Town Zoning Ordinance
Page 1
April 25, 2016
Town of Isle Town of Isle au Haut
Planning Board Revised Zoning
Ordinance March, 1975
With Amendments of March, 1978,
March - May 1982
March 2012,
and April 25, 2016
Table of Contents
This table of contents has not been accepted as part of the Isle Au Haut Zoning
Ordinance. It is included here to help readers find what they may be looking for in
the ordinance.
I.
Preamble.................................................................2
II.
Effective Date and Area of Jurisdiction..............2
III. Exclusions...............................................................3
IV. Zoning and Maps....................................................3
V.
Uses..........................................................................8
VI. Land Use Standards.............................................15
VII. Administration.....................................................23
VIII. Separability...........................................................26
IX. Concurrence of Jurisdictions..............................26
X.
Amendment...........................................................26
XI.
Enforcement.........................................................27
XII. Definitions.............................................................28
XII. Transition Provision..............................................32
Appendix A
Color Zoning Map..........................................................33
Black and White Zoning Map.......................................34
Outer Islands..................................................................35
Affordable Housing Overlay Zone Map......................36
Town Zoning Ordinance
Page 2
April 25, 2016
Isle au Haut
Planning Board Revised
Zoning Ordinance March,
1975
With Amendments of March, 1978,
March - May 1982
March 2012
and April 25, 2016
I. Preamble.
The purpose of this Ordinance is to regulate the development and
conservation of Isle au Haut in accordance with State law and the
this ordinance as it has been amended from time to time by the
voters of the town; to facilitate the economic and social life desired
by the town inhabitants; and to promote the public health and
safety.
Title 12 M.R.S.A. "Mandatory Zoning and Subdivision Control Law"
requires all municipalities to adopt zoning and subdivision control
ordinances for shoreland areas subject to review and approval by the
Maine Department of Environmental Protection (MDEP). The Town of
Isle au Haut has zoned the entire area within its jurisdiction.
II.
Effective Date and Area of Jurisdiction.
This ordinance and subsequent amendments shall take effect immediately
upon passage by the voters of the Town of Isle au Haut. It shall apply to
the land within the township of Isle au Haut including: Isle au Haut,
Town Zoning Ordinance
Page 3
April 25, 2016
Western Ear, Eastern Ear, Battery, Spoon Islands, York Island, Dolliver's
Island, Rabbit's Ear, Kimball's Island, Mouse Island, Wheat Island, Pell's
Island, Nathan's Island, Nathan's Island Ledge, Merchant's Island, Harbor
Island, Bill's Island, Ewe Island, Ram Island, Hardwood Island, and Fog
Island.
III.
Exclusions
All structures built, and any new land use activity undertaken after the
effective date of this ordinance, shall conform to the provisions of this
ordinance. The continuing use of the buildings and subdivisions already
in existence when this ordinance or its applicable amendments were
enacted, shall not be adversely affected by this ordinance. Their
existence and use may continue, even if non-conforming, subject to
restrictions or suppressions lawfully imposed by the Federal
government, State government, or Town government acting
independently of this ordinance.
Such non-conforming structures may be maintained or improved. If
destroyed by fire or other Act of God, they may be replaced on site by
new structures of similar character.
However, if a building or structure is not occupied or maintained for a
period of more than twelve months in a condition suitable for occupancy,
its exemption shall lapse. Thereafter, any use of the building, structure, or
its site must be in conformity with this Ordinance.
IV. Zoning and Maps.
The following zones are hereby defined and set down on the Official Map,
a paper version of which is included in Appendix A.
Note: For the purpose of this section, the term "any road" means only
roads which:
1. Meet the definition of section XII subsection F and
2. Are in existence as of March 31, 1975 , and
3. Are recorded on the Official Map, and
4. Only to the extent (i.e. fork or termination) that such roads can be
considered to serve more than one principal structure or
residential dwelling unit as defined in section XII subsection H
Town Zoning Ordinance
Page 4
April 25, 2016
and J.
Zone A. Remote Shoreland
Land that is less than 500 feet from mean high water but more
than 1,000 feet from the centerline, fork or termination of any
road.
Zone B. Accessible Interior
Land that is less than 1,000 feet from the centerline fork, or
termination of any road but more than 500 feet from mean high
water.
Zone B also includes land between 125 feet and 500 feet from the
normal high water mark of Long Pond. If land more than 125 feet
and less than 500 feet from the normal high water mark of Long
Pond is by any other definition included in Zones A, C, or D, it shall
be deemed to be in Zone B. If land more than 125 feet and less
than 500 feet from the normal high water mark of Long Pond is by
any other definition included in Zone E, it shall be deemed to be in
Zone E.
Zone C. Accessible Shoreland
Land which is less than 500 feet from mean high water and less
than 1,000 feet from the centerline, fork, or termination of any
road.
Zone D. Remote Interior
Land which is more than 500 feet from mean high water and more
than 1,000 feet from the centerline, for or termination of any road.
Zone E. Resource Protection
Resource Protection Districts include areas in which development
would adversely affect water quality, productive habitat, biotic
systems, or scenic and natural values; as follows:
Town Zoning Ordinance
Page 5
April 25, 2016
1. Merchant's Cove, Isle au Haut, permanent marshy, non-tidal
wetland, adjoining seawall and a belt of land 125 feet
horizontal width surrounding wetland and seawall.
2. Long Pond Outlet, stream and belt of land 250 feet in total
width, extending 125 feet on each side of the centerline of
the Outlet Brook lying between the South end of Long Pond
and mean low water on the east shore of Isle au Haut.
3. Long Pond Greenbelt, Isle au Haut land around Long Pond a
distance of 125 feet horizontal distance from normal high
water elevation of the Pond.
4. Great Meadow, Isle au Haut, interior source bog West of
North end of Long Pond and belt of land 125 feet horizontal
width surrounding the meadow.
5. Great Spoon Island, pond area behind beach on North end of
island 125 feet horizontal width surrounding pond.
6. York Island, tidal inlet on East shore and tidal pond and belt
of land 125 feet horizontal width surrounding pond.
7. Rich's Point, North of Old Cove, Isle au Haut, brackish water
pond, marshy area, and beach.
8. Pond Point, Burnt Island, area surrounding the small ponds
on Pond Point and neighboring belt of land 125 feet
horizontal width.
9. Moore's Harbor Swale, Isle au Haut, spruce bog and fresh
water marsh and belt of land 125 feet in width surrounding
swale, Northwest side of Isle au Haut.
10. Fog Island, small pond on the Southwest end and belt of
land 125 feet in width surrounding pond.
11. All the fee ownership of Acadia National Park within
the Town of Isle au Haut excepting the Park Trailer
Lot.
Zone F. Affordable Year Round Housing Overlay Zone.
Land shown as the Overlay Zone on the Official Map - This zone
overlays zones defined in the preceding paragraphs of Section IV of
Isle au Haut Zoning Ordinance. Within the Affordable Year Round
Housing Overlay Zone the total acreage of any lot must equal or
exceed 1 acre. All other uses and land use standards shall be as
specified for the zones overlaid by Zone F.
Zone G. Limited Commercial District.
Town Zoning Ordinance
Page 6
April 25, 2016
The Limited Commercial District includes areas of mixed, light
commercial and residential uses, exclusive of the Stream
Protection District, which should not be developed as intensively
as the General Development Districts. This district includes areas
of two or more contiguous acres in size devoted to a mix of
residential and low intensity business and commercial uses.
Industrial uses are prohibited. Minimum setback shall be 75' from
normal high water; minimum lot size 40,000 square feet, and
minimum frontage 200'.
Zone H. General Development I District.
The General Development I District includes the following types of
existing, intensively developed areas:
(1)
Areas of two or more contiguous acres devoted to
commercial, industrial or intensive recreational activities, or a
mix of such activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other
industrial activities;
(b) Areas devoted to wholesaling, warehousing, retail trade
and service activities, or other commercial activities; and
(c) Areas devoted to intensive recreational development
and activities, such as, but not limited to amusement parks,
race tracks and fairgrounds.
(2)
Areas otherwise discernible as having patterns of
intensive commercial, industrial or recreational uses. (Portions
of the General Development District may also include
residential development. However, no area shall be designated
as a General Developmennt District based solely on residential
use.)
Zone I. General Development II District.
The General Development II District includes the same types of
Town Zoning Ordinance
Page 7
April 25, 2016
areas as those listed for the General Development I District. The
General Development II District, however, is applied to newly
established General Development Districts where the pattern of
development at the time of adoption is undeveloped or not as
intensively developed as that of the General Development I District.
Portions of the General Development District I or II may also
include residential development. However, no area shall be
designated as a General Development I or II District based solely
on residential use.
In the General Development Districts the setback from the normal
high-water line shall be at least twenty five (25) feet, horizontal
distance; minimum lot size is 40,000 square feet; and minimum
shore frontage 125' except no frontage is required if a Commercial
Fisheries/Maritime Activities District occurs between the General
Development District and the shore within the same lot. Non-
vegetated area must not exceed 70% of the area in the Shoreland
Zone.
Zone J. Commercial Fisheries/Maritime Activities District.
The Commercial Fisheries/Maritime Activities District includes
areas where the existing predominant pattern of development is
consistent with the allowed uses for this district as indicated in the
Table of Land Uses, and other areas which are suitable for
functionally water-dependent uses, taking into consideration such
factors as:
(1)
Shelter from prevailing winds and waves;
(2)
Slope of the land within 250 feet, horizontal distance, of
the shoreline;
(3)
Depth of the water within 150 feet, horizontal distance,
of the shoreline;
(4)
Available support facilities including utilities and
transportation facilities; and
(5)
Compatibility with adjacent upland uses.
Town Zoning Ordinance
Page 8
April 25, 2016
In the Commercial Fisheries/Maritime Activities District there
shall be no minimum setback except for 25 feet for parking areas,
no minimum lot size, and no minimum shore frontage. Non-
vegetated area must not exceed 70% of the Shoreland Zone portion
of the lot.
V.
Uses.
Land uses permitted in each zone, in conformance with the land use
standards of this Ordinance, are shown below:
Key: Yes - Allowed (no permit required)
No - Prohibited
PB Permit - Requires Planning Board Permit
Land Uses
Resource
Protection
(E)
Remote
Shoreland
(A)
Accessible
Interior
(B)
Accessible
Shoreland
(C)
Remote
Interior
(D)
1. Non-Intensive
Recreational
Uses, such as
biking, fishing,
hunting, etc.
Yes
Yes
Yes
Yes
Yes
2. Resource
Management
Practices
(Forestry,
Wildlife
Management,
and Soil and
Water
Conservation
Yes
Yes
Yes
Yes
Yes
3. Timber
Harvesting
No
Yes
Yes
Yes
Yes
4. Surveying,
Resource
Analysis, and
Mineral
Exploration
Yes
Yes
Yes
Yes
Yes
Town Zoning Ordinance
Page 9
April 25, 2016
Land Uses
Resource
Protection
(E)
Remote
Shoreland
(A)
Accessible
Interior
(B)
Accessible
Shoreland
(C)
Remote
Interior
(D)
5. Emergency
Operations
(Fire Control,
Search and
Rescue, etc.
Yes
Yes
Yes
Yes
Yes
6. Agriculture
No
Yes
Yes
Yes
Yes
7. Marine Uses
a. Marine
Related
Activities
(Excluding
Structures)
b. Marine
Related
Activities
(Including
Structures)
Yes
No
Yes
PB Permit
Yes
No Permit
Yes
PB Permit
Yes
No
8. Structures
(Principal)*
a. Residential
Dwelling Units
b. Govern-
mental,
Institu-
tional,
and
Commercial
Structures,
Industrial
Structures,
and Cottage
Domestic
Industries
No
No
PB Permit
PB Permit
PB Permit
PB Permit
PB Permit
PB Permit
PB Permit
PB Permit
Town Zoning Ordinance
Page 10
April 25, 2016
Land Uses
Resource
Protection
(E)
Remote
Shoreland
(A)
Accessible
Interior
(B)
Accessible
Shoreland
(C)
Remote
Interior
(D)
8c. Residential
dwelling units
no greater
than 600
square feet, no
more than one
bedroom in
addition to the
principal
structure on
any lot.
No
PB Permit PB Permit PB Permit PB Permit
9. Structures
(accessory) to
permitted
uses, additions
(200 sq. ft. or
less) and
alterations to
existing
structures
No
CEO
Permit
CEO
Permit
CEO
Permit
CEO
Permit
10. Road
Construction
No
PB Permit PB Permit PB Permit PB Permit
11. Commercial
campground
No
No
No
No
No
Town Zoning Ordinance
Page 11
April 25, 2016
Land Uses
Resource
Protection
(E)
Remote
Shoreland
(A)
Accessible
Interior
(B)
Accessible
Shoreland
(C)
Remote
Interior
(D)
12. Bridges,
over 20 ft. in
length,
causeways,
marinas and
similar uses
projecting into
or over the
Pond or ocean*
a. Temporary
b. Permanent
No
No
CEO Permit
PB
Permit
CEO Permit
PB
Permit
CEO Permit
PB
Permit
CEO Permit
PB
Permit
13. Clearing for
approved uses
Yes
Yes
Yes
Yes
Yes
14. Public
Utilities
No
PB Permit Yes, except
PB Permit
on private
roads
Yes, except
PB Permit
on private
roads
PB Permit
15. Private
Sewage
disposal
systems
No,
See Note
1, below
LPI
Permit
LPI
Permit
LPI
Permit
LPI
Permit
16. Filling and
earth
moving
a. 10 cubic
yards or
less
b. >10
yards or
more
No
No
Yes
CEO
Permit
Yes
Yes, except
CEO Permit
outside
public roads
Yes
Yes, except
CEO Permit
outside
public roads
Yes
CEO
Permit
Town Zoning Ordinance
Page 12
April 25, 2016
Land Uses
Resource
Protection
(E)
Remote
Shoreland
(A)
Accessible
Interior
(B)
Accessible
Shoreland
(C)
Remote
Interior
(D)
17. Other Uses
Permit requirements to be determined by the Code
Enforcement Officer but subject to review by the Planning
Board.
Land Uses
G--Limited
Commercial
H--General
Development
I
I--General
Development
II
J--Commercial
Fisheries/Maritime
Activities
1. Non-
Intensive
Recreational
Uses, such as
biking, fishing,
hunting, etc.
Yes
Yes
Yes
Yes
2. Resource
Management
Practices
(Forestry,
Wildlife
Management,
and Soil and
Water
Conservation
Yes
Yes
Yes
Yes
3. Timber
Harvesting
Yes
Yes
Yes
Yes
4. Surveying,
Resource
Analysis, and
Mineral
Exploration
CEO
CEO
CEO
CEO
5. Emergency
Operations
(Fire Control,
Search and
Rescue, etc.
Yes
Yes
Yes
Yes
6. Agriculture
Yes
Yes
Yes
Yes
Town Zoning Ordinance
Page 13
April 25, 2016
Land Uses
G--Limited
Commercial
H--General
Development
I
I--General
Development
II
J--Commercial
Fisheries/Maritime
Activities
7. Marine
Uses
a. Marine
Related
Activities,
including
aquaculture
and docks but
Excluding
other
Structures
b. Marine
Related
Activities
including
aquaculture
and structures
No
PB Permit
PB Permit
PB Permit
PB Permit
PB Permit
PB Permit
PB Permit
8. Structures
(Principal)
a. Residential
Dwelling Units
b.
Governmental,
Institutional,
and
Commercial
Structures,
Industrial
Structures,
and Cottage
Domestic
Industries
c. Residential
dwelling units
<600 sq. feet,
no more than
one bedroom
in addition to
PB Permit
PB Permit*
PB Permit
PB Permit
PB Permit*
PB Permit
PB Permit
PB Permit*
Yes
No
PB Permit*
Yes
Town Zoning Ordinance
Page 14
April 25, 2016
the principal
structure on
any lot
Land Uses
G--Limited
Commercial
H--General
Development
I
I--General
Development
II
J--Commercial
Fisheries/Maritime
Activities
9. Structures
(accessory) to
permitted
uses, additions
(≤ 200 sq. ft.)
and alterations
to existing
structures
CEO Permit
CEO Permit
CEO Permit
CEO Permit
10. Road
Construction
PB Permit
PB Permit
PB Permit
PB Permit
11.
Commercial
Campground
No
No
No
No
12.Bridges,
over 20 ft. in
length,
causeways,
marinas and
similar uses
projecting
into or over
the Pond or
ocean*
Temporary
Permanent
PB permit
CEO Permit
PB permit
CEO Permit
PB permit
CEO Permit
PB permit
CEO Permit
13. Clearing
for approved
construction
Yes
Yes
Yes
Yes
14. Public
Utilities
Yes
Yes
Yes
Yes
15. Private
Septic Sewage
Disposal
systems
LPI permit
LPI permit
LPI permit
LPI permit
Town Zoning Ordinance
Page 15
April 25, 2016
Land Uses
G--Limited
Commercial
H--General
Development
I
I--General
Development
II
J--Commercial
Fisheries/Maritime
Activities
16. Filling and
earth
Moving
a. 10 cubic
yards or less
b. >10 yards
or more
Yes
CEO permit
Yes
CEO permit
Yes
CEO permit
Yes
CEO permit
17. Other
Uses
PB Permit
PB permit
PB permit
PB permit
* Heavy Industries - including all the following, but not necessarily
limited to these, not permitted in any zone: Oil refining, Nuclear
generating plants, Metallurgical processing, Stone quarrying, Mills or
Factories employing more than 50 persons at one location, Restaurants,
Motels, Hotels, Entertainment or other service facilities providing on
premise services to more than 50 persons at one time, and Commercial
boats unloading more than 50 persons at one time.
** Notwithstanding other provision regarding use of resource
protection districts, support structures for commercial aquaculture
projects and Town public recreational access to the southern portion of
Long Pond contemplated in the Comprehensive Plan may be
accommodated in the Long Pond Greenbelt and Outlet Brook Resource
Protection District by Planning Board Permit.
Note 1: A private sewage disposal system and associated pumps,
piping, tanks, and electrical systems may be built and maintained in the
Moore's Swale and Long Pond Resource Protection 125' buffer areas to
benefit any dwelling in existence as of March 1975.
VI.
Land Use Standards.
All land use activities shall conform to the following applicable land use
standards for all Zones (excepting where specified.)
A. Agriculture - The following provisions shall govern agricultural
Town Zoning Ordinance
Page 16
April 25, 2016
practices in Zone A, (Remote Shoreland).
(1) All spreading of manure shall be accomplished in conformance
with the Manure Utilization Guidelines published by the former
Maine Department of Agriculture on November 1, 2001, and the
Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100)
feet, horizontal distance, of a great pond classified GPA or a river
flowing to a great pond classified GPA, or within seventy-five (75)
feet horizontal distance, of other water bodies, tributary streams, or
wetlands. All manure storage areas within the shoreland zone must be
constructed or modified such that the facility produces no discharge
of effluent or contaminated storm water.
(3) There shall be no tilling of soil within 50 feet of the normal high
water mark of Long Pond.
B. Beach Construction
Beach construction on any great pond or coastal wetland shall
require a permit from the Maine Department of Environmental
Protection (DEP) under the Natural Resources Protection Act
(NRPA). Beach construction on any river, stream, or brook defined
in the Shoreland Zoning Ordinance shall also require a permit from
the DEP.
C. Clearing - Vegetation cutting and clearing shall conform to the
standards of the Shoreland Zoning Ordinance for all areas within
250 feet of the normal high water mark of the ocean and the
normal high water mark of Long Pond, and within 75 feet of the
streams designated as requiring buffers under the Shoreland
Zoning Ordinance as stipulated for the applicable Shoreland Zone.
D. Erosion and Sedimentation Control
Filling, grading, lagooning, dredging, earth-moving activities, and
other land use activities shall be conducted in such manner to
prevent to the maximum extent possible, erosion and sedimentation
of surface waters. To this end, all construction shall be
accomplished in conformance with the most current version of the
Town Zoning Ordinance
Page 17
April 25, 2016
DEP Maine Sediment and Erosion Control Best Management
Practices (BMPs) which can be found on the DEP website.
E. Mineral Exploration
Mineral exploration to determine the nature or extent of mineral
resources shall be accomplished by hand sampling, test boring, or
other methods which create minimal disturbance. A permit from
the planning board shall be required for mineral exploration which
exceeds the above limitations.
F. Piers, Docks, Wharves, Breakwaters, Causeways, Marinas, Bridges
over 20 feet in length and Uses projecting into Water Bodies
In addition to federal or state permits, which may be required for
such structures and uses, they shall conform to the following:
1. Access from shore shall be developed on soils or bedrock
appropriate for such use and constructed so as to control
erosion to prevent sedimentation from entering water bodies
2. The location shall not interfere with developed beach areas.
3. The facility shall be located so as to minimize adverse effects
on fisheries.
4. The facility shall be no longer in dimension than necessary to
carry on the activity and be consistent with existing conditions,
use, and character of the area.
G. Residential Lot Standards
1. Lots shall meet or exceed the following minimum
requirements:
a. If a lot is comprised entirely of "Remote Shoreland"
(Zone A), the total acreage of the parcel must equal or
exceed 10 acres.
b. If a lot is comprised entirely of "Accessible Interior"
(Zone B) the total acreage of the parcel must equal or
exceed 2 acres.
Town Zoning Ordinance
Page 18
April 25, 2016
i. Lots existing January 1, 1978 in Zone B area
surrounding Long Pond Greenbelt which are less
than 2 acres in size may nevertheless be built upon.
If the owner of such non-conforming lot owns
other lots, which share a common border with it,
he must combine such lots in order to meet the 2
acre minimum, or to comply as nearly as possible
with such minimum.
c. If a lot is comprised entirely of "Accessible Shoreland"
(Zone C) the total acreage of the lot must equal or exceed
0.7 acre.
d. If a lot is comprised entirely of "Remote Interior" (Zone
D) the total acreage of the parcel must equal or exceed
20 acres.
e. If a lot is comprised entirely of "Resource Protection
District" (Zone E), it may not be built upon. If a lot is
comprised partially of "Resource Protection District,"
that part may not be built upon if the District is
defined in the State Shoreland Zoning Guidelines as
important habitat, or part of the Long Pond 125-foot
buffer. However, if the Resource Protection is based
on slopes >20% for 2 or more contiguous acres, the
slope may be used for any permitted use in that zone
if a Licensed Professional Engineer specializing in
geotechnical engineering finds the use meets
adequate factors of safety and specifies construction
practices that must be followed, and the Planning
Board approves of the use. If the Resource Protection
Zone is defined because it is a Special Flood Hazard
Area as delineated on an Effective Federal Emergency
Management Agency (FEMA) Flood Hazard Map,
construction may occur in the zone if a Licensed
Professional Engineer issues a report that states that
the proposed use will not create adjacent
incremental flooding of more than 1 foot, and that the
construction is based on FEMA approved standards
for construction in a flood zone of the type where the
construction is contemplated, and the Planning Board
approves of the use.
f. If a lot is comprised of more than one zone, the total
acreage of the parcel must equal or exceed an
Town Zoning Ordinance
Page 19
April 25, 2016
intermediate size, computed as the acreage of the above
minimum sizes (a through d) with each such minimum
size weighted according to the percentage of that zone
contained in the parcel. For the purpose of this
computation only, any resource protection district area
contained in a parcel will be computed on the basis of the
minimum lot size that would prevail if the land had not
been designated a resource protection district.
Example:
A lot is comprised as follows:
Zone
Acres
% Total
Parcel
Applicable
Minimum
Lot Size
Contribution
to Minimum
Requirement
(A) Remote
Shoreland
3.0 A
30%
x 10 A
=
3.000 A
(B)
Accessible
Interior
4.9 A
49%
x 2 A
=
.980 A
(C)
Accessible
Shoreland
1.0 A
10%
x0.7 A
=
.07 A
(D) Remote
Interior
1.0 A
10%
x 20 A
=
2.000 A
(E) Long
Pond
Greenbelt
.1 A
1%
x 2 A
=
.020 A
Total Parcel 10.0 A
Minimum
Required = 6.07 A
2. If more than one residential dwelling unit is constructed on a
single lot, the minimum lot size requirement shall be met for
each additional dwelling unit except where that unit consists of
a single unit not exceeding 600 square feet in conformance with
the land use Table 8(C).
Town Zoning Ordinance
Page 20
April 25, 2016
H. Road Construction
1. Roads shall be located, constructed, and maintained in such a
manner that minimal erosion and sedimentation occurs.
Adequate provision shall be made to prevent soil erosion and
sedimentation of surface waters. All roads shall be located,
constructed and maintained in conformance with Maine
Sediment and Erosion Control BMPs, previously cited.
2. Additionally, all roads constructed shall conform with the
following standards:
a. Road crossings of watercourses shall be kept to the
minimum number necessary;
b. Bottoms of culverts shall be installed at streambed
elevation;
c. All cut or fill banks and areas of exposed mineral soil shall
be revegetated or otherwise stabilized as soon as
possible; and
d. Bridges or culverts of adequate size and design shall be
provided for all road crossings of watercourses, which are
to be used when surface waters are unfrozen. The
requirement for a bridge or culvert may be waived by
obtaining a permit from the Planning Board.
I. Sanitary Standards
The following provision should govern the use of Subsurface
Sewage Disposal in the "Remote Shoreland Zone" (Zone A):
1. Subsurface Sanitary Sewage Disposal shall be in conformance
with the Maine State Plumbing Code.
2. The minimum setback for underground sewage disposal
facilities from normal high water mark of water body shall be
no less than 100 horizontal feet.
J.
Soils
All land uses shall be located on soils in or upon which
proposed uses or structures can be established or maintained
without causing adverse environmental impacts, including severe
erosion, mass soil movement, and water pollution, whether
Town Zoning Ordinance
Page 21
April 25, 2016
during or after construction. Proposed uses requiring subsurface
waste disposal, and other similar intensive land uses, shall
require a soils report, prepared by, as appropriate, a Licensed Site
Evaluator, a State-Certified Soil Scientist, or State-Certified
Geologist, or Licensed Professional Engineer with geotechnical
expertise based on an on-site investigation.
K. Structures
All principal structures allowed by Section V in any zone except in
the Commercial Fisheries/Maritime Activities Zone and except in
Zone C, shall be set back at least 75 feet from the normal high water
mark, as defined in Section XII, of any pond, river, or salt water
body.
This setback requirement shall not apply to marine-related
support structures, such as docks, piers, and launch ramps.
L. Timber Harvesting
1. No substantial accumulation of slash shall be left within fifty
(50) feet of the normal high water mark of any pond, river, or salt
water body as defined. At a distance greater than fifty (50) feet
from the normal high water mark of such waters and extending to
the limits of the area covered by this Ordinance, if slash is not
burned or chipped, all slash shall be disposed of in such a manner
that it lies on the ground and no part thereof extends more than
four feet above the ground.
2. Skid trails, log yards, and other sites where the operation of
logging machinery results in the exposure of substantial areas of
mineral soil shall be located such that an un-scarified filter strip
is retained between the exposed mineral soil and the normal
high watermark of any pond, river, or salt water body as defined.
The width of this strip shall vary according to the average slope
of the land as follows:
Town Zoning Ordinance
Page 22
April 25, 2016
Average Slope of Land between
Exposed Mineral Soil and Normal
High Water Mark (percent)
Width of Strip Between Exposed
Mineral Soil and Normal High
Water mark (Feet along Surface of
the Ground)
0
25
10
45
20
65
30
85
40
105
50
125
60
145
70
165
3. Harvesting operations shall be conducted in such a manner and
at such a time that minimal soil disturbance results. Adequate
provision shall be made to prevent soil erosion and sedimentation
of surface waters.
4. Harvesting operations shall be conducted in such a manner that
a well-distributed stand of trees is retained.
5. Except in the Commercial Fisheries/Marine Activities
Zone, and General Development Districts, harvesting
activities shall not create single openings greater than seven
thousand five hundred (7,500) square feet in the forest canopy.
6. Except in the Commercial Fisheries/Marine Activities
Zone, and General Development Districts, in any stand,
harvesting shall remove not more than forty (40) percent of the
volume of trees in any ten (10) year period. For the purpose of
these standards, a stand means a contiguous group of trees,
sufficiently uniform in species, arrangement of age classes, and
conditions, to be identifiable as a homogeneous and distinguishable
unit.
7. Timber harvesting operations not in conformance with 2, 4, 5,
and 7 above may be allowed by the Planning Board upon approval
of a permit granted in accordance with provisions of Section VII,
subsection 6, paragraphs a-e upon a clear showing by the
Town Zoning Ordinance
Page 23
April 25, 2016
applicant that such an exception is necessary for proper timber
management.
M. Water Quality Protection
No activity shall locate, store, discharge, or permit the discharge of
any treated, untreated, or inadequately treated liquid, gaseous, or
solid materials of such nature, quantity, obnoxiousness, toxicity, or
temperature that run off, seep, percolate, or wash into surface or
ground waters so as to contaminate, pollute, or harm such waters
or cause nuisances, such as objectionable shore deposits, floating
or submerged debris, oil or scum, color, odor, taste, or
unsightliness, or be harmful to human, animal, plant or aquatic life.
VII. Administration.
A. Permit Procedures
1. No structure, building, prefabricated house, mobile home, trailer,
campground, or road may be located or work begun in the township
without a written permit from the Planning Board. (For the purpose
of this paragraph docks, sheds, garages, workshops, major
incinerators and above-ground storage tanks for water, kerosene,
and gasoline are considered structures.)
2. No title to any subdivision of land may be transferred without
written approval of the subdivision plan by the Planning Board,
unless otherwise exempted by State Statute. The Planning Board
shall use the definitions and standards in the State Subdivision Statute
(30-A M.R.S.A. §4401, et seq.) in its review and approval process of a
subdivision application.
3. Any resident or taxpayer may apply for a building permit or approval
of title transfer without payment of fees or reimbursement of Town
expenses, provided the permits are outside of the Shoreland Zone
and for residential uses and residential subdivisions of 5 dwelling
units or less . When permits are requested for commercial or
industrial uses or subdivisions of over 5 dwelling units, then the
Board will require the Applicant to reimburse the Board for
expenses that may be incurred to hire professionals to provide a
peer review of the application. When permits are requested for
areas covered by the Shoreland Zoning Ordinance, the Applicant must
pay any fees incurred in arranging for the Town-appointed Codes
Town Zoning Ordinance
Page 24
April 25, 2016
Enforcement Officer (CEO) to issue the permit or inspect a construction
project in progress. Any applicant for a Plumbing Permit must pay the
required fees for that permit. Anyone who is granted a permit or
approval must proceed to his or her requested undertaking without
delay. Outside the Shoreland Zone, permits will expire if
substantial construction (i.e., >30% of the value of the permitted
structure) is not completed within 2 years.
4. Each application must document by plans, narrative, and supporting
calculations the location of any proposed structure, its intended
construction, arrangements to be made for plumbing and sewage,
safety precautions for dangerous or combustible substances, and
access from public rights-of-way. For the purposes of this paragraph
trailers, mobile homes, docks, sheds, garages, workshops, out-
buildings, and storage tanks for inflammable liquids or gases are all
considered structures requiring the specified information. All
subdivision application plans shall be submitted in both paper form
and also in a digital format with features and lot lines georeferenced
to Maine State Plane, NAD83, East Zone, in feet. The Board shall
specify the format requirements.
5. The Code Enforcement Officer shall approve or deny those
applications on which he is empowered to act as shown in Section V.
Approval shall be granted only if the proposed use is in conformance
with the provisions of this Ordinance.
6. The Planning Board shall approve or deny those applications on
which it is empowered to act as stated in this Ordinance. The
Planning Board must use its best efforts to review any
Application for completeness within 35 days of receipt by the
Planning Board Chair. Once an Application is deemed complete,
the Planning Board must render a decision within 35 days,
unless it votes, by a majority of those present, to hold a public
hearing, in which case a decision would be rendered within 35
days of the close of the public hearing. The Board must use its
best efforts to hold a public hearing within 60 days of the receipt
of a complete application. The Board must consider each
application and approve it unless the Board finds one of the
following obtains:
a. Water quality of the ocean, lake, brooks, or the water supply of
an abutter or other landowner will be adversely and materially
affected, or that high probability of such adverse and material
effect exists.
Town Zoning Ordinance
Page 25
April 25, 2016
b. That significant air pollution would occur in violation of either
primary or secondary standards established by the Federal
Government or the State Government or that a high probability of
such air pollution would exist.
c. A public nuisance or a fire hazard would be created.
d. Access from public rights-of-way or from the shore would be
inadequate for the traffic likely to be created.
e. A proposed land use would, based on the Planning Board's
review of the evidence presented, be seriously destructive of
the present character of the island.
7. All decisions of the Planning Board and of the Appeals Board
will conform to State Law, including the State Subdivision Law,
the Mandatory Shoreland Zoning Act, and statutes governing
the Appeals Board found at 30-A M.R.S.A. §2691 & §4353, where
applicable.
B. Administering Bodies and Agents
1. The Planning Board shall consist of five members and two
alternates . The Planning Board members shall be nominated and
voted on at the Annual Town Meeting to serve a term of either one year,
two years, or three years at the first election following the approval of
this Ordinance amendment. Thereafter, when the initial terms expire,
those positions will be elected for terms of 3 years. If a vacancy occurs
due to death, resignation, or other reason, the Selectmen shall appoint a
person to fill the position for the remainder of the year until the next
Annual Town Meeting. The Board shall elect its own Chairman to serve
for the year following each Annual Town Meeting. The Board may elect
a Secretary and Vice-Chairman from its members.
2. Code Enforcement Officer. The Selectmen shall appoint a Code
Enforcement Officer following each Annual Town Meeting to serve
a term of one year. The Code Enforcement Officer must become
Certified by the State within one year of appointment in accordance
with 30-A M.R.S.A. §4451.
3. Board of Appeals. The Board of Appeals of the Town of Isle au Haut
shall hear appeals from decisions of either the CEO or Planning Board.
The Board of Appeals will use its best efforts to conduct a hearing
Town Zoning Ordinance
Page 26
April 25, 2016
on a properly filed appeal within 60 days and render its decision
on the appeal within 35 days of the hearing. The Board will
conduct de novo hearings, permitting new evidence to be
submitted that was not part of the Planning Board record. The
Board of Appeals is empowered to grant variances based on undue
hardship (30-A M.R.S.A. §4353(4)), disabilities (30-A M.R.S.A.
§4353(4-A)), set-back variances for single-family dwellings (30-A
M.R.S.A. §4353 (4-A), dimensional standard variances (30-A
M.R.S.A. §4343 (4-C)), and use variances (however, use variances
shall not be granted in the State 250' Shoreland Zone). Use
variances shall only be granted in cases of undue hardship.
4. Rules. Each board shall set its own rules and establish its own
procedures subject to the following stipulations. All meetings shall
be public, all minutes shall be available, after approval at the next
subsequent meeting of the Board concerned, to any resident or
non-resident taxpayer who requests them.
VIII. Separability
If any provision of this Ordinance is held to be invalid for any reason,
such invalidity shall not affect the remaining provision of the Ordinance
which shall remain in full force and effect.
IX. Concurrence of Jurisdictions.
In case of concurrence of jurisdictions (State ownership of certain
islands and/or ledges, Federal ownership of property), the provisions of
this Ordinance will be advisory with respect to the State and Federal
Governments.
X. Amendment.
This Ordinance may be amended in whole or in part at any regular
Town Meeting by an affirmative vote of a majority of those present and
voting. If an amendment is contemplated, the Planning Board shall hold
a public hearing at least 30 days prior to the Town Meeting.
Town Zoning Ordinance
Page 27
April 25, 2016
XI. Enforcement.
A. Nuisances.
Any violation of this Ordinance shall be deemed to be a nuisance.
B. Code Enforcement Officer.
It shall be the duty of the Code Enforcement Officer to enforce the
provisions of this Ordinance. If the Code Enforcement Officer shall
find that any provision of this Ordinance is being violated, he shall
notify in writing the person responsible for such a violation,
indicating the nature of the violation and ordering the action
necessary to correct it, including discontinuance of illegal use of
land, buildings, structures, or work being done, removal of illegal
buildings or structures, and abatement of nuisance conditions. A
copy of such notices shall be maintained as a permanent record.
C. Legal Actions.
When the above action does not result in the correction or
abatement of the violation or nuisance condition, the Municipal
officers, upon notice from the Code Enforcement Officer, are
hereby authorized and directed to institute any and all actions
and proceedings, either legal or equitable, including seeking
injunctions of violations and the imposition of fines, that may be
appropriate or necessary to enforce the provisions of this
Ordinance in the name of municipality.
D. Fines.
Any person who continues to violate any provision of this
Ordinance after receiving notice of such violation shall be guilty of
a misdemeanor subject to a fine of a minimum of $100.00 and no
greater than the statutory limit for each day a violation continues
beyond official notice of the violation is given, subject to the
maximum fine permitted by Statute. Each day such a violation is
continued is a separate offense. Fines shall be converted to the
Town of Isle au Haut general fund.
Town Zoning Ordinance
Page 28
April 25, 2016
XII. Definitions.
Terms not defined herein shall have the customary dictionary meaning.
As used in this ordinance, the following definitions shall apply:
Water Related Terms.
A. Pond.
Any inland body of water which has a surface area in excess of 10
acres, except where such body of water is man-made and in
addition is completely surrounded by land held by a single owner,
and except those privately owned ponds less than 30 acres which
are held primarily as waterfowl and fish breeding areas for
hunting and fishing.
B. Mean High Water Mark of Coastal Waters.
That line on the shore of tidal waters reached by the shoreward
limit of the rise of the medium tides between the spring and the
neap, called Mean High Water on the NOAA tide charts, and
may be determined by topographic land surveying techniques.
C. Normal High Water Mark of Inland Waters.
That line on the shores and banks of non-tidal waters which is
apparent because of the contiguous different character of the soil
or the vegetation due to the prolonged action of the water.
Relative to vegetation, it is that line where the vegetation changes
from predominantly aquatic to predominantly terrestrial (by way
of illustration, aquatic vegetation includes but is not limited to the
following plants and plant groups - water lily, pond lily,
pickerelweed, cattail, wild rice, sedges, rushes, and marsh grasses;
and terrestrial vegetation includes but is not limited to the
following plant groups - upland grasses, aster, lady slipper,
wintergreen, partridge berry, sasparilla, pines, cedars, oaks, ashes,
alders, elms, and maples). In places where the shore or bank is of
such character that the high water mark cannot be easily
determined (rockslides, ledges, rapidly eroding or slumping
banks) the normal high water mark shall be estimated from places
Town Zoning Ordinance
Page 29
April 25, 2016
where it can be determined by the above method.
D. Normal High Water (coastal)
This has the same meaning as the State Shoreland Zoning
Guidelines "upland edge of a coastal wetland". This boundary is
the line formed by the landward limits of the salt tolerant
vegetation and/or the highest annual tide (HAT) level, including
all areas affected by tidal action.
Forest Management Terms.
D. Forest Management Activities.
Timber cruising and other forest resources evaluation activities,
management planning activities, insect and disease control,
timber stand improvement, pruning, timber harvesting and other
forest harvesting, regeneration of forest stands, and other similar
associated activities, but no the construction or creation of roads.
E. Timber Harvesting.
The cutting and removal of trees from their growing site, and the
attendant operation of cutting and skidding machinery, but not
the construction or creation of roads. Timber harvesting does not
include the clearing of land for approved construction.
Road Terms.
F. Roads.
A route or track consisting of a bed of exposed mineral soil, gravel,
asphalt, or other surfacing material constructed for or created by
the repeated passage of motorized vehicles. As defined by this
Ordinance, a road includes all public ways and all private ways
serving more than one dwelling that were in existence as of March
1975.
Town Zoning Ordinance
Page 30
April 25, 2016
Structure Terms.
G. Structure.
Anything built for the support, shelter, or enclosure of persons,
animals, goods, or property of any kind. It does not include
wells, utility poles, or below-ground constructed facilities.
H. Principal Structure.
The Structure in or on which the primary use of the lot is
conducted.
I. Accessory Structure.
A structure of a nature customarily incidental or subordinate to
that of the principal structure or the primary use to which the
premises are devoted.
J. Residential Dwelling Unit.
A room or group of rooms designed and equipped exclusively for
use as permanent, seasonal, or temporary living quarters for only
one family. The term shall include mobile homes and motor
homes
K. Bridges over 20 feet in Length, Causeways, Marinas, and Similar
Uses Projecting into Water Bodies.
Temporary: Structures which remain in the water for less than
seven months in any period of twelve consecutive months.
Permanent: Structures which remain in the water for seven
months or more in any period of twelve consecutive months.
L. Emergency Operations.
Emergency operations shall include operations conducted for the
public health, safety or general welfare, such as protection of
resources from immediate destruction or loss, law enforcement
and operations to rescue human beings and livestock from the
Town Zoning Ordinance
Page 31
April 25, 2016
threat of destruction or injury.
M. Marine-Related Activities.
This term includes commercial and pleasure activities which are
directly related to the ocean. Such activities shall include but not
necessarily be limited to all activities directly related to the
commercial harvesting or growing of fish, shellfish, seaweed, and
boating; including the loading and off-loading of materials,
supplies and "catches" as well as the maintenance, construction
and repair of vessels, gear and equipment associated with these
marine activities.
N. Marine-Related Support Structures.
This term shall include principal structures including piers, docks,
wharves, floats, launch ramps, ways, pounds, and weirs and
accessory structures associated with the facilitation of marine
related activities.
O. Official Map
The Official Zoning Map of the Town of Isle au Haut Zoning
Ordinance shall be defined as the geographic areas contained
within the official map polygon shapefiles or equivalent Google
Earth™ Keyhole Markup Language (KML) files that are available
for download from the Town website. These Geographic
Information System (GIS)-based files show which land areas of
Isle au Haut are contained within each defined zone described in
Section IV of the Ordinance. Where zones were intended to
conform to parcel lot lines, as in the case of Zones F, G, H, I, and J,
the boundaries of the zones are intended to conform to actual lot
lines in any case where the lot lines are later determined by a
registered survey to differ from the boundaries of the intended
zones as defined in the GIS files. A paper map illustrating the
locations of these zones is appended to this Ordinance, but the
Official Map shall be the GIS files.
Town Zoning Ordinance
Page 32
April 25, 2016
XIII. Transition Provision.
Nothing in this ordinance shall adversely affect a building permit
issued by the planning board or the renewal thereof if the
building permit has been issued prior to January 1, 1978.
B
D
C
A
C
A
D
C
B
A
I
J
J
J
J
526,000
526,000
528,000
528,000
530,000
530,000
532,000
532,000
534,000
534,000
536,000
536,000
4,872,000
4,872,000
4,874,000
4,874,000
4,876,000
4,876,000
4,878,000
4,878,000
4,880,000
4,880,000
4,882,000
4,882,000
4,884,000
4,884,000
Legend
F
Roads
Town2016Zoning
Zone
A
B
C
D
E
I
J
0
4,000
8,000
12,000
16,000
2,000
Feet
:
Town of Isle au Haut Zoning Ordinance Map Adopted April 25, 2016
Grid is based on UTM NAD83 Zone 19 in meters
Note: the Official Zoning Map of the
Town of Isle au Haut Zoning Ordinance
shall be the Digital ESRI Shapefiles
stored and available on the Town website
Zone Classifications
A = Remote Shoreland
B = Accessible Interior
C = Accessible Shoreland
D = Remote Interior
E = Resource Protection
F = Affordable Housing Overlay
I = General Development II
J = Commercial Fisheries/Maritime
B
D
C
A
C
A
D
C
B
A
I
J
J
J
J
526,000
526,000
528,000
528,000
530,000
530,000
532,000
532,000
534,000
534,000
536,000
536,000
4,872,000
4,872,000
4,874,000
4,874,000
4,876,000
4,876,000
4,878,000
4,878,000
4,880,000
4,880,000
4,882,000
4,882,000
4,884,000
4,884,000
Legend
F
Roads
Town2016Zoning
Zone
A
B
C
D
E
I
J
0
4,000
8,000
12,000
16,000
2,000
Feet
:
Town of Isle au Haut Zoning Ordinance Map Adopted April 25, 2016
Grid is based on UTM NAD83 Zone 19 in meters
Note: the Official Zoning Map of the
Town of Isle au Haut Zoning Ordinance
shall be the Digital ESRI Shapefiles
stored and available on the Town website
Zone Classifications
A = Remote Shoreland
B = Accessible Interior
C = Accessible Shoreland
D = Remote Interior
E = Resource Protection
F = Affordable Housing Overlay
I = General Development II
J = Commercial Fisheries/Maritime