1
Approved May 3, 2010 Town Meeting -- May 2010
TOWN OF NEW GLOUCESTER
WIND ENERGY CONVERSION SYSTEM ORDINANCE
1. Purpose and Intent
The purpose of this ordinance is to reduce dependence on fossil fuel energy sources by
encouraging the development of on-site energy production and consumption by providing
standards for alternative wind powered systems. The wind energy conversion provisions
set forth in this ordinance are intended to protect the public health and safety, promote the
general welfare of the community and conserve the environment, wildlife habitat,
fisheries and unique natural areas; and to fit Wind Energy Conversion Systems
harmoniously into the fabric of the community by assuring the following standards are
accomplished with the least possible regulation.
2. Authority
The Code Enforcement Officer and the Planning Board are vested with the authority to
review and approve, conditionally approve or reject any application for Wind Energy
Conversion Systems.
The Code Enforcement Officer shall have the authority to review and approve Wind
Energy Conversion Systems that include fewer than four (4) wind turbines and which
generate no more than 100 kW combined and each of which either: 1) are not more than
thirty (30) feet taller in height than any structures or trees located within 300 feet from
the wind turbine (measured horizontally from the bottom of the blade rotation), or 2)
have a hub height of seventy-five (75) feet or less. All other applications for Wind
Energy Conversion Systems shall be reviewed by the Planning Board in accordance with
Article 7 of the Zoning Ordinance and the provisions of this Ordinance.
3. Applicability
The requirements of this ordinance shall apply to Wind Energy Conversion Systems
proposed, first operated, materially modified or constructed after the date of adoption of
this ordinance.
4. Conflicts with Other Ordinances
This ordinance is not intended to interfere with, abrogate or annul any other ordinance,
rule, regulation, statute, or other provision of the law except as specifically provided in
this ordinance. If any provision in this ordinance imposes restrictions different from any
other ordinance, rule, regulation, statute, or other provision of the law, the provision that
is more restrictive or imposes higher standards shall control, except with respect to the
height standards set forth in this ordinance. Any height standards or limits set forth in the
New Gloucester Land Use Ordinance shall not apply to a Wind Energy Conversion
System approved pursuant to this Ordinance.
2
Approved May 3, 2010 Town Meeting -- May 2010
5. Severability
If any section, clause, or provision of this ordinance is declared unconstitutional or
otherwise invalid by a court of competent jurisdiction, said declaration shall not affect the
validity of the remainder of this ordinance as a whole or any part thereof, other than the
part so declared to be unconstitutional or invalid.
6. Pre-Application and Application Procedures
A. Pre-Application Procedure
(1) Prior to submitting an application for approval of the proposed project the
applicant shall meet informally with the Code Enforcement Officer to present a
sketch plan and generally discuss the proposal and to obtain guidance in
development of the plan. The sketch plan may be a freehand drawing and shall
show to the extent known:
(a) The outline of the tract or parcel with estimated dimensions, road rights of
way and existing easements;
(b) North Arrow;
(c) The proposed layout of the Wind Energy Conversion System equipment,
related features of the project and existing or planned building(s),
identification of general areas of steep slopes, wetlands, streams, and flood
plains;
(d) Other information pertinent to the project.
B. Minor Application Procedure
Applications for Wind Energy Conversion Systems that include fewer than four (4)
wind turbines and which generate no more than 100 kW combined and each of which
are either: 1) not more than thirty (30) feet taller in height than any structures or trees
located within 300 feet from the wind turbine (measured horizontally from the bottom
of the blade rotation), or 2) have a total Hub Height of seventy-five (75) feet or less
are deemed Minor Applications and are eligible for expedited review by the Code
Enforcement Officer
(1) The applicant shall submit a fully executed and signed copy of the building
permit application, the Wind Energy Conversion System fee and submissions
required under Section 6.C below.
(2) The Code Enforcement Officer shall indicate any other approvals from local,
regional and State agencies that may be required. Letters, permits or approvals
from these agencies shall be included as a part of the application and/or review.
(3) The Code Enforcement Officer shall make an inspection of the site.
3
Approved May 3, 2010 Town Meeting -- May 2010
(4) The applicant shall notify all landowners within 250 feet of the site by certified
mail upon application for a building permit to construct a Wind Energy
Conversion System with a maximum power rating of over 20kW. The
landowners will be afforded thirty (30) days to submit comments to the Code
Enforcement Officer prior to the issuance of the building permit.
(5) Within thirty-five (35) days from submission of a Minor Application for a Wind
Energy Conversion System and following an on-site inspection the Code
Enforcement Officer shall evaluate the application for compliance with the
standards outlined in Section 9 of this ordinance and shall approve, approve with
conditions, or deny the application.
C. Minor Application Submission Requirements
The following submission requirements shall apply to all applications for Wind
Energy Conversion Systems:
(1) Evidence of right, title or interest in the property such as deed, option to
purchase, lease, or agreement.
(2) A copy of the tax map showing general location of the site within the town.
(3) List of landowners within 250 feet of the site.
(4) Standard drawings of wind turbine structure including the rotor, nacelle, tower,
footings, and, if applicable, guy wires provided by the Wind Energy Conversion
System manufacturer.
(5) Tower foundation blueprints or drawings. For systems with a maximum power
rating of 20kw or greater, the applicant shall provide a soils analysis and an
engineered foundation plan stamped by a professional engineer licensed in the
State of Maine.
(6) Wind Energy Conversion System manufacturer specifications, including model,
rotor diameter, tower height, tower type, nameplate generation capacity, cut-in
speed, EMI and RFI shielding, sound analysis, and system safety and stability
data. Also include the estimated generation capacity based on average annual
wind speed at the site based on meteorological tower data or as estimated using
data from the U.S. Department of Energy or another acceptable source. 3
(7) Certification that the wind energy system is compliant with the National
Electrical Code, or State Electrical Code where applicable.
(8) Evidence of compliance or non-applicability with Federal Aviation
Administration requirements.
(9) A site plan measuring no smaller than 11" X 17" and no larger than 24" X 36"
and drawn at a scale no greater than 1" = 30' for parcels under ten acres, and 1" =
50' for parcels exceeding ten acres and showing the following:
4
Approved May 3, 2010 Town Meeting -- May 2010
(a) Boundaries of all contiguous property under the control of the owner or
applicant regardless of whether all or part is being developed at this time;
(b) A title block in the lower right-hand corner containing the name and address
of the applicant and property owner, the name and address of the preparer of
the plan if applicable, the map and lot number according to municipal tax
maps, and the date of the plan preparation and revisions;
(c) A parcel information block located in the lower left-hand corner containing the
parcel acreage, zoning district(s), and required setbacks;
(d) The location of all existing structures, overhead utility lines, roads and
easements; and copies of any proposed or existing easements, covenants, deed
restrictions or other legal matters related to the deed;
(e) The location of each proposed Wind Energy Conversion System, foundations,
guy anchors, setback lines, fencing, access roads and turnout locations,
substations(s), electrical cabling from the system to the substation, accessory
equipment, buildings and structures, right-of-way boundaries, railroads, and
the layout of all structures within the Wind Energy Conversion System
setback area;
(f) Zoning district boundaries as applicable;
(g) The location and height of highest tree or structure within 300' of the
proposed Wind Energy Conversion System.
D. Major Application Procedure
Applications for Wind Energy Conversion Systems that are either greater than three
(3) wind turbines, generate more than 100kW combined, or exceed the height
restrictions for Minor Applications are deemed Major Applications and require
Planning Board review.
(1) The applicant shall follow the procedures for Site Plan Review laid out in Article
7 of the New Gloucester Zoning Ordinance. The applicant shall submit a fully
executed and signed copy of the building permit application, the Wind Energy
Conversion System fee and submissions required under Section 6.E below.
(2) The Code Enforcement Officer shall indicate any other approvals from local and
regional and State agencies that may be required. Letters, permits or approvals
from these agencies shall be included as a part of the application and/or review.
(3) The applicant shall obtain a Wind Energy Conversion System Application,
complete the application and submit it to the Code Enforcement Officer. The
project shall be reviewed by the Code Enforcement Officer to determine if it
generally conforms to applicable ordinance requirements.
5
Approved May 3, 2010 Town Meeting -- May 2010
(4) The Code Enforcement Officer shall make an inspection of the site.
(5) If the project appears to conform to applicable ordinance requirements, the
applicant shall complete a building permit application, provide supporting
documents and pay only the Wind Energy Conversion System fee.
(6) After receipt of the full application, the Code Enforcement Officer and Planner
shall submit the application to the Planning Board for site plan review.
(7) The Planning Board shall hold a public hearing for all requests for a major Wind
Energy Conversion System. Such hearing shall be scheduled within 30 days of
acceptance of an application as complete.
(8) The Board may attach reasonable conditions to approvals to ensure conformity
with the purposes and provisions of this ordinance.
E. Major Application Submission Requirements
A completed application for Major Application review shall consist of 10 copies of
all of the following:
(1) All submission requirements for Minor Application review;
(2) All applicable submission requirements for site plan review.
(3) The Planning Board may require a scenic assessment consisting of one or more of
the following:
(a) A visual analysis composed of elevation drawings of the proposed Wind
Energy Conversion System and any other proposed structures, showing height
above ground level. The analysis may include a computerized photographic
simulation demonstrating the visual impacts from nearby strategic vantage
points or photo simulations of the proposed facility taken from perspectives
determined by the Board. Each photo must be labeled with the line of sight,
elevation, and with the date taken imprinted on the photograph. The photos
must show the color of the facility and method of screening.
(b) A brief narrative discussing: the extent to which the proposed facility would
be visible from or within a scenic resource or scenic viewshed, the tree line
elevation of vegetation within 100 feet of the facility, and the distance to the
proposed facility from the scenic resource viewpoints.
7. Meteorological Towers (MET Towers)
Applications for Meteorological (MET) Towers shall be subject to the Minor Application
procedure for wind energy conversion systems, as applicable, except that,
notwithstanding any contrary provisions in the New Gloucester Land Use Ordinance, no
height limitation shall apply. A permit for a MET Tower shall be valid for 2 years and 2
months from the date of issuance. The Code Enforcement Officer may grant one or more
6
Approved May 3, 2010 Town Meeting -- May 2010
one-year extensions of this permit period. Within 30 days following removal of a MET
Tower, the Applicant shall restore the site to its original condition to the extent
practicable. The provisions of this section do not apply to permanent MET Towers
included as facilities associated with approved Wind Energy Conversion Systems.
8. Dimensional Requirements
A. Setbacks.
All Wind Energy Conversion Systems shall be set back a minimum horizontal
distance of 1.1 times the Total Height of the system from property lines, public right-
of-ways, and easements. The Planning Board or Code Enforcement Officer may
reduce the Wind Energy Conversion System setback to the minimum structure
setbacks of the zoning district if there are no habitable buildings within the fall zone
area of the abutting property or easements and the applicant obtains a fall zone
easement from the pertinent abutting landowner.
Grandfathered Wind Energy Conversion Systems in operation at the time of approval
of the new ordinance may increase system height consistent with the ordinance
without meeting the setback requirement.
B. Minimum Height.
The minimum distance between the ground and any part of the rotor blade shall be
fifteen (15) feet.
9. Development Standards
If a project includes construction other than a Wind Energy Conversion System project,
such other construction must comply with other applicable Town ordinances.
A. The system's tower and blades shall be a non-reflective color that blends the system
and its components into the surrounding landscape to the greatest extent possible and
incorporates non-reflective surfaces to minimize any visual disruption.
B. The system shall be designed and located to minimize Negative Visual Impacts on
Significant Designated Resources without inhibiting adequate access to the wind
resource.
C. Exterior lighting on any tower or turbine associated with the Wind Energy
Conversion System shall not be allowed except that which is specifically required by
the Federal Aviation Administration.
D. All on-site electrical wires associated with the systems shall be installed underground
except for 'tie-ins' to a public utility company transmission poles, towers and lines.
A licensed electrician shall connect the small Wind Energy Conversion System to the
residence or other structure. This standard may be modified by the Planning Board if
the project terrain is determined to be unsuitable due to the reasons of need for
excessive excavation, grading or similar factors.
7
Approved May 3, 2010 Town Meeting -- May 2010
E. The system shall be operated and located such that no disruptive electromagnetic
interference with signal transmission or reception is caused beyond the site. If it has
been demonstrated that the system is causing disruptive interference beyond the site,
the system operator shall promptly eliminate the disruptive interference or cease
operation of the system.
F. Towers shall be constructed to provide one of the following means of access control
or another appropriate method of access control as approved by the Code
Enforcement Officer or Planning Board:
(1) Tower climbing apparatus shall be located no closer than twelve (12) feet from
the ground.
(2) A locked anti-climb device shall be installed on the tower.
(3) A locked, protective fence at least six (6) feet in height shall be maintained that
fully encloses the tower.
G. Anchor points for any guy wires for a system tower shall be located within the site.
No guy wires or other system components shall be located so as to block access by
emergency vehicles. The Fire Department shall be afforded the ability to cut
electricity going into the house or other habitable building remotely.
H. All Wind Energy Conversion Systems shall comply with applicable Federal Aviation
Administration (FAA) rules and regulations.
I. No Wind Energy Conversion System shall be installed or operated in a manner that
causes interference with the operation of any existing aviation facility including
helicopter pads.
J. The conformance of rotor and over-speed control design and fabrication with good
engineering practices shall be certified by the manufacturer.
K. Noise
Except during short-term events including utility outages and severe wind storms, the
audible noise created by operation of a Wind Energy Conversion System as measured
at the property boundary line shall not exceed fifty-five (55) dBA.1
A. The Code Enforcement Officer and/or Planning Board is authorized to review and act
on all Wind Energy Conversion System applications. In considering Wind Energy
Conversion System plans under this ordinance, the Code Enforcement Officer and
Planning Board may act to approve, disapprove or approve with conditions as
10. Administration and Waivers or Modifications
1 42-55 dB is approx. sound of small refrigerator.
8
Approved May 3, 2010 Town Meeting -- May 2010
authorized by these provisions. No municipal permit shall be issued nor construction
work begun on any Wind Energy Conversion System project until the Wind Energy
Conversion System plan has been approved by the Code Enforcement Officer or
Planning Board. All work shall be carried out in accord with the documentation
submitted and approved by the Code Enforcement Officer or Planning Board.
B. The Planning Board may attach reasonable conditions to approvals to ensure
conformity with the purposes and provisions of this ordinance. The Planning Board
may condition final approval on receipt of copies of all State or Federal permits
required by the project including, but not limited to, the Zoning Ordinance or the
Federal Aviation Administration (FAA) permits.
C. All approvals shall expire within one year of the date of issuance unless work
thereunder is substantially commenced within one year from the date of approval. If
work is not substantially completed within two years from the date of issue, a new
application may be required by the Board.
11. Definitions
A. Applicant: The person, firm, partnership, corporation, company, limited liability
company or other entity which applies for approval under this ordinance.
B. Fall Zone: 1.1 times the Total Height of the Wind Energy Conversion System.
C. Habitable Building (or structure): Places likely to be occupied on a continuous or
temporary basis. This includes, but is not limited to, dwellings, commercial
businesses, places of worship, nursing homes, schools or other places used for
education, day-care centers, motels, hotels, correctional institutions or barns.
D. Hub Height: The vertical distance measured from a point on the ground at the
original grade to the turbine hub.
E. Line of Sight: The direct view of the object from selected locations.
F. Material Modification: Changes in the location of any approved unit, location of main
exterior switch, size of rotor blades, and approved height(s); the replacement of the
turbine with a unit of different manufacturer specifications regarding level of power
or noise generation, adding additional turbine(s), or any other significant change(s)
regarding safety features of the approved Wind Energy Conversion System.
G. Meteorological (MET) Tower: A tower used for the measurement and collection of
wind data that supports various types of equipment, including but not limited to
anemometers, data recorders, and solar power panels. MET Towers may also include
wildlife related equipment such as ANABAT detectors, bird diverts and wildlife
entanglement protectors.
H. Negative Visual Impact: A change in the appearance of the landscape as a result of a
Wind Energy Conversion System development that is both out-of-character with a
Significant Designated Resource and which significantly diminishes the scenic value
9
Approved May 3, 2010 Town Meeting -- May 2010
of the significant resource. Mere visibility of a Wind Energy Conversion System
does not in and of itself constitute a Negative Visual Impact.
I. Significant Designated Resource: A specific location, view or corridor identified as a
scenic resource in the Comprehensive Plan or by a State or Federal agency.
Significant designated resources include, but are not limited to, National Register of
Historic Places buildings, locales or views of same.
J. Site: The parcel of land where a Wind Energy Conversion System is to be placed.
The site can be publicly or privately owned and is a single lot.
K. Total Height: The vertical distance measured from a point on the ground at the
original grade to the highest point of the wind turbine blade (or other component)
when the tip is at full vertical.
L. Viewshed Map: A map that shows the geographic area from which a Wind Energy
Conversion System may be seen.
M. Wind Energy Conversion System: A Wind Energy Conversion System consisting of
a wind turbine, a tower, footings, electrical infrastructure, fence and any other
associated equipment or structures. Any Wind Energy Conversion System, herein