This is the exact embedded text of the captured official document.
Snapshot 1ad6cd18eb99 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
1
SHORELAND ZONING ORDINANCE
For the Municipality of Montville
Adopted: March 28, 2009
TABLE OF CONTENTS
Page
1. Purposes ........................................................................................................................................................3
2. Authority.......................................................................................................................................................3
3. Applicability .................................................................................................................................................3
4. Effective Date ...............................................................................................................................................3
A. Effective Date of Ordinance ...................................................................................................................3
B. Sections 15(O) and 15(O-1)....................................................................................................................3
5. Availability ...................................................................................................................................................3
6. Severability...................................................................................................................................................4
7. Conflicts with Other Ordinances.................................................................................................................4
8. Amendments.................................................................................................................................................4
9. Districts and Zoning Map ............................................................................................................................4
A. Official Shoreland Zoning Map............................................................................................................4
B. Scale of Map ..........................................................................................................................................4
C. Certification of Official Shoreland Zoning Map .................................................................................4
D. Changes to the Official Shoreland Zoning Map..................................................................................4
10. Interpretation of District Boundaries...........................................................................................................4
11. Land Use Requirements...............................................................................................................................4
12. Non-conformance.........................................................................................................................................5
A. Purpose...................................................................................................................................................5
B. General ...................................................................................................................................................5
C. Non-conforming Structures...................................................................................................................5
D. Non-conforming Uses ...........................................................................................................................7
E. Non-conforming Lots............................................................................................................................7
13. Establishment of Districts............................................................................................................................8
A. Resource Protection District .................................................................................................................8
B. Limited Residential District..................................................................................................................9
14. Table of Land Uses.....................................................................................................................................10
15. Land Use Standards ..................................................................................................................................12
A. Minimum Lot Standards .....................................................................................................................12
B. Principal and Accessory Structures....................................................................................................12
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Beyond the Normal High-Water Line of a Water Body or Within a Wetland ................................14
D. Campgrounds.......................................................................................................................................15
E. Individual Private Campsites .............................................................................................................15
F. Commercial and Industrial Uses.........................................................................................................16
G. Parking Areas.......................................................................................................................................17
H. Roads and Driveways .........................................................................................................................17
I.
Signs .....................................................................................................................................................19
J. Storm Water Runoff ..........................................................................................................................19
K. Septic Waste Disposal ........................................................................................................................20
L. Essential Services ...............................................................................................................................20
M. Mineral Exploration and Extraction ..................................................................................................20
N. Agriculture ...........................................................................................................................................21
2
O. Timber Harvesting ..............................................................................................................................22
O-1 Timber Harvesting - Statewide Standards.........................................................................................23
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ........................30
Q. Erosion and Sedimentation Control ...................................................................................................33
R. Soils......................................................................................................................................................33
S. Water Quality.......................................................................................................................................34
T. Archaeological Site ............................................................................................................................34
16. Administration............................................................................................................................................34
A. Administering Bodies and Agents .....................................................................................................34
B. Permits Required .................................................................................................................................34
C. Permit Application...............................................................................................................................35
D. Procedure for Administering Permits ...............................................................................................35
E. Special Exceptions...............................................................................................................................36
F. Expiration of Permit ............................................................................................................................36
G. Installation of Public Utility Service .................................................................................................37
H. Appeals.................................................................................................................................................37
I.
Enforcement.........................................................................................................................................40
17. Definitions .................................................................................................................................................41
Appendix A.................................................................................................................................................50
3
Shoreland Zoning Ordinance for the Municipality of Montville
_____________________________
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird
and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to
protect archaeological and historic resources; to protect freshwater wetlands; to control building sites,
placement of structures and land uses; to conserve shore cover, and visual as well as actual points of
access to inland waters; to conserve natural beauty and open space; and to anticipate and respond to
the impacts of development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
-
normal high-water line of any great pond or river, or
-
upland edge of a freshwater wetland,
and all land areas within 75 feet, horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or other
structure extending or located below the normal high-water line of a water body or within a wetland.
4. Effective Date
A. Effective Date of Ordinance and Repeal of Formerly Adopted Ordinance. This Ordinance,
which was adopted by the municipal legislative body on March 28, 2009, shall not be effective unless
approved by the Commissioner of the Department of Environmental Protection. A certified copy of
the Ordinance, attested and signed by the Municipal Clerk, shall be forwarded to the Commissioner
for approval. If the Commissioner fails to act on this Ordinance within forty-five (45) days of his/her
receipt of the Ordinance, it shall be automatically approved. Upon approval of this Ordinance by the
Commissioner of the Department of Environmental Protection, the Shoreland Zoning Ordinance for
the Municipality of Montville adopted on March 23, 1991 and revised on March 28, 1992 is hereby
repealed.
Any application for a permit submitted to the municipality within the forty-five (45) day period shall
be governed by the terms of this Ordinance, if the Ordinance is approved by the Commissioner.
B. Sections 15(O) and 15(O-1). Section 15(O) is repealed on the statutory date established under
38 M.R.S.A. section 438-B (5), at which time Section 15(O-1) shall become effective. Until such
time as Section 15(O) is repealed, Section 15(O-1) is not in effect.
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at reasonable
cost at the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
4
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute
administered by the municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote at the town meeting. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of
the Department of Environmental Protection following adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on
any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Shoreland Zoning Map(s) which is
(are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1
inch = 2000 feet. District boundaries shall be clearly delineated and a legend indicating the
symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall be
certified by the attested signature of the Municipal Clerk and shall be located in the municipal
office. In the event the municipality does not have a municipal office, the Municipal Clerk shall
be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with Section 8,
are made in the district boundaries or other matter portrayed on the Official Shoreland Zoning
Map, such changes shall be made on the Official Shoreland Zoning Map within thirty (90) days
after the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland Zoning
Map, district boundary lines are property lines, the centerlines of streets, roads and rights of way, and
the boundaries of the shoreland area as defined herein. Where uncertainty exists as to the exact
location of district boundary lines, the Board of Appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in conformity with
all of the regulations herein specified for the district in which it is located, unless a variance is
granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except as
5
otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and
the new owner may continue the non-conforming use or continue to use the non-conforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations that do
not involve expansion of the non-conforming use or structure, and such other changes in a
non-conforming use or structure as federal, state, or local building and safety codes may
require.
NOTE: See Section 17 for the definitions of non-conforming structures, non-conforming uses and non-
conforming lots.
C. Non-conforming Structures
(1) Expansions. A non-conforming structure may be added to or expanded after obtaining a
permit from the same permitting authority as that for a new structure, if such addition or
expansion does not increase the non-conformity of the structure and is in accordance with
subparagraphs (a) and (b) below.
(a) After January 1, 1989 if any portion of a structure is less than the required setback from
the normal high-water line of a water body or tributary stream or the upland edge of a
wetland, that portion of the structure shall not be expanded, as measured in floor area or
volume, by 30% or more, during the lifetime of the structure. If a replacement structure
conforms with the requirements of Section 12(C)(3), and is less than the required setback
from a water body, tributary stream or wetland, the replacement structure may not be
expanded if the original structure existing on January 1, 1989 had been expanded by 30%
in floor area and volume since that date.
(b) Whenever a new, enlarged, or replacement foundation is constructed under a non-
conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 12(C)(2)
Relocation, below. If the completed foundation does not extend beyond the exterior
dimensions of the structure, except for expansion in conformity with Section 12(C)(1)(a)
above, and the foundation does not cause the structure to be elevated by more than three
(3) additional feet, as measured from the uphill side of the structure (from original ground
level to the bottom of the first floor sill), it shall not be considered to be an expansion of
the structure.
(2) Relocation. A non-conforming structure may be relocated within the boundaries of the parcel
on which the structure is located provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the Planning Board or its
designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
6
the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for septic
systems, and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation. In addition, the area from which the relocated
structure was removed must be replanted with vegetation. Replanting shall be required as
follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one native
tree, three (3) feet in height, for every tree removed. If more than five trees are planted,
no one species of tree shall make up more than 50% of the number of trees planted.
Replaced trees must be planted no further from the water or wetland than the trees that
were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged, or
removed must be reestablished within the setback area. The vegetation and/or ground
cover must consist of similar native vegetation and/or ground cover that was disturbed,
destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees, or
a combination thereof.
(3) Reconstruction or Replacement. Any non-conforming structure which is located less than the
required setback from a water body, tributary stream, or wetland and which is removed, or
damaged or destroyed, regardless of the cause, by more than 50% of the market value of the
structure before such damage, destruction or removal, may be reconstructed or replaced
provided that a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in compliance
with the water body, tributary stream or wetland setback requirement to the greatest practical
extent as determined by the Planning Board or its designee in accordance with the purposes of
this Ordinance. In no case shall a structure be reconstructed or replaced so as to increase its non-
conformity. If the reconstructed or replacement structure is less than the required setback it shall
not be any larger than the original structure, except as allowed pursuant to Section 12(C)(1)
above, as determined by the non-conforming floor area and volume of the reconstructed or
replaced structure at its new location. If the total amount of floor area and volume of the
original structure can be relocated or reconstructed beyond the required setback area, no portion
of the relocated or reconstructed structure shall be replaced or constructed at less than the
setback requirement for a new structure. When it is necessary to remove vegetation in order to
replace or reconstruct a structure, vegetation shall be replanted in accordance with Section
12(C)(2) above.
Any non-conforming structure which is located less than the required setback from a water body,
tributary stream, or wetland and which is removed by 50% or less of the market value, or
damaged or destroyed by 50% or less of the market value of the structure, excluding normal
7
maintenance and repair, may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(2) above, the physical condition and type of foundation present, if any.
(4) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may not
be changed to another use unless the Planning Board, after receiving a written application,
determines that the new use will have no greater adverse impact on the water body, tributary
stream, or wetland, or on the subject or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health and
safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover,
visual and actual points of public access to waters, natural beauty, floodplain management,
archaeological and historic resources, and functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1)(a) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning Board may, for
good cause shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure provided that the
structure has been used or maintained for residential purposes during the preceding five (5)
year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-conforming
use provided that the proposed use has no greater adverse impact on the subject and adjacent
properties and resources than the former use, as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria listed in
Section 12(C)(4) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width or shore frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure exists
on each lot, the non-conforming lots may be conveyed separately or together, provided that
8
the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the
State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be as
conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are in
single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on March 23, 1991 and recorded in the
registry of deeds if the lot is served by a public sewer or can accommodate a subsurface
sewage disposal system in conformance with the State of Maine Subsurface Wastewater
Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot
area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
the limits of the shoreland zone except that areas which are currently developed need not be
included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands and
wetlands associated with great ponds and rivers, which are rated "moderate" or "high" value
waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic
Information System (GIS) data layer maintained by either MDIF&W or the Department as of
May 1, 2006. For the purposes of this paragraph "wetlands associated with great ponds and
rivers" shall mean areas characterized by non-forested wetland vegetation and hydric soils
that are contiguous with a great pond or river, and have a surface elevation at or below the
water level of the great pond or river during the period of normal high water. "Wetlands
associated with great ponds or rivers" are considered to be part of that great pond or river.
NOTE: The Natural Resources Protection Act, 38 M.S.R.A. sections 480-A through 480-Z,
requires the Department of Environmental Protection to designate areas of "significant
wildlife habitat". Significant wildlife habitat includes:
Habitat for species appearing on the official state or federal lists of endangered or
threatened species; high and moderate value deer wintering areas and travel corridors as
9
defined by the Department of Inland Fisheries and Wildlife; high and moderate value
waterfowl and wading bird habitats, including nesting and feeding areas as defined by the
Department of Inland Fisheries and Wildlife; critical spawning and nursery areas for
Atlantic sea run salmon as defined by the Atlantic Sea Run Salmon Commission; and
shorebird nesting, feeding and staging areas and seabird nesting islands as defined by the
Department of Inland Fisheries and Wildlife.
(2) Floodplains along rivers and floodplains along artificially formed great ponds along rivers,
defined by the 100 year floodplain as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood
of record, or in the absence of these, by soil types identified as recent floodplain soils.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater wetland as defined, and which are not surficially connected
to a water body during the period of normal high water.
NOTE: These areas usually consist of forested wetlands abutting water bodies and non-forested
wetlands.
(5) Land areas along rivers subject to severe bank erosion, undercutting, or riverbed movement.
B. Limited Residential District. The Limited Residential District includes those areas suitable for
residential and recreational development. It includes areas other than those in the Resource
Protection District.
The areas to which this Ordinance is applicable are hereby divided into the following districts as shown on the
Official Shoreland Zoning Map, which is made a part of this Ordinance:
Resource Protection
Kingdom Bog,
Bartlett Stream, Thompson Stream
Mud Pond
and certain streams and wetlands as designated on the Official
Shoreland Zoning Map (See appendix A)
Limited Residential
Sheepscot River, Trues Pond
Sandy Pond, Ledge Pond
Halfmoon Stream, Halldale Stream, George River
and certain streams and wetlands as designated on the Official
Shoreland Zoning Map (See appendix A)
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the Shoreland
Zone, shall conform with all of the applicable land use standards in Section 15. The district
designation for a particular site shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
10
Yes -
Allowed (no permit required but the use must comply with all applicable land use
standards)
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI -
Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP -
Resource Protection
LR -
Limited Residential
11
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
RP
LR
1. Non-intensive recreational uses not requiring structures such as
hunting, fishing and hiking
yes
yes
2. Motorized vehicular traffic on existing roads and trails
yes
yes
3. Forest management activities except for timber harvesting & land
management roads
yes
yes
4. Timber harvesting
CEO
yes
5.Clearing or removal of vegetation for activities other than timber harvesting
CEO
1
yes
6. Fire prevention activities
yes
yes
7. Wildlife management practices
yes
yes
8. Soil and water conservation practices
yes
yes
9. Mineral exploration
yes
2
yes
2
10. Mineral extraction including sand and gravel extraction
PB
3
PB
11. Surveying and resource analysis
yes
yes
12. Emergency operations
yes
yes
13. Agriculture
PB
yes
14. Aquaculture
PB
PB
15. Principal structures and uses
A. One and two family residential, including driveways
PB
9
CEO
B. Multi-unit residential
no
PB
C. Commercial
no
10
no
10
D. Industrial
no
no
E. Governmental and institutional
no
PB
F. Small non-residential facilities for educational, scientific, or nature
interpretation purposes
PB
CEO
16. Structures accessory to allowed uses
PB
CEO
17.
Piers, docks, wharfs, bridges and other structures and uses extending over or
below the normal high-water line or within a wetland
a. Temporary
b. Permanent
CEO
11
PB
CEO
11
PB
18. Conversions of seasonal residences to year-round residences
no
LPI
19. Home occupations
PB
PB
20. Private sewage disposal systems for allowed uses
LPI
LPI
21. Essential services
PB
6
PB
A. Roadside distribution lines (34.5kV and lower)
CEO6
yes12
B. Non-roadside or cross-country distribution lines involving ten poles or less in the
shoreland zone
PB6
CEO
C. Non-roadside or cross-country distribution lines involving eleven or more poles in
the shoreland zone
PB
6
PB
D. Other essential services
PB6
PB
22. Service drops, as defined, to allowed uses
yes
yes
23. Public and private recreational areas involving minimal structural development
PB
PB
24. Individual, private campsites
CEO
CEO
25. Campgrounds
no
7
PB
26. Road construction
no
8
PB
27. Land management roads
PB
yes
28. Parking facilities
no
7
PB
29. Marinas
no
PB
30. Filling and earth moving of <10 cubic yards
CEO
yes
31. Filling and earth moving of >10 cubic yards
PB
CEO
32. Signs
yes
yes
33. Uses similar to allowed uses
PB
PB
34. Uses similar to uses requiring a CEO permit
PB
PB
35. Uses similar to uses requiring a PB permit
PB
PB
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses only (See note on previous page).
6See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
8Except as provided in Section 15(H)(3)
9Single family residential structures may be allowed by special exception only according to the provisions of Section 16(E), Special
Exceptions. Two-family residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
12
11Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to
38 M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater wetland, great pond, river, stream or brook and
operates in such a manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B.
Draining or otherwise dewatering;
C.
Filling, including adding sand or other material to a sand dune; or
D.
Any construction or alteration of any permanent structure.
15. Land Use Standards. All land use activities within the shoreland zone shall conform with the
following provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
(1)
(a) Residential per dwelling unit
40,000
200
(b) Governmental, Institutional, Commercial
or Industrial per principal structure
60,000
300
(c) Public and Private Recreational Facilities
40,000
200
(2) Land below the normal high-water line of a water body or upland edge of a wetland and land
beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial or
industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit, principal
structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high-water line of great ponds classified GPA and rivers
that flow to great ponds classified GPA, and seventy-five (75) feet, horizontal distance, from
the normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland. In the Resource Protection District the setback requirement shall be 250 feet,
horizontal distance, except for structures, roads, parking spaces or other regulated objects
specifically allowed in that district in which case the setback requirements specified above shall
apply.
In addition:
13
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
(b) On a non-conforming lot of record on which only a residential structure exists, and it is not
possible to place an accessory structure meeting the required water body, tributary stream
or wetland setbacks, the code enforcement officer may issue a permit to place a single
accessory structure, with no utilities, for the storage of yard tools and similar equipment.
Such accessory structure shall not exceed eighty (80) square feet in area nor eight (8) feet
in height, and shall be located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and vegetation clearing
limitations. In no case shall the structure be located closer to the shoreline or tributary
stream than the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are permitted in
the Resource Protection Districts and Limited Residential Districts shall not exceed thirty-five
(35) feet in height. This provision shall not apply to structures such as transmission towers,
windmills, antennas, and similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of record,
or in the absence of these, the flood as defined by soil types identified as recent flood-plain
soils. In those municipalities that participate in the National Flood Insurance Program and have
adopted the April 2005 version, or later version, of the Floodplain Management Ordinance,
accessory structures may be placed in accordance with the standards of that ordinance and need
not meet the elevation requirements of this paragraph.
(4) The total footprint area of all structures, parking lots and other non-vegetated surfaces, within
the shoreland zone shall not exceed twenty (20) percent of the lot or a portion thereof, located
within the shoreland zone, including land area previously developed.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is (are) at least 25 feet, horizontal distance, from the normal high-water line
of a water body, tributary stream, or upland edge of a wetland;
(b) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(c) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on rivers, streams,
wetlands, and tributary streams, as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the
flood of record, or in the absence of these, by soil types identified as recent flood plain
soils.
14
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high-water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation. Where
natural ground cover is lacking the area must be supplemented with leaf or bark
mulch;
(ii)Vegetation plantings must be in quantities sufficient to retard erosion and provide for
effective infiltration of stormwater runoff;
(iii)
Only native species may be used to establish the buffer area;
(iv)
A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
(v)
A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the
buffer;
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal distance, of a
water body, tributary stream or wetland, a permit pursuant to the Natural Resource
Protection Act is required from the Department of Environmental Protection.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed
with a permit from the Code Enforcement Officer, to provide shoreline access in areas of steep
slopes or unstable soils provided: that the structure is limited to a maximum of four (4) feet in
width; that the structure does not extend below or over the normal high-water line of a water
body or upland edge of a wetland, (unless permitted by the Department of Environmental
Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C); and
that the applicant demonstrates that no reasonable access alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Beyond
the Normal High-Water Line of a Water Body or Within a Wetland.
(1) Access from shore shall be developed on soils appropriate for such use and constructed so as to
control erosion.
(2) The location shall not interfere with existing developed or natural beach areas.
(3) The facility shall be located so as to minimize adverse effects on fisheries.
(4) The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or wharf
shall not be wider than six feet for non-commercial uses.
15
(5) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure
extending beyond the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland as an operational necessity.
(6) New permanent piers and docks shall not be permitted unless it is clearly demonstrated to the
Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained
from the Department of Environmental Protection, pursuant to the Natural Resources Protection
Act.
(7) No existing structures built on, over or abutting a pier, dock, wharf or other structure extending
beyond the normal high-water line of a water body or within a wetland shall be converted to
residential dwelling units in any district.
(8) Except in the General Development Districts, structures built on, over or abutting a pier, wharf,
dock or other structure extending beyond the normal high-water line of a water body or within a
wetland shall not exceed twenty (20) feet in height above the pier, wharf, dock or other
structure.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land
area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds
are allowed provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be
permitted.
(2) Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet, horizontal distance, from the normal high-
water line of a great pond classified GPA or river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland.
(3) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no structure
except a canopy shall be attached to the recreational vehicle.
(4) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a
Resource Protection District shall be limited to one thousand (1000) square feet.
16
(5) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or
landowner is required.
(6) When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with the
State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
F. Commercial and Industrial Uses. The following new commercial and industrial uses are
prohibited within the shoreland zone adjacent to great ponds classified GPA, and rivers and
streams which flow to great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts
normally associated with individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except storage on same property as use
occurs and except for storage and sales associated with marinas
(11) Photographic processing
(12) Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities shall be no less than fifty (50) feet,
horizontal distance, from the shoreline or tributary stream if the Planning Board finds that no
other reasonable alternative exists further from the shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and
where feasible, to retain all runoff on-site.
17
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except
that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance, from
the normal high-water line of a great pond classified GPA or a river that flows to a great pond
classified GPA, and seventy-five (75) feet, horizontal distance from the normal high-water line
of other water bodies, tributary streams, or the upland edge of a wetland unless no reasonable
alternative exists as determined by the Planning Board. If no other reasonable alternative
exists, the road and/or driveway setback requirement shall be no less than fifty (50) feet,
horizontal distance, upon clear showing by the applicant that appropriate techniques will be
used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the effective use of
additional ditch relief culverts and turnouts placed so as to avoid sedimentation of the water
body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope above
twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways that
provide access to permitted structures and facilities located nearer to the shoreline or tributary
stream due to an operational necessity, excluding temporary docks for recreational uses. Roads
and driveways providing access to permitted structures within the setback area shall comply
fully with the requirements of Section 15(H)(1) except for that portion of the road or driveway
necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of their
setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route or
location is available outside the district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section 15(Q).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
18
maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal high-
water line of a water body, tributary stream, or upland edge of a wetland. Surface drainage
that is directed to an unscarified buffer strip shall be diffused or spread out to promote
infiltration of the runoff and to minimize channelized flow of the drainage through the buffer
strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular to
the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning, and their inlet and outlet ends shall be stabilized with appropriate
materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
I
Signs. The following provisions shall govern the use of signs in the Resource Protection Districts
and Limited Residential Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such
signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. Signs relating to goods or services not sold or rendered on the premises shall be
prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and
shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
19
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff from
the site in excess of the natural predevelopment conditions. Where possible, existing natural
runoff control features, such as berms, swales, terraces and wooded areas, shall be retained in
order to reduce runoff and encourage infiltration of stormwater.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full permit to
be obtained from the DEP prior to construction of a project consisting of 20,000 square
feet or more of impervious area or 5 acres or more of a developed area in an urban
impaired stream watershed or most-at-risk lake watershed, or a project with 1 acre or
more of developed area in any other stream or wetland watershed. A permit-by-rule is
necessary for a project with one acre or more of disturbed area but less than 1 acre
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams)
and less than 5 acres of developed area. Furthermore, a Maine Construction General
Permit is required if the construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following:
a) clearing or removal
of woody vegetation necessary to site a new system and any associated fill extensions, shall
not extend closer than seventy-five (75) feet, horizontal distance, from the normal high-water
line of a water body or the upland edge of a wetland and b) a holding tank is not allowed for a
first-time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill
extensions, to be constructed no less than one hundred (100) horizontal feet from the normal
high-water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than roadside distribution lines, is not allowed in a
Resource Protection District, except to provide services to a permitted use within said district,
or except where the applicant demonstrates that no reasonable alternative exists. Where
20
allowed, such structures and facilities shall be located so as to minimize any adverse impacts
on surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of
mineral resources shall be accomplished by hand sampling, test boring, or other methods which
create minimal disturbance of less than one hundred (100) square feet of ground surface. A
permit from the Code Enforcement Officer shall be required for mineral exploration that exceeds
the above limitation. All excavations, including test pits and holes, shall be immediately capped,
filled or secured by other equally effective measures to restore disturbed areas and to protect the
public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(3) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall be
permitted within one hundred (100) feet, horizontal distance, of the normal high-water line of
a great pond classified GPA or a river flowing to a great pond classified GPA, and within
seventy-five (75) feet, horizontal distance, of the normal high-water line of any other water
body, tributary stream, or the upland edge of a wetland. Extraction operations shall not be
permitted within fifty (50) feet, horizontal distance, of any property line without written
permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred (100)
cubic yards of materials are removed in any consecutive twelve (12) month period, ground
levels and grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid waste
management rules, Chapters 400-419 of the Department of Environmental Protection's
regulations may contain other applicable provisions regarding disposal of such materials.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
N. Agriculture
21
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the Maine Department of Agriculture on November 1, 2001, and the
Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance,
of a great pond classified GPA or a river flowing to a great pond classified GPA, or within
seventy-five (75) feet horizontal distance, of other water bodies, tributary streams, or
wetlands. All manure storage areas within the shoreland zone must be constructed or
modified such that the facility produces no discharge of effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of the
normal high-water line of a great pond classified GPA; within seventy-five (75) feet,
horizontal distance, from other water bodies; nor within twenty-five (25) feet, horizontal
distance, of tributary streams and wetlands. Operations in existence on the effective date of
this ordinance and not in conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high-water line of a great pond classified GPA; within
seventy-five (75) feet, horizontal distance, of other water bodies; nor within twenty-five (25)
feet, horizontal distance, of tributary streams and wetlands. Livestock grazing associated
with ongoing farm activities, and which are not in conformance with the above setback
provisions may continue, provided that such grazing is conducted in accordance with a
Conservation Plan.
O. Timber Harvesting
(1) In a Resource Protection District abutting a great pond, timber harvesting shall be limited to
the following:
(a) Within the strip of land extending 75 feet, horizontal distance, inland from the normal
high-water line, timber harvesting may be conducted when the following conditions are
met:
(1) The ground is frozen;
(2) There is no resultant soil disturbance;
(3) The removal of trees is accomplished using a cable or boom and there is no entry of
tracked or wheeled vehicles into the 75-foot strip of land;
(4) There is no cutting of trees less than 6 inches in diameter; no more than 30% of the
trees 6 inches or more in diameter, measured at 4½ feet above ground level, are cut in
any 10-year period; and a well-distributed stand of trees and other natural vegetation
remains; and
(5) A licensed professional forester has marked the trees to be harvested prior to a permit
being issued by the municipality.
(b) Beyond the 75-foot strip referred to in Section 15(O)(1)(a) above, timber harvesting is
permitted in accordance with paragraph 2 below except that in no case shall the average
22
residual basal area of trees over 4 ½ inches in diameter at 4 1/2 feet above ground level
be reduced to less than 30 square feet per acre.
(2) Except in areas as described in Section 15(O)(1) above, timber harvesting shall conform with
the following provisions:
(a) Selective cutting of no more than forty (40) percent of the total volume of trees four (4)
inches or more in diameter measured at 4 1/2 feet above ground level on any lot in any
ten (10) year period is permitted. In addition:
(i) Within one-hundred (100) feet, horizontal distance, of the normal high-water line of a
great pond classified GPA or a river flowing to a great pond classified GPA, and
within seventy-five (75) feet, horizontal distance, of the normal high-water line of
other water bodies, tributary streams, or the upland edge of a wetland, there shall be
no clearcut openings and a well-distributed stand of trees and other vegetation,
including existing ground cover, shall be maintained.
(ii) At distances greater than one-hundred (100) feet, horizontal distance, of a great pond
classified GPA or a river flowing to a great pond classified GPA, and greater than
seventy-five (75) feet, horizontal distance, of the normal high-water line of other
water bodies or the upland edge of a wetland, harvesting operations shall not create
single clearcut openings greater than ten-thousand (10,000) square feet in the forest
canopy. Where such openings exceed five thousand (5000) square feet they shall be
at least one hundred (100) feet, horizontal distance, apart. Such clearcut openings
shall be included in the calculation of total volume removal. Volume may be
considered to be equivalent to basal area.
(b) Timber harvesting operations exceeding the 40% limitation in Section 15(O)(2)(a) above,
may be allowed by the planning board upon a clear showing, including a forest
management plan signed by a Maine licensed professional forester, that such an
exception is necessary for good forest management and will be carried out in accordance
with the purposes of this Ordinance. The planning board shall notify the Commissioner
of the Department of Environmental Protection of each exception allowed, within
fourteen (14) days of the planning board's decision.
(c) No accumulation of slash shall be left within fifty (50) feet, horizontal distance, of the
normal high-water line of a water body. In all other areas slash shall either be removed
or disposed of in such a manner that it lies on the ground and no part thereof extends
more than four (4) feet above the ground. Any debris that falls below the normal high-
water line of a water body or tributary stream shall be removed.
(d) Timber harvesting equipment shall not use stream channels as travel routes except when:
(i) Surface waters are frozen; and
(ii) The activity will not result in any ground disturbance.
(e) All crossings of flowing water shall require a bridge or culvert, except in areas with low
banks and channel beds which are composed of gravel, rock or similar hard surface
which would not be eroded or otherwise damaged.
(f) Skid trail approaches to water crossings shall be located and designed so as to prevent
water runoff from directly entering the water body or tributary stream. Upon completion
23
of timber harvesting, temporary bridges and culverts shall be removed and areas of
exposed soil revegetated.
(g) Except for water crossings, skid trails and other sites where the operation of machinery
used in timber harvesting results in the exposure of mineral soil shall be located such that
an unscarified strip of vegetation of at least seventy-five (75) feet, horizontal distance, in
width for slopes up to ten (10) percent shall be retained between the exposed mineral soil
and the normal high-water line of a water body or upland edge of a wetland. For each ten
(10) percent increase in slope, the unscarified strip shall be increased by twenty (20) feet,
horizontal distance. The provisions of this paragraph apply only to a face sloping toward
the water body or wetland, provided, however, that no portion of such exposed mineral
soil on a back face shall be closer than twenty five (25) feet, horizontal distance, from the
normal high-water line of a water body or upland edge of a wetland.
O-1.
Timber Harvesting - Statewide Standards [Effective on effective date established in
Section 4(B)]
(1) Shoreline integrity and sedimentation.
Persons conducting timber harvesting and related
activities must take reasonable measures to avoid the disruption of shoreline integrity, the
occurrence of sedimentation of water, and the disturbance of water body and tributary stream
banks, water body and tributary stream channels, shorelines, and soil lying within water
bodies, tributary streams and wetlands. If, despite such precautions, the disruption of
shoreline integrity, sedimentation of water, or the disturbance of water body and tributary
stream banks, water body and tributary stream channels, shorelines, and soil lying within
water bodies, tributary streams and wetlands occurs, such conditions must be corrected.
(2) Slash treatment. Timber harvesting and related activities shall be conducted such that slash
or debris is not left below the normal high-water line of any water body or tributary stream,
or the upland edge of a wetland. Section 15(O-1)(2) does not apply to minor, incidental
amounts of slash that result from timber harvesting and related activities otherwise conducted
in compliance with this section.
(a) Slash actively used to protect soil from disturbance by equipment or to stabilize exposed
soil, may be left in place, provided that no part thereof extends more than 4 feet above the
ground.
(b) Adjacent to great ponds, rivers and wetlands:
(i) No accumulation of slash shall be left within 50 feet, horizontal distance, of the
normal high-water line or upland edge of a wetland; and
(ii) Between 50 feet and 250 feet, horizontal distance, of the normal high-water line or
upland edge of a wetland, all slash larger than 3 inches in diameter must be disposed
of in such a manner that no part thereof extends more than 4 feet above the ground.
(3) Timber harvesting and related activities must leave adequate tree cover and shall be
conducted so that a well-distributed stand of trees is retained. This requirement may be
satisfied by following one of the following three options:
(a) Option 1 (40% volume removal), as follows:
24
(i) Harvesting of no more than 40 percent of the total volume on each acre of trees 4.5
inches DBH or greater in any 10 year period is allowed. Volume may be considered
to be equivalent to basal area;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including
existing ground cover, must be maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of rivers, streams,
and great ponds, and within 75 feet, horizontal distance, of the upland edge of a
wetland, there must be no cleared openings. At distances greater than 75 feet,
horizontal distance, of the normal high-water line of a river or great pond or upland
edge of a wetland, timber harvesting and related activities must not create single
cleared openings greater than 14,000 square feet in the forest canopy. Where such
openings exceed 10,000 square feet, they must be at least 100 feet, horizontal
distance, apart. Such cleared openings will be included in the calculation of total
volume removal. Volume may be considered equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as follows:
(i) The residual stand must contain an average basal area of at least 60 square feet per
acre of woody vegetation greater than or equal to 1.0 inch DBH, of which 40 square
feet per acre must be greater than or equal to 4.5 inches DBH;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including
existing ground cover, must be maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of water bodies and
within 75 feet, horizontal distance, of the upland edge of wetlands, there must be no
cleared openings. At distances greater than 75 feet, horizontal distance, of the normal
high-water line of a river or great pond, or upland edge of a wetland, timber
harvesting and related activities must not create single cleared openings greater than
14,000 square feet in the forest canopy. Where such openings exceed 10,000 square
feet, they must be at least 100 feet, horizontal distance, apart. Such cleared openings
will be included in the calculation of the average basal area. Volume may be
considered equivalent to basal area.
(c) Option 3 (Outcome based), which requires: An alternative method proposed in an
application, signed by a Licensed Forester or certified wildlife professional, submitted by
the landowner or designated agent to the State of Maine Department of Conservation's
Bureau of Forestry (Bureau) for review and approval, which provides equal or better
protection of the shoreland area than this rule.
Landowners must designate on the Forest Operations Notification form required by 12 M.R.S.A.
chapter 805, subchapter 5 which option they choose to use. If landowners choose Option 1 or
Option 2, compliance will be determined solely on the criteria for the option chosen. If
landowners choose Option 3, timber harvesting and related activities may not begin until the
Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is retained
through a field procedure that uses sample plots that are located randomly or systematically to
provide a fair representation of the harvest area.
25
(4) Skid trails, yards, and equipment operation. This requirement applies to the construction,
maintenance, and use of skid trails and yards in shoreland areas.
(a) Equipment used in timber harvesting and related activities shall not use river, stream or
tributary stream channels as travel routes except when surface waters are frozen and snow
covered, and the activity will not result in any ground disturbance.
(b) Skid trails and yards must be designed and constructed to prevent sediment and concentrated
water runoff from entering a water body, tributary stream, or wetland. Upon termination of
their use, skid trails and yards must be stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of mineral soil within 25 feet,
horizontal distance, of any water body, tributary stream, or wetland. On slopes of 10
percent or greater, the setback for equipment operation must be increased by 20 feet,
horizontal distance, plus an additional 10 feet, horizontal distance, for each 5 percent
increase in slope above 10 percent. Where slopes fall away from the resource, no
increase in the 25-foot setback is required.
(ii) Where such setbacks are impracticable, appropriate techniques shall be used to avoid
sedimentation of the water body, tributary stream or wetland. Such techniques may
include the installation of sump holes or settling basins, and/or the effective use of
additional ditch relief culverts and ditch water turnouts placed to avoid sedimentation of
the water body, tributary stream, or wetland. If, despite such precautions, sedimentation
or the disruption of shoreline integrity occurs, such conditions must be corrected.
(5) Land Management Roads. Land management roads, including approaches to crossings of water
bodies, tributary stream channels, and wetlands, ditches and other related structures, must be
designed, constructed, and maintained to prevent sediment and concentrated water runoff from
directly entering the water body, tributary stream or wetland. Surface water on or adjacent to
water crossing approaches must be diverted through vegetative filter strips to avoid sedimentation
of the watercourse or wetland. Because roadside ditches may not extend to the resource being
crossed, vegetative filter strips must be established in accordance with the setback requirements
in Section 15(O-1)(7) of this rule.
(a) Land management roads and associated ditches, excavation, and fill must be set back at least:
(i) 100 feet, horizontal distance, from the normal high-water line of a great pond, river or
wetland;
(ii) 50 feet, horizontal distance, from the normal high-water line of streams; and
(iii) 25 feet, horizontal distance, from the normal high-water line of tributary streams
(b) The minimum 100 foot setback specified in Section 15(O-1)(5)(a)(i) above may be reduced to
no less than 50 feet, horizontal distance, and the 50 foot setback specified in Section 15(O-
1)(5)(a)(ii) above may be reduced to no less than 25 feet, horizontal distance, if, prior to
construction, the landowner or the landowner's designated agent demonstrates to the
Planning Board's satisfaction that no reasonable alternative exists and that appropriate
techniques will be used to prevent sedimentation of the water body, tributary stream, or
wetland. Such techniques may include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief culverts and turnouts placed to avoid
26
sedimentation of the water body, tributary stream or wetland. If, despite such precautions,
sedimentation or the disruption of shoreline integrity occurs, such conditions must be
corrected.
(c) On slopes of 10 percent or greater, the land management road setback must be increased by at
least 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5
percent increase in slope above 10 percent.
(d) New land management roads are not allowed within the shoreland area along Significant
River Segments as identified in 38 M.R.S.A. section 437, nor in a Resource Protection
District, unless, prior to construction, the landowner or the landowner's designated agent
makes a clear demonstration to the Planning Board's satisfaction that no reasonable
alternative route exists outside the shoreland zone, and that the new road must be set back as
far as practicable from the normal high-water line and screened from the river by existing
vegetation.
(e) Ditches, culverts, bridges, dips, water turnouts and other water control installations associated
with roads must be maintained on a regular basis to assure effective functioning. Drainage
structures shall deliver a dispersed flow of water into an unscarified filter strip no less than
the width indicated in the setback requirements in Section 15(O-1)(7). Where such a filter
strip is impracticable, appropriate techniques shall be used to avoid sedimentation of the
water body, tributary stream, or wetland. Such techniques may include the installation of
sump holes or settling basins, and/or the effective use of additional ditch relief culverts and
ditch water turnouts placed to avoid sedimentation of the water body, tributary stream, or
wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
(f) Road closeout and discontinuance. Maintenance of the water control installations required in
Section 15(O-1)(5)(e) must continue until use of the road is discontinued and the road is put
to bed by effective installation of water bars or other adequate road drainage structures at
appropriate intervals, constructed to avoid surface water flowing over or under the water bar,
and extending a sufficient distance beyond the traveled way so that water does not reenter the
road surface.
(g) Upgrading existing roads. Extension or enlargement of presently existing roads must conform
to the provisions of Section 15(O-1). Any nonconforming existing road may continue to exist
and to be maintained, as long as the nonconforming conditions are not made more
nonconforming.
(h) Exception. Extension or enlargement of presently existing roads need not conform to the
setback requirements of Section 15(O-1)(5)(a) if, prior to extension or enlargement, the
landowner or the landowner's designated agent demonstrates to the Planning Board's
satisfaction that no reasonable alternative exists and that appropriate techniques will be used
to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the effective use
of additional ditch relief culverts and turnouts placed to avoid sedimentation of the water
body, tributary stream, or wetland. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions must be corrected.
(i) Additional measures. In addition to the foregoing minimum requirements, persons
undertaking construction and maintenance of roads and river, stream and tributary stream
crossings must take reasonable measures to avoid sedimentation of surface waters.
27
(6) Crossings of waterbodies. Crossings of rivers, streams, and tributary streams must allow for fish
passage at all times of the year, must not impound water, and must allow for the maintenance of
normal flows.
(a) Determination of flow. Provided they are properly applied and used for the circumstances for
which they are designed, methods including but not limited to the following are acceptable as
a means of calculating the 10 year and 25 year frequency water flows and thereby
determining water crossing sizes as required in Section 15(O-1): The United States
Geological Survey (USGS) Methods; specifically: Hodgkins, G. 1999. Estimating the
Magnitude of Peak Flows for Streams in Maine for Selected Recurrence Intervals. U.S.
Geological Survey. Water Resources Investigations Report 99-4008. 45 pp.
(b) Upgrading existing water crossings. Extension or enlargement of presently existing water
crossings must conform to the provisions of Section 15(O-1). Any nonconforming existing
water crossing may continue to exist and be maintained, as long as the nonconforming
conditions are not made more nonconforming; however, any maintenance or repair work
done below the normal high-water line must conform to the provisions of Section 15(O-1).
(c) Other Agency Permits. Any timber harvesting and related activities involving the design,
construction, and maintenance of crossings on waterbodies other than a river, stream or
tributary stream may require a permit from the Land Use Regulation Commission, the
Department of Environmental Protection, or the US Army Corps of Engineers.
(d) Any timber harvesting and related activities involving the design, construction, and
maintenance of crossings of wetlands identified by the Department of Inland Fisheries and
Wildlife as essential wildlife habitat require prior consultation with the Department of Inland
Fisheries and Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water crossing construction maintenance,
alteration and replacement activities in shoreland areas must be given to the Bureau prior to
the commencement of such activities. Such notice must contain all information required by
the Bureau, including:
(i)
a map showing the location of all proposed permanent crossings;
(ii)
the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires a permit from state or federal
agencies, a copy of the approved permit or permits; and
(iv) a statement signed by the responsible party that all temporary and permanent
crossings will be constructed, maintained, and closed out in accordance with the
requirements of this Section.
(f) Water crossing standards. All crossings of rivers require a bridge or culvert sized according to
the requirements of Section 15(O-1)(6)(g)) below. Streams and tributary streams may be
crossed using temporary structures that are not bridges or culverts provided:
(i) concentrated water runoff does not enter the stream or tributary stream;
(ii) sedimentation of surface waters is reasonably avoided;
(iii) there is no substantial disturbance of the bank, or stream or tributary stream channel;
(iv) fish passage is not impeded; and,
(v) water flow is not unreasonably impeded.
Subject to Section 15(O-1)(6)(f)(i-v) above, skid trail crossings of streams and tributary
streams when channels of such streams and tributary streams are frozen and snow-covered or
28
are composed of a hard surface which will not be eroded or otherwise damaged are not
required to use permanent or temporary structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and tributary stream channels with a
bridge or culvert, the following requirements apply:
(i) Bridges and culverts must be installed and maintained to provide an opening sufficient in
size and structure to accommodate 10 year frequency water flows or with a cross-
sectional area at least equal to 2 1/2 times the cross-sectional area of the river, stream, or
tributary stream channel.
(ii) Temporary bridge and culvert sizes may be smaller than provided in Section 15(O-
1)(6)(g)(i) if techniques are effectively employed such that in the event of culvert or
bridge failure, the natural course of water flow is maintained and sedimentation of the
water body or tributary stream is avoided. Such crossing structures must be at least as
wide as the channel and placed above the normal high-water line. Techniques may
include, but are not limited to, the effective use of any, a combination of, or all of the
following:
1. use of temporary skidder bridges;
2. removing culverts prior to the onset of frozen ground conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii) Culverts utilized in river, stream and tributary stream crossings must:
1. be installed at or below river, stream or tributary streambed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of the culvert;
4. be covered by soil to a minimum depth of 1 foot or according to the
culvert manufacturer's specifications, whichever is greater; and
5. have a headwall at the inlet end that is adequately stabilized by riprap
or other suitable means to reasonably avoid erosion of material around the
culvert.
(iv)River, stream and tributary stream crossings allowed under Section 15(O-1), but located
in flood hazard areas (i.e. A zones) as identified on a community's Flood Insurance Rate
Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must be designed and
constructed under the stricter standards contained in that community's National Flood
Insurance Program (NFIP). For example, a water crossing may be required to pass a 100-
year flood event.
(v) Exception. Skid trail crossings of tributary streams within shoreland areas and wetlands
adjacent to such streams may be undertaken in a manner not in conformity with the
requirements of the foregoing subsections provided persons conducting such activities
take reasonable measures to avoid the disruption of shoreline integrity, the occurrence of
sedimentation of water, and the disturbance of stream banks, stream channels, shorelines,
and soil lying within ponds and wetlands. If, despite such precautions, the disruption of
shoreline integrity, sedimentation of water, or the disturbance of stream banks, stream
channels, shorelines, and soil lying within ponds and wetlands occurs, such conditions
must be corrected.
(h) Skid trail closeout. Upon completion of timber harvesting and related activities, or upon the
expiration of a Forest Operations Notification, whichever is earlier, the following
requirements apply:
29
(i) Bridges and culverts installed for river, stream and tributary stream crossings by skid
trails must either be removed and areas of exposed soil stabilized, or upgraded to comply
with the closeout standards for land management roads in Section15(O-1)(6)(i) below.
(ii) Water crossing structures that are not bridges or culverts must either be removed
immediately following timber harvesting and related activities, or, if frozen into the river,
stream or tributary stream bed or bank, as soon as practical after snowmelt.
(iii) River, stream and tributary stream channels, banks and approaches to crossings of water
bodies and tributary streams must be immediately stabilized on completion of harvest, or
if the ground is frozen and/or snow-covered, as soon as practical after snowmelt. If,
despite such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(i) Land management road closeout. Maintenance of the water control features must continue
until use of the road is discontinued and the road is put to bed by taking the following actions:
(i) Effective installation of water bars or other adequate road drainage structures at
appropriate intervals, constructed to reasonably avoid surface water flowing over or
under the water bar, and extending sufficient distance beyond the traveled way so that
water does not reenter the road surface.
(ii) Water crossing structures must be appropriately sized or dismantled and removed in a
manner that reasonably avoids sedimentation of the water body or tributary stream.
(iii) Any bridge or water-crossing culvert in roads to be discontinued shall satisfy one of the
following requirements:
1. it shall be designed to provide an opening sufficient in size and structure to
accommodate 25-year frequency water flows;
2. it shall be designed to provide an opening with a cross-sectional area at least 3 1/2
times the cross-sectional area of the river, stream or tributary stream channel; or
3. it shall be dismantled and removed in a fashion to reasonably avoid sedimentation of
the river, stream or tributary stream.
If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(7) Slope Table
Filter strips, skid trail setbacks, and land management road setbacks must be maintained as
specified in Section 15(O-1), but in no case shall be less than shown in the following table.
Average slope of land between exposed mineral
Width of strip between exposed
soil and the shoreline (percent)
mineral soil and shoreline
(feet along surface of the ground)
0
25
10
45
20
65
30
85
40
105
50
125
60
145
30
70
165
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation
within the strip of land extending 75 feet, horizontal distance, inland from the normal high-
water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, and except to allow for the development
of permitted uses, within a strip of land extending one-hundred (100) feet, horizontal
distance, inland from the normal high-water line of a great pond classified GPA or a river
flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance, from
any other water body, tributary stream, or the upland edge of a wetland, a buffer strip of
vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from the
outer limits of the tree or shrub crown. However, a footpath not to exceed six (6) feet in
width as measured between tree trunks and/or shrub stems is allowed provided that a
cleared line of sight to the water through the buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to a great pond classified
GPA or a river or stream flowing to a great pond classified GPA, shall be defined as
maintaining a rating score of 24 or more in each 25-foot by 50-foot rectangular (1250
square feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 - < 4 in.
1
4 - <8 in.
2
8-< 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot
rectangular area..
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot contains four (4)
trees between 2 and 4 inches in diameter, two trees between 4 and 8 inches in
diameter, three trees between 8 and 12 inches in diameter, and two trees over 12
inches in diameter, the rating score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 12
points (36- 24 =12) may be removed from the plot provided that no cleared openings
are created.
31
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not
exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4)
inches or more in diameter, measured at 4 1/2 feet above ground level may be removed in any
ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three (3)
feet in height and other ground cover, including leaf litter and the forest duff layer, shall
not be cut, covered, or removed, except to provide for a footpath or other permitted uses
as described in Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
diseased, unsafe, or dead trees results in the creation of cleared openings, these openings
shall be replanted with native tree species unless existing new tree growth is present.
Section 15(P)(2) does not apply to those portions of public recreational facilities adjacent to
public swimming areas as long as cleared areas are limited to the minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond
classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of any other water body, tributary
stream, or the upland edge of a wetland, there shall be allowed on any lot, in any ten (10) year
period, selective cutting of not more than forty (40) percent of the volume of trees four (4)
inches or more in diameter, measured 4 1/2 feet above ground level. Tree removal in
conjunction with the development of permitted uses shall be included in the forty (40) percent
calculation. For the purposes of these standards volume may be considered to be equivalent
to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet, whichever
is greater, including land previously cleared.
32
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(P).
Q. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which result
in unstabilized soil conditions and which require a permit shall also require a written soil
erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as closely
as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project
involving land disturbance, and shall be in operation during all stages of the activity. The
amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week
from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months of
the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred
(500) square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainageways shall be designed and constructed in order
to carry water from a twenty-five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
R. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures can
be established or maintained without causing adverse environmental impacts, including severe
33
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report based on an on-site
investigation and be prepared by state-certified professionals. Certified persons may include
Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified
Geologists and other persons who have training and experience in the recognition and evaluation
of soil properties. The report shall be based upon the analysis of the characteristics of the soil and
surrounding land and water areas, maximum ground water elevation, presence of ledge, drainage
conditions, and other pertinent data that the evaluator deems appropriate. The soils report shall
include recommendations for a proposed use to counteract soil limitations where they exist.
S. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of the
State any pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
T. Archaeological Site. Any proposed land use activity involving structural development or soil
disturbance on or adjacent to sites listed on, or eligible to be listed on the National Register of
Historic Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty (20) days
prior to action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed
annually by July 1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of
30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of
State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first
obtaining a permit, engage in any activity or use of land or structure requiring a permit in the
district in which such activity or use would occur; or expand, change, or replace an existing use
or structure; or renew a discontinued nonconforming use. A person who is issued a permit
pursuant to this Ordinance shall have a copy of the permit on site while the work authorized by
the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
34
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means of
adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in Section 14.
(2) All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that the
information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure or use would
require the installation of a subsurface sewage disposal system.
D. Procedure for Administering Permits. Within 35 days of the date of receiving a written
application, the Planning Board or Code Enforcement Officer, as indicated in Section 14, shall
notify the applicant in writing either that the application is a complete application, or, if the
application is incomplete, that specified additional material is needed to make the application
complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall approve,
approve with conditions, or deny all permit applications in writing within 35 days of receiving a
completed application. However, if the Planning Board has a waiting list of applications, a
decision on the application shall occur within 35 days after the first available date on the Planning
Board's agenda following receipt of the completed application, or within 35 days of the public
hearing, if the proposed use or structure is found to be in conformance with the purposes and
provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in conformity
with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an
application or approve it with conditions if it makes a positive finding based on the information
presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife
habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland waters;
35
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will avoid problems associated with floodplain development and use; and
(8) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be
stated in writing. No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above, excepting
structure setback requirements, the Planning Board may approve a permit for a single family
residential structure in a Resource Protection District provided that the applicant demonstrates
that all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the 100-year flood-plain along rivers and artificially
formed great ponds along rivers, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements, are
elevated at least one foot above the 100-year flood-plain elevation; and the development
is otherwise in compliance with any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is
deemed to be 1/2 the width of the 100-year flood plain.
(4) The total ground-floor area, including cantilevered or similar overhanging extensions, of all
principal and accessory structures is limited to a maximum of 1,500 square feet. This
limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than 75 feet, horizontal distance. In determining the greatest
practical extent, the Planning Board shall consider the depth of the lot, the slope of the land,
the potential for soil erosion, the type and amount of vegetation to be removed, the proposed
building site's elevation in regard to the flood-plain, and its proximity to moderate-value and
high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of issuance if a substantial
start is not made in construction or in the use of the property during that period. If a substantial
36
start is made within one year of the issuance of the permit, the applicant shall have one additional
year to complete the project, at which time the permit shall expire.
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any
utility company of any kind may not install services to any new structure located in the shoreland
zone unless written authorization attesting to the validity and currency of all local permits
required under this or any previous Ordinance has been issued by the appropriate municipal
officials or other written arrangements have been made between the municipal officials and the
utility.
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis,
where it is alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on a de
novo basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code Enforcement
Officer in his or her review of and action on a permit application under this Ordinance.
Any order, requirement, decision or determination made, or failure to act, in the
enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in
this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited
to, lot width, structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality;
and
37
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals may grant a variance
to an owner of a residential dwelling for the purpose of making that dwelling accessible to
a person with a disability who resides in or regularly uses the dwelling. The board shall
restrict any variance granted under this subsection solely to the installation of equipment or
the construction of structures necessary for access to or egress from the dwelling by the
person with the disability. The board may impose conditions on the variance, including
limiting the variance to the duration of the disability or to the time that the person with the
disability lives in the dwelling. The term "structures necessary for access to or egress from
the dwelling" shall include railing, wall or roof systems necessary for the safety or
effectiveness of the structure.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider new
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board of
Appeals shall hear and decide the matter afresh, undertaking its own independent analysis of
evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the decision
was contrary to specific provisions of the Ordinance or contrary to the facts presented to the
Planning Board. The Board of Appeals may only review the record of the proceedings before
the Planning Board. The Board of Appeals shall not receive or consider any evidence that was
not presented to the Planning Board, but the Board of Appeals may receive and consider written
or oral arguments. If the Board of Appeals determines that the record of the Planning Board
proceedings is inadequate, the Board of Appeals may remand the matter to the Planning Board
for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
38
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal that includes:
a. A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty-five (35) days of its receipt of a complete written
application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within
thirty-five (35) days after the close of the hearing, and shall issue a written decision
on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant and to the Department of Environmental Protection within seven (7) days
of the Board's decision. Copies of written decisions of the Board of Appeals shall
be given to the Planning Board, Code Enforcement Officer, and the municipal
officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the Board of Appeals
may take an appeal to Superior Court in accordance with State laws within forty-five (45) days
from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals
may reconsider any decision within forty-five (45) days of its prior decision. A request to the
Board to reconsider a decision must be filed within ten (10) days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must occur and
be completed within forty-five (45) days of the date of the vote on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner, petitioner,
planning board, code enforcement officer, and other parties of interest, including abutters and
39
those who testified at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days after
the decision on reconsideration.
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this Ordinance
is being violated, he or she shall notify in writing the person responsible for such violation,
indicating the nature of the violation and ordering the action necessary to correct it,
including discontinuance of illegal use of land, buildings or structures, or work being done,
removal of illegal buildings or structures, and abatement of nuisance conditions. A copy of
such notices shall be submitted to the municipal officers and be maintained as a permanent
record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted or
denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected. On a biennial basis, a summary of this
record shall be submitted to the Director of the Bureau of Land and Water Quality within
the Department of Environmental Protection.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and proceedings, either
legal or equitable, including seeking injunctions of violations and the imposition of fines, that
may be appropriate or necessary to enforce the provisions of this Ordinance in the name of the
municipality. The municipal officers, or their authorized agent, are hereby authorized to enter
into administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not allow an
illegal structure or use to continue unless there is clear and convincing evidence that the illegal
structure or use was constructed or conducted as a direct result of erroneous advice given by an
authorized municipal official and there is no evidence that the owner acted in bad faith, or
unless the removal of the structure or use will result in a threat or hazard to public health and
safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per violation for
each day that the violation continues. However, in a resource protection district the
maximum penalty is increased to $5000 (38 M.R.S.A. section 4452).
40
17. Definitions.
Accessory structure or use - a use or structure which is incidental and subordinate to the principal use or
structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A deck
or similar extension of the principal structure or a garage attached to the principal structure by a roof or
a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit
or variance has been granted; or any other person or group of persons who have suffered particularized
injury as a result of the granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy
products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and green-
house products. Agriculture does not include forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of
bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more
than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft, and
which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau - State of Maine Department of Conservation's Bureau of Forestry
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling
of goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Cross-sectional area - the cross-sectional area of a stream or tributary stream channel is determined
by multiplying the stream or tributary stream channel width by the average stream or tributary stream
channel depth. The stream or tributary stream channel width is the straight-line distance from the
normal high-water line on one side of the channel to the normal high-water line on the opposite side
of the channel. The average stream or tributary stream channel depth is the average of the vertical
distances from a straight line between the normal high-water lines of the stream or tributary stream
channel to the bottom of the channel.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
41
Development - a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or illness;
and also includes the physical or mental condition of a person which constitutes a substantial handicap
as determined by a physician or in the case of mental handicap, by a psychiatrist or psychologist, as
well as any other health or sensory impairment which requires special education, vocational
rehabilitation or related services.
Disruption of shoreline integrity - the alteration of the physical shape, properties, or condition of a
shoreline at any location by timber harvesting and related activities. A shoreline where shoreline
integrity has been disrupted is recognized by compacted, scarified and/or rutted soil, an abnormal
channel or shoreline cross-section, and in the case of flowing waters, a profile and character altered
from natural conditions.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such as
protection of resources from immediate destruction or loss, law enforcement, and operations to rescue
human beings, property and livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection
or supply systems; and associated storage tanks. Such systems may include towers, poles, wires,
mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and
similar accessories, but shall not include service drops or buildings which are necessary for the
furnishing of such services.
Expansion of a structure - an increase in the floor area or volume of a structure, including all
extensions such as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of more
floor area or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved
in order to discharge the 100-year flood without cumulatively increasing the water surface elevation
by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls,
plus the horizontal area of any unenclosed portions of a structure such as porches and decks.
Forest management activities - timber cruising and other forest resource evaluation activities,
pesticide or fertilizer application, management planning activities, timber stand improvement,
42
pruning, regeneration of forest stands, and other similar or associated activities, exclusive of timber
harvesting and the construction, creation or maintenance of roads.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Forest Stand - a contiguous group of trees sufficiently uniform in age class distribution, composition,
and structure, and growing on a site of sufficiently uniform quality, to be a distinguishable unit.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills and
post supports, but including basements, slabs, frostwalls, or other base consisting of concrete, block,
brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1.
Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state, the
combined surface area is in excess of 10 acres; and
2.
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to
the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, inland waters and that can not be
located away from these waters. The uses include, but are not limited to commercial and recreational
fishing and boating facilities, excluding recreational boat storage buildings, finfish and shellfish
processing, fish storage and retail and wholesale fish marketing facilities, waterfront dock and port
facilities, shipyards and boat building facilities, marinas, navigation aids, basins and channels,
retaining walls, industrial uses dependent upon water-borne transportation or requiring large volumes
of cooling or processing water that can not reasonably be located or operated at an inland site, and
uses that primarily provide general public access to inland waters.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in excess
of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or
increased inland body of water is completely surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-A
Section 465-A. This classification includes some, but not all impoundments of rivers that are defined
as great ponds.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Harvest Area - the area where timber harvesting and related activities, including the cutting of trees,
skidding, yarding, and associated road construction take place. The area affected by a harvest
43
encompasses the area within the outer boundaries of these activities, excepting unharvested areas
greater than 10 acres within the area affected by a harvest.
Height of a structure - the vertical distance between the mean original (prior to construction) grade at
the downhill side of the structure and the highest point of the structure, excluding chimneys, steeples,
antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a residential
structure or property and which is 1) clearly incidental to and compatible with the residential use of
the property and surrounding residential uses; and 2) which employs no more than two (2) persons
other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes further
deviation from the dimensional standard(s) creating the nonconformity such as, but not limited to,
reduction in water body, tributary stream or wetland setback distance, increase in lot coverage, or
increase in height of a structure. Property changes or structure expansions which either meet the
dimensional standard or which cause no further increase in the linear extent of nonconformance of the
existing structure shall not be considered to increase nonconformity. For example, there is no
increase in nonconformity with the setback requirement for water bodies, wetlands, or tributary
streams if the expansion extends no further into the required setback area than does any portion of the
existing nonconforming structure. Hence, a structure may be expanded laterally provided that the
expansion extends no closer to the water body, tributary stream, or wetland than the closest portion of
the existing structure from that water body, tributary stream, or wetland. Included in this allowance
are expansions that in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which is
developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods,
or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for public
purposes.
Land Management Road - a route or track consisting of a bed of exposed mineral soil, gravel, or other
surfacing materials constructed for, or created by, the passage of motorized vehicles and used
primarily for timber harvesting and related activities, including associated log yards, but not including
skid trails or skid roads.
Licensed Forester - a forester licensed under 32 M.R.S.A. Chapter 76.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal
high-water line of a water body or upland edge of a wetland and areas beneath roads serving more
than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
44
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or extent
of mineral resources which create minimal disturbance to the land and which include reasonable
measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot lines
extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment of
this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is
located.
Non-conforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, height, or lot coverage, but which is allowed solely because it was
in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was in
lawful existence at the time this Ordinance or subsequent amendments took effect.
Normal high-water line - that line which is apparent from visible markings, changes in the character
of soils due to prolonged action of the water or changes in vegetation, and which distinguishes
between predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers and
great ponds that support non-forested wetland vegetation and hydric soils and that are at the same or
lower elevation as the water level of the river or great pond during the period of normal high-water
are considered part of the river or great pond.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the normal
high-water line or within a wetland.
Temporary: Structures that remain in or over the water for less than seven (7) months in any period
of twelve (12) consecutive months.
Permanent: Structures that remain in or over the water for seven (7) months or more in any period of
twelve (12) consecutive months.
45
Principal structure - a building other than one that is used for purposes wholly incidental or accessory
to the use of another building or use on the same premises.
Principal use - a use other than one that is wholly incidental or accessory to another use on the same
premises.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public
entity.
Recent floodplain soils - the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time activities,
and other customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a
vehicle and not as a structure, the unit must remain with its tires on the ground, and must be registered
with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the structure, or
2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as
permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Residual basal area - the average of the basal area of trees remaining on a harvested site.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and
soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or
less.
Residual Stand - a stand of trees remaining in the forest following timber harvesting and related
activities
River - a free-flowing body of water including its associated floodplain wetlands from that point at
which it provides drainage for a watershed of twenty five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a
driveway as defined.
46
Service drop - any utility line extension which does not cross or run beneath any portion of a water
body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b. the extension requiring the installation of new utility poles or placement underground is less
than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary
stream, or upland edge of a wetland, to the nearest part of a structure, road, parking space or other
regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line
between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance, of
the normal high-water line of any great pond or river; within 250 feet of the upland edge of a
freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the normal high-water
line of a stream.
Shoreline - the normal high-water line, or upland edge of a wetland.
Skid Road or Skid Trail - a route repeatedly used by forwarding machinery or animal to haul or drag
forest products from the stump to the yard or landing, the construction of which requires minimal
excavation.
Slash - the residue, e.g., treetops and branches, left on the ground after a timber harvest.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted on the most recent edition of a United States Geological Survey 7.5
minute series topographic map, or if not available, a 15-minute series topographic map, to the point
where the body of water becomes a river or flows to another water body or wetland within the
shoreland area.
Structure - anything built for the support, shelter or enclosure of persons, animals, goods or property
of any kind, together with anything constructed or erected with a fixed location on or in the ground,
exclusive of fences, and poles, wiring and other aerial equipment normally associated with service
drops as well as guying and guy anchors. The term includes structures temporarily or permanently
located, such as decks, patios, and satellite dishes.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
47
Subsurface sewage disposal system - any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi-municipal
sewer or waste water treatment system..
Sustained slope - a change in elevation where the referenced percent grade is substantially maintained
or exceeded throughout the measured area.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of trees in the shoreland zone on a lot that has less
than two (2) acres within the shoreland zone shall not be considered timber harvesting. Such cutting
or removal of trees shall be regulated pursuant to Section 15 (P), Clearing or Removal of Vegetation
for Activities Other Than Timber Harvesting.
Timber harvesting and related activities - timber harvesting, the construction and maintenance of
roads used primarily for timber harvesting and other activities conducted to facilitate timber
harvesting.
Tributary stream - means a channel between defined banks created by the action of surface water,
which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of
topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is
connected hydrologically with other water bodies. "Tributary stream" does not include rills or gullies
forming because of accelerated erosion in disturbed soils where the natural vegetation cover has been
removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only
applies to that portion of the tributary stream located within the shoreland zone of the receiving water
body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a freshwater
wetland, the upland edge is formed where the soils are not saturated for a duration sufficient to
support wetland vegetation; or where the soils support the growth of wetland vegetation, but such
vegetation is dominated by woody stems that are six (6) meters (approximately twenty (20) foot) tall
or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over and
under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
48
as well as maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - a freshwater wetland.
Windfirm - the ability of a forest stand to withstand strong winds and resist windthrow, wind rocking,
and major breakage.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
49
Appendix A:
For purposes of this chapter, other significant wetlands that are resource protected include the following: