Shoreland Zoning
Ordinance
Adopted: December, 1997 rtifi ;
Amended: June 12, 1999 Certification
June 15, 2002 Adopted on June 18,2022
June 16, 2007 . J oo .
October 29, 2007 . aA Gf? fo
June 13, 2009 Certified By (2 Aaya
June 17, 2017 Town Clerk
June 15, 2019
July 18, 2020
June 18, 2022
+ > 4 ~, ;
2 2s
Table of Contents
Contents
SECTION 1 Gemneral Provisions ..........csccsssscsccssccecsvecsssseecsonesnsessvsenacsecsanecsccsserscessssscssscsesesnescesanesnseageessssstesssansescsesse D
LL. PULPOSES 00... eccceecsescsesesesessscsesesesevssacsesesenesesssacscscusvavesaaesescesseetstsesevesesseasasasssssssssuevesesavssasasssssavasasasscssuesecessvasatiseceenacsteueseestscatasesestseaeseaesd
1.2, AUthOT ity. eee ec cscs ceescesenesesescscausnsesecscsesersevasesesessnsseececessasacsesscussensacaessessusacsceaeessususasisaeavaraseseasstssssscsescensusssrsasasanaueauessesessassnsnsatererd
1.3. Applicability 20.0... cccecccceseseesesesesessscsevessssuscsesesenavasesesescecacscsesesessnesesessssssesesssavesesasseseceaeseeesasesacacsusesavavavssasasssussesesavacanssesusivavaccstecsvacstaesd
1.4. Effective Date oo... .ccescsececessseseceesesesesessesesesesescensesuescncssacsesacsessavavassussssessavavesssssscassvessssssssasasssesssessssasssavsuassusscsessscscsssearcseesrsateatatsaeseasanenesd
14.A. Effective Date of Ordinance and Ordinance Amendment. .0.......0...cccccescccscseseseescesesssesecesseceasssscecvavecavascsssavecesesavssssssesavsvssaseareacaeatecsavatavanenasd
1.5. Availability oo. cccceeeseceeeeeeseeesesescscsnsneneasacacasscsesenesestscsusssscseacsvcesaussssavsussssessasasavensscssavasavsuesessscstacsessesseeessscsssescscseseescseesseessseseassesearcesea
1.6. Severability 0.0... ccccecesesssssecscsesesessscescsescsesesssencsecesasscecsavssssesevevavasevasssasaseceesesavavasasssstasessesavavscasecscsseseesesstscseececsssessasecacsssrssetessacsteverersnsaee
1.7. Conflicts with other Ordinances ....0....ccccccecccccssesssssescescecscscscseecscscsssesesesasasesaussseseseseusssseceeseseserssacesasesscstscsesessvscacscstiaseessarcsntavsestesecacseesarse
1.8. AMENAMENES ooo... ccc ee eseseseeeesesesescscsesesassescecstscacscseasacsenessssssseseveseseussasessstenevessussesesssssassesesanasacacacsessuesesesasiescsesecseecsessacseeneansaeasseesecessseesee4
2.1, Districts and Zoning Map.........cccccccccssecsssssssesesesesecececscnesesesesussesceteseneseasseseeveuesesescseseessecuestasasavavasessicssacseacseeveveaeseaeacscseseesasesssseecesssasaeacareen
2.1.A. Official Shoreland Zoning Map............cccccccccscsscsssessecsesessesesssvesssescesesesescscsssucseseseasscssssavavsuesssssssaecessnessasscsesececececeecesesssvaesessreaveeseacavtseseereee
2.1L.B. Scale Of Map....c.cccccecccccsscssssssescsesesceessseseseseseususeacseseseussacscavasasseacsesesavesesacauaseecessscsssectsacseasssucessesuvavssacsessvavesaratetsavscseesscisineersacstseeecseasseseereD
2.1.C. Certification of Official Shoreland Zoning Map ............0cccccccsscescesecsececescsesescscsessecseeuvscsesseesssavasesscacssssecsesuceeatssavsecueeeeeevassvasesssetessavavecetsvaveaD
2.1.D. Changes to the Official Shoreland Zoning Map..........cccccccccccccssssessssssnecccsesesesesessseseseuevasseseseseseussasasassesesesesasasssesesasssacssacsessesteatstaesensesescaeseD
2.2. Interpretation of District Boundaries .....0.0...c.ccccceceesesesesesesesesseseeeececescscsesessusscseseseeuenensnsneaeseseenececeneacacaeaucvasessststssstavavassseneaeassssreatenssaeeeeeeD
2.3. Land Use Requirements ..0........eecccccccsesesesesesessesesesesescesevenesssescessscaavavasecectstscsesvavcasasasavavsusssssacssscasasassusssscscacasvsvavacsucisassesnesssausesacatasanensaseeeed
SECTION 3 Non-Comformance........cccccsssscsccsessccscccesssscseesccerscsscsscesecsessasersesssssesssesescesensecessceaseusssseersasentsseeseesenerseseney 5
3.1. Nom-comformaince oe. seceeeceececeenersscsesestscsnscecucnenessasasevessssnssscsensasssaeansususueseseaceseveneesssacsesseseceseseacavsnauavessaessvesessscesesaussesstesvsnissscssasacteasaneneeeaed
BLA, PUMPOSE ec cccccsecesesesesesesesnsnecesecessncscscsesesusssseseecssesessneseseueessnsnsnssssuasessssatssasecsusueasesessceueutusssseasavesavevareatstasssavavavassecesacassessessueavacasitssersssaesed
BARB. Gemerab ee cee ccccccsescscsesesesevessvenensnsneacsveveneacscssesaveseuecsssucsnsneesasacevavansacasscansseseueasssssavansneasisasacarssevenessseasacacavecananensnsasasaceneensaneassnesaesensaeeeeed)
B.L.C. Non-Conforming Structures 0.0... cccceccceccssesesessscsescesucecscscsncesseseecesessneesscacauaueseassuscecevsneesssusseaeeseeseseneaeaessseaeencreseesaeseseeseearecsessseeestsereseanesO)
3.1.D. -- Non-Conforming Uses oo... cccecsessesesesceesneccseseseseseseausvsuesesseneneassessesesesaueaescseauessseneaeseseensnsneneasasaeasseeeeeesessseseeceeetsnessisaecssstestsesenessenees LO
B.L.E. -- Non-Conforming Lots 0.0.0. cceccssssssssssesesesesseseseseseseacsnsscescevevensnsneaeacesesenessacaeacsesaeseacsceeseansnsscasasseeseceneseatssacseseseseetesessessasatsessssestaceaeeeeee LO
SECTION 4 Shoreland Districts.............sccscsscsccscorovsrescossssessssescssersonsrssvaserecsecsescsessessessssessassassssasesscessessssssctseseseseneee LL
4.1. Establishment of Districts 00.0.0... cece cececcesecesesesesesceeesescsencnesesesesenenesecseaesesesesensesescseacaesesenensseeseseseseseaussneseseatiseseeestsestiseseaseeessteereeeeeee LL
4.1L.A. Resource Protection District.........0..cccccccssssssssssessesssssssussssasessessesucsessessvsscsessussvssesseesseesssesusniesseassecarssrssessecseareestresacersateesseesesseaeseieneeee db
4.1.B. Limited Residential District 0.0... ccccccsseeeessesseseseseseeseesseevsvsnssescaeeceeuenessscsesesesueseseseesevavsnaneasasevacaeeeeseeeeeeseesesceeeveasnseesscansateeastensaeesesee LD
4.1.C. Stream Protection District 0.0.00... ceccccccssccesssesessseseseeseseseseseneseseuenesenenessscaeecsenesseuseaecescacseseeecsnseseseaensssaeseseneaeeesssscsesesesesssesssscecssareeseeeseee LQ
SECTION 5 Land Uses Table... .sssssserssscsecsesscvoserssssersseescscscorecessoescsccaccesecsesensescsssseesoesssssssacsessescsnesarassarveaseorseee LO
5.1. Table of Land Uses oo... ccecccccscseescsessssesesesescsesenensecscsesesesessesseseuesesavasaaeecsaneneaceasaeseaeacacaeaeaesenacaeneseaesevaeseaeeessecseessesenseestsssutssseetsvesteeseses LO
Key to Table 1:..........scssssnvescsosscsssssecsressecsncsssssssssocsssssssovorseseceoensonssscecosesssssenesssesssceonesesssersnassassssseasesaseasseassessasereassssseneves LO
5.2. Land Use Standards .........cccceccecscescssecesceeeseececessesesesneaacecscnsscsccacseaesacsevecaacaeaesaassaasseeseaevacseeeessecenesessssessesstasstsassasissecasssssssesessessssessesees LO
5.2.A. Minimum Lot Standards... ccessccscsesesesesesseenenssssscscseneecsesensucsesessesesesenesceasacseseaeseseseneeeeecaeseseaeeeessaeseaseesseenasaeeeseneretstestesessseesseasseees LO
5.2.B. Principal and Accessory Structures 0.0.0.0. ccccccscecscsessneeseaesestesecseseaeceseesecsececscseaesesenensseeecseseaeseseneesesceesaneeeneescssieieteestetstetstenttestessessssee LO
5.2.€. Piers, Docks, Wharves, Bridges, Etc. ...........c.cccceccsccseseeeceeeceseseeeesessesececacsevscacseracsevsesucansecacarecneaesieseaesaesteseaseeseseeseeenstssestatansasessessssensenees LD
5.2.D. Campgrounds... ec cceceesesecessceeeseecesseeseseesesesacsessescsueseracacsesesasesasaesasstsavasuasssassessusesassasssssusesssassessessssesessesssaseessessssesscssesseseseatirerereseene Dh
5.2.E. Individual Private Campsites............cccscscesccseeseseseeeceeeesceesesecacseseessueecacececesnsusnsseacseeceessasasansneeatecacacseesscesstseensnsasaestavaressessseessaseeetsneeeessees ed
5.2.F. Outdoor Lighting oo... ecceecccccsecesesneceseseseecesssencscscseesaveusssssusasecssecscesesensucacaveeceaeacacessnsnsuacsasscacacaeesessasssecacsesusnsesecseesaesusansansteasenstatesenee Qe
5.2.G, Parking Areas oo... cece csccscsecsesecseseeeeseesssesecaescencssseeesscssuesscsesssssssusssassesessssevssssvasasesssesessssesassssassdssssessessesessssssasassecateccacseseessencascatstessaes Dla
5.2.H. Roads and Driveways.............sccsccessessscsececeeseseseseesescscececscscessesensevanensnsavavaneueacaeacsnssueuessacacsesseseneusasasacacaeecsversaceeecaesceuarsusuenesnesasatstesenaeaeeees 2
5.2]. Storm Water Runoff... cc cccceccccsssseesseseseseseseseseeneeseseseseseceacseseseneseecseneasscucaesecsecvacetaessucseescsesesesasaeseeeaseeesieeseeneseeaeieiseevestneseseesceeaneceeaes DO
Town of Litchfield Shoreland Zone Ordinance 2022
1
5.2.K. Septic Waste Disposal... cesses sesssesseessecsssssesssseasssessessnssassssussuscsucsravassussusssuesisuscavessucssessavsquusssstesssessusavessessssessecetsarecsstecssvesasveces 26
S.2.L, Essential Services... ceccccscscsscecssesssesesssevecseseenesusesnessssvessnsassessussssssessecssecasssssersusssusssuasesssasssusssuessavecsstessessassaesstvesavesseareeraseesssveerensans26
5.2.M. Mineral Exploration and Extraction ...........ccccccccssecssssessesssscesesusessssussessusevecssssvesusssvseuesavesessaetanseasansessssratstessussessesatensessessessveseasecessveseveseec27
S.2.N. Agriculture ec cec ccc essecsstessvessvecssesanscsnscunscssenasearsssssssssussssesisssecssessresssssssessseesssessncssvessusesasssuessussaversuvssissatssateusessessessseesereesseescaseeecD®
5.2.0, -- Clearing or Removal of Vegetation .........0..cecsescssssssssssessessssesssseasssssessuessucssvesssessssssucssessavessusssvessstssacesvacssussssacsavsssesesssvecsessseasesssiveesavesserese29
5.2.P. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal ..0........c.cccccccsessessssssessssseessessseseteseesesstestsessuesstsststeavestesssesseasasesseseeaseeed
5.2.9. Exemptions to Clearing and Vegetation Removal Requirements..........0..0..:c.cscsesssssssessessuessscseesuessessressecsesssesaseareaessessesaressssececeessessseesvessees33
5.2.R. Revegetation Requirements... ccscceecssecssssssesssesssecsecossescssessssssscssesssssavessessusssutesesssusssussavssavssacessatatisessesstesstsarseesessessiserepsssevesareeseeeaee35
5.2.8. Erosion and Sedimentation Control .............ceccscsesssssssssssssesssseessessscasecsscsssessecssecsuesssecsscessssvessevssvecsusssussssutessiearsassessesssasssesstsasiesssessseesseeee3O
5.2.0, Water Quality... occ cecceccscesessnsssesesseesesueesssssssaucassssssssssssessvsensasuesussssusansevessevesuvsussussasssssssessvassaseascsessvsutesresueseseesseresseeastisavesavesteevsseessec38
5.2.V. Archaeological Site... eecceceecsessesssessecsessesueesessesssssussseesssssussussuesessanessusucsesssecssecracsustessneaseessssutavestesssssseesessvarsarecesesevsessavssvessessnceseeee3S
5.2.W. -- Natural Resource Protection...........c.csceeccsscsssssessssesseesscsssecssvesossessscsusssessssessssssucsuecssvsssvessuessvcssesesassavecsusssssessussstesiussuesssesssessesssessssesssaecesseeed8
5.2.X. Phosphorus Contt0l........ceseeccsssssessessssssssesssesesscucsuenesscseavsssussusarsesussusessnsausarsussaseussussveavervssessesseascasesecsvasetsussissvsessesvesiveressreercivesavsevesveseeseec38
S.2.Y. NOUSC....essececcsseecssesssessssecsssecssnscssssessuecessseesssessnsessneesnscesvscsessssessussatescssscsssscsssesasecsssvecssvessassessnstersesesavessussesstseessessissssuessssesseessseeasisecesssseeeeed9
SECTION 6 Administration and Enforcement ............cscssscsssssssesssssssseesssssessesssssessssssssesssssssstssazassosavenacarsesssseceeaees 39
6.1. Administration .......0..0.cceccesssssscsseecssesssecsuseserssscsanesusesussesssssnssssecssusesessusesecasussssessvssssessusssnvessesaueessvsssnsssnessvessuesstsanesssessessvessesssserssseesseseee39
6.1.A. Administering Bodies and Agents ...........0...cccccccccscssessesssesssesssessssscssvesvesessussasssusesessvsavssuessussuesavssteatesseasessessessssseesessecaesvestersesereareesseese39
6.1.B. Permits Required... esc cccecsssesssessnsessessssessessessssesuccavsnsaveessnsssessavssesesersnvessusesecssvesasessaeasissasessassresaseseavenssesssaseestitearespesseaseesssseessuesr. 40
GAC. Permit Application... cececsscssssssesecssesssssssessecenecsuessssesssscssussussssscsvecsusssusssnsesaesasesuvesssasucsisavesssesssiesssussassavscsessetssssesisssesssersaseeesveseee4l
6.1.D. -- Procedure for Administering Permits ..............cccccccssecsssssseeesosessvesvecsscessesssessusesuesaressusessesssessareeracatsesssssseessstesnsaresseesseesssesssessessessecsseeeee4 Ll
GLE. Special Exceptions... ccecccecssesseesseecsecssesneesnssssessussssseessesssscssscsssssseasesesvssansssessavestusssucssvessusesseaueeavensaressiessessvesseessseessesseesiesssrerseseesee2
6.1.F. Expiration of Permiit.............cccscscscsescsessssssesssessusecsessnsesnesssssssusesasesuecevessessuscasessrecsssssnessnsespessueesunaresssusssnesssiessesusatesssssssesreasesseesesersseeeec
6.1.G. Installation of Public Utility Service oo... eeceeessesssecsssssecssssesseesosecssusecsessssssssvecssistsnsesssssesssutesavecsressssnesssutsstssitesssasessesssetseiessasenscasee
GLA. Appeals... ccc cecscecsescseecssessseesssessessseessucesssessssvssssssssssusessussssessssssssasesssessascssssusssapserecsaneesnessvesasestucaritersstesiesressestesseseesirsstsserssssecaseeeeee
6.2. EMfOrcement..........ccccsececseecsseeseseecsseecsssesssncsssessssssansesunsessnvesgssuessusesssesssecssusassecessuetssnsesssssssvasssssssvesssvessesvessavecaseseaveransissurassessaseesasveceareerA
6.2.A. NUISANCES... ceccseccecsesseccssseecssessssseseessuvecessssessusesnnnsesenssiessesstsssstisssstunecssssessissessssiessnsitessassesssaveceessueecesssintsarsussrseeessniaetssetssvanmssasseeeend
SECTION T Defimitions............esesesesssececssssssssssssesssessssesessssecesesecsssseseseensscessssacoessseesesssescsssassssesesssussvsesesesseessssssaceeee SO
PREFACE: The Mandatory Shoreland Zoning Act, 38 M.R.S.A. sections 435-449, requires all
municipalities to adopt, administer, and enforce ordinances which regulate land use activities within 250
feet of great ponds, rivers, freshwater and coastal wetlands, including all tidal waters; and within 75 feet
of streams as defined. The Act also requires the Board of Environmental Protection to establish minimum
guidelines for such ordinances. This document, adopted by the Board on February 14, 1990 and amended
July 14, 1992, August 7, 1994, February 6, 1999, February 13, 2000 and May 1, 2006 contains those
guidelines for municipal shoreland ordinances. The Act requires that municipalities adopt shoreland
zoning ordinances consistent with, or no less stringent than, those minimum guidelines.
Town of Litchfield Shoreland Zone Ordinance 2022
2
Shoreland Zoning Ordinance for the Municipality of Litchfield
SECTION 1 General Provisions
1.1. Purposes
The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds,
aquatic life, bird and other wildlife habitat; to protect buildings and lands from flooding
and accelerated erosion; to protect archaeological and historic resources; to protect
freshwater wetlands; to control building sites, placement of structures and land uses; to
conserve shore cover, and visual as well as actual points of access to inland waters; to
conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
1.2. Authority
This Ordinance has been prepared in accordance with the provisions of Title 38 sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
1.3. Applicability
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the:
1. Normal high-water line of any great pond or river, or
2. Upland edge of a freshwater wetland, or
3. Carter Pond and Knight Pond as depicted on the Shoreland Zoning Map, land
areas within 75 feet, horizontal distance, of the normal high-water line of a
stream.
4. This Ordinance also applies to any structure built on, over or abutting a dock,
wharf or pier, or other structure extending or located below the normal high-
water line of a water body or within a wetland.
1.4. Effective Date
1.4.A. Effective Date of Ordinance and Ordinance Amendments.
This Ordinance, which was adopted by the municipal legislative body on June 16, 2007,
shall not be effective unless approved by the Commissioner of the Department of
Environmental Protection. A certified copy of the Ordinance, or Ordinance Amendment,
attested and signed by the Municipal Clerk, shall be forwarded to the Commissioner for
approval. If the Commissioner fails to act on this Ordinance or Ordinance Amendment,
within forty-five (45) days of his/her receipt of the Ordinance, or Ordinance Amendment,
it shall be automatically approved.
Town of Litchfield Shoreland Zone Ordinance 2022
3
Any application for a permit submitted to the municipality within the forty-five (45) day
period shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the
Ordinance, or Ordinance Amendment, is approved by the Commissioner.
1.5. Availability
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at
reasonable cost at the expense of the person making the request. Notice of availability of
this Ordinance shall be posted.
1.6. Severability
Should any section or provision of this Ordinance be declared by the courts to be invalid,
such decision shall not invalidate any other section or provision of the Ordinance.
1.7. Conflicts with other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another
provision of this Ordinance or of any other ordinance, regulation or statute administered
by the municipality, the more restrictive provision shall control.
1.8. Amendments
This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the
Commissioner of the Department of Environmental Protection following adoption by the
municipal legislative body and shall not be effective unless approved by the
Commissioner. If the Commissioner fails to act on any amendment within forty-five (45)
days of his/her receipt of the amendment, the amendment is automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day
period shall be governed by the terms of the amendment, if such amendment is approved
by the Commissioner.
SECTION 2 Districts
2.1. Districts and Zoning Map
2.1.A. Official Shoreland Zoning Map
The areas to which this Ordinance is applicable are hereby divided into the following
districts as shown on the Official Shoreland Zoning Map(s) which is (are) made a part of
this Ordinance:
1. Resource Protection
2. Limited Residential
3. Stream Protection
Town of Litchfield Shoreland Zone Ordinance 2022
4
2.1.B. Scale of Map
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch =
2000 feet. District boundaries shall be clearly delineated and a legend indicating the
symbols for each district shall be placed on the map.
2.1.C. Certification of Official Shoreland Zoning Map
The Official Shoreland Zoning Map shall be certified by the attested signature of the
Municipal Clerk and shall be located in the municipal office. In the event the
municipality does not have a municipal office, the Municipal Clerk shall be the custodian
of the map.
2.1.D. Changes to the Official Shoreland Zoning Map
If amendments, in accordance with Section 1.8, are made in the district boundaries or
other matter portrayed on the Official Shoreland Zoning Map, such changes shall be
made on the Official Shoreland Zoning Map within thirty (30) days after the amendment
has been approved by the Commissioner of the Department of Environmental Protection.
2.2. Interpretation of District Boundaries
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines
are property lines, the centerlines of streets, roads and rights of way, and the boundaries
of the shoreland area as defined herein. Where uncertainty exists as to the exact location
of district boundary lines, the Board of Appeals shall be the final authority as to location.
2.3. Land Use Requirements
Except as hereinafter specified, no building, structure or land shall hereafter be used or
occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in
conformity with all of the regulations herein specified for the district in which it is
located, unless a variance is granted.
SECTION 3 Non-Conformance
3.1. | Non-conformance
_ 3.1.A. Purpose
It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or
amendments thereto shall be allowed to continue, subject to the requirements set forth in
section 3. Except as otherwise provided in this Ordinance, a non-conforming condition
shall not be permitted to become more non-conforming.
3.1.B. General
Town of Litchfield Shoreland Zone Ordinance 2022
5
1. Transfer of Ownership. Non-conforming structures, lots, and uses may be
transferred, and the new owner may continue the non-conforming use or
continue to use the non-conforming structure or lot, subject to the provisions
of this Ordinance.
2. Repair and Maintenance. This Ordinance allows, without a permit, the
normal upkeep and maintenance of non-conforming uses and structures
including repairs or renovations that do not involve expansion of the non-
conforming use or structure, and such other changes in a non-conforming use
or structure as federal, state, or local building and safety codes may require.
3.1.C. Non-Conforming Structures
1. Expansions. All new principal and accessory structures, excluding
functionally water-dependent uses, must meet the water body, tributary
stream, or wetland setback requirements contained in Section 5.2.B.1. A non-
conforming structure may be added to or expanded after obtaining a permit
from the same permitting authority as that for a new structure, if such
addition or expansion does not increase the non-conformity of the structure,
and is in accordance with subparagraphs (1), and (2) below.
L. Expansion of any portion of a structure within 25 feet, horizontal
distance, of the normal high-water line of a water body, tributary
stream, or upland edge of a wetland is prohibited, even if the
expansion will not increase nonconformity with the water body,
tributary stream or wetland setback requirement. Expansion of
an accessory structure that is located closer to the normal high-
water line of a water body, tributary stream, or upland edge of a
wetland than the principal structure is prohibited, even if the
expansion will not increase nonconformity with the water body
or wetland setback requirement.
2. Notwithstanding paragraph (1), above, if a legally existing
nonconforming principal structure is entirely located less than 25
feet from the normal high-water line of a water body, tributary
stream, or upland edge of a wetland, that structure may be
expanded as follows, as long as all other applicable municipal
land use standards are met and the expansion is not prohibited by
Section 3.1.C.1.
(i) The maximum total footprint for the principal structure may
not be expanded to a size greater than 800 square feet or
30% larger than the footprint that existed on January 1,
1989, whichever is greater. The maximum height of the
principal structure may not be made greater than 15 feet or
the height of the existing structure, whichever is greater.
3. All other legally existing nonconforming principal and accessory
structures that do not meet the water body, tributary stream, or
wetland setback requirements may be expanded or altered as
Town of Litchfield Shoreland Zone Ordinance 2022
6
follows, as long as other applicable municipal land use standards
are met and the expansion is not prohibited by Section 3.1.C.1.
or Section 3.1.C.1.1. above.
(i) For structures located less than 75 feet from the normal high-
water line of a water body, tributary stream, or upland edge
of a wetland, the maximum combined total footprint for all
structures may not be expanded to a size greater than 1,000
square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height
of any structure may not be made greater than 20 feet or the
height of the existing structure, whichever is greater.
(ii) For structures located less than 100 feet horizontal distance
from the normal high-water line of a great pond classified as
GPA or a river flowing to a great pond classified as GPA,
the maximum combined total footprint for all structures may
not be expanded to a size greater than 1,500 square feet or
30% larger than the footprint that existed on January 1,
1989, whichever is greater. The maximum height of any
structure may not be made greater than 25 feet or the height
of the existing structure, whichever is greater. Any portion of
those structures located less than 75 feet from the normal
high-water line of a water body, tributary stream, or upland
edge of a wetland must meet the footprint and height limits
in Section 3.1.C.1.2.i and Section 3.1.C.1.3.i ,above.
(i11)In addition to the limitations in subparagraphs (i) and (ii), for
structures that are legally nonconforming due to their
location within the Resource Protection District when
located at less than 250 feet from the normal high-water line
of a water body or the upland edge of a wetland, the
maximum combined total footprint for all structures may not
be expanded to a size greater than 1,500 square feet or 30%
larger than the footprint that existed at the time the Resource
Protection District was established on the lot, whichever is
greater. The maximum height of any structure may not be
made greater than 25 feet or the height of the existing
structure, whichever is greater, except that any portion of
those structures located less than 75 feet from the normal
high-water line of a water body, tributary stream, or upland
edge of a wetland must meet the footprint and height limits
in Section 3.1.C.1.2.i and Section 3.1.C.1.3.1, above.
4. An approved plan for expansion of a nonconforming structure
must be recorded by the applicant with the registry of deeds,
within 90 days of approval. The recorded plan must show the
existing and proposed footprint of the non-conforming structure,
the existing and proposed structure height, the footprint of any
Town of Litchfield Shoreland Zone Ordinance 2022
7
other structures on the parcel, the shoreland zone boundary and
evidence of approval by the municipal review authority.
2. Foundations. Whenever a new, enlarged, or replacement foundation is
constructed under a non-conforming structure, the structure and new
foundation must be placed such that the setback requirement is met to the
greatest practical extent as determined by the Planning Board or its designee,
basing its decision on the criteria specified in Section 3.1.C.3 Relocation,
below. If the completed foundation does not extend beyond the exterior
dimensions of the structure and the foundation does not cause the structure to
be elevated by more than three (3) additional feet, as measured from the
uphill side of the structure, it shall not be considered to be an expansion of
the structure.
3. Relocation. A non-conforming structure may be relocated within the
boundaries of the parcel on which the structure is located provided that the
site of relocation conforms.to all setback requirements to the greatest
practical extent as determined by the Planning Board or its designee, and
provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine
. Subsurface Wastewater Disposal Rules (Rules), or that a new system can be
installed in compliance with the law and said Rules. In no case shall a
structure be relocated in a manner that causes the structure to be more non-
conforming.
In determining whether the building relocation meets the setback to the
greatest practical extent, the Planning Board or its designee shall consider the
size of the lot, the slope of the land, the potential for soil erosion, the location
of other structures on the property and on adjacent properties, the location of
the septic system and other on-site soils suitable for septic systems, and the
type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland
setback area in order to relocate a structure, the Planning Board shall require
replanting of native vegetation to in accordance with Section 5.2.R. In
addition, the area from which the relocated structure was removed must be
replanted with vegetation. Replanting shall be required as follows:
1. Trees removed in order to relocate a structure must be replanted
with at least one native tree, three (3) feet in height, for every
tree removed. If more than five trees are planted, no one species
of tree shall make up more than 50% of the number of trees
planted. Replaced trees must be planted no further from the
water or wetland than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged,
or removed must be reestablished within the setback area. The vegetation and/or
Town of Litchfield Shoreland Zone Ordinance 2022
8
ground cover must consist of similar native vegetation and/or ground cover that was
disturbed, destroyed or removed.
2. Where feasible, when a structure is relocated on a parcel the
original location of the structure shall be replanted with
vegetation which may consist of grasses, shrubs, trees, or a
combination thereof.
4. Reconstruction or Replacement. Any non-conforming structure which is
located less than the required setback from a water body, tributary stream, or
wetland and which is removed, or damaged or destroyed, regardless of the
cause, by more than 50% of the market value of the structure before such
damage, destruction or removal, may be reconstructed or replaced provided
that a permit is obtained within eighteen (18) months of the date of said
damage, destruction, or removal, and provided that such reconstruction or
replacement is in compliance with the water body, tributary stream or
wetland setback requirement to the greatest practical extent as determined by
the Planning Board or its designee in accordance with the purposes of this
Ordinance. In no case shall a structure be reconstructed or replaced so as to
increase its non-conformity. If the reconstructed or replacement structure is
less than the required setback it shall not be any larger than the original
structure, except as allowed pursuant to Section 3.1.C.1 above, as determined
by the non-conforming footprint of the reconstructed or replaced structure at
its new location. If the total footprint of the original structure can be
relocated or reconstructed beyond the required setback area, no portion of the
relocated or reconstructed structure shall be replaced or constructed at less
than the setback requirement for a new structure. When it is necessary to
remove vegetation in order to replace or reconstruct a structure, vegetation
shall be replanted in accordance with Section 3.1.C.3 above.
Any non-conforming structure which is located less than the required setback
from a water body, tributary stream, or wetland and which is removed by
50% or less of the market value, or damaged or destroyed by 50% or less of
the market value of the structure, excluding normal maintenance and repair,
may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or
removal.
In determining whether the building reconstruction or replacement meets the
setback to the greatest practical extent the Planning Board or its designee
shall consider, in addition to the criteria in Section 3.1.C.3 above, the
physical condition and type of foundation present, if any.
5. Change of Use of a Non-conforming Structure. The use of a non-
conforming structure may not be changed to another use unless the Planning
Board, after receiving a written application, determines that the new use will
have no greater adverse impact on the water body, tributary stream, or
Town of Litchfield Shoreland Zone Ordinance 2022
9
wetland, or on the subject or adjacent properties and resources than the
existing use.
In determining that no greater adverse impact will occur, the Planning Board
shall require written documentation from the applicant, regarding the
probable effects on public health and safety, erosion and sedimentation,
water quality, fish and wildlife habitat, vegetative cover, visual and actual
points of public access to waters, natural beauty, floodplain management,
archaeological and historic resources, and functionally water-dependent uses.
3.1.D. Non-Conforming Uses
1. Expansions. Expansions of non-conforming uses are prohibited, except that
non-conforming residential uses may, after obtaining a permit from the
Planning Board, be expanded within existing residential structures or within
expansions of such structures as allowed in Section 3.1(C)(1) above.
2. Resumption Prohibited. A lot, building or structure in or on which a non-
conforming use is discontinued for a period exceeding one year, or which is
superseded by a conforming use, may not again be devoted to a non-
conforming use except that the Planning Board may, for good cause shown
by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure
provided that the structure has been used or maintained for residential
purposes during the preceding five (5) year period.
3. Change of Use. An existing non-conforming use may be changed to another
non-conforming use provided that the proposed use has no greater adverse
impact on the subject and adjacent properties and resources than the former
use, as determined by the Planning Board. The determination of no greater
adverse impact shall be made according to criteria listed in Section 3.1.C.5
above.
3.1.E. Non-Conforming Lots
1. Non-conforming Lots. A non-conforming lot of record as of the effective
date of this Ordinance or amendment thereto may be built upon, without the
need for a variance, provided that such lot is in separate ownership and not
contiguous with any other lot in the same ownership, and that all provisions
of this Ordinance except lot area, lot width and shore frontage can be met.
Variances relating to setback or other requirements not involving lot area, lot
width or shore frontage shall be obtained by action of the Board of Appeals.
2. Contiguous Built Lots. If two or more contiguous lots or parcels are ina
single or joint ownership of record at the time of adoption of this Ordinance,
if all or part of the lots do not meet the dimensional requirements of this
Ordinance, and if a principal use or structure exists on each lot, the non-
conforming lots may be conveyed separately or together, provided that the
State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-
Town of Litchfield Shoreland Zone Ordinance 2022
10
D) and the State of Maine Subsurface Wastewater Disposal Rules are
complied with.
If two or more principal uses or structures existed on a single lot of record on
the effective date of this ordinance, each may be sold on a separate lot
provided that the above referenced law and rules are complied with. When
such lots are divided each lot thus created must be as conforming as possible
to the dimensional requirements of this Ordinance.
3. Contiguous Lots - Vacant or Partially Built. If two or more contiguous lots
or parcels are in single or joint ownership of record at the time of or since
adoption or amendment of this Ordinance, if any of these lots do not
individually meet the dimensional requirements of this Ordinance or
subsequent amendments, and if one or more of the lots are vacant or contain
no principal structure the lots shall be combined to the extent necessary to
meet the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of
which is non-conforming, owned by the same person or persons on
November 16, 1991 and recorded in the registry of deeds if the lot is served
by a public sewer or can accommodate a subsurface sewage disposal system
in conformance with the State of Maine Subsurface Wastewater Disposal
Rules; and
1. Each lot contains at least 100 feet of shore frontage and at least
20,000 square feet of lot area; or
2. Any lots that do not meet the frontage and lot size requirements
of Section3.1.E.3.a are reconfigured or combined so that each
new lot contains at least 100 feet of shore frontage and 20,000
square feet of lot area.
SECTION 4 Shoreland Districts
4.1. Establishment of Districts
4.1.A. Resource Protection District
The Resource Protection District includes areas in which development would
adversely affect water quality, productive habitat, biological ecosystems, or scenic
and natural values. This district shall include the following areas when they occur
within the limits of the shoreland zone, exclusive of the Stream Protection District,
except areas which are currently developed.
1. Areas within 250 feet, horizontal distance, of the upland edge of freshwater
wetlands and wetlands associated with great ponds and rivers, which are
rated "moderate" or "high" value waterfowl and wading bird habitat,
including nesting and feeding areas, by the Maine Department of Inland
Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic
Information System (GIS) data layer maintained by either MDIF&W or the
Town of Litchfield Shoreland Zone Ordinance 2022
11
Department as of May 1, 2006. For the purposes of this paragraph "wetlands
associated with great ponds and rivers" shall mean areas characterized by
non-forested wetland vegetation and hydric soils that are contiguous with a
great pond or river, and have a surface elevation at or below the water level
of the great pond or river during the period of normal high water. "Wetlands
associated with great ponds or rivers" are considered to be part of that great
pond or river.
2. Floodplains along rivers and floodplains along artificially formed great ponds
along rivers, defined by the 100 year floodplain as designated on the Federal
Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or
Flood Hazard Boundary Maps, or the flood of record, or in the absence of
these, by soil types identified as recent floodplain soils.
3. Areas of two (2) or more contiguous acres with sustained slopes of 20% or
greater.
4. Areas of two (2) or more contiguous acres supporting wetland vegetation and
hydric soils that are not part of a freshwater wetland as defined, and that are
not sufficiently connected to a water body during the period of normal high
water.
5. Land areas along rivers subject to severe bank erosion, undercutting, or
riverbed movement.
4.1.B. Limited Residential District
The Limited Residential District includes those areas suitable for residential and
recreational development. It includes areas other than those in the Resource Protection
District, or Stream Protection District.
4.1.C. Stream Protection District
The Stream Protection District includes all land areas within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream, exclusive of those areas
within two-hundred and fifty (250) feet, horizontal distance, of the normal high-water
line of a great pond, or river, or within two hundred and fifty (250) feet, horizontal
distance, of the upland edge of a wetland. Where a stream and its associated shoreland
area are located within two-hundred and fifty (250) feet, horizontal distance, of the above
water bodies or wetlands, that land area shall be regulated under the terms of the
shoreland district associated with that water body or wetland.
Town of Litchfield Shoreland Zone Ordinance 2022
12
SECTION 5 Land Uses Table
5.1. Table of Land Uses
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall
conform with all of the applicable land use standards in Section 15. The district
designation for a particular site shall be determined from the Official Shoreland Zoning
Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all applicable land
use standards)
No- Prohibited
PB- Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP - Resource Protection
LR - Limited Residential
SP- Stream Protection
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICT
a
1. Non-intensive recreational uses not requiring structures
such as hunting, fishing and hiking yes yes yes
2. Motorized vehicular traffic on existing roads and trails
4. Clearing or removal of vegetation for activities other than
timber harvesting CEO | CEO? yes
6. Wildlife management practices
7. Soil and water conservation practices
8. Mineral exploration | no | yes? | yes? |
9. Mineral extraction including sand and gravel extraction | no | pe? | pa |
10. Surveying and resource analysis
Town of Litchfield Shoreland Zone Ordinance 2022
13
ee
}12.Agricutture ves |B | yes
|43.Aquacuture | TB
14. Principal structures and uses:
a
driveways pp* PB? CEO
|B. Multi-unitresidential =| sto | no |B
| Commerciad =| to | no | no
| ___E.Governmental and institutional =| no | no | PB
ee
scientific or nature interpretation purposes PB' CEO
[15.Structures accessory toallowed uses |B | PB | CEO
fSeccmcemenenetntmone |
structures and uses extending over or below the normal high-
water line or within a wetland
seentemnemenmrey ToT La
residences LPI LPI LPI
}18.Home occupations |B TPB PB
[ao tsentsisevices «dh | |r|
[rgeseremeeace |e oo
involving ten poles or less in the shoreland zone PB® PB° CEO
ee
involving eleven or more poles in the shoreland
zone PB PB°
| D.Otheressentialservices | PB |B | PB
Er atale
structural development
24. Campgrounds | to |! |B
[25.Roadconstruction |B | | PB
Town of Litchfield Shoreland Zone Ordinance 2022
14
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICT
ph To fe
27. Parking facilities | no | no' | pB |
}28.marinss | | nto | ee
29. Filling and earth moving of <10 cubic yards
30. Filling and earth moving of >10 cubic yards | pB | pB | CEO |
31. Signs
32. Uses similar to allowed uses
33. Uses similar to uses requiring a CEO permit
34. Uses similar to uses requiring a PB permit | pp | pa | pp |
* in RP not allowed within 75 feet horizontal distance, of the normal high-water line of
great ponds, except to remove safety hazards.
* Requires permit from the Code Enforcement Officer if more than 100 square feet of
surface area, in total, is disturbed.
3 in RP not allowed in areas so designated because of wildlife value.
* Provided that a variance from the setback requirement is obtained from the Board of
Appeals.
° Functionally water-dependent uses and uses accessory to such water dependent uses
only (See note on previous page).
* See further restrictions in Section 15( L)(2).
" Except when area is zoned for resource protection due to floodplain criteria in which
case a permit is required from the PB.
® Except as provided in Section 15(H)(4).
* Single-family residential structures may be allowed by special exception only according
to the provisions of Section 16(E), Special Exceptions. Two-family residential structures
are prohibited.
10 Except for commercial uses otherwise listed in this Table, such as marinas and
campgrounds, that are allowed in the respective district.
* Excluding bridges and other crossings not involving earthwork, in which case no permit
is required.
" Permit not required, but must file a written "notice of intent to construct" with CEO.
3 Must meet Litchfield Road Ordinance to a Public Way.
NOTE: A person performing any of the following activities shall require a permit from the
Department of Environmental Protection, pursuant to 38 M.R.S.A. section 480-C, if the
activity occurs in, on, over or adjacent to any freshwater wetland, great pond, river,
stream or brook and operates in such a manner that material or soil may be washed into
them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other
Town of Litchfield Shoreland Zone Ordinance 2022
15
TABLE 1. LAND USES IN THE SHORELAND ZONE
pot ses istic
pe Tire Ti
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
5.2. Land Use Standards
All land use activities within the shoreland zone shall conform with the following
provisions, if applicable.
5.2.A. Minimum Lot Standards
1.
Minimum Lot | Minimum
Area (sq. ft.) | Shore
Frontage (ft.)
(a) Residential per dwelling unit 40,000
(b) Governmental, Institutional,
Commercial or Industrial per
principal structure 60,000 300
(c) Public and Private Recreational
Facilities 40,000 200
2. Land below the normal high-water line of a water body or upland edge of a
wetland and land beneath roads serving more than two (2) lots shall not be
included toward calculating minimum lot area.
3. Lots located on opposite sides of a public or private road shall be considered
each a separate tract or parcel of land unless such road was established by the
owner of land on both sides thereof after September 22, 1971.
4. The minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high-water line of a water body or upland
edge of a wetland shall be equal to or greater than the shore frontage
requirement for a lot with the proposed use.
5. If more than one residential dwelling unit, principal governmental,
institutional, commercial or industrial structure or use, or combination
thereof, is constructed or established on a single parcel, all dimensional
requirements shall be met for each additional dwelling unit, principal
structure, or use.
5.2.B. Principal and Accessory Structures
Town of Litchfield Shoreland Zone Ordinance 2022
16
1. All new principal, accessory structures and Subsurface sewage disposal
systems shall be set back at least one hundred (100) feet, horizontal distance,
from the normal high-water line of great ponds classified GPA, rivers that
flow to great ponds classified GPA, and Carter Pond, and seventy-five (75)
feet, horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland, twenty (20) feet
from a side or rear property line and twenty (20) feet from the right of way of
a private or public road. In the Resource Protection District, the setback
requirement shall be 250 feet, horizontal distance, except for structures,
roads, parking spaces or other regulated objects specifically allowed in that
district in which case the setback requirements specified above shall apply.
In addition:
1. The water body, tributary stream, or wetland setback provision
shall neither apply to structures which require direct access to the
water body or wetland as an operational necessity, such as piers,
docks and retaining walls, nor to other functionally water-
dependent uses.
2. On a non-conforming lot of record on which only a residential
structure exists, and it is not possible to place an accessory
structure meeting the required water body, tributary stream or
wetland setbacks, the code enforcement officer may issue a
permit to place a single accessory structure, with no utilities, for
the storage of yard tools and similar equipment. Such accessory
structure shall not exceed eighty (80) square feet in area nor
eight (8) feet in height, and shall be located as far from the
shoreline or tributary stream as practical and shall meet all other
applicable standards, including lot coverage and vegetation
clearing limitations. In no case shall the structure be located
closer to the shoreline or tributary stream than the principal
structure.
2. Principal or accessory structures and expansions of existing structures that
are permitted in the Resource Protection, Limited Residential, and Stream
Protection Districts, shall not exceed thirty-five (35) feet in height. This
provision shall not apply to structures such as transmission towers,
windmills, antennas, and similar structures having no floor area.
3. The lowest floor elevation or openings of all buildings and structures,
including basements, shall be elevated at least one foot above the elevation of
the 100 year flood, the flood of record, or in the absence of these, the flood as
defined by soil types identified as recent flood-plain soils. In those
municipalities that participate in the National Flood Insurance Program and
have adopted the April 2005 version, or later version, of the Floodplain
Management Ordinance, accessory structures may be placed in accordance
with the standards of that ordinance and need not meet the elevation
requirements of this paragraph.
Town of Litchfield Shoreland Zone Ordinance 2022
17
4. The total footprint area of all structures, parking lots and other non-vegetated
surfaces, within the shoreland zone shall not exceed twenty (20) percent of
the lot or a portion thereof, located within the shoreland zone, including land
area previously developed.
5. Retaining walls that are not necessary for erosion control shall meet the
structure setback requirement, except for low retaining walls and associated
fill provided all of the following conditions are met:
1. The site has been previously altered and an effective vegetated
buffer does not exist;
2. The wall(s) is(are) at least 25 feet, horizontal distance, from the
normal high-water line of a water body, tributary stream, or
upland edge of a wetland;
3. The site where the retaining wall will be constructed is legally
existing lawn or is a site eroding from lack of naturally occurring
vegetation, and which cannot be stabilized with vegetative
plantings;
4. The total height of the wall(s), in the aggregate, are no more than
24 inches;
5. Retaining walls are located outside of the 100-year floodplain on
rivers, streams, wetlands, and tributary streams, as designated on
the Federal Emergency Management Agency's (FEMA) Flood
Insurance Rate Maps or Flood Hazard Boundary Maps, or the
flood of record, or in the absence of these, by soil types
identified as recent flood plain soils.
6. The area behind the wall is revegetated with grass, shrubs, trees,
or a combination thereof, and no further structural development
will occur within the setback area, including patios and decks;
and
7. A vegetated buffer area is established within 25 feet, horizontal
distance, of the normal high-water line of a water body, tributary
stream, or upland edge of a wetland when a natural buffer area
does not exist. The buffer area must meet the following
characteristics:
(i) The buffer must include shrubs and other woody and
herbaceous vegetation. Where natural ground cover is
lacking the area must be supplemented with leaf or bark
mulch;
(ii) Vegetation plantings must be in quantities sufficient to
retard erosion and provide for effective infiltration of
stormwater runoff;
Town of Litchfield Shoreland Zone Ordinance 2022
18
(iii)Only native species may be used to establish the buffer
area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is
required, measured perpendicularly to the normal high-
water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section
5.2.0.2.1 may traverse the buffer;
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal
distance, of a water body, tributary stream or wetland, a permit pursuant to the Natural
Resource Protection Act is required from the Department of Environmental Protection.
6. Notwithstanding the requirements stated above, stairways or similar
structures may be allowed with a permit from the Code Enforcement Officer,
to provide shoreline access in areas of steep slopes or unstable soils
provided: that the structure is limited to a maximum of four (4) feet in width;
that the structure does not extend below or over the normal high-water line of
a water body or upland edge of a wetland, (unless permitted by the
Department of Environmental Protection pursuant to the Natural Resources
Protection Act, 38 M.R.S.A. section 480-C); and that the applicant
demonstrates that no reasonable access alternative exists on the property.
7. Access Structures Related to Disabilities
§4353-A. Code enforcement officer; authority for disability structures
permits. The code enforcement officer may issue a permit to an owner of a
dwelling for the purpose of making a dwelling accessible to a person with a
disability who resides in or regularly uses the dwelling. If the permit requires
a variance, the permit is deemed to include that variance solely for the
installation of equipment or the construction of structures necessary for
access to or egress from the dwelling for the person with a disability. The
code enforcement officer may impose conditions on the permit, including
limiting the permit to the duration of the disability or to the time that the
person with a disability lives in the dwelling.
All medical records submitted to the code enforcement officer and any other
documents submitted for the purpose of describing or verifying a person's
disability are confidential.
For the purposes of this section, the term "structures necessary for access to
or egress from the dwelling" includes ramps and associated railings, walls or
roof systems necessary for the safety or effectiveness of the ramps. Fees for
permits issued under this section shall be waived.
§.2.C. Piers, Docks, Wharves, Bridges, Etc.
Town of Litchfield Shoreland Zone Ordinance 2022
19
Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below
the Normal High-Water Line of a Water Body or Within a Wetland
1. No more than one pier, dock, wharf or similar structure extending or located
below the normal high-water line of a water body or within a wetland is
allowed on a single lot; except that when a single lot contains at least twice
the minimum shore frontage as specified in Section 5.2.A, a second structure
may be allowed and may remain as long as the lot is not further divided.
2. Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
3. The location shall not interfere with existing developed or natural beach
areas.
4. The facility shall be located so as to minimize adverse effects on fisheries.
5. The facility shall be no larger in dimension than necessary to carry on the
activity and be consistent with the surrounding character and uses of the area.
6. No new structure shall be built on, over or abutting a pier, wharf, dock or
other structure extending beyond the normal high-water line of a water body
or within a wetland unless the structure requires direct access to the water
body or wetland as an operational necessity.
NOTE: A structure constructed on a float or floats is prohibited unless it is
designed to function as, and is registered with the Maine Department of
Inland Fisheries and Wildlife as a watercraft.
7. New permanent piers and docks shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not
feasible, and a permit has been obtained from the Department of
Environmental Protection, pursuant to the Natural Resources Protection Act.
8. No existing structures built on, over or abutting a pier, dock, wharf or other
structure extending beyond the normal high-water line of a water body or
within a wetland shall be converted to residential dwelling units in any
district.
9. Structures built on, over or abutting a pier, wharf, dock or other structure
extending beyond the normal high-water line of a water body or within a
wetland shall not exceed twenty (20) feet in height above the pier, wharf,
dock or other structure.
10. Vegetation may be removed in excess of the standards in Section 5.2.0 of
this ordinance in order to conduct shoreline stabilization of an eroding
shoreline, provided that a permit is obtained from the Planning Board.
Construction equipment must access the shoreline by barge when feasible as
determined by the Planning Board.
Town of Litchfield Shoreland Zone Ordinance 2022
20
1. When necessary, the removal of trees and other vegetation to
allow for construction equipment access to the stabilization site
via land must be limited to no more than 12 feet in width. When
the stabilization project is complete the construction equipment
accessway must be restored.
2. Revegetation must occur in accordance with Section 5.2.R.
NOTE: A permit pursuant to the Natural Resource Protection Act is required from the
Department of Environmental Protection for Shoreline Stabilization activities.
NOTE: New permanent structures, and expansions thereof, projecting into or over water
bodies shall require a permit from the Department of Environmental Protection pursuant
to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C. Permits may also
be required from the Army Corps of Engineers if located in navigable waters.
5.2.D. Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet
of land, not including roads and driveways, for each site. Land supporting
wetland vegetation, and land below the normal high-water line of a water
body shall not be included in calculating land area per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter,
and utility and service buildings shall be set back a minimum of one hundred
(100) feet, horizontal distance, from the normal high-water line of a great
pond classified GPA or a river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line
of other water bodies, tributary streams, or the upland edge of a wetland.
5.2.E. Individual Private Campsites
Individual private campsites not associated with campgrounds are allowed provided the
following conditions are met:
1. One campsite per lot existing on the effective date of this Ordinance, or thirty
thousand (30,000) square feet of lot area within the shoreland zone,
whichever is less, may be permitted.
2. When an individual private campsite is proposed on a lot that contains
another principal use and/or structure, the lot must contain the minimum lot
dimensional requirements for the principal structure and/or use, and the
individual private campsite separately.
Town of Litchfield Shoreland Zone Ordinance 2022
21
3. Campsite placement on any lot, including the area intended for a recreational
vehicle or tent platform, shall be set back one hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA or
river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland.
4. Only one recreational vehicle shall be allowed on a campsite. A recreational
vehicle shall not be located on any type of permanent foundation except for a
gravel pad, and no structure except a canopy shall be attached to the
recreational vehicle.
5. The clearing of vegetation for the siting of a recreational vehicle, tent or
similar shelter in a Resource Protection District shall be limited to one
thousand (1000) square feet.
6. A written sewage disposal plan describing the proposed method and location
of sewage disposal shall be required for each campsite and shall be approved
by the Local Plumbing Inspector. Where disposal is off-site, written
authorization from the receiving facility or landowner is required.
7. When a recreational vehicle, tent or similar shelter is placed on-site for more
than one hundred and twenty (120) days per year, all requirements for
residential structures shall be met, including the installation of a subsurface
sewage disposal system in compliance with the State of Maine Subsurface
Wastewater Disposal Rules unless served by public sewage facilities.
5.2.F. Outdoor Lighting
1. The outdoor lighting standards shall apply to all land use activities except for
residential dwellings, and agricultural activities.
2. Lighting fixtures shall be shielded or hooded so that lighting elements are not
exposed to normal view by motorist, pedestrians, structures located on
adjacent properties. Light shall be directed downward so it does not light up
the night sky.
3. No lighting fixture, except for streetlights, shall extend beyond a height of 25
feet, as measured from ground level.
4. All exterior lighting and all reflective properties of the proposed
development will be designed to minimize adverse impact on neighboring
properties. No activity shall be permitted to produce a strong, dazzling light,
flashing light or reflection of light beyond its lot lines onto neighboring
properties, or onto any town way so as to impair the vision of the driver of
any vehicle upon that town way or create a nuisance for neighboring property
owners.
5.2.G. Parking Areas
Town of Litchfield Shoreland Zone Ordinance 2022
22
1. Parking areas shall meet the shoreline and tributary stream setback
requirements for structures for the district in which such areas are located.
The setback requirement for parking areas serving public boat launching
facilities shall be no less than fifty (50) feet, horizontal distance, from the
shoreline or tributary stream if the Planning Board finds that no other
reasonable alternative exists further from the shoreline or tributary stream.
2. Parking areas shall be adequately sized for the proposed use and shall be
designed to prevent stormwater runoff from flowing directly into a water
body, tributary stream or wetland and where feasible, to retain all runoff on-
site.
3. In determining the appropriate size of proposed parking facilities, the
following shall apply:
1. Typical parking space: Approximately ten (10) feet wide and
twenty (20) feet long, except that parking spaces for a vehicle
and boat trailer shall be forty (40) feet long.
2. Internal travel aisles: Approximately twenty (20) feet wide.
5.2.H. Roads and Driveways
The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
1. Roads and driveways shall be set back at least one-hundred (100) feet,
horizontal distance, from the normal! high-water line of a great pond
classified GPA or a river that flows to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance from the normal high-water line of
other water bodies, tributary streams, or the upland edge of a wetland unless
no reasonable alternative exists as determined by the Planning Board. If no
other reasonable alternative exists, the road and/or driveway setback
requirement shall be no less than fifty (50) feet, horizontal distance, upon
clear showing by the applicant that appropriate techniques will be used to
prevent sedimentation of the water body, tributary stream, or wetland. Such
techniques may include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief culverts and turnouts
placed so as to avoid sedimentation of the water body, tributary stream, or
wetland.
On slopes of greater than twenty (20) percent the road and/or driveway
setback shall be increased by ten (10) feet, horizontal distance, for each five
(5) percent increase in slope above twenty (20) percent.
Section 5.2.H.1. does not apply to approaches to water crossings or to roads
or driveways that provide access to permitted structures and facilities located
nearer to the shoreline or tributary stream due to an operational necessity,
excluding temporary docks for recreational uses. Roads and driveways
providing access to permitted structures within the setback area shall comply
Town of Litchfield Shoreland Zone Ordinance 2022
23
fully with the requirements of Section 5.2.H.1. except for that portion of the
road or driveway necessary for direct access to the structure.
2. Existing public roads may be expanded within the legal road right of way
regardless of their setback from a water body, tributary stream or wetland.
3. New permanent roads are not allowed within the shoreland zone along
Significant River Segments except:
L. To provide access to structures or facilities within the zone; or
2. When the applicant demonstrates that no reasonable alternative
route exists outside the shoreland zone. When roads must be
located within the shoreland zone they shall be set back as far as
practicable from the normal high-water line and screened from
the river by existing vegetation.
4. New roads and driveways are prohibited in a Resource Protection District
except that the Planning Board may grant a permit to construct a road or
driveway to provide access to permitted uses within the district. A road or
driveway may also be approved by the Planning Board in a Resource
Protection District, upon a finding that no reasonable alternative route or
location is available outside the district. When a road or driveway is
permitted in a Resource Protection District the road and/or driveway shall be
set back as far as practicable from the normal high-water line of a water
body, tributary stream, or upland edge of a wetland.
5. Road and driveway banks shall be no steeper than a slope of two (2)
horizontal to one (1) vertical, and shall be graded and stabilized in
accordance with the provisions for erosion and sedimentation control
contained in Section 5.2.S.
6. Road and driveway grades shall be no greater than ten (10) percent except for
segments of less than two hundred (200) feet.
7. In order to prevent road and driveway surface drainage from directly entering
water bodies, tributary streams or wetlands, roads and driveways shall be
designed, constructed, and maintained to empty onto an unscarified buffer
strip at least (50) feet plus two times the average slope, in width between the
outflow point of the ditch or culvert and the normal high-water line of a
water body, tributary stream, or upland edge of a wetland. Surface drainage
which is directed to an unscarified buffer strip shall be diffused or spread out
to promote infiltration of the runoff and to minimize channelized flow of the
drainage through the buffer strip.
8. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall
be installed in a manner effective in directing drainage onto unscarified
buffer strips before the flow gains sufficient volume or head to erode the
road, driveway, or ditch. To accomplish this, the following shall apply:
Town of Litchfield Shoreland Zone Ordinance 2022
24
1. Ditch relief culverts, drainage dips and associated water turnouts
shall be spaced along the road, or driveway at intervals no
greater than indicated in the following table:
:
200-135
100-80
11-15 80-60
16-20
2. Drainage dips may be used in place of ditch relief culverts only
where the grade is ten (10) percent or less.
3. On sections having slopes greater than ten (10) percent, ditch
relief culverts shall be placed at approximately a thirty (30)
degree angle down slope from a line perpendicular to the
centerline of the road or driveway.
4. Ditch relief culverts shall be sufficiently sized and properly
installed in order to allow for effective functioning and their inlet
and outlet ends shall be stabilized with appropriate materials.
9. Ditches, culverts, bridges, dips, water turnouts and other storm water runoff
control installations associated with roads and driveways shall be maintained
on a regular basis to assure effective functioning.
5.2.1. Signs .
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection and Limited Residential:
1. Signs relating to goods and services sold on the premises shall be allowed,
provided that such signs shall not exceed six (6) square feet in area and shall
not exceed two (2) signs per premises. Signs relating to goods or services
not sold or rendered on the premises shall be prohibited.
2. Name signs are allowed, provided such signs shall not exceed two (2) signs
per premises, and shail not exceed twelve (12) square feet in the aggregate.
3. Residential users may display a single sign not over three (3) square feet in
area relating to the sale, rental, or lease of the premises.
4. Signs relating to trespassing and hunting shall be allowed without restriction
as to number provided that no such sign shall exceed two (2) square feet in
area.
Town of Litchfield Shoreland Zone Ordinance 2022
25
5. Signs relating to public safety shall be allowed without restriction.
6. No sign shall extend higher than fourteen (14) feet above the ground.
7. Signs may be illuminated only by shielded, non-flashing lights.
5.2.J. Storm Water Runoff
1. All new construction and development shall be designed to minimize storm
water runoff from the site in excess of the natural predevelopment
conditions. Where possible, existing natural runoff control features, such as
berms, swales, terraces and wooded areas, shall be retained in order to reduce
runoff and encourage infiltration of stormwaters.
2. Storm water runoff control systems shall be maintained as necessary to
ensure proper functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full
permit to be obtained from the DEP prior to construction of a project consisting of 20,000
square feet or more of impervious area or 5 acres or more of a developed area in an urban
impaired stream watershed or most-at-risk lake watershed, or a project with | acre or
more of developed area in any other stream or wetland watershed. A permit-by-rule is
necessary for a project with one acre or more of disturbed area but less than | acre
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams)
and less than 5S acres of developed area. Furthermore, a Maine Construction General
Permit is required if the construction will result in one acre or more of disturbed area.
5.2.K. Septic Waste Disposal
1. All subsurface sewage disposal systems shall be installed in conformance
with the State of Maine Subsurface Wastewater Disposal Rules, and the
following: a) clearing or removal of woody vegetation necessary to site a
new system and any associated fill extensions, shall not extend closer than
seventy-five (75) feet, horizontal distance, from the normal high-water line
of a water body or the upland edge of a wetland and b) a holding tank is not
allowed for a first-time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems,
excluding fill extensions, to be constructed no less than one hundred (100) horizontal feet
from the normal high-water line of a perennial water body. The minimum setback
distance for a new subsurface disposal system may not be reduced by variance.
5.2.L. Essential Services
1. Where feasible, the installation of essential services shall be limited to
existing public ways and existing service corridors.
2. The installation of essential services, other than roadside distribution lines, is
not allowed in a Resource Protection or Stream Protection District, except to
provide services to a permitted use within said district, or except where the
Town of Litchfield Shoreland Zone Ordinance 2022
26
applicant demonstrates that no reasonable alternative exists. Where allowed,
such structures and facilities shall be located so as to minimize any adverse
impacts on surrounding uses and resources, including visual impacts.
3. Damaged or destroyed public utility transmission and distribution lines,
towers and related equipment may be replaced or reconstructed without a
permit.
5.2.M. Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from
the Code Enforcement Officer shall be required for mineral exploration, which exceeds
the above limitation. All excavations, including test pits and holes, shall be immediately
capped, filled or secured by other equally effective measures to restore disturbed areas
and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
1. A reclamation plan shall be filed with, and approved, by the Planning Board
before a permit is granted. Such plan shall describe in detail procedures to be
undertaken to fulfill the requirements of Section 5.2.(M)(4) below.
2. No part of any extraction operation, including drainage and runoff control
features, shall be permitted within one hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA or a
river flowing to a great pond classified GPA, and within seventy-five (75)
feet, horizontal distance, of the normal high-water line of any other water
body, tributary stream, or the upland edge of a wetland. Extraction
operations shall not be permitted within fifty (50) feet, horizontal distance, of
any property line without written permission of the owner of such adjacent
property.
3. Developers of new gravel pits along Significant River Segments shall
demonstrate that no reasonable mining site outside the shoreland zone exists.
When gravel pits must be located within the zone, they shall be set back as
far as practicable from the normal high-water line and no less than seventy-
five (75) feet and screened from the river by existing vegetation.
4. Within twelve (12) months following the completion of extraction operations
at any extraction site, which operations shall be deemed complete when less
than one hundred (100) cubic yards of materials are removed in any
consecutive twelve (12) month period, ground levels and grades shall be
established in accordance with the following:
1. All debris, stumps, and similar material shall be removed for
disposal in an approved location, or shall be buried on-site. Only
materials generated on-site may be buried or covered on-site.
Town of Litchfield Shoreland Zone Ordinance 2022
27
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid
waste management rules, Chapters 400-419 of the Department of Environmental
Protection's regulations may contain other applicable provisions regarding disposal of
such materials.
2. The final graded slope shall be two and one-half to one (2 1/2:1)
slope or flatter.
3. Top soil or loam shall be retained to cover all disturbed land
areas, which shall be reseeded and stabilized with vegetation
native to the area. Additional topsoil or loam shall be obtained
from off-site sources if necessary to complete the stabilization
project.
5. In keeping with the purposes of this Ordinance, the Planning Board may
impose such conditions as are necessary to minimize the adverse impacts
associated with mineral extraction operations on surrounding uses and
resources.
5.2.N. Agriculture
1. All spreading of manure shall be accomplished in conformance with the
Manure Utilization Guidelines published by the Maine Department of
Agriculture on November 1, 2001, and the Nutrient Management Law (7
M.R.S.A. sections 4201-4209),
2. Manure shall not be stored or stockpiled within one hundred (100) feet,
horizontal distance, of a great pond classified GPA or a river flowing to a
great pond classified GPA, or within seventy-five (75) feet horizontal
distance, of other water bodies, tributary streams, or wetlands. All manure
storage areas within the shoreland zone must be constructed or modified such
that the facility produces no discharge of effluent or contaminated storm
water.
3. Agricultural activities involving tillage of soil greater than forty thousand
(40,000) square feet in surface area, within the shoreland zone shall require a
Conservation Plan to be filed with the Planning Board. Non-conformance
with the provisions of said plan shall be considered to be a violation of this
Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available
through the local Soil and Water Conservation District office.
4. There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA;
within seventy-five (75) feet, horizontal distance, from other water bodies;
nor within twenty-five (25) feet, horizontal distance, of tributary streams and
wetlands. Operations in existence on the effective date of this ordinance and
not in conformance with this provision may be maintained.
Town of Litchfield Shoreland Zone Ordinance 2022
28
5. Newly established livestock grazing areas shall not be permitted within one
hundred (100) feet, horizontal distance, of the normal high-water line of a
great pond classified GPA; within seventy-five (75) feet, horizontal distance,
of other water bodies; nor within twenty-five (25) feet, horizontal distance, of
tributary streams and wetlands. Livestock grazing associated with ongoing
farm activities, and which are not in conformance with the above setback
provisions may continue, provided that such grazing is conducted in
accordance with a Conservation Plan.
5.2.0. Clearing or Removal of Vegetation
1. Ina Resource Protection District abutting a great pond, there shall be no
cutting of vegetation within the strip of land extending 75 feet, horizontal
distance, inland from the normal high-water line, except to remove hazard
trees as described in section 5.2.P.
Elsewhere, in any Resource Protection District the cutting or removal of
vegetation shall be limited to that which is necessary for uses expressly
authorized in that district.
2. Except in areas as described in Section 5.2.0.1, above, and except to allow
for the development of permitted uses, within a strip of land extending one-
hundred (100) feet, horizontal distance, inland from the normal high-water
line of a great pond classified GPA or a river flowing to a great pond
classified GPA, and seventy-five (75) feet, horizontal distance, from any
other water body, tributary stream, or the upland edge of a wetland, a buffer
strip of vegetation shall be preserved as follows:
1. There shall be no cleared opening greater than 250 square feet in
the forest canopy (or other existing woody vegetation if a
forested canopy is not present) as measured from the outer limits
of the tree or shrub crown. However, a footpath not to exceed
six (6) feet in width as measured between tree trunks and/or
shrub stems is allowed provided that a cleared line of sight to the
water through the buffer strip is not created.
2. Selective cutting of trees within the buffer strip is allowed
provided that a well-distributed stand of trees and other natural
vegetation is maintained. For the purposes of Section 5.2.0.2.1
a "well-distributed stand of trees" adjacent to a great pond
classified GPA or a river or stream flowing to a great pond
classified GPA, shall be defined as maintaining a rating score of
24 or more in each 25-foot by 50-foot rectangular (1250 square
feet) area as determined by the following rating system:
Diameter of Tree at 4-1/2 feet Above
Ground Level (inches) F
2 to < 4 inches
Town of Litchfield Shoreland Zone Ordinance 2022
29
8 to < 12 inches 4
12 inches or greater | og |
Adjacent to other water bodies, tributary streams, and wetlands, a
"well-distributed stand of trees" is defined as maintaining a
minimum rating score of 16 per 25-foot by 50-foot rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-
foot plot contains four (4) trees between 2 and 4 inches in diameter,
two trees between 4 and 8 inches in diameter, three trees between 8
and 12 inches in diameter, and two trees over 12 inches in diameter,
the rating score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points.
Trees totaling 12 points (36-24 =12) may be removed from the plot
provided that no cleared openings are created.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established
where the landowner or lessee proposes clearing within the
required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a
previous plot;
(iii) Any plot not containing the required points must have no
vegetation removed except as otherwise allowed by this
Ordinance;
(iv) Where conditions permit, no more than 50% of the points on
any 25-foot by 50-foot rectangular area may consist of trees
greater than 12 inches in diameter.
For the purposes of Section 5.2.0.2.2 "other natural
vegetation" is defined as retaining existing vegetation under
three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at
four and one half (4 2) feet above ground level for each 25-
foot by 50-foot rectangle area. If five saplings do not exist,
no woody stems less than two (2) inches in diameter can be
removed until 5 saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of
the total volume of trees four (4) inches or more in diameter,
measured at 4 1/2 feet above ground level may be removed in
any ten (10) year period.
Town of Litchfield Shoreland Zone Ordinance 2022
30
3. In order to protect water quality and wildlife habitat, existing
vegetation under three (3) feet in height and other ground cover,
including leaf litter and the forest duff layer, shall not be cut,
covered, or removed, except to provide for a footpath or other
permitted uses as described in Section 5.2.0 paragraphs 2 and
2.1 above.
4. Pruning of tree branches, on the bottom 1/3 of the tree is
allowed.
5. In order to maintain a buffer strip of vegetation, when the
removal of storm-damaged, diseased, unsafe, or dead trees
results in the creation of cleared openings, these openings shall
be replanted with native tree species unless existing new tree
growth is present.
6. In order to maintain the vegetation in the shoreline buffer,
clearing or removal of vegetation for allowed activities,
including associated construction and related equipment
operation, within or outside the shoreline buffer, must comply
with the requirements of Section 5.2.0.2.
3. Atdistances greater than one hundred (100) feet, horizontal distance, from a
great pond classified GPA or a river flowing to a great pond classified GPA,
and seventy-five (75) feet, horizontal distance, from the normal high-water
line of any other water body, tributary stream, or the upland edge of a
wetland, there shall be allowed on any lot, in any ten (10) year period,
selective cutting of not more than forty (40) percent of the volume of trees
four (4) inches or more in diameter, measured 4 1/2 feet above ground level.
Tree removal in conjunction with the development of permitted uses shall be
included in the forty (40) percent calculation. For the purposes of these
standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited
to, principal and accessory structures, driveways, lawns and sewage disposal
areas, exceed in the aggregate, 25% of the lot area within the shoreland zone
or ten thousand (10,000) square feet, whichever is greater, including land
previously cleared.
4. Legally existing nonconforming cleared openings may be maintained, but
shall not be enlarged, except as allowed by this Ordinance.
5. Fields and other cleared openings which have reverted to primarily shrubs,
trees, or other woody vegetation shall be regulated under the provisions of
Section 5.2.0.
5.2.P. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
Town of Litchfield Shoreland Zone Ordinance 2022
31
1. Hazard trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following
requirements are met:
1. Within the shoreline buffer, if the removal of a hazard tree
results in a cleared opening in the tree canopy greater than two
hundred and fifty (250) square feet, replacement with native tree
species is required, unless there is new tree growth already
present. New tree growth must be as near as practicable to where
the hazard tree was removed and be at least two (2) inches in
diameter, measured at four and one half (4.5) feet above the
ground level. If new growth is not present, then replacement
trees shall consist of native species and be at least four (4) feet in
height, and be no less than two (2) inches in diameter. Stumps
may not be removed.
2. Outside of the shoreline buffer, when the removal of hazard trees
exceeds forty (40) percent of the volume of trees four (4) inches
or more in diameter, measured at four and one half (4.5) feet
above ground level in any ten (10) year period, and/or results in
cleared openings exceeding twenty-five (25) percent of the lot
area within the shoreland zone, or ten thousand (10,000) square
feet, whichever is greater, replacement with native tree species is
required, unless there is new tree growth already present. New
tree growth must be as near as practicable to where the hazard
tree was removed and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level.
If new growth is not present, then replacement trees shall consist
of native species and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level.
3. The removal of standing dead trees, resulting from natural
causes, is permissible without the need for replanting or a permit,
as long as the removal does not result in the creation of new
lawn areas, or other permanently cleared areas, and stumps are
not removed. For the purposes of this provision dead trees are
those trees that contain no foliage during the growing season.
4. The Code Enforcement Officer may require the property owner
to submit an evaluation from a licensed forester or arborist
before any hazard tree can be removed within the shoreland
zone.
5. The Code Enforcement Officer may require more than a one--
for-one replacement for hazard trees removed that exceed eight
(8) inches in diameter measured at four and one half (4.5) feet
above the ground level.
Town of Litchfield Shoreland Zone Ordinance 2022
32
2. Storm-damaged trees in the shoreland zone may be removed without a permit
after consultation with the Code Enforcement Officer if the following
requirements are met:
1. Within the shoreline buffer, when the removal of storm-damaged
trees results in a cleared opening in the tree canopy greater than
two hundred and fifty (250) square feet, replanting is not
required, but the area shall be required to naturally revegetate,
and the following requirements must be met:
(i) The area from which a storm-damaged tree is removed
does not result in new lawn areas, or other permanently
cleared areas;
(it) Stumps from the storm-damaged trees may not be
removed;
(iii) Limbs damaged from a storm event may be pruned even if
they extend beyond the bottom one-third (1/3) of the tree;
and
(iv) If after one growing season, no natural regeneration or
regrowth is present, replanting of native tree seedlings or
saplings is required at a density of one seedling per every
eighty (80) square feet of lost canopy.
2. Outside of the shoreline buffer, if the removal of storm damaged
trees exceeds 40% of the volume of trees four (4) inches or more
in diameter, measured at four and one half (4.5) feet above the
ground level in any ten (10) year period, or results, in the
aggregate, in cleared openings exceeding 25% of the lot area
within the shoreland zone or ten thousand (10,000) square feet,
whichever is greater, and no natural regeneration occurs within
one growing season, then native tree seedlings or saplings shall
be replanted on a one-for-one basis.
5.2.Q. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards
set forth in Section 5.2.0, provided that all other applicable requirements of this chapter
are complied with, and the removal of vegetation is limited to that which is necessary:
1. The removal of vegetation that occurs at least once every two (2) years for
the maintenance of legally existing areas that do not comply with the
vegetation standards in this chapter, such as but not limited to cleared
openings in the canopy or fields. Such areas shall not be enlarged, except as
allowed by this section. If any of these areas, due to lack of removal of
vegetation every two (2) years, reverts back to primarily woody vegetation,
the requirements of Section 5.2.0. apply;
Town of Litchfield Shoreland Zone Ordinance 2022
33
2. The removal of vegetation from the location of allowed structures or allowed
uses, when the shoreline setback requirements of section 5.2.B are not
applicable;
3. The removal of vegetation from the location of public swimming areas
associated with an allowed public recreational facility;
4. The removal of vegetation associated with allowed agricultural uses,
provided best management practices are utilized, and provided all
requirements of section 5.2.N are complied with;
5. The removal of vegetation associated with brownfields or voluntary response
action program (VRAP) projects provided that the removal of vegetation is
necessary for remediation activities to clean-up contamination on a site ina
general development district, commercial fisheries and maritime activities
district or other equivalent zoning district approved by the Commissioner
that is part of a state or federal brownfields program or a voluntary response
action program pursuant 38 M.R.S.A section 343-E, and that is located
along:
l. A coastal wetland; or
2. A river that does not flow to a great pond classified as GPA
pursuant to 38 M.R.S.A section 465-A.
6. The removal of non-native invasive vegetation species, provided the
following minimum requirements are met:
1. If removal of vegetation occurs via wheeled or tracked
motorized equipment, the wheeled or tracked motorized
equipment is operated and stored at least twenty-five (25) feet,
horizontal distance, from the shoreline, except that wheeled or
tracked equipment may be operated or stored on existing
structural surfaces, such as pavement or gravel;
2. Removal of vegetation within twenty-five (25) feet, horizontal
distance, from the shoreline occurs via hand tools; and
3. If applicable clearing and vegetation removal standards are
exceeded due to the removal of non-native invasive species
vegetation, the area shall be revegetated with native species to
achieve compliance.
NOTE: An updated list of non-native invasive vegetation is maintained by the
Department of Agriculture, Conservation and Forestry's Natural Areas Program:
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
7. The removal of vegetation associated with emergency response activities
conducted by the Department, the U.S. Environmental Protection Agency,
the U.S. Coast Guard, and their agents.
Town of Litchfield Shoreland Zone Ordinance 2022
34
5.2.R. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set
forth in Section 5.0, to address the removal of non- native invasive species of vegetation,
or as a mechanism to allow for development that may otherwise not be permissible due to
the vegetation standards, including removal of vegetation in conjunction with a shoreline
stabilization project, the revegation must comply with the following requirements.
1. The property owner must submit a revegetation plan, prepared with and
signed by a qualified professional, that describes revegetation activities and
maintenance. The plan must include a scaled site plan, depicting where
vegetation was, or is to be removed, where existing vegetation is to remain,
and where vegetation is to be planted, including a list of all vegetation to be
planted.
2. Revegetation must occur along the same segment of shoreline and in the
same area where vegetation was removed and at a density comparable to the
pre-existing vegetation, except where a shoreline stabilization activity does
not allow revegetation to occur in the same area and at a density comparable
to the pre-existing vegetation, in which case revegetation must occur along
the same segment of shoreline and as close as possible to the area where
vegetation was removed:
3. If part of a permitted activity, revegetation shall occur before the expiration
of the permit. If the activity or revegetation is not completed before the
expiration of the permit, a new revegetation plan shall be submitted with any
renewal or new permit application.
4. Revegetation activities must meet the following requirements for trees and
saplings:
1. All trees and saplings removed must be replaced with native
noninvasive species;
2. Replacement vegetation must at a minimum consist of saplings;
3. If more than three (3) trees or saplings are planted, then at least
three (3) different species shall be used;
4. No one species shall make up 50% or more of the number of
trees and saplings planted;
5. If revegetation is required for a shoreline stabilization project,
and it is not possible to plant trees and saplings in the same area
where trees or saplings were removed, then trees or sapling must
be planted in a location that effectively reestablishes the
screening between the shoreline and structures; and
6. A survival rate of at least eighty (80) percent of planted trees or
saplings is required for a minimum five (5) years period.
Town of Litchfield Shoreland Zone Ordinance 2022
35
5. Revegetation activities must meet the following requirements for woody
vegetation and other vegetation under three (3) feet in height:
1, All woody vegetation and vegetation under three (3) feet in
height must be replaced with native noninvasive species of
woody vegetation and vegetation under three (3) feet in height as
applicable;
2. Woody vegetation and vegetation under three (3) feet in height
shall be planted in quantities and variety sufficient to prevent
erosion and provide for effective infiltration of stormwater;
3. If more than three (3) woody vegetation plants are to be planted,
then at least three (3) different species shall be planted;
4. No one species shall make up 50% or more of the number of
planted woody vegetation plants; and
5. Survival of planted woody vegetation and vegetation under three
feet in height must be sufficient to remain in compliance with the
standards contained within this chapter for minimum of five (5)
years
6. Revegetation activities must meet the following requirements for ground
vegetation and ground cover:
1. All ground vegetation and ground cover removed must be
replaced with native herbaceous vegetation, in quantities and
variety sufficient to prevent erosion and provide for effective
infiltration of stormwater;
2. here necessary due to a lack of sufficient ground cover, an area
must be supplemented with a minimum four (4) inch depth of
leaf mulch and/or bark mulch to prevent erosion and provide for
effective infiltration of stormwater; and
3. Survival and functionality of ground vegetation and ground
cover must be sufficient to remain in compliance with the
standards contained within this chapter for minimum of five (5)
years.
5.2.8. Erosion and Sedimentation Control
1. All activities which involve filling, grading, excavation or other similar
activities which result in unstabilized soil conditions and which require a
permit shall also require a written soil erosion and sedimentation control
plan. The plan shall be submitted to the permitting authority for approval
and shall include, where applicable, provisions for:
1. Mulching and revegetation of disturbed soil.
Town of Litchfield Shoreland Zone Ordinance 2022
36
2. Temporary runoff control features such as hay bales, silt fencing
or diversion ditches.
3. Permanent stabilization structures such as retaining walls or
riprap.
2. In order to create the least potential for erosion, development shall be
designed to fit with the topography and soils of the site. Areas of steep
slopes where high cuts and fills may be required shall be avoided wherever
possible, and natural contours shall be followed as closely as possible.
3. Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during
all stages of the activity. The amount of exposed soil at every phase of
construction shall be minimized to reduce the potential for erosion.
4. Any exposed ground area shall be temporarily or permanently stabilized
within one (1) week from the time it was last actively worked, by use of
riprap, sod, seed, and mulch, or other effective measures. In all cases
permanent stabilization shall occur within nine (9) months of the initial date
of exposure. In addition:
1. Where mulch is used, it shall be applied at a rate of at least one
(1) bale per five hundred (500) square feet and shall be
maintained until a catch of vegetation is established.
2. Anchoring the mulch with netting, peg and twine or other
suitable method may be required to maintain the mulch cover.
3. Additional measures shall be taken where necessary in order to
avoid siltation into the water. Such measures may include the
use of staked hay bales and/or silt fences.
5. Natural and man-made drainage ways and drainage outlets shall be protected
from erosion from water flowing through them. Drainage ways shall be
designed and constructed in order to carry water from a twenty five (25) year
storm or greater, and shall be stabilized with vegetation or lined with riprap.
5.2.T. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts,
including severe erosion, mass soil movement, improper drainage, and water pollution,
whether during or after construction. Proposed uses requiring subsurface waste disposal,
and commercial or industrial development and other similar intensive land uses, shall
require a soils report based on an on-site investigation and be prepared by state-certified
professionals. Certified persons may include Maine Certified Soil Scientists, Maine
Registered Professional Engineers, Maine State Certified Geologists and other persons
who have training and experience in the recognition and evaluation of soil properties.
The report shall be based upon the analysis of the characteristics of the soil and
Town of Litchfield Shoreland Zone Ordinance 2022
37
surrounding land and water areas, maximum ground water elevation, presence of ledge,
drainage conditions, and other pertinent data which the evaluator deems appropriate. The
soils report shall include recommendations for a proposed use to counteract soil
limitations where they exist.
$.2.U. Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
5.2.V. Archaeological Site
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic
Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty
(20) days prior to action being taken by the permitting authority. The permitting
authority shall consider comments received from the Commission prior to rendering a
decision on the application.
5.2.W. Natural Resource Protection
1. Ifany portion of the parcel has been identified as a Critical natural Area by
the Maine Natural Areas Program or as containing threatened or endangered
species of plants or animals by the Maine Department of Inland Fisheries and
Wildlife, these areas should not be developed. If development of these areas
is proposed because no other reasonable alternative exists, the applicant shall
develop a mitigation plan in cooperation with the Maine Department of
Conservation and/or the Maine Department of Inland Fisheries and Wildlife
as appropriate. The Code Enforcement Officer or the Planning Board shall
incorporate the provisions of the mitigation plan as conditions of the permit.
2. If any portion of the parcel to be developed includes areas mapped by the
Maine Department of Inland Fisheries and Wildlife as Deer Wintering Areas,
the applicant shall consult with the Department or a qualified wildlife
biologist on means to limit the impact of the development on the habitat and
incorporate those recommendations into the plan insofar as practicable.
3. Ifany portion of the development contains a wetland as identified by the
Town of Litchfield, The Maine Department of Environmental Protection or
listed on the most recent map edition of the National Wetland Inventory
Maps, the applicant shall avoid, minimize, or mitigate impacts on the
wetland both during and after construction. The applicant shall comply with
all applicable state and federal regulations.
5.2.X. Phosphorus Control
1. The following standards shall apply to all development that exceeds 3,000
square feet of building footprint or has more than 20,000 square feet of
Town of Litchfield Shoreland Zone Ordinance 2022
38
impervious area and is within the direct watershed of a Great Pond, Carter
Pond or Knight Pond. Agricultural and single family residential dwellings
are not required to meet these standards.
1. A phosphorus control plan shall be developed in accordance with
the design criteria contained in the current edition of
"Phosphorus Control in Lake Watersheds: A Technical Guide
for Evaluating New Development" published by the Maine
Department of Environmental Protection, revised September
1992 or latest revision thereof.
5.2.Y. Noise
1. The following standards shall apply to all commercial uses over 3,000 square
feet, industrial uses, mineral extraction operations junkyards, and commercial
outdoor recreation facilities. Any land use activity not listed such as
agricultural, home occupations, resource production activities, and cottage
industry are not required to meet these standards.
2. The maximum permissible sound pressure level of any continuous regular, or
frequent source of sound produced by any activity shall be limited by the
time period and receiving district listed below:
Sound Pressure Level Limits (measured in dB)
Planned Development District
All other Districts
3. The levels specified may be exceeded by 10 dB for no more than 15 minutes
per day. Noise shall be measured by a meter set on the A-weighted response
scale, slow response. The meter shall meet the American National Standards
Institute (ANSI SI.4-1961) "Specification for General Purpose Sound Level
Meters". Sound levels shall be measured at least 4 feet above the ground at
the property boundary.
4. The following shall be exempt from these standards:
Sounds emanating from safety signals, warning devices, emergency pressure relief
valves, and other emergency or public safety devices.
SECTION 6 Administration and Enforcement
6.1. Administration
6.1.A. Administering Bodies and Agents
Town of Litchfield Shoreland Zone Ordinance 2022
39
1. Code Enforcement Officer. A Code Enforcement Officer shall be appointed
or reappointed annually by July Ist.
2. Board of Appeals. A Board of Appeals shall be created in accordance with
the provisions of 30-A M.R.S.A. section 2691.
3. Planning Board. A Planning Board shall be created in accordance with the
provisions of State law.
6.1.B. Permits Required
After the effective date of this Ordinance no person shall, without first obtaining a permit,
engage in any activity or use of land or structure as defined in the Section 5.1 Table of
Land uses requiring a permit in the district in which such activity or use would occur; or
expand, change, or replace an existing use or structure; or renew a discontinued
nonconforming use. A person who is issued a permit pursuant to this Ordinance shall
have a copy of the permit on site while the work authorized by the permit is performed.
1. Permits shall be required for the following:
1. The construction, erection, improvement, addition, enlargement,
alteration, demolition, or movement of any building or structure
including temporary structures when the fair market value of
such labor and materials exceeds $1,000.00 cumulatively within
a 12-month period.
2. The installation or construction of a dwelling unit, mobile home
or modular home.
3. Expansions of a non-conforming use or structure.
4. Mineral extraction activities.
5. For a new or expanded land use activity as listed and permitted
in the Table of Land Uses contained within this Ordinance.
6. Change of use to one that is allowed.
7. For the installation of internal plumbing and subsurface
wastewater disposal systems.
2. A permit is not required for the replacement of an existing road culvert as
long as:
1. The replacement culvert is not more than 25% longer than the
culvert being replaced;
2. The replacement culvert is not longer than 75 feet; and
Town of Litchfield Shoreland Zone Ordinance 2022
40
3. Adequate erosion control measures are taken to prevent
sedimentation of the water, and the crossing does not block fish
passage in the watercourse.
3. A permit is not required for an archaeological excavation as long as the
excavation is conducted by an archaeologist listed on the State Historic
Preservation Officer's level 1 or level 2 approved list, and unreasonable
erosion and sedimentation is prevented by means of adequate and timely
temporary and permanent stabilization measures.
4. Any permit required by this Ordinance shall be in addition to any other
permit required by other law or ordinance.
6.1.C. Permit Application
1. Every applicant for a permit shall submit a written application, including a
scaled site plan, on a form provided by the municipality, to the appropriate
official as indicated in Section 5.1.
2. All applications shall be signed by an owner or individual who can show
evidence of right, title or interest in the property or by an agent,
representative, tenant, or contractor of the owner with authorization from the
owner to apply for a permit hereunder, certifying that the information in the
application is complete and correct.
3. All applications shall be dated, and the Code Enforcement Officer or
Planning Board, as appropriate, shall note upon each application the date and
time of its receipt.
4. Ifthe property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation
approved by the Plumbing Inspector, shall be submitted whenever the nature
of the proposed structure or use would require the installation of a subsurface
sewage disposal system.
5. The applicant is required to provide to the municipal permitting authority
preconstruction photographs and, no later than 20 days after completion
of the development, postconstruction photographs of the shoreline
vegetation and development site. (Pursuant to 38 M.R.S. §439-A(10
6.1.D. Procedure for Administering Permits
Within 35 days of the date of receiving a written application, the Planning Board or
Code Enforcement Officer, as indicated in Section 5.1, shall notify the applicant in
writing either that the application is a complete application, or, if the application is
incomplete, that specified additional material is needed to make the application
complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall
approve, approve with conditions, or deny all permit applications in writing within 35
days of receiving a completed application. However, if the Planning Board has a
waiting list of applications, a decision on the application shall occur within 35 days
Town of Litchfield Shoreland Zone Ordinance 2022
4]
after the first available date on the Planning Board's agenda following receipt of the
completed application, or within 35 days of the public hearing, if the proposed use or
structure is found to be in conformance with the purposes and provisions of this
Ordinance.The applicant shall have the burden of proving that the proposed land use
activity is in conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall
approve an application or approve it with conditions if it makes a positive finding based
on the information presented that the proposed use:
1. Will maintain safe and healthful conditions;
2. Will not result in water pollution, erosion, or sedimentation to surface waters;
3. Will adequately provide for the disposal of all wastewater;
4. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird
or other wildlife habitat;
5. Will conserve shore cover and visual, as well as actual, points of access to
inland waters;
6. Will protect archaeological and historic resources as designated in the
comprehensive plan;
7. Will avoid problems associated with floodplain development and use; and
8. Is in conformance with the provisions of Section 5.2, Land Use Standards.
9. Will not have an adverse impact on wetlands.
10. Will dispose of all solid waste in conformance with all local, state and
federal regulations.
11. Will not have a significant detrimental effect on adjacent land uses, wetland,
or other properties, that might be affected by waste, noise, glare, fumes,
smoke, dust odors or their effects.
12. To the maximum extent possible will not have an adverse effect on historic
and archeological sites, significant wildlife habitat identified by the
Department of Inland Fisheries and Wildlife, or rare and irreplaceable natural
areas.
If a permit is either denied or approved with conditions, the reasons as well
as conditions shall be stated in writing. No approval shall be granted for an
application involving a structure if the structure would be located in an
unapproved subdivision or would violate any other local ordinance, or
regulation or statute administered by the municipality.
6.1.E. Special Exceptions
Town of Litchfield Shoreland Zone Ordinance 2022
42
In addition to the criteria specified in Section 6.1.D above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential
Town of Litchfield Shoreland Zone Ordinance 2022
43
structure in a Resource Protection District provided that the applicant demonstrates that
all of the following conditions are met:
1. There is no location on the property, other than a location within the
Resource Protection District, where the structure can be built.
2. The lot on which the structure is proposed is undeveloped and was
established and recorded in the registry of deeds of the county in which the
lot is located before the adoption of the Resource Protection District.
3. All proposed buildings, sewage disposal systems and other improvements
are:
1. Located on natural ground slopes of less than 20%; and
2. Located outside the floodway of the 100-year flood-plain along
rivers and artificially formed great ponds along rivers, based on
detailed flood insurance studies and as delineated on the Federal
Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all buildings,
including basements, are elevated at least one foot above the
100-year flood-plain elevation; and the development is otherwise
in compliance with any applicable municipal flood-plain
ordinance.
If the floodway is not shown on the Federal Emergency Management
Agency Maps, it is deemed to be 1/2 the width of the 100-year flood
plain.
4. The total footprint, including cantilevered or similar overhanging extensions,
of all principal and accessory structures is limited to a maximum of 1,500
square feet. This limitation shall not be altered by variance.
5. All structures, except functionally water-dependent structures, are set back
from the normal high-water line of a water body, tributary stream or upland
edge of a wetland to the greatest practical extent, but not less than 75 feet,
horizontal distance. In determining the greatest practical extent, the Planning
Board shall consider the depth of the lot, the slope of the land, the potential
for soil erosion, the type and amount of vegetation to be removed, the
proposed building site's elevation in regard to the flood-plain, and its
proximity to moderate-value and high-value wetlands.
6.1.F. Expiration of Permit
Permits are valid for 24 months from the date of issuance.
6.1.G. Installation of Public Utility Service
A public utility, water district, sanitary district or any utility company of any kind may
not install services to any new structure located in the shoreland zone unless written
Town of Litchfield Shoreland Zone Ordinance 2022
44
authorization attesting to the validity and currency of all local permits required under this
or any previous Ordinance has been issued by the appropriate municipal officials or other
written arrangements have been made between the municipal officials and the utility.
6.L.H. Appeals
1. Powers and Duties of the Board of Appeals. The Board of Appeals shall
have the following powers:
1. Administrative Appeals: To hear and decide administrative
appeals, on an appellate basis, where it is alleged by an
aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the
Planning Board in the administration of this Ordinance; and to
hear and decide administrative appeals on a de novo basis where
it is alleged by an aggrieved party that there is an error in any
order, requirement, decision or determination made by, or failure
to act by, the Code Enforcement Officer in his or her review of
and action on a permit application under this Ordinance. Any
order, requirement, decision or determination made, or failure to
act, in the enforcement of this ordinance is not appealable to the
Board of Appeals.
2. Variance Appeals: To authorize variances upon appeal, within
the limitations set forth in this Ordinance.
2. Variance Appeals. Variances may be granted only under the following
conditions:
lL. Variances may be granted only from dimensional requirements
including, but not limited to, lot width, structure height, percent
of lot coverage, and setback requirements.
2. Variances shall not be granted for establishment of any uses
otherwise prohibited by this Ordinance.
3. The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions
of Section 5.2 except for the specific provision which has
created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would
result in undue hardship. The term "undue hardship" shall
mean:
1. That the land in question cannot yield a reasonable
return unless a variance is granted;
Town of Litchfield Shoreland Zone Ordinance 2022
45
2. That the need for a variance is due to the unique
circumstances of the property and not to the general
conditions in the neighborhood;
3. That the granting of a variance will not alter the
essential character of the locality; and
4. That the hardship is not the result of action taken by
the applicant or a prior owner.
4, Notwithstanding Section 6.1.H.2.3.ii above, the Board of
Appeals, or the code enforcement officer if authorized in
accordance with 30-A MRSA §4353-A, may grant a variance to
an owner of a residential dwelling for the purpose of making that
dwelling accessible to a person with a disability who resides in
or regularly uses the dwelling. The board shall restrict any
variance granted under this subsection solely to the installation
of equipment or the construction of structures necessary for
access to or egress from the dwelling by the person with the
disability. The board may impose conditions on the variance,
including limiting the variance to the duration of the disability or
to the time that the person with the disability lives in the
dwelling. The term "structures necessary for access to or egress
from the dwelling" shall include railing, wall or roof systems
necessary for the safety or effectiveness of the structure. Any
permit issued pursuant to this subsection is subject to Sections
6.1.H.2.6 and 6.1.H.4.1.iv below.)
5. The Board of Appeals shall limit any variances granted as
strictly as possible in order to ensure conformance with the
purposes and provisions of this Ordinance to the greatest extent
possible, and in doing so may impose such conditions to a
variance as it deems necessary. The party receiving the variance
shall comply with any conditions imposed.
6. A copy of each variance request, including the application and
all supporting information supplied by the applicant, shall be
forwarded by the municipal officials to the Commissioner of the
Department of Environmental Protection at least twenty (20)
days prior to action by the Board of Appeals. Any comments
received from the Commissioner prior to the action by the Board
of Appeals shall be made part of the record and shall be taken
into consideration by the Board of Appeals.
3. Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement
Officer the Board of Appeals shall hold a "de novo" hearing. At this time the
Board may receive and consider new evidence and testimony, be it oral or
written. When acting in a "de novo" capacity the Board of Appeals shall
Town of Litchfield Shoreland Zone Ordinance 2022
46
hear and decide the matter afresh, undertaking its own independent analysis
of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall
hold an appellate hearing, and may reverse the decision of the Planning
Board only upon finding that the decision was contrary to specific provisions
of the Ordinance or contrary to the facts presented to the Planning Board.
The Board of Appeals may only review the record of the proceedings before
the Planning Board. The Board Appeals shall not receive or consider any
evidence which was not presented to the Planning Board, but the Board of
Appeals may receive and consider written or oral arguments. If the Board of
Appeals determines that the record of the Planning Board proceedings are
inadequate, the Board of Appeals may remand the matter to the Planning
Board for additional fact finding.
4. Appeal Procedure
1. Making an Appeal
(i) An administrative or variance appeal may be taken to the
Board of Appeals by an aggrieved party from any decision
of the Code Enforcement Officer or the Planning Board,
except for enforcement-related matters as described in
Section 6.1.H.1.1 above. Such an appeal shall be taken
within thirty (30) days of the date of the official, written
decision appealed from, and not otherwise, except that the
Board, upon a showing of good cause, may waive the
thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the
Board of Appeals a written notice of appeal which
includes:
A concise written statement indicating what relief is
requested and why the appeal or variance should be
granted.
1. A sketch drawn to scale showing lot lines, location
of existing buildings and structures and other
physical features of the lot pertinent to the relief
sought.
(iii) Upon receiving an application for an administrative
appeal or a variance, the Code Enforcement Officer or
Planning Board, as appropriate, shall transmit to the
Board of Appeals all of the papers constituting the record
of the decision appealed from.
Town of Litchfield Shoreland Zone Ordinance 2022
47
(iv) The Board of Appeals shall hold a public hearing on an
administrative appeal or a request for a variance within
thirty-five (35) days of its receipt of a complete written
application, unless this time period is extended by the
parties.
2. Decision by Board of Appeals
(i) A majority of the full voting membership of the Board
shall constitute a quorum for the purpose of deciding an
appeal.
(ii) The person filing the appeal shall have the burden of
proof.
(111) The Board shall decide all administrative appeals and
variance appeals within thirty five (35) days after the
close of the hearing, and shall issue a written decision on
all appeals.
(iv) The Board of Appeals shall state the reasons and basis for
its decision, including a statement of the facts found and
conclusions reached by the Board. The Board shall cause
written notice of its decision to be mailed or hand-
delivered to the applicant and to the Department of
Environmental Protection within seven (7) days of the
Board's decision. Copies of written decisions of the
Board of Appeals shall be given to the Planning Board,
Code Enforcement Officer, and the municipal officers.
5. Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section
269 1(3)(F), any aggrieved party who participated as a party during the
proceedings before the Board of Appeals may take an appeal to Superior
Court in accordance with State laws within forty-five (45) days from the date
of any decision of the Board of Appeals.
6. Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the
Board of Appeals may reconsider any decision within forty-five (45) days of
its prior decision. A request to the Board to reconsider a decision must be
filed within ten (10) days of the decision that is being reconsidered. A vote
to reconsider and the action taken on that reconsideration must occur and be
completed within forty-five (45) days of the date of the vote on the original
decision. Reconsideration of a decision shall require a positive vote of the
majority of the Board members originally voting on the decision, and proper
notification to the landowner, petitioner, planning board, code enforcement
officer, and other parties of interest, including abutters and those who
testified at the original hearing(s). The Board may conduct additional
hearings and receive additional evidence and testimony.
Town of Litchfield Shoreland Zone Ordinance 2022
48
Appeal of a reconsidered decision to Superior Court must be made within
fifteen (15) days after the decision on reconsideration.
6.2. Enforcement
6.2.A. Nuisances
1. Any violation of this Ordinance shall be deemed to be a nuisance.
2. Code Enforcement Officer
1. It shall be the duty of the Code Enforcement Officer to enforce
the provisions of this Ordinance. If the Code Enforcement
Officer shall find that any provision of this Ordinance is being
violated, he or she shall notify in writing the person responsible
for such violation, indicating the nature of the violation and
ordering the action necessary to correct it, including
discontinuance of illegal use of land, buildings or structures, or
work being done, removal of illegal buildings or structures, and
abatement of nuisance conditions. A copy of such notices shall
be submitted to the municipal officers and be maintained as a
permanent record.
2. The Code Enforcement Officer shall conduct on-site inspections
to insure compliance with all applicable laws and conditions
attached to permit approvals. The Code Enforcement Officer
shall also investigate all complaints of alleged violations of this
Ordinance.
3. The Code Enforcement Officer shall keep a complete record of
all essential transactions of the office, including applications
submitted, permits granted or denied, variances granted or
denied, revocation actions, revocation of permits, appeals, court
actions, violations investigated, violations found, and fees
collected. On a biennial basis, a summary of this record shall be
submitted to the Director of the Bureau of Land and Water
Quality within the Department of Environmental Protection.
3. Legal Actions.
When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the
Code Enforcement Officer, are hereby directed to institute any and all actions
and proceedings, either legal or equitable, including seeking injunctions of
violations and the imposition of fines, that may be appropriate or necessary
to enforce the provisions of this Ordinance in the name of the municipality.
The municipal officers, or their authorized agent, are hereby authorized to
enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such
agreements shall not allow an illegal structure or use to continue unless there
Town of Litchfield Shoreland Zone Ordinance 2022
49
is clear and convincing evidence that the illegal structure or use was
constructed or conducted as a direct result of erroneous advice given by an
authorized municipal official and there is no evidence that the owner acted in
bad faith, or unless the removal of the structure or use will result in a threat
or hazard to public health and safety or will result in substantial
environmental damage.
4. Fines.
Any person, including but not limited to a landowner, a landowner's agent or
a contractor, who violates any provision or requirement of this Ordinance
shall be penalized in accordance with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than
$2500 per violation for each day that the violation continues. However, ina
resource protection district the maximum penalty is increased to $5000 (38
M.R.S.A. section 4452).
SECTION 7 Definitions
Accessory structure or use - a use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated, shall not subordinate the principal
use of the lot. A deck or similar extension of the principal structure or a garage attached to the
principal structure by a roof or a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the
granting or denial of a permit or variance under this Ordinance; a person whose land abuts land
for which a permit or variance has been granted; or any other person or group of persons who
have suffered particularized injury as a result of the granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops; grains and seed crops; dairy animals and
dairy products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and
greenhouse products. Agriculture does not include forest management and timber harvesting
activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant
or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and
inclusive of bark.
Basement _- any portion of a structure with a floor-to-ceiling height of 6 feet or more and having
more than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for vehicles
and trailers.
Town of Litchfield Shoreland Zone Ordinance 2022
50
Bureau -- State of Maine Department of Conservation's Bureau of Forestry
Bureau of Forestry -- State of Maine Department of Agriculture, Conservation, and
Forestry, Bureau of Forestry.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy -- the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation,"
defined below, the intent and result of which activity is the production of income from the buying
and selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling
units.
Dimensional requirements - numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Development -- a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a
substantial handicap as determined by a physician or in the case of mental handicap, by a
psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare,
such as protection of resources from immediate destruction or loss, law enforcement, and
operations to rescue human beings, property and livestock from the threat of destruction or
injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or
water transmission or distribution lines, towers and related equipment; telephone cables or lines,
poles and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage
lines, collection or supply systems; and associated storage tanks. Such systems may include
towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes,
traffic signals, hydrants and similar accessories, but shall not include service drops or buildings
which are necessary for the furnishing of such services.
Expansion of a structure - an increase in the footprint or height of a structure, including all
extensions such as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of
more footprint of a structure or ground area devoted to a particular use.
Town of Litchfield Shoreland Zone Ordinance 2022
51
Family - one or more persons occupying a premise and living as a single housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved
in order to discharge the 100-year flood without cumulatively increasing the water surface elevation
by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls, plus the horizontal area of any unenclosed portions of a structure such as porches and
decks.
Footprint. "Footprint" means the entire area of ground covered by the structures on a premise, including
cantilevered or similar overhanging extensions, as well as unenclosed structures, such as patios and decks.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters
tall (approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frost walls, or other base consisting of
concrete, block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1. Often or more contiguous acres; or of less than 10 contiguous acres and
adjacent to a surface water body, excluding any river, stream or brook, such
that in a natural state, the combined surface area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and fora
duration sufficient to support, and that under normal circumstances do
support, a prevalence of wetland vegetation typically adapted for life in
saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform
to the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location
on submerged lands or that require direct access to, or location in, inland waters and that cannot
be located away from these waters. The uses include, but are not limited to commercial and
recreational fishing and boating facilities, finfish and shellfish processing, fish-related storage
and retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards
and boat building facilities, marinas, navigation aids, basins and channels, shoreline structures
necessary for erosion control purposes, industrial uses dependent upon water-borne transportation
or requiring large volumes of cooling or processing water that cannot reasonably be located or
operated at an inland site, and uses that primarily provide general public access to inland waters.
Recreational boat storage buildings are not considered to be a functionally water dependent use.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed
or increased inland body of water is completely surrounded by land held by a single owner,
Town of Litchfield Shoreland Zone Ordinance 2022
52
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-
A Section 465-A. This classification includes some, but not all impoundments of rivers that are
defined as great ponds.
Ground cover -- small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Hazard tree - a tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site exhibits a high
probability of failure and loss of a major structural component of the tree in a manner that will strike a
target. A normal range of environmental conditions does not include meteorological anomalies, such
as, but not limited to: hurricanes; hurricane-force winds; tornados; microbursts; or significant ice
storm events. Hazard trees also include those trees that pose a serious and imminent risk to bank
stability. A target is the area where personal injury or property damage could occur if the tree or a
portion of the tree fails. Targets include roads, driveways, parking areas, structures, campsites, and
any other developed area where people frequently gather and linger.
' Height of a structure - the vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding
chimneys, steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession that is customarily conducted on or in a
residential structure or property and that is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) that employs no more than
two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property that causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot
coverage, or increase in height of a structure. Property changes or structure expansions which
either meet the dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area
than does any portion of the existing nonconforming structure. Hence, a structure may be
expanded laterally provided that the expansion extends no closer to the water body, tributary
stream, or wetland than the closest portion of the existing structure from that water body,
tributary stream, or wetland. Included in this allowance are expansions which in-fill irregularly
shaped structures.
Individual private campsite - an area of land that is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10) individuals
and which involves site improvements which may include but not be limited to a gravel pad,
parking area, fire place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Town of Litchfield Shoreland Zone Ordinance 2022
53
Institutional -- a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for
public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads
serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and
outdoor storage of boats and marine equipment, bait and tackle shops and marine fuel service
facilities.
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources that create minimal disturbance to the land and that include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period that removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction
site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot
lines extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling
units.
Native -- indigenous to the local forests.
Non-conforming condition -- non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment took
effect.
Non-conforming lot - a single lot of record that, at the effective date of adoption or amendment
of this Ordinance, does not meet the area, frontage, or width requirements of the district in which
it is located.
Non-conforming structure - a structure that does not meet any one or more of the following
dimensional requirements; setback, height, lot coverage or footprint, but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took
effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof that is not
Town of Litchfield Shoreland Zone Ordinance 2022
54
allowed in the district in which it is situated, but which is allowed to remain solely because it was
in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation - species of vegetation listed by the Maine
Department of Agriculture, Conservation and Forestry as being invasive in Maine ecosystems
and not native to Maine ecosystems.
Normal high-water line (non-tidal waters) - that line that is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation,
and which distinguishes between predominantly aquatic and predominantly terrestrial land.
Areas contiguous with rivers and great ponds that support non-forested wetland vegetation and
hydric soils and that are at the same or lower elevation as the water level of the river or great
pond during the period of normal high-water are considered part of the river or great pond.
Outlet stream - any perennial or intermittent stream, as shown on the most recent highest resolution
version of the national hydrography dataset available from the United States Geological Survey on
the website of the United States Geological Survey or the national map, that flows from a freshwater
wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the
normal high-water line or within a wetland.
3. Temporary: Structures that remain in or over the water for less than seven
(7) months in any period of twelve (12) consecutive months.
4. Permanent: Structures that remain in or over the water for seven (7)
months or more in any period of twelve (12) consecutive months.
Principal structure - a structure other than one that is used for purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
Principal use - a use other than one that is wholly incidental or accessory to another use on the
same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas,
and roads, that are owned, leased, or otherwise operated, or funded by a governmental body or
public entity.
Recent floodplain soils - the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg Hadley Limerick
Lovewell Medomak Ondawa
Alluvial Cornish Charles Podunk
Rumney Saco Suncook
Town of Litchfield Shoreland Zone Ordinance 2022
55
Sunday Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat-launching
facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and
designed for temporary sleeping or living quarters for one or more persons, and which may
include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be
considered as a vehicle and not as a structure, the unit must remain with its tires on the ground,
and must be registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the
structure, or 2.) any existing overboard wastewater discharge.
Residential dwelling unit or Residential Structure - a room or group of rooms designed and
equipped exclusively for use as permanent, seasonal, or temporary living quarters for only one
family at a time, and containing cooking, sleeping and toilet facilities. The term shall include
mobile homes and rental units that contain cooking, sleeping, and toilet facilities regardless of the
time-period rented. Recreational vehicles are not residential dwelling units.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion
control and soil stabilization, typically used on ground slopes of two (2) units horizontal to one
(1) unit vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that point
at which it provides drainage for a watershed of twenty five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet
above ground level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height above ground
level.
Service drop - any utility line extension that does not cross or run beneath any portion of a water
body provided that:
1. inthe case of electric service
1. the placement of wires and/or the installation of utility poles is
located entirely upon the premises of the customer requesting
service or upon a roadway right-of-way; and
Town of Litchfield Shoreland Zone Ordinance 2022
56
the total length of the extension is less than one thousand (1,000)
feet.
5. inthe case of telephone service
1. the extension, regardless of length, will be made by the
installation of telephone wires to existing utility poles, or
2. the extension requiring the installation of new utility poles or
placement underground is less than one thousand (1,000) feet in
length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or
tributary stream, or upland edge of a wetland, to the nearest part of a structure, road, parking
space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight
line between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal
distance, of the normal high-water line of any great pond or river; within 250 feet of the upland
edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the normal
high-water line of a stream.
Shoreline -- the normal high-water line, or upland edge of a wetland.
Significant River Segments - See Appendix B or 38 M.R.S.A. section 437.
Storm-damaged tree - a tree that has been uprooted, blown down, is lying on the ground, or that
remains standing and is damaged beyond the point of recovery as the result of a storm event.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two
(2) perennial streams as depicted on the most recent, highest resolution version of the national
hydrography dataset available from the United States Geological Survey on the website of the
United States Geological Survey or the national map, to the point where the stream becomes a
river or where the stream meets the shoreland zone of another water body or wetland. When a
stream meets the shoreland zone of a water body or wetland and a channel forms downstream of
the water body or wetland as an outlet, that channel is also a stream.
Structure - anything temporarily or permanently located, built, constructed or erected for the
support, shelter or enclosure of persons, animals, goods or property of any kind, or anything
constructed or erected on or in the ground, . The term includes structures temporarily or
permanently located, such as decks, patios, and satellite dishes. Structure does not include fences;
poles and wiring and other aerial equipment normally associated with service drops, including guy
wires and guy anchors; subsurface waste water disposal systems as defined in Title 30-A, section
4201, subsection 5; geothermal heat exchange wells as defined in Title 32, section 4700-E, subsection
3-C; or wells or water wells as defined in Title 32, section 4700-E, subsection 8 .
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as
a percentage of estimated total cost.
Town of Litchfield Shoreland Zone Ordinance 2022
57
Subsurface sewage disposal system -- any system designed to dispose of waste or waste water
on or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture,
mechanism, or apparatus used for those purposes; does not include any discharge system licensed
under 38 M.R.S.A. section 414, any surface waste water disposal system, or any municipal or
quasi-municipal sewer or waste water treatment system.
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tree - a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four
and one half (4.5) feet above the ground, with a more or less definite crown, and reaching a height of
at least ten (10) feet at maturity.
Tributary stream -- means a channel between defined banks created by the action of surface
water, which is characterized by the lack of terrestrial vegetation or by the presence of a bed,
devoid of topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and
which is connected hydrologically with other water bodies. "Tributary stream" does not include
rills or gullies forming because of accelerated erosion in disturbed soils where the natural
vegetation cover has been removed by human activity.
*This definition does not include the term "stream" as defined elsewhere in this Ordinance, and
only applies to that portion of the tributary stream located within the shoreland zone of the
receiving water body or wetland.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) foot) tall or taller.
Vegetation_- all live trees, shrubs, and other plants including without limitation, trees both over
and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and
cables as well as maintenance work on these crossings. This definition includes crossings for
timber harvesting equipment and related activities.
Wetland - a freshwater wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
Town of Litchfield Shoreland Zone Ordinance 2022