SUBDIVISION ORDINANCE
TOWN OF LIMINGTON
Adopted by the Limington Planning Board
May 25, 1972
Voted by Town of Limington
March 1973
Amended by Town of Limington
March 5, 2010
Amended by Town of Limington
November 6, 2018
Amended November 5, 2019
Amended March 1, 2022
Attest: ___________________________
Table of Contents
Article 1.
Purpose and Statutory Review Criteria
6
1.01 Purpose
6
1.02 Statutory Review
6
Article 2.
Authority and Administration
10
2.01 Authority
10
2.02 Administration
10
2.03 Amendments
10
Article 3.
Definitions
12
Article 4.
Administrative Procedure
15
Article 5.
Waivers
16
5.01 Waivers Authorized
16
5.02 Waivers of Certain Improvements Authorized
16
5.03 No Waiver of Zoning Ordinance Requirements
16
5.04 Imposition of Conditions
16
5.05 Waivers are to be shown on Final Plan
16
Article 6.
Sketch Plan and Site Inspection
17
6.01 Purpose
17
6.02 Procedure
17
6.03 Submissions
17
6.04 Contour Interval and On-site Inspection
18
Table of Contents
6.05 Rights not Vested
18
6.06 Establishment of File
18
Article 7.
Review and Approval of Minor Subdivisions
19
7.01 General
19
7.02 Procedure
19
7.03 Submissions
20
7.04 Public Hearing
21
Article 8.
Preliminary Plan for a Major Subdivision
23
8.01 General
23
8.02 Procedure
23
8.03 Submissions
25
Article 9.
Final Plan for a Major Subdivision
28
9.01 Procedure
28
9.02 Submissions
29
9.03 Bond
32
Article 10.
Performance and Design Standards
33
10.01 Pollution
33
10.02 Sufficient Water
33
10.03 Impact on Existing Water Supply
37
Table of Contents
10.04 Soil Erosion
38
10.05 General Requirements for Traffic Control
38
10.06 Sewage Disposal
41
10.07 Impact on Municipality's Ability to Dispose of Solid Waste
42
10.08 Impact on Historic Sites, Wildlife Habitat,
Public Access to the Shoreline
42
10.09 Conformance with Zoning Ordinance and
Other Land Use Ordinances
42
10.10 Impact on Ground water Quality or Quantity
42
10.11 Impact on Water Quality of Shoreline
44
10.12 Identification of Freshwater Wetlands, Rivers, Streams or Brooks
44
10.13 Storm Water Management
44
10.14 Reservation or Dedication and Maintenance of Open Space and
Common Land, Facilities and Services
46
10.15 Phosphorus Impacts on Great Ponds
47
10.16 Street Designs and Construction Standards
47
Design Standards Table according to Street Classification
50
10.17 Lots
54
10.18 Utilities
55
10.19 Monuments
55
10.20 Cluster Developments
56
10.21 Multi-Family Development
59
Table of Contents
10.22 Floodplain Management
62
Article 11.
Revisions to Approved Subdivision Plans
63
11.01 Procedure
63
11.02 Submission
63
11.03 Scope of Review
63
Article 12.
Performance Guarantees
64
12.01 Type of Guarantees
64
12.02 Contents of Guarantee
64
12.03 Escrow Account
64
12.04 Performance Bond
65
12.05 Letter of Credit
65
12.06 Phasing of Development
65
12.08 Release of Guarantee
65
12.09 Improvements Guarantee
65
Article 13.
Inspections and Enforcement
67
13.01 Inspection of Required Improvements
67
13.02 Violations and Enforcement
68
Article 14.
Appeals
69
Article 15.
Separability and Effective Date
70
6
ARTICLE 1. PURPOSES AND STATUTORY REVIW CRITERIA
1.01
Purposes
The purposes of this Ordinance are:
A. To provide for an expeditious and efficient process for the review of proposed
subdivisions;
B. To clarify the approval criteria of the State Subdivision Law, found in 30A, M.R.S.A.,
4404;
C. To assure new development in the Town of Limington works to meet the objectives
of the Limington Comprehensive Plan;
D. To assure the comfort, convenience, safety, health and welfare of the people of the
Town of Limington;
E. To protect the environment and conserve the natural and cultural resources identified
in the Limington Comprehensive Plan as important to the community;
F. To assure that a minimal level of services and facilities are available to the residents
of new subdivisions and that lots in subdivisions are capable of supporting the
proposed uses and structures;
G. To minimize the potential impacts from new subdivisions on neighboring properties
and on the municipality;
H. To promote the development of an economically sound and stable community; and
I. To encourage cluster developments and multi-family housing to allow for flexibility
in the design of housing developments to allow for the creation of open space. It is
recommended that all residential subdivision development proposals encompassing
ten (10) or more acres of existing open fields or pasture shall be laid out according to
the "cluster" standards;
1.02
Statutory Review
When reviewing any application for a subdivision, the Planning Board shall consider the
following criteria and, before granting final approval, shall make findings of fact that the
proposed subdivision will meet the following criteria as found in 30-A A.M.R.S.A., 4404,
as well as all applicable provisions of the Zoning Ordinance and this Ordinance:
A. Pollution. Will not result in undue water or air pollution. In making this
determination, the Planning Board shall at least consider:
7
A.1. The elevation of the land above sea level and its relation to the flood plains;
A.2. The nature of soils and subsoils and their ability to adequately support waste
disposal;
A.3. The slope of the land and its effect on effluents;
A.4. The vulnerability of streams for disposal of effluents; and
A.5. The applicable State and local health and water resources rules and regulations.
B. Sufficient Water. Has sufficient water available for the reasonably foreseeable
needs of the subdivision.
C. Municipal Water Supply. Will not cause an unreasonable burden on an existing
water supply, if one is to be used.
D. Erosion. Will not cause unreasonable soil erosion or reduction in the land's capacity
to hold water so that a dangerous or unhealthy condition results.
E. Traffic. Will not cause unreasonable highway or public road congestion or unsafe
conditions with respect to the use of the highways or public roads existing or
proposed and, if the proposed subdivision requires driveways or entrances onto a state
or state aid highway, located outside the urban compact area of an urban compact
municipality, the Department of Transportation has provided documentation indicting
that the driveways or entrances conform to Title 23, Section 704 and any rules
adopted under that section.
F. Sewage Disposal. Will provide for adequate sewage disposal and will not cause an
unreasonable burden on municipal services if they are utilized.
G. Municipal Solid Waste Disposal. Will not cause an unreasonable burden on the
municipality's ability to dispose of solid waste if municipal services are to be used.
H. Aesthetic, Cultural and Natural Values. Will not have an undue adverse effect on
the scenic or natural beauty of the area, aesthetics, historic sites, significant wildlife
habitat identified by the State Department of Inland Fisheries and Wildlife, or rare
and irreplaceable natural areas or any public rights for physical or visual access to the
shoreline.
I. Conformity with Local Ordinances and Plans. Is in conformance with a duly
adopted subdivision ordinance, comprehensive plan, development plan or land use
plan, if any. In making this determination, the municipal reviewing authority may
interpret these ordinances and plans.
8
J. Financial and Technical Capacity. The developer has adequate financial and
technical capacity to meet the standards of this section.
K. Surface Waters. Whenever situated entirely or partially within the watershed of any
pond or lake or within 250 feet of any wetland, great pond or river as defined in 38
M.R.S.A., 435 through 490, will not adversely affect the quality of such body of
water or unreasonably affect the shoreline of such body of water.
1. When lots in a subdivision have frontage on an outstanding river segment, the
proposed subdivision plan must require principle structures to have a combined
lot shore frontage and setback from the normal high water mark of 500 feet.
a. To avoid circumventing the intent of this provision, whenever a proposed
subdivision adjoins a shoreland strip narrower than 250 feet which is not
plotted, the proposed subdivision shall be reviewed as if lot lines extended to
the shore.
b. The frontage and setback provisions of this paragraph do not apply either
within areas zoned as general development or its equivalent under Shoreland
Zoning, Title 38, Chapter 3, Subchapter I, Article 2-B, or within areas
designated by ordinance as densely developed. The determination of which
areas are densely developed must be based on a finding that existing
development met the definitional requirements of Section 4401, Subsection 1,
on September 23, 1983.
L. Ground Water. Will not, alone or in conjunction with existing activities, adversely
affect the quality or quantity of ground water.
M. Flood Areas. Based on the Federal Emergency Management Agency's Flood
Boundary and Floodway Maps and Flood Insurance Rate Maps, and information
presented by the applicant whether the subdivision is in a flood prone area. If the
subdivision, or any part of it, is in such an area, the applicant shall determine the 100
year flood elevation and flood hazard boundaries within the subdivision. The
proposed subdivision or project plan must include a condition of plan approval
requiring that principal structures in the subdivision will be constructed with their
lowest floor, including the basement, at least one (1) foot above the 100 year flood
elevation.
N. Freshwater Wetlands. All freshwater wetlands within the proposed subdivision
have been identified on any maps submitted as part of the application, regardless of
the size of these wetlands. Any mapping of freshwater wetlands may be done with
the help of the local soil and water conservation district.
O. Rivers, Streams or Brooks. Any river, stream or brook within or abutting the
proposed subdivision has been identified on any maps submitted as part of the
9
application. For purposes of this section, "river, stream or brook" has the same
meaning as in 38 M.R.S.A., 480-B(9).
P. Storm Water. The proposed subdivision will provide for adequate storm water
management.
Q. Spaghetti Lots Prohibited. If any lots in the proposed subdivision have shore
frontage on a river, stream or brook, great pond or coastal wetland as these features
are defined in 38 M.R.S.A., 480-B, none of the lots created within the subdivision
have a lot depth to shore frontage ratio greater than 5 to 1.
R. Lake Phosphorous Concentration. The long term cumulative effects of the
proposed subdivision will not unreasonably increase a great pond's phosphorus
concentration during the construction phase and life of the proposed subdivision.
S. Impact on Adjoining Municipalities. For any proposed subdivision that crosses
municipal boundaries, the proposed subdivision will not cause unreasonable traffic
congestion or unsafe condition with respect to the use of existing public ways in an
adjoining municipality in which part of the subdivision is located; and
T. Lands Subject to Liquidation Harvesting. Timber on the parcel being subdivided
has not been harvested in violation of rules adopted pursuant to 12 M.R.S.A.,
8869(14). If a violation of rules adopted by the Maine Forest Service to substantially
eliminate liquidation harvesting has occurred, the Planning Board must determine,
prior to granting approval for the subdivision, that five (5) years have elapsed from
the date the landowner under whose ownership the harvest occurred acquired the
parcel. The Planning Board may request technical assistance from the Department of
Conservation, Bureau of Forestry to determine whether a rule violation has occurred,
or the Board may accept a determination certified by a forester licensed pursuant Title
32, Chapter 76. If the Bureau agrees to provide assistance, it shall make a finding and
determination as to whether a rule violation has occurred. If the Bureau notifies the
Planning Board that it will not provide assistance, the Board may require a
subdivision applicant to provide a determination certified by a licensed forester. For
the purposes of this subsection, "liquidation harvesting" has the same meaning as in
12 M.R.S.A., 8868(6) and "parcel" means a contiguous area within one municipality,
township or plantation owned by one person or a group of persons in common or joint
ownership.
10
ARTICLE 2. AUTHORITY AND ADMINISTRATION
2.01. Authority
A. These standards have been prepared in accordance with the provisions of
30-A M.R.S.A., 4403.
B. These standards shall be known and be cited as "Subdivision Ordinance of the
Town of Limington, Maine".
2.02. Administration
A. The Planning Board of the Town of Limington hereinafter called the Board,
shall administer this Ordinance.
B. The provisions of this Ordinance shall pertain to all land and buildings
proposed for subdivisions within the boundaries of the Town of Limington.
2.03. Amendments
A. Initiation.
A proposal for an amendment to this Ordinance may be initiated by:
A.1. The Planning Board, by majority vote of the Board;
A.2. The Municipal Officers of the Town of Limington through a request to
the Planning Board;
A.3. A written petition of a number of voters equal to at least ten percent
(10%) of the number of votes cast in Limington in the last gubernatorial
election.
B. Procedure.
B.1. Any proposal for an amendment shall be made to the Planning Board in
writing stating the specific changes requested.
B.2. Within thirty (30) days of receiving an amendment proposal the
Planning Board shall hold a public hearing on the proposed amendment.
Unless the amendment has been submitted by the Municipal Officers or
by a petition, the Board shall vote whether to forward the amendment to
the Legislative body. The Board shall make a written recommendation
regarding the passage to the Municipal Officers and the Legislative body
prior to any action on the amendment.
11
B.3. The Municipal Officers shall hold a public hearing on the proposed
amendment at least ten (10) days prior to the day of voting. Notice of
the hearing shall be posted and advertised in a newspaper of general
circulation in the Municipality at least seven (7) days prior to the public
hearing. The notice shall contain the time, date and place of hearing,
and sufficient detail about the proposed changes as to give adequate
notice of their content. If the proposed changes are extensive, a brief
summary of the changes, together with an indication that a full text is
available at the Town Clerk's office shall be adequate notice.
B.4. Any amendment initiated by citizen's petition shall be governed by the
applicable provisions of 30-A M.R.S.A., 2522 and 2528(5).
C. Adoption.
C.1. Any amendments to this Ordinance shall be adopted by the Legislative
body of the Town of Limington by referendum ballot.
12
ARTICLE 3. DEFINITIONS
In general, words and terms used in this Ordinance shall have their customary dictionary
meanings. More specifically, any word or term defined in the Limington Zoning
Ordinance shall have the definition contained in that Ordinance, unless defined
differently below. Other words and terms used herein are defined as follows:
Affordable Housing: A safe and sanitary dwelling, apartment or other living
accommodation for a household whose income does not exceed 80% of the median
income for the area as defined by the United States Department of Housing and
Urban Development under the U.S. Housing Act of 1937, Public Law 412, 50 Stat.
888, Section 8, as amended.
Capital Improvement Program (CIP): The Municipality's proposed schedule of future
projects listed in order of construction priority together with cost estimates and the
anticipated means of financing each project.
Capital Investment Plan: The portion of the Comprehensive Plan that identifies the
projects by consideration for inclusion within the capital improvements program,
together with an estimate of the order of magnitude for the cost of each project.
Cluster Subdivision: A form of development that allows a subdivision design in which
individual lot sizes and setbacks are reduced in exchange for the creation of common
open space and recreation areas, the preservation of environmentally sensitive areas,
agriculture and silviculture and the reduction in the size of road and utility systems.
Common Open Space: Land within or related to a subdivision, not individually owned
or within an individual lot, which is designed and intended for the common use or
enjoyment of the residents of the development or the general public. It may include
complementary structures and improvements, typically used for maintenance and
operation of the open space, such as for outdoor recreation.
Comprehensive Plan: A document or interrelated documents containing the elements
established under 30-A M.R.S.A., 4326(1) to (4), including the strategies for an
implementation program which are consistent with the goals and guidelines
established under 30-A M.R.S.A., Chapter 187, Subchapter 2.
Conservation Easement: A non-possessory interest in real property imposing
limitations or affirmative obligations, the purposes of which include retaining or
protecting natural, scenic or open space values of real property; assuring its
availability for agricultural, forest, recreational or open space use; protecting natural
resources; or maintaining air or water quality.
Direct Watershed or a Great Pond: That portion of the watershed which drains
directly to the great pond without first passing through an upstream great pond. For
the purposes of this Ordinance, the watershed boundaries, as depicted in the drainage
13
divide data layer provided by the Maine Office of GIS. Due to the scale of the map
there may be small inaccuracies in the delineation of the watershed boundary. Where
there is a dispute as to exact location of a watershed boundary, the Board or its
designee, and the applicant shall conduct an on-site investigation to determine where
the drainage divide lies. If the Board and the applicant cannot agree on the location
of the drainage divide based on the on-site investigation, the burden of proof shall lie
with the applicant to provide the Board with information from a professional land
surveyor showing where the drainage divide lies.
Driveway. A vehicular access serving one or two private lots.
Easement: An interest in land owned by another that entitles its holder to a specific,
limited use or enjoyment.
Engineer: A professional engineer licensed by the State of Maine.
Final Plan: The final drawing on which the applicant's plan of subdivision is presented
to the Board for approval and which, if approved, may be recorded at the Registry of
Deeds.
Legislative Body: Town Meeting
Multi-family Development: A lot which contains one or more multi-family dwellings,
two or more duplexes, three or more single family dwellings, or any combination of
buildings containing three or more dwelling units or land in common ownership, such
as apartment buildings, condominiums, or mobile home parks.
Municipality: Town of Limington.
Official Maps: All maps adopted by the Town of Limington.
Person: Includes a firm, association, organization, partnership, trust, company or
corporation, as well as an individual.
Planning Board: The Planning Board of the Town of Limington.
Preliminary Plan: The preliminary drawings indicating the proposed layout of the
subdivision to be submitted to the Planning Board for its consideration.
Private Roads: Private roads may be designated for use in building lot(s) serving one (1)
or two (2) homes and shall follow the standards stipulated in the Street Design
Standards chart in the Zoning Ordinance.
Recording Plan: An original of the Final Plan, suitable for recording at the Registry of
Deeds.
14
Reserve Strip: A narrow strip of land between an existing or proposed street and other
property which can be used to limit access to the street by others.
Reserved Affordable Housing: Affordable housing which is restricted by means of
deed covenants, financing restrictions, or other binding long term methods to
occupancy by households making eighty percent (80%) or less of the area median
household income.
Revision: Any change in a previously approved subdivision.
Sketch Plan: Conceptual maps, renderings, and supportive data describing the project
proposed by the applicant for initial review prior to submitting an application for
subdivision approval.
Street: Public and private ways such as alleys, avenues, highways, roads, and other
rights-of-way, as well as areas on subdivision plans designated as rights-of-way for
vehicular access. Driveways, as defined, are excluded.
Subdivision: The term shall be defined as in 30-A M.R.S.A., 4401(4), as amended.
Subdivision, Major: Any subdivision containing four (4) or more lots or dwelling units,
or any subdivision requiring any new public street extension, or the extension of
municipal facilities.
Subdivision, Minor: Any subdivision containing three (3) lots or dwelling units.
Tract or Parcel of Land: All contiguous land in the same ownership, provided that
lands located on opposite sides of a public or private street shall be considered each a
separate tract or parcel of land unless such street was established by the owner of land
on both sides of the street after September 22, 1971.
Useable Open Space: That portion of the common open space which, due to its slope,
drainage characteristics and soil conditions can be used for active recreation,
horticulture or agriculture.
Waiver: A waiver or modification of the requirements of this Ordinance, granted by the
Planning Board. Such waiver or modification must meet the criteria as stated in
Article 5 of this Subdivision Ordinance.
Wet Pond: Acts as a settling basin to remove sediment from the run-off and to
assimilate suspended phosphorus prior to the run-off leaving the property. They must
be dredged periodically to remove phosphorus bearing sediment and maintain their
design capacity.
15
ARTRICLE 4. ADMINISTRATIVE PROCEDURE
In order to establish an orderly, equitable and expeditious procedure for reviewing
subdivisions and to avoid unnecessary delays in processing applications for subdivision
review:
A. Applicants shall request to be placed on the Board's agenda two (2) weeks in advance
of a regularly scheduled meeting by contacting the Code Enforcement Officer.
B. Applicants who attend a meeting but who are not on the Board's agenda may be
heard only after all agenda items have been completed, and then only if a majority of
the Board so votes.
C. The Board shall take no action on any application not appearing on the Board's
written agenda.
D. If at any point during or after its review of an application for subdivision approval,
the Board determines that it requires the assistance of independent technical or legal
consultants to provide information relevant to its determination of whether the
application meets any of the criteria set forth in this Ordinance, or, whether any
approved subdivision complies with the terms or conditions of approval, the Board
may retain the services of said consultants. Any and all costs and expenses associated
with these services will be borne exclusively by the applicant.
16
ATRICLE 5. WAIVERS
5.01. Waivers Authorized.
Where the Board makes written findings of fact that there are special circumstances of a
particular parcel proposed to be subdivided, or that the application is simple and minor in
nature, it may waive portions of the submission requirements, unless prohibited by this
Ordinance or Maine law, provided that the applicant has demonstrated that the
performance and design standard of this Ordinance and the criteria of the subdivision
statue have been or will be met, the public health, safety, and welfare are protected, and
provided the waivers do not have the effect of nullifying the intent and purpose of the
Zoning Ordinance or this Ordinance.
5.02. Waivers of Certain Improvements Authorized.
Where the Board makes written findings of fact that due to special circumstances of a
particular lot proposed to be subdivided, the provision of certain required improvements
is not requisite to provide for the public health, safety or welfare, or are inappropriate
because of inadequate or lacking connecting facilities adjacent to or in proximity of the
proposed subdivision, it may waive the requirement for such improvements, subject to
appropriate conditions, provided the waivers do not have the effect of nullifying the
intent and purpose of the Zoning Ordinance or this Ordinance, and further provided that
the performance criteria of this Ordinance and the criteria of the subdivision statute have
been or will be met by the proposed subdivision.
5.03. No Waiver of Zoning Ordinance Requirements.
The Planning Board does not have the authority to grant waivers from the standards set
forth in the Zoning Ordinance, except as specifically set forth in this Ordinance and the
Zoning Ordinance.
5.04. Imposition of Conditions.
In granting waivers, the Planning Board shall require such conditions as will, in its
judgment, secure the objectives of the requirements so waived.
5.05. Waivers are to be shown on Final Plan.
When the Board grants a waiver of any improvements required by this Ordinance, the
final plan to be recorded at the Registry of Deeds shall indicate the waivers granted and
the date on which they were granted.
17
ARTICLE 6. SKETCH PLAN AND SITE INSPECTION
6.01. Purpose.
The purpose of the Sketch Plan meeting and on-site inspection is for the applicant
to present general information regarding the proposed subdivision to the Board
and receive the Board's comments prior to the expenditure of substantial sums of
money on surveying, soils identification, and engineering by the applicant.
6.02. Procedure.
A. The applicant shall present the Sketch Plan and make a verbal presentation
regarding the site and the proposed subdivision.
B. Following the applicant's presentation, the Board may ask questions and make
suggestions to be incorporated by the applicant into the application.
C. The date of the on-site inspection is selected.
D. The Board will make a determination as to whether the proposed subdivision
is a minor or a major subdivision and shall also determine, where appropriate,
whether the proposed subdivision will be classified as a cluster subdivision.
E. All applications for subdivision plan approval shall be accompanied by a non-
refundable application fee, payable by check to the municipality. See
application form for fee.
6.03. Submissions.
Eight (8) copies of the Sketch Plan and all supporting materials must be submitted
two (2) weeks prior to a regularly scheduled Planning Board meeting in order to
be placed on the agenda. The Sketch Plan shall show in simple sketch form the
proposed layout of streets, lots, buildings and other features in relation to existing
conditions. The Sketch Plan should be supplemented with general information to
describe or outline the existing conditions of the site and the proposed
development. It will be most helpful to both the applicant and the Board for site
conditions such as steep slopes, wet areas and vegetative cover to be identified in
a general manner. It is recommended that the Sketch Plan be superimposed on or
accompanied by a copy of the Assessor's map(s) on which the land is located.
The Sketch Plan shall be accompanied by:
A. A copy of a portion of the U.S.G.S. topographic map of the area showing the
outline of the proposed subdivision unless the proposed subdivision is less
than ten (10) acres in size.
18
B. A copy of that portion of the county soil survey covering the proposed
subdivision, showing the outline of the proposed subdivision.
C. A brief written narrative describing the project.
6.04. Contour Interval and On-site Inspection.
Within thirty (30) days of the Sketch Plan meeting the Board may hold an on-site
inspection of the property and inform the applicant in writing of the required
contour interval on the Preliminary Plan, or Final Plan in the case of a Minor
Subdivision. The applicant shall place "flagging" at the centerline of any
proposed streets, and at the approximate intersections of the street centerlines and
lot corners, prior to the on-site inspection. A site walk is expected for all
subdivisions but the Planning Board reserves the right to waive this requirement.
The Board may choose not to conduct on-site inspections when there is inclement
weather or snow on the ground. On-site inspections shall be noticed as required
by 1 M.R.S.A., 401-410, and the public shall be allowed to accompany the Board.
6.05. Rights Not Vested.
The Sketch Plan meeting, the submittal or review of the Sketch Plan or the on-site
inspection shall not be considered the initiation of the review process for the
purposes of bringing the plan under the protection of 1 M.R.S.A., 302.
6.06. Establishment of File.
Following the Sketch Plan meeting the Board shall establish a file for the
proposed subdivision. All correspondence and submissions regarding the Sketch
Plan application meeting and application shall be maintained in the file.
19
ARTICLE 7. REVIEW AND APPROVAL OF MINOR SUBDIVISIONS
7.01. General
In addition to the following requirements for Minor Subdivisions, the Planning Board
may require where it deems it necessary for the protection of public health, safety and
welfare, and to meet the standards of Article 10, that a Minor Subdivision comply with
all or any of the requirements specified for a Major Subdivision.
7.02. Procedure
A. Within six (6) months after the on-site inspection by the Board, the applicant
shall submit a Final Plan for approval.
B. The Final Plan shall be submitted by mail to the Code Enforcement Officer at
least ten (10) days prior to a scheduled meeting of the Board. Failure to
submit the Final Plan within six (6) months shall require re-submission of the
Sketch Plan to the Board.
C. The Final Plan shall conform to the layout shown on the Sketch Plan plus any
recommendations made by the Planning Board.
D. The subdivider, or his/her duly authorized representative, shall attend all
meetings of the Planning Board to discuss the Final Plan, otherwise, the Board
shall reschedule review of the subdivider's application to its next regularly
scheduled meeting.
E. Within ten (10) business days of the receipt of the Final Plan application, the
Board, or its designee, shall:
E.1. Issue a dated receipt to the applicant;
E.2. Notify in writing by First Class Mail all owners of abutting property that
an application for subdivision approval has been submitted, specifying
the location of the proposed subdivision and including a general
description of the project.
E.3. Notify the clerk and the review authority of the neighboring
municipalities if any portion of the subdivision abuts or crosses the
municipal boundary.
F. Within thirty (30) days after the Planning Board has reviewed the application,
the Board shall notify the applicant in writing either that the application is
complete or, if the application is incomplete, the specific additional material
needed to complete the application. All submissions shall be signed and
sealed by the appropriate Maine State licensed professional.
20
G. Prior to submittal of the Final Plan, the following approvals shall be obtained
in writing, where applicable:
G.1. Maine Department of Environmental Protection, under the Site Location
of Development Act.
G.2. Maine Department of Environmental Protection, under the Natural
Resources Protection Act if a storm water management permit or a waste
water discharge license is needed.
G.3. Maine Department of Human Services, if an engineered subsurface
waste water disposal system(s) is to be utilized.
G.4. U.S. Army Corps of Engineers, if a permit under Section 404 of the
Clean Water Act is required.
G.5. Any other required state or federal permit or approval.
7.03. Submissions
A. The applicant shall submit eight (8) copies of the application and any
accompanying documents. The Final Plan shall be on 24 x 36 inch size sheets
drawn to a scale of not more than one hundred (100) feet to the inch with
reserved space for endorsement by the Planning Board members. This plan
shall include all the conditions voted by the Planning Board as described in
the Notice of Decision.
B. All applications for approval of minor subdivisions shall be accompanied by a
non-refundable application fee, payable by check to the municipality. See
application form for fees.
C. The application for approval of the Final Plan for a Minor Subdivision shall
include all the information presented on the Sketch Plan plus the following:
C.1. Verification of right, title or interest in the property by deed, purchase
and sales agreement, option to purchase, or some other proof of interest.
C.2. A copy of such covenants or deed restrictions as are intended to cover all
or part of the tract.
C.3. A field survey of the boundary lines of the tract, giving complete
descriptive data by bearings and distance, made and certified by a
licensed land surveyor. The corners of the tract shall be located on the
ground and marked by iron pins, stone or precast monumentation, and
21
shall be referenced as shown on the Plan. The entire parcel or tract shall
be shown, including all contiguous land in common ownership within
the last five (5) years, as required by Title 30-A M.R.S.A. 4401.
C.4. A soils report identifying the soils boundaries and names in the proposed
development with the soils information superimposed upon the plot plan
in accord with U.S.D.A. Soil Conservation Service National Cooperative
Soil Classification. The intensity of this study must identify changes in
soil conditions down to one eighth of an acre.
C.5. A lot by lot soils suitability determination for house building with septic
sewerage disposal will be made in accord with the State of Maine
Subsurface Wastewater Disposal Rules and will accompany the plot plan
soils study.
C.6. The proposed name of the subdivision and the name of the municipality
in which it is located.
C.7. The date, north point, graphic map scale, name and address of record
owner, subdivider, individual or company who prepared the plan, and
names of adjoining property owners shall be shown on the plan.
C.8. A soil erosion and sediment control plan designed to comply with the
DEP best management practices.
C.9. A list of all abutters to the proposed subdivision.
C.10. The Planning Board may require any additional information not listed
above when it is determined necessary by the Board to determine
whether the statutory review criteria of 30-A M.R.S.A., 4404 have
been met.
7.04. Public Hearing
The Planning Board shall hold a public hearing within thirty (30) days of
determining that it has received a completed Final Plan.
A. Notice of the public hearing containing the date, time and place of said
hearing shall be mailed to the applicant and to all abutters.
B. Notice of the hearings must be posted and published twelve (12) days prior to
the date of the scheduled hearing. One such notice must be posted at the
municipal building.
22
C. Notice shall also be published at least two (2) times in a newspaper(s) having
general circulation in the Town, once at least twelve (12) days before the
hearing.
D. The date of the second publication must be at least seven (7) days before the
hearing.
E. The Planning Board shall, within thirty (30) days of the public hearing, or
within any other time limit otherwise mutually agreed to:
E.1. Issue a decision granting approval of the proposed subdivision with all
waivers granted, and applicable terms and conditions; or
E.2. Issue a decision denying the proposed subdivision.
E.3. In issuing its decision, the Planning Board shall make findings of fact
establishing that the proposed subdivision does/does not meet the criteria
established herein.
The Final Plan shall include one (1) reproducible, stable based transparency and three (3)
paper copies to be filed at the Town Office. Space shall be reserved thereon for
endorsement by the Planning Board. This plan shall include all the conditions voted by
the Planning Board as described in the Notice of Decision.
23
ARTICLE 8. PRELIMINARY PLAN FOR A MAJOR SUBDIVISION
8.01. General
The standards stated in Article 10 are applicable for the approval of a Major
Subdivision.
8.02. Procedure
A. Within six (6) months after classification of the Sketch Plan as a Major
Subdivision, the applicant shall submit an application for the consideration of
a Preliminary Plan. Failure to do so shall require re-submission of the Sketch
Plan to the Planning Board for reclassification.
B. Applications shall be submitted to the Code Enforcement Officer at the
municipal office at least ten (10) days prior to a scheduled meeting of the
Board. Failure to submit the application within six (6) months shall require
re-submission of the Sketch Plan to the Board.
C. The Preliminary Plan shall conform to the layout shown on the Sketch Plan
plus any recommendations made by the Planning Board.
D. A non-refundable fee for major subdivisions shall be remitted at the time of
submission of the Preliminary Plan, payable by check to the municipality. See
application form for fees.
E. The subdivider, or his/her duly authorized representative, shall attend all
meetings of the Planning Board to discuss the Preliminary Plan; otherwise the
Board shall reschedule review of the subdivider's application to its next
regularly scheduled meeting.
F. Within ten (10) days of the receipt of the Preliminary Plan application, the
Board, or its designee, shall:
F.1. Issue a dated receipt to the applicant and,
F.2. Notify in writing by First Class Mail all owners of abutting property that
an application for subdivision approval has been submitted, specifying
the location of the proposed subdivision and including a general
description of the project.
F.3. Notify the clerk and the review authority of the neighboring
municipalities if any portion of the subdivision abuts or crosses the
municipal boundary.
24
G. Within thirty (30) days after the Planning Board reviews the application, the
Board shall:
G.1. Notify the applicant in writing, or at a meeting with the applicant, either
that the application is complete or, if the application is incomplete, the
specific additional material needed to complete the application.
H. Upon determination that a complete application has been submitted for review,
the Board shall notify the Road Commissioner and the Fire Chief of the
proposed subdivision, the number of dwelling units proposed, the length of
roadways, and the size and construction characteristics of any multi-family,
commercial or industrial buildings. The Board shall request that these
officials comment upon the adequacy of their department's existing capital
facilities to service the proposed subdivision.
I. Prior to submittal of the Preliminary Plan application, the following approvals
shall be obtained in writing, where applicable:
I.1. Maine Department of Environmental Protection, under the Site Location
of Development Act.
I.2. Maine Department of Environmental Protection, under the Natural
Resources Protection Act if a storm water management permit or a
wastewater discharge license is needed.
I.3. Maine Department of Human Services, if an engineered subsurface
wastewater disposal system(s) is to be utilized.
I.4. U.S. Army Corps of Engineers, if a permit under Section 404 of the
Clean Water Act is required.
I.5. Inland Fisheries and Wildlife approval where necessary.
I.6. Any other applicable state or federal approval or permit.
J. Prior to approval of the Preliminary Plan for a Major Subdivision the Planning
Board shall hold a public hearing. The procedure for the public hearing shall
be the same as identified in Article 7.04.
K. Within thirty (30) days after the public hearing, or within any other time limit
otherwise mutually agreed to, the Planning Board shall either approve, with or
without modifications, or disapprove the Preliminary Plan. The reasons for
any modifications required, or the grounds for disapproval, shall be stated
upon the records of the Board. The applicant shall be notified in writing of
such findings.
25
L. When granting approval of the Preliminary Plan, the Board shall state the
conditions of such approval, if any, with respect to:
L.1. The specific changes which it will require in the Final Plan.
L.2. The character and extent of the required improvements for which
waivers may have been requested and which the Board finds may be
waived without jeopardy to the public health, safety, and general welfare;
and
L.3. The amount of all bonds which will be required as a prerequisite to the
approval of the Final Plan.
M. Approval of the Preliminary Plan shall not constitute approval of the Final
Plan.
8.03. Submissions
A. The applicant shall submit eight (8) copies of the Preliminary Plan on standard
size sheets with reserved space for endorsement by the Planning Board
members upon approval of the Final Plan.
B. The application for approval of the Preliminary Plan for a Major Subdivision
shall include all the information presented on the Sketch Plan plus the
following:
B.1. Verification of right, title or interest in the property by deed, purchase
and sales agreement, option to purchase or some other proof of interest.
B.2. A copy of such covenants or deed restrictions as are intended to cover all
or part of the tract.
B.3. The number of acres within the proposed subdivision, location of
property lines, existing easements, buildings, watercourses and other
essential existing physical features.
B.4. The names of all subdivisions immediately adjacent and the names of
owners of record of adjacent acreage.
B.5. The zoning district in which the proposed subdivision is located and the
location of any zoning district boundaries affecting the subdivision.
B.6. Location, names and present width of existing and proposed streets,
easements, building lines, and public open spaces in or adjacent to the
proposed subdivision. The plan shall contain sufficient data to allow the
26
location, bearing and length of every street line, lot line, and boundary
line to be readily determined and reproduced on the ground..
B.7. Contour lines at intervals of nor more than five (5) feet or at such
intervals as the Planning Board may require, based on U.S. Geological
Survey datum of existing grades where change of existing found
elevation will be five (5) feet or more.
B.8. A field survey of the boundary lines of the tract, giving complete
descriptive data by bearings and distance, made and certified by a
licensed land surveyor. The corners of the tract shall be located on the
ground and marked by iron pins, stone, or precast concrete
monumentation and shall be referenced as shown on the Plan. The
entire parcel or tract shall be shown, including all contiguous land in
common ownership within the last five (5) years, as required by 30-A
M.R.S.A. 4401.
B.9. A soils report identifying the soils boundaries and names in the proposed
development with the soils information superimposed upon the plot plan
in accord with U.S.D.A. Soil Conservation Service National Cooperative
Soil Classification. The intensity of this study must identify changes in
soil conditions down to one eighth of an acre.
B.10. A lot by lot soils suitability determination for house building with
septic sewerage disposal will be made in accord with the Soil
Suitability Guide for Land Use Planning in Maine and will accompany
the plot plan soils study.
B.11. All on site sewerage and water supply facilities shall be shown
designed to meet the minimum specifications of these standards and all
pertinent State and local Ordinances. Compliance shall be stated on
the plan and signed by a Licensed Site Evaluator. A map showing the
location of all test pits dug on the site shall be submitted.
B.12. The proposed name of the subdivision and the name of the
municipality in which it is located and the assessor's map and lot
numbers of the parcel(s) proposed to be subdivided.
B.13. The date, north point, graphic map scale, name and address of owner
of record and subdivider, individual or company who prepared the
plan, and names of adjoining property owners shall be shown on the
plan.
B.14. A soil erosion and sediment control plan that meets Standard Best
Management Practices for Soil Erosion and Sediment Control.
27
B.15. Typical cross sections of the proposed grading for roadways and
sidewalks.
B.16. The proposed location and test results for waste water disposal systems
to ascertain subsurface soil and ground water conditions, depth to
maximum ground water level.
B.17. Provisions for collecting and discharging storm drainage, in the form
of a drainage plan.
B.18. The proposed lot lines with approximate dimensions and suggested
locations of buildings.
B.19. The location of all natural features or site elements to be preserved.
B.20. All parcels of land, if any, proposed to be dedicated to public use and
the conditions of such dedication.
B.21. A list of all abutters to the proposed subdivision.
B.22. Location, where applicable, of any vernal pools.
B.23. The Planning Board may require any additional information not listed
above, when it is determined necessary by the Board to determine
whether the statutory review criteria of 30-A M.R.S.A., 4404 have
been met.
28
ARTICLE 9. FINAL PLAN FOR A MAJOR SUBDIVISION
9.01. Procedure
A. Within six (6) months after the approval of the Preliminary Plan, the applicant
shall file an application for approval of the Final Plan. If the Final Plan is not
submitted to the Planning Board within six (6) months after the approval of
the Preliminary Plan, the Board may refuse without prejudice to act on the
Final Plan and require re-submission of the Preliminary Plan.
B. Within five (5) days of receipt of the Final Plan, the Board, or its designee,
shall issue a dated receipt to the applicant.
C. Within thirty (30) days of the receipt of the Final Plan application, the Board
shall:
C.1. Determine whether the application is complete and notify the applicant
in writing of its determination. If the application is not complete, the
Board shall notify the applicant of the specific additional material
needed in order to complete the application.
C.2. Notify in writing by First Class Mail all owners of abutting property that
an application for subdivision approval has been submitted, specifying
the location of the proposed subdivision and including a general
description of the project.
C.3. Notify the clerk and the review authority of the neighboring
municipalities if any portion of the subdivision abuts or crosses the
municipal boundary.
D. Upon determination that a complete Final Plan application has been submitted,
the Board shall notify the applicant in writing.
E. The Board shall hold a public hearing within thirty (30) days after determining
that the Final Plan application is complete. The procedure for the public
hearing shall be the same as identified in Article 7.04.
F. The Planning Board shall, within thirty (30) days of a public hearing for the
Final Plan or within any other time limit otherwise mutually agreed to, issue
an order:
F.1. Denying approval of the proposed subdivision.
F.2. Granting approval of the proposed subdivision.
29
F.3. Granting approval upon any terms and conditions that it considers
advisable to:
A. Satisfy the criteria listed in Title 30-A M.R.S.A. 4404 and the
standards of Article 10 of this Ordinance.
B. Protect and preserve the public's health, safety and general welfare.
G. The Final Plan shall consist of one (1) reproducible, stable based transparency,
one to be filed at the Town office, plus two (2) paper copies. Space shall be
reserved thereon for endorsement by the Planning Board. This plan shall
include all the conditions voted by the Planning Board as described in the
Notice of Decision.
9.02
Submissions
The Final Plan shall show, unless waived by the Planning Board, the following
items:
A. All the information presented on the Preliminary Plan along with any
amendments suggested or required by the Planning Board.
B. Proposed name of the subdivision and the name of the municipality, plus the
assessor's map and lot number.
D. Verification of right, title, or interest in the property. A copy of the most
recently recorded deed for the parcel. A copy of all deed restrictions,
easements, rights-of-way, or other encumbrances currently affecting the
property.
E. A copy of any deed restrictions intended to cover all or part of the lots or
dwellings in the subdivision.
F. A standard boundary survey of the parcel, giving complete descriptive data by
bearings and distances, made and certified by a registered land surveyor. The
corners of the parcel shall be located on the ground and marked by iron pins,
stone, or precast concrete monumentation.
G. An indication of the type of sewage disposal system to be used in the
subdivision.
G.1. When disposal is to be accomplished by connection to the public sewer,
a letter from the Sewer District stating the district has the capacity to
collect and treat the waste water shall be provided.
30
G.2. When sewage disposal is to be accomplished by subsurface waste water
disposal systems, test pit analyses, prepared by a Licensed Site
Evaluator shall be provided. A map showing location of all test pits dug
on the site shall be submitted.
G.3. When sewage disposal is to be accomplished by a central sewage
collection and treatment system, any necessary approvals by the State of
Maine Department of Health and Welfare shall be submitted.
H. An indication of the type of water supply system(s) to be used in the
subdivision.
H.1. When water is to be supplied by public water supply, a written statement
from the servicing water district shall be submitted indicating there is
adequate supply and pressure for the subdivision.
H.2. When a central well is proposed, the applicant is required to provide all
necessary written approvals by the State of Maine Department of Health
and Welfare and to present information which indicates the "cone of
influence" around the well to establish pre-development water table
levels.
I. The date the plan was prepared, north point, and graphic map scale.
J. The names and addresses of the owner of record, applicant, and individual or
company who prepared the plan, and abutting property owners.
K. Soil survey by a Certified Soil Scientist.
L. Wetland areas shall be identified on the survey, regardless of size.
M. The number of acres within the proposed subdivision, location of property
lines, existing buildings, vegetative cover type and other essential physical
features.
N. The location of all rivers, streams and brooks within or adjacent to the
proposed subdivision. If any portion of the proposed subdivision is located in
the direct watershed of a great pond, the application shall indicate which great
pond.
O. Contour lines at intervals of not more than five (5) feet or at such intervals as
the Board may require, showing elevations in relation to mean sea level.
31
P. The zoning district in which the proposed subdivision is located and the
location of any zoning boundaries affecting the subdivision.
Q. The location and size of existing culverts and drainage ways on or adjacent to
the property to be subdivided.
R. The location, names, and present widths of existing streets and highways, and
existing and proposed easements, building lines, parks and other open spaces
on or adjacent to the subdivision. The plan shall contain sufficient data to
allow the location, bearing and length of every street line, lot line, and
boundary line to be readily determined and be reproduced on the ground.
S. Street plans meeting the requirements of Section 10.16 are applicable.
T. The width and location of any streets, public improvements or open space
shown on the official map, if any, within the subdivision.
U. The location of any open space to be preserved and a description of proposed
improvements and its management.
V. All parcels of land, if any, proposed to be dedicated to public use and the
conditions of such dedication.
V.1 Written offers to convey title to the municipality of all public open
spaces shown on the plan, and copies of agreements or other documents
showing the manner in which open spaces to be retained by the applicant
or lot owners are to be maintained shall be submitted.
V.2 If open space or other land is to be offered to the municipality, written
evidence that the Planning Board is satisfied with the legal sufficiency of
the written offer to convey title shall be included.
W. If any portion of the subdivision is in a flood prone area, the boundaries of any
flood hazard areas and the 100 year flood elevation, as depicted on the town's
Flood Insurance Rate Map, shall be delineated on the plan.
X. The board may require a hydrogeologic assessment prepared by a Certified
Geologist or Registered Professional Engineer, experienced in hydrogeology,
when:
X.1 Any part of the subdivision is located over a sand and gravel aquifer, as
shown on a map entitled "Hydrogeologic Data for Significant Sand and
Gravel Aquifers", by the Maine Geological Survey; or
X.2 The subdivision has an average density of more than one (1) dwelling
unit per 120,000 square feet; or
32
X.3 Where site considerations or development designs indicate greater
potential of adverse impacts on ground water quality. The cases include:
a. Extensive areas of shallow to bedrock soils; or
b. Cluster subdivisions in which the average density is less than one (1)
dwelling unit per 100,000 square feet but the density of the developed
portion is in excess of one (1) dwelling unit per 80,000 square feet; or
c. The proposed use of shared or common subsurface waster water
disposal systems.
X.4 The hydrogeologic assessment shall be conducted in accordance with the
provisions of Section 10.10.A.
Y. The Board may require a storm water management plan, prepared by a
Registered Professional Engineer in accordance with the Stormwater
Management for Maine: Best Management Practices, published by the Maine
Department of Environmental Protection.
A storm water management plan is required for new development in the
watershed of a great pond.
Z. The location and method of disposal for land clearing and construction debris.
9.03. Bond
See Article 12 - Performance Guarantees.
33
ARTICLE 10. PERFORMANCE AND DESIGN STANDARDS
The standards in this article are intended to clarify and expand upon the criteria for
approval found within the Subdivision Statute (30-A M.R.S.A., 4404). In reviewing a
proposed subdivision, the Board shall review the application for conformance with the
following standards and make written findings that each has been met prior to the
approval of a final plan. In all instances the burden of proof shall be upon the applicant
to present adequate information to indicate all performance and design standards and
statutory criteria for approval have been or will be met. However, any citizen claiming
that any standard or statutory criteria have not been met must provide verifiable data to
satisfy their claim.
10.01 Pollution
a. The proposed subdivision will not result in undue water or air pollution.
b. The proposed subdivision shall not discharge wastewater to a water body
without a license from the Maine Department of Environmental Protection.
c. Discharge of storm water shall be treated to remove oil, grease, and sediment
prior to discharge into surface water bodies. When the subdivision is within
the watershed of a great pond, the storm water shall be treated in order to
remove excess nutrients.
10.02 Sufficient Water
A. Water Supply
A.1. When a proposed subdivision is not within the area designated for public
water supply service in the Comprehensive Plan, water supply shall be
from individual wells or a private community water system.
a. Individual wells shall be sited and constructed to prevent infiltration of
surface water and contamination from subsurface waste water disposal
systems and other sources of potential contamination
b. Lot design shall permit placement of wells, subsurface waste water
disposal areas, and reserve sites for subsurface waste water disposal
areas in compliance with the Maine Subsurface Wastewater Disposal
Rules and the Well Drillers and Pump Installers Rules.
c. If a central water supply system is provided by the applicant the
location and protection of the source, the design, construction and
operation of the system shall conform to the standards of the Maine
Rules Relating to Drinking Water (10-144A C.M.R.231).
34
B.Fire Protection and Public Safety
B.1
Authority
Except for exemptions cited herein, Section D shall be applicable to the
following structures constructed after November 6th, 2018 :
1. Residential subdivisions regulated by 30-A MRSA §4403 and
subdivisions exempt by 30-A MRSA §4401.4 and 4401.4D -1, D-2, D-3,
and D-4 [Probate and family divisions] consisting of:
a. Three (3) lots.
b. Between four (4) and seven (7) lots located more than 1,500
linear feet by established travel way from a designated and
operational Fire Department water supply of at least 15,000
gallon capacity.
2. Commercial and institutional structures within excess of 4,000 square
feet of area, excepting agricultural buildings.
B.2
Performance Standards
A. Residential Fire Protection Water Supply
1. Proximity to Fire Protection Water Supply:
All residential buildings governed by B.1. shall be located within
1,200 linear feet by established travel way of a designated and
operational Fire Department water supply of at least 15,000 gallon
capacity.
2. Alternative Water Supply Required:
Proposed new residential structures failing to meet the standard
B.2.A.1 will be required to provide one of the following remedies:
a) Install a residential fire sprinkler system in all residential units in
conformance with the standards of NFPA 13D or latest published
edition of NFPA;
b) Install an enclosed concrete or polycarbonate cistern with a
minimum 15,000 gallon capacity on site or within 500 feet by
established travel way of the principal structure and provide Fire
Department vehicular access to the cistern;
35
B. Non-Residential Fire Protection Water Supply
1. Proximity to Fire Protection Water Supply:
Commercial and institutional structures in excess of 4,000
square feet in area must be located within 1,200 linear feet by
established travel way of a designated and operational Fire
Department water supply of at least 15,000 gallon capacity. The
Fire Chief and/or Planning Board may require a water supply in
excess of 15,000 gallons based on building size, use, fire load,
and/or number of buildings served by the water supply.
2. Design Standards:
All hydrants shall be designed and constructed in conformance
with NFPA 24 or latest published edition of NFPA24. No
hydrant shall be serviced by a water supply main of less than six
(6) inch diameter.
3.Costs & Responsibilities:
The applicant shall be responsible for expenses associated with
the installation, maintenance, and/or lease of fire hydrants
located in private ways, driveways, and private property.
Applicants shall also be responsible for the installation and
lease costs associated with a hydrant installed in the right-of-
way of a Town or State road for a period of three (3) years,
whereupon all lease costs shall be assumed by the Town of
Limington.
C. Automatic Fire Sprinkler Systems
1. Fire Sprinkler Design Standards
All Automatic Fire Sprinkler Systems shall conform to the following
design criteria:
a. NFPA 13D or latest published edition for one and two family
residential dwelling units;
b. NFPA 13R or latest published edition in all residential structures
except for one and two family dwelling units;
c. NFPA 13 or latest published edition in any commercial or non-
residential structure.
D. Cistern Standards
1. Cisterns:
Fire Water Supply cisterns shall be designed as follows:
36
Performance Standards
a. All cisterns shall be waterproofed prior to installation.
b. Cisterns shall be plumbed with six (6) inch drafting outlet with a
threaded fitting with long handles and a metal cap mounted on an
elbow at least two (2) feet above the surface of the ground
c. All plumbing fixtures shall be metal in construction.
d. A separate vent pipe shall be installed
e. A separate fill pipe on an elbow mounted at least 2 feet above the
ground and fitted with a threaded 2.5 inch wye.
f. A sight gauge showing water level in the cistern.
g. Cisterns shall be constructed with a cleanout manhole enabling
maintenance access to the interior with a locking mechanism to
prevent vandalism.
2. Pumping Apron:
a. Apron Design:
A paved access apron at least 15 feet long shall be constructed from
the cistern to the edge of the street or private way to provide easy
Fire Department access to the dry hydrant and fill pipe.
b. Bituminous Surface:
The apron shall consist of 2.5 inch bituminous concrete surface
constructed on 18 inches of MDOT Type D gravel compacted to 95
Proctor.
c. Protective Bollards:
Two three-inch concrete filled metal pipe bollards shall be installed
on either side of the fill pipe connections in order to protect the
fittings from impact from vehicles.
2. Fire Response Accessibility
1.Road & Parking Design:
All private ways, subdivision roads, private driveways, and parking lots
shall be Designed to provide adequate travel way widths and curve/curb
radii to accommodate a 100-foot ladder /tower apparatus with a
minimum 65 - foot inside turning radius.
2.Fire Lanes:
Buildings of high-density occupancy, public accommodation or
hazardous conditions; including but not limited to multifamily
complexes, shopping centers, auditoriums, theaters, office buildings,
hospitals, lodging, and manufacturing facilities, shall provide 15-foot
fire lanes designated as "No Parking Zones" that will enable rapid and
37
unimpeded access of fire/rescue equipment and personnel to the interior,
roof, mechanical room, and/or other critical areas. The Limington Fire
Chief or designee shall exercise sole discretion in the location and
design of such Fire Lanes.
3. Fire Department Connection (FDC)
All buildings fitted with an Automatic Fire Sprinkler System in
conformance with NFPA 13 and NFPA 13R shall provide an exterior
Fire Department Connection (FDC) in a location readily accessible to
responding Fire apparatus. The Fire Chief or designee shall exercise
sole discretion on the location of the FDC, and the configuration of
road access to the FDC.
4. "Knox Box" Rapid Entry System (RES)
All multi-family uses and non-residential buildings, including but not
limited to places of public accommodation, manufacturing and
fabrication facilities, gated emergency accesses and similar uses shall
install a secure Rapid Entry System box, containing keys facilitating
rapid entry of fire and rescue personnel to a locked facility. The
Limington Fire Chief or designee shall specify the location and number
of such Knox Box systems.
3. Exemptions and Additions:
1. Exemptions:
Given the proximity of adequate established Fire Department water
supplies, the Fire Chief or designee may exempt a proposed
development from providing an on-site water supply.
2. Additional Requirements:
Given site conditions and constraints, inaccessibility, fire loads, and
/or exposures, the Fire Chief or designee may impose additional fire
protection standards beyond the minimum requirements specified in
Section B in order to maintain neighborhood safety, preserve property,
and protect civilian and firefighter lives.
10.03 Impact on Existing Water Supplies
In meeting the standards of Section 10.2, a proposed subdivision shall not
generate a demand on the source, treatment facilities or distribution system of the
servicing water company or district beyond the capacity of those system
components, considering improvements that are planned to be in place prior to
occupancy of the subdivision. The applicant shall be responsible for paying costs
of system improvements to the district's or company's system a necessary to
alleviate existing deficiencies.
38
10.04 Soil Erosion
The proposed subdivision shall prevent soil erosion from entering water bodies,
wetlands, and adjacent properties.
10.05 General Requirements for Traffic Control
A. Provision shall be made for vehicular access to the subdivision and circulation
within the subdivision in such as manner as to:
A.1. Safeguard against hazards to traffic and pedestrians in existing streets
and within the subdivision.
A.2. Avoid traffic congestion on any street.
A.3. Provide safe and convenient circulation on public streets and within the
subdivision.
A.4. The street giving access to the subdivision and neighboring streets and
intersections which can be expected to carry traffic generated by the
subdivision shall have the capacity or be suitably improved to
accommodate that traffic and avoid unreasonable congestion.
A.5. Where necessary to safeguard against hazards to traffic and pedestrians
and/or to avoid traffic congestion, provision shall be made for turning
lanes, traffic directional islands, frontage roads, sidewalks, bicycle ways
and traffic controls within existing public streets.
A.6. Access ways to non-residential subdivisions or to multi-family
developments shall be designed to avoid queuing of entering vehicles on
any street.
A.7. Where topographic and other site conditions allow, provision may be
made for street connections to adjoining lots of similar existing or
potential uses.
A.8. In non-residential subdivisions such access shall be provided if it will:
b. Facilitate fire protection services as approved by the fire chief; or
c. Enable the public to travel between two existing or potential uses,
generally open to the public, without need to travel upon a public
street.
39
A.9. Street Names and Signs
Streets which join and are in alignment with streets of abutting or
neighboring properties shall bear the same name. Names of new streets
shall not duplicate, nor bear phonetic resemblance to the names of
existing streets within the Municipality and shall be subject to the
approval of the 911 Coordinator. The developer shall either install street
name, traffic safety and control signs meeting municipal specification or
reimburse the Municipality for the costs of their installation.
B. Access Control
B.1. Where a subdivision abuts or contains an existing or proposed arterial
street, no residential lot may have vehicular access directly onto the
arterial street. This requirement shall be noted on the plan and in the
deed of any lot with frontage on the arterial street.
B.2. Subdivisions Entering onto Arterial Streets. When the access to a
subdivision is a street, the street design and construction standards of
Section 10.16.B. below shall be met. Where there is a conflict between
the standards in this section and the standards of Section 10.16 below,
the stricter or more stringent shall apply.
a. General
Access design shall be based on the estimated volume using the access
classification defined below. Traffic volume estimates shall be as
defined in the Trip Generation Manual, current edition, published by
the Institute of Transportation Engineers.
(i)
Low Volume Access: An access with fifty (50) vehicle trips per
day or less.
(ii) Medium Volume Access: Any access with more than fifty (50)
vehicle trips per day but less than two hundred (200) peak hour
vehicle trips per day.
(iii) High Volume Access: Peak hour volume of two hundred (200)
or greater vehicle trips per day.
b. Submissions
An access design shall be submitted as approved by the Maine
Department of Transportation or the Limington Road Commissioner.
The submitted design shall include, but not be limited to, the following:
40
(i)
Sight Distances. Accesses shall be located and designed in
profile and grading to provide the required sight distance
measured in each direction. Sight distance shall be measured
from the driver's seat of a vehicle standing on that portion of the
exit with the front of the vehicle a minimum of ten (10) feet
behind the curb line or edge of shoulder, with the height of the
eye three and one half (3 ½ ) feet, to the top of an object four and
one half 4 ½ feet above the pavement.
(ii) Vertical Alignment. Accesses shall be flat enough to prevent the
dragging of any vehicle under carriage. Accesses shall slope
upward or downward from the gutter line on a straight slope of
three (3) percent or less for at least the first seventy-five (75) feet.
The maximum grade over the entire length shall not exceed
fifteen (15) percent.
(iii) Skew Angle. Accesses shall intersect the road at an angle as
nearly ninety (90) degrees as site conditions permit, but in no
case less than sixty (60) degrees.
(iv) Turning Radius according to access volume.
(v)
Access Width according to access volume.
(vi) High Volume Access: Appropriate traffic control signage shall
be erected at the intersection of the access and the street and on
medians and channelization islands.
(vii) Access Location and Spacing, including:
(1)
Minimum Corner Clearance. Corner clearance shall be
measured from the point of tangency for the corner to the
point of tangency for the access. In general the maximum
corner clearance should be provided as practical based on
site constraints. If full access to the site cannot be provided
on either the major or minor streets, the site shall be
restricted to partial access. Alternately, construction of a
shared access drive with an adjacent lot is recommended.
(2)
Access Spacing. Accesses and street intersections shall be
separated from adjacent accesses, streets and property lines
in order to allow major through routes to effectively serve
their primary function of conducting through traffic.
41
c. Number of Accesses
The maximum number of accesses onto a single street is controlled by
the available site frontage and approved minimum access spacing
approved in Access Design submitted. In addition, the following
criteria shall limit the number of accesses independent of frontage
length.
(i)
No low volume traffic generator shall have more than one (1)
two-way access onto a single roadway.
(ii) No medium or high volume traffic generator shall have more
than two (2) two-way accesses or three (3) accesses in total onto
a single roadway.
d. Construction Materials/Paving
(i)
All accesses entering a curbed street shall be curbed with
materials matching the street curbing. Sloped curbing is required
around all raised channelization islands or medians.
(ii) All access shall be paved with bituminous concrete pavement
within the street right-of-way. All commercial accesses,
regardless of access volume, shall be paved with bituminous
concrete pavement with thirty (30) feet of the street right-of-way.
10.06 Sewage Disposal
A. Sewage disposal shall be private subsurface wastewater disposal systems or a
private treatment facility with surface discharge.
B. The applicant shall submit evidence of site suitability for subsurface sewage
disposal prepared by a Maine Licensed Site Evaluator in full compliance with
the requirements of the Sate of Maine Subsurface Wastewater Disposal Rules.
B.1. The Site Evaluator shall certify in writing that all test pits which meet
the requirements for a new system represent an area large enough for a
disposal area on soils which meet the Disposal Rules.
B.2. In no instance shall a disposal area be on a site which requires a new
system variance from the Subsurface Wastewater Disposal Rules.
B.3. When sewage disposal is to be accomplished by a private central sewage
collection and treatment system, all required state approvals shall be
submitted.
42
10.07 Impact on Municipality's Ability to Dispose of Solid Waste
If the additional solid waste from the proposed subdivision exceeds the capacity
of the municipal waste facility, causes the municipal facility to no longer be in
compliance with its license from the Department of Environmental Protection, or
causes the Municipality to exceed its contract with a non-municipal facility, the
applicant shall make alternate arrangements for the disposal of solid waste. The
alternate arrangements shall be at a disposal facility which is in compliance with
its license. The Board may not require the alternate arrangement to exceed a
period of five (5) years.
10.08 Impact on Historic Sites, Wildlife Habitat, Public Access to the Shoreline
A.1. If any portion of the subdivision is designated a site of historic or prehistoric
importance by the Maine Historic Preservation Commission appropriate
measures for the protection of the historic or prehistoric resources shall be
included in the plan.
A.2. Reserved open space land may be dedicated to the Municipality.
A.3. Any existing public rights of access to the shoreline of a water body shall be
maintained by means of easements or rights-of-way, or should be included
in the open space with provisions made for continued public access.
B. Protection of Significant Wildlife Habitat
In any portion of a proposed subdivision which lies within areas identified and
mapped as significant wildlife habitat by the Department of Inland Fisheries
and Wildlife and the Limington Shoreland Zoning Ordinance the applicant
shall provide documentation that there will be no adverse impacts on the
habitat and species it supports.
10.09 Conformance with Zoning Ordinance and Other Land Use Ordinances
All lots shall meet the minimum dimensional requirements of the Zoning
Ordinance for the zoning district in which they are located, except as otherwise
specified in the Zoning Ordinance or this Ordinance. The proposed subdivision
shall meet all applicable performance and design standards specified herein and
design criteria from the Zoning Ordinance.
10.10 Impact on Ground Water Quality or Quantity
A. Ground Water Quality
A.1. When a hydrogeologic assessment is submitted, the assessment shall
contain at least the following information:
43
a. A map showing the basic soils types.
b. The depth to the water table at representative points throughout the
subdivision.
c. Drainage conditions throughout the subdivision.
d. Data on the existing ground water quality, either from test wells in
the subdivision or from existing wells on neighboring properties.
e. An analysis and evaluation of the effect of the subdivision on ground
water resources. In the case of residential developments, the
evaluation shall, at a minimum, include a projection of post
development nitrate/nitrogen concentrations at any wells within the
subdivision or at the subdivision boundaries; or at a distance of one
thousand (1,000) feet from potential contamination sources,
whichever is a shorter distance.
f. A map showing the location of any subsurface wastewater disposal
systems and drinking water wells within the subdivision and within
two hundred (200) feet of the subdivision boundaries.
A.2. Projections of groundwater quality shall be based on the assumption of
drought conditions (assuming 60% of annual average precipitation).
A.3. No subdivision shall increase any contaminant in the groundwater to
more than one half of the Primary Drinking Water Standards. No
subdivision shall increase any contaminant concentration in the
groundwater to more than the Secondary Drinking Water Standards. See
the Maine Safe Water Drinking Act.
A.4. If groundwater contains contaminants in excess of the primary standards,
and the subdivision is to be served by on-site groundwater supplies, the
applicant shall demonstrate how water quality will be improved or
treated.
A.5. If groundwater contains contaminants in excess of the secondary
standards, the subdivision shall not cause the concentration of the
parameters in question to exceed 150% of the ambient concentration.
44
A.6. Subsurface wastewater disposal systems and drinking water wells shall
be constructed as shown on the map submitted with the assessment. If
construction standards for drinking water wells or other measures to
reduce groundwater contamination and protect drinking water supplies
are recommended in the assessment, those standards shall be included as
a note on the Final Plan and as restriction in the deeds to the affected lots.
The Primary and Secondary Drinking Water Standards refer to the Maine
Rules Relating to Drinking Water (10-114A C.M.R. 231).
10.11. Impact on Water Quality of Shoreline
Where a strip of land extending one hundred (100) feet inland from the normal
high water line of a great pond or any tributary to a great pond, and seventy-five
(75) feet from any other water body or the upland edge of a wetland, a buffer strip
of vegetation shall be preserved. The deeds to any lots which include any such
land shall contain the following restrictions:
A. A footpath not to exceed ten (10) feet in width as measured between tree
trunks is permitted.
B. Selective cutting of trees within the buffer strip is permitted provided that a
well distributed stand of trees and other vegetation is maintained. Not more
than forty percent (40%) of the total volume of trees four (4) inches or more in
diameter, measured at four and one half (4 ½) feet above ground level may be
removed in any ten (10) year period.
C. In order to protect water quality and wildlife habitat adjacent to great ponds,
and tributaries to great ponds, existing vegetation under three (3) feet in height
and other ground cover shall not be removed, except to provide for a footpath
or other permitted uses as described above.
D. Pruning of tree branches, on the bottom third of the tree is permitted.
10.12. Identification of Freshwater Wetlands, Rivers, Streams or Brooks
Freshwater wetlands shall be identified in accordance with the current Corps of
Engineers Wetland Delineation Manual, published by the United States Army
Corps of Engineers. Any rivers, streams, or brooks within or abutting the
proposed subdivision shall also be identified.
10.13. Storm Water Management
Adequate provision shall be made for the management of the quantity and quality
of all storm water generated within the subdivision, and any drained groundwater
through a managements system of swales, culverts, under drains, storm drains and
best management practices equivalent to those described in the most recent
45
version of Stormwater Management for Maine: Best Management Practices,
published by the Maine Department of Environmental Protection. The storm
water management system shall be designed to meet the following standards:
1. Quantity
Peak discharge rates shall be limited to the pre-development levels for the 2-
year, 20-year, and 25-year frequency, 24 hour duration storm unless storm
water from the subdivision will drain directly into a major water body such as
a great pond.
2.Quality
Storm water run off must be treated by the use of best management practices
equivalent to those described in the most recent version of Stormwater
Management for Maine: Best Management Practices, published by the Maine
Department of Environmental Protection.
3. Easements
Where necessary to achieve the above standards, there shall be provided
easements or drainage rights-of-way with swales, culverts, catch basis, or
other means of channeling surface water within the subdivision and over other
properties. Wherever the storm drainage system is not within the right-of-way
of a public street, perpetual easements shall be provided to the Municipality
allowing maintenance and improvement of the system. Drainage easements
for existing water courses or proposed drainage ways shall be provided at least
thirty (30) feet wide, conforming substantially to the lines of existing drainage.
4. Catch basins
Catch basins shall be installed where necessary and, when located within a
street, shall be located at the curb line.
5. Storm Drainage Construction Standards
A. The minimum pipe size for any storm drainage pipe shall be fifteen (15)
inches for driveway entrances and eighteen (18) inches for cross culverts.
B. Storm drainage pipes shall conform to the requirements of Maine Department
of Transportation materials specifications Section 706 for non-metallic pipe
and Section 707 for metallic pipe. Plastic (polyethylene) pipes shall not be
installed except in closed systems such as street underdrains. Bituminous
coated steel pipes shall not be used.
C. Where the storm drainage pipe is to be covered by ten (10) feet or more of
fill material, pipe material with s fifty (50) year life shall be used. These
46
materials include concrete pipe, polymer coated galvanized corrugated
steel pipe, polyvinylchloride (PVC) pipe, and corrugated aluminum alloy
pipe.
10.14. Reservation or Dedication and Maintenance of Open Space and Common
Land, Facilities and Services
A. All open space common land, facilities and property shall be owned by:
A.1. The owners of the lots or dwelling units by means of a lot owners'
association;
A.2. An association which has as its principal purpose the conservation or
preservation of land in essential its natural condition; or
A.3. The Municipality.
B. Further subdivision of the common land or open space and its uses for other
than non-commercial recreation, agriculture, or conservation purposes, except
for easements for underground utilities, shall be prohibited. Structures and
buildings accessory to non-commercial recreational or conservation uses may
be erected on the common land. When open space is to be owned by an entity
other than the Municipality, there shall be a conservation easement deeded to
the Municipality or deed restrictions prohibiting future development.
C. The common land or open space shall be shown on the Final Plan with
appropriate notations on the plan to indicate:
C.1. It shall not be used for future building lots; and
C.2. Which portions of the open space, if any, may be dedicated for
acceptance by the Municipality.
D. The Final Plan application shall include the following:
D.1. Covenants for mandatory membership in the lot owners' association
setting forth the owners' rights, interests, and privileges in the
association and the common property and facilities, to be included in the
deed for each lot or dwelling.
D.2. Draft articles of incorporation of the proposed lot owners' association as
a not-for-profit corporation; and
D.3. Draft bylaws of the proposed lot owners' association specifying the
responsibilities and authority of the association, the operating procedures
of the association and providing for proper capitalization of the
47
association to cover the costs of major repairs, maintenance and
replacement of common facilities.
E. In combination, the documents referenced in paragraph D above shall provide
the following:
E.1. The homeowners' association shall have the responsibility of
maintaining the common property or facilities.
E.2. The association shall levy charges against all owners of lots or dwelling
units to defray the expenses connected with the maintenance, repair and
replacement of common property and facilities and tax assessments.
E.3. The association shall have the power to place a lien on the property of
members who fail to pay dues or assessments.
E.4. The developer or subdivider shall maintain control of the common
property and be responsible for its maintenance until development
sufficient to support the association has taken place.
10.15. Phosphorus Impacts on Great Ponds
When the proposed subdivision is within the direct watershed of a great pond
and does not qualify for simplified review, the phosphorus control measures
shall meet the design criteria in Phosphorus Control in Lake Watersheds: A
Technical Guide for Evaluating New Development, published by the Maine
Department of Environmental Protection.
10.16 Street Design and Construction Standards
A. General Requirements
A.1. The Board shall not approve any subdivision plan unless proposed
streets are designed by a licensed professional engineer licensed in
Maine in accordance with any local ordinance or the specifications
contained in this Ordinance. Approval of the Final Plan by the Board
shall not be deemed to constitute or be evidence of acceptance by the
Municipality of any street or easement.
A.2. Applicants shall submit to the Board, as part of the Final Plan, detailed
construction drawings showing a plan view, profile, and typical cross
section of the proposed streets and existing streets with three hundred
(300) feel of any proposed intersections. The plan view shall be at a
scale of one (1) inch equals nor more than fifty (50) feet. The vertical
scale of the profile shall be one (1) inch equals no more than five (5) feet.
The plans shall include the following information:
48
(i)
Date, scale, and true north point.
(ii) Intersections of the proposed street with existing streets.
(iii) Roadway and right-of-way limits including edge of pavement, edge of
shoulder, sidewalks, and curbs.
(iv) Kind, size, location, material, profile and cross section of all existing
and proposed drainage structures and their location with respect to the
existing natural waterways and proposed drainage ways.
(v)
Complete curve data shall be indicated for all horizontal and vertical
curves.
(vi) Turning radii at all intersections.
(vii) Centerline gradients.
(viii) Size, type and locations of all existing and proposed overhead and
underground utilities, to include but not limited to water, sewer,
electricity, telephone, lighting, and cable television.
A.3. Where the applicant proposes improvements within existing public
streets, the proposed design and construction details shall be approved in
writing by the Road Commissioner or the Maine Department of
Transportation, as appropriate.
A.4. The creation of private way(s) to provide frontage and/or access to any
lot in a subdivision is expressly prohibited.
B. Street Design Standards
B.1. These design guidelines shall control the roadway, shoulders, curbs,
sidewalks, drainage systems, culverts, and other appurtenances
associated with the street, and shall be met by all streets within a
subdivision, unless the applicant can provide clear and convincing
evidence that an alternate design will meet good engineering practices
and will meet the performance and design standards of Article 10.16.
B.2. Reserve strips controlling access to streets shall be prohibited except
where their control is definitely placed with the Municipality.
B.3. Adjacent to areas zoned and designed for commercial use, or where a
change of zoning to a zone which permits commercial uses is
contemplated by the Municipality, the street right-of-way and/or
49
pavement width shall be increased on each side by half of the amount
necessary to bring the road into conformance with the standards for
commercial streets in this Ordinance.
B.4. Any subdivision expected to generate average daily traffic of two
hundred (200) trips per day or more shall have at least two (2) street
connections with existing public streets, streets shown on an Official
Map, or streets on an approved subdivision plan for which performance
guarantees have been filed and accepted.
B.5. The design standards in the following table apply, according to street
classification.
50
Street Design Standards
Description
Arterial
Collector
Minor
Industrial
Commercial
Minimum Right-of-
80'
50'
50'
60'
Way Width
Minimum Traveled
44'
24'
20'
30'
Way Width
Minimum Width of
5'
3'
3'
5'
Shoulders (each side)
Maximum Grade Within
3%
3%
3%
3%
75 ft. of Intersections
Minimum Right-of-Way
20'
10'
10'
20'
Radii at Intersections
Sidewalk Width
8'
5'
5'
8'
(where required)
Minimum Grade
.5%
.5%
.5%
.5%
Maximum Grade 1
5%
6%
8%
5%
Minimum Centerline
500'
280'
280'
400'
Radius (without
superelevation)
Minimum Centerline
350'
175'
175'
300'
Radius (with
Superelevation)
Roadway Crown 2
.25"/ft
.25"/ft
.25"/ft
.25"/ft
Minimum Angle of Street
90o
90o
75o
90o
Intersections 4
Minimum Curb Radii
30'
25'
20'
30'
at Intersection *
1Maximum grade may be exceeded for a length of two hundred (200) feet or less.
2Roadway crown is per foot of land width.
3Street intersection angles shall be as close to 90o as feasible, but not less than the listed angle.
4Should be based on turning radii of expected commercial vehicles, but not less than thirty (30)
feet.
* Note: Where applicable
51
B.6. The centerline of the roadway shall be the centerline of the right-of-way.
B.7. Dead End Streets. In addition to the design standards in the preceding
table, dead end streets shall be constructed to provide a turn-around with
the following requirements:
a. Hammerhead. Property line: sixty (60) feet; outer edge of pavement:
fifty (50) feet; inner edge of pavement: thirty (30) feet. Over all
length of road shall not exceed two thousand five hundred (2,500)
linear feet. All road surfaces must be asphalt in accordance with
NFPA (National Fire Protection Agency) 1 Fire Dept Access.
b. Cul-de-sac. Diameter shall be Seventy (70) feet; outer edge of
pavement. All road surfaces must be Asphalt (the entire Cul-de-sac).
In accordance with NFPA ( National Fire Protection Agency )1 Fire
Dept Access.
c. Where the road cannot be extended, the Board may require the
reservation of a twenty (20) foot easement in line with the street to
provide continuation of pedestrian traffic or utilities to the next street.
d. The Board may also require the reservation of a fifty (50) foot
easement in line with the street to provide continuation of the road
where future subdivision is possible.
C. Grades, Intersections, and Sight Distances
C.1. Grades of all streets shall conform in general to the terrain, so that cut
and fill are minimized while maintaining the grade standards in the
preceding table.
C.2. All changes in grade shall be connected by vertical curves in order to
provide the following minimum stopping sight distances based on the
street design speed.
Design Speed (mph)
20
25
30
35
Stopping Sight Distance (ft)
125
150
200
250
C.3. Stopping sight distance shall be calculated with a height of eye at three
and one half (3 1/2) feet and the height of object at one half (½) foot.
C.4. Where new street intersections or driveway curb cuts are proposed, sight
distances, as measured along the road onto which traffic will be turning,
shall be based upon the posted speed limit and conform to the table
below. Sight distance shall be measured from the driver's seat of a
vehicle standing on that portion of the exit with the front of the vehicle a
52
minimum of ten (10) feet behind the curb line or edge of shoulder, with
the height of the eye three and one half (3 ½ ) feet, to the top of an
object four and one half (4 ½ ) feet above the pavement.
Posted Speed Limit (mph)25
30
35
40
45
50
55
Sight Distance (ft)
250
300
350
400
450
500
550
C.5. Where necessary, corner lots shall be cleared of all growth and sight
obstructions, including ground excavation, to achieve the require
visibility.
C.6. Cross (four-cornered) street intersections shall be avoided whenever
possible. A minimum distance of one hundred and twenty-five (125)
feet shall be maintained between centerlines of minor streets and two
hundred (200) feet between collectors or a collector and minor streets.
D. Sidewalks and Curbs (if required)
Sidewalks and curbs shall be installed within subdivisions where foot traffic
to adjoining subdivisions or commercial enterprises can be reasonably
anticipated and preferable to vehicular traffic. Where sidewalks exist adjacent
to a proposed subdivision, sidewalks shall be installed connecting to existing
sidewalks. Where installed, sidewalks shall meet the minimum requirements
of: 8" base course gravel and a surface of 2" bituminous concrete.
E. Street Construction Standards
E.1. The minimum thickness of material after compaction shall meet the
specification in the following table:
Street Materials
Arterial
Collector
Minor
Private
Industrial -
Right-of
Way
Commercial
Aggregate Sub-Base
Course (Maximum sized stone 6")
Without Base Gravel
24"
18"
18"
15"
24"
With Base Gravel
20"
15"
15"
12"
20"
Crushed Aggregate Base
4"
3"
3"
3"
4"
Course (if necessary)
Hot Bituminous Pavement
Total Thickness
3"
3"
3"
n/a
4"
Surface Course
1 ¼ "
1 ¼ "
1 ¼ "
n/a
1 ¼ "
Base Course
1 ¾ "
1 ¾ "
1 ¾ "
n/a
1 ¾ "
Surface Gravel
n/a
n/a
n/a
3"
n/a
53
Note: Road construction must be designed by a professional engineer licensed in Maine and
constructed in accordance with the plans.
E.2. Preparation
5. The center line and sidelines of the new road shall be staked or
flagged at approximately fifty (50) foot intervals.
6. Before grading is started, the entire area within the right-of-way
necessary for traveled way, shoulders, sidewalks, drainage ways, and
utilities shall be cleared of all stumps, roots, brush, and other
objectionable material. All shallow ledge, large boulders and tree
stumps shall be removed from the cleared area.
7. All organic materials or other deleterious material shall be removed
to a depth of two (2) feet below the sub-grade of the roadway.
Rocks and boulders shall also be removed to a depth of two (2) feet
below the sub-grade of the roadway. On soils which have been
identified by the engineer as not suitable for roadways, either the
subsoil shall be removed from the street site to a depth of two (2)
feet below the sub-grade and replaced with material meeting the
specifications for gravel aggregate sub-base below, or a Maine
Department of Transportation approved stabilization geotextile may
be used.
8. Except in a ledge cut, side slopes in the right-of-way shall be not
steeper than a slope of three (3) feet horizontal to one (1) foot
vertical, and shall be graded, loamed, limed, fertilized, and seeded
according to the specifications of the erosion and sedimentation
control plan.
Where a cut results in exposed ledge, a side slope no steeper than
one (1) foot horizontal to four (4) feet vertical is permitted.
5. All underground utilities shall be installed prior to paving to avoid
cuts in the pavement. Building sewers and water service connections
shall be installed to the edge of the right-of-way prior to paving.
E.3 Bases and Pavement
1. Bases/Sub-base. (See page 44)
2. Pavement Joints. Where pavement joins an existing pavement, the
existing pavement shall be cut along a smooth line and form a neat,
even, vertical joint.
54
3. Pavements
(i) Minimum standards for the base layer of pavement shall be the
Maine Department of Transportation specifications for plant mix
grade B with an aggregate size no more than three quarters (3/4)
inch maximum and a liquid asphalt content between 4.8% and
6.0% by weight depending on aggregate characteristics. The
pavement may be placed provided the air temperature in the
shade at the paving location of 40 degrees F or higher (or 35
degrees F only if using a DOT approved warm mix) and the
surface to be paved is not frozen or unreasonable wet.
(ii) Minimum standards for the surface layer of pavement shall be
the Maine Department of Transportation specifications for plant
mix Grade C or D with an aggregate size nor more than one half
(1/2) inch maximum and a liquid asphalt content between 5.8%
and 7.0% by weight depending on aggregate characteristics. The
pavement may be placed provided the air temperature in the
shade at the paving location of 50o F or higher.
E.4. Surface Gravel. Private rights-of-ways need not be paved and may have
a gravel surface. Surface ravel shall be placed on top of the aggregate sub-
base, and shall have no stones larger that two (2) inches in size.
E.5. If paving is required, then stages of pavement shall be completed in
three stages. Occupancy permits may be issued for the first 25% of lots
with a gravel sub-base; 75% with pavement base layer; and the final
25% with pavement surface layer.
F. Clean Up
Following street construction, the developer or contractor shall conduct a
thorough clean up of stumps and other debris from the entire street right-of-
way. If on-site disposal of the stumps and debris is proposed, the site shall
be indicated on the plan, and be suitably covered with fill and topsoil, limed,
fertilized and seeded.
G. Sign Off
Completed paved streets shall require a professional engineer's review and
approval.
10.17. Lots
A. Where possible, side lot lines shall be perpendicular to the street.
55
B. The subdivision of tracts into parcels with more than twice the required
minimum lot size (see Dimensions Table in the Zoning Ordinance) shall be
laid out in such a manner as either to provide for or preclude future division.
Deed restrictions and notes on the plan shall either prohibit future divisions of
the lots or specify that any future division shall constitute a revision to the
plan and shall require approval from the Planning Board, subject to the criteria
of the subdivision statute, the standards of this Ordinance and conditions
placed on the original approval.
C. If a lot on one side of a road fails to meet the minimum requirements for lot
size, it may not be combined with a lot on the other side of the road to meet
the minimum lot size.
D. Double frontage lots and reverse frontage lots shall be avoided except where
essential to provide separation of residential development from traffic arteries
or to overcome specific disadvantages of topography and orientation. A
planting screen easement of at least ten (10) feet, across which there shall be
no right of access, shall be provided along the line of lots abutting such a
traffic artery or other disadvantageous use.
E. The ratio of lot length to width shall not be more than five (5) to one (1).
F. Flag lots and other odd shaped lots in which narrow strips are joined to other
parcels in order to meet minimum lot size requirements are prohibited.
10.18. Utilities
The Board may approve either underground or overhead utilities.
10.19. Monuments
A. The Board may require stone monuments to be set for the corners and angle
points.
B. Stone monuments shall be a minimum of four (4) inches square at the top and
four (4) feet in length, and set in the ground four (4) inches above final grade
level. After they are set, drilled holes one half (1/2) inch deep shall locate the
point or points described above.
C. All other subdivision boundary corners and angle points, as well as all lot
boundary corners, street corners and angle points shall be marked by iron pins,
stone, or precast concrete monumentation.
D. At no point shall the boundary extend more than six hundred (600) feet
without monumentation being set to mark the line.
56
10.20. Cluster Developments
A. Purpose
The purpose of these provisions is to allow for new concepts of housing
development where variations of design may be allowed, provided that the net
residential density shall be no greater than is permitted in the district in which
the development is proposed. Notwithstanding other provisions of this
Ordinance relating to dimensional requirements, the Planning Board, in
reviewing and approving proposed residential developments located in the
Town, may modify said provisions related to dimensional requirements to
permit innovative approaches to housing and environmental design in
accordance with the following standards. This shall not be construed as
granting variances to relieve hardship.
B. Application Procedure
The Planning Board may allow subdivided development on reduced lot sizes
in return for open space where the Planning Board determines that the benefits
of the cluster approach will prevent the loss of natural features without
increasing the net density of the development. The developer shall submit a
written application to the Planning Board for a cluster development. Two (2)
sketch plans shall be submitted with one layout as a standard subdivision and
the second as a cluster development indicating open space and significant
natural features.
Each lot in the standard subdivision shall meet the minimum lot size and lot
width requirements of this Ordinance, and, if not serviced by a public sewer,
have an area suitable for subsurface waster water disposal according to the
Maine Subsurface Wastewater Disposal Rules. The number of lots in the
cluster development shall in no case exceed the number of lots in the standard
subdivision.
Within thirty (30) days of receiving the application, the Board shall invite
comments on the application from appropriate municipal or quasi-municipal
agencies and the abutters. Within sixty (60) days of receiving the application,
the Planning Board may determine whether to allow the subdivision to be
developed in accordance with the cluster standards of this section based upon
findings that a clustered development will permit more efficient creation and
utilization of infrastructure and provision of municipal and quasi-municipal
services that would a standard subdivision layout.
57
C. Basic Requirements for Cluster Developments
C.1. Cluster development shall meet all requirements for a subdivision, the
street acceptance ordinance and all other applicable Town Ordinances,
including the Performance and Design Standards, Article 10, of this
Ordinance.
C.2. Each building shall be an element of an overall plan for site
development. Only developments having a total site plan for structures
will be considered. The developer shall illustrate the placement of
building envelopes and the treatment of spaces, paths, roads, service and
parking and in so doing shall take into consideration all requirements of
this section and of other relevant sections of this Ordinance.
C.3. The net residential acreage shall be calculated by taking the total area of
the lot and subtracting, in order, the following:
C.3.1. Fifteen (15) percent of the area of the lot to account for roads and
parking, except that if an applicant demonstrates that a
conventional subdivision of the lot would result in a higher net
residential density than a cluster subdivision using the fifteen (15)
percent reduction prescribed herein, the applicant may subtract a
figure equal to the actual area of the lot required for roads and
parking in a conventional subdivision instead of the prescribed
fifteen (15) percent.
C.3.2. Portions of the lot which, because of existing land uses or lack of
access, are isolated and unavailable for building purposes or for
use in common with the remainder of the lot, as determined by
the Planning Board.
C.3.3. Portions of the lot shown to be in a floodway as designated in the
Flood Boundary and Floodway Map prepared by the Federal
Insurance Administration.
C.3.4. Portions of the lot which are unsuitable for development in their
natural state due to topographical, drainage or subsoil conditions
such as but not limited to:
C.3.4.A. Slopes greater than twenty (20) percent.
C.3.4.B. Wetland s exceeding ten (10) percent of total developed
area.
C.3.5. Portions of the lot subject to rights of way.
58
C.3.6. Portions of the lot covered by surface waters.
C.3.7. Portions of the lot utilized for storm water management facilities.
C.4. In order to determine the maximum number of dwelling units permitted
on a tract of land, the net residential acreage shall be divided by the
minimum lot size required in the District.
C.5. Unless a community sewage collection and treatment system is provided,
no lot shall be smaller in area than twenty thousand (20,000) square feet.
C.6. The total area of common land within the development shall equal or
exceed the sum of the areas by which any building lots are reduced
below the minimum lot area normally required in the District.
C.7. No individual lot or dwelling unit shall have direct vehicular access onto
a public road existing at the time of the development.
C.8. Shore frontage shall not be reduced below the minimum normally
required in the zone.
C.9. Where a cluster development abuts a water body, a usable portion of the
shoreline, as well as reasonable access to it, shall be a part of the
common land.
C.10. The location of subsurface waste water disposal systems and an
equivalent reserve area for replacement systems shall be shown on the
plan. The reserve areas shall be restricted so as not to be built upon.
The report of a licensed Site Evaluator shall accompany the plan. If the
subsurface disposal system is an engineered system, approval from the
Department of Human Services, Division of Health Engineering shall be
obtained prior to Planning Board approval.
D. Dedication and Maintenance of Common Open Space and Facilities
D.1. Common open space shall be dedicated upon approval of the project.
There shall be no further subdivision of this land, which shall be used
only for non-commercial recreation, agriculture or conservation.
However, easements for public utilities, or structures accessory to non-
commercial recreation, agriculture or conservation may be permitted.
D.2. The common open space(s) shall be shown on the development plan and
with appropriate notation on the face thereof to indicate that:
D.2.A. The common open space shall not be used for future building lots;
and
59
D.2.B. A part or all of the common open space may be dedicated for
acceptance by the Town.
D.3. If any or all of the common open space is to be reserved for use by the
residents, the by-laws of the proposed homeowner's association shall
specify maintenance responsibilities and shall be submitted to the
Planning Board prior to approval.
D.4. Covenants for mandatory membership in the association, setting forth
the owners' rights and interests and privileges in the association and the
common land, shall be reviewed by the Planning Board and included in
the deed for each lot.
D.5. This homeowner's association shall have the responsibility of
maintaining the common open space(s) and other common facilities,
where applicable.
D.6. The association shall levy annual charges against all property owners to
defray the expenses connected with the maintenance of open space,
other common and recreational facilities and Town assessments.
D.7. The developer shall maintain control of such open space(s) and be
responsible for their maintenance until development sufficient to support
the association has taken place. Such determination shall be made by
the Planning Board upon request of the homeowner's association or the
developer.
10.21. Multi-Family Development
A. Multi-family developments may be approved by the Planning Board in
accordance with the Land Use Table of the Zoning Ordinance. All proposals
to construct multi-family developments shall also be in conformance with the
Performance and Design Standards specified in Article 10 of this Ordinance
and the design requirements listed below.
B. Application for approval shall include: a map of the area; dimensions,
boundaries and principle elevations of the land for which approval is sought;
the names of all property owners within one hundred (100) feet of the
proposed site, as found on the most recent tax list; building layout and general
construction plans; a site plan of all driveways and parking areas proposed to
be constructed; and other information which addresses all appropriate
performance and design standards and all appropriate factors to be considered
in evaluating proposals.
60
C. Design Requirements
C.1. Density
C.1.A. The net residential acreage shall be calculated by taking the total
area of the land and subtracting, in order, the following:
a. Fifteen (15) percent of the area of the lot to account for roads
and parking.
b. Portions of the lot which, because of existing land uses or
lack of access, are isolated and unavailable for building
purposes or for use in common with the remainder of the lot,
as determined by the Planning Board.
c. Portions of the lot shown to be in a floodway or a coastal
high hazard zone as designated in the Flood Plain Boundary
and Floodway Map prepared by the Federal Insurance
Administration.
d. Portions of the lot which are unsuitable for development in
their natural state due to topographical, drainage or subsoil
conditions such as, but not limited to:
(i)
Slopes greater than twenty (20) percent.
(ii) Wetlands exceeding 10% of total development area.
e. Portions of the lot subject to rights of way.
f. Portions of the lot covered by surface waters
g. Portions of the lot utilized for storm water management
facilities.
C.1.B. In order to determine the maximum number of dwelling units
permitted on a tract of land, the net residential acreage shall be
divided by the minimum lot size required by the District.
D. Sewage Disposal
All residential buildings shall be connected to a properly engineered and
approved system
61
E. Site Maintenance
It shall be the responsibility of the owner to provide for rubbish disposal,
snow removal, and site maintenance. All outdoor storage areas for waste
collection shall be enclosed by a wooden or masonry screen at least six (6)
feet in height.
F. Buffers
A fifty (50) foot landscaped buffer shall be provided along all property
boundaries.
G. Storm Water/Drainage Systems
Storm water and surface drainage systems shall be designed in accordance
with the Town subdivision standards.
H. Access, Circulation and Parking
H.1. The proposed development shall provide for safe access to and from
public or private roads. Safe access shall be assured by providing an
adequate number and location of access points, with respect to sight
distances, intersections, schools, and other traffic generators. All corner
lots shall be kept clear from visual obstructions higher than three (3) feet
above ground level, for a distance of twenty-five (25) feet, measured
along the intersecting street lines.
H.2. The proposed development shall not have an unreasonable adverse
impact on the public road system, and shall assure safe interior
circulation within its site, by separating pedestrian and vehicular traffic
and by providing adequate parking and turn around areas.
H.3. All developments containing fifteen (15) or more dwelling units may be
required by the Planning Board to have more than one (1) street access
for emergency and safety purposes. No more than two (2) accesses shall
be allowed on any single street or roadway.
I. Recreation and Open Space
All multi-family developments of twenty-five (25) dwelling units or more
shall provide a developed play area no smaller than five thousand (5,000)
square feet. Any development in which occupancy is restricted to the elderly
need not provide a play area, but space shall be provided for outdoor
recreation.
62
10.22. Floodplain Management
Any part of a subdivision located in a special flood hazard area as identified by the
Federal Emergency Management Agency must meet the requirements in the Limington
Floodplain Management Ordinance.
63
ARTICLE 11.
REVISIONS TO APPROVED SUBDIVISION PLANS
11.01 Procedure
An applicant for a revision to a previously approved plan shall, at least two (2)
weeks prior to a scheduled meeting of the Board, request to be placed on the
Board's agenda. If the revision involves a minor subdivision, the procedure set
forth in Article 7 shall be followed. If the revision involves a major subdivision
and proposes the creation of additional lots or dwelling units, the procedures for
preliminary plan approval set forth in Article 8 shall be followed. If the revision
involves only modifications of the approved plan, without the creation of
additional lots or dwelling units, the procedures for final plan approval set forth in
Article 9 shall be followed.
11.02 Submissions
The applicant shall submit a copy of the approved plan as well as eight (8) copies
of the proposed revisions. The application shall also include enough supporting
information to allow the Board to make a determination that the proposed
revisions meet the standards of this Ordinance and the criteria of the statute. The
revised plan shall indicate that it is the revision of a previously approved and
recorded plan and shall show the title of the subdivision and the book and page or
cabinet sheet on which the original plan is recorded at the Registry of Deeds.
11.03 Scope of Review
The Board's scope of review shall be limited to those portions of the plan which
are proposed to be changed.
64
ARTICLE 12. PERFORMANCE GUARANTEES
12.01 Type of Guarantees
Upon approval of the Final Plan and prior to any construction, the applicant shall
provide to the CEO one of the following performance guarantees for an amount
adequate to cover the total construction costs of all required improvements, taking
into account the time span of the construction schedule and the inflation rate for
construction costs:
A. Either a certified check payable to the municipality or a savings account or
certificate of deposit naming the municipality as owner, or the establishment
of an escrow account.
B. A performance bond payable to the municipality issued by a surety company,
approved by the municipal officers.
C. An irrevocable letter of credit from a financial institution establishing funding
for the construction of the subdivision from which the municipality may draw
if construction is inadequate, approved by the municipal officers.
D. The Planning Board may choose not to require a performance guarantee for a
minor subdivision.
E. The conditions and the amount of the performance guarantee shall be
determined by the Board with advice of the municipal officers and the CEO.
12.02 Contents of Guarantee
The performance guarantee shall contain a construction schedule, cost estimates
for each major phase of construction taking into account inflation, provisions for
inspections of each phase of construction, provisions for the release of part or all
of the performance guarantee to the developer, and a date after which the
applicant will be in default and the municipality shall have access to the funds to
finish construction.
12.03 Escrow Account
A cash contribution to the establishment of an escrow account shall be made by
either a certified check made out to the municipality, the direct deposit into a
savings account or the purchase of a certificate of deposit into an FDIC insured
institution. For any account opened by the applicant, the municipality shall be
named as owner or co-owner, and the consent of the municipality shall be
required for a withdrawal. Any interest earned on the escrow account shall be
returned to the applicant unless the municipality has found it necessary to draw on
the account, in which case the interest earned shall be proportionately divided
65
between the amount returned to the applicant and the amount withdrawn to
complete the required improvements.
12.04 Performance Bond
A performance bond shall detail the conditions of the bond, the method for release
of the bond or portions of the bond to the applicant, and the procedures for
collection by the municipality. The bond documents shall specifically reference
the subdivision for which approval is sought.
12.05 Letter of Credit
An irrevocable letter of credit from a bank or other lending institution shall
indicate that funds have been set aside for the construction of the subdivision and
may not be used for any other project or loan.
12.06 Phasing of Development
The Planning Board may approve plans to develop a major subdivision in separate
and distinct phases. This may be accomplished by limiting final approval to those
lots abutting that section of the proposed subdivision street which is covered by a
performance guarantee. When development is phased, road construction shall
commence from an existing public way. Final approval of lots in subsequent
phases shall be given only upon satisfactory completion of all requirements
pertaining to previous phases.
12.07 Release of Guarantee
Prior to the release of any part of the performance guarantee, the CEO shall
determine to his satisfaction that the proposed improvements meet or exceed the
design and construction requirements for that portion or phase of the subdivision
for which the release is requested. Within thirty (30) days of release of guarantee,
any unused funds shall be returned to the developer.
12.08 Default
If upon inspection, the CEO finds that any of the required improvements have not
been constructed in accordance with the plans and specifications filed as part of
the application, he or she shall so report in writing to the municipal officers, the
Planning Board, and the applicant or builder. The municipal officers shall take
any steps necessary to preserve the municipality's rights.
12.09 Improvements Guarantee
Performance guarantees shall be tendered for all improvements required to meet
the standards of these regulations and for the construction of the streets, storm
66
water management facilities, public sewage collection or disposal facilities, public
water systems, and erosion and sedimentation control measures.
67
ARTICLE 13. INSPECTIONS AND ENFORCEMENT
13.01 Inspection of Required Improvements
A. At least five (5) days prior to commencing construction of required
improvements, the subdivider or builder shall:
Notify the Code Enforcement Officer (CEO) in writing of the time when (s)he
proposes to commence construction of such improvements, so that the CEO
can arrange for inspections to assure that all municipal specifications,
requirements, and conditions of approval are met during the construction of
required improvements, and to assure the satisfactory completion of
improvements and utilities required by the Board.
B. If the CEO finds upon inspection of the improvements that any of the required
improvements have not been constructed in accordance with the plans and
specifications filed by the subdivider, the CEO shall so report in writing to the
municipal officers and the subdivider and builder. The municipal officers
shall take any steps necessary to assure compliance with the approved plans.
C. If at any time it appears necessary or desirable to modify the required
improvements before or during the construction of the required improvements,
the CEO is authorized to approve minor modifications due to unforeseen
circumstances such as encountering hidden outcrops of bedrock, natural
springs, etc. The CEO shall issue any approval under this section in writing
and shall transmit a copy of the approvals to the Planning Board. Revised
plans shall be filed with the Board. For major modifications, such as
relocation of rights-of-way, property boundaries, changes of grade by more
than one percent (1%) etc., the subdivider shall obtain approval from the
Board to modify the plans in accordance with Article 10.
D. Prior to the sale of any lot, the subdivider shall provide the Board with a letter
from a Registered Land Surveyor, stating that all monumentation shown on
the plan has been installed.
E. Upon completion of street construction and prior to a vote by the municipal
officers to submit a proposed public way to a town meeting, a written
certification signed by a professional engineer shall e submitted to the
municipal officers at the expense of the applicant, certifying that the proposed
public way meets or exceeds the design and construction requirements of this
or any other applicable Ordinance or criteria. If there are any underground
utilities, the servicing utility shall certify in writing that they have been
installed in a manner acceptable to the utility. "As built" plans shall be
submitted to the municipal officers.
68
F. The subdivider shall be required to maintain all improvements and provide for
snow removal on streets and sidewalks until acceptance of the improvements
by the municipality or control is placed with a low owners' association.
G. If the services of a Licensed Professional Engineer are required, the applicant
shall assume the cost of this service.
13.02 Violations and Enforcement
A. No plan of a division of land within the municipality which would constitute a
subdivision shall be recorded in the Registry of Deeds until a Final Plan has
been approved by the Planning Board in accordance with this Ordinance.
B. A person shall not convey, offer or agree to convey any land in a subdivision
which has not been approved by the Planning Board and recorded in the
Registry of Deeds.
C. A person shall not sell, lease, or otherwise convey any land in an approved
subdivision which is not shown on the plan as a separate lot.
D. No public utility, water district, sanitary district or any utility company of any
kind shall serve any lot in a subdivision for which a Final Plan has not been
approved by the Planning Board.
E. Development of a subdivision without Planning Board approval shall be a
violation of law. Development includes grading or construction of roads,
grading of land or lots, or construction of buildings which require a plan
approved as provided in this Ordinance and recorded in the Registry of Deeds.
F. Violations of the above provisions of this section are a nuisance and shall be
punished in accordance with the provisions of 30-A M.R.S.A., 4452.
69
ARTICLE 14.
APPEALS
An appeal from a decision of the Planning Board may be taken to the Limington Zoning Board
of Appeals within thirty (30) days of the date the Board issues its written decision then to the
York County District Court if desired.
70
ARTICLE 15.
SEPARABILITY AND EFFECTIVE DATE
A. The invalidity of any provision of these standards shall not invalidate any other part.
B. These standards shall take effect immediately on adoption of the same by the legislative
body.