Cell Tower Ordinance
Town of Morrill
Section 1. Title
This Ordinance shall be known and cited as the "Wireless Telecommunications Facilities Siting
Ordinance" of Town of Morrill, Maine, (hereinafter referred to as the "ordinance").
Section 2. Authority
This ordinance is adopted pursuant to the enabling provisions of Article VIII, Part 2, Section 1 of
the Maine Constitution; the provisions of Title 30-A M.R.S.A. Section 3001 (Home Rule), and
the provisions of the Planning and Land Use Regulation Act, Title 30-A M.R.S.A. Section 4312
et seq.
Section 3. Purpose
The purpose of this ordinance is to provide a process and a set of standards for the construction
of wireless telecommunications facilities in order to:
- Implement a municipal policy concerning the provision of wireless telecommunications
services, and the siting of their facilities;
- Establish clear guidelines, standards and time frames for the exercise of municipal
authority to regulate wireless telecommunications facilities;
- Allow competition in telecommunications service;
- Encourage the provision of advanced telecommunications services to the largest number
of businesses, institutions and residents of Town of Morrill;
- Permit and manage reasonable access to the public rights of way of Town of Morrill for
telecommunications purposes on a competitively neutral basis;
- Ensure that all telecommunications carriers providing facilities or services within Town
of Morrill comply with the ordinances of Town of Morrill;
- Ensure that Town of Morrill can continue to fairly and responsibly protect the public
health, safety and welfare;
- Encourage the colocation of wireless telecommunications facilities , thus helping to
minimize adverse visual impacts on the community;
- Enable Town of Morrill to discharge its public trust consistent with rapidly evolving
federal and state regulatory policies, industry competition and technological
development;
- Further the goals and policies of the comprehensive plan, while promoting orderly
development of the town with minimal impacts on existing uses; and
- Protect the scenic and visual character of the community.
Page 1 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
Section 4. Applicability
This ordinance applies to all construction and expansion of wireless telecommunications
facilities, except as provided in section 4.1.
4.1. Exemptions
The following are exempt from the provisions of this ordinance:
A.)
Emergency
Wireless
Telecommunications
Facility.
Temporary
wireless
communication facilities for emergency communications by public officials.
B.) Amateur (ham) radio stations. Amateur (ham) radio stations licensed by the
Federal Communications Commission (FCC).
C.) Parabolic antenna. Parabolic Antennas less than seven (7) feet in diameter, that are
an accessory use of the property.
D.) Maintenance or repair. Maintenance, repair or reconstruction of a wireless
telecommunications facility and related equipment, provided that there is no
change in the height or any other dimension of the facility.
E.)
Temporary
wireless
telecommunications
facility.
Temporary
wireless
telecommunications facility, in operation for a maximum period of one hundred
eighty (180) days.
F.) Antennas as Accessory Uses. An antenna that is an accessory use to a residential
dwelling unit.
Section 5. Review and Approval Authority
5.1. Approval Required
No person shall construct or expand a wireless telecommunication facility without approval of
the Code Enforcement Officer (CEO) or the Planning Board as follows:
A.) Expansion of an Existing Facility and Colocation. Approval by the CEO is required
for any expansion of an existing wireless telecommunications facility that increases
the height of the facility by less than 20 feet; or an accessory use of an existing
wireless telecommunications facility; or colocation on an existing wireless
telecommunications facility.
B.) New Construction. Approval of the Planning Board is required for construction of a
new wireless telecommunications facility; and any expansion of an existing wireless
telecommunications facility that increases the height of the facility by more than 20
feet.
5.2 Approval Authority
In accordance with Section 5.1 above, the CEO or Planning Board shall review applications for
wireless telecommunications facilities, and make written findings on whether the proposed
facility complies with this Ordinance.
Page 2 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
Section 6. Approval Process
6.1. Pre-Application Conference
All persons seeking approval of the CEO or the Planning Board under this ordinance shall meet
with the CEO no less than thirty (30) days before filing an application. At this meeting, the CEO
shall explain to the applicant the ordinance provisions, as well as application forms and
submissions that will be required under this ordinance.
6.2. Application
All persons seeking approval of the CEO or the Planning Board under this ordinance shall
submit an application as provided below. The CEO shall be responsible for ensuring that notice
of the application has been published in a newspaper of general circulation in the community.
A.) Application for CEO Approval. Applications for permit approval by the CEO must
include the following materials and information:
1.) Documentation of the applicant's right, title, or interest in the property where the
facility is to be sited, including name and address of the property owner and the
applicant.
2.) A copy of the FCC license for the facility or a signed statement from the owner or
operator of the facility attesting that the facility complies with current FCC
regulations.
3.) Identification of districts, sites, buildings, structures or objects, significant in
American history, architecture, archaeology, engineering or culture, that are
listed, or eligible for listing, in the National Register of Historic Places 4.)
Location map and elevation drawings of the proposed facility and any other
proposed structures, showing color, and identifying structural materials.
5.) For proposed expansion of a facility, a signed statement that commits the owner of
the facility, and his or her successors in interest, to:
a.) respond in a timely, comprehensive manner to a request for information
from a potential colocation applicant, in exchange for a reasonable fee not
in excess of the actual cost of preparing a response;
b.) negotiate in good faith for shared use by third parties;
c.) allow shared use if an applicant agrees in writing to pay reasonable charges
for colocation;
d.) require no more than a reasonable charge for shared use, based on
community rates and generally accepted accounting principles. This
charge may include but is not limited to a pro rata share of the cost of site
selection, planning project administration, land costs, site design,
construction and maintenance, financing, return on equity, depreciation,
and all of the costs of adopting the tower or equipment to accommodate a
shared user without causing electromagnetic interference.
B.) Application for Planning Board Approval. An application for approval by the
Planning Board must be submitted to the Code Enforcement Officer. The application
must include the following information:
Page 3 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
1.) Documentation of the applicant's right, title, or interest in the property on which
the facility is to be sited, including name and address of the property owner and
the applicant.
2.) A copy of the FCC license for the facility, or a signed statement from the owner or
operator of the facility attesting that the facility complies with current FCC
regulations.
3.) A USGS 7.5 minute topographic map showing the location of all structures and
wireless telecommunications facilities above 150 feet in height above ground
level, except antennas located on roof tops, within a five (5) mile radius of the
proposed facility, unless this information has been previously made available to
the municipality. This requirement may be met by submitting current information
(within thirty days of the date the application is filed) from the FCC Tower
Registration Database.
4.) A site plan:
a.) prepared and certified by a professional engineer registered in Maine indicating
the location, type, and height of the proposed facility, antenna capacity, on-site
and abutting off-site land uses, means of access, setbacks from property lines,
and all applicable American National Standards Institute (ANSI) technical and
structural codes;
b.) certification by the applicant that the proposed facility complies with all FCC
standards for radio emissions is required; and
c.) a boundary survey for the project performed by a land surveyor licensed by the
State of Maine.
5.) A scenic assessment, consisting of the following:
a.) Elevation drawings of the proposed facility, and any other proposed structures,
showing height above ground level;
b.) A landscaping plan indicating the proposed placement of the facility on the site;
location of existing structures, trees, and other significant site features; the type
and location of plants proposed to screen the facility; the method of fencing, the
color of the structure, and the proposed lighting method.
c.) Photo simulations of the proposed facility taken from perspectives determined by
the Planning Board, or their designee, during the pre-application conference.
Each photo must be labeled with the line of sight, elevation, and with the date
taken imprinted on the photograph. The photos must show the color of the
facility and method of screening.
d.) A narrative discussing:
i.)
the extent to which the proposed facility would be visible from or
within a designated scenic resource,
ii.)
the tree line elevation of vegetation within 100 feet of the facility,
and
iii.) the distance to the proposed facility from the designated scenic
resource's noted viewpoints.
6.) A written description of how the proposed facility fits into the applicant's
telecommunications network. This submission requirement does not require
disclosure of confidential business information.
Page 4 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
7.) Evidence demonstrating that no existing building, site, or structure can
accommodate the applicant's proposed facility, the evidence for which may
consist of any one or more of the following:
a.) Evidence that no existing facilities are located within the targeted market
coverage area as required to meet the applicant's engineering
requirements,
b.) Evidence that existing facilities do not have sufficient height or cannot be
increased in height at a reasonable cost to meet the applicant's engineering
requirements,
c.) Evidence that existing facilities do not have sufficient structural strength to
support applicant's proposed antenna and related equipment. Specifically:
i.) Planned, necessary equipment would exceed the structural capacity
of the existing facility, considering the existing and planned use
of those facilities, and these existing facilities cannot be
reinforced to accommodate the new equipment.
ii.) The applicant's proposed antenna or equipment would cause
electromagnetic interference with the antenna on the existing
towers or structures, or the antenna or equipment on the existing
facility would cause interference with the applicant's proposed
antenna.
iii.) Existing or approved facilities do not have space on which planned
equipment can be placed so it can function effectively.
d.) For facilities existing prior to the effective date of this ordinance, the fees,
costs, or contractual provisions required by the owner in order to share or
adapt an existing facility are unreasonable. Costs exceeding the pro rata
share of a new facility development are presumed to be unreasonable. This
evidence shall also be satisfactory for a tower built after the passage of
this ordinance;
e.) Evidence that the applicant has made diligent good faith efforts to
negotiate colocation on an existing facility, building, or structure, and has
been denied access;
8.) Identification of districts, sites, buildings, structures or objects, significant in
American history, architecture, archaeology, engineering or culture, that are
listed, or eligible for listing, in the National Register of Historic Places 9.) A
signed statement stating that the owner of the wireless telecommunications
facility and his or her successors and assigns agree to:
a.) respond in a timely, comprehensive manner to a request for information
from a potential colocation applicant, in exchange for a reasonable fee not
in excess of the actual cost of preparing a response;
b.) negotiate in good faith for shared use of the wireless telecommunications
facility by third parties;
c.) allow shared use of the wireless telecommunications facility if an applicant
agrees in writing to pay reasonable charges for colocation;
d.) require no more than a reasonable charge for shared use, based on
community rates and generally accepted accounting principles. This
Page 5 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
charge may include but is not limited to a pro rata share of the cost of site
selection, planning project administration, land costs, site design,
construction, financing, return on equity, depreciation, and all of the costs
of adapting the tower or equipment to accommodate a shared user without
causing electromagnetic interference. The amortization of the above costs
by the facility owner shall be accomplished at a reasonable rate, over the
useful life span of the facility.
10.) A form of surety approved by the Planning Board to pay for the costs of
removing the facility if it is abandoned.
11.) Evidence that a notice of the application has been published in a local newspaper
of general circulation in the community.
6.3. Submission Waiver
The CEO or Planning Board, as appropriate, may waive any of the submission requirements
based upon a written request of the applicant submitted at the time of application. A waiver of
any submission requirement may be granted only if the CEO or Planning Board finds in writing
that due to special circumstances of the application, the information is not required to determine
compliance with the standards of this Ordinance.
6.4. Fees
A.) CEO Application Fee
An application for CEO approval shall include payment of an application fee of $100.
The application shall not be considered complete until this fee is paid. The applicant is
entitled to a refund of the application fee if the application is withdrawn within fifteen
(15) days of date of filing, less all expenses incurred by the Town of Morrill to review the
application.
B.) Planning Board Application Fee
An application for Planning Board approval shall include payment of an application .fee
of $300. The application shall not be considered complete until this fee is paid. An
applicant is entitled to a refund of the application portion of fee if the application is
withdrawn within fifteen (15) days of date of filing, less all expenses incurred by the
[municipality] to review the application.
C. Planning Board Review Fee
Any cost for the professional service (attorney) or consultant review of one or more
aspects of the application that the Planning Board may require to determine compliance
or non-compliance of the Wireless Telecommunication Ordinance Town of Morrill, or to
advise and assist the Board in making its decision. The attorney or consultant first, prior
to deliberations, shall estimate the cost of such review and the applicant shall deposit
with the Town, the full estimated cost, which the Town shall place in an escrow account
and shall reimburse the applicant if funds remain after payment.
Page 6 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
6.5 Notice of Complete Application
Upon receipt of an application, the CEO shall provide the applicant with a dated receipt. Within
five (5) working days of receipt of an application the CEO shall review the application and
determine if the application meets the submission requirements. The CEO or Planning Board, as
appropriate, shall review any requests for a waiver from the submission requirements and shall
act on these requests prior to determining the completeness of the application.
If the application is complete, the CEO shall notify the applicant in writing of this determination
and require the applicant to provide a sufficient number of copies of the application to the
Planning Board.
If the application is incomplete, the CEO shall notify the applicant in writing, specifying the
additional materials or information required to complete the application.
If the application is deemed to be complete, and requires Planning Board review, the CEO shall
notify all abutters to the site as shown on the Assessor's records, by first-class mail, that an
application has been accepted. This notice shall contain a brief description of the proposed
activity and the name of the applicant, give the location of a copy of the application available for
inspection, and provide the date, time, and place of the Planning Board meeting at which the
application will be considered. Failure on the part of any abutter to receive such notice shall not
be grounds for delay of any consideration of the application nor denial of the project.
6.6. Public Hearing
For applications for Planning Board approval under Section 5.1(B), a public hearing shall be held
within 30 days of the notice of the complete application. The applicant shall notify all abutters,
within 1,000 feet of the proposed Wireless Telecommunication Facility, of the time and location
of the public hearing.
6.7. Approval
A.) CEO Approval. Within thirty (30) days of receiving a complete application for
approval under section 5.1(A), the CEO shall approve, approve with conditions, or
deny the application in writing, together with the findings on which that decision is
based. The CEO shall approve the application if the CEO finds that the application
complies with the provisions in Section 7.1 of this ordinance.
The CEO shall notify all abutters of the decision to issue a permit under this section.
The time period may be extended upon agreement between the applicant and the
CEO.
B.) Planning Board Approval. Within ninety (90) days of receiving a complete
application for approval under section 5.1(B), the Planning Board shall approve,
approve with conditions, or deny the application in writing, together with the
findings on which that decision is based. However, if the Planning Board has a
waiting list of applications that would prevent the Planning Board from making a
decision within the required ninety (90) day time period, then a decision on the
application shall be issued within sixty (60) days of the public hearing, if necessary,
Page 7 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
or within 60 days of the completed Planning Board review. This time period may be
extended upon agreement between the applicant and the Planning Board.
Section 7. Standards of Review
To obtain approval from the CEO or the Planning Board, an application must comply with the
standards in this section.
7.1. CEO Approval Standards
An application for approval by the CEO under Section 5.1(A) must meet the following standards.
A.) The proposed facility is an expansion, accessory use, or colocation to a structure
existing at the time the application is submitted.
B.) The applicant has sufficient right, title, or interest to locate the proposed facility on the
existing structure.
C.) The proposed facility increases the height of the existing structure by no more than
twenty (20) feet and which does not exceed 100 feet in height
D.) The proposed facility will be constructed with materials and colors that match or blend
with the surrounding natural or built environment, to the maximum extent practicable.
E.) The proposed facility, to the greatest degree practicable, shall have no unreasonable
adverse impact upon districts, sites, buildings, structures or objects, significant in
American history, architecture, archaeology, engineering or culture, that are listed, or
eligible for listing, in the National Register of Historic Places.
7.2. Planning Board Approval Standards
An application for approval by the Planning Board under Section 5.1(B) must meet the following
standards.
A.) New wireless telecommunications facilities may be sited on Municipal Property.
B.) If an applicant proposes to locate a new wireless telecommunications facility, or
expand an existing facility on municipal property, the applicant must show the
following:
1.) The proposed location complies with applicable municipal policies and
ordinances.
2.) The proposed facility will not interfere with the intended purpose of the property.
3.) The applicant has adequate liability insurance and a lease agreement with the
municipality that includes reasonable compensation for the use of the property and
other provisions to safeguard the public rights and interests in the property.
C.) Design for Colocation. A new wireless telecommunications facility and related
equipment must be designed and constructed to accommodate expansion for future
colocation of at least three additional wireless telecommunications facilities or
providers. However, the Planning Board may waive or modify this standard where the
district height limitation effectively prevents future colocation.
Page 8 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
D.) Height. A new wireless telecommunications facility must be no more than 100 feet in
height.
E.) Setbacks. A new or expanded wireless telecommunications facility must be set back
one hundred five percent (105%) of its height from all property lines. The setback
may be satisfied by including the areas outside the property boundaries if secured by
an easement. The following exemptions apply:
An antenna is exempt from the setback requirement if it extends no more than
five (5) feet horizontally from the edge of the structure to which it is attached, and
it does not encroach upon an abutting property.
F.) Landscaping. A new wireless telecommunications facility and related equipment must
be screened with plants from view by abutting properties, to the maximum extent
practicable. Existing plants and natural land forms on the site shall also be preserved
to the maximum extent practicable.
G.) Fencing. A new wireless telecommunications facility must be fenced to discourage
trespass on the facility and to discourage climbing on any structure by trespassers.
H.) Lighting. A new wireless telecommunications facility must be illuminated only as
necessary to comply with FAA or other applicable state and federal requirements.
However, security lighting may be used as long as it is shielded to be down-
directional to retain light within the boundaries of the site, to the maximum extent
practicable.
I.) Color and Materials. A new wireless telecommunications facility must be constructed
with materials and colors that match or blend with the surrounding natural or built
environment, to the maximum extent practicable. Unless otherwise required, muted
colors, earth tones, and subdued hues shall be used.
J.) Structural Standards. A new wireless telecommunications facility must comply with
the current Electronic Industries Association/ Telecommunications Industries
Association (EIA/TIA) 222 Revision Standard entitled "Structural Standards for Steel
Antenna Towers and Antenna Supporting Structures."
K.) Visual Impact. The proposed wireless telecommunications facility will have no
unreasonable adverse impact upon designated scenic resources within the Town, as
identified either in the municipally adopted comprehensive plan, or by a State or
federal agency. In determining the potential unreasonable adverse impact of the
proposed facility upon the designated scenic resources, the Planning Board shall
consider the following factors:
1.) The extent to which the proposed wireless telecommunications facility is
visible above tree line, from the viewpoint(s) of the impacted designated
scenic resource;
2.) The type, number, height, and proximity of existing structures and features, and
background features within the same line of sight as the proposed facility;
3.) The extent to which the proposed wireless telecommunications facility would
be visible from the viewpoint(s);
4.) The amount of vegetative screening;
6.) The distance of the proposed facility from the viewpoint and the facility's
location within the designated scenic resource; and
Page 9 of 17
Adopted March 15, 2014
Cell Tower Ordinance
Town of Morrill
6.) The presence of reasonable alternatives that allow the facility to function
consistently with its purpose.
L.) Noise. During construction, repair, or replacement, operation of a back-up power
generator at any time during a power failure, and testing of a back-up generator
between 8 a.m. and 9 p.m. is exempt from existing municipal noise standards.
M.) Historic & Archaeological Properties. The proposed facility, to the greatest degree
practicable, will have no unreasonable adverse impact upon a historic district, site or
structure which is currently listed on or eligible for listing on the National Register of
Historic Places.
7.3 Standard Conditions of Approval
The following standard conditions of approval shall be a part of any approval or conditional
approval issued by the CEO or Planning Board. Where necessary to ensure that an approved
project meets the criteria of this ordinance, the Planning Board can impose additional conditions
of approval. Reference to the conditions of approval shall be clearly noted on the final approved
site plan, and shall include:
1.) The owner of the wireless telecommunications facility and his or her successors and
assigns agree to:
a.) respond in a timely, comprehensive manner to a request for information from a
potential colocation applicant, in exchange for a reasonable fee not in excess of
the actual cost of preparing a response;
b.) negotiate in good faith for shared use of the wireless telecommunications facility
by third parties;
c.) allow shared use of the wireless telecommunications facility if an applicant agrees
in writing to pay reasonable charges for colocation.
d.) require no more than a reasonable charge for shared use of the wireless
telecommunications facility, based on community rates and generally accepted
accounting principles. This charge may include, but is not limited to, a pro rata
share of the cost of site selection, planning project administration, land costs,
site design, construction and maintenance, financing, return on equity,
depreciation, and all of the costs of adapting the tower or equipment to
accommodate a shared user without causing electromagnetic interference. The
amortization of the above costs by the facility owner shall be accomplished at a
reasonable rate, over the life span of the useful life of the wireless
telecommunications facility.
2.) Upon request by the municipality, the applicant shall certify compliance with all
applicable FCC radio frequency emissions regulations.
Section 8. Amendment to an Approved Application
Any changes to an approved application must be approved by the CEO or the Planning Board, in
accordance with Section 5.
Page 10 of 17
Cell Tower Ordinance
Town of Morrill
Section 9. Abandonment
A wireless telecommunications facility that is not operated for a continuous period of twelve (12)
months shall be considered abandoned. The CEO shall notify the owner of an abandoned facility
in writing .and order the removal of the facility within ninety (90) days of receipt of the written
notice. The owner of the facility shall have thirty (30) days from the receipt of the notice to
demonstrate to the CEO that the facility has not been abandoned.
If the Owner fails to show that the facility is in active operation, the owner shall have sixty (60)
days to remove the facility. If the facility is not removed within this time period, the municipality
may remove the facility at the owner's expense. The owner of the facility shall pay all site
reclamation costs deemed necessary and reasonable to return the site to its pre-construction
condition, including the removal of roads, and reestablishment of vegetation.
If a surety has been given to the municipality for removal of the facility, the owner of the facility
may apply to the Planning Board for release of the surety when the facility and related equipment
are removed to the satisfaction of the Planning Board.
Section 10. Appeals
10.1 Powers and Duties of the Board of Appeals
The Board of Appeals shall have the following powers:
a.) Administrative Appeals: To hear and decide administrative appeals, on an
appellate basis, where it is alleged by an aggrieved party that there is an error in
any order, requirement, decision, or determination made by, or failure to act by,
the Planning Board in the administration of this Ordinance; and to hear and decide
administrative appeals on a de novo basis where it is alleged by an aggrieved
party that there is an error in any order, requirement, decision or determination
made by, or failure to act by, the Code Enforcement Officer in his or her review
of and action on a permit application under this Ordinance. Any order,
requirement, decision or determination made, or failure to act, in the enforcement
of this ordinance is not appealable to the Board of Appeals.
10.2 Appeal Procedure
1. Making an Appeal
a. An administrative appeal may be taken to the Board of Appeals by an aggrieved
party from any decision of the Code Enforcement Officer or the Planning Board.
Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement. Applications
for appeal shall be made by filing with the Board of Appeals a written notice of
appeal which includes:
(i) A concise written statement indicating what relief is requested and why
the appeal should be granted.
Page 11 of 17
Cell Tower Ordinance
Town of Morrill
(ii) A sketch drawn to scale showing lot lines, location of existing buildings
and structures and other physical features of the lot pertinent to the relief
sought.
b. Upon receiving an application for an administrative appeal, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the
Board of Appeals all of the papers constituting the record of the decision
appealed from.
c. The Board of Appeals shall hold a public hearing on an administrative appeal
within thirty-five (35) days of its receipt of a complete written application, unless
this time period is extended by the parties.
2. Decision by Board of Appeals
a. A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
b. The person filing the appeal shall have the burden of proof.
c. The Board shall decide all administrative appeals within thirty five (35) days
after the close of the hearing, and shall issue a written decision on all appeals.
d. The Board of Appeals shall state the reasons and basis for its decision, including
a statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant within seven (7) days of the Board's decision. Copies of written
decisions of the Board of Appeals shall be given to the Planning Board, Code
Enforcement Officer, and the Municipal Officers.
3. Appeal to Superior Court
Except as provided by 30-A M.R.S.A. section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take
an appeal to Superior Court in accordance with State laws within forty-five (45) days
from the date of any decision of the Board of Appeals.
4. Reconsideration
In accordance with 30-A M.R.S.A. section 2691(3) (F), the Board of Appeals may
reconsider any decision within forty-five (45) days of its prior decision. A request to
the Board to reconsider a decision must be filed within ten (10) days of the decision
that is being reconsidered. A vote to reconsider and the action taken on that
reconsideration must occur and be completed within forty-five (45) days of the date
of the vote on the original decision. Reconsideration of a decision shall require a
positive vote of the majority of the Board members originally voting on the decision,
and proper notification to the landowner, petitioner, planning board, code
enforcement officer, and other parties of interest, including abutters and those who
testified at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony. Appeal of a reconsidered decision to
Superior Court must be made within fifteen (15) days after the decision on
reconsideration.
Page 12 of 17
Cell Tower Ordinance
Town of Morrill
Section 11. Administration and Enforcement
The CEO, as appointed by the Board of Selectmen, shall enforce this ordinance. If the CEO finds
that any provision of this ordinance has been violated, the CEO shall notify in writing the person
responsible for such violation, indicating the nature of the violation, and ordering the action
necessary to correct it. The CEO shall order correction of the violation and may take any other
legal action to ensure compliance with this ordinance.
The Board of Selectmen, or their authorized agent, are authorized to enter into administrative
consent agreements for the purpose of resolving violations of this ordinance and recovering fines
and expended attorneys fees and expert witness fees without court action. Such agreements shall
not allow a violation of this ordinance to continue unless: there is clear and convincing evidence
that the violation occurred as a direct result of erroneous advice given by an authorized
municipal official upon which the applicant reasonably relied to its detriment and there is no
evidence that the owner acted in bad faith; and the non-removal of the violation will not result in
a threat to public health and safety or substantial environmental damage. The selectmen may
direct the town's legal council to enforce this ordinance through the courts pursuant to Title 30-A
M.R.S.A. § 4452.
Section 12. Penalties
Any person who owns or controls any building or property that violates this ordinance shall be
fined in accordance with Title 30-A M.R.S.A. § 4452. Each day such violation continues after
notification by the CEO shall constitute a separate offense. In addition all fees, expert fees and
court costs shall be awarded to the town as set forth in Title 30-A M.R.S.A. § 4452.
Section 13. Conflict and Severability
13.1 Conflicts with other Ordinances
Whenever a provision of this ordinance conflicts with or is inconsistent with another provision of
this ordinance or of any other ordinance, regulation, or statute, the more restrictive provision
shall apply.
13.2 Severability
The invalidity of any part of this ordinance shall not invalidate any other part of this ordinance.
Section 14. Definitions
The terms used in this ordinance shall have the following meanings:
"Antenna" means any system of poles, panels, rods, reflecting discs or similar devices used for
the transmission or reception of radio or electromagnetic frequency signals.
"Antenna Height" means the vertical distance measured from the base of the antenna support
structure at grade to the highest point of the structure, even if said highest point is an antenna.
Page 13 of 17
Cell Tower Ordinance
Town of Morrill
Measurement of tower height shall include antenna, base pad, and other appurtenances and shall
be measured from the finished grade of the facility site. If the support structure is on a sloped
grade, then the average between the highest and lowest grades shall be used in calculating the
antenna height.
"Colocation" means the use of a wireless telecommunications facility by more than one wireless
telecommunications provider.
"Expansion" means the addition of antennas, towers, or other devices to an existing structure.
"FAA" means the Federal Aviation Administration, or its lawful successor.
"FCC" means the Federal Communications Commission, or its lawful successor.
"Height" means the vertical measurement from a point on the ground at the mean finish grade
adjoining the foundation as calculated by averaging the highest and lowest finished grade around
the building or structure, to the highest point of the building or structure. The highest point shall
exclude farm building components, flagpoles, chimneys, ventilators, skylights, domes, water
towers, bell towers, church spires, processing towers, tanks, bulkheads, or other building
accessory features usually erected at a height greater than the main roofs of buildings.
"Historic or Archaeological Resources" means resources that are:
1. Listed individually in the National Register of Historic Places or eligible for listing on the
National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to
the historical significance of a registered historic district or a district preliminarily
determined by the Secretary of the Interior to qualify as a registered historic district;
3. Individually listed on a state inventory of historic places in states with historic
preservation programs approved by the Secretary of the Interior;
4. Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified by Secretary of the Interior through the
Maine Historic Preservation Commission; or
5. Areas identified by a governmental agency such as the Maine Historic Preservation
Commission as having significant value as an historic or archaeological resource and any
areas identified in the municipality's comprehensive plan, which have been listed or are
eligible to be listed on the National Register of Historic Places.
"Historic District" means a geographically definable area possessing a significant concentration,
linkage or continuity of sites, buildings, structures or objects united by past events or
aesthetically by plan or physical development and identified in the municipality's comprehensive
plan, which is listed or is eligible to be listed on the National Register of Historic Places. Such
historic districts may also comprise individual elements separated geographically, but linked by
association or history.
Page 14 of 17
Cell Tower Ordinance
Town of Morrill
"Historic Landmark" means any improvement, building or structure of particular historic or
architectural significance to the Town relating to its heritage, cultural, social, economic or
political history, or which exemplifies historic personages or important events in local, state or
national history identified in the municipality's comprehensive plan, which have been listed or
are eligible to be listed on the National Register of Historic Places.
"Line of sight" means the direct view of the object from the designated scenic resource.
"Parabolic Antenna" (also known as a satellite dish antenna) means an antenna which is bowl-
shaped, designed for the reception and or transmission of radio frequency communication signals
in a specific directional pattern.
"Principal Use" means the use other than one which is wholly incidental or accessory to another
use on the same premises.
"Public Recreational Facility" means a regionally or locally significant facility, as defined and
identified either by State statute or in the municipality's adopted comprehensive plan, designed to
serve the recreational needs of municipal property owners.
"Designated Scenic Resource" means that specific location, view, or corridor, as identified as a
scenic resource in the municipally adopted comprehensive plan or by a State or federal agency,
that consists of:
1.) a three dimensional area extending out from a particular viewpoint on a public way or
within a public recreational area, focusing on a single object, such as a mountain,
resulting in a narrow corridor, or a group of objects, such a downtown skyline or
mountain range, resulting in a panoramic view corridor; or
2.) lateral terrain features such as valley sides or woodland as observed to either side of the
observer, constraining the view into a narrow or particular field, as seen from a viewpoint
on a public way or within a public recreational area.
"Targeted Market Coverage Area" means the area which is targeted to be served by this
proposed telecommunications facility.
"Unreasonable Adverse Impact" means that the proposed project would produce an end result
which is:
1.) excessively out-of-character with the designated scenic resources affected, including
existing buildings structures and features within the designated scenic resource, and
2.) would significantly diminish the scenic value of the designated scenic resource.
"Viewpoint" means that location which is identified either in the municipally adopted
comprehensive plan or by a federal or State agency, and which serves as the basis for the
location and determination of a particular designated scenic resource.
"Wireless Telecommunications Facility" or "Facility" means any structure, antenna, tower, or
other device which provides radio/television transmission, commercial mobile wireless services,
Page 15 of 17
Cell Tower Ordinance
Town of Morrill
unlicensed wireless services, cellular phone services, specialized mobile radio communications
(SMR), common carrier wireless exchange phone services, specialized mobile radio
communications (SMR), common carrier wireless exchange access services, and personal
communications service (PCS) or pager services.
Section 15. Effective Date
This Ordinance becomes effective on
and shall repeal any
inconsistent ordinance or ordinance provision. Without limitation this ordinance specifically
repeals and supersedes the Telecommunication Facilities Ordinance adopted on 3/16/2002 by
Town meeting Article 26.
Public Hearing Held
Notice Published
Page 16 of 17
Cell Tower Ordinance
Town of Morrill
MUNICIPAL OFFICERS' CERTIFICATION OF OFFICIAL TEXT OF PROPOSED
ORDINANCE
To the Town Clerk of the Town of Morrill, Maine:
We hereby certify to you that the document to which we have affixed this certificate is a
true copy of the official text of an ordinance entitled
CELL TOWER ORDINANCE
which is to be presented to the voters for their consideration on
MARCH 15, 2014.
Pursuant to 30-A M.R.S.A. § 3002 (2), you will retain this copy of the complete text of
the ordinance as a public record and make other copies available for distribution to the
voters, and you will ensure that copies are available at the town meeting/polling places
on the day of the vote.
DATED: MARCH 3, 2014
Page 17 of 17