Floodplain (Flood Hazard) Management Ordinance
Island Falls, Maine
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 72144447e58e · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Flood Hazard Development Permit Appli¢ation(: ive A |
| | Permit Forms mal BBO |
. | | By
For Communities with Base Flood Elevations
[60.3(c&d)] |
CONTENTS | il
1. Cover Letter | | |
| 2. Decision Tree
3. Flood Hazard Development Permit Application |
- 4, Flood Hazard Development Permit Partl a
5. Flood Hazard Development Permit Part II
6. Flood Hazard Development Permit For Minor Development --_--|i
7. Flood Hazard Development Permit For Floodproofing Non-
| Residential Structures ! | |
8. Hydraulic Openings Certificate -
9. Certificate of Compliance )
10. FEMA Elevation Certificate :
11. FEMA Floodproofing Certificate : |
This document was prepared by the .
Maine Floodplain Management Program
State Planning Office
38 State House Station |
184 State Street
Augusta, Maine 04333-0038
Phone (207) 287-3261 :
ae STATE OF MAINE _- , --
a - @ ee? a EXECUTIVE DEPARTMENT Oo
a a oe en MAINE STATE PLANNING OFFICE | .
Nea, 38 STATE HOUSE STATION |
gre AUGUSTA, ME 04333 =
| |
JOHN ELIAS BALDACCI ; ; _.MARTHA E. FREEMAN
GOVERNOR DirECTOR ,
S| April, 2004 -
Dear Local Floodplain Management Permitting Authority: ..
oo Enclosed are a model floodplain management permit application form, mode] floodplain management
permits, and a Certificate of Compliance which have been developed by the Floodplain Management ;
_ Program for use in the administration of local floodplain -management programs. These documents
; represent a change from the model permit application forms we 'have previously distributed. Those -
communities presently using the old permit process should consider replacing it with thisone. _
It is not mandatory that the community use the enclosed forms, but some form of floodplain permitting
must be developed by the community. These forms may be adopted by the community as they are or used
- as areference in developing a floodplain management permit application and permit form. ;
There has been a structural change, with the three part permitting system being replaced by a two-part
"system for new structures and substantial improvements. This change was instituted in order that the --_
---- application and permit more closely mirror the. wording and dictates of the state model floodplain
' Management ordinance. The three numbered pages are' the actual application, to be completed by the
, applicant and the permitting authority. Other changes include a change in the expiration of the issued
permit from 90 days to 180 days. This is in recognition of the National Flood Insurance Program (NFIP) .
Regulations definition of 'Start of Construction". : - .
oo "If the community wishes to develop an application and permit of its own, it is important to take into
account all existing NFIP and state regulations, as well as the requirements of your community's own
floodplain management ordinance. The model application and permits have been developed to meet the
"minimum NFIP standards and those of the state's model floodplain management ordinance. , _
; Some wording has been incorporated into the application and permits which is optional. Options include
. the time frame for review of an application and issuance of a Certificate of Compliance. Again, consult
oO your adopted ordinance for uniformity. :
Whether your community chooses to adopt the state's model or develop your own permitting system, all
permits issued must be maintained on file at the municipal office and be easily accessible to the public. It
is strongly suggested that the community provide some way to access floodplain permits and documents
separately from other municipal permits. a --
Floodplain Management Program Staff are available for- technical assistance in modifying and i
implementing the application and permit, or with implementing a total floodplain management program in
, _ your community. 'Please do not hesitate to contact Bonnie Cowle, Sue Baker, or myself at (207) 287- |
3261 for assistance. oo :
Sincerely,
W. Louis Sidell, Jr. - | ; |
- oe State Floodplain Management Coordinator i
: OFFICE LOCATED AT: 184 STATE STREET, AUGUSTA, MAINE 04333-0038 7
- PHONE: (207) 287-3261 INTERNET? www.maine.gov/spo FAX: (207) 287-6489
poo Maine Floodplain Management oe
Te Decision Tree for oo
| Flood Hazard Development --
ys Permits
| - | - | Please check appropriate boxes. a yt
|| Is the development in the floodplain |
_as shown on the Community's flood | _
| map? Efyes Ono |
| If yes, goto page 2.
[fno, no flood hazard permit =|.
required. oe a of
| | (A completed copy of this form should accompany each =f |
Flood Hazard Development Permit Application file) _
'|| Are other permits required (i.e., federal or state)?
_ Ulf yes, advise applicant of what additional permits are needed.
| C Request copy for attachment to Flood Hazard Development Permit _ |
Application. - : Oo ; oa oe
[Application may be made but permit shall not be issued until other
permits are provided.] oe oe a
Go to section 2. . | | 7 .
Mit no, proceed with Flood Hazard Development Permit Application. |
{| -- Go to section 2. a | a | |
: | ; -- Section 2 | | 7
| Is the development in a Special Flood Hazard Zone A, A1-30, AE, or AH
but not in the floodway'? -- : ae | | T
Byes. [1] no | . |
If yes, go to page 3. Ifno, continue. oo :
Is the development in Zone AO? . oO |
Oyes © 'Bino | .
If yes, go to page 4. Ifno, continue. |
: Is the development in the Floodway? | . | _ | | |
Dyes Mno | On
«Tf yes, go to page 5: Ifno, continue. = 7 . |
- Ts the development in Zone V1-30 or VE? | a
yo CI yes . FA no
If yes, go to page 6. Ifno, startover. - _ . |
In Unnumbered A-Zones for riverine areas, the floodway is considered to be 4 the width of the floodplain a
as measured from the water's edge to the upland limit of the floodplain measured perpendicular to the stream.
or myer : H:\Flood\2002 FP Permits\decision tree 2003.doc ; March 7, 2003 : |
. . . - 3 | . .
- A, A1-30, AE and AH Zones [Not in Floodway] -
[ss MNewDevelopment' |] = Existing Development |
| Be | mw. | a Fo. 6g |
| - Minor Permit i New Construction Value morethan | ValuelessthanSO% j|
. . - 50% Minor Permit =|.
(RFU -. . on 'Substantial
| C1 Grading Improvement - | |
| CJ Paving» . 7 = ae
C1 Dredging 7 ' (Does your ordinance . Flood Damage Resistant |
Other provide for cumulative | . Materials
- Residentialor =| . Residential or. Residential or Non Residential
Non Residential - Non Residential | Non Residential . Floodproofed .
on crawl | slab or basement on fill
Elevate top of lowest | Elevate top of lowest | Elevate top of lowest. Floodproofing |
" floor one foot, above' floor (including floor one foot above | Certificate must |
bfe ~ basement floor) one bfe _ | accompany Permit |
foot above bfe oo Application signed and-
oo oo, sealedbyPE. ~ |
7 Any area below lowest floor Any area below lowest Any area below lowest | .
not on fill must have floor not on fill must have floor not on fill must
| hydraulic openings of one | hydraulic openings ofone | have hydraulic openings | ;
| square inch for each square square inch for each of one square inch for
foot of footprint ~ | square foot of footprint each square footof |
; | . _ footprint
Two PartPermit | Two Part Permit - Two Part Permit | One Part Permit 7
. Process Process * - Process |:
' | Blevation Certificate Elevation Certificate | Elevation Certificate | | _
: H:\Flood\2002 FP Permits\decision tree 2003.doc March 7, 2003