This is the exact embedded text of the captured official document.
Snapshot 130ba4a5d4a0 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Town of Mariaville
Mariaville Wireless
Telecommunications Facilities
Ordinance
Adopted March 29, 2010
Mariaville Wireless Telecommunications Facilities Ordinance
This page left intentionally blank.
2
Mariaville Wireless Telecommunications Facilities Ordinance
Table of Contents
Mariaville Wireless Telecommunications Facilities Ordinance ................... 4
Section 1. Title ................................................................................ 4
Section 2. Authority .......................................................................... 4
Section 3. Purpose ........................................................................... 4
Section 4. Applicability ...................................................................... 4
Section 5. Review and Approval Authority ............................................ 5
5.1. Approval Required ................................................................... 5
Section 6. Approval Process ............................................................... 6
6.1. Pre-Application Conference ....................................................... 6
6.2. Application ............................................................................. 6
6.3. Submission Waiver ................................................................ 10
6.4. Fees .................................................................................... 10
6.6. Public Hearing ...................................................................... 11
6.7. Approval .............................................................................. 11
Section 7. Standards of Review ........................................................ 12
7.1. CEO Approval Standards ........................................................ 12
7.2. Planning Board Approval Standards ......................................... 12
7.3 Standard Conditions of Approval .............................................. 14
Section 8. Amendment to an Approved Application.............................. 15
Section 9. Abandonment ................................................................. 15
Section 10. Appeals ........................................................................ 16
Section 11. Administration and Enforcement ...................................... 16
Section 12. Penalties ...................................................................... 17
Section 13. Conflict and Severability ................................................. 17
13.1 Conflicts with other Ordinances .............................................. 17
13.2 Severability ......................................................................... 17
Section 14. Definitions .................................................................... 17
Section 15. Effective Date ............................................................... 20
3
Mariaville Wireless Telecommunications Facilities Ordinance
Mariaville Wireless Telecommunications Facilities Ordinance
Section 1. Title
This Ordinance shall be known and cited as the "Wireless
Telecommunications Facilities Siting Ordinance" of Mariaville, Maine,
(hereinafter referred to as the "ordinance").
Section 2. Authority
This ordinance is adopted pursuant to the enabling provisions of Article
VIII, Part 2, Section 1 of the Maine Constitution; the provisions of Title 30-
A M.R.S.A. Section 3001 (Home Rule), and the provisions of the Planning
and Land Use Regulation Act, Title 30-A M.R.S.A. Section 4312 et seq.
Section 3. Purpose
The purpose of this ordinance is to provide a process and a set of
standards for the construction of wireless telecommunications facilities in
order to: Implement a municipal policy concerning the provision of
wireless telecommunications services, and the siting of their facilities;
Establish clear guidelines, standards and time frames for the exercise of
municipal authority to regulate wireless telecommunications facilities;
Allow competition in telecommunications service; Encourage the provision
of advanced telecommunications services to the largest number of
businesses, institutions and residents of Mariaville; Permit and manage
reasonable access to the public rights of way of Mariaville for
telecommunications purposes on a competitively neutral basis; Ensure
that all telecommunications carriers providing facilities or services within
Mariaville comply with the ordinances of Mariaville; Ensure that Mariaville
can continue to fairly and responsibly protect the public health, safety and
welfare; Encourage the co-location of wireless telecommunications
facilities , thus helping to minimize adverse visual impacts on the
community; Enable Mariaville to discharge its public trust consistent with
rapidly evolving federal and state regulatory policies, industry competition
and technological development; Further the goals and policies of the
comprehensive plan, while promoting orderly development of the town
with minimal impacts on existing uses; and Protect the scenic and visual
character of the community.
Section 4. Applicability
This local land use ordinance applies to all construction and expansion of
wireless telecommunications facilities, except as provided in section 4.1.
4.1. Exemptions The following are exempt from the provisions of this
ordinance:
4
Mariaville Wireless Telecommunications Facilities Ordinance
A.) Emergency Wireless Telecommunications Facility. Temporary wireless
communication facilities for emergency communications by public officials.
B.) Amateur (ham) radio stations. Amateur (ham) radio stations licensed
by the Federal Communications Commission (FCC).
C.) Parabolic antenna. Parabolic Antennas less than seven (7) feet in
diameter, that are an accessory use of the property.
D.) Maintenance or repair. Maintenance, repair or reconstruction of a
wireless telecommunications facility and related equipment, provided that
there is no change in the height or any other dimension of the facility.
E.) Temporary wireless telecommunications facility. Temporary wireless
telecommunications facility, in operation for a maximum period of one
hundred eighty (180) days.
F.) Antennas as Accessory Uses. An antenna that is an accessory use to a
residential dwelling unit.
Section 5. Review and Approval Authority
5.1. Approval Required
No person shall construct or expand a wireless telecommunication facility
without approval of the Code Enforcement Officer (CEO) or the Planning
Board as follows:
A.) Expansion of an Existing Facility and Co-location. Approval by the CEO
is required for any expansion of an existing wireless telecommunications
facility that increases the height of the facility by no more than 20 feet;
accessory use of an existing wireless telecommunications facility; or co-
location on an existing wireless telecommunications facility.
B.) New Construction. Approval of the Planning Board is required for
construction of a new wireless telecommunications facility; and any
expansion of an existing wireless telecommunications facility that
increases the height of the facility by more than 20 feet.
5.2 Approval Authority
In accordance with Section 5.1 above, the CEO or Planning Board shall
review applications for wireless telecommunications facilities, and make
written findings on whether the proposed facility complies with this
Ordinance.
5
Mariaville Wireless Telecommunications Facilities Ordinance
Section 6. Approval Process
6.1. Pre-Application Conference
All persons seeking approval of the CEO or the Planning Board under this
ordinance shall meet with the CEO no less than thirty (30) days before
filing an application. At this meeting, the CEO shall explain to the applicant
the ordinance provisions, as well as application forms and submissions
that will be required under this ordinance.
6.2. Application
All persons seeking approval of the CEO or the Planning Board under this
ordinance shall submit an application as provided below. The CEO shall be
responsible for ensuring that notice of the application has been published
in a newspaper of general circulation in the community.
A.) Application for CEO Approval. Applications for permit approval by the
CEO must include the following materials and information:
1.) Documentation of the applicant's right, title, or interest in the
property where the facility is to be sited, including name and address of
the property owner and the applicant.
2.) A copy of the FCC license for the facility or a signed statement from
the owner or operator of the facility attesting that the facility complies
with current FCC regulations.
3.) Identification of districts, sites, buildings, structures or objects,
significant in American history, architecture, archaeology, engineering or
culture, that are listed, or eligible for listing, in the National Register of
Historic Places (see 16 U.S.C. 470w(5); 36 CFR 60 and 800).
4.) Location map and elevation drawings of the proposed facility and
any other proposed structures, showing color, and identifying structural
materials.
5.) For proposed expansion of a facility, a signed statement that
commits the owner of the facility, and his or her successors in interest,
to:
a.) respond in a timely, comprehensive manner to a request for
information from a potential co-location applicant, in exchange
for a reasonable fee not in excess of the actual cost of preparing
a response;
b.) negotiate in good faith for shared use by third parties;
c.) allow shared use if an applicant agrees in writing to pay
reasonable charges for co-location;
d.) require no more than a reasonable charge for shared use, based
on community rates and generally accepted accounting principles.
6
Mariaville Wireless Telecommunications Facilities Ordinance
This charge may include but is not limited to a pro rata share of
the cost of site selection, planning project administration, land
costs, site design, construction and maintenance, financing,
return on equity, depreciation, and all of the costs of adopting the
tower or equipment to accommodate a shared user without
causing electromagnetic interference.
B.) Application for Planning Board Approval. An application for approval by
the Planning Board must be submitted to the Code Enforcement Officer.
The application must include the following information:
1.) Documentation of the applicant's right, title, or interest in the
property on which the facility is to be sited, including name and address
of the property owner and the applicant.
2.) A copy of the FCC license for the facility, or a signed statement from
the owner or operator of the facility attesting that the facility complies
with current FCC regulations.
3.) A USGS 7.5 minute topographic map showing the location of all
structures and wireless telecommunications facilities above 150 feet in
height above ground level, except antennas located on roof tops, within
a five (5) mile radius of the proposed facility, unless this information
has been previously made available to the municipality. This
requirement may be met by submitting current information (within
thirty days of the date the application is filed) from the FCC Tower
Registration Database.
4.) A site plan:
a.) prepared and certified by a professional engineer registered in
Maine indicating the location, type, and height of the proposed
facility, antenna capacity, on-site and abutting off-site land uses,
means of access, setbacks from property lines, and all applicable
American National Standards Institute (ANSI) technical and
structural codes;
b.) certification by the applicant that the proposed facility complies
with all FCC standards for radio emissions is required; and
c.) a boundary survey for the project performed by a land surveyor
licensed by the State of Maine.
5.) A scenic assessment, consisting of the following:
a.) Elevation drawings of the proposed facility, and any other proposed
structures, showing height above ground level;
7
Mariaville Wireless Telecommunications Facilities Ordinance
b.) A landscaping plan indicating the proposed placement of the facility
on the site; location of existing structures, trees, and other significant
site features; the type and location of plants proposed to screen the
facility; the method of fencing, the color of the structure, and the
proposed lighting method.
c.) Photo simulations of the proposed facility taken from perspectives
determined by the Planning Board, or their designee, during the pre-
application conference. Each photo must be labeled with the line of
sight, elevation, and with the date taken imprinted on the photograph.
The photos must show the color of the facility and method of screening.
d.) A narrative discussing:
i.) the extent to which the proposed facility would be visible
from or within a designated scenic resource,
ii.) the tree line elevation of vegetation within 100 feet of the
facility, and
iii.) the distance to the proposed facility from the designated
scenic resource's noted viewpoints.
6.) A written description of how the proposed facility fits into the
applicant's telecommunications network. This submission requirement
does not require disclosure of confidential business information.
7.) Evidence demonstrating that no existing building, site, or structure
can accommodate the applicant's proposed facility, the evidence for which
may consist of any one or more of the following:
a.) Evidence that no existing facilities are located within the targeted
market coverage area as required to meet the applicant's engineering
requirements,
b.) Evidence that existing facilities do not have sufficient height or
cannot be increased in height at a reasonable cost to meet the
applicant's engineering requirements,
c.) Evidence that existing facilities do not have sufficient structural
strength to support applicant's proposed antenna and related
equipment. Specifically:
i.) Planned, necessary equipment would exceed the structural
capacity of the existing facility, considering the existing and planned
use of those facilities, and these existing facilities cannot be
reinforced to accommodate the new equipment.
ii.) The applicant's proposed antenna or equipment would cause
8
Mariaville Wireless Telecommunications Facilities Ordinance
electromagnetic interference with the antenna on the existing towers
or structures, or the antenna or equipment on the existing facility
would cause interference with the applicant's proposed antenna.
iii.) Existing or approved facilities do not have space on which
planned equipment can be placed so it can function effectively.
d.) For facilities existing prior to the effective date of this ordinance,
the fees, costs, or contractual provisions required by the owner in
order to share or adapt an existing facility are unreasonable. Costs
exceeding the pro rata share of a new facility development are
presumed to be unreasonable. This evidence shall also be satisfactory
for a tower built after the passage of this ordinance;
e.) Evidence that the applicant has made diligent good faith efforts to
negotiate co-location on an existing facility, building, or structure, and
has been denied access;
8.) Identification of districts, sites, buildings, structures or objects,
significant in American history, architecture, archaeology, engineering or
culture, that are listed, or eligible for listing, in the National Register of
Historic Places (see 16 U.S.C. 470w(5); 36 CFR 60 and 800).
9.) A signed statement stating that the owner of the wireless
telecommunications facility and his or her successors and assigns agree
to:
a.) respond in a timely, comprehensive manner to a request for
information from a potential co-location applicant, in exchange for a
reasonable fee not in excess of the actual cost of preparing a
response;
b.) negotiate in good faith for shared use of the wireless
telecommunications facility by third parties;
c.) allow shared use of the wireless telecommunications facility if an
applicant agrees in writing to pay reasonable charges for co-location;
d.) require no more than a reasonable charge for shared use, based on
community rates and generally accepted accounting principles. This
charge may include but is not limited to a pro rata share of the cost of
site selection, planning project administration, land costs, site design,
construction, financing, return on equity, depreciation, and all of the
costs of adapting the tower or equipment to accommodate a shared
user without causing electromagnetic interference. The amortization of
the above costs by the facility owner shall be accomplished at a
reasonable rate, over the useful life span of the facility.
9
Mariaville Wireless Telecommunications Facilities Ordinance
10.) A form of surety approved by the Planning Board to pay for the costs
of removing the facility if it is abandoned.
11.) Evidence that a notice of the application has been published in a local
newspaper of general circulation in the community.
6.3. Submission Waiver
The CEO or Planning Board, as appropriate, may waive any of the
submission requirements based upon a written request of the applicant
submitted at the time of application. A waiver of any submission
requirement may be granted only if the CEO or Planning Board finds in
writing that due to special circumstances of the application, the
information is not required to determine compliance with the standards of
this Ordinance.
6.4. Fees
A.) CEO Application Fee
An application for CEO approval shall include payment of an application fee
of $500.00. The application shall not be considered complete until this fee
is paid. The applicant is entitled to a refund of the application fee if the
application is withdrawn within fifteen (15) days of date of filing, less all
expenses incurred by the [municipality] to review the application.
B.) Planning Board Application Fee
An application for Planning Board approval shall include payment of an
application fee of $1,500.00. The application shall not be considered
complete until this fee is paid. An applicant is entitled to a refund of the
application portion of fee if the application is withdrawn within fifteen (15)
days of date of filing, less all expenses incurred by the Mariaville to review
the application.
C.) Planning Board Review Fee
An applicant for approval by the Planning Board shall pay all reasonable
and customary fees incurred by the municipality that are necessary to
review the application. The review fee shall be paid in full prior to the start
of construction. That portion of the review fee not used shall be returned
to the applicant within fourteen (14) days of the Planning Board's decision.
6.5. Notice of Complete Application
Upon receipt of an application, the CEO shall provide the applicant with a
dated receipt. Within five (5) working days of receipt of an application the
CEO shall review the application and determine if the application meets
the submission requirements. The CEO or Planning Board, as appropriate,
shall review any requests for a waiver from the submission requirements
and shall act on these requests prior to determining the completeness of
10
Mariaville Wireless Telecommunications Facilities Ordinance
the application.
If the application is complete, the CEO shall notify the applicant in writing
of this determination and require the applicant to provide eight of copies
of the application to the Planning Board.
If the application is incomplete, the CEO shall notify the applicant in
writing, specifying the additional materials or information required to
complete the application.
If the application is deemed to be complete, and requires Planning Board
review, the CEO shall notify all abutters to the site as shown on the
Assessor's records, by first-class mail, that an application has been
accepted. This notice shall contain a brief description of the proposed
activity and the name of the applicant, give the location of a copy of the
application available for inspection, and provide the date, time, and place
of the Planning Board meeting at which the application will be considered.
Failure on the part of any abutter to receive such notice shall not be
grounds for delay of any consideration of the application nor denial of the
project.
6.6. Public Hearing
For applications for Planning Board approval under Section 5.1(B), a public
hearing shall be held within 30 days of the notice of the complete
application.
6.7. Approval
A.) CEO Approval. Within thirty (30) days of receiving a complete
application for approval under section 5.1(A), the CEO shall approve,
approve with conditions, or deny the application in writing, together with
the findings on which that decision is based. The CEO shall approve the
application if the CEO finds that the application complies with the
provisions in Section 7.1 of this ordinance. The CEO shall notify all
abutters of the decision to issue a permit under this section. The time
period may be extended upon agreement between the applicant and the
CEO.
B.) Planning Board Approval. Within ninety (90) days of receiving a
complete application for approval under section 5.1(B), the Planning Board
shall approve, approve with conditions, or deny the application in writing,
together with the findings on which that decision is based. However, if the
Planning Board has a waiting list of applications that would prevent the
Planning Board from making a decision within the required ninety (90) day
time period, then a decision on the application shall be issued within sixty
(60) days of the public hearing, if necessary, or within 60 days of the
completed Planning Board review. This time period may be extended upon
11
Mariaville Wireless Telecommunications Facilities Ordinance
agreement between the applicant and the Planning Board.
Section 7. Standards of Review
To obtain approval from the CEO or the Planning Board, an application
must comply with the standards in this section.
7.1. CEO Approval Standards
An application for approval by the CEO under Section 5.1(A) must meet
the following standards.
A.) The proposed facility is an expansion, accessory use, or co-location to
a structure existing at the time the application is submitted.
B.) The applicant has sufficient right, title, or interest to locate the
proposed facility on the existing structure.
C.) The proposed facility increases the height of the existing structure by
no more than twenty (20) feet.
D.) The proposed facility will be constructed with materials and colors that
match or blend with the surrounding natural or built environment, to the
maximum extent practicable.
E.) The proposed facility, to the greatest degree practicable, shall have no
unreasonable adverse impact upon districts, sites, buildings, structures or
objects, significant in American history, architecture, archaeology,
engineering or culture, that are listed, or eligible for listing, in the National
Register of Historic Places (see 16 U.S.C. 470w(5); 36 CFR 60 and 800).
7.2. Planning Board Approval Standards
An application for approval by the Planning Board under Section 5.1(B)
must meet the following standards.
A.) Location: New wireless telecommunications facilities may be permitted
on private property.
B.) Siting on Municipal Property. If an applicant proposes to locate a new
wireless telecommunications facility, or expand an existing facility on
municipal property, the applicant must show the following:
1.) The proposed location complies with applicable municipal policies
and ordinances.
2.) The proposed facility will not interfere with the intended purpose of
the property.
3.) The applicant has adequate liability insurance and a lease
12
Mariaville Wireless Telecommunications Facilities Ordinance
agreement with the municipality that includes reasonable compensation
for the use of the property and other provisions to safeguard the public
rights and interests in the property.
C.) Design for Co-location. A new wireless telecommunications facility and
related equipment must be designed and constructed to accommodate
expansion for future co-location of at least three additional wireless
telecommunications facilities or providers. However, the Planning Board
may waive or modify this standard where the district height limitation
effectively prevents future co-location.
D.) Height. A new wireless telecommunications facility must be no more
than 199 feet in height
E.) Setbacks. A new or expanded wireless telecommunications facility
must comply with the set back requirements for the zoning district in
which it is located, or be set back one hundred five percent (105%) of its
height from all property lines, whichever is greater. The setback may be
satisfied by including the areas outside the property boundaries if secured
by an easement. The following exemptions apply:
1.) The setback may be reduced by the Planning Board upon a showing
by the applicant that the facility is designed to collapse in a manner
that will not harm other property.
2.) An antenna is exempt from the setback requirement if it extends no
more than five (5) feet horizontally from the edge of the structure to
which it is attached, and it does not encroach upon an abutting
property.
F.) Landscaping. A new wireless telecommunications facility and related
equipment must be screened with plants from view by abutting properties,
to the maximum extent practicable. Existing plants and natural land forms
on the site shall also be preserved to the maximum extent practicable.
G.) Fencing. A new wireless telecommunications facility must be fenced to
discourage trespass on the facility and to discourage climbing on any
structure by trespassers.
H.) Lighting. A new wireless telecommunications facility must be
illuminated only as necessary to comply with FAA or other applicable state
and federal requirements. However, security lighting may be used as long
as it is shielded to be down-directional to retain light within the boundaries
of the site, to the maximum extent practicable.
I.) Color and Materials. A new wireless telecommunications facility must
be constructed with materials and colors that match or blend with the
surrounding natural or built environment, to the maximum extent
practicable. Unless otherwise required, muted colors, earth tones, and
subdued hues shall be used.
13
Mariaville Wireless Telecommunications Facilities Ordinance
J.) Structural Standards. A new wireless telecommunications facility must
comply with the current Electronic Industries Association/
Telecommunications Industries Association (EIA/TIA) 222 Revision
Standard entitled "Structural Standards for Steel Antenna Towers and
Antenna Supporting Structures."
K.) Visual Impact. The proposed wireless telecommunications facility will
have no unreasonable adverse impact upon designated scenic resources
within the Town, as identified either in the municipally adopted
comprehensive plan, or by a State or federal agency.
1.) In determining the potential unreasonable adverse impact of the
proposed facility upon the designated scenic resources, the Planning
Board shall consider the following factors:
a.) The extent to which the proposed wireless telecommunications
facility is visible above tree line, from the viewpoint(s) of the
impacted designated scenic resource;
b.) the type, number, height, and proximity of existing structures
and features, and background features within the same line of sight
as the proposed facility;
c.) the extent to which the proposed wireless telecommunications
facility would be visible from the viewpoint(s);
d.) the amount of vegetative screening;
e.) the distance of the proposed facility from the viewpoint and the
facility's location within the designated scenic resource; and
f.) the presence of reasonable alternatives that allow the facility to
function consistently with its purpose.
L.) Noise. During construction, repair, or replacement, operation of a
back-up power generator at any time during a power failure, and testing
of a back-up generator between 8 a.m. and 9 p.m. is exempt from
existing municipal noise standards.
M.) Historic & Archaeological Properties. The proposed facility, to the
greatest degree practicable, will have no unreasonable adverse impact
upon a historic district, site or structure which is currently listed on or
eligible for listing on the National Register of Historic Places.
7.3 Standard Conditions of Approval
The following standard conditions of approval shall be a part of any
approval or conditional approval issued by the CEO or Planning Board.
Where necessary to ensure that an approved project meets the criteria of
14
Mariaville Wireless Telecommunications Facilities Ordinance
this ordinance, the Planning Board can impose additional conditions of
approval. Reference to the conditions of approval shall be clearly noted on
the final approved site plan, and shall include:
1.) The owner of the wireless telecommunications facility and his or her
successors and assigns agree to:
a.) respond in a timely, comprehensive manner to a request for
information from a potential co-location applicant, in exchange for a
reasonable fee not in excess of the actual cost of preparing a response
b.) negotiate in good faith for shared use of the wireless
telecommunications facility by third parties;
c.) allow shared use of the wireless telecommunications facility if an
applicant agrees in writing to pay reasonable charges for co-location.
d.) require no more than a reasonable charge for shared use of the
wireless telecommunications facility, based on community rates and
generally accepted accounting principles. This charge may include, but
is not limited to, a pro rata share of the cost of site selection, planning
project administration, land costs, site design, construction and
maintenance, financing, return on equity, depreciation, and all of the
costs of adapting the tower or equipment to accommodate a shared
user without causing electromagnetic interference. The amortization of
the above costs by the facility owner shall be accomplished at a
reasonable rate, over the life span of the useful life of the wireless
telecommunications facility.
2.) Upon request by the municipality, the applicant shall certify compliance
with all applicable FCC radio frequency emissions regulations.
Section 8. Amendment to an Approved Application
Any changes to an approved application must be approved by the CEO or
the Planning Board, in accordance with Section 5.
Section 9. Abandonment
A wireless telecommunications facility that is not operated for a continuous
period of twelve (12) months shall be considered abandoned. The CEO
shall notify the owner of an abandoned facility in writing and order the
removal of the facility within ninety (90) days of receipt of the written
notice. The owner of the facility shall have thirty (30) days from the
receipt of the notice to demonstrate to the CEO that the facility has not
been abandoned.
15
Mariaville Wireless Telecommunications Facilities Ordinance
If the Owner fails to show that the facility is in active operation, the owner
shall have sixty (60) days to remove the facility. If the facility is not
removed within this time period, the municipality may remove the facility
at the owner's expense. The owner of the facility shall pay all site
reclamation costs deemed necessary and reasonable to return the site to
its pre-construction condition, including the removal of roads, and
reestablishment of vegetation.
If a surety has been given to the municipality for removal of the facility,
the owner of the facility may apply to the Planning Board for release of the
surety when the facility and related equipment are removed to the
satisfaction of the Planning Board.
Section 10. Appeals
Any person aggrieved by a decision of the CEO or the Planning Board
under this ordinance may appeal the decision to the Board of Appeals, as
provided by Section 7 of the Mariaville Permit Ordinance. Written notice of
an appeal must be filed with the Board of Appeals within thirty (30) days
of the decision. The notice of appeal shall clearly state the reasons for the
appeal.
Section 11. Administration and Enforcement
The CEO, as appointed through either the Permit Ordinance or by the
Board of Selectmen, shall enforce this ordinance. If the CEO finds that any
provision of this ordinance has been violated, the CEO shall notify in
writing the person responsible for such violation, indicating the nature of
the violation, and ordering the action necessary to correct it. The CEO
shall order correction of the violation and may take any other legal action
to ensure compliance with this ordinance.
The Selectmen, or their authorized agent, are authorized to enter into
administrative consent agreements for the purpose of eliminating
violations of this ordinance and recovering fines without court action. Such
agreements shall not allow a violation of this ordinance to continue unless:
there is clear and convincing evidence that the violation occurred as a
direct result of erroneous advice given by an authorized municipal official
upon which the applicant reasonably relied to its detriment and there is no
evidence that the owner acted in bad faith; the removal of the violation
will result in a threat to public health and safety or substantial
environmental damage.
16
Mariaville Wireless Telecommunications Facilities Ordinance
Section 12. Penalties
Any person who owns or controls any building or property that violates
this ordinance shall be fined in accordance with Title 30-A M.R.S.A. §
4452. Each day such violation continues after notification by the CEO shall
constitute a separate offense.
Section 13. Conflict and Severability
13.1 Conflicts with other Ordinances
Whenever a provision of this ordinance conflicts with or is inconsistent
with another provision of this ordinance or of any other ordinance,
regulation, or statute, the more restrictive provision shall apply.
13.2 Severability
The invalidity of any part of this ordinance shall not invalidate any other
part of this ordinance.
Section 14. Definitions
The terms used in this ordinance shall have the following meanings:
Antenna means any system of poles, panels, rods, reflecting discs or
similar devices used for the transmission or reception of radio or
electromagnetic frequency signals.
Antenna Height means the vertical distance measured from the base of
the antenna support structure at grade to the highest point of the
structure, even if said highest point is an antenna. Measurement of tower
height shall include antenna, base pad, and other appurtenances and shall
be measured from the finished grade of the facility site. If the support
structure is on a sloped grade, then the average between the highest and
lowest grades shall be used in calculating the antenna height.
Co-location means the use of a wireless telecommunications facility by
more than one wireless telecommunications provider.
Expansion means the addition of antennas, towers, or other devices to an
existing structure.
FAA means the Federal Aviation Administration, or its lawful successor.
17
Mariaville Wireless Telecommunications Facilities Ordinance
FCC means the Federal Communications Commission, or its lawful
successor.
Height means the vertical measurement from a point on the ground at
the mean finish grade adjoining the foundation as calculated by averaging
the highest and lowest finished grade around the building or structure, to
the highest point of the building or structure. The highest point shall
exclude farm building components, flagpoles, chimneys, ventilators,
skylights, domes, water towers, bell towers, church spires, processing
towers, tanks, bulkheads, or other building accessory features usually
erected at a height greater than the main roofs of buildings.
Historic or Archaeological Resources means resources that are:
1. Listed individually in the National Register of Historic Places or eligible
for listing on the National Register;
2. Certified or preliminarily determined by the Secretary of the Interior
as contributing to the historical significance of a registered historic
district or a district preliminarily determined by the Secretary of the
Interior to qualify as a registered historic district;
3. Individually listed on a state inventory of historic places in states
with historic preservation programs approved by the Secretary of the
Interior;
4. Individually listed on a local inventory of historic places in
communities with historic preservation programs that have been
certified by Secretary of the Interior through the Maine Historic
Preservation Commission; or
5. Areas identified by a governmental agency such as the Maine Historic
Preservation Commission as having significant value as an historic or
archaeological resource and any areas identified in the municipality's
comprehensive plan, which have been listed or are eligible to be listed
on the National Register of Historic Places.
Historic District means a geographically definable area possessing a
significant concentration, linkage or continuity of sites, buildings,
structures or objects united by past events or aesthetically by plan or
physical development and identified in the municipality's comprehensive
plan, which is listed or is eligible to be listed on the National Register of
Historic Places. Such historic districts may also comprise individual
elements separated geographically, but linked by association or history.
Historic Landmark means any improvement, building or structure of
particular historic or architectural significance to the Town relating to its
heritage, cultural, social, economic or political history, or which
exemplifies historic personages or important events in local, state or
18
Mariaville Wireless Telecommunications Facilities Ordinance
national history identified in the municipality's comprehensive plan, which
have been listed or are eligible to be listed on the National Register of
Historic Places.
Line of sight means the direct view of the object from the designated
scenic resource.
Parabolic Antenna (also known as a satellite dish antenna) means an
antenna which is bowl-shaped, designed for the reception and or
transmission of radio frequency communication signals in a specific
directional pattern.
Principal Use means the use other than one which is wholly incidental or
accessory to another use on the same premises.
Public Recreational Facility means a regionally or locally significant
facility, as defined and identified either by State statute or in the
municipality's adopted comprehensive plan, designed to serve the
recreational needs of municipal property owners.
Designated Scenic Resource means that specific location, view, or
corridor, as identified as a scenic resource in the municipally adopted
comprehensive plan or by a State or federal agency, that consists of:
1.) a three dimensional area extending out from a particular viewpoint
on a public way or within a public recreational area, focusing on a single
object, such as a mountain, resulting in a narrow corridor, or a group of
objects, such a downtown skyline or mountain range, resulting in a
panoramic view corridor; or
2.) lateral terrain features such as valley sides or woodland as observed
to either side of the observer, constraining the view into a narrow or
particular field, as seen from a viewpoint on a public way or within a
public recreational area.
Targeted Market Coverage Area means the area which is targeted to
be served by this proposed telecommunications facility.
Unreasonable Adverse Impact means that the proposed project would
produce an end result which is:
1.) excessively out-of-character with the designated scenic resources
affected, including existing buildings structures and features within the
designated scenic resource, and
2.) would significantly diminish the scenic value of the designated
scenic resource.
Viewpoint means that location which is identified either in the municipally
adopted comprehensive plan or by a federal or State agency, and which
serves as the basis for the location and determination of a particular
designated scenic resource.
19
Mariaville Wireless Telecommunications Facilities Ordinance
20
Wireless Telecommunications Facility or Facility means any
structure, antenna, tower, or other device which provides radio/television
transmission, commercial mobile wireless services, unlicensed wireless
services, cellular phone services, specialized mobile radio communications
(SMR), common carrier wireless exchange phone services, specialized
mobile radio communications (SMR), common carrier wireless exchange
access services, and personal communications service (PCS) or pager
services.
Section 15. Effective Date
This ordinance becomes effective on March 29, 2010.