we a a %, 5 os . thks ih % * "3 Pt t ig? i
Sa Os Cee! . ie 7 ° > Sn ' :
4 » MN i } : ie ee ; 6 Cot
ae Ss Sa Bre Po a
\ TSN. : i o ,
\ ---- aS " oy vp' n'y
NS Rg ----
=< ee 2 *\ . SS < nae EN yo ae
ie en OT laa r : é
dors Fa ha ~Fh St Ce > = ; - - saceaelit' i J
' : = ey f nee 5 tins
\ oe o " s . < * y) A apes
i = . a ee tay Sore ;
TOWN OF JONESPORT
COMMERCIAL SOLAR ENERGY SYSTEMS ORDINANCE
6/21/2023
TOWN OF JONESPORT
WASHINGTON COUNTY, MAINE
COMMERCIAL SOLAR ENERGY SYSTEMS ORDINANCE
Table of Contents
SECTION 1. TITLE 2
SECTION 2. AUTHORITY 2
SECTION 3. APPLICABILITY 2
SECTION 4. PURPOSE AND INTENT Z
SECTION 5. PROCEDURES 3
SECTION 6. STANDARDS 4
SECTION 7. SPECIFIC APPLICATION SUBMISSION REQUIREMENTS .
SECTION 8. DECOMMISSIONING PLAN REQUIREMENTS 9
SECTION 9. DEFINITIONS 12
SECTION 10. RELATIONSHIP WITH OTHER ORDINANCES 13
SECTION 11. SEVERABILITY L3
SECTION 12. ENFORCEMENT 13
SECTION 14. EFFECTIVE DATE 14
page 1
TOWN OF JONESPORT
WASHINGTON COUNTY, MAINE
COMMERCIAL SOLAR ENERGY SYSTEMS ORDINANCE
Section 1. TITLE
This Ordinance shall be known and may be cited as the "Commercial Solar Energy System (SES) Ordinance."
Section 2. AUTHORITY
This Ordinance is adopted pursuant to the Town's "Home Rule" authority, provided to it by Maine Constitution and
Title 30-A, M.R.S. § 3001.
The Jonesport Planning Board (PB) may hire independent professional consultants to review Commercial SES
applications to determine any impacts to nearby properties, public safety implications or address any issues with a
Commercial SES application. The cost (if any) for such consulting services shall be borne by the Applicant. The PB
will notify the Applicant of the consultant's name and address, the reason for the consultation and estimated cost.
Section 3. APPLICABILITY
1. This Ordinance applies to the entire Town of Jonesport, including without limitation its islands and any
waterways located within the designated boundaries of the Town.
2. This Ordinance does not address Private Solar Energy Systems where the primary purpose of the system is
to generate power for residential or local business personal use.
3. This Ordinance shall apply to all proposals for new Commercial SES projects, including structures,
enlargement of existing structures, and all new land uses. Commercial SES projects are subject to location
and permitting requirements as set forth Section 15 of the Jonesport Land Use and Development Ordinance
"Table of Land Uses".
4. Any SES project proposal approved for construction prior to the effective date of this Ordinance shall not be
required to meet the terms and conditions of this Ordinance.
5. Any physical modification to any existing Commercial SES, including projects approved or constructed prior
to the effective date of this Ordinance, that expands or relocates the footprint of the Commercial SES, shall
require approval by the Planning Board under this Ordinance.
6. Routine maintenance or the installation of replacement equipment for the Commercial SES does not require
a permit unless planned work increases the design power generating capacity of the facility.
Section 4. PURPOSE AND INTENT
The purpose of this ordinance is to establish municipal review procedures and performance standards to
regulate Commercial Solar Energy Systems (SES's), including those typically characterized as "solar farms".
These standards are intended to:
1. Establish guidelines, standards, and time frames for the Town of Jonesport to regulate Commercial SESs.
2. Protect property owners from new uses of land or structures which would make their own property less
desirable and to protect the established character, social and economic stability of the Town of Jonesport.
page 2
3. Promote safe and healthful conditions by protecting public health, safety, and welfare.
4. Protect the town character including the scenic and natural beauty of the area, maintaining open spaces,
and anticipating and responding to the potential adverse effects of SES development on surrounding land
use.
5. Protect bird and other wildlife habitats, protect freshwater and coastal wetlands, conserve shore cover, and
maintain visual/actual points of access to inland and coastal waters.
6. Protect archaeological and historic resources.
7. Prevent water and soil pollution.
8. Provide for the decommissioning of Commercial SES facilities that are no longer being used for power
generation and transmission purposes.
9. Support the goals of the Jonesport Comprehensive Plan.
Section 5. PROCEDURES
1. The applicant may request a preapplication meeting with the Planning Board. The purpose of the
preapplication meeting is for the Applicant to present general information regarding the proposed
Commercial SES facility to the Planning Board. It is also an opportunity for the Applicant to receive the
Planning Board's comments prior to the expenditure of substantial sums of money on surveying, soils
identification, engineering and various other costs incurred by the Applicant.
a. The Applicant may present a preliminary sketch plan and make a verbal presentation regarding the
site and details of the proposed SES facility.
b. Following the Applicant's presentation, the Planning Board may ask questions and make
suggestions to be incorporated by the applicant into the application.
c. The Planning Board may consider whether an on-site inspection is advised. If so, a date is scheduled
and public notice given regarding the date and location.
The preapplication meeting, the submittal or review of the sketch plan or the on-site inspection shall not
be considered the initiation of the review process for the purposes of bringing the plan under the protection
of Title 1 M.R.S.A. § 302.
2. Application and Permit Fees:
More than 2 acres but not more > 500 kw $2500 $1.00 per kw
than 25 acres
Before any activity to which this Ordinance applies may commence, an application shall be filed with the
Planning Board for review. The application shall be accompanied by an application fee based upon the
planned size of the Commercial SES (Ground Space Definition and/or Power Definition). The Commercial
page 3
SES initial development project, and any subsequent modification project(s), is subject to a permit fee of
$1.00 per KW of design power generation capacity.
3. Per the Land Use Ordinance, a Code Enforcement Officer (CEO) Inspection Form must accompany each
permit application. A CEO fee of $150.00 is to be made payable to the Treasurer, Town of Jonesport, which
includes the Certificate of Compliance inspection. The application will not be considered without payment
of the CEO fee.
Within 30 (thirty) days of receiving an application, the Planning Board or CEO shall notify the Applicant that
the application is complete or if specific additional material is needed to make it complete. Application
forms are available at the Town Office.
4. Once the application is completed, the Planning Board shall set a time and place for a meeting for
consideration of the application and will notify the Applicant.
5. The Planning Board shall post notices of proposals and meetings in the Town Office and publish them ina
local newspaper. The Applicant will inform abutters of proposals by certified return receipt mail where SES
development will occur. The certified returned receipt notice(s) to abutters must be included as part of the
application.
6. The Planning Board may hold a public hearing on the proposal within 30 days of receipt of the completed
application if it feels such a hearing will be helpful in considering the proposal. If requested by one or more
abutters, the Planning Board shall hold a hearing.
7. Within 30 days of a public hearing, the planning board shall either approve, approve with conditions, or
disapprove the application. The time limit for review may be extended by mutual agreement between the
Planning Board and the Applicant.
Section 6. STANDARDS
Standards listed in this section shall be used by the Planning Board for judging an application and shall serve as
minimum requirements for approval of the proposal unless a waiver is granted in accordance with the Jonesport
Land Use and Development Ordinance, Section 8, "Waivers."
1. Maintain Scenic Views - All reasonable efforts, as determined by the Planning Board, shall be made to
ensure that Commercial SESs are visually consistent with the character of the community and maintain
scenic views identified by Jonesport Comprehensive Plan.
2. Archeological Sites: Any proposed land use activity involving structural development or soil disturbance
on or adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as
determined by the Applicant to the Maine Historic Preservation Commission for review and comment, at
least twenty (20) days prior to action being taken by the permitting authority. The permitting authority
shall consider comments received from the Commission prior to rendering a decision on the application.
Municipal officials should contact the Maine Historic Preservation Commission for the listing and location
of Historic Places in the community.
3. Lots and Coverage --Commercial SESs shall not cover more than 25 acres and shall not exceed 50% coverage
of any lot. Lot coverage shall be calculated based on the total Commercial SES structure surface area on
and/or projected over the ground. The lot size and boundaries shall be confirmed and mapped by a
page 4
Licensed Maine Surveyor. All Commercial SESs should be designed and located to ensure access without
reliance on and/or interference with adjacent properties.
4. Legal Responsibilities - The Applicant must provide proof that it has authorization to construct, use and
maintain the property and any access drive for the life of the project including decommissioning. If the
project site is leased, the lease term must cover the life of the project including decommissioning with the
property owner jointly and severally liable for the implementation and decommissioning plans. If the
project is transferred, the Applicant remains jointly and severally liable for implementation and
decommissioning plans. The roles and responsibilities of the system owner, operator, landowner, and
any other party involved in the project must be clear and meet the satisfaction of the Planning Board that
the public interest is protected. The Applicant shall build and maintain any structures, equipment, and
facilities in compliance with all relevant Federal, State and Local Laws, Regulations, and Ordinances.
5. Deed Registration -- A notice of the Commercial SES decommissioning requirements for the property shall
be recorded with the Washington County Registry of Deeds within 30 days of Commercial SES operation.
6. Setback--All Commercial SES structures shall be set back a minimum of 200 feet from all lot lines to mitigate
visual and functional impacts.
7. Prohibited Locations -- Commercial SES structures or equipment shall not be placed within any legal
easement or right-of-way, within any stormwater conveyance system, or in any location that would alter or
impede the operation of any stormwater conveyance system, and must comply with all requirements in the
Land Use and Shoreland Ordinances. A Commercial SES may not be located within one-quarter mile of State
Route 187, the Bold Coast National Scenic Byway, within Jonesport. A Commercial SES is not permitted
within the Shoreland Zone.
8. System types and locations -- Only ground-mounted photovoltaic Commercial SESs will be permitted in
Jonesport. All other Commercial SES system types are prohibited, including but not limited to systems built
on or in waterways or waterbodies, and thermal water or air collector systems.
9. Equipment Quality - Electrical Equipment must have an Underwriters Laboratory (UL) or equivalent listing.
Commercial SES equipment produced by any manufacturer, as determined by the Planning Board, known
to produce poor quality equipment that is unsafe, and/or is known to leach toxic or hazardous chemicals
into the environment is prohibited.
10. Utility Notification - Grid-integrated Commercial SESs shall not be authorized until evidence has been
provided to the Planning Board that the Applicant has an agreement with the utility to accept the power.
11. Fence - Commercial SESs shall be protected by a well-constructed perimeter security fence at least eight
feet in height. Such fences shall be raised 6 (six) inches above the ground to allow for small wildlife passage
and movement.
12. Signage - Clear and visible signage shall be installed which identifies the Commercial SES operator and
provides a 24-hour emergency contact phone number. A clearly visible warning sign shall be placed at the
base of all pad-mounted transformers and substations and on any fence surrounding the Commercial SES
informing individuals of potential voltage hazards. Signs should be posted at distances of every 25 ft.
Commercial SESs shall not be used to display any advertising.
13. Physical Screening - Commercial SESs shall have perimeter screening that ensures structures, equipment,
and facilities are screened from view to the greatest extent practical from any adjacent properties, roads,
page 5
public ways or waterways. The screen shall consist of plantings, berms, or natural topographic features
that will provide a visual screen. If these methods are deemed impractical by the Planning Board, a fence
may be used if it complies with other town ordinances.
14. Glare -- Commercial SESs shall be situated and constructed in a way that eliminates concentrated glare
visible from other properties, abutters, roadways, scenic areas, waterways, and waterbodies.
15. Noise -- Any noise generated by the Commercial SES shall not be more than 10 decibels greater than the
ambient noise level measured prior to construction, nor should it be a pure tone. The background noise
measurement should be conducted during the quietest time of the night. This noise standard must be met
at all property lines, public roads and right of ways, or any coastal or inland shoreline.
16. Height restrictions -- Commercial SES solar photovoltaic cells or arrays shall be subject to a maximum height
of 15 feet above the ground surface when oriented at maximum tilt. Associated SES structures shall be
subject to the maximum height regulations specified for principal and accessory buildings within the
applicable zoning district.
17. Lighting -- Commercial SES lighting shall be limited to that required for safety and operational purposes and
be shielded to the maximum extent possible from visibility at abutting properties. Lighting of the SES shall
be directed downward and shall incorporate full cut-off fixtures to reduce light pollution and shall otherwise
comply with the provisions of the Jonesport Land Use and Development Ordinance. Other than required
lighting, lighting shall not be used between the hours of 9:00 PM and 7:00 AM.
18. Stormwater Management -- Commercial SESs developments shall have a stormwater management system
designed by a Maine Professional Engineer for both pre and post development conditions. Components of
Commercial SES must not be located so that stormwater runoff could negatively impact an adjacent water
supply (e.g., domestic well) or a septic system.
19. Utility Connections - Reasonable efforts shall be made to place all utility connections for the Commercial
SES underground, depending on appropriate soil conditions, shape, and topography of the site and any
requirements of the utility provider. Electrical transformers for utility interconnections may be above
ground if required by the utility provider.
20. Emergency Services -- The Applicant shall provide a copy of the development project plan, electrical
schematics, and site plan to the Fire Chief.
a. The Applicant shall coordinate with the Fire Chief and any local emergency services in developing
an emergency response plan.
b. A "3200 Series KNOX-BOX", or agreed equivalent, shall be provided and installed by the Applicant
to be used to allow emergency service personnel continuous access. All means of shutting down
powered systems shall be clearly marked.
c. The Applicant shall identify a responsible person to address and respond to public inquiries
throughout the life of the Commercial SES.
d. The Applicant or Operator must provide emergency action training to Jonesport emergency services
personnel upon start of operations and at least once every 3 (three) years to the satisfaction of the
Fire Chief.
page 6
21. Fire Safety - Commercial SES Solar photovoltaic (PV) systems shall be installed in accordance with the
International Building Code or International Residential Code. The electrical portion of the solar PV systems
shall be installed in accordance with NFPA 70. Ground-mounted solar photovoltaic systems shall comply
with section 1205.5 of the International Fire Code.
22. Electromagnetic and Radiofrequency Radiation Emissions (EMFR) -- Emissions of any frequency from
Commercial SES operations shall be minimized within the limits established by the International
Commission on Non-lonizing Radiation Protection (ICNIRP) and the Institute of Electrical and Electronics
Engineers at any property lines, public roads and right of ways, or any coastal or inland shoreline.
23. Ongoing Maintenance -- The Planning Board must find that the Applicant has an appropriate operations
maintenance plan. Commercial SESs must be properly maintained and be kept free from all hazards
detrimental to public health/safety or general welfare.
a) Maintenance shall include, but not be limited to, painting, structural repairs, vegetative screening,
fences, landscaping and plantings, and security measures.
b) Cleaning of solar panels using harsh chemicals shall be avoided as they may damage the surface of
the panel and leach into the water supply. A mixture of water, mild detergent and ammonia may
be safely used for cleaning.
c) Site access shall be maintained to a level acceptable to the Fire Chief for emergency response. The
Applicant shall be responsible for the cost of maintaining the SES and any access road(s), including
regular plowing of snow to maintain road access.
d) When any portion of a ground mounted Commercial SES is removed, any earth disturbance must
be graded and reseeded, unless authorized for another use.
24. Decommissioning & Removal - Any Commercial SES shall have a Decommissioning Plan developed by a
qualified expert reviewed by the Code Enforcement Officer (CEO) and approved by the Planning Board. The
plan shall include the qualified expert's name and business information. The plan must adhere to "State of
Maine Act to Ensure Decommissioning of Solar Energy Developments" procedures and guidelines as noted
in S.P. 113-LD 802, §1, 35-A M.R.S.A c 34-D. Refer to Section 8 of this Ordinance for the "Decommissioning
Plan Requirements."
25. Sufficient Financing - The Planning Board must find that the Applicant has the financial resources to fund
development, safely operate and decommission the Commercial SES.
Section 7. SPECIFIC APPLICATION SUBMISSION REQUIREMENTS
An application for permit to construct and operate a Commercial SES must include the following submitted items
at the cost of the Applicant:
1. Identities of the owner and operator if different, with contact information. Detailed qualifications of the
operator and an overview of their experience and safety record.
2. If the Applicant will be leasing the site, a copy of the lease agreement (excluding financial consideration
terms) and a document detailing roles, rights and responsibilities of the Commercial SES owner, operator,
landowner, and any other responsible parties over the life of the lease agreement.
page 7
3. Adescription of how and to whom the energy produced will be sold and or used. .
4. Acopy of the agreement and schematic details of the connection arrangement with the transmission or
grid system clearly indicating the roles, rights, and responsibilities of all parties involved over the
development, operation, and decommissioning of the Commercial SES.
5. The Commercial SES design and equipment layout plan showing conformance to applicable industry
standards, including, but not limited to the American National Standards (ANSI), Underwriters Laboratories
(UL), the American Society for Testing and Materials (ASTM), Institute of Electrical and Electronics Engineers
(IEEE), Solar Rating and Certification Corporation (SRCC), Electrical Testing Laboratory (ETL), or other similar
certifying organizations.
6. Adescription of the PV panels, major components, and equipment to be installed, including manufacturer,
make and model, and design specifications.
7. Acomplete construction project plan with site plan, timeline, identifying known contractors, site security
controls, electrical schematic, and anticipated date of initial operations. Such plan will also be submitted
to the Fire Chief, along with a signed waiver acknowledging that the Town of Jonesport and the Jonesport
Town Fire Department have no liability beyond containing said fire to the property.
8. An Operations and Maintenance Plan, including site security controls and the projected operating life of
the Commercial SES. Such plan shall be completed by qualified experts and include measures for
maintaining safe access to the installation, stormwater controls, as well as general procedures for
operational maintenance. The plan shall include all efforts to protect and support beneficial flora and fauna
(e.g., wildlife, birds, honeybees, butterflies, wildflowers, etc.) as well as a commitment to not using pest
control substances (e.g., pesticides, herbicides, fungicides, and/or insecticides). Qualified experts' names
and places of business shall be included with the plan.
9. An Emergency Management Plan addressing all reasonably anticipated potential hazards which has been
approved by and filed with the Fire Chief.
10. A Stormwater Management Plan, certified by a Licensed Maine Engineer. The Licensed Engineer's
certification, name and business shall be disclosed as part of said plan.
11. A Soils and Groundwater Assessment, a Soils Management Plan, and a Soils Testing Plan from a qualified
soils and water expert that contains proper provisions by the expert for yearly testing for contamination
that may be produced by or leach from the Commercial SES. The soils and water expert's name and business
shall be provided as part of the plan.
a. The plan will include appropriate soils and groundwater testing before construction to determine
existing baseline conditions.
b. The plan will ensure testing the overall site conditions during construction, and after operation
starts on an annual frequency until decommissioning of the Commercial SES is complete. Annual
test results and reports will be sent to the CEO.
c. Should soil or groundwater contamination occur at any point over the life of the Commercial SES,
a point source contamination remediation plan should be developed and submitted to the CEO.
page 8
The plan will include remediation actions to be performed by a qualified soils and groundwater
specialist. The specialist's name and business shall be disclosed as part of the plan.
12. Evidence that the noise levels at all property lines, public roads and right of ways, or any coastal or inland
shoreline will not exceed 10 (ten) dB above preconstruction noise levels at any time during steady state
operation of the Commercial SES.
13. A copy of the deed detailing the property boundaries and lot description for the proposed Commercial SES
project from the Washington County Registry of Deeds and the survey of the property conducted by a
Licensed Maine Surveyor including their name and business information.
14. Hazardous waste disposal plan demonstrating compliance with Local, State and Federal waste disposal
regulations.
15. An Electromagnetic and Radiofrequency Radiation (EMFR) Management Plan provided by a reputable
professional EMFR consultant. The EMFR Management Plan will demonstrate baseline EMFR survey results
and planned actions to keep EMFR emissions from the Commercial SES within the limits specified by The
International Commission on Non-lonizing Radiation Protection (ICNIRP) at any property lines, public roads
and right of ways, or any coastal or inland shoreline. Documentation shall include the EMFR professional's
name and business information.
16. Copies of notifications and receipts sent to all abutters. Such notifications shall be sent certified mail with
return receipt at least two (2) months prior to application submission to the Planning Board. Written
notification shall include a detailed description, overall sketch, and location of the proposed SES.
17. A copy of public postings published in local newspapers with the widest local community circulation with
proof of publication date. The public postings will include an overview of the Commercial SES project and
intent to seek Planning Board approval.
18. A Decommissioning Plan meeting the requirements of Section 8 of this ordinance shall be provided by a
qualified expert. Documentation shall include qualified expert's name and business information. The plan
must adhere to "State of Maine Act to Ensure Decommissioning of Solar Energy Developments" procedures
and guidelines as noted in S.P. 113-LD 802, § 1, 35-A M.R.S.A c 34-D.
19. An escrow, surety bond, or other financial instrument which demonstrates the ability to fund future
decommissioning in the event of default or bankruptcy of the Applicant in accordance with Section 8 of this
ordinance.
20. Should a proposed Commercial SES project fail to meet the standards in this Ordinance, an Applicant may
modify the system and amend the application to propose an alternative site on the original lot, where the
project may comply with applicable standards.
Section 8. DECOMMISSIONING PLAN REQUIREMENTS
Per the State of Maine Act to Ensure Decommissioning of Solar Energy Developments, S.P. 113-LD 802, § 1, 35-A
M.R.S.A c 34-D, "Decommissioning is the physical removal of all components of a solar energy development,
including but not limited to solar panels and associated anchoring systems and foundations to a depth of at least
24" (twenty-four inches) or to the depth of bedrock, whichever is less, and other structures, buildings, roads, fences,
cables, electrical components or associated facilities and foundations to a depth of at least 24" or to the depth of
page 9
bedrock, whichever is less, to the extent the components of the development are not otherwise or proposed to be
placed in productive use or otherwise authorized to remain in place by the environmental permitting entity."
For any portion of a solar energy development located on land classified as farmland anytime within 5 years
preceding the start of construction of the development, "decommissioning" means the physical removal of all such
components of the development to a depth of at least 48" (48 inches) or to the depth of bedrock, whichever is less,
to the extent such components are not otherwise in or proposed to be placed in productive use or otherwise
authorized to remain in place by environmental permitting entity.
A Decommissioning Plan shall be provided by a qualified expert for review and approval by the Planning Board and
CEO. The plan shall include qualified expert's name and business information.
A. Decommissioning Plan Components
1. Adescription of the work required to physically remove all Commercial SES structures, equipment, security
barriers, foundations above and below grade, and transmission lines from the site, with a decommissioning
schedule. At the time of decommissioning, the Applicant may provide evidence of plans for continued
beneficial use of any or all components. Any changes to the approved decommissioning plan shall be
subject to review of the CEO and approval by the Planning Board.
Decommissioning shall consist of:
a. Physical removal of all Commercial SES structures, equipment, security barriers and transmission
lines from the site.
b. Disposal of all solid and hazardous waste in accordance with Local, State and Federal waste disposal
regulations.
c. Stabilization and re-vegetation of the site as necessary to minimize erosion. The CEO may allow the
Applicant or current responsible party to leave landscaping or designated below-grade foundations
to minimize erosion and disruptions to vegetation.
d. Any earth disturbance must be graded and re-seeded, unless authorized for another developed use.
Reseeding will be only with native species of this area, and no invasive species shall be used.
2. Anestimate of the total cost to decommission the Commercial SES including an itemized list of estimated
major expenses. The estimates will also include measures to be taken to minimize or prevent adverse
impacts on the environment during Decommissioning Plan execution. The itemized costs may include,
but are not limited to panel, equipment, foundation, building, transmission corridor, and road removal
and permanent stabilization.
3. Aninflation guard provision where cost will be adjusted yearly for inflation based on the Consumer Price
Index (CPI) forecasts over the design life of the project. Such adjustment shall be reflected in the amount
covered and/or available for the estimated total cost of decommissioning as itemized in Item 2 of this
section.
4. Aperformance bond, surety bond, letter of credit, or other form of financial assurance deemed acceptable
by the Planning Board to ensure that at the end of the Commercial SES's useful life, the Applicant will have
the necessary financial resources to pay for 110% of the estimated total inflation adjusted cost of
decommissioning. The financial assurance shall include a provision granting the Town of Jonesport the
ability to access the funds and property to perform the decommissioning if the facility is abandoned, or the
Applicant or subsequent responsible party fails to meet their obligations after reasonable notice.
page 10
5. Disposal plan for of all decommissioned equipment and facilities with specific provisions for solid and
hazardous waste in accordance with Local, State and Federal waste disposal regulations.
6. Letter acknowledging and agreeing to the Decommissioning Plan performance triggers detailed in Section
8.B. below.
B. Decommissioning Plan Performance Triggers
The following decommissioning plan triggers shall be acknowledged and agreed to by the Applicant:
1. A Commercial SES will be presumed to be abandoned if it ceases operation for more than twelve (12)
consecutive months. Upon such occurrence, the Town will notify the Applicant that a presumption of
abandonment has arisen. The Applicant may file an objection within thirty (30) days of notification. The
Applicant will then be afforded the opportunity to rebut the presumption to the Selectboard. If the
Selectboard finds that operation has not been abandoned, the Applicant will be required to file a
reasonable time-table for recommencing operations or initiating decommissioning. If the Selectboard
finds that the Applicant has not rebutted the presumption, decommissioning will be initiated. The
Applicant may appeal the Selectboard's finding of abandonment to Superior Court pursuant to Maine
Rules of Civil Procedure 80b. Decommissioning will be stayed during any such appeal.
2. Decommissioning plan shall be initiated if the project causes the soils and groundwater to become
contaminated beyond baseline levels measured during the initial soils and groundwater assessment and
remediation has not been initiated within 30 (thirty) days of identifying contamination. Proof of
remediation must be provided to the Selectboard within 6 (six) months. An extension of the six-month
requirement may be granted by the Selectboard where reasonable progress is being made. Remediation
must be completed by a qualified remediation expert. Documentation detailing remediation actions and
the professional's name and business information shall be provided to the Selectboard.
3. In addition to the remedies for conviction of a violation of this Ordinance, the Court may order
decommissioning for repeated, serious ordinance violations.
C. Applicant Reporting Requirements
1. The Commercial SES Applicant will provide the CEO a report detailing monthly power production output,
and output as a percentage of capacity for the prior full 6 months by January 15 and July 15 each year.
2. The Commercial SES Applicant will provide the results of annual soil and water contamination monitoring
to the CEO by January 15 each year.
D. Decommissioning Plan Execution
1. Commercial SESs that have reached the end of their useful operating life, cease to generate power or
have been abandoned shall be decommissioned in accordance with the approved Decommissioning
Plan.
2. Decommissioning should be completed in accordance with the decommissioning schedule contained
in the Decommissioning Plan.
3. The Applicant or current responsible party shall notify the CEO by certified mail, return receipt
; requested, of the proposed date of the discontinued operations and plans for decommissioning.
4. The Applicant or current responsible party may apply to the CEO for release of any financial assurances at
such time that it or its assignees remove the system and associated abandoned structures, and such
completed removal is found to be satisfactory by the Planning Board.
page 11
Section 9. DEFINITIONS
Abutter/Abutting Property: A person who owns property that adjoins the delineated project site property
boundary, including owners of property directly across a public or private way.
Array: A grouping of multiple solar modules with the purpose of collecting solar energy.
Commercial Solar Energy System (SES): A solar energy system where the primary purpose of the system is to
generate income from the power produced for off-site consumption.
Electromagnetic and Radiofrequency Radiation (EMFR): All known EMFR fields commonly referred to as, including
but not limited to, electromagnetic fields, electric fields, magnetic fields, radiofrequency radiation, radiofrequency
microwave radiation, dirty electricity, ionizing radiation, non-ionizing radiation, and power frequency ELF from
both wired and wireless apparatus and technologies.
Electromagnetic Field (EMF): Invisible lines of force created whenever electricity is generated or used. EMFs are
produced by power lines, electric wiring, and electric equipment and appliances. The frequency of EMFs is
measured in hertz (Hz, or cycles per second).
Electromagnetic Radiation (EMR): Electrical and magnetic energy emitted by various types of energy sources such
as radio waves, microwaves, light, x-rays, and nuclear energy and sometimes expressed or measures in photons
(particles) or as waves.
Extremely Low Frequency (ELF): The ITU designation for electromagnetic radiation (radio waves) with frequencies
from 3 to 30 Hz, and corresponding wavelengths of 100,000 to 10,000 kilometers, respectively. In atmospheric
science, an alternative definition is usually given, from 3 Hz to 3kHz.
Kilowatt (kW): A unit for measuring power that is equivalent to 1,000 watts.
Megawatt (Mw): A unit for measuring power that is equivalent to 1 (one) million watts, or 1,000 kW.
Megawatt Hour (MWh): A megawatt hour is equal to 1,000 kilowatt hours (KWh). It is equal to 1,000 kilowatts of
electricity used continuously for one hour.
Off-Grid Solar Energy System: Solar panel(s) or solar energy systems that are not integrated with the utility grid
power system.
Person: A natural person, partnership, association, company, corporation, limited liability company or
organization or a manager, agent, owner, director, servant, officer, or employee thereof. "Person" does not
include any governmental organization.
Pure Tone: The simplest periodic sound which is a constant sound created as a pressure disturbance that
fluctuates sinusoidally as a fixed frequency.
Private Solar Energy System: Solar energy system where the primary purpose is to generate power for on-site
personal residential or business use.
Rated Nameplate Capacity: The maximum rated output of electric power production of the photovoltaic system
in watts of Direct Current (DC).
Solar Energy: Radiant energy (direct, diffuse and/or reflective) received from the sun.
Solar Array: A grouping of multiple solar modules with the purpose of harvesting solar energy.
Solar Farm: See Commercial Solar Energy System (SES).
page 12
Solar Panel (CSP): A commercial solar panel is a collection of photovoltaic solar cells grouped together. Each
photovoltaic solar cell converts the energy of the sun into electricity.
Section 10. RELATIONSHIP WITH OTHER ORDINANCES
Whenever a provision of this Ordinance is inconsistent with another provision of any other ordinance, regulation,
or statute, the more restrictive provision shall control.
Section 11. SEVERABILITY
Should any section or provision of this Ordinance be declared to be invalid or void, the remaining provisions shall
not be affected and shall remain in full force and effect.
Section 12. ENFORCEMENT
This Ordinance shall be enforced by the Selectboard or their designee. Violation of this Ordinance shall be subject
to the enforcement and penalty provisions of 30-A, M.R.S. § 4452, Enforcement of Land Use Laws and Ordinances.
A. Nuisances
Any violation of this Ordinance shall be deemed to be a nuisance.
B. Code Enforcement Officer (CEO)
The Code Enforcement Officer (CEO) is authorized and shall have the authority to enforce all provisions of
this Ordinance, including obtaining fines, injunctive relief, and reasonable attorney's fees and costs
pursuant to Title 30-A, M.R.S. § 4452. If the CEO shall find any provision of this Ordinance is being
violated, he shall notify, in writing, the person responsible for such violation, indicating the nature of the
violation and ordering the action necessary to correct it, including discontinuance of illegal use of land,
buildings, or structures, and abatement of nuisance conditions. A copy of such notice shall be maintained
as a permanent record by the Planning Board.
C. Legal Actions
When the above action does not result in the correction or abatement of the violation or nuisance
condition, the Selectboard, upon notice from the CEO, are hereby directed to institute any and all actions
and proceedings, either legal or equitable, including seeking injunctions of violations and the imposition of
fines, that may be appropriate or necessary to enforce the provisions of this Ordinance in the name of
Jonesport.
The Selectboard, or their authorized agent, are hereby authorized to enter into administrative consent
agreements for the purpose of elimination violations of this Ordinance and recovering fines with Court
action. Such agreements shall not allow an illegal structure or use to continue unless there is clear and
convincing evidence that the illegal structure or use was constructed or conducted as a direct result of
erroneous advice given by and authorized Selectboard member and there is no evidence that the Applicant
acted in bad faith, or unless the removal of the structure or use will result in a threat or hazard to public
health and safety, or will result in substantial environmental damage.
D. Appeals
Except as otherwise stated herein, the Board of Appeals may, upon written application of an aggrieved
party and after public notice, hear appeals from determinations of the Planning Board or CEO in the
administration of this Ordinance. Such hearings shall be held in accordance with State laws. Following
such hearing, the Board of Appeals may reverse the decision of the Planning Board or CEO only upon a
finding that the decision is clearly contrary to specific provisions of this Ordinance.
page 13
Section 13. AMENDMENTS
A. Anamendment to this Ordinance may be initiated by the Selectboard, provided a majority of them have so
voted; or, by written petition conducted in accordance with 30-A M.R.S.A §2504, § 2522, and §2528, as
applicable.
B. The Selectboard shall hold a public hearing on the proposed amendment. Notification of the hearing shall
be posted and advertised in a newspaper of general circulation in the municipality at least seven (7) days
prior to the hearing.
C. Anamendment of this Ordinance shall be adopted by a majority vote of a Town Meeting.
Section 14, EFFECTIVE DATE
This Ordinance will be enacted on 06/21/2023, following the approval by the Voters of the Town of Jonesport
and shall take effect immediately thereafter.
Date Approved: (, Al / AOG3
Attested: Avia ( v | | AC | IAA Tonia Merchant, Town Clerk
Harry Fish Jr., Selectman r
ie
Denise ie lectwoman
'i --) el
Logan N. Alley, Selectman
page 14