This is the exact embedded text of the captured official document.
Snapshot 353d0db86272 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Kingsbury Plantation
Zoning Ordinance
Enacted: _______________________________
Amended: _______________________________
Kingsbury Plantation Zoning Ordinance
3/11/2020
2
Table of Contents
1: General Provisions ...................................................................................................................... 4
1.1
Legal Authority ................................................................................................................ 4
1.2
Purpose ............................................................................................................................. 4
1.3
Legal Provisions ............................................................................................................... 5
1.4
Amendments..................................................................................................................... 5
1.5
Availability ....................................................................................................................... 6
2: Administration and Operation of this Ordinance ........................................................................ 7
2.1
Applicability ..................................................................................................................... 7
2.2
Regulatory Coordination .................................................................................................. 7
2.3
Development Fees ............................................................................................................ 8
2.4
Violations and Enforcement of this Ordinance ................................................................ 9
2.5
Code Enforcement Officer Powers and Duties .............................................................. 10
2.6
Planning Board Powers and Duties ................................................................................ 10
2.7
Board of Appeals Powers and Duties ............................................................................. 11
3: Zoning District Definitions and Requirements ......................................................................... 16
3.1
Land Use Districts Established ...................................................................................... 16
3.2
District Requirements ..................................................................................................... 19
3.3
Non-conformance ........................................................................................................... 27
4: Review and Permitting.............................................................................................................. 34
4.1
Permits Required ............................................................................................................ 34
4.2
Permit Procedure for Code Enforcement Officer Permits ............................................. 34
4.3
Permit Procedure for Planning Board Permits ............................................................... 36
4.4
Amendments and Revisions ........................................................................................... 41
4.5
Submission Requirements .............................................................................................. 42
4.6
Expiration of Permits ..................................................................................................... 46
4.7
Installation of Public Utility Service .............................................................................. 46
5: Criteria for Approval of Land Use Activities ........................................................................... 47
5.1
Applicability ................................................................................................................... 47
5.2
Criteria for all Land Use Activities ................................................................................ 47
5.3
Criteria Specific to Subdivisions .................................................................................... 47
5.4
Criteria Specific to Shoreland Zones ............................................................................. 50
6: General Land Use Standards..................................................................................................... 51
6.1
Technical and Financial Capacity .................................................................................. 51
6.2
Public Health and Safety ................................................................................................ 51
6.3
Road and Access Design ................................................................................................ 54
6.4
Protection of Natural and Cultural Resources ................................................................ 61
6.5
Site Design Standards..................................................................................................... 71
6.6
Additional Standards for Subdivisions ........................................................................... 81
7: Activity-specific Standards ....................................................................................................... 83
7.1
Accessory Structures in the Rural District ..................................................................... 83
7.2
Agriculture and Timber Harvesting ............................................................................... 83
Kingsbury Plantation Zoning Ordinance
3/11/2020
3
7.3
Extraction of Groundwater ............................................................................................. 84
7.4
Home Occupations ......................................................................................................... 85
7.5
Mineral Exploration and Extraction ............................................................................... 86
7.6
Recreational Facilities, Campgrounds, and Campsites .................................................. 89
7.7
Structures with Water Access ........................................................................................ 91
7.8
Wind Energy Generation Facilities ................................................................................ 94
7.9
Wireless Communication Facilities ............................................................................... 94
7.10 Essential Services ........................................................................................................... 95
8: Performance Guarantees ........................................................................................................... 96
8.1
Performance Guarantee .................................................................................................. 96
8.2
Conditional Agreement .................................................................................................. 96
8.3
Cash Bond ...................................................................................................................... 97
8.4
Performance Bond .......................................................................................................... 97
8.5
Guarantee Procedures ..................................................................................................... 97
8.6
Default ............................................................................................................................ 98
9: Definitions ................................................................................................................................ 99
Appendix A ................................................................................................................................. 112
Kingsbury Plantation Zoning Ordinance
3/11/2020
4
1: General Provisions
1.1
Legal Authority
This Ordinance has been prepared and enacted in accordance with the provisions of 30-A
M.R.S.A., §3001, Home Rule; and pursuant to the authority and limitations of 30-A,
M.R.S.A., §§4401-4407, Subdivision Law; and 38 M.R.S.A., §435-449, Mandatory
Shoreland Zoning.
Kingsbury Plantation has the legal authority to adopt land use and control measures to reduce
future flood losses pursuant to 30-A M.R.S.A., §§3001-3007, §4352, §§4401-4407; and 38
M.R.S.A., §440. The "Floodplain Management Ordinance for Kingsbury Plantation" is
contained in Appendix A to this "Kingsbury Plantation Zoning Ordinance" and is a part of
this Ordinance.
1.2
Purpose
1.2.1 The purpose of this Ordinance is to promote and protect the health, welfare and safety
of Kingsbury Plantation (hereinafter referred to as "the Plantation") and its residents
through a system of land use regulation that achieves the following:
A. Ensure the design, layout, construction and maintenance of land, improvements
and structures consistent with public health and safety;
B. Provide for review and permitting of construction, subdivision, and other
development proposals with the potential to impact the Plantation;
C. Assure that new development meets the goals and conforms to the policies of the
Kingsbury Comprehensive Plan;
D. Conserve the Plantation's natural beauty and visual character by ensuring the
adequate design, layout, construction and maintenance of land, structures, signs,
and other improvements;
E. Accommodate change and growth in a manner that will prevent disruptions in
community life and in the provision of town services;
F. Protect the Plantation's natural resources including but not limited to ponds,
streams, wetlands, shoreland areas, floodplains, ground water, and wildlife
habitat from potential negative impacts of land development;
G. Provide the applicant, residents, and local government with clear procedures and
requirements for the review of applications for development; and
H. Otherwise provide for the protection of the public health, safety, and general
welfare in the management of land uses.
1.2.2 Portions of this Ordinance are intended to comply with Guidelines for Municipal
Shoreland Zoning Ordinances (38 M.R.S., Ch. 1000). The purposes of those
guidelines are: to further the maintenance of safe and healthful conditions; to prevent
and control water pollution; to protect fish spawning grounds, aquatic life, bird and
other wildlife habitat; to protect buildings and lands from flooding and accelerated
Kingsbury Plantation Zoning Ordinance
3/11/2020
5
erosion; to protect archaeological and historic resources; to protect commercial
fishing; to protect freshwater wetlands; to control building sites, placement of
structures and land uses; to conserve shore cover, and visual as well as actual points
of access to inland waters; to conserve natural beauty and open space; and to
anticipate and respond to the impacts of development in shoreland areas.
1.3
Legal Provisions
1.3.1 Conflict with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another
provision of this Ordinance or of any other ordinance, regulation or statute
administered by Kingsbury Plantation, the more restrictive provision shall control.
1.3.2 Validity and Severability
Should any provision or section of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other provision or section of this
Ordinance.
1.3.3 Effective Date
This Ordinance shall become effective upon the date specified by the Land Use
Planning Commission in its approval of Kingsbury Plantation's withdrawal petition.
Shoreland zoning provisions shall not become effective unless approved by the
Commissioner of the Department of Environmental Protection (Commissioner). A
certified copy of the Ordinance, or Ordinance Amendment, attested and signed by the
Plantation Clerk, shall be forwarded to the Commissioner for approval. If the
Commissioner fails to act on this Ordinance or Ordinance Amendment, within forty-
five (45) days of his/her receipt of the Ordinance, or Ordinance Amendment, it shall
be automatically approved. Any application for a permit submitted to the Plantation
within the forty-five (45) day period shall be governed by the terms of this Ordinance,
or Ordinance Amendment, if the Ordinance, or Ordinance Amendment, is approved
by the Commissioner.
As of the effective date of this Ordinance, Kingsbury Plantation has the sole authority
for enforcement, inspection, and penalties for violations of permits issued by the Land
Use Planning Commission to property owners within the boundaries of Kingsbury
Plantation prior to the effective date of this Ordinance.
1.4
Amendments
This Ordinance, including the Official Plantation Map, may be amended by a
majority vote of the Plantation at a Town Meeting in accordance with statutory
procedures specified for the enactment of ordinances.
1.4.1 Any proposed amendment shall be presented at a public hearing of the Planning
Board.
Kingsbury Plantation Zoning Ordinance
3/11/2020
6
The public hearing shall be advertised by a public notice posted in the Town Office at
least thirteen (13) days prior to the date of the hearing, and by two notices in at least
one newspaper of general circulation, the first to appear at least twelve (12) days prior
to the date of the hearing; the second to appear at least seven (7) days prior.
1.4.2 A proposed amendment shall be placed on the warrant of the Town Meeting by a
majority vote of the Board of Assessors, upon the recommendation of the Planning
Board or upon submission of a valid petition signed by a minimum of ten (10) percent
of the number of Kingsbury Plantation residents voting in the most recent
gubernatorial election.
1.4.3 A proposed amendment may not be further amended on the floor of a Town Meeting.
1.4.4 For amendments involving the shoreland zoning provisions of this ordinance, a copy,
attested and signed by the Plantation Clerk, shall be submitted to the Commissioner
of the Department of Environmental Protection following adoption by the Plantation,
and shall not be effective unless approved by the Commissioner. If the Commissioner
fails to act on an amendment within forty-five (45) days of his/her receipt of the
amendment, the amendment shall be automatically approved. Any application for a
permit submitted to the Plantation within the forty-five (45) day period shall be
governed by the terms of the amendment, if such amendment is approved by the
Commissioner.
1.5
Availability
A certified copy of this Ordinance and the Official Plantation Map shall be filed with
the Plantation Clerk and shall be accessible to any member of the public at reasonable
times. Copies shall be made available to the public at reasonable cost at the expense
of the person making the request. Notice of availability of this Ordinance shall be
posted.
Kingsbury Plantation Zoning Ordinance
3/11/2020
7
2: Administration and Operation of this Ordinance
2.1
Applicability
2.1.1 This Ordinance shall apply to land uses and development within Kingsbury
Plantation. All divisions of land, and buildings or structures hereinafter erected,
reconstructed, altered, enlarged, or moved in to the Plantation as well as land use
activities within shoreland zones shall be in conformance with the provisions of this
Ordinance.
2.1.2 Shoreland Zones
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
- normal high-water line of any great pond or river, or
- upland edge of a freshwater wetland, and
- all land areas within 75 feet, horizontal distance, of the normal high-water line
of a stream.
All projects must be in compliance with the Natural Resources Protection Act,
(NRPA). Contact the Maine Department of Environmental Protection Bangor Office
at 207-941-4570, or at 106 Hogan Road, Suite 6, Bangor, Maine 04401 for all
information concerning NRPA. See note at the end of Table 1, Section 3.2.1; and
Section 4.1.2,D.
NOTE: Pursuant to 38 M.R.S.A. section 440, municipalities may extend or adopt
zoning controls beyond the limits established in Section 2.1, above, in order to protect
the public health, safety, and welfare and to avoid problems associated with
floodplain development.
2.1.3 Except as provided in Section 2.1.4, below, this Ordinance does not regulate routine
maintenance and minor improvements to residential or commercial property. "Minor
improvements" means interior or exterior renovation that does not create additional
floor area or lot coverage or add to the height of the structure.
2.1.4 Floodplain Management
Within Areas of Special Flood Hazard, all new construction and substantial
improvements, as defined, will require a permit in accordance with Appendix A of
this Ordinance.
2.2
Regulatory Coordination
The issuance of a permit or approval under the terms of this Ordinance does not
relieve the developer of the obligation to obtain permits under other federal, state, or
local authority. To aid its review of permit applications, the Planning Board may
require copies of federal or state permits or applications.
Kingsbury Plantation Zoning Ordinance
3/11/2020
8
2.3
Development Fees
2.3.1 The Board of Assessors of Kingsbury Plantation is hereby authorized to determine the
amounts of fees to be assessed for permits, applications and related activities. A fee
schedule shall be published and attached to all applications for development under
this Ordinance.
2.3.2 The Board of Assessors may amend the fee schedule from time to time as deemed
necessary upon the advice of the Planning Board. A public hearing shall be held prior
to the Board vote to amend the fee schedule. Notice of the public hearing shall be
posted in the town office a minimum of fourteen (14) prior to the date of the hearing.
2.3.3 The initial fee schedule shall become effective on the day it is approved. Amended
fee schedules shall become effective thirty (30) days after the date of approval.
2.3.4 The purpose of the fees to be collected is so that the applicant will bear the cost of
development review. The amounts of fees shall be set to reasonably relate to the
actual cost of review except that no fee shall be charged for a permit for which the
total cost of construction does not exceed $5,000. Fees shall be set on a sliding scale
to reflect the complexity of the review and administrative services expected to be
incurred.
2.3.5 The fee schedule shall include provisions for a technical review fee, to be
administered under the following provisions:
A. A technical review fee may be required by the Planning Board when it
determines that an application is likely to require the services of professionals not
employed by the Plantation. This may include, but not be limited to, engineering,
scientific, or legal services. The amount of the fee shall be set by the Planning
Board, based on a reasonable estimate of the cost of services required.
B. This fee must be paid to Kingsbury Plantation and must be deposited in a
Planning Board Trust Account, which shall be separate and distinct from all other
Plantation accounts. The application will be considered incomplete until this fee
is paid. If the cost of services exceeds the amount available, the Board shall
request additional payment from the applicant, and review of the permit shall be
suspended until payment has been made.
C. Technical review fees may be used to pay for reasonable costs incurred by the
Planning Board, at its discretion, which relate directly to the review of the
application. Fees shall not be used by the Planning Board for any enforcement
purposes nor shall the applicant be liable for costs incurred by or costs of
services contracted for by the Planning Board, which do not relate directly to the
applicant's project.
D. The Plantation shall refund all the remaining monies, including accrued interest,
in the account after the payment of all costs and services related to this review.
Refund of remaining monies shall be made no later than ninety (90) days after
Kingsbury Plantation Zoning Ordinance
3/11/2020
9
final action on the application. Such refund shall be accompanied by a final
accounting of expenditures from the fund.
2.4
Violations and Enforcement of this Ordinance
Nuisances: Any violation of this Ordinance shall be deemed to be a nuisance.
2.4.1 It shall be the duty of the Code Enforcement Officer (CEO) to enforce the provisions
of this Ordinance.
2.4.2 The Code Enforcement Officer, in the discharge of official duties, and upon proper
identification, shall have authority to enter any building, structure or premises at
reasonable hours to inspect for compliance with this Ordinance. The Code
Enforcement Officer shall conduct on-site inspections to insure compliance with all
applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
2.4.3 If the Code Enforcement Officer shall find that any provision of this Ordinance is
being violated, he or she shall notify in writing the person responsible for such
violation, indicating the nature of the violation and ordering the action necessary to
correct it, including discontinuance of illegal use of land, buildings or structures, or
work being done, removal of illegal buildings or structures, and abatement of
nuisance conditions. A copy of such notices shall be submitted to the municipal
officers and be maintained as a permanent record.
2.4.4 Legal Actions
When the above action does not result in the correction or abatement of the violation
or nuisance condition, the Board of Assessors, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and
proceedings, either legal or equitable, including seeking injunctions of violations and
the imposition of fines, that may be appropriate or necessary to enforce the provisions
of this Ordinance in the name of Kingsbury Plantation.
2.4.5 Administrative Consent Agreements
The Board of Assessors, or their authorized agent, are hereby authorized to enter into
administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not
allow an illegal structure or use to continue unless there is clear and convincing
evidence that the illegal structure or use was constructed or conducted as a direct
result of erroneous advice given by an authorized municipal official and there is no
evidence that the owner acted in bad faith, or unless the removal of the structure or
use will result in a threat or hazard to public health and safety or will result in
substantial environmental damage.
Kingsbury Plantation Zoning Ordinance
3/11/2020
10
2.4.6 Fines
Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be
penalized in accordance with 30-A, M.R.S.A. §4452.
Each day such violation is permitted to exist after notification shall constitute a
separate offense. All fines shall be paid to Kingsbury Plantation. Such persons shall
also be liable for court costs and reasonable attorney fees incurred by the Plantation.
NOTE: Current penalties include fines of not less than $100 nor more than $2,500
per violation for each day that the violation continues. However, in a Resource
Protection district the maximum penalty is increased to $5,000 (38 M.R.S.A. §4452).
2.5
Code Enforcement Officer Powers and Duties
2.5.1 Code Enforcement Officer
The Code Enforcement Officer shall be appointed or reappointed annually by July 1st
by the Board of Assessors. During any temporary absence or disability of the CEO,
the Board of Assessors shall designate an acting CEO.
2.5.2 Powers and Duties
The Code Enforcement Officer shall keep a complete record of all essential
transactions of the office, including applications submitted, permits granted or
denied, variances granted or denied, revocation actions, revocation of permits,
appeals, court actions, violations investigated, violations found, and fees collected.
The Code Enforcement Officer shall have the following duties:
A. Issue permits as authorized by this Ordinance;
B. Advise the Planning Board regarding technical aspects of applications for which
it has review responsibility;
C. Inspect sites where permits have been issued to insure compliance with this
Ordinance;
D. Investigate complaints and reported violations;
E. Enforce the provisions of this Ordinance;
F. Keep written inspections reports and thorough records;
G. Participate in appeals procedures;
H. Appear in court when necessary;
I.
Confer with citizens upon request; and
J.
Attend meetings of the Planning Board.
2.6
Planning Board Powers and Duties
2.6.1 In accordance with the provisions of State law, this Ordinance authorizes the
establishment of the Kingsbury Plantation Planning Board.
Kingsbury Plantation Zoning Ordinance
3/11/2020
11
A. The Planning Board will consist of three (3) members and two (2) associate
members. Two (2) Board members and one (1) associate member shall be
Plantation residents, the remaining members may be seasonal residents of the
Plantation or residents from the surrounding communities who are regularly
engaged in Plantation recreational activities.
B. The term of appointment shall be for four (4) years, with the initial appointment
of one (1) member and one (1) associate member being for two (2) years. If a
member or associate member shall resign before his or her term expires, the
Board of Assessors shall appoint a new member to fill the unexpired term.
C. The Planning Board shall annually elect a chairperson and a vice-chair/secretary
from among its membership.
D. No meeting of the Planning Board shall be held without a quorum, consisting of
at least three (3) members. Any decision of the Planning Board shall be by a
majority vote of those present and voting.
E. The vice-chair/secretary of the Planning Board shall be responsible for seeing
that a record is kept of all meetings, decisions, transactions, correspondence, and
other determinations. All records are public information and may be inspected by
the public during the hours that the Plantation is normally open for business.
2.6.2 The Planning Board shall perform such duties and exercise such powers as are
authorized by this Ordinance. The Planning Board may also engage in such studies
and plans as are authorized by the Board of Assessors or Town Meeting.
2.6.3 No Planning Board member shall vote or participate in deliberations on any
application in which he or she has a conflict of interest or appearance of a conflict of
interest. If a member does not recuse himself or herself voluntarily and the issue is
raised, the member's participation shall be determined by a majority vote of the
board, excluding that member who is being challenged.
2.6.4 The Planning Board shall from time to time review and make recommendations to the
Board of Assessors concerning the operation of this ordinance, proposed amendments
or fees to be collected.
2.6.5 The Planning Board is authorized to adopt such rules and procedures as will
contribute to the efficient administration of their duties under this ordinance.
2.7
Board of Appeals Powers and Duties
2.7.1 This Ordinance authorizes the creation of the Kingsbury Plantation Board of Appeals,
consisting of three (3) members in accordance with the provisions of State law, 30-A
M.R.S.A., §2691, to hear and decide administrative and variance appeals. The
organization and procedures of the Board of Appeals shall be as provided in 30-A
M.R.S.A., §2691(2) and (3). A minimum of one (1) member of the Board of Appeals
must be a resident of the Plantation; two (2) members may be seasonal residents.
Kingsbury Plantation Zoning Ordinance
3/11/2020
12
Neither a member of the Planning Board nor a spouse of a Planning Board member
shall be appointed to the Board of Appeals.
2.7.2 Administrative Appeals
A. The Board of Appeals shall hear and decide administrative appeals, on a de novo
basis, where it is alleged by an aggrieved party that there is an error in any
order, requirement, decision, or determination made by, or failure to act by, the
Planning Board in the administration of this Ordinance; and hear and decide
administrative appeals on a de novo basis where it is alleged by an aggrieved
party that there is an error in any order, requirement, decision or determination
made by, or failure to act by, the Code Enforcement Officer in his or her review
of and action on a permit application under this Ordinance.
B. The Board of Appeals shall hear and authorize variances upon appeal, within the
limitations set forth in this Ordinance.
C. In its consideration of an administrative appeal, the Board of Appeals shall hear
and act only on evidence already presented at the administrative level. No new
evidence shall be considered.
D. When errors of administrative procedure or interpretation are found by the Board
of Appeals, the case shall be remanded to the Planning Board or Code
Enforcement Officer for reconsideration consistent with the Board of Appeals
decision.
E. Any order, requirement, decision or determination made, or failure to act, in the
enforcement of this Ordinance is not appealable to the Board of Appeals.
2.7.3 Variance Appeals
A. The Board of Appeals may permit variances only under the following conditions:
(1)
Variances may be granted only from dimensional requirements including
but not limited to, lot width, structure height, percent of lot coverage, and
setback requirements.
(2)
Variances shall not be granted for establishment of any uses otherwise
prohibited by this Ordinance.
(3)
Except as provided in subsection B, below, the Board of Appeals shall not
grant a variance unless it finds that the proposed structure or use would
meet the provisions of Sections 3, 6 and 7, as applicable, except for the
specific provision which has created the non-conformity and from which
relief is sought; and the strict application of the terms of this Ordinance
would result in "undue hardship", as stated below:
(a) The land in question cannot yield a reasonable return unless a
variance is granted;
(b) The need for a variance is due to the unique circumstances of the
property and not to the general conditions in the neighborhood;
Kingsbury Plantation Zoning Ordinance
3/11/2020
13
(c) The granting of a variance will not alter the essential character of the
locality; and
(d) The hardship is not the result of action taken by the applicant or a
prior owner.
B. Notwithstanding Section 2.7.3,A,3, above, the Board of Appeals, or the Code
Enforcement Officer if authorized in accordance with 30-A M.R.S.A. §4353-A,
may grant a variance to an owner of a residential dwelling for the purpose of
making that dwelling accessible to a person with a disability who resides in or
regularly uses the dwelling. The Board of Appeals shall restrict any variance
granted under this subsection solely to the installation of equipment or the
construction of structures necessary for access to or egress from the dwelling by
the person with the disability. The Board of Appeals may impose conditions on
the variance, including limiting the variance to the duration of the disability or to
the time that the person with the disability lives in the dwelling. The term
"structures necessary for access to or egress from the dwelling" shall include
railing, wall or roof systems necessary for the safety or effectiveness of the
structure. Any permit issued pursuant to this subsection is subject to Sections
2.7.3,D and 2.7.7,B,4, below.
C. The Board of Appeals shall limit any variances granted as strictly as possible in
order to ensure conformance with the purposes and provisions of this Ordinance
to the greatest extent possible, and in doing so may impose such conditions to a
variance as it deems necessary. The party receiving the variance shall comply
with any conditions imposed.
D. A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the municipal
officials to the Commissioner of the Department of Environmental Protection at
least twenty (20) days prior to action by the Board of Appeals. Any comments
received from the Commissioner prior to the action by the Board of Appeals shall
be made part of the record and shall be taken into consideration by the Board of
Appeals.
2.7.4 Timing of Appeals
A. An administrative or variance appeal may be taken to the Board of Appeals by an
applicant, owner, or aggrieved party. Such appeal shall be taken within thirty
(30) days of the date of the action being appealed, and not otherwise, except that
the Board of Appeals, upon a showing of good cause, may waive the thirty (30)
day requirement.
B. Any applicant, owner, or aggrieved party who participated as a party during the
proceedings before the Board of Appeals may take an appeal to Superior Court in
accordance with State laws within thirty (30) days from the date of any decision
of the Board of Appeals or as otherwise allowed by the Superior Court.
Kingsbury Plantation Zoning Ordinance
3/11/2020
14
2.7.5 Administrative Appeals of a Code Enforcement Officer Decision
When the Board of Appeals reviews a decision of the Code Enforcement Officer, the
Board of Appeals shall hold a "de novo" hearing. At this time the Board may receive
and consider new evidence and testimony, be it oral or written. When acting in a "de
novo" capacity the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of evidence and the law, and reaching its
own decision.
2.7.6 Administrative Appeals of a Planning Board Decision
When the Board of Appeals hears a decision of the Planning Board, it shall hold a de
novo hearing, and may reverse the decision of the Planning Board only upon finding
that the decision was contrary to specific provisions of the Ordinance or contrary to
the facts presented to the Planning Board. The Board of Appeals may receive and
consider new evidence and testimony, be it oral or written. When acting in a "de
novo" capacity the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of evidence and the law, and reaching its
own decision.
2.7.7 Appeal Procedure
A. Making an Appeal
(1)
An administrative or variance appeal may be taken to the Board of Appeals
by an aggrieved party from any decision of the Code Enforcement Officer
or the Planning Board, except for enforcement-related matters as
described in Section 2.7.2,A, above. Such an appeal shall be taken within
thirty (30) days of the date of the official, written decision appealed from,
and not otherwise, except that the Board, upon a showing of good cause,
may waive the thirty (30) day requirement.
(2)
Applications for appeals shall be made by filing with the Board of Appeals
a written notice of appeal which includes:
(a) A concise written statement indicating what relief is requested and
why the appeal or variance should be granted.
(b) A sketch drawn to scale showing lot lines, location of existing
buildings and structures and other physical features of the lot
pertinent to the relief sought.
(3)
Upon receiving an application for an administrative appeal or a variance,
the Code Enforcement Officer or Planning Board, as appropriate, shall
transmit to the Board of Appeals all of the papers constituting the record of
the decision appealed from.
(4)
The Board of Appeals shall hold a public hearing on an administrative
appeal or a request for a variance within thirty-five (35) days of its receipt
of a complete written application, unless this time period is extended by the
parties.
Kingsbury Plantation Zoning Ordinance
3/11/2020
15
B. Decision by Board of Appeals
(1)
A majority of the full voting membership of the Board shall constitute a
quorum for the purpose of deciding an appeal.
(2)
The person filing the appeal shall have the burden of proof.
(3)
The Board shall decide all administrative appeals and variance appeals
within thirty-five (35) days after the close of the hearing and shall issue a
written decision on all appeals.
(4)
The Board of Appeals shall state the reasons and basis for its decision,
including a statement of the facts found and conclusions reached by the
Board. The Board shall cause written notice of its decision to be mailed or
hand-delivered to the applicant, and to the Department of Environmental
Protection when the decision affects the shoreland zone, within seven (7)
days of the Board's decision. Copies of written decisions of the Board of
Appeals shall be given to the Planning Board, Code Enforcement Officer,
and the municipal officers.
2.7.8 Appeal to Superior Court
Except as provided by 30-A M.R.S.A. §2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take
an appeal to Superior Court in accordance with State laws within forty-five (45) days
from the date of any decision of the Board of Appeals.
2.7.9 Reconsideration
In accordance with 30-A M.R.S.A. §2691(3)(F), the Board of Appeals may reconsider
any decision within forty-five (45) days of its prior decision. A request to the Board to
reconsider a decision must be filed within ten (10) days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must
occur and be completed within forty-five (45) days of the date of the vote on the
original decision. Reconsideration of a decision shall require a positive vote of the
majority of the Board members originally voting on the decision, and proper
notification to the landowner, petitioner, planning board, code enforcement officer,
and other parties of interest, including abutters and those who testified at the original
hearing(s). The Board may conduct additional hearings and receive additional
evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15)
days after the decision on reconsideration.
Kingsbury Plantation Zoning Ordinance
3/11/2020
16
3: Zoning District Definitions and Requirements
3.1
Land Use Districts Established
3.1.1 Official Plantation Map
The zoning districts referenced in this Ordinance are located and bounded as shown
on the Official Plantation Map, which is hereby made a part of this Ordinance.
A. Certification of Official Plantation Map
The Official Plantation Map (hereinafter referred to as the "Map") shall be
certified by the attested signature of the Plantation Clerk under the following
words: "This is the Official Map of the Zoning Ordinance of Kingsbury
Plantation" and shall be located in the municipal office. In the event the
municipality does not have a municipal office, the Plantation Clerk shall be the
custodian of the map.
The areas to which the Shoreland Zoning Ordinance is applicable are hereby
divided into the following districts as shown on the Official Plantation Map(s)
which is (are) made a part of this Ordinance: Resource Protection, Limited
Residential, and Stream Protection.
B. Scale of Map
The Official Plantation Map shall be drawn at a scale of not less than: 1 inch =
2000 feet. District boundaries shall be clearly delineated and a legend indicating
the symbols for each district shall be placed on the map.
NOTE: Because of map scale or other reason, a municipality may have a series
of maps depicting its shoreland zone.
C. Changes to the Official Plantation Map
(1)
If amendments are made in the district boundaries that are not within the
shoreland zone, or other matter portrayed on the Official Plantation Map,
such changes shall be made on the Map within fourteen (14) days after the
amendment has been adopted together with an entry on the Map as follows:
"On [date], the Town Meeting enacted the following change: [insert brief
description of the nature of change]." Immediately beneath the entry the
Plantation Clerk shall place his or her signature.
(2)
If amendments are made in the district boundaries of the Resource
Protection, Limited Residential, or Stream Protection Districts, or other
matter portrayed on the Official Plantation Map, such changes shall be
made on the Map within thirty (30) days after the amendment has been
approved by the Commissioner of the Department of Environmental
Protection.
Kingsbury Plantation Zoning Ordinance
3/11/2020
17
D. Replacement of Official Plantation Map
In the event that the Official Plantation Map becomes damaged, destroyed, lost
or difficult to interpret because of the nature or number of changes and additions
the Board of Assessors shall authorize re-creation of the map as nearly as
possible to the most recent official version.
3.1.2 Interpretation of District Boundaries
Unless otherwise set forth on the Official Plantation Map, district boundary lines are
property lines, or measured from the centerlines of streets, roads and rights of way,
and the boundaries of the shoreland area as defined herein. Where uncertainty exists
as to the exact location of district boundary lines, the reference points, e.g. edge of
wetland, waterbody or road, shall be as located on the face of the earth. In all cases,
the Board of Appeals shall be the final authority as to location.
3.1.3 Land Use Requirements
Except as hereinafter specified, no building, structure or land shall hereafter be used
or occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in
conformity with all of the regulations herein specified for the district in which it is
located, unless a variance is granted.
3.1.4 District Descriptions
A. Rural District
The Rural District contains all lands not included in other defined districts. The
Rural District is intended for low-intensity development, forest management,
agriculture, and protection of critical natural resources.
B. Limited Residential (LR) District
The Limited Residential District includes those areas within the shoreland zone
that are suitable for residential and recreational development. It includes areas
other than those in the Resource Protection District or Stream Protection
District.
C. Stream Protection (SP) District
The Stream Protection District includes all land areas within seventy-five (75)
feet, horizontal distance, of the normal high-water line of a stream, exclusive of
those areas within two-hundred and fifty (250) feet, horizontal distance, of the
normal high-water line of a great pond, or river, or within two hundred and fifty
(250) feet, horizontal distance, of the upland edge of a freshwater wetland.
Where a stream and its associated shoreland area are located within two-
hundred and fifty (250) feet, horizontal distance, of the above water bodies or
wetlands, that land area shall be regulated under the terms of the shoreland
district associated with that water body or wetland.
Kingsbury Plantation Zoning Ordinance
3/11/2020
18
D. Resource Protection (RP) District
The Resource Protection District includes areas in which development would
adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This District shall include the following areas when
they occur within the limits of the shoreland zone, exclusive of the Stream
Protection District, except that areas which are currently developed need not be
included within the Resource Protection District. As required by the Mandatory
Shoreland Zoning Act, 38 M.R.S.A., §§435-449, these include:
(1)
IWWH
Areas within 250 feet, horizontal distance, of the upland edge of freshwater
wetlands, which are rated "moderate" or "high" value waterfowl and
wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W), as depicted on
the Official Plantation Map. These areas are generally depicted on a
Geographic Information System (GIS) data layer.
(2)
Floodplains
Floodplains along rivers and floodplains along artificially formed great
ponds along rivers, defined by the 100-year flood plain as designated on
the Federal Emergency Management Agency's (FEMA) Flood Insurance
Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in
the absence of these, by soil types identified as recent flood plain soils.
(3)
Steep Slopes
Areas of two (2) or more contiguous acres with sustained slopes of 20% or
greater.
(4)
Additional Wetlands
Areas of two (2) or more contiguous acres supporting wetland vegetation
and hydric soils, which are not part of a freshwater wetland as defined, and
which are not surficially connected to a water body during the period of
normal high water.
NOTE: These areas usually consist of forested wetlands abutting water
bodies and non-forested wetlands.
(5)
Land Along Rivers
Land areas along rivers subject to severe bank erosion, undercutting, or
river bed movement.
(6)
Wildlife Habitat
Other important wildlife habitat;
(7)
Scenic and Esthetic Sites
Natural sites of significant scenic or esthetic value;
Kingsbury Plantation Zoning Ordinance
3/11/2020
19
(8)
Natural Areas of Significance
Areas designated by federal, state or municipal governments as natural
areas of significance to be protected from development; and
(9)
Other Significant Areas
Other significant areas which should be included in this district to fulfill
the purposes of this Ordinance, such as, but not limited to, existing public
access areas and certain significant archaeological and historic sites
deserving of long-term protection as determined by the municipality after
consultation with the Maine Historic Preservation Commission.
E. Wind Energy Generation Facility (WE) District
The purpose of the Wind Energy Facility District is to allow for development of
grid-scale wind energy generation facilities. The Wind Energy Facility District
includes all land, related structures, utilities, and connections associated with the
conversion and delivery of energy, including but not limited to wind turbines,
buildings and other structures, access roads, and generator lead lines. The WE
District is an overlay district and may include areas also designated as Stream
Protection (SP) or Resource Protection (RP) Districts. In cases where the WE
District includes areas that are also included within the SP or RP Districts, the
Planning Board will designate the land area for inclusion in that major district
which best achieves the purpose and intent of this ordinance.
3.2
District Requirements
3.2.1 Permitted Uses
All land use activities, as indicated in Table 1, Table of Regulated Land Uses, shall
conform with all of the applicable land use standards in Sections 3.2, 6, and 7. The
district designation for a particular site shall be determined from the Official
Plantation Zoning Map.
Key to Table 1
District Designations
Yes
Allowed. No permit required but the use must comply with
all applicable land use standards.
Rural
Rural
No
Prohibited
RP
Resource Protection
PB
Allowed with permit issued by the Planning Board
LR
Limited Residential
CEO Allowed with permit issued by the Code Enforcement
Officer
SP
Stream Protection
LPI
Allowed with permit issued by the Local Plumbing
Inspector
WE
Wind Energy Facility
Kingsbury Plantation Zoning Ordinance
3/11/2020
20
TABLE 1: Table of Regulated Land Uses
LAND USES
DISTRICTS
Rural
SP
RP
LR
WE
1
Non-intensive recreational uses not requiring
structures, such as hunting, fishing, and hiking
Yes
Yes
Yes
Yes
Yes
2
Motorized vehicular traffic on existing roads
and trails
Yes
Yes
Yes
Yes
Yes
3
Clearing or removal of vegetation for approved
construction and other allowed uses for activities
other than timber harvesting (see Section 6.5.1)
Yes
CEO
CEO1
Yes
PB
4
Fire prevention activities
Yes
Yes
Yes
Yes
Yes
5
Wildlife management practices
Yes
Yes
Yes
Yes
Yes
6
Soil and water conservation practices
Yes
Yes
Yes
Yes
Yes
7
Mineral exploration (see Section 7.5.2)
Yes
No
Yes2
Yes2
Yes
8
Mineral extraction including sand and gravel
extraction (see Section 7.5.1)
PB
No
PB3
PB
PB
9
Surveying and resource analysis (see Section
4.1.2,B)
Yes
Yes
Yes
Yes
Yes
10 Emergency operations
Yes
Yes
Yes
Yes
Yes
11 Agriculture (see Section 7.2)
Yes
Yes
PB
Yes
No
12 Agricultural processing facility
PB
No
No
No
No
13 Aquaculture
PB
PB
PB
PB
No
14 Principal structures and uses and additions
thereto:
A. One and two family residential, including
driveways
CEO
PB4
PB9
CEO
No
B. Multi-unit residential
No
No
No
PB
No
C. Commercial
No
No
No10
No10
No
D. Governmental and institutional
PB
No
No
PB
No
E. Small non-residential facilities for
educational, scientific, or nature interpretation
purposes
CEO
PB4
PB
CEO
No
15 Structures accessory to allowed uses (see
Section 7.1)
Yes13
PB4
PB
CEO
PB
16 Conversions of seasonal residences to year-
round residences
LPI
LPI
LPI
LPI
n/a
17 Home occupations (see Section 7.4)
PB
PB
PB
PB
n/a
18 Private sewage disposal systems for allowed
uses
LPI
LPI
LPI
LPI
n/a
19 Essential services (see Section 7.10)
PB
PB6
PB6
PB
PB
A. Roadside distribution lines (34.5kV and
lower)
Yes
CEO6
CEO6
Yes12
PB
B. Non-roadside or cross-country distribution
lines involving ten poles or less
CEO
PB6
PB6
CEO
PB
Kingsbury Plantation Zoning Ordinance
3/11/2020
21
TABLE 1: Table of Regulated Land Uses
LAND USES
DISTRICTS
Rural
SP
RP
LR
WE
C. Non-roadside or cross-country distribution
lines involving eleven or more poles
PB
PB6
PB6
PB
PB
D. Other essential services
PB
PB6
PB6
PB
PB
20 Service drops, as defined, to allowed uses
Yes
Yes
Yes
Yes
PB
21 Recreational lodging facility (see Section 7.6)
A. Primitive
CEO
CEO
No
CEO
No
B. Small
PB
No
No
No
No
22 Public and private recreational areas involving
minimal structural development
PB
PB
PB
PB
No
23 Individual, private campsites (see Section 7.6.5)
Yes
CEO
CEO
CEO
No
24 Campgrounds (see Section 7.6.4)
PB
No
No7
PB
No
25 Road and commercial driveway construction
PB
PB
No8
PB
PB
26 Parking facilities
PB
No
No7
PB
PB
27 Marinas and houseboats
n/a
PB
No
PB
n/a
28 Filling and earthmoving of < 10 cubic yards
Yes
CEO
CEO
Yes
Yes
29 Filling and earthmoving of => 10 cubic yards
PB
PB
PB
CEO
CEO
30 Signs meeting the provisions of Section 6.5.5
Yes
Yes
Yes
Yes
Yes
31 Uses similar to allowed uses
Yes
CEO
CEO
CEO
Yes
32 Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
PB
33 Uses similar to uses requiring a PB permit
PB
PB
PB
PB
PB
34 Wind Energy Generation Facility, including
generator lead lines
No
No
No
No
PB
1 In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove
safety hazards.
2 Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3 In RP not allowed in areas so designated because of wildlife value.
4 Provided that a variance from the setback requirement is obtained from the Board of Appeals.
6 See further restrictions in Section 7.10.2.
7 Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the
PB.
8 Except as provided in Section 6.3.1,H,6.
9 Single family residential structures may be allowed by special exception only according to the provisions of Section
4.3.6, Special Exceptions. Two-family residential structures are prohibited.
10 Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the
respective district.
12 Permit not required but must file a written "notice of intent to construct" with CEO.
13 Permit not required only if the provisions of Section 7.1 are met. Otherwise, a CEO permit is required.
NOTE: A person performing any of the following activities shall require a permit from the
Department of Environmental Protection, pursuant to 38 M.R.S.A. §480-C, if the activity occurs in,
Kingsbury Plantation Zoning Ordinance
3/11/2020
22
on, over or adjacent to any freshwater wetland, great pond, river, stream or brook and operates in
such a manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B.
Draining or otherwise dewatering;
C.
Filling; or
D.
Any construction or alteration of any permanent structure.
3.2.2 Dimensional Standards
NOTE: Municipalities should review the land use standards contained herein to
determine whether they will result in a scale of development that is compatible with
existing development or with the future desired scale of development. If not, more
restrictive land use standards may be adopted by the municipality.
Numerical standards in this section cannot be waived. A person can get relief from
dimensional standards only through obtaining a variance, as provided in Section
2.7.3.
A. General Standards in all Districts
All land use activities shall conform with the following provisions, if applicable.
(1)
If more than one residential dwelling unit, principal governmental or
institutional structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met
for each additional dwelling unit, principal structure, or use.
(2)
Lots located on opposite sides of a public or private road shall be
considered each a separate tract or parcel of land unless such road was
established by the owner of land on both sides thereof after September 22,
1971.
(3)
Minimum Lot Area
(a) Per dwelling unit: 40,000 square feet
(b) For Government and Institutional, per principal structure: 60,000
square feet
(c) For Public and Private Recreational Facilities: 40,000 square feet
(d) Land below the normal high-water line of a water body or upland edge
of a wetland and land beneath roads serving more than two (2) lots
shall not be included toward calculating minimum lot area.
(e) The minimum width of any portion of any lot within one hundred (100)
feet, horizontal distance, of the normal high-water line of a water body
or upland edge of a wetland shall be equal to or greater than the shore
frontage requirement for a lot with the proposed use.
(4)
Lot Configuration Ratio
Not to exceed 5:1 length-to-width
Kingsbury Plantation Zoning Ordinance
3/11/2020
23
(5)
Minimum Road Frontage
(a) 100 feet per dwelling unit for residential development
(b) 200 feet for non-residential development
(c) If a lot borders more than one road, the frontage requirement must be
met on only one road.
(6)
Road and Property Line Setbacks
(a) 50 feet from the edge of a road (residential)
(b) 75 feet from the edge of a road (non-residential)
(c) 15 feet from all property lines (residential)
(d) 25 feet from all property lines (non-residential)
(7)
Structure Height: 35 feet
Principal or accessory structures and expansions of existing structures
which are permitted in the Rural, Wind Energy Facility, Stream Protection,
Resource Protection, and Limited Residential Districts, shall not exceed
thirty-five (35) feet in height. This provision shall not apply to structures
such as transmission towers, windmills, antennas, and similar structures
having no floor area.
NOTE: A municipality may also exempt a cupola, dome, widow's walk or
other similar feature from the height limits in accordance with 38 M.R.S.A.
§439-A(9).
(8)
Lot Coverage
20 percent in all districts, except as provided in Section 3.2.2.A.6.a.
(a) Districts located adjacent to rivers that do not flow to great ponds,
non-vegetated surfaces shall not exceed a total of twenty (20) percent
of the portion of the lot located within the shoreland zone. This
limitation does not apply to public boat launching facilities regardless
of the district in which the facility is located.
(b) For the purposes of calculating lot coverage, non-vegetated surfaces
include, but are not limited to the following: structures, driveways,
parking areas, and other areas from which vegetation has been
removed. Naturally occurring ledge and rock outcroppings are not
counted as non-vegetated surfaces when calculating lot coverage for
lots of record on March 24, 1990 and in continuous existence since
that date.
(9)
The lowest floor elevation or openings of all buildings and structures,
including basements, shall be elevated at least one foot above the elevation
of the 100-year flood, the flood of record, or in the absence of these, the
flood as defined by soil types identified as recent flood-plain soils. In those
municipalities that participate in the National Flood Insurance Program
Kingsbury Plantation Zoning Ordinance
3/11/2020
24
and have adopted the April 2005 version, or later version, of the
Floodplain Management Ordinance, accessory structures may be placed in
accordance with the standards of that ordinance and need not meet the
elevation requirements of this paragraph.
B. Dimensional Standards for all Districts - Shore Frontage and Shoreline
Setbacks
(1)
Minimum Shore Frontage
Residential, per dwelling unit: 200 feet
Government and Institutional: 300 feet
Public and Private Recreational Facilities: 200 feet
(2)
Minimum Shoreline Setbacks
(a) Residential
All new residential principal and accessory structures shall be set back
at least one hundred (100) feet, horizontal distance, from the normal
high-water line of great ponds classified GPA and rivers that flow to
great ponds classified GPA, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland.
NOTE: The Natural Resources Protection Act, 38 M.R.S.A. §§480-A
through 480-HH, requires the Department of Environmental Protection to
designate areas of "significant wildlife habitat".
Permitting under the Natural Resources Protection Act for activities
adjacent to significant wildlife habitat areas may require greater setbacks.
Contact your local Department of Environmental Protection office to see if
additional permitting is required.
(b) Non-Residential
All non-residential principal and accessory structures shall be set back
at least one hundred fifty (150) feet, horizontal distance, from the
normal high-water line of great ponds classified GPA and rivers that
flow to great ponds classified GPA, and one hundred (100) feet,
horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or upland edges of wetlands.
(c) In the Resource Protection District the setback requirement shall be
250 feet, horizontal distance, except for structures, roads, parking
spaces or other regulated objects specifically allowed in that district in
which case the setback requirements specified in subsection 2,a and b,
above, shall apply.
Kingsbury Plantation Zoning Ordinance
3/11/2020
25
(d) The water body, tributary stream, or wetland setback provision shall
neither apply to structures which require direct access to the water
body or wetland as an operational necessity, such as piers, docks and
retaining walls, nor to other functionally water-dependent uses.
(e) On a non-conforming lot of record on which only a residential
structure exists, and it is not possible to place an accessory structure
meeting the required water body, tributary stream or wetland
setbacks, the code enforcement officer may issue a permit to place a
single accessory structure, with no utilities, for the storage of yard
tools and similar equipment. Such accessory structure shall not exceed
eighty (80) square feet in area nor eight (8) feet in height, and shall be
located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and
vegetation clearing limitations. In no case shall the structure be
located closer to the shoreline or tributary stream than the principal
structure.
NOTE: A municipality may within its ordinance, authorize the Planning
Board to increase the required setback of a proposed structure, as a
condition to permit approval, if necessary to accomplish the purposes of
this ordinance. Instances where a greater setback may be appropriate
include, but are not limited to: areas of steep slope; shallow or erodible
soils; or where an adequate vegetative buffer does not exist.
NOTE: A tributary stream may be perennial or intermittent. Where a
tributary stream is present within the shoreland zone, setback standards
from that tributary stream are applicable.
C. Additional Dimensional Standards
Specific uses are subject to additional dimensional standards, as specified in
Section 7.
(1)
Retaining walls that are not necessary for erosion control shall meet the
structure setback requirement, except for low retaining walls and
associated fill provided all of the following conditions are met:
(a) The site has been previously altered and an effective vegetated buffer
does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the
normal high-water line of a water body, tributary stream, or upland
edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing
lawn or is a site eroding from lack of naturally occurring vegetation,
and which cannot be stabilized with vegetative plantings;
Kingsbury Plantation Zoning Ordinance
3/11/2020
26
(d) The total height of the wall(s), in the aggregate, are no more than 24
inches;
(e) Retaining walls are located outside of the 100-year floodplain on
rivers, streams and tributary streams, as designated on the Federal
Emergency Management Agency's (FEMA) Flood Insurance Rate
Maps or Flood Hazard Boundary Maps, or the flood of record, or in
the absence of these, by soil types identified as recent flood plain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a
combination thereof, and no further structural development will occur
within the setback area, including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal
distance, of the normal high-water line of a water body, tributary
stream, or upland edge of a wetland when a natural buffer area does
not exist. The buffer area must meet the following characteristics:
(i)
The buffer must include shrubs and other woody and
herbaceous vegetation. Where natural ground cover
is lacking the area must be supplemented with leaf or
bark mulch;
(ii)
Vegetation plantings must be in quantities sufficient
to retard erosion and provide for effective infiltration
of stormwater runoff;
(iii)
Only native species may be used to establish the
buffer area;
(iv)
A minimum buffer width of 15 feet, horizontal
distance, is required, measured perpendicularly to the
normal high-water line or upland edge of a wetland;
and
(v)
A footpath not to exceed the standards in Section
6.5.1,B may traverse the buffer.
NOTE: If the wall and associated soil disturbance occurs within 75 feet,
horizontal distance, of a water body or tributary stream, a permit pursuant
to the Natural Resource Protection Act is required from the Department of
Environmental Protection.
(2)
Notwithstanding the requirements stated above, stairways or similar
structures may be allowed with a permit from the Code Enforcement
Officer, to provide shoreline access in areas of steep slopes or unstable
soils provided: that the structure is limited to a maximum of four (4) feet in
width; that the structure does not extend below or over the normal high-
water line of a water body or upland edge of a wetland, (unless permitted
by the Department of Environmental Protection pursuant to the Natural
Kingsbury Plantation Zoning Ordinance
3/11/2020
27
Resources Protection Act, 38 M.R.S.A. §480-C); and that the applicant
demonstrates that no reasonable access alternative exists on the property.
3.3
Non-conformance
3.3.1 Purpose
It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or
amendments thereto shall be allowed to continue, subject to the requirements set
forth in Section 3.3. Except as otherwise provided in this Ordinance, a non-
conforming condition shall not be permitted to become more non-conforming.
NOTE: See Section 9 for the definitions of "non-conforming structures," "non-
conforming uses" and "non-conforming lots."
3.3.2 General
A. Transfer of Ownership
Non-conforming structures, lots, and uses may be transferred, and the new
owner may continue the non-conforming use or continue to use the non-
conforming structure or lot, subject to the provisions of this Ordinance.
B. Repair and Maintenance
This Ordinance allows, without a permit, the normal upkeep and maintenance of
non-conforming uses and structures including repairs or renovations that do not
involve expansion of the non-conforming use or structure, and such other
changes in a non-conforming use or structure as federal, state, or local building
and safety codes may require. "Normal upkeep and maintenance" does not
include reconstruction, replacement, or substantial improvement as provided in
Section 3.3.3, D.
3.3.3 Non-conforming Structures
A. Expansions
All new principal and accessory structures, excluding functionally water-
dependent uses, must meet the setback requirements contained in Section 3.2.2,
B. A non-conforming structure may be added to or expanded after obtaining a
permit from the same permitting authority as that for a new structure, if such
addition or expansion does not increase the non-conformity of the structure and
is in accordance with subparagraphs 1 and 2, below.
(1)
Expansion of any portion of a structure within 25 feet of the normal high-
water line of a water body, tributary stream, or upland edge of a wetland is
prohibited, even if the expansion will not increase nonconformity with the
water body, tributary stream or wetland setback requirement. Expansion of
an accessory structure that is located closer to the normal high-water line
of a water body, tributary stream, or upland edge of a wetland than the
Kingsbury Plantation Zoning Ordinance
3/11/2020
28
principal structure is prohibited, even if the expansion will not increase
nonconformity with the water body, tributary stream, or wetland setback
requirement.
(2)
Notwithstanding paragraph 1, above, if a legally existing non-conforming
principal structure is entirely located less than 25 feet from the normal
high-water line of a water body, tributary stream, or upland edge of a
wetland, that structure may be expanded as follows, as long as all other
applicable land use standards are met and the expansion is not otherwise
prohibited by Section 3.3.3, A,1.
(a) The maximum total footprint for the principal structure may not be
expanded to a size greater than 800 square feet or 30% larger than the
footprint that existed on January 1, 1989, whichever is greater. The
maximum height of the principal structure may not be made greater
than 15 feet or the height of the existing structure, whichever is
greater.
(3)
All other legally existing nonconforming principal and accessory
structures that do not meet the water body, tributary stream, or wetland
setback requirements may be expanded or altered as follows, as long as
other applicable municipal land use standards are met and the expansion
is not prohibited by Sections 3.3.3, A, or 3.3.3, A,1, above.
(a) For structures located less than 75 feet from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland, the
maximum combined total footprint for all structures may not be
expanded to a size greater than 1,000 square feet or 30% larger than
the footprint that existed on January 1, 1989, whichever is greater.
The maximum height of any structure may not be made greater than 20
feet or the height of the existing structure, whichever is greater.
(b) For structures located less than 100 feet from the normal high-water
line of a great pond classified as GPA or a river flowing to a great
pond classified as GPA, the maximum combined total footprint for all
structures may not be expanded to a size greater than 1,500 square
feet or 30% larger than the footprint that existed on January 1, 1989,
whichever is greater. The maximum height of any structure may not be
made greater than 25 feet or the height of the existing structure,
whichever is greater. Any portion of those structures located less than
75 feet from the normal high-water line of a water body, tributary
stream, or upland edge of a wetland must meet the footprint and height
limits in Section 3.3.3,A,2,a and Section 3.3.3,A3,a, above.
(c) In addition to the limitations in subparagraphs a and b, for structures
that are legally non-conforming due to their location within the
Resource Protection District when located at less than 250 feet from
the normal high-water line of a water body or the upland edge of a
Kingsbury Plantation Zoning Ordinance
3/11/2020
29
wetland, the maximum combined total footprint for all structures may
not be expanded to a size greater than 1,500 square feet or 30% larger
than the footprint that existed at the time the Resource Protection
District was established, whichever is greater. The maximum height of
any structure may not be made greater than 25 feet or the height of the
existing structure, whichever is greater, except that any portion of a
structure located less than 75 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland must meet
the footprint and height limits above.
(4)
An approved plan for expansion of a nonconforming structure must be
recorded by the applicant with the registry of deeds, within 90 days of
approval. The recorded plan must show the existing and proposed footprint
of the non-conforming structure, the existing and proposed structure
height, the footprint of any other structures on the parcel, the shoreland
zone boundary, and evidence of approval by the Plantation review
authority.
B. Foundations
Whenever a new, enlarged, or replacement foundation is constructed under a
non-conforming structure, the structure and new foundation must be placed such
that the setback requirement is met to the greatest practical extent as determined
by the Planning Board or its designee, basing its decision on the criteria
specified in Section C, Relocation, below.
C. Relocation
(1)
A non-conforming structure may be relocated within the boundaries of the
parcel on which the structure is located provided that the site of relocation
conforms to all setback requirements to the greatest practical extent as
determined by the Planning Board or its designee, and provided that the
applicant demonstrates that the present subsurface sewage disposal system
meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed
in compliance with the law and said Rules. In no case shall a structure be
relocated in a manner that causes the structure to be more non-
conforming.
(2)
In determining whether the building relocation meets the setback to the
greatest practical extent, the Planning Board or its designee shall consider
the size of the lot, the slope of the land, the potential for soil erosion, the
location of other structures on the property and on adjacent properties, the
location of the septic system and other on-site soils suitable for septic
systems, and the type and amount of vegetation to be removed to
accomplish the relocation.
(3)
When it is necessary to remove vegetation within the water or wetland
setback area in order to relocate a structure, the Planning Board shall
Kingsbury Plantation Zoning Ordinance
3/11/2020
30
require replanting of native vegetation to compensate for the destroyed
vegetation in accordance with Section 6.5.4. In addition, the area from
which the relocated structure was removed must be replanted with
vegetation. Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with
at least one native tree, three (3) feet in height, for every tree removed.
If more than five trees are planted, no one species of tree shall make
up more than 50% of the number of trees planted. Replaced trees must
be planted no further from the water or wetland than the trees that
were removed.
(b) Other woody and herbaceous vegetation, and ground cover, that are
removed or destroyed in order to relocate a structure must be re-
established. An area at least the same size as the area where
vegetation and/or ground cover was disturbed, damaged, or removed
must be reestablished within the setback area. The vegetation and/or
ground cover must consist of similar native vegetation and/or ground
cover that was disturbed, destroyed or removed.
(4)
Where feasible, when a structure is relocated on a parcel the original
location of the structure shall be replanted with vegetation which may
consist of grasses, shrubs, trees, or a combination thereof.
D. Reconstruction, Replacement, Substantial Improvement
(1)
Any nonconforming structure which is located less than the required
setback from a water body, tributary stream, or wetland and which is
removed, or damaged or destroyed or which requires substantial
improvement, regardless of the cause, by more than 50% of the market
value of the structure before such damage, destruction or removal may be
reconstructed, improved, or replaced provided that a permit is obtained
within eighteen (18) months of the date of said damage, destruction, or
removal, and provided that such reconstruction or replacement is in
compliance with all water body, tributary stream or wetland setback
requirements to the greatest practical extent as determined by the Planning
Board or its designee in accordance with the purposes of this Ordinance.
In no case shall a structure be reconstructed or replaced so as to increase
its non-conformity. If the reconstructed or replacement structure is less
than the required setback it shall not be any larger than the original
structure, except as allowed pursuant to Section 3.3.3,A, above, as
determined by the non-conforming footprint of the reconstructed or
replaced structure at its new location. If the total footprint of the original
structure can be relocated or reconstructed beyond the required setback
area, no portion of the relocated or reconstructed structure shall be
replaced or constructed at less than the setback requirement for a new
structure. When it is necessary to remove vegetation in order to replace or
Kingsbury Plantation Zoning Ordinance
3/11/2020
31
reconstruct a structure, vegetation shall be replanted in accordance with
Section 3.3.3,C,3, above.
(2)
Any non-conforming structure which is located less than the required
setbacks from a water body, tributary stream, or wetland and which is
removed by 50% or less of the market value, or damaged or destroyed by
50% or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is
obtained from the Code Enforcement Officer within one year of such
damage, destruction, or removal.
(3)
In determining whether the building reconstruction or replacement meets
the setback to the greatest practical extent the Planning Board or its
designee shall consider, in addition to the criteria in Section 3.3.3,C above,
the physical condition and type of foundation present, if any.
E. Change of Use of a Nonconforming Structure
(1)
The use of a non-conforming structure may not be changed to another use
unless the Planning Board, after receiving a written application,
determines that the new use will have no greater adverse impact on the
water body, tributary stream, or wetland, or on the subject or adjacent
properties and resources than the existing use.
(2)
In determining that no greater adverse impact will occur, the Planning
Board shall require written documentation from the applicant, regarding
the probable effects on public health and safety, erosion and
sedimentation, water quality, fish and wildlife habitat, vegetative cover,
visual and actual points of public access to waters, natural beauty,
floodplain management, archaeological and historic resources, and
commercial fishing activities, and other functionally water-dependent uses.
3.3.4 Nonconforming Uses
A. Expansions
Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be
expanded within existing residential structures or within expansions of such
structures as allowed in Section 3.3.3,A, above.
B. Resumption Prohibited
A lot, building or structure in or on which a non-conforming use is discontinued
for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning
Board may, for good cause shown by the applicant, grant up to a one-year
extension to that time period. This provision shall not apply to the resumption of
a use of a residential structure provided that the structure has been used or
maintained for residential purposes during the preceding five (5) year period.
Kingsbury Plantation Zoning Ordinance
3/11/2020
32
C. Change of Use
An existing non-conforming use may be changed to another nonconforming use
provided that the proposed use has no greater adverse impact on the subject and
adjacent properties and resources than the former use, as determined by the
Planning Board. The determination of no greater adverse impact shall be made
according to criteria listed in Section 3.3.3,E, above.
3.3.5 Nonconforming Lots
A. Non-conforming Lots
A non-conforming lot of record as of the effective date of this Ordinance or
amendment thereto may be built upon, without the need for a variance, provided
that such lot is in separate ownership and not contiguous with any other lot in
the same ownership, and that all provisions of this Ordinance except lot area, lot
width and shore frontage can be met. Variances relating to setback or other
requirements not involving lot area, lot width or shore frontage shall be obtained
by action of the Board of Appeals.
B. Contiguous Built Lots
(1)
If two or more contiguous lots or parcels are in a single or joint ownership
of record at the time of adoption of this Ordinance, if all or part of the lots
do not meet the dimensional requirements of this Ordinance, and if a
principal use or structure exists on each lot, the non-conforming lots may
be conveyed separately or together, provided that the State Minimum Lot
Size Law (12 M.R.S.A. §4807-A through §4807-D) and the State of Maine
Subsurface Wastewater Disposal Rules are complied with.
(2)
If two or more principal uses or structures existed on a single lot of record
on the effective date of this Ordinance, each may be sold on a separate lot
provided that the above referenced law and rules are complied with. When
such lots are divided each lot thus created must be as conforming as
possible to the dimensional requirements of this Ordinance.
C. Contiguous Lots - Vacant or Partially Built
(1)
If two or more contiguous lots or parcels are in single or joint ownership
of record at the time of or since adoption or amendment of this Ordinance,
if any of these lots do not individually meet the dimensional requirements
of this Ordinance or subsequent amendments, and if one or more of the lots
are vacant or contain no principal structure the lots shall be combined to
the extent necessary to meet the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of
which is non-conforming, owned by the same person or persons on the
adoption of this Ordinance and recorded in the registry of deeds if the lot is
served by a public sewer or can accommodate a subsurface sewage
disposal system in conformance with the State of Maine Subsurface
Wastewater Disposal Rules; and
Kingsbury Plantation Zoning Ordinance
3/11/2020
33
(a) Each lot contains at least 100 feet of shore frontage and at least
20,000 square feet of lot area; or
(b) Any lots that do not meet the frontage and lot size requirements of
Section 3.3.5,C,1,a are reconfigured or combined so that each new lot
contains at least 100 feet of shore frontage and 20,000 square feet of
lot area.
Kingsbury Plantation Zoning Ordinance
3/11/2020
34
4: Review and Permitting
4.1
Permits Required
4.1.1 After the effective date of this Ordinance no person shall, without first obtaining a
permit as indicated in Table 1, Section 3.2, engage in any activity or use of land or
structure requiring a permit in the district in which such activity or use would occur;
or expand, change, or replace an existing use or structure; or renew a discontinued
nonconforming use. A person who is issued a permit pursuant to this Ordinance shall
have a copy of the permit on site while the work authorized by the permit is
performed.
4.1.2 Permits will be issued either by the Code Enforcement Officer or by the Planning
Board, according to the district and use, as provided in Table 1. Permits issued by the
Code Enforcement Officer will follow the procedures in Section 4.2, below. Permits
issued by the Planning Board will follow the procedures in Section 4.3, below.
A. A permit is not required for the replacement of an existing road culvert as long
as:
(1)
The replacement culvert is not more than 25% longer than the culvert
being replaced;
(2)
The replacement culvert is not longer than 75 feet; and
(3)
Adequate erosion control measures are taken to prevent sedimentation of
the water, and the crossing does not block fish passage in the watercourse.
B. A permit is not required for an archaeological excavation as long as the
excavation is conducted by an archaeologist listed on the State Historic
Preservation Officer's level 1 or level 2 approved list, and unreasonable erosion
and sedimentation is prevented by means of adequate and timely temporary and
permanent stabilization measures.
C. Any permit required by this Ordinance shall be in addition to any other permit
required by other law or ordinance.
D. If a permit from any regulatory authority other than Kingsbury Plantation is
required for an activity or use, the Plantation's CEO or Planning Board must be
notified, and a copy of the application must be submitted to the Plantation when
the permit application is submitted to the other regulatory authority.
4.2
Permit Procedure for Code Enforcement Officer Permits
4.2.1 Every applicant for a permit shall submit a written application, including a scaled
site plan, on a form provided by the Plantation, to the Code Enforcement Officer or
his or her designated agent within the Plantation.
4.2.2 All applications shall be signed by an owner or individual who can show evidence of
right, title or interest in the property or by an agent, representative, tenant, or
Kingsbury Plantation Zoning Ordinance
3/11/2020
35
contractor of the owner with authorization from the owner to apply for a permit
hereunder, certifying that the information in the application is complete and correct.
4.2.3 All applications shall be dated, and the Code Enforcement Officer or Planning
Board, as appropriate, shall note upon each application the date and time of its
receipt.
4.2.4 If the property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation approved
by the Licensed Plumbing Inspector, shall be submitted whenever the nature of the
proposed structure or use would require the installation of a subsurface sewage
disposal system.
4.2.5 When an excavation contractor will perform an activity that requires or results in
more than one (1) cubic yard of soil disturbance, the person responsible for
management of erosion and sedimentation control practices at the site must be
certified in erosion control practices by the Maine Department of Environmental
Protection. This person must be present at the site each day earthmoving activity
occurs for a duration that is sufficient to ensure that proper erosion and
sedimentation control practices are followed. This is required until erosion and
sedimentation control measures have been installed, which will either stay in place
permanently or stay in place until the area is sufficiently covered with vegetation
necessary to prevent soil erosion. The name and certification number of the person
who will oversee the activity causing or resulting in soil disturbance shall be included
on the permit application. This requirement does not apply to a person or firm
engaged in agriculture or timber harvesting if best management practices for erosion
and sedimentation control are used; and municipal, state and federal employees
engaged in projects associated with that employment.
4.2.6 Within ten (10) working days of the date of receiving a written application, the Code
Enforcement Officer shall notify the applicant in writing either that the application is
a complete application, or, if the application is incomplete, that specified additional
material is needed to make the application complete.
4.2.7 The Code Enforcement Officer shall provide notice of the application by regular mail
to all owners of property abutting the subject property. The CEO shall not make a
decision on the application before seven (7) days have elapsed from the date
landowner's notices were sent out.
4.2.8 The Code Enforcement Officer shall approve, approve with conditions, or deny all
permit applications in writing within 35 days of receiving a completed application.
4.2.9 The applicant shall have the burden of proving that the proposed land use activity is
in conformity with the relevant criteria and standards of this Ordinance.
Kingsbury Plantation Zoning Ordinance
3/11/2020
36
4.3
Permit Procedure for Planning Board Permits
4.3.1 Pre-application Requirement
A pre-application (sketch plan) meeting is required of all prospective applicants for a
Planning Board permit. The purpose of the pre-application process is for the
prospective applicant to present general information regarding the proposal to the
Planning Board for guidance before investing substantial time and money developing
the application. This meeting provides the applicant information on procedures and
requirements for submitting an application. The applicant may also use this
opportunity to ask questions, seek waivers to submission requirements, and schedule
a site inspection if warranted.
4.3.2 Pre-application Procedure
A. The prospective applicant shall contact the Chair or Vice-chair of the Planning
Board to request to be placed on the board's agenda. The pre-application will be
placed on the next agenda, provided that the agenda has not already been posted.
B. Prior to or at the meeting, the prospective applicant will provide a sketch plan of
the proposed development indicating the proposed layout of roads and lot lines,
anticipated location of proposed structures, and locations of existing features
such as roads, easements, wetlands, and water bodies. The sketch plan does not
need to be drawn to scale or be completed by a licensed professional.
C. The Planning Board or Code Enforcement Officer may arrange with the applicant
to perform an on-site inspection of the proposed site. The purpose of the on-site
inspection is to verify information provided on the sketch plan and answer any
questions the developer may have with regard to the site. If the Planning Board
conducts the on-site inspection, it is to be considered a public meeting, with the
date and time of the inspection posted at the town office in the same manner as
other meetings.
D. The Planning Board, at the meeting, will provide guidance to the prospective
applicant as follows:
(1)
A determination of the scope of the application, for example whether it
contains roads or other improvements which may require detailed
information, or whether the proposed development may need permits or
review by state or federal agencies and the proposed timeline for approval;
(2)
An expectation of whether additional submittals, for example traffic study,
erosion control plan, or analysis of special historic or ecological resources,
should be included;
(3)
An estimate of the need for and amount of technical review fees, as
provided in Section 2.3.5 of this Ordinance; and
(4)
Action, if requested, concerning any waivers to submission requirements to
be proposed by the applicant.
Kingsbury Plantation Zoning Ordinance
3/11/2020
37
E. The pre-application meeting shall not be considered the initiation of the review
process for the purpose of bringing the application under protection of 1
M.R.S.A., §302.
F. Following the pre-application meeting, the Planning Board shall establish a file
for the proposed development. All information and submittals regarding the
development shall be maintained in the file.
4.3.3 Submission of Application
A. An applicant will submit six (6) copies of application materials as required in
Section 4.5 of this Ordinance. The application must be accompanied by the
signed official Application Form, available from the Code Enforcement Officer
or Planning Board, and Development Fees as calculated using the Fee Schedule.
B. The applicant will submit the application by mail or in person directly to the
Code Enforcement Officer or Planning Board Chair. The Plantation will issue the
applicant a dated receipt showing that the application has been received and fee
paid.
C. Within thirty (30) days after receiving the application, the Planning Board will
meet to determine whether the application is complete. The applicant is not
required to attend this meeting, but is advised that questions regarding adequacy
of the contents may come up in the course of the meeting.
D. Within 35 days of the date of receiving a written application, the Planning Board
shall notify the applicant in writing either that the application is a complete
application, or, if the application is incomplete, that specified additional material
is needed to make the application complete.
E. If the application is incomplete, the applicant shall complete its submission to the
Planning Board before it commences review. After the Planning Board receives
the materials from the applicant, it has thirty (30) additional days to review this
material before notifying the applicant whether the application is complete.
F. The Planning Board shall approve, approve with conditions, or deny all permit
applications in writing within 35 days of receiving a completed application.
However, if the Planning Board has a waiting list of applications, a decision on
the application shall occur within 35 days after the first available date on the
Planning Board's agenda following receipt of the completed application, or
within 35 days of the public hearing, if the proposed use or structure is found to
be in conformance with the purposes and provisions of this Ordinance.
G. At the meeting at which it deems the application to be complete, the Planning
Board may identify portions of the application that, due to its complexity, require
assistance in review that is not ordinarily available to the Board. Examples
include, but are not limited to, procedural questions, traffic analysis, noise, light,
radio frequency propagation, archeological analysis, or scenic impact due to a
grid-scale wind energy facility. The Planning Board is authorized to retain
impartial professional assistance to advise it on these elements of the application,
drawing from the technical review fee submitted by the applicant.
Kingsbury Plantation Zoning Ordinance
3/11/2020
38
The scope of services of the expert retained for this purpose shall be strictly
limited to analysis of the application in hand.
4.3.4 Permit Review Notification Procedures
A. Upon determining that the application is complete, the Planning Board will place
it on the agenda for the next regularly-scheduled meeting of the board, provided
that adequate notice can be given.
B. Abutters shall be notified by regular mail that an application has been filed. The
notification shall identify the property to be developed, include a brief
description of the type of development proposed, and provide the date, time, and
place at which the Planning Board review will take place. Notification to abutters
shall be mailed no less than fourteen (14) days before the scheduled date of
review.
C. Notice of the date, time, and place of the pending review shall be posted on the
Plantation's community bulletin board and the Plantation's website. The date of
the posting must be at least fourteen (14) days before the scheduled date of
review.
D. If any portion of the property to be developed crosses a Plantation boundary,
notice shall be sent to the clerk and planning board of the affected town, or to the
Land Use Planning Commission as appropriate, providing the date, time, and
place of review. The Planning Board shall offer to conduct a joint review with
the planning board of the affected town.
E. A copy of the application shall be available for public viewing.
4.3.5 Review and Decision Procedure
A. All Planning Board discussion of the application shall be conducted in open,
public session. The conduct of the meeting shall be as follows:
(1)
The applicant or his/her representative is required to attend. He or she shall
give an oral presentation concerning the application.
(2)
Members of the public who wish to may speak for, against, or concerning
the application. Written comment will also be accepted and read into the
record. The applicant may respond to questions if permitted by the
Chairman of the Planning Board.
(3)
The Planning Board will act on any request by the applicant to modify
performance standards.
(4)
The Planning Board will engage in deliberations concerning the
application. The applicant and members of the public may participate
during this period only at the discretion of the Chairman of the Planning
Board.
(5)
The Planning Board will make findings of fact and conclusions of law and
shall vote to approve, conditionally approve, or deny the application.
B. The Planning Board is not required to complete review of the application in one
meeting. The Planning Board may defer any portion of the decision-making
Kingsbury Plantation Zoning Ordinance
3/11/2020
39
process to a subsequent meeting. The Planning Board shall, within sixty (60)
days of determining it has received a complete application or within any other
time limit that is otherwise mutually agreed to by the applicant and the Planning
Board, issue a written decision to either approve the application; approve the
application with conditions; or deny the application.
C. The Planning Board shall base its decision on the following:
(1)
For subdivisions, compliance with the review criteria contained in 30-A
M.R.S.A. §4404 (see Section 5.3 of this Ordinance).
(2)
For land use permits, compliance with the criteria of Section 5.2 and the
applicable standards of Sections 6 and 7 of this Ordinance.
(3)
For permits to be issued in the Resource Protection, Stream Protection, or
Limited Residential Districts, compliance with the criteria of Sections 5.2
and 5.4 and the applicable standards of Sections 6 and 7 of this Ordinance.
D. After the submission of a complete application to the Planning Board, the Board
shall approve an application or approve it with conditions if it makes a positive
finding based on the information presented that the proposed use:
(1)
Will maintain safe and healthful conditions;
(2)
Will not result in water pollution, erosion, or sedimentation to surface
waters;
(3)
Will adequately provide for the disposal of all wastewater;
(4)
Will not have an adverse impact on spawning grounds, fish, aquatic life,
bird or other wildlife habitat;
(5)
Will conserve shore cover and visual, as well as actual, points of access to
inland waters;
(6)
Will protect archaeological and historic resources as designated in the
comprehensive plan;
(7)
Will avoid problems associated with floodplain development and use; and
(8)
Is in conformance with the applicable provisions of Sections 3.2 and 3.3;
Section 6, General Land Use Standards; and Section 7, Activity-specific
Standards.
E. If a permit is either denied or approved with conditions, the reasons as well as
conditions shall be stated in writing. No approval shall be granted for an
application involving a structure if the structure would be located in an
unapproved subdivision or would violate any other local ordinance, or
regulation or statute administered by the Plantation.
4.3.6 Special Exceptions
In addition to the criteria specified in Section 4.3.5, above, excepting structure
setback requirements, the Planning Board may approve a permit for a single-family
residential structure in a Resource Protection District provided that the applicant
demonstrates that all of the following conditions are met:
Kingsbury Plantation Zoning Ordinance
3/11/2020
40
A. There is no location on the property, other than a location within the Resource
Protection District, where the structure can be built.
B. The lot on which the structure is proposed is undeveloped and was established
and recorded in the registry of deeds of the county in which the lot is located
before the adoption of the Resource Protection District.
C. All proposed buildings, sewage disposal systems and other improvements are:
(1)
Located on natural ground slopes of less than 20%; and
(2)
Located outside the floodway of the 100-year flood-plain along rivers and
artificially formed great ponds along rivers and outside the velocity zone in
areas subject to tides, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's Flood
Boundary and Floodway Maps and Flood Insurance Rate Maps; all
buildings, including basements, are elevated at least one foot above the
100-year flood-plain elevation; and the development is otherwise in
compliance with any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management
Agency Maps, it is deemed to be 1/2 the width of the 100-year flood-plain.
D. The total footprint, including cantilevered or similar overhanging extensions, of
all principal and accessory structures is limited to a maximum of 1,500 square
feet. This limitation shall not be altered by variance.
E. All structures, except functionally water-dependent structures, are set back from
the normal high-water line of a water body, tributary stream or upland edge of a
wetland to the greatest practical extent, but not less than 75 feet, horizontal
distance. In determining the greatest practical extent, the Planning Board shall
consider the depth of the lot, the slope of the land, the potential for soil erosion,
the type and amount of vegetation to be removed, the proposed building site's
elevation in regard to the flood-plain, and its proximity to moderate-value and
high-value wetlands.
4.3.7 Provisions for Two-stage Review
A. Conditional Preliminary Approval
(1)
The Planning Board is authorized to grant approval of a permit application
conditional on provision by the applicant of additional information. The
form of information is generally, but not exclusively, of two types:
(a) Engineering information, such as final road or stormwater design or
the survey and setting of lot boundary markers; and
(b) Administrative information, such as pending permit approvals from
State or Federal regulatory authorities.
The Planning Board will state in writing as part of its conditional approval
the elements that must be added to the application package in order to
receive final approval.
Kingsbury Plantation Zoning Ordinance
3/11/2020
41
(2)
A conditional preliminary approval shall expire after ninety (90) days of
the date of the Planning Board's decision, or such other time period as
mutually agreed upon between the board and the applicant.
(3)
Final approval shall be scheduled for the first regularly-scheduled meeting
after the Code Enforcement Officer has certified that the elements required
as part of the conditional approval have been submitted. The public is not
required to be notified except through the standard posting of the agenda.
4.3.8 Final Approval and Signing
A. The applicant shall submit for signature at least two mylar copies and one paper
copy of the final plan. One paper copy and one mylar copy will be retained in the
records of Kingsbury Plantation.
B. Planning Board members in attendance at the final review shall sign the
approved plan if they find as follows:
(1)
All changes, modifications and amendments required by the Planning
Board have been placed on the Plan;
(2)
Any permits required from Maine DEP, Maine DOT, US Army Corps of
Engineers, or other state or federal agency are in hand;
(3)
All waivers approved by the Planning Board are listed on the Plan;
(4)
Any conditions imposed by the Planning Board that have not been met at
the time of final approval are listed on the Plan; and
(5)
Costs for professional assistance, if any, are paid in full.
4.4
Amendments and Revisions
4.4.1 Amendments to a Subdivision Plan
The Planning Board shall review any amendments or revisions to an approved
subdivision plan. If the amendment or revision involves the creation of new lots or
units, or a significant change in road alignment or design, the notice and meeting
requirements for a new subdivision shall be followed.
4.4.2 Amendments to Planning Board Permits
A. The Planning Board shall review and may approve a proposed change to any
permit which it has issued in accordance with Section 4.3, above, which involves
any of the following conditions. The Planning Board may follow notice and
meeting requirements if it determines the change to be significant, such as:
(1)
An increase in the number or footprint area of buildings on the site;
(2)
An increase in the area of impervious surface on the site;
(3)
A change of use of the property to a use which will generate a higher traffic
demand; or
(4)
A change in location or design of any infrastructure that will be used by the
general public, including but not limited to parking areas, streetlights, or
roads. or sidewalks.
Kingsbury Plantation Zoning Ordinance
3/11/2020
42
Review by the Planning Board shall be limited to the impacts of the proposed
changes and shall not encompass nor burden the original approval.
B. The Code Enforcement Officer shall review and may approve permits issued by
him or her under Section 4.2, above, and shall review changes to Planning
Board-issued permits that do not meet the criteria in paragraph A, above.
If the Code Enforcement Officer reviews a change to a Planning Board-issued
permit, he or she shall make a written record of the action and transmit the record
to the Chairman of the Planning Board for the file.
4.5
Submission Requirements
4.5.1 Application Package
A. All applications shall be covered by a Kingsbury Plantation Application Form.
B. All applications shall be submitted with sufficient fees, as calculated under the
Kingsbury Plantation Fee Schedule. No application shall be considered complete
until fees are paid.
C. All applications shall include sufficient and legible copies for review. These shall
include:
(1)
Six (6) copies of all required submissions, including plan drawings reduced
to fit on 11 x 17 pages.
(2)
One (1) copy of all plan drawings at a size of 24 x 36 inches. Subdivision
plats shall be drawn at a scale of no smaller than one hundred feet (100') to
the inch. Design plans for roads and other infrastructure shall include plans,
profiles, and cross-sections, as appropriate.
D. For the final plan, only, the page for Planning Board signature shall be 24 x 36
inches in size and shall be presented on reproducible, stable based transparent
"mylar" originals. Two (2) mylar copies shall be provided, one to be retained by
the Plantation and one to be filed in the Piscataquis County Registry of Deeds as
necessary. One paper copy shall be provided, to be retained by the Plantation.
4.5.2 Submittals Required for all Applications
A. Application Form: A completed application form with all information included
shall be signed by the applicant and by the owner of the property, if different.
B. Plan Drawing: The plan drawing shall contain the listed elements. In order to
maintain clarity, the drawing may consist of two or more pages, individually
numbered and labelled with the name of the development.
(1)
Proposed name of the development and municipality(ies) in which it is
located, together with assessor's map and lot number(s) and street address
if available.
(2)
Name and address of the landowner, applicant, his/her agent, and the
person(s) who prepared the application.
Kingsbury Plantation Zoning Ordinance
3/11/2020
43
(3)
Contour lines showing elevations in relation to Mean Sea Level. (Most
common contour interval is five feet (5')).
(4)
The date the Plan was prepared, magnetic north point, declination, and
graphic map scale.
(5)
The boundary lines of the tract, survey monuments found or to be set, and
any proposed new lot lines with approximate dimensions and lot areas,
including any proposed open space or land to be dedicated for public use.
(6)
The boundaries of all water bodies, wetlands, significant vernal pools or
unique natural areas as identified on Beginning with Habitat maps or
known historic or archeological sites located on the tract.
(7)
The location of any zoning boundaries within or affecting the tract.
(8)
If any portion of the development is in a flood prone area, the boundaries
of any flood hazard areas with the 100-year flood elevation delineated.
(9)
The approximate location and dimensions of structures, both existing and
proposed to be erected in the development, including but not limited to
buildings, support structures, signs, lighting, and auxiliary and accessory
structures.
(10) The approximate alignment and dimensions (profile and cross-section) of
any road(s), access points, driveways, or parking areas proposed to be
constructed or improved to serve the development.
(11) The location, dimensions, and description of any buffers or landscaping
proposed for the development.
(12) The size, type, and location of any water lines, sewer lines, hydrants, fire
ponds, drainage facilities, electric or telephone lines and other utilities
designed to service the development.
(13) The boundaries of any farmland within the tract.
(14) A location map insert showing an outline of the development area at a scale
sufficient to show adjacent roads, water bodies, municipal boundaries and
other significant features in the vicinity.
C. Attachments to the Application
The following documents will be included with all applications.
(1)
Verification of applicant's right, title, or interest in the property by means
of a deed, lease, signed purchase and sales agreement or similar document.
(2)
A copy of the deed for the parent tract together with copies of all covenants
or deed restrictions, easements, rights of way, or other encumbrances
currently affecting the property.
(3)
A copy of any lease terms, covenants, or deed restrictions proposed to
cover all or part of the development.
(4)
Indication of the type of sewage disposal to be used in the development.
When sewage disposal is to be accomplished by subsurface sewage
disposal system, test pit analyses, prepared by a licensed site evaluator
Kingsbury Plantation Zoning Ordinance
3/11/2020
44
shall be provided. A map showing the location of all test pits on the site
shall be submitted. (see Form HHE 200 - Page 2 of 3)
(5)
Indication of the type of water supply to be used in the development. When
water is to be supplied by a public water supply, certification that the water
supply has been designed by a licensed professional engineer. When water
is to be supplied by a private well, evidence of adequate ground water
supply and quality, in the form of test wells or a written statement from
either a well driller or a geologist familiar with the area.
(6)
A description of fire protection measures to be available. Proposed sources
of water must be reviewed by the fire chief prior to submittal of the
application.
(7)
The names and addresses of owners of record of all property abutting the
parcel to be developed, including any property directly across an existing
public street.
(8)
A medium intensity soil survey covering the development. When the
medium intensity soil survey shows soils that are generally unsuitable for
the uses proposed, the applicant shall provide a report by a registered soil
scientist or registered professional engineer experienced in geotechnics,
indicating the suitability of soil conditions for those uses.
(9)
An estimate of the costs required to construct the infrastructure required for
the development, including but not limited to public and private roads,
sidewalks, parking areas, utility installations, and lighting fixtures, together
with a proposed mechanism for financing the construction.
D. Conditional Requirements for Certain Applications
Due to their size or potential impact on resources or facilities in Kingsbury
Plantation, certain development applications shall be required to submit
additional application information:
(1)
If the development is a subdivision, include an affidavit that no timber
harvesting has occurred on the tract within the preceding five (5) years, or
if it has, that it has not been conducted in violation of rules adopted
pursuant to 12 M.R.S. §8869(14). The affidavit must be signed by a
licensed forester or an agent of the Maine Forest Service.
(2)
If the development is predicted to generate traffic of more than 400
vehicles per day, include a traffic impact analysis, prepared by a licensed
professional engineer with experience in traffic modeling. The Traffic
Impact Analysis shall indicate recommended improvements to maintain the
desired level of service on affected streets. If the development is large
enough to require a Traffic Movement Permit from the Maine DOT, the
applicant may substitute data and analysis necessary for that permit.
(3)
If the development involves any grading or construction, include a grading
plan and an erosion control plan meeting the requirements of Maine
Kingsbury Plantation Zoning Ordinance
3/11/2020
45
Erosion and Sedimentation Control BMP's (DEP, March 2003 or as
revised.)
(4)
If the development will create more than 10,000 square feet of impervious
surface, include a Stormwater Management Plan prepared by a licensed
professional engineer.
(5)
If the development proposes the establishment of an association for
maintenance of a private road, central sewer system or water supply, open
space or parkland, include proposed articles of incorporation and bylaws
for the association.
(6)
If the development will result in the extraction of more than 2,000 gallons
per day of water or if it is located over a mapped aquifer, include a
groundwater impact analysis, prepared by a groundwater hydrologist.
(7)
If the development will utilize or handle hazardous or toxic chemicals in
the course of its operation, include a description of the chemicals to be
used and a Spill Prevention, Control, and Cleanup Plan in accordance with
38 M.R.S.A. §1318-C.
(8)
If located within the High Value Scenic Resource Area identified by the
Kingsbury Comprehensive Plan, include a Scenic Resource Assessment
and Mitigation Plan prepared by a qualified professional.
(9)
Additional submission requirements may apply for specific forms of
development, e.g. subdivisions, groundwater extraction, wireless
telecommunication towers, wind energy facilities. Consult Section 6.6,
Additional Standards for Subdivisions; and the applicable sections of
Section 7, Activity Specific Standards of this ordinance for requirements.
4.5.3 Nothing in this Ordinance shall be construed as limiting the authority of the Planning
Board to require the applicant to prepare and submit additional studies or analyses, or
to hire a consultant to review any or all portions of an application.
4.5.4 Final Plans
A. Any final plan intended for signature by the Planning Board shall include on its
face the following items:
(1)
The plan must show the name and signature, registration number, and seal
of the surveyor or engineer who prepared it.
(2)
All waivers approved by the Planning Board shall be listed on the Plan.
(3)
Any conditions imposed by the Planning Board that have not been met at
the time of final approval shall be listed on the Plan.
(4)
If any roads within the development are to be privately-owned, the
following sentence must appear: "[Name of Roads] shall remain private, to
be maintained by [Name of developer or homeowners' association], and
shall not be offered for acceptance or maintained by the Plantation until
they meet applicable public road design standards."
Kingsbury Plantation Zoning Ordinance
3/11/2020
46
(5)
A signature block shall appear with the words "Approved, Kingsbury
Plantation Planning Board" together with five signature lines and a date
line.
4.6
Expiration of Permits
For activities or uses locate in the shoreland zone, permits shall expire one year from
the date of issuance if a substantial start is not made in construction or in the use of
the property during that period. If a substantial start is made within one year of the
issuance of the permit, the applicant shall have one additional year to complete the
project, at which time the permit shall expire.
For activities or uses located in the Rural district, permits shall expire two years from
the date of issuance if a substantial start is not made in construction or use of the
property during that period. If a substantial start is made within two years of the
issuance of the permit, the applicant shall have one additional year to complete the
project, at which time the permit shall expire.
4.7
Installation of Public Utility Service
A public utility, water district, sanitary district or any utility company of any kind
may not install services to any new structure located in the shoreland zone unless
written authorization attesting to the validity and currency of all local permits
required under this or any previous Ordinance has been issued by the appropriate
municipal officials or other written arrangements have been made between the
municipal officials and the utility.
Kingsbury Plantation Zoning Ordinance
3/11/2020
47
5: Criteria for Approval of Land Use Activities
5.1
Applicability
All applications for approval of land use activities within Kingsbury Plantation must
meet the appropriate criteria listed below. The approval authority must find that
through demonstrated planning, siting, and design of land use activities, each criterion
can reasonably be met. General land use standards (Section 6) and standards for
specific land use activities (Section 7) are intended to be a guide to this finding. The
requirements of Section 4 explain the information to be submitted with the
application in order to meet the criteria for approval.
The criteria listed below cannot be waived.
5.2
Criteria for all Land Use Activities
5.2.1 Adequate technical and financial provision has been made for complying with the
requirements of this Ordinance and the State's air and water pollution control and
other environmental laws.
5.2.2 Adequate provision has been made for solid waste and sewage disposal, for
protection of public safety, and for the securing and maintenance of sufficient
healthful water supplies.
5.2.3 Adequate provision has been made for loading, parking and circulation of traffic, in,
on and from the site, and for assurance that the proposal will not cause congestion or
unsafe conditions with respect to existing or proposed transportation arteries or
methods.
5.2.4 Adequate provision has been made for fitting the proposal harmoniously into the
existing natural environment in order to assure there will be no undue adverse effect
on existing uses, scenic character, and natural and historic resources in the area likely
to be affected by the proposal.
5.2.5 The proposal will not cause unreasonable soil erosion or reduction in the capacity of
the land to absorb and hold water and suitable soils are available for a sewage
disposal system if sewage is to be disposed on-site.
5.2.6 The proposal is otherwise in conformance with this ordinance, standards, and plans
adopted pursuant thereto.
5.3
Criteria Specific to Subdivisions
All proposed subdivisions shall be reviewed for conformance to the criteria listed in
the Maine Subdivision Law, 30-A M.R.S.A. §4404, at the time of review. As of the
date of enactment of this Ordinance, those criteria are:
Kingsbury Plantation Zoning Ordinance
3/11/2020
48
5.3.1 The activity will not result in undue water or air pollution. In making this
determination, the Planning Board shall at least consider:
A. The elevation of the land above sea level and its relation to the flood plains;
B. The nature of soils and subsoils and their ability to adequately support waste
disposal;
C. The slope of the land and its effect on effluents;
D. The availability of streams for disposal of effluents; and
E. The applicable State and local health and water resources rules and regulations.
5.3.2 There will be sufficient water available for the reasonably foreseeable needs of the
subdivision.
5.3.3 The activity will not cause an unreasonable burden on an existing water supply, if one
is to be used.
5.3.4 The activity will not cause unreasonable soil erosion or reduction in the land's
capacity to hold water so that a dangerous or unhealthy condition results.
5.3.5 The activity will not cause unreasonable highway or public road congestion or unsafe
conditions with respect to the use of the highways or public roads existing or
proposed and, if the proposed subdivision requires driveways or entrances onto a state
or state aid highway, located outside the urban compact area of an urban compact
municipality, the Department of Transportation has provided documentation
indicating that the driveways or entrances conform to 23 M.R.S.A., §704 and any
rules adopted under that section.
5.3.6 The activity will provide for adequate sewage waste disposal and will not cause an
unreasonable burden on municipal services if they are utilized.
5.3.7 The activity will not cause an unreasonable burden on the Plantation's ability to
dispose of solid waste if Plantation services are to be utilized.
5.3.8 The activity will not have an undue adverse effect on the scenic or natural beauty of
the area, aesthetics, historic sites, significant wildlife habitat identified by the
Department of Inland Fisheries and Wildlife or the Plantation, or rare and
irreplaceable natural areas or any public rights for physical or visual access to the
shoreline.
5.3.9 The activity will be in conformance with the duly adopted subdivision ordinance,
comprehensive plan, development plan, or land use plan. In making this
determination, the Planning Board may interpret these ordinances and plans.
5.3.10 The developer has adequate financial and technical capacity to meet the standards of
this Ordinance.
5.3.11 Whenever situated entirely or partially within the watershed of any pond or lake or
within 250 feet of any wetland, great pond or river as defined in 38 M.R.S.A., §435
Kingsbury Plantation Zoning Ordinance
3/11/2020
49
through §490, the activity will not adversely affect the quality of such body of water
or unreasonably affect the shoreline of such body of water.
5.3.12 The activity will not, alone or in conjunction with existing activities, adversely affect
the quality or quantity of ground water.
5.3.13 Based on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps, and information presented by the
applicant, whether the subdivision is in a flood-prone area. If the subdivision, or any
part of it, is in such an area, the applicant shall determine the 100-year flood elevation
and flood hazard boundaries within the subdivision. The proposed subdivision or
project plan must include a condition of plan approval requiring that principal
structures in the subdivision will be constructed with their lowest floor, including the
basement, at least one foot above the 100-year flood elevation.
5.3.14 All freshwater wetlands within the proposed subdivision have been identified on any
maps submitted as part of the application, regardless of the size of these wetlands.
Any mapping of freshwater wetlands may be done with the help of the local soil and
water conservation district.
5.3.15 All farmland within the proposed subdivision has been identified on maps submitted
as part of the application. Any mapping of farmland may be done with the help of the
local soil and water conservation district.
5.3.16 Any river, stream or brook within or abutting the proposed subdivision has been
identified on any maps submitted as part of the application. For purposes of this
section, "river, stream or brook" has the same meaning as in 38 M.R.S.A., §480-B,
sub-§ 9.
5.3.17 The proposed subdivision will provide for adequate storm water management.
5.3.18 If any lots in the proposed subdivision have shore frontage on a river, stream, brook,
or great pond as these features are defined in 38 M.R.S.A., §480-B, none of the lots
created within the subdivision have a lot depth to shore frontage ratio greater than 5
to 1.
5.3.19 The long-term cumulative effects of the proposed subdivision will not unreasonably
increase a great pond's phosphorus concentration during the construction phase and
life of the proposed subdivision.
5.3.20 For any proposed subdivision that crosses municipal boundaries, the proposed
subdivision will not cause unreasonable traffic congestion or unsafe conditions with
respect to the use of existing public ways in an adjoining municipality in which part
of the subdivision is located.
5.3.21 Timber on the parcel being subdivided has not been harvested in violation of rules
adopted pursuant to 12 M.R.S.A. §8869, sub-§14, "liquidation harvesting."
NOTE: See Section 6.6 for Additional Standards for Subdivisions.
Kingsbury Plantation Zoning Ordinance
3/11/2020
50
5.4
Criteria Specific to Shoreland Zones
The following criteria apply only to land use activities in the Resource Protection, Stream
Protection, and Limited Residential Districts. The activity:
5.4.1 Will maintain safe and healthful conditions;
5.4.2 Will not result in water pollution, erosion, or sedimentation to surface waters;
5.4.3 Will adequately provide for the disposal of all wastewater;
5.4.4 Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
5.4.5 Will conserve shore cover and visual, as well as actual, points of access to inland
waters;
5.4.6 Will protect archaeological and historic resources as designated in the
comprehensive plan;
5.4.7 Will not adversely affect existing commercial fishing;
5.4.8 Will avoid problems associated with floodplain development and use; and
5.4.9 Is in conformance with the provisions of this ordinance.
Kingsbury Plantation Zoning Ordinance
3/11/2020
51
6: General Land Use Standards
The standards of this Section shall be used by Kingsbury Plantation in reviewing applications for
permits for land use activities and shall serve as minimum requirements for approval of the
application. This Section is arranged to mirror the criteria of Section 5 in such a way that each
criterion is accompanied by a set of standards. Compliance with development standards is prima
facie evidence of meeting the criterion. However, applicants may propose alternative designs and
approaches that will satisfy the criteria equally as well or better than the standards herein. In all
instances, the burden of proof shall be on the applicant to demonstrate that criteria have been met.
This shall not be construed as limiting the authority of the Plantation to require additional evidence
or design elements or set additional conditions on approval based on characteristics of the site or
development.
6.1
Technical and Financial Capacity
Criterion:
Adequate technical and financial provision has been made for complying with the
requirements of this Ordinance
6.1.1 The applicant must demonstrate that he/she has the financial and technical capacity to
carry out the project in accordance with this ordinance and the approved plan.
A. The application must list the names of architects, engineers, and other
professionals who were involved in the development of the project.
B. The application must list either the names of contractors who have been engaged
to construct the project, or the process by which those contractors will be hired.
C. The application must include the estimated cost of the project, including required
public improvements, and the source of funding sufficient to meet those costs.
6.1.2 If any development or improvement of public infrastructure is proposed or required
for the development of the project, the terms of performance guarantees must be
approved as part of the application process. Performance guarantees will be
developed in accordance with Section 8 of this ordinance.
6.2
Public Health and Safety
Criteria:
Adequate provision has been made for solid waste and sewage disposal, for protection of
public safety, and for the securing and maintenance of sufficient healthful water supplies.
Sufficient water will be available for the reasonably foreseeable needs.
Provide for adequate sewage waste disposal and will not cause an unreasonable burden on
municipal services if they are utilized.
Kingsbury Plantation Zoning Ordinance
3/11/2020
52
Will not cause an unreasonable burden on the Plantation's ability to dispose of solid waste if
municipal services are to be utilized.
6.2.1 Water Supply
A. Individual wells shall be sited and constructed to prevent infiltration of surface
water and contamination from subsurface waste water disposal systems and other
known sources of potential contamination.
B. Site design shall allow for placement of wells, subsurface waste water disposal
areas, and reserve sites for subsurface waste water disposal in compliance with
the Maine Subsurface Waste Water Disposal Rules.
C. Proposed activities involving sources of potential contamination, including but
not limited to junkyards, automobile graveyards, gas stations, and bulk storage of
petroleum products, must be located at least three hundred (300) feet from an
existing public water supply and at least one hundred (100) feet from an existing
private water supply (well).
D. For subdivisions and other non-residential development, the applicant shall
demonstrate that there is sufficient healthful water supply to serve the needs of
the project.
6.2.2 Waste Water Disposal
A. Determination of soil suitability for subsurface wastewater disposal shall be
based on the Natural Resources Conservation Service's soils potential ratings for
low density development. Soils with a low or very low development potential
rating shall not be developed unless the Planning Board determines that adequate
corrective measures will be used to overcome those limitations.
B. Soil types shall be determined by a site-specific soil survey, according to the
"Guidelines for Maine Certified Soil Scientists for Soil Identification and
Mapping" (Maine Association of Professional Soil Scientists, 2004). For
subdivisions and commercial, industrial and other non-residential development, a
medium-intensity soil survey shall be provided, except where soils with a low or
very low development potential rating are evident, a high-intensity soil survey
shall be conducted within the proposed building envelope.
C. At least two test pits shall be dug within the boundaries of each lot proposed to
be served by a subsurface wastewater disposal system. At least one test pit shall
be dug within the boundaries of each lot proposed to be served by a primitive
septic system. The location of such test pits shall be shown on the subdivision
plat.
D. No permit will be issued for a project with subsurface waste water disposal
unless an acceptable subsurface wastewater design (HHE-200) is prepared by a
licensed site evaluator or a Maine Licensed Professional Engineer, in accordance
with the Subsurface Waste Water Disposal Rules.
E. When private central or clustered waste water disposal systems are proposed,
adequate provision shall be made for ongoing maintenance and repair of the
Kingsbury Plantation Zoning Ordinance
3/11/2020
53
system and for reserving an area adequate for a future replacement system, in
accordance with the Maine Subsurface Waste Water Disposal Rules.
F. All subsurface sewage disposal systems shall be installed in conformance with
the State of Maine Subsurface Wastewater Disposal Rules, and the following:
(1)
Clearing or removal of woody vegetation necessary to site a new system
and any associated fill extensions, shall not extend closer than seventy-five
(75) feet, horizontal distance, from the normal high-water line of a water
body or the upland edge of a wetland; and
(2)
A holding tank is not allowed for a first-time residential use in the
shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems,
excluding fill extensions, to be constructed no less than one hundred (100) horizontal
feet from the normal high-water line of a perennial water body. The minimum setback
distance for a new subsurface disposal system may not be reduced by variance.
6.2.3 Solid Waste Disposal
A. Provision shall be made for the regular collection and disposal of site-generated
solid wastes at a state-approved landfill or transfer station.
B. Provision shall be made for the legal disposal of all construction debris, stumps,
brush, wood wastes, asphalt and pavement products.
C. The handling, storage, and use of all materials identified by the standards of a
federal or state agency as hazardous, special or radioactive must be done in
accordance with the standards established by federal or state agencies. The
applicant shall identify any wastes proposed to be generated of these types and
provide evidence that they will be disposed of in accordance with said standards.
6.2.4 Emergency Services
A. The development must be designed to provide protection from the spread of fire.
At a minimum, the requirements of NFPA-1 and NFPA-101 must be met for
commercial development. The applicant must submit evidence that proposed fire
protection measures are adequate, in the form of a written statement from the fire
chief that the proposed development will not exceed the capacity of his/her
department to provide adequate protection. The fire chief may recommend
additional protective improvements, including but not limited to fire ponds, dry
hydrants, fire lanes, separation of flammable wastes, or sprinkler systems.
B. No flammable or explosive liquids, solids or gases shall be stored in bulk above
ground unless they are located at least seventy five (75) feet from any lot line, or
forty (40) feet in the case of underground storage. All materials must be stored in
a manner and location, which is in compliance with appropriate rules and
regulations of the Maine Department of Public Safety and other appropriate
federal, state, and local regulations.
Kingsbury Plantation Zoning Ordinance
3/11/2020
54
C. All subdivision roads and commercial driveways shall be designed and
maintained to permit the passage of emergency response vehicles. At a
minimum, the design standards of Section 6.3.1 shall be followed.
6.3
Road and Access Design
Criteria:
Adequate provision has been made for loading, parking and circulation of traffic, in, on and
from the site, and for assurance that the proposal will not cause congestion or unsafe
conditions with respect to existing or proposed transportation arteries or methods.
The proposed development will not cause unreasonable highway or public road congestion or
unsafe conditions with respect to the use of the highways or public roads existing or
proposed and, if the proposed development requires driveways or entrances onto a state or
state aid highway, the Department of Transportation has provided documentation indicating
that the driveways or entrances conform to 23 M.R.S.A., §704 and any rules adopted under
that section.
6.3.1 Road Design and Construction
A. Classification of Roadways
Roads designed and built under the terms of this ordinance shall be classified as
follows:
(1)
Class 1 Roadway
Roads that are intended to serve commercial or industrial projects with
anticipated traffic of at least fifty (50) trips per day, or residential
subdivisions where a road is proposed to be dedicated to the Plantation or
where the road will serve eight (8) or more lots.
(2)
Class 2 Roadway
Roads which are intended to be privately maintained and that serve a low
volume of use.
B. Roadways shall adhere to the specifications outlined in Table 2, below, unless
the Planning Board determines that a proposed alternative road design will meet
the needs of the development and will not cause erosion or safety problems.
TABLE 2: Road Design Standards
Class 1 Road
Class 2 Road
Minimum right-of-way
50 feet
40 feet
Minimum roadway surface width
20 feet
14 feet
Minimum base (coarse gravel)
18 in.
12 in.
Minimum wearing surface
3 in. fine gravel or 2.5 in.
bituminous concrete
3 in. fine gravel or 2.5 in.
bituminous concrete
Maximum sustained grade
8%
12%
Kingsbury Plantation Zoning Ordinance
3/11/2020
55
C. Roadways that will be co-utilized for forest management purposes shall include
turnouts that are large enough to accommodate wood haulers and other large
vehicles.
D. Adequate provisions shall be made for disposal of all storm water generated
within the right-of-way. All components of the storm water management system
shall be designed to limit peak discharge to pre development levels provided
every storm between the two (2) year and twenty-five (25) year, twenty-four (24)
hour duration, frequencies, based on rainfall data for Portland, Maine. This storm
water management system shall be designed by a Registered Professional
Engineer.
E. A storm water management system shall be designed to direct storm water flows
to existing water courses or storm water drains. Where a right-of-way is traversed
by a stream, river or surface water drainage, drainage rights of way with swales,
culverts, catch basins, or other means of channeling surface water shall be
provided. Drainage easements for existing water courses or proposed drainage
ways shall be provided at least thirty (30') feet wide, conforming substantially
with the lines of existing natural drainage.
(1)
The minimum pipe size for any storm drainage pipe shall be twelve (12)
inches. Maximum trench width at the pipe crown shall be the outside
diameter of the pipe plus two (2) feet. Pipe shall be bedded in fine granular
materials, containing no stones larger than three (3) inches, lumps of clay,
or organic matter, reaching a minimum of six (6) inches below the bottom
of the pipe extending to six (6) inches above the top.
(2)
Outlets shall be stabilized against soil erosion by stone riprap or other
suitable materials to reduce storm water velocity. Wherever the storm
drainage system is not within the right-of-way of a public street, perpetual
easements shall be provided to the Plantation allowing maintenance and
improvement of the system.
(3)
Storm Drainage Construction Specifications
(a) Reinforced Concrete Pipe: Reinforced Concrete Pipe shall meet the
requirements of ASIM Designation C 76 (AASHTO M170). Pipe
classes shall be required to meet the soil and traffic loads with a safety
factor of 1.2 on the .01-inch crack strength with Class B bedding.
Joints shall be of the rubber gasket type meeting ASIM Designation
C443 70, or of an approved preformed plastic jointing material.
Perforated Concrete Pipe shall conform to the requirements of
AASHTO M175 for the appropriate diameters.
(b) Corrugated Metal Pipe: Corrugated Metal Pipe shall meet AASHTO
M196 for aluminum alloy pipe. Pipe gauge shall be as required to meet
the soil and traffic loads with a deflection of not more than five (5%)
percent.
Kingsbury Plantation Zoning Ordinance
3/11/2020
56
(c) ABS Pipe: ABS (Acrylonitrile butadiene styrene) composite pipe and
fittings shall conform to the requirements of AASHTO M264 and
AASHTO M265. Perforated pipe shall conform to the requirements of
AASHTO M36, Type 252.
(d) Corrugated Plastic Pipe: Corrugated Plastic Pipe shall conform to the
requirements of AASHTO M252.
F. Construction Materials
(1)
The construction requirements for aggregate base and sub-base course shall
be as specified in Subsections 304.03 through 304.0 of the most current
edition of the MDOT Standard Specifications Highway and Bridges
manual.
(2)
The base layer of pavement shall be mixed and placed as per the most
current edition of the MDOT Standard Specifications Highway and
Bridges, section 401 and section 703.9. The surface layer of pavement shall
be mixed and placed as per section 401 and section 701.4.
(3)
Construction requirements shall be as specified in Subsections 401.07
through 401.20, most current edition of the MDOT Standard Specifications
Highway and Bridges manual.
G. Dead-End Roads
(roads with a single entrance to the existing road system) shall be constructed to
provide a means to reverse direction at the terminus.
(1)
Circular style turnarounds shall have a right-of-way radius no less than
sixty (60) feet, and a travel surface radius of no less than fifty (50) feet.
(2)
A "T" or hammer head style turnaround shall be centered within a fifty
(50) foot right-of-way and shall be designed and constructed according to
the same specifications as the road and no less than forty (40) feet in length
(perpendicular leg).
H. Roads and Driveways Within the Shoreland Zone
Within the shoreland zones (Resource Protection, Stream Protection, and
Limited Residential), the following standards shall apply to the construction of
roads and/or driveways and drainage systems, culverts and other related
features.
(1)
Roads and driveways shall be set back at least one-hundred (100) feet,
horizontal distance, from the normal high water mark of a great pond
classified GPA or a river that flows into a great pond classified GPA and
seventy-five (75) feet, horizontal distance from the normal high-water line
of other water bodies, tributary streams or the upland edge of a wetland
unless no reasonable alternative exists as determined by the Planning
Board. If no other reasonable alternative exists, the road and/or driveway
setback requirement shall be no less than fifty (50) feet, horizontal
distance, upon clear showing by the applicant that appropriate techniques
Kingsbury Plantation Zoning Ordinance
3/11/2020
57
will be used to prevent sedimentation of the waterbody, tributary stream,
or wetland. Such techniques may include, but are not limited to, the
installation of settling basins, and/or the effective use of additional ditch
relief culverts and turnouts placed so as to avoid sedimentation of the
water body, tributary stream, or wetland.
(2)
On slopes of greater than twenty (20) percent the road and/or driveway
setback shall be increased by ten (10) feet, horizontal distance, for each
five (5) percent increase in slope above twenty (20) percent.
(3)
This section does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures and facilities located
nearer to the shoreline due to an operational necessity, excluding
temporary docks for recreational uses. Roads and driveways providing
access to permitted structures within the setback area shall comply fully
with the requirements of this section, except for that portion of the road or
driveway necessary for direct access to the structure.
(4)
Existing public roads may be expanded within the legal road right of way
regardless of their setback from a water body, tributary stream, or
wetland.
(5)
New permanent roads are not allowed within the shoreland zone along
Significant River Segments except:
(a) To provide access to structures or facilities within the zone; or
(b) When the applicant demonstrates that no reasonable alternative route
exists outside the shoreland zone. When roads must be located within
the shoreland zone they shall be set back as far as practicable from the
normal high-water line and screened from the river by existing
vegetation.
(6)
New roads and driveways are prohibited in a Resource Protection District
except that the Planning Board may grant a permit to construct a road or
driveway to provide access to permitted uses within the district. A road or
driveway may also be approved upon a finding that no reasonable
alternative route or location is available outside the district. When a road
or driveway is permitted in a Resource Protection District the road and/or
driveway shall be set back as far as practicable from the normal high-
water line of a water body, tributary stream, or upland edge of a wetland.
(7)
Road and driveway banks shall be no steeper than a slope of two (2)
horizontal to one (1) vertical, and shall be graded and stabilized in
accordance with the provisions for erosion and sedimentation control
contained in Section 6.4.2.
(8)
Road and driveway grades shall be no greater than ten (10) percent except
for segments of less than two hundred (200) feet.
(9)
In order to prevent road and driveway surface drainage from directly
entering water bodies, tributary streams, or wetlands, roads and driveways
Kingsbury Plantation Zoning Ordinance
3/11/2020
58
shall be designed, constructed, and maintained to empty onto an
unscarified buffer strip at least (50) feet plus two times the average slope,
in width between the outflow point of the ditch or culvert and the normal
high-water line of a water body, tributary stream, or upland edge of a
wetland. Surface drainage which is directed to an unscarified buffer strip
shall be diffused or spread out to promote infiltration of the runoff and to
minimize channelized flow of the drainage through the buffer strip.
(10) Ditch relief (cross drainage) culverts, drainage dips and water turnouts
shall be installed in a manner effective in directing drainage onto
unscarified buffer strips before the flow gains sufficient volume or head to
erode the road, driveway, or ditch. To accomplish this, the following shall
apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts
shall be spaced along the road, or driveway at intervals no greater
than indicated in the following table:
Grade
(Percent)
Spacing
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21+
40
Drainage dips may be used in place of ditch relief culverts only where the
grade is ten (10) percent or less.
(b) On sections having slopes greater than ten (10) percent, ditch relief
culverts shall be placed at approximately a thirty (30) degree angle
downslope from a line perpendicular to the centerline of the road or
driveway.
(c) Ditch relief culverts shall be sufficiently sized and properly installed in
order to allow for effective functioning, and their inlet and outlet ends
shall be stabilized with appropriate materials.
(11) Ditches, culverts, bridges, dips, water turnouts and other storm water
runoff control installations associated with roads and driveways shall be
maintained on a regular basis to assure effective functioning.
6.3.2 Access Management
A. Access onto Rt. 16 is regulated by Maine Department of Transportation. Any
application for land use activity directly accessing Rt. 16 shall provide evidence
of a MDOT permit issued under 23 M.R.S.A., §704 or exemption.
Kingsbury Plantation Zoning Ordinance
3/11/2020
59
B. Access to Plantation roads shall comply with the following standards:
(1)
The number and width of entrances and exits onto any road shall be limited
to that necessary for safe entering and exiting.
(2)
Access for any commercial development shall be designed such that
vehicles may exit the premises without backing onto any public roadway or
shoulder.
(3)
Driveways shall intersect the roadway at an angle as near to 90 degrees as
site conditions allow, but in no case less than 60 degrees, and shall be
designed to blend with the road in a radius of between 10 feet and 15 feet,
with a preferred radius of 10 feet.
(4)
Points of access shall be at locations with suitable line-of-sight distance to
avoid "blind drives." At a minimum, driveways should have a clear line of
sight for 250 feet in each direction.
C. The Planning Board may require a traffic impact study of roadways and
intersections in the vicinity of a proposed project site if the development has the
potential of generating significant amounts of traffic or if traffic safety or
capacity deficiencies exist in the vicinity of the project site.
D. No driveway shall be located within fifteen (15) feet of a property line, except to
allow for a shared driveway or direct access onto the adjacent property.
E. A "sight triangle" shall be maintained 25 feet in length on each side of the
intersection of the driveway and the roadway right-of-way, with the third side
connecting the other two sides. Within each sight triangle, no landscape plants,
other than low growing shrubs, shall be planted. These shrubs must be
maintained to be no more than 30 inches in height above the driveway elevation.
6.3.3 Circulation and Parking for Non-residential Development
Provision shall be made for vehicular access within the project premises in such a
manner as to avoid traffic congestion and safeguard against hazards to traffic and
pedestrians along existing roadways and within the project area.
A. Sufficient parking shall be provided on the site to meet the parking needs of the
development. Where practicable, off-street parking shall be located to the side or
rear of the principal structure. Table 3 shall be used as a guideline. In cases
where it is demonstrated that a particular use can be carried out with fewer
spaces than required without causing traffic congestion or safety problems, the
Planning Board may reduce number of required spaces.
TABLE 3: Parking Requirements
# of Spaces
Land Use Activity
Places of Residence or Accommodation -- spaces per room or dwelling unit
1/3
Dedicated retirement home, nursing care facility
1
Overnight accommodations
1.5
Multifamily buildings
Kingsbury Plantation Zoning Ordinance
3/11/2020
60
Places of Public Assembly -- spaces per seat based on maximum seating capacity
¼
Theater, with fixed seating
1/3
Religious institution, restaurant
½
Meeting hall, grange, bottle club
Places of Commerce and Industry -- spaces per 1,000 sq. ft. of gross floor area.
3
Grocery stores over 5,000 sq. ft., offices, except as noted.
3.5
Retail sales, except as noted
5
Banks, medical, dental, veterinary offices, fitness clubs, child care
Public and Institutional Facilities -- spaces per 1,000 sq. ft. of gross floor area
4
Other education - classroom area only, community center.
Miscellaneous -- criteria as specified
30 per acre
Other outdoor amusements
3 per service bay
1 per 10 vehicles
displayed
Motor vehicle sales or service
B. At least one (1) space within each parking lot shall be designated and signed for
handicapped parking. If the lot consists of more than twenty-five (25) spaces, a
second space shall be so designated.
C. In determining the appropriate size of proposed parking facilities, the following
shall apply:
(1)
Typical Parking Space
Approximately ten (10) feet wide and twenty (20) feet long, except that
parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(2)
Internal Travel Aisles
Approximately twenty (20) feet wide. In lots that are not paved, a layout
shall be shown on the site plan showing at least three hundred (300) square
feet for each required space (allowing for aisles).
D. Parking areas shall be adequately sized for the proposed use and shall be
designed to prevent stormwater runoff from flowing directly into a water body,
tributary stream or wetland and where feasible, to retain all runoff on-site. If
runoff water is discharged to a concentrated flow channel, wetland or water
body, a sediment basin shall be constructed to collect sediment before the runoff
water is discharged.
E. Off-street parking shall not be directly accessible from any public roadway. No
parking space shall be provided which requires vehicles to back out onto a
roadway. Ingress and egress to parking areas shall be limited to driveway
entrances.
Kingsbury Plantation Zoning Ordinance
3/11/2020
61
F. Off-street parking areas with more than two parking spaces shall be arranged so
that each space can be used without moving another vehicle.
G. When parking areas associated with commercial development are adjacent to
existing residential property, landscaping and/or architectural screens shall be
used to provide an effective visual buffer between adjacent properties and the
edge of the parking area.
H. Parking areas shall meet the shoreline and tributary stream setback
requirements for structures for the district in which such areas are located. The
setback requirement for parking areas serving public boat launching facilities
shall be no less than fifty (50) feet, horizontal distance, from the shoreline or
tributary stream if the Planning Board finds that no other reasonable alternative
exists further from the shoreline or tributary stream.
6.4
Protection of Natural and Cultural Resources
6.4.1 General Criteria:
Adequate provision has been made for fitting the proposal harmoniously into the
existing natural environment in order to assure there will be no undue adverse effect
on existing uses, scenic character, and natural and historic resources in the area likely
to be affected by the proposal.
A. The activity will not result in undue water or air pollution, considering:
(1)
The elevation of the land above sea level and its relation to the flood
plains;
(2)
The nature of soils and subsoils and their ability to adequately support
waste disposal;
(3)
The slope of the land and its effect on effluents;
(4)
The availability of streams for disposal of effluents; and
(5)
The applicable State and local health and water resources rules and
regulations.
B. Specific Criteria:
(1)
The activity will not cause unreasonable soil erosion or reduction in the
land's capacity to hold water so that a dangerous or unhealthy condition
results.
(a) The activity will not have an undue adverse effect on the scenic or
natural beauty of the area, aesthetics, historic sites, significant wildlife
habitat identified by the Department of Inland Fisheries and Wildlife
or the municipality, or rare and irreplaceable natural areas or any
public rights for physical or visual access to the shoreline.
(b) Whenever situated entirely or partially within the watershed of any
pond or lake or within 250 feet of any wetland, great pond or river as
defined in 38 M.R.S.A., §435 through §490, will not adversely affect
Kingsbury Plantation Zoning Ordinance
3/11/2020
62
the quality of such body of water or unreasonably affect the shoreline
of such body of water.
(c) The activity will not, alone or in conjunction with existing activities,
adversely affect the quality or quantity of ground water.
(d) If the development, or any part of it, is in a flood-prone area, the
applicant shall determine the 100-year flood elevation and flood
hazard boundaries within the developed area. The proposed project
must include a condition of plan approval requiring that all structures
will be constructed with their lowest floor, including the basement, at
least one foot above the 100-year flood elevation.
(e) All freshwater wetlands have been identified on any maps submitted as
part of the application, regardless of the size of these wetlands.
(f) Any river, stream or brook within or abutting the proposed
development has been identified on any maps submitted as part of the
application.
6.4.2 Erosion and Sedimentation Control; and Soils
A. All activities which involve filling, grading, excavation or other similar activities
which result in unstabilized soil conditions and which require a Planning Board
permit shall also require a written soil erosion and sedimentation control plan in
accordance with Maine Erosion and Sediment Control BMPs, published by DEP
(March 2003 or as revised). The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(1)
Mulching and revegetation of disturbed soil.
(2)
Temporary runoff control features such as hay bales, silt fencing or
diversion ditches.
(3)
Permanent stabilization structures such as retaining walls or rip-rap.
B. In order to create the least potential for erosion, development shall be designed
to fit with the topography and soils of the site. Areas of steep slopes where high
cuts and fills may be required shall be avoided wherever possible, and natural
contours shall be followed as closely as possible.
C. Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all
stages of the activity. The amount of exposed soil at every phase of construction
shall be minimized to reduce the potential for erosion.
D. Any exposed ground area shall be temporarily or permanently stabilized within
one (1) week from the time it was last actively worked, by use of riprap, sod,
seed, and mulch, or other effective measures. In all cases permanent stabilization
shall occur within nine (9) months of the initial date of exposure. In addition:
(1)
Where mulch is used, it shall be applied at a rate of at least one (1) bale per
five hundred (500) square feet and shall be maintained until a catch of
vegetation is established.
Kingsbury Plantation Zoning Ordinance
3/11/2020
63
(2)
Anchoring the mulch with netting, peg and twine or other suitable method
may be required to maintain the mulch cover.
(3)
Additional measures shall be taken where necessary in order to avoid
siltation into the water. Such measures may include the use of staked hay
bales and/or silt fences.
E. Natural and man-made drainage ways and drainage outlets shall be protected
from erosion from water flowing through them. Drainageways shall be designed
and constructed in order to carry water from a twenty-five (25) year storm or
greater, and shall be stabilized with vegetation or lined with riprap.
F. For commercial, industrial, or other non-residential development that results in
more than one acre of soil disturbance in the Rural District and all development
within a shoreland zone, the developer shall hire a contractor certified in erosion
control practices by the Maine Department of Environmental Protection to install
all control measures and shall hire a Maine Registered Professional Engineer to
conduct follow-up inspections.
G. Inspections
Inspections shall be conducted in accordance with the erosion and sedimentation
control plan. Inspections shall be conducted at least once a week and after each
rainfall event accumulating more than ½ inch of precipitation, until all permanent
control measures have been effectively implemented. Inspections shall also be
conducted (1) at the start of construction or land-disturbing activity, (2) during
the installation of sedimentation and erosion control measures, and (3) at the
completion of final grading or close of the construction season.
H. Soils
All land uses shall be located on soils in or upon which the proposed uses or
structures can be established or maintained without causing adverse
environmental impacts, including severe erosion, mass soil movement, improper
drainage, and water pollution, whether during or after construction. Proposed
uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report
based on an on-site investigation and be prepared by state-certified
professionals. Certified persons may include Maine Certified Soil Scientists,
Maine Registered Professional Engineers, Maine State Certified Geologists and
other persons who have training and experience in the recognition and
evaluation of soil properties. The report shall be based upon the analysis of the
characteristics of the soil and surrounding land and water areas, maximum
ground water elevation, presence of ledge, drainage conditions, and other
pertinent data which the evaluator deems appropriate. The soils report shall
include recommendations for a proposed use to counteract soil limitations where
they exist.
Kingsbury Plantation Zoning Ordinance
3/11/2020
64
6.4.3 Surface Water Quality
A. No activity shall deposit on or into the ground or discharge to the waters of the
State any pollutant that, by itself or in combination with other activities or
substances, will impair designated uses or the water classification of the water
body, tributary stream or wetland (38 M.R.S.A. §464 et seq.); which impart
toxicity and cause a surface water body to be unsuitable for the existing and
designated uses of the water body; or which otherwise would result in a violation
of state or federal water quality laws.
B. Appropriate best management practices of point and nonpoint sources of water
pollutants shall be utilized, unless the Planning Board determines that alternative
specifications will meet the needs of the activity and will cause no undue adverse
impact to the surface water quality of the affected surface water body.
6.4.4 Groundwater Quality and Quantity
No activity shall deposit on or into the ground or discharge to the waters of the State
any pollutant that, by itself or in combination with other activities or substances, will
impair designated uses or the water classification of the water body, tributary stream
or wetland.
The standards set forth below must be met for all subdivisions, and commercial,
industrial and other non-residential development.
A. The development shall not pose an unreasonable risk that a discharge of
pollutants to a groundwater aquifer will occur.
B. The project shall not result in groundwater quality becoming inferior to the
physical, biological, chemical, and radiological levels for raw and untreated
drinking water supply sources specified in the Maine State Drinking Water
Regulations, pursuant to 22 M.R.S.A., §601. If the pre-development groundwater
quality is inferior to the Maine State Drinking Water Regulations, the
development shall not degrade the water quality any further.
C. If the proposed land use activity will result in withdrawal of more than 2,000
gallons per day of groundwater, it will comply with the standards of Section 7.3
of this Ordinance.
6.4.5 Commercial and Industrial Uses
The following new commercial and industrial uses are prohibited within the
shoreland zone adjacent to great ponds classified GPA, and rivers and streams which
flow to great ponds classified GPA:
A. Auto washing facilities;
B. Auto or other vehicle service and/or repair operations, including body shops;
C. Chemical and bacteriological laboratories;
D. Storage of chemicals, including herbicides, pesticides or fertilizers, other than
amounts normally associated with individual households or farms;
Kingsbury Plantation Zoning Ordinance
3/11/2020
65
NOTE: 22 M.R.S.A. §1471-U requires municipal ordinances that apply to pesticide
storage, distribution or use be filed with the Maine Board of Pesticides Control, 28
State House Station, Augusta, ME 04333. If a municipality's ordinance is more
inclusive or restrictive than these Guidelines, as it pertains to pesticides, a copy of the
ordinance must be filed with the Board of Pesticides Control.
E. Commercial painting, wood preserving, and furniture stripping;
F. Dry cleaning establishments;
G. Electronic circuit assembly;
H. Laundromats, unless connected to a sanitary sewer;
I.
Metal plating, finishing, or polishing;
J.
Petroleum or petroleum product storage and/or sale except storage on same
property as use occurs and except for storage and sales associated with marinas;
K. Photographic processing; and
L. Printing.
6.4.6 Wetland Protection
A. The applicant must delineate on the ground and in a subdivision or site plan all
wetlands within the general project area using methods described in the Corps of
Engineers Wetlands Delineation Manual (1987 or as revised).
B. The following requirements apply to activities resulting in the alteration of more
than 0.1 acre (4,300 square feet) to forested and non-forested wetlands that are
not already within a Resource Protection Zone:
(1)
Projects shall seek to avoid alteration of wetland areas to the extent
feasible considering natural features, cost, existing technology and
logistics based on the overall purpose of the project. Projects must not
cause a loss in wetland area, functions and values if there is a practicable
alternative to the project that would be less damaging to the environment.
(2)
Projects must limit the amount of wetland to be altered to the minimum
amount necessary to complete the project.
(3)
Projects that would alter wetland hydrology and could also alter stream
flows or other adjacent surface waters must comply with the water quality
classification standards contained in 38 M.R.S.A. §465.
(4)
A 25-foot buffer strip must be maintained between the activity and any
surface waters.
6.4.7 Wildlife Habitat Protection
A. The applicant and the Planning Board shall utilize information available from the
Beginning with Habitat Program or the Maine Department of Inland Fisheries
and Wildlife to ascertain the existence and status of significant wildlife habitat,
including, but not limited to candidate deer wintering areas, rare, threatened or
endangered wildlife, rare or exemplary natural communities, and significant
vernal pools.
Kingsbury Plantation Zoning Ordinance
3/11/2020
66
B. If any portion of a subdivision, or commercial industrial or other non-residential
project could impact critically imperiled (S1) or imperiled (S2) natural
communities or plant species as determined by the appropriate State agency, the
applicant shall demonstrate that there will be no undue adverse impact on the
community and species the site supports and indicate appropriate measures for
the preservation of the values that qualify the site for such designation.
C. If an area within the proposed development site has been identified by the Maine
Department of Inland Fisheries and Wildlife as a candidate deer wintering area,
the developer shall consult with a qualified wildlife biologist and incorporate
measures for protection of the resource into the development plan.
D. The design for a new residential subdivision or non-residential development must
include suitable open space for wildlife passage, around or through the
development, of at least 500 feet in width. The wildlife passage shall be located,
in order of preference, along the side of flowing waters or wetlands, in a way that
links high value wildlife habitats on or off the property, along the property line of
any abutting conserved land, or adjacent to one of the boundary lines of the
parcel, to the extent practicable.
Notwithstanding Section 6.4.7, D, the Planning Board may allow a design
without onsite open space for wildlife passage:
(1)
In cases where a proposed development constitutes "in-fill" development,
on a parcel surrounded by existing development, for which any designated
open space would be an isolated pocket providing little long-term value.
(2)
In cases where the residential subdivision or non-residential development
has joined with a group of landowners to jointly establish a common
wildlife corridor at least 500 feet in width, within one-quarter mile of the
project site.
(3)
In cases where a site-specific resource assessment shows that the wildlife
passage goal will otherwise be met on or within one-quarter mile of the
project site.
Permit applications for residential subdivisions and non-residential development
required to meet this standard shall include a plan identifying the wildlife
passage and demonstrating that the open space for wildlife passage will not be
materially altered in the future by any uses allowed with or without a permit.
6.4.8 Protection of Scenic Resources
A. The design of proposed commercial, industrial or other non-residential
development shall take into account the scenic character of the area. Structures
shall be located, designed and landscaped to reasonably minimize their visual
impact, particularly when viewed from existing roadways or shorelines.
B. To the extent practicable, proposed structures and other visually intrusive
development shall be placed in locations least likely to block or interrupt scenic
views as seen from traveled ways, water bodies, or public property.
Kingsbury Plantation Zoning Ordinance
3/11/2020
67
C. The Kingsbury Comprehensive Plan has identified the Kingsbury Dam and
Picnic Area a High Value Scenic Resource. Any commercial, industrial or other
non-residential development affecting these areas shall preserve the visual
character of the areas. The Planning Board shall require a Scenic Resource
Assessment and Mitigation Plan as part of the application process.
D. Hillside Resources
The standards for hillside resources must be met for all subdivision, residential,
commercial, industrial, and other non-residential development, if any portion of
the project area is located on a hillside, except as provided below.
(1)
Exceptions
The hillside resources standards in Section 6.4.8,D,3 through 6 do not
apply to:
(a) Features of structures within non-residential developments that contain
no floor area such as chimneys, towers, ventilators, and spires; or to
freestanding towers and turbines; or
(b) A development or portions of a development that will not be visible
from existing roadways, major water bodies, coastal wetlands,
permanent trails, or public property located within three miles of the
project boundary. Where views of the development are blocked by
natural conditions or features such as existing vegetation, to qualify for
this exception, the applicant shall demonstrate that these obstructing
features or conditions will not be materially altered in the future by
any uses allowed with or without a permit. In cases where the Planning
Board determines the development will be visually intrusive or where
there is a particularly sensitive resource more than three miles away,
the Planning Board may increase the distance for determining
applicability of the hillside standards.
(2)
Ridgeline Protection
The development must be designed to ensure buildings, structures, and
other improvements will not extend above the existing ridgeline or
otherwise alter the ridge profile significantly when viewed from existing
roadways, major water bodies, coastal wetlands, permanent trails, or public
property.
(3)
Vegetative Clearing
The proposal must include a vegetation management plan that establishes
and provides for long-term maintenance of clearing limits that will
minimize potential impacts to views from existing roadways, major water
bodies, coastal wetlands, permanent trails, and public property. The
vegetation management plan must ensure:
Kingsbury Plantation Zoning Ordinance
3/11/2020
68
(a) There will be a sufficient area of clearing allowed around buildings to
maintain the minimum extent needed for defensible space for fire
safety, generally 30 feet in width;
(b) There will be sufficient vegetation maintained on steep slopes to
protect long-term slope stability;
(c) Existing forest cover will be maintained to interrupt the view of the
façade of buildings, provide a forested backdrop to buildings, and
reduce or eliminate the visual impact of new development;
(d) Clearing for views will be limited, with narrow view openings
between trees and beneath tree canopies being a desirable alternative
to clearing large openings adjacent to building facades; and
(e) If cleared openings are allowed outside the building envelope, such as
clearing for views, the plan shall include a quantifiable standard for
limiting that clearing.
(f) The Commission may require additional vegetative clearing
limitations or standards in cases where the proposed development
could be visible from a scenic resource that has a unique or special
value relative to other scenic resources in the area.
(4)
Structural Development
The development must provide for building designs that will complement
the site and topography (e.g., avoiding long unbroken roof lines; orienting
buildings such that the greatest horizontal dimension of the structure is
parallel with, and not perpendicular to, the natural contour of the land;
stepping the building down the slope rather than creating building pads that
require extensive excavation and filling, and sloping roofs in the direction
and general angle of the natural slope on the project site).
(5)
Construction Materials
The development must be designed to ensure that:
(a) The exterior colors of structures, including but not limited to siding,
roofing, retaining structures, foundations, trim, gutters, vents and
chimneys, will be a muted tone naturally found at the specific site or in
the surrounding landscape.
(b) Structures use only low or non-reflective exterior building materials,
including but not limited to windows, roofing, gutters, vents, and
chimneys. If a highly reflective material, such as aluminum or other
smooth metal, is used for an essential component of the structure
because no other material is reasonably available for that component,
reduced reflectivity must be incorporated and maintained to the
greatest extent practicable by, for example, painting the component
with a muted color naturally found at the site, boxing in the component
Kingsbury Plantation Zoning Ordinance
3/11/2020
69
with non-reflective material, or using a textured or pre-weathered
version of the component.
(6)
Linear Infrastructure
Roads, driveways, utility corridors, and other similar linear infrastructure
must be located and constructed so as to minimize the visibility of corridor
openings to the extent practicable (by, for example, following topographic
contours and retaining existing vegetation).
6.4.9 Protection of Historic or Archeological Resources
Any proposed land use activity involving structural development or soil disturbance
on or adjacent to sites listed on, or eligible to be listed on the National Register of
Historic Places, as determined by the permitting authority, shall be submitted by the
applicant to the Maine Historic Preservation Commission for review and comment, at
least twenty (20) days prior to action being taken by the permitting authority. The
permitting authority shall consider comments received from the Commission prior to
rendering a decision on the application.
NOTE: Plantation officials should contact the Maine Historic Preservation
Commission for the listing and location of Historic Places in Kingsbury Plantation.
A. If any portion of a subdivision or commercial, industrial or other non-residential
project site includes an archaeologically sensitive area or a structure listed in the
National Register of Historic Places, or is considered by the Maine Historic
Preservation Commission as likely to contain a significant archaeological site or
structure, the applicant shall conduct archaeological surveys or submit
information on the structure, as requested by the Planning Board.
B. If a significant archaeological site or structure is located in the project area, the
applicant shall demonstrate that there will be no undue adverse impact to the
archaeological site or structure, either by project design, physical or legal
protection, or by appropriate archaeological excavation or mitigation.
6.4.10 Floodplain Management
All development in flood prone areas shall meet the applicable requirements and
standards in Appendix A: Floodplain Management Ordinance for Kingsbury
Plantation.
6.4.11 Storm Water Management
A. Standards for all development:
(1)
All new construction and development shall be designed to minimize storm
water runoff from the site in excess of the natural predevelopment
conditions. Where possible, existing natural runoff control features, such
as berms, swales, terraces and wooded areas, shall be retained in order to
reduce runoff and encourage infiltration of stormwaters.
Kingsbury Plantation Zoning Ordinance
3/11/2020
70
(2)
Storm water runoff control systems shall be maintained as necessary to
ensure proper functioning.
(3)
To the extent possible, the plan must retain stormwater on the site using the
natural features of the site and must not have adverse impacts on abutting
or downstream properties.
(4)
Any project which requires a Stormwater Management Permit from the
Maine Department of Environmental Protection must submit a copy of the
approved permit at time of application.
(5)
For projects involving structural treatments, a Stormwater Maintenance
Agreement (SMA) must be submitted at the time of application. The SMA
must indicate how stormwater facilities will be maintained through the
course of their projected life.
(6)
The biological and chemical properties of receiving waters must not be
degraded by stormwater runoff. The use of oil and grease traps in catch
basins, the use of on site vegetated waterways, and vegetated buffer strips
along waterways and drainage swales, and the reduction in use of deicing
salts and fertilizers may be required.
B. Standards for development that disturbs one acre or more of land or is located in
the shoreland zone:
(1)
Adequate provisions must be made for the collection and disposal of all
stormwater that runs off proposed streets, parking areas, roofs, and other
surfaces, through a Stormwater Management Plan consistent with Maine's
Stormwater Best Management Practices Manual, (DEP, March and May
2016, or as revised).
(2)
Stormwater runoff systems must detain or retain water such that the rate of
flow from the site after development does not exceed the predevelopment
rate. The applicant must demonstrate that on and off site downstream
channel or system capacity is sufficient to carry the flow without adverse
effects, including but not limited to, flooding and erosion of shoreland
areas, or that he/she will be responsible for whatever improvements are
needed to provide the required increase in capacity and/or mitigation.
C. Standards for development on hillsides, as defined in Section 9. The proposal
must include plans for the construction and maintenance of stormwater best
management practices designed to slow down and spread runoff from developed
areas and ensure that increased runoff does not cause downgradient soil erosion.
NOTE: The Stormwater Management Law (38 M.R.S.A. §420-D) requires a full
permit to be obtained from the DEP prior to construction of a project consisting of
20,000 square feet or more of impervious area or 5 acres or more of a developed
area in an urban impaired stream watershed or most-at-risk lake watershed, or a
project with 1 acre or more of developed area in any other stream, coastal or wetland
watershed. A permit-by-rule is necessary for a project with one acre or more of
Kingsbury Plantation Zoning Ordinance
3/11/2020
71
disturbed area but less than 1-acre impervious area (20,000 square feet for most-at-
risk lakes and urban impaired streams) and less than 5 acres of developed area.
Furthermore, a Maine Construction General Permit is required if the construction
will result in one acre or more of disturbed area.
6.5
Site Design Standards
Criteria:
The land use activity is in conformance with this Ordinance and standards adopted
thereto.
The activity is in conformance with the duly adopted ordinance, comprehensive plan,
development plan or land use plan.
6.5.1 Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
within Shoreland Areas
A. In a Resource Protection District abutting a great pond, there shall be no cutting
of vegetation within the strip of land extending 75 feet, horizontal distance,
inland from the normal high-water line, except to remove hazard trees as
described in Section 6.5.2.
Elsewhere, in any Resource Protection District the cutting or removal of
vegetation shall be limited to that which is necessary for uses expressly
authorized in that district.
B. Except in areas as described in Section A, above, within a strip of land extending
one-hundred (100) feet, horizontal distance, inland from the normal high-water
line of a great pond classified GPA or a river flowing to a great pond classified
GPA, or within a strip extending seventy-five (75) feet, horizontal distance, from
any other water body, tributary stream, or the upland edge of a wetland, a buffer
strip of vegetation shall be preserved as follows:
(1)
There shall be no cleared opening greater than 250 square feet in the
forest canopy (or other existing woody vegetation if a forested canopy is
not present) as measured from the outer limits of the tree or shrub crown.
However, a single footpath not to exceed six (6) feet in width as measured
between tree trunks and/or shrub stems is allowed for accessing the
shoreline provided that a cleared line of sight to the water through the
buffer strip is not created.
(2)
Selective cutting of trees within the buffer strip is allowed provided that a
well-distributed stand of trees and other natural vegetation is maintained.
For the purposes of Section 6.5.1,B,2, a "well-distributed stand of trees"
adjacent to a great pond classified GPA or a river or stream flowing to a
great pond classified GPA shall be defined as maintaining a rating score of
24 or more in each 25-foot by 50-foot rectangular (1250 square feet) area
as determined by the following rating system.
Kingsbury Plantation Zoning Ordinance
3/11/2020
72
Diameter of Tree at 4-1/2 feet
Above Ground Level (inches)
Points
2.0 to < 4.0
1
4.0 to < 8.0
2
8.0 to < 12.0
4
12.0+
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-
distributed stand of trees" is defined as maintaining a minimum rating
score of 16 per 25-foot by 50-foot rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot
contains four (4) trees between 2 and 4 inches in diameter, two trees
between 4 and 8 inches in diameter, three trees between 8 and 12 inches in
diameter, and two trees over 12 inches in diameter, the rating score is:
(4x1) + (2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees
totaling 12 points (36- 24 =12) may be removed from the plot provided that
no cleared openings are created.
The following shall govern in applying this rating system:
(a) The 25-foot x 50-foot rectangular plots shall be established where the
landowner or lessee proposes clearing within the required buffer;
(b) Each successive plot shall be adjacent to but not overlap a previous
plot;
(c) Any plot not containing the required points shall have no vegetation
removed except as otherwise allowed by these rules;
(d) Any plot containing the required points may have vegetation removed
down to the minimum points required or as otherwise allowed by these
rules; and
(e) Where conditions permit, no more than 50% of the points on any 25-
foot by 50-foot rectangular area may consist of trees greater than 12
inches in diameter.
For the purposes of Section 6.5.1,B,2, "other natural vegetation" is defined
as retaining existing vegetation under three (3) feet in height and other
ground cover and retaining at least five (5) saplings less than two (2)
inches in diameter at four and one half (4 ½) feet above ground level for
each 25-foot by 50-foot rectangle area. If five saplings do not exist, no
woody stems less than two (2) inches in diameter can be removed until 5
Kingsbury Plantation Zoning Ordinance
3/11/2020
73
saplings have been recruited into the plot. In addition, the soil shall not be
disturbed, except to provide for a footpath or other permitted use.
Notwithstanding the above provisions, no more than 40% of the total
volume of trees four (4) inches or more in diameter, measured at 4½ feet
above ground level may be removed in any ten (10) year period.
(3)
In order to protect water quality and wildlife habitat, existing vegetation
under three (3) feet in height and other ground cover, including leaf litter
and the forest duff layer, shall not be cut, covered, or removed, except to
provide for a footpath or other permitted uses as described in Section
6.5.1, paragraphs B and B.
(4)
Pruning of tree branches, on the bottom 1/3 of the tree is allowed, provided
that tree vitality will not be adversely affected.
(5)
In order to maintain a buffer strip of vegetation, when the removal of
storm-damaged, dead or hazard trees results in the creation of cleared
openings in excess of 250 square feet, these openings shall be replanted
with native tree species in accordance with Section Q, below, unless
existing new tree growth is present.
(6)
In order to maintain the vegetation in the shoreline buffer, clearing or
removal of vegetation for allowed activities, including associated
construction and related equipment operation, within or outside the
shoreline buffer, must comply with the requirements of Section 6.5.1,B.
C. At distances greater than one hundred (100) feet, horizontal distance, from a
great pond classified GPA or a river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of any
other water body, tributary stream, or the upland edge of a wetland, there shall
be allowed on any lot, in any ten (10) year period, selective cutting of not more
than forty (40) percent of the volume of trees four (4) inches or more in diameter,
measured 4 1/2 feet above ground level. Tree removal in conjunction with the
development of permitted uses shall be included in the forty (40) percent
calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to,
principal and accessory structures, driveways, lawns and sewage disposal areas,
exceed in the aggregate, 25% of the lot area within the shoreland zone or ten
thousand (10,000) square feet, whichever is greater, including land previously
cleared. This provision applies to the portion of a lot within the shoreland zone,
including the buffer area.
D. Legally existing nonconforming cleared openings may be maintained, but shall
not be enlarged, except as allowed by this Ordinance.
Kingsbury Plantation Zoning Ordinance
3/11/2020
74
E. Fields and other cleared openings which have reverted to primarily shrubs,
trees, or other woody vegetation shall be regulated under the provisions of
Section 6.5.1,B.
6.5.2 Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
A. Hazard trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are
met:
(1)
Within the Shoreline Buffer
If the removal of a hazard tree results in a cleared opening in the tree
canopy greater than two hundred and fifty (250) square feet, replacement
with native tree species is required, unless there is new tree growth already
present. New tree growth must be as near as practicable to where the
hazard tree was removed and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level. If new
growth is not present, then replacement trees shall consist of native species
and be at least four (4) feet in height, and be no less than two (2) inches in
diameter. Stumps may not be removed.
(2)
Outside of the Shoreline Buffer
When the removal of hazard trees exceeds forty (40) percent of the volume
of trees four (4) inches or more in diameter, measured at four and one half
(4.5) feet above ground level in any ten (10) year period, and/or results in
cleared openings exceeding twenty-five (25) percent of the lot area within
the shoreland zone, or ten thousand (10,000) square feet, whichever is
greater, replacement with native tree species is required, unless there is
new tree growth already present. New tree growth must be as near as
practicable to where the hazard tree was removed and be at least two (2)
inches in diameter, measured at four and one half (4.5) feet above the
ground level. If new growth is not present, then replacement trees shall
consist of native species and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level.
(3)
The removal of standing dead trees, resulting from natural causes, is
permissible without the need for replanting or a permit, as long as the
removal does not result in the creation of new lawn areas, or other
permanently cleared areas, and stumps are not removed. For the purposes
of this provision dead trees are those trees that contain no foliage during
the growing season.
(4)
The Code Enforcement Officer may require the property owner to submit
an evaluation from a licensed forester or arborist before any hazard tree
can be removed within the shoreland zone.
Kingsbury Plantation Zoning Ordinance
3/11/2020
75
(5)
The Code Enforcement Officer may require more than a one-for-one
replacement for hazard trees removed that exceed eight (8) inches in
diameter measured at four and one half (4.5) feet above the ground level.
B. Storm-damaged trees in the shoreland zone may be removed without a permit
after consultation with the Code Enforcement Officer if the following
requirements are met:
(1)
Within the shoreline buffer, when the removal of storm-damaged trees
results in a cleared opening in the tree canopy greater than two hundred
and fifty (250) square feet, replanting is not required, but the area shall be
required to naturally revegetate, and the following requirements must be
met:
(a) The area from which a storm-damaged tree is removed does not result
in new lawn areas, or other permanently cleared areas;
(b) Stumps from the storm-damaged trees may not be removed;
(c) Limbs damaged from a storm event may be pruned even if they extend
beyond the bottom one-third (1/3) of the tree; and
(d) If after one growing season, no natural regeneration or regrowth is
present, replanting of native tree seedlings or saplings is required at a
density of one seedling per every eighty (80) square feet of lost
canopy.
(2)
Outside of the shoreline buffer, if the removal of storm damaged trees
exceeds 40% of the volume of trees four (4) inches or more in diameter,
measured at four and one half (4.5) feet above the ground level in any ten
(10) year period, or results, in the aggregate, in cleared openings
exceeding 25% of the lot area within the shoreland zone or ten thousand
(10,000) square feet, whichever is greater, and no natural regeneration
occurs within one growing season, then native tree seedlings or saplings
shall be replanted on a one-for-one basis.
6.5.3 Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal
standards set forth in Section 6.5.1, provided that all other applicable requirements
of this chapter are complied with, and the removal of vegetation is limited to that
which is necessary:
A. The removal of vegetation that occurs at least once every two (2) years for the
maintenance of legally existing areas that do not comply with the vegetation
standards in this chapter, such as but not limited to cleared openings in the
canopy or fields. Such areas shall not be enlarged, except as allowed by this
section. If any of these areas, due to lack of removal of vegetation every two (2)
years, reverts back to primarily woody vegetation, the requirements of Section
6.5.1 apply;
Kingsbury Plantation Zoning Ordinance
3/11/2020
76
B. The removal of vegetation from the location of allowed structures or allowed
uses, when the shoreline setback requirements of Section 3.2.2 are not
applicable;
C. The removal of vegetation from the location of public swimming areas associated
with an allowed public recreational facility;
D. The removal of vegetation associated with allowed agricultural uses, provided
best management practices are utilized, and provided all requirements of Section
7.2.1 are complied with;
E. The removal of vegetation associated with brownfields or voluntary response
action program (VRAP) projects provided that the removal of vegetation is
necessary for remediation activities to clean-up contamination on a site in a
general development district, commercial fisheries and maritime activities
district or other equivalent zoning district approved by the Commissioner that is
part of a state or federal brownfields program or a voluntary response action
program pursuant 38 M.R.S.A §343-E, and that is located along:
(1)
A river that does not flow to a great pond classified as GPA pursuant to 38
M.R.S.A §465-A.
F. The removal of non-native invasive vegetation species, provided the following
minimum requirements are met:
(1)
If removal of vegetation occurs via wheeled or tracked motorized
equipment, the wheeled or tracked motorized equipment is operated and
stored at least twenty-five (25) feet, horizontal distance, from the shoreline,
except that wheeled or tracked equipment may be operated or stored on
existing structural surfaces, such as pavement or gravel;
(2)
Removal of vegetation within twenty-five (25) feet, horizontal distance,
from the shoreline occurs via hand tools; and
(3)
If applicable clearing and vegetation removal standards are exceeded due
to the removal of non-native invasive species vegetation, the area shall be
revegetated with native species to achieve compliance.
NOTE: An updated list of non-native invasive vegetation is maintained by the
Department of Agriculture, Conservation and Forestry's Natural Areas
Program:
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
The removal of vegetation associated with emergency response activities
conducted by the Department, the U.S. Environmental Protection Agency, the
U.S. Coast Guard, and their agents.
6.5.4 Revegetation of Cleared Areas in Shoreland Zones
When revegetation is required in response to violations of the vegetation standards
set forth in Section 6.5.1, to address the removal of non-native invasive species of
vegetation, or as a mechanism to allow for development that may otherwise not be
Kingsbury Plantation Zoning Ordinance
3/11/2020
77
permissible due to the vegetation standards, including removal of vegetation in
conjunction with a shoreline stabilization project, the revegetation must comply with
the following requirements.
A. The property owner must submit a revegetation plan, prepared with and signed
by a qualified professional, that describes revegetation activities and
maintenance. The plan must include a scaled site plan, depicting where
vegetation was, or is to be removed, where existing vegetation is to remain, and
where vegetation is to be planted, including a list of all vegetation to be planted.
B. Revegetation must occur along the same segment of shoreline and in the same
area where vegetation was removed and at a density comparable to the pre-
existing vegetation, except where a shoreline stabilization activity does not allow
revegetation to occur in the same area and at a density comparable to the pre-
existing vegetation, in which case revegetation must occur along the same
segment of shoreline and as close as possible to the area where vegetation was
removed.
C. If part of a permitted activity, revegetation shall occur before the expiration of
the permit. If the activity or revegetation is not completed before the expiration
of the permit, a new revegetation plan shall be submitted with any renewal or
new permit application.
D. Revegetation activities must meet the following requirements for trees and
saplings:
(1)
All trees and saplings removed must be replaced with native noninvasive
species;
(2)
Replacement vegetation must at a minimum consist of saplings;
(3)
If more than three (3) trees or saplings are planted, then at least three (3)
different species shall be used;
(4)
No one species shall make up 50% or more of the number of trees and
saplings planted;
(5)
If revegetation is required for a shoreline stabilization project, and it is not
possible to plant trees and saplings in the same area where trees or
saplings were removed, then trees or sapling must be planted in a location
that effectively reestablishes the screening between the shoreline and
structures; and
(6)
A survival rate of at least eighty (80) percent of planted trees or saplings is
required for a minimum five (5) years period.
E. Revegetation activities must meet the following requirements for woody
vegetation and other vegetation under three (3) feet in height:
(1)
All woody vegetation and vegetation under three (3) feet in height must be
replaced with native noninvasive species of woody vegetation and
vegetation under three (3) feet in height as applicable;
Kingsbury Plantation Zoning Ordinance
3/11/2020
78
(2)
Woody vegetation and vegetation under three (3) feet in height shall be
planted in quantities and variety sufficient to prevent erosion and provide
for effective infiltration of stormwater;
(3)
If more than three (3) woody vegetation plants are to be planted, then at
least three (3) different species shall be planted;
(4)
No one species shall make up 50% or more of the number of planted woody
vegetation plants; and
(5)
Survival of planted woody vegetation and vegetation under three feet in
height must be sufficient to remain in compliance with the standards
contained within this ordinance for minimum of five (5) years.
F. Revegetation activities must meet the following requirements for ground
vegetation and ground cover:
(1)
All ground vegetation and ground cover removed must be replaced with
native herbaceous vegetation, in quantities and variety sufficient to prevent
erosion and provide for effective infiltration of stormwater;
(2)
Where necessary due to a lack of sufficient ground cover, an area must be
supplemented with a minimum four (4) inch depth of leaf mulch and/or
bark mulch to prevent erosion and provide for effective infiltration of
stormwater; and
(3)
Survival and functionality of ground vegetation and ground cover must be
sufficient to remain in compliance with the standards contained within this
ordinance for minimum of five (5) years.
6.5.5 Exterior Lighting
A. All exterior lighting fixtures will be full cut-off, except for security lighting
containing a 160 watt or less incandescent bulb, or any other lighting source of
60 watts or less. Full cut-off fixtures are those that project no more than 2.5% of
light above the horizontal plane of the luminary's lowest part.
B. Light fixtures mounted on structural canopies shall be recessed so that fixtures
are flush with the canopy. Alternatively, canopies may be indirectly lit using
light beamed upward and then reflected down from the underside of the canopy.
In this case light fixtures must be shielded so that direct illumination is focused
exclusively on the underside of the canopy.
C. All exterior lighting shall be designed, located, installed and directed in such a
manner as to illuminate only the target area, to the extent practicable. No activity
shall produce a strong, dazzling light or reflection of that light onto neighboring
properties or onto any road so as to impair the vision of the driver of any vehicle
upon that roadway or to create nuisance conditions.
D. For commercial, industrial and other non-residential development, all non-
essential outdoor lighting shall be turned off after business hours, leaving only
the minimal necessary lighting for site security. The term "non-essential" applies,
without limitation, to display, aesthetic and parking lighting.
Kingsbury Plantation Zoning Ordinance
3/11/2020
79
E. The following activities are exempt from these standards:
(1)
Roadway and airport lighting, and lighting required by the Federal
Aviation Administration for air traffic safety;
(2)
Temporary fair, event, or civic uses;
(3)
Emergency lighting, provided it is temporary and is discontinued upon
termination of the work;
(4)
Lighting that is activated by motion-sensors; and
(5)
Lighting that was in place on April 1, 2004.
6.5.6 Noise
A. With the exception of Wind Energy Generation Facilities, the maximum
permissible sound pressure level of any continuous, regular or frequent source of
sound produced by any commercial, industrial and other non-residential
development shall be as established by the time period listed below. Sound
pressure levels shall be measured at all property boundary lines, at a height of at
least 4 feet above the ground surface. The levels specified below may be
exceeded by 10 dB(A) for a single period, no longer than 15 minutes per day.
7:00 AM to 7:00 PM
7:00 PM to 7:00 AM
55 dB(A)
45 dB(A)
B. The following activities are exempt from the requirements of the preceding
subsection:
(1)
Sounds emanating from construction-related or woods-related activities
conducted between 7:00 A.M. and 7:00 P.M.;
(2)
Sounds emanating from safety signals, warning devices, emergency
pressure relief valves, and other emergency activities; and
(3)
Sounds emanating from traffic or machinery on roadways.
6.5.7 Signs
A. All signs shall conform to the standards of the Maine Traveler Information
Services Act, 23 M.R.S.A., §1901 et seq. or successor statute.
B. Unless licensed as an Official Business Directional Sign in accordance with 23
M.R.S.A., §1918, or successor statute, signs must be placed on the property of
the business offering the goods or service being advertised and not be located
more than 1,000 feet from the building or other particular site at which the
activity advertised is conducted.
C. Size
No individual sign may measure more than thirty-two (32) square feet in size. No
combination of signs on a single site may, in aggregate, measure more than sixty-
four (64) square feet in area. Within the Resource Protection, Stream Protection,
and Limited Residential Districts, no more than two (2) signs are permitted, each
measuring no more than six (6) square feet in area.
Kingsbury Plantation Zoning Ordinance
3/11/2020
80
D. Signs Relating to Goods and Services Sold on the Premises
Signs relating to goods and services sold on the premises shall be allowed,
provided that such signs shall not exceed six (6) square feet in area and shall not
exceed two (2) signs per premises. Signs relating to goods or services not sold or
rendered on the premises shall be prohibited.
E. Height
No sign shall extend higher than twenty (20) feet above the ground.
F. Lighting
Signs may be illuminated only by shielded, non-flashing lights. No sign shall be
internally lit. Exterior lighting shall be directed at the sign in such a way that
lighting elements are not directly visible to travelers on the road.
G. Free-standing Signs
Free-standing signs shall be sufficiently secured to the ground to withstand
strong winds. Free-standing signs shall not extend more than 15 feet above
ground level and shall not have a supporting structure which extends more than
two feet above such sign. (Free-standing signs which are in place for fewer than
sixty (60) days per year are considered temporary and are not subject to the
requirements of this Ordinance.)
H. Building-Mounted Signs
Building-mounted signs must be mounted flush or, if projecting, no lower than
nine (9) feet above the ground and may project no more than 2 feet from the
building. Signs shall not extend above the eave line of the building. Roof signs
are prohibited.
I.
Signs for Sale, Rental or Lease of the Premises
Residential users may display a single sign not over three (3) square feet in area
relating to the sale, rental, or lease of the premises. Signs advertising the sale or
lease of real estate by the owner or his agent shall not have an area of more than
6 square feet.
J.
Name Signs
Name signs are allowed, provided such signs shall not exceed two (2) signs per
premises, and shall not exceed twelve (12) square feet in the aggregate.
K. No Trespassing and Hunting Signs
Signs relating to trespassing and hunting shall be allowed without restriction as
to number provided that no such sign shall exceed two (2) square feet in area.
L. Public Safety Signs
Signs relating to public safety shall be allowed without restriction.
Kingsbury Plantation Zoning Ordinance
3/11/2020
81
6.5.8 Roadside Buffer
A vegetative buffer strip consisting of natural vegetation no less than fifty (50) feet in
width shall be maintained between the developed area of the property and the edge of
right-of-way of a public road. The buffer strip shall be preserved as provided for
shoreland buffer strips in Section 6.5.1,B.
6.6
Additional Standards for Subdivisions
Criteria:
All freshwater wetlands within the proposed subdivision have been identified on any
maps submitted as part of the application, regardless of the size of these wetlands.
Any mapping of freshwater wetlands may be done with the help of the local soil and
water conservation district.
All farmland within the proposed subdivision has been identified on maps submitted
as part of the application. Any mapping of farmland may be done with the help of the
local soil and water conservation district.
Any river, stream or brook within or abutting the proposed subdivision has been
identified on any maps submitted as part of the application. For purposes of this
section, "river, stream or brook" has the same meaning as in 38 M.R.S.A., §480-B,
sub-§ 9.
Timber on the parcel being subdivided has not been harvested in violation of rules
adopted pursuant to 12 M.R.S.A, §8869, sub-§14, "liquidation harvesting."
6.6.1 Creation of Subdivision Lots
A. Harmonious Fit and No Undue Adverse Impact
Subdivisions shall be designed to fit harmoniously into the natural environment
and shall cause no adverse impact on surrounding uses.
B. Subdivisions shall be staged so that no more than five (5) lots are sold per 12-
month period. Subdivisions totaling more than five (5) lots shall be designed to
avoid the linear placement of lots and driveways along roadways or shorelines. If
practicable, subdivision lots can be placed so as to create a distinct
neighborhood. Regardless, lots shall be configured in such a manner so that
groups of lots are separated by at least 500 feet of undeveloped land and the lots
within a group do not extend more than 1,320 feet along any roadway or
shoreline.
C. Driveway Access Points
To the extent practicable, subdivisions shall be designed to reduce the number of
driveway access points onto roadways and interior roads.
D. Building Envelopes
Building envelopes shall be marked and identified on the subdivision plat for
each proposed lot in accordance with the following requirements:
Kingsbury Plantation Zoning Ordinance
3/11/2020
82
(1)
Building envelopes shall identify all areas within each subdivision lot
where structural development may occur;
(2)
Building envelopes shall be arranged to conform with the minimum
shoreline, road and property line setback and maximum lot coverage
requirements; and
(3)
Where practicable, building envelopes shall be arranged so as to avoid the
placement of structures and driveways along ridge lines, in wetlands, or on
slopes greater than 20 %, or any other important topographic and natural
features.
6.6.2 Survey and Monumentation
All subdivision and lot boundary corners and angle points shall be marked by
suitable, permanent monumentation set according to the standards of the Maine Board
of Registered Land Surveyors. Monuments shall be marked with the name and
registration number of the individual responsible for its placement.
6.6.3 Platting for Subdivision Review
A. The subdivision plat shall show all areas of freshwater wetlands, regardless of
size.
B. The subdivision plat shall show all areas of farmland, as defined in this
Ordinance.
C. The subdivision plat shall show any river, stream, or brook within or abutting the
proposed subdivision.
D. The final subdivision plat shall identify the location and type of survey
monuments placed and shall contain the identifying number and seal of the
registered surveyor or professional engineer who prepared the plan.
6.6.4 Restriction on Liquidation Harvesting
The applicant for a subdivision shall show that timber on the parcel being subdivided
has not been harvested in violation of rules adopted by the Maine Forest Service
pursuant to 12 M.R.S.A., §8869, sub-§14. If a violation of rules has occurred, the
Planning Board must determine prior to granting approval for the subdivision that 5
years have elapsed from the date the landowner under whose ownership the harvest
occurred acquired the parcel. The Planning Board may request technical assistance
from the Maine Forest Service to determine whether a rule violation has occurred, or
the board may accept a determination certified by a forester licensed pursuant to 32
M.R.S.A., Ch. 76. If the Forest Service agrees to provide assistance, it shall make a
finding and determination as to whether a rule violation has occurred. The Planning
Board may require a subdivision applicant to provide a determination certified by a
licensed forester. For the purposes of this subsection, "liquidation harvesting" has the
same meaning as in 12 M.R.S.A., §8868, sub-§6 and "parcel" means a contiguous
area within the Plantation owned by one person or a group of persons in common or
joint ownership.
Kingsbury Plantation Zoning Ordinance
3/11/2020
83
7: Activity-specific Standards
7.1
Accessory Structures in the Rural District
All new or expanded accessory structures are allowed with a permit from the CEO, except
that such structures are allowed without a permit in the Rural District if they meet the
following conditions:
7.1.1 Be accessory to a legally existing principal structure and use;
7.1.2 Meet the definition of accessory structure in Section 9;
7.1.3 Conform with any applicable permit conditions, and/or deed restrictions recorded for
the property;
7.1.4 Meet all of the applicable dimensional requirements in Section 3.2.2;
7.1.5 Not be used for human habitation;
7.1.6 Have no internal plumbing and not be supplied with water other than for a hose bib
(exterior hose faucet);
7.1.7 Be consistent with the use of the principal structure and not add a new activity to
those currently permitted at the site or facility; and
7.1.8 Not cause the total development on a property to exceed any gross floor area or lot
coverage limitation related to the type of use.
7.2
Agriculture and Timber Harvesting
7.2.1 Agriculture
The following standards apply only within the Resource Protection, Stream
Protection, and Limited Residential Districts.
A. All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the former Maine Department of Agriculture
on November 1, 2001, and the Nutrient Management Law (7 M.R.S.A., §§4201-
4209).
B. Manure shall not be stored or stockpiled within one hundred (100) feet,
horizontal distance, of a great pond or a river, or within seventy-five (75) feet
horizontal distance, of other water bodies, tributary streams, or wetlands. All
manure storage areas within the shoreland zone must be constructed or modified
such that the facility produces no discharge of effluent or contaminated storm
water.
C. Agricultural activities involving tillage of soil greater than forty thousand
(40,000) square feet in surface area shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall
be considered to be a violation of this Ordinance.
Kingsbury Plantation Zoning Ordinance
3/11/2020
84
NOTE: Assistance in preparing a Conservation Plan may be available through the
local Soil and Water Conservation District office.
D. There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA; within
seventy-five (75) feet, horizontal distance, from other water bodies; nor within
twenty-five (25) feet, horizontal distance, of tributary streams and freshwater
wetlands. Operations in existence on the effective date of this Ordinance and not
in conformance with this provision may be maintained.
E. Newly established livestock grazing areas shall not be permitted within one
hundred (100) feet, horizontal distance, of the normal high-water line of a great
pond classified GPA; within seventy-five (75) feet, horizontal distance, of other
water bodies, nor; within twenty-five (25) feet, horizontal distance, of tributary
streams and freshwater wetlands. Livestock grazing associated with ongoing
farm activities, and which are not in conformance with the above setback
provisions may continue, provided that such grazing is conducted in accordance
with a Conservation Plan that has been filed with the Planning Board.
NOTE: 7 M.R.S.A. section 155 requires a municipality to provide the Commissioner
of Agriculture, Conservation and Forestry with a copy of any proposed ordinance
that impacts farm operations. The law further requires the Commissioner to review
the proposed ordinance and advise the municipality if the proposed ordinance would
restrict or prohibit the use of best management practices. A copy of a shoreland
zoning ordinance that regulates no more restrictively than contained in these
Guidelines need not be provided to the Commissioner of Agriculture, Food and Rural
Resources.
7.2.2 Timber Harvesting
The Maine Bureau of Forestry will administer the regulation of all forestry activities
within Kingsbury Plantation.
7.3
Extraction of Groundwater
These standards shall apply to any commercial enterprise or public water supplier proposing
to extract groundwater in excess of two thousand (2,000) gallons per day.
7.3.1 Groundwater Assessment
An assessment of the impacts of the development on ground water shall be required
prior to application. The assessment shall be prepared by a certified geologist or
registered professional engineer and shall include the following:
A. A map showing the basic soil types.
B. The depth to the water table at representative points throughout the development
and presumed ground water flow directions.
C. Drainage conditions throughout the development.
Kingsbury Plantation Zoning Ordinance
3/11/2020
85
D. Data on the existing ground water quality and availability, either from test wells
in the development or from existing wells on neighboring properties.
E. An analysis and evaluation of the effect of the development on ground water
resources. The evaluation shall, at a minimum, include a projection of post
development water quality and quantity, including fluctuations in water table
levels and nitrate concentrations.
F. A map showing the location of any subsurface wastewater disposal systems and
drinking water wells within the development and within 200 feet of the
development boundaries.
7.3.2 Impact on Neighboring Properties
A. No extraction operation shall result in significant lowering of the water table at
the property lines of adjacent residential property.
B. No extraction operation shall have an adverse effect on the quality of
groundwater supplies.
C. The applicant will prepare a wellhead protection plan in accordance with
guidance from the Maine Department of Health and Human Services Drinking
Water Program or show that he has control over land use activities within the
source water protection area to be established.
7.3.3 Permit Limitations
A permit issued by the Planning Board will specify the maximum volume of water to
be extracted, as projected by the groundwater assessment. The maximum volume may
be exceeded only by amending the original permit.
7.4
Home Occupations
7.4.1 A commercial enterprise which conforms to the following standards is considered to
be a home occupation, provided it meets the following criteria:
A. It is carried out within an existing residence and without altering the residential
character of the home or changing the character of the lot from its principal use
as a residence.
B. It employs the residents of the dwelling unit, with not more than two employees
who are not residents of the dwelling unit.
C. It does not generate any nuisance, waste discharge, offensive noise, vibration,
smoke, dust, odors, heat, glare, radiation, fumes, or electrical interference with
normal radio or television reception, or cause other nuisances which extend
beyond the limits of the subject property.
D. It does not generate any substantial increase in daily or seasonal traffic.
7.4.2 A commercial enterprise which cannot meet the standards of this section is
considered a commercial use, subject to the limitations and requirements of Table 1.
Kingsbury Plantation Zoning Ordinance
3/11/2020
86
7.5
Mineral Exploration and Extraction
7.5.1 Mineral Extraction Operations
A. Supplemental Application Requirements
A mineral extraction operation that will exceed five (5) acres is required under
38 M.R.S.A., §490-A et seq. to obtain a permit from the Maine Department of
Environmental Protection. Applicants shall submit a copy of the DEP application
to the Plantation. Otherwise, an application shall contain the following elements:
(1)
The site plan shall include the following features:
(a) Topography with contour intervals no greater than ten (10) foot, based
on USGS data; and
(b) The location and slope of grades existing and proposed upon
completion of the extraction operation.
(2)
A written statement of the proposed operating procedure and working
hours.
(3)
A five-year plan, showing new areas to be mined, and old areas to be
reclaimed, together with estimates of volumes to be extracted, and detailed
plans for reclamation of completed excavation.
(4)
The Planning Board may require a hydrogeologic study to determine the
effects of the proposed activity on groundwater movement and quality in
the vicinity.
B. Development Standards for Extraction Operations
Mineral extraction may be permitted under the following conditions:
(1)
A reclamation plan shall be filed with, and approved, by the Planning
Board before a permit is granted. Such plan shall describe in detail
procedures to be undertaken to fulfill the requirements of Section
7.5.1,B,13, below.
(2)
Extraction operations shall not be permitted within two-hundred fifty (250)
feet, horizontal distance, of any property line without written permission of
the owner of such adjacent property. No part of any extraction operation
shall be permitted within two-hundred fifty (250) feet of any property or
street line, except drainage ways to reduce run-off into or from the
extraction area may be allowed provided suitable erosion control measures
are in place. Natural vegetation shall be left and maintained on the
undisturbed land.
(3)
No part of any extraction operation, including drainage and runoff control
features, shall be permitted within one hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA or a
river flowing to a great pond classified GPA, and within seventy-five (75)
feet, horizontal distance, of the normal high-water line of any other water
Kingsbury Plantation Zoning Ordinance
3/11/2020
87
body, tributary stream, or the upland edge of a wetland. A vegetated strip
shall be retained within these setbacks.
(4)
Within 250 feet of any water body the extraction area shall be protected
from soil erosion by ditches, sedimentation basins, dikes, dams, or such
other control devices which are effective in preventing sediments from
being eroded or deposited into such water body.
(5)
The sides and bottom of cuts, fills, channels, and artificial water courses
shall be stabilized to prevent erosion or failure. Such structures are to be
designed and built according to accepted Best Management Practices for
erosion control.
(6)
Lagooning shall be conducted in such a manner as to avoid creation of fish
trap conditions. The developer shall obtain written approval from the
Maine Department of Environmental Protection, and/or the Department of
Inland Fisheries and Wildlife, as applicable.
(7)
The hours of operation at any extraction site shall be limited, if necessary
to ensure operational compatibility with neighboring residences.
(8)
All driveways from the extraction site to public roads shall be treated with
suitable materials to reduce dust and mud for a distance of at least one
hundred (100) feet back from such public roads.
(9)
Within twelve (12) months following the completion of extraction
operations at any extraction site, or a cell within a site, which operations
shall be deemed complete when less than one hundred (100) cubic yards of
materials are removed in any consecutive twelve (12) month period,
ground levels and grades shall be established in accordance with the
following:
(a) All debris, stumps, and similar material shall be removed for disposal
in an approved location, or shall be buried on-site. Only materials
generated on-site may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A. §1301 and the solid
waste management rules, Chapters 400-419 of the Department of Environmental
Protection's regulations may contain other applicable provisions regarding
disposal of such materials.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope
or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas,
which shall be reseeded and stabilized with vegetation native to the
area. Additional topsoil or loam shall be obtained from off-site
sources if necessary to complete the stabilization project.
(10) Topsoil removed during the extraction operation will be stockpiled on the
site and used during reclamation. Debris, stumps, boulders, and similar
Kingsbury Plantation Zoning Ordinance
3/11/2020
88
materials shall be removed and disposed of on the property in an approved
location, or, in the case of inorganic material, buried and covered with a
minimum of two (2) feet of soil. Only materials generated on-site may be
buried or covered.
(11) All areas shall be properly restored to a stable condition adequate to meet
the provisions of the Maine Erosion and Sedimentation Control Handbook
for Construction: Best Management Practices, published by the
Cumberland County Soil and Water Conservation District, 1991, or most
recent edition.
(12) Any temporary shelters or structures erected for operations and equipment
shall be removed within thirty (30) days following completion of extraction
operations.
(13) In keeping with the purposes of this Ordinance, the Planning Board may
impose such conditions as are necessary to minimize the adverse impacts
associated with mineral extraction operations on surrounding uses and
resources.
7.5.2 Mineral Exploration
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit
from the Code Enforcement Officer shall be required for mineral exploration which
exceeds the above limitation.
A. The following requirements shall apply to mineral exploration activities:
(1)
All excavations, including test pits and holes, shall be promptly capped,
refilled or secured by other equally effective measures so as to reasonably
restore disturbed areas and to protect the public health and safety.
(2)
Mineral exploration activities or associated access ways where the
operation of machinery used in such activities results in the exposure of
mineral soil, shall be located such that an unscarified filter strip of at least
the width indicated below is retained between the exposed mineral soil and
the normal high-water mark of a flowing water, body of standing water or
wetland:
Average Slope of Land
Between Exposed Mineral
Soil and Normal High
Water Mark
(Percent)
Width of Strip Between Exposed
Mineral Soil and Normal High
Water Mark
(Feet Along Surface of the Ground)
0-9
25
10-19
45
20-29
65
30-39
85
40-49
105
Kingsbury Plantation Zoning Ordinance
3/11/2020
89
50-59
125
60-69
145
70+
165
These provisions apply only on a face sloping toward the water, provided,
however, no portion of such exposed mineral soil on a back face shall be
closer than 25 feet; the provisions do not apply where access ways cross
such waters.
(3)
Except when surface waters are frozen, access ways for mineral
exploration activities shall not utilize stream channels except to cross by
the shortest possible route; unless culverts or bridges are installed, such
crossings shall only use channel beds which are composed of gravel, rock
or similar hard surface which would not be eroded or otherwise damaged.
(4)
Access way approaches to stream channels shall be located and designed so
as to divert water runoff from the way in order to prevent such runoff from
directly entering the stream.
(5)
In addition to the foregoing minimum requirements, when conducting
mineral exploration activities and creating and maintaining associated
access ways, provision shall be made to effectively stabilize all area of
disturbed soil so as to reasonably avoid soil erosion and sedimentation of
surface waters. These measures shall include seeding and mulching if
necessary to insure effective stabilization.
7.6
Recreational Facilities, Campgrounds, and Campsites
All new recreational facilities, including campgrounds, and campsites, and reconstruction of
or substantial improvements to existing facilities, must be developed in conformance with the
standards of this section.
7.6.1 Classification of Recreational Lodging Facilities
Recreational lodging facilities shall be classified into two categories: "primitive" and
"small."
A. A primitive facility is one in which electric power and running water are not
provided to patrons, buildings are limited to an aggregate of 750 square feet, and
in which no land use activity other than overnight occupancy is conducted by the
operator.
B. A small facility is one in which the aggregate floor area of principal buildings is
less than 10,000 square feet, of which not more than 200 square feet may be
devoted to retail use, and which operates with an occupancy limit of less than
100 overnight guests.
Kingsbury Plantation Zoning Ordinance
3/11/2020
90
7.6.2 Square Footage
Any square footage calculation for recreational lodging facilities shall include only
the total floor area for all principal buildings. Principal buildings generally include,
for example: main lodge, cabins for the housing of guests, bathroom facilities,
caretaker and guide housing, and recreation rooms (e.g., the principal space available
to or necessary for serving the guests). Accessory structures are not counted, such as:
wood shed, generator building, workshop, storage, composting toilet infrastructure,
and structures having a footprint of not more than 100 square feet which are part of an
on-site recreation activity. Outpost cabins are not considered in determining the
applicable floor area limitation.
7.6.3 Conversion of Use
Recreational lodging facilities may not be converted to another use without a permit.
Conversion may be permitted, provided it complies with all applicable regulations.
When the conversion is to a residential use, any water dependent structures for
recreational lodging facilities must be removed or relocated; and all lots and
structures must comply with this ordinance, including approval as a subdivision if
required.
7.6.4 Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
A. Campgrounds shall contain a minimum of five thousand (5,000) square feet of
land, not including roads and driveways, for each site. Land supporting wetland
vegetation, and land below the normal high-water line of a water body shall not
be included in calculating land area per site.
B. The areas intended for placement of a recreational vehicle, tent or shelter, and
utility and service buildings shall be set back a minimum of one hundred (100)
feet, horizontal distance, from the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, and seventy-
five (75) feet, horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland.
7.6.5 Individual Private Campsites
Individual private campsites not associated with campgrounds are allowed in all
districts, provided the following conditions are met:
A. One campsite is permitted per lot existing on the effective date of this Ordinance,
or per thirty thousand (30,000) square feet of lot area, whichever is less.
B. When an individual private campsite is proposed on a lot that contains another
principal use and/or structure, the lot must contain the minimum lot dimensional
requirements for the principal structure and/or use, and the individual private
campsite separately.
Kingsbury Plantation Zoning Ordinance
3/11/2020
91
C. Campsite placement on any lot, including the area intended for a recreational
vehicle or tent platform, shall be set back one hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA or river
flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland.
D. Only one recreational vehicle shall be allowed on a campsite. The recreational
vehicle shall not be located on any type of permanent foundation except for a
gravel pad, and no structure except a canopy shall be attached to the
recreational vehicle.
E. Within a Resource Protection District, the clearing of vegetation for the siting of
the recreational vehicle, tent or similar shelter shall be limited to one thousand
(1,000) square feet.
F. A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by
the Local Plumbing Inspector. Where disposal is off-site, written authorization
from the receiving facility or land owner is required.
G. When a recreational vehicle, tent or similar shelter is placed on-site for more
than one hundred and twenty (120) days per year, all requirements for
residential structures shall be met, including the installation of a subsurface
sewage disposal system in compliance with the State of Maine Subsurface
Wastewater Disposal Rules unless served by public sewage facilities.
7.7
Structures with Water Access
7.7.1 Public Boat Launches and Water-Access Ways
All projects must be in compliance with the Natural Resource Protection Act (NRPA).
Contact the Maine Department of Environmental Protection Bangor Office at
207.941.4570 or at 106 Hogan Road, Suite 6, Bangor ME 04401 for all information
concerning NRPA.
A. Facilities Associated with Shorefront Subdivisions
Shorefront subdivisions may be permitted no more than one permanent launch or
set of water-access ways, and one permanent dock. Any such facility must be
accessible to all lots in the subdivision. The location of the facility must be
identified on the subdivision plat and right of access must be covenanted in the
deeds of all lots in the subdivision.
B. Maintenance of Facilities
Every application for a permit for a new or replacement launch, or expansion
thereof, must contain a description of the procedures the applicant will follow to
maintain the facility on an ongoing basis to minimize erosion, sedimentation, and
transport of phosphorus into the water body.
Kingsbury Plantation Zoning Ordinance
3/11/2020
92
C. Notification for Public Facilities
Public launches are allowed without a permit, providing the following
notification occurs:
(1)
At least 30 days before filing the notification, the applicant shall inform the
Planning Board of the intent to file and mail notice to all
landowners/lessees within 1,000 feet of the proposed project. At the time of
notice, a draft notification form must be available for inspection. The
notice must state how to obtain a copy of the draft notification, the
anticipated date for filing of the notification, and a statement that public
comments on the notification may be submitted. Unless this deadline is
extended, any such comments must be submitted by the anticipated date of
the filing of the notification.
(2)
The applicant may proceed with the proposed project 14 days after filing
the notification unless within this time period the Planning Board informs
the applicant in writing that issues have been identified regarding the
adequacy of the project or that there may be an undue adverse impact on
existing uses or resources in the project area. The board will determine if
there is sufficient public interest in the project to warrant consideration of
a public hearing on the notification. Within 60 days after the close of any
public hearing, the board shall inform the applicant in writing of its
determination. If the board determines that the project will not have an
undue adverse impact on existing uses or resources in the project area, the
notification will be accepted. If the notification is not accepted, the project
will require a permit to proceed.
(3)
A notification expires 2 years from the date of acceptance by the Board.
D. Design and Construction Standards
Unless otherwise indicated, the following standards apply to all launches:
(1)
Erosion Prevention and Control During Construction
Eroded soil or fill material from disturbed areas must be prevented from
entering a water body. Properly installed erosion control measures must be
in place before the project begins. These erosion control measures must
remain in place until the project area is permanently stabilized. Erosion
and sedimentation control measures must comply with the Maine Erosion
and Sediment Control BMPs (Maine Department of Environmental
Protection, March 2003 or as revised).
(2)
Avoidance of Water Bodies
No portion of a ramp or related facilities may be located in, on, or over
wetlands, other than the water body being accessed. Parking areas, access
roads, and paths must not be located in a stream, wetland, or other water
body, except that an access roadway may cross a stream if requirements
pertaining to water crossings, are met.
Kingsbury Plantation Zoning Ordinance
3/11/2020
93
(3)
Maintenance of Vegetated Buffer
Boat launches and associated facilities must be designed to minimize
disturbance to the water body's vegetated buffer. A vegetated buffer zone at
least 25 feet wide for public facilities (100 feet for private facilities) must
be maintained or established between any parking area and the water
body.
(4)
Runoff Diversion
Parking areas, access roads, and paths must divert runoff away from the
launch to an area where it will infiltrate into the ground or pass through a
sedimentation basin before reaching the water body. For private facilities,
the total land area above the normal high water mark that drains directly
into the water body along the approach or from cut slopes must be no
greater than 200% of the area of the ramp or launch lane above the normal
high water mark.
(5)
Hand-carry Launch
A hand-carry launch must meet the following specifications:
(a) The hand-carry launch area and access pathway must not be hard
surfaced and must be constructed of gravel, rock, vegetation, or other
natural erosion resistant materials;
(b) The sloped portion of the launch above the normal high water mark
must have a slope no greater than 18%;
(c) The access path must have a maximum width of 6 feet and must have
at least one bend to divert channelized runoff; and
(d) A landing area that is cleared of obstructions must be no wider than
20 feet and must extend no more than 20 horizontal feet below normal
high water mark. Filled or cut slopes at or below the normal high
water mark must be protected with riprap.
(6)
Washing
No washing of tools, forms, or similar material may occur in or adjacent to
the water body or wetland.
(7)
Machinery in Water
Machinery may enter the water traveling or operating only on newly
placed material or temporary mats and only when necessary to excavate or
place material below the water level.
(8)
Debris
Any debris generated during the work must be prevented from washing into
the water and must be removed from the wetland or water body. Disposal
of debris must be in conformance with the Solid Waste Law, 38 M.R.S.,
§1301 et seq.
Kingsbury Plantation Zoning Ordinance
3/11/2020
94
NOTE: A structure constructed on a float or floats is prohibited unless it is
designed to function as, and is registered with the Maine Department of Inland
Fisheries and Wildlife as a watercraft.
NOTE: A permit pursuant to the Natural Resource Protection Act is required
from the Department of Environmental Protection for Shoreline Stabilization
activities.
NOTE: New permanent structures, and expansions thereof, projecting into or
over water bodies shall require a permit from the Department of Environmental
Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A. §480-
C. Permits may also be required from the Army Corps of Engineers if located in
navigable waters.
7.8
Wind Energy Generation Facilities
The Wind Energy Generation Facilities are contained exclusively within the WE Zone. It
consists of all current facilities and roadways in the Zone. Any expansion or changes must
come before the Planning Board and meet all standards required in the Rural, Limited
Residential, Stream Protection, and Resource Protection Zones described in this Ordinance.
7.9
Wireless Communication Facilities
7.9.1 Wireless Communications Facilities (WCF) may be either free-standing or building-
mounted.
A. A free-standing WCF tower shall be a monopole-type construction and shall not
exceed one hundred seventy-five (175) feet in height.
B. A building-mounted structure shall not extend more than fifteen (15) feet above
the primary roof line of the building upon which it is mounted.
7.9.2 In order to protect public safety, the minimum horizontal distance from the base of
any freestanding tower to any property line, road, or residential structure shall be
equal to one-half (1/2) of the height of the structure. A security fence at least eight (8)
feet in height shall be installed to completely enclose the tower and any associated
buildings or structures.
7.9.3 All WCF's shall be designed to facilitate co-location of services. Accommodation for
co-location shall be demonstrated at the time of application.
7.9.4 No WCF shall commence construction without a commitment for occupancy from at
least one communication service provider. If at any time a facility has not supported a
communication service provider for a period of six (6) consecutive months, the
Plantation may declare the facility abandoned and shall order its removal. If the
facility tower has not been removed within ninety (90) days of such order, the
Plantation shall contract to remove the tower and assess the cost to the property
owner, said cost to become a lien against the property.
Kingsbury Plantation Zoning Ordinance
3/11/2020
95
7.9.5 Visual impact of facilities shall be minimized, through choice of siting, design of the
structure itself, or structural or vegetative buffering. The Kingsbury Comprehensive
Plan has identified the Kingsbury Dam and Picnic Area as a High Value Scenic
Resource Area. Any WCF proposed for placement within three (3) miles of this area
shall provide a Scenic Resource Assessment and Mitigation Plan as part of the
application process.
7.9.6 No signage shall be placed on the tower itself, except for warning signs at the base.
Signs on supporting buildings and structures shall be limited to those identifying the
facility, the owner and operator, and emergency contact information.
7.9.7 Lighting of towers and antennae shall be prohibited except as required by the Federal
Aviation Administration.
7.9.8 In review of the application for a wireless communication facility, the Planning Board
is specifically authorized to retain an expert in the field of RF engineering to review
technical details of the application. The cost of this expertise shall be borne by the
applicant through the technical review fee and such additional assessment as is
necessary.
7.10 Essential Services
7.10.1 Where feasible, the installation of essential services shall be limited to existing public
ways and existing service corridors.
7.10.2 The installation of essential services, other than road-side distribution lines, is not
allowed in a Resource Protection or Stream Protection District, except to provide
services to a permitted use within said district, or except where the applicant
demonstrates that no reasonable alternative exists. Where allowed, such structures
and facilities shall be located so as to minimize any adverse impacts on surrounding
uses and resources, including visual impacts.
7.10.3 Damaged or destroyed public utility transmission and distribution lines, towers and
related equipment may be replaced or reconstructed without a permit.
Kingsbury Plantation Zoning Ordinance
3/11/2020
96
8: Performance Guarantees
8.1
Performance Guarantee
8.1.1 A guarantee of completion is required whenever an applicant proposes improvements
that will be accessible to the general public, including but not limited to roads,
commercial drives and parking lots, and public water systems.
8.1.2 A performance guarantee may also be required for the removal of facilities such as
wind energy generation, wireless communication, or reclamation of gravel pits or
other mineral extraction sites.
8.1.3 With submittal of the application for approval, the applicant shall provide a proposal
for one of the following forms of Performance Guarantee. The guarantee must be for
an amount adequate to cover the total construction costs of all required improvements
and streets, taking into account the time span of the construction schedule and the
inflation rate for construction costs. The type, conditions and amount of the
Performance Guarantee shall be determined by the Planning Board with the advice of
the Board of Assessors.
8.2
Conditional Agreement
8.2.1 The Planning Board at its discretion may permit the developer to enter into a binding
agreement with the Plantation in lieu of financial performance guarantees. Such an
agreement shall provide for approval of the plan on the condition that no lot may be
sold or structure occupied until either:
A. It is certified by the Planning Board and the Road Commissioner or their agent
that all the required improvements have been installed in accordance with this
Ordinance and the Board's conditions of approval; or
B. A financial guarantee acceptable to the Plantation is submitted in an amount
necessary to cover the completion of the required activities at an amount adjusted
for inflation and prorated for the portion of any required improvements already
installed.
8.2.2 All conditional agreements shall have a time limit for completion and shall be
approved by the Planning Board and by the Board of Assessors prior to final review
of the plan. Notice of the agreement and any conditions shall be noted on the plan
which is recorded at the Piscataquis County Registry of Deeds.
8.2.3 Release from the agreement shall follow the procedures contained in Section 8.5.3.
Kingsbury Plantation Zoning Ordinance
3/11/2020
97
8.3
Cash Bond
Cash Bond for the Establishment of an Escrow Account
8.3.1 A cash contribution to the establishment of an escrow account shall be made by either
a certified check made out to Kingsbury Plantation, a direct deposit into a savings
account, or the purchase of a certificate of deposit naming the Plantation as owner.
For any account established by the developer, Kingsbury Plantation shall be named as
owner or co-owner, and the consent of the Plantation shall be required for
withdrawal.
8.3.2 Any interest earned on the escrow account shall be returned to the developer unless
the Plantation has found it necessary to draw on the account, in which case, the
interest earned shall be proportionately divided between the amount returned to the
developer and the amount withdrawn to complete the required improvements.
8.4
Performance Bond
Performance Bond Payable to the Plantation Issued by a Surety Company Licensed to
Practice in the State of Maine and Approved by the Board of Assessors.
8.4.1 The Performance Bond shall detail the conditions of the bond, the method for release
of the bond or portions of the bond to the developer, and the procedures for collection
by the Plantation. The bond documents shall specifically reference the development
for which approval is sought.
8.4.2 An irrevocable letter or line of credit from a financial institutional licensed to practice
in the State of Maine, establishing funding for the construction of the improvements,
from which the Plantation may draw if construction is inadequate. An irrevocable
letter of credit shall indicate that funds have been set aside for the construction of the
development and may not be used for any other project or loan.
8.5
Guarantee Procedures
8.5.1 Contents of Guarantees
The Performance Guarantee shall contain a construction schedule, cost estimates for
each major phase of construction taking into account inflation, provisions for
inspections of each phase of construction, provisions for the release of part of or all of
the Guarantee to the developer, and a date after which the developer will be in default
and the Plantation shall have access to the funds to finish construction.
8.5.2 Final Approval of Guarantees
The performance guarantee submitted for final review shall have received approval
from the Board of Assessors. All necessary agreements and other documents shall
have been fully executed.
Kingsbury Plantation Zoning Ordinance
3/11/2020
98
8.5.3 Release of Guarantees
Financial Performance Guarantees shall remain in effect for one year after completion
of construction unless other arrangements are made, in writing, with the Planning
Board or the Board of Assessors. Prior to the release of any part of the Performance
Guarantee, the Planning Board shall determine to its satisfaction, in part upon the
report of the Code Enforcement Officer, that the improvements meet or exceed the
design and construction requirements for that portion of the improvements for which
the release is requested.
8.6
Default
If, upon inspection, the Code Enforcement Officer finds that any of the required
improvements have not been constructed in accordance with the plan specifications filed as
part of the application, he or she shall so report in writing to the Board of Assessors, the
Planning Board, and the developer or builder. The Board of Assessors shall take any steps
necessary to preserve the Plantation's rights.
Kingsbury Plantation Zoning Ordinance
3/11/2020
99
9: Definitions
All words not defined herein shall carry their customary and usual meanings. Words used in the
present tense shall include the future. Words used in the singular shall include the plural. Definitions
specific to the Floodplain Management Ordinance are contained within Appendix A.
Accessory structure or use - A use or structure which is incidental and subordinate to the principal
use or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot.
A deck or similar extension of the principal structure or a garage attached to the principal structure
by a roof or a common wall is considered part of the principal structure.
Adjacent grade - See Appendix A, Floodplain Management Ordinance.
Aggrieved party - An owner of land whose property is directly or indirectly affected by the granting
or denial of a permit or variance under this Ordinance; a person whose land abuts land for which a
permit or variance has been granted; or any other person or group of persons who have suffered
particularized injury as a result of the granting or denial of such permit or variance.
Agriculture - The production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to, forages and sod crops, grains and seed crops, dairy animals and dairy
products, poultry and poultry products, livestock, fruits and vegetables, and ornamental and green-
house products. Agriculture does not include forest management and timber harvesting activities.
Agricultural processing facility - A facility or operation, and associated site improvements or
buildings, that is located on land where farm products are produced, and that processes raw farm
products to increase their value, to reduce bulk, or to enable efficient transportation for sale or
further processing. Agricultural processing facilities may include temporary or permanent structures,
and may include worker housing. Agricultural processing facilities do not include agricultural
management activities. The term is further defined as small-scale and large-scale agricultural
processing facilities as follows:
Small-scale agricultural processing facility: An agricultural processing facility where all the
raw farm products used in the processing are grown onsite or on lands owned or leased by
the operator, and that utilizes no more than 2,500 square feet of gross floor area.
Large-scale agricultural processing facility: An agricultural processing facility where a
majority of the raw farm products used in the processing are grown onsite or on lands owned
or leased by the operator, and that utilizes up to 5,000 square feet of gross floor area.
Alteration - Dredging; bulldozing; removing or displacing soil, sand, vegetation or other materials;
draining or dewatering; filling; or any construction, repair or alteration of any permanent structure.
On a case-by-case basis and as determined by the Planning Board, the term "alteration" may not
include:
A. An activity disturbing very little soil such as installing a fence post or planting
shrubs by hand;
Kingsbury Plantation Zoning Ordinance
3/11/2020
100
B. The addition of a minor feature to an existing structure such as a bench or hand
rail; and
C. The construction, repair or alteration of a small structure with minimal impact
such as a nesting box, pasture fence, or staff gauge.
Aquaculture - The growing or propagation of harvestable freshwater plant or animal species.
Area of special flood hazard - See Appendix A, Floodplain Management Ordinance.
Basal area - The area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive
of bark.
Base flood - See Appendix A, Floodplain Management Ordinance.
Basement - Any portion of a structure with a floor-to-ceiling height of 6 feet or more and having
more than 50% of its volume below the existing ground level. Also see Appendix A, Floodplain
Management Ordinance.
Boat launching facility - A facility designed primarily for the launching and landing of watercraft,
and which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Building - See Structure. Also see Appendix A, Floodplain Management Ordinance.
Building envelope - The designated building site within a lot or, if one has not been designated, the
area of buildable land within a lot, excluding areas unbuildable due to wetlands, steep slopes, legal
setbacks, or other factors.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation, and Forestry,
Bureau of Forestry.
Campground - Any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - The more or less continuous cover formed by tree crowns in a wooded area.
Code Enforcement Officer - See Appendix A, Floodplain Management Ordinance.
Commercial use - The use of lands, buildings, or structures, other than a "home occupation,"
defined below, the intent and result of which activity is the production of income from the buying and
selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Conversion of use - The alteration of a use or structure such that the use or structure constitutes a
different use listing or defined term.
DBH - The diameter of a standing tree measured 4.5 feet from ground level.
Deer wintering area - An area regularly used by deer during winter for protection from deep snow,
high winds, and low temperatures. Where not previously identified by the Maine Department of
Inland Fisheries and Wildlife, a deer wintering area may only be identified by evidence of actual
usage during winter months.
Kingsbury Plantation Zoning Ordinance
3/11/2020
101
Development - A change in land use involving creation of multiple lots or the alteration of the land,
water or vegetation, or the addition or alteration of structures or other construction not naturally
occurring. Also see Appendix A, FEMA ordinance.
Dimensional requirements - Numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Disability - Any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a
substantial handicap as determined by a physician or in the case of mental handicap, by a
psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
Driveway - A vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Dwelling unit - See Structure, and see Residential Dwelling Unit.
Elevated building - See Appendix A, Floodplain Management Ordinance.
Elevation certificate - See Appendix A, Floodplain Management Ordinance.
Emergency operations - Operations conducted for the public health, safety or general welfare, such
as protection of resources from immediate destruction or loss, law enforcement, and operations to
rescue human beings, property and livestock from the threat of destruction or injury.
Essential services - Gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles
and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines,
collection or supply systems; and associated storage tanks. Such systems may include towers, poles,
wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals,
hydrants and similar accessories, but shall not include service drops or buildings which are
necessary for the furnishing of such services.
Expansion of a structure - An increase in the footprint, floor area, or volume of a structure,
including all extensions such as, but not limited to: attached decks, garages, porches and
greenhouses.
Expansion of use - The addition of one or more months to a use's operating season; or the use of
more floor area or ground area devoted to a particular use.
Family - One or more persons occupying a premise and living as a single housekeeping unit.
Farmland - Any area of five (5) acres or more that is classified as prime farmland or farmland of
statewide or local importance by the Natural Resource Conservation Service, or which has been used
in the production of agricultural products within the past five (5) years.
FEMA - Federal Emergency Management Agency
Kingsbury Plantation Zoning Ordinance
3/11/2020
102
Flood or flooding - See Appendix A, Floodplain Management Ordinance.
Flood Insurance Study (FIS) - See Flood Elevation Study. Also see Appendix A, Floodplain
Management Ordinance.
Floodplain or Flood-prone Area - See Appendix A, Floodplain Management Ordinance.
Floodplain management - See Appendix A, Floodplain Management Ordinance.
Floodplain management regulations - See Appendix A, Floodplain Management Ordinance.
Floodproofing - See Appendix A, Floodplain Management Ordinance.
Floodway - The channel of a river or other watercourse and adjacent land areas that must be
reserved in order to discharge the 100-year flood without cumulatively increasing the water surface
elevation by more than one foot in height.
Floor area - The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint - The entire area of ground covered by the structure(s) on a lot, including but not limited
to cantilevered or similar overhanging extensions, as well as unenclosed structures, such as patios
and decks.
Forested wetland - A freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation - The supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frostwalls, or other base consisting of concrete,
block, brick or similar material.
Freeboard - See Appendix A, Floodplain Management Ordinance.
Freshwater wetland - Freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state, the
combined surface area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not
conform to the criteria of this definition.
Functionally water-dependent uses - Those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, inland waters and that cannot be
located away from these waters. The uses include, but are not limited to, commercial and
recreational fishing and boating facilities, excluding recreational boat storage buildings, finfish and
shellfish processing, fish storage and retail and wholesale fish marketing facilities, boat building
Kingsbury Plantation Zoning Ordinance
3/11/2020
103
facilities, navigation aids, basins and channels, shoreline structures necessary for erosion control
purposes, and uses that primarily provide general public access to inland waters. Also see Appendix
A, Floodplain Management Ordinance.
Great pond - Any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or
increased inland body of water is completely surrounded by land held by a single owner.
Great pond classified GPA - Any great pond classified GPA, pursuant to 38 M.R.S. Article 4-A
§465-A. This classification includes some, but not all impoundments of rivers that are defined as
great ponds.
The great ponds classified as GPA located in Kingsbury Plantation include: Foss Pond (110 acres),
Hilton Pond #1 (13 acres), Kingsbury Pond (390 acres), Unnamed Pond (15 acres) and Whetstone
Pond (256 acres). Hilton Pond #2 (8 acres) and Little Pond (10 acres) are great ponds. Kingsbury
Pond is located in both Kingsbury Plantation and Mayfield Twp., and Whetstone Pond is located in
both Kingsbury Plantation and Blanchard Twp.
Ground cover - Small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Hazard tree - A tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site exhibits a high
probability of failure and loss of a major structural component of the tree in a manner that will
strike a target. A normal range of environmental conditions does not include meteorological
anomalies, such as, but not limited to: hurricanes; hurricane-force winds; tornados; microbursts; or
significant ice storm events. Hazard trees also include those trees that pose a serious and imminent
risk to bank stability. A target is the area where personal injury or property damage could occur if
the tree or a portion of the tree fails. Targets include roads, driveways, parking areas, structures,
campsites, and any other developed area where people frequently gather and linger.
Height of a structure - The vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding chimneys,
steeples, antennas, and similar appurtenances.
Hillside - An area of two or more contiguous acres having a sustained slope of 15 percent or greater.
Historic structure - See Appendix A, Floodplain Management Ordinance
Home occupation - An occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) which employs no more than
two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure - Any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot
Kingsbury Plantation Zoning Ordinance
3/11/2020
104
coverage, or increase in height of a structure. Property changes or structure expansions which
either meet the dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area
than does any portion of the existing nonconforming structure. Hence, a structure may be expanded
laterally provided that the expansion extends no closer to the water body, tributary stream, or
wetland than the closest portion of the existing structure from that water body, tributary stream, or
wetland. Included in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - An area of land which is not associated with a campground, but which
is developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Institutional - A non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for
public purposes.
Licensed forester - A forester licensed under 32 M.R.S.A. Ch. 76.
Locally established datum - See Appendix A, Floodplain Management Ordinance.
Liquidation harvesting - 12 M.R.S.A. §8869, sub-§14
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal
high-water line of a water body or upland edge of a wetland and areas beneath roads serving more
than two lots.
Lot coverage - That portion of a lot which is covered by impervious surfaces, including all roofs,
decks, patios, driveways, parking areas, and sidewalks, regardless of construction material.
Lowest floor - See Appendix A, Floodplain Management Ordinance.
Manufactured housing unit - A structural unit or units constructed in a manufacturing facility and
transported on a chassis to a building site and designed to be used as a dwelling unit when connected
to required utilities. The term includes both mobile homes and manufactured housing, but not travel
trailers.
Manufactured home - See Appendix A, Floodplain Management Ordinance.
Manufactured home park or subdivision - See Appendix A, Floodplain Management Ordinance.
Marina - A business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
Kingsbury Plantation Zoning Ordinance
3/11/2020
105
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value - The estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels. Also see Appendix A, Floodplain Management
Ordinance.
Mean sea level - See Appendix A, Floodplain Management Ordinance.
Mineral exploration - Hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - Any operation within any twelve (12) month period which removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction
site.
Minimum lot width - The closest distance between the side lot lines of a lot. When only two lot lines
extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Minor improvements - Interior or exterior renovation that does not create additional floor area or
lot coverage or add to the height of the structure.
Multi-unit residential - A residential structure containing three (3) or more dwelling units.
National Geodetic Vertical Datum (NGVD) - See Appendix A, Floodplain Management
Ordinance.
Native - Indigenous to the local forests.
New construction - See Appendix A, Floodplain Management Ordinance.
Non-conforming condition - Non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - A single lot of record in lawful existence which, at the effective date of
adoption or amendment of this Ordinance, does not meet the area, frontage, or width requirements
of the district in which it is located.
Non-conforming structure - A structure which does not meet any one or more of the following
dimensional requirements: setback, height, lot coverage, or footprint, but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming use - Use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was in
lawful existence at the time this Ordinance or subsequent amendments took effect.
Kingsbury Plantation Zoning Ordinance
3/11/2020
106
Non-native invasive species of vegetation - Species of vegetation listed by the Maine Department of
Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to
Maine ecosystems.
Normal high-water line - That line which is apparent from visible markings, changes in the
character of soils due to prolonged action of the water or changes in vegetation, and which
distinguishes between predominantly aquatic and predominantly terrestrial land. Areas contiguous
with rivers and great ponds that support non-forested wetland vegetation and hydric soils and that
are at the same or lower elevation as the water level of the river or great pond during the period of
normal high-water are considered part of the river or great pond.
Normal maintenance and repair - Unless otherwise provided, work necessary to maintain an
improvement, structure, or docking structure in its original or previously improved state or
condition, as long as there is no expansion of a nonconforming structure and less than 50 percent of
a structure is replaced. This includes general upkeep, such as painting, fixing portions of the
structure that are in disrepair, or the replacement of sill logs, roofing materials, siding, or windows.
In-kind and in-place replacement of decking or exterior stairs is considered to be normal
maintenance and repair. Normal maintenance and repair shall not include reconstruction, or change
in design, change in structure, change in use, change in location, a change in size or capacity, or any
land use activity that is a shoreline alteration. Activities involving a permanent docking structure
constitute normal maintenance and repair only when less than 50 percent of those portions of the
permanent docking structure that are above the level of the water during normal high water are
maintained or repaired.
North American Vertical Datum (NAVD) - See Appendix A, Floodplain Management Ordinance.
100-year flood - See Appendix A, Floodplain Management Ordinance.
Outlet stream - Any perennial or intermittent stream, as shown on the most recent highest resolution
version of the national hydrography dataset available from the United States Geological Survey on
the website of the United States Geological Survey or the national map, that flows from a freshwater
wetland.
Performance guarantee - A financial or legal guarantee ensuring completion of development
improvements to be used by the general public (including employees and customers) as required
during development review, or a guarantee of future performance in reclaiming or de-commissioning
a development with limited lifespan.
Person - An individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Planning Board - The Kingsbury Plantation Planning Board.
Principal structure - A structure other than one which is used for purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
Principal use - A use other than one which is wholly incidental or accessory to another use on the
same lot.
Kingsbury Plantation Zoning Ordinance
3/11/2020
107
Public facility - Any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public
entity.
Recent floodplain soils - The following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - A place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching facilities.
Recreational lodging facility - Site improvements, a building or group of buildings, or any part
thereof, used, maintained, or held out to the public as a place where sleeping accommodations are
furnished to the public for commercial purposes. The term includes, but is not limited to, commercial
sporting camps, youth or group camps, back-country huts, rental cabins, outpost cabins,
campgrounds, lodges, hotels, motels, inns, or any combination of these types of uses.
Recreational vehicle - A vehicle or an attachment to a vehicle designed to be towed, and designed
for temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a
vehicle and not as a structure, the unit must remain with its tires on the ground, and must be
registered with the State Division of Motor Vehicles.
Replacement system - A system intended to replace: 1) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the structure,
or 2) any existing overboard wastewater discharge.
Residential dwelling unit - A room or group of rooms designed and equipped exclusively for use as
permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Riprap - Rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
River - A free-flowing body of water including its associated floodplain wetlands from that point at
which it provides drainage for a watershed of twenty-five (25) square miles to its mouth.
River, stream or brook - Has the same meaning as in 38 M.R.S.A., §480-B, sub-§ 9.
Riverine - See Appendix A, Floodplain Management Ordinance.
Kingsbury Plantation Zoning Ordinance
3/11/2020
108
Road - A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Sapling - A tree species that is less than two (2) inches in diameter at four and one half (4.5) feet
above ground level.
Seedling - A young tree species that is less than four and one half (4.5) feet in height above ground
level.
Service drop - Any utility line extension which does not cross or run beneath any portion of a water
body provided that:
A. In the case of electric service:
1. The placement of wires and/or the installation of utility poles is located entirely upon
the premises of the customer requesting service or upon a roadway right-of-way; and
2. The total length of the extension is less than one thousand (1,000) feet.
B. In the case of telephone service:
1. The extension, regardless of length, will be made by the installation of telephone wires
to existing utility poles; or
2. The extension requiring the installation of new utility poles or placement underground
is less than one thousand (1,000) feet in length.
Setback - The nearest horizontal distance from the edge of the property line, the normal high-water
line of a water body or tributary stream, or upland edge of a wetland, to the nearest part of a
structure, road, parking space or other regulated object or area.
Shore frontage - The length of a lot bordering on a water body or wetland measured in a straight
line between the intersections of the lot lines with the shoreline.
Shoreland zone - The land area located within two hundred and fifty (250) feet, horizontal distance,
of the normal high-water line of any great pond or river; within 250 feet of the upland edge of a
wetland; or within seventy-five (75) feet, horizontal distance, of the normal high-water line of a
stream.
Shoreline - The normal high-water line, or upland edge of a freshwater wetland.
Sign - Any structure, display, logo, device or representation which is designed or used to advertise
or call attention to any thing, person, business, activity, or place and is visible from any roadway or
other right-of-way. It does not include the flag, pennant, or insignia of any nation, state or town.
Significant groundwater well - A well or connected series of wells intended for the extraction of
water from the ground which is designed to exceed 2,000 gallons of water per day.
Special flood hazard area - See Appendix A, Floodplain Management Ordinance.
Start of construction - See Appendix A, Floodplain Management Ordinance.
Kingsbury Plantation Zoning Ordinance
3/11/2020
109
Storm-damaged tree - A tree that has been uprooted, blown down, is lying on the ground, or that
remains standing and is damaged beyond the point of recovery as the result of a storm event.
Stream - A free-flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted on the most recent, highest resolution version of the national
hydrography dataset available from the United States Geological Survey on the website of the
United States Geological Survey or the national map to the point where the body of water becomes a
river or flows to another water body or wetland. When a stream meets the shoreland zone of a water
body or wetland and a channel forms downstream of the water body or wetland as an outlet, that
channel is also a stream.
Structure - Anything temporarily or permanently located, built, constructed or erected for the
support, shelter or enclosure of persons, animals, goods or property of any kind or anything
constructed or erected on or in the ground. The term includes structures temporarily or permanently
located, such as decks, patios, and satellite dishes. Structure does not include fences; poles and
wiring and other aerial equipment normally associated with service drops, including guy wires and
guy anchors; subsurface waste water disposal systems as defined in Title 30-A, section 4201,
subsection 5; geothermal heat exchange wells as defined in Title 32, section 4700-E, subsection 3-C;
or wells or water wells as defined in Title 32, section 4700-E, subsection 8. Also see Appendix A,
Floodplain Management Ordinance.
Subdivision - A division of land subject to the authority of the Maine Subdivision Law, as defined
in 30-A M.R.S. §4401.
Substantial damage - See Appendix A, Floodplain Management Ordinance.
Substantial improvement - Any reconstruction, rehabilitation, addition, or other improvement of a
structure, the cost of which equals or exceeds 50 percent of the market value of the structure before
the start of construction of the improvement. This term includes structures which have incurred
substantial damage, regardless of the actual repair work performed. The term does not, however,
include either:
a. Any project for improvement of a structure to correct existing violations of state or local
health, sanitary, or safety code specifications which have been identified by the local code
enforcement official and which are the minimum necessary to assure safe living
conditions; or
b. Any alteration of a Historic Structure, provided that the alteration will not preclude the
structure's continued designation as a historic structure, and a variance is obtained from
the community's Board of Appeals. Also see Appendix A, Floodplain Management
Ordinance.
Substantial start - Completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface sewage disposal system - Any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
Kingsbury Plantation Zoning Ordinance
3/11/2020
110
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. §414, any surface waste water disposal system, or any municipal or quasi-municipal sewer
or waste water treatment system.
Sustained slope - A change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Timber harvesting - The cutting and removal of timber for the primary purpose of selling or
processing forest products. "Timber harvesting" does not include the cutting or removal of
vegetation within the shoreland zone when associated with any other land use activities. The cutting
or removal of trees in the shoreland zone on a lot that has less than two (2) acres within the
shoreland zone shall not be considered timber harvesting. Such cutting or removal of trees shall be
regulated pursuant to Section 6.5.1, Clearing or Removal of Vegetation for Activities Other Than
Timber Harvesting.
Tree - A woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at
four and one half (4.5) feet above the ground, with a more or less definite crown, and reaching a
height of at least ten (10) feet at maturity.
Tributary stream - A channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil,
containing waterborne deposits or exposed soil, parent material or bedrock; and which is connected
hydrologically with other water bodies. "Tributary stream" does not include rills or gullies forming
because of accelerated erosion in disturbed soils where the natural vegetation cover has been
removed by human activity.
Upland edge of a wetland - The boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters (approximately
twenty (20) feet) tall or taller.
Variance - See Appendix A, Floodplain Management Ordinance.
Vegetation - All live trees, shrubs, and other plants including without limitation, trees both over and
under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Violation - See Appendix A, Floodplain Management Ordinance.
Volume of a structure - The volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water body - Any great pond, river or stream.
Water crossing - Any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
Kingsbury Plantation Zoning Ordinance
3/11/2020
111
as well as maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - A freshwater wetland.
Wind energy generation facility (WEGF) - A structure or machinery capable of converting the
kinetic energy of wind into electrical energy for residential or commercial purposes. A wind energy
generation facility includes all structures, utilities, and connections associated with the conversion
and delivery of energy.
Wireless communications facility - Any structure, tower or other device which provides
radio/television transmission, commercial mobile wireless services, unlicensed wireless services,
cellular phone services, specialized mobile radio communications (SMR), common carrier wireless
exchange access services, and personal communication services (PCS) or pager services. The term
does not include ham radio facilities, antennae for governmental or emergency services uses, or
residential parabolic antennae.
Woody vegetation - Live trees or woody, non-herbaceous shrubs.
Kingsbury Plantation Zoning Ordinance
3/11/2020
112
Appendix A
FLOODPLAIN MANAGEMENT ORDINANCE
FOR
KINGSBURY PLANTATION, MAINE
Kingsbury Plantation Zoning Ordinance
3/11/2020
113
FLOODPLAIN MANAGEMENT ORDINANCE
FOR
KINGSBURY PLANTATION, MAINE
ENACTED:
Date
EFFECTIVE:
Date
CERTIFIED
BY:
Signature
CERTIFIED
BY:
Print Name
Title
Affix Seal
Kingsbury Plantation Zoning Ordinance
3/11/2020
114
FLOODPLAIN MANAGEMENT ORDINANCE
CONTENTS
ARTICLE ................................................................................................................................ PAGE
I.
PURPOSE AND ESTABLISHMENT ............................................................................121
II.
PERMIT REQUIRED ......................................................................................................121
III.
PERMIT REVIEW AND DEVELOPMENT STANDARDS .........................................121
IV.
SUBDIVISION REVIEW AND DEVELOPMENT PROPOSALS................................122
V.
APPEALS AND VARIANCE .........................................................................................122
VI.
ENFORCEMENT AND PENALTIES ............................................................................124
VII.
VALIDITY AND SEVERABILITY ...............................................................................125
VIII. CONFLICT WITH OTHER ORDINANCES .................................................................125
IX.
DEFINITIONS .................................................................................................................125
X.
ABROGATION ...............................................................................................................129
Kingsbury Plantation Zoning Ordinance
3/11/2020
115
ARTICLE I - PURPOSE AND ESTABLISHMENT
Certain areas of the Town of Kingsbury Plantation, Maine are subject to periodic flooding, causing
serious damages to properties within these areas. Relief is available in the form of flood insurance as
authorized by the National Flood Insurance Act of 1968.
Therefore, the Town of Kingsbury Plantation, Maine has chosen to become a participating
community in the National Flood Insurance Program, and agrees to comply with the requirements of
the National Flood Insurance Act of 1968 (P.L. 90-488, as amended) as delineated in this Floodplain
Management Ordinance.
It is the intent of the Town of Kingsbury Plantation, Maine to require the recognition and evaluation
of flood hazards in all official actions relating to land use in the community.
The Town of Kingsbury Plantation has the legal authority to adopt land use and control measures to
reduce future flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352, 4401-4407, and
Title 38 MRSA, Section 440.
ARTICLE II - PERMIT REQUIRED
1) Permits shall be required for all proposed construction or other development in the community,
including the placement of manufactured homes, so that the Code Enforcement Officer or
Planning Board may determine whether such construction or other development is proposed
within flood prone areas;
2) The Code Enforcement Officer shall review proposed development to assure that all necessary
permits have been obtained from those federal, state, and local government agencies from which
prior approval is required by federal or state law, including but not limited to Section 404 of the
Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1344;
ARTICLE III - APPLICATION REVIEW AND DEVELOPMENT STANDARDS
1) The Code Enforcement Officer shall review all permit applications to determine whether the
proposed development will be reasonably safe from flooding. If the proposed development is in a
flood prone area, all development shall:
a) be designed or modified and adequately anchored to prevent flotation (excluding piers and
docks), collapse or lateral movement of the development resulting from hydrodynamic and
hydrostatic loads, including the effects of buoyancy;
b) use construction materials that are resistant to flood damage;
c) use construction methods and practices that will minimize flood damage; and,
d) use electrical, heating, ventilation, plumbing, and air conditioning equipment, and other
service facilities that are designed and/or located so as to prevent water from entering or
accumulating within the components during flooding conditions.
Kingsbury Plantation Zoning Ordinance
3/11/2020
116
2) The Code Enforcement Officer shall require new and replacement water supply systems within
flood prone areas to be designed to minimize or eliminate infiltration of flood waters into the
systems.
3) The Code Enforcement Officer shall require within flood prone areas:
a) new and replacement sanitary sewage systems be designed to minimize or eliminate
infiltration of flood waters into the system and discharges from the system into flood waters;
b) on site waste disposal systems be located to avoid impairment to them or contamination from
them during flooding.
4) The Code Enforcement Officer shall require new construction or substantial improvement of any
structure within a flood prone area to have the lowest floor elevated to at least two feet above the
highest adjacent grade if no base flood elevation is available. If base flood elevation data is
available from state, federal, or other technical sources, the lowest floor shall be elevated one
foot above the base flood elevation.
5) The Code Enforcement Officer shall require that buildings shall not be permitted which are
partially or wholly over water.
ARTICLE IV - SUBDIVISION REVIEW AND DEVELOPMENT PROPOSALS
The Planning Board shall review subdivision proposals and other proposed new development,
including manufactured home parks or subdivisions, to determine whether such proposals shall be
reasonably safe from flooding. If a subdivision proposal or other proposed new development is in a
flood prone area, any such proposals shall be reviewed to assure that:
1) all such proposals are consistent with the need to minimize flood damage within the flood prone
area;
2) all public utilities and facilities, such as sewer, gas, electrical, and water systems are located and
constructed to minimize or eliminate flood damage;
3) adequate drainage is provided so as to reduce exposure to flood hazards.
ARTICLE V - APPEALS AND VARIANCES
The Board of Appeals of Kingsbury Plantation may, upon written application of an aggrieved party,
hear and decide appeals where it is alleged that there is an error in any order, requirement, decision,
or determination made by, or failure to act by, the Code Enforcement Officer or Planning Board in
the administration or enforcement of the provisions of this Ordinance.
The Board of Appeals may grant a variance from the requirements of this Ordinance consistent with
state law and the following criteria:
1) Variances shall be granted only upon:
a) a showing of good and sufficient cause; and,
Kingsbury Plantation Zoning Ordinance
3/11/2020
117
b) a determination that should a flood comparable to the base flood occur, the granting of a
variance will not result in increased flood heights, additional threats to public safety, public
expense, or create nuisances, cause fraud or victimization of the public or conflict with
existing local laws or ordinances; and,
c) a showing that the issuance of the variance will not conflict with other state, federal or local
laws or ordinances; and,
d) a determination that failure to grant the variance would result in "undue hardship," which in
this sub-section means:
i) that the land in question cannot yield a reasonable return unless a variance is granted;
and,
ii) that the need for a variance is due to the unique circumstances of the property and not to
the general conditions in the neighborhood; and,
iii) that the granting of a variance will not alter the essential character of the locality; and,
iv) that the hardship is not the result of action taken by the applicant or a prior owner.
2) Variances shall only be issued upon a determination that the variance is the minimum necessary,
considering the flood hazard, to afford relief, and the Board of Appeals may impose such
conditions to a variance as it deems necessary.
3) Variances may be issued for new construction, substantial improvements, or other development
for the conduct of a functionally dependent use provided that:
a) other criteria of Article III and Article V are met; and,
b) the structure or other development is protected by methods that minimize flood damages
during the base flood and create no additional threats to public safety.
4) Variances may be issued for the repair, reconstruction, rehabilitation, or restoration of Historic
Structures upon the determination that:
a) the development meets the criteria of Article V, paragraphs A. through C. above; and,
b) the proposed repair, reconstruction, rehabilitation, or restoration will not preclude the
structure's continued designation as a Historic Structure and the variance is the minimum
necessary to preserve the historic character and design of the structure.
5) Any applicant who meets the criteria of Article V, paragraphs A. through D. shall be notified by
the Board of Appeals in writing over the signature of the Chairman of the Board of Appeals that:
a) the issuance of a variance to construct a structure below the base flood level will result in
greatly increased premium rates for flood insurance up to amounts as high as $25 per $100 of
insurance coverage;
b) such construction below the base flood level increases risks to life and property; and,
c) the applicant agrees in writing that the applicant is fully aware of all the risks inherent in the
use of land subject to flooding, assumes those risks and agrees to indemnify and defend the
municipality against any claims filed against it that are related to the applicant's decision to
Kingsbury Plantation Zoning Ordinance
3/11/2020
118
use land located in a flood prone area and that the applicant individually releases the
municipality from any claims the applicant may have against the municipality that are related
to the use of land located in a flood prone area.
6) Appeal Procedure for Administrative and Variance Appeals
a) An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved
party within thirty days after receipt of a written decision of the Code Enforcement Officer or
Planning Board.
b) Upon being notified of an appeal, the Code Enforcement Officer or Planning Board, as
appropriate, shall transmit to the Board of Appeals all of the papers constituting the record of
the decision appealed from.
c) The Board of Appeals shall hold a public hearing on the appeal within thirty-five days of its
receipt of an appeal request.
d) The person filing the appeal shall have the burden of proof.
e) The Board of Appeals shall decide all appeals within thirty-five days after the close of the
hearing, and shall issue a written decision on all appeals.
f) The Board of Appeals shall submit to the Code Enforcement Officer and Planning Board a
report of all variance actions, including justification for the granting of the variance and an
authorization for the Code Enforcement Officer to issue a Flood Hazard Development
Permit, which includes any conditions to be attached to said permit.
g) Any aggrieved party who participated as a party during the proceedings before the Board of
Appeals may take an appeal to Superior Court in accordance with State laws within forty-five
days from the date of any decision of the Board of Appeals.
ARTICLE VI - ENFORCEMENT AND PENALTIES
1) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance
pursuant to Title 30-A MRSA § 4452.
2) The penalties contained in Title 30-A MRSA § 4452 shall apply to any violation of this
Ordinance.
3) In addition to any other actions, the Code Enforcement Officer, upon determination that a
violation exists, may submit a declaration to the Administrator of the Federal Insurance
Administration requesting a denial of flood insurance. The valid declaration shall consist of;
a) the name of the property owner and address or legal description of the property sufficient to
confirm its identity or location;
b) a clear and unequivocal declaration that the property is in violation of a cited State or local
law, regulation, or ordinance;
c) a clear statement that the public body making the declaration has authority to do so and a
citation to that authority;
Kingsbury Plantation Zoning Ordinance
3/11/2020
119
d) evidence that the property owner has been provided notice of the violation and the
prospective denial of insurance; and,
e) a clear statement that the declaration is being submitted pursuant to Section 1316 of the
National Flood Insurance Act of 1968, as amended.
ARTICLE VII - VALIDITY AND SEVERABILITY
If any section or provision of this Ordinance is declared by the courts to be invalid, such decision
shall not invalidate any other section or provision of this Ordinance.
ARTICLE VIII - CONFLICT WITH OTHER ORDINANCES
This Ordinance shall not in any way impair or remove the necessity of compliance with any other
applicable rule, ordinance, regulation, bylaw, permit, or provision of law. Where this Ordinance
imposes a greater restriction upon the use of land, buildings, or structures, the provisions of this
Ordinance shall control.
ARTICLE IX - DEFINITIONS
Unless specifically defined below, words and phrases used in this Ordinance shall have the same
meaning as they have at common law and to give this Ordinance its most reasonable application.
Words used in the present tense include the future, the singular number includes the plural, and the
plural number includes the singular. The word "may" is permissive; "shall" is mandatory and not
discretionary.
Adjacent Grade - means the natural elevation of the ground surface prior to construction next to the
proposed walls of a structure.
Area of Special Flood Hazard - in the absence of a Flood Insurance Study, Flood Hazard
Boundary Map, or Flood Insurance Rate Map issued by the Federal Emergency Management
Agency (FEMA), the areas of special flood hazard shall include, at minimum, the following:
identified wetlands, low-lying areas along the shores of lakes and streams, areas subject to shallow
flooding during intense storms, and areas known to have flooded historically.
Base Flood - means the flood having a one percent chance of being equaled or exceeded in any
given year, commonly called the 100-year flood.
Basement - means any area of the building having its floor subgrade (below ground level) on all
sides.
Building - see Structure.
Code Enforcement Officer - a person certified under Title 30-A MRSA, Section 4451 (including
exceptions in Section 4451, paragraph 1) and employed by a municipality to enforce all applicable
comprehensive planning and land use laws and ordinances.
Kingsbury Plantation Zoning Ordinance
3/11/2020
120
Development - means any man made change to improved or unimproved real estate, including but
not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation,
drilling operations or storage of equipment or materials.
Elevated Building - means a non-basement building
1) built to have the top of the elevated floor, elevated above the ground level by means of pilings,
columns, post, piers, or "stilts;" and
2) adequately anchored so as not to impair the structural integrity of the building during a flood of
up to one foot above the magnitude of the base flood.
Elevated Building also includes a building elevated by means of fill or solid foundation perimeter
walls with hydraulic openings sufficient to facilitate the unimpeded movement of flood waters.
Elevation Certificate - An official form (FEMA Form 81-31) that:
1) is used to verify compliance with the floodplain management regulations of the National Flood
Insurance Program; and,
2) is required for purchasing flood insurance.
Flood or Flooding - means:
1) A general and temporary condition of partial or complete inundation of normally dry land areas
from:
a) The overflow of inland or tidal waters.
b) The unusual and rapid accumulation or runoff of surface waters from any source.
2) The collapse or subsidence of land along the shore of a lake or other body of water as a result of
erosion or undermining caused by waves or currents of water exceeding anticipated cyclical
levels or suddenly caused by an unusually high water level in a natural body of water,
accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an
abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in
flooding as defined in paragraph a.1. of this definition.
Floodplain or Flood-prone Area - means any land area susceptible to being inundated by water
from any source (see flooding).
Floodplain Management - means the operation of an overall program of corrective and preventive
measures for reducing flood damage, including but not limited to emergency preparedness plans,
flood control works, and floodplain management regulations.
Floodplain Management Regulations - means zoning ordinances, subdivision regulations, building
codes, health regulations, special purpose ordinances (such as a floodplain ordinance, grading
ordinance, and erosion control ordinance) and other applications of police power. The term describes
such state or local regulations, in any combination thereof, which provide standards for the purpose
of flood damage prevention and reduction.
Kingsbury Plantation Zoning Ordinance
3/11/2020
121
Floodproofing - means any combination of structural and non-structural additions, changes, or
adjustments to structures which reduce or eliminate flood damage to real estate or improved real
property, water and sanitary facilities, structures and contents.
Freeboard - means a factor of safety usually expressed in feet above a flood level for purposes of
floodplain management. Freeboard tends to compensate for the many unknown factors, such as wave
action, bridge openings, and the hydrological effect of urbanization of the watershed, that could
contribute to flood heights greater than the height calculated for a selected size flood and floodway
conditions.
Functionally Dependent Use - means a use which cannot perform its intended purpose unless it is
located or carried out in close proximity to water. The term includes only docking facilities, port
facilities that are necessary for the loading and unloading of cargo or passengers, and ship building
and ship repair facilities, but does not include long-term storage or related manufacturing facilities.
Historic Structure - means any structure that is:
1) Listed individually in the National Register of Historic Places (a listing maintained by the
Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting
the requirements for individual listing on the National Register;
2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the
historical significance of a registered historic district or a district preliminarily determined by the
Secretary of the Interior to qualify as a registered historic district;
3) Individually listed on a state inventory of historic places in states with historic preservation
programs which have been approved by the Secretary of the Interior; or
4) Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified either:
a) By an approved state program as determined by the Secretary of the Interior, or
b) Directly by the Secretary of the Interior in states without approved programs.
Locally Established Datum - means, for purposes of this ordinance, an elevation established for a
specific site to which all other elevations at the site are referenced. This elevation is generally not
referenced to the National Geodetic Vertical Datum (NGVD), North American Vertical Datum
(NAVD) or any other established datum and is used in areas where Mean Sea Level data is too far
from a specific site to be practically used.
Lowest Floor - means the lowest floor of the lowest enclosed area (including basement).
Manufactured Home - means a structure, transportable in one or more sections, which is built on a
permanent chassis and is designed for use with or without a permanent foundation when connected
to the required utilities. For floodplain management purposes the term manufactured home also
includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than 180
consecutive days.
Kingsbury Plantation Zoning Ordinance
3/11/2020
122
Manufactured Home Park or Subdivision - means a parcel (or contiguous parcels) of land divided
into two or more manufactured home lots for rent or sale.
Mean Sea Level - means, for purposes of the National Flood Insurance Program, the National
Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD) or other
datum.
National Geodetic Vertical Datum (NGVD) - means the national vertical datum, whose standard
was established in 1929, which is used by the National Flood Insurance Program (NFIP). NGVD
was based upon mean sea level in 1929 and also has been called "1929 Mean Sea Level (MSL)".
New Construction - means structures for which the "start of construction" commenced on or after
the effective date of the initial floodplain management regulations adopted by a community and
includes any subsequent improvements to such structures.
North American Vertical Datum (NAVD)- means the national datum whose standard was
established in 1988, which is the new vertical datum used by the National Flood Insurance Program
(NFIP) for all new Flood Insurance Rate Maps. NAVD is based upon vertical datum used by other
North American countries such as Canada and Mexico and was established to replace NGVD
because of constant movement of the Earth's crust, glacial rebound, and subsidence and the
increasing use of satellite technology.
100-year flood - see Base Flood.
Riverine - means relating to, formed by, or resembling a river (including tributaries), stream, brook,
etc.
Special Flood Hazard Area - see Area of Special Flood Hazard.
Start of Construction - means the date the building permit was issued, provided the actual start of
construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement or
other improvement was within 180 days of the permit date. The actual start means either the first
placement of permanent construction of a structure on a site, such as the pouring of slab or footings,
the installation of piles, the construction of columns, or any work beyond the stage of excavation; or
the placement of a manufactured home on a foundation. Permanent construction does not include
land preparation, such as clearing, grading and filling; nor does it include the installation of streets
and/or walkways; nor does it include excavation for basement, footings, piers, or foundations or the
erection of temporary forms; nor does it include the installation on the property of accessory
buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure.
For a substantial improvement, the actual start of construction means the first alteration of any wall,
ceiling, floor, or other structural part of a building, or modification of any construction element,
whether or not that alteration affects the external dimensions of the building.
Structure - means, for floodplain management purposes, a walled and roofed building. A gas or
liquid storage tank that is principally above ground is also a structure.
Kingsbury Plantation Zoning Ordinance
3/11/2020
123
Substantial Damage - means, damage of any origin sustained by a structure whereby the cost of
restoring the structure to its before damage condition would equal or exceed 50 percent of the market
value of the structure before the damage occurred.
Substantial Improvement - means any reconstruction, rehabilitation, addition, or other
improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of
the structure before the start of construction of the improvement. This term includes structures which
have incurred substantial damage, regardless of the actual repair work performed. The term does not,
however, include either:
1) Any project for improvement of a structure to correct existing violations of state or local health,
sanitary, or safety code specifications which have been identified by the local code enforcement
official and which are the minimum necessary to assure safe living conditions; or
2) Any alteration of a Historic Structure, provided that the alteration will not preclude the
structure's continued designation as a historic structure, and a variance is obtained from the
community's Board of Appeals.
Variance - means a grant of relief by a community from the terms of a floodplain management
regulation.
Violation - means the failure of a structure or development to comply with a community's floodplain
management regulations.
ARTICLE X - ABROGATION
This Ordinance repeals and replaces any municipal ordinance previously enacted to comply with the
National Flood Insurance Act of 1968 (P.L. 90-488, as amended).