SOLAR GARDEN
ORDINANCE
Town of Mapleton
Attest: A true copy as certified to me by the municipal officers of Mapleton
on the 12th day of February 2023.
___________________________________
Sandra L. Fournier
Town Clerk
2
I.
Title and Purpose: Pg. 3
II.
Effective Date: Pg. 3
III.
Types of Systems: Pg. 3-4
IV.
Permitted Use: Pg. 4
V.
Application Requirements: Pg. 4-5
VI.
Application Fees: Pg. 5
VII.
Standards: Pg. 6-8
VIII.
Decommissioning/Discontinuance: Pg. 8-9
IX.
Enforcement: Pg. 9
X.
Miscellaneous: Pg. 9-10
XI.
Definitions: Pg. 10-12
3
Title and Purpose
This ordinance shall be known as the Solar Garden Ordinance for the town of
Mapleton, Maine.
The purpose of this ordinance is to enable the Town of Mapleton to:
a) Establish clear guidelines, standards and time frames for the town to regulate
Solar Garden Systems.
b) Be informed of placement of said solar gardens.
c) Permit the town to fairly and responsibly protect public health, safety and
welfare.
d) Protect natural resources of Mapleton.
e) Allow for orderly development of land.
f) Protect property values in the town of Mapleton.
Effective Date
This ordinance shall be effective upon its adoption by vote of the eligible voters
of the Town of Mapleton, at a town meeting.
Types of Systems
Personal Use Solar Garden Systems
A solar array system that is used to capture solar energy and supply primarily for
personal on-site use.
Commercial Solar Garden Systems.
An area of land or other area used by property owner and/or corporate entity for
solar collection for profit. Commercial Solar Garden Systems do not have a limit
on rated nameplate compacity and can be up to 150 acres and not allowed within
4
2000 feet of residential business, residential, or industrial zones. Setback can be
waived if proper screening or conditions are met set forth by the planning board.
Permitted use
No person shall construct a Personal Use or Commercial Solar Garden System
without obtaining a permit from the Code Enforcement Officer, herein referred to
as CEO, or Planning Board as follows:
a) For Personal Use Solar Garden Systems approval by CEO is required for the
construction and or the expansion of all free-standing solar array systems.
b) For Commercial Garden Systems approval by the planning board is required
for the construction and or expansion of all such solar array systems.
Application Requirements
Solar Garden Systems shall be subject to the provisions set forth in this
Ordinance for the Town of Mapleton and the following application requirements:
Personal Use Solar Garden Systems.
You must provide the following before your project will be reviewed:
a) A building/land use permit.
b) A site plan provided by the solar contractor performing the work which
includes:
a. Drawings showing the proposed layout and location on a parcel
including distances to nearby structures and property lines.
b. Construction timeline.
Commercial Solar Garden Systems
You must provide the following before your project will be reviewed.
a) A building/land use permit
b) A site plan which includes:
5
a. A description and drawings showing entire scope of the proposed
project, layout and location on a parcel and distance to nearby
structures and property lines.
b. A description detailing the entire scope of the project.
c. Construction timeline including anticipated on-line date.
c) If the operator will be leasing the land, a copy of the agreement clearly
outlining the relationship inclusive of the rights and responsibilities of the
operator and the landowner
d) A description of the panels to be installed, including make, model, and
associated major system components.
e) A copy of the agreement with the power company, clearly indicating which
party is responsible and how they will be operated and maintained.
f) Any relevant environmental studies.
g) A stormwater plan as well as well as any erosion and sedimentation control
plans.
h) An operations and maintenance plan.
i) An emergency management plan for all anticipated hazards.
j) A decommissioning plan.
k) Copy of the bond given to the state of Maine.
Application Fees
All personal use and commercial solar garden system applications shall fall
under the same fee schedule as any other building permit in Mapleton.
a) $5 per thousand-dollar valuation (minimum $50)
b) Planning Board Meeting: $40 plus cost of advertising (fee can be waived)
c) Board of Appeals: $40 plus cost of advertising (fee can be waived)
Standards
Standards for Personal Use Solar Array Systems.
6
Personal Use Solar Array System can be permitted in all locations as long as the
follow standards are followed.
a) No part of a system that is mounted on the roof or exterior wall of a building
shall project more than two feet from the primary surface of the roof or the
wall.
b) No part of a ground mounted system shall be located between the front
property line of the lot and the front wall of the building. This restriction
shall not apply in any area where the front wall of the building is located
more than 150 feet from the front property line.
c) A ground-mounted system shall be screened from all public streets and all
residential uses located within 100 feet of any portion of the solar array as
measured from the closet part of the residential structure.
d) A ground-mounted system is prohibited within any legal easement or right
of way.
e) Any roof mounted system shall provide evidence by a structural engineer
that the roof structure can support the additional load of the system.
f) Must have exterior disconnect.
Standards for Commercial Use Solar Garden Systems.
Commercial Use Solar Garden Systems permitted only in Residence and
Farming District designated areas and the following standards must be followed:
a) Project must be 500 feet from any primary residential dwelling and follow
all town set back standards.
b) Ground-mounted solar energy systems shall be buffered from all public
roads and residences by plantings, berms, and natural topographical features.
c) All solar gardens shall be protected by a perimeter fence. Such fences shall
allow for small wildlife passage and movement.
d) At least one sign is required to identify the owner/operator and provide a 24-
hour emergency contact phone number. Solar energy systems shall not be
used for displaying any advertising. A clearly visible warning sign shall be
placed at the base of all pad-mounted transformers and substations and on
the fence surrounding the array of any potential voltage hazards.
e) After 2 pole lengths off the road, all electrical must be buried to State of
Maine standards.
7
f) Any solar array system is prohibited on any legal easement or right of way
g) Owner or operator shall provide a copy of the project summary, electrical
schematics, and site plan to the Fire Chief. Owner or operator shall also
coordinate with local emergency services in developing an emergency
response plan. A 3200 series Knox-Box, or agreed equivalent, shall be
provide and installed by the operator to be used to allow emergency service
personnel continuous access. All means of shutting down the solar energy
system shall be clearly marked. The owner or operator shall identify a
responsible person for public inquires throughout the life of the installation.
h) When any portion of a solar array is removed any earth disturbance must be
graded and re-seeded per state standards.
i) The owner shall maintain the facility in good condition. Maintenance shall
include, but not be limited to painting, structural repairs, vegetative
screening, fences, landscaping, plantings, and integrity of security measures.
j) Site Access shall be maintained to a level acceptable to the fire chief for
emergency response and the code enforcement officer. The owner or
operator shall be responsible for the cost of maintaining any access roads,
including regular plowing of snow to maintain road access.
k) Exterior lighting shall be limited to that is required for safety and operational
purposes.
Decommissioning/Discontinuance
For Commercial Use Solar Gardens, decommissioning of the entire facility will
begin if twelve (12) consecutive months of no generation occurs at the facility.
a) Decommissioning/ Decommissioning Funds are required for all solar energy
development.
b) A person may not construct, cause to be constructed or operate a solar
energy development with ground-mounted solar panels without submitting a
copy of a decommissioning plan from the permitting entities, State, Federal,
and local.
c) A detailed decommissioning plan with a documented decommissioning costs
and salvage value projections are required with submission of a building
application to the Town. The salvage value projections and
8
decommissioning cost shall be either produced by, or reviewed by an
independent licensed engineer. All decommissioning plans shall adhere to
the Maine Solar Decommissioning Law 35-A M.R.S.A § 3495.
d) In order to facilitate and ensure appropriate removal of the solar array
equipment when it reaches the end of its useful life, or if the applicant cease
operation of the facility, the owner, operator, and or land owner will notify
the CEO by written and signed documentation.
e) If operating on leased land, the landowner may be held liable for
decommissioning if operator declares bankruptcy.
f) Upon a transfer of ownership of a solar energy development, subject to an
approved decommissioning plan, a person that transfers ownership of the
development remains jointly and severally liable for implementation of the
plan until the permitting entities, State, Federal, and local, approves transfer
of the decommissioning plan to the new owner or operator.
g) Prior to construction all permitting entities, State, Federal, or local, shall
approve a decommissioning plan whenever it finds the following:
1.) The plan, if implemented, will result in successful
decommissioning of the solar energy development, including the
restoration of farmland sufficient to support resumption of farming
or agricultural activities;
2.) The person identified in the plan as responsible for
decommissioning demonstrates financial assurance, in the form of
a performance bond, surety bond, irrevocable letter of credit or
other form of financial assurance acceptable to the permitting
entity, State, Federal, and local for the total cost of
decommissioning; and
3.) The plan requires the financial assurance be updated 15 years after
approval of the plan and no less frequently than every 5 years
thereafter. Updates to financial assurance required under this
subsection must be submitted to the permitting entities on or before
December 31st of the year in which such updates are required.
h) The site is subject to CEO inspection at upon reasonable notice.
9
Enforcement
a) Any enforcement of Personal Use Solar Garden Systems is up to the Code
Enforcement Officer.
b) Any enforcement of Commercial Use Solar Garden Systems will be up to
the towns code enforcement officer with the approval from the Select Board.
c) As and additional means of enforcement the CEO may suspend or revoke
any permit issued if it determines after notice and hearing that it was issued
in error or upon incomplete or false information, or the that applicant has
failed to comply with any conditions of approval. Upon such suspension or
revocation all operations addressed by said permit shall cease until a new
approval or permit is obtained under this ordinance by the applicant within
ninety days of suspension or revocation. If no approval or permit is issued
within ninety days of suspension or revocation the decommissioning plan
must start.
Miscellaneous
Amendment After Approval
a) No modifications shall be made in approved applications unless they have
been resubmitted and approved by CEO for personal or by planning board
for commercial. The intensity of the review will be determined by the
Planning board and depends upon the complexity of the proposed alteration.
Administrative Appeals
a) All administrative appeals shall follow the procedure of the board of
appeals.
Amendment of this Ordinance
a) The process for amending this Ordinance may be initiated by the Select
Board and shall be adopted by the Town's legislative body at Town
Meeting.
10
Definitions
Code Enforcement Officer (CEO): A person appointed by the municipal officers to
administer and enforce an ordinance. Reference to the CEO may be construed to
include Building Inspector, Plumbing Inspector, Electrical Inspector, and the like,
where applicable
Commercial Solar Garden System: A solar collection system that's primary goal is
to collection solar energy for Profit.
Decommissioning: Means the physical removal of all components of a solar energy
development, including but not limited to solar panels and associated anchoring
systems and foundations to a depth of at least 24 inches or to the depth of bedrock,
whichever is less, and other structures, buildings, roads, fences, cables, electrical
components or associated facilities and foundations to a depth of at least 24 inches
or to the depth of bedrock, whichever is less, to the extent the components of the
development are not otherwise in or proposed to be placed in productive use or
otherwise authorized to remain in place by the environmental permitting entity. For
any portion of a solar energy development located on land classified as farmland
any time within 5 years preceding the start of construction of the development,
"decommissioning" means the physical removal of all such components of the
development to a depth of at least 48 inches or to the depth of bedrock, whichever
is less, to the extent such components are not otherwise in or proposed to be placed
in productive use or otherwise authorized to remain in place by the environmental
permitting entity. "Decommissioning" includes the grading to postconstruction
grade and revegetation of all earth disturbed during construction and
decommissioning, except for areas already restored
Emergency Management Plan: An emergency management plan is a course of
action developed to mitigate the damage of potential events that could endanger a
facility's ability to function.
Financial Assurance: Is a financial instrument provided by an entity to ensure
timely environmental cleanup should an owner or operator be unable or unwilling
to perform required environmental actions.
11
Operations and Maintenance Plan (O&M Plan): Combination of general
maintenance, management, training, budgeting, and business processes that are
used collectively for the proper functioning of a facility.
Permitting Entity: The Department of Environmental Protection in the case of a
solar energy development: (1) Located wholly or partly outside of the unorganized
areas; or (2) Subject to the department's jurisdiction pursuant to Title 38, chapter 3,
subchapter 1, article 6; or B. The Maine Land Use Planning Commission in the
case of a solar energy development located wholly in the unorganized areas and
not subject to the jurisdiction of the Department of Environmental Protection
pursuant to Title 38, chapter 3, subchapter 1, article 6.
Personal us Solar Garden Systems: A solar collection system that is used to capture
solar energy primarily for on-site use and to offset installers electrical use.
Planning Board: The Planning Board for the Municipality.
Primary Residence: A person's primary residence, or main residence is the
dwelling where they usually live, typically a house.
Pure Tone: A tone of a single frequency produced by simple harmonic vibrations
and without overtones.
Residence and Farming District: The R-F District is established as a district in
which the principal use of the land is for agriculture, forestry, rural-type residence,
and customary associated uses. Included in this district are certain uses unsuited to
the more densely developed urbanized portions of town. Large lots, with ample
space between buildings, are required as a means of reducing fire hazards, and to
provide sufficient area for both private water supply and septic disposal system on
the same lot. Other purposes of this district include conservation of natural
resources, reduction of soil erosion, and encouragement of appropriate recreational
use of the land.
Transfer of ownership: Means a change in the legal entity that owns or operates a
solar energy development. A sale or exchange of stock or membership interests or
a merger is not a transfer of ownership as long as the legal entity that owns or
operates the solar energy development remains the same.