Page 1
Town of Monson
Natural Resource Extraction Ordinance
Section 1: Title
This Ordinance shall be known and cited as the "Natural Resource Extraction
Ordinance" of the Town of Monson, Maine.
Section II: Purpose
A.
To protect the short-term and long-term quality and quantity of natural
resources within the Town of Monson;
B.
To ensure that any proposed large-scale resource extraction activity is
subject to appropriate review and approval by the Town of Monson and
the State of Maine;
C.
To establish a regulatory framework for the oversight and management
of natural resources, and to develop management practices governing
the extraction of natural resources to ensure ongoing sustainability and
quality and avoid interruption of supply or degradation in the quality of
natural resources within the Town of Monson;
D.
To protect the general health, safety and welfare and well-being
of all persons dependent on natural resources located in the Town of
Monson;
E.
To ensure that natural resource extraction does not adversely impact or
impair plant, wildlife, wetlands, meadows, and forested areas dependent
on natural resources;
F.
To ensure the ongoing stability and to safeguard the environmental
health of surface land in the conservation of topsoil and agricultural
activities dependent on natural resources;
Page 2
G.
To protect private and public property proximate to and within areas of
natural resources by regulating structures, facilities, and activities
requiring natural resource extraction so there is no undue adverse impact
to new and existing roadways (private or public), due to extraction,
processing, loading, or transport of natural resources;
H.
To minimize, limit and require mitigation and buffering of noise,
vibration, dust, pollution, and other adverse impacts associated with
natural resource extraction activities, including the regulation of
equipment, vehicles, or transport through natural resource areas;
I.
To provide policies promoting fair use of and equitable access to natural
resources.
Section III: Statutory Authority
A.
Title 38 M.R.S.A. §401 etc. seq.
B.
Maine Constitution, Article VIII, and Title 30-A M.R.S.A. §2101 et seq.;
C.
Title 30-A M.R.S.A. §§3001 through 3006.
D.
Title 30-A M.R.S.A. §4311; and
E.
Title 22 M.R.S.A. §2611 et seq.
Section IV: Definitions
In this Ordinance, the words and phrases listed below have the following meanings
unless a contrary meaning is required by the context or is specifically prescribed. Terms
related to natural resources shall be defined in the following order: as defined by State
of Maine Statutes; in accordance with their generally accepted technical meaning within
the applicable scientific disciplines; and their common dictionary definition.
Page 3
Section V: Permits Required/Exceptions/Applications
A.
General
The following provisions are intended to ensure the ongoing sustainability or
quality and quantity of natural resources to members of the general public
within the Town of Monson and to protect the health, safety and well-being of
all persons dependent upon natural resources within the Town of Monson.
B.
Permit Required
Any person seeking to develop or engage in natural resource extraction activities
must first apply for and obtain a land use permit issued by the Planning Board of
the Town of Monson.
C.
Natural Resource Extraction Not Requiring a Permit
The following natural resource extraction activities and uses do not require a
Land Use Permit:
1. Resource extraction associated with agricultural activities for use on
farmlands, agricultural or on silvicultural lands for such purposes in the
immediate vicinity of an extraction point for such activities and use;
2. Resource extraction associated with drinking and domestic water by
private residences located in the Town of Monson;
3. Resource extraction associated with public facilities, schools,
treatment facilities, utilities or similar facilities located in the Town of
Monson;
4. Resource extraction activities associated with public safety;
5. Resource extraction activities currently supporting ongoing residential,
commercial and industrial activities within the Town of Monson, existing
as of the date of the adoption of this Ordinance.
Page 4
D.
Application for Permit
1. Application for Land Use Permits shall be subject to the provisions set
forth in the Town of Monson Land Use Ordinance Section IV, V and VI and
the following application and performance standards.
2. Additional Application and Performance Standards
a. Written application required. Applications for a permit from
the Planning Board to conduct Resource Extraction Activities shall
be in writing and accompanied by detailed site plans and project
descriptions prepared by an appropriately qualified and licensed
professional or Engineer.
b. Right, Title and Interest. Applicants must submit with an
application adequate evidence of the applicant's right, title and
interest in and to the property or properties on which any
resource extraction activity is proposed. Applicants may show
sufficient right, title and interest by providing a copy of a deed
duly recorded in the Piscataquis Registry of Deeds or a copy of the
lease, option, contract or other instrument establishing their
right, title and interest. In all cases, such instruments must be
provided in their entirety and must be submitted with the
application. Reference to purchase price and specific business
sensitive financing terms may be redacted from the
documentation provided.
c. Extraction methods and quantity. Applications shall include a
detailed statement describing the extraction methods proposed
and the total maximum quantity of natural resources to be
extracted within any 24 hour period from the aggregate of all
extraction points as operated by and proposed to be operated by
the same individual/entity, or consortium/association of
individuals or entities. The description and submissions shall
include a detailed summary and maps describing and showing the
locations of all existing and proposed points of extraction and the
proposed and existing methods of extraction, the depth of
extraction methods and a summary description of the
characteristics and type of natural resource.
Page 5
d. Resource use. Applications shall include detailed description of
the proposed use for which the resource is to be extracted,
including a description of the facilities for the use, processing,
transporting, storage, sales or other similar activities with the
proposed extraction activity.
e. Transportation. Applications shall include a description
detailing the means of transportation, transportation vehicles,
and the proposed number of daily trips of the resource extraction
vehicles on specified routes with the Town of Monson to and
from the extraction points. The Planning Board may require a
traffic study to be completed by a qualified, registered traffic or
transportation engineer, retained by the Town of Monson, and
paid for by the applicant.
f. Related applications and documents. Applications shall include
copies of all related applications, exhibits and reports filed with
any other agency or department of the State of Maine or United
States Government, including, but not limited to, the Maine
Department of Environmental Protection, Department of Fisheries
and Wildlife, Maine Forest Service, and Department of Health and
Human Services rules and regulations.
g. Applications shall include a written Environmental Assessment,
addressed to the Town of Monson Planning Board of the property
and the impacted areas.
3. Site Plan
A detailed site plan depicting the following:
a. Dimensions of Property
b. Impacted Areas
c. Identified Natural Resources
Page 6
d. Exiting Public and Private Roads
e. Proposed New Roads
f. Utilities
g. Other Required Information per Land Use Ordinance
4. Traffic Impact Analysis
Traffic Impact Analysis, if required by the Planning Board, shall be
prepared, signed and sealed by a State of Maine certified Engineer with
experience in traffic engineering and modeling. The Analysis shall include
the following:
a. Proposed Route
b. Access to Route
c. Types and Weights of Vehicles
d. Expected Vehicle Trips per Day
e. Peak Hour Volumes
f. Assessment of Load Capability and Volume Capacity of
Road
g. Mitigation Measures to Neighboring Properties
h. Recommended improvements to assure an adequate
level of service on affected streets, if any, to mitigate the
physical degradation of roads sooner than expected life
span.
5. Conditions of Permit
No application for Resource Extraction activities shall be issued until and
unless the Planning Board affirmatively finds that each of the following
performance standards has been or will be met and all other Town of
Monson requirements are met. The burden of proof is solely on the
applicant.
Page 7
a. Technical Expertise and Financial Capability
b. Sustainability of Natural Resources
c. Land Subsidence
d. Monitoring Systems as Appropriate
6. Independent Expert Assistance
If the Planning Board reasonably determines it requires independent
expert assistance to assist in its review of the application, or in evaluating
the substance of the application or in developing appropriate conditions
of approval, it may engage the service of a technical expert to assist the
Board. The applicant shall pay to the Town, in advance of the scheduling
of any public hearing, a sum equal to the estimated cost of the
independent expert. The failure to make payment shall excuse the
reviewing authority from scheduling any further review of the application
by the Planning Board until such payment is made in full.
7. Surety and Terms of Permit
No permit shall be issued without a surely bond or an equivalent and
appropriate security, including anticipated inflation, as determined by the
Planning Board in consultation with the Board of Selectmen to secure a
performance of the activities permitted to an applicant seeking to engage
in resource extraction activities and to ensure compliance with such
conditions as the Planning Board may impose in connection with such
authority. The bond or surety shall be in an amount recommended by
the Board of Selectmen and approved by the Planning Board.
Section VI: When Effective
This article shall become effective immediately upon its adoption and enactment by
vote of the legislative body of the Town of Monson at a duly called Town Meeting.