties
across the street, with the names and addresses of the owners as disclosed on the tax maps on file
in the Town Office as of the date of the development plan review application.
14. Traffic Data: Traffic data shall include the following:
a. The estimated peak-hour traffic to be generated by the proposal.
b. Existing traffic counts and volumes on surrounding streets.
c. Traffic accident data covering the most recent three-year period for which such data is available.
d. The capacity of surrounding streets and any improvements that may be necessary on such
streets to accommodate anticipated traffic generation. :
e. The need for traffic signals and signs or other directional markers to regulate anticipated traffic.
66
15. A storm water drainage and erosion control plan showing:
a. The existing and proposed method of handling storm water runoff.
b. The direction of flow of the runoff through the use of arrows.
c. The location, elevation and size of all catch basins, dry wells, drainage ditches, swales, retention
basins and storm sewers.
d. Engineering calculations used to determine drainage requirements based upon the 2-, 10- and
25-year, 24-hour storm frequency, if the project will significantly alter the existing drainage
pattern due to such factors as the amount of new impervious surfaces (such as paving and
building area) being proposed.
e. Methods of controlling erosion and sedimentation during and after construction.
16. Aground water Impact analysis prepared by ground water hydrologist for projects involving shared on-site water
supply or sewage disposal facilities with a capacity of two thousand (2,000) gallons or more per day.
17. Autility plan showing, in addition to provisions for water supply and wastewater disposal the location and nature
of electrical, telephone and any other utility services to be installed on the site.
18. The location, width, typical cross-section, grades and profiles of any proposed streets and sidewalks.
19. Construction drawings for streets, sanitary sewers, water and storm drainage systems, designed and prepared
by a professional engineer registered in the State of Maine.
20. Cost of the proposed development and evidence of financial capacity to complete it. This evidence should be
in the form of a letter from a bank or other source of financing indicating the name of the project, amount of
financing proposed, and interest in financing the project.
\ 21. Submission Waivers
Where the Code Enforcement Officer or Planning Board makes written findings of fact that there are special
circumstances of a particular application, it may waive portions of the submission requirements, unless
otherwise indicated in this Chapter, provided that the applicant has demonstrated that the standards of this
Ordinance have been or will be met, the public health, safety, and welfare are protected, and provided the
waivers do not have the effect of nullifying the meaning and purpose of the Comprehensive Plan, this Chapter,
and this Ordinance.
6-501 General Review Standards
The foilowing criteria and standards shall be utilized by the Planning Board or, when allowed by ordinance, the CEO
in reviewing applications for Site Plan Review approval. The standards are not intended to discourage creativity,
invention, and innovation. The Board shall approve the Development Plan unless the Board fines that the applicant
has not satisfied one or more of the following criteria provided that the criteria were not first waived by the Planning
Board in accordance with Subsection 6-701.
6-501.1 Standards
A. Preservation of Landscape
The landscape will be preserved in its natural state, as far as practical, by minimizing tree and soil removal, retaining
existing vegetation where desirable, and keeping any grade changes in character with the general appearance of
neighboring areas. If the site contains a scenic site and/or view as identified in the Town of Greene Comprehensive
Plan, special attempts shall be made to preserve the natural environment of the skyline and view.
. Environmentally sensitive areas which include wetlands, significant wildlife habitat, unique natural features and
Soe archaeological sites as identified in the Town of Greene Comprehensive Plan shall be conserved to the maximum
extent vernal pools significant as defined by MDEP.
67
The Board shall assess the proposed activities impact upon scenic areas and views as identified in the Town of
Greene Comprehensive Plan. Where the Board finds that the proposed activity would have an undue adverse effect
on identified scenic views, the Board shall require the applicant to minimize such effects.
B. Relation of Proposed Buildings to Environment
Proposed structures shall be related harmoniously to the terrain and to existing buildings in the vicinity that
have a visual relationship to the proposed structures so as to have a minimally adverse effect on the
environmental and aesthetic qualities of the developed and neighboring areas. The Planning Board shall
consider the following criteria.
1. Architectural style is not restricted. Evaluation of the appearance of a project shall be based on the
compatibility of its design, that Include complementary building style, form, size, color and materials.
2. Materials shall be selected for suitability to the type of buildings and the design in which they are used.
Buildings shall have the same materials, or those that are architecturally harmonious, used for all building
walls and other exterior building components wholly or partly visible from public ways.
3. Building components, such as windows, doors and eaves, shall have good proportions and relationships
to one another.
4. Mechanical equipment or other utility hardware on roof, ground or buildings shall be screened from public
view with materials harmonious with the building, or they shall be located so visibility from any public way
is minimized.
5. Refuse and waste removal areas, service yards, storage yards, and exterior work areas shall be screened
from view from public ways, using materials as stated in criteria for equipment screening.
6. Monotony of design in single or multiple building projects shall be avoided. Variation of detail, form and
siting shall be used to provide visual interest. In multiple building projects, variable siting of individual
buildings may be used to prevent a monotonous appearance.
C. Vehicular Access
The proposed development shall provide safe vehicular access to and from public and private streets. The applicant
for a development to be located on a parcel of land of ten (10) acres or greater, or five hundred (500) feet or more
of frontage on a public street shall file a conceptual Access Master Plan with the Planning Board. The conceptual
Access Master Plan shall addressthe overall use of the parcel, the overall vehicular circulation system within the
parcel, and the coordination of access into and out of the site. The conceptual Access Master Plan shall
demonstrate how the requirements for access as contained in this Chapter will be met.
After the conceptual master plan has been filed with the Planning Board, any application for approval shall be
consistent with the plan unless a revised plan is filed.
1. Vehicular access to the site shall be on streets which have adequate capacity to accommodate the
additional traffic generated by the development. Intersections on majoraccess routes to the site within
one half (1/2) mile of any entrance street that are functioning at a Level of Service of C or better prior to
the development must function at aminimum at Level of Service C after development. If any intersection is
functioning at a Level of Service D or lower prior to the development, the project must not reduce the
current level of service.
The Planning Board may approve a development not meeting this requirement if theapplicant demonstrates
that:
a. A public agency has committed funds to construct the improvements necessary to bring the level of
access to this standard, or
b. The applicant shall assume financial responsibility. for the improvements necessary to bring the leve.
service to this standard and will guarantee the completion of the improvements within one (1) year of
approval of the project.
68
2. Any exit driveway or driveway lane shall be so designed in profile and grading and so located as to provide
the following minimum sight distance measured in each direction. The measurements shail be from the
driver's seat of a vehicle standing on that portion of the exit driveway from distances between ten (10) and
fifteen (15) feet behind the curb line or edge of shoulder, with the height of the eye 3.5 feet to the top of
an object 4.25 feet above the pavement.
Posted Speed Sight
Limit Distance
200 ft
250 ft
305 ft
360 ft
426 ft
495 ft
570 ft
Where truck traffic is expected to be substantial, the minimum sight distance shall be increased by fifty (50)
percent of that required In the table above. Height of the eye should be six (6) feet with height of object no
more than 4.25 feet above the pavement.
3. Where more than one business or structure is located on a single parcel, all vehicular access to and from
a public or private street shall be via a common access or entrance way(s) serving all business and
structures except as provided for herein.
4. The grade of any exit driveway or proposed street for a distance of fifty (50) feet from its intersection with
any existing street shall be a maximum of three (3) percent.
5. The intersection of any access drive or proposed street must function at a Level of Service of C following
development if the project will generate four hundred {400) or more vehicle trips per 24-flour period on a
( level that will allow safe access into and out of the project if less than four hundred (400) trips are generated.
6. Projects generating four hundred (400) or more vehicle trips per 24-hour period must provide two (2) or
more separate points of vehicular access into and out of the site.
D. Vehicular access to Route 202, Allen Pond Road, and Sawyer Road
Vehicular access to Route 202, Allen Pond Road, and Sawyer Road shall comply with the following provisions
in addition to the above. Where conflicts exist between this subsection and above, this subsection shall apply.
1. Where a proposed development is to be located at the intersection of Route 202 Allen Pond Road or Sawyer
Road and a minor or collector street entrance(s) to and exit(s) from the site shall be located only on the
minor or collector street provided that this requirement maybe waived where the applicant demonstrates
that existing site conditions preclude the location of a driveway on the minor or collector street, or that the
location of the driveway. on the minor or collector street would interfere with a predominately residential
neighborhood.
2. Curb cuts or access points shall be limited to one per lot for all lots with less than two hundred (200) linear
feet or less of street frontage. For lots with greater than two hundred (200) feet of frontage, a maximum of
one curb cut per two hundred (200} feet of front shail be permitted to a maximum of three, provided the
Planning Board makes a finding that (a) the driveway design relative to the site characteristics and site
design provides safe entrance and exit to the site and (b} no other practical alternative exists
3. The maximum number of curb cuts to a particular site shall be governed by the following:
a. No low volume traffic generator shall have more than one (1) two-way access onto a single street.
i b. No medium or high-volume traffic generator shall have more than two (2) two- way accesses or three
(3) accesses in total onto a single street.
69
4. Curb cut widths and design shall conform to the following standards:
a. Low volume driveways: Defined as driveways with less than fifty (50) vehicle trips/day based on
the latest edition of the Institute of Traffic Engineers' Trip Generation Report, as the same may +
amended from time to time shall:
[1] have two-way operation;
[2] intersect the street at an angle as close to ninety (90) degrees as site conditions permit but
at no less than sixty (60) degrees;
[3] not require a median;
[4] slope from the gutter line on a straight slope of three (3) percent or less for at least fifty (50)
feet with a slope no greater than eight (B) percent except where unique site conditions
permit a waiving of the slope standard to ten (10) percent and
[5] comply with the following geometric standards:
NOTE: The Planning Board may vary these standards due to unique factors such as a significant level of truck
traffic.
ITEM DESIRED VALUE MINIMUM VALUE MAXIMUM VALUE
FT FT FT
"Upper values where major street speed and/or truck volume is high.
b. Median volume driveways with more than fifty (50) vehicle trips/day but fewer than two hundred
(200) peak hour vehicle trips, based on the latest edition of the Institute of Traffic Engineers' Trip
Generation Report, as the same may be amended from time to time, and generally including all
land uses not in the low or high-volume groups, shall:
[1] have either two-way or one-way operation;
[2] intersect the street at an angle as close to ninety (90) degrees as site conditions perm ~
but at no less than sixty (60) degrees:
[3] not require a median;
{4] slope upward from the gutter line on a straight slope of three (3) percent or less for at least
fifty (50) feet and a slope of no more than six (60) percent thereafter, with the preferred
grade being a four and one half (4.5) percent, depending on the site; and
[5] comply with the following geometric standards:
FT FT FT
W (Drive
POR st
NOTE: The Planning Board may vary these standards due to unique factors such as a significant level of truck
traffic.
"Where separate left and right exit lanes are desirable
c. High volume driveways defined as driveways with more than two hundred (200) peak hour vehicle
trips shall: .
{1] have two-way operations separated by a raised median of six (6) to ten (10) feet in width
and a fifty (50) to one hundred (100) feet length depending upon necessary storage length
for queued vehicles;
70
[2] intersect with the street at an angle as close to ninety (90) degrees as possible, but at no
less than sixty (60) degrees;
[3] be striped for two (2) to four (4) lanes with each lane twelve (12) feet wide:
. [4] slope upward from the gutter line on a straight slope of three (3) percent or less for at least
seventy-five (75) feet and a slope of no more than five (5) percent thereafter;
[5] have a "STOP" sign control and appropriate "Keep Right" and "Yield" sign controls for
channelization; signalization may be required . Level of service and traffic signal warrants
should be conducted for all high-volume driveways; and comply with the following
geometric standards:
NOTE: The Planning Board may vary these standards due to unique factors such as a significant level of truck
traffic.
FT FT FT
| W(Drivewiathy) | eT Tt
pO RT to t0
PM tT
"For industrial developments with a high percentage of truck traffic, maximum values are required.
d. Driveway Spacing: Distance from edge of driveway corner (point of tangency) to edge of
intersection comer (point of tangency) by type of driveway should be as follows:
f Minimum corner Clearance (feet)
Driveway Intersection intersection
Signalization Unsignalization
Low Volume <50-100 trips/day
Medium Volume >50-100
1 0
trips/day, <200 trips/hour
e. Minimum distances between driveways serving the same parcel measured from point of tangency
to point of tangency by type of driveway, should be as follows:
The minimum distance between driveway to property line, as measured from point of tangency, should be:
For lots with shared access, the driveway may be located along the property line. The minimum
spacing to property line may be varied if (1) the safest point of access to the site is closer to the
property. line and (2) there are at least twenty (20) feet of separation between low volume
driveways serving adjacent parcels, forty (40) feet of separation between medium volume driveways,
and one hundred fifty (50) feet ofseparation between high volume driveways.
f. When the proposed development is to be located on the opposite side of an existing development,
the driveway shall be directly opposite of the existing driveway or separated from the opposite
71
driveway by a minimum of seventy-five (75) feet whenever possible.
g. When a conversion or expansion of an existing use occurs, access shall be upgraded to comply
with these standards. This requirement may be waived upon a written finding that (a) the need *
demolish or relocate an existing building on the site or (b) denial of full access to Route 202, Al
Pond Road or Sawyer Road where full access presently exists and cannot be provided by Route
202, Allen Pond Road or Sawyer Road or adjacent side street.
E. Off-Street Parking
A use shall not be extended, and no structure shall be constructed or enlarged unless sufficient off-street
automobile parking space is provided. Parking shall comply with Chapter 3-101.8
F. Surface Water and Storm water Runoff
The proposed activity will not result in undue surface water pollution or significantly change the quantity or
quality of storm water runoff. In making this determination, the Board shall at least consider the elevation,
slope, land cover, and topography of the land, its relation to the floodplains, the nature of soils and subsoils
and their ability to adequately support waste disposal and/or any other anproved licensed discharge.
1. All construction shall be designed to minimize storm water runoff from the site in excess of the natural pre-
development conditions. Storm water management systems shall maintain the natural drainage
characteristics to the extent feasible; existing natural runoff control features, such as berms, swales,
terraces, and wooded areas shall be retained in order to reduce runoff and encourage infiltration of storm
waters. The use of constructed natural type features is preferred over engineered structures for the control
of storm water quantity or quality where existing natural features must be supplemented to obtain the
necessary results.
2. There shall be no significant change in the quantity of storm water. Particular attention shall be given to
ensure that downstream properties and infrastructure, natural channels, and natural resources are not
adversely impacted. Likewise, the quantity of runoff shall not be reduced to the point that recharge .
groundwater, wetlands, and downstream water bodies, and the natural environment is adverse.,
impacted.
3. Storm water runoff control systems shall be maintained as necessary to ensure proper functioning.
G. Conservation, Erosion and Sediment Control
Erosion soil and sedimentation of watercourses and water bodies shall be minimized. The following measures
shall be included, where applicable, as part of any Site Plan Review and approval.
1. Stripping of vegetation, regrading or other development shall be done in such a way as to minimize
erosion.
2. Development shall keep cut-fill operations to a minimum and ensure conformity with topography so as to
create the least erosion potential and so as to adequately handle surface water runoff.
3. The disturbed area and the duration of exposure of the disturbed area shall be kept to a practical minimum.
4. Disturbed soils shall be stabilized as quickly as practical.
5. Temporary vegetation or mulching shall be used to protect exposed critical areas during development.
6. The permanent (final) vegetation and mechanical erosion contro! measure shall be installed as soon as
practical on the site.
7. Until the disturbed area is stabilized, sediment in the runoff water shall be trapped by the use of debris _
basins, sediment basins, silt traps or other acceptable methods. .
8. Whenever sedimentation is caused by stripping vegetation, regrading, or other development, it shall be
the responsibility of the developer causing such sedimentation to remove it from all adjoining surfaces,
72
drainage systems and watercourses and to repair any damage at his or her expense as quickly as
possible.
vos, 9. Maintenance of drainage facilities or watercourses originating and completely on private property is the
responsibility of the owner to the point of open discharge at the property line or at a communal watercourse
within the property.
10. The standards set forth in the Maine Erosion and Sediment Control! Handbook for Construction, Best
Management Practices (March 1991 and as amended) shall be employed.
H. Phosphorous Export
Projects proposed within the direct watershed of a lake or pond listed below shall be designed to limit phosphorus
runoff to the levels defined below.
a eee
Level Loads (1 Export per Acre (pounds
(1) The pounds per year of phosphorus from the watershed that would produce an increase in phosphorus
concentration by more than 1.0 parts per billion.
1. Phosphorus export from a proposed development shall be calculated according to the procedures
defined in "Phosphorus Control in Lake Watersheds: A Technical Guide for Evaluating New Development"
(Maine DEP et.al., September 1989 with revision in 1992 and as may be amended). Copies of all
i worksheets and calculations shall be submitted to the Planning Board.
- 2. Phosphorus control measures shall meet the design criteria contained in "Phosphorus Control in Lake
Watersheds: A Technical Guide for Reviewing Development" (Maine DEP et al., September 1989 with
revisions in 1992 or as may be amended). The Planning Board shall require the reasonable use of
vegetative buffers, limits on clearing, and minimizing street lengths, and shall encourage the use of other
nonstructural measures prior to allowing the use of high maintenance structural measures such as
infiltration systems and wet ponds.
1. Site Conditions
1. During construction, the site shall be maintained and left each day in a safe and sanitary manner. Site
area shall be regularly sprayed with an environmentally safe product to control dust from construction
activity.
2. Developed areas shall be cleared of all stumps, litter, rubbish, brush, weeds, dead and dying trees, roots,
and debris, and excess or scrap building materials shall be removed or destroyed immediately upon the
request and to the satisfaction of the Code Enforcement Officer prior to issuing an occupancy permit.
J. Signs
All signs shall comply with standards set forth in Chapter 3-101.10.
K. Special Features
Exposed storage areas, exposed machinery installations, service areas, truck loading areas, utility buildings and
structures, and similar accessory areas and structures, shall be subject to such setbacks, plantings or other
screening methods as shall reasonably be required to prevent their being incompatible with the existing or
Nee contemplated environment and the surrounding properties.
73
i. Exterior Lighting
All exterior lighting shallbe designed to encourage energy efficiency, to ensure safe movement of people and
vehicles, and to minimize adverse impact on neighboring properties and public ways. Adverse impact is to t
judged in terms of hazards to people and vehicle traffic and potential damage to the value of adjace.
properties. Lighting shall be arranged to minimize glare and reflection on adjacent properties and the traveling
public.
M. Emergency Vehicle Access
Provisions shall be made for providing and maintaining convenient and safe emergency vehicle access to all
buildings and structures.
N. Municipal Services
The development will not have an unreasonable adverse impact on the municipal services including municipal
street systems, fire protection, police protection, emergency medical services, solid waste disposal, schools,
open spaces, recreational programs and facilities and other municipal services and facilities. The Planning
Board shall consider the input from the Town's Department Heads in making a determination of an
unreasonable adverse impact. If the Board makes a finding of unreasonable adverse impacts, the Planning
Board, as a condition of approval, may require the applicant to make or pay for required upgraded municipal
services necessitated by the development.
O. Water Supply
The development has sufficient water available for the intended use. When the location of the water supply
source will be a public water supply as defined in Title 22M. M.R.S.A. Section 2601, its location shall not
restrict the location of a subsurface sewage disposal system on adjacent parcels. If subsurface sewage
disposal will be restricted, the applicant shall obtain an easement.
P. Ground Water
The proposed development shall not result in undue effect of the quality or quantity of ground water. In making
this determination, the Board shall consider the location of aquifers and aquifer recharge areas, the nature of
the proposed development and its potential threat to ground water resources. The Board may place conditions
upon an application to minimize potential impacts to the Town's ground water resources.
1. The development will not result in the existing ground water quality becoming inferior to the physical,
biological, chemical, and radiological levels for raw and untreated drinking water supply sources specified
in the Maine State Drinking Water Regulations, pursuant to 22 M.R.S.A., Section 601. If the existing
ground water quality is inferior to the State Drinking Water Regulations, the development will not degrade
the water quality any further.
2. For above ground fuel storage and chemicals or industrial wastes and potentially harmful raw materials,
an impermeable diked area shall be provided: the diked area must be sized to contain 110 percent of the
volume of the largest tank; roofed to prevent accumulation of rainwater in the diked area and shall be
property vented. There shall be no drains in the facility. All concrete, whether walls or pads, shall be
reinforced concrete and sha!! be designed by a Professional Engineer Registered in the State of Maine
when required by the Planning Board.
3. Underground petroleum tanks shall be installed in accordance with the standards promulgated by the
Maine Board of Environmental Protection.
Q. Air Emissions
No emission of dust, ash, smoke or other particulate matter or gases and chemicals shall be allowed which
can cause damage to human or animal health, vegetation, or property by reason of concentration or toxici
which can cause soiling beyond the property boundaries, or which fail to meet or cannot meet the standards
set by the Maine Department of Environmental Protection.
14
R. Odor Control
The proposed development shall not produce offensive or harmful odors perceptible beyond their lot lines either
a at ground or habitable elevation.
S. Noise
The proposed development shall not raise noise levels to the extent that abutting or nearby residents are
adversely affected.
1. The maximum permissible sound pressure level of any continuous, regular, or frequent or intermittent
source of sound produced by any activity shall be limited by the time-period and land use which it abuts
listed below. Sound levels shall be measured at least 4 feet above ground at the property boundary of the
source.
Sound Pressure Level Limits Using the Sound Equivalent Level of One Minute (Leq 1) (measured in dB(a) scale)
| industrial | 70 | eo
2. Noise shall be measured by a meter set on the A-weighted response scale, fast response. The meter shall
meet the American National Standards Institute (ANSI 81 4-1961) "American Standard Specification for
General Purpose Sound Level Meters."
3. The following uses and activities shall be exempt from the sound pressure level regulations:
a. Noises created by construction and temporary maintenance activities between 6:30 a.m. and 8:00
p.m.
b. The noises of safety signals, warning devices and emergency pressure relief valves and any other
emergency activity.
c. Traffic noise on public streets.
T. Sewage Disposal
The development shall provide for a suitable sewage disposal.
1. Allindividual on-site systems will be designed by a licensed soil evaluator in full compliance with the Maine
Subsurface Wastewater Disposal Rules.
2. The Planning Board may require an analysis and evaluation including nitrate-nitrogen concentrations of
the impacts of the subsurface sewage disposal system on ground water. The Planning Board shall base
its determination for the need for an analysis and evaluation on density, designed flows and nature of
wastewater.
U. Waste Disposal
The proposed development will provide for adequate disposal of solid wastes and hazardous wastes.
1. All solid waste will be disposed of at a licensed disposal facility having adequate capacity to accept the
project's wastes.
2. Allhazardous waste will be disposed of at a licensed hazardous waste disposal facility and evidence of a
contractual arrangement with the facility shall be submitted.
va" VV. Buffer Areas
No industrial or commercial buildings or uses shall be established in, or adjacent to, a residential use unless
75
a landscaped buffer strip is provided to create a visual screen between the uses. Where no natural vegetation
can be maintained or due to varying site conditions, the landscaping screen may consist of fences, walls, tree
plantings, hedges, or combinations thereof. The buffering shall be sufficient to minimize the impacts of any
kind of potential use such as: loading and unloading operations, outdoor storage areas, vehicle parkin~
mineral extraction, waste collection and disposal areas. Where a potential safety hazard to small childr. -
would exist, physical screening or barriers shall be used to deter entry to such premises. The buffer areas
shall be maintained, and vegetation replaced to ensure continuous year-round screening.
W. The applicant must show adequate financial and technical capacity to meet these standards.
X. The proposed activity is in conformance with the comprehensive plan.
6-601 Specific Standards
6-601.1 Ground Water Protection
in addition to the standards contained in Chapter 6-501.1.P, the following standards shall be used by the Planning
Board for reviewing development applications located on a mapped sand and gravel aquifer:
A. The boundaries of sand and gravel aquifers shall be as delineated on the Sand and Gravel Aquifer Map
prepared by the Maine Geological Survey labeled Map 16 and identified as Open File Report No. 85-82d,
Plate 3 of 5.
B. When the boundaries of the sand and gravel aquifer are disputed due to lack of sufficient detail on available
maps, the applicant or agent may submit hydro geologic evidence prepared by. a geologist
certified in the State of Maine that identifies actual field locations of the aquifer boundaries within the
project area. The Planning Board may require actual field identification if they believe the Maine Geological
Survey Maps are incorrect.
C. Hydrogeologic Study. Based on the size, location, surrounding uses or other characteristics of t'
proposed use or site to determine compliance with the requirements of this Chapter and the water qual,
criteria of the Site Plan Review, the Planning Board may require submittal by the applicant of a hydro
geologic impact study. The impact study shall be prepared by a State of Maine Certified Geologist with
experience in hydro geology. The study shall contain the following components unless waived by a specific
vote of the Board.
1. A map showing: (1) soil types; (2) surficial geology on the property; (3) the recommended sites for
individual subsurface wastewater disposal systems and wells in the development; and (4) direction of
ground water flow. (The Planning Board expects the detail of this study to vary with the intensity of the
development.)
2. The relationship of surface drainage conditions to ground water conditions.
3. Documentation of existing ground water quality for the site.
4. A nitrate nitrogen analysis or other contaminant analysis as applicable including calculation of levels
of the property line(s) and well{s) on the property.
5. A statement indicating the potential sources of contamination to ground water from the proposed use
and recommendations on the best technologies to reduce the risks.
6. For water intensive uses, analysis of the effects of aquifer drawdown on the quantity and quality of
water available for other water supplies or potential water supplies.
7. The Planning Board may require installation and regular sampling of water quality monitoring wells for
any use or proposed use deemed to be a significant actual or potential source of pollutants or
excessive drawdown. The number, location and depth of monitoring wells shall be determined as pe
of the hydro geologic study, and wells shall be installed and sampled in accordance with "Guidelines
for Monitoring Well Installation and Sampling" Water quality sample results from monitoring wells
shall be submitted to the Code Enforcement Officer with evidence showing that contaminant
76
concentrations meet the performance standard for pollution levels.
8. Alist of assumptions made to produce the required information.
D. Conditions/Standards
In addition to the standards contained in Chapter 6-501.1.P, the following standards shall be met:
1. No use including home occupations shall dispose of other than normal domestic wastewater on-site
without approval of the permit granting authority. Disposal of wastewater shall be in strict compliance
with the Maine Subsurface Wastewater Disposal Rules and other relevant State and local laws, rules,
and ordinances.
2. Indoor use or storage facilities where hazardous materials, wastes or other liquids with the potential
to threatened ground water quality are used or stored shall be provided with containment which is
impervious to the material being stored and have the capacity to contain 10 percent of total volume of
the containers, or 110 percent of the volume of the largest container, whichever is larger.
3. Petroleum and Other Hazardous Material or Waste Transfer. A Spill Control and Countermeasure Plan
shall be submitted and approved by the Planning Board.
4. In those areas identified as sand and gravel aquifers as defined in Chapter 6-601.1.A. the following
land uses are prohibited unless the Planning Board finds by engineering study must meet state and
federal regulations that no discharges will occur such that water quality at the property line will fall
below State Drinking Water Standards and all provisions of this ordinance are met:
e Dry cleaners
e Photo processors
e Printers
e Auto washes
e Laundromats
t e Meat packers/Slaughterhouses
e Salt pries/Sand-salt piles
e Wood preservers
e Leather and leather products
e Electrical equipment manufacturers
® Plastic/Fiberglass fabricating
« Chemical reclamation facilities
e Industrial waste disposal/Impoundment areas
e Landfills/Dumps/Transfer stations
e Junk and Salvage yards
e Graveyards
e Chemical manufacturing
e Pesticide/Herbicide stores
e Metal platers
e Concrete/Asphalt/Tar/Coal companies
6-701 Waivers
Where the Code Enforcement Officer or Planning Board makes written findings of fact that due to special circumstances
of a particular application, certain required improvements or standards of this Chapter are not necessary to provide for
the public health, safety or welfare, or are inappropriate because of inadequate or lacking connecting facilities adjacent
to or in proximity of the proposed development, it may waive the requirement for such improvements, subject to
appropriate conditions, provided the waivers do not have the effect of nullifying the intent and purpose of the
comprehensive plan or this Chapter and further provided the performance standards of this ordinance have been or will
be met. In granting waivers, the Code Enforcement Officer or Planning Board shall require such conditions as will assure
the purpose of these regulations are met.
"~~ §-801 Appeals
An aggrieved party may appeal any decision of the Code Enforcement Officer or Planning Board under this Chapter to
77
the Board of Appeais within thirty (30) days of the date the Code Enforcement Officer or PlanningBoard issues a written
order of its decision.
AMENDED: March 8, 2003 |
AMENDED: March 7, 2009
AMENDED: August 5, 2023
78
Chapter 7
7-101 Subdivision Standards
'~101.1 Purposes
The purposes of this Chapter are:
A. To assure the comfort, convenience, safety, health, and welfare of the people of the Town of Greene;
B. To protect the environment and to promote the development of an economically sound and stable
community.
C. To this end in approving subdivisions within the Town of Greene, Maine, the Planning Board shall consider
the following criteria and before granting approval shall make findings of fact that the provisions of this
Chapter and Ordinance have been met and that the propose a subdivision will meet the requirements set
forth in the State Subdivision Law.
7-101.2 Applicability
The provisions of this Chapter shall pertain to all land and buildings proposed for subdivision within the boundaries of
Greene, Maine.
7-201 Administration
7-201.1 Agenda
To avoid unnecessary delays in processing applications the Planning Board shall prepare an agenda for each
regularly scheduled meeting. Applicants shall request to be placed on the Planning Board's agenda no less than
fourteen (14) days in advance of a regularly scheduled meeting by contacting the Chairperson. Applicants who
if attend a meeting but who are not on the agenda may be heard but only after all agenda items have been completed and
then only if a majority of the Planning Board so votes.
7-201.2 Pre-application Meeting
Applicants shall schedule a meeting with the Planning Board prior to formal submission, to present a sketch plan and
make a verbal presentation regarding the site and the proposed project.
A. Submission
The Pre-application Sketch Plan shall show in simple sketch form, the proposed development area, and
other features in relation to existing conditions. The Sketch Plan, which may be a freehand penciled sketch
should be supplemented with general information to describe or outline the existing conditions or the site
and the proposed development. It is recommended that the sketch plan be superimposed on or
accompanied by a copy of the Assessor's Map(s) on which the land is located.
When a proposed subdivision will encompass ten (10) acres or more, or five (5) lots, whichever is less,
the applicant shall submit sketch plans of both a traditional subdivision layout and open space subdivision
layout. The sketch plan shall be accompanied by a written narrative of the advantages and disadvantages
of both subdivision techniques in relation to the particular site. The Planning Board shail within thirty (30)
days of receiving the sketch plan, inform the applicant of their recommendations based on the intent of
the comprehensive plan and the nature of the site, which type of subdivision is the most appropriate. This
provision shall not be interpreted to grant the authority to the Planning Board to require a particular type
of subdivision.
B. Contour Interval and On-Site Inspection.
* Within thirty (30) days of the pre-application meeting, the Planning Board shall determine and inform the
applicant, in writing, of the required contour interval on the development plan and conduct an on-site
inspection of the property.
79
C. Ownership Interest
The applicant will furnish written evidence showing right, title or interest (option, contract for sale, etc.) in
the property to be developed to the Planning Board.
7-201.3 Joint Meetings
If any portion of the proposed subdivision crosses the boundary of an adjacent municipality the Planning
Board shall meet jointly with that municipality's planning board to review the application and conduct any
public hearings. The joint meetings and any hearings required under this section may be waived by written
agreement of both planning boards.
7-301 Minor Subdivisions (five [5] lots or less)
7-301.1 General
In any case, whether due to the complexity of the subdivision proposal, or because of circumstances indicating that
some aspect of the proposal is likely to present a substantial risk to public health, safety, or welfare, the Planning
Board may require the applicant to submit any additional information required for a major subdivision when deemed
necessary to assure that a hazardous condition will not be present.
7-301.2 Procedure
A. The final plan should approximate the layout shown on the sketch plan, and include recommendations
made by the Planning Board. The Planning Board shall provide the subdivider with a dated receipt of a
Final Plan application at the Planning Board meeting where the final plan application is first presented and
heard by the Planning Board.
B. All applications for final plan approval for a Minor Subdivision shall be accompanied by an application fee
as required In Chapter 10. The Planning Board may require the owner or his authorized agent to deposit
in escrow with the town an amount of money sufficient to cover the costs for any professional review
the subdivision which the Planning Board may feel is reasonably necessary to protect the general welfare
of the town. This escrow payment shall be made before the Planning Board engages any outside party to
undertake this review and to make recommendations to the Planning Board. Any part of the escrow
payment in excess of the final costs for the review shall be returned to the owner or the owner's agent
within thirty (30) days of final approval.
C. The subdivider, or his duly authorized representative, shall attend the meeting of the Planning Board to
discuss the final plan.
D. With the filing of an application property. owners within one hundred (100) feet of the edge of the
applicant's property lines shall be notified by Certified Mail Return Receipt Requested, of a pending
application for subdivision approval by the Town of Greene. Notification forms and the names and
addresses shall be obtained from the Town Office; fees to be borne by applicant. This notice shall indicate
the time, date and place of the Planning Boards first consideration of the application. Should the meeting
of the first consideration of the application not be held for any reason renotification shall be provided by
Certified Mail, Return Receipt Requested of the new date of the meeting fees to be borne by applicant.
E. Within thirty (30) days of the Planning Board issuing a dated receipt of a Final Plan application form and
fee, the Town Office on behalf of the Planning Board shall notify the applicant in writing as to whether or
not the application is complete, and what, if any, additional submissions are required for a complete
application, and determine whether to hold a public hearing on the final plan application. No application
shall be considered complete nor shall application tie in order for review or approval if the subject parcel
is Known to be in violation of any ordinance.
F. The Planning Board shall determine whether to' hold a public hearing on the final plan. If the Planning
Board decides to hold a public hearing, it shall hold the hearing within thirty (30) days of receipt of >
complete application, and shall publish notice of the date, time and place of the hearing ina newspap'
of general circulation in the municipality at least two times, the date of the first publication to be at least
seven (7) days prior to the hearing. Notice of the public hearing shall be mailed to all notified in subsection
D above of the proposed subdivision seven (7) days prior to the hearing by the Town of Greene.
80
G. Within thirty (30) days of a public hearing, or within sixty (60) days of receipt of a complete application if
no hearing Is held, or within another time limit as may be otherwise mutually. agreed upon the Planning
iy Board and the subdivider, the Planning Board shall make findings of fact on the application, and approve,
approve with conditions, or deny the final plan. The Planning Board shall specify in writing its findings of
facts that the final plan satisfies all the approval criteria for subdivision approval set forth in this Chapter
and in Title 30-A M.R.S.A. Section 4404 and reasons for any conditions or denial.
7-301.3 Submissions
The subdivision plan for a Minor Subdivision shall consist of two (2) reproducible, stable-based transparent originals
embossed with the seal and signed by the professional who prepctred the Qian. One (1) will be recorded at the
Registry of Deeds, the other will be filed at the Municipal Office and three (3) copies of one (1) or more maps or
drawings drawn to a scale of not more than one hundred (100) feet to the inch shall and all accompanying. the plan(s}
shall be provided to the Planning Board. Plans shail be no larger than twenty-four (24) by thirty-six (36) inches in size
and shall have a margin of two (2) inches outside the border lines on the left side and one-inch margins outside the
border along the remaining sides. Space shall be provided for endorsement by the Planning Board. In addition, a
copy of the plan(s) which may be reduced to a size of 8.5 by 11 inches, and all accompanying information shall be
to each Planning Board member. Upon the finding of a complete application the applicant shall provide the Fire
Department, Rescue Chief, Road Commissioner, and Superintendent of Schools copies for their comments and/or
suggestions.
The application for approval of a Minor Subdivision shall include the following information:
1. Proposed name of the subdivision, or identifying title, and the name of the municipality in which it is located,
along with the tax assessor's map and lot numbers.
2. An actual field survey of the boundary lines of the tract, giving complete descriptive data by bearings and
distances, made and certified by a licensed land surveyor. The comers of the tract shall be located on the
ground and marked by monuments. The plan shall indicate the type of monument set or found at each lot
' corner.
3. A copy of the deed from which the survey was based and proof of right title, or interest. A copy of all
covenants, deed restrictions, easements, rights-of-way, or other encumbrances currently affecting the
property.
4. Acopy of any proposed covenant, agreements, or deed restrictions intended to cover all or part of the lots
in the subdivision.
5. The date the Plan was prepared, magnetic north point, graphic map scale, names and addresses of the
record owner, subdivider, and individual or company who prepared the plan, and the names of adjoining
property owners. The plan(s) shall be embossed with the seal and signed by the professional engineer or
surveyor that prepared the Plan.
6. Contour lines at the interval specified by the Planning Board, showing elevations in relation to mean sea
level.
7. fany portion of the subdivision is in a flood-prone area, the boundaries of any flood hazard areas and the
100-year flood elevation shall be delineated on the plan.
8. The location of any Land Management District boundaries affecting the subdivision.
9. Indication of the type of sewage disposal to be used in the subdivision. When sewage disposal is to be
accomplished by subsurface wastewater disposal systems test pit analyses prepared by a licensed site
evaluator and in compliance with Maine Subsurface Wastewater Disposal Rules shall be provided. A map
showing the location of all test pits dug on the site shall be submitted.
10. Indication of the type of water supply system(s} to be used in the subdivision. When water is to be supplied
by private wells, evidence of adequate ground water supply and quality shall be submitted-by a well driller
~~ or a hydrogeologist familiar with the area.
11. A copy of the portion of the county soil survey covering the subdivision, along with soil descriptions and
81
interpretations. When the county soil survey shows soils that are generally unsuitable for the uses
proposed, the Planning Board may require submission of a report by a registered soil scientist indicating
the suitability of soil conditions for those uses.
12. A soil erosion and sedimentation control plan that employs the Best Management Practices as containe
in the Maine Erosion and Sediment Control Handbook for Construction Best Management Practices.
13. A plan for the disposal of surface waters prepared by a qualified professional knowledgeable in surface
drainage.
14. The location of any freshwater wetlands, significant vernal pools as defined by MDEP, forested wetlands.
15. The location of river, stream, or brook within or abutting the proposed subdivision.
16. The location and nature of significant wildlife habitats identified by the Maine Department of Inland
Fisheries and Wildlife.
17. Any portion of the subdivision that is within the watershed of a great pond shall be identified and a
phosphorus impact analysis and control plan submitted.
18. The location of known archaeological resources.
19. Identification of documented rare and endangered species identified by the state or federal governments
and measures to protect them.
20. The location of documented historic buildings and sites on or adjacent to the site and measures to minimize
impacts of them.
21. The location of scenic sites or views as identified in the Town of Greene Comprehensive Plan.
22. The cost of storm drainage, erosion and sediment control and other improvements proposed a'
statements of the applicant's technical and financial capacity to carry out the project as proposed
7-401 Preliminary Plan for Major Subdivision (More than five [5] lots or containing a proposed street)
7-401.1 Procedure
A. The Preliminary Plan should approximate the layout shown on the Sketch Plan and recommendations made
by the Planning Board. The Planning Board shall provide the subdivider with a dated receipt of a Preliminary
Plan application at the Planning Board meeting where the Preliminary Plan application is first presented and
heard by the Planning Board.
B. All applications for preliminary approval for a Major Subdivision shall be accompanied by an application fee
as required in Chapter 10. The Planning Board may require the owner or his authorized agent to deposit in
escrow with the town an amount of money sufficient to cover the costs for any professional review of the
subdivision which the Planning Board may feel is reasonably necessary to Protect the general welfare of the
town. This escrow payment shall be made before the Planning Board engages any outside party to undertake
this review and to make recommendations to the--Planning Board. Any part of the escrow payment in excess
of the final costs for the review shall be returned to the owner or his agent by certified mail within thirty (30)
days of final plan approval.
C. The subdivider, or his duly authorized representative, shall attend the meeting of the Planning Board to discuss
the preliminary plan.
D. With the filing of an application property: owners within one hundred (100) feet of the edge of the applicant's
property lines shail be notified by Certified Mail, Return Receipt Requested of a pending application for
subdivision approval by the Town of Greene fees to be borne by applicant. Notification forms and the names
and addresses shall be obtained from the Town Office. This notice shall indicate the time date and place:
the Planning Board's first consideration of the application. Should the meeting of the first consideration of the
application not be held for any reason renotification shall be provided by Certified Mail, Return Receipt
Requested of the new date of the meeting fees to be borne by applicant.
82
E. Within thirty (30) days of the Planning Board issuing a receipt of a Preliminary Plan application form and fee,
the Planning Board shall notify the applicant in writing whether or not the application is complete, and what, if
ms, any, additional submissions are required for a complete application. No application shall be considered
complete, nor shall application be in order for review or approval if the subject parcel is known to be in violation
of any ordinance.
F. The Planning Board shall determine whether to hold a public hearing on the preliminary plan application, if the
Planning Board decides to hold a public hearing, it shall hold the hearing within thirty (30) days of receipt of a
complete application, and shall publish notice of the date, time and place of the hearing in a newspaper of
general circulation in the municipality at least two times, the date of the first publication to be at least seven
(7) days prior to the hearing; fees to be borne by applicant. Notice of the public hearing shall be mailed to all
notified in subsection D above of the proposed subdivision seven (7) days prior to the hearing by the Town of
Greene; fees to be borne by applicant.
G. The Planning Board shall, within thirty (30) days of a public hearing, or within sixty (60) days of receipt of a
complete application, if no hearing is held, or within another time limit as may be otherwise mutually agreed
upon by the Planning Board and the subdivider, make findings of fact on the application, and approve, approve
with conditions, or deny the preliminary plan. The Planning Board shall specify in writing its findings of facts
and reasons for any conditions or denial.
H. When granting approval to a preliminary plan, the Planning Board shall state the conditions of such approval,
if any, with respect to:
1. The specific changes which it will require in the final plan;
2. The character and extent of the required improvements for which waivers may have been requested and
which, in the Planning Board's opinion, may be waived without jeopardy to the public health, safety, and
general welfare; and
Q 3. The amount and type of all performance guarantees which it will require as prerequisite to the approval of
A the final plan.
|. Approval of a preliminary plan shail not constitute approval of the final plan or intent to approve the final plan,
but rather it shall be deemed an expression of approval of the design of the preliminary plan as a guide to the
preparation of the final plan. The final plan shall be submitted for approval of the Planning Board upon
fulfillment of the requirements of this Chapter and this Ordinance and the conditions of preliminary approval_.,
if any. Prior to the approval of the final plan, as a result of the further study of the proposed subdivision or as
a result of additional information received, the Planning Board may require additional changes deemed
necessary or other conditions to be met so that the final plan will satisfy all of the approval criteria set forth in
this Chapter or in 30-A M.R.S.A. Section 4404 for subdivision approval.
7-401.2 Submissions
The Preliminary Plan shall be submitted in three (3) copies of one or more maps or drawings that may be
printed or reproduced on paper, with all dimensions shown in feet or decimals of a foot. The preliminary plan
shall be drawn to a scale of not more than one hundred (100) feet to the inch. Three (3) copies of all
information accompanying the plan shall be submitted. In addition, acopy of the plan(s) which m be reduced
to a size of 1/2 by 11 inches and all accompanying information shall be to each Planning Board member.
Upon the finding of acomplete application the applicant shall provide the Fire Department, Rescue Chief,
Road Commissioner, and Superintendent of Schools copies for their comments and/or suggestions. The
following information shall either be shown on the Preliminary Plan or accompany the application:
1. Proposed name of the subdivision or identifying title and the name of the municipality in which it is located,
and the tax assessor's map and lot numbers.
2. An actual field survey of the boundary lines of the tract, giving complete descriptive data by bearings and
distances, made and certified by a licensed land surveyor. The comers of the tract shall be located on the
Dee ground and marked by monuments. The plan shall indicate the type of monument set or found at each lot
corner.
83
3. A copy of the deed from which the survey was based and proof of right, title. or interest. A copy of all
covenants or deed restrictions, easements, rights-of-way, or other encumbrances currently affecting the
property.
4. The number of acres within the proposed subdivision-' location of property lines, existing building |
watercourses, vegetative cover type, and other essential existing physical features shall be shawn on the
plan.
5. The proposed lot lines with dimensions and lot area.
6. The location and size of existing and proposed sewers, water mains, culverts, and drainage ways on or
adjacent to the property to be subdivided.
7. The location, names and present widths of existing and proposed streets, highways, sidewalks,
easements, building lines, parks, and other open spaces on or adjacent to the subdivision.
8. The date the plan was prepared magnetic north point arrow or grid north, graphic map scale, names and
addresses of the record owner, subdivider, and individual or company who prepared the plan. The plan(s)
shall be stamped or sealed by a professional engineer and/or, surveyor or planner, or an of them, as the
case may be.
9. Contour lines at the interval specified by the Planning Board, showing based on defined data.
10. If any portion of the subdivision is in a flood-prone area, the boundaries of any flood hazard areas and the
100-year flood elevation shall be delineated on the plan.
11. The location of any Land Management District districts affecting the subdivision.
12. A copy of any proposed deed restrictions, covenants or agreements intended to cover all or part of the
lots in the subdivision.
13. Indication of the type of sewage disposal to be used in the subdivision. When sewage disposal is to be
accomplished by subsurface sewage disposal systems, test pit analyses, prepared by a licensed site
evaluator and in compliance the Maine Subsurface Wastewater Disposal Rules shall be provided. A map
showing the location of all test pits dug on the site shall be submitted.
14. Indication of the type of water supply system(s) to be used in the subdivision. When water is to be supplied
by private wells, evidence of adequate ground water supply and quality shall be submitted by a well driller
or a hydrogeologist familiar with the area.
15. A copy of that portion of the county soil survey covering the subdivision along with soil descriptions and
interpretations. When the medium intensity soil survey shows soils that are generally unsuitable for the
uses proposed the Planning Board- may require the submission of a report by a registered soil scientist
indicating the suitability of soil conditions for those uses.
16. A soil erosion and sedimentation control plan that employs the Best Management Practices as contained
in the Maine Erosion and Sediment Control! Handbook for Construction Best Management Practices.
17. A plan for the disposal of surface waters prepared by a qualified professional knowledgeable in surface
drainage.
18. The location of any freshwater wetlands, forested wetland, significant vernal pools as defined by MDEP.
19. The location of river, stream, or brook within or abutting the proposed subdivision.
20. The location and nature of significant wildlife habitat identified by the Maine Department of Inland Fisheries
and Wildlife.
21. Any portion of the subdivision that is located within the watershed of a great pond shall be identified and
a phosphorus impact analysis and control plan provided.
84
22. The location of known archaeological resources.
23. Identification of documented rare and endangered species identified by the state or federal governments
; and measures to protect them.
24. The location of documented historic buildings and sites on or adjacent to the site and measures as
identified in Town of Greene Comprehensive Plan, which will be taken to minimize impacts upon the
buildings and sites.
25. The location of scenic sites or views as identified in the Town of Greene Comprehensive Plan.
26. The cost of streets, storm drainage, erosion and sediment control and other improvements proposed and
statements of the applicants technical and financial capacity to carry out the project as proposed.
27. All parcels of land proposed to be dedicated to public use and the conditions of such dedication.
28. The location of any open space to be preserved and an indication of its improvement and management.
29. A traffic impact analysis prepared by a Professional Engineer when required by the Planning Board.
30. The names and addresses of owners of record of adjacent property including any property directly across
an existing public street from the subdivision.
7-501 Final Plan for Major Subdivision
7-501.1 Procedure
A. The subdivider shall, within twelve (12) months after the approval of the preliminary plan, file an application
for approval of the final plan. The final plan shall approximate the layout shown on the preliminary plan, and
recommendations made by the Planning Board. The Planning Board shall provide the subdivider with a dated
7 receipt of a final plan application at the Planning Board meeting where the final plan application is first
presented and-heard by the Planning Board.
B. The subdivider or his duly authorized representative shall attend the meeting of the Planning Board to discuss
the final plan.
C. Within thirty (30) days of the Planning Board issuing a dated receipt of a Final Plan application form, the
Planning board shall notify the applicant in writing as to whether or not the application is complete, and what,
if any, additional submissions are required for a complete application, and determine whether to hold a public
hearing on the final plan application. No application shall be considered complete, nor shall application be in
order for review or approval if the subject parcel is known to be in violation of any ordinance
D. Ifthe Planning Board decides to hold a public hearing, it shall hold the hearing within thirty (30) days of receipt
of a complete application, and shall publish notice of the date, time, and place of the hearing in a newspaper
of general circulation in the municipality at least two times, the date of the first publication to be at least seven
(7) days prior to the hearing and the notice of the hearing shall be posted in at least three prominent places at
least seven days prior to the hearing. Notice of the public hearing shall be mailed to notified in Section 7-
401.1.D of the proposed subdivision seven (7) days prior to the hearing by the Town of Greene.
E. Before the Planning Board grants approval of the final plan, the subdivider shall meet the performance
guarantee requirements contained in Chapter 7-901.
F. Within thirty (30) days from the public hearing, or within sixty (60) days of receiving a complete application if
no hearing is held, the Planning board shall make findings of act, and conclusions relative to the standards
contained in Title 30-A M.R.S.A. §4404, this Chapter and Ordinance. Ifthe Planning Board finds that all
standards of the Statute and this Chapter and Ordinance have been met, they shall approve the final plan. If
the Planning Board finds that any of the standardsof the Statute, this Chapter and this Ordinance have not
been met, the Planning Board shall either deny the application or approve the application with conditions to
Sees ensure all of the standards will be met by the subdivision. The reasons for any conditions shall be stated in
the records of the Planning Board.
85
7-501.2 Submissions
A. The Final Plan shail consist of two (2) reproducible, stable-based transparent originals and one paper
embossed with the seal and signed by the professional who prepared the plan. One will be recorded at t'
Registry of Deeds, the other will be filed at the Municipal Office and three (3) copies of one or more maps. ~
drawings drawn to a scale of not more than one hundred (100) feet to the inch shall be provided to the Planning
Board. Plans shall be no larger than twenty by thirty-six (36) inches in size and shall have a margin of two (2)
inches outside the border lines on the left side, and one (1) inch margins outside the border along the remaining
sides. Space shall be provided for endorsement by the Planning Board.
Three (3) copies of all information accompanying the plan shall be submitted. In addition, one copy of the plans,
which may be reduced to a size of 8.5-by-11 inches, and all accompanying information shall be provided to
each Planning Board member through the code enforcement office.
B. The application for approval of the Final Plan shall include the following information:
1. Proposed name of the subdivision or identifying title and the name of the municipality in which it is located,
along with the assessor's map and lot numbers.
2. An actual field survey of the boundary lines of the tract, giving complete descriptive data by bearings and
distances, and made and certified by a licensed land surveyor. The corners of the tract shall be located
on the ground and marked by monuments. The plan shall indicate the type of monument set or found at
each lot corner.
3. Location of property lines, existing buildings, watercourses, and other essential existing physical features.
4. The date the plan was prepared, magnetic, grid or true north point, graphic map scale, names and
addresses of the record owner, subdivider, and individual or company who prepared the plan.
5. The location of any district boundaries affecting the subdivision.
6. The location and size of existing and proposed culverts, and drainage ways on or adjacent to the propeny
to be subdivided.
7. The location, names and present widths of existing and proposed streets, highways, sidewalks,
easements, building lines, parks, and other open spaces in the subdivision. The plan shall contain
sufficient data to allow the location, bearing and length of every street line, lot line, and boundary line to
be readily determined and be reproduced upon the ground. These lines shail be tied to reference points
previously established.
8. All parcels of land proposed to be dedicated to public use and the conditions of such dedication. Written
offers of cession to the municipality of all public open spaces shown on the plan, and copies of agreements
or other documents showing the manner in which open spaces to be retained oy the developer or lot
owners are to be maintained shall be submitted. If open space or other land 1s to be offered to the
municipality, written evidence that the Municipal Officers are satisfied with the legal sufficiency of the
written offer of cession shall be included.
9. If any portion of the subdivision is in a flood-prone area, the boundaries of any flood hazard areas and the
100-yearflood elevation shall be delineated on the plan.
7-601 Final Approval and Filing
7-601.1 Filing
Upon findings of fact and determination. that all standards in Title 30-A, M.R.S.A. §4404, this Chapter and
Ordinance have been met, and upon voting to approve the subdivision, the Planning Board shall sign the fin='
plan The Planning Board shall specify in writing its findings of facts and reasons for any conditions or deni. |
One (1) copy of the signed plan shall be retained by the Planning Board as part of its permanent records. One
copy of the signed plan shall be forwarded to the tax assessor. Any subdivision not recorded in the Registry of
86
Deeds by the subdivider within ninety (90) days of the date upon which the plan is approved and signed by the
Planning Board shall become null and void.
-7-601.2 Revisions
No change, erasures, modifications, or revisions shall be made in any final plan after approval has been given
by the Planning Board and endorsed in writing on the plan, unless the revised final Plan is first submitted, and
the Planning Board approves any modifications. The Planning Board shall make findings that the revised plan
meets the standards of Title 30-A, M.R.S.A. §4404, this Chapter and Ordinance. In the event that a plan is
recorded without complying with this requirement, it shall be considered null and void, and the Planning Board
shall institute proceedings-to have the plan stricken from the records of the Registry of Deeds.
7-601.3 Acceptance of Street, Easement or Open Space
The approval by the Planning Board of a subdivision plan shall not be deemed to constitute or be evidence of
any acceptance by the municipality of any street easement, or other open space shown on such plan. When a
park, playground, or other recreation area shall have been shown on the Rian to be dedicated to the
municipality, approval of the plan shall not constitute an acceptance by the municipality of such areas. The
Planning Board shall require the plan to contain appropriate notes to this effect. The Planning Board may also
require the filing of a written agreement between the applicant and the municipal officers covering future deed
and title, dedication, and provision for the cost of grading, development, equipment, and maintenance of any
such dedicated area.
7-601.4 Construction of Necessary Improvements
Failure to commence substantial construction of the necessary improvements in the subdivision within two (2)
years of the date of approval and signing of the plan shall render the plan null and void. Upon determining that
a subdivision's approval has expired under this paragraph, the Planning Board shall have a notice placed in
the Registry of Deeds to that effect.
,-701 Performance Standards
In reviewing applications for a subdivision, the Planning Board shail consider the following standards and make
finding that each, in addition to standards contained in Title 30-A, M.R.S.A. Section §4404, have been met prior
to the approval of a final plan. In all instances, the burden of proof shah be upon the applicant.
7-701.1 Conformance with Comprehensive Plan
All proposed subdivisions shalt be in conformity with the Comprehensive Plan and with the provisions of all
pertinent state and local codes and ordinances.
7-701.2 Buffer Provisions
The Planning Board may require that a proposed subdivision design include a landscape plan that will maintain
natural buffers adjacent to rivers, brooks, and streams.
7-701.3 Lots
A. All lots shall meet the minimum requirements of the applicable Town of Greene Ordinancesexcept as
may otherwise be permitted by this Chapter.
B. Lot configuration and area shall be designed to provide for adequate off-street parking and service facilities
based upon the type of development contemplated.
C. The Planning Board may require the location of structures to be arranged to avoid tops of ridge lines and
fields. Whenever possible and feasible the designated area for the placement of structures shall be on the
edges of fields.
87
7-701.4 Water Supply
If a central water supply system is provided by the subdivider, the location and protection of the source and the
design, construction and operation of the system shall conform to the standards of the State of Maine Rules a
the Department of Human Services Relating to Drinking Water (10-144 A.C.M.R. 231).
7-701.5 Sewage Disposal
A. The applicant shall submit evidence of soil suitability for subsurface sewage disposal prepared bya Licensed
Site Evaluator in full compliance with the requirements of the State of Maine Subsurface Wastewater Disposal
Rule.
B. On lots in which the minimum depth to seasonal water table, or hydraulically restrictive horizon or minimum
depth to bedrock is fifteen (15) inches or less as reported by a licensed site evaluator, a second site with
suitable soils shall be shown as a reserve area for future replacement of thedisposal system. The reserve
area shall be shown on the Plan and restricted as to not be built upon.
7-701.6 Surface Drainage
A. Where a subdivision is traversed by a stream, river, or surface water drainage way or where the Planning
Board has determined that surface water runoff to be created by the subdivision should be controlled, there
shall be provided easements or drainage rights-of-way with swales, culverts, catch basins or other means of
channeling surface water within the subdivision and over other properties. This stormwater management
system shall be designed by a qualified professional knowledgeable in surface drainage.
B. The applicant shall provide a statement from the designing professional that the proposed subdivision will not
create erosion, drainage, or runoff problems either in the subdivision or with respect to adjoining properties.
Where the peak runoff from the subdivision onto abutting properties Is increased either in volume or duration,
easements allowing such additional discharge shall be obtained from abutting property owners.
7-701.7 Land Features
The Planning Board shall require the applicant to take measures as contained in the Maine Erosion and
Sediment Control Handbook for Construction Best Management Practices to correct and prevent soil erosion
in the proposed subdivision.
7-701.8 Phosphorus Export
A. Subdivisions proposed within the direct watershed of a lake or pond listed below shall be designed to limit
phosphorus runoff to the levels defined below:
[Tener tat [ Peston nes | STR CNE
| BeryPond | Medium | Tt
(1) The pounds per year of phosphorus from the watershed that would produce an increase in phosphorus
concentration by more than 1.0 parts per billion.
B. Phosphorus export from a proposed subdivision shall be calculated according to the procedures defined in
"Phosphorus Control in Lake Watersheds: A Technical Guide for Evaluating New Development" (Maine DEP
et.al. September 1989 with revision in 1992 and as may be amended). Copies of ali worksheets and
calculations shall be submitted to the Planning Board.
C. Phosphorus control measures shall meet the design criteria contained in "Phosphorus Control in Lak
Watersheds: A Technical Guide for Reviewing Development" (Maine DEP et al., September 1989 with
revisions in 1992 or as may be amended). The Planning Board shall require the reasonable use of vegetative
buffers, limits on clearing, and minimizing street lengths, and shall encourage the use of other nonstructural
88
measures prior to allowing the use of high-maintenance structural measures such as infiltration systems and
wet ponds
--7-701.9 Construction in Flood Hazard Areas
When any part of a subdivision is in a special flood hazard area as identified by the Federal Emergency
Management Agency, the plan shall indicate that all principal structures on lots in the subdivision shall be
constructed with their lowest floor including the basement, at least one (1) foot above the 100-year flood elevation.
Such a restriction shall be included in the deed to any lot which is included or partially included in the flood hazard
area.
7-701.10 Mobile Home Parks
These standards shall apply to all development proposals for new mobile home parks and to any expansion of existing
mobile home parks.
A. Lot Size, Width and Density
Lots in a mobile home park shall meet the following minimum lot size, width, and density requirements.
Minimum requirements shall be based on Title 30-A M.R.S.A. Section 4358.
1. Lots served by individual subsurface sewage disposal systems
-minimum lot area - 20,000 square feet
-minimum lot width - 100 feet
2. Lots served by a central subsurface wastewater disposal system
-minimum lot area - 12,000 square feet
-minimum lot width - 75 feet
M. 3. The overall density of a mobile home park served by a central subsurface wastewater disposal system
shall be no greater than one unit per Z0,000 square feet of total park area. The overall density shall be
computed using the combined area of its mobile home lots plus:
a. the area required for street rights-of-way; and
b. the area required for buffer strips, if any.
4. Where lots front on a curved right-of-way or are served by a driveway, the frontage requirement shall be
measured in a straight line perpendicular to the setback line.
5. Lots within the area regulated by the Shoreland Zoning Ordinance, Town of Greene shall meet the lot
area, lot width, setback and shore frontage requirements set forth in that Ordinance.
B. Lot Setbacks
1. The following lot setbacks shall apply to all manufactured housing units.
Front setback ........20 feet
Side setback..........10 feet
Rear setback.........20 feet
Setbacks from Town or State maintained streets shall comply with Chapter 3-101.2.A.
2. For aesthetic purposes, the Planning Board may allow the front or rear setbacks on a private street within
a mobile home park to be varied provided that no home may be closer than (ten} 10 feet from the right-of-
way or the rear of any lot and the average distance is at least twenty (20) feet for all units.
3. Carports of non-combustible materials are not subject to side setback requirements.
4. The Planning Board may allow lot side yard setbacks to be reduced to five {5) feet provided thirty (30) feet
" is maintained between manufactured housing units for the purpose of providing more usable yard space
on one side of the home.
89
Cc, Lot Coverage
All buildings on the lot including accessory buildings and structures, but excluding open decks and parking
spaces, shall not cover more than fifty (50) percent of the lot area. LS,
D. Buffer Strips
1. A fifty (50). foot wide buffer strip shall be provided along all property boundaries that abut residential land
that has a gross density of less than half of that proposed in the park, or no structures, streets or utilities
may be placed in the buffer strip except that they may cross a buffer strip to provide services to the park.
2. Within twenty-five (25) feet of any property line and within the buffer strip, visual screening and/or
landscaping shail be provided. The visual screening may consist offences, berms, landscaping (such as
shrubs and trees) and/or undisturbed natural existing vegetation. This screening shall effectively screen
at least fifty (50) percent of the homes from view from the adjacent property and shall be maintained
throughout the life of the project
E. Parking
For each mobile home lot, there shall be provided and maintained at least two (2) off-street parking spaces.
F. Street Standards
1. Streets in a mobile home park shall meet the standards contained in Chapter 5 Street Construction
Standards and the provisions of this section. Where the standards are at conflict, the stricter standard
shall apply.
a. Private Streets. Privately-owned streets within the mobile home park shall be designed by a
professional engineer who is registered in the State of Maine, and shall be built according to accepted
engineering standards, and shall comply with current standards adopted by the Maine Manufactured
Housing Board.
b. Streets for Public Acceptance. Streets within mobile home parks that are to be offered for acceptance
by the Town of Greene shall meet the minimum street acceptance standards for public streets as
required in Chapter 5.
c. No mobile home lot may have vehicular access directly onto an existing public street, unless a new
street is constructed to town standards to serve the mo6lre home park and accepted as a public street.
2. Right-of-way and pavement width
a. Two-way park streets shall have a minimum right-of-way of twenty-three (23) feet and a minimum
travel way surface of twenty (20) feet. On-street parking shall be prohibited.
b. One-way streets shall have a minimum right-of-way of eighteen (18) feet and a minimum travel way
surface of fourteen {14) feet. On-street parking shall be prohibited.
c. Parking lanes, if provided, shall be a minimum of nine (9) feet in width.
G. Utility Requirements
All mobile home parks shall provide permanent electrical, water and sewage disposal connections to each
mobile home in accordance with applicable state and local rules and regulations.
H. Refuse Disposal
The storage collection and disposal of refuse in the mobile home park shail be so conducted as to create no
health hazards, rodent harborage, insect breeding areas, accident or fire hazards, or air pollution.
|. Skirting
The area between the ground or stand and the bottom of the unit shall be fully enclosed by skirting. This
90
skirting shall provide for access and adequate ventilation of the space under the unit. This skirting may consist
of one of the following materials:
aan 1. Approved vinyl or metal mobile home skirting; or
2. A poured concrete wall; or
3. A mortared or loose laid masonry wall; or
4. Painted wood or similar materials.
No subdivision that has been approved as a mobile home park may be converted to another use without the
approval of the Planning Board, and shall meet the appropriate lot size, lot width, setback, and other
requirements. The plan to be recorded at the Registry of Deeds and filed with the municipality shall include
the following restrictions as well as any other notes or conditions of approval.
1. The land within the park shall remain in the unified ownership and the fee to lots or portions of lots shall
not be transferred
2. No dwelling unit other than a manufactured housing unit shall be located within the park.
7-701.11 Multi-Family Residential
A. The applicant shall demonstrate the availability of adequate supply and quality of water for both domestic and
firefighting purposes.
B. It shall be the responsibility of the owner to provide for rubbish disposal, snow removal, and site maintenance.
All outdoor storage areas for waste collection shall be enclosed by a wooden or masonry screen at least six
(6) feet in height.
f C. All multi-family developments of six (6) dwelling units or more shail provide a developed play area no smaller
than five thousand (5,000) square feet. Any development in which occupancy is restricted to the elderly need
not provide a play area, but space shall be provided for outdoor recreation.
7-701.12 Municipal Services
When the Planning Board finds, based upon the recommendation of department heads, that municipal
services do not have sufficient capacity to service the proposed subdivision, the Planning Board may require
the following:
A. Phasing of the subdivision to allow for the development of expanded municipal services;
B. deny the application; and/or
C. Require the applicant to assist in upgrading municipal services.
7-701.13 Open Space Subdivisions
A. It is the policy of the Town of Greene to encourage the development of subdivision designs and layouts that
preserve a sense of space, provide for agriculture, forestry, and recreational land uses, preserve other
resources identified in the Town of Greene Comprehensive Plan, and blend new development with the
traditional open and wooded, agricultural and village landscapes of Greene.
This standard is intended to implement that policy by providing incentives that afford flexibility in street and lot
layout and design and street frontage requirements to the landowner. It also allows the Planning Board to
waive or reduce certain otherwise applicable standards and provisions of this Ordinance if such landowners
commit to the permanent preservation of important open space, historic, or cultural resources or preservation
of traditional residences, structures, and neighborhoods. These incentives are designed to encourage greater
_ flexibility and more innovative approaches to development and environmental design that will promote the
most appropriate use of land, preservation of permanent open space or agricultural land forest land important
natural features, wildlife habitat, water resources, ecological systems and historic and scenic areas, historic
91
and cultural resources, and historic and traditional neighborhoods for the benefit of present and future
residents.
B. A resource preservation subdivision achieves the purposes of this performance standard by reducing the ° |
size, frontage, and setback requirements. It locates housing, structures, and accompanying uses in thos.
areas where they have the smallest impact on identified environmental, wildlife, agricultural, forest, open
space, historic, cultural, and traditional neighborhood resources. These resources are then permanently
preserved by covenants and restrictions or conservation easements.
C. An individual may apply for approval of a resource preservation subdivision either after sketch plan review of
a conventional subdivision or by initial filing an application for a resource preservation subdivision. In either
case, the Planning Board shall review the application in accordance with Title 30-A M.R.S.A. Section §4404
and this Chapter.
1. Pre-application Procedure
Any applicant for a resource preservation subdivision is encouraged, but not required, to submit at the pre-
application stage a complete build out plan for the entire parcel.
2. Application Procedure
Required Plans: The submissions for a resource preservation subdivision shall include all plans and materials
required for a conventional subdivision under this Chapter and Ordinance.
3. General Requirements
In Planning Board review and approval of a resource preservation subdivision, the following requirements
shail apply and shall supersede any inconsistent or more restrictive provisions of this Chapter, Ordinance, and
other Town of Greene Ordinances.
a. Use and District Requirements
All resource preservation subdivisions shall meet the use standards of the districts in which they are
located.
b. Allowable Density
[1] Allowable density shall be based upon one of the following methods as determined by the
applicant:
{a] Net density method which is calculated in the following manner. Determine the buildable
acreage of the parcel by taking the total area of the parcel and subtracting in order the
following:
[1] area in proposed rights-of-way;
[2] area of two (2) or more contiguous acres with sustained slopes of twenty (20) percent
and greater;
[3] area of wetlands identified as Class |, II and Ill under the Natural Resource Protection
Act
[4] area shown to be in floodway as designed in the Fiood Boundary and Floodway Map
prepared by the Federal Emergency Management Agency; and
[5] area of the lot covered by surface waters.
Then divide the buildable area by the minimum lot size required. eo
[b] Simplified method, which is calculated in the following manner: Determine the number of
allowable uses or units by taking sixty-five (65)percent of the total lot area divided by the minimum lot
92
size requirement
[2] For residential development the Planning Board may grant a density bonus of one (1) lot or
_ dwelling unit or each ten (10) lots or dwelling units when it makes a written finding that the resource
preservation subdivision satisfies the policies of the comprehensive plan, achieves the applicable
purposes contained in Section 7 701.13.C.4.a-d.
4. Layout and Siting Standards
In planning the location and siting of structures in a resource preservation subdivision, priority should be given
to the preservation of the open space for its natural resource value or the historic, cultural, and traditional
neighborhood resources for their intrinsic values. Where open space is being preserved, human habitation
activity should be located and sited on the least valuable natural resource portion of a parcel, taking into
account the contours of the land and the steepness of slopes. Where historic, cultural, and traditional
neighborhood values are being preserved, the design, layout and style of the subdivision and structures shall
complement the resources that are being protected or a located in the surrounding area.
a. Where open space is being preserved, the building lots on a parcel shall be laid out and the structures
shall be sited according to the following principles. The Planning Board, in its discretion, shall resolve
conflicts between these principles as applied to a particular site.
(1) Upon soils least suitable for agricultural use and in a manner that maximizes the useable area
remaining for the designated open space use. Where agricultural, forestry, or recreational, whether
existing or future uses, are particularly targeted for preservation;
(2) Within woodlands, or along the far edges of open agricultural fields adjacent to any woodland in order
to reduce encroachment upon agricultural soils and to enable new development to be visually
absorbed by natural landscape features;
(3) In such manner that the boundaries between residential lots or other proposed uses and active
i agricultural use, commercial forest land, and/or wildlife habitat are well-buffered by vegetation,
on topography, streets or other barriers in order to minimize potential conflict between new uses and
agricultural and forestry uses;
(4) In locations where buildings may be oriented with respect to scenic vistas, natural landscape features,
topography and natural drainage areas, in accordance with an overall plan for site development:
b. Where historic or cultural or traditional neighborhood resources and values are being protected, the building
lots shall be laid out and the structures sited according to the following principles.
(1) The layout and structures shall preserve and compliment the resources and traditional neighborhood
character, where applicable through setbacks, scale, landscaping, and quality of construction which
should all be in keeping with the surrounding uses.
(2) In such manner that the boundaries between proposed uses and existing uses are buffered or
screened in keeping with the |:>uffers and screening that exist in the area in order to minimize potential
conflict between new uses and existing uses, especially residential uses;
(3) Historic or cultural resources shall be preserved and protected to the greatest extent possible in
keeping with the economic feasibility. The Planning Board may require that certain resources be open
to the public with such conditions as may be appropriate for the location and type of resource, including
being open on an appointment only basis. Or the Planning Board may require that permanent
easements be obtained to insure the preservation of such resources.
5. Space Standards
a. Shore frontage and shore setback requirements shall not be reduced below the minimum shore
. frontage or shore setback required.
b. In all districts except Village |, the required minimum land area per dwelling unit for the building
envelope may be reduced to twenty thousand (20,000) square feet or for non-residential structures by
93
50 percent of the minimum lot size, except that in no case shall the minimum building envelope for
non-residential structures be reduced below that needed to meet the impervious area requirements of
3-101.2.G, Space and Bulk Standards. The building envelope shall not include 100-year floodplains,
areas of two (2) or more acres of sustained slopes greater than twenty (20) percent, or wetlands
defined by the Natural Resource Protection Act. If the lot area is reduced, there shall be additionu.
land area in the development equal or exceed the sum of the areas by which the building lots are
reduced below the minimum lot area normally required in the district.
In the Village | and II districts, the required minimum land area per dwelling unit for the building
envelope shall be 15,000 sq. feet or for nonresidential structures be 50 percent ofthe minimum lot size,
except that in no case shall the minimum building envelope for non-residential structures be reduced below
that needed to meet-the impervious area requirements of 3-101.2.G, Space and Bulk Standards.
For subdivisions preserving open space, the additional area shall be laid out to preserve the agricultural,
forestry, or environmental resources the subdivision seeks to protect. Where open space or environmental
resources are being preserved, the layout shall provide access and minimal facilities such as trails to
ensure that the lot owners in the subdivision can enjoy the benefits of the open space or environmental
reSOUrces.
c. Minimum street frontage requirements contained Chapter 3-101.2 may be waived or modified by the
Planning Board provided that:
{1] Any applicable provisions regarding streets in Subsection 6 below are satisfied; and
[2] Adequate access and tum-around to and from all parcels by emergency vehicles can be ensured by
private streets and/or common driveways.
d. A reduction of required setback distances may be allowed at the discretion of the Planning Board, based
upon the public benefits to be achieved from the design, provided that the front and rear setbacks shall be
no less than twenty-five (25) feet.
e. No individual lot or dwelling unit shall have direct vehicular access onto a public street existing at the time
development unless in the case of developments in theVillage | and II districts such access is already
available to a structure that is being preserved and that such access does not constitute a traffic or safety
hazard.
6. Streets
The Planning Board shall require private streets and common driveways to comply with the design standards
set forth in Chapter 5.
7. Open Space Requirements
In Planning Board review and approval of a subdivision with open space whether primarily intended to
preserve open space or to preserve and protect historic, cultural, or traditional neighborhood resources, the
following requirements shall apply and shall supersede any inconsistent or more restrictive provision of this
Chapter and Ordinance.
a. Open Space Uses. On all parcels, open space uses shall be appropriate to the site. Open space should
include natural features located on the parcel (such as but not limited to, agricultural land, forested
acreage, wildlife habitat and historic features and sites. Open space shall be preserved and maintained
subject to the following, as applicable:
[1] On parcels that contain significant portions of land suited to agriculture or commercial forestry, open
space shall be preserved for agricultural or forestry, other compatible open space uses such as wildlife
habitat, recreation (active or passive), and resource conservation.
[2] When the principal purpose of preserving portions of the open space is the protection of natu:
resources such as wetlands, steep slopes, wildlife habitats, and stream corridors, open space uses in
those portions may be limited to those which are no more intensive than passive recreation.
94
b. Notations on Plan. Open space, common lands, streets, or facilities must be clearly labeled on the final plan as
to its use or uses with respect to the portions of the open space that such use or uses apply, ownership,
management, method of preservation, and the rights, if any, of the owners in the subdivision to such land or
vo portions thereof. The plan shall clearly show that the open space land is permanently reserved for open space
purposes and shail contain a notation indicating the book and page of any conservation easements or deed
restrictions required to be recorded to implement such reservations.
c. Ownership of Open Space Land. Open space land may be held in private ownership; or owned in common by
a Homeowners' Association (HOA); transferred to a non-profit organization such as a conservation trust, or
association, acceptable to the Planning Board; or held in such other form of ownership as the Planning Board
finds adequate to achieve the purposes set forth in section. The Planning Board shall, in its review, require as
a condition of approval provisions for the ongoing maintenance and associated costs for such maintenance of
the open space.
8. Land or Homeowners' Associations or Agreements
Where any portion of a subdivision is proposed or required to be held in common by owners of lots, or owned
in common by an owners' Association (HOA) or similar entity, covenants for mandatory membership in the
association setting forth the owners' rights interest, privileges, responsibilities for maintenance, and obligations
in the association and the common land, street or open space shall be approved by the Planning Board and
included in the deed for each lot.
7-701.14 Access Control and Traffic Impacts
Provisions shall be made for vehicular access to the subdivision and circulation within the subdivision in such a
manner as to safeguard against hazards to traffic on existing streets and within the subdivision. More specifically,
access and circulation shall also conform to the following standards and the design criteria below.
A. The street giving access to the subdivision and neighboring streets which can be expected to carry traffic to
and from the subdivision shall have traffic carrying capacity and be of such physical condition to accommodate
f the amount and types of traffic generated by the proposed subdivision. If traffic studies indicate improvements
' are necessary, the applicant shall pay a proportional share to accommodate the amount and types of traffic
generated by the proposed subdivision when the town's Road Improvement Program has prioritized such
street(s).
When the town's Road Improvement Program has not prioritized the street(s) for improvements, it shall be the
responsibility of the applicant to pay for the required improvements.
B. Any subdivision expected to generate average daily traffic of two hundred (200) trips per day or more shall
have at least two (2) street connections with an existing public or private streel or streets on an approved
subdivision plan. A minimum of two hundred (200) feet shall be maintained between center lines of such street
to any other street.
C. Where the subdivision lots will be accessed by- off-site public streets, the use of common driveways shall be
used where appropriate to minimize the number of entrances to public streets.
D. Where a subdivision will be accessed from Route 202, Allen Pond Road or Sawyer Road shall be limited to
two points through common access or shared driveways.
&. Where a lot has frontage on two or more streets, the access to the lot shall, where practical, be provided to
the lot across the frontage and from the street where there is lesser potential for traffic congestion and hazards
to traffic and pedestrians.
7-701.15 Ground Water Quality
A. When a hydrogeologic assessment is submitted, by request of the Planning Board, the assessment shall
contain at least the following information:
' 1. Amap showing the basic soil types.
2. The depth to the water table at representative points throughout the subdivision.
95
3. Drainage conditions throughout the subdivision.
4. Data on the existing ground water quality, either from test wells in the subdivision or from existing wells
on neighboring properties.
5. An analysis and evaluation of the effect of the subdivision on ground water resources. In the case of
residential developments, the evaluation shall, at a minimum, include a projection of post development
nitrate-nitrogen concentrations at any wells within the subdivision or at the subdivision boundaries; or at a
distance of one thousand (1,000) feet from potential contamination sources, whichever is a shorter
distance.
6. A map showing the location of any subsurface wastewater disposal systems and drinking water wells
within the subdivision and within one hundred (100) feet of the subdivision boundaries.
B. The subdivision will not result in the existing ground water quality becoming inferior to the physical, biological,
chemical, and radiological levels for raw and untreated drinking water supply sources specified in the Maine
State to Drinking Water Regulations, pursuant to 22 M.R.S.A., Section 601.
C. If ground water contains contaminants in excess of the primary standards, and the subdivision is to be served
by on-site ground water supplies, the applicant shall demonstrate how water quality will be improved or treated.
D. If ground water contains contaminants in excess of the secondary standards, the subdivision shall not cause
the concentration of the parameters in question to exceed one hundred fifty (150) percent of the ambient
concentration.
E. Subsurface wastewater disposal systems and drinking water wells shall be constructed as shown on the map
submitted with the assessment. If construction standards for drinking water wells or other measures to reduce
ground water contamination and protect drinking wafer SUP-Plies are recommended in the assessment, those
standards shall be included as a note on the final plan, and as restrictions in the deeds to the affected lots.
7-701.16 Protection of Significant Wildlife Habitat
Applicants proposing to subdivide land in or within seventy-five (75) feet of wildlife resources identified by the
Maine Department of Inland Fisheries and Wildlife shall consult with a recognized wildlife or fisheries consultant
or the Maine Department of Inland Fisheries and Wildlife and provide their written comments to the Planning
Board. Any conditions to the approval to wildlife habitat preservation shall appear on the plan and as deed
restrictions to the effected lots.
7-701.17 Scenic Locations
The Planning Board shall consider the existence of a scenic site or view location as identified in the Town of
Greene Comprehensive Plan and the impact of the proposed subdivision on such a site or view. The Planning
Board may require the placement or visual qualities of structures on lots in such locations so to minimize the
negative impacts of the subdivision on such sites and views.
7-701.18 Archaeological Sites
Any proposed subdivision activity involving structural development or soil disturbance on, or adjacent to, sites
listed on, or eligible to be listed on the National Register of Historic Places, as determined by the permitting
authority shall be submitted by the applicant to the Maine Historic Preservation Commission for review ana
comment at least 20 days prior to final approval in the case of a minor subdivision or preliminary approval! of a
major subdivision by the Planning Board. The Planning Board shall consider comments received from the
Commission prior to rendering a decision on the application.
7-701.19 Historic Locations
The Planning Board shall consider a proposed subdivision's impacts on historic buildings and sites as identifie~
in the Greene Comprehensive Plan. When a proposed subdivision will include a historic building or site, 1 ~
applicant will design the subdivision to minimize the Impacts on the historic building or site.
96
7-701.20 Endangered and Threatened Species
The planning Board shall consider a proposed subdivisions impacts on state documented endangered species.
-701.21 Solid Waste
All solid waste shall be disposed of at a Department of Environmental Protection licensed facility.
7-801 Street and Storm Drainage Design and Construction Standards
7-801.1 Street Standards
A. All streets proposed as an element of a subdivision shall comply with Chapter 5, Street Construction Standards
except as provided for within this Chapter.
B. All street designs and submissions as required by Chapter 5, Street Construction Standards, shall be
submitted as an element of the subdivision application as required by this Chapter.
C. Approval of the Final Plan shall not constitute or be evidence of any acceptance by the Town of Greene of
any street or easement.
7-801.2 Storm Water Management Design Standards
A. Adequate provision shall be made for disposal of all storm water generated within the subdivision, and any
drained ground water through a management system of ditches, swales, culverts, underdrains, and/or storm
drains. The storm water management system shall be designed to conduct storm water flows to existing
watercourses or storm drains.
All components of the storm water management system shall be designed to meet the criteria of a 25-year
storm.
B. The storm water management system shall be designed to accommodate upstream drainage taking into
account existing conditions and approve or planned developments not yet built and shall include a surplus
design capacity factor of 25% for potential increase in upstream runoff.
C. Downstream drainage requirements shall be studied to determine the effect of the proposed subdivision. The
storm drainage shall not overload existing or future planned storm drainage systems downstream from the
subdivision. The subdivider shall be responsible for financing any improvements to existing drainage
systems required to handle the increased storm flows.
D. Wherever the storm drainage system is not within the right-of-way of a public street perpetual easements shall
be provide a to the Town allowing maintenance and improvement of the system.
7-901 Performance Guarantees
7-901.1 Types of Guarantees
With submission of the application for final plan approval, the subdivider shall provide one of the following
performance guarantees for an amount adequate to cover the total construction costs of all required
improvements, taking into account the timespan of the construction schedule and the inflation rate for construction
costs:
A. Acertified check payable to the town, or a savings account or certificate of deposit naming the town as owner, for
the establishment of an escrow account; or
B. A performance bond issued by a surety company payable to the town and approved by the municipal officers: or
om C. An irrevocable letter of credit from a financial institution establishing funding for the constructionof the subdivision,
from which the town may draw if construction is inadequate, approved by themunicipal officers; or
97
D. An offer of conditional approval limiting the number of units built or lots sold until all requiredimprovements
have been constructed.
The conditions and amount of performance guarantee shall be determined by the Planning Board with the advi
of any engineer retained-by the Planning Board, Road Commissioner, and municipal officers.
7-901.2 Contents of Guarantee
The performance guarantee shall contain construction schedule, cost estimates for each major phase of
construction taking inflation into account provisions for inspections of each phase of construction, provisions for
the release of part or all of the performance guarantee to the developer, and a date after which the developer will
be in default. The guarantee shall state that the town shall have access to the funds to finish construction.
7-901.3 Phasing of Development
The Planning Board may approve plans to develop a major subdivision in separate and distinct phases. This may
be accomplished by limiting final approval to those rots abutting that section of the proposed subdivision street
which is covered oy a performance guarantee. When development is phased, street construction shall commence
from an existing public way. Final approval of lots in subsequent phases shall be given only upon satisfactory
completion of all requirements pertaining to previous phases.
7-901.4 Release of Guarantee
Prior to the release of any part of the performance guarantee, the Planning Board shall determine to its satisfaction
that the proposed improvements meet or exceed the design and construction requirements for that portion of the
improvements for which the release is requested.
7-901.5 Default
lf, upon inspection, it is found that any of the required improvements have not been constructed in accordance
with the plans and specifications filed as part of the application, the Code Enforcement Officer shall so repor!
writing to the municipal officers, the Planning Board, and the subdivider or contractor. The municipal officers shai
take any steps necessary to preserve the Town's rights.
7-901.6 Privately-Owned Streets
Where the subdivision streets are to remain privately-owned streets, the following words shall appear on the
recorded plan.
"All streets in this subdivision shall remain private streets to be maintained by the developer or the lot
owners and shall not be accepted or maintained by the Town."
7-110 Waivers
7-1710.1 Waivers
Where the Planning Board makes written findings of fact that the applicant will suffer an undue economic or other
hardship if the requirements of this Chapter are strictly applied, it may waive the necessity for strict compliance
with the requirements of this Chapter in order to provide relief from the hardship in question and to permit a more
practical and economic development. However, this shall not compromise the public health, safety, and welfare
and the waivers in question shall not have the effect of nullifying the effect of this Chapter, Ordinance, or the
comprehensive plan.
7-110.2 Requirement
In granting waivers to any of these standards in accordance with Sections 7-110.1, the Planning Board shall
require such conditions as that will assure the objectives of these regulations are met.
7-110.3 Recording
When the Planning Board grants a waiver to any of the improvements required by this Chapter, the final plan, to be
98
recorded at the Registry of Deeds, shall indicate the waivers granted and the date that they were granted.
7-111 Inspection and Enforcement
411.1 Inspection of Required Improvements
A. At least five (5) days prior to commencing each major phase of construction of required improvements, the
subdivider or contractor shall notify the Code Enforcement Officer in writing when construction of
improvements will begin. The municipal officers shall cause inspection to be made to assure that all municipal
specifications and requirements shall be met during the construction of required improvements, and to assure
the satisfactory completion of improvements and utilities required by the Planning Board.
B. If the inspecting official finds, upon inspection of the improvements, that any of the required improvements
have not been constructed in accordance with the plans and specifications fired by the subdivider he shall so
report in writing to the municipal officers, Planning Board, and the subdivider or builder. The municipal officers
shall take any steps necessary to preserve the municipality's rights.
C. If at any time before or during the construction of the required improvement r1 it appears to be necessary or
desirable to modify the required Improvements, the inspecting official is authorized to approve minor
modifications due to unforeseen circumstance such as encounters with hidden outcrops of bedrock, natural
springs, etc. The Inspecting officia1 shall issue any approval under this section in writing and shall transmit a
copy of the approval to the Planning Board. Revised plans shall be filed with the Town. For major modifications,
such as relocation of rights-of-way property boundaries, changes of grade by more than one (1) percent etc.,
the subdivider shall obtain permission to modify the plans from the Planning Board.
D. Prior to the sale of any lot, the subdivider shall provide the Planning Board with a letter from a registered land
surveyor, stating that all monumentation shown on the plan has been installed.
E. Upon completion of street construction and prior to a vote by the municipal officers to submit a proposed town
way to a town meeting, a written certification signed by a professional engineer registered in the State of Maine
i may Be required by the municipal officers at the expense of the applicant, certifying that the proposed town
i way meets or exceeds the design and construction requirements.
F. The subdivider or builder shall be required to maintain all improvements and provide for snow removal on
streets and sidewalks and maintenance until acceptance of the improvements by the municipality.
7-111.2 Violations and Enforcement
A. No plan of a division of land within the municipality that would constitute a subdivision shall be recorded in
the Registry of Deeds until a final plan has been approved by the Planning Board in accordance with this
Ordinance.
B. No person, firm, corporation, or other legal entity may convey, offer, or agree to convey any land in a
subdivision that has not been approved by the Planning Board and recorded in the Registry of Deeds.
C. Any person, firm, corporation, or other legal entity who conveys, offers, or agrees to convey any land in a
subdivision that has not been approved as required by these regulations shall be punished by a fine of not
less than $100, and not more than $2,500 for each such conveyance, offering or agreement. The Town may
institute proceedings to enjoin the violation of this section, and may collect attorney's fees and court costs if it
is the prevailing party.
D. No public utility or any utility company of any kind shall serve any lot in a subdivision for which a Final Plan
has not been approved by the Planning Board.
E. No person shall establish or develop a subdivision without first having a final plan thereof approved by the
Planning Board." Develop" shall include grading or construction of streets, grading of land or lots, or
construction of any buildings.
99
7-712 Appeals
An aggrieved party may appeal any decision of the Planning Board under this Chapter to the Board of Appeals within
thirty (30) days of the date the Planning Board issues a written order of its decision.
AMENDED: March 8, 2003
AMENDED: March 7, 2009
AMENDED: June 18, 2022
100
Chapter 8
8-101 Appeals
-101.1 Board of Appeals
The Board of Appeals as established in accordance with Title 30-A, M.R.S.A., Section 2691 and the Board of
Appeals Ordinance for the Town of Greene shall process appeals in accordance with Title 30-A M.R.S.A., Section
4353, the Board of Appeals Ordinance for the Town of Greene and the provisions of this Chapter.
8-101.2 Powers and Duties
A. Administrative Appeals
To hear and decide administrative appeals, on an appellate basis, where it is alleged by an aggrieved party that
there is an error in any order, requirement, decision, or determination made by, or failure to act by, the Planning
Board in the administration of this Ordinance; and to hear and decide administrative appeals on a de novo basis
where it is alleged by an aggrieved party that there is an error in any order, requirement, decision or determination
made by, or failure to act by, the Building Inspector or Code Enforcement Officer in his or her review of an action
on a permit application under this Ordinance. Any order, requirement, decision, or determination made, or failure
to act, in the enforcement of this ordinance is not appealable to the Board of Appeals.
When the Board of Appeals reviews a decision of the Building Inspector or Code Enforcement Officer the Board of
Appeals shall hold a"de novo" hearing. Atthis time the Board may receive and consider new evidence and testimony, be
it oral or written. When acting in a"de novo" capacity the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate hearing, and may
reverse the decision of the Planning Board only upon finding that the decision was contrary to specific provisions
of the Ordinance or contrary to the facts presented to the Planning Board. The Board of Appeals may only review
i the record of the proceedings before the Planning Board. The Board Appeals shall not receive or consider any
evidence which was not presented to the Planning Board, but the Board of Appeals may receive and consider
written or oral arguments. If the Board of Appeals determines that the record of the Planning Board proceedings
is inadequate, the Board of Appeals may remand the matter to the Planning Board for additional fact finding.
B. Variance Appeals
To consider, in specific cases where a relaxation of terms of this Ordinance would not be contrary to the public
interest and intent of this Ordinance and where, owing to unique conditions of the property and not the results of
the actions of the applicant, literal enforcement would cause undue hardship.
1. The words "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is granted;
b. That the need for a variance is due to the unique circumstances of the property and not to the general
conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality; and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
2. The Board of Appeals may grant a variance to an owner of a residential dwelling for the purpose of making
that dwelling accessible to a person with a disability who is living in the dwelling or regularly uses the
dwelling. The Board shall restrict any variance granted under this subsection solely to the installation of
equipment or the construction of structures necessary for access to or egress from the dwelling by the
person with the disability. The board may impose conditions on the variance including without limitation
the variance to the duration of the disability or to the time that the person with the disability lives in the
oe dwelling. The term "structures necessary for access to or egress from the dwelling" shall include railing,
wall or roof systems necessary for the safety or effectiveness of the structure.
101
3. The Board of Appeals shall limit any variances granted as strictly as possible in order to ensure
conformance with the purposes and provisions of this Ordinance to the greatest extent possible, and in
doing so may impose such conditions to a variance as it deems necessary. The party receiving the
variance and all subsequent owners or occupants shall comply with any conditions imposed.
4. Avariance is only authorized for dimensional requirements, including but not limited to lot width, structure
height, percent of lot coverage, and setback requirements of this Ordinance.
5. All variances granted shall be recorded by the applicant in the Registry of Deeds as required by Title 30-
AWM.R.S.A. Section 4353.5. Any variance not so recorded within ninety (90) days of the date of the decision
shall be void.
6. A copy of each variance request in the Shoreland Zone, including the application and all supporting
information supplied by the applicant, shall be forwarded by the municipal officials to the Commissioner of
the Department of Environmental Protection at least twenty (20) days prior to action by the Board of
Appeals. Any comments received from the Commissioner prior to the action by the Board of Appeals shall
be made part of the record and shall be taken into consideration by the Board of Appeals.
C. Further Appeal!
The decision of the Board of Appeals may be taken, within forty-five (45) days from the date of the decision is
rendered by an aggrieved party to Superior Court in accordance with the Maine Rules of Civil Procedure.
8-101.3 Appeal Procedures
An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved party from any
decision of the Building Inspector, Code Enforcement Officer or the Planning Board, except for enforcement-
related matters as described in 8-101.2.A above.
A. Filing
Appeals shall be filed with the Town Clerk not more than thirty (30) days of the date of the official written decision
being appealed. A filing fee as established in Chapter 10 shall accompany the appeal which shall be submitted
on forms approved by the Board of Appeals.
B. Hearing
1. The Board of Appeals shall, before taking action on any appeal, hold a public hearing on the appeal within
thirty (30) days of the acceptance of a complete appeal application. The Board of Appeals shall notify the
Selectmen, Building Inspector, Code Enforcement Officer, Planning Board, and the owners of the property
abutting that for which the appeal is taken, at least twenty (20) days in advance, of the time and place of
the hearing.
2. The Board of Appeals shall also publish the time, date, and place of the hearing at least two times, the
date of the first publication to be at least seven days prior to the hearing in a newspaper of area wide
circulation.
3. The Board of Appeals shall notify, by certified mail, the owners of the property abutting the property for
which the appeal has been filed at least twenty (20) days in advance of the hearing. The notice shail
include the nature of the appeal, and the time and place of the hearing.
4. Within thirty (30) days of the date of the final hearing, the Board of Appeals shall reach a decision on the
appeal and shall inform the appellant, The Planning Board, the Building Inspector, Code Enforcement
Officer, and the Selectmen, in writing. For appeals in the Shoreland Zone the Board of Appeals shall cause
written notice of its decision to be mailed or hand-delivered to the Department of Environmental Protection
within seven (7) days of the decision.
AMENDED: March 7, 2009 '
102
Chapter 9
9-101 Building Standards for the Town of Greene
| -101.1 Purpose
To provide for safety, health, and public welfare through the regulation of construction and relocation of structures,
providing for permits and prescribing penalties for violation.
9-101.2 Scope
The provisions of this chapter shall apply to new construction, manufactured homes set up after March 7, 1970,
additions, and relocation of any dwelling or part thereof.
9-101.3 Building Inspector/Code Enforcement Officer
This chapter shall be administered by the Building Inspector/Code Enforcement Officer who shall be appointed by
the municipal officers.
A. Inspector
The Building Inspector/Code Enforcement Officer will inspect all dweilings being constructed or relocated for
the purpose of enforcing the provisions of this chapter, and all other local and State laws governing the
construction of buildings.
B. Right of Entry
The Building Inspector/Code Enforcement Officer, and/or his or her assistant, in performance of his or her
duties, may enter any building for the purpose of making the inspection required by this chapter.
, ~-201 Permit
Before the construction, placement or relocation of any structure or part thereof that requires a permit shall be
commenced, the owner or lessee, or the architect, contractor or builder employed by such owner or lessee shall
obtain from the Building Inspector/Code Enforcement Officer a permit covering such proposed work. Failure to
obtain the required building permit prior to construction, addition and/or relocation of any building or part thereof,
shall constitute double the permit cost.
9-201.1 Application
The application for the permit shall be in writing and shall be made in such a form as the Building Inspector/Code
Enforcement Officer shall prescribe and shall contain a description of the proposed new or relocated building. For
any permit which involves plumbing and/or the installation of a subsurface wastewater disposal system a valid
Plumbing Permit issued by the Local Plumbing Inspector must accompany the application. The soil evaluation test
must meet the requirements of the state of Maine Subsurface Wastewater Disposal Rules and must be performed
by a State of Maine Licensed Soil Evaluator. No building permit for a dwelling shall be issued without soil
evaluation test. The application shall be filed with the board of assessors.
9-201.2 Permit Approval
The Building Inspector/Code Enforcement Officer, after determining the application is complete, shall either issue
the requested permit or transmit notice of refusal within seven (7) days of the determination of a complete
application. Notice of refusal shall be in writing and shall state the reasons therefor.
9-201.3 Life of Permit
All building permits shall be void unless work thereunder has a substantial start within one (1) year from the date of
issuance and if the work is not substantially completed within two (2) years from the date of issuance.
103
9-201.4 Display of Permit
Every building permit shall be displayed in a conspicuous place on the premises, clearly visible from the princir
traveled street, and shall not be removed until all work covered by the permit has been approved.
9-201.5 Fees
Allapplications for a permit shall be accompanied by a fee according to Chapter 10.
9-301 Installation of Public Utility Service
A public utility or any utility company of any kind may not install services to any new structure located in the
shoreland zone unless written authorization attesting to the validity and currency of all local permits required under
this Ordinance, has been issued by the appropriate municipal officials or other written arrangements have been
made between the municipal officials and the utility.
9-401 Standards
9-401.1 Foundations
All dwellings shall be set upon permanent complete foundations of solid rock, poured concrete, or concrete blocks,
masonry, or concrete slabs. Concrete posts or partial foundations do not meet the requirements of this chapter.
No dwelling, or manufactured home shall be constructed or moved onto the lot until the foundation is complete
and the unit can be set upon the finished foundation.
9-401.2 Minimum Construction Standards
All building materials used and practices followed in the construction of dwellings shall conform to the generally
accepted standards of good practice.
9-401.3 Exterior Finish
The exterior walls shall be finished with a covering of clapboards, wood-siding, wood or asphalt, masonry, brick
or stone or other approved material. Such coverings shall be completed within two years from the date of issuance
of the Building Permit. Tarred paper, tarred felt, or exterior vapor barrier (Tyvek or Typar) or similar materials shall
not be used unless completely hidden from view by the finished exterior wall covering.
9-401.4 Roof Covering
The roof shall be covered with noncombustible or fire-resistant materials. Untreated wooden shingles are
prohibited.
9-401.5 Chimneys
Chimneys will be of construction approved by the inspector in accordance with most recent edition of NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid Burning Appliances.
9-401.6 Vent pipes
Vent pipes shall not pass through a floor or ceiling, and shall not pass through a combustible wall or partition
unless it is properly guarded at the point of passage by a double collar of metal with air space of at least five
inches, or at least five inches in brick or other non-combustible material between the pipe and the combustible
material.
9-501 Violations
Any dwelling constructed or work performed in violation of the provisions of this ordinance shall be considered
nuisance.
104
9-501.1 Penalty
Any person found guilty of violating any provisions of this chapter shall be subject to a fine as set forth in Title 30-
AM.R.S.A. Section 4452. Each day in which a violation is proved to exist shall constitute a separate offense
under this section.
105
106
Chapter 10
10-101 Fees
0-101.1 General
A. All applications for a permit, appeal, variance, site plan review, subdivision approval or other review required
by this Ordinance shall be accompanied by the following fee. No application for a permit, appeal, variance,
site plan review, subdivision approval or other review required by this Ordinance shall not be considered
compiete until the required fee is received.
B. The Municipal Officers shall have the authority from time to time to revise the fee schedule after public hearing.
C. Application fees shall be paid by check payable to the Town of Greene, Maine and shall not be refundable.
D. The Applicant shall be responsible for any costs incurred in addition to those listed herein, including, but not
limited to registering plans, copying documents, and informing abutters.
10-201 Fee Schedule [Amended January 23, 2006]
10-201.1 Building Permit
$25.00 and B
Residential/Mobile home $0.25 per sq. ft. of primary and accessory structures. No maximum.
$0.30 per sq. ft
10-201.2 Street Construction/Alteration
Street construction/Reconstruction | $100.00
This application fee shall be waived if the street is being reviewed as an element of a Site Plan Review or
Subdivision application.
In addition to the application fee the Planning Board may charge the applicant for costassociated with professional
technical review of the application.
10-201.3 Home Occupations
Home occupation not requiring a Code Enforcement Officer or Planning Board Permit
Home occupation requiring a Code Enforcement Officer $25.00
Home occupation requiring a Planning Board Permit $50.00
10-201.4 Site Plan Review
First-time Application: Commercial $1000.00
First-time Application: Residential $250.00
$75.00
Substantial enlargement $75.00
Resumption of use $75.00
Amendment to approved plan $50.00
In addition to the application fee the Planning Board may charge the applicant for cost associated with professional
technical review of the application.
107
10-201.5 Subdivision Review
Application fee $250.00 first lot, $100.00 per lot thereafter .
Amendment to approved plan $50.00 first lot; $100.00 per lot thereafter
In addition to the application fee the Planning Board may charge the applicant for cost associated with professional
technical review of the application.
An Escrow Account, in the name of the Applicant, shall be established for each Subdivision Review with the initial
payment to the Planning Board set at $250.00 per lot. These funds shall be used to assist the Planning Board with
the cost associated with professional and technical review of the Application. Upon expenditures of 75% of the
escrowed amount, the Planning board may, at its discretion, require additional funds to be placed into the account.
Any and all funds unused and remaining in the escrow account at completion of the Subdivision Review shail be
returned to the Applicant. The Planning Board shall maintain and provide the Applicant with an accounting of all
expenditures upon completion of the Review.
10-201.6 Appeals
Administrative appeal $100.00
Variance appeal $100.00
Filling, earth-moving, and storage of material of more than one hundred (100) cubic yards $10.00
10-201.7 Reserved
10-201.8 Individual Lot Phosphorus Management Permit
Individual lot phosphorus management permit $25.00
10-201.9 Other Permits and Approvals |
Expansion/Change of nonconforming use/Structure $50.00
Other Planning Board permits $25.00
$25.00
$25.00
Temporary vendor permit $25.00
Mobile vendor permit $25.00
Driveway entrance permit $25.00
Demolition permit $25.00
AMENDED: August 23, 2021
AMENDED: August 5, 2023
108
Chapter 11
~47-101 Temporary, Mobile Vendor Permits
11-101.1 Purpose
The purposes of this chapter are:
A. To provide municipal review of temporary, mobile vendors that may wish to operate in the town from mobile
stands, vehicles, wagons, or similar facilities and that would not otherwise be subject to Chapter 6, Site Plan
Review.
B. To promote and protect the health, welfare, and safety of the residents of the Town of Greene and people
using highways within the town of Greene.
11-101.2 Applicability
A. All temporary, mobile vendors shall obtain a permit from the Code Enforcement Officer prior to opening for or
conducting businesses in the town of Greene.
B. A Permit is not required for Vendors who are owned and operated by Not-for-Profit, educational, charitable,
or community service entities located in the town of Greene or towns in the surrounding area including public
schools, clubs, and associations.
11-102 Administration
11-102.1 Code Enforcement Officer
A. The Code Enforcement Officer shall review and approve, approve with conditions or deny all applications for
a Temporary, Mobile Vendor Permit.
| B. The Code Enforcement Officer shail utilize the following procedures for review of the permit.
1. The applicant shall submit two (2) copies of an Application on the forms provided. Upon receiving the
application, the Code Enforcement Officer may issue the permit, deny the permit, or issue the permit with
conditions based on the criteria set forth following.
[f an application is denied, the Code Enforcement Officer shall make a written finding, a copy of which shall
be given to the applicant.
11-202 Application Requirements
The written application shall contain the following information:
1. Name
2. Permanent Address
3. Temporary Address, if applicable
4. Permanent Phone
5. Temporary Phone number, if applicable
6. State Tax Identification Number, if applicable
7. Types of services (s) or commodities to be offered for sale
8. Location of Operation
9. Acomplete description of vehicles, stands, carts, wagons, or other facilities to be used and/or parked on
site.
10. Method to dispose of solid and/or liquid wastes including provisions for personal sanitation.
11. A sketch of the setup, including parking for customers.
109
11-203 Standards
A. The vending operation, including any personal vehicles, shall not create a safety hazard for traffic or
pedestrians in parking areas where such vendors may set up.
B. The vending operation, including any personal vehicles, shall not create a traffic or pedestrian hazard along
public roads or private roads that are open to the public.
C. In determining whether a traffic or pedestrian hazard has been created, the Code Enforcement Officer shall
consider traffic and pedestrian patterns, ability of customers to pull their vehicles completely off of the road,
ability of customers to fully enter parking areas so as not to block other vehicles wishing to stop from
completely pulling off of the road, and encroachment on sidewalks, road shoulders and bicycle lanes.
D. The vending operation shall have adequate provisions for personal sanitary facilities so as not to create a
nuisance, create pollution, or create a health hazard for customers.
E. The vending operation shall provide for disposal of any liquid or sanitary waste or litter created at or by the
operation.
F. The vendor may be located on public land or private land upon which said vendor has written permission to
operate. The vendor shall not have any acquired interest in any private land upon which said vendor wishes
to operate. If located on public land, the vendor shall have the permission of the Greene Board of selectmen
either individually or as a general approval to allow vendors for a special event specified in section 11.101.2.
G. The vendor's products and equipment shall be completely removed and the site left substantially the same as
prior to the vending operation at the completion of the 120-day period.
11-204 Appeals
Any party aggrieved by the decision of the Code Enforcement Officer may apply to the Planning Board for a permit:
may request a review of a permit issued by the Code Enforcement Officer if the aggrieved party requests to be placeu
on the Planning Board agenda within 30 days of the Code Enforcement Officer's decision. Further appeal will be in
accordance with Chapter 6 of this ordinance.
110
Chapter 12
12-101 Definitions
2-101.1 Construction of Language
In this Ordinance, certain words shall be interpreted as follows: The word "person" includes a firm, association,
organization, partnership, trust, company or corporation, as well as an individual; the present tense includes the future
tense the singular number includes the plural, and the plural includes the singular; the word "shall" is mandatory, and
the word "may" is permissive; the word "used" or "occupied" includes the words "intended," "designed," or "arranged to
be used or occupied," the word "building" includes the word "structure, and the word "dwelling" includes the word
"residence," the word "lot" includes "plot" or "Parcel." In the case of any difference of meaning or implication between
the text of this Ordinance and any map or illustration, the text shall control.
Terms not defined shall have the customary dictionary meaning.
12-101.2 Definitions
In this Ordinance, the following terms shall have the following meanings unless a contrary meaning is required by the
context or is specifically prescribed.
ABUTTER- The owner(s) of property sharing a common boundary with a given piece of property, whether or not these
properties are separated by a public or private street or right of way, The owners of property shall be considered to be the
parties listed by the Tax Assessor of Greene as the ones against whom taxes are assessed.
ACCESSORY DWELLING UNIT -- A separate, secondary dwelling unit located on a property with a single-family dwelling.
ACCESSORY STRUCTURE OR USE- A separate use or structure which is customarily both incidental and subordinate to
the principal structure and is on the same lot only. The term "incidental" in reference to the principal structure shall mean
both a) subordinate and minor in significance to the principal structure, and b) attendant to the principal structure. Such
- recessory structures, when aggregated shall not subordinate the alleged principal use of the lot. Accessory structures shall
~ ot exceed one hundred (100) square feet in floor area.
For the purpose of this definition, an addition to or extension of an existing principal structure such as a deck or garage
where the addition is attached to the principal structure by a common wall and roof is considered a part of the principal
structure.
ADULT BOOK, VIDEO AND/OR ENTERTAINMENT STORE- An establishment having as a substantial or significant portion
of it stock in trade in sexual devices, printed or video material including, but not limited to, magazines, books, pictures,
photographs, videos, computer video or connection, or films for sale or viewing on premises that are distinguished or
characterized by their emphasis on matter depicting, describing or relating to sexual activities or anatomical areas, or an
establishment with a segment or section devoted to the sale or display of such material, or an establishment that holds itself
out to the public as a purveyor of such materials based upon its signage, advertising, displays, actual sales, presence of
video preview or coin-operated booths, the exclusion of minors from the establishment's premises, or any other factors
showing that the establishment's primary purpose is to purvey such material.
ADULT ENTERTAINMENT FACILITY- An establishment devoted to adult entertainment, either with or without a liquor
license, presenting material, either live or via film, video, computer, or other media, and distinguished or characterized by
an emphasis on matter depicting, describing, or relating to sexual activities or anatomical genital areas or featuring topless
dancers, strippers, male or female impersonators, or similar entertainers for observation by patrons. Entertainers shall
include employees, contracted firms offering such entertainers, and patrons who may beencouraged to perform ina
sexually explicit manner or display anatomical areas.
AGRICULTURE- The production, keeping or maintenance for sale or lease, of plants and/or animals, including but not
limited to: forages and sod crops; grains and seed crops; dairy animals and dairy products; livestock; fruits and
vegetables; and ornamental and green house products. Agriculture does not include confined feeding operations, forest
management and timber harvesting activities.
ss AGRICULTURAL RELATED SALES AND SERVICES- The use of buildings or land for sale of equipment, products, or
services to those primarily engaged in agricultural and forestry activities.
111
AGGRIEVED PARTY- An owner of land whose property is directly or indirectly affected by the granting or denial of an
approval, permit, or variance under this Ordinance; a person whose land abuts land for which an approval, permit or variance
has been granted; or any other person or group of persons who have suffered particularized injury as a result of the granting
or denial of such approval, permit or variance. ,
ALTERATION- Any change or modification in construction, (normal maintenance of buildings or property shall not be
misconstrued as an alteration) or change in the structural members of a building or structure such as bearing walls,
columns, beams, or girders, or in the use of a building. The term shall also include change, modification, or addition
of a deck, dormer, or roof of a building.
AQUICULTURE- The growing or propagation of harvestable freshwater, plant, or animal species.
AUTOMOBILE GRAVEYARD- A yard, field or other area used as a place of storage, other than temporary storage of
up to one hundred twenty (120) days by an establishment or place of business which is engaged primarily in doing
auto body repair work for the purpose of making repairs to render a motor vehicle serviceable for three (3) or more
unserviceable, discarded, worn out or junked motor vehicles as defined in Title 29, section 1, subsection 7, or parts
thereof.
BACKLOT- Any lot or parce! of land that does not have frontage on a public street or privately- owned street
meeting the standards contained in Chapter 5, Street Construction Standards.
BASAL AREA- The area of cross section of a tree stem at 4 1/2 feet above ground level inclusive of bark.
BASEMENT- Any portion of a building with a floor to ceiling height of six (6) feet or more and having more than 50%
of its volume below the existing ground level.
BUILDING PERMIT- The official written document to be displayed at the construction site that grants the authorization
for the construction. This document is issued by the Building Inspector.
CAMPGROUND- Any area or tract of land to accommodate two (2) or more parties in temporary living quarters
including, but not limited to tents, recreational vehicles, or other shelters.
CANOPY - The more-or-less continuous cover formed by tree crowns in a wooded area.
CHANGE OF USE- Any action which alters an existing or proposed use of a property to any other use. The change
will be in the actual function or type of business occurring or proposed for the property and shail not be limited to the
categories of uses as set forth in Chapter 3. Multiple uses may exist on any property provided that a Change of Use
has been granted for each use. This includes the rental or leasing of any portion of a parcel with an approved use for
any other additional use(s).
CHILD CARE HOME- A child boarding home, summer camp, foster family home or other place providing domiciliary
arrangements for compensation of less than three children, unrelated to the operator by blood, marriage, or adoption,
under eighteen years of age.
COLLECTOR STREET- A Collector Street shall be those streets and roads classified by the Maine Department of
Transportation as either Major or Minor Collectors according to the Federal Functional Classification System.
COMMERCIAL COMMUNICATION TOWER- Any structure, antenna, tower, or other device which provides
radio/television transmission, commercial mobile wireless services, unlicensed wireless service, cellular phone
service, specialized mobile radio communications (SMR) common carrier wireless exchange phone service,
specialized mobile radio communication (SMR), common carrier wireless exchange access service, and personal
communications service (PCS) or pager service.
COMMERCIAL RECREATION- Any commercial enterprise that receives a fee in return for some recreational activity.
COMMERCIAL USE- The use of lands, buildings, or structures, other than a "home occupation" as defined below, the
intent and result of which activity is the production of income from the buying and selling of goods and/or
services, exclusive of rental residential buildings and/or dwelling units. :
COMMON DRIVEWAY A vehicular access-way serving two (2) single-family dwellings that provides access to a street.
112
CONFINED FEEDING OPERATIONS- Specialized livestock production enterprises with confined beef cattle and hog
feeding and poultry and egg farms and accessory structures. These operations have large animal populations
restricted to small areas.
CONFORMING USE- A use of buildings, structures or land which complies with all applicable provisions of this
Ordinance.
CONGREGATE HOUSING- Residential housing consisting of private apartments and central dining facilities and
within which a congregate housing supportive services program serves functionally impaired elderly or disabled
occupants; the individuals are unable to live independently yet do not require the constant supervision or intensive
health care available at intermediate care or skilled nursing facilities. Congregate housing shall include only those
facilities which have been certified by the State of Maine as meeting all certification standards and guidelines for
congregate housing facilities as promulgated by the Department of Human Services pursuant to the provisions of
Maine State Statutes.
CONSTRUCTION- Includes building, erecting, altering, reconstructing, moving upon or any physical operations on
the premises which are required for construction. Excavating, fill, drainage, and the like, shall be considered a part of
construction.
CORNER LOT- Any lot bordered by two (2) intersecting streets.
DAYCARE - Supervision of and care for children or physically or mentally disabled adults that is provided during the
day by a person or organization.
DIMENSIONAL REQUIREMENTS- Numerical standards relating to spatial relationships including but not limited to
setback, lot area, street frontage and height.
DIRECT WATERSHED OF A GREAT POND- Any land area that contributes stormwater runoff either by surface water
or subsurface flow to a great pond without such runoff traveling through another great pond
.~ MSABILITY- Any disability, infirmity, malformation, disfigurement, congenital defect, or mental condition caused by
'. sodily injury, accident, disease, birth defect, environmental conditions or illness; and also includes the physical or
mental condition of a person which constitutes a substantial handicap as determined by a psychologist as well as any
other health or sensory impairment which requires special education, vocational rehabilitation or related services.
DITCH- A natural or constructed waterway or outlet shaped or graded to form a parabolic cross section, for safe
conveyance of runoff.
DREDGING- The act of excavating or dredging material (natural or unnatural) from any navigable waters.
DRIVEWAY- A vehicular access-way serving one (1) lot that provides access to a street.
DUPLEX OR TWO-FAMILY DWELLING- A structure that provides living accommodations for two (2) families by having
separate entrances, kitchens, bedrooms, porches, living rooms, baths, with a full common wall or (floor/ceiling) between
the living units and a single foundation (or slab) for the structure.
DWELLING OR DWELLING UNIT- A room or group of rooms designed and equipped exclusively for use as permanent,
seasonal, or temporary living quarters for only one family at a time, and containing cooking, sleeping and toilet facilities.
The term shall include mobile homes and rental units that contain cooking, sleeping, and toilet facilities regardless of the
time period rented. Recreational vehicles are not residential dwelling units.
EARTH MOVING- The removal of earth from its original position.
ECHO UNIT- Elderly Cottage Housing Opportunity-A small residential living area (not more than 600 square feet of
floor area) contained in a structure placed or constructed to the side or rear of an existing single-family dwelling to be
occupied by one or two people who are (a) age is 62 or older or (b) disabled, who are related by birth, marriage, or
adoption to the occupants of one principal residence, and who benefit from living close to the family.
"~ELDERLY HOUSING COMPLEX- A dwelling complex that is occupied by a minimum of ten (10) persons 62 years of
age or older and/or handicapped persons as a residential living environment with other persons 62 years of age or
older and/or handicapped persons.
113
EMERGENCY OPERATIONS- Operations conducted for the public health, safety, or general welfare, such as
protection of resources from immediate destruction or loss, law enforcement, and operations to rescue human beings,
property, and livestock from the threat of destruction orinjury.
ESSENTIAL SERVICES- The construction, alteration, or maintenance of gas, electrical or communication facilities;
steam, fuel, electric power or water transmission or distribution lines, towers and related equipment; telephone cables
or lines, poles and related equipment; gas, oil, water slurry or similar pipelines; municipal sewage lines, collection or
supply systems; and associated storage tanks. Such systems may include towers, poles, wires, mains, drains, pipes,
conduits, cables, fire alarms and police call boxes, traffic signals, hydrants, and similar accessories, but shall not
include service drops or buildings which are necessary for the furnishing of such services.
EXPANSION OF A STRUCTURE- An increase in the footprint or height of a structure, including all extensions such
as, but not limited to: attached decks, garages, porches, and greenhouses
EXPANSION OF USE- The addition of one or more months to a use's operating season; or the use of more footprint
of a structure or ground area devoted to a particular use.
FAMILY- One or more persons occupying a dwelling unit and living as a single housekeeping unit, as distinguished
from a group occupying a boarding house, lodging house, motel, hotel, or other transient visitor quarters. A family
shall not exceed three persons not related by blood or marriage.
FILLING- Depositing or dumping any matter on or into the ground or water.
FLOOD PLAIN- The lands adjacent to a water body which have been or may be covered by a regional flood. These
areas are defined by the 100-year flood plain as designated on the Federal Emergency Management Agency's
(FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps.
FLOOR AREA- The sum of the horizontal areas of floor(s) of a structure enclosed by exterior walls. plus the horizontal
area of any unenclosed portions of a structure such as porches and decks.
FOOTPRINT- The entire area of ground covered by the structure(s) on a lot, including but not limited to cantileverea
or similar overhanging extensions, as well as unenclosed structures, such as patios or decks.
FORESTED WETLAND- A freshwater wetland dominated by woody vegetation is six (6) meters tall or taller.
FOUNDATION- The supporting substructure of a building or other structure including but not limited to basements,
slabs, sills, posts, or frost walls.
FRESHWATER WETLAND- Water Wetland- Means freshwater swamps, marshes, bogs, and similar areas which are:
a. Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to support, and
which under normal circumstances do support, a prevalence of wetland vegetation typically adapted for life in
saturated soils; and
b. Not considered part of great pond, river, stream, or brook.
These areas may contain small stream channels or inclusions of land that do not conform to the criteria.
FRESHWATER WETLAND (Shoreland Zone)- Freshwater swamps, marshes, bogs, and similar areas, other than
forested wetlands which are:
a. of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a surface water body,
excluding any river, stream, or brook such that in a natural state, the combined surface area is in excess of
10 acres; and
b. inundated or saturated by surface or ground water at a frequency and for a duration sufficient to support, and
which under normal circumstances do support, a prevalence of wetland vegetation typically adapted for life in
saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the criteria of
this definition.
114
FUNCTIONALLY WATER DEPENDENT USES- Those uses that require, for their primary purpose, location on submerged
lands or that require direct access to, or location in, coastal or inland waters and that cannot be located away from these
waters. The uses include, but are not limited to, commercial and recreational fishing and boating facilities, finfish and
- shellfish processing, fish-related storage and retail and wholesale fish marketing facilities, waterfront dock and port facilities,
hipyards and boat building facilities, marinas, navigation aids, basins and channels, shoreline structures necessary for
erosion control purposes, industrial uses dependent upon water-borne transportation or requiring large volumes of cooling
or processing water that cannot reasonably be located or operated at an inland site, and uses that primarily provide general
public access to coastal or inland waters. Recreational boat storage buildings are not considered to be a functionally water-
dependent use.
GRADE- In relation to buildings, it is the average of the finished ground level at the center of each wall of a building.
GREAT POND- Any inland body of water which in a natural state has a surface area in excess of ten acres, and any inland
body of water artificially formed or increased which has a surface area in excess of thirty (30) acres except for the purposes
of this Ordinance, where the artificially formed or increased inland body of water is completely surrounded by land held by
a single owner.
GREAT POND CLASSIFIED GPA- Any great pond classified GPA, pursuant to Title 38, M.R.S.A. Article 4-A.
GROUND COVER- Small plants, fallen leaves, needles and twigs, and the partially decayed organic matter of the forest
floor.
HAZARD TREE- A tree with a structural defect, combination of defects, or disease resulting in a structural defect that under
the normal range of environmental conditions at the site exhibits a high probability of failure and loss of a major structural
component of the tree in a manner that will strike a target. A normal range of environmental conditions does not include
meteorological anomalies, such as, but not limited to hurricanes; hurricane-force winds; tornados; microbursts; or significant
ice storm events. Hazard trees also include those trees that pose a serious and imminent risk to bank stability. A target is
the area where personal injury or property damage could occur if the tree or a portion of the tree fails. Targets include roads,
driveways, parking areas, structures, campsites, and any other developed area where people frequently gather and linger.
. dEIGHT OF A STRUCTURE- The vertical distance between the grade at the downhill side of the structure and the highest
'_ yoint of the structure. excluding chimneys, steeples, antennas, and similar appurtenances which have no floor area.
HOME OCCUPATION- An occupation conducted entirely within a dwelling or accessory structure by a member or members
of the immediate family residing thereon which is clearly incidental to the residential use.
IMPERVIOUS SURFACE- Roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt.
Paving, gravel, packed earthen materials, and macadam or other surfaces which similarly impeded the natural infiltration of
stormwater.
INCREASE IN NONCONFORMITY OF A STRUCTURE- Any change in a structure or property which causes further
deviation from the dimensional standard(s) creating the nonconformity. Property changes or structure expansions which
either meet the dimensional standard or which cause no further increase in the linear extent of the nonconformance of the
existing structure shall not be considered to increase the nonconformity. For example, there is no increase in nonconformity
if the expansion extends no further into the required setback area than does any portion of the existing nonconforming
structure.
INDIVIDUAL PRIVATE CAMPSITE- An area of land which is not associated with a campground, but which is developed for
repeated camping by only one group not to exceed ten (10) individuals
and which involves site improvements which may include but not be limited to a gravel pad, parking area, fireplace, or tent
platform.
INDUSTRIAL- The assembling, fabrication, finishing, manufacturing, packaging, or processing of goods, or the extraction
of minerals.
INDUSTRIAL PARK-
_ 'SUNKYARD-A yard, field, or other area used as a place of storage for:
» a. Automobile graveyards (as defined by M.R.S.A. Title 30-A, Sections 3751-3760).
b. Discarded, worn out or junked plumbing, heating supplies, household appliances and furniture.
c. Discarded scrap and junked lumber.
115
d. Old or scrap copper, brass, rope, rags, batteries, paper trash, rubber or plastic debris, waste and all scrap iron,
steel, and other scrap ferrous or non-ferrous material, and;
e. Garbage dumps, waste dumps, and sanitary fills.
LAGOON- An artificial enlargement of a water body, primarily by means of dredging and excavation.
LOT- An area of land in one ownership, or leasehold, with ascertainable boundaries established by deed or instrument of
record, or a segment of land ownership defined by lot boundary lines on a land subdivision plan duly approved by the
Planning Board and recorded in the County Registry of Deeds. See also: TRACT
LOT AREA- The area of land enclosed within the boundary lines of a lot, not including area of a great pond.
LOT COVERAGE- The percentage of the lot covered by ail buildings.
LOT, MINIMUM AREA- The required lot area for a single use.
LPI- Licensed Plumbing Inspector
M.R.S.A.- Maine Revised Statutes Annotated
MARINA- A business establishment having frontage on navigable water and, as its principal use, providing for hire moorings
or docking facilities for boats, and which may also provide accessory services such as boat and related sales, boat repair
and construction, indoor and outdoor storage of boats and equipment, boat and tackle shops, and boat fuel service facilities.
MARKET VALUE- The estimated price a property will bring in the open market and under prevailing market conditions in a
sale between a willing seller and a willing buyer, both conversant with the property and with prevailing general price levels.
MINERAL EXPLORATION- Hand sampling, test boring, or other methods of determining the nature or extent of mineral
resources which create minimal disturbance to the land, and which include reasonable measures to restore the land to Its
original condition.
MINERAL EXTRACTION- Any operation within any twelve (12) month period which removes more than one hundred (100)
cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from its natural location, and to transport
the product removed, away from the extraction site.
MINOR STREET-A street servicing less than nineteen (19) lots or dwelling units.
MOBILE HOME- A structure designed as a dwelling unit for location on a permanent foundation, and containing sleeping
accommodations, a toilet, a tub or shower bath, and kitchen facilities, including major appliances and furniture, with plumbing
and electrical connections provided for attachment to outside systems; and designed to be transported after fabrication on
its own wheels.
MOBILE HOME PARK- A parcel of land under unified ownership approved by the municipality for the placement of three
(3) or more manufactured homes. (As contained in State Law.)
MOBILE HOME PARK LOT- The area of land on which an individual home is situated within a mobile home park, and which
is reserved for the use of the occupants of that home.
MULTI-FAMILY RESIDENTIAL- A residential structure containing three (3) or more residential dwelling units.
NATIVE- Indigenous to the local forests.
NATURAL RESOURCE BASED PROCESSING/MANUFACTURING- The processing and manufacturing of products
primarily from raw natural resources, such activities include but are not limited to sawmills, vegetable and fruit packing and
processing, and dairy product processing.
NEIGHBORHOOD COMMERCIAL- Commercial use with less than 1,500 square feet of floor area intended to serve the
convenience of primarily residential neighborhoods. 7
NONCONFORMING CONDITION- Nonconforming lot, structure or use which is allowed solely because it was in lawful
existence at the time this Ordinance or subsequent amendment took effect.
116
NONCONFORMING LOT- A single lot of record which at the effective date of adoption or amendment of this Ordinance,
does not meet the area, frontage, width, or spatial requirements Ordinance.
| ONCONFORMING RIGHT OF WAY-A right-of way, other than those on which a public way maintained by the Town of
Greene or the State of Maine is located or a private way shown on a recorded plan and approved by the Planning Board,
that is less than sixty (60) feet in width.
NONCONFORMING STREET -A vehicular way other than those maintained by the Town of Greene or the State of Maine,
not meeting the standards of Chapter 5, Street Construction Standards.
NONCONFORMING STRUCTURE- A structure which does not meet any one or more of the following dimensional
requirements: setback, height, or lot coverage, but which is allowed solely because it was in lawful existence at the time
this Ordinance or subsequent amendments took effect.
NONCONFORMING USE- Use of buildings, structures, premises, land, or part thereof which is not permitted in the district
in which it is situated, but which is allowed to remain solely because it was in lawful existence at the time this Ordinance or
subsequent amendments took effect.
NON-NATIVE INVASIVE SPECIES OF VEGETATION- Species of vegetation listed by the Maine Department of Agriculture,
Conservation and Forestry as being invasive in Maine ecosystems and not native to Maine ecosystems.
NORMAL HIGHWATER LINE- That line, which is apparent from visible markings, changes in thecharacter of soils
due to prolonged action of the water or changes in vegetation, and which distinguishes between predominantly
aquatic and predominantly terrestrial land. Areas contiguous with rivers and great ponds that support non-forested
wetland vegetation and hydricsoils and that are at the same or lower elevation as the water level of the river or great
pond during the period of normal high-water are considered part of the river or great pond
NUISANCE- |
é a. Athing or condition causing danger or annoyance either to a limited number of persons or to the general public
: or, because of its attraction, to children who will be unlikely to recognize its dangerous quality.
b. Any property or use existing in violation of this Ordinance.
OUTLET STREAM- Any perennial or intermittent stream, as shown on the most recent highest resolution version of
the national hydrography dataset available from the United States Geological Survey on the website of the United
States Geological Survey or the national map, that flows from a freshwater wetland.
PARCEL -- See TRACT
PERSON- An individual, corporation, governmental agency, municipality, trust, estate, partnership, association, two
or more individuals having joint or common interest, or other legal entity.
PIERS, DOCK, WHARFS, BRIDGES, AND STRUCTURES- Any uses extending over or beyond the normal high-
water line or within a wetland:
a. Temporary: Structures which remain in or over the water for less than seven (7) months in any period of twelve
(12) consecutive months.
b. Permanent: Structures which remain in or over the water for seven (7) months or more in any period of twelve
(12) consecutive months.
PRINCIPAL STRUCTURE- A structure other than one which is used for purposes wholly incidental or accessory to
the use of another structure or use on the same lot.
PRINCIPAL USE- A use other than one which is wholly incidental or accessory to another use on the same lot.
PRIVATELY OWNED STREET- A street which is not intended to be dedicated as a town way.
~-UBLIC FACILITY- Any facility, including, but not limited to, buildings, property, recreation areas, and streets,
easements, or rights-of-ways, which are owned, leased, or otherwise operated, or funded by a governmental body or
public entity.
117
PUBLIC UTILITY- Any person, firm, corporation, municipal department, board of commission authorized to furnish
gas, steam, electricity, waste disposal, communication facilities, transportation, or water to the public.
PUBLIC WAY- An area or strip of land designated and held by the municipality or the State of Maine for the passa,
and use of the general public by motor vehicle.
OUTLET STREAM- Any perennial or intermittent stream, as shown on the most recent highest resolution version of
the national hydrography dataset available from the United States Geological Survey on the website of the United
States Geological Survey or the national map, that flows from a freshwater wetland.
RECREATIONAL VEHICLE- A vehicle or an attachment to a vehicle designed to be towed and designed for temporary
sleeping or living quarters for one or more persons, and which may include a pick-up camper, travel trailer, tent trailer,
camp trailer, and motor home. In order to be considered as a vehicle and not as a structure, the unit must remain with
its tires on the ground and must be registered with a State Division of Motor Vehicles.
RENOVATION- Any improvement to the exterior that requires an electrical or plumbing permit and that is not an
alteration, new construction, or enlargement.
REPLACEMENT SEPTIC SYSTEM- A system intended to replace an existing system which is either malfunctioning
or being upgraded with no significant change of design flow or use of the structure.
RESUMPTION OF USE- The reestablishment of the former use or activity.
RIGHT-OF-WAY (R.O.W.)- A strip of land acquired by fee simple, reservation, dedication, prescription, orcondemnation.
The land reserved for the passage over land of another. The total width of the land area within which a public or private
street is located or to be located.
NOTE: For the purpose of establishing building and other improvement setbacks, setback distances shall be measured
from the outer most right-of-way limit, NOT the edge of traveled way or pavement.
RIVER- A free-flowing body of water including its associated flood plain wetlands from that point at which it provide.
drainage for a watershed of twenty-five (25) square miles to its mouth.
ROAD- See STREET
SAPLING- A tree species that is less than two (2) inches in diameter at four and one half (4.5) feet above ground
level.
SEEDLING- A young tree species that is less than four and one half (4.5) feet in height above ground level.
SECONDARY STRUCTURE- Any structure of over one hundred (100) square feet in floor area which exists or is to
be constructed or placed on a lot and whose use is secondary to that of the principal structure on the same lot. This
includes, but is not limited to, items such as truck trailers or bodies used for storage purposes.
SERVICE DROP- Any utility line extension which does not cross or run beneath any portion of a water body provided
that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon the premises of the
customer requesting service or upon a roadway right- of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. inthe case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to existing utility
poles, or
b. the extension requiring the installation of new utility poles or placement underground is less than one
thousand (1,000) feet in length.
SERVICES- Uses that provide a service rather than a product including banking, insurance, real estate, hote
personal services, business services and, health services
SETBACK- The minimum horizontal distance from a lot line, right of way or normal high-water line of a water body,
118
tributary stream, or upland edge of a wetland to the nearest part of a structure.
- SHORE FRONTAGE- The length of a lot bordering on a water body or wetland measured in a straight line between
..the intersections of the lot lines with the shoreline.
SHORELAND ZONE- The land area located within two-hundred fifty (250) feet, horizontal distance of the normal high
water line of any great pond or river; within two-hundred fifty (250) feet horizontal distance of the upland edge of a
freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream.
SIGN- Any device, fixture, placard, or structure that uses color, form, graphic, illumination, symbol, or writing to
advertise, announce the purpose of, or identify the purpose of a person or entity, or to communicate information of
any kind to the public.
SIGNIFICANT VIEW LOCATION- Points where scenic views can be accessed as identified in the Greene
Comprehensive Plan. -
SINGLE-FAMILY DWELLING- A structure containing only one (1) dwelling unit for occupation by not more than one
family.
STORAGE OF MINERALS- The stock piling of topsoil, loam, rock, sand, gravel, or other similar materials on a site to
be moved to another location at a future date.
STORM DAMAGED TREE- A tree that has been uprooted, blown down, is lying on the ground, or that remains
standing and is damaged beyond the point of recovery as the result of a storm event.
STREAM (Shoreland Zone)- A free-flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted on the most recent, highest resolution version of the national hydrography dataset
available from the United States Geological Survey on the website of the United States Geological Survey or the
national map to the point where the stream becomes a river or where the stream meets the shoreland zone of another
water body or wetland. When a stream meets the shoreland zone of a water body or wetland and a channel forms
. townstream of the water body or wetland as an outlet, that channel is also a stream.
STREAM, RIVER, or BROOK- A channel between defined banks. A channel is created by the action of surface water
and has two (2) or more of the following characteristics:
A. It is depicted as a solid or broken blue line on the most recent edition of the U.S. Geological Survey 7.5-minute
series topography map or if that is not available, a 15-minute series topography map.
B. It contains or is known to contain flowing water continuously for a period of at least three (3) months of the
year in most years.
C. The channel bed is primarily composed of material such as sand and gravel, parent material, or bedrock that
has been deposited or scoured by water.
D. The channel contains aquatic animals such as fish, aquatic insects, or mollusks in the water or, if no surface
water is present, in the stream bed.
E. The channel bed contains aquatic vegetation and is essentially devoid of upland vegetation.
River, stream, or brook does not mean a ditch or other drainage way constructed and maintained solely for the purpose
of draining storm water or a grassy swale.
STREET- A vehicular public way maintained by the Town of Greene or the State of Maine, a private vehicular way
shown on a recorded plan and approved by the Planning Board or a vehicular way meeting the standards of Chapter
5 Street Construction Standards. The term street does not include driveways, common driveways, farm
roads or logging roads.
STREET NEW CONSTRUCTION- See Chapter 5.102-12.
STREET RECONDITIONING- The replacement of the wearing surface or the overlying of a new wearing surface over
the existing surface. Street reconditioning may include the placement of new base material and shoulder grading.
Street reconditioning shall not include the placement of new sub-base material on 50% or more of the project length.
~.a TREET RECONSTRUCTION- The rebuilding, including new sub-base on 50% and more of the project length,
pavement, shoulders, and ditches, of a street or section of a street.
119
STRUCTURE- Anything temporarily or permanently located, built, constructed, or erected for the support, shelter or
enclosure of persons, animals, goods or property of any kind or anything constructed or erected on or in the ground.
The term includes structures temporarily or permanently located, such as decks, patios, and satellite dishes. Structure
does not include fences; poles and wiring and other aerial equipment normally associated with service drops, includir
guy wires and guy anchors; subsurface wastewater disposal systems as defined in Title 30-A, section 42U -
subsection 5; geothermal heat exchange wells as defined in Title 32, section 4700-E, subsection 3-C; or wells or water
wells as defined in Title 32, section 4700-E, subsection 8.
SUBDIVISION- The division of a tract or parcel of land into three or more lots as defined by State law and in addition
shall include developments where there are three or more units involved such as mobile home parks, multiple family
housing, apartment houses, multiple housing units, mini malls, shopping plazas, business complexes, condominiums,
shopping centers and industrial parks.
SUBDIVISION, MAJOR- Any subdivision containing more than five (5) lots or dwelling units, or units in a shopping
center or similar commercial establishment or any subdivision containing a proposed street.
SUBDIVISION, MINOR- Any subdivision containing not more than five (5) lots or dwelling units, and in which no street
is proposed to be constructed or units in a shopping center or similar commercial establishment.
SUSTAINED SLOPE- A change in elevation where the referenced percent grade is substantially maintained or
exceeded throughout the measured area.
SUBSTANTIAL COMPLETION- The progression of work to the point where the structure or improvement is habitable
or usable for the purpose(s) intended without presenting a health or safety hazard to the occupants, users, employees,
or customers and without creating a potential environmental problem due to erosion control, stormwater management,
or wastewater disposal as determined by the Building Inspector/Code Enforcement Officer. It shall include, but not
necessarily be limited to adequate plumbing, an electrical system in accordance with the State Electrical Code,
completed but not necessarily painted, interior partitions of main rooms, windows, exterior doors, final roofing, and
permanent site work and vegetation or other means to control erosion and manage stormwater.
SUBSTANTIAL ENLARGEMENT- The expansion of the land area of the development site or the expansion of t
floor area of any structure by either five hundred (500) square feet or twenty-five (25) percent in area (whichever .
less provided such expansion involves at least two hundred fifty (250) square feet) within any five (5) year period.
SUBSTANTIAL START- Completion of thirty (30) percent of a permitted structure or use measured as a percentage
of estimated total cost.
SUBSURFACE SEWAGE DISPOSAL SYSTEM- Any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered cesspools;
holding tanks; pretreatment filter, piping, or any other fixture, mechanism, or apparatus used for those purposes; does
not include any discharge system licensed under 38 M.R.S.A. section 414, any surface waste water disposal system,
or any municipal or quasi-municipal sewer or waste water treatment system.
SWIMMING POOL- A permanent outdoor man-made receptacle or excavation designed to hold water to a depth of
at least twenty-four (24) inches, primarily for swimming or bathing, whether in the ground or above the ground. A
swimming pool over one hundred (100) square feet is considered to be a structure.
TEMPORARY, MOBILE VENDOR- A seller of goods or services at a location or locations in the town of Greene
whose primary facility is not permanently affixed to the earth such as, but not limited to, a motor vehicle, cart, wagon,
tent, or stand for a period not to exceed 120 days from the date of issuance of the permit. Said vendor may be located
on public land or private land upon which said vendor has written permission to operate. The vendor shall not have
any acquired interest in any private land upon which said vendor wishes to operate.
TIMBER HARVESTING- The cutting and removal of timber for the primary purpose of selling or processing forest
products. "Timber harvesting" does not include the cutting or removal of vegetation within the shoreland zone when
associated with any other land use activities. The cutting or removal of trees in the shoreland zone on a lot that has
less than two (2) acres within the shoreland zone shall not be considered timber harvesting.
TRACT (or PARCEL) of LAND- All contiguous land in the same ownership, whether or not the land is separated at
any point by an intermittent or non-navigable stream provided that lands on the opposite sides of a public or private
road are considered each a separate tract or parcel of land unless the road was established by the owner of land on
120
feet above the ground, with a more or less definite crown, and reaching a height of at least ten (10) feet at maturity.
TRIBUTARY STREAM- Means a channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing waterborne
deposits or exposed soil, parent material or bedrock; and which is connected hydrologically with other water bodies.
"Tributary stream" does not include rills or gullies forming because of accelerated erosion in disturbed soils where the
natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only applies to that
portion of the tributary stream located within the shoreland zone of the receiving water body or wetland.
UPLAND EDGE OF A WETLAND- The boundary between upland and wetland. For purposes of a coastal wetland,
this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or the highest annual tide
level, including all areas affected by tidal action. For purposes of a freshwater wetland, the upland edge is formed
where the soils are not saturated for a duration sufficient to support wetland vegetation; or where the soils support the
growth of wetland vegetation, but such vegetation is dominated by woody stems that are six (6) meters (approximately
twenty (20) feet) tall or taller.
USE- The purpose for which land or a structure is arranged, designed, or intended, or for which land or a structure is
or may be occupied.
USE PERMIT- Is a written document issued by the Code Enforcement Officer and/or Planning Board that provides
evidence the property use applied for has been found acceptable (possibly with conditions and/or restrictions) and is
authorized for that purpose.
VARIANCE- A relaxation of the terms of this Ordinance where such variance is specifically authorized under Chapter
8.
VEGETATION- All live trees, shrubs, and other plants, including without limitations, trees, both over and under four
(4") inches in diameter, measured four and one half (4.5) feet above ground level.
| VERNAL POOLS-
VOLUME OF A STUCTURE- The volume of all portions of a structure enclosed by roof and fixed exterior walls as
measured from the exterior faces of these walls and roof.
WAREHOUSING- A structure used primarily for the storage of goods and materials.
WETLAND- See FRESHWATER WETLAND
WATER BODY- Any great pond, river, or stream.
WATER CROSSING- Any project extending from one bank to the opposite bank of a river, stream, tributary stream,
or wetland whether under, through, or over the water or wetland. Such projects include, but may not be limited to,
roads, fords, bridges, culverts, water lines, sewer lines, and cables, as well as maintenance work on these crossings.
This definition includes crossings for timber harvesting equipment and related activities.
WOODY VEGETATION- Live trees or woody, non-herbaceous shrubs.
WRITTEN PETITION- A petition signed by at least ten (10) percent of the municipal voters in the last Gubernatorial
Election.
121
Town of Greene, Maine
Land Use Ordinance
AMENDED: March 8, 2003
REVISED: October 31, 2008
AMENDED: March 7, 2009
AMENDED: March 6, 2010
AMENDED: June 18, 2022
AMENDED: August 5, 2023
AMENDED: August 3, 2024
AMENDED: August 2, 2025
AMENDED: April 11, 2026
True and attested copy;
Carol Buzzell; Town Clerk
122