This is the exact embedded text of the captured official document.
Snapshot 71d8b829d510 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
1
ADOPTED JUNE 23, 2009
EFECTIVE DATE JULY 14, 2009__
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
2
TOWN OF HANOVER SHORELAND ZONING ORDINANCES TABLE OF CONTENTS
Page
1. Purposes................................................ 5
2. Authority .............................................. 5
3. Applicability........................................... 5
4. Effective Date...........................................5
A. Effective Date of Ordinance and Ordinance
Amendments............................................5
B. Sections 15(O) and 15(O-1).........................5
5. Availability.............................................6
6. Severability............................................ 6
7. Conflicts with Other Ordinances..........................6
8. Amendments...............................................6
9. Districts and Zoning Map.................................6
A. Official Shoreland Zoning Map...................... 6
B. Scale of Map ...................................... 6
C. Certification of Official Shoreland Zoning .........6
D. Changes to the Official Shoreland Zoning Map .......6
10. Interpretation of District Boundaries...................7
11. Land Use Requirements ................................. 7
12. Non-conformance.........................................7
A. Purpose..............................................7
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
3
B. General............................................. 7
C. Non-conforming Structures ...........................7
D. Non-conforming Uses..................................10
E. Non-conforming Lots................................. 10
13. Establishment of Districts...............................11
A. Resource Protection District ........................11
B. Limited Residential District.........................12
C. Limited Commercial District ........................ 13
D. General Development I District ......................13
E. General Development II District......................13
F. Stream Protection District...........................13
14. Table of Land Uses.......................................14
15. Land Use Standards ......................................16
A. Minimum Lot Standards ..............................17
B. Principal and Accessory Structures..................17
C. Piers, Docks, Wharves, Bridges and Other Structures
and Uses Extending Over or Beyond the Normal High-
Water Line of a Water body or Within a Wetland...................19
D. Campgrounds..........................................20
E. Individual Private Campsites ........................21
F. Commercial and Industrial Uses........................21
G. Parking Areas.......................................22
H. Roads and Driveways ................................22
I. Signs...............................................24
J. Storm Water Runoff .................................24
K. Septic Waste Disposal ..........................................25
L. Essential Services .................................25
M. Mineral Exploration and Extraction..................25
N. Agriculture ......................................26
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
4
O. Timber Harvesting ................................27
O-1 Timber Harvesting - Statewide Standards..........29
P. Clearing or Removal of Vegetation for Activities
Other than Timber Harvesting .......................37
Q. Erosion and Sedimentation Control ................40
R. Soils ........................................... 41
T. Archaeological Site ..............................41
16. Administration.........................................41
A. Administering Bodies and Agents ................. 41
B. Permits Required................................. 41
C. Permit Application............................... 42
D. Procedure for Administering Permits ............. 42
E. Special Exceptions............................... 43
F. Expiration of Permit............................. 44
G. Installation of Public Utility Service .......... 44
H. Appeals ..........................................44
J. Enforcement...................................... 48
17. Definitions .......................................... 49
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
5
1. Purposes. The purposes of this Ordinance are to further the maintenance of
safe and healthful conditions; to prevent and control water pollution; to
protect fish spawning grounds, aquatic life, bird and other wildlife habitat;
to protect buildings and lands from flooding and accelerated erosion; to
protect archaeological and historic resources; to protect freshwater wetlands;
to control building sites, placement of structures and land uses; to conserve
shore cover, and visual as well as actual points of access to inland waters; to
conserve natural beauty and open space; and to anticipate and respond to the
impacts of development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the
provisions of Title 38 sections 435-449 of the Maine Revised Statutes Annotated
(M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within 250 feet,
horizontal distance, of the normal high-water line of any great pond or river,
or upland edge of a freshwater wetland, and all land areas within 75 feet,
horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock,
wharf or pier, or other structure extending or located below the normal high-
water line of a water body or within a wetland.
4. Effective Date __________________________
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance,
which was adopted by the municipal legislative body on ________________,
shall not be effective unless approved by the Commissioner of the
Department of Environmental Protection. A certified copy of
the Ordinance, or Ordinance Amendment, attested and signed by the
Municipal Clerk, shall be forwarded to the Commissioner for approval. If
the Commissioner fails to act on this Ordinance or Ordinance Amendment,
within forty-five (45) days of his/her receipt of the Ordinance, or
Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the
forty-five (45) day period shall be governed by the terms of this
Ordinance, or Ordinance Amendment, if the Ordinance, or Ordinance
Amendment, is approved by the Commissioner.
B. Sections 15(O) and 15(O-1). Section 15(O) is repealed on the statutory
date established under 38 M.R.S.A. section 438-B (5), at which time
Section 15(O-1) shall become effective. Until such time as Section 15(O)
is repealed, Section 15(O-1) is not in effect.
NOTE: The statutory date established under 38 M.R.S.A. section 438-B (5)
is the effective date of state-wide timber harvesting standards. That
date is "the first day of January of the 2nd year following the year in
which the Commissioner of Conservation determines that at
least 252 of the 336 municipalities identified by the Commissioner of
Conservation as the municipalities with the highest acreage of timber
harvesting activity on an annual basis for the period 1992-2003 have
either accepted the state-wide standards or have
adopted an ordinance identical to the state-wide standards." 38 M.R.S.A.
section 438-B (5) further provides that "the Commissioner of Conservation
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
6
shall notify the Secretary of State in writing and advise the Secretary
of the effective date of the state-wide standards."
5. Availability. A certified copy of this Ordinance shall be filed with the
Municipal Clerk and shall be accessible to any member of the public. Copies
shall be made available to the public at reasonable cost at the expense of the
person making the request. Notice of availability of this Ordinance shall be
posted.
6. Severability. Should any section or provision of this Ordinance be declared
by the courts to be invalid, such decision shall not invalidate any other
section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance
conflicts with or is inconsistent with another provision of this Ordinance or
of any other ordinance, regulation or statute administered by the municipality,
the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the
legislative body. Copies of amendments, attested and signed by the Municipal
Clerk, shall be submitted to the Commissioner of the Department of
Environmental Protection following adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the
Commissioner fails to act on any amendment within forty-five (45) days of
his/her receipt of the amendment, the amendment is automatically approved. Any
application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such
amendment is approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is
applicable are hereby divided into the following districts as shown on
the Official Shoreland Zoning Map(s) which is (are) made a part of this
Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Limited Commercial
(4) General Development I
(5) Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a
scale of not less than: 1 inch = 2000 feet. District boundaries shall be
clearly delineated and a legend indicating the symbols for each district
shall be placed on the map.
NOTE: Because of map scale or other reason, a municipality may have a
series of maps depicting its shoreland zone.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland
Zoning Map shall be certified by the attested signature of the Municipal
Clerk and shall be located in the municipal office. In the event the
municipality does not have a municipal office, the Municipal Clerk shall
be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in
accordance with Section 8, are made in the district boundaries or other
matter portrayed on the Official Shoreland Zoning Map, such changes shall
be made on the Official Shoreland Zoning Map within thirty (30) days after
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
7
the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the
Official Shoreland Zoning Map, district boundary lines are property lines, the
centerlines of streets, roads and rights of way, and the boundaries of the
shoreland area as defined herein. Where uncertainty exists as to the exact
location of district boundary lines, the Board of Appeals shall be the final
authority as to location.
NOTE: Municipalities are encouraged to incorporate specific written
descriptions of district boundaries into the Ordinance so that disputes
over district boundaries are minimized. The Maine Supreme Judicial Court
has held that the Official Shoreland Zoning Map is the primary tool to
which to refer in determining district boundaries under ordinances that
are not more explicit in their district descriptions than the language of
the Guidelines, and that where there is inconsistency between the Map and
these general text descriptions of the shoreland districts as provided in
the minimum guidelines, the Map prevails.
11. Land Use Requirements. Except as hereinafter specified, no building,
structure or land shall hereafter be used or occupied, and no building or
structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all
of the regulations herein specified for the district in which it is located,
unless a variance is granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use
conformities, except that nonconforming conditions that existed before the
effective date of this Ordinance or amendments thereto shall be allowed to
continue, subject to the requirements set forth in Section 12.Except as
otherwise provided in this Ordinance, a non-conforming condition shall not
be permitted to become more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and
uses may be transferred, and the new owner may continue the non-
conforming use or continue to use the non-conforming structure or
lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a
permit, the normal upkeep and maintenance of non-conforming uses
and structures including repairs or renovations that do not involve
expansion of the non-conforming use or structure, and such other
changes in a non-conforming use or structure as federal, state, or
local building and safety codes may require.
NOTE: See Section 17 for the definitions of non-conforming structures,
non-conforming uses and nonconforming lots.
C. Non-conforming Structures
(1) Expansions: A non-conforming structure may be added to or
expanded after obtaining a permit from the same permitting
authority as that for a new structure, if such addition or
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
8
expansion does not increase the non-conformity of the structure and
is in accordance with subparagraphs (a) and (b) below.
(a) After January 1, 1989 if any portion of a structure is
less than the required setback from the normal high-water
line of a water body or tributary stream or the upland edge
of a wetland, that portion of the structure shall not be
expanded, as measured in floor area or volume, by 30% or
more, during the lifetime of the structure. If a replacement
structure conforms with the requirements of Section 12(C)(3),
and is less than the required setback from a water body,
tributary stream or wetland, the replacement structure may
not be expanded if the original structure existing on
January 1, 1989 had been expanded by 30% in floor area and
volume since that date.
(b) Whenever a new, enlarged, or replacement foundation is
constructed under a nonconforming structure, the structure
and new foundation must be placed such that the setback
requirement is met to the greatest practical extent as
determined by the Planning Board or its designee, basing its
decision on the criteria specified in Section
12(C)(2)Relocation, below. If the completed foundation does
not extend beyond the exterior dimensions of the structure,
except for expansion in conformity with Section 12(C)(1)(a)
above, and the foundation does not cause the structure to be
elevated by more than three additional feet, as measured from
the uphill side of the structure (from original ground level
to the bottom of the first floor sill), it shall not be
considered to be an expansion of the structure.
(2) Relocation. A non-conforming structure may be relocated within
the boundaries of the parcel on which the structure is located
provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the
Planning Board or its designee, and provided that the applicant
demonstrates that the present subsurface sewage disposal system
meets the requirements of State law and the State of Maine
Subsurface Wastewater Disposal Rules (Rules), or that a new system
can be installed in compliance with the law and said Rules. In no
case shall a structure be relocated in a manner that causes the
structure to be more non-conforming. In determining whether the
building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size
of the lot, the slope of the land, the potential for soil erosion,
the location of other structures on the property and on adjacent
properties, the location of the septic system and other on-site
soils suitable for septic systems, and the type and amount of
vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or
wetland setback area in order to relocate a structure, the Planning
Board shall require replanting of native vegetation to compensate
for the destroyed vegetation. In addition, the area from which the
relocated structure was removed must be replanted with vegetation.
Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be
replanted with at least one native tree, three (3) feet in
height, for every tree removed. If more than five trees are
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
9
planted, no one species of tree shall make up more than 50%
of the number of trees planted. Replaced trees must be
planted no further from the water or wetland than the trees
that were removed. Other woody and herbaceous vegetation, and
ground cover, that are removed or destroyed in order to
relocate a structure must be re-established. An area at least
the same size as the area where vegetation and/or ground
cover was disturbed, damaged, or removed must be
reestablished within the setback area. The vegetation and/or
ground cover must consist of similar native vegetation and/or
ground cover that was disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel
the original location of the structure shall be replanted
with vegetation which may consist of grasses, shrubs, trees,
or a combination thereof.
(3) Reconstruction or Replacement. Any non-conforming structure
which is located less than the required setback from a water body,
tributary stream, or wetland and which is removed, or damaged or
destroyed, regardless of the cause, by more than 50% of the market
value of the structure before such damage, destruction or removal,
may be reconstructed or replaced provided that a permit is obtained
within eighteen (18) months of the date of said damage destruction,
or removal, and provided that such reconstruction or replacement is
in compliance with the water body, tributary stream or wetland
setback requirement to the greatest practical extent as determined
by the Planning Board or its designee in accordance with the
purposes of this Ordinance. In no case shall a structure be
reconstructed or replaced so as to increase its nonconformity.
If the reconstructed or replacement structure is less than the
required setback it shall not be any larger than the original
structure, except as allowed pursuant to Section 12(C)(1) above, as
determined by the non-conforming floor area and volume of the
reconstructed or replaced structure at its new location. If the
total amount of floor area and volume of the original structure can
be relocated or reconstructed beyond the required setback area, no
portion of the relocated or reconstructed structure shall be
replaced or constructed at less than the setback requirement for a
new structure. When it is necessary to remove vegetation in order
to replace or reconstruct a structure, vegetation shall be
replanted in accordance with Section 12(C)(2) above.
Any non-conforming structure which is located less than the
required setback from a water body, tributary stream, or wetland
and which is removed by 50% or less of the market value, or damaged
or destroyed by 50% or less of the market value of the structure,
excluding normal maintenance and repair, may be reconstructed in
place if a permit is obtained from the Code Enforcement Officer
within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement
meets the setback to the greatest practical extent the Planning
Board or its designee shall consider, in addition to the criteria
in Section 12(C)(2) above, the physical condition and type of
foundation present, if any.
(4) Change of Use of a Non-conforming Structure. The use of a non-
conforming structure may not be changed to another use unless the
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
10
Planning Board, after receiving a written application, determines
that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent
properties and resources than the existing use.
In determining that no greater adverse impact will occur, the
Planning Board shall require written documentation from the
applicant, regarding the probable effects on public health and
safety, erosion and sedimentation, water quality, fish and wildlife
habitat, vegetative cover, visual and actual points of public access
to waters, natural beauty, floodplain management, archaeological and
historic resources, and functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions: Expansions of non-conforming uses are prohibited,
except that non-conforming residential uses may, after obtaining a
permit from the Planning Board, be expanded within existing
residential structures or within expansions of such structures as
allowed in Section 12(C)(1)(a) above.
(2) Resumption Prohibited. A lot, building or structure in or on
which a non-conforming use is discontinued for a period exceeding
one year, or which is superseded by a conforming use, may not again
be devoted to a non-conforming use except that the Planning Board
may, for good cause shown by the applicant, grant up to a one year
extension to that time period. This provision shall not apply to
the resumption of a use of a residential structure provided that
the structure has been used or maintained for residential purposes
during the preceding five (5) year period.
(3) Change of Use. An existing non-conforming use may be changed
to another non-conforming use provided that the proposed use has no
greater adverse impact on the subject and adjacent properties and
resources than the former use, as determined by the Planning Board.
The determination of no greater adverse impact shall be made
according to criteria listed in Section 12(C)(4) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the
effective date of this Ordinance or amendment thereto may be built
upon, without the need for a variance, provided that such lot is in
separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except
lot area, lot width and shore frontage can be met. Variances
relating to setback or other requirements not involving lot area,
lot width or shore frontage shall be obtained by action of the
Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or
parcels are in a single or joint ownership of record at the time of
adoption of this Ordinance, if all or part of the lots do not meet
the dimensional requirements of this Ordinance, and if a principal
use or structure exists on each lot, the non-conforming lots may be
conveyed separately or together, provided that the State Minimum
Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the
State of Maine Subsurface Wastewater Disposal Rules are complied
with.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
11
If two or more principal uses or structures existed on a single lot
of record on the effective date of this ordinance, each may be sold
on a separate lot provided that the above referenced law and rules
are complied with. When such lots are divided each lot thus created
must be as conforming as possible to the dimensional requirements
of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more
contiguous lots or parcels are in single or joint ownership of
record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent
amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent
necessary to meet the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at
least one of which is nonconforming, owned by the same person or
persons on January 17, 1995 and recorded in the registry of deeds
if the lot is served by a public sewer or can accommodate a
subsurface sewage disposal system in conformance with the State of
Maine Subsurface Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and
at least 20,000 square feet of lot area; or
(b) Any lots that do not meet the frontage and lot size
requirements of Section 12(E)(3)(a) are reconfigured or
combined so that each new lot contains at least 100 feet of
shore frontage and 20,000 square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes
areas in which development would adversely affect water quality,
productive habitat, biological ecosystems, or scenic and natural values.
This district shall include the following areas when they occur within
the limits of the shoreland zone, exclusive of the Stream Protection
District, except that areas which are currently developed and areas which
meet the criteria for the Limited Commercial or General Development I
Districts need not be included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge
of freshwater wetlands and wetlands associated with great ponds and
rivers, which are rated "moderate" or "high" value waterfowl and
wading bird habitat, including nesting and feeding areas, by the
Maine Department of Inland Fisheries and Wildlife (MDIF&W) that are
depicted on a Geographic Information System (GIS) data layer
maintained by either MDIF&W or the Department as of May 1, 2006.
For the purposes of this paragraph "wetlands associated with great
ponds and rivers" shall mean areas characterized by non-forested
wetland vegetation and hydric soils that are contiguous with a
great pond or river, and have a surface elevation at or below the
water level of the great pond or river during the period of normal
high water. "Wetlands associated with great ponds or rivers" are
considered to be part of that great pond or river.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
12
NOTE: The Natural Resources Protection Act, 38 M.S.R.A. sections
480-A through 480-Z, requires the Department of Environmental
Protection to designate areas of "significant wildlife habitat".
Significant wildlife habitat includes:
Habitat for species appearing on the official state or federal
lists of endangered or threatened species; high and moderate value
deer wintering areas and travel corridors as defined by the
Department of Inland Fisheries and Wildlife; high and moderate
value waterfowl and wading bird habitats, including nesting and
feeding areas as defined by the Department of Inland Fisheries and
Wildlife; critical spawning and nursery areas for Atlantic sea run
salmon as defined by the Atlantic Sea Run Salmon Commission; and
shorebird nesting, feeding and staging areas and seabird nesting
islands as defined by the Department of Inland Fisheries and
Wildlife.
(2) Floodplains along rivers and floodplains along artificially
formed great ponds along rivers, defined by the 100 year floodplain
as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary
Maps, or the flood of record, or in the absence of these, by soil
types identified as recent floodplain soils.
(3) Areas of two or more contiguous acres with sustained slopes of
20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland
vegetation and hydric soils, which are not part of a freshwater
wetland as defined, and which are not surficially connected to a
water body during the period of normal high water.
NOTE: These areas usually consist of forested wetlands abutting water
bodies and non-forested wetlands.
(5) Land areas along rivers subject to severe bank erosion,
undercutting, or river bed movement.
NOTE: Municipalities may also include the following other areas which
have been recommended for protection in the comprehensive plan of the
municipality, such as:
A. Other important wildlife habitat;
B. Natural sites of significant scenic or esthetic value;
C. Areas designated by federal, state or municipal governments as natural
areas of significance to be protected from development; and
D. Other significant areas which should be included in this district to
fulfill the purposes of this Ordinance, such as, but not limited to,
existing public access areas and certain significant archaeological and
historic sites deserving of long-term protection as determined by the
municipality after consultation with the Maine Historic Preservation
Commission.
B. Limited Residential District. The Limited Residential District includes
those areas suitable for residential and recreational development. It
includes areas other than those in the Resource Protection District, or
Stream Protection District, and areas which are used less intensively than
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
13
those in the Limited Commercial District or the General Development
Districts.
C. Limited Commercial District. The Limited Commercial District includes
areas of mixed, light commercial and residential uses, exclusive of the
Stream Protection District, which should not be developed as intensively
as the General Development Districts. This district includes areas of two
or more contiguous acres in size devoted to a mix of residential and low
intensity business and commercial uses. Industrial uses are prohibited.
D. General Development I District. The General Development I District
includes the following types of existing, intensively developed areas:
(1) Areas of two or more contiguous acres devoted to commercial,
industrial or intensive recreational activities, or a mix of such
activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other
industrial activities;
(b) Areas devoted to wholesaling, warehousing, retail trade
and service activities, or other commercial activities; and
(c) Areas devoted to intensive recreational development and
activities, such as, but not limited to amusement parks, race
tracks and fairgrounds.
(2) Areas otherwise discernible as having patterns of intensive
commercial, industrial or recreational uses.
E.Stream Protection District. The Stream Protection District includes all
land areas within seventy-five (75) feet, horizontal distance, of the
normal high-water line of a stream, exclusive of those areas within two
hundred and fifty (250) feet, horizontal distance, of the normal high-
water line of a great pond, or river, or within two hundred and fifty
(250) feet, horizontal distance, of the upland edge of a wetland. Where a
stream and its associated shoreland area are located within two-hundred
and fifty (250) feet, horizontal distance, of the above water bodies or
wetlands, that land area shall be regulated under the terms of the
shoreland district associated with that water body or wetland.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land
Uses in the Shoreland Zone, shall conform with all of the applicable land use
standards in Section 15. The district designation for a particular site shall
be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all
applicable land use standards)
No -Prohibited
PB -Allowed with permit issued by the Planning Board.
CEO -Allowed with permit issued by the Code Enforcement Officer
LPI -Allowed with permit issued by the Local Plumbing Inspector
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
14
Abbreviations:
RP -Resource Protection GD -General Development I
LR - Limited Residential LC - Limited Commercial
SP -Stream Protection
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICT
SP
RP
LR
LC
GD
1. Non-intensive recreational uses not
requiring structures such as hunting,
fishing and hiking
yes yes yes
yes yes
2. Motorized vehicular traffic on
existing roads and trails
yes yes yes yes yes
3. Forest management activities except
for timber harvesting & land
yes
yes yes yes
yes
management roads
4. Timber harvesting
yes
CEO yes yes yes
5. Clearing or removal of vegetation
for activities other than timber
CEO CEO1 yes yes yes
harvesting
6. Fire prevention activities
yes
yes yes yes yes
7. Wildlife management practices
yes yes yes yes yes
8. Soil and water conservation practices yes yes
yes yes yes
9. Mineral exploration
no
yes2 yes2 yes2 yes2
10. Mineral extraction including sand
and gravel extraction
no
PB3 PB PB
PB
11. Surveying and resource analysis
yes
yes yes yes yes
12. Emergency operations
yes
yes yes yes yes
13. Agriculture
yes
PB yes
yes yes
14. Aquaculture
PB
PB PB yes yes
15. Principal structures and uses
A. One and two family residential,
including driveways
PB4 PB9
CEO CEO CEO
B. Multi-unit residential
no
no
PB
PB
PB
C. Commercial
no no10 no 10 PB
PB
D. Industrial
no
no
no no
PB
E. Governmental and institutional
no
no
PB PB
PB
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
15
F.Small non-residential facilities
for educational, scientific,
PB4 PB
CEO CEO
CEO
or nature interpretation purposes
16. Structures accessory to allowed uses PB4 PB
CEO CEO yes
17. Piers, docks, wharfs, bridges and
other structures and uses extending
over or below the normal high-water
line or within a wetland
a. Temporary
CEO11 CEO11 CEO11 CEO11 CEO11
b. Permanent
PB PB
PB
PB PB
18. Conversions of seasonal residences
to year-round residences
LPI LPI LPI
LPI LPI
19. Home occupations
PB PB
PB CEO yes
20. Private sewage disposal systems for
allowed uses
LPI
LPI LPI LPI LPI
21. Essential services
PB6 PB6 PB PB PB
A. Roadside distribution lines
(34.5kV and lower)
CEO6 CEO6 yes 12 yes 12 yes 12
B. Non-roadside or cross-country
distribution lines involving ten
PB6 PB6 CEO CEO CEO
poles or less in the shoreland zone
C. Non-roadside or cross-country
distribution lines involving eleven PB6 PB6 PB PB PB
or more poles in the shoreland zone
D. Other essential services
PB6
PB6 PB PB
PB
22. Service drops, as defined,
to allowed uses
yes yes yes yes yes
23. Public and private recreational
areas involving minimal structural
PB
PB
PB CEO CEO
development
24. Individual, private campsites
CEO CEO CEO CEO CEO
25. Campgrounds
no
no7 PB
PB
PB
26. Road and driveway construction
PB
no8 PB PB
PB
27. Land management roads
yes PB
yes yes yes
28. Parking facilities
no
no 7 PB
PB PB
29. Marinas
PB
no PB
PB
PB
30. Filling and earth moving of <10
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
16
cubic yards
CEO CEO
yes yes yes
31. Filling and earth moving of >10
cubic yards
PB
PB
CEO CEO CEO
32. Signs
yes
yes yes yes yes
33. Uses similar to allowed uses
CEO
CEO CEO CEO
CEO
34. Uses similar to uses requiring
a CEO permit
CEO
CEO CEO
CEO CEO
35. Uses similar to uses requiring a
PB permit
PB
PB
PB
PB
PB
1 In RP not allowed within 75 feet horizontal distance, of the normal high-
water line of great ponds, except to remove safety hazards.
2 Requires permit from the Code Enforcement Officer if more than 100 square
feet of surface area, in total, is disturbed.
3 In RP not allowed in areas so designated because of wildlife value.
4 Provided that a variance from the setback requirement is obtained from the
Board of Appeals.
5 Functionally water-dependent uses and uses accessory to such water dependent
uses only (See note on previous page).
6 See further restrictions in Section 15(L)(2).
7 Except when area is zoned for resource protection due to floodplain criteria
in which case a permit is required from the PB.
8 Except as provided in Section 15(H)(3).
9 Single family residential structures may be allowed by special exception only
according to the provisions of Section 16(E), Special Exceptions. Two-
family residential structures are prohibited.
10 Except for commercial uses otherwise listed in this Table, such as marinas
and campgrounds that are allowed in the respective district.
11 Excluding bridges and other crossings not involving earthwork, in which case
no permit is required.
12 Permit not required, but must file a written "notice of intent to construct"
with CEO.
NOTE: A person performing any of the following activities shall require a
permit from the Department of Environmental Protection, pursuant
to 38 M.R.S.A. section 480-C, if the activity occurs in, on, over or
adjacent to any fresh water wetland, great pond, river, stream or brook
and operates in such a manner that material or soil may be washed into
them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or
other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
15. Land Use Standards. All land use activities within the shoreland zone shall
conform with the following provisions, if applicable.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
17
A. Minimum Lot Standards
Minimum Lot Minimum Shore
Area (sq. ft.) Frontage (ft.)
(1)
(a) Residential per dwelling unit 40,000
200
(b) Governmental, Institutional,
Commercial or Industrial per
principal structure 60,000
300
(c) Public and Private Recreational
Facilities
40,000
200
(2) Land below the normal high-water line of a water body or upland edge
of a wetland and land beneath roads serving more than two (2) lots shall
not be included toward calculating minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be
considered each a separate tract or parcel of land unless such road was
established by the owner of land on both sides thereof after September
22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100)
feet, horizontal distance, of the normal high-water line of a water body
or upland edge of a wetland shall be equal to or greater than the shore
frontage requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental,
institutional, commercial or industrial structure or use, or combination
thereof, is constructed or established on a single parcel, all
dimensional requirements shall be met for each additional dwelling unit,
principal structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least
one hundred (100) feet, horizontal distance, from the normal high-water
line of great ponds classified GPA and rivers that flow to great ponds
classified GPA, and seventy-five (75) feet, horizontal distance, from
the normal high-water line of other water bodies, tributary streams, or
the upland edge of a wetland, except that in the General Development I
District the setback from the normal high-water line shall be at least
twenty five (25) feet, horizontal distance. In the Resource Protection
District the setback requirement shall be 250 feet, horizontal distance,
except for structures, roads, parking spaces or other regulated objects
specifically allowed in that district in which case the setback
requirements specified above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision
shall neither apply to structures which require direct access to
the water body or wetland as an operational necessity, such as
piers, docks and retaining walls, nor to other functionally water-
dependent uses.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
18
(b) On a non-conforming lot of record on which only a residential
structure exists, and it is not possible to place an accessory
structure meeting the required water body, tributary stream or
wetland setbacks, the code enforcement officer may issue a permit
to place a single accessory structure, with no utilities, for the
storage of yard tools and similar equipment. Such accessory
structure shall not exceed eighty (80) square feet in area nor
eight (8) feet in height, and shall be located as far from the
shoreline or tributary stream as practical and shall meet all other
applicable standards, including lot coverage and vegetation
clearing limitations. In no case shall the structure be located
closer to the shoreline or tributary stream than the principal
structure.
NOTE: A tributary stream may be perennial or intermittent. Where a
tributary stream is present within the shoreland zone, setback standards
from that tributary stream are applicable.
(2) Principal or accessory structures and expansions of existing
structures which are permitted in the Resource Protection, Limited
Residential, Limited Commercial, and Stream Protection Districts, shall
not exceed thirty-five (35) feet in height. This provision shall not
apply to structures such as transmission towers, windmills, antennas, and
similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and
structures, including basements, shall be elevated at least one foot
above the elevation of the 100 year flood, the flood of record, or in the
absence of these, the flood as defined by soil types identified as recent
flood-plain soils. In those municipalities that participate in the
National Flood Insurance Program and have adopted the April 2005 version,
or later version, of the Floodplain Management Ordinance, accessory
structures may be placed in accordance with the standards of that
ordinance and need not meet the elevation requirements of this paragraph.
(4) The total footprint area of all structures, parking lots and other
non-vegetated surfaces, within the shoreland zone shall not exceed twenty
(20) percent of the lot or a portion thereof, located within the
shoreland zone, including land area previously developed, except in the
General Development District adjacent to rivers that do not flow to great
ponds classified GPA, where lot coverage shall not exceed seventy (70)
percent.
(5) Retaining walls that are not necessary for erosion control shall meet
the structure setback requirement, except for low retaining walls and
associated fill provided all of the following conditions are met:
(a) The site has been previously altered and an effective vegetated
buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from
the normal high-water line of a water body, tributary stream, or
upland edge of a wetland;
(c) The site where the retaining wall will be constructed is
legally existing lawn or is a site eroding from lack of naturally
occurring vegetation, and which cannot be stabilized with
vegetative plantings;
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
19
(d) The total height of the wall(s), in the aggregate, are no more
than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain
on rivers, streams, wetlands, and tributary streams, as designated
on the Federal Emergency Management Agency's (FEMA) Flood Insurance
Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or
in the absence of these, by soil types identified as recent flood
plain soils.
(f) The area behind the wall is revegetated with grass, shrubs,
trees, or a combination thereof, and no further structural
development will occur within the setback area, including patios
and decks; and
(g) A vegetated buffer area is established within 25 feet,
horizontal distance, of the normal high-water line of a water body,
tributary stream, or upland edge of a wetland when a natural buffer
area does not exist. The buffer area must meet the following
characteristics:
(i)
A minimum buffer width of 25 feet, horizontal
distance, is required, measured perpendicularly to the
normal high-water line or upland edge of a wetland;
(ii) The buffer must include shrubs and other woody and
herbaceous vegetation. Where natural ground cover is
lacking the area must be supplemented with leaf or
bark mulch;
(iii) Vegetation plantings must be in quantities sufficient
to retard erosion and provide for effective
infiltration of stormwater runoff;
(iv) Only native species may be used to establish the
buffer area;
(v) A footpath not to exceed the standards in Section
15(P)(2)(a), may traverse the buffer;
NOTE: If the wall and associated soil disturbance occurs within 75
feet, horizontal distance, of a water body, tributary stream or
wetland, a permit pursuant to the Natural Resource Protection Act
is required from the Department of Environmental Protection.
(6) Notwithstanding the requirements stated above, stairways or similar
structures may be allowed with a permit from the Code Enforcement
Officer, to provide shoreline access in areas of steep slopes or unstable
soils provided: that the structure is limited to a maximum of four (4)
feet in width; that the structure does not extend below or over the
normal high-water line of a water body or upland edge of a wetland,
(unless permitted by the Department of Environmental Protection pursuant
to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C); and
that the applicant demonstrates that no reasonable access alternative
exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over
or Below the Normal High-Water Line of a Water Body or Within a Wetland.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
20
(1) Access from shore shall be developed on soils appropriate for such use
and constructed so as to control erosion.
(2) The location shall not interfere with existing developed or natural
beach areas.
(3) The facility shall be located so as to minimize adverse effects on
fisheries.
(4) The facility shall be no larger in dimension than necessary to carry
on the activity and be consistent with the surrounding character and uses
of the area. A temporary pier, dock or wharf shall not be wider than six
feet for non-commercial uses.
(5) No new structure shall be built on, over or abutting a pier, wharf,
dock or other structure extending beyond the normal high-water line of a
water body or within a wetland unless the structure requires direct access
to the water body or wetland as an operational necessity.
(6) New permanent piers and docks shall not be permitted unless it is
clearly demonstrated to the Planning Board that a temporary pier or dock
is not feasible, and a permit has been obtained from the Department of
Environmental Protection, pursuant to the Natural Resources Protection
Act.
(7) No existing structures built on, over or abutting a pier, dock, wharf
or other structure extending beyond the normal high-water line of a water
body or within a wetland shall be converted to residential dwelling units
in any district.
(8) Except in the General Development Districts, structures built on, over
or abutting a pier, wharf, dock or other structure extending beyond the
normal high-water line of a water body or within a wetland shall not
exceed twenty (20) feet in height above the pier, wharf, dock or other
structure.
NOTE: New permanent structures, and expansions thereof, projecting into
or over water bodies shall require a permit from the Department of
Environmental Protection pursuant to the Natural Resources Protection
Act, 38 M.R.S.A. section 480-C. Permits may also be required from the
Army Corps of Engineers if located in navigable waters.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed
under State licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square
feet of land, not including roads and driveways, for each site. Land
supporting wetland vegetation, and land below the normal high-water line
of a water body shall not be included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or
shelter, and utility and service buildings shall be set back a minimum of
one hundred (100) feet, horizontal distance, from the normal high-water
line of a great pond classified GPA or a river flowing to a great pond
classified GPA, and seventy-five (75) feet, horizontal distance, from the
normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
21
E. Individual Private Campsites. Individual private campsites not associated
with campgrounds are allowed provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance,
or thirty thousand (30,000) square feet of lot area within the shoreland
zone, whichever is less, may be permitted.
(2) Campsite placement on any lot, including the area intended for a
recreational vehicle or tent platform, shall be set back one hundred (100)
feet, horizontal distance, from the normal high- water line of a great
pond classified GPA or river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water
line of other water bodies, tributary streams, or the upland edge of a
wetland.
(3) Only one recreational vehicle shall be allowed on a campsite. The
recreational vehicle shall not be located on any type of permanent
foundation except for a gravel pad, and no structure except a canopy shall
be attached to the recreational vehicle.
(4) The clearing of vegetation for the siting of the recreational vehicle,
tent or similar shelter in a Resource Protection District shall be limited
to one thousand (1000) square feet.
(5) A written sewage disposal plan describing the proposed method and
location of sewage disposal shall be required for each campsite and shall
be approved by the Local Plumbing Inspector. Where disposal is off-site,
written authorization from the receiving facility or land owner is
required.
(6) When a recreational vehicle, tent or similar shelter is placed on-site
for more than one hundred and twenty (120) days per year, all
requirements for residential structures shall be met, including the
installation of a subsurface sewage disposal system in compliance with the
State of Maine Subsurface Wastewater Disposal Rules unless served by
public sewage facilities.
F. Commercial and Industrial Uses. The following new commercial and industrial
uses are prohibited within the shoreland zone adjacent to great ponds
classified GPA, and rivers and streams which flow to great ponds classified
GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including
body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or
fertilizers, other than amounts normally associated with individual
households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
22
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except storage on
same property as use occurs and except for storage and sales associated
with marinas
(11) Photographic processing
(12) Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback
requirements for structures for the district in which such areas are
located. The setback requirement for parking areas serving public boat
launching facilities in Districts other than the General Development I
District shall be no less than fifty (50) feet, horizontal distance, from
the shoreline or tributary stream if the Planning Board finds that no
other reasonable alternative exists further from the shoreline or
tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall
be designed to prevent stormwater runoff from flowing directly into a
water body, tributary stream or wetland and where feasible, to retain all
runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the
following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and
twenty (20) feet long, except that parking spaces for a vehicle and
boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction
of roads and/or driveways and drainage systems, culverts and other related
features.
(1) Roads and driveways shall be set back at least one-hundred (100)
feet, horizontal distance, from the normal high-water line of a great
pond classified GPA or a river that flows to a great pond classified GPA,
and seventy-five (75) feet, horizontal distance from the normal high-
water line of other water bodies, tributary streams, or the upland edge
of a wetland unless no reasonable alternative exists as determined by the
Planning Board. If no other reasonable alternative exists, the road
and/or driveway setback requirement shall be no less than fifty (50)
feet, horizontal distance, upon clear showing by the applicant that
appropriate techniques will be used to prevent sedimentation of the water
body, tributary stream, or wetland. Such techniques may include, but are
not limited to, the installation of settling basins, and/or the effective
use of additional ditch relief culverts and turnouts placed so as to
avoid sedimentation of the water body, tributary stream, or wetland.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
23
On slopes of greater than twenty (20) percent the road and/or driveway
setback shall be increased by ten (10) feet, horizontal distance, for
each five (5) percent increase in slope above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or
to roads or driveways that provide access to permitted structures and
facilities located nearer to the shoreline or tributary stream due to
an operational necessity, excluding temporary docks for recreational
uses. Roads and driveways providing access to permitted structures
within the setback area shall comply fully with the requirements of
Section 15(H)(1) except for that portion of the road or driveway
necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right
of way regardless of their setback from a water body, tributary
stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection
District except that the Planning Board may grant a permit to
construct a road or driveway to provide access to permitted uses
within the district. A road or driveway may also be approved by the
Planning Board in a Resource Protection District, upon a finding that
no reasonable alternative route or location is available outside the
district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far
as practicable from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two
(2) horizontal to one (1) vertical, and shall be graded and stabilized
in accordance with the provisions for erosion and sedimentation
control contained in Section 15(Q).
(5) Road and driveway grades shall be no greater than ten (10) percent
except for segments of less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from
directly entering water bodies, tributary streams or wetlands, roads
and driveways shall be designed, constructed, and maintained to empty
onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or
culvert and the normal high-water line of a water body, tributary
stream, or upland edge of a wetland. Surface drainage which is
directed to an unscarified buffer strip shall be diffused or spread
out to promote infiltration of the runoff and to minimize channelized
flow of the drainage through the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water
turnouts shall be installed in a manner effective in directing
drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To
accomplish this, the following shall apply:
(a) Ditch relief culverts, drainage dips and associated water
turnouts shall be spaced along the road or driveway at intervals no
greater than indicated in the following table:
Grade Spacing
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
24
GRADE
SPACING
(Percent)
(Feet)
0-2
250
3-5 200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts
only where the grade is ten (10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch
relief culverts shall be placed at approximately a thirty (30)
degree angle downslope from a line perpendicular to the centerline
of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly
installed in order to allow for effective functioning, and their
inlet and outlet ends shall be stabilized with appropriate
materials.
(9) Ditches, culverts, bridges, dips, water turnouts and other
storm water runoff control installations associated with roads and
driveways shall be maintained on a regular basis to assure
effective functioning.
I Signs. The following provisions shall govern the use of signs in the Resource
Protection, Stream Protection, Limited Residential and Limited Commercial
Districts:
(1) Signs relating to goods and services sold on the premises shall be
allowed, provided that such signs shall not exceed six (6) square feet in
area and shall not exceed two (2) signs per premises. In the Limited
Commercial District, however, such signs shall not exceed sixteen (16)
square feet in area. Signs relating to goods or services not sold or
rendered on the premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2)
signs per premises, and shall not exceed twelve (12) square feet in the
aggregate.
(3) Residential users may display a single sign not over three (3) square
feet in area relating to the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without
restriction as to number provided that no such sign shall exceed two (2)
square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
25
(1) All new construction and development shall be designed to minimize
storm water runoff from the site in excess of the natural predevelopment
conditions. Where possible, existing natural runoff control features,
such as berms, swales, terraces and wooded areas, shall be retained in
order to reduce runoff and encourage infiltration of storm waters.
(2) Storm water runoff control systems shall be maintained as necessary to
ensure proper functioning.
NOTE: The Storm water Management Law (38 M.R.S.A. section 420-D) requires
a full permit to be obtained from the DEP prior to construction of a
project consisting of 20,000 square feet or more of impervious area or 5
acres or more of a developed area in an urban impaired stream watershed
or most-at-risk lake watershed, or a project with 1 acre or more of
developed area in any other stream or wetland watershed. A permit-by-rule
is necessary for a project with one acre or more of disturbed area but
less than 1 acre impervious area (20,000 square feet for most-at-risk
lakes and urban impaired streams)and less than 5 acres of developed area.
Furthermore, a Maine Construction General Permit is required if the
construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in
conformance with the State of Maine Subsurface Wastewater Disposal Rules,
and the following: a) clearing or removal of woody vegetation necessary to
site a new system and any associated fill extensions, shall not extend
closer than seventy-five (75) feet, horizontal distance, from the normal
high-water line of a water body or the upland edge of a wetland and b) a
holding tank is not allowed for a first-time residential use in the
shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems,
excluding fill extensions, to be constructed no less than one hundred
(100) horizontal feet from the normal high-water line of a perennial
water body. The minimum setback distance for a new subsurface disposal
system may not be reduced by variance.
L. Essential Services
(1) Where feasible, the installation of essential services shall be
limited to existing public ways and existing service corridors.
(2) The installation of essential services, other than road-side
distribution lines, is not allowed in a Resource Protection or Stream
Protection District, except to provide services to a permitted use within
said district, or except where the applicant demonstrates that no
reasonable alternative exists. Where allowed, such structures and
facilities shall be located so as to minimize any adverse impacts on
surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution
lines, towers and related equipment may be replaced or reconstructed
without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the
nature or extent of mineral resources shall be accomplished by hand sampling,
test boring, or other methods which create minimal disturbance of less than one
hundred (100) square feet of ground surface. A permit from the Code Enforcement
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
26
Officer shall be required for mineral exploration which exceeds the above
limitation. All excavations, including test pits and holes, shall be
immediately capped, filled or secured by other equally effective measures to
restore disturbed areas and to protect the public health and safety. Mineral
extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning
Board before a permit is granted. Such plan shall describe in detail
procedures to be undertaken to fulfill the requirements of Section 15
(M)(3) below.
(2) No part of any extraction operation, including drainage and runoff
control features, shall be permitted within one hundred (100) feet,
horizontal distance, of the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, and
within seventy-five (75) feet, horizontal distance, of the normal high-
water line of any other water body, tributary stream, or the upland edge
of a wetland. Extraction operations shall not be permitted within fifty
(50) feet, horizontal distance, of any property line without written
permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction
operations at any extraction site, which operations shall be deemed
complete when less than one hundred (100) cubic yards of materials are
removed in any consecutive twelve (12) month period, ground levels and
grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for
disposal in an approved location, or shall be buried on-site. Only
materials generated on-site may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and
the solid waste management rules, Chapters 400-419 of the Department of
Environmental Protection's regulations may contain other applicable
provisions regarding disposal of such materials.
(b) The final graded slope shall be two and one-half to one (2
1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land
areas, which shall be reseeded and stabilized with vegetation
native to the area. Additional topsoil or loam shall be obtained
from off-site sources if necessary to complete the stabilization
project.
(4) In keeping with the purposes of this Ordinance, the Planning
Board may impose such conditions as are necessary to minimize the
adverse impacts associated with mineral extraction operations on
surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the
Manure Utilization Guidelines published by the Maine Department of
Agriculture on November 1, 2001, and the Nutrient Management Law (7
M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100)
feet, horizontal distance, of a great pond classified GPA or a river
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
27
flowing to a great pond classified GPA, or within seventy-five (75) feet
horizontal distance, of other water bodies, tributary streams, or
wetlands. All manure storage areas within the shoreland zone must be
constructed or modified such that the facility produces no discharge of
effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty
thousand (40,000) square feet in surface area, within the shoreland zone
shall require a Conservation Plan to be filed with the Planning Board.
Non-conformance with the provisions of said plan shall be considered to
be a violation of this Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available through
the local Soil and Water Conservation District office.
(4) There shall be no new tilling of soil within one-hundred (100) feet,
horizontal distance, of the normal high-water line of a great pond
classified GPA; within seventy-five (75) feet, horizontal distance, from
other water bodies; nor within twenty-five (25) feet, horizontal
distance, of tributary streams and wetlands. Operations in existence on
the effective date of this ordinance and not in conformance with this
provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted
within one hundred (100)feet, horizontal distance, of the normal high-
water line of a great pond classified GPA; within seventy-five (75) feet,
horizontal distance, of other water bodies; nor within twenty-five (25)
feet, horizontal distance, of tributary streams and wetlands. Livestock
grazing associated with ongoing farm activities, and which are not in
conformance with the above setback provisions may continue, provided that
such grazing is conducted in accordance with a Conservation Plan.
O. Timber Harvesting
(1) In a Resource Protection District abutting a great pond, timber
harvesting shall be limited to the following:
(a) Within the strip of land extending 75 feet, horizontal
distance, inland from the normal high-water line, timber harvesting
may be conducted when the following conditions are met:
(1) The ground is frozen;
(2) There is no resultant soil disturbance;
(3) The removal of trees is accomplished using a cable or
boom and there is no entry of tracked or wheeled vehicles
into the 75-foot strip of land;
(4) There is no cutting of trees less than 6 inches in
diameter; no more than 30% of the trees 6 inches or more in
diameter, measured at 4 ½ feet above ground level, are cut in
any 10-year period; and a well-distributed stand of trees and
other natural vegetation remains; and
(5) A licensed professional forester has marked the trees to
be harvested prior to a permit being issued by the
municipality.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
28
(b) Beyond the 75 foot strip referred to in Section 15(O)(1)(a)
above, timber harvesting is permitted in accordance with paragraph
2 below except that in no case shall the average residual basal
area of trees over 4 ½ inches in diameter at 4 1/2 feet above
ground level be reduced to less than 30 square feet per acre.
(2) Except in areas as described in Section 15(O)(1) above, timber
harvesting shall conform with the following provisions:
(a) Selective cutting of no more than forty (40) percent of the
total volume of trees four (4) inches or more in diameter measured
at 4 1/2 feet above ground level on any lot in any ten (10) year
period is permitted. In addition:
(i) Within one-hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond classified GPA or
a river flowing to a great pond classified GPA, and within
seventy-five (75) feet, horizontal distance, of the normal
high-water line of other water bodies, tributary streams, or
the upland edge of a wetland, there shall be no clearcut
openings and a well-distributed stand of trees and other
vegetation, including existing ground cover, shall be
maintained.
(ii) At distances greater than one-hundred (100) feet,
horizontal distance, of a great pond classified GPA or a
river flowing to a great pond classified GPA, and greater
than seventy-five (75) feet, horizontal distance, of the
normal high-water line of other water bodies or the upland
edge of a wetland, harvesting operations shall not create
single clearcut openings greater than ten-thousand (10,000)
square feet in the forest canopy. Where such openings exceed
five-thousand (5000) square feet they shall be at least one
hundred (100) feet, horizontal distance, apart. Such clearcut
openings shall be included in the calculation of total volume
removal. Volume may be considered to be equivalent to basal
area.
(b) Timber harvesting operations exceeding the 40% limitation in
Section 15(O)(2)(a) above, may be allowed by the planning board
upon a clear showing, including a forest management plan signed by
a Maine licensed professional forester, that such an exception is
necessary for good forest management and will be carried out in
accordance with the purposes of this Ordinance. The planning board
shall notify the Commissioner of the Department of Environmental
Protection of each exception allowed, within fourteen (14) days of
the planning board's decision.
(c) No accumulation of slash shall be left within fifty (50) feet,
horizontal distance, of the normal high water line of a body of
water. In all other areas slash shall either be removed or
disposed of in such a manner that it lies on the ground and no part
thereof extends more than four (4) feet above the ground. Any
debris that falls below the normal high-water line of a water body
or tributary stream shall be removed.
(d) Timber harvesting equipment shall not use stream channels as
travel routes except when:
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
29
(i) Surface waters are frozen; and
(ii) The activity will not result in any ground
disturbance.
(e) All crossings of flowing water shall require a bridge or
culvert, except in areas with low banks and channel beds which are
composed of gravel, rock or similar hard surface which would not be
eroded or otherwise damaged.
(f) Skid trail approaches to water crossings shall be located and
designed so as to prevent water runoff from directly entering the
water body or tributary stream. Upon completion of timber
harvesting, temporary bridges and culverts shall be removed and
areas of exposed soil revegetated.
(g) Except for water crossings, skid trails and other sites where
the operation of machinery used in timber harvesting results in the
exposure of mineral soil shall be located such that an unscarified
strip of vegetation of at least seventy-five (75) feet, horizontal
distance, in width for slopes up to ten (10) percent shall be
retained between the exposed mineral soil and the normal high-water
line of a water body or upland edge of a wetland. For each ten (10)
percent increase in slope, the unscarified strip shall be increased
by twenty (20) feet, horizontal distance. The provisions of this
paragraph apply only to a face sloping toward the water body or
wetland, provided, however, that no portion of such exposed mineral
soil on a back face shall be closer than twenty five (25) feet,
horizontal distance, from the normal high-water line of a water
body or upland edge of a wetland.
O-1. Timber Harvesting - Statewide Standards [Effective on effective date
established in Section 4(B)]
(1) Shoreline integrity and sedimentation. Persons conducting timber
harvesting and related activities must take reasonable measures to avoid
the disruption of shoreline integrity, the occurrence of sedimentation of
water, and the disturbance of water body and tributary stream banks,
water body and tributary stream channels, shorelines, and soil lying
within water bodies, tributary streams and wetlands. If, despite such
precautions, the disruption of shoreline integrity, sedimentation of
water, or the disturbance of water body and tributary stream banks, water
body and tributary stream channels, shorelines, and soil lying within
water bodies, tributary streams and wetlands occurs, such conditions must
be corrected.
(2) Slash treatment. Timber harvesting and related activities shall be
conducted such that slash or debris is not left below the normal high-
water line of any water body or tributary stream, or the upland edge of a
wetland. Section 15(O-1)(2) does not apply to minor, incidental amounts
of slash that result from timber harvesting and related activities
otherwise conducted in compliance with this section.
(a) Slash actively used to protect soil from disturbance by
equipment or to stabilize exposed soil, may be left in place,
provided that no part thereof extends more than 4 feet above the
ground.
(b) Adjacent to great ponds, rivers and wetlands:
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
30
(i) No accumulation of slash shall be left within 50 feet,
horizontal distance, of the normal high-water line or upland
edge of a wetland; and
(ii) Between 50 feet and 250 feet, horizontal distance, of
the normal high-water line or upland edge of a wetland, all
slash larger than 3 inches in diameter must be disposed
of in such a manner that no part thereof extends more than 4
feet above the ground.
(3) Timber harvesting and related activities must leave adequate tree
cover and shall be conducted so that a well-distributed stand of trees is
retained. This requirement may be satisfied by following one of the
following three options:
(a) Option 1 (40% volume removal), as follows:
(i) Harvesting of no more than 40 percent of the total volume
on each acre of trees 4.5 inches DBH or greater in any 10
year period is allowed. Volume may be considered to be
equivalent to basal area;
(ii) A well-distributed stand of trees which is windfirm, and
other vegetation including existing ground cover, must be
maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal
high-water line of rivers, streams, and great ponds, and
within 75 feet, horizontal distance, of the upland edge of a
wetland, there must be no cleared openings. At distances
greater than 75 feet, horizontal distance, of the normal
high-water line of a river or great pond or upland
edge of a wetland, timber harvesting and related activities
must not create single cleared openings greater than 14,000
square feet in the forest canopy. Where such openings exceed
10,000 square feet, they must be at least 100 feet,
horizontal distance, apart. Such cleared openings will be
included in the calculation of total volume removal. Volume
may be considered equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as follows:
(i) The residual stand must contain an average basal area of
at least 60 square feet per acre of woody vegetation greater
than or equal to 1.0 inch DBH, of which 40 square feet per
acre must be greater than or equal to 4.5 inches DBH;
(ii) A well-distributed stand of trees which is windfirm, and
other vegetation including existing ground cover, must be
maintained; and,
(iii)Within 75 feet, horizontal distance, of the normal high-
water line of water bodies and within 75 feet, horizontal
distance, of the upland edge of wetlands, there must be no
cleared openings. At distances greater than 75 feet,
horizontal distance, of the normal high-water line of a river
or great pond, or upland edge of a wetland, timber harvesting
and related activities must not create single cleared canopy.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
31
Where such openings exceed 10,000 square feet, they must be
at least 100 feet, horizontal distance, apart. Such cleared
openings will be included in the calculation of the average
basal area. Volume may be considered equivalent to basal
area.
(c) Option 3 (Outcome based), which requires: An alternative method
proposed in an application, signed by a Licensed Forester or
certified wildlife professional, submitted by the landowner or
designated agent to the State of Maine Department of Conservation's
Bureau of Forestry (Bureau) for review and approval, which provides
equal or better protection of the shoreland area than this rule.
Landowners must designate on the Forest Operations Notification
form required by 12 M.R.S.A.chapter 805, subchapter 5 which option
they choose to use. If landowners choose Option 1 or Option 2,
compliance will be determined solely on the criteria for the option
chosen. If landowners choose Option 3, timber harvesting and
related activities may not begin until the Bureau has approved the
alternative method.
The Bureau may verify that adequate tree cover and a well-
distributed stand of trees is retained through a field procedure
that uses sample plots that are located randomly or systematically
to provide a fair representation of the harvest area.
(4) Skid trails, yards, and equipment operation. This requirement applies
to the construction, maintenance, and use of skid trails and yards in
shoreland areas.
(a) Equipment used in timber harvesting and related activities
shall not use river, stream or tributary stream channels as travel
routes except when surface waters are frozen and snow covered, and
the activity will not result in any ground disturbance.
(b) Skid trails and yards must be designed and constructed to
prevent sediment and concentrated water runoff from entering a
water body, tributary stream, or wetland. Upon termination of their
use, skid trails and yards must be stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of
mineral soil within 25 feet, horizontal distance, of any
water body, tributary stream, or wetland. On slopes of 10
percent or greater, the setback for equipment operation must
be increased by 20 feet, horizontal distance, plus an
additional 10 feet, horizontal distance, for each 5 percent
increase in slope above 10 percent. Where slopes fall away
from the resource, no increase in the 25-foot setback is
required.
(ii) Where such setbacks are impracticable, appropriate
techniques shall be used to avoid sedimentation of the water
body, tributary stream or wetland. Such techniques may
include the installation of sump holes or settling basins,
and/or the effective use of additional ditch relief culverts
and ditch water turnouts placed to avoid sedimentation of the
water body, tributary stream, or wetland. If, despite such
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
32
precautions, sedimentation or the disruption of shoreline
integrity occurs, such conditions must be corrected.
(5) Land Management Roads. Land management roads, including approaches to
crossings of water bodies, tributary stream channels, and wetlands,
ditches and other related structures, must be designed, constructed, and
maintained to prevent sediment and concentrated water runoff from
directly entering the water body, tributary stream or wetland. Surface
water on or adjacent to water crossing approaches must be diverted
through vegetative filter strips to avoid sedimentation of the
watercourse or wetland. Because roadside ditches may not extend to the
resource being crossed, vegetative filter strips must be established in
accordance with the setback requirements in Section 15(O-1)(7) of this
rule.
(a) Land management roads and associated ditches, excavation, and
fill must be set back at least:
(i) 100 feet, horizontal distance, from the normal high-water
line of a great pond, river or wetland;
(ii) 50 feet, horizontal distance, from the normal high-water
line of streams; and
(iii) 25 feet, horizontal distance, from the normal high-
water line of tributary streams
(b) The minimum 100 foot setback specified in Section 15(O-
(1)(5)(a)(i) above may be reduced to no less than 50 feet,
horizontal distance, and the 50 foot setback specified in Section
15(O1)(5)(a)(ii) above may be reduced to no less than 25 feet,
horizontal distance, if, prior to construction, the landowner or
the landowner's designated agent demonstrates to the Planning
Board's satisfaction that no reasonable alternative exists and that
appropriate techniques will be used to prevent sedimentation of the
water body, tributary stream, or wetland. Such techniques may
include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief
culverts and turnouts placed to avoid sedimentation of the water
body, tributary stream or wetland. If, despite such precautions,
sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
(c) On slopes of 10 percent or greater, the land management road
setback must be increased by at least 20 feet, horizontal distance,
plus an additional 10 feet, horizontal distance, for each 5
percent increase in slope above 10 percent.
(d) New land management roads are not allowed within the shoreland
area along Significant River Segments as identified in 38 M.R.S.A.
section 437, nor in a Resource Protection District, unless, prior
to construction, the landowner or the landowner's designated agent
makes a clear demonstration to the Planning Board's satisfaction
that no reasonable alternative route exists outside the shoreland
zone, and that the new road must be set back as far as practicable
from the normal high-water line and screened from the river by
existing vegetation.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
33
(e) Ditches, culverts, bridges, dips, water turnouts and other
water control installations associated with roads must be
maintained on a regular basis to assure effective functioning.
Drainage structures shall deliver a dispersed flow of water into an
unscarified filter strip no less than the width indicated in the
setback requirements in Section 15(O-1)(7). Where such a filter
strip is impracticable, appropriate techniques shall be used to
avoid sedimentation of the water body, tributary stream, or
wetland. Such techniques may include the installation of sump holes
or settling basins, and/or the effective use of additional ditch
relief culverts and ditch water turnouts placed to avoid
sedimentation of the water body, tributary stream, or wetland. If,
despite such precautions, sedimentation or the disruption of
shoreline integrity occurs, such conditions must be corrected.
(f) Road closeout and discontinuance. Maintenance of the water
control installations required in Section 15(O-1)(5)(e) must
continue until use of the road is discontinued and the road is put
to bed by effective installation of water bars or other adequate
road drainage structures at appropriate intervals, constructed to
avoid surface water flowing over or under the water bar, and
extending a sufficient distance beyond the traveled way so that
water does not reenter the road surface.
(g) Upgrading existing roads. Extension or enlargement of presently
existing roads must conform to the provisions of Section 15(O-1).
Any nonconforming existing road may continue to exist and to be
maintained, as long as the nonconforming conditions are not made
more nonconforming.
(h) Exception. Extension or enlargement of presently existing roads
need not conform to the setback requirements of Section
15(O1)(5)(a) if, prior to extension or enlargement, the landowner
or the landowner's designated agent demonstrates to the Planning
Board's satisfaction that no reasonable alternative exists and that
appropriate techniques will be used to prevent sedimentation of the
water body, tributary stream, or wetland. Such techniques may
include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief
culverts and turnouts placed to avoid sedimentation of the water
body, tributary stream, or wetland. If, despite such precautions,
sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
(i) Additional measures. In addition to the foregoing minimum
requirements, persons undertaking construction and
maintenance of roads and river, stream and tributary stream
crossings must take reasonable measures to avoid
sedimentation of surface waters.
(6) Crossings of waterbodies. Crossings of rivers, streams, and tributary
streams must allow for fish passage at all times of the year, must not
impound water, and must allow for the maintenance of normal flows.
(a) Determination of flow. Provided they are properly applied and
used for the circumstances for which they are designed, methods
including but not limited to the following are acceptable as a
means of calculating the 10 year and 25 year frequency water flows
and thereby determining water crossing sizes as required in Section
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
34
15(O-1): The United States Geological Survey (USGS) Methods;
specifically: Hodgkins, G. 1999. Estimating the Magnitude of Peak
Flows for Streams in Maine for Selected Recurrence Intervals. U.S.
Geological Survey. Water Resources Investigations Report 99-4008.
45 pp.
(b) Upgrading existing water crossings. Extension or enlargement of
presently existing water crossings must conform to the provisions
of Section 15(O-1). Any nonconforming existing water crossing may
continue to exist and be maintained, as long as the nonconforming
conditions are not made more nonconforming; however, any
maintenance or repair work done below the normal high-water line
must conform to the provisions of Section 15(O-1).
(c) Other Agency Permits. Any timber harvesting and related
activities involving the design, construction, and maintenance of
crossings on waterbodies other than a river, stream or tributary
stream may require a permit from the Land Use Regulation
Commission, the Department of Environmental Protection, or the US
Army Corps of Engineers.
(d) Any timber harvesting and related activities involving the
design, construction, and maintenance of crossings of wetlands
identified by the Department of Inland Fisheries and Wildlife as
essential wildlife habitat require prior consultation with the
Department of Inland Fisheries and Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water
crossing construction maintenance, alteration and replacement
activities in shoreland areas must be given to the Bureau prior to
the commencement of such activities. Such notice must contain all
information required by the Bureau, including:
(i) a map showing the location of all proposed permanent
crossings;
(ii) the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires a
permit from state or federal agencies, a copy of the approved
permit or permits; and
(iv) a statement signed by the responsible party that all
temporary and permanent crossings will be constructed,
maintained, and closed out in accordance with the
requirements of this Section.
(f) Water crossing standards. All crossings of rivers require a
bridge or culvert sized according to the requirements of Section
15(O-1)(6)(g)) below. Streams and tributary streams may be crossed
using temporary structures that are not bridges or culverts
provided:
(i) concentrated water runoff does not enter the stream or
tributary stream;
(ii) sedimentation of surface waters is reasonably avoided;
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
35
(iii) there is no substantial disturbance of the bank, or
stream or tributary stream channel;
(iv) fish passage is not impeded; and,
(v) water flow is not unreasonably impeded. Subject to
Section 15(O-1)(6)(f)(i-v) above, skid trail crossings of
streams and tributary streams when channels of such streams
and tributary streams are frozen and snow-covered or are
composed of a hard surface which will not be eroded or
otherwise damaged are not required to use permanent or
temporary structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and
tributary stream channels with a bridge or culvert, the following
requirements apply:
(i) Bridges and culverts must be installed and maintained to
provide an opening sufficient in size and structure to
accommodate 10 year frequency water flows or with a cross-
sectional area at least equal to 2 1/2 times the cross-
sectional area of the river, stream, or tributary stream
channel.
(ii) Temporary bridge and culvert sizes may be smaller than
provided in Section 15(O1)(6)(g)(i) if techniques are
effectively employed such that in the event of culvert or
bridge failure, the natural course of water flow is
maintained and sedimentation of the water body or tributary
stream is avoided. Such crossing structures must be at least
as wide as the channel and placed above the normal high-water
line. Techniques may include, but are not limited to, the
effective use of any, a combination of, or all of the
following:
1. use of temporary skidder bridges;
2. removing culverts prior to the onset of frozen
ground conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii) Culverts utilized in river, stream and tributary stream
crossings must:
1. be installed at or below river, stream or tributary
stream bed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of
the culvert;
4. be covered by soil to a minimum depth of 1 foot or
according to the culvert manufacturer's specifications,
whichever is greater; and
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
36
5. have a headwall at the inlet end which is adequately
stabilized by riprap or other suitable means to
reasonably avoid erosion of material around the
culvert.
(iv)River, stream and tributary stream crossings allowed
under Section 15(O-1), but located in flood hazard areas
(i.e. A zones) as identified on a community's Flood Insurance
Rate Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must
be designed and constructed under the stricter standards
contained in that community's National Flood Insurance
Program (NFIP). For example, a water crossing may be required
to pass a 100year flood event.
(v) Exception. Skid trail crossings of tributary streams
within shoreland areas and wetlands adjacent to such streams
may be undertaken in a manner not in conformity with the
requirements of the foregoing subsections provided persons
conducting such activities take reasonable measures to avoid
the disruption of shoreline integrity, the occurrence of
sedimentation of water, and the disturbance of stream banks,
stream channels, shorelines, and soil lying within ponds and
wetlands. If, despite such precautions, the disruption of
shoreline integrity, sedimentation of water, or the
disturbance of stream banks, stream channels, shorelines, and
soil lying within ponds and wetlands occurs, such conditions
must be corrected.
(h) Skid trail closeout. Upon completion of timber harvesting and
related activities, or upon the expiration of a Forest Operations
Notification, whichever is earlier, the following requirements
apply:
(i) Bridges and culverts installed for river, stream and
tributary stream crossings by skid trails must either be
removed and areas of exposed soil stabilized, or upgraded to
comply with the closeout standards for land management roads
in Section15(O-1)(6)(i) below.
(ii) Water crossing structures that are not bridges or
culverts must either be removed immediately following timber
harvesting and related activities, or, if frozen into the
river, stream or tributary stream bed or bank, as soon as
practical after snowmelt.
(iii) River, stream and tributary stream channels, banks and
approaches to crossings of water bodies and tributary streams
must be immediately stabilized on completion of harvest, or
if the ground is frozen and/or snow-covered, as soon as
practical after snowmelt. If, despite such precautions,
sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
(i) Land management road closeout. Maintenance of the water control
features must continue until use of the road is discontinued and
the road is put to bed by taking the following actions:
(i)
Effective installation of water bars or other adequate
road drainage structures at appropriate intervals,
constructed to reasonably avoid surface water flowing
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
37
over or under the water bar, and extending sufficient
distance beyond the traveled way so that water does not
reenter the road surface.
(ii) Water crossing structures must be appropriately sized or
dismantled and removed in a manner that reasonably avoids
sedimentation of the water body or tributary stream.
(iii) Any bridge or water crossing culvert in roads to be
discontinued shall satisfy one of the following requirements:
1. it shall be designed to provide an opening
sufficient in size and structure to accommodate 25 year
frequency water flows;
2. it shall be designed to provide an opening with a
cross-sectional area at least 3 1/2 times the cross-
sectional area of the river, stream or tributary stream
channel; or
3. it shall be dismantled and removed in a fashion to
reasonably avoid sedimentation of the river, stream or
tributary stream. If, despite such precautions,
sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
(7) Slope Table
Filter strips, skid trail setbacks, and land management road setbacks
must be maintained as specified in Section 15(O-1), but in no case shall
be less than shown in the following table.
Average slope of land between Width of strip between exposed soil
Exposed mineral (percent) and the shoreline (feet along surface
of the ground)
0___________________________ 25
10__________________________ 45
20__________________________ 65
30__________________________ 85
40__________________________ 105
50__________________________ 125
60__________________________ 145
70__________________________ 165
P. Clearing or Removal of Vegetation for Activities Other Than Timber
Harvesting
(1) In a Resource Protection District abutting a great pond, there shall
be no cutting of vegetation within the strip of land extending 75 feet,
horizontal distance, inland from the normal high-water line, except to
remove safety hazards. Elsewhere, in any Resource Protection District the
cutting or removal of vegetation shall be limited to that which is
necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, and except to
allow for the development of permitted uses, within a strip of land
extending one-hundred(100) feet, horizontal distance, inland from the
normal high-water line of a great pond classified GPA or a river flowing
to a great pond classified GPA, and seventy-five (75) feet, horizontal
distance, from any other water body, tributary stream, or the upland edge
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
38
of a wetland, a buffer strip of vegetation shall be preserved as
follows:
(a) There shall be no cleared opening greater than 250 square feet
in the forest canopy (or other existing woody vegetation if a
forested canopy is not present) as measured from the outer limits
of the tree or shrub crown. However, a footpath not to exceed six
(6) feet in width as measured between tree trunks and/or shrub
stems is allowed provided that a cleared line of sight to the water
through the buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed
provided that a well-distributed stand of trees and other natural
vegetation is maintained. For the purposes of Section 15(P)(2)(b) a
"well-distributed stand of trees" adjacent to a great pond
classified GPA or a river or stream flowing to a great pond
classified GPA, shall be defined as maintaining a rating score of
24 or more in each 25-foot by 50-foot rectangular (1250 square
feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet
Above Ground Level (inches) Points
2 - <4 in.
1
4 - <8 in.
2
8 - <12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a
"well-distributed stand of trees" is defined as maintaining a
minimum rating score of 16 per 25-foot by 50-foot rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot
plot contains four (4) trees between 2 and 4 inches in diameter, two
trees between 4 and 8 inches in diameter, three trees between 8 and 12
inches in diameter, and two trees over 12 inches in diameter, the rating
score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees
totaling 12 points (36- 24 =12) may be removed from the plot provided
that no cleared openings are created.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be
established where the landowner or lessee proposes clearing
within the required buffer;
(ii) Each successive plot must be adjacent to, but not
overlap a previous plot;
(iii) Any plot not containing the required points must have
no vegetation removed except as otherwise allowed by this
Ordinance;
(iv) Any plot containing the required points may have
vegetation removed down to the minimum points required or as
otherwise allowed by this
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
39
Ordinance;
(v) Where conditions permit, no more than 50% of the points
on any 25-foot by 50foot rectangular area may consist of
trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation"
is defined as retaining existing vegetation under three (3) feet in
height and other ground cover and retaining at least five (5)
saplings less than two (2) inches in diameter at four and one half
(4 ½) feet above ground level for each 25-foot by 50-foot rectangle
area. If five saplings do not exist, no woody stems less than two
(2) inches in diameter can be removed until 5 saplings have been
recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total
volume of trees four (4) inches or more in diameter, measured at 4
1/2 feet above ground level may be removed in any ten (10) year
period.
(c) In order to protect water quality and wildlife habitat,
existing vegetation under three (3) feet in height and other ground
cover, including leaf litter and the forest duff layer, shall not
be cut, covered, or removed, except to provide for a footpath or
other permitted uses as described in Section 15(P) paragraphs (2)
and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is
allowed.
(e) In order to maintain a buffer strip of vegetation, when the
removal of storm-damaged, diseased, unsafe, or dead trees results
in the creation of cleared openings, these openings shall be
replanted with native tree species unless existing new tree growth
is present. Section 15(P)(2) does not apply to those portions of
public recreational facilities adjacent to public swimming areas as
long as cleared areas are limited to the minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal
distance, from a great pond classified GPA or a river flowing to a great
pond classified GPA, and seventy-five (75) feet, horizontal distance,
from the normal high-water line of any other water body, tributary
stream, or the upland edge of a wetland, there shall be allowed on any
lot, in any ten (10) year period, selective cutting of not more than
forty (40) percent of the volume of trees four (4)inches or more in
diameter, measured 4 1/2 feet above ground level. Tree removal
conjunction with the development of permitted uses shall be included in
the forty (40) percent calculation. For the purposes of these standards
volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not
limited to, principal and accessory structures, driveways, lawns and
sewage disposal areas, exceed in the aggregate, 25% of the lot area
within the shoreland zone or ten thousand (10,000) square feet, whichever
is greater, including land previously cleared. This provision shall not
apply to the General Development Districts.
(4) Legally existing nonconforming cleared openings may be maintained,
but shall not be enlarged, except as allowed by this Ordinance.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
40
(5) Fields and other cleared openings which have reverted to primarily
shrubs, trees, or other woody vegetation shall be regulated under the
provisions of Section 15(P).
Q. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or
other similar activities which result in unstabilized soil
conditions and which require a permit shall also require a written
soil erosion and sedimentation control plan. The plan shall be
submitted to the permitting authority for approval and shall
include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt
fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining
walls or rip-rap.
(2) In order to create the least potential for erosion, development
shall be designed to fit with the topography and soils of the site.
Areas of steep slopes where high cuts and fills may be required
shall be avoided wherever possible, and natural contours shall be
followed as closely as possible.
(3) Erosion and sedimentation control measures shall apply to all
aspects of the proposed project involving land disturbance, and
shall be in operation during all stages of the activity.
The amount of exposed soil at every phase of construction shall
minimized to reduce the potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently
stabilized within one (1) week from the time it was last actively
worked, by use of riprap, sod, seed, and mulch, or other effective
measures. In all cases permanent stabilization shall occur within
nine (9) months of the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at
least one (1) bale per five hundred (500) square feet and
shall be maintained until a catch of vegetation is
established.
(b) Anchoring the mulch with netting, peg and twine or other
suitable method may be required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in
order to avoid siltation into the water. Such measures may
include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall
be protected from erosion from water flowing through them. Drainage
ways shall be designed and constructed in order to carry water from
a twenty five (25) year storm or greater, and shall be stabilized
with vegetation or lined with riprap.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
41
R. Soils. All land uses shall be located on soils in or upon which the
proposed uses or structures can be established or maintained without
causing adverse environmental impacts, including severe erosion, mass
soil movement, improper drainage, and water pollution, whether during or
after construction. Proposed uses requiring subsurface waste disposal,
and commercial or industrial development and other similar intensive land
uses, shall require a soils report based on an on-site investigation and
be prepared by state-certified professionals. Certified persons may
include Geologists and other persons who have training and experience in
the recognition and evaluation of soil properties. The report shall be
based upon the analysis of the characteristics of the soil and
surrounding land and water areas, maximum ground water elevation,
presence of ledge, drainage conditions, and other pertinent data which
the evaluator deems appropriate. The soils report shall include
recommendations for a proposed use to counteract soil limitations where
they exist.
S. Water Quality. No activity shall deposit on or into the ground or
discharge to the waters of the State any pollutant that, by itself or in
combination with other activities or substances, will impair designated
uses or the water classification of the water body, tributary stream or
wetland.
T. Archaeological Site. Any proposed land use activity involving
structural development or soil disturbance on or adjacent to sites listed
on, or eligible to be listed on the National Register of Historic Places,
as determined by the permitting authority, shall be submitted by the
applicant to the Maine Historic Preservation Commission for review and
comment, at least twenty (20) days prior to action being taken by the
permitting authority. The permitting authority shall consider comments
received from the Commission prior to rendering a decision on the
application.
NOTE: Municipal officials should contact the Maine Historic Preservation
Commission for the listing and location of Historic Places in their
community.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be
appointed or reappointed annually by July 1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance
with the provisions of 30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with
the provisions of State law.
B. Permits Required. After the effective date of this Ordinance no person
shall, without first obtaining a permit, engage in any activity or use of
land or structure requiring a permit in the district in which such
activity or use would occur; or expand, change, or replace an existing
use or structure; or renew a discontinued nonconforming use. A person who
is issued a permit pursuant to this Ordinance shall have a copy of the
permit on site while the work authorized by the permit is performed.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
42
(1) A permit is not required for the replacement of an existing
road culvert as long as:
(a) The replacement culvert is not more than 25% longer than
the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent
sedimentation of the water, and the crossing does not block
fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as
long as the excavation is conducted by an archaeologist listed on
the State Historic Preservation Officer's level 1 or level 2
approved list, and unreasonable erosion and sedimentation is
prevented by means of adequate and timely temporary and permanent
stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to
any other permit required by other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written
application, including a scaled site plan, on a form provided by
the municipality, to the appropriate official as indicated in
Section 14.
(2) All applications shall be signed by an owner or individual who
can show evidence of right, title or interest in the property or by
an agent, representative, tenant, or contractor of the owner with
authorization from the owner to apply for a permit hereunder,
certifying that the information in the application is complete and
correct.
(3) All applications shall be dated, and the Code Enforcement
Officer or Planning Board, as appropriate, shall note upon each
application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid
subsurface wastewater permit or a completed application for a
subsurface wastewater permit, including the site evaluation
approved by the Plumbing Inspector, shall be submitted whenever the
nature of the proposed structure or use would require the
installation of a subsurface sewage disposal system.
D. Procedure for Administering Permits. Within 35 days of the date of
receiving a written application, the Planning Board or Code Enforcement
Officer, as indicated in Section 14, shall notify the applicant in
writing either that the application is a complete application, or, if the
application is incomplete, that specified additional material is needed
to make the application complete. The Planning Board or the Code
Enforcement Officer, as appropriate, shall approve, approve with
conditions, or deny all permit applications in writing within 35 days of
receiving a completed application. However, if the Planning Board has a
waiting list of applications, a decision on the application shall occur
within 35 days after the first available date on the Planning Board's
agenda following receipt of the completed application, or within 35 days
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
43
of the public hearing, if the proposed use or structure is found to be in
conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use
activity is in conformity with the purposes and provisions of this
Ordinance.
After the submission of a complete application to the Planning Board, the
Board shall approve an application or approve it with conditions if it
makes a positive finding based on the information presented that the
proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation
to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish,
aquatic life, bird or other wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points
of access to inland waters;
(6) Will protect archaeological and historic resources as
designated in the comprehensive plan;
(7) Will avoid problems associated with floodplain development and
use; and
(8) Is in conformance with the provisions of Section 15, Land Use
Standards.
If a permit is either denied or approved with conditions, the reasons as
well as conditions shall be stated in writing. No approval shall be
granted for an application involving a structure if the structure would
be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
E. Special Exceptions. In addition to the criteria specified in Section
16(D) above, excepting structure setback requirements, the Planning Board
may approve a permit for a single family residential structure in a
Resource Protection District provided that the applicant demonstrates
that all of the following conditions are met:
(1) There is no location on the property, other than a location
within the Resource Protection District, where the structure can be
built.
(2) The lot on which the structure is proposed is undeveloped and
was established and recorded in the registry of deeds of the county
in which the lot is located before the adoption of the Resource
Protection District.
(3) All proposed buildings, sewage disposal systems and other
improvements are:
(a) Located on natural ground slopes of less than 20%; and
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
44
(b) Located outside the floodway of the 100-year flood-plain
along rivers and artificially formed great ponds along
rivers, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's Flood
Boundary and Floodway Maps and Flood Insurance Rate Maps; all
buildings, including basements, are elevated at least one
foot above the 100-year flood-plain elevation; and the
development is otherwise in compliance with any applicable
municipal flood-plain ordinance. If the floodway is not
shown on the Federal Emergency Management Agency Maps, it is
deemed to be 1/2 the width of the 100-year flood-plain.
(4) The total ground-floor area, including cantilevered or similar
overhanging extensions, of all principal and accessory structures
is limited to a maximum of 1,500 square feet. This limitation shall
not be altered by variance.
(5) All structures, except functionally water-dependent structures,
are set back from the normal high-water line of a water body,
tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than 100 feet, horizontal distance.
In determining the greatest practical extent, the Planning Board
shall consider the depth of the lot, the slope of the land, the
potential for soil erosion, the type and amount of vegetation to be
removed, the proposed building site's elevation in regard to the
flood-plain, and its proximity to moderate-value and high-value
wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of
issuance if a substantial start is not made in construction or in the use
of the property during that period. If a substantial start is made within
one year of the issuance of the permit, the applicant shall have one
additional year to complete the project, at which time the permit shall
expire.
G. Installation of Public Utility Service. A public utility, water
district, sanitary district or any utility company of any kind may not
install services to any new structure located in the shoreland zone
unless written authorization attesting to the validity and currency of
all local permits required under this or any previous Ordinance has been
issued by the appropriate municipal officials or other written
arrangements have been made between the municipal officials and the
utility.
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals
shall have the following powers:
(a) Administrative Appeals: To hear and decide administrative
appeals, on an appellate basis, where it is alleged by an
aggrieved party that there is an error in any order
requirement, decision, or determination made by, or failure
to act by, the Planning Board in the administration of this
Ordinance; and to hear and decide administrative appeals on a
de novo basis where it is alleged by an aggrieved party that
there is an error in any order, requirement, decision or
determination made by, or failure to act by, the Code
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
45
Enforcement Officer in his or her review of and action on a
permit application under this Ordinance. Any order,
requirement, decision or determination made, or failure to
act, in the enforcement of this ordinance is not appealable
to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal,
within the limitations set forth in this Ordinance.
(2) Variance Appeals. Variances may be granted only under the
following conditions:
(a) Variances may be granted only from dimensional
requirements including, but not limited to, lot width,
structure height, percent of lot coverage, and setback
requirements.
(b) Variances shall not be granted for establishment of any
uses otherwise prohibited by this Ordinance.
(c) The Board shall not grant a variance unless it finds
that:
(i) The proposed structure or use would meet the
provisions of Section 15 except for the specific
provision which has created the non-conformity and from
which relief is sought; and
(ii) The strict application of the terms of this
Ordinance would result in undue hardship. The term
"undue hardship" shall mean:
a. That the land in question cannot yield a
reasonable return unless a variance is granted;
b. That the need for a variance is due to the
unique circumstances of the property and not to
the general conditions in the neighborhood;
c. That the granting of a variance will not alter
the essential character of the locality; and
d. That the hardship is not the result of action
taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board
of Appeals may grant a variance to an owner of a residential
dwelling for the purpose of making that dwelling accessible
to a person with a disability who resides in or regularly
uses the dwelling. The board shall restrict any variance
granted under this subsection solely to the installation of
equipment or the construction of structures necessary for
access to or egress from the dwelling by the person with the
disability. The board may impose conditions on the variance,
including limiting the variance to the duration of the
disability or to the time that the person with the disability
lives in the dwelling. The term "structures necessary for
access to or egress from the dwelling" shall include railing,
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
46
wall or roof systems necessary for the safety or
effectiveness of the structure.
(e) The Board of Appeals shall limit any variances granted as
strictly as possible in order to ensure conformance with the
purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions
to a variance as it deems necessary. The party receiving the
variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the
application and all supporting information supplied by the
applicant, shall be forwarded by the municipal officials to
the Commissioner of the Department of Environmental
Protection at least twenty (20) days prior to action by the
Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made
part of the record and shall be taken into consideration by
the Board of Appeals.
(3) Administrative Appeals When the Board of Appeals reviews a
decision of the Code Enforcement Officer the Board of Appeals shall
hold a "de novo" hearing. At this time the Board may receive and
consider new evidence and testimony, be it oral or written. When
acting in a "de novo" capacity the Board of Appeals shall hear and
decide the matter afresh, undertaking its own independent analysis
of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board,
it shall hold an appellate hearing, and may reverse the decision of
the Planning Board only upon finding that the decision was contrary
to specific provisions of the Ordinance or contrary to the facts
presented to the Planning Board. The Board of Appeals may only
review the record of the proceedings before the Planning Board. The
Board of Appeals shall not receive or consider any evidence which
was not presented to the Planning Board, but the Board of Appeals
may receive and consider written or oral arguments. If the Board of
Appeals determines that the record of the Planning Board
proceedings are inadequate, the Board of Appeals may remand the
matter to the Planning Board for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken
to the Board of Appeals by an aggrieved party from any
decision of the Code Enforcement Officer or the
Planning Board, except for enforcement-related matters
as described in Section 16(H)(1)(a) above. Such an
appeal shall be taken within thirty (30) days of the
date of the official, written decision appealed from,
and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day
requirement.
(ii) Applications for appeals shall be made by filing
with the Board of Appeals a written notice of appeal
which includes:
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
47
a. A concise written statement indicating what
relief is requested and why the appeal or
variance should be granted.
b. A sketch drawn to scale showing lot lines,
location of existing buildings and structures and
other physical features of the lot pertinent to
the relief sought.
(iii) Upon receiving an application for an
administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate,
shall transmit to the Board of Appeals all of the
papers constituting the record of the decision appealed
from.
(iv) The Board of Appeals shall hold a public hearing
on an administrative appeal or a request for a variance
within thirty-five (35) days of its receipt of a
complete written application, unless this time period
is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the
Board shall constitute a quorum for the purpose of
deciding an appeal.
(ii) The person filing the appeal shall have the burden
of proof.
(iii) The Board shall decide all administrative appeals
and variance appeals within thirty five (35) days after
the close of the hearing, and shall issue a written
decision on all appeals.
(iv) The Board of Appeals shall state the reasons and
basis for its decision, including a statement of the
facts found and conclusions reached by the Board.
The Board shall cause written notice of its decision to
be mailed or hand-delivered to the applicant and to the
Department of Environmental Protection within seven (7)
days of the Board's decision. Copies of written
decisions of the Board of Appeals shall be given to the
Planning Board, Code Enforcement Officer, and the
municipal officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A.
section 2691(3)(F), any aggrieved party who participated as a party
during the proceedings before the Board of Appeals may take an
appeal to Superior Court in accordance with State laws within
forty-five (45) days from the date of any decision of the Board of
Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section
2691(3)(F), the Board of Appeals may reconsider any decision within
forty-five (45) days of its prior decision. A request to the Board
to reconsider a decision must be filed within ten (10) days of the
decision that is being reconsidered. A vote to reconsider and the
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
48
action taken on that reconsideration must occur and be completed
within forty-five (45) days of the date of the vote on the original
decision. Reconsideration of a decision shall require a positive
vote of the majority of the Board members originally voting on the
decision, and proper notification to the landowner, petitioner,
planning board, code enforcement officer, and other parties of
interest, including abuttors and those who testified at the
original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made
within fifteen (15) days after the decision on reconsideration.
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to
be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to
enforce the provisions of this Ordinance. If the Code
Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in
writing the person responsible for such violation, indicating
the nature of the violation and ordering the action necessary
to correct it, including discontinuance of illegal use of
land, buildings or structures, or work being done, removal of
illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the
municipal officers and be maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on-site
inspections to insure compliance with all applicable laws and
conditions attached to permit approvals. The Code
Enforcement Officer shall also investigate all complaints of
alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record
of all essential transactions of the office, including
applications submitted, permits granted or denied, variances
granted or denied, revocation actions, revocation of permits,
appeals, court actions, violations investigated, violations
found, and fees collected. On a biennial basis, a summary of
this record shall be submitted to the Director of the Bureau
of Land and Water Quality within the Department of
Environmental Protection.
(3) Legal Actions. When the above action does not result in the
correction or abatement of the violation or nuisance condition, the
Municipal Officers, upon notice from the Code Enforcement Officer,
are hereby directed to institute any and all actions and
proceedings, either legal or equitable, including seeking
injunctions of violations and the imposition of fines, that
may be appropriate or necessary to enforce the provisions of this
Ordinance in the name of the municipality. The municipal officers,
or their authorized agent, are hereby authorized to enter into
administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
49
action. Such agreements shall not allow an illegal structure or use
to continue unless there is clear and convincing evidence that the
illegal structure or use was constructed or conducted as a direct
result of erroneous advice given by an authorized municipal
official and there is no evidence that the owner acted in bad
faith, or unless the removal of the structure or use will result in
a threat or hazard to public health and safety or will result in
substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a
landowner's agent or a contractor, who violates any provision or
requirement of this Ordinance shall be penalized in accordance with
30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than
$2500 per violation for each day that the violation continues. However,
in a resource protection district the maximum penalty is increased to
$5000 (38 M.R.S.A. section 4452).
17. Definitions.
Accessory structure or use - a use or structure which is incidental and
subordinate to the principal use or structure. Accessory uses, when aggregated,
shall not subordinate the principal use of the lot. A deck or similar extension
of the principal structure or a garage attached to the principal structure by a
roof or a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly
affected by the granting or denial of a permit or variance under this
Ordinance; a person whose land abuts land for which a permit or variance has
been granted; or any other person or group of persons who have suffered
particularized injury as a result of the granting or denial of such permit or
variance.
Agriculture - the production, keeping or maintenance for sale or lease, of
plants and/or animals, including but not limited to: forages and sod crops;
grains and seed crops; dairy animals and dairy products; poultry and poultry
products; livestock; fruits and vegetables; and ornamental and greenhouse
products. Agriculture does not include forest management and timber harvesting
activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine,
or marine plant or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above
ground level and inclusive of bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet
or more and having more than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and
landing of watercraft, and which may include an access ramp, docking area, and
parking spaces for vehicles and trailers.
Bureau - State of Maine Department of Conservation's Bureau of Forestry
Campground - any area or tract of land to accommodate two (2) or more parties
in temporary living quarters, including, but not limited to tents, recreational
vehicles or other shelters.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
50
Canopy - the more or less continuous cover formed by tree crowns in a wooded
area.
Commercial use - the use of lands, buildings, or structures, other than a "home
occupation," defined below, the intent and result of which activity is the
production of income from the buying and selling of goods and/or services,
exclusive of rental of residential buildings and/or dwelling units.
Cross-sectional area - the cross-sectional area of a stream or tributary stream
channel is determined by multiplying the stream or tributary stream channel
width by the average stream or tributary stream channel depth. The stream or
tributary stream channel width is the straight line distance from the normal
high-water line on one side of the channel to the normal high-water line on the
opposite side of the channel. The average stream or tributary stream channel
depth is the average of the vertical distances from a straight line between the
normal high-water lines of the stream or tributary stream channel to the bottom
of the channel.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
Development - a change in land use involving alteration of the land, water or
vegetation, or the addition or alteration of structures or other construction
not naturally occurring.
Dimensional requirements - numerical standards relating to spatial
relationships including but not limited to setback, lot area, shore frontage
and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital
defect or mental condition caused by bodily injury, accident, disease, birth
defect, environmental conditions or illness; and also includes the physical or
mental condition of a person which constitutes a substantial handicap as
determined by a physician or in the case of mental handicap, by a psychiatrist
or psychologist, as well as any other health or sensory impairment which
requires special education, vocational rehabilitation or related services.
Disruption of shoreline integrity - the alteration of the physical shape,
properties, or condition of a shoreline at any location by timber harvesting
and related activities. A shoreline where shoreline integrity has been
disrupted is recognized by compacted, scarified and/or rutted soil, an abnormal
channel or shoreline cross-section, and in the case of flowing waters, a
profile and character altered from natural conditions.
Driveway -a vehicular access-way less than five hundred (500) feet in length
serving two single-family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or
general welfare, such as protection of resources from immediate destruction or
loss, law enforcement, and operations to rescue human beings, property and
livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel,
electric power or water transmission or distribution lines, towers and related
equipment; telephone cables or lines, poles and related equipment; gas, oil,
water, slurry or other similar pipelines; municipal sewage lines, collection or
supply systems; and associated storage tanks. Such systems may include towers,
poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police
call boxes, traffic signals, hydrants and similar accessories, but shall not
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
51
include service drops or buildings which are necessary for the furnishing of
such services.
Expansion of a structure - an increase in the floor area or volume of a
structure, including all extensions such as, but not limited to: attached
decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating
season; or the use of more floor area or ground area devoted to a particular
use.
Family - one or more persons occupying a premises and living as a single
housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas
that must be reserved in order to discharge the 100-year flood without
cumulatively increasing the water surface elevation by more than one foot in
height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure
enclosed by exterior walls, plus the horizontal area of any unenclosed portions
of a structure such as porches and decks.
Forest management activities - timber cruising and other forest resource
evaluation activities, pesticide or fertilizer application, management planning
activities, timber stand improvement, pruning, regeneration of forest stands,
and other similar or associated activities, exclusive of timber harvesting and
the construction, creation or maintenance of roads.
Forested wetland - a freshwater wetland dominated by woody vegetation that is
six (6) meters tall (approximately twenty (20) feet) or taller.
Forest Stand - a contiguous group of trees sufficiently uniform in age class
distribution, composition, and structure, and growing on a site of sufficiently
uniform quality, to be a distinguishable unit.
Foundation - the supporting substructure of a building or other structure,
excluding wooden sills and post supports, but including basements, slabs,
frostwalls, or other base consisting of concrete, block, brick or similar
material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other
than forested wetlands, which are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres
and adjacent to a surface water body, excluding any river, stream or
brook, such that in a natural state, the combined surface area is in
excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and
for a duration sufficient to support, and which under normal
circumstances do support, a prevalence of wetland vegetation typically
adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land
that do not conform to the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary
purpose, location on submerged lands or that require direct access to, or
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
52
location in, inland waters and that can not be located away from these waters.
The uses include, but are not limited to commercial and recreational fishing
and boating facilities, excluding recreational boat storage buildings, finfish
and shellfish processing, fish storage and retail and wholesale fish marketing
facilities, waterfront dock and port facilities, shipyards and boat building
facilities, marinas, navigation aids, basins and channels, retaining walls,
industrial uses dependent upon water-borne transportation or requiring large
volumes of cooling or processing water that can not reasonably be located or
operated at an inland site, and uses that primarily provide general public
access to inland waters.
Great pond - any inland body of water which in a natural state has a surface
area in excess of ten acres, and any inland body of water artificially formed
or increased which has a surface area in excess of thirty (30) acres except for
the purposes of this Ordinance, where the artificially formed or increased
inland body of water is completely surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to 38
M.R.S.A. Article 4-A Section 465-A. This classification includes some, but not
all impoundments of rivers that are defined as great ponds.
Ground cover - small plants, fallen leaves, needles and twigs, and the
partially decayed organic matter of the forest floor.
Harvest Area - the area where timber harvesting and related activities,
including the cutting of trees, skidding, yarding, and associated road
construction take place. The area affected by a harvest encompasses the area
within the outer boundaries of these activities, excepting unharvested areas
greater than 10 acres within the area affected by a harvest.
Height of a structure - the vertical distance between the mean original (prior
to construction) grade at the downhill side of the structure and the highest
point of the structure, excluding chimneys, steeples, antennas, and similar
appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on
or in a residential structure or property and which is 1) clearly incidental to
and compatible with the residential use of the property and surrounding
residential uses; and 2) which employs no more than two (2) persons other than
family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or
property which causes further deviation from the dimensional standard(s)
creating the nonconformity such as, but not limited to, reduction in water
body, tributary stream or wetland setback distance, increase in lot coverage,
or increase in height of a structure. Property changes or structure expansions
which either meet the dimensional standard or which cause no further increase
in the linear extent of nonconformance of the existing structure shall not be
considered to increase nonconformity. For example, there is no increase in
nonconformity with the setback requirement for water bodies, wetlands, or
tributary streams if the expansion extends no further into the required setback
area than does any portion of the existing nonconforming structure. Hence, a
structure may be expanded laterally provided that the expansion extends no
closer to the water body, tributary stream, or wetland than the closest portion
of the existing structure from that water body, tributary stream, or wetland.
Included in this allowance are expansions which in-fill irregularly shaped
structures.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
53
Individual private campsite - an area of land which is not associated with a
campground, but which is developed for repeated camping by only one group not
to exceed ten (10) individuals and which involves site improvements which may
include but not be limited to a gravel pad, parking area, fire place, or tent
platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging
or processing of goods, or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a
church, library, public or private school, hospital, or municipally owned or
operated building, structure or land used for public purposes.
Land Management Road - a route or track consisting of a bed of exposed mineral
soil, gravel, or other surfacing materials constructed for, or created by, the
passage of motorized vehicles and used primarily for timber harvesting and
related activities, including associated log yards, but not including
skid trails or skid roads.
Licensed Forester - a forester licensed under 32 M.R.S.A. Chapter 76.
Lot area - The area of land enclosed within the boundary lines of a lot, minus
land below the normal high-water line of a water body or upland edge of a
wetland and areas beneath roads serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as
its principal use, providing for hire offshore moorings or docking facilities
for boats, and which may also provide accessory services such as boat and
related sales, boat repair and construction, indoor and outdoor storage of
boats and marine equipment, bait and tackle shops and marine fuel service
facilities.
Market value - the estimated price a property will bring in the open market and
under prevailing market conditions in a sale between a willing seller and a
willing buyer, both conversant with the property and with prevailing general
price levels.
Mineral exploration - hand sampling, test boring, or other methods of
determining the nature or extent of mineral resources which create minimal
disturbance to the land and which include reasonable measures to restore the
land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which
removes more than one hundred (100) cubic yards of soil, topsoil, loam, sand,
gravel, clay, rock, peat, or other like material from its natural location and
to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot.
When only two lot lines extend into the shoreland zone, both lot lines shall be
considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more
residential dwelling units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is
allowed solely because it was in lawful existence at the time this Ordinance or
subsequent amendment took effect.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
54
Non-conforming lot - a single lot of record which, at the effective date of
adoption or amendment of this Ordinance, does not meet the area, frontage, or
width requirements of the district in which it is located.
Non-conforming structure - a structure which does not meet any one or more of
the following dimensional requirements; setback, height, or lot coverage, but
which is allowed solely because it was in lawful existence at the time this
Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts
thereof which is not allowed in the district in which it is situated, but which
is allowed to remain solely because it was in lawful existence at the time this
Ordinance or subsequent amendments took effect.
Normal high-water line - that line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or
changes in vegetation, and which distinguishes between predominantly aquatic
and predominantly terrestrial land. Areas contiguous with rivers and great
ponds that support non-forested wetland vegetation and hydric soils and that
are at the same or lower elevation as the water level of the river or great
pond during the period of normal high-water are considered part of the river or
great pond.
Person - an individual, corporation, governmental agency, municipality, trust,
estate, partnership, association, two or more individuals having a joint or
common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or
beyond the normal high-water line or within a wetland.
Temporary: Structures which remain in or over the water for less than
seven (7) months in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7)
months or more in any period of twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes
wholly incidental or accessory to the use of another building or use on the
same premises.
Principal use - a use other than one which is wholly incidental or accessory to
another use on the same premises.
Public facility - any facility, including, but not limited to, buildings,
property, recreation areas, and roads, which are owned, leased, or otherwise
operated, or funded by a governmental body or public entity.
Recent floodplain soils - the following soil series as described and identified
by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
55
Recreational facility - a place designed and equipped for the conduct of
sports, leisure time activities, and other customary and usual recreational
activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be
towed, and designed for temporary sleeping or living quarters for one or more
persons, and which may include a pick-up camper, travel trailer, tent trailer,
camp trailer, and motor home. In order to be considered as a vehicle and not as
a structure, the unit must remain with its tires on the ground, and must be
registered with the State Division of Motor Vehicles.
Replacement system -a system intended to replace: 1.) an existing system which
is either malfunctioning or being upgraded with no significant change of design
flow or use of the structure, or 2.) any existing overboard wastewater
discharges.
Residential dwelling unit - a room or group of rooms designed and equipped
exclusively for use as permanent, seasonal, or temporary living quarters for
only one family at a time, and containing cooking, sleeping and toilet
facilities. The term shall include mobile homes and rental units that contain
cooking, sleeping, and toilet facilities regardless of the time-period rented.
Recreational vehicles are not residential dwelling units.
Residual basal area - the average of the basal area of trees remaining on a
harvested site.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter,
used for erosion control and soil stabilization, typically used on ground
slopes of two (2) units horizontal to one (1) unit vertical or less.
Residual Stand - a stand of trees remaining in the forest following timber
harvesting and related activities
River - a free-flowing body of water including its associated floodplain
wetlands from that point at which it provides drainage for a watershed of
twenty five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel,
asphalt, or other surfacing material constructed for or created by the repeated
passage of motorized vehicles, excluding a driveway as defined.
Service drop - any utility line extension which does not cross or run beneath
any portion of a water body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles
is located entirely upon the premises of the customer requesting
service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand
(1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the
installation of telephone wires to existing utility poles, or
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
56
b. the extension requiring the installation of new utility poles or
placement underground is less than one thousand (1,000) feet in
length.
Setback - the nearest horizontal distance from the normal high-water line of a
water body or tributary stream, or upland edge of a wetland, to the nearest
part of a structure, road, parking space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland
measured in a straight line between the intersections of the lot lines with the
shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet,
horizontal distance, of the normal high-water line of any great pond or river;
within 250 feet of the upland edge of a freshwater wetland; or within seventy-
five (75) feet, horizontal distance, of the normal high-water line of a stream.
Shoreline - the normal high-water line, or upland edge of a wetland.
Skid Road or Skid Trail - a route repeatedly used by forwarding machinery or
animal to haul or drag forest products from the stump to the yard or landing,
the construction of which requires minimal excavation.
Slash - the residue, e.g., treetops and branches, left on the ground after a
timber harvest.
Stream - a free-flowing body of water from the outlet of a great pond or the
confluence of two (2) perennial streams as depicted on the most recent edition
of a United States Geological Survey 7.5 minute series topographic map, or if
not available, a 15-minute series topographic map, to the point where the body
of water becomes a river or flows to another water body or wetland within the
shoreland area.
Structure - anything built for the support, shelter or enclosure of persons,
animals, goods or property of any kind, together with anything constructed or
erected with a fixed location on or in the ground, exclusive of fences, and
poles, wiring and other aerial equipment normally associated with service drops
as well as guying and guy anchors. The term includes structures temporarily or
permanently located, such as decks, patios, and satellite dishes.
Substantial start - completion of thirty (30) percent of a permitted structure
or use measured as a percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or
waste water on or beneath the surface of the earth; includes, but is not
limited to: septic tanks; disposal fields; grandfathered cesspools; holding
tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system
licensed under 38 M.R.S.A. section 414, any surface waste water disposal
system, or any municipal or quasi-municipal sewer or waste water treatment
system.
Sustained slope - a change in elevation where the referenced percent grade is
substantially maintained
or exceeded throughout the measured area.
Timber harvesting - the cutting and removal of timber for the primary purpose
of selling or processing forest products. The cutting or removal of trees in
the shoreland zone on a lot that has less than two (2) acres within the
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
57
shoreland zone shall not be considered timber harvesting. Such cutting or
removal of trees shall be regulated pursuant to Section 15 (P), Clearing or
Removal of Vegetation for Activities Other Than Timber Harvesting.
Timber harvesting and related activities -timber harvesting, the construction
and maintenance of roads used primarily for timber harvesting and other
activities conducted to facilitate timber harvesting.
Tributary stream - means a channel between defined banks created by the action
of surface water, which is characterized by the lack of terrestrial vegetation
or by the presence of a bed, devoid of topsoil, containing waterborne deposits
or exposed soil, parent material or bedrock; and which is connected
hydrologically with other water bodies. "Tributary stream" does not include
rills or gullies forming because of accelerated erosion in disturbed soils
where the natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this
Ordinance, and only applies to that portion of the tributary stream located
within the shoreland zone of the receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the
shoreland zone.
Upland edge of a wetland - the boundary between upland and wetland. For
purposes of a freshwater wetland, the upland edge is formed where the soils are
not saturated for a duration sufficient to support wetland vegetation; or where
the soils support the growth of wetland vegetation, but such vegetation is
dominated by woody stems that are six (6) meters (approximately twenty (20)
foot) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without
limitation, trees both over and under 4 inches in diameter, measured at 4 1/2
feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by
roof and fixed exterior walls as measured from the exterior faces of these
walls and roof.
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a
river, stream, tributary stream, or wetland whether under, through, or over the
water or wetland. Such projects include but may not be limited to roads, fords,
bridges, culverts, water lines, sewer lines, and cables as well as maintenance
work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - a freshwater wetland.
Windfirm - the ability of a forest stand to withstand strong winds and resist
windthrow, wind rocking, and major breakage.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
58
TOWN OF HANOVER SHORELAND ZONING ORDINANCE
Town of Hanover Shoreland Zonining Ordinance
59