This is the exact embedded text of the captured official document.
Snapshot 227370497708 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
SHORELAND ZONING
TOWN OF INDUSTRY
Adopted: 12/06/1991
Amended: 03/13/1993
Amended: 10/19/1993
Amended: 03/10/2018
Effective: 12/31/1991
COUNTY OF FRANKLIN
STATE OF MAINE
Shoreland Zoning Ordinance
Town of Industry, Maine
TABLE OF CONTENTS
Page
1. Purposes.................................................................................................................................................. 1
2. Authority ................................................................................................................................................ 1
3. Applicability ........................................................................................................................................... 1
4. Effective Date ......................................................................................................................................... 1
5. Availability ............................................................................................................................................. 1
6. Severability ............................................................................................................................................. 1
7. Conflicts with Other Ordinances ............................................................................................................ 1
8. Amendments ........................................................................................................................................... 2
9. Districts and Zoning Map ....................................................................................................................... 2
A. Official Shoreland Zoning Map ....................................................................................................... 2
B. Scale of Map .................................................................................................................................... 2
C. Certification of Official Shoreland Zoning Map .............................................................................. 2
D. Changes to the Official Shoreland Zoning Map .............................................................................. 2
10. Interpretation of District Boundaries ...................................................................................................... 2
11. Land Use Requirements ......................................................................................................................... 2
12. Non-conformance ................................................................................................................................... 3
A. Purpose ............................................................................................................................................. 3
B. General ............................................................................................................................................. 3
C. Non-conforming Structures ............................................................................................................. 3
D. Non-conforming Uses ...................................................................................................................... 6
E. Non-conforming Lots....................................................................................................................... 7
13. Establishment of Districts....................................................................................................................... 7
A. Resource Protection District ............................................................................................................ 7
B. Limited Residential District ............................................................................................................. 8
C. Limited Commercial District ........................................................................................................... 8
D. General Development District ........................................................................................................ 8
E. Stream Protection District ................................................................................................................ 9
14. Table of Land Uses ................................................................................................................................. 9
15. Land Use Standards .............................................................................................................................. 11
A. Minimum Lot Standards ................................................................................................................ 11
B. Principal and Accessory Structures ............................................................................................... 11
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Below the Normal High-Water Line of a Water body or Within a Wetland ................................. 14
D. Campgrounds ................................................................................................................................. 15
E. Individual Private Campsites ......................................................................................................... 15
F. Commercial and Industrial Uses .................................................................................................... 16
G. Parking Areas ................................................................................................................................. 17
H. Roads and Driveways .................................................................................................................... 17
I.
Signs............................................................................................................................................... 19
J. Storm Water Runoff ....................................................................................................................... 19
K. Septic Waste Disposal ................................................................................. ....... 20
L. Essential Services........................................................................................................................... 20
M. Mineral Exploration and Extraction ............................................................................................... 20
N. Agriculture ..................................................................................................................................... 21
O. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ........................ 22
P. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal ................................................... 24
Q. Exemptions to Clearing and Vegetation Removal Requirements .................................................. 25
R. Revegetation Requirements ........................................................................................................... 26
S. Erosion and Sedimentation Control ............................................................................................... 28
T. Soils............................................................................................................. 28
U. Water Quality. ................................................................................................................................ 29
V. Archaeological Site. ....................................................................................................................... 29
W. Shore Front Common Area.................................................................................29
16. Administration ...................................................................................................................................... 30
A. Administering Bodies and Agents ................................................................................................. 30
B. Permits Required ............................................................................................................................ 30
C. Permit Application ......................................................................................................................... 30
D. Procedure for Administering Permits ............................................................................................ 31
E. Special Exceptions ......................................................................................................................... 31
F. Expiration of Permit ....................................................................................................................... 32
G. Installation of Public Utility Service .............................................................................................. 32
H. Appeals .......................................................................................................................................... 33
I.
Enforcement ................................................................................................................................... 36
17. Definitions ............................................................................................................................................ 36
1
Shoreland Zoning Ordinance
Town of Industry, Maine
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird
and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to
protect archaeological and historic resources; to protect freshwater wetlands; to control building
sites, placement of structures and land uses; to conserve shore cover, and visual as well as actual
points of access to inland waters; to conserve natural beauty and open space; and to anticipate and
respond to the impacts of development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 sections
435-449 of the Maine Revised Statutes (M.R.S.).
3. Applicability. This Ordinance applies to all land areas within two hundred fifty (250) feet,
horizontal distance, of the normal high-water line of any great pond or river or the upland edge of a
freshwater wetland and all land areas within seventy-five (75) feet, horizontal distance, of the normal
high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or other
structure extending or located below the normal high-water line of a water body or within a wetland.
4. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was adopted by
the municipal legislative body of the Town of Industry on December 31. 1991 and amended on March
10, 2018, shall not be effective unless approved by the Commissioner of the Department of
Environmental Protection. A certified copy of the Ordinance, or Ordinance Amendment, attested and
signed by the Municipal Clerk, shall be forwarded to the Commissioner for approval. If the
Commissioner fails to act on this Ordinance or Ordinance Amendment, within forty-five (45) days of
his/her receipt of the Ordinance, or Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period
shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or
Ordinance Amendment, is approved by the Commissioner.
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at reasonable
cost at the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute
administered by the municipality, the more restrictive provision shall control.
2
8. Amendments. This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of
the Department of Environmental Protection following adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on
any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Shoreland Zoning Map(s) which is
(are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Limited Commercial
(4) General Development
(5) Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less than: one
(1) inch = two thousand (2000) feet. District boundaries shall be clearly delineated and a legend
indicating the symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall be
certified by the attested signature of the Municipal Clerk and shall be located in the municipal
office. In the event the municipality does not have a municipal office, the Municipal Clerk shall
be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with Section 8,
are made in the district boundaries or other matter portrayed on the Official Shoreland Zoning
Map, such changes shall be made on the Official Shoreland Zoning Map within thirty (30) days
after the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland Zoning
Map, district boundary lines are property lines, the centerlines of streets, roads and rights of way, and
the boundaries of the shoreland area as defined herein. Where uncertainty exists as to the exact
location of district boundary lines, the Board of Appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in conformity with
all of the regulations herein specified for the district in which it is located, unless a variance is
granted.
3
12. Non-conformance
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except as
otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and
the new owner may continue the non-conforming use or continue to use the non-conforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations that do
not involve expansion of the non-conforming use or structure, and such other changes in a
non-conforming use or structure as federal, state, or local building and safety codes may
require.
C. Non-conforming Structures
(1) Expansions. All new principal and accessory structures, excluding functionally water-
dependent uses, must meet the water body, tributary stream, or wetland setback requirements
contained in Section 15(B)(1). A non-conforming structure may be added to or expanded
after obtaining a permit from the same permitting authority as that for a new structure, if such
addition or expansion does not increase the non-conformity of the structure and is in
accordance with subparagraphs (a) and (b) below.
(a) Expansion of any portion of a structure within twenty-five (25) feet of the normal high-
water line of a water body, tributary stream, or upland edge of a wetland is prohibited,
even if the expansion will not increase nonconformity with the water body, tributary
stream or wetland setback requirement. Expansion of an accessory structure that is
located closer to the normal high-water line of a water body, tributary stream, or upland
edge of a wetland than the principal structure is prohibited, even if the expansion will not
increase nonconformity with the water body, tributary stream, or wetland setback
requirement.
(b) Notwithstanding paragraph (a), above, if a legally existing nonconforming principal
structure is entirely located less than twenty-five (25) feet from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland, that structure may be
expanded as follows, as long as all other applicable municipal land use standards are met
and the expansion is not prohibited by Section 12(C)(1).
(i) The maximum total footprint for the principal structure may not be expanded to a
size greater than eight hundred (800) square feet or thirty (30) percent larger than the
footprint that existed on January 1, 1989, whichever is greater. The maximum height
of the principal structure may not be made greater than fifteen (15) feet or the height
of the existing structure, whichever is greater.
4
(c) All other legally existing nonconforming principal and accessory structures that do not
meet the water body, tributary stream, or wetland setback requirements may be expanded
or altered as follows, as long as other applicable municipal land use standards are met and
the expansion is not prohibited by Section 12(C)(1) or Section 12(C)(1)(a), above.
(i) For structures located less than seventy-five (75) feet from the normal high-water line
of a water body, tributary stream, or upland edge of a wetland, the maximum
combined total footprint for all structures may not be expanded to a size greater than
one thousand (1000) square feet or thirty (30) percent larger than the footprint that
existed on January 1, 1989, whichever is greater. The maximum height of any
structure may not be made greater than twenty (20) feet or the height of the existing
structure, whichever is greater.
(ii) For structures located less than one hundred (100) feet from the normal high-water
line of a great pond classified as GPA or a river flowing to a great pond classified as
GPA, the maximum combined total footprint for all structures may not be expanded
to a size greater than one thousand five hundred (1,500) square feet or thirty (30)
percent larger than the footprint that existed on January 1, 1989, whichever is greater.
The maximum height of any structure may not be made greater than twenty-five (25)
feet or the height of the existing structure, whichever is greater. Any portion of those
structures located less than seventy-five (75) feet from the normal high-water line of
a water body, tributary stream, or upland edge of a wetland must meet the footprint
and height limits in Section 12(C)(1)(b)(i) and Section 12(C)(1)(c)(i), above.
(iii) In addition to the limitations in subparagraphs (i) and (ii), for structures that are
legally nonconforming due to their location within the Resource Protection District
when located at less than two hundred fifty (250) feet from the normal high-water
line of a water body or the upland edge of a wetland, the maximum combined total
footprint for all structures may not be expanded to a size greater than one thousand
five hundred (1,500) square feet or thirty (30) percent larger than the footprint that
existed at the time the Resource Protection District was established on the lot,
whichever is greater. The maximum height of any structure may not be made greater
than twenty-five (25) feet or the height of the existing structure, whichever is greater,
except that any portion of those structures located less than seventy-five (75) feet
from the normal high-water line of a water body, tributary stream, or upland edge of
a wetland must meet the footprint and height limits in Section 12(C)(1)(b)(i) and
Section 12(C)(1)(c)(i), above.
(d) An approved plan for expansion of a nonconforming structure must be recorded by the
applicant with the registry of deeds, within ninety (90) days of approval. The recorded
plan must show the existing and proposed footprint of the non-conforming structure, the
existing and proposed structure height, the footprint of any other structures on the parcel,
the shoreland zone boundary and evidence of approval by the municipal review authority.
(2) Foundations. Whenever a new, enlarged, or replacement foundation is constructed under a
non-conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 12(C)(3)
Relocation, below.
5
(3) Relocation. A non-conforming structure may be relocated within the boundaries of the parcel
on which the structure is located provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the Planning Board or its
designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for septic
systems, and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation in accordance with Section 15(S). In addition, the
area from which the relocated structure was removed must be replanted with vegetation.
Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one (1)
native tree, three (3) feet in height, for every tree removed. If more than five (5) trees are
planted, no one species of tree shall make up more than fifty (50) percent of the number
of trees planted. Replaced trees must be planted no further from the water or wetland than
the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the same
size as the area where vegetation and/or ground cover was disturbed, damaged, or
removed must be reestablished within the setback area. The vegetation and/or ground
cover must consist of similar native vegetation and/or ground cover that was disturbed,
destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees, or
a combination thereof.
(4) Reconstruction or Replacement. Any non-conforming structure which is located less than
the required setback from a water body, tributary stream, or wetland and which is removed,
or damaged or destroyed, regardless of the cause, by more than fifty (50) percent of the
market value of the structure before such damage, destruction or removal, may be
reconstructed or replaced provided that a permit is obtained within eighteen (18) months of
the date of said damage, destruction, or removal, and provided that such reconstruction or
replacement is in compliance with the water body, tributary stream or wetland setback
requirement to the greatest practical extent as determined by the Planning Board or its
designee in accordance with the purposes of this Ordinance. In no case shall a structure be
reconstructed or replaced so as to increase its non-conformity. If the reconstructed or
replacement structure is less than the required setback it shall not be any larger than the
original structure, except as allowed pursuant to Section 12(C)(1) above, as determined by
the non-conforming footprint of the reconstructed or replaced structure at its new location. If
6
the total footprint of the original structure can be relocated or reconstructed beyond the
required setback area, no portion of the relocated or reconstructed structure shall be replaced
or constructed at less than the setback requirement for a new structure. When it is necessary
to remove vegetation in order to replace or reconstruct a structure, vegetation shall be
replanted in accordance with Section 12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by fifty (50) percent or less of the
market value, or damaged or destroyed by fifty (50) percent or less of the market value of the
structure, excluding normal maintenance and repair, may be reconstructed in place if a permit
is obtained from the Code Enforcement Officer within one year of such damage, destruction,
or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(3) above, the physical condition and type of foundation present, if
any.
(5) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may
not be changed to another use unless the Planning Board, after receiving a written
application, determines that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent properties and resources than
the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health and
safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover,
visual and actual points of public access to waters, natural beauty, floodplain management,
archaeological and historic resources, and commercial fishing and maritime activities, and
other functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one (1) year, or which is superseded by a conforming
use, may not again be devoted to a non-conforming use except that the Planning Board may,
for good cause shown by the applicant, grant up to a one (1) year extension to that time
period. This provision shall not apply to the resumption of a use of a residential structure
provided that the structure has been used or maintained for residential purposes during the
preceding five (5) year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-conforming
use provided that the proposed use has no greater adverse impact on the subject and adjacent
properties and resources than the former use as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria listed in
Section 12(C)(5) above.
7
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width or shore frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two (2) or more contiguous lots or parcels are in a single or joint
ownership of record on January 1, 1989, if all or part of the lots do not meet the dimensional
requirements of this Ordinance, and if a principal use or structure exists on each lot, the non-
conforming lots may be conveyed separately or together, provided that the State Minimum
Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the State of Maine
Subsurface Wastewater Disposal Rules are complied with.
If two (2) or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be as
conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two (2) or more contiguous lots or parcels
are in single or joint ownership of record at the time of or since adoption or amendment of
this Ordinance, if any of these lots do not individually meet the dimensional requirements of
this Ordinance or subsequent amendments, and if one (1) or more of the lots are vacant or
contain no principal structure the lots shall be combined to the extent necessary to meet the
dimensional requirements.
This provision shall not apply to two (2) or more contiguous lots, at least one (1) of which is
non-conforming, owned by the same person or persons on December 31, 1991 and recorded
in the registry of deeds if the lot is served by a public sewer or can accommodate a subsurface
sewage disposal system in conformance with the State of Maine Subsurface Wastewater
Disposal Rules; and
(a) Each lot contains at least one hundred (100) feet of shore frontage and at least twenty
thousand (20,000) square feet of lot area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least one hundred (100)
feet of shore frontage and twenty thousand (20,000) square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
the limits of the shoreland zone, exclusive of the Stream Protection District, except that areas
8
which are currently developed and areas which meet the criteria for the Limited Commercial or
General Development need not be included within the Resource Protection District.
(1) Floodplains along rivers and floodplains along artificially formed great ponds along rivers,
defined by the one hundred (100) year floodplain as designated on the Federal Emergency
Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary
Maps, or the flood of record, or in the absence of these, by soil types identified as recent
floodplain soils.
(2) Areas of two (2) or more contiguous acres with sustained slopes of twenty (20) percent or
greater.
(3) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater wetland as defined, and which are not surficially connected
to a water body during the period of normal high water.
(4) Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement,
and lands adjacent to tidal waters which are subject to severe erosion or mass movement,
such as steep coastal bluffs.
B. Limited Residential District. The Limited Residential District includes those areas suitable for
residential and recreational development. It includes areas other than those in the Resource
Protection District, or Stream Protection District, and areas which are used less intensively than
those in the Limited Commercial District or the General Development District.
C. Limited Commercial District. The Limited Commercial District includes areas of mixed, light
commercial and residential uses, exclusive of the Stream Protection District, which should not be
developed as intensively as the General Development Districts. This district includes areas of two
(2) or more contiguous acres in size devoted to a mix of residential and low intensity business and
commercial uses. Industrial uses are prohibited.
D. General Development District. The General Development I District includes the following types
of existing, intensively developed areas:
(1) Areas of two (2) or more contiguous acres devoted to commercial, industrial or intensive
recreational activities, or a mix of such activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other industrial activities;
(b) Areas devoted to wholesaling, warehousing, retail trade and service activities, or other
commercial activities; and
(c) Areas devoted to intensive recreational development and activities, such as, but not
limited to amusement parks, race tracks and fairgrounds.
(2) Areas otherwise discernible as having patterns of intensive commercial, industrial or
recreational uses.
9
E. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream, exclusive of
those areas within two hundred fifty (250) feet, horizontal distance, of the normal high-water line
of a great pond, or river, or within two hundred fifty (250) feet, horizontal distance, of the upland
edge of a freshwater or coastal wetland. Where a stream and its associated shoreland area are
located within two hundred fifty (250) feet, horizontal distance, of the above water bodies or
wetlands, that land area shall be regulated under the terms of the shoreland district associated
with that water body or wetland.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the Shoreland
Zone, shall conform with all of the applicable land use standards in Section 15. The district
designation for a particular site shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all applicable land use
standards.)
No - Prohibited
PB - Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
GD - General Development
LR - Limited Residential
LC - Limited Commercial
SP - Stream Protection
RP - Resource Protection
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP
LR
LC
GD
1.
Non-intensive recreational uses not requiring structures such as hunting, fishing
and hiking
yes
yes
yes
yes
yes
2.
Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
yes
3.
Clearing or removal of vegetation for activities other than timber harvesting 13
CEO
CEO1
Yes
CEO
Yes
CEO
Yes
CEO
4.
Fire prevention activities
yes
yes
yes
yes
yes
5.
Wildlife management practices
yes
yes
yes
yes
yes
6.
Soil and water conservation practices
yes
yes
yes
yes
yes
7.
Mineral exploration
no
yes2
yes2
yes2
yes2
8.
Mineral extraction including sand and gravel extraction
no
PB3
PB
PB
PB
9.
Surveying and resource analysis
yes
yes
yes
yes
yes
10.
Emergency operations
yes
yes
yes
yes
yes
11.
Agriculture
yes
PB
yes
yes
yes
12.
Aquaculture
PB
PB
PB
yes
yes
13.
Principal structures and uses
A.
One and two family residential, including driveways
PB4
PB9
PB
PB
PB
B.
Multi-unit residential
no
no
PB
PB
PB
C.
Commercial
no
no10
no10
PB
PB
D.
Industrial
no
no
no
no
PB
E.
Governmental and institutional
no
no
PB
PB
PB
F.
Small non-residential facilities for educational, scientific, or nature
interpretation purposes
PB4
PB
PB
PB
PB
14.
Structures accessory to allowed uses
PB4
PB
PB
PB
yes
10
15.
Piers, docks, wharfs, bridges and other structures and uses extending over
or below the normal high-water line or within a wetland
a.
Temporary
b.
Permanent
CEO11
PB
CEO11
PB
CEO11
PB
CEO11
PB
CEO11
PB
16.
Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
LPI
LPI
17.
Home occupations
PB
PB
PB
CEO
yes
18.
Private sewage disposal systems for allowed uses
LPI
LPI
LPI
LPI
LPI
19.
Essential services
PB6
PB6
PB
PB
PB
A.
Roadside distribution lines (34.5kV and lower)
CEO6
CEO6
yes12
yes12
yes12
B.
Non-roadside or cross-country distribution lines involving ten poles or less
in the shoreland zone
PB6
PB6
CEO
CEO
CEO
C.
Non-roadside or cross-country distribution lines involving eleven or more
poles in the shoreland zone
PB6
PB6
PB
PB
PB
D.
Other essential services
PB6
PB6
PB
PB
PB
20.
Service drops, as defined, to allowed uses
yes
yes
yes
yes
yes
21.
Public and private recreational areas involving minimal structural development
PB
PB
PB
CEO
CEO
22.
Individual, private campsites
CEO
CEO
CEO
CEO
CEO
23.
Campgrounds
no
no7
PB
PB
PB
24.
Road construction
PB
no8
PB
PB
PB
25.
Parking facilities
no
no7
PB
PB
PB
26.
Marinas
PB
no
PB
PB
PB
27.
Filling and earth moving of <10 cubic yards
CEO
CEO
yes
yes
yes
28.
Filling and earth moving of >10 cubic yards
PB
PB
CEO
CEO
CEO
29.
Signs
yes
yes
yes
yes
yes
30.
Uses similar to allowed uses
CEO
CEO
CEO
CEO
CEO
31.
Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
CEO
32.
Uses similar to uses requiring a PB permit
PB
PB
PB
PB
PB
1In RP not allowed within seventy-five (75) feet horizontal distance, of the normal high-water line of great ponds, except to remove safety
hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses only (See note on previous page).
6See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
8Except as provided in Section 15(H)(4).
9Single family residential structures may be allowed by special exception only according to the provisions of Section 16(E), Special
Exceptions. Two-family residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
11Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
13All timber harvesting is regulated by the Maine Froest Service.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant
to 38 M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great pond, river,
stream or brook and operates in such a manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B.
Draining or otherwise dewatering;
C.
Filling, including adding sand or other material to a sand dune; or
D.
Any construction or alteration of any permanent structure.
11
15. Land Use Standards. All land use activities within the shoreland zone shall conform with the
following provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
(1)
(a) Residential per dwelling unit
40,000
200
(b) Governmental, Institutional, Commercial or
Industrial per principal structure 60,000
300
(c) Public and Private Recreational Facilities 40,000
200
(2) Land below the normal high-water line of a water body or upland edge of a wetland and land
beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(5) If more than one (1) residential dwelling unit, principal governmental, institutional, commercial
or industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit, principal
structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high-water line of great ponds classified GPA and rivers,
and seventy-five (75) feet, horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland, except that in the General
Development I District the setback from the normal high-water line shall be at least twenty five
(25) feet, horizontal distance. In the Resource Protection District the setback requirement shall
be two hundred and fifty (250) feet, horizontal distance, except for structures, roads, parking
spaces or other regulated objects specifically allowed in that district in which case the setback
requirements specified above shall apply.
12
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
(b) On a non-conforming lot of record on which only a residential structure exists, and it is not
possible to place an accessory structure meeting the required water body, tributary stream
or wetland setbacks, the code enforcement officer may issue a permit to place a single
accessory structure, with no utilities, for the storage of yard tools and similar equipment.
Such accessory structure shall not exceed eighty (80) square feet in area nor eight (8) feet
in height, and shall be located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and vegetation clearing
limitations. In no case shall the structure be located closer to the shoreline or tributary
stream than the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are permitted in
the Resource Protection, Limited Residential, Limited Commercial, and Stream Protection
Districts, shall not exceed thirty-five (35) feet in height. This provision shall not apply to
structures such as transmission towers, windmills, antennas, and similar structures having no
floor area or to a cupola, dome or widow's walk (or other similar feature) that are not used for
habitation.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the one hundred (100) year flood, the
flood of record, or in the absence of these, the flood as defined by soil types identified as
recent flood-plain soils. In those municipalities that participate in the National Flood
Insurance Program and have adopted the April 2005 version, or later version, of the
Floodplain Management Ordinance, accessory structures may be placed in accordance with
the standards of that ordinance and need not meet the elevation requirements of this
paragraph.
(4) With the exception of General Development Districts located adjacent to rivers that do not
flow into great ponds non-vegetated surfaces shall not exceed a total of twenty (20) percent of
the portion of the lot located within the shoreland zone. This limitation does not apply to
public boat launching facilities regardless of the district in which the facility is located.
In a General Development District located adjacent to rivers that do not flow into great ponds
the non-vegetated surfaces shall not exceed a total of seventy (70) percent of the portion of
the lot located within the shoreland zone.
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not
limited to the following: structures, driveways, parking areas, and other areas from which
vegetation has been removed. Naturally occurring ledge and rock outcroppings are not
counted as nonvegetated surfaces when calculating lot coverage for lots of record on March
24, 1990 and in continuous existence since that date.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
13
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least twenty-five (25) feet, horizontal distance, from the normal
high-water line of a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than twenty-four (24) inches;
(e) Retaining walls are located outside of the one hundred (100) year floodplain on rivers,
streams, coastal wetlands, and tributary streams, as designated on the Federal Emergency
Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary
Maps, or the flood of record, or in the absence of these, by soil types identified as recent
flood plain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within twenty-five (25) feet, horizontal distance, of
the normal high-water line of a water body, tributary stream, or upland edge of a wetland
when a natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i)
The buffer must include shrubs and other woody and herbaceous vegetation. Where
natural ground cover is lacking the area must be supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide
for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of fifteen (15) feet, horizontal distance, is required,
measured perpendicularly to the normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(O)(2)(a), may traverse the buffer;
If the wall and associated soil disturbance occurs within seventy-five (75) feet, horizontal
distance of a water body or tributary stream a permit pursuant to the Natural Resource
Protection Act is required from the Department of Environmental Protection.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed
with a permit from the Code Enforcement Officer, to provide shoreline access in areas of steep
slopes or unstable soils provided: that the structure is limited to a maximum of four (4) feet in
width; that the structure does not extend below or over the normal high-water line of a water
body or upland edge of a wetland, (unless permitted by the Department of Environmental
Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C); and
that the applicant demonstrates that no reasonable access alternative exists on the property.
14
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the
Normal High-Water Line of a Water Body or Within a Wetland, and Shoreline Stabilization
(1) No more than one (1) pier, dock, wharf or similar structure extending or located below the
normal high-water line of a water body or within a wetland is allowed on a single lot; except
that when a single lot contains at least twice the minimum shore frontage as specified in Section
15(A), a second structure may be allowed and may remain as long as the lot is not further
divided.
(2) Access from shore shall be developed on soils appropriate for such use and constructed so as to
control erosion.
(3) The location shall not interfere with existing developed or natural beach areas.
(4) The facility shall be located so as to minimize adverse effects on fisheries.
(5) The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or wharf
in non-tidal waters shall not be wider than six feet for non-commercial uses.
(6) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure
extending beyond the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland as an operational necessity.
(7) New permanent piers and docks shall not be permitted unless it is clearly demonstrated to the
Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained
from the Department of Environmental Protection, pursuant to the Natural Resources
Protection Act.
(8) No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending beyond the normal high-water line of a water body or within a wetland shall be
converted to residential dwelling units in any district.
(9) Except in the General Development Districts structures built on, over or abutting a pier,
wharf, dock or other structure extending beyond the normal high-water line of a water body
or within a wetland shall not exceed twenty (20) feet in height above the pier, wharf, dock or
other structure.
(10) Vegetation may be removed in excess of the standards in Section 15(O) of this ordinance in
order to conduct shoreline stabilization of an eroding shoreline, provided that a permit is
obtained from the Planning Board. Construction equipment must access the shoreline by
barge when feasible as determined by the Planning Board.
(a) When necessary, the removal of trees and other vegetation to allow for construction
equipment access to the stabilization site via land must be limited to no more than twelve
(12) feet in width. When the stabilization project is complete the construction equipment
accessway must be restored.
(b) Revegetation must occur in accordance with Section 15(P).
15
A permit pursuant to the Natural Resource Protection Act is required from the
Department of Environmental Protection for Shoreline Stabilization activities.
(11) A deck over a river may be exempted from the shoreland setback requirements if it is part of
a downtown revitalization project that is defined in a project plan approved by the legislative
body of the municipality, and may include the revitalization of structures formerly used as
mills that do not meet the structure setback requirements, if the deck meets the following
requirements:
(a) The total deck area attached to the structure does not exceed seven hundred (700) square
feet;
(b) The deck is cantilevered over a segment of a river that is located within the boundaries of
the downtown revitalization project;
(c) The deck is attached to or accessory to an allowed commercial use in a structure that was
constructed prior to 1971 and is located within the downtown revitalization project;
(d) The construction of the deck complies with all other applicable standards, except the
shoreline setback requirements in section 15(B); and
(e) The construction of the deck complies with all other state and federal laws.
New permanent structures, and expansions thereof, projecting into or over water bodies
shall require a permit from the Department of Environmental Protection pursuant to the
Natural Resources Protection Act, 38 M.R.S.A. section 480-C. Permits may also be required
from the Army Corps of Engineers if located in navigable waters.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including
roads and driveways, for each site. Land supporting wetland vegetation, and land below the
normal high-water line of a water body shall not be included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds
are allowed provided the following conditions are met:
(1) One (1) campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be permitted.
(2) When an individual private campsite is proposed on a lot that contains another principal use
and/or structure, the lot must contain the minimum lot dimensional requirements for the
principal structure and/or use, and the individual private campsite separately.
16
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet, horizontal distance, from the normal high-
water line of a great pond classified GPA or river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland.
(4) Only one (1) recreational vehicle shall be allowed on a campsite. The recreational vehicle
shall not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shall be attached to the recreational vehicle.
(5) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a
Resource Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or land
owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred
twenty (120) days per year, all requirements for residential structures shall be met, including
the installation of a subsurface sewage disposal system in compliance with the State of Maine
Subsurface Wastewater Disposal Rules unless served by public sewage facilities.
F. Commercial and Industrial Uses. The following new commercial and industrial uses are
prohibited within the shoreland zone adjacent to great ponds classified GPA, and rivers and
streams which flow to great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts
normally associated with individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except storage on same property as use
occurs and except for storage and sales associated with marinas
(11) Photographic processing
17
(12) Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for parking
areas serving public boat launching facilities in Districts other than the General Development
District shall be no less than fifty (50) feet, horizontal distance, from the shoreline or tributary
stream if the Planning Board finds that no other reasonable alternative exists further from the
shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and
where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river that flows to a great
pond classified GPA, and seventy-five (75) feet, horizontal distance from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland unless no
reasonable alternative exists as determined by the Planning Board. If no other reasonable
alternative exists, the road and/or driveway setback requirement shall be no less than fifty
(50) feet, horizontal distance, upon clear showing by the applicant that appropriate techniques
will be used to prevent sedimentation of the water body, tributary stream, or wetland. Such
techniques may include, but are not limited to, the installation of settling basins, and/or the
effective use of additional ditch relief culverts and turnouts placed so as to avoid
sedimentation of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways
that provide access to permitted structures and facilities located nearer to the shoreline or
tributary stream due to an operational necessity, excluding temporary docks for recreational
uses. Roads and driveways providing access to permitted structures within the setback area
shall comply fully with the requirements of Section 15(H)(1) except for that portion of the
road or driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of their
setback from a water body, tributary stream or wetland.
18
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route or
location is available outside the district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section 15(T).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least fifty (50) feet plus two (2) times
the average slope, in width between the outflow point of the ditch or culvert and the normal
high-water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is
ten (10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular to
the centerline of the road or driveway.
19
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning, and their inlet and outlet ends shall be stabilized with appropriate
materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
I. Signs. The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, Limited Residential and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such
signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. In the Limited Commercial District, however, such signs shall not exceed sixteen
(16) square feet in area. Signs relating to goods or services not sold or rendered on the
premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and
shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff from
the site in excess of the natural predevelopment conditions. Where possible, existing natural
runoff control features, such as berms, swales, terraces and wooded areas, shall be retained in
order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full permit to be
obtained from the DEP prior to construction of a project consisting of twenty thousand
(20,000) square feet or more of impervious area or five (5) acres or more of a developed
area in an urban impaired stream watershed or most-at-risk lake watershed, or a project
with one (1) acre or more of developed area in any other stream, coastal or wetland
watershed. A permit-by-rule is necessary for a project with one acre or more of disturbed
area but less than one (1) acre impervious area (twenty thousand (20,000) square feet for
most-at-risk lakes and urban impaired streams) and less than five (5) acres of developed
area. Furthermore, a Maine Construction General Permit is required if the construction
will result in one acre or more of disturbed area.
20
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following: a) clearing or removal of
woody vegetation necessary to site a new system and any associated fill extensions, shall not
extend closer than seventy-five (75) feet, horizontal distance, from the normal high-water line
of a water body or the upland edge of a wetland and b) a holding tank is not allowed for a
first-time residential use in the shoreland zone.
The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill
extensions, to be constructed no less than one hundred (100) horizontal feet from the
normal high-water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed in
a Resource Protection or Stream Protection District, except to provide services to a permitted
use within said district, or except where the applicant demonstrates that no reasonable
alternative exists. Where allowed, such structures and facilities shall be located so as to
minimize any adverse impacts on surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of
mineral resources shall be accomplished by hand sampling, test boring, or other methods which
create minimal disturbance of less than one hundred (100) square feet of ground surface. A permit
from the Code Enforcement Officer shall be required for mineral exploration which exceeds the
above limitation. All excavations, including test pits and holes, shall be immediately capped,
filled or secured by other equally effective measures to restore disturbed areas and to protect the
public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(4) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall be
permitted within one hundred (100) feet, horizontal distance, of the normal high-water line of
a great pond classified GPA or a river flowing to a great pond classified GPA, and within
seventy-five (75) feet, horizontal distance, of the normal high-water line of any other water
body, tributary stream, or the upland edge of a wetland. Extraction operations shall not be
permitted within fifty (50) feet, horizontal distance, of any property line without written
permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred (100)
cubic yards of materials are removed in any consecutive twelve (12) month period, ground
levels and grades shall be established in accordance with the following:
21
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
(b) The final graded slope shall be two and one-half to one (2 ½: 1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the former Maine Department of Agriculture on November 1, 2001,
and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, of
a great pond classified GPA or a river flowing to a great pond classified GPA, or within
seventy-five (75) feet horizontal distance, of other water bodies, tributary streams, or wetlands.
All manure storage areas within the shoreland zone must be constructed or modified such that
the facility produces no discharge of effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one hundred (100) feet, horizontal distance, of the
normal high-water line of a great pond classified GPA; within seventy-five (75) feet,
horizontal distance, from other water bodies and coastal wetlands; nor within twenty-five (25)
feet, horizontal distance, of tributary streams and freshwater wetlands. Operations in
existence on the effective date of this ordinance and not in conformance with this provision
may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high-water line of a great pond classified GPA; within
seventy-five (75) feet, horizontal distance, of other water bodies and coastal wetlands, nor;
within twenty-five (25) feet, horizontal distance, of tributary streams and freshwater wetlands.
Livestock grazing associated with ongoing farm activities, and which are not in conformance
with the above setback provisions may continue, provided that such grazing is conducted in
accordance with a Conservation Plan that has been filed with the planning board.
22
O. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation
within the strip of land extending seventy-five (75 feet), horizontal distance, inland from the
normal high-water line, except to remove hazard trees as described in Section P.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section O(1), above, within a strip of land extending one
hundred (100) feet, horizontal distance, inland from the normal high-water line of a great
pond classified GPA or a river flowing to a great pond classified GPA, or within a strip
extending seventy-five (75) feet, horizontal distance, from any other water body, tributary
stream, or the upland edge of a wetland, a buffer strip of vegetation shall be preserved as
follows:
(a) There shall be no cleared opening greater than two hundred fifty (250) square feet in the
forest canopy (or other existing woody vegetation if a forested canopy is not present) as
measured from the outer limits of the tree or shrub crown. However, a single footpath not
to exceed six (6) feet in width as measured between tree trunks and/or shrub stems is
allowed for accessing the shoreline provided that a cleared line of sight to the water
through the buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(O)(2)(b) a "well-distributed stand of trees" adjacent to a great pond classified
GPA or a river or stream flowing to a great pond classified GPA, shall be defined as
maintaining a rating score of twenty-four (24) or more in each twenty-five (25) foot by
fifty (50) foot rectangular (one thousand two hundred fifty (1,250) square feet) area as
determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 - < 4 in.
1
4 - <8 in.
2
8-< 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of sixteen (16) per twenty-five
(25) foot by fifty (50) foot rectangular area.
The following shall govern in applying this point system:
(i) The twenty-five (25) foot by fifty (50) foot rectangular plots must be established
where the landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed except
as otherwise allowed by this Ordinance;
23
(iv) Any plot containing the required points may have vegetation removed down to the
minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than fifty (50) percent of the points on any twenty-
five ( 25) foot by fifty (50) foot rectangular area may consist of trees greater than
twelve (12) inches in diameter.
For the purposes of Section 15(O)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet
above ground level for each twenty-five (25) foot by fifty (50) foot rectangle area. If five
(5) saplings do not exist, no woody stems less than two (2) inches in diameter can be
removed until five (5) saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than forty (40) percent of the total
volume of trees four (4) inches or more in diameter, measured at four and one-half (4 ½)
feet above ground level may be removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three (3)
feet in height and other ground cover, including leaf litter and the forest duff layer, shall
not be cut, covered, or removed, except to provide for a footpath or other permitted uses
as described in Section 15(O) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom one third (1/3) of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
dead or hazard trees results in the creation of cleared openings, these openings shall be
replanted with native tree species in accordance with Section P, below, unless existing
new tree growth is present.
(f) In order to maintain the vegetation in the shoreline buffer, clearing or removal of
vegetation for allowed activities, including associated construction and related equipment
operation, within or outside the shoreline buffer, must comply with the requirements of
Section 15.O(2).
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond
classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of any other water body, tributary
stream, or the upland edge of a wetland, there shall be allowed on any lot, in any ten (10) year
period, selective cutting of not more than forty (40) percent of the volume of trees four (4)
inches or more in diameter, measured four and one-half (4 ½) feet above ground level. Tree
removal in conjunction with the development of permitted uses shall be included in the forty
(40) percent calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
twenty-five (25) percent of the lot area within the shoreland zone or ten thousand (10,000)
square feet, whichever is greater, including land previously cleared. This provision applies to
24
the portion of a lot within the shoreland zone, including the buffer area, but shall not apply to
the General Development District.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(O).
P. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
(1) Hazard trees in the shoreland zone may be removed without a permit after consultation with
the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in
the tree canopy greater than two hundred fifty (250) square feet, replacement with native
tree species is required, unless there is new tree growth already present. New tree growth
must be as near as practicable to where the hazard tree was removed and be at least two
(2) inches in diameter, measured at four and one-half (4 ½) feet above the ground level. If
new growth is not present, then replacement trees shall consist of native species and be at
least four (4) feet in height, and be no less than two (2) inches in diameter. Stumps may
not be removed.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured at four and
one-half (4 ½) feet above ground level in any ten (10) year period, and/or results in
cleared openings exceeding twenty-five (25) percent of the lot area within the shoreland
zone, ten thousand (10,000) square feet, whichever is greater, replacement with native
tree species is required, unless there is new tree growth already present. New tree growth
must be as near as practicable to where the hazard tree was removed and be at least two
(2) inches in diameter, measured at four and one-half (4 ½) feet above the ground level. If
new growth is not present, then replacement trees shall consist of native species and be at
least two (2) inches in diameter, measured at four and one -half (4 ½) feet above the
ground level.
(c) The removal of standing dead trees, resulting from natural causes, is permissible without
the need for replanting or a permit, as long as the removal does not result in the creation
of new lawn areas, or other permanently cleared areas, and stumps are not removed. For
the purposes of this provision dead trees are those trees that contain no foliage during the
growing season.
(d) The Code Enforcement Officer may require the property owner to submit an evaluation
from a licensed forester or arborist before any hazard tree can be removed within the
shoreland zone.
(e) The Code Enforcement Officer may require more than a one-for-one replacement for
hazard trees removed that exceed eight (8) inches in diameter measured at four and one-
half (4 ½) feet above the ground level.
(2) Storm-damaged trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are met:
25
(a) Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared
opening in the tree canopy greater than two hundred fifty (250) square feet, replanting is
not required, but the area shall be required to naturally revegetate, and the following
requirements must be met:
(i) The area from which a storm-damaged tree is removed does not result in new lawn
areas, or other permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed unless the stumps pose a
hazard or will result in increased erosion, as determined by the Code Enforcement
Officer;
(iii) Limbs damaged from a storm event may be pruned even if they extend beyond the
bottom one-third (1/3) of the tree; and
(iv) If after one growing season, no natural regeneration or regrowth is present, replanting
of native tree seedlings or saplings is required at a density of one seedling per every
eighty (80) square feet of lost canopy.
(b) Outside of the shoreline buffer, if the removal of storm damaged trees exceeds forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured at four and
one half (4.5) feet above the ground level in any ten (10) year period, or results, in the
aggregate, in cleared openings exceeding twenty-five (25) percent of the lot area within
the shoreland zone or ten thousand (10,000) square feet, whichever is greater, and no
natural regeneration occurs within one (1) growing season, then native tree seedlings or
saplings shall be replanted on a one-for-one basis.
Q. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth
in Section 15(O), provided that all other applicable requirements of this chapter are complied
with, and the removal of vegetation is limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two (2) years for the maintenance
of legally existing areas that do not comply with the vegetation standards in this chapter, such
as but not limited to cleared openings in the canopy or fields. Such areas shall not be
enlarged, except as allowed by this section. If any of these areas, due to lack of removal of
vegetation every two (2) years, reverts back to primarily woody vegetation, the requirements
of Section 15(O) apply;
(2) The removal of vegetation from the location of allowed structures or allowed uses, when the
shoreline setback requirements of section 15(B) are not applicable;
(3) The removal of vegetation from the location of public swimming areas associated with an
allowed public recreational facility;
(4) The removal of vegetation associated with allowed agricultural uses, provided best
management practices are utilized, and provided all requirements of section 15(N) are
complied with;
26
(5) The removal of vegetation associated with brownfields or voluntary response action program
(VRAP) projects provided that the removal of vegetation is necessary for remediation
activities to clean-up contamination on a site in a General Development District or other
equivalent zoning district approved by the Commissioner that is part of a state or
federal brownfields program or a voluntary response action program pursuant 38
M.R.S.A section 343-E, and that is located along:
(a) A river that does not flow to a great pond classified as GPA pursuant to
38 M.R.S.A section 465-A.
(6) The removal of non-native invasive vegetation species, provided the following minimum
requirements are met:
(a) If removal of vegetation occurs via wheeled or tracked motorized equipment, the wheeled
or tracked motorized equipment is operated and stored at least twenty-five (25) feet,
horizontal distance, from the shoreline, except that wheeled or tracked equipment may be
operated or stored on existing structural surfaces, such as pavement or gravel;
(b) Removal of vegetation within twenty-five (25) feet, horizontal distance, from the
shoreline occurs via hand tools; and
(c) If applicable clearing and vegetation removal standards are exceeded due to the removal
of non-native invasive species vegetation, the area shall be revegetated with native
species to achieve compliance.
(7) The removal of vegetation associated with emergency response activities conducted by the
Department, the U.S. Environmental Protection Agency, the U.S. Coast Guard, and their
agents.
R. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth in
Section 15(O), to address the removal of non- native invasive species of vegetation, or as a
mechanism to allow for development that may otherwise not be permissible due to the vegetation
standards, including removal of vegetation in conjunction with a shoreline stabilization project,
the revegation must comply with the following requirements.
(1) The property owner must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include a
scaled site plan, depicting where vegetation was, or is to be removed, where existing
vegetation is to remain, and where vegetation is to be planted, including a list of all
vegetation to be planted.
(2) Revegetation must occur along the same segment of shoreline and in the same area where
vegetation was removed and at a density comparable to the pre-existing vegetation, except
where a shoreline stabilization activity does not allow revegetation to occur in the same area
and at a density comparable to the pre-existing vegetation, in which case revegetation must
occur along the same segment of shoreline and as close as possible to the area where
vegetation was removed:
27
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. If
the activity or revegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must at a minimum consist of saplings;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different species
shall be used;
(d) No one species shall make up fifty (50) percent or more of the number of trees and
saplings planted;
(e) If revegetation is required for a shoreline stabilization project, and it is not possible to
plant trees and saplings in the same area where trees or saplings were removed, then trees
or sapling must be planted in a location that effectively reestablishes the screening
between the shoreline and structures; and
(f) A survival rate of at least eighty (80) percent of planted trees or saplings is required for a
minimum five (5) years period.
(5) Revegetation activities must meet the following requirements for woody vegetation and other
vegetation under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced with
native noninvasive species of woody vegetation and vegetation under three (3) feet in
height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in
quantities and variety sufficient to prevent erosion and provide for effective infiltration of
stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3)
different species shall be planted;
(d) No one species shall make up fifty (50) percent or more of the number of planted woody
vegetation plants; and
(e) Survival of planted woody vegetation and vegetation under three feet in height must be
sufficient to remain in compliance with the standards contained within this chapter for
minimum of five (5) years
(6) Revegetation activities must meet the following requirements for ground vegetation and
ground cover:
(a) All ground vegetation and ground cover removed must be replaced with native
herbaceous vegetation, in quantities and variety sufficient to prevent erosion and provide
for effective infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, an area must be supplemented
with a minimum four (4) inch depth of leaf mulch and/or bark mulch to prevent erosion
and provide for effective infiltration of stormwater; and
28
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to
remain in compliance with the standards contained within this chapter for minimum of
five (5) years.
S. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which result
in unstabilized soil conditions and which require a permit shall also require a written soil
erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as closely
as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project
involving land disturbance, and shall be in operation during all stages of the activity. The
amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week
from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months of
the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred
(500) square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainageways shall be designed and constructed in order
to carry water from a twenty-five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
T. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures can
be established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report based on an on-site
investigation and be prepared by state-certified professionals. Certified persons may include Maine
Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified
Geologists and other persons who have training and experience in the recognition and evaluation
of soil properties. The report shall be based upon the analysis of the characteristics of the soil and
29
surrounding land and water areas, maximum ground water elevation, presence of ledge, drainage
conditions, and other pertinent data which the evaluator deems appropriate. The soils report shall
include recommendations for a proposed use to counteract soil limitations where they exist.
U. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of the
State any pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
V. Archaeological Site. Any proposed land use activity involving structural development or soil
disturbance on or adjacent to sites listed on, or eligible to be listed on the National Register of
Historic Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty (20) days
prior to action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
W. Shore Front Common Areas. Shore front common areas, as defined, shall conform to the
following provisions:
(1) Each shore front common area shall contain a minimum of two hundred (200) feet of shore
frontage and two hundred (200) feet in depth, plus an additional twenty five (25) feet in frontage,
for each lot or residential dwelling unit above two (2) which has access to the shore front
common area and for each right of use granted to the shoreland common area.
(2) Each shore front common area shall contain a minimum of two (2) acres.
(3) Land within the Resource Protection District shall not be used as shore front common area.
(4) Each shore front common area shall contain no more than one (1) pier or dock and one (1)
swimming float per two hundred and fifty (250) feet of shore frontage. Such structure shall meet
the applicable standards contained within this Ordinance.
(5) Structural development in the shore front common area shall be limited to piers and docks,
picnic tables and toilet facilities.
(6) Each shore front common area shall contain one (1) privy or other toilet facility for each sex
installed on the parcel which facility shall meet the State of Maine Subsurface Wastewater
Disposal Rules.
(7) Each shore front common area shall contain one (1) thirty (30) gallon capacity covered and
animal-proof refuse container on the site per five (5) lots. Solid wastes shall be collected weekly
at the minimum or more if use warrants.
(8) Each shore front common area shall contain one (1) parking space for each lot granted access.
Parking spaces shall be setback twenty (20) feet from the road right-of-way, thirty (30) feet from
the side lot lines and two hundred (200) feet from the normal high water line of a water body as
defined.
30
6. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed
annually by July 1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of
30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of
State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first
obtaining a permit, engage in any activity or use of land or structure requiring a permit in the
district in which such activity or use would occur; or expand, change, or replace an existing use
or structure; or renew a discontinued nonconforming use. A person who is issued a permit
pursuant to this Ordinance shall have a copy of the permit on site while the work authorized by
the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than twenty-five (25) percent longer than the culvert
being replaced;
(b) The replacement culvert is not longer than seventy-five (75) feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level one (1)
or level two (2) approved list, and unreasonable erosion and sedimentation is prevented by
means of adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in Section 14.
(2) All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that the
information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
31
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure or use would
require the installation of a subsurface sewage disposal system.
D. Procedure for Administering Permits. Within thirty-five (35) days of the date of receiving a
written application, the Planning Board or Code Enforcement Officer, as indicated in Section 14,
shall notify the applicant in writing either that the application is a complete application, or, if the
application is incomplete, that specified additional material is needed to make the application
complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall approve,
approve with conditions, or deny all permit applications in writing within thirty-five (35) days of
receiving a completed application. However, if the Planning Board has a waiting list of
applications, a decision on the application shall occur within thirty-five (35) days after the first
available date on the Planning Board's agenda following receipt of the completed application, or
within thirty-five (35) days of the public hearing, if the proposed use or structure is found to be in
conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in conformity
with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an
application or approve it with conditions if it makes a positive finding based on the information
presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife
habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will not adversely affect existing commercial fishing;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be
stated in writing. No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above, excepting
structure setback requirements, the Planning Board may approve a permit for a single family
32
residential structure in a Resource Protection District provided that the applicant demonstrates
that all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than twenty (20) percent; and
(b) Located outside the floodway of the one hundred (100) year flood-plain along rivers and
artificially formed great ponds along rivers and outside the velocity zone in areas subject
to tides, based on detailed flood insurance studies and as delineated on the Federal
Emergency Management Agency's Flood Boundary and Floodway Maps and Flood
Insurance Rate Maps; all buildings, including basements, are elevated at least one foot
above the one hundred (100) year flood-plain elevation; and the development is otherwise
in compliance with any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is
deemed to be one-half (1/2) the width of the one hundred (100) year flood-plain.
(4) The total footprint, including cantilevered or similar overhanging extensions, of all principal
and accessory structures is limited to a maximum of one thousand five hundred (1,500)
square feet. This limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than seventy-five (75) feet, horizontal distance. In determining
the greatest practical extent, the Planning Board shall consider the depth of the lot, the slope
of the land, the potential for soil erosion, the type and amount of vegetation to be removed,
the proposed building site's elevation in regard to the flood-plain, and its proximity to
moderate-value and high-value wetlands.
F. Expiration of Permit. Permits shall expire one (1) year from the date of issuance if a substantial
start is not made in construction or in the use of the property during that period. If a substantial
start is made within one (1) year of the issuance of the permit, the applicant shall have one (1)
additional year to complete the project, at which time the permit shall expire.
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any utility
company of any kind may not install services to any new structure located in the shoreland zone
unless written authorization attesting to the validity and currency of all local permits required under
this or any previous Ordinance has been issued by the appropriate municipal officials or other
written arrangements have been made between the municipal officials and the utility.
33
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis,
where it is alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on a de
novo basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code Enforcement
Officer in his or her review of and action on a permit application under this Ordinance. Any
order, requirement, decision or determination made, or failure to act, in the enforcement of
this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in
this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited
to, lot width, structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality;
and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals, or the Code
Enforcement Officer if authorized in accordance with 30-A MRSA §4353-A, may grant a
variance to an owner of a residential dwelling for the purpose of making that dwelling
accessible to a person with a disability who resides in or regularly uses the dwelling. The
34
board shall restrict any variance granted under this subsection solely to the installation of
equipment or the construction of structures necessary for access to or egress from the
dwelling by the person with the disability. The board may impose conditions on the
variance, including limiting the variance to the duration of the disability or to the time that
the person with the disability lives in the dwelling. The term "structures necessary for
access to or egress from the dwelling" shall include railing, wall or roof systems necessary
for the safety or effectiveness of the structure. Any permit issued pursuant to this
subsection is subject to Sections 16(H)(2)(f) and 16(H)(4)(b)(iv) below.)
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider new
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board of
Appeals shall hear and decide the matter afresh, undertaking its own independent analysis of
evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the decision
was contrary to specific provisions of the Ordinance or contrary to the facts presented to the
Planning Board. The Board of Appeals may only review the record of the proceedings before
the Planning Board. The Board Appeals shall not receive or consider any evidence which was
not presented to the Planning Board, but the Board of Appeals may receive and consider written
or oral arguments. If the Board of Appeals determines that the record of the Planning Board
proceedings are inadequate, the Board of Appeals may remand the matter to the Planning Board
for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
35
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty-five (35) days of its receipt of a complete written
application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum for the
purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within thirty
five (35) days after the close of the hearing, and shall issue a written decision on all
appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board shall
cause written notice of its decision to be mailed or hand-delivered to the applicant and
to the Department of Environmental Protection within seven (7) days of the Board's
decision. Copies of written decisions of the Board of Appeals shall be given to the
Planning Board, Code Enforcement Officer, and the municipal officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the Board of Appeals
may take an appeal to Superior Court in accordance with State laws within forty-five (45) days
from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals
may reconsider any decision within forty-five (45) days of its prior decision. A request to the
Board to reconsider a decision must be filed within ten (10) days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must occur and
be completed within forty-five (45) days of the date of the vote on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner, petitioner,
planning board, code enforcement officer, and other parties of interest, including abutters and
those who testified at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days after
the decision on reconsideration.
36
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing the person responsible for
such violation, indicating the nature of the violation and ordering the action necessary to
correct it, including discontinuance of illegal use of land, buildings or structures, or work
being done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal officers and be
maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted or
denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and proceedings, either
legal or equitable, including seeking injunctions of violations and the imposition of fines, that
may be appropriate or necessary to enforce the provisions of this Ordinance in the name of the
municipality. The municipal officers, or their authorized agent, are hereby authorized to enter
into administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not allow an
illegal structure or use to continue unless there is clear and convincing evidence that the illegal
structure or use was constructed or conducted as a direct result of erroneous advice given by an
authorized municipal official and there is no evidence that the owner acted in bad faith, or
unless the removal of the structure or use will result in a threat or hazard to public health and
safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. section 4452.
17. Definitions
Accessory structure or use - a use or structure which is incidental and subordinate to the principal use
or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A deck
or similar extension of the principal structure or a garage attached to the principal structure by a roof or
a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit
37
or variance has been granted; or any other person or group of persons who have suffered particularized
injury as a result of the granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease of plants or animals, including,
but not limited to, forages and sod crops, grains and seed crops, dairy animals and dairy products,
poultry and poultry products, livestock, fruits and vegetables and ornamental green-house products.
Agriculture does not include forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area - the area of cross-section of a tree stem at four and one-half (4 ½) feet above ground level
and inclusive of bark.
Basement - any portion of a structure with a floor-to-ceiling height of six (6) feet or more and having
more than fifty (50) percent of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft,
and which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation, and Forestry, Bureau
of Forestry.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling
of goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Development - a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or illness;
and also includes the physical or mental condition of a person which constitutes a substantial
handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or
psychologist, as well as any other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such
as protection of resources from immediate destruction or loss, law enforcement, and operations to
rescue human beings, property and livestock from the threat of destruction or injury.
38
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection
or supply systems; and associated storage tanks. Such systems may include towers, poles, wires,
mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and
similar accessories, but shall not include service drops or buildings which are necessary for the
furnishing of such services.
Expansion of a structure - an increase in the footprint of a structure, including all extensions such
as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of more
footprint of a structure or ground area devoted to a particular use.
Family - one or more persons occupying premises and living as a single housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved
in order to discharge the one hundred (100) year flood without cumulatively increasing the water
surface elevation by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint - the entire area of ground covered by the structure(s) on a lot, including but not limited to
cantilevered or similar overhanging extensions, as well as unenclosed structures, such as patios and decks.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills and
post supports, but including basements, slabs, frostwalls, or other base consisting of concrete, block,
brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
(1)
Of ten or more contiguous acres; or of less than ten (10) contiguous acres and adjacent to
a surface water body, excluding any river, stream or brook, such that in a natural state,
the combined surface area is in excess of ten (10) acres; and
(2)
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to
the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal or inland waters and that can
not be located away from these waters. The uses include, but are not limited to, commercial and
recreational fishing and boating facilities, finfish and shellfish processing, fish-related storage and
39
retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and boat
building facilities, marinas, navigation aids, basins and channels, shoreline structures necessary for
erosion control purposes, industrial uses dependent upon water-borne transportation or requiring large
volumes of cooling or processing water that can not reasonably be located or operated at an inland
site, and uses that primarily provide general public access to coastal or inland waters. Recreational
boat storage buildings are not considered to be a functionally water-dependent use.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in excess
of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or
increased inland body of water is completely surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-A
Section 465-A. This classification includes some, but not all impoundments of rivers that are defined
as great ponds.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Hazard tree - a tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site exhibits a high
probability of failure and loss of a major structural component of the tree in a manner that will strike a
target. A normal range of environmental conditions does not include meteorological anomalies, such
as, but not limited to: hurricanes; hurricane-force winds; tornados; microbursts; or significant ice
storm events. Hazard trees also include those trees that pose a serious and imminent risk to bank
stability. A target is the area where personal injury or property damage could occur if the tree or a
portion of the tree fails. Targets include roads, driveways, parking areas, structures, campsites, and
any other developed area where people frequently gather and linger.
Height of a structure - the vertical distance between the mean original (prior to construction) grade
at the downhill side of the structure and the highest point of the structure, excluding chimneys,
steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a residential
structure or property and which is 1) clearly incidental to and compatible with the residential use of
the property and surrounding residential uses; and 2) which employs no more than two (2) persons
other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not limited
to, reduction in water body, tributary stream or wetland setback distance, increase in lot coverage, or
increase in height of a structure. Property changes or structure expansions which either meet the
dimensional standard or which cause no further increase in the linear extent of nonconformance of the
existing structure shall not be considered to increase nonconformity. For example, there is no increase
in nonconformity with the setback requirement for water bodies, wetlands, or tributary streams if the
expansion extends no further into the required setback area than does any portion of the existing
nonconforming structure. Hence, a structure may be expanded laterally provided that the expansion
extends no closer to the water body, tributary stream, or wetland than the closest portion of the
existing structure from that water body, tributary stream, or wetland. Included in this allowance are
expansions which in-fill irregularly shaped structures.
40
Individual private campsite - an area of land which is not associated with a campground, but which
is developed for repeated camping by only one (1) group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods,
or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for public
purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal
high-water line of a water body or upland edge of a wetland and areas beneath roads serving more
than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two (2) lot
lines extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment of
this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is
located.
Non-conforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, height, lot coverage or footprint, but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took effect.
41
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was in
lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation - species of vegetation listed by the Maine Department of
Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to
Maine ecosystems.
Normal high-water line (non-tidal waters) - that line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with rivers and great ponds that support non-forested wetland vegetation and hydric soils
and that are at the same or lower elevation as the water level of the river or great pond during the
period of normal high-water are considered part of the river or great pond.
Outlet stream - any perennial or intermittent stream, as shown on the most recent highest resolution
version of the national hydrography dataset available from the United States Geological Survey on
the website of the United States Geological Survey or the national map, that flows from a freshwater
wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the normal
high-water line or within a wetland.
Temporary:
Structures which remain in or over the water for less than seven (7) months in
any period of twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or more in any
period of twelve (12) consecutive months.
Principal structure - a structure other than one which is used for purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
Principal use - a use other than one which is wholly incidental or accessory to another use on the
same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public
entity.
Recent floodplain soils - the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
42
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one (1) or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a vehicle
and not as a structure, the unit must remain with its tires on the ground, and must be registered with
the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the structure, or
2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as
permanent, seasonal, or temporary living quarters for only one (1) family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that point at
which it provides drainage for a watershed of twenty-five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a
driveway as defined.
Sapling - a tree species that is less than two (2) inches in diameter at four and one-half (4 ½) feet
above ground level.
Seedling - a young tree species that is less than four and one-half (4 ½) feet in height above ground
level.
Service drop - any utility line extension which does not cross or run beneath any portion of a water
body provided that:
(1) in the case of electric service
(a) the placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
(b) the total length of the extension is less than one thousand (1,000) feet.
(2) in the case of telephone service
(a) the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
43
(b) the extension requiring the installation of new utility poles or placement underground is
less than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary
stream, or upland edge of a wetland, to the nearest part of a structure, road, parking space or other
regulated object or area.
Shore Front Common Area - a parcel of land containing shore frontage, which parcel is a part of a
planned development such as a subdivision or a landowner's association or similar organization and
which parcel provides access to the shoreland zone of water bodies for non-shoreland or shoreland lot
owners in the development, subdivision or association. Access for lot owners to such common areas
may be by formal easement, rights-of-way, adoption of bylaws or development covenants.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line
between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred fifty (250) feet, horizontal distance, of the
normal high-water line of any great pond or river; within two hundred fifty (250) feet, horizontal
distance, of the upland edge of a coastal wetland, including all areas affected by tidal action; within
two hundred fifty (250) feet of the upland edge of a freshwater wetland; or within seventy-five (75)
feet, horizontal distance, of the normal high-water line of a stream.
Shoreline - the normal high-water line or upland edge of a freshwater or coastal wetland.
Significant River Segments - See Appendix A or 38 M.R.S.A. section 437.
Storm-damaged tree - a tree that has been uprooted, blown down, is lying on the ground, or that
remains standing and is damaged beyond the point of recovery as the result of a storm event.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted on the most recent , highest resolution version of the national
hydrography dataset available from the United States Geological Survey on the website of the United
States Geological Survey or the national map to the point where the stream becomes a river or where
the stream meets the shoreland zone of another water body or wetland. When a stream meets the
shoreland zone of a water body or wetland and a channel forms downstream of the water body or
wetland as an outlet, that channel is also a stream.
Structure - anything temporarily or permanently located, built, constructed or erected for the support,
shelter or enclosure of persons, animals, goods or property of any kind or anything constructed or
erected on or in the ground. The term includes structures temporarily or permanently located, such as
decks, patios, and satellite dishes. Structure does not include fences; poles and wiring and other aerial
equipment normally associated with service drops, including guy wires and guy anchors; subsurface
waste water disposal systems as defined in Title 30-A, section 4201, subsection 5; geothermal heat
exchange wells as defined in Title 32, section 4700-E, subsection 3-C; or wells or water wells as
defined in Title 32, section 4700-E, subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
44
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi-municipal
sewer or waste water treatment system..
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or
processing forest products. "Timber harvesting" does not include the cutting or removal of vegetation
within the shoreland zone when associated with any other land use activities. The cutting or removal
of trees in the shoreland zone on a lot that has less than two (2) acres within the shoreland zone shall
not be considered timber harvesting. Such cutting or removal of trees shall be regulated pursuant to
Section 15 (O), Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting.
Tree - a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four
and one-half (4.5) feet above the ground, with a more or less definite crown, and reaching a height of
at least ten (10) feet at maturity.
Tributary stream - means a channel between defined banks created by the action of surface water,
which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of
topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is
connected hydrologically with other water bodies. "Tributary stream" does not include rills or gullies
forming because of accelerated erosion in disturbed soils where the natural vegetation cover has been
removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only
applies to that portion of the tributary stream located within the shoreland zone of the receiving water
body or wetland.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a coastal
wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or
the highest annual tide level, including all areas affected by tidal action. For purposes of a freshwater
wetland, the upland edge is formed where the soils are not saturated for a duration sufficient to
support wetland vegetation; or where the soils support the growth of wetland vegetation, but such
vegetation is dominated by woody stems that are six (6) meters (approximately twenty (20) feet) tall
or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over and
under four (4) inches in diameter, measured at four and one-half (4 ½ ) feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
as well as maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
45
Wetland - a freshwater or coastal wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.