This is the exact embedded text of the captured official document.
Snapshot 1a8bb139dd59 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
TOWN OF HARRISON
SHORELAND ZONING ORDINANCE
$3.00
Adopted:
June 30, 1992
Amended:
June 19, 1993
Amended:
June 12, 1996
Amended:
June 9, 1999
Amended:
June 13, 2002
Amended:
September 21, 2004
Amended:
June 15, 2005
Amended:
June 11, 2008
Amended:
June 10, 2009
Amended:
June 13, 2012
Amended:
June 13, 2017
Amended:
July 14, 2020
Original 1st Adopted:
June 26, 1974
Amended:
May 18, 1976
Amended:
March 12, 1977
Amended:
March 13, 1981
Amended:
March 11, 1983
Amended:
June 13, 1987
Amended:
June 25, 1988
Amended:
August 29, 1989
SECTION 1. PURPOSES
1
SECTION 2. AUTHORITY
1
SECTION 3. APPLICABILITY
1
SECTION 4. EFFECTIVE DATE OF ORDINANCE AND ORDINANCE AMENDMENTS
1
SECTION 5. AVAILABILITY 1
SECTION 6. SEVERABILITY 2
SECTION 7. CONFLICTS WITH OTHER ORDINANCES 2
SECTION 8. AMENDMENTS 2
SECTION 9. DISTRICTS AND ZONING MAP
2
A. Official Shoreland Zoning Map 2
B. Scale of Map
2
C. Certification of Official Shoreland Zoning Map 2
D. Changes to the Official Shoreland Zoning Map 2
SECTION 10. INTERPRETATION OF DISTRICT BOUNDARIES
3
SECTION 11. LAND USE REQUIREMENTS
3
SECTION 12. NON-CONFORMANCE
3
A. Purpose
3
B. General
3
1. Transfer of Ownership
3
2. Repair and Maintenance 3
C. Non-conforming Structures
3
1. Expansions
3
2. Foundations
5
3. Relocation
5
4. Reconstruction or Replacement 6
5. Change of Use of a Non-Conforming Structure
6
D. Non-conforming Uses
6
1. Expansions
6
2. Resumption Prohibited 7
3. Change of Use
7
E. Non-conforming Lots
7
1. Non-conforming Lots
7
2. Contiguous Built Lots
7
3. Contiguous Lots - Vacant or Partially Built
7
SECTION 13. ESTABLISHMENT OF DISTRICTS 8
A. Resource Protection District
8
B. Limited Residential District
8
C. Limited Commercial District
8
THE FOLLOWING USES ARE PERMITTED IN THE LIMITED COMMERCIAL DISTRICT 9
D. Stream Protection District
9
SECTION 14. TABLE OF LAND USES
9
SECTION 15: LAND USE STANDARDS
10
A. Minimum Lot Standards 10
1. Residential Lot Standards;
10
2. Non-Residential Lot Standards: 11
B. Principal and Accessory Structures
11
C. Piers, Docks, Wharfs, Bridges and Other Structures and Uses 12
D. Campgrounds
14
E. Individual-Private Campsites
14
F. Commercial and Industrial Uses 15
G. Parking Areas
15
H. Roads and Driveways
16
I. Signs
17
J. Storm Water Runoff
19
K. Septic Waste Disposal
19
L. Essential Services Error! Bookmark not defined.
M.Mineral Exploration and Extraction
20
N. Agriculture
20
O. Timber Harvesting
21
P. Clearing of Vegetation for Development
22
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal24
R. Exemptions to Clearing and Vegetation Removal Requirements
25
S. Revegetation Requirements
26
T. Erosion and Sedimentation Control
28
U. Soils
28
V. Water Quality
29
W.
Archaeological Site
29
SECTION 16. ADMINISTRATION
29
A. Administering Bodies and Agents
29
B. Permits Required 30
C. Permit application
30
D. Procedure for Administering Permits
31
E. Special Exceptions
32
F. Expiration of Permit
32
G. Installation of Public Service
33
H. Appeals
33
1. Administrative Appeals: 33
2. Variance Appeals: 33
3. Administration Appeals 34
4. Appeal Procedure 35
A. Making an Appeal 35
B. Decision by Board of Appeals
35
5. Appeal to Superior Court 36
6. Reconsideration 36
I. Enforcement
36
1. Nuisances 36
2. Code Enforcement Officer 36
3. Legal Actions
36
4. Fines
37
SECTION 17. DEFINITIONS 37
1
SHORELAND ZONING ORDINANCE
Section 1. Purposes
The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other
wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect
archaeological and historic resources; to protect freshwater wetlands: to control building sites,
placement of structures and land uses; to conserve shore cover, visual as well as actual points of
access to inland waters; to conserve natural beauty and open space; and to anticipate and
respond to the impacts of development in Shoreland areas.
Section 2. Authority
This Ordinance has been prepared in accordance with the provisions of Title 38 Sections 435-449
of the Maine Revised Statutes Annotated (M.R.S.A.).
Section 3. Applicability
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
-
normal high-water line of any great pond, or river;
-
upland edge of a freshwater wetland;
-
and within 100 feet, horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or
other structure extending or located beyond the normal high-water line of a water body or within a
wetland.
Section 4. Effective Date of Ordinance and Ordinance Amendments
This Ordinance, which was adopted by the municipal legislative body on June 30, 1992 and
Amended on July 14, 2020, shall not be effective unless approved by the Commissioner of the
Department of Environmental Protection. A certified copy of the Ordinance, or Ordinance Amendment,
attested and signed by the Municipal Clerk, shall be forwarded to the Commissioner for approval. If
the Commissioner fails to act on this Ordinance within forty-five (45) days of his/her receipt of the
Ordinance or Ordinance Amendment, it shall be automatically approved. Any application for a permit
submitted to the municipality within the forty-five (45) day period shall be governed by the terms of
this Ordinance or Ordinance Amendment.
Section 5. Availability
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this Ordinance shall be posted.
2
Section 6. Severability
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this Ordinance shall be posted.
Section 7. Conflicts with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of this
Ordinance or of any other ordinance, regulation or statute administered by the municipality, the
more restrictive provision shall control.
Section 8. Amendments
This Ordinance may be amended by majority vote of the legislative body. Copies of amendments,
attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of the
Department of Environmental Protection following adoption by the municipal legislative body and
shall not be effective unless approved by the Commissioner If the Commissioner fails to act on any
amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
Section 9. Districts and Zoning Map
A. Official Shoreland Zoning Map
The areas to which this Ordinance is applicable are hereby divided into the following districts as
shown on the Official Shoreland Zoning Map(s) which is (are) made a part of this Ordinance:
1. Resource Protection
2. Limited Residential
3. Limited Commercial
4. Stream Protection
B. Scale of Map
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000 feet.
District boundaries shall be clearly delineated and a legend indicating the symbols for each district
shall be placed on the map.
C. Certification of Official Shoreland Zoning Map
The Official Shoreland Zoning Map shall be certified by the attested signature of the Municipal Clerk
and shall be located in the municipal office. In the event the municipality does not have a municipal
office; the Municipal Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map
If amendments, in accordance with Section 8, are made in the district boundaries or other matter
portrayed on the Official Shoreland Zoning Map, such changes shall be made on the Official
Shoreland Zoning Map within thirty (30) days after the amendment has been approved by the
Commissioner of the Department of Environmental Protection.
3
Section 10. Interpretation of District Boundaries
Unless otherwise set forth on the Official Harrison Shoreland Zoning Map, district boundaries are
property lines, the centerlines of streets, roads and rights of way, and the boundaries of the
shoreland area as defined herein. Where uncertainty exists as to the exact location of district boundary
lines and buffer area boundaries, the Board of Appeals shall be the final authority as to location.
Section 11. Land Use Requirements
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all of the regulations
herein specified for the district in which it is located, unless a variance is granted.
Section 12. Non-conformance
A. Purpose
It is the intent of this Ordinance to promote land use conformities, except that non-conforming
conditions that existed before the effective date of this Ordinance or Amendments thereto shall be
allowed to continue, subject to the requirements set forth in Section 12. Except as otherwise
provided in this Ordinance, a non-conforming condition shall not be permitted to become more non-
conforming.
B. General
1. Transfer of Ownership
Non-conforming structures, lots, and uses may be transferred, and the new owner may continue
the non-conforming use or continue to use the non-conforming structure or lot, subject to the
provisions of this Ordinance.
2. Repair and Maintenance
This Ordinance allows the normal upkeep and maintenance of non-conforming uses and
structures including repairs or renovations that do not involve expansion of the non-conforming
use or structure, and such other changes in a non-conforming use or structure as federal, state,
or local building and safety codes may require.
NOTE: See Section 17 for the definitions of non-conforming structures, non-conforming uses and
non-conforming lots.
C. Non-conforming Structures
1. Expansions
All new principal and accessory structures, excluding functionally water-dependent uses, must
meet the water body, tributary stream, or wetland setback requirements contained in Section
15(B)(1). A non-conforming structure may be added to or expanded after obtaining a permit from
the same permitting authority as that for a new structure, if such addition or expansion does not
increase the non-conformity of the structure and is in accordance with subparagraphs (a) and (b)
below.
4
a. Expansion of any portion of a structure within 25 feet of the normal high-water line
of a water body, tributary stream, or upland edge of a wetland is prohibited, even if
the expansion will not increase nonconformity with the water body, tributary stream
or wetland setback requirement. Expansion of an accessory structure that is located
closer to the normal high-water line of a water body, tributary stream, or upland
edge of a wetland than the principal structure is prohibited, even if the expansion
will not increase nonconformity with the water body, tributary stream, or wetland
setback requirement.
b. Notwithstanding paragraph (a), above, if a legally existing nonconforming principal
structure is entirely located less than 25 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland, that structure may be
expanded as follows, as long as all other applicable municipal land use standards
are met and the expansion is not prohibited by Section 12(C)(1).
i. The maximum total footprint for the principal structure may not be expanded to
a size greater than 800 square feet. The maximum height of the principal
structure may not be made greater than 15 feet or the height of the existing
structure, whichever is greater.
c. All other legally existing nonconforming principal and accessory structures that do
not meet the water body, tributary stream, or wetland setback requirements may be
expanded or altered as follows, as long as other applicable municipal land use
standards are met and the expansion is not prohibited by Section 12(C)(1) or
Section 12(C)(1)(a), above.
i. For structures located less than 75 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland, the maximum
combined total footprint for all structures may not be expanded to a size greater
than 1,000 square feet. The maximum height of any structure may not be made
greater than 20 feet or the height of the existing structure, whichever is greater.
ii. For structures located less than 100 feet from the normal high-water line of a
great pond classified as GPA or a river flowing to a great pond classified as GPA,
the maximum combined total footprint for all structures may not be expanded to a
size greater than 1,500 square feet. The maximum height of any structure may
not be made greater than 25 feet or the height of the existing structure,
whichever is greater. Any portion of those structures located less than 75 feet
from the normal high-water line of a water body, tributary stream, or upland edge
of a wetland must meet the footprint and height limits in Section 12(C)(1)(b)(i)
and Section 12(C)(1)(c)(i), above.
iii. In addition to the limitations in subparagraphs (i) and (ii), for structures that
are legally nonconforming due to their location within the Resource Protection
District when located at less than 250 feet from the normal high-water line of a
water body or the upland edge of a wetland, the maximum combined total
footprint for all structures may not be expanded to a size greater than 1,500
square feet. The maximum height of any structure may not be made greater than
25 feet or the height of the existing structure, whichever is greater, except that
any portion of those structures located less than 75 feet from the normal high-
water line of a water body, tributary stream, or upland edge of a wetland must
meet the footprint and height limits in Section 12(C)(1)(b)(i) and Section
12(C)(1)(c)(i), above.
5
d. An approved plan for expansion of a nonconforming structure must be recorded by
the applicant with the registry of deeds, within 90 days of approval. The recorded
plan must show the existing and proposed footprint of the non-conforming structure,
the existing and proposed structure height, the footprint of any other structures on
the parcel, the Shoreland zone boundary and evidence of approval by the municipal
review authority.
2. Foundations
Whenever a new, enlarged, or replacement foundation is constructed under a nonconforming
structure, the structure and new foundation must be placed such that the setback requirement is
met to the greatest practical extent as determined by the Planning Board or its designee, basing
its decision on the criteria specified in Section 12(C)(3).
3. Relocation
A non-conforming structure may be relocated within the boundaries of the parcel on which the
structure is located provided that the site of relocation conforms to all setback requirements to
the greatest practical extent as determined by the Planning Board or its designee, and provided
that the applicant demonstrates that the present subsurface sewage disposal system meets the
requirements of State law and the State of Maine Subsurface Wastewater Disposal Rules
(Rules), or that a new system be installed in compliance with the law and said Rules. In no case
shall a structure be relocated in a manner that causes the structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical extent,
the Planning Board or its designee shall consider the size of the lot, the slope of the land, the
potential for soil erosion, the location of other structures on the property and on adjacent
properties, the location of the septic system and other on-site soils suitable for septic systems,
and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order to
relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation in accordance with Section 15(S). In addition, the area
from which the relocated structure was removed must be replanted with vegetation. Replanting
shall be required as follows:
a. Trees removed in order to relocate a structure must be replanted with at least one
native tree, three (3) feet in height, for every tree removed. If more than five trees
are planted, no one species of tree shall make up more than 50% of the number of
trees planted. Replaced trees must be planted no further from the water or wetland
than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least
the same size as the area where vegetation and/or ground cover was disturbed,
damaged, or removed must be reestablished within the setback area. The
vegetation and /or ground cover must consist of similar native vegetation and/or
ground cover that was disturbed, destroyed or removed.
b. Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs,
trees, or a combination thereof.
6
4. Reconstruction or Replacement
Any non-conforming structure which is located less than the required water body, tributary
stream, or wetland and which is removed, or damaged or destroyed, regardless of the cause, by
more than 50% of the market value of the structure before such damage, destruction or removal,
may be reconstructed or replaced provided that a permit is obtained within eighteen (18) months
of the date of said damage, destruction, or removal, and provided that such reconstruction or
replacement is in compliance with the water body, tributary stream or wetland setback
requirement to the greatest practical extent as determined by the Planning Board or its designee
in accordance with the purposes of this Ordinance. In no case shall a structure be
reconstructed or replaced so as to increase its non-conformity. If the reconstructed or
replacement structure is less than the required setback it shall not be any larger than the original
structure, except as allowed pursuant to Section 12(C)(1) above, as determined by the non-
conforming footprint of the reconstructed or replaced structure at its new location. If the total
footprint of the original structure can be relocated or reconstructed beyond the required setback
area, no portion of the relocated or reconstructed structure shall be replaced or constructed at
less than the setback requirement for the new structure. When it is necessary to remove
vegetation in order to replace or reconstruct a structure, vegetation shall be replanted in
accordance with Section12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water body,
tributary stream, or wetland and which is removed by 50% or less of the market value, or
damaged or destroyed by 50% or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent, the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C) (3) above, the physical condition and type of foundation present, if any.
5. Change of Use of a Non-Conforming Structure
The use of a non-conforming structure may not be changed to another use unless the Planning
Board, after receiving a written application, determines that the new use will have no greater
adverse impact on the water body, tributary stream, or wetland, or on the subject or adjacent
properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health and
safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover, visual
and actual points of public access to waters, natural beauty, flood plain management,
archaeological and historic resources, and functionally water-dependent uses.
D. Non-conforming Uses
1. Expansions
Expansions of non-conforming uses are prohibited, except that non-conforming residential uses
may, after obtaining a permit from the Code Enforcement Officer, be expanded within existing
residential structures or within expansions of such structures as allowed in Section 12(C) (1)
above.
7
2. Resumption Prohibited
A lot, building or structure in or on which a non-conforming use is discontinued for a period
exceeding one year, or which is superseded by a conforming use, may not again be devoted to a
non-conforming use except that the Planning Board may, for good cause shown by the applicant,
grant up to a one year extension to that time period. This provision shall not apply to the
resumption of a use of a residential structure provided that the structure has been used or
maintained for residential purposes during the preceding five (5) year period.
3. Change of Use
An existing non-conforming use may be changed to another non-conforming use provided that
the proposed use has no greater adverse impact on the subject and adjacent properties and
resources than the former use, as determined by the Planning Board. The determination of no
greater adverse impact shall be made according to criteria listed in Section 12 (C)(5) above.
E. Non-conforming Lots
1. Non-conforming Lots
A non-conforming lot of record as of the effective date of this Ordinance or amendment thereto
may be built upon, without the need for a variance, provided that such lot is in separate
ownership and not contiguous with any other lot in the same ownership, and that all provisions of
this Ordinance except lot size and frontage can be met. Variances relating to setback or other
requirements not involving lot size or frontage shall be obtained by action of the Board of
Appeals.
2. Contiguous Built Lots
If two or more contiguous lots or parcels are in a single or joint ownership of record at the time of
adoption of this Ordinance, if all or part of the lots do not meet the dimensional requirements of
this Ordinance, and if a principal use or structure exists on each lot, the non-conforming lots may
be conveyed separately or together, provided that the State Minimum Lot Size Law and
Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective date of
this ordinance, each may be sold on a separate lot provided that the above referenced law and
rules are complied with. When such lots are divided each lot thus created must be as conforming
as possible to the dimensional requirements of this Ordinance.
3. Contiguous Lots - Vacant or Partially Built
If two or more contiguous lots or parcels are in single or joint ownership of record at the time of or
since adoption or amendment of this Ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent amendments, and if one or more of
the lots are vacant or contain no principal structure the lots shall be combined to the extent
necessary to meet the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on the effective date of this Ordinance and
recorded in the registry of deeds if the lot is served by a public sewer or can accommodate a
subsurface sewage disposal system in conformance with the State of Maine Subsurface
Wastewater Disposal Rules; and
8
a. Each lot contains at least 100 feet of shore frontage and at least 20,000 square
feet of lot area, or
b. Any lots that do not meet the frontage and lot size requirements of Section
12(E)(3)(a) are reconfigured or combined so that each new lot contains at least
100 feet of shore frontage and 20,000 square feet of lot area.
Section 13. Establishment of Districts
A. Resource Protection District
The Resource Protection District includes areas in which development would adversely affect water
quality, productive habitat, biological ecosystems, or scenic and natural values. This district shall
include the following areas when they occur within the limits of the shoreland zone, exclusive of the
stream Protection district, except that areas which are currently developed and areas which meet
the criteria for the Limited Commercial District need not be included within the Resource Protection
District.
1. Flood plains along rivers defined by the 100-year flood plain as designated on the Federal
Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard
Boundary Maps, or the flood of record, or in the absence of these, by soil types identified as
recent flood plain soils.
2. Areas of two (2) or more contiguous acres with sustained slopes of 20% or greater.
3. Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater wetland as defined, and which are not surficially connected
to a water body during the period of normal high water.
4. Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement.
B. Limited Residential District
The Limited Residential District includes those areas suitable for residential and recreational
development. It includes areas other than those in the Resource Protection District, or Stream
Protection District and areas which are used less intensively than those in the Limited Commercial
District.
C. Limited Commercial District
The Limited Commercial District is established to provide locations for the traditional retail and
service needs of the local community. The scale of development in these areas is intended to be in
keeping with the existing residential rural development in these areas. The Limited Commercial
District is comprised and shown on the Tax Map #45, Lots: 57; 59; 59A; 59B; 60; 61; 62, 62A; 63;
64; 65; 66; 67; 68; 69; 70; 71; 72; 73; 74; 75; 76, 77; 78; 79; 80; 81; 82; 83; 84; 89; 93; 95; 95A; 98;
99; 100; 101; 102; 114; 115, 116; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 151; 154;
155; 156; 157; 159; 160; 161; 166; 169: 170; 171; 172; 173; and Tax Map #46, Lots 33A; 35A; 35-1;
35-2; 35-3; 35-4; 35-5;
Tax Map #45 and #46 should be referenced when making a determination of the appropriate zone.
9
The following uses are permitted in the Limited Commercial District
1. Single Family residence (Existing single family residential structures) within the LCD are
permitted to have one apartment within the structure, provided the structure is served by a
subsurface wastewater disposal system which meets the application requirements in effect on
or after July 1, 1974);
2. grocery and general store;
3. restaurants, excluding drive-in/through restaurants
4. inns; bed and breakfast establishments;
5.
retail
service
business
conducted
wholly
within
structure
except
for
incidental
outdoor display limited to 1% of the structures 1st floor;
6. professional or business offices;
7. churches, schools, clinics, municipal facilities and public utilities;
8. low intensity commercial uses conducted wholly within structure (including disposal of waste
materials) and employing less than 12 employees. See Section 15, Subsection, F Commercial
Uses.
D. Stream Protection District
The Stream Protection District includes all land areas within one hundred (100) feet, horizontal
distance of the normal high-water line of a stream, exclusive of those areas within two-hundred and
fifty (250) feet horizontal distance, of the normal high-water line of a great pond, river, or within two
hundred and fifty (250) feet horizontal distance, of the upland edge of a wetland. Where a stream
and its associated shoreland area are located within two-hundred and fifty (250) feet horizontal
distance, of the above water bodies or wetlands, that land area shall be regulated under the terms
of the shoreland district associated with that water body or wetland.
Section 14. Table of Land Uses
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform to
all of the applicable land use standards in Section 15. The district designation for a particular site
shall be determined from the Official Shoreland Zoning Map.
Key to Table 1: (Located at the end of this Ordinance)
YES - Allowed (no permit required but the use must comply with all applicable land use
standards.)
NO - Prohibited
PB - Allowed with permit issued by the Planning Board's
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP - Resource Protection
LR - Limited Residential
LC - Limited Commercial
SP - Stream Protection
10
Section 15: Land Use Standards
All land use activities within the Shoreland zone shall conform to the following provisions, if
applicable.
A. Minimum Lot Standards
1. Residential Lot Standards;
All residential development within, the shoreland zone shall conform to, the following provisions, if
applicable.
A lot abutting a lake, pond, river or stream (as designated on the shoreland zoning map), shall
have a minimum shore frontage of 200 feet measured in a straight line between the points of
intersection of the side lot lines with the shoreline at normal high water elevation.
a. All residential lots shall contain a minimum of 50,000 square feet except for residential lots
in the LCD which shall contain a minimum of 40,000 square feet.
b. Shorefront common areas shall meet the following criteria:
i.
The shorefront common area shall contain a minimum of two acres to
provide access for up to 20 residential units. Increased access rights beyond 20
residential units shall require an additional 4,000 square feet of common
area per unit.
ii.
The shorefront common area shall have a minimum of 25 feet of shoreline
frontage for each residential dwelling unit which has access to the
common area and for each right of use granted to the common area.
iii.
Use of common area within a subdivision shall be limited to residential dwelling
units contained within contiguous properties which may be separated
from the shorefront area by a public roadway.
iv.
Accommodations for motorboats shall be limited to one boat for each 25
feet of shoreline frontage. This shall not apply to motorboats of transient
visitors which remain at the common area for less than 24 hours, and boats with
motors of less than 10 horsepower.
c. Except as provided in Section 13(C)(1), if more than one residential dwelling unit is constructed
on a single parcel, all dimensional requirements shall be met for each dwelling unit.
Residential dwelling units in a new subdivision (not zoned as Resource Protection
District) may be constructed on lots of a minimum of 40,000 sq. ft. (which is the present State
minimum requirement) provided a shorefront common area is included in the subdivision plan
meeting the density requirements of Section 15(A)(l)(b).
d. Land below the normal high-water line of a water body or upland edge of a wetland
and land beneath roads serving more than two (2) lots shall not be included toward
calculating minimum lot area.
e. Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of
land on both sides thereof after September 22, 1971.
11
f. The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland
shall be equal to or greater than the shore frontage requirement for a lot with the
proposed use.
g. If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met for each
additional dwelling unit, principal structure, or use.
2. Non-Residential Lot Standards:
a. Non-residential lots in the Limited Commercial Districts shall contain a minimum of
40,000 square feet.
b. Non-residential lots abutting a lake, pond, river or stream shall have minimum
shoreline frontage of 200 feet, measured in a straight line between the points of
intersection of the side lot lines with the shoreline at normal high-water elevation.
c. Section 15(A)(d) thru 15(A)(g) shall apply.
B. Principal and Accessory Structures
1. All new principal and accessory structures shall be set back at least one hundred (100) feet
horizontal distance, from the normal high-water line of great ponds classified GPA and rivers
that flow to great ponds classified GPA, and one hundred (100) feet horizontal distance, from
the normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland. In the Resource Protection District the setback requirement shall be 250 feet,
horizontal distance, except for structures, roads, parking spaces or other regulated objects
specifically allowed in that district in which case the setback requirements specified above
shall apply. Structures in the Limited Commercial District shall setback at least twenty-five (25)
feet from the normal high-water line.
In addition:
a. The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an
operational necessity, such as piers, docks and retaining walls, nor to other
functionally water-dependent uses.
2. Principal or accessory structures and expansions of existing structures, which are
permitted in the Resource Protection, Limited Residential, Limited Commercial, and
Stream Protection Districts, shall not exceed thirty-five (35) feet in height. This
provision, shall not apply to structures such as transmission towers, windmills, antennas,
and similar structures having no floor area.
3. The lowest floor elevation or openings of all buildings and structures, including basements, shall
be elevated at least one foot above the elevation of the 100-year flood, the flood of record, or in
the absence of these, the flood as defined by soil types identified as recent flood-plain soils. In
those municipalities that participate in the National Flood Insurance Program and have adopted
the April 2005 version or later of the Floodplain Management Ordinance, accessory structures
may be placed in accordance with the standards of that ordinance and need not meet the
elevation requirements of this paragraph.
12
4. Non-vegetated surfaces shall not exceed a total of twenty (20) percent of the portion of the lot
located within the shoreland zone. This limitation does not apply to public boat launching
facilities regardless of the district in which the facility is located.
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not limited
to the following: structures, driveways, parking areas, and other areas from which vegetation
has been removed. Naturally occurring ledge and rock outcroppings are not counted as non-
vegetated surfaces when calculating lot coverage for lots of record on March 24, 1990 and in
continuous existence since that date.
5. All structures shall be set back at least twenty (20) feet from all lots lines with the exception of
the LCD where the setback will be ten (10) feet. No building or structure shall be erected or
located on a lot for more than thirty (30) days per year, unless it shall be setback at least fifty
(50) feet from the right of way line of any public road.
6. New stairways for the sole purpose of gaining access to or egress from a residential
structure need not be considered when determining a structures setback provided that the
stairway and landing, if any, is no wider than 5' and extends no closer to the water than is
necessary to accomplish their purpose. If the elevation at the top of the stairway or landing
is greater than 4' above ground level the stairway shall be constructed such that it parallels
the wall of the structure rather than extending toward the shoreline.
7. Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access in
areas of steep slopes or unstable soils provided; that the structure is limited to a maximum
of four (4) feet in width; that the structure does not extend below or over the normal high-
water line of a water body or upland edge of a wetland, (unless permitted by the
Department of Environmental Protection pursuant to the Natural Resources Protection Act,
Title 38, Section 480-C); and that the applicant demonstrates that no reasonable access
alternative exists on the property.
C. Piers, Docks, Wharfs, Bridges and Other Structures and Uses Extending Over or Below the
Normal High-Water Line of a Water Body or Within a Wetland, and shoreline stabilization.
1. No more than one pier, dock, wharf or similar structure extending or located below the normal
high-water line of a water body or within a wetland is allowed on a single lot; except that when a
single lot contains at least twice the minimum shore frontage as specified in Section 15(A), a
second structure may be allowed and may remain as long as the lot is not further divided.
2. Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
3. The location shall not interfere with existing developed or natural beach areas.
4. The facility shall be located so as to minimize adverse effects on fisheries.
5. The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area A temporary pier, dock or wharf
shall not be wider than six feet for non-commercial uses.
6. There shall be no more than 1 dock, slip or accommodation for motorized watercraft (in excess
of 5 hp) per 25 feet of shoreline frontage.
13
7. New permanent piers and docks shall not be permitted unless it is clearly demonstrated to the
Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained
from the Department of Environmental Protection, pursuant to the Natural Resource Protection
Act.
8. No pier, dock, or slips will extend more than 48 feet from the normal high-water mark.
9. No slips, docks, or accommodations for watercraft shall be located within 20 feet of the property
line as projected into the water normal to the shoreline.
10. There shall be no commercial docking facilities in Limited Residential District (LRD) and
Resource Protection District (RP).
11. Commercial docking facilities shall mean, but not limited to: any areas which give easements,
rights-of-way, or other use rights which are sold, or leased for accommodation of watercraft.
Deeded rights for residential developments in a subdivision are not to be considered as
commercial docking.
12. In the Limited Commercial District, there shall be one private parking vehicle space for every
watercraft accommodation.
13. No new structure shall be built on, over or abutting a pier, dock, wharf or other structure
extending beyond the normal high-water line of a water body or within a wetland unless
the structure requires direct access to the water as and operational necessity.
14. No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending beyond the normal high-water body or within a wetland shall be converted to
residential dwelling units in any district.
15. Structures built on, over or abutting a pier, wharf, dock or other structure extending
beyond the normal high-water line of a water body or within a wetland shall not exceed
twenty (20) feet in height above the pier, wharf, dock or other structure.
16. A structure constructed on a float or floats is prohibited unless it is designed to function
as, and is registered with the Maine Department of Inland Fisheries and Wildlife as a
watercraft.
17. Vegetation may be removed in excess of the standards in Section 15(P) of this ordinance in
order to conduct shoreline stabilization of an eroding shoreline, provided that a permit is
obtained from the Planning Board. Construction equipment must access the shoreline by barge
when feasible as determined by the Planning Board.
a. When necessary, the removal of trees and other vegetation to allow for construction
equipment access to the stabilization site via land must be limited to no more than
12 feet in width. When the stabilization project is complete the construction
equipment access way must be restored.
b. Revegetation must occur in accordance with Section 15(S).
NOTE: A permit pursuant to the Natural Resource Protection Act is required from the Department of
Environmental Protection for Shoreline Stabilization activities.
14
NOTE: Permanent structures projecting into or over water bodies shall require a permit from the Department of
Environmental Protection pursuant to the natural Resources Protection Act, Title 38 M.R.S.A., Section
480-C.
D. Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land
area per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and one hundred (100) feet, horizontal distance, from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland.
E. Individual-Private Campsites
Individual, private campsites not associated with campgrounds are permitted provided the following
conditions are met:
NOTE: For items 1, 2, and 3 below, Individual Private Campsites in existence prior to June 13, 2001 shall be
grandfathered.
1. One campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be
permitted.
2. When an individual private campsite is proposed on a lot that contains another principal use
and/or structure, the lot must contain the minimum lot dimensional requirements for the
principal structure and/or use, and the individual private campsite separately.
3. Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet, horizontal distance, from the normal high-
water line of a great pond classified GPA or river flowing to a great pond classified GPA, and
one hundred (100) feet, horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland.
4. Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no structure
except a canopy shall be attached to the recreation vehicle.
5. The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a
Resource Protection District shall be limited to one thousand (1000) square feet.
6.. A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or
landowner is required.
15
7. When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with
the State of Maine Subsurface Wastewater Disposal Rules unless served by public
sewage facilities.
F. Commercial and Industrial Uses
The following new commercial and industrial uses are prohibited within the shoreland zone adjacent
to great ponds classified GPA, and rivers and streams which flow to great ponds classified GPA.
1. Auto washing facilities
2. Auto or other vehicle service and/or repair operations, including body shops
3. Chemical and bacteriological laboratories
4. Storage of chemicals, including herbicides, pesticides or fertilizers other than amounts
normally associated with individual households or farms
5. Commercial painting, wood preserving, and furniture stripping
6. Dry cleaning establishments
7. Electronic circuit assembly
8. Laundromats, unless connected to a sanitary sewer
9. Metal plating, finishing, or polishing
10. Petroleum or petroleum product storage and/or sale except storage on same property as use
occurs and except for storage and sales associated with marinas
11. Photographic processing
12. Printing
G. Parking Areas
1. Parking areas shall meet the shoreline setback requirements for structures for the district in
which such areas are located, except that for parking areas serving public boat launching
facilities the setback shall be to the greatest practical extent.
2. Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent storm water runoff from flowing directly into a water body, and where feasible, to
retain all runoff on-site.
3. In determining the appropriate size of proposed parking facilities, the following shall
apply:
a. Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40)
feet long.
b. Internal travel aisles: Approximately twenty (20) feet wide.
16
H. Roads and Driveways
The following standards shall apply to the construction of roads and/or driveways and drainage
systems, culverts and other related features.
1. Roads and driveways shall be set back at least one-hundred (100) feet from the
normal high-water line of a great pond or a river that flows to a great pond
classified GPA, and seventy-five (75) feet, horizontal distance from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland
unless no reasonable alternative exists as determined by the Planning Board. If no
other reasonable alternative exists the road and/or driveway setback requirement
shall be no less than fifty (50) feet horizontal distance upon clear showing by the
applicant that appropriate techniques will be used to prevent sedimentation of the
water body, tributary stream, or wetland. Such techniques may include, but are not limited
to, the installation of settling basins, and/or the effective use of additional ditch relief
culverts and turnouts placed to avoid sedimentation of the water body, tributary
stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet for each five (5) percent increase in slope above twenty
(20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures, and facilities located nearer to the
shoreline or tributary stream due to an operational necessity, excluding temporary
docks for recreational uses. Roads and driveways providing access to permitted
structures within the setback area shall comply fully with the requirement of Section
15(H) (1) except for that portion of the road or driveway necessary for direct access
to the structure.
2. Existing public roads may be expanded within the legal road right-of-way regardless
of their setback from a water body tributary stream or wetland.
3. New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the
Planning Board in a Resource Protection District, upon a finding that no reasonable
alternative route or location is available outside the district. When a road or driveway is
permitted in a Resource Protection District the road or driveway shall be set back as far
as practicable from the normal high-water line of a water body, tributary stream, or upland
edge of a wetland.
4. Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical and shall be graded and stabilized in accordance with the provisions for erosion
and sedimentation control contained in Section 15 (T).
5. Road and driveway grades shall be no greater than ten (10) percent except for
segments of less than two hundred (200) feet.
6. In order to prevent road and driveway surface drainage from directly entering water bodies
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least fifty (50) feet plus two times
the average slope, in width between the outflow point of the ditch or culvert and the normal
17
high-water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
7. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto unscarified buffer strips
before the flow gains sufficient volume or head to erode the road, driveway, or ditch. To
accomplish this, the following shall apply:
a. Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road or driveway at intervals no greater than indicated in
the following table:
Grade Spacing
(Percent)
(Feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
b. Drainage dips may be used in place of ditch relief culverts only where the
grade is ten (10) percent or less.
c. On sections having slopes greater than ten (10) percent, ditch relief culverts
shall be placed approximately a thirty (30) degree angle down slope from a line
perpendicular to the centerline of the road or driveway.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order to allow
for effective functioning and their inlet and outlet ends shall be stabilized with
appropriate materials.
8. Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular
basis to assure effective functioning.
I. Signs
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, Limited Residential and Limited Commercial Districts.
1. Signs relating to goods and services sold on the premises shall be allowed, provided that
such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. Signs relating to goods or services not sold or rendered on the premises shall be
prohibited.
2. Name signs are allowed, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
3. Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
18
4. Signs relating to trespassing and hunting shall be allowed without restriction as to number,
provided that, no such sign shall exceed two (2) square feet in area.
5. Signs relating to public safety shall be allowed without restriction.
6. No sign shall extend higher than twenty (20) feet above the ground.
7. Signs may be illuminated only by shielded, non-flashing lights.
8. The following provisions shall govern the use of signs in the Limited Commercial District.
a. All signs located in the Limited Commercial District shall be constructed of wood or
metal. Illumination is permitted only by steady, uncolored, shielded external
lighting during normal business hours of operation or 10 P.M. whichever is
later. Illumination shall not cause glare or reflection beyond its lot lines onto
neighboring properties. Free standing signs may not swivel, rotate or have
animated parts and may be a maximum of twenty (20) feet above the original
grade. Roof signs, strings of pennants and strings of bulbs are not permitted
(This restriction does not apply to holiday observances.)
b. Measurements of free-standing signs, shall include the area of all boards,
panels or sheets of materials, but do not include the supporting posts or
structural element outside the limits of such perimeter, which does not form
an integral part of the display. In determining the area of wall signs, the entire
area within a continuous perimeter enclosing the extreme limits of the actual
letters and characters shall be measured. The area of background color will
also be included if it differs from the color of the building itself.
c. Temporary commercial signs may be used by a business while awaiting
arrival of permanent signs, however, may not be displayed for more than sixty
(60) days.
d. No commercial sign shall be allowed or placed in the Town of Harrison until a
permit has been issued.
e. Signs located in the Limited Commercial District may total in aggregate no
more than forty (40) square feet per use. No single sign shall exceed 24 square
feet.
f. One (1) flag, per use, which indicates a business is open may be displayed
and is exempt from the above regulations.
g. Any sign or part thereof, legally existing at the time of the adoption of the 1992
Shoreland Zoning Ordinance, which does not conform to the requirements of this
ordinance may continue, but may not be extended, reconstructed, enlarged, or
altered. Any sign replacing a non-conforming sign shall conform to the provisions of
this article, and thereafter the non-conforming sign shall not be displayed.
19
J. Storm Water Runoff
1. All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of storm waters.
2. Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
NOTE: The Stormwater Management Law (38M.R.S.A. section 420-D) requires a full permit to be obtained
from DEP prior to Construction of a project consisting of 20,000 square feet or more of impervious
area or 5 acres or more of a developed area in an urban impaired stream watershed or most-at-risk
lake watershed, or a project with 1 acre or more of a developed area in any other stream, coastal or
wetland watershed. A permit-by-rule is necessary for a project with one acre or more of disturbed area
but less than 1 acre impervious area (20,000 square feet for most-at-risk lakes and urban impaired
streams) and less than 5 acres of developed area. Furthermore, a Maine Construction General Permit
is required if the construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal
1. All subsurface sewage disposal systems shall be installed in conformance with the
State of Maine Subsurface "Wastewater Disposal Rules (Rules),
2. The Rules, among other requirements, include:
a. The minimum setback for new subsurface sewage disposal systems, shall be no less
than one hundred (100) horizontal feet from the normal high-water line of a
perennial water body. The minimum setback distances from water bodies for new
subsurface sewage disposal systems shall not be reduced by variance.
b. Replacement systems shall meet the standards for replacement systems as
contained in the Rules.
3. Clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet,
horizontal distance, from the normal high-water line of the water body or the upland
edge of a wetland. In addition, a holding tank is not allowed for a first-time
residential use in the Shoreland zone."
L. Essential Service
1. Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
2. The installation of essential services is not allowed in a Resource Protection or Stream
Protection District, except to provide services to a permitted use within said district, or except
where the applicant demonstrates that no reasonable alternative exists. Where allowed,
such structures and facilities shall be located so as to minimize any adverse impacts on
surrounding uses and resources, including visual impacts.
3. Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
20
M. Mineral Exploration and Extraction
Effective June 13, 2001, no new mineral exploration or extraction is permitted within the
Shoreland-Zone.
1. Within twelve (12) months following the completion of extraction operations at any extraction
site, which operations shall be deemed complete when less than one hundred (100) cubic
yards of materials are removed in any consecutive twelve (12) month period, ground levels
and grades shall be established in accordance with the following:
a. All debris, stumps, and similar material shall be removed for disposal in an
approved location, or shall be buried on-site. Only materials generated on-
site may be buried or covered on-site.
b. The final graded slope shall be two to one (2:1) slope or flatter.
c. Top soil or loam shall be retained to cover all disturbed land areas, which
shall be reseeded and stabilized with vegetation native to the area. Additional
topsoil or loam shall be obtained from off-site sources if necessary to
complete the stabilization project.
2. In keeping with the purposes of this Ordinance, the Planning Board may impose
such conditions as are necessary to minimize the adverse impacts associated with
mineral extraction operations on surrounding uses and resources.
N. Agriculture
1. Effective June 13. 2001, there shall be no new agricultural activities involving the tilling of soil
within one hundred (100) feet, horizontal distance, of the normal high-water line of a great
pond classified GPA; within seventy-five (75) feet, horizontal distance, of other water bodies,
nor; within twenty-five (25) feet, horizontal distance, of tributary streams and freshwater
wetlands. Agricultural activities legally in existence prior to June 13, 2001 may remain, but
shall meet the requirements set forth below:
2. All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the former Maine Department of Agriculture on November 1, 2001
and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
3. Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, of
a great pond classified GPA or a river flowing to a great pond classified GPA, or within one
hundred (100) feet horizontal distance, of other water bodies, tributary streams, or wetlands.
All manure storage areas within the shoreland zone must be constructed or modified such
that the facility produces no discharge of effluent or contaminated storm water. Existing
facilities which do not meet the setback requirement may remain, but must meet the no
discharge provision.
4. Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, or the spreading, disposal or storage of manure, or livestock grazing
associated with ongoing farm activities within the shoreland zone shall require a Soil and
Water Conservation Plan to be filed with the Planning Board. Non-conformance with the
provisions of said plan shall be considered to be a violation of this Ordinance.
5. Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high-water line of a great pond classified GPA; with
21
seventy-five (75) feet, horizontal distance, of other water bodies, nor; within twenty-five (25)
feet, horizontal distance, of tributary streams and freshwater wetlands. Livestock grazing
associated with ongoing farm activities, and which are not in conformance with the above
setback provisions may continue, provided that such grazing is conducted in accordance with
a Conservation Plan that has been filed with the Planning Board.
NOTE: Assistance in preparing a soil and water conservation plan may be available through the local Soil and
Water Conservation District office.
O. Timber Harvesting
1. Timber harvesting shall only be allowed within the Stream Protection District. In all other
areas, the cutting of trees and other vegetation shall conform to the standards contained in
Section 15(P).
2. Timber harvesting shall conform with the following provisions:
a. Selective cutting of no more than forty (40) percent of the total volume of
trees four (4) inches or more in diameter measured at 4 ½ feet above ground
level on any lot in any ten (10) year period is permitted. In addition;
b. No accumulation of slash shall be left within fifty (50) feet of the normal high-
water line of a water body. In all other areas slash shall either be removed or
disposed of in such a manner that it lies on the ground and no part thereof extends
more than four (4) feet above the ground. Any debris that falls below the
normal high-water line of a water body shall be removed.
c. Timber harvesting equipment shall not use stream channels as travel routes
except when:
i. Surface waters are frozen; and
ii. The activity will not result in any ground disturbance.
d. All crossings of flowing water shall require a bridge or culvert, except in areas
with low banks and channel beds which are composed of gravel, rock or
similar hard surface which would not be eroded or otherwise damaged,
e. Skid trail approaches to water crossings shall be located and designed so as
to prevent water runoff from directly entering the water body or tributary stream.
Upon completion of timber harvesting, temporary bridges and culverts shall be
removed and areas of exposed soil re-vegetated.
f. Except for water crossings, skid trails and other sites where the operation of
machinery used in timber harvesting results in the exposure of mineral soil shall be
located such that an unscarified strip of vegetation of at least seventy-five
(75) feet in width for slopes up to ten (10) percent shall be retained between the
exposed mineral soil and the normal high-water line of a stream. For each ten
(10) percent increase in slope, the unscarified strip shall be increased by
twenty (20) feet. The provisions of this paragraph apply only to a face sloping
toward the stream, provided, however, that no portion of such exposed mineral soil on
a back face shall be closer than twenty-five (25) feet from the normal high-water
line of a stream.
22
P. Clearing of Vegetation for Development
1. In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation
within the strip of land extending 100 feet, horizontal distance, inland from the normal high-
water line, except to remove hazard trees as described in section Q.
Elsewhere, in any Resource Protection District the clearing of vegetation shall be limited to
that which is necessary for uses expressly authorized in that district.
2. Except in areas as described in Section P(1) above, within a strip of land extending one-
hundred (100) feet, horizontal distance, inland from the normal high-water line of a great
pond classified GPA or a river flowing to a great pond classified GPA, or within a strip
extending one hundred (100) feet horizontal distance, from any other water body,
tributary stream, or the upland edge of a wetland a buffer strip of vegetation, shall be
preserved as follows:
a. There shall be no cleared opening greater than 250 square feet in the forest
canopy (or other existing woody vegetation if a forested canopy is not
present) as measured from the outer limits of the shrub crown. However, a
single footpath not to exceed six (6) feet in width as measured between tree
trunks and/or shrub stems is allowed for accessing the shoreline provided
that a cleared line of sight to the water through the buffer strip is not created.
b. Selective cutting of trees within the buffer strip is allowed provided that a
well-distributed stand of trees and other natural vegetation is maintained. For
the purposes of Section 15(P)(2)(b) a "well-distributed stand of trees"
adjacent to a great pond classified GPA or a river or stream flowing to a great
pond classified GPA, shall be defined as maintaining a rating score of 12 or
more in any 25-foot by 25-foot square (625 square feet) area as determined
by the following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 - 4 in.
1
>4 - 12 in.
2
>12 - in. 4
Adjacent to other water bodies, tributary streams, and wetlands, a "well-
distributed stand of trees" is defined as maintaining a minimum rating score of
8 per 25-foot square area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 25-foot plot contains three (3) trees
between 2 and 4 inches in diameter, three trees between 4 and 12 inches in diameter, and
three trees over 12 inches in diameter, the rating score is:
(3x1) + (3x2) + (3x4) = 21 points
Thus, the 25-foot by 25-foot plot contains trees worth 21 points. Tress totaling 9 points
(21 - 12 = 9) may be removed from the plot provided that no cleared openings are created.
For the purposes of Section 15(P) (2) (b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at least
three (3) saplings less than two (2) inches in diameter at four and one-half (41/2) feet above
ground level for each 25-foot by 25-foot square area. If three (3) saplings do not exist, no
23
woody stems less than two (2) inches in diameter can be removed until 3 saplings have been
recruited into the plot.
Notwithstanding the above provisions, no more than 30% of the total volume of trees four (4)
inches or more in diameter, measured at 4 ½ feet above ground level may be removed in any
ten (10) year period from Long Lake, Crystal Lake, and Island Pond. All other water bodies,
tributary stream, or the upland edge of a wetland have this same requirement, except the
allowable removal volume is 40% in any ten (10) year period, in lieu of 30%.
c. In order to protect water quality and wildlife habitat, existing vegetation under
three (3) feet in height and other ground cover, including leaf litter and the
forest duff layer, shall not be cut, covered, or removed, except to provide for
a footpath or their permitted uses as described in paragraphs 3(a), above and
paragraph 6 below, both of this section."
d. Pruning of tree branches, on the bottom 1/3 of the tree is permitted.
e. In order to maintain a buffer strip of vegetation, when the removal of storm-
damaged, dead or hazard trees results in the creation of cleared openings, these
openings shall be replanted with native tree species in accordance with
Section Q below, unless existing new tree growth is present.
f. In order to maintain the vegetation in the shoreline buffer, clearing or removal
of vegetation for allowed activities, including associated construction and
related equipment operation, within or outside the shoreline buffer, must
comply with the requirements of Section 15.P(2).
The provisions contained in paragraph 2 above shall not apply to those portions of public recreational
facilities adjacent to public swimming areas. Cleared areas, however, shall be limited to the
minimum area necessary.
3. At distances greater than one hundred (100) feet, horizontal distance, from a great
pond or a river flowing to a great pond, and one hundred (100) feet, horizontal
distance, from the normal high-water line of any other water body, tributary stream,
or the upland edge of a wetland, except to allow for the development of permitted uses,
there shall be permitted on any lot, in any ten (10) year period, selective cutting of not more
than forty (40) percent of the volume of trees four (4) inches or more in diameter,
measured 4 ½ feet above ground level. Tree removal in conjunction with the development
of permitted uses shall be included in the forty (40) percent calculation. For the purposes
of these standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for development, including but not limited to,
principal and accessory structures, driveways, lawns and sewage disposal areas,
exceed in the aggregate, 25% of the lot area within the shoreland zone or ten thousand
(10,000) square feet, whichever is greater, including land previously cleared.
4. Cleared openings legally in existence on the effective date of this Ordinance may
be
maintained but shall not be enlarged, except as permitted by this Ordinance.
5. Fields which have reverted to primarily shrubs, trees, or other woody vegetation shall be
regulated under the provisions this section.
24
6. Within 100 feet of the normal high water mark no alterations to the existing topography.
Soils or vegetation shall be allowed unless the disturbance is made from approved
construction (building permit approval) and a site plan showing original features and
proposed vegetative cutting, re-vegetation, earthmoving, roadways, drainage and
structures (proposed and existing) shall be submitted for review and approval by the Code
Enforcement Officer to assure compliance with the provisions of the Shoreland Zoning
Ordinance. Vegetation may be removed as needed for one access footpath of no more
than 6 feet in width for each 200 feet of shoreline frontage. The footpath shall be
constructed so as to minimize erosion and retain runoff and shall not be constructed so as
to create a clear line of sight through the buffer area to the water. Stairways and walkways
may be used in place of the footpath provided that they are not more than 4 feet in width.
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
1. Hazard trees in the shoreland zone may be removed without a permit after consultation with
the Code Enforcement Officer if the following requirements are met:
a. Within the shoreline buffer, if the removal of a hazard tree results in a cleared
opening in the tree canopy greater than two hundred and fifty (250) square
feet, replacement with native tree species is required, unless there is new
tree growth already present. New tree growth must be as near as practicable
to where the hazard tree was removed and be at least two (2) inches in
diameter, measured at four and one half (4.5) feet above the ground level. If
new growth is not present, then replacement trees shall consist of native
species and be at least four (4) feet in height, and be no less than two (2)
inches in diameter. Stumps may not be removed.
b. Outside of the shoreline buffer, when the removal of hazard trees exceeds
forty (40) percent of the volume of trees four (4) inches or more in diameter,
measured at four and one half (4.5) feet above ground level in any ten (10)
year period, and/or results in cleared openings exceeding twenty-five (25)
percent of the lot area within the shoreland zone, or ten thousand (10,000)
square feet, whichever is greater, replacement with native tree species is
required, unless there is new tree growth already present. New tree growth
must be as near as practicable to where the hazard tree was removed and be
at least two (2) inches in diameter, measured at four and one half (4.5) feet
above the ground level. If new growth is not present, then replacement trees
shall consist of native species and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level.
c. The removal of standing dead trees, resulting from natural causes, is
permissible without the need for replanting or a permit, as long as the
removal does not result in the creation of new lawn areas, or other
permanently cleared areas, and stumps are not removed. For the purposes of
this provision dead trees are those trees that contain no foliage during the
growing season.
d. The Code Enforcement Officer may require the property owner to submit an
evaluation from a licensed forester or arborist before any hazard tree can be
removed within the shoreland zone.
e. The Code Enforcement Officer may require more than a one-for-one
replacement for hazard trees removed that exceed eight (8) inches in
25
diameter measured at four and one half (4.5) feet above the ground level.
2. Storm-damaged trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are met:
a. Within the shoreline buffer, when the removal of storm-damaged trees
results in a cleared opening in the tree canopy greater than two hundred and
fifty (250) square feet, replanting is not required, but the area shall be
required to naturally revegetate, and the following requirements must be met:
i. The area from which a storm-damaged tree is removed does not
result in new lawn areas, or other permanently cleared areas;
ii.Stumps from the storm-damaged trees may not be removed;
iii.Limbs damaged from a storm event may be pruned even if they
extend beyond the bottom one-third (1/3) of the tree; and
iv.If after one growing season, no natural regeneration or regrowth is
present, replanting of native tree seedlings or saplings is required at
a density of one seedling per every eighty (80) square feet of lost
canopy.
b. Outside of the shoreline buffer, if the removal of storm damaged trees
exceeds 40% of the volume of trees four (4) inches or more in diameter,
measured at four and one half (4.5) feet above the ground level in any ten
(10) year period, or results, in the aggregate, in cleared openings exceeding
25% of the lot area within the shoreland zone or ten thousand (10,000)
square feet, whichever is greater, and no natural regeneration occurs within
one growing season, then native tree seedlings or saplings shall be
replanted on a one-for-one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth in
Section 15(P), provided that all other applicable requirements of this chapter are complied with, and
the removal of vegetation is limited to that which is necessary:
1. The removal of vegetation that occurs at least once every two (2) years for the maintenance
of legally existing areas that do not comply with the vegetation standards in this chapter, such
as but not limited to cleared openings in the canopy or fields. Such areas shall not be
enlarged, except as allowed by this section. If any of these areas, due to lack of removal of
vegetation every two (2) years, reverts back to primarily woody vegetation, the requirements
of Section 15(P) apply;
2. The removal of vegetation from the location of allowed structures or allowed uses, when the
shoreline setback requirements of section 15(B) are not applicable;
3. The removal of vegetation from the location of public swimming areas associated with an
allowed public recreational facility;
4. The removal of vegetation associated with allowed agricultural uses, provided best
management practices are utilized, and provided all requirements of section 15(N) are
complied with;
26
5. The removal of non-native invasive vegetation species, provided the following minimum
requirements are met:
a. If removal of vegetation occurs via wheeled or tracked motorized equipment,
the wheeled or tracked motorized equipment is operated and stored at least
twenty-five (25) feet, horizontal distance, from the shoreline, except that
wheeled or tracked equipment may be operated or stored on existing structural
surfaces, such as pavement or gravel;
b. Removal of vegetation within twenty-five (25) feet, horizontal distance, from
the shoreline occurs via hand tools; and
c. If applicable clearing and vegetation removal standards are exceeded due to
the removal of non-native invasive species vegetation, the area shall be
revegetated with native species to achieve compliance.
NOTE: An updated list of non-native invasive vegetation is maintained by the Department of
Agriculture, Conservation and Forestry's Natural Areas Program:
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
6. The removal of vegetation associated with emergency response activities conducted by the
Department, the U.S. Environmental Protection Agency, the U.S. Coast Guard, and their agents.
S. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth in
Section 15(P), to address the removal of non- native invasive species of vegetation, or as a
mechanism to allow for development that may otherwise not be permissible due to the vegetation
standards, including removal of vegetation in conjunction with a shoreline stabilization project, the
revegetation must comply with the following requirements.
1. The property owner must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include a
scaled site plan, depicting where vegetation was, or is to be removed, where existing
vegetation is to remain, and where vegetation is to be planted, including a list of all vegetation
to be planted.
2. Revegetation must occur along the same segment of shoreline and in the same area where
vegetation was removed and at a density comparable to the pre-existing vegetation, except
where a shoreline stabilization activity does not allow revegetation to occur in the same area
and at a density comparable to the pre-existing vegetation, in which case revegetation must
occur along the same segment of shoreline and as close as possible to the area where
vegetation was removed:
3. If part of a permitted activity, revegetation shall occur before the expiration of the permit. If the
activity or revegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application.
4. Revegetation activities must meet the following requirements for trees and saplings:
a. All trees and saplings removed must be replaced with native noninvasive
species;
27
b. Replacement vegetation must at a minimum consist of saplings;
c. If more than three (3) trees or saplings are planted, then at least three (3)
different species shall be used;
d. No one species shall make up 50% or more of the number of trees and
saplings planted;
e. If revegetation is required for a shoreline stabilization project, and it is not
possible to plant trees and saplings in the same area where trees or saplings
were removed, then trees or sapling must be planted in a location that
effectively reestablishes the screening between the shoreline and structures;
and
f. A survival rate of at least eighty (80) percent of planted trees or saplings is
required for a minimum five (5) years period.
5. Revegetation activities must meet the following requirements for woody vegetation
and other vegetation under three (3) feet in height:
a. All woody vegetation and vegetation under three (3) feet in height must be
replaced with native noninvasive species of woody vegetation and vegetation
under three (3) feet in height as applicable;
b. Woody vegetation and vegetation under three (3) feet in height shall be
planted in quantities and variety sufficient to prevent erosion and provide for
effective infiltration of stormwater;
c.If more than three (3) woody vegetation plants are to be planted, then at least
three (3) different species shall be planted;
d. No one species shall make up 50% or more of the number of planted woody
vegetation plants; and
e.Survival of planted woody vegetation and vegetation under three feet in height
must be sufficient to remain in compliance with the standards contained
within this chapter for minimum of five (5) years.
6. Revegetation activities must meet the following requirements for ground vegetation
and ground cover:
a. All ground vegetation and ground cover removed must be replaced with
native herbaceous vegetation, in quantities and variety sufficient to prevent
erosion and provide for effective infiltration of stormwater;
b. Where necessary due to a lack of sufficient ground cover, an area must be
supplemented with a minimum four (4) inch depth of leaf mulch and/or bark
mulch to prevent erosion and provide for effective infiltration of stormwater;
and
c. Survival and functionality of ground vegetation and ground cover must be
sufficient to remain in compliance with the standards contained within this
chapter for minimum of five (5) years.
28
T. Erosion and Sedimentation Control
1. All activities which involve filling, grading, excavation or other similar activities which result in
unstabilized soil conditions and which require a permit shall require a written soil erosion
and sedimentation control plan. The plan shall be submitted to the permitting authority for
approval and shall include, where applicable, provisions for:
a. Mulching and revegetation of disturbed soil.
b. Temporary runoff control features such as hay bales, silt fencing or diversion
ditches.
c. Permanent stabilization structures such as retaining walls or rip-rap.
2. In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as closely
as possible.
3. Erosion and sedimentation control measures shall apply to all aspects of the proposed
project involving land disturbance, and shall be in operation during all stages of the
activity. The amount of exposed soil at every phase of construction shall be minimized to
reduce the potential for erosion.
4. Any exposed ground area shall be temporarily or permanently stabilized within one (1)
week from the time it was last actively worked, by use of rip-rap, sod, seed, and mulch, or
other effective measures. In all cases, permanent stabilization shall occur within nine (9)
months of the initial date of exposure, In addition:
a. Where mulch is used, it shall be applied at a rate of at least one (1) bale per
five hundred (500) square feet and shall be maintained until a catch of
vegetation is established.
b. Anchoring the mulch with netting, peg and twine or other suitable method may
be required to maintain the mulch cover.
c. Additional measures shall be taken where necessary in order to avoid
siltation into the water. Such measures may include the use of staked hay
bales and/or silt fences.
5. Natural and man-made drainage ways and drainage outlets shall be protected from
erosion from water flowing through them. Drainage ways shall be designed and
constructed in order to carry water from a twenty-five (25) year storm or greater,
and shall be stabilized with vegetation or lined with rip-rap.
U. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses shall require a soils report based on an on-site
investigation and be prepared by state-certified professionals. Certified persons may include Maine
29
Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified Geologists
and other report shall be based upon the analysis of the characteristics of the soil and surrounding
land and water areas, maximum ground water elevation, presence of ledge, drainage conditions,
and other pertinent data which the evaluator deems appropriate. The soils report shall include
recommendations for a proposed use to counteract soil limitations where they exist.
V. Water Quality
1. No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body.
2. Where the CEO determines that no other option exists, wells may be located within the high-
water setback limit of a great pond, a river flowing to a great pond, other water bodies,
tributary streams, or wetlands if all of the following provisions are met:
a. The access corridor for equipment does not exceed 20 feet in width and must
follow any existing or proposed footpath. The CEO may expand this 20- foot
limit to the minimum extent needed, where access is difficult;
b. All slag shall be removed, from the ground, and no erosion or sedimentation
shall enter any adjacent water body as a result of well construction;
c. All areas not covered by the footpath, shall be stabilized immediately and fully
vegetated within 9 months.
W. Archaeological Site
Any proposed land use activity involving structural development or soil disturbance on or adjacent
to sites listed on, or eligible to be listed on the National Register of Historic Places, as determined
by the permitting authority shall be submitted by the applicant to the Maine Historic Preservation
Commission for review and comment, at least twenty (20) days prior to action being taken by the
permitting authority. The permitting authority shall consider comments received from the
Commission prior to rendering a decision on the application.
Section 16. Administration
A. Administering Bodies and Agents
1. Code Enforcement Officer.
A Code Enforcement Officer shall be appointed or re-appointed annually by July 1.
2. Board of Appeals.
A Board of Appeals shall be created in accordance with the provisions of Title 30-AM.R.S.A.
section 2691.
3. Planning Board.
A Planning Board shall be created in accordance with the provisions of State law.
30
B. Permits Required
After the effective date of this Ordinance no person shall construct, alter, relocate, repair or replace
any building or part thereof, or place any mobile home or other form of pre-constructed building,
until obtaining from the Code Enforcement Officer or his/her deputy a permit covering such
proposed work.
However, no fee shall be required for repairs or improvements when the reasonable cost is less
than $2,500.00. Nor shall any person, without first obtaining a permit, engage in any activity or use
of land or structure requiring a permit in the district in which such activity or use would occur; or
expand, change, or replace an existing use or structure; or renew a discontinued nonconforming
use.
1. A permit is not required for the replacement of an existing road culvert as long as the
replacement culvert is:
a. Not more than one standard culvert size wider in diameter than the culvert
being replaced;
b. Not more than 25 % longer than the culvert being replaced; and
c. No longer than 75 feet AND:
d. Adequate erosion control measures are taken to prevent sedimentation of
water, and the crossing does not block fish passage in the water course.
2. A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means of
adequate and timely temporary and permanent stabilization measures.
3. Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit application
1. Every applicant for a permit shall submit a written application (appendix 2), including a scaled
site plan, on a form provided by the municipality, to the appropriate official as indicated in
Section 14.
2. All applications shall be signed by the owner or owners of the property or other person
authorizing the work, certifying that the information in the application is complete and correct.
If the person signing the application is not the owner or lessee of the property then that
person shall submit a letter of authorization from the owner or lessee.
3. All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
4. If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure would require
the installation of a subsurface wastewater disposal system.
31
5. All landowners shall be required to read, sign, and date the Acknowledgment of Shoreland
Zoning Buffer Standards form (Appendix 1), to ensure the landowner has prior knowledge of
the rules necessary to preserve the shoreland buffer area. This form shall be attached to the
application.
6. When an excavation contractor will perform an activity that requires or results in more than
one (1) cubic yard of soil disturbance, the person responsible for management of erosion and
sedimentation control practices at the site must be certified in erosion control practices by the
Maine Department of Environmental Protection. This person must be present at the site each
day earthmoving activity occurs for a duration that is sufficient to ensure that proper erosion
and sedimentation control practices are followed. This is required until erosion and
sedimentation control measures have been installed, which will either stay in place
permanently or stay in place until the area is sufficiently covered with vegetation necessary to
prevent soil erosion. The name and certification number of the person who will oversee the
activity causing or resulting in soil disturbance shall be included on the permit application.
This requirement does not apply to a person or firm engaged in agriculture or timber
harvesting if best management practices for erosion and sedimentation control are used; and
municipal, state and federal employees engaged in projects associated with that
employment.
D. Procedure for Administering Permits
1. Within 35 days of the date of receiving written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either that
the application is a complete application, or, if the application is incomplete, that specified
additional material is needed to make the application complete. The Planning Board or the
Code Enforcement Officer, as appropriate shall approve, approve with conditions, or deny all
permit applications in writing within 35 days of receiving a completed application. However, if
the Planning board has a waiting list of applications, a decision on the application shall occur
within 35 days after the first available date on the Planning Board's agenda following receipt
of the completed application, or within 35 days of the public, hearing, if one is held. Permits
shall be approved if the proposed use or structure is found to be in conformance with the
purposes and provisions of this Ordinance.
2. The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
3. After the submission, of a complete application to the Planning Board or CEO, the permitting
authority shall approve an application or approve it with conditions if it makes a positive finding
based on the information presented that the proposed use:
a. Will maintain safe and healthful conditions;
b. Will not result in water pollution, erosion, or sedimentation to surface waters;
c. Will adequately provide for the disposal of all wastewater;
d. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird
or other wildlife habitat;
e. Will conserve shore cover and visual, as well as actual, points of access to
inland water;
f. Will protect archaeological and historic resources as designated in the
comprehensive plan;
g. Will avoid problems associated with the flood plain development and use; and
h. Is in conformance with the provisions of Section 15, Land Use Standards.
32
4. If a permit is either denied or approved with conditions, the reasons as well as condition shall
be stated in writing. No approval shall be granted for an application involving a structure if
the structure would be located in an unapproved subdivision or would violate any other local
ordinance or regulation or any State law which the municipality is responsible for enforcing.
E. Special Exceptions
In addition to the criteria specified in Section 16(D) above, accepting structure setback
requirements, the Planning Board may approve a permit for a single-family residential structure in a
Resource Protection District provided that the applicant demonstrates that all of the following
conditions are met:
1. There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
2. The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
3. All proposed buildings, sewage disposal systems and other improvements are:
a. Located on natural ground slopes of less than 20%.
b. Located outside the floodway of the 100-year flood-plain along rivers based
on detailed flood insurance studies and as delineated on the Federal
Emergency Management Agency's flood Boundary and Floodway Maps and
flood Insurance Rate Maps: all buildings, including basements, are elevated
at least one foot above the 100-year flood-plain elevation; and the
development is otherwise in compliance with any applicable municipal flood-
plain ordinance.
c. If the floodway is not shown on the Federal Emergency Management Agency
Maps, it is deemed to be ½ the width of the 100-year flood-plain.
4. The total footprint including cantilevered or similar overhanging extensions, of all principal and
accessory structures is limited to a maximum of 1,500 square feet. This limitation shall not be
altered by variance.
5. All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than 75 feet, horizontal distance. In determining the greatest
practical extent, the Planning Board shall consider the depth of the lot, the slope of the land,
the potential for soil erosion, the type and amount of vegetation to be removed, the proposed
building site's elevation in regard to the flood-plain, and its proximity to moderate-value and
high-value wetlands.
F. Expiration of Permit
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made within one
year of the issuance of the permit, the applicant shall have one additional year to complete the
project, at which time the permit shall expire.
33
G. Installation of Public Service
No public utility, water district, sanitary district or any utility company of any kind may install services
to any new structure located in the shoreland zone unless written authorization attesting to the
validity and currency of all local permits required under this or any previous Ordinance has been
issued by the appropriate municipal officials. Following installation of service, the company or
district shall forward the written authorization to the municipal official, indicating that installation has
been completed.
H. Appeals
Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
1. Administrative Appeals:
To hear and decide administrative appeals, on an appellate basis, where it is
alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on
a de novo basis where it is alleged by an aggrieved party that there is an error in
any order, requirement, decision or determination made by, or failure to act by, the
Code Enforcement Officer in his or her review of and action on a permit application
under this Ordinance. Any order, Requirement, decision or determination made, or
failure to act, in the enforcement of this ordinance is not appealable to the Board of
Appeals.
2. Variance Appeals:
Variances may be granted only under the following conditions:
a.
Variances may be granted only from dimensional requirements including, but
not limited to, lot width, structure height, percent of lot coverage, and setback
requirements.
b.
Variances shall not be granted for establishment of any uses otherwise
prohibited by this Ordinance.
c.
The Board shall not grant a variance unless it finds that:
i. The proposed structure or use would meet the provisions of Section 15
except for the specific provision which has created the non-conformity and
from which relief is sought; and
ii. The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance
is granted
b. That the need for a variance, is due to the unique circumstances of the
property and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of
the locality; and
34
d. That the hardship is not the result of action taken by the applicant or a
prior owner.
d. Notwithstanding Section 16(H(2)(c)(ii) above, The Board of Appeals may grant a
variance to a property owner for the purpose of making that dwelling accessible
to a person with a disability who is living in the dwelling. The board shall restrict
any variance granted under this subsection solely to the installation of equipment or
the construction of structures necessary for access to or egress from the dwelling by
the person with the disability. The board may impose conditions on the variance,
including limiting the variance to the duration of the disability or to the time that
the person with the disability lives in the dwelling. The "term structures necessary
for access to or egress from the dwelling" shall include railing, wall or roof systems
necessary for the safely or effectiveness of the structure. Any permit issued pursuant
to this subsection is subject to Sections 16(H)(2)(f) and 16(H)(4)(b)(iv) below.
e. The Board of Appeals shall limit any variances granted as strictly as possible in
order to insure conformance with the purposes and provisions of this Ordinance
to the greatest extent possible, and in doing so may impose such conditions to a
variance as it deems necessary. The party receiving the variance shall comply
with any conditions imposed.
f. A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the municipal
officials to the Commissioner of the Department of Environmental Protection at
least twenty (20) days prior to action by the Board of Appeals. Any comments
received from the Commissioner prior to the action by the board of Appeals
shall be made part of the record and shall be taken into consideration by the
Board of Appeals.
g. The Board shall cause written notice of its decision to be mailed or hand-
delivered to the applicant and to the Department of Environmental Protection
with seven (7) days of the Board's decision."
3. Administration Appeals
a. When the Board of Appeals reviews a decision of the Code Enforcement Officer
the Board of appeals shall hold a "de novo" hearing. At this time, the Board
may receive and consider new evidence and testimony, be it oral or written.
When acting in a "de novo" capacity the Board of Appeals shall hear and
decide the matter afresh, undertaking its own independent analysis of evidence
and the law, and reaching its own decision.
b. When the Board of Appeals hears a decision of the Planning Board, it shall hold an
appellate hearing, and may reverse the decision of the Planning Board only upon
finding that the decision was contrary to specific provisions of the Ordinance or
contrary to the facts presented to the Planning Board. The Board of appeals may only
review the record of the proceedings before the Planning Board. The Board Appeals
shall not receive or consider any evidence which was not presented to the Planning
Board, but the Board of Appeals may receive and consider written or oral arguments. If
the Board of Appeals determines that the record so the Planning Board proceedings
are inadequate, the Board of appeals may remand the matter to the Planning Board for
additional fact finding.
35
4. Appeal Procedure
A. Making an Appeal
1. An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board. Such appeal shall be taken within thirty (30) days of the date of the
decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
2. Such appeal shall be made by filing with the Board of Appeals a written notice of
appeal which includes:
a. A concise written statement indicating what relief is requested and why it
should be granted. A sketch drawn to scale showing lot lines, location of
existing buildings and structures and other physical features of the lot pertinent
to the relief sought.
3. Upon being notified of an appeal, the Code Enforcement Officer or Planning
Board as appropriate shall transmit to the Board of Appeals all of the papers
constituting the record of the decision appealed from.
4. The Board of appeals shall hold a public hearing on the appeal within thirty-five
(35) days of its receipt of an appeal request.
B. Decision by Board of Appeals
1. A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal. A member who abstains shall not be
counted in determining whether a quorum exists.
2. The concurring vote of a majority of the members of the Board of Appeals
present
and voting shall be necessary to reverse an order, requirement, decision, or
determination of the Code Enforcement Officer or Planning Board, or to decide in
favor of the applicant on any matter on which it is required to decide under this
Ordinance, or to affect any variation in the application of this Ordinance from its
stated terms. The board may reverse the decision, or failure to act, of the Code
Enforcement Officer or Planning Board only upon a finding that the decision, or
failure to act, was clearly contrary to specific provisions of this Ordinance.
a. The person filing the appeal shall have the burden of proof.
b. The Board shall decide all administrative appeals and variance
appeals within thirty-five (35) days after the close of the hearing, and
shall issue a written decision on all appeals.
c. The Board of Appeals shall state the reasons and basis for its
decision, including a statement of the facts found and conclusions
reached by the Board. The Board shall cause written notice of its
decision to be mailed or hand-delivered to the applicant and top the
Department of Environmental Protection within seven (7) days of the
Board's decision. Copies of written decisions of the Board of Appeals
shall be given to the Planning Board, Code Enforcement Officer, and
the Municipal Officers.
36
5. Appeal to Superior Court
Any aggrieved party who participated as a party during the proceedings before the
Board of Appeals may take an appeal to Superior Court in accordance with State
laws within forty-five (45) days from the date of any decision of the Board of
Appeals.
6. Reconsideration
The Board of Appeals may reconsider any decision within forty-five (45) days of its prior
decision. A request to the Board to reconsider a decision must be filed within ten (10) days
of the decision that is being reconsidered. A vote to reconsider and the action taken on that
reconsideration must occur and be completed within forty-five (45) days of the date of the
vote on the original decision. Reconsideration of a decision shall require a positive vote of
the majority of the board members originally voting on the decision, and proper notification
to the landowner, petitioner, planning board, code enforcement officer, and other parties of
interest, including abutters and those who testified at the original hearing(s). The board
may conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
I. Enforcement
1. Nuisances
a. Any violation of this Ordinance shall be deemed to be a nuisance.
2. Code Enforcement Officer
a. It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing the person responsible for
such violation, indicating the nature of the violation and ordering the action necessary to
correct it, including discontinuance of illegal use of land, buildings or structures, or work
being done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal officers and be
maintained as a permanent record.
b. The Code Enforcement Officer shall conduct on-site inspections to ensure compliance
with all applicable laws and conditions attached to permit approvals. The Code
Enforcement Officer shall also investigate all complaints of alleged violations of this
Ordinance.
c. The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted
or denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
3. Legal Actions
When the above action does not result in the correction or abatement of the violation or
nuisance condition, the Municipal Officers, upon notice from the Code Enforcement
Officer, are hereby directed to institute any and all actions and proceedings, either legal
or equitable, including seeking injunctions of violations and the imposition of fines, that
37
may be appropriate or necessary to enforce the provisions of this Ordinance in the name
of the municipality. The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such agreements
shall not allow an illegal structure or use to continue unless there is clear and convincing
evidence that the illegal structure or use was constructed or conducted as a direct result of
erroneous advice given by an authorized municipal official and there is no evidence that
the owner acted in bad faith, or unless the removal of the structure or use will result in a
threat or hazard to public health and safety or will result in substantial environmental
damage.
4. Fines
Any person, including but not limited to a landowner, a landowner's agent or a contractor,
who violates any provision or requirement of this Ordinance shall be penalized in
accordance with Title 30-A, Maine Revised Statutes Annotated, Subsection 4452. (See
Town Fee Schedule)
Section 17. Definitions
Accessory structure or use - a use or structure which is incidental and subordinate to the principal use or
structure. Accessory uses, when aggregated shall not subordinate the principal use of the lot. A deck or
similar extension of the principal structure or a garage attached to the principal structure by a roof or a
common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit or
variance has been granted; or any other person or group of persons who have suffered particularized injury
as a result of the granting or denial of such permit or variance. The term "aggrieved party" shall also include
but not limited to the Code Enforcement Officer, the Planning Board and/or the Municipal Officers.
Agriculture - the production, keeping or maintenance for sale or lease, of plants or animals, including,
but not limited to: forages and sod crops, grains and seed crops, dairy animals and dairy products, poultry
and poultry products, livestock, fruits and vegetables, and ornamental greenhouse products. Agriculture
does not include forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or animal
species.
Basal Area - the area of cross-section of a tree stem at 4 ½ feet above ground level and inclusive of bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more that
50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for
vehicles and trailers.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation and Forestry, Bureau of
Forestry.
38
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to tents, recreational vehicles or other shelters
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which, activity is the production of income from the buying and
selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Cross-sectional area - the cross-sectional area of a stream or tributary stream channel is determined by
multiplying the stream or tributary stream channel width by the average stream or tributary stream channel
depth. The stream or tributary stream channel width is the straight-line distance from the normal high-water line
on one side of the channel to the normal high-water line on the opposite side of the channel. The average
stream or tributary stream channel depth is the average of the vertical distances from a straight line between
the normal high-water line of the stream or tributary stream channel to the bottom of the channel.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
Development - a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but
not limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a
substantial handicap as determined by a physician or in the case of mental handicap, by a
psychiatrist or psychologist, as well as any other health or, sensory impairment which requires special
education, vocational rehabilitation or related services.
Disruption of shoreline integrity - the alteration of the physical shape, properties, or condition
of a shoreline at any location by timber harvesting and related activities. A shoreline where
shoreline integrity has been disrupted is recognized by compacted, scarified and/or rutted soil, an
abnormal channel or shoreline cross-section, and in the case of flowing water, a profile and
character altered from natural conditions.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-family
dwellings or one two-family dwelling or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such as
protection of resources from immediate destruction or loss, law enforcement, and operations to rescue
human beings, property and livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and related
equipment; gas, oil, water, slurry or other similar pipelines: municipal sewage lines, collection or supply
systems; and associated storage tanks. Such systems may include towers, poles, wires, mains, drains,
pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and similar accessories,
but shall not include service drops or buildings which are necessary for the furnishing of such services.
Excavation Contractor - means an individual or firm engaged in a business that causes the disturbance of
soil, including grading, filling and removal, or in a business in which the disturbance of soil results from an
activity that the individual or firm is retained to perform.
39
Expansion of a structure - an increase in the footprint or height of a structure, including all extensions
such as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of more
footprint of a structure or ground area devoted to a particular use.
Family - one or more persons occupying premises and living as a single housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved in
order to discharge the 100-year flood without cumulatively increasing the water surface elevation by more
than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint- The entire area of ground covered by the structure(s) on a lot, including but not limited
to cantilevered or similar overhanging extensions, as well as unenclosed structures, such as
patios and decks.
Forest management activities - timber cruising and other forest resource evaluation activities,
pesticide or fertilizer application, management planning activities, timber stand improvement,
pruning, regeneration of forest stands, and other similar or associated activities, exclusive of
timber harvesting and the construction, creation or maintenance of roads.
Forest Stand - a contiguous group of trees sufficiently uniform in age class distribution,
composition, and structure, and growing on a site of sufficiently uniform quality, to be a
distinguishable unit.
Forested Wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters
tall (approximately twenty (20) feet) or taller.
Foundation the supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frost walls, or other base consisting of
concrete, block, brick or similar material."
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a surface water
body, excluding any river, stream or brook, such that in a natural state, the combined surface area is
in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of wetland
vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform
to the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in inland waters and that cannot be
located away from these waters. The uses include, but are not limited to, recreational fishing and
boating facilities, waterfront dock and port facilities, shipyards and boat building facilities, marinas,
navigation aids, basins and channels, shoreline structures necessary for erosion control
purposes, and uses that primarily provide general public access to marine inland waters.
Recreational boat storage buildings are not considered to be a functionally water-dependent use.
40
Great pond - any inland body of water which in a natural state has- a surface area in excess of
ten acres and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres-except for the purposes of this Ordinance, where the artificially formed
or increased inland body of water is completely surrounded by land held by a single owner.
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-A
Section 465-A. This classification includes some, but not all impoundment of rivers that are
defined as great ponds.
Ground Cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Harvest Area - the area where timber harvesting and related activities, including the cutting of
trees, skidding, yarding, and associated road construction take place. The area affected by a
harvest encompasses the area within the outer boundaries of these activities, excepting
unharvested areas greater than 10 acres within the area affected by a harvest.
Hazard tree- a tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site, exhibits a
high probability of failure and loss of a major structural component of the tree in a manner that
will strike a target. A normal range of environmental conditions does not include meteorological
anomalies, such as, but not limited to; hurricanes; hurricane-force winds; tornados; microbursts;
or significant ice storm events. Hazard trees also include those trees that pose a serious and
imminent risk to bank stability. A target is the area where personal injury or property damage
could occur if the tree or a portion the tree fails. Targets include roads, driveways, parking areas,
structures, campsites, and any other developed area where people frequently gather and linger.
Height of a structure - the vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding chimneys,
steeples, antennas, and similar appurtenances which have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a residential
structure or property and which is 1) clearly incidental to and compatible with the residential use
of the property and surrounding residential uses; and 2) which employs no more than two (2)
persons other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as but not limited to,
reduction in water body, tributary stream or wetland setback distance, increase in lot coverage, or
increase in height of a structure. Property changes or structure expansions which either meet the
dimensional standard or which cause no further increase in the linear extent of nonconformance of the
existing structure shall not be considered to increase nonconformity. [Amended June 9, 1999] For
example, there is no increase in non-conformity with the setback requirement for water bodies, wetlands,
or tributary streams if the expansion extends no further into the required setback area than does any
portion of the existing non-conforming structure. Hence, a structure may be expanded laterally provided
that the expansion extends no closer to the water body or wetland than the closest portion of the
existing structure from that water body or wetland. Included in this allowance are expansions which in-fill
irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which is
developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to gravel pads, parking areas, fire places,
or tent platforms.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods, or the
extraction of minerals.
41
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or private
school, hospital, or municipally owned or operated building, structure or land used for public purposes.
Land Management Road - a route or track consisting of a bed of exposed mineral soil, gravel, or other
surfacing materials constructed for, or created by, the passage of motorized vehicles and used primarily for
timber harvesting and related activities, including associated log yards, but not including skid trails or skid
roads.
Licensed Forester - a forester licensed under 32 M.R.S.A. Chapter 76.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads
serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and
outdoor storage of boats and marine equipment, boat and tackle shops and marine fuel service
facilities.
Market value - the estimated price a property will bring in the open market and under prevailing market
conditions in a sale between a willing seller and a willing buyer, both conversant with the property
and with prevailing general price levels.
Mineral exploration - hand samplings, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more
than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other
like material from its natural location and to transport the product removed, away from the
extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling
units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment took
effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirements of the
district in which it is located.
42
Non-conforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, height, lot coverage or footprint, but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took
effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not
permitted in the district in which it is situated, but which is allowed to remain solely because it was
in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation- species of vegetation listed by the Maine Department of
Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to Maine
ecosystems.
Normal high-water line - that line which is apparent from visible markings, changes in the character of
soils due to prolonged action of the water or changes in vegetation, and which distinguishes between
predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers and great ponds that
support non-forested wetland vegetation and hydric soils and that are at the same or lower elevation as the
water level of the river or great pond during the period of normal high-water is considered part of the river
or great pond.
Outlet Stream - any perennial or intermittent stream, as shown on the most recent highest resolution
version of the national hydrography dataset available from the United States Geological Survey on the
website of the United States Geological Survey or the national map, that flows from a freshwater wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharfs, bridges and other structures and uses extending over or beyond the
normal high-water line or within a wetland.
Temporary: Structures which remain in or over the water for less than seven (7) months in any
period of twelve (12) consecutive months.
Permanent: Structures, which remain in or over the water for seven (7) months or more in any period of
twelve (12) consecutive months.
Principal structure - A structure other than one which is used for purposes wholly incidental or
accessory to the use of another or use on the same lot.
Principal use - a use other than one which is wholly incidental or accessory to another use on the
same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and roads,
which are owned, leased, or otherwise operated, or funded by a governmental body or public entity.
43
Recent flood plain soils - the following soil series as described and identified by the National Cooperative
Soil Survey:
Fryeburg
Hadley
Limerick
Lovell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time activities,
and other customary and "usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home, In order to be considered as a vehicle and
not as a structure, the unit must remain with its tires on the ground, and must be registered with the State
Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the structure,
or 2.) any existing overboard wastewater discharge.
Residential dwelling unit - A room or group of rooms designed and equipped exclusively for use
as permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Residual Basal area - the sum of the basal area of trees remaining on a harvested site.
Residual Stand - a stand of trees remaining in the forest following timber harvesting and related
activities
Riprap- rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
River - a free-flowing body of water including its associated flood plain wetlands from that point at
which it provides drainage for a watershed of twenty-five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles
excluding a driveway as defined.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet
above ground level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height above
ground level.
44
Service drop - any utility line extension which does not cross or run beneath any portion of a
water body provided that:
1. In the case of electric service
a. the placement of wires and/or the installation of utility poles are located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than on thousand (1,000) feet.
2. In case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b. the extension requiring the installation of new utility poles or placement underground is
less than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or
tributary stream, to the nearest part of a structure, road, parking space or other regulated object
or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight
line between the intersections of the lot lines with the shoreline.
Shorefront Common Area - any land area having shoreline frontage on any water body
regulated by this Ordinance and intended for use by more than one residential dwelling unit or
family unit or other legal entity, excluding visitors and guests. This definition shall also include
areas for which easements, right-of way, or other use rights are granted or sold.
Shoreland Zone - the land area located within two hundred and fifty (250) feet, horizontal
distance, of the normal high-water line of any great pond, river, within 250 feet of the upland edge
of a freshwater wetland; or within one hundred(100) feet, horizontal distance, of the normal high-
water line of a stream.
Shoreline - the normal high-water line, or upland edge of a wetland.
Sign - Any structure or part of the structure attached thereto or painted or represented thereon,
which will display or include any letter, word, model, banner, flag, pennant, insignia, device or
representation used as, or which is in the nature of an announcement, direction, or advertisement
and which is intended for or effectively achieves the result of announcing, directly and/or
advertising to the out of door public. The word sign does not include the flag pennant or insignia
of any nation, state, city or other political unit nor does it include inside window type display or
paraphernalia incidental and necessary to the business, such as jewelry cases, antiques,
mannequins, clothing layouts, real estate boards, menus, and the like. Temporary display of any
political, educational, charitable, civic, religious, professional or like campaign drive, monument or
event is not considered a sign.
Skid Road or Skid Trail - a route repeatedly used by forwarding machinery or animal to haul or drag
forest products from the stump to the yard or landing, the construction of which requires minimal
excavation.
Slash - the residue, e.g., treetops and branches, left on the ground after a timber harvest.
45
Storm-damaged tree- a tree that has been uprooted, blown down, is lying on the ground, or that remains
standing and is damaged beyond the point of recovery as the result of a storm event
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2) perennial
streams as depicted on the most recent, highest resolution version of the national hydrography dataset
available from the United States Geological Survey on the website of the United States Geological Survey
or the national map to the point where the stream becomes a river or where the stream meets the
shoreland zone of another water body or wetland. When a stream meets the shoreland zone of a water
body or wetland and a channel forms downstream of the water body or wetland as an outlet, that
channel is also a stream.
Structure - anything temporarily or permanently located, built, constructed or erected for the support,
shelter or enclosure of persons, animals, goods or property of any kind, or anything constructed or erected
on or in the ground. The term includes structures temporarily or permanently located, such as decks,
patios, and satellite dishes. Structure does not include fences; poles and wiring and other aerial
equipment normally associated with service drops, including guy wires and guy anchors; subsurface
waste water disposal systems as defined in Title 30-A, section 4201, subsection 5; geothermal heat
exchange wells as defined in Title 32, section 4700-E, subsection 3-C; or wells or water wells as defined
in Title 32, section 4700-E, subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface sewage disposal system - Any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered
cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism, or apparatus used
for those purposes; does not include any discharge system licensed under 38 M.R.S.A. section 414, any
surface waste water disposal system, or nay municipal or quasi-municipal sewer or waste water treatment
system.
Sustained slope - a change in elevation where the referenced percent grade is substantially maintained
or exceeded throughout the measured area.
Timber harvesting - the cutting and removal of timber from their growing site, for the primary purpose of
selling or processing forest products, and the attendant operation of cutting and skidding machinery,
including the creation and use of skid trails, skid roads, and winter haul roads, but not the construction or
creation of roads. "Timber harvesting" does not include the cutting or removal of vegetation within the
shoreland zone when associated with any other land use activities. The cutting or removal of trees in the
shoreland zone on a lot that has less than two (2) acres within the shoreland zone shall not be considered
timber harvesting. Such cutting or removal of trees shall be regulated pursuant to Section 15 (P), Clearing
of Vegetation for Development.
Timber Harvesting and related activities - timber harvesting, the construction and maintenance of the
roads used primarily for timber harvesting and other activities conducted to facilitate timber harvesting.
Tree - a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four and
one half (4.5) feet above the ground, with a more or less definite crown, and reaching a height of at least
ten (10) feet at maturity.
46
Tributary stream - a channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of top soil,
containing waterborne deposits or exposed soil, parent material or bedrock, and which is connected
hydrologically with other water bodies. "Tributary stream" does not include rills or gullies forming because
of accelerated erosion in disturbed soils where the natural vegetation cover has been removed by human
activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only applies
to that portion of the tributary stream located within the shoreland zone of the receiving water body or
wetland.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) feet) tall or taller.
Variance - The grant of relief from the requirements of this Ordinance which permits construction
in a manner that would otherwise be prohibited by this Ordinance.
Vegetation - all live trees, shrubs, ground cover, and other plants including without limitation,
trees both over and under 4 inches in diameter measured at 4 ½ above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river, stream.
Water crossing - any project extending from one bank to the opposite bank of a river or stream,
whether under, through, or over the water course. Such projects include but may not be limited to
roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these
crossings. This definition includes crossings for timber harvesting equipment and related activities.
Wetland - a freshwater wetland. (See Freshwater Wetland)
Wind firm - the ability of a forest stand to withstand strong winds and resist wind throw, wind
rocking, and major breakage.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
47
TABLE 1 LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP
LR
LC
1. Non-intensive recreational uses not requiring structures
such as hunting, fishing and hiking
yes
yes
yes
yes
2. Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
3. Forest management activities except for timber
harvesting
yes
yes
yes
yes
4. Timber harvesting
yes
no
no
no
5. Clearing of vegetation for approved construction and
other allowed uses
CEO
CEO
CEO
CEO
6. Fire prevention activities
yes
yes
yes
yes
7. Wildlife management practices
yes
yes
yes
yes
8. Soil and water conservation practices
yes
yes
yes
yes
9. Mineral exploration
no
no
no
no
10. Mineral extraction including sand and gravel extraction
no
no
no
no
11. Surveying and resource analysis
yes
yes
yes
yes
12. Emergency operations
yes
yes
yes
yes
13. Agriculture
no
no
no
no
14. Aquaculture
PB
PB
PB
PB
15. Principal structures and uses
A. One and two family residential
CEO
PB
CEO
CEO
B. Multi-unit residential
no
no
PB
PB
C. Commercial
no
no
no
PB
D. Industrial
no
no
no
no
E. Governmental and institutional
no
no
no
PB
F. Small non-residential facilities for educational,
scientific, or nature interpretation purposes
PB
PB
PB
PB
16. Structures accessory to allowed uses
CEO
PB
CEO
CEO
17. Piers, docks, wharfs, bridges and other structures
and uses extending over or below the normal high-
water line or within a wetland
a. Temporary
b. Permanent
CEO
PB
CEO
PB
CEO
PB
PB
PB
18. Conversions of seasonal residences to year-round
residences
LPI
no
LPI
LPI
19. Home occupations
PB
no
PB
PB
20. Private sewage disposal systems for allowed uses
LPI
no
LPI
LPI
21. Essential services
PB6
PB6
PB
PB
22. Service drops, as defined, to allowed uses
yes
yes
yes
yes
23. Public and private recreational areas involving minimal
structural development
PB
PB
CEO
CEO
24. Individual, private campsites
CEO
CEO
CEO
CEO
25. Campgrounds
no
no
PB
PB
26. Road construction
PB
no8
PB
PB
27. Driveway construction
CEO
no8
CEO
CEO
28. Parking facilities
no
no7
PB
PB
29. Marinas
PB
no
PB
PB
30. Filling and earth moving of <10 cubic yards
CEO
CEO
CEO
CEO
31. Filling and earth moving of >10 cubic yards
PB
PB
CEO
CEO
32. Signs
yes9
Yes9
Yes9
PB10
33. Uses similar to allowed uses
CEO
CEO
CEO
CEO
34. Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
35. Uses similar to uses requiring a PB permit
PB
PB
PB
PB
48
6See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required
from the PB.
8Except as provided in Section 15(H)(4).
9Non-commercial signs only. Commercial signs would fall under Site Plan Review with PB.
10Site Plan Review is required with the PB.
NOTE: A person performing any of the following activities shall require a permit from the Department of
Environmental Protection, pursuant to 38 M.R.S.A. section 480-C, if the activity occurs in, on, over or
adjacent to any freshwater or coastal wetland, great pond, river, stream or brook and operates in such a
manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.