This is the exact embedded text of the captured official document.
Snapshot 16461fb3aa89 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Town of
Harpswell
Maine
2026
Basic Land
Use
Ordinance
Town of Harpswell
Basic Land Use Ordinance
Adopted February 3, 1994
As Amended March 15, 1997
As Amended March 6, 1999
As Amended March 11, 2000
As Amended August 23, 2001
As Amended March 16, 2002
As Amended November 23, 2002
As Amended March 8, 2003
As Amended May 20, 2004
As Amended March 13, 2005
As Amended March 11, 2006
As Amended March 10, 2007
As Amended March 14, 2009
As Amended March 20, 2010
As Amended March 12, 2011
As Amended June 12, 2012
As Amended March 9, 2013
As Amended March 15, 2014
As Amended March 14, 2015
As Amended March 12, 2016
As Amended March 11, 2017
As Amended March 9, 2019
As Amended June 8, 2021
As Amended April 23, 2022
As Amended June 15, 2024
As Amended March 14, 2026
Replaces Land Use Ordinance adopted February 3, 1994
BASIC LAND USE ORDINANCE
TABLE OF CONTENTS
Page
Section 1.
Purpose............................................................................
1
Section 2.
Authority..........................................................................
1
Section 3.
Applicability......................................................................
1
Section 4.
Effective Date....................................................................
1
Section 5.
Availability.......................................................................
2
Section 6.
Severability.......................................................................
2
Section 7.
Conflicts with Other Ordinances...............................................
2
Section 8.
Amendments......................................................................
2
Section 9.
Land Use Requirements.........................................................
2
Section 10.
Nonconformance.................................................................
2
10.1 Purpose.............................................................................
2
10.2 General.............................................................................
3
10.2.1 Transfer of Ownership...................................................
3
10.2.2. Repair and Maintenance................................................
3
10.3 Nonconforming Structures......................................................
3
10.3.1 Expansions.................................................................
3
10.3.2 Relocation, Reconstruction or Replacement..........................
4
10.3.2.1 Relocation.......................................................
4
10.3.2.2 Reconstruction or Replacement..............................
4
10.3.2.3 Authority of Planning Board to Exercise
Jurisdiction over an Application.............................
5
10.3.2.4 Greatest Practical Extent Setback Factors..................
6
10.4 Nonconforming Lots.............................................................
6
10.4.2 Nonconforming Lots.....................................................
6
10.4.2.1 Setback Reduction for Small Nonconforming Lots.......
6
10.4.3 Contiguous Built Lots....................................................
7
10.4.4 Contiguous Lots - Vacant or Partially Built..........................
7
10.4.5 Creation of Nonconforming Lot(s) for Preservation or
Conservation Purposes..................................................
8
Section 11.
Standards...........................................................................
9
11.1 Minimum Lot Standards..........................................................
9
11.2 Minimum Lot Frontage...........................................................
11
11.2.1 Off-Shore Island...........................................................
11
11.3 Principal and Accessory Structures.............................................
11
11.3.1 Setback.....................................................................
11
11.3.2 Height of Structures......................................................
11.3.3 Accessory Temporary Living Accommodation.......................
11
12
11.4 Subsurface Waste Disposal......................................................
13
11.4.3 Existing Use - Continuation of Use....................................
13
11.4.4 Change in Use.............................................................
13
Page
11.5 Roads and Driveways.............................................................
14
11.6 Storm Water Runoff..............................................................
14
11.7 Campgrounds......................................................................
14
11.8 Individual Private Campsites and Temporary Residential Use.............
14
11.9 Agriculture.........................................................................
14
11.10 Earth Moving, Erosion and Sedimentation Control..........................
14
11.11 Water Quality Protection.........................................................
14
11.12 Accessory Dwelling Units.....................................................
15
11.13 Utilities and Essential Services..................................................
15
11.14 Soils.................................................................................
15
11.15 Vegetative Buffers.................................................................
15
11.16 Home Occupations................................................................
16
11.17 Archeological and Historic Sites................................................
16
11.18 Workforce Housing...............................................................
16
11.18.1 Purpose....................................................................
16
11.18.2 Applicability..............................................................
16
11.18.2.1 Single Lot Development Standards.......................
16
11.18.2.2 New Subdivisions............................................
17
11.18.3 Standards for Development of Workforce Housing
Subdivisions..............................................................
18
11.18.3.1 Density Bonus Provisions..................................
18
11.18.3.2 Plan Notations and Recorded Documentation
Of Affordability.........................................................
18
11.18.3.3 Location.......................................................
19
11.18.3.4 Neighborhood Compatibility...............................
19
11.18.3.5 Workforce Housing Covenant.............................
19
11.18.3.6 Development of Workforce Housing Lots...............
19
11.18.3.7 Off Site Option...............................................
19
11.18.3.8 Administration of Workforce Housing...................
20
11.18.4 Qualified Buyers........................................................
20
11.19 Swimming Pools..................................................................
20
11.20 Wheelchair Ramps and Other Accessibility Structures.....................
20
Section 12.
Administration....................................................................
21
12.1 Administrative Bodies and Agents..............................................
21
12.1.1 Code Enforcement Officer (CEO).......................................
21
12.1.2 Powers and Duties........................................................
21
12.2 Planning Board....................................................................
21
12.2.1 Appointment...............................................................
21
12.2.2 Organization and Rules..................................................
22
12.2.3 Duties and Powers........................................................
22
12.2.3.2 Notification to Abutters.......................................
22
12.2.3.3 Technical Review Fee.........................................
23
12.3 Board of Appeals..................................................................
23
12.3.1 Powers and Duties........................................................
23
12.3.1.1 Administrative Appeals........................................
23
12.3.1.2 Variance Requests..............................................
24
12.3.1.3 Boundary Line Determinations...............................
24
12.3.1.4 Notification to Abutters........................................
24
12.4 Definitions..........................................................................
24
Section 13.
Permits, Approvals and Certificates of Compliance Required..............
24
13.1 Permits or Approvals.............................................................
24
13.2 Certificates of Compliance......................................................
24
13.2.1 Temporary Certificates of Compliance................................
24
13.3 Table 1-Land Uses and Activities...............................................
25
13.3 Permit and Approval Application...............................................
29
13.4 Procedure for Administering Permits..........................................
30
13.5 Fee and Time Limits..............................................................
32
13.6 Violation, Enforcement, Penalties and Legal Actions.......................
33
Section 14.
Variances and Appeals...........................................................
34
14.1 Variances...........................................................................
34
14.1.4.3 Disability Variance.............................................
35
14.1.4.4 Setback Variance for One-Unit Residential Uses .........
35
14.1.4.5 Practical Difficulty Variance..................................
36
14.1.5 Variance Recorded........................................................
36
14.1.6 Interpretation of Ordinance Requirements.............................
36
14.2 Appeals.............................................................................
37
14.2.1 Administrative Appeal...................................................
37
14.3 Decision by Board of Appeals...................................................
37
14.4 Appeal to Superior Court.........................................................
38
14.5 Reconsideration....................................................................
38
Appendix I. Shoreland Zoning Map............................................................ 38
THIS UNOFFICIAL TABLE OF CONTENTS IS NOT A PART OF THE ORDINANCE AND IS PROVIDED FOR
CONVENIENCE ONLY.
1
SECTION 1. PURPOSE
The purpose of this Ordinance is to provide for reasonable and orderly development within all
areas of the Town while protecting the health, safety, and welfare of its citizens.
This Ordinance seeks to preserve the character of Harpswell as a residential, fishing, and
vacation community with clean waters, healthy wetland functions and wildlife habitats, scenic
attractiveness and a sense of openness. It seeks also to preserve to the maximum extent possible,
traditional rights of landowners to use their lands as they desire, while at the same time
protecting nearby residential owners from excessive conflicting uses that might degrade property
values and damage the attractiveness of the community to the detriment of all.
SECTION 2. AUTHORITY
This Ordinance is adopted under powers granted to the town by 30-A M.R.S.A. §§ 3001 and
4352, as may be amended from time to time.
Throughout this Ordinance there are "Citizen's Notes". These notes shall not be considered part
of this Ordinance as adopted by the Town, but shall only be considered as aids for citizens to use
this Ordinance and as guides to the intent of Ordinance provisions and their proper interpretation.
Section Titles of this Ordinance do not constitute official ordinance language. These Titles shall
only be considered as an aid for citizens using this Ordinance.
SECTION 3. APPLICABILITY
This Ordinance applies to all dwellings, accessory structures, and uses that are not subject to
Shoreland Zoning. The provisions of this Ordinance pertaining to nonconformance apply to all
nonconforming, nonresidential structures, developments, and uses not subject to the Shoreland
Zoning Ordinance. In addition, the procedural and administrative provisions contained in this
Ordinance govern the administration of all the Town's land use ordinances. Insofar as this
Ordinance is inconsistent with state law as it relates to mobile home parks, the provisions of
30-A M.R.S.A. § 4358, as may be amended from time to time, shall prevail.
Citizen's Note: For creation of subdivisions, see Subdivision Ordinance. For activities in the
Shoreland Zone requiring permits, see Shoreland Zoning Ordinance. Multi-family dwellings and
nonresidential development, wherever located, are also subject to the provisions of the Site Plan
Review Ordinance.
SECTION 4. EFFECTIVE DATE
The effective date of this Ordinance is September 15, 1997.
2
SECTION 5. AVAILABILITY
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible
to any member of the public. Copies shall be made available to the public at reasonable cost at
the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
SECTION 6. SEVERABILITY
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance.
SECTION 7. CONFLICTS WITH OTHER ORDINANCES
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision
of this Ordinance or of any other Ordinance, regulation or statute, the more restrictive provision
shall control unless state law provides otherwise.
SECTION 8. AMENDMENTS
Amendments may be made by a majority vote of the Town at any Harpswell Town Meeting and
shall take effect upon enactment unless otherwise specified.
Amendments may be initiated by a majority vote of the Planning Board, by a majority vote of the
Board of Selectmen or by written petition signed by a number of registered voters equal to ten
percent (10%) of Harpswell voters voting in the last gubernatorial election.
SECTION 9. LAND USE REQUIREMENTS
Except as hereinafter specified, no structure or land shall hereafter be used or occupied, and no
structure or part thereof shall hereafter be erected, constructed, expanded, moved, altered,
replaced and no new lot shall be created except in conformity with all of the regulations herein
specified for the area or district in which it is located, unless a variance is granted by the Board
of Appeals.
SECTION 10. NONCONFORMANCE
10.1. Purpose. It is the intent of this Ordinance to promote land use conformities, except that
lawful nonconforming conditions that existed before September 15, 1997 and the effective dates
of any amendments to this Ordinance creating new nonconforming conditions shall be allowed to
continue, subject to the requirements set forth in this section.
Citizen's Note: Nonconformance should not be considered illegal or unacceptable.
Nonconformance means lots of record or uses that are grandfathered because they were in
conformance with the standards in effect before the adoption of this Ordinance or any
3
amendments creating new nonconforming conditions. The concerned party is encouraged to read
through this Ordinance and contact a town official should a question arise. If the property is
located in the Shoreland Zone, see the relevant provisions in the Shoreland Zoning Ordinance.
10.2. General.
10.2.1. Transfer of Ownership. Nonconforming structures, lots and uses may be transferred,
and the new owner may continue the nonconforming use or continue to use the nonconforming
structure or lot, subject to the provisions of this Ordinance.
10.2.2. Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep
and maintenance of nonconforming uses and structures including repair or renovations that do
not involve expansion of the nonconforming use or structure, and such other changes in a
nonconforming use or structure as Federal, State, or local building and safety codes may
require.
Citizen's Note: See Definitions Addendum for the definitions of nonconforming structures,
nonconforming uses, and nonconforming lots.
10.3. Nonconforming Structures
10.3.1. Expansions. A nonconforming structure may be added to or expanded after obtaining a
permit from the same permitting authority as that for a new structure, if such addition or
expansion does not increase the nonconformity of the structure. For the purposes of this
Ordinance, an increase to the nonconformity of the structure shall mean:
·
any expansion towards a property line or road that decreases the shortest existing
nonconforming setback distance from property line or road, or
·
any expansion which would cause the total area covered by the structures, driveways,
parking lots, and other impermeable surfaces to exceed twenty percent (20%) of the
total lot area, or
·
any expansion which would cause the structure to exceed the height limits of this
Ordinance.
The shortest existing nonconforming setback distance from a property line or a road may not
be measured from an existing area, such as a small patio, terrace, landing, or small set of stairs,
used mainly for access to a structure.
Citizen's Note: It should be understood that small patios, terraces, landings, or small sets of
stairs within minimum setbacks do not change the setback of the adjacent structure and cannot
be used to justify expansion of any other part of the structure into that setback.
4
10.3.1.1. After September 15, 1997, or the effective date of any amendment to this
Ordinance creating any new nonconforming conditions, if any portion of an existing
structure is less than the required setback from the road or property line, that portion of the
structure shall not be expanded in floor area or volume, by more than thirty percent (30%),
during the lifetime of the structure.
10.3.1.2. Construction of a foundation beneath an existing building that is nonconforming
as to setbacks shall not be considered an expansion of the structure provided that:
10.3.1.2.1. The foundation shall not extend beyond the exterior dimension of the
building as it existed on September 15, 1997 or the effective date of any amendment to
this Ordinance creating any new nonconforming condition, or as expanded in
accordance with Section 10.3.1.1.
Citizen's Note: Disputed decisions may be appealed to the Board of Appeals.
10.3.2. Relocation, Reconstruction, or Replacement
10.3.2.1. Relocation. A nonconforming structure may be relocated within the boundaries of
the parcel on which the structure is located provided that the site of relocation conforms to all
setback requirements to the greatest practical extent as determined by the CEO, and provided
that the applicant demonstrates that the present sub-surface wastewater disposal system meets
the requirements of State law and the State of Maine Subsurface Wastewater Disposal Rules,
or that a new system can be installed in compliance with the law and said Rules. In no case
shall a structure be relocated in a manner that causes the structure to be more nonconforming.
Any relocation approved by the CEO pursuant to this subsection shall be endorsed in writing
by the CEO.
10.3.2.2. Reconstruction or Replacement. Any nonconforming structure that is located less
than the required setback from a property line or road and which is removed, damaged, or
destroyed by more than fifty percent (50%) of the assessed value of the structure, as adjusted
by the Town's assessment ratio as most recently certified by the Assessors to the State of
Maine, before such damage, destruction, or removal, as determined by the Assessors or their
designee in consultation with the CEO, may be reconstructed or replaced provided that a
permit is obtained within one (l) year of the date of said damage, destruction, or removal, and
provided such replacement or reconstruction is in compliance with the setback requirements to
the greatest practical extent as determined by the CEO in accordance with the purposes of this
Ordinance; provided, however, that any nonconforming structure that is located less than the
required setback from a property line or road and that is damaged or destroyed by fire or any
cause other than the willful act or negligence of the owner or the owners agent may be
reconstructed on the same footprint as the structure that was destroyed. In no case shall a
structure be reconstructed or replaced so as to increase its nonconformity. Any reconstruction
or replacement approved by the CEO pursuant to this subsection shall be endorsed in writing
by the CEO.
5
10.3.2.3 Authority of Planning Board to Exercise Jurisdiction over an Application.
Except as provided for below, for any application for relocation of a nonconforming structure,
or for the reconstruction or replacement of a nonconforming structure that was removed,
damaged, or destroyed by more than fifty percent (50%) of the adjusted assessed value of the
structure, made under Section 10.3.2, the CEO shall provide written notice to the Planning
Board and all property owners within two hundred fifty (250) feet of the property as listed on
the Town's most recent assessing records that a relocation, reconstruction or replacement
application has been received and is being reviewed. The opportunity for the Planning Board
to take jurisdiction under this provision and to receive notice shall not apply in the following
situations:
(a) The relocation, replacement, or reconstruction will be carried out such that the structure
complies with all applicable setback requirements, or
(b) The structure being relocated is an accessory structure that meets all the following
requirements:
1) The floor area of the existing nonconforming structure is less than two hundred
(200) square feet,
2) The floor area or volume of the structure will not be increased,
3) The structure is and will continue to be accessory to the principal use of the
property,
4) The structure will not be served by water, and
5) The structure has not been and will not be used for human habitation.
(c) The structure being reconstructed or replaced is an accessory structure that meets all of
the following requirements:
1) The floor area of the existing nonconforming structure is less than two hundred
(200) square feet,
2) The floor area and volume of the replacement or reconstructed structure will not
be larger than one hundred fifty percent (150%) of the floor area and volume of
the existing structure,
3) The existing structure is accessory to the principal use of the property and the
replacement or reconstructed structure will continue to be so,
4) The replacement or reconstructed structure will not be served by water, and
5) The replacement or reconstructed structure will not be used for human habitation.
During that forty (40) day time period, the Planning Board may elect to exercise jurisdiction
over the relocation, reconstruction or replacement application. The Planning Board's review,
if any, shall be governed by the same review standards as govern the CEO review. The CEO
shall not issue any permit under this Section until the earlier of (a) forty (40) days after the
date that the CEO provides such written notice to the Planning Board and all property owners
within two hundred fifty (250) feet of the property as listed on the Town's most recent
assessing records or (b) the date the Planning Board declines to exercise jurisdiction over the
application. Any relocation, reconstruction or replacement application approved by the
Planning Board pursuant to this subsection shall be endorsed in writing. Failure of any
property owner to receive the notice sent under this subsection does not invalidate any action
taken by the CEO or Planning Board.
6
10.3.2.4. Greatest Practical Extent Setback Factors. In determining whether the building
relocation, reconstruction or replacement meets the setback to the greatest practical extent, the
CEO or Planning Board, as applicable, shall consider the size of the lot, the slope of the land,
the potential for soil erosion, the location of other structures on the property and on adjacent
properties, the location of the septic systems and other on-site soils suitable for septic systems,
and the type and amount of vegetation to be removed to accomplish the relocation.
10.4. Nonconforming Lots
10.4.1. Nonconforming lots whether located in legal subdivisions or elsewhere are subject to the
provision of this section.
10.4.2. Nonconforming Lots. A nonconforming lot of record as of September 15, 1997 or the
effective date of any amendment to this Ordinance creating any new nonconforming conditions
may be built upon, without the need for a variance, provided that such lot is in separate ownership
and not contiguous with any other lot in the same ownership, and that all provisions of this
Ordinance except lot size and frontage are met; provided, further, that reduced setback
requirements may be applicable to those lots that meet the criteria set forth in Section 10.4.2.1.
Variances relating to setback or other requirements not involving lot size or frontage shall be
obtained by action of the Board of Appeals.
The status of a nonconforming lot of record shall not change as a result of realigning a common
boundary line with the owner of a contiguous parcel of land, provided that (a) neither lot ends up
more nonconforming after the transaction than it was prior to the transaction, as evidenced in
writing by a land surveyor licensed to practice in Maine; (b) the parties cause copies of the
recorded deeds to be submitted to the CEO within thirty (30) days of the recording of the deeds at
the registry; and (c) no permits or approvals relating to such nonconforming lot shall be issued
unless or until the applicant complies with subsections (a) and (b) herein.
10.4.2.1. Setback Reduction for Small Nonconforming Lots. The setback of structures from
lot lines may be reduced to five (5) feet and the setback of structures from traveled ways may
be reduced to ten (10) feet in order to allow the expansion or construction of a structure to be
used solely for one-unit residential purposes or an accessory structure appurtenant to it,
provided that the following conditions are met:
(a)
The nonconforming lot in question was lawfully created prior to September 15, 1997
and is evidenced by a recorded deed or subdivision plan;
(b)
The lot meets the following size requirements:
(i) less than one-quarter (¼) acre (i.e., less than 10,890 square feet) in size; and
(ii) if, as determined by the Code Enforcement Office, less than one-half (1/2) of the
eligible owner(s) of lots under Section 10.4.2.1(b)(i) do not apply for the
reduced setback described herein within two (2) years of the adoption of this
subsection, then owner(s) of lots less than one-half (1/2) acre (i.e. less than
21,780 square feet) in size may apply for the reduced setback established
herein; provided, however, that no more than fifty percent (50%) of the total
number of eligible lots will be permitted the reduced setbacks described
herein;
7
(c)
The lot is not located in whole or in part within the Shoreland Zone;
(d)
There exist two (2) or more other nonconforming lots meeting the size requirement
then applying under Section 10.4.2.1(b) that have been improved with one-unit
residential uses within a five hundred (500) foot radius of the lot in question;
(e)
Neither Section 10.4.3 nor Section 10.4.4 apply to the lot; and
(f)
The owner or owners of the property located along the boundary line adjacent to
which the setback reduction is requested consents in writing to the reduction; and
(g)
That any new structure constructed pursuant to this Section is consistent with the
character of the local area in which it is to be situated, as determined by the Planning
Board.
If a reduced setback is approved pursuant to this Section on previously unimproved lots, the
impermeable surface coverage requirements set forth in Section 11.1.1 shall continue to
apply.
If a reduced setback is approved pursuant to this Section on lots that have been previously
improved with a structure, that structure shall not be expanded in floor area or volume, by
thirty percent (30%) or more, during the lifetime of the structure, and the impermeable
surface coverage requirement set forth in Section 11.1.1 shall not apply.
10.4.3. Contiguous Built Lots. If two (2) or more contiguous lots or parcels are in a single or
joint ownership of record as of September 15, l997 or the effective date of any amendment to this
Ordinance creating any new nonconforming conditions if all or part of the lots do not meet the
dimensional requirements of this Ordinance, and if a principal use or structure exists on each lot,
the nonconforming lots may be conveyed separately or together, provided that the State Minimum
Lot Size Law and Subsurface Wastewater Disposal Rules are complied with.
If two (2) or more principal uses or structures existed on a single lot of record as of September l5,
l997 or the effective date of any amendment to this Ordinance creating new nonconforming
conditions, each may be sold as a separate lot, provided that State Minimum Lot Size Law and
Subsurface Wastewater Disposal Rules are complied with. When such lots are divided, each lot
thus created must be as conforming as possible to the dimensional requirements of this Ordinance.
10.4.4. Contiguous Lots - Vacant or Partially Built. If two (2) or more contiguous lots or
parcels are in single or joint ownership of record at the time of or since September l5, l997 or the
effective date of any amendment to this Ordinance creating new nonconforming conditions, if any
of these lots do not individually meet the dimensional requirements of this Ordinance or
subsequent amendments, and if one (1) or more of the lots are vacant or contain no principal
structure, the lots shall be combined to the extent necessary to meet the dimensional requirements.
This provision shall not apply to two (2) or more contiguous lots, at least one (1) of which is
nonconforming, owned by the same person or persons as of September 15, 1997 or the effective
date of any amendment to this Ordinance creating new nonconforming conditions and recorded in
the Registry of Deeds, if the lot is served by the public sewer, or can accommodate a subsurface
sewage disposal system in conformance with the State of Maine Subsurface Wastewater Rules
and:
8
10.4.4.1. Each lot contains at least one hundred (100) feet of road frontage and at least twenty
thousand (20,000) square feet of lot area; or
10.4.4.2. Any lots that do not meet the frontage and lot size requirements of subparagraph
10.4.3. Are reconfigured or combined so that each new lot contains at least one hundred (100)
feet of road frontage and twenty thousand (20,000) square feet of lot area.
10.4.5. Creation of Nonconforming Lot(s) for Preservation or Conservation Purposes
An existing conforming lot or a nonconforming lot may be divided so as to create not more than
two (2) lots, one (1) or both of which are nonconforming lots, provided that the Harpswell
Planning Board finds that the following conditions are met:
10.4.5.1. One (1) of the resulting lots is conveyed to a governmental body or a nonprofit tax
exempt organization (preservation grantee) for conservation or preservation purposes.
10.4.5.2. The division does not create or exacerbate a public health or safety problem on
the nonconforming lot not to be conveyed to a preservation grantee (the remaining lot) to the
extent that the remaining lot does not have adequate (as defined by the appropriate code) well
and septic waste disposal options.
10.4.5.3. If the lot conveyed to the preservation grantee is undeveloped land, or is to be
returned to an undeveloped state, the deed or instrument of conveyance shall contain
restrictions which require that the land be preserved or maintained in its natural state (although
not necessarily "forever wild") in perpetuity for one (1) or more generally recognized purposes
which benefit the natural, cultural, or architectural history of the Town or which preserves a
diminishing or threatened place, parcel of land, resource, or habitat.
10.4.5.4. If the lot conveyed to the preservation grantee contains a pre-existing structure or
improvement, the structure or improvement must have a demonstrable historic, cultural or
architectural importance and the deed or instrument of conveyance shall contain restrictions
which require that the land and the improvements thereon be preserved and maintained so as
to protect and preserve said historic, cultural or architectural importance. No structure on the
lot conveyed to a preservation grantee pursuant to this section may be inhabited as a dwelling.
9
SECTION 11. STANDARDS
11.1. Minimum Lot Standards
AREAS OF TOWN NOT SUBJECT TO SHORELAND ZONING1,2&3
AREAS LOCATED
OUTSIDE OF A
SUBDIVISION
AREAS LOCATED WITHIN A
SUBDIVISION4
MIN. LOT SIZE (S.F.) PER DWELLING UNIT
40,000
80,000
ROAD FRONTAGE (FT)
1503
1505
PROPERTY LINE SETBACK (FT)
See Section 11.3.1
See Section 11.3.1
ROAD SETBACK (FT)
See Section 11.3.1
See Section 11.3.1
STRUCTURE HEIGHT (FT)
35
35
1. For uses in the Shoreland Zone, see Sections 15.1 and 15.2 of the Shoreland Zoning
Ordinance and the Site Plan Review Ordinance.
2. Nonresidential development in these areas is governed by the Site Plan Review Ordinance.
3. For any road serving more than two (2) lots or dwelling units, the road must comply with the
requirements of the Town of Harpswell Road Ordinance. For any lot to which access is only
by one (1) or more roads terminating at the lot, no minimum road frontage is required
provided that access to any development on the lot is wide enough to accommodate
emergency vehicles but in no event less than twelve (12) feet in width.
4. The minimum lot size and road frontage requirements may be reduced for lots in
subdivisions developed in accordance with the Flexible Lot Size Subdivision provisions of
the Subdivision Ordinance.
5. The frontage requirement for lots on a hammerhead or T-shaped turnaround for dead end
roads in a subdivision may be reduced to fifty (50) feet where no future road is either
feasible or provided for on the subdivision plan, provided that all of the requirements of the
Town of Harpswell Road Ordinance are met.
6. Notwithstanding the minimum lot size per dwelling unit requirement in the table, an existing
one-unit residential structure with three or more bedrooms may be converted to a two-unit
residential structure with a total number of bedrooms equal to or less than the number of
bedrooms in the existing structure even if it is nonconforming with respect to the minimum
lot area requirement if all of the following conditions are met:
10
a. The structure is located on a lot that is not part of a subdivision;
b. The one-unit residential structure was in existence on the lot as of April 1, 2024;
c. Written evidence shall be provided to the Plumbing Inspector before the issuance of any
permits needed to reconfigure the structure that a subsurface wastewater disposal
system(s) to serve both units is or will be sized to meet the design sewage flows for the
two units in accordance with the Maine Subsurface Wastewater Disposal Rules; and
d. If an existing subsurface wastewater disposal system will be used, written evidence that
the system is properly functioning shall be submitted to the Plumbing Inspector prior to
the issuance of any permits needed to reconfigure the structure
11.1.1. The total area covered by all structures, driveways, parking lots, and other impermeable
surfaces shall not exceed twenty percent (20%) of the total area of the lot with the following
exceptions:
11.1.1.1. Lots in Flexible Lot Size subdivisions that have a lot area of less than 40,000 square
feet may have up to 7,500 square feet of impermeable surface.
11.1.1.2. Lots with a principal residential use utilizing green infrastructure and low impact
development (LID) techniques may have up to twenty-five (25%) percent impermeable
surface.
11.1.1.3. Lots with a principal nonresidential use utilizing green infrastructure and low impact
development (LID) techniques may have up to fifty (50%) percent impermeable surface.
11.1.2. Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on both
sides thereof after September 22, 1971.
11.1.3. The following land shall not be included in the calculation of the area of a lot for the
purposes of meeting minimum lot size or other density or dimensional requirements:
11.1.3.1 Land below the minimum high water line of a great pond, stream, or tributary stream,
11.1.3.2 Land below the HAT of a coastal wetland,
11.1.3.3 Land below the upland edge of a freshwater wetland with a contiguous are of more
than twenty thousand (20,000) square feet,
11.1.3.4 Land which is part of a road, or a transportation right-of-way, or easement serving
more than two (2) lots, except rights-of-way or easements used exclusively for pedestrian
access, and
11.1.3.5 Land created by the filling or draining of a great pond, stream, tributary stream, or
coastal or freshwater wetland.
11
11.2. Minimum Lot Frontage
11.2.1. Off-Shore Island. Lots on off-shore islands not covered by Shoreland Zoning will be
exempt from Frontage requirements.
11.3. Principal and Accessory Structures
11.3.1. Setback. All principal structures and expansions of existing principal structures shall be
set back at least forty (40) feet from the edge of the traveled way and at least twenty (20) feet
from all lot lines; provided, however, that if more than one (1) traveled way abuts a lot, the
dwelling need only be set back from the traveled way that serves as access to the driveway for the
lot. All accessory structures shall be set back at least twenty (20) feet from all lot lines or the edge
of a traveled way, whichever is more restrictive. If the location of a property line along a traveled
way is unknown, the setback for accessory structures shall be forty (40) feet from the edge of the
traveled way.
11.3.1.1. One accessory structure not to exceed eighty (80) square feet and not to exceed ten
feet six inches (10'6") in height may intrude up to ten (10) feet into a sideline or rear setback
without the need for a variance if the CEO determines that the proposed location meets the
setback requirements to the greatest practical extent as described in Section 10.3.2.4, has been
consented to in writing by the property owner(s) abutting the lot line in question, and will
meet all other requirements of the ordinance.
11.3.1.2. One accessory structure not to exceed eighty (80) square feet and not to exceed ten
feet six inches (10'6") in height may intrude up to fifteen (15) feet into a sideline or rear
setback without the need for a variance if the CEO determines that the structure will be
accessory to a principal structure listed on the National Register of Historic Places, that the
intrusion into the setback has been determined by the Maine Historic Preservation
Commission to be necessary to maintain the historic character of the property, that the
intrusion has been consented to in writing by the property owner(s) abutting the lot line in
question, and the accessory structure will meet all other requirements of the ordinance.
11.3.2. Height of Structures. All principal and accessory structures shall not exceed thirty-five
(35) feet in height. All expansions of principal and accessory structures that increase the footprint
of the structure shall not exceed thirty-five (35) feet in height. For any principal or accessory
structure existing as of March 10, 2007 that lawfully exceeds thirty-five (35) feet in height, such
structure may be expanded without the need for a variance provided that (a) the expansion does
not increase the footprint of the structure; and (b) the expansion does not exceed the greatest
height of the existing structure. Expansions of nonconforming structures must comply with all
other expansion limitations of this Ordinance. The CEO shall review any proposed expansion of a
structure and shall determine, in writing, whether the requirements of this subsection are met prior
to the issuance of any permit. This subsection does not apply to structures having no floor area,
such as transmission towers, windmills, antennas and similar structures.
The height of a structure shall be determined by using the definition of height in the Definitions
Addendum. Notwithstanding the preceding sentence, cupolas or similar portions of a structure
12
having no floor area and exceeding any of the following dimensions (a) a side wall of sixteen (16)
square feet; (b) a side wall of four (4) feet in height; (c) sixteen (16) square feet of horizontal area;
or (d) a twelve/twelve (12/12) roof pitch, shall be included in the measurement of the height of a
structure.
If the measurement cannot be made from the original grade where the structure is to be located,
the CEO shall establish a reasonable approximation of original grade for the purposes of
determining height.
11.3.3. Accessory Temporary Living Accommodation. During the construction or
reconstruction of a one-unit residential use, a property owner may place an accessory temporary
living accommodation on the lot in conformance with this section. Prior to installing the
accessory temporary living accommodation on the lot, the property owner must obtain a
temporary certificate of compliance from the Code Enforcement Officer (CEO). The CEO shall
issue the temporary certificate only if he/she finds that all of the provisions of this section have
been met. The temporary certificate of compliance shall be for a period of not more than twelve
(12) months. The owner may apply for up to two (2) twelve (12) month renewals of the
temporary compliance permit and the CEO shall approve such renewals only if he/she finds that
the property owner is in compliance with all of the provisions of this section.
The placement and use of the accessory temporary living accommodation shall conform to all of
the following requirements:
11.3.3.1. The accessory temporary living accommodation shall be a travel trailer,
recreational vehicle, tent, or other similar enclosure that is not permanently attached to the
ground.
11.3.3.2. The temporary living accommodation shall have a maximum of three hundred
(300) square feet of area that can be occupied.
11.3.3.3. The accommodation shall be used only for the temporary living quarters of the
property owner and her/his immediate family while construction is in progress on the home.
11.3.3.4. The temporary living accommodation shall be located on the lot in full
conformance with the shoreland and property line setbacks.
11.3.3.5. The temporary living accommodation shall not be located on any type of
permanent foundation and if the accommodation is a travel trailer, recreational vehicle, or
similar mobile enclosure with integral wheels, the wheels shall remain on the vehicle while
it is on the lot.
11.3.3.6. The owner shall prepare a written sewage disposal plan describing the proposed
method and location of provisions for sewage disposal. The plan must be approved by the
local plumbing inspector. When disposal is off-site, written authorization from the
receiving facility or land owner is required.
13
A property owner who has been issued a temporary certificate of compliance for the
placement of an accessory temporary living accommodation on the lot shall remove the
temporary living accommodation within fifteen (15) days of being notified by the CEO in
writing that the use is not in compliance with the standards and/or that the temporary
certificate of compliance has expired, or shall disconnect the unit from all permanent
utilities and sewage disposal provisions within fifteen (15) days of receiving a certificate of
compliance for the new or replacement home. Failure to remove the accessory temporary
living accommodation or disconnect it from all permanent utilities and sewage disposal
provisions as required shall constitute a violation of this Ordinance subject to the penalties
described in Section 13.6 herein.
11.4. Subsurface Waste Disposal
11.4.1. All subsurface wastewater disposal systems shall be permitted and installed in
conformance with the State of Maine Subsurface Wastewater Disposal Rules and to minimize
adverse impacts on ground water quality.
11.4.2. All new, replacement, renovated, or expanded structures or uses generating waste, shall
provide evidence of the type specified in Section 13.3.4 that an adequate wastewater disposal
system can be constructed or that an adequate wastewater disposal system already exists.
11.4.3. Existing Use - Continuation of Use. The use of any legal system that exists on the
effective date of this Ordinance, or which had previously been approved for installation, may be
continued without change except as may be specifically covered by the Maine State Plumbing
Code or deemed necessary by the plumbing inspector, for the general safety and welfare of the
occupants and the public.
11.4.4. Change in Use - It shall be unlawful to make any change in the use of any system, or to
erect, enlarge, or change the use of a structure that uses an existing system without the approval of
the plumbing inspector and certification that such change does not result in any hazard to public
health, safety, and welfare.
11.4.5. The minimum setback for new subsurface wastewater disposal fields shall be not less than
one hundred (100) horizontal feet from the maximum high water line of a perennial water body.
The minimum setback distance from the water body for new subsurface wastewater disposal
fields shall not be reduced by variance.
11.4.6. Replacement systems shall meet the standards for replacement systems as contained in the
Maine Subsurface Wastewater Disposal Rules.
11.4.7. The owner of the proposed system may locate the system or components partially on
property not owned or controlled by the owner of the system, provided that the owner of the
property where the system is to be located executes an easement in perpetuity for the construction,
operation, replacement, and maintenance of the system, giving the system's owner authorization
to cross any land or right-of-way between the two parcels. The easement shall be filed and cross-
referenced in the Registry of Deeds and the Code Enforcement Office prior to issuance of a
14
disposal system permit. The easement shall provide sufficient buffer around the disposal field and
fill material extensions for future replacement and maintenance of the system.
Citizens Note: The Town recommends that all owners of new and replacement systems install
low-flow flushes and shower heads.
11.5. Roads and Driveways. Roads serving more than two (2) lots or dwelling units must comply
with the requirements of the Town of Harpswell Road Ordinance.
Citizen's Note: Roads in the Shoreland Zone are also governed by the Shoreland Zoning
Ordinance. Any owners of lots fronting on State Route 123, State Route 24, the Cundy's Harbor
Road, or the Mountain Road are encouraged to share driveways to reduce curb cuts and improve
safety. A curb cut must be approved by Maine DOT and the Town Road Commissioner.
11.6. Storm Water Runoff
11.6.1. All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural pre-development conditions. Where possible, green
infrastructure and low impact development (LID) techniques (rain gardens, infiltration planters,
bioswales), as well as existing natural runoff control features (berms, swales, terraces, and
wooded areas) shall be retained in order to reduce runoff and encourage infiltration of stormwater.
11.6.2. Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
11.7. Campgrounds. Campgrounds shall be subject to the same provisions as those set forth in
Section 15.4 of the Shoreland Zoning Ordinance, as may be amended from time to time.
11.8. Individual Private Campsites and Temporary Residential Use. Individual private
campsites and temporary residential uses shall be subject to the same provisions as those set forth in
Section 15.5 of the Shoreland Zoning Ordinance, as may be amended from time to time.
11.9. Agriculture. Agriculture shall be subject to the same provisions as those set forth in Section
15.13 of the Shoreland Zoning Ordinance, as may be amended from time to time.
11.10. Earth Moving, Erosion and Sedimentation Control. Earth moving, erosion and
sedimentation control shall be subject to the same provisions as those set forth in Section 15.16 of
the Shoreland Zoning Ordinance, as may be amended from time to time.
11.11. Water Quality Protection. No activity shall deposit on or into the ground or discharge to
the water of the State any pollutant that, by itself or in combination with other activities or
substances will impair designated uses or the water classification of a water body.
No activity shall locate, store, discharge, or permit the discharge of any treated, untreated, or
inadequately treated liquid, gaseous, or solid materials of such nature, quantity, obnoxiousness,
toxicity, or temperature that run off, seep, percolate, or wash into surface or ground waters so as to
contaminate, pollute, or harm such waters or cause nuisances.
15
11.12. Accessory Dwelling Unit (ADU). One accessory dwelling unit (ADU) may be added to any
lot with a principal one-unit residential structure without having to meet the minimum lot area per
dwelling unit requirement for the ADU, provided that it meets all of the following standards:
(a) The owner of the property shall occupy either the principal dwelling unit or the ADU;
(b) Any ADU within or attached to the principal structure or within an accessory or
freestanding structure shall have a maximum of seven hundred fifty (750) square feet of floor
area;
(c) If the ADU is located within or attached to the principal structure, the design of the ADU,
including its entrance from the outside, shall maintain the appearance of a one-unit residential
structure;
(d) Any addition to the principal structure or an accessory structure to create the ADU shall
comply with the property line and road setbacks. If the principal or accessory structure is
nonconforming with respect to any setback, the addition shall not increase the nonconformity;
(f) The location of a freestanding structure on the property for use as an ADU shall comply
with the property line and road setbacks and shall not obscure the front of the principal
structure;
(g) Written evidence shall be provided to the Plumbing Inspector before the issuance of any
permits needed to create the ADU that a subsurface wastewater disposal system(s) to serve
both the principal unit and the ADU is or will be sized to meet the design sewage flows for the
two units in accordance with the Maine Subsurface Wastewater Disposal Rules; and
(h) If an existing subsurface wastewater disposal system will be used, written evidence that
the system is properly functioning shall be submitted to the Plumbing Inspector prior to the
issuance of any permits needed to create the ADU.
11.13. Utilities and Essential Services. Where feasible, the installation of essential services shall
be limited to existing public ways and existing service corridors and above ground facilities must be
located so as to avoid crossing open areas and scenic views as identified in the Comprehensive Plan.
11.14. Soils. All land uses shall be located on soils in or upon which proposed uses or structures can
be established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses shall require a soils report based in an on-site
investigation and be prepared by state-certified professionals. Certified persons may include Maine
Certified Soil Scientists, and Maine State Certified Geologists. The report shall include an analysis
of the characteristics of the soil and surrounding land and water areas, maximum ground water
elevation, presence of ledge, drainage conditions, and other pertinent data which the evaluator
deems appropriate. The soils report shall include recommendations for a proposed use to counteract
soil limitations where they exist.
11.15. Vegetative Buffers. Within seventy-five (75) feet, horizontal distance, from the maximum
high water line of a tributary stream, the clearing of existing vegetation in areas other than the
Shoreland Zone, shall be conducted in accordance with the following provisions.
16
11.15.1. There shall be no clearcut openings greater than two hundred fifty (250) square feet in
the forest canopy as measured from the outer limits of the tree crown, and a well-distributed stand
of trees and other vegetation, including existing ground cover, shall be maintained. Selective
cutting of trees within the buffer strip is permitted provided that a well distributed stand of trees
and other vegetation is maintained.
11.15.2. No accumulation of slash shall be left within fifty (50) feet of the maximum high water
line of a tributary stream. Slash shall either be removed or disposed of in such a manner that it lies
on the ground and no part of it extends more than four (4) feet above the ground. Any debris that
falls below the maximum high water line of a tributary stream shall be removed.
11.15.3. Cleared openings legally in existence as of March 10, 2001 may be maintained, but shall
not be enlarged, except as permitted by this Ordinance.
11.15.4. Fields which have reverted to primarily shrubs, trees, or other woody vegetation shall be
regulated under the provisions of this section.
11.16. Home Occupations. All home occupations are subject to the provisions of Section 15.20 of
the Shoreland Zoning Ordinance setting forth performance standards for home occupations
regardless of whether they are located within the Shoreland Zone.
11.17. Archeological and Historic Sites. All proposed land use activities shall be designed to
protect archeological and historic sites that have been identified in the Town's Comprehensive Plan,
or by the Maine Historic Preservation Commission or the National Park Service. Any proposed land
use activity involving structural development or soil disturbance on sites listed on the National
Register of Historic Places shall be submitted by the applicant to the Maine Historic Preservation
Commission for review and comment, at least twenty (20) business days prior to action being taken
by the applicable Town permitting authority; provided, however, that the CEO may, in the event of
an emergency as determined by the CEO, take appropriate action to allow only such limited land
use activity as is necessary to protect the public health, safety and welfare in order to cure the
emergency situation. The Town permitting authority shall consider comments received from the
Commission prior to rendering a decision on the application.
11.18. Workforce Housing
11.18.1. Purpose
The 2005 Harpswell Comprehensive Plan sets forth the need in Harpswell for the availability of
Workforce Housing to maintain the diversity of Harpswell's population. To that end, this Section
is intended to provide and promote the acquisition and construction of housing that is affordable
for current and future generations of Harpswell residents.
11.18.2. Applicability
11.18.2.1. Single Lot Development Standards
Notwithstanding any other provision of this Ordinance to the contrary, a Workforce Housing
Unit may be built upon a lot, located outside of the shoreland zone and in lawful existence as
17
of March 13, 2010 but that does not meet the Section 11.1 minimum lot size requirements,
subject to an acceptable soils test and an engineering design for a one-unit residential
subsurface wastewater disposal system approved by the CEO of the Town of Harpswell and
the following requirements:
a. Lot Size
A lot with a minimum area of twenty thousand (20,000) square feet may be used for
a single Workforce Housing Unit.
b. Road Setback
If there is a predominate pattern of development in the immediate neighborhood with
respect to the relationship of the principal structure to the road as determined by the
CEO, the Workforce Housing Unit must be located on the lot so that it has a similar
relationship to the road as other neighboring principal structures on the same side of
the road. If this requires the Workforce Housing Unit to be closer to the front lot line
than the required front yard setback, the Workforce Housing Unit may encroach into
the front setback area and no variance is required.
c. Property Line Setback
If there is a predominate pattern of development in the immediate neighborhood with
respect to the relationship of the principal structure to the property lines to the side of
the structure as determined by the CEO, the Workforce Housing Unit must be
located on the lot so that it has a similar relationship to the side property lines as
other neighboring principal structures on the same side of the road. If this requires
the Workforce Housing Unit to be closer to the property line(s) to the side of the
structure than the required property line setback, the Workforce Housing Unit may
encroach into the setback area(s) and no variance is required.
Prior to issuance of a building permit for a single Workforce Housing Unit, the Workforce
Housing Lot shall be subjected to a Workforce Housing Covenant as set forth in Section
11.18.3.5 and that is recorded at the Cumberland County Registry of Deeds. The applicant
shall provide a copy of the recorded instrument to the CEO.
11.18.2.2. New Subdivisions
Applications for new subdivisions may provide permanently restricted Workforce Housing
Lots or Units by means of one or more of the following, as determined by the Planning Board:
a) Provide one (1) or more permanently restricted Workforce Housing Lots or Units
within the project; or
b) Provide one (1) or more off-site permanently restricted Workforce Housing Lots
or Units.
11.18.2.3. Notwithstanding any other provision of this ordinance to the contrary, two (2) or
more Workforce Housing Lots or Units may share a subsurface wastewater disposal system,
subject to review and approval of the CEO.
18
11.18.2.4. An applicant who is qualified to purchase a Workforce Housing Lot or Unit under
this Section at the time of purchase of such Lot or Unit shall not be required to vacate such
Lot or Unit due to a subsequent increase in income, provided that said applicant otherwise
remains in compliance with this Section and any rules and regulations adopted by the Board of
Selectmen for its management.
11.18.3. Standards for Development of Workforce Housing Subdivisions
11.18.3.1. Density Bonus Provisions. If a subdivision application provides Workforce
Housing Lots or Units, the subdivision shall be eligible for a density bonus of one (1) additional
market rate lot or unit for each moderate income Workforce Housing Lot or Unit and two (2)
additional market rate lots or units for each low or very low income Workforce Housing Lot or
Unit. Non-bonus lots shall meet all requirements of this ordinance and the Subdivision
Ordinance. The reduced minimum lot size of twenty thousand (20,000) square feet, as allowed
in Section 11.18.2.1a, shall apply only to the creation of Workforce Housing Lots or bonus lots
in a new subdivision. No density bonus shall be applied where offsite Workforce Housing Lots
or Units are provided.
The following chart illustrates calculations under this subsection:
Proposed
Units/Lots in
subdivision
# of Market
Rate Units
or Lots
# of Moderate
Income
Workforce
Housing
Units/Lots
# of Low/Very
Low Income
Workforce
Housing
Units/Lots
Bonus Market
Rate Units/Lots
Allowed
Total # of
Units/Lots
Possible
3
2
1
0
1
4
5
4
0
1
2
7
5
3
1
1
3
8
6
5
1
0
1
7
6
5
0
1
2
8
10
8
2
0
2
12
For example, if developer/applicant proposes a three (3) lot subdivision and one (1) of those
lots is affordable at the moderate income level, a bonus market rate lot would be allowed and
then the total number of lots allowed would be four (4). If the developer/applicant proposes a
five (5) lot subdivision and one (1) of those lots is affordable at the low income level, then the
developer/applicant gains two (2) additional or "bonus" lots which may be market rate for a
total of seven (7) lots. The same analysis and calculations apply to units.
11.18.3.2. Plan Notations and Recorded Documentation of Affordability. A note shall be
added to all subdivision plans designating the lots or units that shall be permanently restricted
Workforce Housing Lots or Units. The Workforce Housing Covenant shall be recorded in the
Cumberland County Registry of Deeds concurrently with the recording of the approved plan.
A copy of the recorded instrument shall be provided to the CEO within thirty (30) days after
recording. Any deed or conveyance of title to a Workforce Housing Lot or Unit shall include
19
reference to the recorded Workforce Housing Covenant imposed upon the initial approval of
such Unit or Lot and failure to do so shall constitute a violation of this ordinance.
11.18.3.3. Location. Workforce Housing Lots and Units shall, to the greatest extent possible,
be geographically dispersed throughout the subdivision or, if developed offsite, throughout the
town.
11.18.3.4. Neighborhood Compatibility. The appearance and design of Workforce Housing
Units on Workforce Housing Lots shall be compatible with the appearance and design of
dwellings in the remainder of the subdivision. Exterior designs of the outside facades of both
the market rate units and Workforce Housing Units shall be submitted to the Planning Board
during the subdivision review process.
11.18.3.5. Workforce Housing Covenant. During the Planning Board review process and prior to
final approval of a subdivision that includes Workforce Housing Lots or Units, the applicant shall
submit to the Board of Selectmen, for approval on behalf of the Town, an executed Workforce
Housing Covenant agreement that preserves the long-term affordability of the Workforce
Housing Lots or Units to very low, low and moderate income households. The agreement
must be in a form acceptable to the town and include, at a minimum, provisions for the following:
a) Permanent affordability for low and moderate income buyers;
b) A formula for accruing limited equity recapture to the owner of a Workforce
Housing Lot or Unit which includes approved physical improvements;
c) Enforcement provisions;
d) Administrative costs to the Town; and
e) Supervision of the agreement.
The Planning Board shall not grant final subdivision approval until the Board of Selectmen
has approved the Workforce Housing Covenant agreement.
11.18.3.6. Development of Workforce Housing Lots.
For subdivisions for which the applicant chooses not to develop the Workforce Housing Unit
or Workforce Housing Lot, the applicant may convey the Unit or Lot to a nonprofit
corporation recognized under state and federal law as qualified to accept funding for the
development of Workforce Housing. The nonprofit corporation shall complete the Unit or Lot
pursuant to the provisions of this Section.
11.18.3.7. Off Site Option.
The Planning Board is authorized to allow acquisition and construction of Workforce Housing
Lots or Units offsite. If the applicant chooses to utilize the offsite option for Workforce
Housing Lots or Units, the applicant may join with others to provide the units through new off
site construction or renovation of existing offsite structures.
Any deed or conveyance of title to an offsite Workforce Housing Lot or Unit shall include
reference to the recorded Workforce Housing Covenant imposed upon the initial approval of
such Lot or Unit and failure to do so shall constitute a violation of this ordinance.
20
11.18.3.8. Administration of Workforce Housing.
The Town may contract with a qualified individual or entity for the administration of
Workforce Housing Lots or Units for the screening of qualifying potential purchasers and the
long term monitoring and administration of this Section. The costs for administration of the
Workforce Housing provisions of this ordinance shall be paid for out of the Workforce
Housing Fund.
11.18.4. Qualified Buyers.
Preference for buyers of Workforce Housing Lots or Units shall be given to Town residents,
persons employed in the Town, persons with family members or relatives in Town, and former
Town residents who wish to re-establish Town residency.
11.19. Swimming Pools. All swimming pools, as that term is defined in 22 M.R.S.A. § 1631(2),
shall comply with the fence enclosure requirements set forth in 22 M.R.S.A. §§ 1631-1632, as may
be amended from time to time. Failure to do so shall constitute a violation of this Ordinance.
11.20. Wheelchair Ramps and Other Accessibility Structures
Notwithstanding any other setback provision of this Ordinance to the contrary, the CEO may issue a
permit to allow a wheelchair ramp or other structure necessary for access to or egress from a
structure within a required setback provided that the following standards are met:
(1)
The wheelchair ramp or other structure necessary for access to or egress
("accessibility structure") from a structure is only for the purpose of making a
structure accessible to a person with a disability who resides in or regularly uses the
structure;
(2)
The accessibility structure is designed to limit the encroachment into the required
setback to the greatest practical extent;
(3)
The design, construction and location of the accessibility structure is appropriate to
the context of the existing structure and neighborhood; and
(4)
All of the requirements of this Ordinance, with the exception of setback
requirements, are met.
All permits issued pursuant to this Section shall contain a condition of approval shown on the face
of the permit as follows: "This permit approval is limited to the duration of the disability or the
time that the individual requiring the accessibility structure resides in or regularly uses the structure.
The encroachment into the setback shall be removed when the individual requiring the accessibility
structure no longer resides in or regularly uses the structure. The permit shall be renewed within
five (5) years from its issuance."
For the purposes of this Section, the term "structure necessary for access to or egress from a
structure" is defined to include railing, wall or roof systems necessary for the safety or effectiveness
of the accessibility structure, and the term "disability" has the same meaning as a physical or mental
disability under 5 M.R.S.A. § 4553-A, as may be amended from time to time.
21
SECTION 12. ADMINISTRATION
12.1. Administrative Bodies and Agents
12.1.1. Code Enforcement Officer (CEO). A CEO shall be appointed or reappointed annually
by March 31.
12.1.2. Powers and Duties. The CEO shall enforce the provisions of the Town's land use
ordinances and monitor all activities within the jurisdiction of the Town's land use ordinances.
The CEO shall follow up all building permits to ascertain compliance with any conditions or
restrictions imposed on the permittee by the CEO, Planning Board, Board of Appeals, or the
Town's land use ordinances. The CEO shall also investigate all complaints of alleged violations of
the Town's land use ordinances. He or she shall enforce the Town's land use ordinances, as
defined in his or her job description, for which purpose he or she shall establish reasonable
procedures.
The CEO shall have all of the duties, responsibilities, and powers set forth in the State statute or
local ordinance, including but not limited to the power to issue "stop work" orders, notices of
violation of the Town's land use ordinances, and orders to cease violations. He or she shall also
have the authority to revoke building permits as a result of violations of the Town's land use
ordinances by the permit holder or his or her agents or contractors, noncompliance with
conditions of building permits, or other sufficient cause under the Town's land use ordinances.
12.1.3. The CEO shall keep a complete written record of all essential transactions of his or her
office, including applications submitted, permits granted or denied, variances granted or denied,
revocation actions, revocation of permits, appeals, court actions, violations investigated,
violations found, and fees collected. Such records shall be available for inspection by the public.
On a biennial basis, a summary of this record for the shoreland districts shall be submitted to the
Director of the Bureau of Land Quality Control within the Department of Environmental
Protection.
12.1.4. The CEO shall maintain a list of permits granted by his or her office, the Board of Appeals
and the Planning Board. Permits will remain on the list as long as they are active.
12.1.5. The CEO shall report to the Board of Selectmen any changes that may be needed in the
Town's land use ordinances and prepare a file for review by the Selectmen and appropriate town
boards and committees for future action.
12.2. Planning Board. A Planning Board is created in accordance with the provisions of State law.
12.2.1. Appointment.
12.2.1.1. Appointment to the Board shall be made by the Selectmen as terms expire and/or as
vacancies occur. Terms shall be for three (3) years.
22
12.2.1.2. The Board shall consist of five (5) members and two (2) associate members.
12.2.1.3. Associate members shall be appointed annually for one (1) year terms.
12.2.1.4. Resignations from the Board shall be filled by appointments for the unexpired terms.
12.2.2. Organization and Rules.
12.2.2.1. The Board shall elect a chairman and a secretary from its members and create and fill
such offices as it may determine. The term of all offices shall be one (1) year, with eligibility
for re-election.
12.2.2.2. When a member is unable to act because of conflict of interest, physical incapacity,
absence, or any other reason satisfactory to the chairman, the chairman shall designate an
associate member to sit in his stead.
12.2.2.3. An associate member may attend all meetings of the Board and participate in its
proceedings, but may vote only when he has been designated by the chairman to sit for a
member.
12.2.2.4. Any question as to whether a member shall be disqualified from voting shall be
decided by a majority vote of the members except the member who is being challenged.
12.2.2.5. The Chairman shall call at least eight (8) regular meetings of the Board each year.
12.2.2.6. Four (4) persons shall be a quorum of the Board.
12.2.2.7. The Board shall adopt rules for the transaction of business and the secretary shall
keep a record of its resolutions, transactions, correspondence, findings, and determinations.
All records shall be deemed public and may be inspected at reasonable times.
12.2.2.8. The Selectmen may appoint a replacement for any member with two (2) or more
consecutive unexcused absences from regularly scheduled meetings.
12.2.3. Duties and Powers.
12.2.3.1. The Board shall perform such duties and exercise such powers as are provided by
Town Ordinances and State Law.
12.2.3.2. Notification to Abutters. Owners of properties, any part of which is located within
two hundred fifty (250) feet of the nearest boundary of any property on which a development
requiring Planning Board approval is proposed shall be notified by the Municipal Office, at
the applicant's expense, by first class mail, of the date on which the application will be
considered by the Planning Board. Failure of any property owner to receive the notice sent as
required under this subsection shall not necessitate another public meeting or invalidate any
action taken by the Planning Board.
23
12.2.3.3. Technical Review Fee.
In addition to the application fee, every applicant to the Planning Board may also be required
by the Planning Board to pay a technical review fee to defray the Town's legal and technical
costs of the application review. This fee must be paid to the Town and shall be deposited in an
individual trust account, which is separate and distinct from all other Planning Board and
Town accounts. When a technical review fee is required, the application will be considered
incomplete until evidence of payment of this fee is submitted to the Planning Board. If the
initial fee proves to be insufficient to meet the Town's legal and technical costs of reviewing
the application, the Planning Board may assess an additional fee(s) to cover such legal and
technical costs.
The technical review fee may be used by the Planning Board only to pay reasonable costs
incurred by the Board, at its discretion, which relate directly to the review of the application
pursuant to the review criteria. Such services may include, but need not be limited to,
consulting, engineering or other professional fees, attorney fees, recording fees, and appraisal
fees. The Town shall provide the applicant, upon written request, with an accounting of his or
her account and shall refund all of the remaining monies, including accrued interest, in the
account after the payment by the Town of all costs and services related to the review. Such
payment of remaining monies shall be made no later than sixty (60) days after the approval of
the application, denial of the application, or approval with conditions of the application. Such
refund shall be accompanied by a final accounting of expenditures from the fund. The monies
in such fund shall not be used by the Board for any enforcement purposes.
12.3. Board of Appeals. A Board of Appeals is created in accordance with the provisions of State
law.
12.3.1. Powers and Duties. The Board of Appeals has the following powers and duties:
12.3.1.1. Administrative Appeals. To hear and decide appeals, on an appellate basis, where it
is alleged that there is an error in any order, requirement, decision, or determination made by,
or failure to act by, the Planning Board under the Basic Land Use Ordinance, Floodplain
Management Ordinance, Shoreland Zoning Ordinance, Site Plan Review Ordinance,
Subdivision Ordinance, or Wireless Telecommunications Facilities Ordinance, and to hear and
decide administrative appeals, on a de novo basis, where it is alleged that there is an error in
any order, requirement, decision or determination made by the Code Enforcement Officer in
the administration of the Basic Land Use Ordinance, Floodplain Management Ordinance,
Road Ordinance, Shoreland Zoning Ordinance, or Wireless Telecommunications Facilities
Ordinance; provided, however, that decisions or determinations made by the CEO not to
undertake an enforcement action shall not be appealable to the Board of Appeals. Other
decisions made by the CEO or the Local Plumbing Inspector shall only be appealable to the
Board of Appeals if expressly provided by statute, ordinance, or administrative regulation.
Citizen's Note: Some decisions made by the Planning Board in administering the Subdivision
Ordinance are not subject to appeal. See Section 14 of the Subdivision Ordinance.
24
12.3.1.2. Variance Requests. To authorize variances upon request or otherwise, on a de novo
basis, within the limitations set forth in the Town's land use ordinances.
12.3.1.3. Boundary Line Determinations. To hear and decide disputes, on a de novo basis,
regarding the location of the boundary line for the Shoreland Zoning District.
12.3.1.4. Notification to Abutters. Owners of properties, any part of which is located within
two hundred fifty (250) feet of the nearest boundary of any property subject to an
administrative appeal, variance request, or dispute about the Shoreland Zoning District
boundary line shall be notified by the Municipal Office, at the applicant's expense, by first
class mail, of the date on which the appeal, request, or dispute will be heard by the Board of
Appeals. Failure of any property owner to receive the notice sent as required under this
subsection shall not necessitate another public meeting or invalidate any action taken by the
Board of Appeals.
12.4. Definitions. For purposes of this Ordinance, certain terms or words used herein shall be
defined as set forth in the Definitions Addendum attached hereto and made a part hereof.
SECTION 13. PERMITS, APPROVALS AND CERTIFICATES OF COMPLIANCE
REQUIRED
13.1. Permits or Approvals. After the effective date(s) of the applicable land use ordinance and
amendments thereto, no person shall, without first obtaining a permit or approval, engage in any
activity or use of land or structure requiring a permit or approval under the applicable Town land
use ordinance governing the area in which the activity or land use would occur. Permits shall be
posted on site in a manner that is readily visible within two (2) working days of issuance. Permits or
approvals are required as noted in Table 1.
13.2. Certificates of Compliance. Prior to occupancy or use of any structure or land use requiring a
permit or approval, the owner shall obtain a certificate of compliance from the CEO. No occupancy
or use of a structure, development, or land use may occur without a certificate of compliance, unless
specifically allowed by the conditions of an approval or permit. The CEO shall not issue a
certificate of compliance until he or she has determined that the structure, development or land use
has been completed in accordance with all of the Town's land use ordinances and with any
conditions of permits or approvals imposed under those ordinances. A certificate of compliance
shall not be issued for any project located in the Shoreland Zone until the owner has submitted
pictures documenting the work done on the lot including all planting and revegetation required by
the Shoreland Zoning Ordinance.
13.2.1. Temporary Certificates of Compliance. Residing in a basement or foundation before the
structure has been completed shall be permitted for a period of three (3) years from the date of
issuance of a building permit subject to issuance of a one (1) year temporary certificate of
compliance, renewable annually, provided the following conditions are met:
a. reasonable progress, as determined by the CEO, is being made toward completion of the
structure as permitted;
b. nuisance conditions do not exist;
25
c. a valid plumbing permit has been issued and all conditions of that permit are being met;
d. dimensional requirements of the applicable ordinance are being met; and
e. all other applicable requirements of the Town's ordinances are being met.
13.3. TABLE 1. LAND USES AND ACTIVITIES
Land Uses
Interior
Shoreland Districts
INT
RP
SR
SB
CFI
CFII
MFMB16
1. Non-intensive recreational uses not requiring
structures such as hunting, fishing, and hiking
Yes
Yes
Yes
Yes
Yes
Yes
Yes15
2. Motorized vehicular traffic on existing roads and
trails
Yes
Yes
Yes
Yes
Yes
Yes
Yes
3. Forest management activities except for timber
harvesting
Yes
Yes
Yes
Yes
Yes
Yes
No
4. *Timber Harvesting Note: Deleted
Yes
NA
NA
NA
NA
NA
NA
5. *Clearing of vegetation for approved construction
and other allowed uses
Yes
CEO
Yes
Yes
Yes
Yes
Yes
6. Fire prevention activities
Yes
Yes
Yes
Yes
Yes
Yes
Yes
7. Wildlife management practices
Yes
Yes
Yes
Yes
Yes
Yes
Yes
8. Soil and water conservation practices
Yes
Yes
Yes
Yes
Yes
Yes
Yes
9. Mineral exploration
Yes
No
No
No
No
No
No
10. Mineral extraction including sand and gravel
extraction
PB
No
No
No
No
No
No
11. Surveying and resource analysis
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Land Uses
Interior
Shoreland Districts
INT
RP
SR
SB
CFI
CF2
MFMB16
12. Emergency operations
Yes
Yes
Yes
Yes
Yes
Yes
Yes
13. *Agriculture
Yes
PB
Yes
Yes
No1
Yes
No
14. Aquaculture
PB
PB
PB
PB
PB
PB
PB16
15. Principal structures and uses
15.1 One and two-unit residential uses including
driveways
CEO
PB10
CEO
CEO
No
CEO
No
15.2 Multi-unit residential
PB
No
No
No
No
No
No
15.3 *Commercial
PB
No13
No13
PB
PB4
PB2
PB16
26
15.4 *Industrial
PB
No
No
PB
No
No
PB16
15.5 *Governmental and Institutional
PB
No9
PB
No
No
No
PB
15.6 Small nonresidential facilities for marine,
scientific or nature related purposes
PB
No
PB
PB
PB
PB
PB17
15.7 Nonagricultural Fertilizer Use
15.7.1 Chemical fertilizer, sludge, and non-
composted manure
No
No
No
No
No
No
No
15.7.2 Organic fertilizer and composted manure
Yes21
Yes21
Yes21
Yes21
Yes21
Yes21
Yes21
15.8 Community Shoreland Access
PB20
CEO
CEO
CEO
CEO
CEO
CEO
16. Accessory structures and uses
CEO11
PB 11
CEO11
CEO11
CEO11
CEO11
CEO
17. Structural repair
Yes
Yes
Yes
Yes
Yes
Yes
Yes
17.1 Structural alteration/replacement: residential
CEO
CEO
CEO
CEO
CEO
CEO
No
17.2 Structural alteration/replacement:
nonresidential
CEO/
PB
CEO/
PB
CEO/
PB
CEO/
PB
CEO/
PB
CEO/
PB
CEO/PB
18.1 *Noncommercial piers, docks, wharves, bridges
and other structures and uses extending over or below
the HAT, maximum high water line or wetland
Yes
PB14
CEO
14/18
CEO
14/18
CEO
14/18
CEO
14/18
CEO
14/18
18.2 *Commercial piers, docks, wharves, bridges and
other structures and uses extending over or below the
HAT, maximum high water line or wetland
Yes
CEO/
PB
14/19
CEO/PB
14/19
CEO/
PB
14/19
CEO/PB
14/19
CEO/PB
14/19
CEO/
PB
14/19
18.3 Community piers, docks, and wharves
NA
PB
PB
PB
PB
PB
PB
19. Conversions of seasonal residences to year round
residences
Yes
No
LPI
LPI
No
LPI
No
20. *Home occupations
Yes8
PB8
Yes8
Yes8
Yes8
Yes8
No
21. Sewage disposal systems
LPI
PB10/
LPI
LPI
LPI
LPI
LPI
LPI
22. *Essential services
Yes
PB
PB
PB
PB
PB
PB
23. Service drop for allowed uses
Yes
Yes
Yes
Yes
Yes
Yes
Yes
24. Public and private recreational areas involving
minimal development, but no building
Yes12
PB
PB
CEO
CEO
CEO
CEO
25. *Individual private campsites
Yes
CEO
CEO
CEO
No
CEO
No
26. *Campgrounds
PB
No5
PB
PB
No
PB
No
27. *Road construction
Yes12
No6
CEO
CEO
CEO4
CEO
CEO
28. *Parking areas - residential
Yes
CEO/
PB
CEO
CEO
CEO
CEO
No
29. *Parking areas - nonresidential
PB
No9
PB
PB
PB4
PB
PB
30. *Marinas
PB
No
No
PB
PB7
PB7
PB16
31. Boat Repair Facility
PB
No
No
PB
PB
PB
PB16
32. Filling and earth moving < 50 cubic yards
Yes
CEO
Yes
Yes
Yes
Yes
Yes
27
33. Filling and earth moving > 50 cubic yards but less
than 1,000 cubic yards12
Yes
PB
CEO
CEO
CEO4
CEO
CEO
34. Filling and earthmoving > 1,000 cubic yards 12
PB
PB
PB
PB
PB4
PB
PB
35. *Signs
CEO
CEO
CEO
CEO
CEO
CEO
CEO
36. Uses similar to allowed uses
CEO
CEO
CEO
CEO
CEO4
CEO
CEO
37. Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
CEO
CEO
CEO
38. Uses similar to uses requiring a PB permit
PB
PB
PB
PB
PB4
PB
PB
39. Projects which use more than 1000 gallons of
water/day
CEO
CEO
CEO
CEO
CEO
CEO
PB
40. Land Management Roads
Yes
PB
Yes
Yes
Yes
Yes
No
41. Mobile Food Handlers
BOS
No
BOS
BOS
BOS
BOS
No
Yes
= Allowed (no permit required but the use must
comply with all applicable land use standards)
No
= Prohibited
BOS
= License or other approval issued by the
Board of Selectmen may be required under
the Town's Mobile Food Handlers
Ordinance or Mitchell Field use policies;
site plan review and approval by the
Planning Board may be required if a seating
area for customers is provided.
PB
= Requires land use permit issued by the
Planning Board
LPI
= Plumbing permit required
CEO
= Permit required from Code Enforcement
Officer
MHW
= Maximum High Water
NA
= Not Applicable
INT
= Areas not in the Shoreland Zone
RP
= Resource Protection Zone
SR
= Shoreland Residential
SB
= Shoreland Business
CFI
= Commercial Fisheries I
CFII
= Commercial Fisheries II
HAT
= Highest Annual Tide
Citizen's Note: If you are uncertain about the activity you wish to conduct, that is not listed above, you
are advised to contact the Code Enforcement Office for further details.
FOOTNOTES: Land Use Table
* For further information on the * uses in land use chart, see Section 15 of the Shoreland Zoning
Ordinance.
1. No - except grandfathered properties.
2. Marine related services only. Retail stores limited to nine hundred (900) or less square
feet in size.
3. No except limited Commercial Fishing activities.
4. Functionally water-dependent and accessory to Commercial Fishing uses only.
28
5. Except when area is zoned for resource protection due to flood plain criteria in which
case a permit is required from the Planning Board.
6. Except to provide access to permitted uses within the district, or where no reasonable
alternative route or location is available outside the RP area, in which case a permit is
required from the Planning Board.
7. Primarily commercial fishing related use.
8. Home occupations that provide public restrooms and showers or serve food to the
public require a CEO permit. All home occupations are subject to the provisions of
Section 15.20 of the Shoreland Zoning Ordinance regardless of whether they are located
within the Shoreland Zone.
9. Additions or expansions to existing Town Office Complex may be allowed with
Planning Board approval
10. Only as provided in Section 13.1.1 of the Shoreland Zoning Ordinance.
11. When a structure is accessory to both residential and nonresidential uses, the provisions
of the more restrictive ordinance shall apply.
12. May require site plan review approval. See Town of Harpswell Site Plan Review.
13. Except for other allowed commercial uses listed in the Table that are allowed in the
respective district.
14. Excluding bridges and other crossings not involving earthwork, in which case no permit
is required.
15. Hunting is prohibited on all property at Mitchell Field that is owned by the Town of
Harpswell.
16. At least forty-five percent (45%) of the gross leasable lot area within the district must be
utilized for aquaculture, marinas, boat repair facilities, and/or functionally water-
dependent uses as defined in the Definitions Addendum. Not more than fifteen percent
(15%) of the gross leasable lot area in the district may be used for commercial or
industrial uses that are not functionally water-dependent uses, aquaculture, marinas,
and/or boat repair facilities nor other marine-related businesses as defined in the
Definitions Addendum provided that these uses may not be located within two hundred
fifty (250) feet of the HAT of the coastal wetland. Marine-related business uses are
allowed within the district provided that the limitations set forth above are met. The use
of the pier and the causeway leading to the pier is limited to activities involving public
access and recreation and activities related to and in support of functionally water-
dependent uses and marine related businesses that are located within the Mitchell Field
29
Marine Business District provided that the private use of these facilities does not unduly
restrict reasonable public access to and use of the pier.
17. The limitation on the size of nonresidential facilities for marine, scientific, or nature
related purposes shall not apply in the Mitchell Field Business Districts if the Planning
Board finds that the scale and location of the facility are consistent with the objectives of
shoreland zoning and the Mitchell Field Master Plan.
18. Permit applications for noncommercial, private piers, docks or wharves with a maximum
width of six (6) feet as measured parallel to the shoreline and which do not extend below
the low water line shall be reviewed and issued by the CEO. Noncommercial, private
piers greater than six (6) feet wide as measured parallel to the shoreline or which extend
below the low water line are prohibited.
19. Permit applications for commercial piers, docks or wharves with a maximum width of
twelve (12) feet as measured parallel to the shoreline and which limit the length of the
structure to the minimal amount necessary to provide access to the boats intended to use
the facility shall be reviewed and issued by the CEO. Permits for commercial piers
greater than twelve (12) feet wide as measured parallel to the shoreline or which exceed
the minimum length necessary to provide access to the boats intended to use the facility
shall be reviewed and issued by the Planning Board.
20. Only as provided in Section 13.1.2. of the Shoreland Zoning Ordinance.
21. Organic fertilizer and composted manure may not be applied within twenty-five (25) feet
of the maximum high water line of a great pond, stream, tributary stream, HAT of the
coastal wetland or the upland edge of a freshwater wetland as outlined in Section 15.21.1
of the Shoreland Zoning Ordinance.
Citizen's Note: Land use activity adjacent to protected natural resources requires a permit from
the Department of Environmental Protection pursuant to the Natural Resources Protection Act,
38 M.R.S.A.§ 480-C, as may be amended from time to time. Please see CEO for more
information.
13.3. Permit and Approval Application
13.3.1. Every applicant for a permit or approval shall submit a written application including a
scaled site plan on a form provided by the CEO to the appropriate administering body or agent.
Application forms shall account for all aspects to which the Town's land use ordinances apply.
If the application is for a project that is located in the Shoreland Zone, the application shall
include pictures of the lot documenting the existing conditions on the lot including the area
adjacent to a coastal or freshwater wetland, stream, tributary stream or great pond.
13.3.2. All applications shall be signed by the owner or owners of the property, certifying that
the information in the application is complete and correct. If the person signing the application
30
is not the owner of the property, then that person shall submit a letter of authorization from the
owner.
13.3.3. All applications shall be dated and the CEO shall note upon each application the date
and time of its receipt.
13.3.4. A completed application for a plumbing permit, including the site evaluation approved
by the Plumbing Inspector, shall be submitted whenever the nature of a proposed structure
would require the installation of a subsurface sewage disposal system. Whenever the nature of
the proposed use includes any construction, installation, or alteration of plumbing facilities, the
applicant shall provide one or more of the following, as appropriate, documenting that the
structure or use will be served by an adequate wastewater disposal system:
-
A valid plumbing permit or completed application for a plumbing permit, including
the site evaluation approved by the plumbing inspector.
-
A certificate of approval indicating the existing system was installed after July 1974
and was inspected and approved by the plumbing inspector.
-
Documentation from the DEP showing that a licensed overboard discharge system
exists in accordance with 38 M.R.S.A. § 413 and § 414, as may be amended from
time to time.
-
Written documentation, acceptable to the plumbing inspector that an adequate
wastewater disposal system exists for the property.
The plumbing inspector may require that systems installed prior to 1974 be inspected and
documented if the applicant cannot provide evidence that an adequate system exists. In lieu of
this inspection, a replacement system may be designed for future installation.
13.4. Procedure for Administering Permits
13.4.1. With the exception of applications for subdivision and site plan review approvals and
applications for which the Planning Board is provided the opportunity to take jurisdiction, the
Planning Board or CEO, as appropriate, shall examine all written applications for permits or
other actions under the Town's land use ordinances and within thirty-five (35) days from the
date of receipt of such written application, shall notify the applicant in writing either that the
application is a complete application, or, if the application is incomplete, that specified
additional material is needed to make the application complete.
13.4.2. With the exception of applications for subdivision and site plan review approvals and
applications for which the Planning Board is provided the opportunity to take jurisdiction, the
Planning Board may or CEO shall, as appropriate, within the thirty-five (35) day time frame,
visit the site for which the permit is sought.
31
13.4.3. The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purpose and provisions of the Town's land use ordinances and any State or
Federal law, regulation or rule.
13.4.4. With the exception of applications for subdivision and site plan review approvals and
applications for which the Planning Board is provided the opportunity to take jurisdiction, the
Planning Board or CEO, as appropriate, shall approve, approve with conditions, or deny all
permit applications in writing within thirty-five (35) days of receiving a completed application.
However, if the Planning Board has a waiting list of applications, a decision on the application
shall occur within thirty-five (35) days of the public hearing if one is held, or within thirty-five
(35) days of the next regularly scheduled meeting at which the application is considered.
Citizen's Note: See Section 13.4.7 if Planning Board approval is required for activity in the
Shoreland Zone.
13.4.5. Permits shall be approved and approvals given when the proposed use or structure is
found to be in conformance with the purposes and provisions of the applicable ordinance.
13.4.6. No permit or approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local
ordinance or regulation or any State law, or Federal law or regulation or rule, which the Town
is responsible for enforcing.
13.4.7. The Planning Board shall approve, or approve with conditions, a request for a land use
permit in the Shoreland Zone if the Board finds that the proposed use:
13.4.7.1. Will maintain safe and healthful conditions;
13.4.7.2. Will not result in water pollution, erosion, or sedimentation to surface waters;
13.4.7.3. Will adequately provide for the disposal of all wastewater;
13.4.7.4. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or
other wildlife habitat;
13.4.7.5. Will conserve shore cover and points of access to inland and coastal waters;
13.4.7.6. Will protect archaeological and historic resources as identified in the Town's
Comprehensive Plan, or by the Maine Historic Preservation Commission or the National
Park Service;
13.4.7.7. Will not adversely affect existing commercial fishing or maritime activities in a
Commercial Fisheries I or II District;
13.4.7.8. Will avoid problems associated with flood plains development and use; and
32
13.4.7.9. Is in conformance with the provisions of Section 15, Land Use Standards of the
Shoreland Zoning Ordinance.
If a permit or approval is either denied or approved with conditions, the reasons as well as
conditions shall be stated in writing. No approval shall be granted for an application involving
a structure if the structure would be located in an unapproved subdivision or would violate any
other local ordinance or regulation or any State or federal law or regulation or rule which the
municipality is responsible for enforcing.
13.5. Fee and Time Limits
13.5.1. Unless otherwise provided by law, permits and approvals shall expire if substantial start
of construction or other permitted or approved activity has not commenced within twelve (12)
months from the date on which the permit or approval was granted. An extension of time to
commence shall be granted upon application to and approval by the CEO, if reasonable need
can be shown. A permit or approval is transferable unless otherwise specified.
13.5.2. Unless otherwise provided by local law, when a substantial start of construction, as
defined in the Definitions Addendum, has been made in accordance with 13.5.1 and the
Certificate of Compliance has not been issued by the Code Enforcement Office within five (5)
years from the date on which the permit or approval was granted, the permit or approval shall
expire. An extension of time to obtain a Certificate of Compliance may be granted upon
applications to and approval by Board of Appeals, if reasonable need can be shown due to
exigent circumstances. Exigent circumstances would include severe family, medical, or
financial problems which prevented substantial completion of construction within the required
five (5) year timeframe, as determined by the Board of Appeals.
13.5.3. A nonrefundable fee, in such amount as may be established by the Board of Selectmen
from time to time, shall be charged for applications, permits and approvals required under the
Town's land use ordinances, and a higher fee shall be charged for permit and approval
applications that are filed by the applicant after the commencement of the activity for which
the permit or approval is required.
13.5.4. When a permit or approval has expired, a new permit or approval must be obtained in
order for construction to continue. Further construction must meet the requirements of the
Town's land use ordinances in effect at the time the new permit or approval is sought.
13.5.5. The provisions of Sections 13.5.2 and 13.5.4. of this Ordinance apply only to permits
and approvals issued on or after April 1, 1998
13.5.6. Failure of the Planning Board to act upon a request for action or upon an application for
a permit or approval, or of the CEO to act upon a request for action or upon an application for a
building permit, within thirty-five (35) days of the date of receipt of a complete application
shall constitute denial of that request or application, unless the applicable ordinance provides
otherwise.
33
13.6. Violation, Enforcement, Penalties, and Legal Actions
13.6.1. Any violation of the Town's land use ordinances shall be deemed to be a nuisance.
13.6.2. If the CEO finds that provisions of the Town's land use ordinances are being violated,
he or she shall notify personally or in writing, if necessary by certified mail return receipt
requested, the person responsible for such violation indicating the nature of the violation, and
ordering the action necessary to correct it. He or she shall order the discontinuance of illegal
use of land, structures, or work being done, removal of illegal structures, or of additions,
alterations, or structural changes thereto; discontinuance of any illegal work being done or
nuisance conditions; or shall take any other action authorized by this Article to ensure
compliance with or to prevent violation of the provisions of the Town's land use ordinances. A
copy of such notice shall be submitted to the Board of Selectmen and shall be maintained as a
permanent record.
13.6.3. Any person, including but not limited to a landowner, a landowner's agent, or
contractor who orders or conducts any activity in violation of the Town's land use ordinances
shall be penalized in accordance with 30-A, M.R.S.A. § 4452, as may be amended from time to
time.
Citizen's Note: Current penalties include fines of not less than one hundred ($100) dollars nor
more than twenty-five hundred ($2,500) dollars. Fines may be assessed for each day the
violation occurs.
13.6.3.1. In addition to penalties provided herein, the Town may bring an action in the
Superior Court or District Court to enjoin violators of the Town's land use ordinances, for
collection of penalties, and for such other relief as may be provided by law.
13.6.3.2. Each day in which a violation is proved to exist shall constitute a separate offense
under this Section.
13.6.3.3. In addition to the penalties provided above, any violation of Section 15.15.2. of
the Shoreland Zoning Ordinance regarding clearing of vegetation within the seventy-five
(75) foot shoreland setback must be remedied by replanting such that the standards of
Section 15.15.2.2. of the Shoreland Zoning Ordinance for a well distributed stand of trees
and other vegetation are met, unless the Selectmen find that the violation is minor, in which
case they may determine such lesser penalty as law allows.
13.6.4. When notification and penalties for actions in violation of the Town's land use
ordinances do not result in the correction or abatement of the violation or nuisance condition,
the CEO shall advise the Board of Selectmen, who may institute any and all actions and
proceedings either legal or equitable, to correct the violation, including seeking injunctions of
violations, that may be appropriate or necessary for the enforcement of the provisions of the
Town's land use ordinances in the name of the Town. The Board of Selectmen is authorized to
34
enter into administrative consent agreements for the purpose of eliminating violations of the
Town's land use ordinances and recovering fines without Court action. Such agreements shall
not allow an illegal structure or use to continue unless there is clear and convincing evidence
that the illegal structure or use was constructed or conducted as a direct result of erroneous
advice given by an authorized Town official and there is no evidence that the owner acted in
bad faith, or unless the removal of the structure or use will result in a threat or hazard to public
health and safety or will result in substantial environmental damage.
SECTION 14. VARIANCES AND APPEALS
14.1. Variances.
Variances may be permitted only under the following conditions:
14.1.1. Variances may be granted only from dimensional requirements including but not
limited to, lot width, structure height, and setback requirements.
14.1.2. Variances shall not be granted for establishment of any uses otherwise prohibited by the
applicable ordinance.
14.1.3. A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the Board of Appeals or its
designee to the Commissioner of the Department of Environmental Protection at least twenty
(20) days prior to action by the Board of Appeals. Any comments received from the
Commissioner prior to the action by the Board of Appeals shall be made part of the record and
shall be taken into consideration by the Board of Appeals
14.1.4. The Board shall not grant a variance unless it finds that:
14.1.4.1. The proposed structure or use would meet the requirements of the applicable
Town land use ordinance except for the specific provision(s) which has created the
nonconformity and from which relief is sought; and
14.1.4.2. Except as provided in subsections 14.1.4.3 and 14.1.4.4, and 14.1.4.5, the Board
may grant a variance only if strict application of the ordinance to the applicant and the
applicant's property would cause undue hardship. The term "undue hardship" as used in
this subsection means:
1. That the land in question cannot yield a reasonable return unless a variance is
granted;
2. That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood;
35
3. That the granting of a variance will not alter the essential character of the
locality; and
4. That the hardship is not the result of action taken by the applicant or a prior
owner.
14.1.4.3. Disability Variance. The Board may grant a variance to an owner of a dwelling
for the purpose of making that dwelling accessible to a person with a disability who
resides in or regularly uses the dwelling. The Board shall restrict any variance granted
under this subsection solely to the installation of equipment or the construction of
structures necessary for access to or egress from the dwelling by the person with the
disability. The Board may impose conditions on the variance, including limiting the
variance to the duration of the disability or to the time that the person with the disability
lives in the dwelling. For the purposes of this subsection, a disability has the same
meaning as a physical or mental disability under 5 M.R.S.A., § 4553, as may be amended
from time to time, and the term "structures necessary for access to or egress from the
dwelling" is defined to include railing, wall, or roof systems necessary for the safety or
effectiveness of the structure.
14.1.4.4. Setback Variance for One-Unit Residential Uses. The Board may grant a
setback variance for a one-unit residential use. The Board may consider a variance from a
setback requirement only when strict application of the zoning ordinance to the applicant
and the applicant's property would cause undue hardship. The term "undue hardship" in
the subsection means:
1. The need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
2. The granting of a variance will not alter the essential character of the locality;
3. The hardship is not the result of action taken by the applicant or a prior owner;
4. The granting of the variance will not substantially reduce or impair the use of
an abutting property; and:
5. That the granting of a variance is based upon demonstrated need, not
convenience, and no other feasible alternative is available.
A variance granted under this subsection is strictly limited to permitting a variance from a
setback requirement for a one-unit residential use that is the primary year-round residence
of the applicant. A variance under this subsection may not exceed twenty percent (20%)
of a setback requirement and may not be granted if the variance would cause the area of
the dwelling to exceed the maximum permissible lot coverage. The Board may allow for
a variance under this subsection to exceed twenty percent (20%) of the setback
requirement, except for minimum setbacks from a water body, or the upland edge of a
wetland, or a tributary stream within the Shoreland Zone, if the applicant has obtained the
written consent of an affected abutting land owner.
36
14.1.4.5. Practical Difficulty Variance. The Board may grant a variance from the
dimensional standards of a zoning ordinance when strict application of the ordinance to
the applicant and the applicant's property would cause a practical difficulty and when the
following conditions exist:
1. The need for a variance is due to the unique circumstances of the property and
not to the general condition of the neighborhood;
2. The granting of the variance will not produce an undesirable change in the
character of the neighborhood and will not unreasonably detrimentally affect the
use or market value of abutting properties;
3. The practical difficulty is not the result of action taken by the petitioner or a
prior owner;
4. No other feasible alternative to a variance is available to the petitioner;
5. The granting of a variance will not unreasonably or adversely affect the natural
environment; and
6. The property is not located in whole or in part within the Shoreland Zone.
As used in this subsection, "dimensional standards" means and is limited to ordinance
provisions relating to lot area, lot coverage, frontage, and setback requirements.
As used in this subsection, "practical difficulty" means that the strict application of the
ordinance to the property precludes the ability of the applicant to pursue a use permitted
in the zoning district or area in which the property is located and results in significant
economic injury to the applicant.
14.1.5. Variance Recorded. If the Board of Appeals grants a variance under this section, a
certificate indicating the name of the current property owner, identifying the property by
reference to the last recorded deed in its chain of title and indicating the fact that a variance,
including any conditions on the variance, has been granted and the date of the granting, shall
be prepared in recordable form. This certificate must be recorded in the local Registry of Deeds
within ninety (90) days of the final written approval of the variance or the variance is void. The
variance is not valid until recorded as provided in this subsection. For the purpose of this
subsection, the date of the final written approval shall be the date stated on the written
approval.
14.1.6. Interpretation of Ordinance Requirements. The Board of Appeals shall limit any
variances granted as strictly as possible in order to insure conformance with the purposes and
provisions of this Ordinance to the greatest extent possible, and in doing so, may impose such
conditions to a variance as it deems necessary. The party receiving the variance shall comply
with any conditions imposed.
37
14.1.7. A copy of all variances granted by the Board of Appeals in the Shoreland Zone shall be
submitted to the Department of Environmental Protection within fourteen (14) days of the
decision.
14.2. Appeals
14.2.1. Administrative Appeal. An administrative appeal may be taken to the Board of
Appeals by an aggrieved party from a decision of the CEO, the Planning Board, or the LPI
outlined in Section 12.3.1. Such appeal shall be taken within forty (40) days of the date of the
decision appealed from, and not otherwise, except that the Board, upon showing of good cause,
may waive the forty (40) day requirement.
14.2.2. Such appeal shall be made by filing with the Board of Appeals a written notice of
appeal which includes:
1.
A concise written statement indicating the decision of the Planning Board, CEO
or Local Plumbing Inspector being appealed from, the specific provisions of the
applicable ordinance, to which the decision is alleged to be in error, and what
relief is requested.
2.
A sketch drawn to scale showing lot lines, location of existing structures and other
physical features of the lot pertinent to the relief sought.
14.2.3. Upon being notified of an administrative appeal, the CEO, Local Plumbing Inspector or
Planning Board, as appropriate, shall transmit to the Board of Appeals all the papers
constituting the record of the decision appealed from.
14.2.4. The Board of Appeals shall hold a public hearing on the appeal within thirty-five (35)
days of its receipt of an appeal request.
14.3. Decision by Board of Appeals
14.3.1. A majority of the Board shall constitute a quorum for the purpose of deciding an
appeal, request, or dispute. A member who abstains shall not be counted in determining
whether a quorum exists.
14.3.2. The concurring vote of a majority of the members of the Board of Appeals present and
voting shall be necessary to reverse an order, requirement, decision, or determination of the
CEO, Local Plumbing Inspector or Planning Board, or to decide in favor of the applicant on
any matter on which it is required to decide, or to grant any variance, or to settle a dispute
about the Shoreland Zoning District boundary. When acting in an appellate capacity, the Board
of Appeals may reverse the decision of the Planning Board only when there is an error in the
Planning Board's interpretation or application of specific provisions of the ordinance. When
acting in a de novo capacity, the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of the evidence.
38
14.3.3. The person filing the variance application, administrative appeal or dispute about the
Shoreland Zoning District boundary line shall have the burden of proof.
14.3.4. The Board shall decide all appeals, requests, or disputes within thirty-five (35) days
after the close of the hearing, and shall issue a written decision on all appeals.
14.3.5. All decisions shall become a part of the record and shall include a statement of findings
and conclusions as well as the reasons or basis thereof, and the appropriate order, relief or
denial thereof.
14.4. Appeal to Superior Court
Any aggrieved party who participated in the proceedings before the Board of Appeals may take
an appeal to Superior Court as set forth in 30-A M.R.S.A. § 2691(3), as may be amended from
time to time.
14.5. Reconsideration
The Board of Appeals may reconsider any decision as set forth in 30-A M.R.S.A. § 2691(3), as
may be amended from time to time. The Board may conduct additional hearings and receive
additional evidence and testimony.