TOWN OF
MAPLETON
WIND ENERGY
FACILITY ORDINANCE
Wind Energy Facility Ordinance for Mapleton
Adopted by the Residents on March 18, 2013
Board of Selectmen
Barry Buck Grant Clark Shawn Doyen
a}
a |
x TAK
David Dunlavey Scott Smith "
Planning Board
fia) a a ae Lig a ee 4} a
Mary 'Beaulieu Dan Breton Bruce Buck
|
Darren Chandler Dan Edgeco Maxine Maynard
He 2 Nerblen.
Glenn Nadeau
Wind Energy Facility Ordinance for
: Mapleton, Maine
1.0 ='Title 2
2.0 Authority 2
3.0 Purpose 2
4.0 Definitions 2
5.0 Applicability 7
6.0 Conflict and Severability 7
7.0 Effective Date and Repeal of Prior Ordinances 7
8.0 Classification of Wind Energy Facilities 8
9.0 Administration 8
10.0 Application Submission Requirements is
11.0 Meteorological Towers (MET Towers) 18
12.0 General Standards 18
13.0 Special Standards for Type 1A and 1B Wind Energy Facilities 21
14.0 Special Standards for Type 2 and Type 3 Wind Energy Facilities 24
Appendix A: Application Fees 28
Appendix B: Type 2 and Type 3 Noise Control Standards 29
Appendix C: Type 2 and Type 3 Decommissioning Plan Standards 44
1
1.0 Title
This Ordinance shall be known as the Wind Energy Facility Ordinance for
Mapleton.
2.0 Authority
This Ordinance is adopted pursuant to the enabling provisions of Article VIII, Part
2, Section 1 of the Maine Constitution; the provisions of 30-A M.R.S. § 3001
(Home Rule), and the provisions of the Planning and Land Use Regulation Act,
30-A M.R.S. § 4312, et seq.
3.0 Purpose
The purpose of the Ordinance is to provide for the construction and operation of
Wind Energy Facilities in Mapleton, subject to reasonable conditions that will
protect the public health, safety, and welfare.
4.0 Definitions
Adverse visual impact means the negative effect of a regulated activity on the
visual quality of a landscape.
Applicant is the legal entity, including successors and assigns, that files an
application under this Ordinance.
Approved Residential Subdivision means a residential subdivision for which all
applicable land use permits have been issued, provided that the time for
beginning construction under such permits has not expired.
Associated Facilities means elements of a Wind Energy Facility other than its
Generating Facilities that are necessary to the proper operation and maintenance
of the Wind Energy Facility, including but not limited to buildings, access roads,
Generator Lead Lines and substations.
DEP Certification means a certification issued by the Maine Department of
Environmental Protection pursuant to 35-A M.R.S. § 3456 for a Wind Energy
Development.
Generating Facilities means Wind Turbines and electrical lines, not including
Generator Lead Lines that are immediately associated with the Wind Turbines.
2
Generator Lead Line means a "generator interconnection transmission facility" as
defined by 35-A M.R.S.A. § 3132 (1-B).
Historic Area means a Historic Site administered by the Bureau of Parks and
Recreation of the Maine Department of Conservation, with the exception of the
Arnold Trail.
Historic Site means any site, structure, district or archaeological site which has
been officially included on the National Register of Historic Places and/or on the
Maine Historic Resource Inventory, or which is established by qualified testimony
as being of historic significance.
Landscape means an area characterized by its geology, landform, biota, and
human influences throughout the area.
Locally-Designated Passive Recreation Area means any site or area designated
by a municipality for passive recreation that is open and maintained for public
use and which: a) has fixed boundaries, b) is owned in fee simple by a
municipality or is accessible by virtue of public easement, c) is identified and
described in a local comprehensive plan and, d) has been identified and
designated at least nine months prior to the submission of the Applicant's Wind
Energy Facility permit application.
Meteorological Tower (MET Tower) means a Tower used for the measurement
and collection of wind data that supports various types of equipment, including
but not limited to anemometers, data recorders, and solar power panels. MET
Towers may also include wildlife related equipment such as ANABAT detectors,
bird diverts and wildlife entanglement protectors.
Municipal Reviewing Authority means the municipal planning board, agency or
office, or if none, the municipal officers.
Nacelle means the frame and housing at the top of the Tower that encloses the
gearbox and generator.
Non-Participating Landowner means any landowner, other than a Participating
Landowner whose land is located within Mapleton.
Occupied Building means a residence, school, hospital, house of worship, public
library or other building that is occupied or in use as a primary residence or is
3
customarily frequented by the public at the time when the permit application is
submitted.
Participating Landowner means one or more Persons that hold title in fee or a
leasehold interest with sublease rights to property on which Generating Facilities
or Associated Facilities are proposed to be located pursuant to an agreement
with the Applicant or an entity that has entered into a written agreement with the
Applicant allowing the Applicant to demonstrate the requisite right, title and
interest in such property.
Person means an individual, corporation, partnership, firm, organization or other
legal entity.
Planned Residence means a Residence for which all applicable building and land
use permits have been issued, provided that the time for beginning construction
under such permits has not expired.
Protected Location means any location that is:
1) accessible by foot, on a parcel of land owned by a Non-Participating
Landowner containing a residence or planned residence, or an approved
residential subdivision, house of worship, academic school, college, library,
duly licensed hospital or nursing home near the development site at the time
an application for a Wind Energy Facility is submitted under this Ordinance;
2) a hotel, motel, campsite or duly licensed campground that the municipal
authority responsible for review and approval of the pending application under
9.1 has designated a Protected Location after making a determination that the
health and welfare of the guests or the economic viability of the establishment
will be unreasonably impacted by noise in excess of that allowed under
section 13.1.3(b).
Residence means a building or structure, including manufactured housing,
maintained for permanent or seasonal residential occupancy providing living,
cooking and sleeping facilities and having permanent indoor or outdoor sanitary
facilities, excluding recreational vehicles, tents and watercraft.
Scenic Resource means a Scenic Resource of either state or national
significance, as defined in 35-A M.R.S.A. § 3451(9) or a scenic resource of local
significance located within the municipality and identified as such in a
4
comprehensive plan, open space plan or scenic inventory adopted by the
municipal legislative body.
Sensitive Receptor means a residence or other place or structure intended for
human habitation, whether inhabited or not, public park, state or federal wildlife
area, school, daycare center, elder care facility, medical facility, place of seated
assemblage, nonagricultural business, or manicured area of a recreational
establishment designed for public use, including but not limited to a golf course,
campground or other non agricultural business licensed by a state or federal
agency. A sensitive area is more likely to be sensitive to the exposure of noise,
shadow flicker or other potentially adverse affects of a Wind Energy Facility.
Shadow Flicker means alternating changes in light intensity caused by the
movement of Wind Turbine blades casting shadows on the ground or a stationary
object.
Short Duration Repetitive Sounds means a sequence of repetitive sounds which
occur more than once within an hour, each clearly discernible as an event and
causing an increase in the sound level of at least 6 dBA on the fast meter
response above the sound level observed immediately before and after the
event, each typically less than ten seconds in duration, and which are inherent to
the process or operation of the development and are foreseeable.
Sight Line Representation means a profile drawing showing prominent features,
including but not limited to topography, buildings, and trees, along and in relation
to a line of sight extending from an observer's eye to the lowest point visible on a
proposed Tower.
Significant Wildlife Habitat means a Significant Wildlife Habitat as defined in 38
M.R.S.A. § 480-B(10).
Substantial Start means that construction shall be considered to be substantially
commenced when any work beyond excavation, including but not limited to, the
pouring of a slab or footings, the installation of piles , the construction of
columns, or the placement of a Tower on a foundation has begun.
Tower means the free-standing structure on which a wind measuring or energy
conversion system is mounted.
5
Turbine Height means the distance measured from the surface of the Tower
foundation to the highest point of any turbine rotor blade measured at the highest
arc of the blade.
Viewshed means any areas from which the proposed activity will be visible.
Visual Impact Assessment means a written assessment including narrative and
visual aids that include each of the following points:
1) Visual Impact Visualization of the proposed activity and evaluation of
potential adverse impacts of that activity within the viewshed. All scenic
resources within the viewshed must be identified and the surrounding
landscape must be described.
2) Composition. The arrangement of the component parts of a landscape.
Component parts are objects or activities that usually are described in terms
of color, texture, line, form, dominance and scale.
3) Contrast. Comparing the component parts of a landscape in terms of form,
line, color, texture, dominance, or scale.
4) Existing uses. The current appearance and use of the landscape,
considering previous human alterations.
Wind Energy Facility means a facility that uses one or more Wind Turbines to
convert wind energy to electrical energy. A Wind Energy Facility includes
Generating Facilities and Associated Facilities.
Wind Energy Facility, Type 1A means a Wind Energy Facility having a maximum
generating capacity of less than 100kW, a maximum of one Wind Turbine and a
maximum Turbine Height of 65 feet or less.
Wind Energy Facility, Type 1B means a Wind Energy Facility having a maximum
generating capacity of less than 100kW and either more than one Wind Turbine,
or one or more Wind Turbines with a Turbine Height greater than 65 feet.
Wind Energy Facility, Type 2 means a Wind Energy Facility having a maximum
generating capacity of 100 kW or greater and which does not require a state
permit issued by the Department of Environmental Protection under the Site
Location of Development Act, 38 M.R.S.A. §481, et seq.
6
Wind Energy Facility, Type 3 means a Wind Energy Facility having a generating
capacity of 100kW or greater and which requires a state permit issued by the
Department of Environmental Protection under the Site Location of Development
Act, 38 M.R.S.A. §481, et seq.
Wind Turbine means a system for the conversion of wind energy into electricity
which is comprised of a Tower, generator, Nacelle, rotor and transformer.
5.0 Applicability
5.1. This Ordinance applies to any Wind Energy Facility proposed for construction
in Mapleton after the effective date of this Ordinance. This Ordinance does
not apply to Associated Facilities unless the Generating Facilities are located
within Mapleton, in which case this Ordinance applies to both the Generating
Facilities and the Associated Facilities.
5.2 A Wind Energy Facility that is the subject of an application determined to be
complete by the Mapleton Planning Board prior to the effective date of this
Ordinance shall not be required to meet the requirements of this Ordinance;
provided that any physical modifications after the effective date of the
Ordinance shall be subject to the permitting requirements of Section 9.2.
6.0 Conflict and Severability
6.1' If there is a conflict between provisions in this Ordinance, the more stringent
shall apply. {f there is a conflict between a provision in this Ordinance and
that of another Mapleton ordinance, the provision of this Ordinance shall
apply.
6.2 The invalidity of any part of this Ordinance shall not invalidate any other part
of this ordinance.
7.0 Effective Date and Repeal of Prior Ordinances
This Ordinance becomes effective on March 18, 2013. All prior Wind Energy
Facility Ordinances are repealed as of the effective date of this Ordinance.
7
8.0 Classification of Wind Energy Facilities
All Wind Energy Facilities shall be classified in accordance with Table 1
below:
Table 1: Classification of Wind Energy Facilities and
Corresponding Local Review and Approval Authority
AGGREGATE [| TURBINE | MAX#OF | DEPSITELOCATION | LOCALREVIEW | ALLOWABLE
caciuity | CAPACITY HEIGHT ZONES
TURBINES | PERMIT REQ AUTHORITY
TYPE
1 Per 35-A MRS §3456. DEP Certificate required if energy generated is for sale or use by a Person other than the generator.
2 Per 38 MRS §482(2}
9.0 Administration
9.14 Review and Approval Authority
1. The Code Enforcement Officer is authorized to review all applications
for Type 1A Wind Energy Facilities and MET Towers pursuant to
section 11.0, and may approve, deny or approve such applications with
conditions in accordance with the standards of the Ordinance.
2. The Mapleton Planning Board is authorized to review all applications
for Type 1B, Type 2, and Type 3 Wind Energy Facilities and may
approve, deny or approve such applications with conditions in
accordance with this Ordinance.
9.2 Permit Required
8
1. No Wind Energy Facility shall be constructed or located within
Mapleton without a permit issued by the Code Enforcement Officer in
accordance with this Ordinance.
2. Any physical modification to an existing Wind Energy Facility that
materially alters the location or increases the area of development on
the site or that increases the Turbine Height or the level of sound
emissions of any Wind Turbine shall require a permit modification
under this Ordinance. Like-kind replacements and routine maintenance
and repairs shall not require a permit modification.
9.3. Permit Applications
1. Application components. A Wind Energy Facility permit application
shall consist of the application form, application fee, and supporting
documents, as described below:
a. Application Forms. The municipality shall provide the application
form which shall be signed by: 1) a Person with right, title and
interest in the subject property or; 2) a Person having written
authorization from a Person with right, title and interest in the
subject property. The signature shall be dated and the signatory
shall certify that the information in the application is complete and
correct and that the proposed facility will be constructed and
operated in accordance with the standards of this ordinance and all
approval and permit conditions, if any.
b. Application Fees. Application fees shall be assessed and paid
upon submission of the application in accordance with Appendix A
of this Ordinance.
c. Supporting Documents. The application shall include all additional
documents necessary to satisfy the applicable submission
requirements under section 10 of this Ordinance.
2. Application Submission. The Applicant shall submit its application for a
Wind Energy Facility permit to the Code Enforcement Officer who shall
note on the application the date on which it was received.
3. Changes to a Pending Application
9
a. The Applicant shall promptly notify the municipal entity responsible
for review and approval of a pending application under section 9.1
of any changes the Applicant proposes to make to information
contained in the application.
b. If changes are proposed to a pending application after a public
hearing has been held, the Mapleton Planning Board may consider
those changes and continue with the review and approval process
without a renewed public hearing if it determines that the changes
do not materially alter the application. If the Mapleton Planning
Board determines that the proposed changes do materially alter the
application it shall schedule and conduct another public hearing
within 30 days of that determination. In making its determination,
the Mapleton Planning Board shall consider whether the proposed
changes involve potential adverse effects different than or in
addition to those addressed in the initial application.
9.4 Permit Application Procedures
1. Type 1A Wind Energy Facility Application
a. Within 10 days after receiving an application, the Code
Enforcement Officer shall notify the Applicant in writing either that
the application is complete or, if the application is incomplete, the
specific additional material needed to complete the application.
The Code Enforcement Officer may waive any submission
requirement if the Code Enforcement Officer issues a written
finding that, due to special circumstances of the application,
adherence to that requirement is not necessary to determine
compliance with the standards of this Ordinance.
b. Within 30 days after determining the application to be complete, the
Code Enforcement Officer shall issue a written order: 1) denying
approval of the proposed Wind Energy Facility, 2) granting approval
of the proposed Wind Energy Facility or, 3) granting approval of the
proposed Wind Energy Facility with conditions. {n making the
decision, the Code Enforcement Officer shall make findings on
whether the proposed Wind Energy Facility meets the applicable
criteria described in sections 12 and 13.
10
c. With the agreement of the applicant, the Code Enforcement Officer
may extend the procedural time frames of this section.
2. Type 1B, Type 2 and Type 3 Wind Energy Facility Applications
a. The Applicant is strongly encouraged to meet with the Code
Enforcement Officer before submitting an application. At this pre-
application meeting, the Code Enforcement Officer will explain the
Ordinance's provisions, application forms, and submission
requirements. The Applicant should provide photos of the proposed
site and written descriptions of the proposed facility and the
proposed site, including its location and lot area.
b. An application shall be eligible for consideration at a regularly-
scheduled meeting of the Mapleton Planning Board only if the
applicant submits it at least 21 days prior to the meeting.
c. Within 45 days after receipt of the application by the Code
Enforcement Officer, the Mapleton Planning Board shall notify the
Applicant in writing either that the application is complete or, if the
application is incomplete, the specific additional material needed to
complete the application. The Mapleton Planning Board may waive
any submission requirement if it issues a written finding that, due to
special circumstances of the application, adherence to that
requirement is not necessary to determine compliance with the
standards of this Ordinance.
d. The Mapleton Planning Board shall hold a public hearing for a Type
3 Wind Energy Facility application within 60 days after determining
that the application is complete. The Mapleton Planning Board may
decide to hold a public hearing for a Type 1B or a Type 2 Wind
Energy Facility application. If it decides to hold a public hearing for
a Type 1B application, the Planning Board shall hold that hearing
within 30 days after determining that application is complete. If it
decides to hold a public hearing for a Type 2 application, the
Planning Board shall hold that hearing within 60 days after
determining that the application is complete.
e. Within 60 days after determining that an application for a Type 1B
Wind Energy Facility is complete or within 90 days after
11
determining that an application for a Type 2 or Type 3 Wind Energy
Facility is complete, the Mapleton Planning Board shall issue a
written order: 1) denying approval of the proposed Wind Energy
Facility, 2) granting approval of the proposed Wind Energy Facility
or, 3) granting approval of the proposed Wind Energy Facility with
conditions. In making its decision, the Mapleton Planning Board
shall make findings on whether the proposed Wind Energy Facility
meets the applicable criteria described in sections 12, 13, and 14.
f. With the agreement of the applicant, the Mapleton Planning Board
may extend the procedural time frames of this section.
Table 2:
Procedural Time Frames
Facility Application Public Final
Type Completeness Hearing Decision
1, Days after receipt of the application by the Code Enforcement Officer
2. Days after the applicalion is determined to be complete
9.5 Notice of Meetings
Ten days prior to any meeting at which an application for a Type 1B, Type 2,
or Type 3 Wind Energy Facility is to be considered, the Mapleton Planning
Board shall send notice by first class mail, to the applicant and all owners
within 500 feet for Type 1B or 5,280 feet for Type 2 or Type 3 windmills of the
property on which the Wind Energy Facility is proposed to be located. The
notice shall state the date, time and place of the meeting and the proposed
location and the classification of the proposed Wind Energy Facility.
9.6 Public Hearings
12
The Planning Board shall have notice of the date, time, and place of any
public hearing and the proposed location and the classification of the
proposed Wind Energy Facility:
1. Published at least once in a newspaper having general circulation within
the municipality. The date of the first publication shall be at least 10 days
before the hearing.
2. Mailed by first class mail to the Applicant and to owners of property within
500 feet for Type 1B, or 5,280 feet for Type 2 or Type 3, of the property on
which the Wind Energy Facility is proposed, at least 10 days before the
public hearing. The Code Enforcement Officer shall maintain a list of
property owners to whom notice is mailed in the application file. Failure of
any of these property owners to receive a notice shall not invalidate the
public hearing, nor shall it require the Planning Board to schedule another
hearing.
9.7 Professional Services
In reviewing the application for compliance with this Ordinance, the Planning
Board may retain professional services, including but not limited to those of
an attorney or consultant, to verify information presented by the Applicant and
to assist the Planning Board in reviewing the Application. The attorney or
consultant shall first estimate the reasonable cost of such review and the
Applicant shall deposit, with the municipality, the full estimated cost, which the
municipality shall place in an escrow account. The municipality shall pay the
attorney or consultant from the escrow account and reimburse the Applicant if
funds remain after payment.
9.8 Expiration of Permits
Permits shall expire: 1) two years after the date of approval unless a
substantial start on construction has occurred and; 2) three years after the
date of approval unless construction of the Wind Energy Facility has been
completed. If a permit for a Type 2 or Type 3 Wind Energy Facility expires,
the Applicant shall implement pertinent provisions of the approved
decommissioning plan. Upon the Applicant's written request, the municipal
entity responsible for review and approval of the application under section 9.1
may extend either or both expiration time limits by one year.
9.9 Access
13
The Code Enforcement Officer shall have access to the site at all times to
review the progress of the work and shall have the authority to review all
records and documents directly related to the design, construction and
operation of the facility to determine compliance with the requirements of the
ordinance and state and federal laws and regulations.
9.10 Enforcement
1. It shall be unlawful for any Person to violate or fail to comply with or
take any action that is contrary to the terms of the Ordinance, or to
violate or fail to comply with any permit issued under the Ordinance, or
to cause another to violate or fail to comply or take any action which is
contrary to the terms of the Ordinance or any permit issued under or
subject to the Ordinance.
2. If the Code Enforcement Officer or other Person charged with
enforcement of municipal laws determines that a violation of the
Ordinance or a permit has occurred, the Code Enforcement Officer
shall provide written notice to any Person alleged to be in violation of
this Ordinance or permit. If the alleged violation does not pose an
immediate threat to public health or safety, the Code Enforcement
Officer and the alleged violator shall engage in good faith negotiations
to resolve the alleged violation. Such negotiations shall be conducted
within thirty (30) days of the notice of violation and, with the consent of
the alleged violator, may be extended. The Code Enforcement Officer
may require the Windmill to remain inoperable during this time.
Experts in the field of Wind Energy may be consulted, if necessary, at
the applicant's expense.
3. If, after thirty (30) days from the date of notice of violation or further
period as agreed to by the alleged violator, the Code Enforcement
Officer determines, in the officer's reasonable discretion, that the
parties have not resolved the alleged violation, the Code Enforcement
Officer may institute civil enforcement proceedings or any other
remedy at law to ensure compliance with the Ordinance or permit.
9.11 Appeals
Any Person aggrieved by a decision of the Code Enforcement Officer or the
Mapleton Planning Board under this Ordinance may appeal the decision to
14
the Board of Appeals, as provided by section 11.4 of the Mapleton Zoning
Ordinance.
10.0 Application Submission Requirements
10.1 General Submission Requirements
1. A completed application form including:
a. The Applicant and Participating Landowner(s') name(s) and contact
information.
b. The address, tax map number, zone and owner(s) of the proposed
facility site and any contiguous parcels owned by Participating
Landowners.
c. The tax map number, zone, current use, owner(s) and addresses of
owner(s) of parcels that abut the proposed facility site or abut
parcels of participating landowners that are contiguous with the
proposed facility site.
d. An affirmation, signed and dated by the Applicant, that the
information provided in the application is correct and that the
proposed Wind Energy Facility, if approved and built, shall be
constructed and operated in accordance with the standards of this
ordinance and all conditions of approval, if any
2. Receipt showing payment of application fee in accordance with
Appendix A.
3. A copy of a deed, easement, purchase option or other comparable
documentation demonstrating that the Applicant has right, title or
interest in the proposed facility site.
4, Location map showing the boundaries of the proposed facility site and
all contiguous property under total or partial control of the Applicant or
Participating Landowner(s) and any Scenic Resource or Historic Site
within 2500 feet of the proposed development.
5. A description, to the satisfaction of the reviewing authority, of the
proposed Wind Energy Facility that includes the number and
aggregate generating capacity of all Wind Turbines, the Turbine Height
and manufacturer's specifications, drawings, for each Wind Turbine
15
(including but not limited to the make, model, maximum generating
capacity, sound emission levels and types of overspeed controls) and
a description of Associated Facilities.
6. Site plan, drawn at a scale of not less than 1" = 50', showing the
proposed location of each Wind Turbine and Associated Facilities and
any of the following features located within 500 feet of any Wind
Turbine: parcel boundaries, required setbacks, topographic contour
lines (maximum 20-foot interval), roads, rights-of-way, overhead utility
lines, buildings (identified by use), land cover, wetlands, streams,
water bodies and areas proposed to be re-graded or cleared of
vegetation.
a. In addition to the information in 6, above, site plans for Wind
Energy Facilities shall show the location and average height of tree
cover to be retained and the location, variety, planting height and
mature height of proposed trees, if any.
7. Written evidence that the Environmental Coordinator of the Maine
Department of Inland Fisheries and Wildlife (MDIFW) and that the
Maine Natural Areas Program (MNAP) have both been notified of the
pending application and the location and Turbine Height of all
proposed Wind Turbines.
8. Written evidence that the provider of electrical service to the property
has been notified of the intent to connect an electric generator to the
electricity grid, if such connection is proposed.
9. Description of emergency and normal shutdown procedures.
10. | Photographs of existing conditions at the site.
11 An application for a Type 1A or 1B Wind Energy Facility shall include
structural drawings of the Tower foundation and anchoring system: a)
prepared by the Wind Turbine or Tower manufacturer, b) prepared in
accordance with the manufacturer's specifications or, c) prepared and
stamped by a Maine-licensed professional engineer.
12. An application for a Type 1A or Type 1B Wind Energy Facility shall
include:
a. awritten statement, signed by the Applicant, that certifies that the
proposed facility is designed to meet the applicable noise control
standards under section 13.1.3 and acknowledges the Applicant's
16
obligation to take remedial action in accordance with section 13.1.6
if the Code Enforcement Officer determines those standards are
not being met or;
b. a written request for review under section 14.1 along with
information required under Appendix B, subsection B
(Submissions).
13. An Application for Type 1B, Type 2 or Type 3 Wind Energy Facility
shall include a visual impact assessment from locations determined by
the Planning Board.
14. An application for a Type 2 Wind Energy Facility that generates energy
primarily for sale or use by a Person other than the generator, shall
include, if issued at the time of application, certification from the
Department of Environmental Protection pursuant to 35-A M.R.S.A. §
3456 that the Wind Energy Facility:
a. Will meet the requirements of the noise control rules adopted by the
Board of Environmental Protection pursuant to the Site Location of
Development Act, 38 M.R.S.A. §481, et seq.;
b. Will be designed and sited to avoid adverse Shadow Flicker effects:
and
c. Will be constructed with setbacks adequate to protect public safety.
If such certification has not been issued at the time of application, the
Applicant shall include written evidence that the Applicant has applied
for certification.
10.2 Additional Submission Requirements for an Application for a Type 2 and 3
Wind Energy Facility
1. Certificates of design compliance obtained by the equipment
manufacturers from Underwriters Laboratories, Det Norske Veritas, or
other similar certifying organizations.
2. Decommissioning plan in conformance with Appendix C.
3. Written summary of operation and maintenance procedures for the
Wind Energy Facility and a maintenance plan for access roads,
erosion and sedimentation controls and storm water management
facilities.
17
4. Standard boundary survey of the subject property stamped by a
Maine-licensed surveyor. The Planning Board may waive this
requirement if it determines that the Applicant has provided information
sufficient to identify property boundaries to the extent necessary.
5. Stormwater management plan stamped by a Maine-licensed
professional engineer.
6. Sound level analysis, prepared by a qualified engineer, which
addresses the standards of section 14.1.
7. Shadow Flicker analysis based on WindPro or other modeling software
approved by the Department of Environmental Protection.
8. Foundation and anchoring system drawings that are stamped by a
Maine-licensed professional engineer.
9. Other relevant studies, reports, certifications and approvals as may be
reasonably requested by the Mapleton Planning Board to ensure
compliance with this Ordinance.
11.0 Meteorological Towers (MET Towers)
Applications for Meteorological (MET) Towers shall be subject to the submission
and review standards for a Type 1A Wind Energy Facility, as applicable, except
that no height limitation shall apply. A permit for a MET Tower shall be valid for 2
years and 2 months from the date of issuance. The Code Enforcement Officer
may grant one or more one-year extensions of this permit period. Within 30 days
following removal of a MET Tower, the Applicant shall restore the site to its
original condition to the extent practicable. The provisions of this section do not
apply to permanent MET Towers included as Associated Facilities in approved
Wind Energy Facility applications.
12.0 General Standards -- Applicable to all applications.
12.1 Safety Setbacks
Wind Turbines shall be set back a horizontal distance equivalent to 150% of
the Turbine Height from property boundaries, public and private rights-of-way
and overhead utility lines that are not part of the proposed Generating Facility
except that the entity responsible for review and approval of the application
18
may allow a reduced setback if the Applicant submits, in writing: 1) a waiver
of the property boundary setback signed by the pertinent abutting landowner
and evidence, such as operating protocols, safety programs, or a licensed
professional engineer with appropriate expertise and experience with Wind
Turbines, that demonstrates that the reduced setback proposed by the
Applicant is appropriate.
12.2 Natural Resource Protection
A Wind Energy Facility shall not have an adverse impact on rare, threatened,
or endangered wildlife, significant wildlife habitat, rare, threatened or
endangered plants and rare and exemplary plant communities. In making its
determination under this subsection, the municipal entity responsible for
review and approval of the permit application under section 9.1 shall consider
pertinent application materials and the written comments and/or
recommendations, if any, of the Maine Department of Inland Fisheries and
Wildlife (MDIFW) Environmental Coordinator and the Maine Natural Areas
Program (MNAP).
12.3 Building Permit
All components of the Wind Energy Facility shall comform to relevant and
applicable local and state and federal building codes and regulations.
12.4 Overspeed Controls and Brakes
Each Wind Turbine shall be equipped with an overspeed control system that:
1) includes both an aerodynamic control such as stall regulation, variable
blade pitch, or other similar system, and a mechanical brake that operates in
fail safe mode; or 2) has been designed by the manufacturer or a licensed
civil engineer and found by the municipal entity responsible for review and
approval of the application under 9.1, based on its review of a written
description of the design and function of the system, to meet the needs of
public safety.
12.5 Electrical Components and Interconnections
All electrical components of the Wind Energy Facility shall conform to relevant
and applicable local, state, and national codes.
12.6 Access
19
All ground-mounted electrical and control equipment and all access doors to a
Wind Turbine shall be labeled and secured to prevent unauthorized access.
A Wind Tower shall not be climbable up to a minimum of fifteen (15) feet
above ground surface.
12.7 Blade Clearance
The minimum distance between the ground and all blades of a Wind Turbine
shall be 25 feet as measured at the lowest arc of the blades.
12.8 Signal Interference
The Applicant shall ensure that there will be no interference in the
transmission or reception of electrical impulses beyond the property lines,
including radio, telephone, television, or similar signals caused by the Wind
Energy Facility.
12.9 Structure Type
With the exception of Meteorological (MET) Towers, Towers shall be
monopoles with no guy wires. This requirement may be waived if the
Applicant demonstrates to the satisfaction of the municipal entity responsible
for review and approval of the permit application under section 9.1, that there
is no practicable alternative. Bird flight diverters must be installed on any guy
wires that are permitted.
12.10 Erosion Control
Erosion of soil and sedimentation shall be minimized by employing "best
management practices" in the "Maine Erosion Control Handbook for
Construction: Best Management Practices", March 2003.
12.11 Building-Mounted Wind Turbines
Building-mounted Wind Turbines are not permitted.
12.12 Visual Appearance
1. A Wind Turbine shall be a non-obtrusive color such as white, off-white
or gray, or as may otherwise be required by another governmental
agency with jurisdiction over the Wind Energy Facility.
2. A Wind Turbine shall not be lighted artificially, except to the extent
consistent with Federal Aviation Administration recommendations or
other applicable authority that regulates air safety or as is otherwise
20
required by another governmental agency with jurisdiction over the
Wind Energy Facility.
3. A Wind Turbine shall not be used to support signs and shall not display
advertising except for reasonable and incidental identification of the
turbine manufacturer, facility owner and operator, and for warnings.
12.13 Visibility of Wind Turbine
The following requirements apply, to the extent practicable, to Type 1B and
Type 2 Wind Energy Facilities:
1. Each Wind Turbine shall be located to maximize the effectiveness of
existing vegetation, structures and topographic features in screening
views of the Wind Turbine from Occupied Buildings and Scenic
Resources.
2. When existing features do not screen views of a Wind Turbine from
Residences and Scenic Resources, screening may be required, where
feasible and effective, through the planting of trees and/or shrubs. In
order to maximize the screening effect and minimize wind turbulence
near the Wind Turbine, plantings should be situated as near as
possible to the point from which the Wind Turbine is being viewed.
Such plantings should be of native varieties.
13.0 Special Standards for Type 1A and Type 1B Wind Energy Facilities
13.1 Noise emanating from a Type 1A or Type1B Wind Energy Facility shall be
controlled in accordance with the provisions of this section or, upon the
written request of the applicant, the provisions of section 14.1. If the
Applicant chooses review under section 14.1, the provisions of 13.1.1, 13.1.2
and 13.1.6 shall apply, but the provisions of 13.1.3, 13.1.4 and 13.1.5 shall
not apply.
1. The sound level limits contained in this section apply only to areas that
are defined as Protected Locations and to property boundaries that
describe the outer limits of the facility site in combination with any
parcel(s) owned by a Participating Land-Owner that are contiguous
with the facility site .
21
2. The sound level limits contained in this section do not apply to the
facility site or any parcel(s) owned by a Participating Land-Owner that
are contiguous with the facility site.
3. The sound levels resulting from routine operation of a Wind Energy
Facility, as measured in accordance with the procedures described in
section 13.1.5 or appendix B sect f. shall not exceed the limits
specified for the following locations and times:
a. At a Protected Location with no living and sleeping quarters:
55 dBA during the Protected Location's regular hours of
operation
b. Ata Protected Location with living and sleeping quarters:
1. Area(s) within 500 feet of living and sleeping quarters:
45 dBA between 7:00 p.m. and 7:00 a.m.
55 dBa between 7:00 a.m. and 7:00 p.m.
2. Area(s) more than 500 feet from living and sleeping quarters:
55dBA at all times.
c. At property boundaries that describe the outer limits of the facility
site combined with any parcel(s) owned by a Participating Land-
Owner that are contiguous with the facility site:
75 dBA at all times.
4. If the Applicant submits the certification and acknowledgement
required by Section 10.1.12(1), the municipal entity responsible for
review and approval of the application under Section 9.1 shall
determine, for purposes of issuing its approval, that the pertinent
sound-level limits under section 13.1.1 have been met, subject to the
Applicant's obligation to take remedial action as necessary under
section 13.1.4.
22
IS), The Code Enforcement Officer may perform measurements of sound
levels resulting from routine operation of an installed Type 1A or Type
1B Wind Energy Facility at the officer's own initiative or in response to
a noise-related complaint to determine compliance with the pertinent
standards in section 13.1.1, or Appendix B. sect f. Such
measurements shall be performed as follows:
a. Measurements shall be obtained during representative weather
conditions when the sound of the Wind Energy Facility is most
clearly noticeable. Preferable weather conditions for sound
measurements at distances greater than about 500 feet from the
sound source include overcast days when the measurement
location is downwind of the Wind Turbine and inversion periods
(which most commonly occur at night).
b. Sound levels shall be measured at least four (4) feet above the
ground by a meter set on the A-weighted response scale, fast
response. The meter shall meet the latest version of American
National Standards Institute (ANSI $1.4.) "American Standard
Specification for General Purpose Sound Level Meters" and shall
have been calibrated at a recognized laboratory within the past
year.
c. 5 dBA shall be added to sound levels of any Short Duration
Repetitive Sound measured in accordance with paragraphs a and
b,
6. The Applicant shall operate the proposed Wind Energy Facility in
conformance with the sound level limits of section 13.1 or section 14.1,
as applicable. If, based on post-installation measurements taken in
accordance with section 13.1.3 or section 14.1, as applicable, the
Code Enforcement Officer determines that the applicable sound-level
limits are not being met, the Applicant shall, at the Applicant's expense
and in accordance with the Mapleton Wind Energy Facility Ordinance
and in consultation with the Code Enforcement Officer, take remedial
action deemed necessary by the Code Enforcement Officer to ensure
compliance with those limits. Remedial action that the Code
Enforcement Officer may require, but shall not be limited to, one or
more of the following:
23
a. modification or limitation of operations during certain hours or wind
conditions;
b. maintenance, repair, modification or replacement of equipment;
c. relocation of the Wind Turbine(s); and,
d. removal of the Wind Turbine(s) provided that the Code
Enforcement Officer may require removal of the Wind Turbine(s)
only if the Code Enforcement Officer determines that there is no
practicable alternative.
13.2 Discontinued Use
1. The Applicant shall prepare a decommissioning plan in conformance
with Appendix C. A Type 1A or Type 1B Wind Energy Facility that is
not generating electricity for twelve (12) consecutive months shall be
deemed a discontinued use and shall be removed from the property by
the Applicant within 120 days of receipt of notice from the Code
Enforcement Officer, unless the Applicant provides information that the
Mapleton Planning Board deems sufficient to demonstrate that the
project has not been discontinued and should not be removed. !f the
Wind Energy Facility is not removed within this time period, the
municipality may remove the turbine at the Applicant's expense. The
Applicant shall pay all site reclamation costs deemed necessary and
reasonable to return the site to its pre-construction condition, including
the removal of roads and reestablishment of vegetation.
2. If a surety has been given to the municipality for removal of a Type 1B
Wind Energy Facility, the Applicant may apply to the Mapleton
Planning Board for release of the surety when the Wind Energy Facility
has been removed to the satisfaction of the Code Enforcement Officer.
14.0 Special Standards for Type 2 and Type 3 Wind Energy Facilities
14.1. Control of Noise
Noise emanating from a Type 2 Wind Energy Facility, a Type 3 Wind Energy
Facility, or, upon written request of the Applicant pursuant to section 13.1, a
Type 1A or Type 1B Wind Energy Facility shall be controlled in accordance
with the provisions of Appendix B.
24
If there is a conflict between a provision of Appendix B and another provision
of this ordinance, the provision of Appendix B shall apply.
14.2 Use of Public Roads
1. The Applicant shall identify all state and local public roads to be used
within Mapleton to transport equipment and parts for construction,
operation or maintenance of a Type 2 or Type 3 Wind Energy Facility.
2. The Town Engineer, Road Commissioner or a qualified third-party
engineer reasonably acceptable to both the Mapleton Planning Board
and the Applicant and paid for by the Applicant pursuant to Section 9.7
of the Ordinance, shall document road conditions prior to construction.
The Town Engineer, Road Commissioner or third-party engineer shall
document road conditions again thirty (30) days after construction is
complete or as weather permits.
3. The Applicant shall demonstrate, to the satisfaction of the Mapleton
Planning Board, that it has financial resources sufficient to comply with
subsection 4, below, and the Mapleton Planning Board may require the
Applicant to post a bond or other security in order to ensure such
compliance.
4, Any road damage caused by the Applicant or its contractors shall be
promptly repaired at the Applicant's expense.
14.3. Warnings
A clearly visible warning sign concerning voltage must be placed at the base
of all pad-mounted transformers and substations.
14.4 Artificial Habitat
To the extent practicable, the creation of artificial habitat for raptors or raptor
prey shall be minimized. In making its determination under this subsection
the Mapleton Planning Board shall consider comments and
recommendations, if any, provided by the Maine Department of Inland
Fisheries and Wildlife.
14.5 Community and Environmental Protection Setback Distances
Notwithstanding any other provision contained in this Ordinance, when any
Type 2 or Type 3 wind turbines are proposed to be constructed or operated
within 5,280 feet of any Sensitive Receptor or Scenic Resource, the Planning
Board shall consider visual impacts on the affected property owners.
25
14.6 Shadow Flicker
Type 2 and Type 3 Wind Energy Facilities shall be designed to avoid adverse
shadow flicker effect at any Occupied Building located on a Non-Participating
Landowner's property.
14.7 Relationship to DEP Certification and Permitting
For a Type 2 Wind Energy Facility for which a DEP Certification has been
submitted in accordance with section 10.1.14, the Mapleton Planning Board
shall consider, to the extent applicable, pertinent findings in that certification
when making its determination under sections 12.1, 14.1, and 14.6.
14.8 Local Emergency Services
1. The Applicant shall provide a copy of the project summary and site
plan to local emergency service providers, including paid or volunteer
fire department(s).
2. Upon request, the Applicant shall cooperate with emergency service
providers to develop and coordinate implementation of an emergency
response plan for a Type 2 or Type 3 Wind Energy Facility.
Sh, A Wind Turbine shall be equipped with an appropriate fire suppression
system to address fires within the Nacelle portion of the turbine or shall
otherwise address the issue of fire safety to the satisfaction of the
Mapleton Planning Board.
14.9 Liability Insurance
The Applicant or an Applicant's designee acceptable to the Mapleton
Planning Board shall maintain a current general liability policy for the Type 2
or Type 3 Wind Energy Facility that covers bodily injury and property damage
with limits in an amount commensurate with the scope and scale of the
Facility as determined by the insurer. The Applicant or its designee shall
make certificates of insurance available to the Mapleton Planning Board upon
request.
14.10 Design Safety Certification
Each Wind Turbine shall conform to applicable industry standards including
those of the American National Standards Institute (ANSI) and at least one of
the following: Underwriters Laboratories, Det Norske Veritas, Germanischer
Llloyd Wind Energies, or other similar certifying organization.
26
14.11 Public Inquiries and Complaints
1. The Applicant or its designee shall maintain a phone number and
identify a responsible Person for the public to contact with inquiries and
complaints throughout the life of the Wind Energy Facility.
2. The Applicant or its designee shall make reasonable efforts to respond
to the public's inquiries and complaints and shall provide written copies
of all complaints and the company's resolution or response to the Code
Enforcement Officer upon request.
14.12 Decommissioning
The Applicant shall prepare a decommissioning plan in conformance with
Appendix C.
27
APPENDIX A
Application Fees
$5.00 per thousand of value of the entire project.
28
APPENDIX B
Control of Noise
Pursuant to section 14.1, noise emanating from a Type 2 Wind Energy Facility, a Type 3 Wind
Energy Facility, or, upon written request of the Applicant pursuant to section 13.1, a Type 7A or
Type 1B Wind Energy Facility, shall be controlled in accordance with the following provisions:
A. Sound Level Limits
(1} Sound from Routine Operation of Facility.
(a) Except as noted in subsections (b) and (c) below, the hourly sound levels
resulting from routine operation of the facility and measured in accordance with
the measurement procedures described in subsection F shall not exceed the
following limits:
(i) At any property line of the facility site or contiguous property owned by the
Applicant or Participating Land Owner(s), whichever is farther from the
proposed facility's regulated sound sources:
75 dBA at any time of day.
{ii) At any Protected Location in an area for which the zoning, or, if unzoned,
the existing use or use contemplated under a comprehensive plan, is not
predominantly commercial, transportation, or industrial;
60 dBA between 7:00 a.m. and 7:00 p.m.
{the "daytime hourly limit"), and
50 dBA between 7:00 p.m. and 7:00 a.m.
(the "nighttime hourly limit").
(iii) At any Protected Location in an area for which the zoning, or, if unzoned,
the existing use or use contemplated under a comprehensive plan, is
predominantly commercial, transportation, or industrial:
70 dBA between 7:00 a.m. and 7:00 p.m.
(the "daytime hourly limit"), and
60 dBA between 7:00 p.m. and 7:00 a.m.
(the 'nighttime hourly limit').
(iv) For the purpose of determining whether the use of an unzoned area is
predominantly commercial, transportation, or industrial (e.g. non-residential
in nature), the Code Enforcement Officer shall consider the municipality's
29
comprehensive plan, if any. Furthermore, the usage of properties abutting
each Protected Location shall be determined, and the limits applied for that
Protected Location shall be based upon the usage occurring along the
greater portion of the perimeter of that parcel; in the event the portions of
the perimeter are equal in usage, the limits applied for that Protected
Location shall be those for a Protected Location in an area for which the
use is not predominantly commercial, transportation, or industrial.
(v} When a proposed facility is to be located in an area where the daytime pre-
development ambient hourly sound level at a Protected Location is equal to
or less than 45 dBA and/or the nighttime pre-development ambient hourly
sound level at a Protected Location is equal to or less than 35 dBA, the
hourly sound levels resulting from routine operation of the facility and
measured in accordance with the measurement procedures described in
subsection F shall not exceed the following limits at that Protected Location:
55 dBA between 7:00 a.m. and 7:00 p.m.
{the "daytime hourly limit"), and
45 dBA between 7:00 p.m. and 7:00 a.m.
(the "nighttime hourly limit").
For the purpose of determining whether a Protected Location has a daytime
or nighttime pre-development ambient hourly sound levei equal to or less
than 45 dBA or 35 dBA, respectively, the Applicant may make sound level
measurements in accordance with the procedures in subsection F or may
estimate the sound-level based upon the population density and proximity
to local highways. If the resident population within a circle of 3,000 feet
radius around a Protected Location is greater than 300 persons, or the
hourly sound Jevel from highway traffic at a Protected Location is predicted
to be greater than 45 dBA in the daytime or 35 dBA at night, then the
Applicant may estimate the daytime or nighttime pre-development ambient
hourly sound level to be greater than 45 dBA or 35 dBA, respectively.
NOTE: Highway traffic noise can be predicted using the nomograph method of
FHWA Highway Traffic Noise Prediction Model, FHWA-RD-77-108,
December, 1978.
(vi) Notwithstanding the above, the Applicant need not measure or estimate the
pre-development ambient hourly sound levels at a Protected Location if he
demonstrates, by estimate or example, that the hourly sound levels
resulting from routine operation of the facility will not exceed 50 dBA in the
daytime or 40 dBA at night.
{b) If the Applicant chooses to demonstrate by measurement that the daytime and/or
nighttime pre-development ambient sound environment at any Protected
Location near the facility site exceeds the daytime and/or nighttime limits in
subsection 1{a)(ii) or 1(a)(iii) by at least 5 dBA, then the daytime and/or nighttime
limits shall be 5 dBA less than the measured daytime and/or nighttime pre-
30
development ambient hourly sound level at the location of the measurement for
the corresponding time period.
(c) For any Protected Location near an existing facility, the hourly sound level limit
for routine operation of the existing facility and all future expansions of that facility
shall be the applicable hourly sound level limit of 1(a) or 1(b) above, or, at the
Applicant's election, the existing hourly sound level from routine operation of the
existing facility plus 3 dBA.
{d) For the purposes of determining compliance with the above sound level limits, 5
dBA shall be added to the observed levels of any tonal sounds that result from
routine operation of the facility.
(e}) When routine operation of a facility produces short duration repetitive sound, the
following limits shall apply:
(i) For short duration repetitive sounds, 5 dBA shall be added to the
observed levels of the short duration repetitive sounds that result from
routine operation of the facility for the purposes of determining
compliance with the above sound level limits.
(ii) For short duration repetitive sounds which the municipal entity
responsible for review and approval of a pending application under
section 9.1 determines, due to their character and/or duration, are
particularly annoying or pose a threat to the health and welfare of nearby
neighbors, 5 dBA shali be added to the observed levels of the short
duration repetitive sounds that result from routine operation of the facility
for the purposes of determining compliance with the above sound level
limits, and the maximum sound level of the short duration repetitive
sounds shall not exceed the following limits:
(a) At any Protected Location in an area for which the zoning, or, if
unzoned, the existing use or use contemplated under a
comprehensive plan, is not predominantly commercial,
transportation, or industrial:
65 dBA between 7:00 a.m. and 7:00 p.m., and
55 dBA between 7:00 p.m. and 7:00 a.m.
(b) At any Protected Location in an area for which the zoning, or, if
unzoned, the existing use or use contemplated under a
comprehensive plan, is predominantly commercial, transportation,
or industrial:
75 dBA between 7:00 a.m. and 7:00 p.m., and
65 dBA between 7:00 p.m. and 7:00 a.m.
31
(c) The methodology described in subsection 1(a)(iv) shal! be used to
determine whether the use of an unzoned area is predominantly
commercial, transportation, or industrial.
(d) If the Applicant chooses to demonstrate by measurement that the
pre-development ambient hourly sound level at any Protected
Location near the facility site exceeds 60 dBA between 7:00 a.m.
and 7:00 p.m., and/or 50 dBA between 7:00 p.m. and 7:00 a.m.,
then the maximum sound level limit for short duration repetitive
sound shall be 5 dBA greater than the measured pre-development
ambient hourly sound level at the location of the measurement for
the corresponding time period.
(e) For any Protected Location near an existing facility, the maximum
sound level limit for short duration repetitive sound resulting from
routine operation of the existing facility and all future expansions
and modifications of that facility shall be the applicable maximum
sound level limit of (e)(ii)(a) or (e)(ii)(b) above, or, at the Applicant's
election, the existing maximum sound level of the short duration
repetitive sound resulting from routine operation of the existing
facility plus 3 dBA.
NOTE: The maximum sound level of the short duration repetitive sound shall be
measured using the fast response [Lafma,]. See the definition of maximum sound
level.
(2) Sound from Construction of a Facility
(a) The sound from construction activities between 7:00 p.m. and 7:00 a.m. is
subject to the following limits:
(i) Sound from nighttime construction activities shall be subject to the
nighttime routine operation sound level limits contained in subsections 1(a)
and 1{b).
(ii) If construction activities are conducted concurrently with routine operation
of the facility, then the combined total of construction and routine operation
sound shall be subject to the nighttime routine operation sound level limits
contained in subsections 1(a) and 1(b).
(iii) Higher levels of nighttime construction sound are permitted when a duly
issued permit authorizing nighttime construction sound in excess of these
limits has been granted by the Code Enforcement Officer.
(b} Sound from construction activities between 7:00 a.m. and 7:00 p.m. shall not
exceed the following limits at any Protected Location:
32
Duration of Activity © Hourly Sound Level Limit
12 hours 87 dBA
8 hours 90 dBA
6 hours 92 dBA
4 hours 95 dBA
3 hours 97 dBA
2 hours 100 dBA
{ hour orless 105 dBA
(c) All equipment used in construction on the facility site shall comply with applicable
federal noise regulations and shall include environmental noise control devices in
proper working condition, as originally provided with the equipment by its
manufacturer.
(3) Sound from Maintenance Activities
(a) Sound from routine, ongoing maintenance activities shall be considered part of
the routine operation of the facility and the combined total of the routine
maintenance and operation sound shall be subject to the routine operation sound
level limits contained in subsection 1.
(b) Sound from occasional, major, scheduled overhaul activities shall be subject to
the construction sound level limits contained in subsection 2. If overhaul activities
are conducted concurrently with routine operation and/or construction activities,
the combined total of the overhaul, routine operation and construction sound
shall be subject to the construction sound level limits contained in subsection 2.
B. Submissions
(1) Facilities with Minor Sound Impact.
An Applicant proposing facility with minor sound impact may choose to file, as part of
the permit application, a statement attesting to the minor nature of the anticipated
sound impact of their facility. An applicant proposing an expansion or modification of
an existing facility with minor sound impact may follow the same procedure as
described above. For the purpose of this ordinance, a facility or an expansion or
modification of an existing facility with minor sound impact means a facility where the
Applicant demonstrates, by estimate or example, that the regulated sound from
routine operation of the facility will not exceed 5 dBA less than the applicable limits
established under Section A. It is the intent of this subsection that an applicant need
not conduct sound level measurements to demonstrate that the facility or an
expansion or modification of an existing facility will have a minor sound impact.
33
(2) Other Facilities
Technical information shall be submitted describing the Applicant's plan and intent to
make adequate provision for the control of noise. The applicant's plan shall contain
information such as the following, when appropriate:
(a} Maps and descriptions of the land uses, local zoning and comprehensive plans
for the area potentially affected by sounds from the facility.
(b) A description of major sound sources, including tonal sound sources and sources
of short duration repetitive sounds, associated with the construction, operation
and maintenance of the proposed facility, including their locations within the
proposed facility.
(c) A description of the daytime and nighttime hourly sound levels and, for short
duration repetitive sounds, the maximum sound levels expected to be produced
by these sound sources at Protected Locations near the proposed facility.
(d) A description of the Protected Locations near the proposed facility.
(e) A description of proposed major sound control measures, including their
locations and expected performance.
{f) A comparison of the expected sound levels from the proposed facility with the
sound level limits of this regulation.
C. Terms and Conditions
The municipal entity responsible for review and approval of the pending application
under 9.1 may, as a term or condition of approval, establish any reasonable requirement
to ensure that the Applicant has made adequate provision for the control of noise from
the facility and to reduce the impact of noise on Protected Locations. Such conditions
may include, but are not limited to, enclosing equipment or operations, imposing limits
on hours of operation, or requiring the employment of specific design technologies, site
design, modes of operation, or traffic patterns.
The sound level limits prescribed in this ordinance shall not preclude the municipal entity
responsible for review and approval of the pending application under 9.1 from requiring
an Applicant to demonstrate that sound levels from a facility will not unreasonably
disturb wildlife or adversely affect wildlife populations in accordance with 12.2. In
addition, the sound level limits shail not preclude the municipal entity responsible for
review and approval of the pending application under 9.1, as a term or condition of
approval, from requiring that lower sound level limits be met to ensure that the Applicant
has made adequate provision for the protection of wildlife.
D. Waiver from Sound Level Limits
Mapleton recognizes that there are certain facilities or activities associated with facilities
for which noise control measures are not reasonably available. Therefore, the municipal
34
entity responsible for review and approval of the pending application under section 9.1
may grant a waiver from any of the sound level limits contained in this ordinance upon
(1) a showing by the Applicant that he or she has made a comprehensive assessment of
the available technologies for the facility and that the sound level limits cannot
practicably be met with any of these available technologies, and (2) a finding by the
municipal entity responsible for review and approval of the pending application under
section 9.1 that the proposed facility will not have an adverse impact on Protected
Locations. In addition, a waiver may be granted by the municipal entity responsible for
review and approval of the pending application under section 9.1 if (1) a facility is
deemed necessary in the interest of national defense or public safety and the Applicant
has shown that the sound level limits cannot practicably be met without unduly limiting
the facility's intended function, and (2) a finding is made by the municipal entity
responsible for review and approval of the pending application under section 9.1 that the
proposed facility will not have an adverse impact on Protected Locations. The municipal
entity responsible for review and approval of the pending application under section 9.1
shall consider the request for a waiver as part of the review of a completed permit
application. In granting a waiver, the municipal entity responsible for review and approval
of the pending application under section 9.1 may, as a condition of approval, impose
terms and conditions to ensure that no adverse sound impacts will occur.
E. Definitions
Terms used herein are defined below for the purpose of this noise regulation:
(1) AMBIENT SOUND: At a specified time, the all-encompassing sound associated
with a given environment, being usually a composite of sounds from many sources
at many directions, near and far, including the specific facility of interest.
(2) CONSTRUCTION: Activity and operations associated with the facility or expansion
of the facility or its site.
(3) EMERGENCY: An unforeseen combination of circumstances which calls for
immediate action.
(4) EMERGENCY MAINTENANCE AND REPAIRS: Work done in response to an
emergency.
(5) ENERGY SUM OF A SERIES OF LEVELS: Ten times the logarithm of the
arithmetic sum of the antilogarithms of one-tenth of the levels. [Note: See Section
F(4.2).]
(6) EXISTING HOURLY SOUND LEVEL: The hourly sound level resulting from routine
operation of an existing facility prior to the first expansion that is subject to this
ordinance.
(7) EQUIVALENT SOUND LEVEL: The level of the mean-square A-weighted sound
pressure during a stated time period, or equivalently the level of the sound
exposure during a stated time period divided by the duration of the period. (NOTE:
For convenience, a one hour equivalent sound level should begin approximately on
the hour.)
35
(8) HISTORIC AREAS: Historic sites administered by the Bureau of Parks and Lands
of the Maine Department of Conservation, with the exception of the Arnold Trail.
(9) HOURLY SOUND LEVEL: The equivalent sound level for one hour measured or
computed in accordance with this ordinance.
(10) LOCALLY-DESIGNATED PASSIVE RECREATION AREA: Any site or area
designated by Mapleton for passive recreation that is open and maintained for
public use and which:
(a) has fixed boundaries,
(b) is owned in fee simple by Mapleton or is accessible by virtue of public
easement,
{c} is identified and described in Mapleton comprehensive plan, and
(d) has been identified and designated at least nine months prior to
submission of the Applicant's Wind Energy Facility permit application.
(11) MAXIMUM SOUND LEVEL: Ten times the common logarithm of the square of the
ratio of the maximum sound to the reference sound of 20 micropascals. Symbol:
LAFmax.
(12) MAXIMUM SOUND: Largest A-weighted and fast exponential-time-weighted sound
during a specified time interval. Unit: pascal (Pa).
(13) RESIDENCE: A building or structure, including manufactured housing, maintained
for permanent or seasonal residential occupancy providing living, cooking and
sleeping facilities and having permanent indoor or outdoor sanitary facilities,
excluding recreational vehicles, tents and watercraft.
(14) PRE-DEVELOPMENT AMBIENT: The ambient sound at a specified location in the
vicinity of a facility site prior to the construction and operation of the proposed
facility or expansion.
(15) PROTECTED LOCATION: any location that is:
(a) accessible by foot, on a parcel of land owned by a Non-Participating
Landowner containing a Residence or planned Residence, or an approved
residential subdivision, house of worship, academic school, college, library,
duly licensed hospital or nursing home near the facility site at the time an
application for a Wind Energy Facility permit is submitted under this ordinance;
or
(b) within a State Park, Baxter State Park, a National Park, a nature preserve
owned by a land trust, the Maine Audubon Society or the Maine chapter of the
Nature Conservancy, the Appalachian Trail, the Moosehorn National Wildlife
refuge, a federally designated wilderness area, a state wilderness area
36
designated by statute, a municipal park or a locally-designated passive
recreation area, or any location within consolidated public reserve lands
designated by rule by the Bureau of Public Lands as a Protected Location.
At Protected Locations more than 500 feet from living and sleeping quarters
within the above noted buildings or areas, the daytime hourly sound level limits
shall apply regardless of the time of day.
Houses of worship, academic schools, libraries, State and National Parks
without camping areas, Historic Areas, nature preserves, the Moosehorn
National Wildlife Refuge, federally-designated wilderness areas without
camping areas, state wilderness areas designated by statute without camping
areas, and locally-designated passive recreation areas without camping areas
are considered protected locations only during their regular hours of operation.
Transient living accommodations are generally not considered Protected
Locations; however, in certain special situations where it is determined by the
municipal entity responsible for review and approval of the application under
9.1 that the health and welfare of the guests or the economic viability of the
establishment will be unreasonably impacted, the municipal entity responsible
for review and approval of the application under 9.1 may designate certain
hotels, motels, campsites and duly licensed campgrounds as protected
locations.
This term does not include buildings and structures located on leased camp
lots, owned by the Applicant used for seasonal purposes.
For purposes of this definition, (1) a Residence is considered pianned when the
owner of the parcel of land on which the Residence is to be located has
received all applicable building and land use permits and the time for beginning
construction under such permits has not expired, and (2) a residential
subdivision is considered approved when the developer has received all
applicable land use permits for the subdivision and the time for beginning
construction under such permits has not expired.
(16) ROUTINE OPERATION: Regular and recurrent operation of regulated sound
sources associated with the purpose of the facility and operating on the facility site.
(17) SHORT DURATION REPETITIVE SOUNDS: A sequence of repetitive sounds
which occur more than once within an hour, each clearly discernible as an event
and causing an increase in the sound level of at least 6 dBA on the fast meter
response above the sound level observed immediately before and after the event,
each typically less than ten seconds in duration, and which are inherent to the
process or operation of the facility and are foreseeable.
(18) SOUND COMPONENT: The measurable sound from an audibly identifiable source
or group of sources.
(19) SOUND LEVEL: Ten times the common logarithm of the square of the ratio of the
frequency-weighted and time-exponentially averaged sound pressure to the
37
reference sound of 20 micropascals. For the purpose of this ordinance, sound level
measurements are obiained using the A-weighted frequency response and fast
dynamic response of the measuring system, unless otherwise noted.
(20) SOUND PRESSURE: Root-mean-square of the instantaneous sound pressures in
a Stated frequency band and during a specified time interval. Unit: pascal (Pa).
(21) SOUND PRESSURE LEVEL: Ten times the common logarithm of the square of the
ratio of the sound pressure to the reference sound pressure of 20 micropascals.
(22) TONAL SOUND: for the purpose of this ordinance, a tonal sound exists if, at a
Protected Location, the one-third octave band sound pressure level in the band
containing the tonal sound exceeds the arithmetic average of the sound pressure
levels of the two contiguous one-third octave bands by 5 dB for center frequencies
at or between 500 Hz and 10,000 Hz, by 8 dB for center frequencies at or between
160 and 400 Hz, and by 15 dB for center frequencies at or between 25 Hz and 125
Hz.
Additional acoustical terms used in work associated with this ordinance shall be
used in accordance with the following American National Standards Institute
(ANSI) standards:
ANSI $12.9-1988 - American National Standard Quantities and Procedures for
Description and Measurements of Environmental Sound, Part 1;
ANSI $3.20-1973 - American National Standard Psychoacoustical Terminology;
ANSI $1.1-1960 - American National Standard Acoustical Terminology.
F. Measurement Procedures
(1) Scope. These procedures specify measurement criteria and methodology for use,
with applications, compliance testing and enforcement. They provide methods for
measuring the ambient sound and the sound from routine operation of the facility,
and define the information to be reported. The same methods shall be used for
measuring the sound of construction and maintenance activities.
(2) Measurement Criteria
2.1 Measurement Personnel
Measurements shall be supervised by personnel who are well qualified by training
and experience in measurement and evaluation of environmental sound, or by
personnel trained to operate under a specific measurement plan approved by the
municipal entity responsible for review and approval of the pending application under
9.1.
2.2 Measurement Instrumentation
38
(a) A sound level meter or alternative sound level measurement system used
shall meet all of the Type 1 or 2 performance requirements of American
National Standard Specifications for Sound Level Meters, ANS] S1.4-1983.
(b) An integrating sound level meter (or measurement system) shall also meet
the Type 1 or 2 performance requirements for integrating/averaging in the
International Electrotechnical Commission Standard on Integrating-Averaging
Sound Level Meters, IEC Publication 804 (1985).
(c) A filter for determining the existence of tonal sounds shall meet all the
requirements of-American National Standard Specification for Octave-Band
and Fractional Octave-Band Analog and Digital Filters, ANSI S1.11-1986 for
Order 3, Type 3-D performance.
(d) An acoustical calibrator shall be used of a type recommended by the
manufacturer of the sound level meter and that meets the requirements of
American National Standard Specification for Acoustical Calibrators, ANSI
$1.40-1984.
(e) A microphone windscreen shall be used of a type recommended by the
manufacturer of the sound level meter.
2.3 Calibration
(a) The sound level meter shall have been calibrated by a laboratory within 12
months of the measurement, and the microphone's response shall be
traceable to the National Bureau of Standards.
(b) Field calibrations shall be recorded before and after each measurement
period and at shorter intervals if recommended by the manufacturer.
2.4 Measurement Location, Configuration and Environment
(a) Except as noted in subsection (b} below, measurement locations shall be at
nearby Protected Locations that are most likely affected by the sound from
routine operation of the facility.
(b) For determining compliance with the 75 dBA property line hourly sound level!
limit described in subsection A(Ia)(i), measurement locations shall be
selected at the property lines of the proposed facility or contiguous property
owned by the Applicant, as appropriate.
{c) The microphone shall be positioned at a height of approximately 4 to 5 feet
above the ground, and oriented in accordance with the manufacturer's
recommendations.
(d) Measurement locations should be selected so that no vertical reflective
surface exceeding the microphone height is located within 30 feet. When this
is not possible, the measurement location may be closer than 30 feet to the
reflective surface, but under no circumstances shall it be closer than 6 feet.
39
(e) When possible, measurement locations should be at least 50 feet from any
regulated sound source on the facility.
(f) Measurement periods shall be avoided when the local wind speed exceeds
12 mph and/or precipitation would affect the measurement results.
2.5 Measurement Plans. Plans for measurement of pre-development ambient sound
or post-facility sound may be discussed with the Code Enforcement Officer.
(3) Measurement of Ambient Sound
3.1 Pre-development Ambient Sound
Measurements of the pre-development ambient sound are required only when
the Applicant elects to establish the sound level fimit in accordance with
subsections A(1\b) and A(1)(e)(ii)(d) for a facility in an area with high ambient
sound levels, such as near highways, airports, or pre-existing facilities; or when
the Applicant elects to establish that the daytime and nighttime ambient hourly
sound levels at representative Protected Locations exceed 45 dBA and 35 dBA,
respectively.
{a} Measurements shall be made at representative Protected Locations for
periods of time sufficient to adequately characterize the ambient sound. At a
minimum, measurements shall be made on three different weekdays
(Monday through Friday) during all hours that the facility will operate. If the
proposed facility will operate on Saturdays and/or Sundays, measurements
shall also be made during all hours that the facility will operate.
(b) Measurement periods with particularly high ambient sounds, such as during
holiday traffic activity, significant insect activity or high coastline waves,
should generally be avoided.
(c) At any measurement location the daytime and nighttime ambient hourly
sound level shall be computed by arithmetically averaging the daytime and
nighttime values of the measured one hour equivalent sound levels. Multiple
values, if they exist, for any specific hour on any specific day shall first be
averaged before the computation described above.
3.2 Post-Facility Ambient Sound
(a) Measurements of the post-facility ambient one hour equivalent sound levels
and, if short duration repetitive sounds are produced by the facility, the
maximum sound levels made at nearby Protected Locations and during
representative routine operation of the facility that are not greater than the
applicable limits of subsection C clearly indicate compliance with those limits.
(b} Compliance with the limits of subsection A(|)(b) may also be demonstrated by
showing that the post-facility ambient hourly sound Jevel, measured in
accordance with the procedures of subsection 3.1 above during routine
operation of the facility, does not exceed the pre-development ambient hourly
sound level by more than one decibel, and that the sound from routine
40
operation of the facility is not characterized by either tonal sounds or short
duration repetitive sounds.
(c) Compliance with the limits of subsection A(1)(e){ii)(d) may also be
demonstrated by showing that the post facility maximum sound level of any
short duration repetitive sound, measured in accordance with the procedures
of subsection 3.1 above, during routine operation of the facility, does not
exceed the pre-development ambient hourly sound level by more than five
decibels.
(d) If any of the conditions in (a), (b) or (c) above are not met, compliance with
respect to the applicable limits must be determined by measuring the sound
from routine operation of the facility in accordance with the procedures
described in subsection 4.
(4) Measurement of the Sound from Routine Operation of Facility.
4.1 General
(a) Measurements of the sound from routine operation of facilities are generally
necessary only for specific compliance testing purposes in the event that
community complaints result from operation of the facility, for validation of an
Applicant's calculated sound levels when requested by the municipal entity
responsible for review and approval of the pending application under 9.1, for
determination of existing hourly sound levels for an existing facility or for
enforcement by the Code Enforcement Officer.
(b) Measurements shall be obtained during representative weather conditions
when the facility sound is most clearly noticeable. Preferable weather
conditions for sound measurements at distances greater than about 500 feet
from the sound source include overcast days when the measurement location
is downwind of the facility and inversion periods (which most commonly occur
at night}.
(c) Measurements of the facility sound shall be made so as to exclude the
contribution of sound from facility equipment that is exempt from this
regulation.
4.2 Measurement of the Sound Levels Resulting from Routine Operation of the
Facility.
(a} When the ambient sound levels are greater than the sound level timits,
additional measurements can be used to determine the hourly sound level
that results from routine operation of the facility. These additional
measurements may include diagnostic measurements such as
measurements made close to the facility and extrapolated to the Protected
Location, special checkmark measurement techniques that include the
separate identification of audible sound sources, or the use of sound level
meters with pause capabilities that allow the operator to exclude non-facility
sounds.
41
(b) For the purposes of computing the hourly sound level resulting from routine
operation of the facility, sample diagnostic measurements may be made to
obtain the one hour equivalent sound levels for each sound component.
(c) Identification of tonal sounds produced by the routine operation of a facility for
the purpose of adding the 5 dBA penalty in accordance with subsection
A(|)(d) requires aural perception by the measurer, followed by use of one-
third octave band spectrum analysis instrumentation. If one or more of the
sounds of routine operation of the facility are found to be tonal sounds, the
hourly sound level component for tonal sounds shall be computed by adding
5 dBA to the one hour equivalent sound level for those sounds.
(d) Identification of short duration repetitive sounds produced by routine
operation of a facility requires careful observations. For the sound to be
classified as short duration repetitive sound, the source(s) must be inherent
to the process or operation of the facility and not the result of an
unforeseeable occurrence. If one or more of the sounds of routine operation
of the facility are found to be short duration repetitive sounds, the hourly
sound level component for short duration repetitive sounds shall be computed
by adding 5 dBA to the one hour equivalent sound level for those sounds. If
required, the maximum sound levels of short duration repetitive sounds shall
be measured using the fast response [LAFmax]. The duration and the
frequency of occurrence of the events shall also be measured. In some
cases, the sound exposure levels of the events may be measured. The one
hour equivalent sound level of a short duration repetitive sound may be
determined from measurements of the maximum sound level during the
events, the duration and frequency of occurrence of the events, and their
sound exposure levels.
(e) The daytime or nighttime hourly sound level resulting from routine operation
of a facility is the energy sum of the hourly sound level components from the
facility, including appropriate penalties, (see (c) and (d) above). If the energy
sum does not exceed the appropriate daytime or nighttime sound level limit,
then the facility is in compliance with that sound level limit at that Protected
Location.
(5} Reporting Sound Measurement Data. The sound measurement data report should
include the following:
(a) The dates, days of the week and hours of the day when measurements were
made.
(b}) The wind direction and speed, temperature, humidity and sky condition.
({c) Identification of all measurement equipment by make, model and serial number.
(d) The most recent dates of laboratory calibration of sound level measuring
equipment.
(e)} The dates, times and results of all field calibrations during the measurements.
42
(f) The applicable sound level limits, together with the appropriate hourly sound
levels and the measurement data from which they were computed, including data
relevant to either tonal or short duration repetitive sounds.
(g) A sketch of the site, not necessarily to scale, orienting the facility, the
measurement locations, topographic features and relevant distances, and
containing sufficient information for another investigator to repeat the
measurements under similar conditions.
(h) A description of the sound from the facility and the existing environment by
character and location.
43
APPENDIX C
Decommissioning Plan
A. Pursuant to section 14.12, the Applicant shall provide a plan for decommissioning a Wind
Energy Facility prepared by a Professional Engineer who has been approved by the
Planning Board. The decommissioning plan shall include, but shall not be limited to the
following:
1. A detailed description of the work required to physically remove all Wind Turbines,
associated foundations, buildings, cabling, electrical components, and any other
Associated Facilities to the extent they are not otherwise in or proposed to be placed into
productive use. All earth disturbed during decommissioning must be graded and re-
seeded, unless the landowner of the affected land requests otherwise in writing. Upon
receipt of said request, the Planning Board, in its sole judgment and discretion, shall
approve or disapprove said request within a reasonable amount of time.
2. An estimate of the total cost of decommissioning less salvage value of the equipment
and itemization of the estimated major expenses, including the projected costs of
measures taken to minimize or prevent adverse effects on the environment during
implementation of the decommissioning plan. The itemization of major costs may
include, but is not limited to, the cost of the following activities: turbine removal, turbine
foundation removal and permanent stabilization, building removal and permanent
stabilization, transmission corridor removal and permanent stabilization and road
infrastructure removal and permanent stabilization.
3. No permit for a type 2 or 3 Wind Energy Facility shall be issued unti! Decommissioning
funds, in the full amount of the total costs of decommissioning, have been posted /
deposited by the applicant with a bonding company or a Federal or State-chartered
lending institution (the escrow agent) authorized to conduct such business in the State of
Maine and approved by the Town of Mapleton, said funds and or bond to ensure the
above decommissioning.
4. Estimates, described in section 2 above, shall be redone bi-annually on the anniversary
of the granting of the Wind Energy Facility permit, and the Owner/Operator of the Wind
Energy Facility shall be required to maintain Decommissioning Funds as set forth in
section 3 above that are at least equal to the most recent estimate.
5. Decommissioning Funds may be in the form of a performance bond, surety bond, bank
letter of credit, or other form of financial insurance acceptable to the Town of Mapleton in
its sole judgment and discretion.
6. If the Owner/Operator of the Wind Energy Facility does not complete the
decommissioning within the time prescribed in section B, the Town of Mapleton may
take such action as it deems necessary, in its sole discretion, to secure the posted /
deposited Decommissioning Funds and to ensure the completion of the
Decommissioning. Should the decommissioning funds or bond not be sufficient to
complete the decommissioning the applicant shall be solely responsible for any and all
additional costs and expenses of Decommissioning, along with any and ail costs and
44
expenses, including reasonable Attorney fees, incurred by the town to enforce the
provisions hereof.
7. The Escrow Agent shall not, under any circumstance whatsoever release the
Decommissioning Funds or bond except upon written approval of the Town of Mapleton.
B. Decommissioning is required, if no significant amount of electricity is generated for a
continuous period of twelve (12) months. The Wind Energy Facility shall be deemed a
discontinued use and shall be removed from the property by the Applicant within 120 days
of receipt of notice from the Code Enforcement Officer. The Applicant may provide
evidence to the Planning Board for consideration, such as a force majeure event that
interrupts the generation of electricity, that although the project has not generated electricity
for a continuous period of 12 months, the project has not been abandoned and should not
be decommissioned. Any changes to the approved decommissioning plan shall be subject
to review and approval by the Planning Board, such review and approval to be in its sole
judgment and discretion of said Planning Board.
45