2 eee S DEPARTMENT OF ENVIRONMENTAL PROTECTION
o> \ & 17 STATE HOUSE STATION
al AUGUSTA, ME 04333
DEPARTMENT ORDER -
IN THE MATTER OF
TOWN OF MARIAVILLE ) MANDATORY SHORELAND ZONING ACT
HANCOCK COUNTY ) 38 MLR:S. § 438-A (3)
SHORELAND ZONING ORDINANCE __)
ORDER #34-2014 ) APPROVAL WITH CONDITIONS
Pursuant to the provisions of 38 M.R.S. §§ 435-448, The Mandatory Shoreland Zoning Act
(Act), and, the State of Maine Guidelines for Municipal Shoreland Zoning Ordinances, 06-096
C.M.R. Chapter 1000 (amended May 5, 2012) (Guidelines), the Department of Environmental
' Protection has considered the Shoreland Zoning Ordinance for the Town of Mariaville
(Ordinance), as amended on March 29, 2010, and FINDS THE FOLLOWING FACTS:
L The Act requires municipalities to establish zoning controls in areas within 250 feet of
the normal high-water line of great ponds and rivers; within 250 feet of the upland edge
of freshwater and coastal wetlands; and within 75 feet of the normal high-water line of
streams. Such zoning standards must be consistent with or no less restrictive than those
in the Guidelines, as adopted by the Board of Environmental Protection (Board).
a The Act specifies that before a locally adopted shoreland zoning ordinance, or
amendments to that ordinance, is/are effective, it must be approved by the Commissioner
of the Department of Environmental Protection (Department). The Department may
approve, approve with conditions, or disapprove the ordinance or amendment. If
disapproved, or approved with conditions, such action must be preceded by notice to the
municipality. If the Department fails to act within 45 days of its receipt of the ordinance
or amendment, then the ordinance or amendment is automatically approved.
3: On May 22, 2009, the Department approved the Mariaville Official Shoreland Zoning
Map as adopted on March 30, 2009 (Map), and approved the Shoreland Zoning
Ordinance for the Town of Mariaville as amended on March 30, 2009, with conditions in
Department Order #19-09, addressing deficiencies including omission of required
setbacks and other standards.
4. The Department's review of the Ordinance determined that, with the exception of
deficiencies listed herein, the Ordinance adequately addresses the conditions contained in
Department Order #19-09.
5, The Department's review of the Ordinance has revealed the following significant
deficiencies:
attes|
Luci 'Sargent |
| Town CLerk
2
TOWN OF MARIAVILLE ) MANDATORY SHORELAND ZONING ACT
HANCOCK COUNTY ) 38 MLR.S. §§ 435-448
SHORELAND ZONING ORDINANCE )
ORDER # 34-2014 ) APPROVAL WITH CONDITIONS
A. Section 3, (Applicability), fails to explicitly include all applicable land, resulting
in an unintentional exemption.
B. Section 4, (Effective Date), fails to explicitly state the effective date.
C. Section 13.A, (Resource Protection District), fails to reference the effective date
of habitat ratings and fails to explicitly define flood plains.
D. Section 13.B, (Limited Residential District), fails to reference applicable sections
of the Ordinance.
E. Section 14, (Table of Land Uses), fails to allow repeal of municipal regulation of
timber harvesting, fails to be consistent with Section 15.D.2, and fails to reference
Section 15.H.
F. Section 15.A.1, (Minimum Lot Standards), fails to require lot dimensional
standards in all districts and fails to consistently reference resources.
G. Section 15.B, (Principal and Accessory Structures), fails to consistently reference
resources and fails to consistently define flood plains.
H. Section 15.D.2, (Campgrounds), fails to require adequate setbacks from rivers
, flowing to Graham Lake.
I. Section 15.H, (Roads and Driveways), fails to consistently reference setbacks,
shorelines and resources, and fails to apply all standards to driveways.
J. Section 15.0, (Timber Harvesting), fails to be repealed as intended.
K. Section 15.P, (Clearing or Removal of Vegetation), fails to reference only woody
vegetation as defined when a forested canopy is not present, fails to consistently
outline this section, fails to consistently list the ranges of tree diameters, and fails
to explicitly consider prior development.
L. Section 17, (Definitions), fails to include definitions for all terms.
M. Additional amendments required to bring the Ordinance into compliance with the
amended Guidelines were not adopted.
6. In a letter dated July 30, 2014, the Town of Mariaville (municipality) was notified by the
Department of the above deficiencies, and the proposed conditional approval of the
Ordinance and approval of the Map. Said letter included a list of the remaining
amendments required that are mentioned in paragraph 5.M above.
BASED on the above Findings of Fact, the Department makes the following CONCLUSIONS:
L, The deficiencies noted in paragraph 5 above can be addressed by the Department
approving the Ordinance with conditions. This will result in the Ordinance and Map
being consistent with the standards in the Guidelines.
2, The Department Order #19-09 is no longer necessary, because the Conditions herein shall
adequately address the deficiencies identified in that Order.
3. The failure of the municipality to adopt required amendments to its ordinance should not
prevent the municipality from administering the recently amended Ordinance, the
| | 2
TOWN OF MARIAVILLE , ) MANDATORY SHORELAND ZONING ACT
HANCOCK COUNTY ) 38 MLR.S. §§ 435-448
SHORELAND ZONING ORDINANCE _)
ORDER # 34-2014 ) APPROVAL WITH CONDITIONS
Conditions contained herein, and the Map. Municipalities must fully update their local
shoreland zoning ordinances to be consistent with the Guidelines.
THEREFORE, the Department APPROVES the Ordinance, as amended on March 29, 2010,
SUBJECT TO THE ATTACHED CONDITIONS:
1. Section 3, must be replaced by Section 3 in Appendix A.
2. Section 4, must be replaced by Section 4 in Appendix A.
3. Sections 13.A.1 and 2, must be replaced by Section 13.A in Appendix B.
4. Section 13.B, must be replaced by Section 13.B in Appendix B.
5. Section 14, must be replaced by Appendix C.
6. Section 15.A.1, must be replaced by Appendix D.
7. Section 15.B, must be replaced by Appendix E.
8. Section 15.D.2, must be replaced by Section 15.D in Appendix F.
9. Sections 15.H.1, 6 and 8, must be replaced by respective sections in Appendix F.
| 10. Section 15.0, must read: "O. Timber Harvesting -- Repealed" and the rest of the
section must be removed.
11. Section 15.P, must be replaced with Appendix G.
12. Section 17, must replace certain terms with respective definitions in Appendix H.
13. The municipality must adopt additional amendments, to address the deficiency
noted in Findings of Fact paragraph 5.M above. These amendments were noted in
the letter mentioned in Findings of Fact paragraph 6.
All CONDITIONS of Department Order #19-09 are hereby REPEALED.
DONE AND DATED AT BANGOR, MAINE, THIS 21 DAY OF AUGUST, 2014.
DEPARTMENT OF ENVIRONMENTAL PROTECTION
FOR: Patricia W. Aho, Commissioner
PLEASE NOTE ATTACHED SHEET FOR GUIDANCE ON APPEAL PROCEDURES
APPENDIX A
Section 3. Applicability.
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the normal
high-water line of great ponds; within 250 feet, horizontal distance, of the normal high-water
line of rivers; within 250 feet, horizontal distance, of the upland edge of a freshwater
wetland; and within 75 feet, horizontal distance, of the normal high-water line of a stream.
Additionally, this Ordinance applies to all land areas that are inland from Graham Lake that
are below 107 feet in elevation above sea level. This Ordinance also applies to any structure
built on, over or abutting a dock, wharf or pier, or other structure extending or located below
the normal high-water line of a water body or within a wetland.
NOTE: Graham Lake is the Ellsworth Project of the Bangor Hydroelectric Company (BHEC),
which owns the flowage rights to 107 feet above sea level, as represented by the BHEC project
boundary map dated December 11, 1984, until the year 2022. This means that BHEC has the
expressed authority to flood the banks of Graham Lake and its affected tributaries to the 107-foot
elevation without notice or liability to property owners.
Section 4. Effective Date.
This Ordinance, which was adopted by the municipal legislative body on December 3, 1990,
shall not be effective unless approved by the Commissioner of the Department of
Environmental Protection. A certified copy of the Ordinance, or Ordinance Amendment,
attested and signed by the Municipal Clerk, shall be forwarded to the Commissioner for
approval. If the Commissioner fails to act on this Ordinance or Ordinance Amendment,
within forty-five (45) days of his/her receipt of the Ordinance, or Ordinance Amendment, it
shall be automatically approved. Any application for a permit submitted to the municipality
within the forty-five (45) day period shall be governed by the terms of this Ordinance, or
Ordinance Amendment, if the Ordinance, or Ordinance Amendment, is approved by the
Commissioner.
= pe --_ a |
APPENDIX B
Section 13.A. Resource Protection District.
1. Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands and
wetlands associated with great ponds and rivers, which are rated "moderate" or "high"
value waterfowl and wading bird habitat, including nesting and feeding areas, by the
Maine Department of Inland Fisheries and Wildlife (MDIF& W) that are depicted on a
Geographic Information System (GIS) data layer maintained by either MDIF&W or the
Department as of December 31, 2008. For the purposes of this paragraph "wetlands
associated with great ponds and rivers" shall mean areas characterized by non-forested
wetland vegetation and hydric soils that are contiguous with a great pond or river, and
have a surface elevation at or below the water level of the great pond or river during the
period of normal high water. "Wetlands associated with great ponds or rivers" are
considered to be part of that great pond or river.
2. Flood plains along rivers and flood plains along artificially formed great ponds along
rivers, as defined by the following:
a. The 100 year flood plain as designated on the Federal Emergency Management
Agency's Flood Insurance Rate Maps or Flood Hazard Boundary Maps.
b. The flood of record.
c. The soil types identified as recent flood plain soils as defined by this Ordinance.
d. The 107-foot elevation inland from Graham Lake, which is the BHEC licensed
operation level, as represented by the BHEC project boundary map dated December
11, 1984.
Section 13.B. Limited Residential District.
The Limited Residential District includes those areas suitable for residential and recreational
| development. It includes areas other than those in the Resource Protection District, or Stream
| Protection District. In accordance with Sections 15.B.1.a and 15.C, functionally water-
| dependent structures, as defined in Section 17, may be allowed on the shore, with a permit
from the Planning Board.
|
Section 14. Table of Land Uses.
TABLE 1. LAND USES IN THE SHORELAND ZONE
SP RP LR
1. _Non-intensive recreational uses not requiring structures such as hunting, fishing and hiking yes yes yes
2. _ Motorized vehicular traffic on existing roads and trails yes yes yes
3. Clearing or removal of vegetation for activities other than timber harvesting PB pp! yes
4. _ Fire prevention activities yes yes yes
ah Wildlife management practices yes yes yes
6.___ Soil and water conservation practices yes yes yes
7. Mineral exploration no yes" yes"
8. Mineral extraction including sand and gravel extraction no PB? PB
9. Surveying and resource analysis yes yes yes
10, __ Emergency operations yes yes yes
11. Agriculture yes PB yes
12. Aquaculture PB PB PB
13. Principal structures and uses
A. One and two family residential pp' no CEO
B. _ Multi-unit residential no no PB
C. Commercial 'aoe ee Hee
a D. _Industrial no no no
E. | Governmental and institutional no no PB
F. Small non-residential facilities for educational, scientific, or nature interpretation PB' PB PB
purposes
14. Structures accessory to allowed uses ppt PB PB
15. Piers, docks, wharfs, bridges and other structures and uses extending or located below
the normal high-water line or within a wetland; temporary or permanent PB PB PB
16. Conversions of seasonal residences to year-round residences LPI, PB no LPI, PB
17.__ Home occupations PB no PB
18. Private sewage disposal systems for allowed uses LPI, PB no LPI, PB
19. Essential services PB> PB> PB
20.__ Service drops, as defined, to allowed uses yes yes yes
21. Public and private recreational areas involving minimal structural development PB PB PB
22. Individual private campsites PB PB PB
23. Campgrounds no won PB'
24. Roads and driveways PB ao" PB
25. Parking facilities no 'ioe PB
26. Marinas PB no PB
27. Filling and earth moving of <10 cubic yards PB PB yes
28. Filling and earth moving of >10 cubic yards PB PB CEO
29. __ Signs yes yes yes
30. __Uses similar to allowed uses PB PB PB
31. __ Uses similar to uses requiring a CEO permit CEO CEO CEO
32. _ Uses similar to uses requiring a PB permit PB PB PB
"in RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove safety hazards.
Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3in RP not allowed in areas so designated because of wildlife value.
'Provided that a variance from the setback requirement is obtained from the Board of Appeals.
$See further restrictions in Section 15(L). :
SE xcept when area is zoned for resource protection due to flood plain criteria in which case a permit is required from the PB.
TExcept as provided in Section 15(H).
Sexcept for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
Except as prohibited by Section 15(D)
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to 38
M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great pond, river, stream or brook and
operates in such a manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
|
|
APPENDIX D
Section 15.A. Minimum Lot Standards.
|
| 1. Minimum Lot Area Minimum Shore Frontage
| (square feet) (feet)
a. Residential per dwelling unit
| (i) In subdivisions approved prior to December 3, 1990
| 43,560 200
| (ii) In the shoreland zone of Hopkins Pond or Oran Pond
217,800 200
(iii) Elsewhere in the shoreland zone 80,000 200
b. Governmental, institutional, commercial or industrial per principal structure
(i) In the shoreland zone 80,000 300
c. Public and private recreational facilities
(i) In the shoreland zone 80,000 400
APPENDIX E
Section 15.B. Principal and Accessory Structures.
1. All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high-water line of great ponds and rivers that flow to
great ponds, and seventy-five (75) feet, horizontal distance, from the normal high-water line
of other water bodies, tributary streams, or the upland edge of a wetland. Additionally, no
new structure shall be located inland from Graham Lake below 107 feet in elevation above
sea level, as represented by the BHEC project boundary map dated December 11, 1984. In
the Resource Protection District the setback requirement shall be 250 feet, horizontal
distance, except for structures and activities specifically allowed in accordance with Section
14, in which case the setback requirements specified above shall apply.
a. The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
2. Principal or accessory structures and expansions of existing structures which are permitted in
the shoreland zone shall not exceed thirty-five (35) feet in height. This provision shall not
apply to structures such as transmission towers, windmills, antennas, and similar structures
having no floor area.
3. The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the flood as defined by the following:
a. The elevation of the 100 year flood.
b. The elevation of the flood of record.
c. The elevation of the flood determined by soil types identified as recent flood plain soils
| as defined by this Ordinance.
| d. The 107-foot elevation inland from Graham Lake, which is the BHEC licensed operation
level, as represented by the BHEC project boundary map dated December 11, 1984.
4. The total footprint of all structures, parking areas and other non-vegetated surfaces within the
shoreland zone shall not exceed twenty (20) percent of the lot area or portion thereof within
the shoreland zone, including land area previously developed.
5. Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access in
areas of steep slopes or unstable soils provided: that the structure is limited to a maximum of
four (4) feet in width; that the structure does not extend below or over the normal high-water
line of a water body or upland edge of a wetland, (unless permitted by the Department of
Environmental Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A.
section 480-C); and that the applicant demonstrates that no reasonable access alternative
exists on the property.
|
|
APPENDIX F
Section 15.D. Campgrounds.
2. Campgrounds are prohibited within the shoreland zone of Hopkins Pond and the shoreland
zone of Oran Pond. Elsewhere, the area intended for placement of a recreational vehicle, tent
or shelter, and utility and service buildings, shall be set back a minimum of one hundred
(100) feet, horizontal distance, from the normal high-water line of Graham Lake or a river
flowing to Graham Lake, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a wetland.
Section 15.H. Roads and Driveways.
1. Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond or a river that flows to a great pond, and
seventy-five (75) feet, horizontal distance from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland, unless no reasonable alternative
exists as determined by the Planning Board. If no other reasonable alternative exists, the road
and/or driveway setback requirement shall be no less than fifty (50) feet, horizontal distance,
upon clear showing by the applicant that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may include,
but are not limited to, the installation of settling basins, and/or the effective use of additional
ditch relief culverts and turnouts placed so as to avoid sedimentation of the water body,
tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Additionally, no new road or driveway shall be located inland from Graham Lake below 107
feet in elevation above sea level, as represented by the BHEC project boundary map dated
December 11, 1984. This setback shall not be altered by the Planning Board.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways
that provide access to permitted structures and facilities located nearer to the shoreline or
tributary stream due to an operational necessity, excluding temporary docks for recreational
uses. Roads and driveways providing access to permitted structures within the setback area
shall comply fully with the requirements of Section 15(H)(1) except for that portion of the
road or driveway necessary for direct access to the structure.
6. Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
8. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
APPENDIX F, Continued
Section 15.H.8, continued
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
a. Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road or driveway at intervals no greater than indicated in the following table:
Grade Spacing
(Percent) (Feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
b. Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
| c. On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular to
the centerline of the road or driveway.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning, and their inlet and outlet ends shall be stabilized with appropriate
materials.
APPENDIX G
Section 15.P. Clearing or Removal of Vegetation for Activities other than Timber Harvesting
1. Ina Resource Protection District abutting a great pond, there shall be no cutting of vegetation
within the strip of land extending 75 feet, horizontal distance, inland from the normal high-
water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
2. Except in areas as described in Section P(1), above, and except to allow for the development
of permitted uses, within a strip of land extending one-hundred (100) feet, horizontal
distance, inland from the normal high-water line of a great pond or a river flowing to a great
pond, and seventy-five (75) feet, horizontal distance, from any other water body, tributary
stream, or the upland edge of a wetland, a buffer strip of vegetation shall be preserved as
follows:
a. There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from the
outer limits of the tree or shrub crown. However, a footpath not to exceed six (6) feet in
width as measured between tree trunks and/or shrub stems is allowed provided that a
cleared line of sight to the water through the buffer strip is not created.
b. Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to a great pond, or a river
or stream flowing to a great pond, shall be defined as maintaining a rating score of 24 or
more in each 25-foot by 50-foot rectangular (1250 square feet) area as determined by the
following rating system.
Diameter of Tree at 4 % feet Above Points
Ground Level (inches)
2<4 in. ]
4<8in. 2
8 < 12 in. 4
12 in. or greater 8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot
rectangular area.
APPENDIX G, Continued
Section 15.P.2.b, continued
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot contains
four (4) trees between 2 and 4 inches in diameter, two trees between 4 and 8
inches in diameter, three trees between 8 and 12 inches in diameter, and two
trees over 12 inches in diameter, the rating score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
|
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling
| 12 points (36- 24 =12) may be removed from the plot provided that no cleared
| openings are created.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner
or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(i1i)Any plot not containing the required points must have no vegetation removed
except.as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to the
minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 2) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not
exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
c. In order to protect water quality and wildlife habitat, existing vegetation under three (3)
feet in height and other ground cover, including leaf litter and the forest duff layer, shall
not be cut, covered, or removed, except to provide for a footpath or other permitted uses
as described in Section 15(P) paragraphs (2) and (2)(a) above.
d. Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
APPENDIX G, Continued
Section 15.P.2, continued
e. In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
diseased, unsafe, or dead trees results in the creation of cleared openings, these openings
shall be replanted with native tree species unless existing new tree growth is present.
Section 15(P)(2) does not apply to the following those portions of public recreational
facilities adjacent to public swimming areas, as long as clearing or removal of vegetation is
limited to the minimum area necessary.
3. At distances greater than one hundred (100) feet, horizontal distance, from a great pond or a
river flowing to a great pond, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of any other water body, tributary stream, or the upland edge of a wetland,
there shall be allowed on any lot, in any ten (10) year period, selective cutting of not more
than forty (40) percent of the volume of trees four (4) inches or more in diameter, measured 4
1/2 feet above ground level. Tree removal in conjunction with the development of permitted
uses shall be included in the forty (40) percent calculation. For the purposes of these
standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet,
whichever is greater, including land previously cleared. This provision shall not apply to the
General Development Districts.
4. Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
5. Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(P).
APPENDIX H
Section 17. Definitions.
Expansion of use--the addition of one or more months to a use's operating season; or the use
of more floor area or ground area devoted to a particular use.
Freshwater wetland--freshwater swamps, marshes, bogs and similar areas, other than
forested wetlands, which are:
1. Often or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state,
the combined surface area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence
of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not
conform to the criteria of this definition.
Functionally water-dependent uses--those uses that require, for their primary purpose,
location on submerged lands or that require direct access to, or location in, waters and that
can not be located away from these waters. The uses include, but are not limited to
commercial and recreational fishing and boating facilities (excluding recreational boat
storage buildings), finfish and shellfish processing, fish storage and retail and wholesale fish
marketing facilities, waterfront dock and port facilities, shipyards and boat building facilities,
marinas, navigation aids, basins and channels, retaining walls, industrial uses dependent upon
water-borne transportation or requiring large volumes of cooling or processing water that can
not reasonably be located or operated at an inland site, and uses that primarily provide
general public access to waters.
Individual private campsite--an area of land which is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10)
individuals and which involves site improvements which may include but not be limited to a
gravel pad, parking area, fire place, or tent platform.
Shoreland zone--the land areas within 250 feet, horizontal distance, of the normal high-
water line of great ponds; within 250 feet, horizontal distance, of the normal high-water line
of rivers; within 250 feet, horizontal distance, of the upland edge of a freshwater wetland;
and within 75 feet, horizontal distance, of the normal high-water line of a stream.
Structure--whether temporary or permanent: anything located, built, constructed or erected
for the support, shelter or enclosure of persons, animals, goods or property of any kind;
anything built, constructed or erected on or in the ground. The term structure includes decks,
patios and satellite dishes. Structure does not include fences; poles; wiring, guy wires, guy
anchors and other aerial equipment normally associated with service drops.
APPENDIX H, Continued
Section 17, continued
Upland edge of a wetland--the boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) feet) tall or taller.
Woody vegetation--live trees or woody, non-herbaceous shrubs.
Town of Mariaville
Shoreland Zoning
Ordinance for the
Town of Mariaville
Adopted: December 3, 1990
Amended: March 30, 1998
Amended: March 27, 2006
Amended: March 30, 2009 .
Amended: March 29, 2010
rag Cnde a) Dw
(tesa Sargent |
evn Clerk
THIS PAGE LEFT INTENTIONALLY BLANK
ome
Table of Contents
Shoreland Zoning Ordinance for the Town of Mariaville ..........Error! Bookmark not defined.
SSCHGAN T PUP POSOS ecssscssexesnacnavsnssenvascannnnmnsacnecwencuiviiinisiiansannncnneesnrnenannnnenndeorenneannesannanannnnnoce 2
Section 2 Authority 00... eeeeeesssssessssssssssesceseessesseessessecsussneanscesesaseesssacesacsascenseascareeessasesses 2
Section 3 Applicability 0.00.0... ccsccssssssesssssssesseessesseeseessessacesaescesssesaseecsaecececescesestesesssecseee 2
| Section4 Effective Date and Repeal of Formerly Adopted OrdinanceS..........0..:s0--. 2
| 2 RR ie a
| Section 6 Severability .......cccssscssssssesssssesssssssesesessssssseseesecsessesaseecessessassecssssececsrcassseeesseseenee 3
Section 7 Conflicts With Other Ordinances. ...........:cccscssseccsccceccesscssscseccececessecssessursacsesensene 4
Section 8 Amendment ............ccssccsssseseseessesssscecsecsesececeacsassceassecsacccecsarstcassecsucaesseaceanenssee 4
Section9 Districts and Zoning Map ..........c:csccssccssssssesseseccssescesescesecercessssarsssesarecsetarseceveces 4
Section 10 Interpretation of District BoUNdarieS.............:ccccceccesecsesceccessscesessscesesssscsaseseeee 5
Section 11 Land Use Requirements. ..........:ccssssssssssssessesssessecsssccassecesscssearsseetstesesssesesaseneeee 5
Section 12 NOn-conformane .........s.ssscecccessssssssssseesssesessseseesecacessesesavarecsteseacessesessesesversneeseees 5
eg a er
0 Oe
C. Non-conforming Structures ...........ccccceccscscesesesceseesesecescseessacsesacssvevseevasssesseseevaveseetseeseeeee 6
D. Non-conforming USES .............c.ccccccccseccscesseseecsceaceavsetscssesesseeacsasaevsscseacsesesavstasieeeceseeee 8
E. Non-conforming Lots............ccccecccccsceseseessescssescecescessscersesseseassesstvacsassavsevateacscessvevessevseeeee Q
Section 13 Establishment of Districts ...........0.ccccccccsssssssssssessecsssscecescacsccscscsecseseserscsecevereeee 10
Section 14 = Table of Land USES ..............csscsssssssessscessscasereccecscsecsceccaceacarersesstsscscsccecevenceneee 14
Section 15 Land Use Standards .............cccccsssesssssssessscessseseccecarscssssatsveceesecaravassessesserseeeeee 13
A. Minimum Lot Standards ......0....0.c.cccecccecscscssssssescevecscecstsesecscstsesevarssseevevssssseeveveteveveeeee 13
- B. Principal and Accessory Structures ...........c.cccccccccscssecscsesvscecsestscstststeresestecesereeeseeeeeee 14
C. Piers, Docks, Wharfs, Bridges and Other Structures and Uses Extending Over or
Beyond the Normal High-Water Line of a Water Body or Within a Wetland.................. 15
D. Campground .......... ce cecccecccecescesceccsceecsteceneseceusaesavsesatsasesatsassessrcasatestasvastetesteseeseeeeee., 16
E. Individual Private Campsites (see definitions) 0.0... ceececccscsescesescecescsteccesececesesesecsveee 17
F. Commercial and Industrial USES .....0.0....0cccccccccecececescsceececscecceteesstsrcarsececscearerevsvesseeeveee 17
G. Parking Areas oo... ceecsescscssscscscscscscscsvsvscevsvevssessseveressessaserssssseesstavatstesssssisitatetiesesesseeeeee 18
H. Roads and DrivewayS ............cccccccsecccscesescessscescasessssvacessusvaseassusssssscatsesatvacsussevacesescsees 18
J. Storm Water RuUNOff 0.0... cccccccecssescsccsssccsssssscevseeseseseessesessevassatsacsecssestsavasessevesesseseee 21
K. Septic Waste Disposal ................ccccccccsccecsesesseseeecesccssscsecsassacesecasssscsecsscsseevestesseseeseeeee 22
C. Essential Services...........ccccccccccecccccecsessescescveceevsecsecaecarsassssssacsasessesssasessvssssstsstesvesereeeee 23
M. Mineral Exploration and Extraction ......0..00cccccccecccecssscesccececscesecesscsscesscesscsseresesesesseeseseee 23
BL. AG EICU IEEE envscosmnenyssqeien saceosiniens iS GNRPINSIETNSdhsllnannscanenneseanccanaeuncesnmccenmmanseoomeancerroneannncezne TE
O. Timber Harvesting..........c.ccccccccccscsescsecesesesesssecececevscasaravavatecatatsevavavavscsvevsvetsseseveveveveveeee 25
P. Clearing or Removal of Vegetation for Activities other than Timber Harvesting............ 27
Q. Erosion and Sedimentation Control ...........ccccccccccsesesesesceceecesesesssecatecsstseessssssessssesesesesee 30
R. SOUS... eee ssesssosesesersrssssssssssavesscsuvsssassscsssavecssssessssseaecesetestessssecseseversassaveessersecesese OM
SS. WATS QUENT sesecseescaszzessasiexnss scnsinaneoenerennnnnanatosuneensunensnraneevanasessevtunvarvisesecenuvvecrrsusumsepen BT
(Ln,
Section 16 Admimistration...............ccccccsssccscescsssecsssssecsecscessecsssscsseccsssecsceccacscsessesersceceseeee 32
A. Administering Bodies and Agent .............c.cccccccccsseseseseseecscscsceecsssesevevscsseccvevevsviveseseeses 32
B, Petite Requived vcccicscanssmmcasncrnansseaseneasermceene tit RRTEAS ARR Ad aNd ddndinenpnnnetmene OE
CG. PSHE ABPNCAIGR icccicccvcessmrrnnconeernn semana eens NRNEENTNT OO :
D. Procedure for Administering Permits .......0..00.00cccccccccccesecsccesccssccsseceesesscasensevsesseseesenserees OO
E. Expiration of Permit ............0......ccccceeesseessesessssssesesssssssssssseseseseceeseeeeeeeceeeeceeetesersesesseeseeses O4
F. Installation of Public Utility Service ...................:::::ccssscessesssssssseeserecceseescessececscerssseseeeeeass O4
GS. AQ DCG ccsccssenswensascensieemenaneseneascpeemesnennecuseremeeceaaeocauanesmaaraiae nie Na CR ERR ONNRE OE
Ce
Section 17 De PIM itioMs «2.2... eeceseeeeesnssnsecseesesenssesnanencceceeeeesesensessssssssanseesecessesssesseteesnens 40
|
|
|
Shoreland Zoning Ordinance for the Town of Mariaville
'
Shoreland Zoning Ordinance for the Town of Mariaville
7 Section 1 Purposes
The purposes of this ordinance are to further the maintenance of safe and
healthful conditions; to prevent and control water pollution; to protect fish spawning
grounds, aquatic life, bird and other wildlife habitat; to protect buildings and lands from
flooding and accelerated erosion; to protect archaeological and historic resources; to
protect freshwater wetlands; to control building sites, placements of structures and land
uses; to conserve shore cover, and visual as well as actual points of access to inland
waters; to conserve natural beauty and open space; and to anticipate and respond to
the impacts of development in shoreland areas in order that Mariaville may be a better
place to live, work and play.
Section 2 Authority
This Ordinance has been prepared in accordance with the provisions of Title 38
Sections 435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
Section 3. Applicability .
This ordinance applies to all land areas within Two Hundred Fifty (250) feet
; horizontal distance of the normal high-water line of any great pond or river, or inland to
Bangor Hydroelectric Company's Ellsworth Project (Graham Lake) licensed operating
curve *, whichever is greater; within Two Hundred Fifty (250) feet, horizontal distance,
of the upland edge of a freshwater wetland; and within seventy-five (75) feet horizontal
distance of the normal high-water line of a stream except where affected by the Bangor
Hydro Project (Graham Lake) *.
This Ordinance also applies to any structure built on, over, or abutting a dock,
wharf or pier or other structure extending below the normal high-water line of a water
body or within a wetland.
"NOTE: Bangor Hydroelectric Company (BHEC) owns the flowage rights to 107 feet
above sea level until the year 2022. This means that BHEC has the express authority
to flood the banks of Graham Lake and its affected tributaries to 107-foot elevation
without notice or liability to property owners.
Section4 Effective Date of Ordinance and Ordinance Amendments
-9 -
notice to the contrary from the Commissioner of the Department of Environmental
Protection. A certified copy of the ordinance, attested and signed by the municipal
clerk, shall be forwarded to the Commissioner. If the Commissioner fails to act on this
ordinancéwithin 45 days of its receipt of the ordinance, it shall be deemed approved.
B. Repeal of Municipal Timber Harvesting Regulation. The municipal regulation of
timber harvesting activities is repealed on the statutory date established under 38
M.R.S.A. section 438-B (5), at which time the State of Maine Department of
Conservation's Bureau of Forestry shall administer timber harvesting standards in the
shoreland zone. On the date established under 38 M.R.S.A section 438-B (5), the
following provisions of this Ordinance are repealed:
e Section 14. Table of Land Uses, Column 3 (Forest management activities except
for timber harvesting) and Column 4 (Timber harvesting);
e Section 15(O) in its entirety; and
e Section 17. Definitions, the definitions of "forest management activities" and
"residual basal area"
NOTE: The statutory date established under 38 M.R.S.A. section 438-B (5) is the
effective date of state-wide timber harvesting standards. That date is "the first day of
January of the 2nd year following the year in which the Commissioner of Conservation
determines that at least 252 of the 336 municipalities identified by the Commissioner of
Conservation as the municipalities with the highest acreage of timber harvesting activity
on an annual basis for the period 1992-2003 have either accepted the state-wide
standards or have adopted an ordinance identical to the state-wide standards." 38
M.R.S.A. section 438-B (5) further provides that "the Commissioner of Conservation
shall notify the Secretary of State in writing and advise the Secretary of the effective
date of the state-wide standards."
Section 5 Availability
A certified copy of this ordinance shall be filed with the Municipal Clerk and shall
be accessible to any member of the public. Copies shall be made available to the
public at reasonable cost at the expense of the person making the request. Notice of
availability of this ordinance shall be posted.
Section6 Severability
Should any section or provision of this ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the
ordinance.
oi i
Should any section or provision of this ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the
OS ordinance.
| Section 7 Conflicts With Other Ordinances
Whenever a provision of this ordinance conflicts with or is inconsistent with
another provision of this ordinance or of any other ordinance, regulation or statue
administered by the municipality, the more restrictive provision shall prevail.
| Section8 Amendments
This Ordinance may be amended by majority vote of the town meeting. Copies
of amendments, attested and signed by the Municipal Clerk, shall be submitted to the
Commissioner of the Department of Environmental Protection following adoption by the
. town meeting and shall not be effective unless approved by the Commissioner. If the
Board of Environmental Protection fails to act on any amendment within forty-five (45)
days of the Board's receipt of the amendment, the amendment is automatically
approved. Any application for a permit submitted to the municipality within the forty-five
|
(45) day period shall be governed by the terms of the amendment, if such amendment
| is approved by the Board.
- Section9 Districts and Zoning Map
A. Official Shoreland Zoning Map
The areas to which this Ordinance is applicable are hereby divided into the
following districts as shown on the Official Shoreland Zoning Map which is made a part
of this Ordinance:
1. Resource Protection
2. Limited Residential 3. Stream Protection
B. Scale of map
The official shoreland zoning map is drawn at a scale of not less than 1 inch =
2000 feet. District boundaries are clearly delineated and a legend indicating the
symbols for each district are placed on the map.
C. Certification of Official Shoreland Zoning Map
The official shoreland zoning map shall be certified by the attested signature of
the Municipal Clerk and housed in the town office. It is available for the public to view at
the town office.
-4-
made on the Official Shoreland Zoning Map within thirty (30) days after the amendment
has been approved by the Commissioner of the Department.
on
Section 10 Interpretation of District Boundaries
Unless otherwise set forth on the Official Shoreland Zoning Map, district
boundary lines are property lines, the centerlines of streets, roads and rights of way,
and the boundaries of the shoreland area as defined herein. Where uncertainty exists
as to the exact location of district boundary lines, the Board of Appeals shall be the final
authority as to location.
Section 11 Land Use Requirements
Except as hereinafter specified, no building, structure or land shall hereafter be
used or occupied, and no building or structure or part thereof shall hereafter be erected,
- constructed, expanded, moved, or altered and no new lot shall be created except in
conformity with all of the regulations herein specified for the district in which it is located,
unless a variance is granted.
Section 12 Non-conformance
A. Purpose
It is the intent of this Ordinance to promote land use conformities, except that . |
non-conforming conditions that existed before the effective date of this Ordinance or
amendments thereto shall be allowed to continue, subject to the requirements set forth
in this Section 12. Except as otherwise provided in this ordinance, a non-conforming
condition shall not be permitted to become more non-conforming.
B. General
4. Transfer of Ownership: Non-conforming structures, lots, and uses may be --
transferred, and the new owner may continue the non-conforming use or continue to
use the non-conforming structure or lot, subject to the provisions of this Ordinance.
2. Repair and Maintenance: This Ordinance allows, without a permit, the normal
upkeep and maintenance of non-conforming uses and structures including repairs or
renovations that do not involve expansion of the non-conforming use or structure, and
oe
2. Repair and Maintenance: This Ordinance allows, without a permit, the normal
upkeep and maintenance of non-conforming uses and structures including repairs or
ve renovations that do not involve expansion of the non-conforming use or structure, and
such other changes in a non-conforming use or structure as federal, state, or local
building and safety codes may require.
NOTE: See Section 17 for the definitions of non-conforming structures, non-conforming
uses and non-conforming lots.
|
C. Non-conforming Structures
1. Expansions: A non-conforming structure may be added to or expanded after
obtaining a permit from the Planning Board if such addition or expansion does not
increase the non-conformity of the structure and is in accordance with subparagraphs
(a) and (b) below.
Further Limitations:
a. After January 1, 1989, if any portion of a structure was less than the required
setback from the high-water line of a water body or tributary stream or upland edge of a
wetland, that portion of the structure shall not be expanded, as measured in the floor
area or volume, by 30% or more, during the lifetime of the structure. If a replacement
Structure conforms with the requirements of Section 12(c)(3), and is less than the
required setback from a water body, tributary stream or wetland, the replacement
Nes structure may not be expanded if the original structure existing on January 1, 1989 had
been expanded by 30% in floor area and volume since that date.
b. Whenever a new, enlarged, or replacement foundation is constructed under a
nonconforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the
Planning Board, basing its decision on the criteria specified in Section 12(C) (2)
Relocation, below. If the completed foundation does not extend beyond the exterior
dimensions of the structure, except for expansion in conformity with Section 12(C) (1)(a)
above, and the foundation does not cause the structure to be elevated by more than
three (3) additional feet, as measured from the uphill side of the structure (from original
ground level to the bottom of the first floor sill), it shall not be considered to be an
expansion of the structure.
c. No structure which is less than the required setback from the normal high-
water line of a water body, tributary stream, or upland edge of a wetland shall be
expanded toward the water body, tributary stream, or wetland.
2. Relocation: A non-conforming structure may be relocated within the
boundaries of the parcel on which the structure is located provided that the site of
relocation conforms to all setback requirements to the greatest practical extent as
determined by the Planning Board, and provided that the applicant demonstrates that
-6-
ps ee = )
structure be relocated in a manner that causes the structure to be more non-
conforming.
In détermining whether the building relocation meets the setback to the greatest
practical extent, the Planning Board shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of the septic system and other on-site
soils suitable for septic systems, proximity to other structures and development on
abutting parcels as well as the parcel in question and the type and amount of vegetation
to be removed to accomplish the relocation. When it is necessary to remove vegetation
within the water or wetland setback area in order to relocate a structure, the Planning
Board shall require replanting of native vegetation to compensate for the destroyed
vegetation. In addition, the area from which the relocated structure was removed must
be replanted with vegetation. Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least
one native tree, three (3) feet in height, for every tree removed. If more than five trees
are planted, no one species of tree shall make up more than 50% of the number of trees
planted. Replaced trees must be planted no further from the water or wetland than the
'trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged,
or removed must be reestablished within the setback area. The vegetation and/or
ground cover must consist of similar native vegetation and/or ground cover that was
disturbed, destroyed or removed.
(b.) Where feasible, when a structure is relocated on a parcel the original location of
the structure shall be replanted with vegetation which may consist of grasses, shrubs, .
trees, or a combination thereof.
3. Reconstruction or Replacement: Any non-conforming structure which is |
located less than the required setback from the normal high-water line of a water body,
tributary stream , or upland edge of a wetland and which is removed, or damaged or
destroyed, regardless of the cause, by more than 50% of the market value of the
structure before such damage, destruction or removal, may be reconstructed or
replaced provided that a permit is obtained within one year of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in
compliance with the water body, tributary stream or wetland setback requirement to the
greatest practical extent as determined by the Planning Board in accordance with the
purposes of this Ordinance. In no case shall a structure be reconstructed or replaced
so as to increase its non-conformity. If the reconstructed or replacement structure is
less than the required setback it shall not be any larger than the original structure,
except as allowed pursuant to Section 12(C) (1) above, as determined by the non-
conforming floor area and volume of a reconstructed or replaced structure at its new
location. If the total amount of floor area and volume of the original structure can be
=f =
except as allowed pursuant to Section 12(C) (1) above, as determined by the non-
conforming floor area and volume of a reconstructed or replaced structure at its new
-- location. If the total amount of floor area and volume of the original structure can be
_ relocated or reconstructed beyond the required setback area, no portion of the relocated
or reconstructed structure shall be replaced or constructed at less than the setback
requirement for a new structure. When it is necessary to remove vegetation in order to
replace or reconstruct a structure, vegetation shall be replanted in accordance with
Section 12(C) (2) above.
Any non-conforming structure which is located less than the required setback
from a water body, tributary stream, or wetland and which is removed by 50% or less of
the market value, or which is damaged or destroyed by 50% or less of the market value
of the structure, excluding normal maintenance and repair, may be reconstructed in
place if a permit is obtained from the code enforcement officer within one year of such
damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the
water setback to the greatest practical extent the Planning Board shall consider in
'' addition to the criteria in paragraph 12 (C)(2) above, the physical condition and type of
foundation present, if any.
| 4. Change of Use of a Non-conforming Structure
The use of a non-conforming structure may not be changed to another use
unless the Planning Board after receiving a written application determines that the new
be use will have no greater adverse impact on the water body, tributary stream or wetland,
or on the subject or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall
require written documentation from the applicant, regarding the probable effects on
public health and safety, erosion and sedimentation, water quality, fish and wildlife
habitat, vegetative cover, visual and actual points of public access to waters, natural
beauty, flood plain management, archaeological and historical resources, and other
functionally water-dependent uses.
D. Non-conforming Uses
1. Expansions: Expansions of non-conforming uses are prohibited, except that
non-conforming residential uses may, after obtaining a permit from the Planning Board,
be expanded within existing residential structures or within expansions of such
Structures as permitted in Section 12(C)(1)(a) above.
2. Resumption Prohibited: A lot, building or structure in or on which a non-
conforming use is discontinued for a period exceeding one year, or which is superseded
by a conforming use, may not again be devoted to a non-conforming use except that the
Planning Board may, for good cause shown by the applicant, grant up to a one year
ms |
|
= -|
3. Change of Use: An existing non-conforming use may be changed to another
non-conforming use provided that the proposed use has no greater adverse impact on .
the subje@t and adjacent properties and resources, including water dependent uses in
the CFMA district, than the former use, as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria listed in
Section 12 (C) (4) above.
E. Non-conforming Lots
1. Non-conforming Lots: A non-conforming lot of record as of the effective date
of this Ordinance or amendment thereto may be built upon, without the need for a
variance, provided that such lot is in separate ownership and not contiguous with any
other lot in the same ownership, and that all provisions of this Ordinance except lot
area, lot width and shore frontage can be met. Variances relating to setback or other
requirements not involving lot area, lot width, and shore frontage, shall be obtained by
action of the Board of Appeals.
2. Contiguous Built Lots: If two or more contiguous lots or parcels are in a single
or joint ownership of record at the time of adoption of this Ordinance, if all or part of the
lots do not meet the dimensional requirements of this Ordinance, and if a principal use
or structure exists on each lot, the non-conforming lots may be conveyed separately or
together, provided that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A
through 4807-D and the State of Maine_Subsurface Wastewater Disposal Rules are
complied with.
If two or more principal uses or structures existed on a single lot of record onthe
. effective date of this Ordinance, each may be sold on a separate lot provided that the -
above referenced law and rules are complied with. When such lots are divided each lot
thus created must be as conforming as possible to the dimensional requirements of this
Ordinance.
3. Contiguous Lots - Vacant or Partially Built : If two or more contiguous lots or
parcels are in single or joint ownership of record at the time of or since adoption or
amendment of this Ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent amendments and if one or
more of the lots are vacant or contain no principal structure the lots shall be combined
to the extent necessary to meet the dimensional requirements.
Section 13 Establishment of Districts ;
-9- |
| Section 13 Establishment of Districts
- A. Resource Protection District |
| The Resource Protection District includes areas in which development would
| adversely affect water quality, productive habitat, biological ecosystems, or scenic and
natural values. This district shall include the following areas when they occur within the
| limits of the shoreland zone, exclusive of the Stream Protection District, except that
areas which are currently developed and areas which meet the criteria for the Limited
Commercial District need not be included with the Resource Protection District.
|
1; Areas within 250 feet, horizontal distance, of the upland edge of
freshwater wetlands, and wetlands associated with great ponds and rivers, which are
rated "moderate" or "high" value waterfowl and wading bird habitat, including nesting
and feeding areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W)
that are depicted on a Geographic Information System (GIS) data layer maintained by
. either MDIF&W or the Department as of May 1, 2006. For the purposes of this
paragraph "wetlands associated with great ponds and rivers" shall mean areas
characterized by non-forested wetland vegetation and hydric soils that are contiguous
with a great pond or river, and have a surface elevation at or below the water level of
the great pond or river during the period of normal high water. "Wetlands associated
with great ponds or rivers" are considered to be part of that great pond or river.
2. Flood plains and along rivers and flood plains along artificially formed great
ponds along rivers (as defined on Graham Lake by the 107 foot Bangor Hydroelectric
Company licensed operation level), defined by the 100 year flood plain as designated
on the Federal Emergency Management Agencies (FEMA) flood insurance rate maps or
flood hazard boundary maps, or the flood of record or in the absence of these, soil types
identified as recent flood plain soils. ,
3. Areas of two (2) or more contiguous acres supporting wetland vegetation
and hydric soils, which are not part of a freshwater wetland as defined, and which are
not surficially connected to a water body during the period of normal high water.
4. Areas of two (2) or more contiguous acres with sustained slopes of 20% or
greater.
5. Land areas along rivers subject to severe bank erosion, undercutting, or river
bed movement and lands which are subject to severe erosion or mass movement, such
as steep bluffs.
6. Other important wildlife habitat, natural sites of senic or esthetic value, historic
' or archeologically significant sites as identified in Mariaville's comprehensive plan and
state habitat maps.
=-410:
B. Limited Residential District "
ed
The Limited Residential District includes those areas suitable for residential and
recreational development. It includes areas other than those in the Resource Protection
District, or Stream Protection District, and areas which are used less intensively than
those in the Limited Commercial District.
Structures may be allowed on shore within the limited residential district which are
required for operational necessity as determined by the planning board to support light
home business or aquacultural activities which are clearly water-dependant users. (see
definitions for water-dependant uses).
' C. Stream Protection District
The Stream Protection District includes all land areas within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream, exclusive of those areas
within two hundred fifty (250) feet, horizontal distance, of the normal high-water line of a
great pond, river, or within two hundred and fifty (250) feet, horizontal distance of the
upland edge of a freshwater wetland. Where a stream and its associated shoreland
area is located within two-hundred and fifty (250) feet, horizontal distance, of the above
water bodies or wetlands, that land area shall be regulated under the terms of the
shoreland district associated with that water body or wetland.
Section 14 Table of Land Uses
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone,
shall conform with all of the applicable land use standards in Section 15. The district
designation for a particular site shall be determined from the Official Shoreland Zoning
Map.
Key to Table 1:
-11-
Yes - Allowed (no permit required but the use must comply with all applicable
~ land use standards.)
No - Prohibited
PB - Requires permit issued by the Planning Board.
CEO-Requires permit issued by the Code Enforcement Officer.
LPI - Requires permit issued by the Local Plumbing Inspector.
Abbreviations: |
RP - Resource Protection |
LR - Limited Residential |
SP - Stream Protection
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICTS
| SP RP LR
Non-intensive recreational uses not requiring structures such as hunting, fishing and
1. hiking yes yes yes
2. Motorized vehicular traffic on existing roads and trails | yes yes yes
3. Forest management activities except for timber harvesting yes yes yes
4. Timber harvesting yes PB yes
5. Clearing of vegetation for approved construction and other allowed uses. PB PB yes
6. Fire Protection activities yes yes yes
7. Wildlife management practices yes yes yes
8. Soil and water conservation practices 4 yes yes yes
9. Mineral exploration no yes yes
10. Mineral extraction including sand and gravel extraction no PB PB
11, Surveying and resource analysis yes yes yes
12. Emergency operations yes yes yes
13. Agriculture yes PB yes
14. Aquaculture PB PB PB
- 12 -
| ge meagre ra
B. Multi-unit residential no no PB
C. Commercial no® no® no°
D. Industrial no no no
E. Governmental and Institutional no no no '
FsxSmall non-residential facilities for educational, Scientific, or nature ;
interpretation PB' PB PB
purposes
16. Structures accessory to allowed uses PB PB PB
17. Piers, docks wharfs, bridges and other structures and uses extending over or below
the normal high-water line or within a wetland
A. Temporary PB PB PB
B. Permanent PB PB PB
18. Conversions of seasonal residences to year-round residences LPI, PB no LPI, PB
19. Home occupations PB no PB
20. Private sewage disposal systems for allowed uses LPI, PB no LPI, PB
| 21. Essential services PB PB PB
| 22. Service drops, as defined, to allowed uses yes yes yes
| 23. Public and private recreational areas involving minimal structural development PB PB PB
24. Individual, private campsites PB PB PB
25. Campgrounds no no PB
26. Road and driveway construction PB no PB
27. Parking facilities no no PB
28. Marinas PB no PB
29. Filling and earthmoving of <10 cubic yards PB PB yes
30. Filling and earthmoving of >10 cubic yards PB PB CEO
31. Signs yes yes yes
"32. Uses similar to allowed uses PB PB PB
33. Uses similar to uses requiring a PB permit PB PB PB
34. Uses similar to uses requiring a CEO permit CEO CEO CEO
'In RP not permitted within 75 feet of the normal high-water line of great ponds, except to remove safety hazards.
? Requires permit from the planning board if more than 100 square feet of surface area, in total, is disturbed.
31n RP not permitted on area so designated because of wildlife value.
4 Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5 Functionally water-dependent uses and uses accessory to such water dependent uses only (See note on previous page)*
®° See further restrictions in Sections 15(L) (2).
7 Except when area is zoned for resource protection due to flood plain criteria in which case a permit is required from the PB.
® Except to provide access to permit uses within the district, or where no reasonable alternative route or location is available outside
the RP area, in which case a permit is required from the PB. ; ;
g Except for commercial uses otherwise listed in this table, such as marinas and campgrounds that are allowed in the respective district.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, :
pursuant to Title 38 M.R.S.A., Section 480-C, if the activity occurs in, on, over, or adjacent to any freshwater or coastal wetland, .
great pond, river, stream or brook and operates in such a manner that materials or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
Section15 Land Use Standards
All land use activities within the shoreland zone shall conform with the following
provisions, if applicable.
A. Minimum Lot Standards
i Minimum Lot Minimum Shore
' Area (sq.ft.) Frontage (ft.)
Residential per dwelling unit
Within the Limited Residential Zone 80,000 200
343
.
Within the Limited Residential Zone 80,000 200
~ Lots in Subdivisions Approved Prior to 12/3/90 43,560 200
Lots in Hopkins/Oran Pond District 217,800 200
Governmental, Institutional, Commercial or Industrial per principal structure
Within the Shoreland Zone 80,000 300
Public and Private Recreational Facilities
Within the Shoreland Zone 80,000 400
2. Land below the normal high-water line of a water body or upland edge of a
wetland and land beneath roads serving more than two (2) lots shall not be included
toward calculating minimum lot area.
3. Lots located on opposite sides of a public or private road shall be considered
each a separate tract or parcel of land unless such road was established by the owner
of land on both sides thereof after September 22, 1971.
4. The minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high-water line of a water body or upland edge of a
wetland shall be equal to or greater than the shore frontage requirement for a lot with
~ the proposed use.
5. If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or combination thereof is constructed or established
on a single parcel, all dimensional requirements shall be met for each additional
dwelling unit or principal structure, or use.
NOTE: This ordinance includes provision for clustered housing within the shoreland
zone provided that the overall dimensional requirements, including frontage and lot area
per dwelling unit are met. When determining whether dimensional requirements are
| met, only land area within the shoreland zone shall be considered.
B. Principal and Accessory Structures
1. All new principal and accessory structures shall be set back at least one
hundred (100) feet from the normal high-water line of Graham Lake and rivers that flow
to great ponds classified GPA, and seventy-five (75) feet from the normal high-water
line of other water bodies, tributary streams, or the upland edge of a wetland, and
two hundred-fifty (250) from the normal high-water line of Hopkins and Oran Pond.
= 144
foot setback from normal high water, the 107-foot level shall prevail as the minimum
setback for all building construction.
a. The water body, tributary stream or wetland setback provision shall neither
apply to structures which require direct access to the water body or wetland as an
operational necessity, such as piers, docks and retaining walls, nor to other functionally
water-dependent uses.
b. All principal structures along Significant River Segments as listed in 38 M.R.S.A.
section 437, shall be set back a minimum of one hundred and twenty-five (125) feet,
horizontal distance, from the normal high-water line and shall be screened from the river
by existing vegetation. This provision does not apply to structures related to hydropower
facilities.
2. Principal or accessory structures and expansions of existing structures which
are permitted in the Resource Protection, Limited, Residential, Limited Commercial, and
Stream Protection Districts, shall not exceed thirty-five (35) feet in height. This
' provision shall not apply to structures such as transmission towers, windmills, antennas,
solar panels and similar structures having no floor area.
3. The lowest floor elevation or openings of all buildings and structures including
basements shall be elevated at least one foot above the elevation of the 100 year flood,
the flood of record, or in the absence of these, the flood as defined by soil types
identified as recent flood plain soils.*
4. The total footprint of all structures, parking lots and other non-vegetated
surfaces, within the shoreland zone shall not exceed twenty (20) percent of the lot or a
portion thereof, located within the shoreland zone, including land area previously
developed.
5. Notwithstanding the requirements stated above, stairways or similar
structures may be allowed with a permit from the Code Enforcement Officer, to provide
shoreline access in areas of steep slopes or unstable soils provided; that the structure
is limited to a maximum of four (4) feet in width; that the structure does not extend
below or over the normal high-water line of a water body or upland edge of a wetland,
(unless per-mitted by the Department of Environmental Protection pursuant to the
Natural Resources Protection Act, Title 38, M.R.S.A. Section 480-C) : and that the
applicant demonstrates that no reasonable access alternative exists on the property.
C. Piers, Docks, Wharfs, Bridges and Other Structures and Uses Extending Over or
Below the Normal High-Water Line of a Water Body or Within a Wetland.
1. Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
-15-
1. Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
2. The location shall not interfere with existing developed or natural beach
areas.
3. The facility shall be located so as to minimize adverse effects on fisheries.
4. The facility shall be no larger in dimension than necessary to carry on the
activity and be consistent with the surrounding character and uses, of the area. A
temporary pier, dock or wharf shall be no wider than six feet for non-commercial uses.
5. No new structure shall be built on, over or abutting a pier, wharf, dock or other
structure extending below the normal high-water line of a water body or within a wetland
unless the structure requires direct access to the water as an operational necessity.
6. New permanent piers and docks shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a
"permit has been obtained from the Department of Environmental Protection, pursuant to
the Natural Resources Protection Act.
7. No existing structures built on, over or abutting a pier, dock, wharf or other
structures extending below the normal high-water line of a water body or within a
wetland shall be converted to residential dwelling units in any district.
: 8. Structures built on, over or abutting a pier, wharf, dock or other structures
extending below the normal high-water line of a water body or within a wetland shall not
exceed twenty (20) feet in height above the pier, wharf, dock or other structure.
NOTE: New permanent structures, and expansions thereof. projecting into or over
water bodies shall require a permit from the Department of Environmental Protection
pursuant to the Natural Resources protection Act, 38 MRSA section 480-C. Permits
may also be required from the Army Cops of Engineers if located in navigable waters.
D. Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of
land, not including roads and driveways, for each site. Land supporting wetland
vegetation, and land below the normal high-water line of a water body shall not be
included in calculating land area per site.
2. The area intended for placement of a recreational vehicle, tent, or shelter, and
utility and service building shall be set back a minimum of one hundred (100) feet from
= 16%
seventy-five (75) feet from the normal high-water line or other water bodies, tributary
streams, or other upland edge of a wetland.
3. The clearing of vegetation for the siting of the recreational vehicle, tent or
similar shelter in a Resource Protection District shall be limited to one thousand (1,000)
square feet.
E. Individual Private Campsites (see definitions)
Individual, private campsites not associated with campgrounds are permitted pro-
vided the following conditions are met:
1. One campsite per lot existing on the effective date of this Ordinance, or thirty
thousand (30,000) square feet of lot area within the shoreland zone, whichever is less,
may be permitted.
2. Campsite placement on any lot, including the area intended for a recreational
'vehicle or tent platform, shall be set back one hundred (100) feet from the high-water
line of other water-bodies, tributary streams, or the upland edge of a wetland.
3. Only one recreational vehicle shall be allowed on a campsite. The
recreational vehicle shall not be located on any type of permanent foundation except for
a gravel pad, and no structure except a canopy shall be attached to the recreational
vehicle.
4. The clearing of vegetation for the siting of the recreational vehicle, tent or
similar shelter in a Resource Protection District shall be limited to one thousand (1,000)
square feet. ;
5. Awritten sewage disposal plan describing the proposed method and location
of sewage disposal shall be required for each campsite and shall be approved by the
Local Plumbing Inspector. Where disposal is off-site, written authorization from the
receiving facility or land owner is required.
6. When a recreational vehicle, tent or similar shelter is placed on-site for more
than one hundred and twenty (120) days per year, all requirements for residential
structures shall be met, including the installation of a subsurface sewage disposal
system in compliance with the State of Maine Subsurface Wastewater Disposal Rules
unless served by public sewage facilities.
F. Commercial and Industrial Uses
mm 17 ai
The following new commercial and industrial uses are prohibited within the shoreland
zone adjacent to Graham Lake, Oran Pond or Hopkins Pond and rivers and streams
which flow to those great ponds:
a. Auto washing facilities
b. Auto or other vehicle and/or repair operations, including body shops
c. Chemical and bacteriological laboratories
d. Storage of chemicals, including herbicides, pesticides or fertilizers other than
amounts normally associated with individual households or farms
e. Commercial painting, wood preserving, and furniture stripping
f. Dry cleaning establishments
g. Electronic circuitassembly .
h. Laundromats, unless connected to a sanitary sewer
i. Metal plating, finishing, or polishing
j. Petroleum or petroleum product storage and/or sale except storage on same
property as use occurs and except for storage and sales associated with marinas
k. Photographic processing (outside of home use discharged to septic system)
|. Printing
G. Parking Areas
1. Parking areas shall meet the shoreline setback requirements for structures for
the district in which such areas are located. The setback requirements for parking
: areas serving public boat launching facilities, in Districts other than the General
Development District shall be no less than fifty (50) feet, horizontal distance,, from the
| shoreline or tributary stream if the Planning Board finds that no other reasonable
alternative exists further from the shoreline or tributary stream.
2. Parking areas shall be adequately sized for the proposed use and shall be |
designed to prevent stormwater runoff from flowing directly into a water body, tributary
stream or wetland and where feasible, to retain all runoff on-site.
3. In determining the appropriate size of proposed parking facilities, the following
shall apply:
a. Typical parking space: Approximately ten (10) feet wide and twenty (20)
feet long, except that parking spaces for a vehicle and boat trailer shall be
forty (40) feet long.
b. Internal travel aisles: Approximately twenty (20) feet wide.
Hi Roads and Driveways
- 18 - |
The following standards shall apply to the construction of roads and/or driveways
and drainage systems, culverts and other related features.
1. Roads and driveways shall be back at least one-hundred (100) feet, -
horizontaldistance from the normal high water line of Graham Lake, Oran and Hopkins
Pond or a river/stream that flows to those lakes and seventy-five (75) feet, horizontal
distance from the normal high water line of other water bodies, tributary streams, or the
upland edge of a wetland unless no reasonable alternative exists as determined by the
Planning Board. If no other reasonable alter-native exists, the the road and/or driveway
setback requirement shall be no less than fifty (50) feet, horizontal distance, upon clear
showing by the applicant that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may
include, but are not limited to, the installation of settling basins, and/or the effective use
of additional ditch relief culverts and turnouts placed so as to avoid sedimentation of the
water body, tributary stream. , the 107-foot level shall prevail as the minimum setback
for all road construction.
On the slopes of greater than twenty (20) percent the road and/or driveway setback
shall be increased by ten (10) feet, horizontal distance, for each five (5) percent
'increase in slope above twenty (20) percent.
Section 15(H) (1) does not apply to approaches to water crossings nor to roads or
driveways that provide access to permitted structures and facilities located nearer to the
shoreline or tributary stream due to an operational necessity, excluding temporary
docks for recreational uses. Roads and driveways providing access to permitted
structures within the setback area shall comply fully with the requirements of Section 15
(H)(1) except for that portion of the road or driveway necessary for direct access to the
structure.
2. Existing public roads may be expanded with the legal road right-of-way
regardless of its setback from a water body, tributary stream or wetland. '
3. New permanent roads are not allowed within the shoreland zone along
Significant River Segments except:
(a) To provide access to structures or facilities within the zone; or
(b) When the applicant demonstrates that no reasonable alternative route exists
outside the shoreland zone. When roads must be located within the shoreland
zone they shall be set back as far as practicable from the normal high-water line
and screened from the river by existing vegetation.
4. New roads and driveways are prohibited in a Resource Protection District
except that the Planning Board may grant a permit to construct a road or driveway
to provide access to permitted uses within the district. A road or driveway may also
be approved by the Planning Board in a Resource Protection District, upon finding
that no reasonable alternative route or location is available outside the district.
When a road or driveway is permitted in a Resource Protection District the road
- 19-
and/or driveway shall be set back as far as practicable from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland.
5. Road and driveway banks shall be no steeper than a slope of two (2)
horizontal to one (1) vertical, and shall be graded and stabilized in accordance with the
provisions for erosion and sedimentation control contained in Section 15 (Q).
6. Road Grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
7. In order to prevent road and driveway surface drainage from directly entering
water bodies, tributary streams or wetlands, roads and driveways shall be designed,
constructed, and maintained to empty onto an unscarified buffer strip at least (50) feet
plus two times the average slope, in width between the outflow point of the ditch or
culvert and the normal high-water line of a water body, tributary stream, or upland edge
of a wetland. Surface drainage which is directed to an unscarified buffer strip shall be
diffused or spread out to promote infiltration of the runoff and to minimize channelized
flow of the drainage through the buffer strip.
8. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall
be installed in a manner effective in directing drainage onto unscarified buffer strips
before the flow gains sufficient volume or head to erode the road, driveway, or ditch.
To accomplish this, the following shall apply:
= a. Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road or driveway at intervals no greater than indicated in
the following table:
Road Grade Spacing
(Percent) (Feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
b. Drainage dips may be used in place of ditch relief culverts only where the
road grade is ten (10) percent or less.
c. On sections having slopes greater than ten (10) percent, ditch relief
culverts shall be placed at approximately a thirty (30) degree angle
_ downslope from a line perpendicular to the centerline of the road or
driveway.
= Bfy
d. Ditch relief culverts shall be sufficiently sized and properly installed in
order to allow for effective functioning and their inlet and outlet ends shall
be stabilized with appropriate materials.
9. Ditches, culverts, bridges, dips, water turnouts and other storm water runoff
control installations associated with roads and driveways shall be maintained on a
regular basis to assure effective functioning.
I. Signs
The following provisions shall govern the use of signs in the Resource Protection,
Stream Protection, Limited Residential and Limited Commercial Districts:
1. Signs relating to goods and services sold on the premises shall be allowed,
provided that such signs shall not exceed six (6) square feet in area and shall
not exceed two (2) signs per premises. In the Limited Commercial District,
however, such signs shall not exceed sixteen (16) square feet in area. Signs
relating to goods or services not sold or rendered on the premises shall be
prohibited.
2. Name signs are allowed, provided such signs shall not exceed two (2) signs
per premises, and shall not exceed twelve (12) square feet in the aggregate.
3. Residential users may display a single sign not over three (3) square feet in
area relating to the sale, rental, or lease of the premises.
4. Signs relating to trespassing and hunting shall be allowed without restriction
as to number provided that no such sign shall exceed two (2) square feet in area.
5. Signs relating to public safety shall be allowed without restriction.
6. No signs shall extend higher than twenty (20) feet above the ground..
7. Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
All new construction and development shall be designed to minimize storm water
runoff from the site in excess of the natural predevelopment conditions. Where
possible, existing natural runoff control features, such as berms, swales, terraces and
wooded areas shall be retained in order to reduce runoff and encourage infiltration of
storm waters.
1. Storm water runoff control systems shall be maintained as necessary to
ensure proper functioning.
4 1m
: K, Septic Waste Disposal
1. All subsurface sewage disposal systems shall be installed in conformance
with the State of Maine Subsurface Wastewater Disposal Rules, and the following: a.)
clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet, horizontal
distance, from the normal high water line of a water body or the upland edge of a
wetland and b.) a holding tank is not allowed for the first-time residential use in the
shoreland zone.. NOTE-SEE TABLE, PG 12, FOR PERMITS REQUIRED.
NOTE: The Rules, among other requirements, include:
a. The minimum setback for new subsurface sewage disposal systems, shall
be no less than one hundred (100) horizontal feet from the high-water line of -
a perennial water body.
b. However, where controlled by the licensed operations of the Bangor
Hydro-Electric Company project (Graham Lake and its tributaries) and where
the 107-foot licensed operations level, as represented by Bangor
Hydroelectric project boundary map, Dec. 11, 1984 extends inland of the 100
foot setback from normal highwater; the 107-foot level shall prevail as the
minimum setback for all septic systems.
c. The minimum setback distances from water bodies for new subsurface
sewage disposal systems shall not be reduced by variance.
2. Privies
Privies may be permitted in areas not served by community sewer facilities under
the following conditions:
a. No plumbing of any kind shall be connected to or discharged into the privy pit.
b. The privy shall be located at a minimum horizontal distance of 100 feet from the
normal high-water line of a water body, or 75 feet from the shoreline of a wetland,
except where controlled by the licensed operations of the Bangor Hydroelectric
Company project (Graham Lake and its tributaries). In any case where the 107-foot
licensed operations level, as represented by Bangor Hydroelectric project boundary
map, Dec. 11, 1984 extends inland of the 100 foot setback from normal high water, the
107-foot level shall prevail as the minimum setback for all privies.
c. The bottom of the privy pit shall be at least two feet above bedrock and the
ground water table at its highest point during the year or have a water tight vault.
d. Privies shall not be permitted on recent flood plain soils.
3. Setbacks for systems larger than 500 gallons
DD x |
The minimum setback for underground sewage disposal facilities from the normal
high-water line of a water body shall be no less than 100 horizontal feet or 75 feet a
horizontal'distance from the shoreline of a wetland. Where daily sewage flow exceeds
500 gallons (no more than 5 bedrooms), the minimum setback shall be 150 feet. Where
flow exceeds 700 gallons (8 bedrooms) the setback shall be 200 feet. For 2,000
gallons, the minimum setback shall be 300 feet from any shoreline. All other setback
requirements of the State Plumbing Code shall be met in full. Setbacks from shorelines
for all subsurface sewage disposal facilities shall not be reduced by variance.
4. Other Systems
Other systems of sanitary waste disposal may be permitted after approval by the
Maine Department of Health and Welfare and after a permit has been issued by the
Planning Board.
L. Essential Services
1. Where feasible, the installation of essential services shall be limited to
existing public ways and existing service corridors.
2. The installation of essential services, other than road-side distribution lines, is
not permitted in a Resource Protection or Stream Protection District, except to provide
services to a permitted use within said district, or except where the applicant
demonstrates that no reasonable alternative exists. Where allowed, such structures
and facilities shall be located so as to minimize any adverse impact on surrounding
uses and resources, including visual impacts.
3. Damaged or destroyed public utility transmission and distribution lines, towers
and related equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit
from the Code Enforcement Officer shall be required for mineral exploration which
exceeds the above limitation. All excavations, including test pits and holes shall be
immediately capped, filled or secured by other equally effective measures, so as to
restore disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
| = 23x
1. Areclamation plan shall be filled with, and approved by the Planning Board
before a permit is granted. Such plan shall describe in detail procedures to be
undertaken to fulfill the requirements of Section 15 (M) (4) below.
2. No part of any extraction operation, including drainage and runoff control
features, shall be permitted within one hundred (100) feet, horizontal distance, of the
normal high-water line of a great pond classified GPA or a river flowing to a great pond
classified GPA, and within seventy-five (75) feet, horizontal distance, of the normal high-
water line of any other water body, tributary stream, or the upland edge of a wetland.
Extraction operations shall not be permitted within fifty (50) feet, horizontal distance, of
any property line without written permission of the owner of such adjacent property.
3. Developers of new gravel pits along the Significant River Segments shall
demonstrate that no reasonable mining site outside the shoreland zone exists.
When gravel pits must be located within the zone, they shall be set back as far as
practicable from the normal high-water line and no less than one hundred (100) feet and
screened from the river by existing vegetation so as not to be visible from any water
craft.
4. Within twelve (12) months following the completion of extraction operations at
any extraction site, which operations shall be deemed complete when less than one
hundred (100) cubic yards of materials are removed in any consecutive twelve (12)
month period, ground levels and grades shall be established in accordance with the
following:
- a. All debris, stumps, and similar materials shall be removed for disposal in
an approved location, or shall be buried on-site. Only materials generated
on-site may be buried or covered on-site.
b. The final graded slope shall be two to one (2:1) slope or flatter.
c. Top soil or loam shall be retained to cover all disturbed land areas, which
shall be reseeded and stabilized with vegetation native to the area.
Additional topsoil or loam shall be obtained from off-site sources if
necessary to complete the stabilization project.
5. In keeping with the purpose of this Ordinance, the Planning Board may
impose such conditions as are necessary to minimize the adverse impacts associated
with mineral extraction operations on surrounding uses and resources.
N. Agriculture
1. All spreading of manure shall be accomplished in conformance with the
Manure Utilization Guidelines published by the Maine Department of Agriculture on
November 1, 2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-
4209).
2 OR -
2. Manure shall not be stored or stockpiled within one hundred (100) feet,
horizontal distance, of a great pond classified GPA or a river flowing to a great pond, ¥
classified GPA, or within seventy-five (75) feet horizontal distance, of other water bodies
tributary streams, or wetlands. All manure storage areas, within the shoreland zone
must be constructed or modified such that the facility produces no discharge of effluent
or contaminated storm water.
3. Agricultural activities involving tillage of soil greater than forty thousand
(40,000) square feet in surface area, within the shoreland zone shall require a
Conservation Plan to be filed with the Planning Board. Non-conformance with the
provisions of said plan shall be considered to be a violation of this Ordinance.
4. There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA; within seventy-
five (75) feet, horizontal distance, from other water bodies; nor within twenty-five (25)
feet, horizontal distance, of tributary streams, and wetlands. Operations in existence on
'the effective date of this ordinance and not in conformance with this provision may be
maintained.
5. After the effective date of this Ordinance, newly established livestock grazing
areas shall not be permitted within one hundred (100) feet, horizontal distance, of the
normal high-water line of a great pond classified GPA; within seventy-five (75) feet,
horizontal distance of other water bodies, nor within twenty-five (25) feet, horizontal
distance of tributary streams, and wetlands. Livestock grazing associated with ongoing
farm activities, and which are not in conformance with the above setback provisions
may continue, provided that such grazing is conducted in accordance with a Soil and
Water Conservation Plan. ;
O. Timber Harvesting
1. Ina Resource Protection District abutting a great pond, timber harvesting
shall be limited as follows:
a. Within the strip of land extending 75 feet, horizontal distance, inland from
the normal high-water line, timber harvesting may be conducted when the following
conditions are met:
1. The ground is frozen;
2. There is no resultant soil disturbance;
3. The removal of trees is accomplished using a cable or boom and there
is no entry of tracked or wheeled vehicles into the 75-foot strip of land;
4. There is no cutting of trees less than 6 inches in diameter; no more than
'30% of the trees 6 inches or more in diameter, measured at 41/2 feet
above ground level, are cut in any 10 year period; and a well-distributed
stand of trees and other natural vegetation remains; and
-25-
5. A licensed professional forester has marked the trees to be harvested
prior to a permit being issued by the municipality.
b. Beyond the 75 foot strip referred to in Section 15 (Q)(1)(a) above, timber
harvesting is permitted in accordance with paragraph 2 below except that in no case
shall the average residual basal area of trees over 4 % inches in diameter at 4 % feet
above ground level be reduced to less than 30 square feet per acre.
2. Except in areas as described in Section 15 (OQ) (1) above, timber harvesting
shall conform with the following provisions:
a. Selective cutting of no more than forty (40) percent of the total volume of
trees four (4) inches or more in diameter measured at 4 % feet above
ground level on any ten (10) year period is permitted. In addition:
i. Within one-hundred (100) feet, horizontal distance of the normal high-
water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and within seventy-five (75) feet, horizontal
distance, of the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland, there shall be no clearcut
openings and a well-distributed stand of trees and other vegetation,
including existing ground cover, shall be maintained.
ii. At distances greater than one-hundred (100) feet, horizontal distance,
of a great pond classified GPA or a river flowing to a great pond
classified GPA, and greater than seventy-five (75) feet, horizontal
distance, of the normal high-water line of other water bodies or the
upland edge of a wetland, harvesting operations shall not create single
clearcut openings greater than ten-thousand (10,000) square feet in
the forest canopy. Where such openings exceed five-thousand (5000)
square feet they shall be at least one hundred (100) feet apart. Such
clearcut openings shall be included in the calculation of total volume
removal. For the purpose of these standards volume may be
with the purposes of this Ordinance.
b. No accumulation of slash shall be left within fifty (50) feet of the normal
high-water line of a water body. In all other areas slash shall either be
removed or disposed of in such a manner that it lies on the ground and no
part thereof extends more than four (4) feet above the ground. Any debris
that falls below the normal high-water line of a water body or tributary
stream shall be removed.
c. Timber harvesting equipment shall not use stream channels as travel
routes except when:
i. Surface waters are frozen; and
«IG «
ii. The activity will not result in any ground disturbance.
_d. All crossings of flowing water shall require a bridge or culvert, except in "
"areas low banks and channel beds which are composed of gravel, rock or
similar hard surface which would not be eroded or otherwise damaged.
e. Skid trail approaches to water crossings shall be located and designed so
as to prevent water runoff from directly entering the water body or tributary
stream. Upon completion of timber harvesting, temporary bridges and
culverts shall be removed and areas of exposed soil revegetated.
f. Except for water crossings, skid trails and other sites where the operation
of machinery used in timber harvesting results in the exposure of mineral
soil shall be located such that an unscarified strip of vegetation of at least
seventy-five (75) feet, horizontal distance, in width for slopes up to ten
(10) percent shall be retained between the exposed mineral soil and the
normal high-water line of a water body or upland edge of a wetland. For
each ten (10) percent increase in slope, the unscarified strip shall be
increased by twenty (20) feet, horizontal distance. The provisions of this
paragraph apply only to a face sloping toward the water body or wetland,
provided, however, that no portion of such exposed mineral soil on a back
face shall be closer than twenty five (25) feet, horizontal from the normal
high-water line of a water body or upland edge of a wetland.
P. Clearing or Removal of Vegetation for Activities other than Timber Harvesting
- 1. Within a shoreland area zoned for Resource Protection abutting a great pond,
there shall be no cutting of vegetation with the strip of land extending 75 feet, horizontal
distance, inland from the normal high-water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall
be limited to that which is necessary for uses expressly authorized in that district.
2. Except in areas as described in Section 15 (P) (1), above, and except to allow
for the development of permitted uses, within a strip of land extending one-hundred
(100) feet, horizontal distance, inland from the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75)
feet, horizontal distance, from any other water body, tributary stream, or the upland
edge of a wetland, a buffer strip of vegetation shall be preserved as follows:
a. There shall be no cleared opening greater than 250 feet in the forest
canopy (or other vegetation if a forested canopy is not present) as
measured from the outer limits of the tree or shrub crown. However, a
footpath not to exceed six (6) feet in width as measured between tree
' trunks and/or shrub stems is permitted provided that a clear line of sight to
the water through the buffer strip is not created.
2 OF
. Selective cutting of trees within the buffer strip is allowed provided that a
well distributed stand of trees and other natural vegetation is maintained.
For the purposes of Section 15(P)(2)(b) a "well-distributed stand of trees"
adjacent to a great pond classified GPA or a river or stream flowing to a great
pond classified GPA, shall be defined as maintaining a rating score of 24 or
more in each 25-foot by 50-foot rectangular (1250 square feet) area as
determined by the following rating system.
Diameter of Tree at 4-%
feet
Above Ground Level Points
(inches)
2- < 4in 7
>4- < 8in. 2
8 -< 12 in. 4
12in. or greater 8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed
'Stand of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by
50-foot rectangular area.
Note: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot contains
four(4) trees between 2 and 4 inches in diameter, two trees between 4 and 8 inches in
diameter, three trees between 8 12 inches in diameter, and two trees over 12 inches in
diameter, the rating score is:
(4x1) + (2x2) + (3x4) + (2x8)= 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 12 points
(36 - 24 = 12) may be removed from the plot provided that no cleared openings are
| created.
|
| The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner »
or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance:
(iv) Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by this Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 %)
a BBs
feet above ground level for each 25-foot by 50-foot rectangle area. If five saplings do
not exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot. 2
Notwithstanding the above provisions, no more than 40 % of the total volume of trees
four (4) inches or more in diameter, measured at 4 % feet above ground level may be
removed in any ten (10) year period.
c. In order to protect water quality and wildlife habitat, existing vegetation
under three (3) feet in height and other ground cover, including leaf litter
and the forest duff layer, shall not be cut, covered, or removed, except to
provide for a footpath or other permitted uses as described in Section
15(P) paragraphs (2) and (2)(a) above.
d. Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
e. In order to maintain a buffer strip of vegetation, when the removal of
storm- damaged, diseased, unsafe, or dead trees results in the creation of
cleared openings, these openings shall be replanted with native tree
species unless existing new tree growth is present.
Section 15(P) (2) does not apply to those portions of public recreational facilities
adjacent to public swimming areas as long as cleared areas are limited to the minimum
area necessary.
. 3. Atdistances greater than one hundred (100) feet, horizontal distance, from a
great pond classified (GPA) or a river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of any other
water body, tributary stream, or the upland edge of a wetland, except to allow for the.
development of permitted uses, there shall be permitted on any lot, in any ten (10) year
period, selective cutting of not more than forty (40) percent of the volume of trees four
(4) inches or more in diameter, measured 4 % feet above ground level. Tree removal in
conjunction with the development of permitted uses shall be included in the forty (40)
percent calculation. For the purposes of these standards volume may be considered to
be equivalent to basal areas.
In no event shall cleared openings for any purpose, including but not limited to, principal
and accessory structures, driveways, lawns and sewage disposal areas, exceed in the
aggregate, 25% of the lot area within the shoreland zone or ten thousand (10,000)
square feet, whichever is greater, including land previously cleared.
4. Legally existing nonconforming cleared openings may be maintained, but
shall not be enlarged, except as allowed by this Ordinance.
5. Fields and other cleared openings which have reverted to primarily shrubs,
trees, or other woody vegetation shall be regulated under the provisions of
Section 15(P).
- 29 -
Q. Erosion and Sedimentation Control
1. All activities which involve filling, grading, excavation or other similar activities
which result in unstabilized soil conditions and which require a permit shall require a
written soil erosion and sedimentation control plan. The plan shall be submitted to the
permitting authority for approval and shall include, where applicable, provisions for:
a. Mulching and revegetation of disturbed soil.
b. Temporary runoff control features such as hay bales, silt fencing or
diversion ditches.
c. Permanent stabilization structures such as retaining walls or riprap.
NOTE** Provision is partially made to encourage stabilization of eroding shorelines
through the use of well designed rip-rap. The state Department of Environmental
Protection provides a form for application to rip rap 100 feet of shore line per year under
~ their "permit by rule" procedure. Town planning board can assist landowners with this
application process. Town Ordinance must be adhered to when applying under "permit
by rule".
| 2. In order to create the least potential for erosion, development shall be
designed to fit with the topography and soils of the site. Areas of steep slopes where
high cuts and fills may be required shall be avoided wherever possible, and natural
- contours shall be followed as closely as possible.
3. Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all stages
of the activity. The amount of exposed soil at every phase of construction shall be
maintained to reduce the potential for erosion.
4. Any exposed ground area shall be temporarily or permanently stabilized
within one (1) week from the time it was last actively worked, by use of riprap, sod,
seed, and mulch, or other effective measures. In all cases permanent stabilization shall
occur within nine (9) months of the initial date of exposure. In addition:
a. Where mulch is used, it shall be applied at a rate of at least one (1) bale
per five hundred (500) square feet and shall be maintained until a catch of
vegetation is established.
b. Anchoring the mulch with netting, peg, and twine or other suitable method
may be required to maintain the mulch cover.
c. Additional measures shall be taken where necessary in order to avoid
siltation into the water. Such measures may include the use of staked hay
bales and/or silt fences.
= B=
5. Natural and man-made drainage ways and drainage outlets shall be protected
from erosion from water flowing through them. Drainage ways shall be designed and
constructed in order to carry water from a twenty-five (25) year storm or greater, and
shall be sf&bilized with vegetation or lined with rip-rap.
R. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts,
including severe erosion, mass soil movement, improper drainage, and water pollution,
whether during or after construction. Proposed uses requiring subsurface waste
disposal, and commercial or industrial development and other similar intensive land
uses, shall require a soils report based on an on-site investigation and be prepared by
state-certified professionals. Certified persons may include Maine Certified Soil
Scientists, Maine Registered Professionals Engineers, Maine State Certified Geologists
and other persons who have training and experience in the recognition and evaluation
of soil properties. The report shall be based upon the analysis of the characteristics of
'the soil and surrounding land and water areas, maximum ground water elevation,
presence of ledge, drainage conditions, and other pertinent data which the evaluator
deems appropriate. The soil report shall include recommendations for a proposed use
to counteract soil limitations where they exist.
S. Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State
any pollutant that, by itself or in combination with other activities or substances will
impair designated uses or the water classification of the water body, tributary stream or
wetland.
T. Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on
or adjacent to sites listed on, or eligible to be listed on the National Register of Historic
Places, as determined by the permitting authority shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty
(20) days prior to action being taken by the permitting authority. The permitting
authority shall consider comments received from the Commission prior to rendering a
decision on the application.
Oe -§1 -
C. Permit Application
1. .Every applicant for a permit shall submit a written application, including a :
scaled site plan, on a form provided by the municipality, to the appropriate officials as
indicated in Section 14.
2. All applications shall be signed by an owner or individual who can show
evidence of right, title or interest in the property or by an agent, representative, tenant,
or contractor of the owner with authorization from the owner to apply for a permit
hereunder, certifying that the information in the application is complete and correct.
3. All applications shall be dated, and the Code Enforcement Officer or Planning
Board, as appropriate, shall note upon each application the date and time of its receipt.
4. |f the property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation approved by
the Plumbing Inspector, shall be submitted whenever the nature of the proposed
Structure or use would require the installation of a subsurface sewage disposal system.
D. Procedure for Administering Permits
Within 35 days of the date of receiving a written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing
either that the application is a complete application, or, if the application is incomplete,
that specified additional material is needed to make the application complete. The
Planning Board or the Code Enforcement Officer, as appropriate, shall approve,
| approve with conditions, or deny all permit applications in writing within 35 days of
| receiving a completed application. However, if the Planning Board has a waiting list of
| applications, a decision on the application shall occur within 35 days after the first
available date on the Planning Board's agenda following receipt of the completed
application, or within 35 days of the public hearing, if one is held. Permits shall be
approved if the proposed use or structure is found to be in conformance with the
purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall
approve an application or approve it with conditions if it makes a positive finding based
on the information presented that the proposed use:
1. Will maintain safe and healthful conditions;
2. Will not result in water pollution, erosion, or sedimentation to surface waters;
3. Will adequately provide for the disposal of all wastewater;
. 53...
4. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or
a other wildlife habitat;
5. Will conserve shore cover and visual, as well as actual, points of access to in-
land and coastal waters;
6. Will protect archaeological and historic resources as designated in the
comprehensive plan;
7. Will avoid problems associated with flood plain development and use; and
8. Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reason as well as conditions
shall be stated in writing. No approval shall be granted for an application involving a
structure if the structure would be located in an unapproved subdivision or would violate
any other local ordinance or regulations or statute, administered by the municipality.
E. Expiration of Permit
Permits shall expire one year from the date of issuance if a substantial start is not
made in construction or in the use of the property during that period. If a substantial
start is made within one year of the issuance of the permit, the applicant shall have
as one additional year to complete the project, at which time the permit shall expire.
F. Installation of Public Utility Service
No public utility, water district, sanitary district or any utility company of any kind may
install services to any new structure located in the shoreland zone unless written
authorization attesting to the validity and currency of all local permits required under this
or any previous Ordinance, has been issued by the appropriate municipal officials or
other appropriate written arrangements have been made between the municipal officials
and the utility.
G. Appeals
1. Powers and Duties of the Board of Appeals
The Board of Appeals shall have the following powers:
a. Administrative Appeals: To hear and decide administrative appeals, on an
appellate basis, where it is alleged by an aggrieved party that there is an error in any
= BAR
order, requirement, decision, or determination made by, or failure to act by, the Planning
Board in the administration of this Ordinance; and to hear and decide administrative
appeals on a de novo basis where it is alleged by an aggrieved party that there is an
error in any order, requirement, decision or determination made by, or failure to act by,
the Code Enforcement Officer in his or her review of and action on a permit application
under this Ordinance. Any order, requirement, decision or determination made, or
failure to act, in the enforcement of this ordinance is not appealable to the Board of
Appeals.
b. Variance Appeals: To authorize variances upon appeal, within the
limitations set forth in this Ordinance.
2. Variance Appeals
Variances may be granted only under the following conditions:
a. Variances may be granted only from dimensional requirements including
not limited to, lot width, structure height6, percent of lot coverage, and
setback requirements.
b. Variances shall not be granted for establishment of any uses otherwise
prohibited by this Ordinance.
c. The Board shall not grant a variance unless it finds that:
(1) The proposed structure or use would meet the provisions of Section 15
except for the specific provision which has created the non-conformity
and from which relief is sought; and
(2) The strict application of the terms of this Ordinance would result in |
undue hardship.
The term "undue hardship" shall mean:
(i) That the land in question cannot yield a reasonable return
unless a variance is granted;
(ii) That the need for a variance is due to the unique circumstances
of the property and not to the general conditions in the
neighborhood;
(iii) That the granting of a variance will not alter the essential
character of the locality; and
(iv) That the hardship is not the result of action taken by the
applicant-or a prior owner.
- 35 -
d. Notwithstanding Section 16(H)(2)(c)(ii)above, the Board of Appeals may
grant a variance to an owner of a residential dwelling for the purpose of
making that dwelling accessible to a person with a disability who resides in
or regularly uses the dwelling. The board shall restrict any variance
granted under this subsection solely to the installation of equipment or the
construction of structures necessary for access to or egress from the
dwelling by the person with the disability. The board may impose
conditions on the variance, including limiting the variance to the duration
of the disability or to the time that the person with the disability lives in the
dwelling. The term "structures necessary for access to or egress from the
dwelling" shall include railing, wall or roof systems necessary for the safety
or effectiveness of the structure.
e. The Board of Appeals shall limit any variances granted as strictly as
possible in order to ensure conformance with the purposes and provisions
of this Ordinance to the greatest extent possible, and in doing so may
impose such conditions to a variance as it deems necessary. The party
receiving the variance shall comply with any conditions imposed.
|
| f. A copy of each variance request, including the application and all
| supporting information supplied by the applicant, shall be forwarded by the
municipal officials to the Commissioner of the Department of
Environmental Protection at least (20) days prior to action by the Board of
Appeals. Any comments received from the Commissioner prior to action
by the Board of Appeals shall be made part of the record and shall be
= taken into consideration by the Board of Appeals.
3. Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement
Officer the Board of Appeals shall hold a de novo hearing. At this time the
Board may receive and consider new evidence and testimony, be it oral or
written. When acting in a "de novo" capacity the Board of Appeals shall
hear and decide the matter afresh, undertaking its own independent
analysis of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall
hold an appellate hearing, and may reverse the decision of the Planning
Board only upon finding that the decision was contrary to specific
provisions of the Ordinance or contrary to the facts presented to the
Planning Board. The Board of Appeals may only review the record of the
proceedings before the Planning Board. The Board of Appeals shall not
receive or consider any evidence which was not presented to the Planning
Board, but the Board of Appeals may receive ad consider written or oral
arguments. If the Board of Appeals determines that the record of the
Planning Board proceedings are inadequate, the Board of Appeals may
remand the matter to the Planning Board for additional fact finding.
o3G"s
4. Appeal Procedure
a. Making an Appeal
(1) An administrative or variance appeal may be taken to the Board of
Appeals by an aggrieved party from any decision of the Code
Enforcement Officer or the Planning Board, except for enforcement-
related matters as described in Section 16(H)(1)(a) above. Such an
appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the
Board, upon a showing of good cause, may waive the thirty (30) day
requirement.
(2) Applications for appeals shall be made by filing with the Board of
Appeals a written notice of appeal which includes:
(i) A concise written statement indicating what relief is requested and
why the appeal or variance should be granted.
| (ii) A sketch drawn to scale showing lot lines, location of existing
| buildings and structures and other physical features of the lot
pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a
. variance, the Code Enforcement Officer or Planning Board, as
| appropriate, shall transmit to the Board of Appeals all of the papers
constituting the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on the
administrative appeal or request for a variance within thirty-five (35)
days of its receipt of a complete written application, unless this time
period is extended by the parties.
b. Decision by Board of Appeals
| (i) A majority of the full voting membership of the board shall constitute a
quorum for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
' (iii) The Board shall decide all appeals within thirty-five (35) days after the
close of the hearing, and shall issue a written decision on all appeals.
| -37-
(iv) The Board of Appeals shall state the reasons and basis for its
decision, including a statement of the facts fond and conclusions reached
: by the Board. The Board shall cause written notice of its decision 0 be
: mailed or hand delivered to the applicant and to the Department of
Environmental Protection within seven (7) days of the Board's decision.
Copies of written decisions of the Board of Appeals shall be given to the
Planning Board, Code Enforcement Officer, and the municipal officers.
5. Appeals to Superior Court
Except as provided with 30 A M.R.S.A. section 2691 (3) (F) any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take an
appeal to Superior Court in accordance with State laws within thirty (30) days from the
date of any decision of the Board of Appeals.
6. Reconsideration
|
| In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may
| reconsider any decision within forty-five (45) days of its prior decision. A request to
| the Board to reconsider a decision must be filed within ten (10) days of the
decision that is being reconsidered. A vote to reconsider and the action taken on
ie that reconsideration must occur and be completed within forty-five (45) days of the
date of the vote on the original decision. Reconsideration of a decision shall
require a positive vote of the majority of the Board members originally voting on the
decision, and proper notification to the landowner, petitioner, planning board, code
enforcement officer, and other parties of interest, including abuttors and those who
testified at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen
(15) days after the decision on reconsideration.
H. Enforcement
1. Nuisances
Any violation of this Ordinance shall be deemed to be a nuisance.
2. Code Enforcement Officer
a. It shall be the duty of the Code Enforcement Officer to enforce the
provisions of this Ordinance. If the Code Enforcement Officer shall find
- 38 - |
Section 17 Definitions
~ Accessory structure or use - a use or structure which is incidental and subordinate to
the principal use or structure. Accessory uses, when aggregated shall not subordinate
the principal use of the lot. A deck or similar extension of the principal structure or a
garage attached to the principal structure by a roof or a common wall is considered part
of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by
the granting or denial of a permit or variance has been granted; or any other person or
group of persons who have suffered particularized injury as a result of the granting or
denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or
animals, including but not limited to: forages and sod crops; grain and seed crops; dairy
animals and dairy products; poultry and poultry products; livestock; fruits and
vegetables; and ornamental and green house products. Agriculture does not include
_ forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater plant or animal
species.
Basement -- any portion of a structure with a floor-to-ceiling height of 6 feet or more and
having more than 50% of its volume below the existing ground level.
oe Boat Launching Facility - a facility designed primarily for the launching and landing of
| watercraft, and which may include an access ramp, docking area, and parking spaces
| for vehicles and trailers.
Campground - any area or tract of land to accommodate two (2) or more parties in
temporary living quarters, including, but not limited to tents, recreational vehicles or
other shelters. |
Canopy -- the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, building, or structures, other than a "home
occupation", defined below, the intent and result of which activity is the production of
income from the buying and selling of goods and/or services, exclusive of rental of
residential buildings and/or dwelling units.
Development -- a change in land use involving alteration of the land, water or
vegetation, or the addition or alteration of structures or other construction not naturally
occurring.
Dimensional requirements - numerical standards relating to spatial relationships
including but not limited to setback, lot area, shore frontage and height.
- 40 -
Disruption of shoreline integrity -- the alteration of the physical shape, properties or
condition of a shoreline at any location by timber harvesting and related activities. A
shoreline where shoreline integrity has been disrupted is recognized by compacted,
scarified and/or rutted soil, an abnormal channel or shoreline cross-section, and in the
case of flowing waters, a profile and character altered from natural conditions.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving
two single family dwellings or one two family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general
welfare, such as protection of resources from immediate destruction or loss, law
enforcement, and operations to rescue human beings, property and livestock from the
threat of destruction or injury.
Essential services - the construction, alteration or maintenance of gas, electrical or
communication facilities; steam, fuel, electric power or water transmission or distribution
lines, towers and related equipment; telephone cables or lines, poles and related
equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines,
' collection or supply systems; and associated storage tanks. Such systems may include
towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call
boxes, traffic signals, hydrants and similar accessories, but shall not include service
drops or buildings which are necessary for the furnishing of such services.
Expansion of a structure - an increase in the floor area or volume of a structure,
including all extensions such as, not limited to attached: decks, garages, porches and
greenhouses.
Expansion of use - the addition of one or more weeks or one or more months to a
use's operating season; additional hours of operation; or the use of more floor area or.
ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single
housekeeping unit.
Floodway--the channel of a river or other watercourse and adjacent land areas that
must be reserved in order to discharge the 100-year flood without cumulatively
increasing the water surface elevation by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by
exterior walls, plus the horizontal area of any unenclosed portions of a structure such as
porches and decks.
Forest management activities - timber cruising and other forest resource evaluation
activities, pesticide or fertilizer application, management planning activities, timber stand
improvement, pruning, regeneration of forest stands, and other similar or associated
activities, exclusive of timber harvesting and the construction, creation or maintenance
of roads.
ait «
Foundation - the supporting substructure of a building or other structure, excluding
ss wooden sills and post supports, but including basements, slabs, frost walls, or other
base consisting of concrete, block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas which are:
1. of ten or more contiguous acres; or of less than 10 contiguous acres and
adjacent to a surface water body, excluding any river, stream or brook such that
in a natural state, the combined surface area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a
duration sufficient to support, and which under normal circumstances do support,
a prevalence of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do
not conform to the criteria of this definition.
' Functionally water-dependent uses -- those uses that require, for their primary
purpose, location on submerged lands or that require direct access to, or location in,
inland waters and that can not be located away from these waters. The uses include,
but are not limited to commercial and recreational fishing and boating facilities,
excluding recreational boat storage buildings, finfish and shellfish processing, fish
storage and retail and wholesale fish marketing facilities, waterfront dock and port
facilities, shipyards and boat building facilities, marinas, navigation aids, basins and
7 channels, retaining walls, industrial uses dependent on water-borne transportation or
requiring large volumes of cooling or processing water that can not reasonably be
located or operated at an inland site, and uses that primarily provide general pubic
access to inland waters.
Great pond - any inland body of water which in a natural state has a surface area in
excess of ten acres, and any inland body of water artificially formed or increased which
has a surface area in excess of thirty (30) acres except for the purposes of this
Ordinance, where the artificially formed or increased inland body of water is completely
surrounded by land held by a single owner.
Great pond classified GPA - any great pond classified GPA, pursuant to Title 38
M.R.S.A. Article 4-A Section 465-A. This classification includes some, but not all
impoundments of rivers that are defined as great ponds.
Ground cover -- small plants, fallen leaves, needles and twigs, and the partially
decayed organic matter of the forest floor.
Height of a structure - the vertical distance between the mean original (prior to
construction) grade at the downhill side of the structure and the highest point of the
structure, excluding chimneys, steeples, antennas, and similar appurtenances which
have no floor area.
- 42 - |
Home occupation - an occupation or profession which is customarily conducted on or
in a residential structure or property and which is 1) clearly incidental to and compatible
with the résidential use of the property and surrounding residential uses; and 2) which
employs no more than two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure -- any change in a structure or property
which causes further deviation from the dimensional standard(s) creating nonconformity
such as, but not limited to, reduction in water body, tributary stream or wetland setback
distance, increase in lot coverage, or increase in height of structure. Property changes
or structure expansions which either meet the dimensional standard or which cause no
further increase in the linear extent of nonconformance of the existing structure shall not
be considered to increase nonconformity. For example, there is no increase in
nonconformity with the setback requirement for water bodies, wetlands, or tributary
streams if the expansion extends no further into the required setback area than does
any portion of the existing nonconforming structure. Hence, a structure may be
expanded laterally provided that the expansion extends no closer to the water body,
tributary stream, or wetland than the closet portion of the existing structure from that
"water body, tributary stream, or wetland. Included in this allowance are expansions
which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a
campground, but which is developed for repeated camping by only one group not to
exceed ten (10) individuals and which involves site improvements which may include
but not be limited to a gravel pads, parking areas, fire places, or tent platforms.
| Industrial - The assembling, fabrication, finishing, manufacturing, packaging or
| processing of goods, or the extraction of minerals.
Institutional -- a non-profit or quasi-public use, or institution such as a church, library,
public or private school, hospital, or municipally owned or operated building, structure or
land used for public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land
below the normal high-water line of a water body or upland edge of a wetland and areas
beneath roads serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its
principal use, providing for hire offshore moorings or docking facilities for boats, and
which may also provide accessory services such as boat and related sales, boat repair
and construction, indoor and outdoor storage of boats and marine equipment, bait and
tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under
prevailing market conditions in a sale between a willing seller and a willing buyer, both
conversant with the property and with prevailing general price levels.
- 43 - |
Mineral exploration - hand sampling, test boring, or other methods of determining the
= nature or extent of mineral resources which create minimal disturbance to the land and
which include reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes
more than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock,
peat, or other like material from its natural location and to transport the product
removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only
two lot lines extend into the shoreland zone, both lot lines shall be considered to be side
lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential
dwelling units.
Native -- indigenous to the local forests.
Non-conforming condition -- non-conforming lot, structure or use which is allowed
solely because it was in lawful existence at the time this Ordinance or subsequent
amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirements
. of the district in which it is located.
Non-conforming structure - a structure which does not meet any one or more of the
following dimensional requirements; setback, height, or lot coverage, but which is
allowed solely because it was existence at the time this Ordinance or subsequent
amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof
which is not allowed in the district in which it is situated, but which is allowed to remain
solely because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect.
Normal high-water line - that line which is apparent from visible markings, changes in
character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land.
Areas contiguous with rivers and great ponds that support non-forested wetland
vegetation and hydric soils and that are at the same or lower elevation as the water
level of the river or great pond during the period of normal high water are considered
part of the river or great pond.
- 44 - |
Person - an individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or
other legal entity.
'eae
Piers, docks, Wharfs, bridges and other structures and uses extending over or
below the normal high-water line or within a wetland-
Temporary: Structures which remain in or over the water for less than seven (7)
months in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or
more in any period of twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes wholly
incidental or accessory to the use of another building or use on the same premises.
Principal use - a use other than one which is wholly incidental or accessory to another
use on the same premises.
Public facility - any facility, including, but not limited to, buildings, property, recreation
areas, and roads, which are owned, leased, or otherwise operated, or funded by a
governmental body or public entity.
Recent flood plain soils - the following soil series as described and identified by the
National Cooperative Soil Survey:
Alluvial Cornish Charles
Fryeburg Hadley Limerick .
Lovewell Medomak Ondawa ;
Podunk Rumney Saco
Suncook Sunday Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure
time activities, and other customary and usual recreational activities, excluding boat
launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed,
and designed for temporary sleeping or living quarters for one or more persons, and
which may include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor
home. In order to be considered as a vehicle and not as a structure, the unit must
remain with its tires on the ground, and must be registered with the State Division of
Motor Vehicles.
Replacement system - a system intended to replace; 1) an existing system which is
either malfunctioning or being upgraded with no significant change of design flow or use
of the structure, or 2) any existing overboard wastewater discharge.
- 45 - |
Person - an individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or
other legal entity.
ioe
Piers, docks, Wharfs, bridges and other structures and uses extending over or
below the normal high-water line or within a wetland-
Temporary: Structures which remain in or over the water for less than seven (7)
months in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or
more in any period of twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes wholly
incidental or accessory to the use of another building or use on the same premises.
Principal use - a use other than one which is wholly incidental or accessory to another
use on the same premises.
Public facility - any facility, including, but not limited to, buildings, property, recreation
areas, and roads, which are owned, leased, or otherwise operated, or funded by a
governmental body or public entity.
Recent flood plain soils - the following soil series as described and identified by the
National Cooperative Soil Survey:
Alluvial Cornish Charles
Fryeburg Hadley Limerick
Lovewell Medomak Ondawa
Podunk Rumney Saco
Suncook Sunday Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure
time activities, and other customary and usual recreational activities, excluding boat
launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed,
and designed for temporary sleeping or living quarters for one or more persons, and
which may include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor
home. In order to be considered as a vehicle and not as a structure, the unit must
remain with its tires on the ground, and must be registered with the State Division of
Motor Vehicles.
Replacement system - a system intended to replace; 1) an existing system which is
either malfunctioning or being upgraded with no significant change of design flow or use
of the structure, or 2) any existing overboard wastewater discharge.
-45- |
SS a
| '
|
| Residential dwelling unit -- a room or group of rooms designed and equipped
| exclusively for use as permanent, seasonal, or temporary living quarters for only one
_ family at a time, and containing cooking, sleeping and toilet facilities. The term shall
| include mobile homes and rental units that contain cooking, sleeping and toilet facilities
regardless of the time period rented. Recreational vehicles are not residential dwelling
units.
|
| Residual basal area - the average of the basal area of trees remaining on a harvested
site.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for
| erosion control and soil stabilization, typically used on ground slopes of two (2) units
| horizontal to one (1) unit vertical or less.
| River - a free-flowing body of water including its associated flood plain wetlands from
| that point at which it provides drainage for a watershed of twenty five (25) square miles
| to its mouth. |
' Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or
other surfacing material constructed for or created by the repeated passage of
motorized vehicles, excluding a driveway as defined.
Service drop - any utility line extension which does not cross or run beneath any
portion of a water body provided that;
s: 1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely
upon the premises of the customer requesting service or upon a roadway
right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet. |
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of
telephone wires to existing utility poles, or
b. the extension requiring the installation of new utility poles or placement
underground is less than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the shoreline to the nearest part of a
structure, road, parking space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in
a straight line between the intersections of the lines with the shoreline.
- 46 -
Shoreland zone - the land area located within two hundred and fifty (250) feet,
horizontal distance, of the normal high-water line of any great pond or river within 250
feet of the upland edge of a coastal or freshwater wetland; or within seventy-five (75) é
feet of the normal high-water line of a stream.
Shoreline -- the normal high water line, or upland edge of a wetland.
Significant River Segments - See Title 38 MRSA Sec. 437.
Stream - a free flowing body of water from the outlet of a great pond or the confluence
of two (2) perennial streams as depicted on the most recent edition of a United States
Geological Survey 7.5 minute series topographic map, or if not available, a 15-minute
series topographic map, to the point where the body of water becomes a river or flows
to another waterbody or wetland within the shoreland Area.
Structure - anything built for the support, shelter, or enclosure of persons, animals,
goods or property of any kind, together with anything constructed or erected with a fixed
'location on or in the ground, exclusive of fences and poles, wiring and other aerial
equipment normally associated with service drops as well as guying and guy anchors.
The term includes structures temporarily or permanently located, such as decks, patios
and satellite dishes.
Substantial start - completion of thirty (30) percent of a permitted structure or use
measured as a percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or
waste water on or beneath the surface of the earth; includes, but is not limited to: septic
tanks, disposal fields; grandfathered cesspools; holding tanks; pretreatment filter,
piping, or any other fixture, mechanism or apparatus used for these purposes, does not
include any discharge system licensed under 38 MRSA Section 414, any surface
wastewater disposal system, or any municipal or quasi municipal sewer or waste water
treatment system.
Sustained slope - a change in elevation where the referenced percent grade is
substantially maintained or exceeded throughout the measured area.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling
or processing forest products. The cutting or removal of trees in the shoreland zone on
a lot that has less than two (2) acres within the shoreland zone shall not be considered
timber harvesting. Such cutting or removal of trees shall be regulated pursuant to
Section 15 (P) Clearing or Removal of Vegetation for Activities Other than Timber
Harvesting.
Tributary stream - a channel between defined banks created by the action of surface
water, whether intermittent or perennial, and which is characterized by the lack of
upland vegetation or presence of aquatic vegetation or by the presence of a bed, devoid
-47-
of topsoil, containing waterborne deposits on exposed soil, parent material or bedrock,
and which is connected hydrologically with other water bodies. [This definition does not
include the term "stream" as defined elsewhere in this Ordinance, and only applies to
that portion of the tributary stream located within the shoreland zone of the receiving
water body or/wetland.] "Tributary stream" does not include rills or gullies forming
because of accelerated erosion in disturbed soils where the natural vegetation cover
has been removed by human activity.
Upland edge - the boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a
duration sufficient to support wetland vegetation; or where the soils support the growth
of wetland vegetation.
. Vegetation - all live trees, shrubs, ground cover, and other plants including, without
limitation, trees both over and under 4 inches in diameter, measured at 4% above
ground level. |
Volume of a structure - the volume of all portions of a structure enclosed by roof and
fixed exterior walls as measured from the exterior of these walls and roof.
Water body - any great pond, river, stream.
| Water Crossing - any project extending from one bank to the opposite bank of a river
| - or stream, tributary stream, or wetland whether under, through, or over the water or
| wetland. Such projects include but may not be limited to roads, fords, bridges, culverts,
water lines, sewer lines, and cables as well as maintenance work on these crossings.
Water dependent uses - those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in inland waters and which
cannot be located away from these waters. The uses include, but are not limited to
commercial and recreational fishing and boating facilities (excluding recreational boat
storage facilities), waterfront dock facilities, boat building facilities, marinas, navigation
aides, basins and channels, uses dependent upon water-borne transportation or
requiring large volumes of cooling or processing water and which cannot reasonably be
located or operated at an inland site, and uses which primarily provide general public
access to waters.
Wetland -- a freshwater wetland.
|
|