Amended Subdivision Ordinance 2024
Liberty, Maine
· No. 2024
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot ac103e9f7e6a · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
*Amended per March 2024 Town Meeting- Updated Article Il, Section 2.3, Paragraph 2, Page 10.
TABLE OF CONTENTS
ARTICLE I. PURPOSES, AUTHORITY, AND ADMINISTRATION
Section 1.1 Purposes 4
Section 1.2 Authority and Administration 6
A. Authority 4
B. Administration
ARTICLE II. ADMINISTRATIVE PROCEDURES
Section 2.1 Purpose and Agenda 7
A. Purpose 7
B. Agenda 7
Section 2.2 Preapplication Preliminary Phase 7
A. Procedure 7
B. Submission Content 8
C. On-site Inspection 9
D. Rights Not Vested 9
E. Site Clearing 9
Section 2.3 All Subdivisions 9
A. General 9
B. Procedure 9
C. Final Plan Submissions 10
D. Additional Final Plan Submissions 12
E. Meetings and Hearings 13
F. Final Submissions for Receipt of Approval and Permit 14
G. Final Approval and Filing 14
Section 2.4 Special Requirements and Additional
Procedures for Major Subdivisions 16
A. Special Requirements for Major Subdivisions 16
B. Additional Procedures for Major Subdivisions 17
Section 2.5 Enforcement 18
A. Inspection of Required Improvements 18
B. Violations and Enforcement 18
ARTICLE III. PERFORMANCE STANDARDS
a ee EF EREURMANCE STANDARDS
Section 3.1 General Standards 20
I
A. Conformance with State and Local Codes 20
B. Retention of Open Spaces, Natural or Historic ae
C. Lots 21
D. Utilities 22
E. Monuments 22
F. Water Supply 22
G. Erosion and Sedimentation Controls 23
H. Stormwater Runoff Controls 25
I. Land Features 27
J. Cluster Development 27
K. Dedication and Maintenance of Common
Open Space and Services 28
L. Construction in Flood Hazard Areas 29
M. Soils Surveys - Standards for Conducting 29
Section 3.2 Street and Street-Related Storm Drainage Design
and Construction Standards 29
A. Purpose 29
B. General Street Design Standards 30
C. Street Design Specifications 30
D. Street Construction Specifications 32
E. Storm Drainage Street Construction Standards 34
F. Additional Improvements and Requirements Lh
G. Certification of Construction 35
ARTICLE IV. PERFORMANCE GUARANTEES
Section 4.1 Performance Guarantees 35
A. Improvements Guarantees 35
B. Types of Guarantees 36
C. Contents of Guarantee 36
D. Performance Bond 36
E. Letter of Credit 36
F. Escrow Account 36
G. Release of Guarantee 37
H. Default 37
ARTICLE V. APPEALS
Section 5.1 Appeals 37
ARTICLE VII. VALIDITY, SEPARABILITY, AND CONFLICT
WITH OTHER ORDINANCES
Section 6.1 Validity, Separability, and Conflict With Other
Ordinances 37
A. Validity and Separability 37
B. Conflict with Other Ordinances 37
2
ARTICLE VII DEFINITIONS
Section 7.1 Definitions 38
Abutter 38
Applicant 38
Authorized Agent 38
Channel 38
Cluster Subdivision 38
Code Enforcement Officer 38
Complete Application 38
Comprehensive Plan or Policy Statement 38
Contiguous Lots 38
Developed Area 38
Direct Drainage of a Lake or Pond 39
Driveway 39
Dwelling Unit 39
Final Plan 39
Frontage 39
Frontage, Shore 39
High Intensity Soil Survey 39
Lot 39
100 Year Flood 39
Normal High Water Elevation of Inland Waters 39
Net Residential Acreage 40
Net Residential Density 40
Official Submittal Date 40 :
Owner 40
Person 40
Planned Unit Development 40
Planning Board 40
Preliminary Plan 40
Recording Plan 40
Resubdivision 40
Street 41
Street Classifications 41
Subdivider 41
Subdivision 41
Subdivision, Major 41
Subdivision, Minor 41
Submissions 41
Tract or Parcel of Land 41
APPENDIX A: STATE DEFINITION OF A SUBDIVISION 42
EE DEPINITION OF A SUBDIVISION
APPENDIX B: APPLICATION CHECK LIST -As adjusted 43
htt TAS adjusted
3
SUBDIVISION ORDINANCE FOR THE TOWN OF LIBERTY, MAINE
ARTICLE I: PURPOSES, AUTHORITY, AND ADMINISTRATION
SECTION 1.1: PURPOSES
The purposes of this Ordinance are to assure the comfort,
convenience, safety, health, and welfare of the people of the
Town of Liberty, to protect the environment and to promote the
orderly development of an economically sound and_ stable
community. To this end, in approving subdivisions within the Town
of Liberty, Maine, the Planning Board shall consider the
following criteria and before granting approval shall make
written findings of fact that the provisions of these regulations
have been met and that the proposed subdivision will meet the
guidelines of Title 30-A, M.R.S.A., section 4403, as amended. In
accordance with Title 30-A, M.R.S.A, section 4404, as amended,
the subdivision:
A. will not result in undue water or air pollution. In making
this determination, the Planning Board shall at least
consider the elevation of the land above the sea level and
its relation to the flood plains; the nature of the soils and
subsoils and their ability to adequately support waste
disposal; the slope of the land and its effect on effluents;
availability of streams for disposal of effluents; and will
meet applicable state and local health and water resource
rules and regulations;
B. will have sufficient water available for the reasonably
foreseeable needs of the subdivision;
C. will not cause an unreasonable burden on an existing water
supply;
D. will not cause unreasonable soil erosion Or reduction in the
Capacity of the land to hold water so that a dangerous or
unhealthy condition may result;
E. will not cause unreasonable highway or public road congestion
or unsafe conditions with respect to use of the highways or
public roads existing or proposed and, if the proposed
subdivision requires driveways or entrances onto a state or
State aid highway located outside the urban compact area of
an urban compact municipality as defined by Title 23, section
754, the Department of Transportation has provided
documentation indicating that the driveways or entrances
conform to Title 23, section 704 and any rules adopted under
that section;
F. will provide for adequate solid and Sewage waste disposal;
4
G. will not cause an unreasonable burden on the ability of the
Town of Liberty to dispose of solid waste and sewage if Town
services are to be utilized;
H. will not have an adverse effect on the scenic or natural
beauty of the area, aesthetics, historic sites or rare and
irreplaceable natural areas or any public rights for physical
or visual access to Liberty's ponds, lakes and rivers;
I. will be in conformance with all applicable State and local
plans, regulations, and ordinances;
J. that applicant will demonstrate proven adequate financial and
technical capacity to meet the above stated standards;
K. that whenever situated in whole or in part within the
watershed of any lake, pond or within two hundred (250) feet
of any wetland, great pond or river, the proposed subdivision
will not adversely affect the quality of the body of water or
unreasonably affect the shoreline of that body of water. In
making this determination, the Board shall at least consider
the affect of the proposed land use on the quantity and
quality of surface runoff generated by the site;
L. alone or in conjunction with existing activities, the
proposed subdivision will not adversely affect the quality or
quantity of ground water;
M. if the subdivision, or any part of it, is in flood-prone
area, as based upon the Federal Emergency Management Agency's
Flood Boundary and Floodway Maps and Flood Insurance Rate
Maps, the applicant shall determine the 100-year flood
elevation and flood hazard boundaries within the subdivision.
The proposed subdivision plan must include a condition of
plan approval requiring that principal structures in the
subdivision will be constructed with their lowest floor,
including the basement, at least one foot above the 100-year
flood elevation;
N. applicant will identify any freshwater wetlands within the
proposed subdivision on any maps submitted as part of the
application, regardless of the size of these wetlands; and,
©. will identify any river, stream or brook within or abutting
the proposed subdivision on any maps submitted as part of the
application;
P. will provide for adequate storm water management;
Q. will insure that if any lots in the proposed subdivision have
shore frontage on a river, stream, brook, great pond or
coastal wetland as these features are defined in Title 38,
section 480-B, none of the lots created within the
5
subdivision will have a lot depth to shore frontage ratio
greater than 5 to 1;
R. that long-term cumulative effects of the proposed subdivision
will not unreasonably increase a great pond's phosphorus
concentration during the construction phase and life of the
proposed subdivision;
S. that any proposed subdivision that crosses municipal
boundaries, will not cause unreasonable traffic congestion or
unsafe conditions with respect to the use of existing public
ways in an adjoining municipality in which part of the
subdivision is located; and
T. that timber on the parcel being subdivided has not been
harvested in violation of rules adopted pursuant to Title 12,
section 8869, subsection 14. If a violation of rules adopted
by the Maine Forest Service to substantially eliminate
liquidation harvesting has occurred, the municipal reviewing
authority must determine prior to granting approval for the
subdivision that 5 years have elapsed from the date the
landowner under whose ownership the harvest occurred acquired
the parcel.
SECTION 1.2: AUTHORITY AND ADMINISTRATION
A. AUTHORITY:
1. These standards have been prepared in accordance with
the provisions of Title 30-A, M.R.S.A., section 4403,as
amended
y These standards shall be known and may be cited as
"SUBDIVISION ORDINANCE OF THE TOWN OF LIBERTY, MAINE."
B. ADMINISTRATION:
The Planning Board of the Town of Liberty hereinafter called the
Board, shall administer this Ordinance.
The provisions of this Ordinance shall pertain to all land
proposed for subdivision as defined in Title 30-A, M.R.S.A.,
section 4401, as amended, within the boundaries of the Town of
Liberty.
6
ARTICLE II: ADMINISTRATIVE PROCEDURES
SECTION 2.1: PURPOSE, AGENDA
A. PURPOSE:
The purpose of this Article is to establish an orderly,
equitable and expeditious procedure for receiving and
reviewing all subdivision applications.
B. AGENDA:
To be placed on the Board's agenda a preliminary application
(available from Town Office) should be submitted along with
preliminary sketch plans that include applicable portions of
USGS topographic map(s) covering the area of the proposed
subdivision, and shall be filed in the Town Office twenty-one
(21) days in advance of a regularly scheduled meeting. A
short narrative description of the intent of the applicant
should be part of the submission. If submissions meet
requirements of this Ordinance, the Chairman shall cause the
matter to be added to meeting agenda and be publicly posted
at least seven (7) days in advance of the scheduled meeting.
If the submission is deemed insufficient Chairman will
contact applicant as to deficiencies. This determination by
the Chairman as to deficiencies is preliminary only and is
not binding upon the Planning Board and is not a final
determination of completeness with regard to the application
or the adequacy or completeness of submissions.
"Upon submitting an application or pre-application for
permit, or notice of construction, to the Town, applicant/
owner accepts that designated town officers and officials
have an implicit right to visit property for purposes of
validating information provided and to inspect for compliance
both work in progress as well completed projects."
SECTION 2.2: PREAPPLICATION PRELIMINARY PHASE
A. PROCEDURE:
Preapplication Phase. Owner or Authorized Agent
(applicant) shall request a preapplication meeting with
the Planning Board and shall submit at least ten (10)
copies of a sketch plan and application to the Town
Office at least twenty-one (21) days in advance of the
regularly scheduled meeting at which applicant wishes
to discuss the proposal with the Planning Board. The
purposes of this preapplication meeting between the
applicant and the Planning Board are:
z
a. To classify the subdivision as a major or a minor
subdivision.
b. To provide an opportunity for the applicant and
the Planning Board to informally review the ideas
for use of the land;
C. To discuss procedures for subdivision review and
approval;
d. If road construction is involved in the proposal,
to classify the road as either minor or collector;
e. To discuss any apparent potential problems
associated with the subdivision; and
f. To arrange for on-site inspection of the
subdivision site.
os Question and answer period. Board may make specific,
preliminary, suggestions to be incorporated by the
applicant into subsequent submissions; and shall make a
preliminary determination as to whether the application
shall be reviewed as a mandatory Major Subdivision (all
subdivisions of four (4) lots or more shall be
considered Major Subdivisions for purposes of this
ordinance).
3 Town Jurisdiction If the subdivision is located in more
than one (1) municipality, the Board shall have a joint
meeting with the Planning Board of the adjacent
municipality to discuss.
4. The Board shall schedule, if appropriate, an on-site
inspection and _ shall notify the Code Enforcement
Officer and the applicant of the time and date
selected. Such date shall be publicly posted at
least seven (7) days before the date scheduled.
B. SUBMISSION CONTENT:
The Preapplication Sketch and/or Preliminary Plan
submissions shall contain: (simple sketch form is
acceptable):
s Location Map showing the proposed layout of streets,
lots, and other features in relation to existing
conditions. The Plan should be supplemented with
general information to describe or outline the existing
conditions of the site and the proposed development.
8
The Sketch Plan shall be superimposed on or accompanied
by a copy of the Assessor's Map(s) on which the land is
located showing abutting property owners. The Sketch
Plan shall be accompanied by a copy of a portion of the
USGS topographic map of the area showing the outline of
the proposed subdivision. And,
a. Shall delineate any existing subdivisions in the
proximity of the proposed subdivision.
b. Shall show boundaries and designations of Zoning
Districts.
Cc. Shall include an outline of the _ proposed
subdivision and any remaining portion of the
owner's entire contiguous holding, superimposed on
or accompanied by a USGS topographic map.
C. ON-SITE INSPECTION:
The Board shall hold a public on site inspection of the
property prior to the determination that a complete Final
Plan has been submitted. Whenever possible, the Board shall
hold its on-site inspection within thirty (30) days of
reviewing a sketch/preliminary plan and shall publicly post
date of site visit at least seven (7) days before.
D. RIGHTS NOT VESTED:
The submittal or review of the Preapplication Sketch and/or
Preliminary Plan shall not be considered the initiation of
the review process for the purposes of bringing the plan
under the protection of Title 1, M.R.S.A., section 302.
E. SITE CLEARING:
Site clearing, at this stage, shall be limited to that
required for test pits and surveying.
SECTION 2.3: All SUBDIVISIONS
A. GENERAL:
The Board may require, where it deems necessary for the
protection of public health, safety, and welfare, that a
Minor Subdivision (less than four lots) comply with all or
any of the submission requirements deemed appropriate for a
Major Subdivision(more than 4 lots).
B. PROCEDURE:
9
1. Within six (6) months after the submission of a
Preapplication Sketch and/or Preliminary Plan to the
Board, the applicant shall submit an "Application for
Approval of a Final Plan" at least twenty-one (21) days
prior to a scheduled meeting of the Board. Failure to
do so shall require the applicant to proceed through
the preliminary phase again, with the resubmission of
the Preapplication Sketch and/or Preliminary Plan to
the Board. The Final Plan shall approximate the layout
shown on the Preliminary Plan, plus any recommendations
for modifications that may have been made by the Board.
y All applications for Final Plan approval for Minor and
Major Subdivisions shall be accompanied by a non-
refundable general application fee of two hundred
dollars ($200), plus three hundred dollars ($300) for
each lot requested, payable by check to the Town of
Liberty - Planning Board Account. In addition, the
Board may require that additional amounts be added to
the base fee paid by the applicant sufficient to enable
the Board to secure outside technical, legal, and other
assistance as the Board (in its sole discretion may
determine) in order to review the proposed subdivision.
If a public hearing is deemed necessary or required by
cne Board Wanciudina Lhe review of Sundivisions of four
-4pebOts=or=morex, an additional fee of one hundred and
fifty dollars ($150) shall be required. *Amended March 2024
3. At least twenty-one (21) days prior to the Planning
Board Meeting at which the proposed Final Plan is to be
discussed, the applicant shall notify, in writing, by
certified mail, return receipt requested delivery, all
owners of abutting property, including abutters to any
right-of-way leading to the subdivision, that an
application for subdivision approval has been submitted
to the Board, and the date of the meeting at which it
is to be discussed. The application shall be deemed
incomplete until the applicant provides proof (copies
of return receipts) of such notification to the Board.
4. At least twenty-one (21) days prior to the Planning
Board meeting at which the proposed Final Plan is to be
discussed, the applicant shall provide ten (10) copies
of the Final Plan and application to the Town Clerk.
C. FINAL PLAN SUBMISSIONS FOR A SUBDIVISION MUST INCLUDE:
Li The proposed name of the subdivision, or its
identifying title, its proposed use, the name of the
Town in which it is located, plus the Assessor's Map
and Lot numbers for all properties contained in the
subdivision.
10
Zs The date the plan was prepared, north point, graphic
map scale, names and addresses of the record owner(s),
applicant(s), and individual(s) or company (ies) who
prepared the plan, and the names of adjoining property
owners.
3. A map of the boundary lines of the tract and all lots
within it, giving complete descriptive data by bearings
and distance, made and certified by a _ licensed
surveyor. The corners of the tract and lots shall be
located on the ground and marked by monuments. The plan
shall include the type of monument set or found at each
lot corner. The map shall also show all zoning district
boundaries within the tract or shall indicate the
applicable zoning districts encompassing the tract. All
wetlands must be delineated.
4. A copy of the portion of the County Soil Survey
covering the subdivision.
5. Contour lines showing elevations in relation to Mean
Sea Level (normally twenty foot [20'] intervals or as
Planning Board may request), drawn on a map scaled not
more than fifty feet (50') to the inch.
6. Any portion of the subdivision in a flood-prone area,
the boundaries of any flood hazard areas and the one
hundred (100) year flood elevation shall be delineated
on the plan, established by the most recent flood plain
study of Waldo County.
Te A copy of the deed(s) on which the survey was based;
and a copy of all covenants, deed restrictions,
easements, right-of-ways, or other encumbrances
currently affecting the property. If the applicant does
not hold title to the property, copies of sales
purchase agreement(s) or purchase option(s) for the
proposed property.
8. Indication of the type of sewage disposal to be used in
the subdivision.
9. When sewage disposal is to be accomplished by
individual subsurface wastewater disposal systems, test
pit analyses, prepared by a Licensed Site Evaluator
shall be provided demonstrating adequate soils for
subsurface sewage disposal of each lot. A map showing
the location of all test pits dug on the site and a
profile of each shall be submitted.
10. When sewage disposal is to be accomplished by a cluster
septic system, test pit analyses, prepared by a
Licensed Site Evaluator shall be provided demonstrating
adequate soils for a common leach bed(s). The developer
11
shall also provide a map showing the location of all
pits dug on the site and an analyses of each; plans
prepared by a registered engineer for all physical
components of the system; and plans for financing and
maintaining the system. If a homeowners association
will be established for maintenance or financing of the
system, the plan shall include documents governing the
association and its duties and powers.
11. Indication of the type of water supply system(s) to be
used in the subdivision.
12. Completed Liberty Subdivision Ordinance "Finding of
Fact" checklist. The "Finding of Fact" checklist will
serve as part of the basis of Board's action in the
deliberative process of reviewing applications.
Majority vote on each delineated finding of fact is
required for approval of all permits.
D. ADDITIONAL FINAL PLAN SUBMISSIONS (IF DEEMED NECESSARY BY THE
PLANNING BOARD) FOR A SUBDIVISION:
1. If the Board suspects groundwater problems, than
statements of water history shall be supplied by
abutting or neighborhood landowners to the Planning
Board at the Board's election.
2. When lots of less than two (2) acres in size contain
significant areas of slopes in excess of fifteen
percent (15%), poorly drained oor _ shallow. soils
generally unsuitable for building, or other physical
limitations reducing the area of the lot on which
structures, wells and septic systems may be placed, the
Board may require the applicant to indicate specific
areas on each lot (drawn at a scale of fifty feet [50']
to the inch or less) where such structures, wells and
septic systems may be placed in accordance with minimum
setback and distance requirements as set forth in the
Maine Plumbing Code or other municipal ordinances.
a. Plans for the maintenance of all stormwater control
measures.
4. A traffic impact analysis to include:
a. An estimate of the number of daily vehicle trips
generated by the project at peak seasonal use.
b. A statement of sight distances at all
intersections of all access roads to- the
subdivision and existing roads, and a_ safety
analysis of these by a traffic safety engineer.
12
Cc. A State and/or Town Road Commissioner permit (s)
satisfying requirements for any road_ cuts,
contemplated traffic and placement of culverts
S. Any additional information that the Board deems
necessary to adequately review the application when
given unique site conditions.
E. MEETINGS AND HEARINGS - SCHEDULE AND CONTENT:
» Within thirty (30) days of receipt of an application for
a Final Plan the Board shall place the application on the
agenda of the next regularly scheduled Board meeting. The
applicant, or his/her duly authorized agent, shall attend
the meeting of the Planning Board to discuss the Final
Plan. At said meeting the Board shall notify the
applicant whether or not the application is complete, and
what, if any, additional submissions are required. In
making this determination, the Board may decide, based on
the information received, that the nature of the site and
plan require a more detailed review, and shall indicate
which additional submission requirements must be met.
Subsequent submissions, for continued applications, must
be received in Town Office at least fourteen (14) days
before meeting in order to be placed on the agenda. NOTE:
The determination by the Board that the application is
complete and the initial determination as to what
additional submissions are required (notwithstanding the
provisions of paragraph 3 hereinafter) are and remain
preliminary determinations which may, as necessary, be
revised by the Board as the Board may deem appropriate
during the entire review process.
r The Board shall determine whether to hold a _ public
hearing on the Final Plan application (A Public Hearing
is mandatory for a Major Subdivision.) When a subdivision
is located within five hundred feet (500') of a municipal
boundary, and a public hearing is to be held, the Board
shall notify the Clerk and the Planning Board of the
adjacent municipality involved, at least ten (10) days
prior to the hearing.
Se Upon determination that a complete application has been
submitted for review, the Board shall issue a dated
receipt to the applicant.
4. If the Board decides to hold a public hearing, it shall
hold the hearing within thirty (30) days and shall
publish notice of the application pending, date, time,
and place of the hearing in the local newspaper at least
13
two (2) times; the date of the first publication to be at
least fourteen (14)days prior to the hearing.
5. Within thirty (30) days of a public hearing, or within
sixty (60) days of receipt of a complete application, if
no hearing is held, or within another time limit as may
be otherwise mutually agreed to by the Board and the
applicant, the Board shall make written findings of fact
on the application, and approve, approve with conditions,
or deny the Final Plan. The Board shall specify in
writing its finding of facts and reasons for any
conditions or denial.
Bw If approved, one (1) copy of the signed plan shall be
eeceerded to the Tax Assessor, and One (1) copy of the
signed plan shall be forwarded to the Code Enforcement
Officer. Any subdivision not recorded in the Registry of
Deeds within ninety (90) days of the date upon which the
plan is approved and signed by the Board shall become
null and void.
F. FINAL SUBMISSIONS FOR RECEIPT OF APPROVAL AND PERMIT:
Le The subdivision Final Plan shall consist of all approved
submissions detailed in this Ordinance in the following
form: two (2) reproducible, stable based transparent
originals, one (1) to be recorded at the Registry of
Deeds, the other to be filed at the Town Office and ten
(10) copies of one (1) or more maps or drawings drawn to
a scale of not more than one hundred feet (100') to the
inch unless otherwise indicated below. Plans for
subdivisions containing more than one hundred (100) acres
may be drawn at a scale of not more than two hundred feet
(200') to the inch provided all necessary detail can
easily be read. Plans shall be no larger than twenty-four
(24) by thirty-six (36) inches in size, and shall have a
margin of two (2) inches outside of the border lines on
the left side for binding and a one (1) inch margin
outside the border along the remaining sides. Space shall
be provided for endorsement by the Board.
G. FINAL APPROVAL AND FILING:
Le No plan shall be approved by the Planning Board as long
as the applicant is in default on a previously approved
Plan or the applicant has failed to tender to the Town
those fees requested by the Board or the financial
guarantees as herein provided.
At the time the Board grants Final Plan approval, it
may permit the Plan to be divided into two (2) or more
14
sections subject to any conditions the Board deems
necessary in order to insure the orderly development of
the Plan. If any municipal department head notified of
the proposed subdivision informs the Board that their
department or district does not have adequate capital
facilities to service the subdivision, the Board shall
require the Plan to be divided into two (2) or more
sections subject to any conditions the Board deems
necessary in order to allow the orderly planning,
financing and provision of public services to the
subdivision.
. No changes, erasures, modifications, or decisions shall
be made to any Final Plan after approval has been given
by the Planning Board and endorsed in writing on the
Plan, unless the revised Final Plan is first submitted
to the Planning Board and the Board approves those
revisions and modifications. The Board shall make
findings that the revised plan meets the standards of
this ordinance and of Title 30-A, M.R.S.A., section
4404. In the event that a Plan is recorded without
complying with this requirement, it shall be considered
null and_ void, and the Board shall institute
proceedings to have the Plan stricken from the records
of the Registry of Deeds.
4. The approval by the Board of a subdivision Final Plan
shall not be deemed to constitute or be evidence of any
acceptance by the Town of any street, easement or other
open space shown on such plan. The Board shall require
the Final Plan to contain appropriate notes to this
effect.
Bi Failure to commence substantial construction relating
to road or other improvements that are part of the
subdivision application and approval of the subdivision
within the period of time to which financial guarantees
apply shall render the Plan null and void. The issuing
bank providing such financial guarantees shall, as a
requirement for approval of the subdivision
application, be required to notify the Town in writing
if letter(s) of credit guarantees relating to the
approved subdivision are canceled. It is the
responsibility of the applicant to notify the issuing
bank of this requirement. Upon determining that a
subdivision's approval has expired under this
paragraph, the Board shall have a notice placed in the
Registry of Deeds to that effect.
15
SECTION 2.4: SPECIAL REQUIREMENTS AND ADDITIONAL PROCEDURES FOR
MAJOR SUBDIVISIONS
A. SPECIAL REQUIREMENTS FOR MAJOR SUBDIVISIONS:
ie All applications for a Major Subdivision [more than
four (4) lots] shall follow those requirements
delineated in Article II, Section 2.3 along with the
following requirements.
2. The location, names, and present widths of existing and
proposed streets, highways, easements, building lines,
parks and other open spaces on or adjacent to the
subdivision.
3. All parcels of land proposed as common use acreage for
the lot owners, if any.
4. The location of any open space to be preserved and an
indication of its improvement and management.
pe When the subdivision is located within a _ lake
watershed, and the Board deems necessary high intensity
soil survey conducted according to the standards in
Article III, Section 3.1.M; and a report by a
Registered Soils Scientist indicating how any
limitations will be overcome. Otherwise, a copy of the
Waldo County Soils Survey map covering the subdivision
shall be presented. Where that soil survey shows soils
which are generally unsuitable for the proposed uses,
the Board shall require the submittal of a high
intensity soils survey and a report by a Registered
Soil Scientist indicating how the limitations will be
overcome. High intensity soils surveys shall be mapped
at a scale of one inch (1") to equal fifty feet (50').
6. A soil erosion and sedimentation control plan meeting
the standards in Article III, Section 3.1.G, drawn at a
scale of one inch (1") to equal fifty feet (50'), to
include:
a. Drawings showing present and proposed grading
contours and elevations, with a contour interval
of not more than five (5) feet.
b. Drawings showing proposed clearing and
construction sites, and the location of proposed
erosion/sedimentation control measures, both
temporary and permanent.
Cia Drawings showing detailed designs of all
structural measures which are engineered permanent
16
diversion ditches, flumes, sediment' basins,
related elements, and copies of all calculations
performed in the design of structures.
d. Construction specifications for all procedures,
both structural and non-structural.
e. Calculations showing runoff quantities and peak
discharge rates before and after development for a
twenty-five (25) year, twenty-four (24) hour
storm. Include a narrative discussion of all
assumptions and generalizations made.
f. An estimate of the number of daily vehicle trips
generated by the project at peak seasonal use.
g. Statement of sight distances at all intersections
of all access roads to the subdivision and
existing roads, and a safety analysis of these by
a traffic safety engineer.
a. Evidence of financial and technical capability to carry
on the project, to include:
a. An estimate of the cost of all construction items
to be completed by the applicant prior to the sale
of lots.
b. A statement of the types oof professional
assistance to be obtained for the design and
construction of the above.
ee A plan for the financing of these costs. If
personal funds are to be used, evidence of the
availability of funds; if funds are to be obtained
from a financial institution, a letter from that
institution expressing its intent to finance and
the extent of its financial commitment.
d. If any portion of the subdivision area is within
the boundaries of any flood hazard areas and the
one hundred (100) year flood elevation, this shall
be delineated on the plan.
B. ADDITIONAL PROCEDURES FOR MAJOR SUBDIVISIONS:
1. Prior to submittal of the Final Plan application, the
following approvals shall be obtained in writing, where
appropriate:
a. Maine Department of Environmental Protection,
under the Site Location of Development Act,
17
Alteration of Coastal Wetlands Act, Great Ponds
Act, Fresh Water Wetland Act, Alteration of
Streams and Rivers Act, or if a Wastewater
Discharge License is needed.
b. Maine Department of Human Services, if the
applicant proposes to provide a central water
supply system.
c. Maine Department of Human Services, if a
centralized or shared subsurface sewage disposal
system(s) is to be utilized.
2. BEFORE THE BOARD GRANTS APPROVAL OF THE FINAL PLAN, THE
APPLICANT SHALL MEET THE PERFORMANCE GUARANTEE
REQUIREMENTS PRESCRIBED BY THE BOARD.
SECTION 2.5 ENFORCEMENT:
A. INSPECTION OF REQUIRED IMPROVEMENTS:
il. At least five (5) days prior to commencing each major
phase of construction or required improvements (i.e.
roads, runoff controls, septic systems, major land
clearing or earth moving, etc.), the applicant or
builder shall notify the Code Enforcement Officer in
writing of the time when he proposes to commence
construction of such improvements.
Ze If at any time before or during the construction of the
required improvements, it appears to be necessary or
desirable to modify the required improvements, the Code
Enforcement Officer is authorized to approve minor
modifications due to unforeseen circumstances such as
encountering hidden outcrops of bedrock, natural
springs, etc. The Code Enforcement Officer shall issue
any approval under this section in writing and shall
transmit a copy of the approval to the Board. Revised
plans shall be filed with the Town. For major
modifications, such as relocation of rights-of-ways,
property boundaries, changes of grade by more than one
percent (1%), etc., the applicant shall obtain
permission to modify the plans from the Board.
as Prior to the sale of any lot, the applicant shall
provide the Board with a letter from a Registered Land
Surveyor, stating that all monumentation shown on the
plan has been installed.
B. VIOLATIONS AND ENFORCEMENT:
Le Failure to obtain a permit.
18
a. No plan of a division of land within the Town
which would constitute a subdivision shall be
recorded in the Registry of Deeds until a Final
Plan has been approved by the Board in accordance
with these regulations.
b. No person, firm, corporation or other legal entity
may convey, offer or agree to convey any land in a
subdivision which has not been approved by the
Board and recorded in the Registry of Deeds.
GC. No person, firm, corporation or other legal entity
may convey, offer or agree to convey any land in
an approved subdivision which is not shown on the
Final Plan as a separate lot.
d. No public utility, water district, sanitary
district or any utility company of any kind shall
serve any lot in a subdivision for which a Final
Plan has not been approved by the Board.
e. Development of a _ subdivision without Board
approval shall be a violation of law. Development
includes grading or construction of roads, grading
of land or lots, or construction of buildings
which require a Final Plan approved by the Board
as provided in these regulations and recorded in
the Registry of Deeds.
Ys No lot in a subdivision may be sold, leased, or
otherwise conveyed before the street upon which
the lot fronts is completed in accordance with
these regulations up to and including the entire
frontage of the lot. No unit in a multi-family
development shall be occupied before the street
upon which the unit is accessed is completed in
accordance with these regulations.
Zs Violations of terms of a permit.
a. If the Code Enforcement Officer finds that any
provision of this Ordinance or the terms of the
subdivision permit are being violated, he/she
shall notify in writing the person responsible for
said violations (applicant, builder, or -
contractor) indicating the nature of the
violation, ordering the action necessary to
correct it and requiring that all construction
activity be discontinued until such corrective
measures have been initiated.
19
b. If the applicant/builder/or contractor fails to
respond to such notice within five (5) days of
receiving the notice, the Code Enforcement Officer
shall so notify the Board of Selectmen who shall
institute any and all proceedings necessary to
enforce this Ordinance.
. Fines.
a. Any person, firm, corporation or other legal
entity who violates the provisions of this
Ordinance shall be guilty of a civil violation and
shall be fined not less than one hundred dollars
($100) nor more than two thousand five hundred
dollars ($2,500) for each day of violation. Each
conveyance, offering or agreement to transfer land
on a subdivision which has not been approved as
required by this Ordinance is a_ separate
violation. Each day that a violation of the terms
of the subdivision permit continues shall
constitute a separate violation. All fines shall
be paid to the Town of Liberty. Such persons shall
also be liable for court costs and reasonable
attorneys' fees incurred by the Town if the Town
prevails in a dispute over violations.
ARTICLE III: PERFORMANCE STANDARDS
SECTION 3.1: GENERAL STANDARDS
In reviewing applications for a subdivision, the Board shall
consider the following general standards and make findings in
writing that each has been met prior to the approval of a Final
Plan. In all instances the burden of proof shall be upon the
applicant.
A. CONFORMANCE WITH STATE AND LOCAL CODES:
All proposed subdivisions shall be in conformity with the
provisions of all pertinent State and local codes and ordinances.
B. RETENTION OF OPEN SPACES, NATURAL OR HISTORIC FEATURES:
Le In any subdivision larger than twenty (20) lots or
dwelling units or more, the applicant shall provide at
least ten percent (10%) of the total area as common
open space for the lot owners.
2 Land reserved for common open space (not to be counted
when computing lots in subdivision) purposes shall be
of a character, configuration and location suitable for
the particular use intended. A site intended to be used
20
for active recreation purposes, such as a playground or
a play field, should be relatively level and dry, have
a total frontage on one (1) or more streets of at least
two hundred feet (200'), and have no major dimensions
of less than two hundred feet (200'). Sites selected
primarily for scenic or passive recreation purposes
shall have such access as the Board may deem suitable
and no less than twenty-five feet (25') of road
frontage. The configuration of such sites shall be
deemed adequate by the Board with regard to scenic
attributes to be preserved, together with sufficient
areas for trails, lookouts, etc., where necessary and
appropriate.
3. The Board may require that the Final Plan include a
landscape plan that will show the preservation of any
existing trees larger than twenty four inches (24")
diameter breast height, the replacement of trees and
vegetation, graded contours, streams and the
preservation of scenic historic or environmentally
significant areas. Cutting of trees on the northerly
borders of lots should be avoided as far as possible,
to retain a natural wind buffer.
Cc. LOTS:
1. Lots shall meet the requirements of the Town's Minimum
Lot Size Ordinance, and shall not include the following
areas in determining minimum acreage:
a. Common roads and parking lots.
b. Right-of-ways and easements.
oc. Easements or areas reserved for installation of
common facilities such as sewage collection and
treatment systems, and areas reserved for storm
water runoff or sedimentation/erosion controls.
d. Portions of the lot which, because of existing
land uses or lack of access, are isolated and
unavailable for building purposes or for use in
common with the remainder of the lot, as
determined by the Planning Board.
e. Portions of the lot which are unsuitable for
development in their natural state due to
topographical, drainage or subsoil conditions,
such as, but not limited to: slopes greater than
thirty percent (30%);
Ei Areas comprised of fifty percent (50%) or more of
poorly drained soils, unless the applicant can
21
demonstrate specific engineering techniques to
overcome the limitations to the satisfaction of
the Planning Board.
g- Portions of the lot covered by surface waters,
including intermittent streams.
es The subdivision of tracts into parcels or lots with
more than twice the required minimum lot size be laid
out in such a manner as either to provide for or
preclude future re-subdivision.
3. If a lot on one (1) side of a stream, road or other
similar barrier fails to meet the minimum requirements
for lot size, it may not be combined with a lot on the
other side of the stream or road to meet the minimum
lot size, unless it contains at least 20,000 square
feet exclusive of items a through g in paragraph C.1
above.
D. UTILITIES:
1. The size, type and location of street lights, electric
and gas lines, telephone and other utilities shall be
shown on the plan and approved by the Board.
E. MONUMENTS:
die Iron monuments shall be set at all street intersections
and points of curvature, but no further than seven
hundred fifty feet (750') apart along street lines
without curves or intersections.
= Iron monuments shall be set at all corners and angle
points of the subdivision boundaries where the interior
angle of the subdivision boundaries is one hundred
thirty-five (135) degrees or less.
3. Iron monuments shall be a minimum of five-eights inch
(5/8") diameter and four feet (4') in length or
anchored to bedrock and set in the ground at final
grade level.
4. All other subdivision boundary corners and angle
points, as well as all lot boundary corners and angle
points shall be marked by suitable monumentation.
F. WATER SUPPLY:
Le Dug wells shall be permitted only if it is demonstrated
that it is not economically feasible to develop other
ground water sources, and shall be constructed so as to
prevent infiltration of surface water into the well.
22
Unless otherwise permitted by the Board, the applicant
shall prohibit dug wells by deed restrictions and a
note on the plan.
y If a central water supply system is provided by the
applicant, the location and protection of the source,
and the design, construction and operation of the
system shall conform to the standards of the Maine
Rules Relating to Drinking Water.
a The Board may require the applicant to construct ponds
and dry hydrants to provide for adequate water storage
for fire-fighting purposes. In such cases an easement
shall be granted to the Town granting access to the dry
hydrants where necessary.
G. EROSION AND SEDIMENTATION CONTROL:
i. Construction of roads and site preparation for
construction of buildings will result in the immediate
and continuing erosion of soil and sedimentation of
drainage ways and water bodies unless' properly
controlled. This causes cost, inconvenience, and
potentially hazardous conditions when road ditches are
filled with sediment. Sediment also degrades the
rivers, streams, and lakes which ultimately receive
runoff from eroding sites. Not only does it fill in
shore areas with unsightly deltas of silt, it also
carries with it nutrients which stimulate the growth of
weeds and algae. It is the very fine soil-particles
that carry these nutrients, and these are the most
difficult to settle out of runoff. The following
standards recognize that extra measures are therefore
needed to limit the erosion of these particles and to
filter or settle them out from the runoff when
construction occurs in the drainage area of a lake or
pond.
Ze All earth changes will be designed, constructed, and
completed in such a manner so that the exposed area of
any disturbed land will be limited to the shortest time
possible.
<i The Board may limit the area exposed at any one time,
and may limit the times of the year when construction
may occur when soil type or slope conditions pose
serious potential for erosion and sedimentation.
4. On slopes greater than thirty percent (30%), there
shall be no grading or filling within one hundred fifty
feet (150') of the normal high water mark of any water
body, except to protect the shoreland and prevent
erosion.
23
7 Temporary vegetation; mulching and/or siltation fabrics
shall be used to protect critical areas during
development.
6. Sediment caused by accelerated soil erosion will be
removed from runoff water to the maximum extent
feasible through the use of debris basins, silt traps,
sediment basins, or other suitable methods.
Ts Any temporary or permanent facility designed and
constructed for the conveyance of water around, through
or from the site will be designed to limit water flow
to non-erosive velocities.
8. The top or bottom of a cut or fill shall not be closer
than ten feet (10') to a property line unless otherwise
mutually agreed to by the affected parties. In no
instance shall any cut or fill exceed a slope of three
(3) to one (1).
9. Permanent soil erosion control measures for all slopes,
channels, ditches or any other disturbed land will be
completed within fifteen (15) calendar days after final
grading has been completed. Seeding for a permanent
vegetative cover shall take place no later than August
15, unless procedures described below are followed.
10. When it is not possible or practical to permanently
Stabilize disturbed land as required in subsection (8)
above, or when final grading will not be accomplished
on a disturbed site for a period of more than thirty
(30) calendar days, temporary erosion control measures
will be implemented within thirty (30) calendar days of
the exposure of the soil. Seeding for a temporary
vegetative cover shall take place no later than
September 30.
11. Erosion control and sedimentation control plans shall
be engineered according to the procedures and criteria
described in USDA Soil Conservation Service technical
manuals, and for projects in lake watersheds, the
Phosphorus Control in Lake Watersheds: A Technical
Guide for Evaluating New Development, published by the
Maine Department of Environmental Protection,
September, 1992 revision, as amended.
H. STORMWATER RUNOFF CONTROLS:
1. When land use is changed from a forested natural state
to residential development, there is a significant
change in the rate, amount and quality of runoff from
24
the site which can be quite damaging to downstream
areas unless properly controlled. Runoff travels faster
over paved and cleared areas, and less is infiltrated
on the site. This faster, increased volume of runoff
picks up more nutrient laden sediment, humus' and
organic materials and carries these into the receiving
water bodies to stimulate weed and algae growth. A
study conducted by the Maine Department of
Environmental Protection in the Augusta Area in 1986
showed phosphorus export from a one (1) acre lot size
residential area to be 7.2 times greater than natural
back ground levels. Phosphorus is the nutrient
responsible for weed and algae problems in lakes. The
following standards recognize that it is therefore
critical to control runoff from development in lake
watersheds to avoid long term and irreversible
degradation of water quality.
2. Storm water runoff from a proposed development shall be
managed to limit the rate of outflow from the site to
predevelopment levels up to the level of intensity of a
twenty-five (25) year twenty-four (24) hour storm. Peak
flow shall be determined using the Stormwater
Management for Maine: Best Management Practices,
published by the Maine Department of Environmental
Protection (1995), as amended.
< For developments within the direct drainage of a lake
or pond, runoff shall also be managed to infiltrate on-
site any excess runoff created by the development for a
one (1) year twenty-four (24) hour storm, through the
use of French drains, infiltration basins, or other
suitable measures.
4. Where soils and slope' conditions preclude the
engineering of onsite infiltration measures, the area
of the site which may be occupied by roads, driveways,
lawns and cleared areas, structures and impervious
surfaces shall be limited to five percent (5%), and
shall be so stated on deed restrictions.
. Calculations of peak runoff and excess runoff required
in subsections (a) and (b) above shall include all
runoff that drains through the site from offsite areas
unless provisions are made to divert such runoff from
the site.
6. Storm water management plans shall be based, as nearly
7 cai on the natural drainage patterns of the
site.
Tv The design of piped or open channel systems will be
based on a ten (10) year flow frequency without
25
overloading or flooding beyond channel limits. In
addition, areas expected to be flooded by a runoff of a
twenty-five (25) year frequency will be designated, and
no structures will be allowed within such area.
8. Where the site is traversed by a water course, drainage
way, channel or stream (whether natural or
constructed), a drainage right-of-way will be provided
that substantially conforms to such watercourse, and
shall be at least thirty feet (30') in width.
os Any grading or other construction activity on the site
shall be so conducted to avoid alteration of natural
drainage ways such that drainage patterns onto or from
adjacent parcels will be adversely affected.
10. The proposed storm water management system must be
designed by a registered professional engineer. Where
permanent embankment type storage or retention basins
are planned, the basins will be designed according to
the standards outlined in the Soil Conservation Service
Engineering Field Manual or other appropriate
references.
I. LAND FEATURES:
Ls Topsoil shall be considered part of the subdivision and
shall not be removed from the site except for surplus
topsoil from roads, parking areas, and building
excavations.
Zs The landscape shall be preserved in its natural state
insofar as practical by minimizing grading and
excavating, and when located in a lake watershed, by
minimizing tree removal or disturbance to the natural
ground cover.
J. CLUSTER DEVELOPMENT:
Ls Purpose: The purpose of these provisions is to allow
for innovative concepts of housing development where
maximum variations of design may be allowed, provided
that the net residential density shall be no greater
than is permitted. To this end, the layout, and
dimensional requirements of this Ordinance and the
Town's Minimum Lot Size Ordinance may be altered
without restriction except that in no case shall lots
abutting a water body be less than one (1) acre in size
or less than one hundred feet (100') in shore frontage.
2. Basic requirements.
26
a. All the requirements and standards of these
Ordinances, except those dealing with lot layout
and dimensions shall be met.
b. The minimum area of land in a cluster development
shall be ten (10) acres.
Ge The plan shall indicate the location of all
proposed roads, structures, parking areas,
footpaths and common open space.
d. No building shall be constructed on soil types
classified by the Soil Conservation Service
(S.C.S.) as being poorly or very poorly drained.
e. Where a cluster development abuts a water body, a
portion of the shoreline, as well as reasonable
access to it, shall be part of the common land.
fs In cluster developments with individual lot sizes
of twenty thousand square feet (20,000') or less,
all dwelling units shall be connected to a common
water supply and distribution system.
Ti. In cluster developments with individual lot sizes
of twenty thousand square feet (20,000') or less,
all dwelling units shall be connected to a central
collection and treatment system.
K. DEDICATION AND MAINTENANCE OF COMMON OPEN SPACE AND SERVICES:
- All common land and common services or utilities shall
be owned jointly or in common and undivided by the
owners of the dwelling units by means of a home-owners
association, or, in the case of common land, by an
association which has as its principal purpose the
conservation or preservation of land in essentially its
natural condition.
Ze Further subdivision of the common land or its use for
other than non-commercial recreation or conservation
purposes, except for easements for underground
utilities, shall be prohibited. Structures and
buildings accessory to non-commercial recreational or
conservation uses may be erected on the common land.
a. The common open space shall be shown on the Final Plan
with appropriate notation on the plan to indicate that
it shall not be used for future building lots.
4. Where a homeowners' association shall have the
responsibility of maintaining the common property or
services:
27
a. The by-laws of the proposed homeowners association
shall specify maintenance responsibilities and
shall be submitted to the Board prior to Final
Plan approval.
b. The applicant shall maintain control of the common
property, and be responsible for its maintenance
until development sufficient to support' the
association has taken place.
GC. Covenants for mandatory membership in the
homeowners association setting forth the owner's
rights, interests, and privileges in the
association and providing a map showing the
location of all pits dug on the site and an
analyses of each; plans prepared by a registered
engineer for all physical components of the
system; and to defray the expenses connected with
the maintenance of common property and tax
assessments.
L. CONSTRUCTION IN FLOOD HAZARD AREAS
i When any part of a subdivision is located in a special
flood hazard area as identified by the Federal
Emergency Management Agency, the plan shall indicate
that all principal structures on lots in the
subdivision shall be constructed in accordance with
standards in the most recently adopted flood hazard
ordinance. Such a restriction shall be included in the
deed to any lot which is included or partially included
in the flood hazard area.
M. SOILS SURVEYS - STANDARDS FOR CONDUCTING:
1. High intensity soil Surveys shall be conducted in
accordance with the "Standards for High Intensity Soil
Surveys" adopted by the Maine Association of
Professional Soil Scientists (2/87 and any subsequent
amendments). Such standards include but are not limited
to the following: Soil types shall be identified down
to the one tenth 1/10 acre or less at a scale of not
more than one (1) inch equals fifty (50) feet. The
mapping units shall be the soils series. Single test
pits and their evaluation shall not constitute a high
intensity soil survey
28
SECTION 3.2: STREET AND STREET-RELATED STORM DRAINAGE DESIGN AND
CONSTRUCTION STANDARDS:
A. PURPOSE:
The construction of roads can have a major effect upon safety,
municipal services, and the environment of the Town. The design
and construction of such roads may also adversely affect soil
erosion and water quality; the severity of periodic flooding;
police and fire protection; safety conditions and traffic
congestion; the visual character of the neighborhood and the
Town; the future use of surrounding land; and maintenance costs
and requirements. These standards are intended to avoid those
adverse impacts.
B. GENERAL STREET DESIGN STANDARDS:
ute Streets shall be designed to discourage through traffic
within a residential subdivision.
Ze Where a subdivision borders an existing narrow street
(not meeting the width requirements of the standards
for streets in this Ordinance), the Final Plan shall
indicate reserved areas for widening or realigning the
road marked "Reserved for Road Realignment and Paving
(Widening) Purposes." Land reserved for such purposes
may not be included in computing lot area or setback
requirements as described in this Ordinance or the
Shoreland Zoning Ordinance. The reserve area shall not
be included in any lot, but shall be reserved to be
deeded to the Town or State.
a Where a subdivision abuts or contains an existing or
proposed arterial street, no residential lot may have
vehicular access directly on to the arterial street,
unless there is no reasonable alternative access. This
requirement shall be noted on the Final Plan and in the
deeds of any lot with frontage on the arterial street.
4. No street names shall be used which will duplicate or
be confused with the names of existing Town roads.
a. All streets shall be designed so that they will provide
safe vehicular travel and traffic patterns. Insofar as
possible, streets shall conform to existing topography,
and excessive cuts and fills shall be avoided.
6. Roads may only be located in areas known to flood if
they are so designed so as to keep the road surface
above water levels known or anticipated for a twenty-
five (25) year storm.
29
cP When the Planning Board determines it is necessary in
order to protect the environment, streets shall be
designed by a registered, professional engineer.
C. STREET DESIGN SPECIFICATIONS:
- The minimum width for a right-of-way for any street
whether public or private shall be fifty (50) feet. The
centerline of the roadway shall be the centerline of
the right-of-way.
a The minimum travel width of collector and minor streets
shall be twenty (20) feet, and for private rights-of-
way, fifteen (15) feet.
35 The minimum width of shoulders shall be two (2) feet,
and they shall be graded to drain water away from the
road surface.
4. The surface of all streets shall have a four inch (4")
crown from the center line to the edge of the travel
way.
Be Grades of all streets shall be reasonably minimal but
shall not be less than six inches (6") per one hundred
feet (100') or more than eight feet (8') per one
hundred feet (100') unless specifically approved by the
Planning Board.
6. A dead end street or cul-de-sac shall be provided with
a suitable turnaround at the closed end. When a turning
circle is' used, it shall meet the following
requirements for radii: Property line sixty-five feet
(65'); outer edge of pavement forty feet (40'). The
Board may require the reservation of a fifty foot (50')
easement in line with the street to provide
continuation of the road where future subdivision is
possible.
7. Side slopes in either cut or fill situations shall not
be graded steeper than 2:1. All embankments shall be
loamed to a depth of not less than four inches (4"),
fine graded, fertilized, limed, and seeded to establish
a good cover of grass.
8. All streets shall be designed to provide adequate,
safe, visibility for both pedestrians and vehicular
traffic. Sight distances shall be provided according to
the following table, or Maine Department of
Transportation requirements, whichever sight distances
are greater:
30
POSTED SPEED
SIGHT DISTANCE
esas [aso [350 [00 [wo | so [500 | sso
9. All changes in grade shall be connected by vertical
curves to provide for the minimum sight distance in the
above table.
10. Where new street intersections or driveway curb-cuts
are proposed, sight distances, as measured along the
road onto which traffic will be turning, shall be based
upon the posted speed limit and conform to the table
above.
11. Where necessary, corner lots shall be cleared of all
growth and sight obstructions, including ground
excavation, to achieve the required visibility.
12. Streets shall be laid out to intersect at right angles
wherever possible; under no circumstances shall a
street intersect with a collector or arterial street at
less than a sixty (60) degree angle.
13. Cross (four-cornered) street intersections shall be
avoided insofar as possible. T-intersections formed on
opposite sides of the same road shall have a minimum
distance of two hundred feet (200') between center
lines.
14. Note: For driveway or entrance access to state or
state aid roads, a permit issued by Maine Department of
Transportation is generally required (Title 23,
M.R.S.A., sections 704 et seq., as amended). The
applicant should obtain that permit before' the
subdivision application is reviewed and/or approved by
the Town.
D. STREET CONSTRUCTION SPECIFICATIONS: (All subject to state
recommendations existing at time of application approval)
xe Preparation:
a. Before any clearing has started on the right-of-
way, the center line and side lines of the new
road shall be staked or flagged at fifty (50) foot
intervals except as needed for surveying.
b. Before grading is started, the entire right-of-
way, other than trees and vegetation intended for
31
preservation, shall be cleared of all stumps,
roots, brush, and other objectionable material.
Large boulders and tree stumps shall be removed
from the roadway.
c. All organic materials shall be removed to a depth
of one foot (1') below the sub grade of the
roadway. On soils which have been identified as
not suitable for roadways, the subsoil shall be
removed from the street site to a depth of two
feet (2') below the sub grade and replaced with
material meeting the specifications for gravel
aggregate sub-grade below.
i. Sub grade:
a. The sub grade shall be carefully graded and
compacted. Sub grade fills shall be composed of
sand or gravel or hard, durable particles, free of
vegetative matter, lumps, or balls of clay.
b. Gravel Base:
Ch) » The gravel base course shall be at least
twelve (12) inches deep, and shall be
composed of sand or gravel of hard,
durable particles, free of vegetative
matter, lumps, or balls of clay, and
shall have a maximum stone size of six
(6) inches in diameter.
(ii). Two feet (24 inches) of gravel or more
may be required in cut sections if earth
or ledge is encountered or in wet or
Swampy areas. Gravel shall be spread in
layers not over six (6) inches deep and
each layer shall be thoroughly compacted
before the next is laid.
as Street or Travel Surface:
a. If the street is to have a gravel surface it shall
be constructed with a depth of six (6) inches with
a maximum rock size of two (2) inch diameter.
b. If the street is to have a paved surface, it shall
meet the following specifications:
(i) . Minimum standards for the base layer of
pavement shall be the Maine Department
of Transportation specifications for
plan mix grade B.
32
(ii). Minimum standards for the surface layer
of pavement shall meet the Maine
Department of Transportation
specifications for plan mix grade C with
an aggregate size no more than 3/4 inch
maximum.
(iii). The compacted thickness of the binder
course shall be two (2) inches; the
compacted thickness of the_- surface
course shall be one (1) inch, for a
total pavement thickness, after
compaction, of three (3) inches.
4. Where pavement joins an existing pavement, the existing
pavement shall be cut along a smooth line and form a
neat, even, vertical joint.
E. STORM DRAINAGE STREET CONSTRUCTION STANDARDS:
1. The collection and management of storm water runoff on
the site shall be designed to meet the general
standards set forth in Article III, Section 3.1H of
this Ordinance.
es Drainage from streets shall be designed to prevent
standing water on the surface or the shoulder. No
surface drainage shall be conveyed or diverted across a
shoulder.
aie Where ditches are required to remove storm and surface
water from streets they shall have side slopes no
greater than 2:1 on back slopes and 3:1 on in-slopes,
and longitudinal slopes no less than one-half percent
(1/2%).
4. Culvert sizes shall be determined on the basis of
estimated runoff from the total area served. Minimum
culvert size shall be fifteen (15) inches diameter.
Minimum trench width at the pipe crown shall be the
outside diameter of the pipe plus two (2) feet. Pipe
shall be bedded in a fine granular compacted material
containing no stones larger than three (3) inches,
lumps of clay, or organic matter, reaching a minimum of
six (6) inches, after compaction, below the bottom of
the pipe extending to six (6) inches, after compaction,
above the top of the pipe.
oe Pipes:
33
a. Corrugated Metal Pipe shall meet the requirements
of AASHTO Designation M 190 Type C for iron or
steel pipe or AASHTO Designation M 196 for
aluminum alloy pipe for sectional dimensions and
type. Pipe gauge shall be as required to meet the
soil and traffic loads with a deflection of not
more than five percent (5%).
b. Reinforced Concrete Pipe shall meet the
requirements of ASTM Designation C-76 (AASHTO M
170). Pipe classes shall be required to meet the
soil and traffic loads with a safety factor of 1.2
on the 0.01 inch crack strength with a Class B
bedding. Joints shall be of the rubber gasket type
meeting ASTM Designation C 443-70, or of an
approved preformed plastic jointing material such
as "Ramnek." Perforated Concrete Pipe shall
conform to the requirements of AASHTO M 175 for
the appropriate diameters.
o. Polyvinylchloride (PVC) pipe shall meet' the
requirements of AASHTO designation M278: and any
gaskets shall meet the requirements of ASTM
designation D3212.
F. ADDITIONAL IMPROVEMENTS AND REQUIREMENTS:
1. Erosion Control. The procedures outlined in the erosion
and sedimentation control plan shall be implemented
during the site preparation, construction and clean-up
stages.
es Cleanup. Following street construction, the developer
or contractor shall conduct a thorough clean-up of
stumps and other debris from the entire street right-
of-way. If onsite disposal of the stumps and other
debris is proposed, the site shall be indicated on the
Final Plan, and be suitably covered with fill and
topsoil, limed, fertilized, and seeded.
G. CERTIFICATION OF CONSTRUCTION:
x Upon completion of street construction a written
certification signed by the Code Enforcement Officer
shall be submitted to the Planning Board at the expense
of the applicant, certifying that the proposed way
meets or exceeds the design and construction
requirements of these regulations. "As built" plans
shall be submitted to the Planning Board.
34
ARTICLE IV: PERFORMANCE GUARANTEES
SECTION 4.1: PERFORMANCE GUARANTEES:
A. IMPROVEMENTS GUARANTEED: With submittal of the application for
Final Plan approval, the applicant shall provide performance
guarantees for an amount adequate to cover the total construction
costs of the following improvements:
1. All required monumentation (Article III, Section
3.1.E); all required or proposed central water supply
systems (Article III);
2. All required or proposed cluster septic systems
(Article II and Article III); all required storm water
runoff and erosion control measures (Article II, and
Article III);
. All engineered streets (Article II and Article III,
Section 3.2); and any other improvements required by
the Board. In calculating the costs of all such
improvements, the applicant shall take into account the
time-span of the construction schedule and the
inflation rate for construction costs;
4. The conditions of the performance guarantee shall be
determined by the Board.
B. TYPES OF GUARANTEES: With submittal of the application for
Final Plan approval, the applicant shall provide one of the
following performance guarantees for the amount determined above:
i. A performance bond payable to the Town issued by a
Surety company, and approved by the Board of Selectmen;
2. An irrevocable letter of credit from a financial
institution establishing funding for the construction
of the subdivision, from which the Town may draw if
construction is inadequate, approved by the Board of
Selectmen; or
ay Either a certified check payable to the Town or a
savings account, a certificate of deposit naming the
Town as owner, or the establishment of an escrow
account.
4. An offer of conditional approval limiting the number of
units built or lots sold and/or deeding such lots to
the Town until all required improvements are
constructed.
35
C. CONTENTS OF GUARANTEE: The performance guarantee shall contain
a construction schedule, cost estimates for each major phase of
construction;
D. PERFORMANCE BOND: A performance bond shall detail the
conditions of the bond, the method for release of the bond or
portions of the bond to the applicant, and the procedures for
collection by the Town. The bond documents shall specifically
reference the subdivision for which approval is sought.
E. LETTER OF CREDIT: An irrevocable letter of credit from a bank
or other lending institution shall indicate that funds have
established for the construction of the subdivision and may not
be used for any other project or loan.
F. ESCROW ACCOUNT: A cash contribution to the establishment of an
escrow account shall be made by either a certified check made out
to the Town, the direct deposit into a savings account, or the
purchase of a certificate of deposit. For any account opened by
the applicant, the Town shall be named as owner or co-owner, and
the consent of the Town shall be required for a withdrawal. Any
interest earned on the escrow account shall be returned to the
applicant unless the Town has found it necessary to draw on the
account, in which case the interest earned shall be
proportionately divided between the amount returned to the
applicant and the amount withdrawn to complete the required
improvements.
G. RELEASE OF GUARANTEE: Prior to the release of any part of the
performance guarantee, the Board shall determine to its
satisfaction, in part upon the report of whatever agencies and
departments may be involved, that the proposed improvements meet
or exceed the design and construction requirements for that
portion of the improvements for which the release is requested.
H. DEFAULT: If, upon inspection, the Code Enforcement Officer
finds that any of the required improvements have not been
constructed in accordance with the plans and specifications filed
as part of the application, he shall so report in writing to the
Municipal Officers, the Board and the applicant. The Municipal
Officers shall take any steps necessary to preserve the Town's
rights.
36
ARTICLE V: APPEALS
SECTION 5.1: APPEALS:
An aggrieved party may appeal any decision of the Board under
this Ordinance to Waldo County Superior Court.
ARTICLE VI: VALIDITY, SEPARABILITY, AND CONFLICT WITH OTHER
ORDINANCES
SECTION 6.1: VALIDITY AND SEPARABILITY, AND CONFLICT WITH OTHER
ORDINANCES :
A. VALIDITY AND SEPARABILITY:
Should any section or provision of this Ordinance be declared by
any court to be invalid, such decision shall not invalidate any
other section or provision of the Ordinance.
B. CONFLICTS WITH OTHER ORDINANCES:
Whenever the requirements of this Ordinance are inconsistent with
the requirements of any other ordinance, code or statute, the
more restrictive requirements shall apply.
37
ARTICLE VII: DEFINITIONS
SECTION 7.1: DEFINITIONS
In general, words and terms used in this Ordinance shall have
their customary dictionary meanings. More specifically, certain
words and terms used herein are defined as follows:
ABUTTER: One whose property abuts, is contiguous, or joins at a
border or boundary, including the property across the street,
road, public way or private way.
APPLICANT: Owner or Authorized Agent and where applicable shall
mean and be used interchangeably with "Subdivider", "builder",
"contractor" etc.
AUTHORIZED AGENT: Anyone having written authorization to act on
behalf of a property owner, signed by the property owner.
CHANNEL: A natural or artificial watercourse with definite beds
and banks to confine and conduct continuously or periodically
flowing water. Channel flow is water flowing within the limits of
the defined channel.
CLUSTER SUBDIVISION: A subdivision in which the lot sizes are
reduced below the Town's minimum lot size in return for the
provision of permanent open space owned in common by lot/unit
owners, or a land conservation organization. Clustering shall not
be used to increase the overall net residential density of the
development.
CODE ENFORCEMENT OFFICER: A person appointed by the Municipal
Officers to administer and enforce these ordinances.
COMPLETE APPLICATION: An application shall be considered complete
upon submission of the required fee and all information required
by these Ordinances for a Final Plan. The Board shall issue a
receipt to the applicant upon it's determination that an
application is complete.
COMPREHENSIVE PLAN or POLICY STATEMENT: Any part or element of
overall plan or policy for development of the Town as defined in
Title 30-A, M.R.S.A., Section 4961.
CONTIGUOUS LOTS: Lots which adjoin at any line or point, or are
separated at any point by a body of water.
DEVELOPED AREA: Any area on which a site improvement or change is
made, including buildings, landscaping, parking areas, and
streets.
38
DIRECT DRAINAGE OF A LAKE OR POND: Any land which drains directly
to a lake or pond, or to a tributary of a lake or pond if that
tributary and all its branches drains less than 25 square miles.
DRIVEWAY: A vehicular access-way serving two (2) dwelling units
or less.
DWELLING UNIT: A room or suite of rooms used as a habitation
which is separate from other such rooms or suites of rooms, and
which contains independent living, cooking, sleeping, bathing and
sanitary facilities; includes single family houses, and the units
in a duplex, apartment house, multi-family dwellings, and
residential condominiums.
FINAL PLAN: The final drawings on which the applicant's plan of
subdivision is presented to the Board for approval and which, if
approved, may be recorded at the Registry of Deeds.
FRONTAGE: The linear distance, measured along the front lot line
which separates the lot from a public or private road, but not
including a private driveway providing access to more than one
(1) lot.
FRONTAGE, SHORE: The horizontal distance, measured in a straight
line, between the intersections of the lot lines with the
shoreline at normal high water elevation.
HIGH INTENSITY SOIL SURVEY: A soil survey conducted by a
Certified Soil Scientist, meeting the standards of the Maine
Association of Soil Scientists, which identifies soil types down
to one tenth (1/10) acre or less at a scale equivalent to
subdivision plan submitted. The mapping units shall be the soil
series. Single test pits and their evaluation shall not be
considered to constitute high intensity soil surveys.
LOT: A parcel of land occupied or capable of being occupied by
one (1)building and the accessory buildings or uses customarily
incidental to it, including such open spaces as are required by
ordinances, and having frontage upon a public street, right-of-
way or private way.
100 YEAR FLOOD: The highest level of flood that, on the average,
is likely to occur once every one hundred 100 years (that has a
one percent [1%] chance of occurring in any year).
NORMAL HIGH WATER ELEVATION OF INLAND WATERS: That line on the
shores or banks of non-tidal waters which is apparent because of
the contiguous different character of the soil or the vegetation
due to the prolonged action of the water. Relative to vegetation,
it is that line where the vegetation changes from predominantly
aquatic to predominantly terrestrial (by way of illustration,
aquatic vegetation includes but is not limited to the following
plants and plant groups:
39
Water lily, pond lily, pickerelweed, cattail, wild rice, sedges,
rushes, and marsh grasses; and terrestrial vegetation includes
but is not limited to the following plants and plant groups:
upland grasses, aster, lady slipper, wintergreen, partridge
berry, sarsaparilla, pines, cedars, oaks, ashes, alders, elms,
and maples). In places where the shore or bank is of such
character that the high water mark cannot be easily determined,
(rockslides, ledges, rapidly eroding or slumping banks) the
normal high water elevation shall be estimated from places where
it can be determined by the above method.
NET RESIDENTIAL ACREAGE: The total acreage available for the
subdivision, and shown on the proposed subdivision plan, minus
the area for streets, right-of-ways, or access areas, areas which
are unsuitable for development and areas devoted to common
facilities or utilities.
NET RESIDENTIAL DENSITY: The average number of dwelling units per
net residential acre.
OFFICIAL SUBMITTAL DATE: The date upon which the Board issues a
receipt indicating a complete application has been submitted.
OWNER: Person or persons who have title to property being
considered for subdivision.
PERSON: Includes a firm, association, organization, partnership,
trust, company, or corporation, as well as an individual.
PLANNED UNIT DEVELOPMENT: A development planned and constructed
by single developer for a mix of residential, commercial, and
industrial uses. A PUD is undertaken in a manner that treats the
developed area in it's entirety to promote the best use of land,
including the creation of open space, a reduction in the length
of road and utility systems, and the retention of the natural
characteristics of the land.
PLANNING BOARD: The Planning Board of the Town of Liberty,
pursuant to Title 30, M.R.S.A., 4956.
PRELIMINARY PLAN: The preliminary information and drawings
indicating the proposed layout of the subdivision to be submitted
to the Board for its consideration.
RECORDING PLAN: A copy of the Final Plan which is recorded at the
Registry of Deeds and which need not show information that is not
relevant to the transfer of an interest in the property.
RESUBDIVISION: The division of an existing subdivision or any
change in the plan for an approved subdivision which affects the
lot lines, including land transactions by the applicant not
indicated on the approved plan.
40
STREET: Public and private ways such as alleys, avenues,
boulevards, highways, roads, and other right-of-ways, as well as
areas on subdivision plans designated as right-of-ways.
STREET CLASSIFICATIONS:
ARTERIAL STREET: A major thoroughfare which serves as a
major traffic way for travel between and through the Town.
CONNECTOR STREET: A street servicing at least fifteen (15)
lots or dwelling units, or streets which serve as feeders to
arterial streets, and collectors of traffic from minor
streets.
MINOR STREET: A street servicing fewer than fifteen (15)
lots o dwelling units.
PRIVATE RIGHT OF WAY: A vehicular access way serving more
than two (2) dwelling units.
SUBDIVIDER: An individual, firm, association, syndicate,
partnership, corporation, trust, or any other legal entity, or
agent thereof, that proposes to build a subdivision. The term
"subdivider" includes "applicant" "developer", "builder".
SUBDIVISION: As defined by Title 30-A M.R.S.A, §4401, as amended.
IMPORTANT: SEE APPENDIX A FOR STATE DEFINITION OF A SUBDIVISION.
The Town has elected to count lots of 40 acres or more as lots
for the purposes of Title 30-A M.R.S.A, §4401, 4. Subdivisions,
when the parcel of land being divided is located entirely outside
any shoreland area as defined in Title 38, section 435 or a
municipality's shoreland zoning ordinance. (VOTED AND ACCEPTED
MARCH 25, 2006)
SUBDIVISION, MAJOR: Any subdivision containing more than four (4)
lots or dwelling units.
SUBDIVISION, MINOR: Any subdivision containing not more than four
(4) lots or not more than four (4) building/dwelling units.
SUBMISSIONS: Plans, sketches, overlays, drawings, surveys, etc.
that are submitted to support an application. Unless otherwise
specified by Board 10 copies of each submission are required.
TRACT OR PARCEL OF LAND: All contiguous land in the _ same
ownership, whether or not the tract is separated at any point by:
an intermittent or non-navigable stream, or a private road
established by the abutting land owners.
41
APPENDIX A: STATE DEFINITION OF A SUBDIVISION
Title 30-A M.R.S.A, $4401, as amended
(Note: This definition is valid as of February 8, 2006 and is
provided as a reference only. It is the responsibility of the
Town and the applicant to ensure that they follow the current
definition, as found in state statutes referenced above, or
stricter standards, if elected by the Town in ordinance.)
Subdivision. "Subdivision" means the division of a tract or
parcel of land into 3 or more lots within any 5-year period that
begins on or after September 23, 1971. This definition applies
whether the division is accomplished by sale, lease, development,
buildings or otherwise. The term "subdivision" also includes the
division of a new structure or structures on a tract or parcel of
land into 3 or more dwelling units within a 5-year period, the
construction or placement of 3 or more dwelling units on a single
tract or parcel of land and the division of an existing structure
or structures previously used for commercial or industrial use
into 3 or more dwelling units within a 5-year period.
A. In determining whether a tract or parcel of land is divided
into 3 or more lots, the first dividing of the tract or parcel
is considered to create the first 2 lots and the next dividing
of either of these first 2 lots, by whomever accomplished, is
considered to create a 3rd lot, unless:
(1) Both dividings are accomplished by a subdivider who has
retained one of the lots for the subdivider's own use as a
single-family residence that has been the _ subdivider's
principal residence for a period of at least 5 years
immediately preceding the 2nd division; or
(2) The division of the tract or parcel is otherwise exempt
under this subchapter. [2001, c. 359, §1 (amd).]
B. The dividing of a tract or parcel of land and the lot or
lots so made, which dividing or lots when made are not subject
to this subchapter, do not become subject to this subchapter
by the subsequent dividing of that tract or parcel of land or
any portion of that tract or parcel. The municipal reviewing
authority shall consider the existence of the previously
created lot or lots in reviewing a proposed subdivision
created by a subsequent dividing. [1989, c. 104, Pt. A, §45
and Pt. C, §10 (new).]
C. A lot of 40 or more acres must be counted as a lot, except:
42
(2) When a municipality has, by ordinance, or the municipal
reviewing authority has, by regulation, elected not to count
lots of 40 or more acres as lots for the purposes of this
subchapter when the parcel of land being divided is located
entirely outside any shoreland area as defined in Title 38,
section 435 or a municipality's shoreland zoning ordinance.
(2001, c. 651, §1 (amd).]
D. [2001, c. 359, §2 (rp).]
D-1. A division accomplished by devise does not create a lot
or lots for the purposes of this definition, unless the
intent of the transferor is to avoid the objectives of this
subchapter. [2001, c. 359, §3 (new).]
D-2. A division accomplished by condemnation does not create
a lot or lots for the purposes of this definition, unless
the intent of the transferor is to avoid the objectives of
this subchapter. [2001, c. 359, §3 (new).]
D-3. A division accomplished by order of court does not
create a lot or lots for the purposes of this definition,
unless the intent of the transferor is to avoid the
objectives of this subchapter. [2001, c. 359, §3 (new) .]
D-4. A division accomplished by gift to a person related to
the donor of an interest in property held by the donor for a
continuous period of 5 years prior to the division by gift
does not create a lot or lots for the purposes of this
definition, unless the intent of the transferor is to avoid
the objectives of this subchapter. If the real estate exempt
under this paragraph is transferred within 5 years to
another person not related to the donor of the exempt real
estate as provided in this paragraph, then the previously
exempt division creates a lot or lots for the purposes of
this subsection. "Person related to the donor" means a
Spouse, parent, grandparent, brother, sister, child or
grandchild related by blood, marriage or adoption. A gift
under this paragraph can not be given for consideration that
is more than 1/2 the assessed value of the real estate.
(2001, c. 359, §3 (new).]
D-5. A division accomplished by a gift to a municipality if
that municipality accepts the gift does not create a lot or
43
lots for the purposes of this definition, unless the intent
of the transferor is to avoid the objectives of this
subchapter. {2001, c. 359, $3 (new).]
D-6. A division accomplished by the transfer of any interest
in land to the owners of land abutting that land that does
not create a separate lot does not create a lot or lots for
the purposes of this definition, unless the intent of the
transferor is to avoid the objectives of this subchapter. If
the real estate exempt under this paragraph is transferred
within 5 years to another person without all of the merged
land, then the previously exempt division creates a lot or
lots for the purposes of this subsection. [2001, c. 359, §3
(new) .]
E. The division of a tract or parcel of land into 3 or more
lots and upon each of which lots permanent dwelling structures
legally existed before September 23, 1971 is not a
subdivision. [1989, c. 104, Pt. A, §45 and Pt. C, §10 (new).]
F. In determining the number of dwelling units in a structure,
the provisions of this subsection regarding the determination
of the number of lots apply, including exemptions from the
definition of a subdivision of land. (1989, c. 104, Pt. A,
§45 and Pt. C, §10 (new) .]}
G. Notwithstanding the provisions of this subsection, leased
dwelling units are not subject to subdivision review if the
municipal reviewing authority has determined that the units
are otherwise subject to municipal review at least as
stringent as that required under this subchapter. (1989, c.
104, Pt. A, §45 and Pt. C, §10 (new); c. 497, §2 (amd) .]
H. [2001, c. 651, §2 (rp).]
H-1. This subchapter may not be construed to prevent a
municipality from enacting an ordinance under its home rule
authority that:
(1) Expands the definition of "subdivision" to include
the division of a structure for commercial or industrial
use; or
(2) Otherwise regulates land use activities.
44
A municipality may not enact an ordinance that expands the
definition of "subdivision" except as provided in this
subchapter. A municipality that has a definition of
"subdivision" that conflicts with the requirements of this
subsection at the time this paragraph takes effect shall
comply with this subsection no later than January 1, 2006.
Such a municipality must file its conflicting definition at
the county registry of deeds by June 30, 2003 for the
definition to remain valid for the grace period ending January
1, 2006. A filing required under this paragraph must be
collected and indexed in a separate book in the registry of
deeds for the county in which the municipality is located.
(2001, c. 651, §3 (new).]
I. The grant of a bona fide security interest in an entire lot
that has been exempted from the definition of subdivision
under paragraphs D-1 to D-6, or subsequent transfer of that
entire lot by the original holder of the security interest or
that person's successor in interest, does not create a lot for
the purposes of this definition, unless the intent of the
transferor is to avoid the objectives of this subchapter.
(2001, c. 359, §5 (amd).]
[2001, c. 651, §§1-3 (amd).]
45
BOARD OF SELECTMEN SES ae \
7 Water Street oe aa
PO Box 116 Melinda Steeves, 1 Selectman, Assessor L | Macag ir
Liberty, Maine 04949 Danny McGovern, 2" Selectman, Assessor eoe/
ee een Duane Jewett, 34 Selectman, Assessor \ NGS"
Fax. 207 589-3160
To Nicole Gates, Deputy Town Clerk of the Town of Liberty: we hereby certify to you
that the document to which we have affixed this certificate is a true copy of the official text of
an ordinance entitled "Subdivision Ordinance Town of Liberty, Maine," Which was approved by
voters on April 6, 2024.
Pursuant to 30-A M.R.S.A. §3002(2), you will retain this copy of the complete text of the
ordinance as a public record and make other copies available for distribution to the voters, and
you will ensure that copies are available at the town meeting on the day of the vote.
Dated: October 1, 2024
Melinda Steeves, 4s Selectman
Danny McGovern, Second Selectman
wale
Duane Jewett/Third Selectman
ATTEST: A true copy of an ordinance entitled "Subdivision Ordinance Town of Liberty, Maine,"
as certified to me by the municipal officers of the Town of Liberty on the ist day of October
2024.
7]: Gates, Deputy Town Clerk