This is the exact embedded text of the captured official document.
Snapshot efdd52a406dd · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
SITE PLAN REVIEW ORDINANCE
Table of Contents
Contents
SECTION A. PURPOSE ........................................................................................................................................... 2
SECTION B. APPLICABILITY ............................................................................................................................... 3
SECTION C. AUTHORITY AND ADMINISTRATION ........................................................................................ 3
SECTION D. SUBMISSION REQUIREMENTS ................................................................................................... 5
SECTION E. DESIGN AND PERFORMANCE STANDARDS ............................................................................. 7
SECTION F. APPEAL ............................................................................................................................................ 19
SECTION G. ENFORCEMENT ............................................................................................................................. 19
SECTION A. PURPOSE
1. The purpose of site plan review is to ensure that the design and layout of commercial, retail,
industrial or institutional uses or multi-family residential development will constitute suitable
development and will not result in a detriment to the Town of Harrison or to the environment.
2. The purpose and objectives of site development requirements and the site plan review
procedure for uses other than single-family and duplex dwellings are to:
a. Encourage originality, flexibility and innovation in site planning and development,
including the architecture, landscaping and graphic design of the development;
b. Discourage monotonous, drab, unsightly, dreary and inharmonious developments;
c. Conserve the Town's natural beauty and visual character and charm by ensuring that
structures, signs and other improvements are properly related to their sites, and to
surrounding sites and structures, with due regard to the aesthetic quality of the natural
terrain and landscaping, and that proper attention is given to exterior appearance of
structures, signs, and other improvements;
d. Protect and enhance the Town's appeal to its residents and visitors and thus support and
stimulate business and industry and promote the desirability of investment and occupancy in
business, commercial and industrial properties;
e. Stabilize and improve property values and prevent blighted areas and, thus, increase tax
revenues.
f. Achieve the beneficial influence of pleasant environments for living and working on
behavioral patterns and, thus, decrease the cost of governmental services;
g. Foster civic pride and community spirit so as to improve the quality and quantity of citizen
participation in local government and in community growth, change and improvement.
h. Sustain the comfort, health, tranquility and contentment of residents and attract new
residents by reason of the town's favorable environment;
And, thus, to promote and protect the health, welfare and safety of the Town.
1
SECTION B. APPLICABILITY
1. Except for single-family and duplex dwellings and "their" accessory uses, no building permit shall
be issued for a new building, a new facility such as a golf course or public utility, or the major
remodeling of an existing building or facility, and no sign permit shall be issued for the erection or
construction of a sign relating to such new building or facility, or major remodeling, until the plans,
drawings, sketches and other documents required under this section have been reviewed and
approved by the Planning Board. For purposes of this Section, the term "major remodeling" shall
mean any remodeling that substantially changes the use of the building or its exterior appearance.
Any revision to or addition of paved areas, parking lots or drives shall constitute a "major
remodeling".
2. Construction, site development and landscaping shall be carried out in substantial accord with the
plans, drawings, sketches and other documents approved by the Board, unless altered with Board
approval. Nothing in this Subsection shall be construed to prevent ordinary repair, maintenance and
replacement of any part of the building or landscaping which does not involve a substantial change
from the purpose and objectives of this ordinance.
SECTION C. AUTHORITY AND ADMINISTRATION
A. AUTHORITY
1. This Ordinance is adopted pursuant to Municipal Home Rule Authority as provided for in Article
VIII. Part Second, Section 1 of the Maine Constitution and Title 30A M.R.S.A, Section 3001
2. This Ordinance shall be known as the "Site Plan Review Ordinance" of the Town of
Harrison, Maine adopted and effective by vote of the Town Meeting.
B. ADMINISTRATION
The Planning Board of the Town of Harrison shall administer this Ordinance.
1. All applications for site plan review shall be made in writing to the Code Enforcement Officer on
forms provided for this purpose. The application shall be made by the owner of the property or by
his agent, as designated in writing by the owner. The application for site plan review shall be
accompanied by a fee as established and revised from time to time, by the Board of Selectmen and
listed in the Town Fee schedule.
Two (2) paper copies and an electronic copy of the completed application for site plan review,
together with the
documentation required in these regulations, shall be submitted at least ten (10) business days
prior to a scheduled Planning Board meeting.
2. Final Site Plan Review Acceptance
2
The Planning Board shall review the final site plan review application to determine whether the
application is complete and in accordance with this Ordinance. The Board shall:
a. Accept the application and begin the final plan review process;
b. Accept the application with conditions, each of which must be satisfied prior to final site plan
review approval; or
c. Reject the application because it fails to meet the requirements of this Ordinance.
In the case of rejection, the Board shall notify the applicant in writing of the reasons for
rejection.
3. Site Plan Review Process
The Planning Board shall, within 30 days of a public hearing or within 60 days of having
received a completed application, if no hearing is held, or within such other time limit as may
mutually be agreed to, issue an order denying or granting approval of the final site plan review
application subject to any conditions as it may deem advisable to satisfy the criteria contained
in this Ordinance. In all instances, the burden of proof shall be upon the applicant. In issuing its
decision, the Planning Board shall make findings of fact establishing that the proposed site in
the application does or does not meet the provisions of this Ordinance.
4. Public Hearing
In the event that the Planning Board determines to hold a public hearing on the proposed,
application it shall hold such public hearing within 30 days of having accepted a site plan
review application, and shall cause notice of the date, time, and place of such hearing to be
given to the applicant and to be published in a newspaper of general circulation in Harrison at
least 7 days prior to the hearing. The decision to hold a public hearing is discretionary, and in
making its decision, the Planning Board may consider the size and type of use, community
impact, and whether any written requests for such hearing have been received.
5. Pre-Application Meeting
Prior to formal application, an owner or his authorized agent may request an informal review of the
site plan by the Planning Board to determine its compliance with town regulations.
0. Recordkeeping
One copy of an approved site plan application shall be included in the application for a
building permit.
The Site Plan Review Ordinance shall be accompanied by a fee as established and revised
from time to time, by the Board of Selectmen and listed in the Town Fee Schedule.
3
6. Waiver Provisions
The Planning Board may waive individual requirements of site plan review, provided that the waiver
does not result in:
a. Undue water or air pollution;
b. An inadequate water supply;
c. Unreasonable soil erosion;
d. Unreasonable traffic congestion or safety risk;
e. Inadequate sewage disposal capacity;
f. Inadequate solid waste disposal capacity;
g. An adverse impact on scenic or natural beauty, aesthetics, historic sites, or rare or
irreplaceable natural areas;
h. Substantial non-conformance with this Ordinance or the Comprehensive Plan.
Factors appropriate for waivers include, but are not limited to: final plan submission
requirements; design standards for streets; storm water management requirements; erosion
and sedimentation requirements; performance guarantees; public open space; appearance
assessment; development impact fees; design for solar access and for the provision of
affordable housing.
SECTION D. SUBMISSION REQUIREMENTS
When the owner of the property or his authorized agenda makes formal application for site plan review,
his application shall contain at least the following exhibits and information:
1. Application. An application for site plan review shall include an electronic copy e.g. (PDF),
two copies of the following:
a. A fully executed and signed application for site plan review.
b. Name of owner, developer and agent; and interest of the applicant if other than the owner or
developer.
c. Name of development, scale and meridian arrow, with specific definition of representation,
date of plan and legend.
d. Names and addresses of all owners of record of all adjacent property, within 200 feet, as
they appear on Assessor's records.
e. Names and addresses of designer, engineer, planner or landscape architect.
2. Map Requirements. One (1) copy 11 by 17, two (2) copies 24 by 36 of a site plan drawn at a scale
of not more than 50 feet to the inch for that portion of the total tract of land being proposed for
development, and showing the following:
a. Current zoning boundaries and 100-year floodplain boundaries including surrounding
areas to a distance of 300 feet from the perimeter of the site.
b. Easements; rights-of-way, existing, planned or proposed; or other reservations adjacent to or
intersecting the property.
4
c. A surveyed topographic map of the site showing existing and proposed contours at no more than
five-foot intervals.
d. Location of watercourses, aquifers and aquifer recharge areas, wetlands, marshes, surface water,
rock outcroppings, wooded areas and areas of significant tree growth.
e. Location of buildings existing on the tract to be developed and on adjacent tracts within a distance
of 100 feet from the property line, indicating whether existing buildings on the tract are to be
retained, modified or removed.
Locations of water mains, sewer mains, wells, fire hydrants, culverts, drains, pipe sizes, grades
and direction of flow existing within 200 feet of the subject property, whether public or private.
Existing soil conditions and soil suitability test results for septic waste disposal, with all test pit
locations shown on the plan. The Planning board also may require submission of a high intensity
soils map.
h. Location of proposed buildings and uses thereof.
i. Proposed traffic circulation system including streets, parking lots, driveways and other access
and egress facilities, curb lines, sidewalk lines, and existing streets including the projected
traffic flow patterns into and upon the site for both vehicles and pedestrians and an estimate of
the projected number of motor vehicle trips to and from the site for an average day and for peak
hours.
J.
Location of existing and proposed public utility lines indicating whether proposed lines will be
placed underground.
k. Location and design of proposed off-street parking and loading areas indicating number and size
of stalls.
I. Proposed location, direction, type and time of use of outdoor lighting.
m. Existing and proposed planting, fences and walls, including all landscaping and screening, and
indicating existing trees to be retained and areas to be left undisturbed including design features
intended to integrate the proposed new development into the existing landscape to enhance
aesthetic assets and to screen objectionable features from neighbors.
n. Location, size, design and manner of illumination of signs.
o. Disposal of sewage, trash, solid waste, oily waste, hazardous waste or radioactive waste
showing disposal facilities, receptacles or areas.
p. Perimeter boundaries of the site giving complete descriptive lot data by bearings, distances, and
radii of curves including the name and seal of the registered land surveyor who prepared the plan.
5
q. A statement on the map of the amount of area of land involved in the site, the percentage of
the site proposed to be covered by buildings, the total number of dwelling units proposed,
the number of dwelling units proposed per acre, the area proposed to be devoted to open
space, the area proposed to be paved for parking, driveways, loading space and sidewalks,
the total number of parking spaces required by Section E. I. d. for the uses proposed, the
number of employees expected per shift, and the total floor area of proposed commercial or
industrial uses.
r. Description and plan of a "phased development concept" detailing the areas and sequence of
phasing.
s. Any other information the Planning Board deems necessary.
3. Supporting Documents. The following additional documents may also be
required.
a. A storm drainage study certified by a professional engineer and a proposed drainage
system plan, both surface and subsurface, showing measures proposed to prevent pollution of
surface or ground water, soil erosion, increased runoff, changes in ground water level and
flooding.
b. Description and plan of capacity and location of means of sewage disposal and evidence
of soil suitability for such disposal approved by a registered engineer, a soils scientist or
site evaluator.
c. A notarized financial statement by the developer assuring that he has the financial
capabilities to fully carry out the project and to comply with the conditions imposed by
the Planning Board. Such statement shall be prepared by a certified public accountant.
d. A traffic impact analysis prepared by a recognized engineer in the field of transportation
planning.
e. Review and comment, when required by the Planning Board, by appropriate Town boards or
officials.
f. Any other information deemed necessary by the Planning Board.
SECTION E. DESIGN AND PERFORMANCE STANDARDS
The following criteria and standards shall be utilized by the Planning Board in reviewing application
for site plan review. These standards are intended to provide a guide for the applicant in the
development of site and building plans as well as a method or review for the Board. These standards
are not intended to discourage creativity, invention and innovation.
6
1. Parking Area Design Standards
a. Access. There shall be adequate provisions for ingress and egress to all parking spaces. The width of
access drives or driveways shall be determined as part of the site plan review, depending on use,
topography and similar consideration, and they shall meet the requirements of this Article.
b. Size of aisles. The width of all aisles providing direct access to individual parking stalls shall be in
accordance with the requirements set forth below. Only one-way traffic shall be permitted in aisles
serving single-row parking spaces placed at an angle other than ninety degrees.
PARKING ANGLE
(degrees)
AISLE WIDTH
(feet)
0 parallel parking
12
30
12
45
13
60
18
90 (perpendicular parking)
25
q. Off-Street Parking. In any district where permitted, no use of premises shall be authorized or
extended, and no building or structure shall be constructed or enlarged, unless there is provided
for such extension, construction or enlargement, off-street automobile parking space within 300
feet of the principal building structure, or use of the premises, in accordance with the following
schedule of parking requirements. No off-street parking facility shall have more than two (2)
entrances and exits on the same street, and no entrance or exit shall exceed thirty (30) feet in
width. Non-residential parking areas with more than two (2) parking spaces shall be so
arranged that vehicles can maneuver within such areas and exit onto the street in a forward
motion. No parking lot shall be constructed closer than five feet from any property line unless a
common parking area is planned between adjacent lots.
r. Parking requirements shall be calculated utilizing one of the following formulas:
(1) Two (2) spaces per dwelling unit.
(2) One (1) space for each sleeping room in a tourist home, boarding or lodging house, motel
or hotel.
(3) One (1) space for each tent or recreational vehicle site in a campground.
(4) One (1) space for each of (2) beds in a hospital or sanatorium.
(5) One (1) space for each four (4) beds for other institutions devoted to the board, care, or
treatment of person.
7
(6) One (1) space for each 180 square feet of fraction thereof, of gross floor area of any retail,
wholesale or service establishment or office or professional building. Except that the ratio
may be changed to one space for each 225 square feet or fraction thereof if an amount of
land area equivalent to the difference between the 180 square feet requirements and the 225
square feet requirement is developed in landscaped green area as defined herein.
(7) One (1) space for each three (3) seats, permanent or otherwise, for patron use for restaurants,
and other places serving food or beverage and for theaters, auditoriums, and other places of
amusement or assembly.
(8) One (1) space for each person employed or anticipated to be employed on the largest shift for
all types of commercial, industrial, or other permitted uses.
(9) Adequate spaces shall be provided to accommodate customers, patrons, and employees at
automobile service stations, drive-in establishments, open-air retail business and amusements
and other permitted uses not specifically enumerated.
e. Parking Space Dimensions. Each parking shall be designed as follows:
Parking
StallWidth
SkewWidth
Stall Depth
AisleWidth
Angle
90°
9'0"
0"
18'5"
26'0"
60°
8'6"
10'5"
19'0"
16'0" (1 Way)
45°
8'6"
12'9"
17'5"
12'0" (1Way)
30°
8'6"
17'0"
17'5"
12'0"
Parallel spaces
10'0"
20'0"
Multiple Purpose. No required parking space shall, for the purpose of this Ordinance, serve
more than one use.
g. General Location. No off-street parking or loading area shall be located in a minimum required
front yard.
h. Sidewalk and Curbing. Sidewalks between parking areas and principal structures along aisles and
driveways and wherever pedestrian traffic shall occur, shall be provided with a minimum width of
four (4) feet of passable area and shall be raised six (6) inches or more above the parking area
except when crossing streets or driveways. Guardrails and wheel stops permanently anchored to
the ground shall be provided in appropriate locations.
i. Parked vehicles shall not overhang or extend over sidewalk areas unless an additional sidewalk
width of two and one-half (2 'h) feet is provided to accommodate such overhang.
Marking and Delineation of Parking and Emergency Access Areas. Parking stalls,
driveways, and aisles shall be clearly marked and delineated. The Planning Board may
8
require that certain areas are maintained for firefighting or other emergency purposes,
such areas shall be appropriately designated.
k. General Circulation and Parking Design Principles.
(1) Parking space allocations should be oriented to specific buildings.
(2) Parking areas should be designed to focus on major walkways, which should be fenced or
marked.
(3) Where pedestrians must cross service roads or access roads to reach parking areas,
crosswalks should be clearly designated by pavement markings or signs and
lighted. Crosswalk surfaces should be raised slightly to designate them to drivers,
unless drainage problems would result. A one-way car movement (to the left or
counterclockwise) should be encouraged. A major loop road should be developed
around the parking areas, and parking bays should run perpendicular off the road.
(4) Driveways should approach from the right to permit passengers to alight to or from the
sidewalk.
(5) Whenever possible, one-way traffic should be established at building entrances.
(6) Where buses are a factor, bus shelters and indentation slots off the roadway should be
provided.
2. Entrance Location and Design Provisions. The following provisions apply to the entrance or exit of
a proposed site.
a. All entrances and exits shall be located to afford maximum safety to traffic, provide for safe
and convenient ingress and egress to and from the site and to minimize conflict with the flow
of traffic.
b. Any entrance or exits shall be so designed in profile and grading and so located as to
provide the following minimum sight distance measured in each direction. The
measurements shall be from the driver's seat of a vehicle standing on that portion of the
entrance/exit driveway with the front of the vehicle a minimum of ten (10) feet behind the
curb line or edge of shoulder with the height of the eye three and seventy-five hundredths
(3.75) feet to the top of an object four and five-tenths (4.5) feet above the pavement.
ALLOWABLE SPEED
(miles per hour)
REQUIRED SIGHT
Distance
25
250
40
400
45
450
50
500
55
550
9
Where appropriate, the applicant shall also apply ITE standards related to safe stopping
distance.
c. Where a site occupies a corner of two (2) intersecting roads, no entrance or exit shall be
located within fifty (50) feet of the point of tangency of the existing or proposed curb radius
of that site.
d. No part of any entrance or exit shall be located within a minimum of ten (10) feet of a side
property line. However, the Planning Board may permit an entrance or exit serving two (2) or
more adjacent sites to be located on or within ten (10) feet of a side property line between the
adjacent sites.
e. Where two (2) or more two-way entrance/exits connect a single site to anyone (1) road, a
minimum clear distance of 1000 feet measured along the right-of-way line shall separate the
closest edges of any two (2) such entrances/exits onto a road. The Planning Board may reduce
that width down to 400 feet, provided the road in question is not a major arterial serving
significant through traffic.
f. Driveway Angles. Entrances or exits used for two-way operation shall intersect the road at
an angle of as near ninety (90) degrees as site conditions will permit and in no case less than
sixty (60) degrees. Entrances or exits used by vehicles in one (1) direction of travel (right
turn only) shall not form an angle smaller than forty-five (45) degrees with a road unless
acceleration and deceleration lanes are provided.
Entrance/Exit Profile. Any vertical curve on an entrance or exit shall be low enough to
prevent the dragging of any vehicle undercarriage. Should the sidewalk be so close to the curb
at a depressed curb entrance/exit as to cause the slope to be too steep and to be likely to cause
undercarriage drag, the sidewalk shall be appropriately lowered to provide a suitable ramp
gradient.
h. Entrance/Exit Grades. Entrances or exits shall not have a grade in excess of ten (10)
percent over their entire length. At intersections with roads, the grade shall not be more
than three (3) percent for the first twenty-five (25) feet from the center of the intersection
for the road or driveway unless otherwise approved by the Planning Board.
i. Entrance/Exit Dimensions. The dimensions of entrances or exits shall be designed to
accommodate adequately the volume and character of vehicles anticipated to be attracted daily
onto the land development for which a site plan is prepared. The required maximum and
minimum dimension for entrance/exits are indicated below. Entrance/exits serving large
volumes of daily traffic or traffic of over fifteen (15) percent truck traffic shall be required to
utilize high-to-maximum dimensions.
One-Way Operation
Two-Way Operation
Entrance/Exits* Width
Entrance/Exits* Width
3 to 10 dwelling units
10 - 15
15 -- 25
10 dwelling units or over
15 -- 25
20 -- 35
Commercial and industrial 15 -- 30 25 -- 35
10
All entrance/exits shall be five (5) feet or wider, depending upon conditions, at the curb line and
this additional width shall be maintained for a distance of twenty (20) feet into the site.
Surfacing. Any driveway or parking area shall be constructed with the surface approved
by the Planning Board in accordance with the specifications of the Code Enforcement
Officer. Such surface shall extend to the paved portion of the road and shall extend
throughout the area defined by the required entrance/exit dimensions specified above.
3. Road Standards
When a project entails the construction of public or private ways, these ways shall conform to
Town standards.
4. Lighting
In connection with every site plan, the applicant shall submit plans for all proposed exterior
lighting. These plans shall include the location, type of light, radius of light, manufacturer's
specifications sheet and the intensity in foot-candles. The following design standards shall be
followed:
a. The style of the light and light standards shall be consistent with the architectural style of the
principal building.
b. The maximum height of freestanding lights shall be the same as the principal building but not
exceeding twenty-five (25) feet.
c. All lights shall be shielded to restrict the maximum apex angle of the cone of illumination to 150
degrees.
d. Lighting shall be shielded so as not to cross property lines and be directly visible to
adjacent residents.
e. Spotlight-type fixtures attached to buildings are prohibited.
Freestanding lights shall be so located and protected as to avoid being easily damaged by
vehicles.
g. Lighting should be located along streets, parking areas, at intersections and crosswalks, and
where various types of circulation systems merge, intersect or split.
h. Pathways, sidewalks and trails should be lighted with low or mushroom-type standards.
i. Stairways and sloping or rising paths, building entrances and exits require illumination.
j. Lighting should be provided where buildings are set back or offset.
11
k. The following intensity in foot-candles should be provided:
(1) Parking lots: an average of one and five-tenths (1.5) foot-candles throughout.
(2) Intersections: three (3) foot-candles.
(3) Maximum at property lines: 0.10 foot-candles
(4) In residential areas: average of six-tenths (0.6) foot-candles.
1. Display lighting shall be shielded and shall be located and maintained as not to constitute a
hazard or nuisance to the traveling public or to neighbors. In particular, so-called "string lights"
shall not be permitted.
5. Buffers
Buffers are fences, landscaping, berms and mounds used to minimize any adverse impacts or
nuisance on the site or form adjacent areas. The following guidelines apply:
a. Evergreens can be used as buffers, provided they are planted properly. An evergreen buffer
requires two (2) or three (3) rows of staggered plantings. The rows can be five (5) feet apart
and the evergreens planted four (4) feet on center.
b. Buffers shall be considered in or for the following areas and purposes:
(1) Along property lines, to shield various uses from each other.
(2) Along interior roads running parallel to roads exterior to the site, to prevent confusion,
particularly at night.
(3) Parking areas, garbage collection areas, and loading and unloading areas.
(4) To block parallel wind patterns and to stop wind-borne debris from leaving the site.
c. Natural features shall be maintained wherever possible to provide a buffer between the proposed
development and non-compatible abutting properties and public roadways. When natural
features such as topography, gullies, stands of trees, shrubbery, or rock outcrops do not exist or
are insufficient to provide a buffer, other kinds of buffers shall be considered.
d. Buffers shall be sufficient to shield structures and uses from the view of non-compatible
abutting properties and public roadways, and to otherwise prevent any nuisances including
but not limited to all loading and unloading operations, storage areas, commercial vehicle
parking, waste disposal and collection areas.
e. Fencing and screening shall be durable and properly maintained at all times by the owner.
Fencing and screening shall be so located within the property line to allow access for
maintenance on both sides without intruding upon abutting properties.
12
g. All buffer areas shall be maintained in a neat and sanitary condition by the owner.
1. Site Conditions During Construction
a. During construction, the site shall be maintained and left each day in a safe and sanitary
manner, and any condition which could lead to personal injury or property damage shall be
immediately corrected by the developer upon an order by the Building Inspector or other
authorized personnel. The developer shall make provision for disposal of oil and grease from
equipment and the site area should be regularly sprayed to control dust from construction
activity.
b. Developed areas shall be cleared of all stumps, litter, rubbish, brush, weeds, dead and
dying trees, roots and debris, and excess or scrap building materials shall be removed or
destroyed immediately following applicable local laws and upon request of and to the
satisfaction of the Code Enforcement Officer prior to issuing an occupancy permit.
c. No change shall be made in the elevation or contour of any lot or site by the removal of
earth to another lot or site other than as shown on an approved site plan. Minimal changes
in elevations or contours necessitated by field conditions may be made only after approval
of the Code Enforcement Officer. All the changes necessitated by field conditions shall be
shown on the final plan and indicated as a change from the preliminary, or if final
approval has been granted, the changes shall be shown on the as-built plans.
d. Temporary improvements. Prior to or during construction, the Code Enforcement Officer
may require the installation or construction of improvements to prevent or correct
temporary conditions on the site which could cause personal injury, damage to property or
erosion and landslide, flooding, heavy construction traffic, creation of steep grades and
pollution. Improvement may include berms, mulching, sediment traps, detention and
retention basins, grading, planting, retaining walls, culverts, pipes, guardrails, temporary
roads and others appropriate to the condition. All temporary improvements shall remain in
place and in operation until otherwise directed by the Code Enforcement Officer.
2. Performance Guarantees
a. Establishing the Level and Type of Guarantee. The developer shall, in an amount set by the
Planning Board, file with the Town, prior to the issuance of a building permit, a
performance guarantee in the form of a certified check payable to the Town of Harrison, a
performance bond running to the Town of Harrison, an irrevocable letter of credit to cover
the full cost of required improvements or some other form of surety that is acceptable to
the Planning Board. For the purposes of this section, required improvement shall mean all
public and private roads, all drainage structures and ditches, all erosion control measures,
all utilities, all landscaping and all recreation facilities. Any such bond shall be
satisfactory to the Planning Board and the municipal attorney as to form, sufficiency,
manner of execution and surety.
(1) At the discretion of the Planning Board, the developer may be allowed to submit
individual bonds for each phase of a project's development. If this option is chosen,
13
prior to submission of each individual bond, the developer shall submit to the Town a
written statement detailing completion dates for all roads and other public improvements
planned for that phase.
(2) A period on one (1) year (or such period as the Planning Board may determine
appropriate, not to exceed three (3) years shall be set forth in the bond time within
which required improvements must be completed.
b. Inspection of Required Improvements. At least fifteen (15) days prior to commencing
construction of required improvements, the developer shall notify in writing the Code
Enforcement Officer of the time when he proposes to commence construction of such
improvements so that the Code Enforcement Officer can cause inspection to be made to
assure that all specifications and requirements shall be met during the construction of
required improvements, and to assure the satisfactory completion of improvements and
utilities required by the Board. Inspection shall be made of all required public improvements
as defined above.
(1)
At least five (5) days prior to commencing construction of required
improvements, the developer shall pay an inspection fee equal to the estimated cost of
inspection by an engineer appointed by the Town, payable by check to the Town of
Harrison, stating the purpose of the fee. No building permits shall be issued on the
project and no work begun until the inspection fee has been paid.
(2)
If the inspector shall find, upon inspection of the improvement performed before
the expiration date of the performance bond, that any of the required improvements
have not been constructed in accordance with plans and specifications filed by the
developer, he shall so report to the Town Manager, Road Commissioner and Building
Inspector. The Town Manager shall then notify the developer and, if necessary, the
bonding company or bank, and take the necessary steps to preserve the municipality's
rights under the bond or letter of credit. No plan shall be approved by the Board as long
as the developer is in default on a previous approved Plan.
(3)
Upon completion and final inspection of all required improvements, any funds
remaining in a project's inspection fee account, after all inspection fees have been paid,
shall be returned to the developer.
(4)
The applicant shall be required to maintain all improvements and provide for
snow removal on streets and sidewalks until acceptance of said improvements by the
legislative body.
c. Release of the Performance Guarantee. The performance guarantee shall not be released by the
Town Manager until:
(1) The inspecting engineer has completed his final inspection of the project and has
submitted a written report stating that all require public improvements as defined
above have been completed in accordance with approved plans and specifications.
14
(2) The Town Manager and Code Enforcement Officer have examined the site, have
reviewed the inspecting engineer's report and concur with these findings.
(3) Performance guarantees collected on phased work segments shall be released in the same
manner as outlined above, upon the completion of each phase.
3. Hazardous Matter. For any toxic or hazardous matter storage as defined in 38 M.R.S.A. Section
13, the Planning Board may require:
a. an environment evaluation of the geologic, hydrologic, and soils conditions of the site;
b. a description of wastes to be stored, the storage method, and the disposal method;
c. information as to the existing ground water quality around the site and a system to monitor any
changes should contamination occur;
d. findings and use of hazardous matter must be shown to be consistent with other local and State
regulations.
4. Odors. Adequate provisions must be made to control the emission of odors from the site.
The Planning Board may require the applicant to establish pre and post construction odor
levels.
5. Noise. Adequate provisions must be made to control unnecessary noise from and at the site
such that pre and post-construction levels remain the same at the property lines. The
Planning Board may require the applicant to establish pre and post-construction decibel
levels.
6. Vibrations. Adequate provisions must be made to control vibrations such that vibrations for pre
and post-construction remain the same at the property line. The Planning Board may require the
applicant to establish pre and post-construction vibration levels.
7. Unique Features. Adequate provision must be made to migrate adverse impact on existing scenic
or natural beauty, rare or irreplaceable historic sites, or other features of importance to the Town,
as identified in the Comprehensive Plan.
8. Storm Water Management, Groundwater, Pollution and Erosion and Sedimentation
Control.
The Storm Water Management, Groundwater Pollution and Erosion/Sedimentation
Requirements are as follows:
a. Storm Water Management Plan. The storm water management plan must be included in the
final plan application. The primary objective of the program is to limit peak discharge,
after development, to equivalent levels before development. In the development of the
plan, the following practices are required: (1) Peak Discharge Measurement. Peak
discharge must be measured for the 2 and 25-year storm period. Estimation of the peak
discharge and volume must be completed, using Urban Hydrology for Small Watersheds.
TR-55. Soil Conservation Service as revised. The engineering design must include
15
provisions for surface and subsurface runoff, especially where the displacement of surface and
subsurface water is involved. Pre-construction and post-construction water flow estimates and
estimates of surrounding watershed impact and displacement of subsurface water are required.
(1) Reduction of Peak Discharge. In reducing peak storm water runoff so as to maintain pre-
construction water flow levels, the management plan must include techniques to detain water on
the proposed site by:
i.
Minimizing slope length through trenching and maintaining flat slopes where
possible.
ii.
Infiltrating precipitation at the source prior to the runoff, which may be accomplished
by delaying runoff from flat roofs, utilizing french drains for low water table soils, or
precast concrete lattice blocks and bricks.
iii.
Increasing the flow length by using diversion ditches and level lip spreaders.
iv.
Infiltrating runoff after concentration in dry wells or trenches, natural swales or dugout
basins, seepage beds or ditches, where there are low water swales.
v.
Using detention ponds for a short-term storage of runoff, or permanent retention ponds
for long-term storage. Embankments for such ponds must have a slope ratio of no less
than four units horizontal to one unit vertical.
(2) Construction Standards. In developing storm drainage plans, the following
construction standards apply:
i. Shoulders beyond the pavement must be compacted and stabilized, and storm water
runoff from adjoining properties and from the roadway must be conducted so that road
shoulder embankments and pavement edges will not be undermined or raveled away.
ii. Headwalls, catch basins and manholes must be constructed according to specifications
approved by the Town Planner. Catch basins must be located to accept drainage from all
low points and sags in the roadway, and to prevent storm water from flowing along the
gutters for more than 400 feet.
(3) Soil Conservation Service. The Planning Board may require the applicant to submit the storm
water management plan to the Cumberland County Soil and Water Conservation District.
(4) Improvement Costs. If the development depends upon storm water control, which affects the
existing system, whether natural or man-made, all costs of improvements must be paid by
the applicant.
b. Groundwater Pollution. The Planning Board may require the applicant to demonstrate that there will
be no adverse effect on subsurface water quality. The applicant may have to
1 6
establish present water quality conditions and install a monitoring system. Special
precautions must be taken where records indicate the existence of a sand and gravel
aquifer or an aquifer recharge area.
c. Erosion and Sedimentation Plan. A site plan must include a plan for erosion and
sedimentation control during and after the construction period. The range of erosion and
sedimentation control options to be incorporated in the plan should be dependent upon the
guidance of the Environmental Quality Handbook of Maine and on the additional standards
stated below. Any individual option or combination is acceptable, as long as it is
considered in relation to the overall site stormwater management plan.
(1) Stripping of vegetation, regrading or other development shall be done in such a way as to
minimize erosion.
(2) Development shall preserve salient natural features, keep cut-fill operations to a
minimum and ensure conformity with topography so as to create the least erosion
potential and adequately handle the volume and velocity of surface water runoff.
(3) Whenever feasible, natural vegetation shall be retained, protected and supplemented.
(4) The disturbed area and the duration of exposure shall be kept to a practical minimum.
(5) Disturbed soils shall be stabilized as quickly as practicable.
(6) Temporary vegetation or mulching shall be used to protect exposed critical areas
during development.
(7) The permanent (final) vegetation and mechanical erosion control measure shall be
installed as soon as practical on the site.
(8) Until the disturbed area is stabilized, sediment in the runoff water shall be trapped by the
use of debris basins, sediment basins, silt traps or other acceptable methods.
9. Landscape and Site Plan Assessment. The following requirements related to site plan layout shall
be incorporated into the site plan:
a. Special Features. Exposed storage areas, exposed machinery installations, service areas,
truck loading areas, utility buildings and structures and similar accessory areas and
structures shall be subject to such setbacks, screen plantings or other screening methods as
shall reasonably be required to prevent their being viewed from surrounding properties.
b. Preservation of Landscape. The landscape shall be preserved in its natural state, insofar as
practicable, by minimizing tree and soil removal, retaining existing vegetation where
desirable, and keeping any grade changes in character with the general appearance of
neighboring areas.
17
If a site includes a ridge or ridges which are elevated above the surrounding areas and
provide scenic vistas for the natural environment of the skyline of the ridge, buildings
shall be located so that they are not clearly visible from surrounding areas. Siting away
from the skyline, plantings and buffering landscaping are potential methods of preserving
the scenic vista.
c. Relation of Proposed Buildings to the Environment. Proposed structures shall be related
harmoniously to the terrain and to the existing buildings in the vicinity which have a visual
relationship to the proposed buildings. Special attention shall be paid to the scale of the
proposed building (s), massing of the structure (s), and such natural features as slope,
orientation, soil type, and drainage courses.
d. Landscaping. Landscaping shall be designed and installed to define, soften or screen the
appearance of off-street parking areas from the public right-of-way and abutting
properties, to enhance the physical design of the building (s) and site, and to minimize the
encroachment of the proposed use of neighboring land uses. Particular attention should be
paid to the use of planning to break up parking areas.
SECTION F. APPEAL
The applicant, abutting landowner, or aggrieved party may appeal a site plan review decision
of the Planning Board to the Zoning Board of Appeals within 30 days of the Planning Board
decision. If it is shown after public hearing that the Planning Board erred in the interpretation
of these regulations in making its final decision, the Zoning Board of Appeals may affirm,
amend or reverse the decision of the Planning Board. The appeals process shall be consistent
with the process described in Section; 16. H. 3-4 of the Harrison Shoreland Zoning Ordinance.
SECTION G. ENFORCEMENT
It shall be the duty of the Code Enforcement Officer to enforce the provisions of this site plan
review ordinance and any final site plan action taken by the Planning Board. Any enforcement
action shall be carried out in accordance with Section 16. I. 1-4 of the Harrison Shoreland
Zoning Ordinance.
18